Loading...
05-3261 (CSCS) Field ReportCORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tei: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN AVAILABLE: SOIL REPORT,,(Y) (N) SPECS. (Y) SSW APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects FOR WEEK ENDING 03/18/2006 PROJECT NO. 3115103 12220 EI Camino Real Suite 200 San Diego, CA 92130 ENGINEER: CSSI REPORT NO 3 PG 1 OF 1 2445 Fifth Street Suite 300 San Diego, CA 92102 CONTRACTOR: Vratsinas Construction Co. PLAN FILE NO. PERMIT NO. 05-3261 P.O. Box 2558 Little Rock, AR 72203 SUB -CONTRACTOR: Portola Constructios, Inc. PROJECT NAME: Major'D' Office Max 10722 Edison Court Rancho Cucamonga, CA 91730 INSPECTION ADDRESS: 79-190 Highway 111 ADDRESS OF PROJECT: 79-190 Highway 111 La Quinta, CA La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 & FCAW NR232 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln SAE 350, Miller Trailblazer 301G, Miller Big Blue 400D AREA, GRIDLINES, PIECES OBSERVED: Items Completed: (1) Welding of the top cords of the roof girders to the wall embeds on lines K/5,8 & 11 and P/5,8 & 11. (2) Welding of the top cord ends of the roof joists to the top cord of the roof girders on lines 5,8,&11/K to P. (3) Welding of the splice plates between the ends of the top cords of the roof joists on lines 5,8 & 11/ K to P. 4) Welding of the TS21/2x2l/2x1/4 tube steel to the top cord of the roof girders on lines 5,8 & 11/K to L.1. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: n/a TEMPERATURE: 71 Deg. F TESTS REQUIRED: n/a SITE TIME START: 7:00 AM SITE TIME FINISH: 4:30 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: RIFIED BY I it I i FIM i i nrwt rtKOUNALLY UBSEHVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIeS WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 03/17/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego I Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 03/18/2006 PROJECT NO. 3115103 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO 1 PG 1. OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-3261 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Major'D' Office Max INSPECTION ADDRESS: 79-190 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-190 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS. AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 & FCAW NR232 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln SAE 350 AREA, GRIDLINES, PIECES OBSERVED: Items Completed: Welding of the entire knife plates between the ends of the top cords of the roof girders on lines 5, 8, & 11/L to O. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: Na TEMPERATURE: 76 Deg. F TESTS REQUIRED: n/a SITE TIME START: 1:00 PM SITE TIME FINISH: 4:30 PM LUNCH PERIOD: none TRAVEL TIME: VERIFIED BY ..v .+I I nnvr- rCKJU11JALLT UCSJtKVtU ALL UI- I HI= VVUHK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 03/15/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County Suite A 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIFI n RFPnRT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (1) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS m ARCHITECT Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 04/01/2006 PROJECT NO. 3115103 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NC 1 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 ' PLAN FILE NO. PERMIT NO. 05-3261 SUB -CONTRACTOR: Portola Construction, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Major'D' Office Max INSPECTION ADDRESS: 79-190 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-190 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODE: SMAW E-7018 CONTRACTORS EQUIPMENT I MANPOWER USED: WELDING MACHINE: Lincoln SAE 350, Miller Big Blue 302P AREA, GRIDLINES, PIECES OBSERVED: In Progress: (1) Puddle welding of the metal roof decking. (2) Welding of the steel framing at the store front. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: n/a TEMPERATURE: 80 Deg. F TESTS REQUIRED: n/a SITE TIME START: 7:00 AM SITE TIME FINISH: 5:00 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME:�"�QERIFIED BY i — o r i r -r% i it T r rvA r r nAvc rrKbUNALLT Ut5btKVtu ALL OF I Ht WUHK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. e- 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 03/27/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number l CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIFI n RFPnRT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT m (N) SPECS. (Y) APPROVED PLANS m APPROVED SHOP DRAWINGS m ARCHITECT Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 04/01/2006 PROJECT NO. 3115103 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NC 2 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-3261 SUB -CONTRACTOR: Portola Construction, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Major 'D' Office Max INSPECTION ADDRESS: 79-190 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-190 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODE; SMAW E-6022, E-7018 & FCAW NR232 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln SAE 350, MillerBig Blue 302P, Lincoln Classic 300D AREA, GRIDLINES, PIECES OBSERVED: In Progress: Puddle welding and side seam punch locking of the metal roof decking. Items Completed. (1) Welding the ends of the roof joists to the top of the steel beams on line 13.5 from L.5 to N.5. 2) Welding of the bridging angles to the top and bottom cords of the roof joists from line L.5 to N.5 between 13 and 13.5. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: n/a TEMPERATURE: 77 Deg. F TESTS REQUIRED: n/a SITE TIME START: 11:00 AM SITE TIME FINISH: 5:00 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: VERIFIED BY I I I u11 I -n rCRJVIVMLLT VDOrr%VCU ALL UI- I Nt WUKK us I tU ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. �• 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 03/28/2006 City Of La Quinta . Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIFI rl RFpnRi Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (1) (N) SPECS. (Y) APPROVED PLANS (1) APPROVED SHOP DRAWINGS (Y) ARCHITECT Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 04/01/2006 PROJECT NO. 3115103 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NC 2 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-3261 SUB -CONTRACTOR: Portola Construction, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Major V Office Max INSPECTION ADDRESS: 79-190 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-190 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODE: SMAW E-6022, E-7018 & FCAW NR232 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln SAE 350, MillerBig Blue 302P, Lincoln Classic 300D AREA, GRIDLINES, PIECES OBSERVED: In Progress: Puddle welding and side seam punch locking of the metal roof decking. Items Completed. (1) Welding the ends of the roof joists to the top of the steel beams online 13.5 from L.5 to N.5. 2 Welding of the bridging angles to the top and bottom cords of the roof joists from line L.5 to N.5 between 13 and 13.5. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: n/a TEMPERATURE: 77 Deg. F TESTS REQUIRED: n/a SITE TIME START: 11:00 AM SITE TIME FINISH: 5:00 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: VERIFIED BY I vU tsY l:tK I IFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. F ' 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 03/28/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE i' 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 s Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) SSW APPROVED PLANS (Y) APPROVED SHOP DRAWINGS m ARCHITECT Smith Consulting Architects FOR WEEK ENDING 04/01/2006 PROJECTNO. 3115103 12220 EI Camino Real Suite 200 San Diego, CA 92130 ENGINEER: CSSI REPORT NC 4 PG 1 OF 1 2445 Fifth Street Suite 300 ' San Diego, CA 92102 CONTRACTOR: Vratsinas Construction Co. PLAN FILE NO. RMIT NO. 05 3261 P.O. Box 2558 Little Rock, AR 72203 T SUB -CONTRACTOR: Portola Constructios, Inc. PROJECT NAME: Major'D' Office Max 10722 Edison Court Rancho Cucamonga, CA 91730 INSPECTION ADDRESS: 79-190 Highway 111 ADDRESS OF PROJECT: 79-190 Highway 111 La Quinta, CA La Quinta, CA _1v -u KCWU1KrMrIV I,: IUHU FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODE: SMAW E-6022 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln Classic 300D, Miller Big Blue 302P AREA, GRIDLINES, PIECES OBSERVED: In Progress: Puddle welding and side seam punch locking of the metal roof decking. ISTRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: n/a TEMPERATURE:__77._Deg. F_.___ _ _TESTS REQUIRED: n/a 10,11 n SITE TIME START: 7:00 AM SITE TIME FINISH: 1:30 PM a., LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: VERIFIED BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS. AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. �0849264-85 Signature ICBO Certification Number Steve W. Bodnar 03/30/2006 City Of La Quinta Print Name , Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave:, Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (1) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (`t) ARCHITECT Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 04/01/2006 PROJECT NO. 3115103 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 . REPORT NC 3 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-3261 SUB -CONTRACTOR: Portola Construction, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Major 'D' Office Max INSPECTION ADDRESS: 79-190 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-190 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBG FIELD INSPECTION MANUAL I MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODE: SMAW E-6022 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Miller Big Blue 302P, Lincoln Classic 300D AREA, GRIDLINES, PIECES OBSERVED: In Progress Puddle welding and side seam punch locking of the metal roof decking. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: n/a TEMPERATURE: 72 Deg. F TESTS REQUIRED: n/a SITE TIME START: 7:00 AM SITE TIME FINISH: 5:00 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: VERIFIED BY i w o T urn i it T i rw i I rwvt rtnJUNALLT UUbtKVtu ALL OF I Ht WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 03/29/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number im CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 ni=i n P5=PnPT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT m (N) SPECS. (1) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 04/01/2006 PROJECT NO. 3115103 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NC 3 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-3261 SUB -CONTRACTOR: Portola Construction, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Major'D' Office Max INSPECTION ADDRESS: 79-190 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-190 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODE: SMAW E-6022 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Miller Big Blue 302P, Lincoln Classic 300D AREA, GRIDLINES, PIECES OBSERVED: In Progress Puddle welding and side seam punch locking of the metal roof decking. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: n/a TEMPERATURE: 72 Deg. F TESTS REQUIRED: n/a SITE TIME START: 7:00 AM SITE TIME FINISH: 5:00 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: VERIFIED BY I uU By ctH I o -Y I HA I I rlAVt PEH5UNALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND I OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 'z7t;' 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 03/29/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number yM�. =,MTWI CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD RFPnRT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. m APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 04/01/2006 PROJECT NO. 3115103 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NC 1 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-3261 SUB -CONTRACTOR: Portola Construction, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Major V Office Max INSPECTION ADDRESS: 79-190 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-190 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODE: SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln SAE 350, Miller Big Blue 302P AREA, GRIDLINES, PIECES OBSERVED: In Progress: (1) Puddle welding of the metal roof decking. (2) Welding of the steel framing at the store front. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: n/a TEMPERATURE: 80 Deg. F TESTS REQUIRED: n/a SITE TIME START: 7:00 AM SITE TIME FINISH: 5:00 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: ERIFIED BY UU CY UEN I IFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. -� 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 03/27/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN AVAILABLE: SOIL REPORT m (N) SPECS. m SSW APPROVED PLANS m APPROVED SHOP DRAWINGS (Y) ARCHITECT Smith Consulting Architects FOR WEEK ENDING 04/01/2006 PROJECT NO. 3115103 12220 EI Camino Real Suite 200 San Diego, CA 92130 ENGINEER: CSSI REPORT NC 4 PG 1 OF 1 2445 Fifth Street Suite 300 San Diego, CA 92102 CONTRACTOR: Vratsinas Construction Co. PLAN FILE NO. PERMIT NO. 05-3261 P.O. Box 2558 Little Rock, AR 72203 SUB -CONTRACTOR: Portola Constructios, Inc. PROJECT NAME: Major'D' Office Max 10722 Edison Court Rancho Cucamonga, CA 91730 INSPECTION ADDRESS: 79-190 Highway 111 ADDRESS OF PROJECT: 79-190 Highway 111 La Quinta, CA La Quinta, CA r%rrUK I inti KEUI IMEMENTS: IGBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS) WELDING ELECTRODES SMAW E-6022 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln Classic 300D, Miller Big Blue 302P AREA, GRIDLINES, PIECES OBSERVED: In Progress: Puddle welding and side seam punch lockinq of the metal roof deckina. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: n/a TEMPERATURE:.__77.Deg. F__. ___._. .__._... TESTS REQUIRED: n/a SITE TIME START: 7:00 AM SITE TIME FINISH: 1:30 PM ^1M LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: VERIFIED BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS. AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 03/30/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave.. Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313.Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FiFi n RFanRr Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) SSW ARCHITECT: Smith Consulting Architects APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) FOR WEEK ENDING 03/18/2006 PROJECT NO. 3115103 12220 EI Camino Real Suite 200 San Diego, CA 92130 ENGINEER: CSSI REPORT NO 2 PG 1 OF 1 2445 Fifth Street Suite 300 San Diego, CA 92102 PLAN FILE NO. PERMIT NO. 05-3261 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 SUB -CONTRACTOR: Portola Constructios, Inc. PROJECT NAME: Major'D' Office Max 10722 Edison Court Rancho Cucamonga, CA 91730 INSPECTION ADDRESS: 79-190 Highway 111 ADDRESS OF PROJECT: 79-190 Highway 111 La Quinta, CA La Quinta, CA REPORTING REQUIREMENTS: ICSO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS. IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 & FCAW Nr232 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln SAE 3 AREA, GRIDLINES, PIECES OBSERVED: Items Completed: (1) Welding the end of the W14x22 beam to the wall embed and reinforcing bars on line 2/K.9 at the roof level. 2) Welding the top cord ends of the roof joists to the wall embeds on lines 1/K to K.9 and 2/L to P. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: Na TEMPERATURE: 76 Deg. F TESTS REQUIRED: n/a SITE TIME START: 7:00 AM SITE TIME FINISH: 4:30 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: VERIFIED BY I nn Rv rco-• r - • -• •� �� .. ��� vQU rLL Ur I nt vvUKK LIb I ED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SFr.TInN nF TW: BUILDING CODE. UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. Signature Steve W. Bodnar Print Name 0849264-85 ICBO Certification Number 03/16/2006 City Of La Quinta Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C 101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) SSW ARCHITECT: Smith Consulting Architects APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) FOR WEEK ENDING 03/18/2006 PROJECT NO. 3115103 12220 EI Camino Real Suite 200 San Diego, CA 92130 ENGINEER: CSSI REPORT NO 3 PG 1 OF 1 2445 Fifth Street Suite 300 San Diego, CA 92102 CONTRACTOR: Vratsinas Construction Co. PLAN FILE NO. PERMIT NO. 05-3261 P.O. Box 2558 Little Rock, AR 72203 SUB -CONTRACTOR: Portola Constructios, Inc. PROJECT NAME: Major'D' Office Max 10722 Edison Court Rancho Cucamonga, CA 91730 INSPECTION ADDRESS: 79-190 Highway 111 ADDRESS OF PROJECT: 79-190 Highway 111 La Quinta, CA La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 & FCAW NR232 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln SAE 350, Miller Trailblazer 301 G, Miller Big Blue 400D AREA, GRIDLINES, PIECES OBSERVED: Items Completed: (1) Welding of the top cords of the roof girders to the wall embeds on lines K/5,8 & 11 and P/5,8 & 11. (2) Welding of the top cord ends of the roof joists to the top cord of the roof girders on lines 5,8,&11/K to P. (3) Welding of the splice plates between the ends of the top cords of the roof joists on lines 5,8 & 11/ K to P. (4) Welding of the TS21/2x21/2x1/4 tube steel to the top cord of the roof girders on lines 5,8 & 11/K to L.1. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: n/a TEMPERATURE: 71 Deg. F TESTS REQUIRED: n/a SITE TIME START: 7:00 AM SITE TIME FINISH: 4:30 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: RIFIED BY -- - • -�• I - I I.- r�rtavrvMLLT VM,3tKVtU ALL UI- I HE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. �. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 03/17/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 F19=1 n 0=Df%0 r Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) SSW ARCHITECT: Smith Consulting Architects APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) FOR WEEK ENDING 03/18/2006 PROJECT NO. 3115103 12220 EI Camino Real Suite 200 San Diego, CA 92130 ENGINEER: CSSI REPORT NO 2 PG 1 OF 1 2445 Fifth Street Suite 300 San Diego, CA 92102 CONTRACTOR: Vratsinas Construction Co. PLAN FILE NO. PERMIT NO. 05-3261 P.O. Box 2558 Little Rock, AR 72203 SUB -CONTRACTOR: Portola Constructios, Inc. PROJECT NAME: Major'D' Office Max 10722 Edison Court Rancho Cucamonga, CA 91730 INSPECTION ADDRESS: 79-190 Highway 111 ADDRESS OF PROJECT: 79-190 Highway 111 La Quinta, CA La Quinta, CA REPORTING REQUIREMENTS: ICBG FIELD INSPECTION MANUAL ! MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 & FCAW Nr232 CONTRACTORS EQUIPMENT/ MANPOWER USED: WELDING MACHINE: Lincoln SAE 3 AREA, GRIDLINES, PIECES OBSERVED: Items Completed: (1) Welding the end of the W14x22 beam to the wall embed and reinforcing bars on line 2/K.9 at the roof level. (2) Welding the top cord ends of the roof joists to the wall embeds on lines 1/K to K.9 and 2/L to P. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: Na TEMPERATURE: 76 Deg. F TESTS REQUIRED: n/a SITE TIME START: 7:00 AM SITE TIME FINISH: 4:30 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: F�IFI�EDBY � nn ev rcorir., r _ — -- • • •• • • •• • �.w LL r v00trcvtU ALL Oh I HE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SFrTInN nF TUG BUILDIIIN—G-CODE• UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. Signature Steve W. Bodnar Print Name 0849264-85 ICBO Certification Number 03/16/2006 City Of La Quinta Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego I Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 03/18/2006 PROJECT NO. 3115103 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO 1 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO.PERMIT NO. 05-3261 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Major'D' Office Max INSPECTION ADDRESS: 79-190 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-190 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL! MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS. AND FIRS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 & FCAW NR232 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln SAE 350 AREA, GRIDLINES, PIECES OBSERVED: Items Completed: Welding of the entire knife plates between the ends of the top cords of the roof girders on lines 5, 8, & 11/L to O. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: Na TEMPERATURE: 76 Deg. F TESTS REQUIRED: n/a SITE TIME START: 1:00 PM SITE TIME FINISH: 4:30 PM LUNCH PERIOD: none TRAVEL TIME: r VERIFIED BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. Signature Steve W. Bodnar 03/15/2006 Print Name Date Of Report 0849264-85 ICBO Certification Number City Of La Quinta City / County Certification Number CorperaIe San Diegolimperial County: Inland Empi._. )„" P. I ,I!nla .,-e.. Sle .a 7313 Carroll RoaLl SUile G 1! G i l !.rl" JA 9 306 Sall Diego. �:I 7 3cD IS i'101[1 SL(B°i. 5)r I 921 i PACT 110 Valley. C?. 9255-1 632.[ J Tel: 858.537.3999 TeL 951.653.x999 632 2974 Fax: 858.537.399D F::x: 951.653.4606 ,...k °''PF. CF'h'OR c NSPEC I'J? I. TECHi�JICI.�.il kA ..;.`•ITE•;" '-. - U c SUB CON rR iNSPETION ACCRESS "J\J FIELD REPORT AVAILABLE S,I, AEPCP- T,— �: APIROVED PLAVS(fNN; FOP. WEEK ENDING REPC'R" Vri.` Pr, ?aN FILENO PROJECT NAME Ma ADDRESS OF P 6 SPECS Q2(N) — APPROVED SHOP DRAW!NG �Y, 14! PROJECT NO ` OF , - - PERMIT N0. 11: THERE IS RtQI'IRF\IF'\Tti ICBG FII Lf) INSPECTION \1A-NUAL;\ITGI. SOIL \IANL`AL - REP'IF\\' PKE\'IOL'S REPORTS AND LISTS IP'rHERE Iti \UN-CONFOk\IINC; WORK AT THE ENDOFTHE WORK DAY. OR MISSING \ITRS.AND RFIS. ETC..FILL OUTAVUATTACH A DEFICIENCY REPORT \\ H N A I)FI-ICIENC'Y. YOL'kS ORA PREVI(.)US INSPECTOR'S. IS CORRECTED. SO NOTE ON THE ORICI\AL DEFICIE\C Y REPORT:\\I.) SL'n\uTA ('CJPY WITH YOUR WEEK'S REPORTS. MATERIALS USED By CONTRACTOR (INCLUDE RESEARCH REPORT Nu. UH MATERIAL TEST REPORTS): CONTRACTORS EOUIPMENT; MANPOWER USED' .. AREA. GRID LINES. PIECES OBSERVED: STRUCTURAL NOTES. DETAIL. CR RFIS USED: REMARKS. INCLUD/MG MEETINGS: WEATHER iE).!PERAiURE SITE TIME START LDNCH PERIOD r NN SAMP,ES TA.KEIJ TESTS RECUMFO sir SITE TIME FINISH ._ aG -\ TRAVEL VER!REC By r l Ifl THAT I; av_ PERSGNAL!Y OBSERVED ALL DE THE WORK LISTED ABOVE AND TRAT THlS WORK COMP! IES WITI' 1HE SOIL IN STIGATION RECOMMENDATIONS. AND: ,,e THE AP�ROVFD PLANS SPECIFICATIONS AND APPLICABLE SECTIOt: OE THE BULGINu DOGE. UNLESS OTHFRVJISE NOTED IN THE DEFICIENCY � F E, I,;IeNCY REPGRT -. �.. aJe J' Re, nr: IC80 Certification I Jumper (I) County Cr1;iffca1,0n Numoer — CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD RFPnRT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT m (N) SPECS. (Y) APPROVED PLANS m APPROVED SHOP DRAWINGS m ARCHITECT Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 04/08/2006 --[PROJECT NO. 3115103 ENGINEER: CSSI 2445 Fifth'Street Suite 300 San Diego, CA 92102 REPORT NC 2 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-3261 SUB -CONTRACTOR: Portola Construction, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Major V Office Max INSPECTION ADDRESS: 79-190 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-190 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. ' MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODE: SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Miller Trailblazer 301G AREA, GRIDLINES, PIECES OBSERVED: Items Completed: Welding of the metal roof decking support angles at the roof drain locations at lines 1.1/K.5, 2.1/M.1, 2.1/N.4 8 2.1/0.4. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: n/a TEMPERATURE: 67Deg. F TESTS REQUIRED: n/a SITE TIME START: 7:00 AM SITE TIME FINISH: 9:00 AM LUNCH PERIOD: none TRAVEL TIME: VERIFIED BY I uU nT circ I o -Y I HA I I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 04/05/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (1) (N) SPECS. m APPROVED PLANS m APPROVED SHOP DRAWINGS (Y) ARCHITECT Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 04/08/2006 PROJECT NO. 3115103 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NC 1 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-3261 SUB -CONTRACTOR: Portola Construction, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Major V Office Max INSPECTION ADDRESS: 79-190 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-190 Highway 111 I La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS. AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODE: SMAW E-6022 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln Classic 300D AREA, GRIDLINES, PIECES OBSERVED: Items Completed: Puddle welding and side seam punch locking of the entire metal roof decking from line K to P between lines 1 and 13.5. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: n/a TEMPERATURE: 87 Deg. F TESTS REQUIRED: n/a SITE TIME START: 7:00 AM SITE TIME FINISH: 8:30 AM LUNCH PERIOD: none TRAVEL TIME: ERIFIED BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS. AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. ;/: 084926485 Signature ICBO Certification Number Steve W. Bodnar 04/03/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT m (N) SPECS. m APPROVED PLANS m APPROVED SHOP DRAWINGS (Y) ARCHITECT Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 04/01/2006 PROJECT NO. 3115103 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NC 5 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-3261 SUB -CONTRACTOR: Portola Construction, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Major V Office Max INSPECTION ADDRESS: 79-190 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-190 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICSO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT/ MANPOWER USED: WELDING MACHINE: Lincoln SAE 350 AREA, GRIDLINES, PIECES OBSERVED: Items Completed: Welding of the steel channels to the top cords of the roof joists at the AC units on lines 4/L.6 & 11.6, 7/K.6 and 10/L.6 & 11.6. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: n/a TEMPERATURE: 74 Deg. F TESTS REQUIRED: n/a 1 SITE TIME START: 8:00 AM SITE TIME FINISH: 11:00 AM �I LUNCH PERIOD: none TRAVEL TIME: ly VERIFIED BY ' LJ UU a T t t:K I Ir Y I HA I I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 04/01/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street. Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (1') APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (1) ARCHITECT Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 04/01/2006 PROJECT NO. 3115103 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NC 5 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-3261 SUB -CONTRACTOR: Portola Construction, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Major'D' Office Max INSPECTION ADDRESS: 79-190 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-190 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODE: SMAW E-7018, FCAW NR232 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln SAE 350 AREA, GRIDLINES, PIECES OBSERVED: Items Completed: (1) Welding of the beam to column moment connections at lines 13.5/M3 & 13.5/N on the roof level. (2) Welding of the tube steel to the top flange of the beams on line 13.5/L.6 to N.9 on the roof level. 3) Welding of the entire seismic sway bracing angles from the bottom cord of the roof joists to the bottom cord of the roof girders from line 1 to 13 between lines K & P. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: n/a TEMPERATURE: 69 Deg. F TESTS REQUIRED: n/a SITE TIME START: 12:30 PM SITE TIME FINISH: 4:30 PM 17 LUNCH PERIOD: none TRAVEL TIME: VERIFIED BY uU t5T ULK I IrY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 03/31/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 6534999 Fax: (909) 6534666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of. COMPRESSIVE STRENGTH -CONCRETE ASTM C39 CITY OF LA QUINTA-BLDG & SAFETY 78495 CALLE TAMPICO LA QUINTA, CA 92253 Client: THOMAS ENTERPRISES A Set No.: 6-1968 File No.: Permit No.: Project No.: 3115103 Project Name: MAJOR D MARKETPLACE @ LA QUINTA 79-190 HWY 111 @ ADAMS LA QUINTA, CA Age (Days) Date Tested Nominal Size Actual Area (Sq. Inch) Load (lbs.) Strength (psi) Type of Fracture 3 3/10/2006 6 X 21 28.37 44,190 1,560 Cone 7 3/14/2006 6X 12 28.37 63,590 2,240 Cone 28 4/4/2006 6X 12 28.37 94,300 3,320 Cone 28 4/4/2006 6X 12 28.37 93,930 3,310 Cone Specified Strength: 3,000 PSI Sampled By MICHAEL G. Location: S.O.G. (K-12) Concrete Supplier: ASSOCIATED READY MIX Mix No.: 25336 Ticket No.: 3639615 Water added at Site: 0.00 gal. By Cement Type: Mix Time: min. Remarks: Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** ASTM C172 Date Sampled: 3/7/2006 Date Received: 3/8/2006 Concrete Temp: °F ASTM C1064 Ambient Temp: °F ASTM C1064 Slump: 4.50 in. ASTM C143 Tested at: Anaheim Respectfully Submitted, MTGL, Inc. 1 M.B. (Ben) Lo Chief Engineer 3320 PSI 28 -day compression test complies with the specified strength. n Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 6534999 Fax: (909) 6534666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel:(818)833-8100 Fax:(818)833-0085 Report of. COMPRESSIVE STRENGTH -CONCRETE ASTM C39 CITY OF LA QUINTA-BLDG & SAFETY 78495 CALLE TAMPICO LA QUINTA, CA 92253 Client: THOMAS ENTERPRISES A Set No'.: 6-1967 File No.: Permit No.: Project No.: 3115103 Project Name: MAJOR D MARKETPLACE @ LA QUINTA 79-190 HWY 111 @ ADAMS LA QUINTA, CA Age (Days) Date Tested Nominal Size Actual Area (Sq. Inch) Load (lbs.) Strength (psi) Type of Fracture 3 3/10/2006 6X 12 28.37 52,310 1,840 Cone 7 3/14/2006 6X 12 28.37 73,790 2,600 Cone 28 4/4/2006 6X 12 28.37 89,980 3,170 Cone 28 4/4/2006 6X 12 28.37 90,510 1 3,190 Cone Specified Strength: 3,000 PSI Sampled By MICHAEL G. Location: S.O.G. (M-10) Concrete Supplier: ASSOCIATED READY MIX Mix No.: 25336 Ticket No.: 3639591 Water added at Site: 0.00 gal. By Cement Type: Mix Time: min. Remarks: Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** ASTM C172 Date Sampled: 3/7/2006 Date Received: 3/8/2006 Concrete Temp: 67 °F ASTM C1064 Ambient Temp: 60 °F ASTM C1064 Slump: 5.00 in. ASTM C143 Tested at: Anaheim Respectfully Submitted, MTGL, Inc. 1 M.B.(Ben) Lo Chief Engineer 3180 PSI 28 -day compression test complies with the specified strength. CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 03/25/2006 PROJECT NO. 3115103 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO 2 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-3261 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Major'D' Office Max INSPECTION ADDRESS: 79-190 Highway 111 La Quinta, CA N�1:w H REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln SAE 350, Miller Trailblazer 301G CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 03/25/2006 PROJECT NO. 3115103 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO 2 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-3261 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Major'D' Office Max INSPECTION ADDRESS: 79-190 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-190 Highway 111 I La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln SAE 350, Miller Trailblazer 301G AREA, GRIDLINES, PIECES OBSERVED: In Progress: Welding of the bridging angles to the top and bottom cords of the roof joists. Items Completed: Welding of the TS 21/2x21/2x1/4 tube steel to the top cord of the roof girders on lines 2/K to K.9 and 5,8 & 11/0 to P. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: warm SAMPLES TAKEN: n/a TEMPERATURE: 68 Deg. F TESTS REQUIRED: Na SITE TIME START: 7:00 AM SITE TIME FINISH: 4:30 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: ERIFIED BY I uU by ULK I IrY I HAI I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 'Ag�'e' g;�I- 4g5?�' 0849264-85 Signature ICBG Certification Number Steve W. Bodnar 03/20/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number zz?. CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego I Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Ellsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) , (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 03/25/2006 PROJECT NO. 3115103 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO 2 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. OS -3261 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Major'D' Office Max INSPECTION ADDRESS: 79-190 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-190 Highway 111 I La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT/ MANPOWER USED: WELDING MACHINE: Lincoln SAE 350, Miller Trailblazer 301 G AREA, GRIDLINES, PIECES OBSERVED: In Progress: (1) Welding of the bridging angles to the top and bottom cords of the roof joists: (2) Welding of the steel framing from line L to 0.5 between lines 13 and 13.5 at the store front. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: Na TEMPERATURE: 69 Deg. F TESTS REQUIRED: n/a SITE TIME START: 7:00 AM SITE TIME FINISH: 4:30 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: V RIFIED BY I LJU DT '-.trc I Ir T I MAI I NAVt rtt(SUNALLY UtfStHVEU ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND 1 OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 03/21/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number t4 CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (`/) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 03/25/2006 PROJECT NO. 3115103 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO 3 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-3261 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Major'D' Office Max INSPECTION ADDRESS: 79-190 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-190 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICSO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln SAE 350 Miller Trailblazer 301 G AREA, GRIDLINES, PIECES OBSERVED: In Progress: Welding of the bridging angles to the top and bottom cords of the roof joists. Items Completed: (1) Welding the ends of the roof joists to the wall embeds on line 13/K to P. (2) Welding the ends of the roof joists to the top of the W14x30 beam online 13.5/L.9 to N.6. (3) Welding of the splice plates between the ends of the roof joists on line 13/L.9 to N.6. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS. REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: Na TEMPERATURE: 76 Deg. F TESTS REQUIRED: Na SITE TIME START: 7:00 AM SITE TIME FINISH: 4:30 PM ou�;;tnn L► LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: VERIFIED BY vv o I —IN i it T I n^ i i nrwc rtKAUNALLT UtsJtKVtU ALL OF I HE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 03/22/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (17 APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 03/25/2006 PROJECT NO. 3115103 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO 4 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO.PERMIT NO. 05-3261 SUB -CONTRACTOR: Portola Construction, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Major'D' Office Max INSPECTION ADDRESS: 79-190 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-190 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT/ MANPOWER USED: WELDING MACHINE: Lincoln SAE 350, Miller Trailblazer 301 G, MQ Whisperweld BLW-400SSW2 AREA, GRIDLINES, PIECES OBSERVED: Items Completed: . (1) Welding of the entire bridging angles to the top and bottom cords of the roof joists from line 1 to 13 between line K & P. (2) Welding of the roof decking support frames at the AC units on lines 4.9/L.6 to N.6, 7.9/K.9 and 10.9/L.6 to N.6. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: Na TEMPERATURE: 85 Deg. F TESTS REQUIRED: Na SITE TIME START: 7:00 AM SITE TIME FINISH: 4:30 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: VERIFIED BY uw o l �rm i it T MAI I I rTHvt NtKSUNALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK C&PLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 03/23/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Fim n RGDnpT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) SSW APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects FOR WEEK ENDING 03/25/2006 PROJECT NO. 3115103 12220 EI Camino Real Suite 200 San Diego, CA 92130 ENGINEER: CSSI REPORT NO 5 PG 1 • OF 1 2445 Fitch Street Suite 300 San Diego, CA 92102 CONTRACTOR: Vratsinas Construction Co. PLAN FILE NO. PERMIT NO. 05-3261 P.O. Box 2558 Little Rock, AR 72203 SUB -CONTRACTOR: Portola Construction, Inc. PROJECT NAME: Major'D' Office Max 10722 Edison Court Rancho Cucamonga, CA 91730 INSPECTION ADDRESS: 79-190 Highway 111 ADDRESS OF PROJECT: 79-190 Highway 111 La Quinta, CA La Quinta, CA REPORTING REQUIREMENTS: ICAO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT/ MANPOWER USED: WELDING MACHINE: Lincoln SAE 350, Miller Trailblazer 301 G, AREA, GRIDLINES, PIECES OBSERVED: Items Completed: (1) Torque tightening of the ASTM A325 High strength boltson the W8x10 beams at lines 12.9/L.5 to L.9 & 12.9/N.4 to L7 on the roof level. (2) Torque tightening of the ASTM A325 high strength bolts on the W14x22 beam at line 2/K on the roof level. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: Na TEMPERATURE 87 Deg. F TESTS REQUIRED: Na SITE TIME START: 7:00 AM SITE TIME FINISH: 4:30 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: VERIFIED BY 1 nn RV r POTIN TUAr 1 Ll As it n _ - • -•- -� �w -�L ur I nc Vwrcn us I tU ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 03/24/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number Corporate: . 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 653A999 Fax: (909) 653-4666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 1'el: (818) 833-8100 Fax: (818) 833-0085 Report of: COMPRESSIVE STRENGTH -GROUT ASTM C1019 GEORGE* VCC P.O. BOX 5883 LA QUINTA, CA 92248 Client: THOMAS ENTERPRISES A Set No.: 6-1870 File No.: Permit No.: Project No.: 3115I03 Project Name: MAJOR D MARKETPLACE @ LA QUINTA 79-190 HWY 111 @ ADAMS LA QUINTA, CA Age (Days) Date Tested Nominal Size Actual Area (Sq. Inch) Load (lbs.) Strength (psi) Type of Fracture 14 3/3/2006 3 X 3 X 6 9.33 23,250 2,490 N/A 28 3/17/2006 3 X 3 X 6 9.76 26,780 2,740 N/A 28 3/17/2006 3 X 3 X 6 1 9.80 1 27,420 1 2,800 1 N/A Specified Strength: 2,500 PSI Sampled By MICHAEL G. Location: 5TH LIFT EAST WALL Concrete Supplier: ASSOCIATED READY MIX Mix No.: 46511 Ticket No.: Water added at Site: 0.00 gal. By Cement Type: Mix Time: min. Remarks Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** A ASTM C172 Date Sampled: 2/17/2006 Date Received: 2/27/2006 Concrete Temp: °F ASTM C1064 Ambient Temp: °F ASTM C1064 Slump: 9.00 in. ASTM C143 Tested at: Anaheim Respectfully Submitted, MTGL, Inc. M.B. (Ben) Lo Chief Engineer 2770 PSI 28 -day compression test complies with the specified strength. r Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 6534999 Fax: (909) 6534666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of: COMPRESSIVE STRENGTH -GROUT ASTM C1019 GEORGE* VCC P.O. BOX 5883 LA QUINTA, CA 92248 Client: THOMAS ENTERPRISES A Set No.: 6-1871 N File No.: Permit No.: Project No.: 3115103 Project Name: MAJOR D MARKETPLACE @ LA QUINTA 79-190 HWY 111 @ ADAMS LA QUINTA, CA Age (Days) Date Tested Nominal Size Actual Area (Sq.Inch) Load (lbs.) Strength (psi) Type of Fracture 7 3/3/2006. 3 X 3 X 6 10.30 14,210 1,380 N/A 28 3/24/2006 3 X 3 X 6 9.30 24,480 2,630 N/A 28 3/24/2006 3 X 3 X 6 9.83 23,220 2,360 r N/A I Specified Strength` 2;500 PSI Sampled By MICHAEL G. Location: 6TH LIFT (PARAPET) NORTH WALL Concrete Supplier: ASSOCIATED READY MIX Mix No.: 46511 Ticket No.: 3638357 Water added at Site: 0.00 gal. By Cement Type: Mix Time: min. Remarks: Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** A ASTM C172 Date Sampled: 2/24/2006 Date Received: 2/27/2006 i Concrete Temp: °F ASTM C1064 Ambient Temp: °F ASTM C1064 Slump: 9.00 in. ASTM C143 Tested at: Anaheim Respectfully Submitted, MTGL, Inc. 1 M.B. (Ben) Lo Chief Engineer 2500 PSI 28 -day compression test does not comply with the specified strength. CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) SSW APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT Smith Consulting Architects FOR WEEK ENDING 04/08/2006 PROJECT NO. 3115103 12220 EI Camino Real Suite 200 San Diego, CA 92130 ENGINEER: CSSI REPORT NC 1 PG 1 OF 1 2445 Fifth Street Suite 300 San Diego, CA 92102 CONTRACTOR: Vratsinas Construction Co. PLAN FILE NO. PERMIT NO. 05-3261 P.O. Box 2558 Little Rock, AR 72203 SUB -CONTRACTOR: Portola Construction, Inc. PROJECT NAME: Major'D' Office Max 10722 Edison Court Rancho Cucamonga, CA 91730 INSPECTION ADDRESS: 79-190 Highway 111 ADDRESS OF PROJECT: 79-190 Highway 111 La Quinta, CA La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODE: SMAW E-6022 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln Classic 300D AREA, GRIDLINES, PIECES OBSERVED: Items Completed: Puddle welding and side seam punch locking of the entire metal roof decking from line K to P between lines 1 and 13.5. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: n/a TEMPERATURE: 87 Deg, F TESTS REQUIRED: n/a SITE TIME START: 7:00 AM SITE TIME FINISH: 8:30 AM LUNCH PERIOD: none TRAVEL TIME: ERIFIED BY 1 DO BY CERTIFY THAT 1 HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMKIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 171 = 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 04/03/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 F r San Diego I Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS m APPROVED SHOP DRAWINGS m ARCHITECT Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 04/08/2006 PROJECT NO. 3115J03 ENGINEER: CSSI I 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NC 1 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-3259 SUB -CONTRACTOR: Portola Construction, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: SHOP 3 Famous Footwear INSPECTION ADDRESS: 79-150 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-150 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODE: SMAW E-7018 & E-6022 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln SAE 350, Lincoln Classic 300D, Miller Big Blue 302P AREA, GRIDLINES, PIECES OBSERVED: In Progress: Puddle welding and side seam punch locking of the metal roof decking. Items Completed: Welding of the diagonal bracing angles from the bottom flange of the W10x12 roof beams to the wall embeds from line B.3 to B.9 between lines 11.5 and 12. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: n/a TEMPERATURE: 87 Deg. F TESTS REQUIRED: n/a SITE TIME START: 8:30 AM SITE TIME FINISH: 12:00 PM LJ Y✓ LUNCH PERIOD: none TRAVEL TIME: VERIFIED BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 04/03/2006 City Of La Quintal Print Name Date Of Report City / County Certification Number Corporate: 2992 E. La Palma Ave., Ste. A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego/Imperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Emph.. 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK (INSPECTOR ❑ TECHNICIAN SA C AVAILABLE: SOIL REPORT (N) SPECSq!4>(N) APPROVED PLANS(a(N) APPROVED SHOP I (Y) ) ARCHITECT P. e FOR WEEK ENDING - 'Z - O Co PROJECT. NO. 1 3 \ \ - ���• ENGINEER 0� REPORT NO. PG l OF 1 CONTRACTOR A ' V PLAN FILE NO. PERMIT NO. SUB -CONTRACTOR PROJECT NAME INSPECTION ADDRESS ADDRESS OF PROJECT �.\l L a a. REPORTING REQUIREMENTS: ICBG FIELD INSPECTION MANUAUMTGL SOIL MANUAL- REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S: IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): 1 c CONTRACTORS EQUIPMENT / MANPOWER L'il V\, -,n iQa Lti ee s ti �rsr2MM�aaaJ AREA, GRID LINES. PIECES OBSERVED: INN y , J STRUCTURAL NOTES, DETAIL, OR RFIS USED: a,cSi�\%7 �R •y-�A CS�..t n\�tV t-CsLi..�c�..q,4 cam, REMARKS, INCLUDING MEETINGS: ^ j C�-"---�/C.- z_ REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMP) ETIM WEATHER: C\� TEMPERATURE: SAMPLES TAKEN: e - TESTS REQUIRED:, SITE TIME START:"Aoc "� SITE TIME FINISH: _7�:tZQ — LUNCH PERIOD: TRAVEL TIME: VERIFIED I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SV INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT Signature Date of Report ICBO Certification Number Print Name City / County Certification Number Rev: 7/97 MTG L Corporate: - 2992 E. La Palma Ave., Ste. A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego/Imperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Empi,_. 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAUMTGL SOIL MANUAL — REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): (73 CONTRACTORS EQUIPMENT / MANPOWER USED: AREA, GRID LINES, PIECES OBSERVED: \ STRUCTURAL NOTES, DETAIL. OR RFIS USED: ^ �rc�s�p�a�.o� o� �c;.,.>�2.�.ctiti +����.�St�c� 02�a�.• REMARKS. INCLUDING MEETING C CANS©`�c�t'�.�A �l�tt*.4 e CL C REWORK AS PERCENT OF ALL WORK TODAY' PlICENT PROJECT COMPLETION* WEATHER: Z 9�a-{� SAMPLES TAKEN: TEMPERATURE: TESTS REQUIRED: SITE TIME START: LUNCHTERIOD: SITE TIME FINISH: TRAVEL TIME: VERIFIED BY: I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVI;TIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPO Signature Date of Report ICBO Certification Number Print Name City / County Certification Number \S� Rev: 7/97 Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 6534999 Fax: (909) 6534666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of: COMPRESSIVE STRENGTH -GROUT ASTM C1019 ** CITY OF LA QUINTA-BLDG & SAFETY 78495 CALLE TAMPICO LA QUINTA, CA 92253 Client: THOMAS ENTERPRISES A Set No.: 6-1508 File No.: Date Tested Permit No.: Actual Area Load (Sq. Inch) (lbs.) Project No.: 3115103 Project Name: MAJOR D MARKETPLACE @ LA QUINTA 3 X 3 X 6 HWY 1 I 1 @ ADAMS 2,070 LA QUINTA, CA Age (Days) Date Tested Nominal Size Actual Area Load (Sq. Inch) (lbs.) Strength (psi) Type of Fracture 7 2/8/2006 3 X 3 X 6 10.73 22,210 2,070 N/A 28 3/1/2006 3 X 3 X 6 9.00 28 3/1/2006 3 X 3 X 6 9.00 28 H 3/1/2006 3 X 3 X 6 9.00 Specified Strength: 2,000 PSI Sampled By Location: 1 ST LIFT LINE K Concrete Supplier: ASSOCIATED READY MIX Mix No.:., 46002 Ticket No.: 3632665 Water added at Site: 0.00 gal. By Cement Type: Mix Time: Remarks: Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** I ASTM C172 Date Sampled: 2/1/2006 Date Received: 2/6/2006 Concrete Temp: 74 °F ASTM C1064 Ambient Temp: 64 °F ASTM C1064 Slump: 9.00 in. ASTM C143 min. Tested at: Anaheim Respectfully Submitted, MTGL, Inc. l M.B. (Ben) Lo Chief Engineer A MTG� Corporate: 2992 r. La Palma Ave Arrlheil:). CA 92806 idl: 714.632.2999 Fast: 71, 4.632.2974 San Diego/Imperial County: Ste. A 7313 Carroll Road. Suite G San Diego. CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Empi,-. 14320 Elsworth Street. Ste CIO', Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT r(PE CF WORK NSPCC10R ❑ TECHNICIAN < P SITE AVAILABLE SOIL REPORT (y)(N1 SPECS 1N) -_ AROUTEC' APPROVED PLANS , N) ='( APPROVED SHOP DRAWING (Y) IN) R ' a" �� FOR WEEK ENDING PROJECT. NO \ INC. INEW* —�--------- � REPORT NO. PG ,\ OF C0nTRAcTOh ' v PLAN FILE NO. PERMIT NO. SUB -CONTRACTOR - c N��,•��uR PROJECT • INSPEC?ION ADDRESS t-PA ADDRESS OF PROJECT REPORTING REQ R1_, EN :S: ICIiO FIELD INSPECTfON YtANUAL/A9TGI. SOIL b1ANUAL - kFVIEN' PREVIOUS REPORTS AND LISTS IFTFiL-'RE IS NON-CONFOR:\11NG \VOkK THE END OF THE .-1T WORK DA1:OR �\11SSING :�9TRS.:\ND kFIS. ETC.. FILL OUT.�IND.-STT-BCH d UEFICIFNCI' REP Ok-F WHEN A DEFICIEN'C'Y. No ORA PREVIOUS INSPECTOR'S, IS CORRECTED. SO NOTE ON THE ORIGINAL DFFICIENCI' SUH\II'I'A COPY \VllFI1'OLrR WEEK'S REPORTS. Rr:PORT:IND MATERIALS USED BY CONTRACTOR t NCLUDE RESEARCH REPORT N0. OR MATERIAL TEST REPORTS): �( CONTRACTOR S,EOUIPMENT / MANPOWER USED: AREA, GRID LINES. PIECES OBSERVE STRUCTURAL NOTES. DETAIL, OR RFIS USED: ` \ _ � c REMARKS. INCLUDING NEET/NGS: ` REWORK AS P RGENT OF ALL WORK TODAY' PER FNT PRn 11=r^T rnlL�pl crinnl WEATHER. SAMPLES TAKEN: _ TEMPERATURE' TESTS REQUIRED: - 46 - SITE TIME START. LUNCH PERIOD SITE TIME FINISH:c TRAVEL TIME: _...... ......._______ VERIFIED BY: I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL IN ESTIGATION RECOM , DATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN t E DEFICIENCY REPORT Signature ——` / �C, /C �C=�fJOC �...•y Date of Report Print Name ICBO Certification Number City / County Certif ication Number Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 653-4999 Fax: (909) 653-4666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of: COMPRESSIVE STRENGTH -GROUT ASTM C1019 CITY OF LA QUINTA-BLDG & SAFETY 78495 CALLE TAMPICO LA QUINTA, CA 92253 Client: THOMAS ENTERPRISES Set No.: 6-1607 File No.: Permit No.: Project No.: 3115I03 Project Name: 1MAJOR D MARKETPLACE @ LA QUINTA — -- -- _ 79-190 HWY 1 I 1 @ ADAMS LA QUINTA, CA Age (Days) Date Tested Nominal Size Actual Area Load (Sq. Inch) (lbs.) Strength Type of (psi) Fracture 7 2/16/2006 3 X 3 X 6 9.24 18,890 2,040 N/A 28 3/9/2006 3 X 3 X 6 9.00 28 3/9/2006 1 3 X 3 X 6 1 9.00 Specified Strength: 2,500 PSI Sampled By MICHAEL G. Location: 3RD LIFT @ MAJOR D LINE I Concrete Supplier: ASSOCIATED READY MDC Mix No.: 46511 Ticket No.: 3634909 Water added at Site: 0.00 gal. By Cement Type: Mix Time: min. - Remarks: Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** ASTM C172 Date Sampled: 2/9/2006 Date Received: 2/10/2006 Concrete Temp: 64 °F ASTM C1064 Ambient Temp: 80 °F ASTM C1064 Slump: 10.00 in. ASTM C143 Tested at: Anaheim Respectfully Submitted, MTGL, Inc. 1 M.B. (Ben) Lo Chief Engineer Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 653A999 Fax: (909) 653-4666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of., COMPRESSIVE STRENGTH -GROUT ASTM C 10 19 CITY OF LA QUINTA-BLDG & SAFETY 78495 CALLE TAMPICO LA QUINTA, CA 92253 Client: THOMAS ENTERPRISES A Set No.: 6-1689 File No.: Permit No.: Project No.: 3.115103 Project Name: (MAJOR-D_MARKETPLACE @ LA QUINTA 79-190 HWY 111 @ ADAMS LA QUINTA, CA Age Date (Days) Tested Nominal Actual Area Size (Sq. Inch) Load (lbs.) Strength Type of (psi) Fracture 7 2/20/2006 3 X 3 X 6 9.61 23,770 2,470 N/A 28 3/13/2006 3 X 3 X 6 9.00 28 3/13/2006 3 X 3 X 6 1 9.00 Specified Strength: 2,000 PSI Sampled By Location: 4TH LIFT LINE 2 Concrete Supplier: ASSOCIATED READY MIX Mix No.: 46511 Ticket No.: 3635552 Water added at Site: 0.00 gal. By Cement Type: Mix Time: Remarks: TRUCK # 827 Distribution: THOMAS ENTERPRISES VCC 'CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** A ASTM C172 Date Sampled: 2/13/2006 Date Received: 2/16/2006 Concrete Temp: 66 °F ASTM C1064 Ambient Temp: 73 °F ASTM C1064 Slump: 9.00 in. ASTM C143 min., Tested at: Anaheim Respectfully Submitted, MTGL, Inc. • j M.B. (Ben) Lo Chief Engineer Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 6534999 Fax: (909) 653-4666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 • r Report of: COMPRESSIVE STRENGTH -GROUT ASTM C1019 CITY OF LA QUINTA-BLDG & SAFETY 78495 CALLE TAMPICO LA QUINTA, CA 92253 Client: THOMAS ENTERPRISES Set No.: 6-1871 File No.: Permit No.: Project No.: 3115I03 Project Name: MAJOR D MARKETPLACE @ LA QUINTA 79-190 HWY 111 @ ADAMS LA QUINTA, CA Age (Days) Date Tested Nominal Size Actual Area Load (Sq. Inch) (lbs.) Strength (psi) Type of Fracture - 7 3/3/2006 3 X 3 X 6 10.30 14,210 1,380 N/A 28 3/24/2006 3 X 3 X 6 9.00 28 3/24/2006 3 X 3 X 6 9.00 , I Specified Strength: 2,500 PSI Sampled By MICHAEL G. Location: 6TH LIFT (PARAPET) NORTH WALL Concrete Supplier: ASSOCIATED READY MIX Mix No.: 46511 Ticket No.: 3638357 Water added at Site: 0.00 gal. By Cement Type: Mix Time: min. Remarks: Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** ASTM C172 Date Sampled: 2/24/2006 Date Received: 2/27/2006 Concrete Temp: °F ASTM C1064 Ambient Temp: °F ASTM C1064 Slump: 9.00 in. ASTM C143 Tested at: Anaheim Respectfully Submitted, MTGL, Inc. 1 i M.B. (Ben) Lo Chief Engineer 0 Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 6534999 Fax: (909) 6534666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Reportof: COMPRESSIVE STRENGTH -GROUT ASTM C1019 s* CITY OF LA QUINTA-BLDG & SAFETY 78495 CALLE TAMPICO LkQUINTA, CA 92253 Client: THOMAS ENTERPRISES A . Set No.: 6-1870 File No.: Permit No.: Project No.: 3115I03 Project Name: MAJOR D MARKETPLACE @ LA QUINTA 79-190 HWY 111 @ ADAMS LA QUINTA, CA Age (Days) Date Tested Nominal Size Actual Area Load (Sq. Inch) (lbs.) Strength (psi) Type of Fracture 14 3/3/2006 3 X 3 X 6 9.33 23,250 2,490 N/A 28 3/17/2006 3 X 3 X 6 9.00 28 3/17/2006 1 3 X 3 X 6 9.00 Specified Strength: 2,500 PSI Sampled By MICHAEL G. Location: 5TH LIFT EAST WALL Concrete Supplier: ASSOCIATED READY MIX Mix No.: 46511 Ticket No.: Water added at Site: 0.00 gal. By Cement Type: Mix Time: min. ? Remarks: • Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** A ASTM C172 Date Sampled: 2/17/2006 Date Received: 2/27/2006 Concrete Temp: °F ASTM C1064 Ambient Temp: °F ASTM C1064 Slump: 9.00 in. ASTM C143 Tested at: Anaheim Respectfully Submitted, MTGL, Inc. 1 M.B. (Ben) Lo Chief Engineer Corporate: 2992'E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Ar,r, ak Tel: (909) 653-4999 Fax: (909) 653-4666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Reportof: COMPRESSIVE STRENGTH-GROUT ASTM C1019 CITY OF LA QUINTA-BLDG & SAFETY 78495 CAL LE TAMPICO LA QUINTA, CA 92253 Client: THOMAS ENTERPRISES A Set No.: 6-1508 File No.: Permit No.: Project No.: 3115103 Project Name: MAJOR D MARKETPLACE @ LA QUINTA 79-190 HWY 111 @ ADAMS LA QUINTA, CA Age Date (Days) Tested Nominal Size Actual Area Load (Sq. Inch) (lbs.) Strength (psi) Type of Fracture 7 2/8/2006. 3 X 3 X 6 10.73 22,210 2,070 N/A 28 3/1/2006 3 X 3 X 6 10.69. 29,200 2,730 N/A 28 3/1/2006 3 X 3 X 6 10.21 30,010 2,940 N/A 28H 3/1/2006 3 X 3 X 6 9.00 Specified Strength: 2,000 PSI Sampled By Location: 1 ST LIFT LINE K Concrete Supplier: ASSOCIATED READY MIX Mix No.: 46002 Ticket No.: 3632665 Water added at Site: 0.00 gal. By Cement Type: Mix Time: Remarks: Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** ASTM C172 Date Sampled: 2/1/2006 Date Received: 2/6/2006 Concrete Temp: 74 °F ASTM C1064 Ambient Temp: 64 °F ASTM C1064 Slump: 9.00 in. ASTM C143 min. Tested at: Anaheim Respectfully Submitted, MTGL, Inc. 1 M.B. (Ben) Lo. Chief Engineer 2840 PSI 28 -day compression test complies with the specified strength. A MTGL :;. ,.,mss-•� Corporate: 2992 E. La Palma Ave., Ste. A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego/Imperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Emph- 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK INSPECTOR , ❑ TECHNICIAN . \-N ��- AVAILABLE: SOIL REPORT (Y)(N) SPECS 4D(N) APPROVED PLANS®(N) APPROVED SHOP DRAWING (Y)[NL ARCHITECT FOR WEEK ENDING PROJECT. NO. ENGINEER REPORT NO. PG OF ` 1 CONTRACTOR , ! V PLAN FILE NO. PERMIT NO. SUB -CONTRACTOR PROJECT NAME t-\�,� INSPECTION ADDRESS ADDRESS OF PROJECT `1 ck- g, mow' \\ REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAUMTGL SOIL MANUAL— REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORKDAY. OR MISSING MTRS. AND RFIS. ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S. IS CORRECTED. SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): CONTRACTORS EQUIPMENT/ MANPOWER USED: AREA, GRID LINES, PIECES OBSERVED: �csc C '-n' ' STRUCTURAL NOTES. DETAIL. OR RFIS USED: REMARKS. INCLUDING MEETINGS., i REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPI ETION• WEATHER: ����` TEMPERATURE: �Cr\ SAMPLESTAKEN: TESTS REQUIRED: �J SITE TIME START: _._��=__�� SITE TIME FINISH: LUNCH PERIOD: TRAVEL TIME: VERIFIED BY: _ I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT Signature Date of Report ICBO Certification Number Print Name City / County Certification Number Rev: 7/97 Corporate: ` 2992 E. La Palma Ave., Ste. A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego/Imperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Empi,_ 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK ' INSPECTOR ❑ TECHNICIAN RT AVAILABLE: SOIL REPORT (Y)(N) SECS 40(N) L-" ARCHITECT APPROVED PLANS®(N) APPROVED SHOP DRAWING (Y) (N) •x FOR WEEK ENDING PROJECT NO. ENGINEER . � REPORT N0. PG OF CONTRACTOR \ ! PLAN FILE N0. PERMIT NO. l V SUBCONTRACTOR a .-- - PROJECT NAME C �`� Awa aR r'\ INSPECTION ADDRESS ADDRESS OF PROJECT :-\S.. \ d - w \L\ LA REPORTING REQUIREMENTS: ICBG FIELD INSPECTION MANUAUMTGL SOIL MANUAL — REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY. OR MISSING MTRS. AND RFIS. ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED. SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMITA COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): -be- CONTRACTORS EQUIPMENT/ MANPOWER USED: {� AREA, GRID LINES, PIECES OBSERVED: r� Cal STRUCTURAL NOTES. DETAIL, OR RFIS USED: REMARKS. INCLUDING MEERNGS: REWORK AS PERCENT OF ALL WORK TODAY• PER FAIT pgo IFC T CoMpl GTinnl WEATHER: ���.j�` SAMPLES TAKEN: TEMPERATURE: r\ TESTS REQUIRED:_ SITE TIME START: _.d__�`�._ SITE TIME FINISH: LUNCH PERIOD: TRAVEL TIME: VERIFIED BY: _ 1 DO CE IFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS. AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT Signature Dt Print Name a e of Report ICBO Certification Number City / County Certification Number Rev: 7/97 4 MTm ..l Corporate: 2992 E. La Palma Ave., Ste Anaheim: CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 - San Diego/Imperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Emph... 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK INSPECTOR 0 TECHNICIAN AVAILABLE: SOIL REPORT (Y)(N) SPECS ®(N) APPROVED PLANSCYN) APPROVED SHOP DRAWING (Y) (N) ARCHITECT FOR WEEK ENDING PROJECT. NO. ENGINEERCIS REPORT N0. PG Of CONTRACTOR\ ! PLAN FILE N0. PERMIT NO. SUBCONTRACTOR c N�A���R PROJECT NAME M a•' INSPECTION ADDRESS CAQ ADDRESS OF PROJECT REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAUMTGL SOIL MANUAL— REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORKDAY, OR MISSING MTRS. AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY. YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY�C]ONTRACTOR(INCLUDE RESEARCH `PORT NO. ORMATERIAL TEST R`PORTS): e - CONTRACTORS EQUIPMENT/ MANPOWER USED: AREA, GRID LINES, PIECES OBSERVED: rt ��= \.tea.- �.-e�.�a�..� l R:c� m��.. ••._e.� STRUCTURAL NOTES, DETAIL, OR FIRS USED: REMARKS. INCLUDING MEETINGS: G% P _p REWORK AS PERCENT OF ALL WORK TODAY• PERCENT PROJECT COMPI ETIONO WEATHER: �tZ�j1` SAMPLES TAKEN: —fir TEMPERATURE: TESTS REQUIRED: —8-- 1 SITE TIME START:_.0 -1_ SITE TIME FINISH:0���� 'LUNCH PERIOD: TRAVEL TIME: VERIFIED BY: I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES W .. THE SO NVESTIGATION RECOMMENDATIONS. AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT Signature Date of Report ICBG Certification Number Print Name City / County Certification Number Rev: 7/97 Y. •:t _ MTG L •=:'��r'=� :r,.�,-:--..car �r� Corporate: 2992 E. La Palma Ave., Ste. A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego/Imperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Empil,,. 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK ' INSPECTOR ❑TECHNICIAN AVAILABLE- SOIL REPORT (Y) (N) SPECS D(N) L \A APPROVED PLANS®(N) APPROVED SHOP DRAWING (Y) (N) ARCHITECT _ FOR WEEK ENDING PROJECT. No. 00) LN , ZM \ J �..,. ENGINEER C � S� REPORT N0. PG � OF CONTRACTOR \ ! V PLAN FILE NO. PERMIT NO. SUBCONTRACTOR PROJECT NAME It-\ (1.•. INSPECTION ADDRESS ADDRESS OF PROJECT REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAUMTGL SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY. OR MISSING MTRS. AND RFIS. ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S. IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): CONTRACTORS EQUIPMENT/ MANPOWER US \� t �(`�\ t \� 1 (�..,�\ c�_��1 \ LV I V AREA. GRID LINES, PIECES OBSERVED: �O � '�,�. o� C'� r�,"a� Iv. �c t -t C�g: t STRUCTURAL NOTES, DETAIL. OR RFIS USED: /� p REMARKS, IMCLUGIMGMEETINGS. REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION - WEATHER: ����` SAMPLES TAKEN: — TEMPERATURE: TESTS REQUIRED:' $� ii SITE TIME START: LUNCH PERIOD: SITE TIME FINISH: __�'QrS�M TRAVEL TIME: VERIFIED BY: I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND/ OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT Signature Date of Report ICBO Certification Number Print Name City / County Certification Number Rev: 7/97 Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 653-4999 Fax: (909) 653-4666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Reportof: COMPRESSIVE STRENGTH -GROUT ASTM C1019 CITY OF LA QUINTA-BLDG & SAFETY 78495 CALLE TAMPICO LA QUINTA, CA 92253 Client: THOMAS ENTERPRISES A Set No.: 6-1607 File No.: Permit No. - Project No.: 3115I03 Project Name: MAJOR D MARKETPLACE @ LA QUINTA 79-190 HWY 111 @ ADAMS LA QUINTA, CA Age (Days) Date Tested Nominal Size rL•` Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 653-4999 Fax: (909) 653-4666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Reportof: COMPRESSIVE STRENGTH -GROUT ASTM C1019 CITY OF LA QUINTA-BLDG & SAFETY 78495 CALLE TAMPICO LA QUINTA, CA 92253 Client: THOMAS ENTERPRISES A Set No.: 6-1607 File No.: Permit No. - Project No.: 3115I03 Project Name: MAJOR D MARKETPLACE @ LA QUINTA 79-190 HWY 111 @ ADAMS LA QUINTA, CA Age (Days) Date Tested Nominal Size Actual Area (Sq. Inch) Load (lbs.) Strength (psi) Type of Fracture 7 2/16/2006 3 X 3 X 6 9.24 18,890 2,040 N/A 28 3/9/2006 3 X 3 X 6 9.15 26,160 2,860 N/A 28 3/9/2006 3 X 3 X 6 9.70 1 25,150 1 2,590 1 N/A Specified Strength: 2,500 PSI Sampled By MICHAEL G. Location: 3RD LIFT @ MAJOR D LINE I Concrete Supplier: ASSOCIATED READY MIX Mix No.: 46511 Ticket No.: 3634909 Water added at Site: 0.00 gal. By Cement Type: Mix Time: min. Remarks: t Distribution: THOMAS. ENTERPRISES • VCC , CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** A ASTM C172 Date Sampled: 2/9/2006 Date Received: 2/10/2006 Concrete Temp: 64 °F ASTM C1064 Ambient Temp: 80 °F ASTM C1064 Slump: 10.00 in. ASTM C143 Tested at: Anaheim Respectfully Submitted, MTGL, Inc. j M.B.(Ben) Lo Chief Engineer t 2720 PSI 28 -day compression test complies with the specified strength. r Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 653-4999 Fax: (909) 6534666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of. COMPRESSIVE STRENGTH -CONCRETE ASTM C39 * * File No.: CITY OF LA QUINTA-BLDG & SAFETY Permit No.: 78495 CALLE TAMPICO Project No.: 3115I03 LA QUINTA, CA 92253 Project Name: MAJOR D MARKETPLACE @ LA QUINTA -- 79-190 HWY 111 @ ADAMS LA QUINTA, CA Client: THOMAS ENTERPRISES A Set No.: 6-1968 Age Date (Days) Tested Nominal Size Actual Area Load Strength (Sq. Inch) (lbs.) (psi) Type of Fracture 3 3/10/2006 6 X 21 28.37 44,190 1,560 Cone 7 3/14/2006 6X 12 28.27 28 4/4/2006 6X 12 28.27 28 4/4/2006 6X 12 28.27 Specified Strength: 3,000 PSI Sampled By MICHAEL G. Location: S.O.G. (K-12) Concrete Supplier: ASSOCIATED READY MIX Mix No.: 25336 Ticket No.: 3639615 Water added at Site: 0.00 gal. 'By Cement Type: Mix Time: min. Remarks: ASTM C172 Date Sampled: 3/7/2006 Date Received: 3/8/2006 Concrete Temp: °F ASTM C1064 Ambient Temp: °F ASTM C1064 Slump: 4.50 in. ASTM C143 Tested at: Anaheim Respectfully Submitted, Distribution: THOMAS ENTERPRISES MTGL, Inc. VCC 1 CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** M.B. (Ben) Lo Chief Engineer A Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 653-4999 Fax: (909) 653-4666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of: COMPRESSIVE STRENGTH -CONCRETE ASTM C39 CITY OF LA QUINTA-BLDG & SAFETY 78495 CALLE TAMPICO LA QUINTA, CA 92253 Client: THOMAS ENTERPRISES Set No.: 6-1967 File No.: Permit No.: Project No.: 3115103 Project Name: MAJOR D MARKETPLACE @ LA QUINTA 79-190 HWY 111 @ ADAMS LA QUINTA, CA Age (Days) Date Nominal Actual Area Tested Size (Sq. Inch) Load (lbs.) Strength (psi) Type of Fracture 3 3/10/2006 6X 12 28.37 52,310 1,840 Cone 7 3/14/2006 6X 12 28.27 28 4/4/2006 6X 12 28.27 28 4/4/2006 6X 12 28.27 Specified Strength: 3,000 PSI Sampled By MICHAEL G. ASTM C172 Date Sampled: 3/7/2006 Date Received: '3/8/2006 Location: S.O.G. (M-10) Concrete Supplier: ASSOCIATED READY MIX Concrete Temp: 67 °F ASTM C1064 Mix No.: 25336 Ambient Temp: 60 °F ASTM C1064 Ticket No.: 3639591 Water added at Site: 0.00 gal. By Slump: 5.00 in. ASTM C143 Cement Type: Mix Time: min. Tested at: Anaheim Remarks: Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** Respectfully Submitted, MTGL, Inc. M.B. (Ben) Lo Chief Engineer Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 653-4999 Fax: (909) 6534666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Reportof: COMPRESSIVE STRENGTH -MASONRY PRISM ASTM C1314 CITY OF LA QUINTA-BLDG & SAFETY 78495 CALLE TAMPICO LA QUINTA, CA 92253 Client: THOMAS ENTERPRISES A Set No.: 6-1953 File No.: Permit No.: Project No.: 3115103 Project Name: MAJOR D MARKETPLACE @ LA QUINTA 79-190 HWY 111 @ ADAMS LA QUINTA, CA Age (Days) Date Nominal Tested Size Actual'Area (Sq. Inch) Load (lbs.) Strength (psi) Type of . Fracture 7 3/10/2006 8 X 8 X 16 58.60 128,270 2,190 N/A 28 3/31/2006 8 X 8 X 16 64.00 28 . 3/31/2006 8 X 8 X 16 1 64.00 Specified Strength: 2,500 PSI Sampled By MICHAEL G. Location: 6TH LIFT STOREFRONT PARAPIT Concrete Supplier: ASSOCIATED READY MDC Mix No.: 46511 Ticket No.: 3631152 Water added at Site: 0.00 gal. By Cement Type: Mix Time: 50 min. Remarks: Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** ASTM C172 Date Sampled: 3/3/2006 Date Received: 3/7/2006 Concrete Temp: 68 °F ASTM C1064 Ambient Temp: 70 °F ASTM C1064 Slump: 8.00 in. ASTM C143 Tested at: Anaheim Respectfully Submitted, MTGL, Inc. 1 M.B. (Ben) Lo Chief Engineer A Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 653-4999 Fax: (909) 6534666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of. COMPRESSIVE STRENGTH -GROUT ASTM C1019 * * File No.: CITY OF LA QUINTA-BLDG & SAFETY Permit No.: 78495 CALLE TAMPICO Project No.: 3115103 LA QUINTA, CA 92253 Project Name: MAJOR D MARKETPLACE @ LA QUINTA 79-190 HWY 1 I I @ ADAMS LA QUINTA, CA Client: THOMAS ENTERPRISES Set No.: -6-1871 Age (Days) Date Tested Nominal Size Actual Area (Sq. Inch) Load (lbs.) Strength (psi) Type of Fracture 7 3/3/2006 3 X 3 X 6 10.30 14,210 1,380 N/A 28 3/24/2006 3 X-3 X 6 9.30 24,480 2,630 N/A 28 3/24/2006 3 X 3 X 6 9.83 23,220 2,360 N/A c Specified Strength: 2,500 PSI Sampled By MICHAEL G. Location: 6TH LIFT (PARAPET) NORTH WALL Concrete Supplier: ASSOCIATED READY MIX Mix No.: 46511 Ticket No.: 3638357 Water added at Site: 0.00 gal. By Cement Type: Mix Time: min. Remarks: Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** u ^ ASTM C172 Date Sampled: 2/24/2006 Date Received: 2/27/2006 Concrete Temp: °F ASTM C1064 Ambient Temp: °F ASTM C1064 Slump: 9.00 in. ASTM C143 Tested at: Anaheim Respectfully Submitted, MTGL, Inc. l M.B.(Ben) Lo Chief Engineer 2500 PSI 28 -day compression test does not comply with the specified strength. Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 6534999 Fax: (909) 6534666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Reportof: COMPRESSIVE STRENGTII-GROUT ASTM C1019 *s CITY OF LA QUINTA-BLDG & SAFETY 78495 CALLE TAMPICO LA QUINTA, CA 92253 Client: THOMAS ENTERPRISES A Set No.: 6-1870 File No.: Permit No.: Project No.: 3115103 Project Name: MAJOR_ D MARKETPLACE @ LA QUINTA C79-190 HWY 111 @ ADAMS LA QUINTA, CA Age (Days) Date Tested Nominal Size Actual Area (Sq. Inch) Load (lbs.) Strength (psi) Type of Fracture 14 3/3/2006 3 X 3 X 6 9.33 23,250 2,490 N/A 28 3/17/2006 3 X 3 X 6 9.76 26,780 2,740 N/A 28 3/17/2006 3 X 3 X 6 9.80 27,420 2,800 N/A Specified Strength: 2,500 PSI Sampled By MICHAEL G. Location: 5TH LIFT EAST WALL Concrete Supplier: ASSOCIATED READY MIX Mix No.: 46511 Ticket No.: Water added at Site: 0.00 gal. By Cement Type: Mix Time: min. Remarks: Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** ASTM C172 Date Sampled: 2/17/2006 Date Received: 2/27/2006 Concrete Temp: °F ASTM C1064 Ambient Temp: °F ASTM C1064 Slump: 9.00 in. ASTM C143 Tested at: Anaheim Respectfully Submitted, MTGL, Inc. 1 M.B. (Ben) Lo Chief Engineer 2770 PSI 28 -day compression test complies with the specified strength. rt. Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 653.4999 Fax: (909) 653-4666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 r Reportof: COMPRESSIVE STRENGTH -GROUT ASTM C1019 CITY OF LA QUINTA-BLDG & SAFETY 78495 CALLE TAMPICO LA QUINTA, CA 92253 Client: THOMAS ENTERPRISES A • Set N o.: 6-1689- Age =1689- File No.: Permit No.: Project No.: 3115103 Project Name: MAJOR D MARKETPLACE @ LA QUINTA 79-190 HWY 111 @ ADAMS LA QUINTA, CA Age (Days) Date Tested Nominal Size Actual Area (Sq. Inch) Load (lbs.) Strength (psi) Type of Fracture 7 2/20/2006 3 X 3 X 6 9.61 23,770 2,470 N/A 28 3/13/2006 3 X 3 X 6 9.52 28,170 2,960 N/A 28 3/13/2006 3 X 3 X 6 9.52 26,330 2,770 N/A Specified Strength: 2,000 PSI Sampled By Location: 4TH LIFT LINE 2 Concrete Supplier: ASSOCIATED READY MIX Mix No.: 46511 Ticket No.: 3635552 Water added at Site: 0.00 gal. By Cement Type: Mix Time Remarks: TRUCK # 827 V Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** A ASTM C172 Date Sampled: 2/13/2006 Date Received: 2/16/2006 Concrete Temp: 66 °F ASTM C1064 Ambient Temp: 73 °F ASTM C1064 Slump: 9.00 in. ASTM C143 min. Tested at: Anaheim Respectfully Submitted, MTGL, Inc. l M.B. (Ben) Lo Chief Engineer 2860 PSI 28 -day compression test complies with the specified strength. i Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 6534999 Fax: (909) 653-4666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel:(818)833-8100 Fax:(818)833-0085 Report of. COMPRESSIVE STRENGTH -CONCRETE ASTM C39 CITY OF LA QUINTA-BLDG & SAFETY 78495 CALLE TAMPICO LA QUINTA, CA 92253 Client: THOMAS ENTERPRISES A Set No.: 6-1968 File No.: Permit No.: Project No.: 3115I03 Project Name: MAJOR D MARKETPLACE @ LA QUINTA 79-190 HWY 111 @ ADAMS LA QUINTA, CA Age (Days) Date Tested Nominal Size Actual Area (Sq. Inch) Load (lbs.) Strength (psi) Type of Fracture 3 3/10/2006 6 X 21 28.37 44,190 1,560 Cone 7 3/14/2006 6X 12 28.37 63,590 2,240 Cone 28 4/4/2006 6X 12 28.27 28 4/4/2006 6X 12 28.27 Specified Strength: 3,000 PSI Sampled By MICHAEL G. Location: S.O.G. (K-12) Concrete Supplier: ASSOCIATED READY MIX Mix No.: 25336 Tickei No.: 3639615 Water added at Site: 0.00. gal. By Cement Type: Mix Time: min. Remarks: Distribution: THOMAS ENTERPRISES VCC E CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** ASTM C172 Date Sampled: 3/7/2006 Date Received: 3/8/2006 Concrete Temp: "F ASTM C1064 Ambient Temp: °F ASTM C1064 Slump: 4.50 in. ASTM C143 Tested at: Anaheim Respectfully Submitted, MTGL, Inc. 1 M.B. (Ben) Lo Chief Engineer A Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 653-4999 Fax: (909) 653-4666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of: COMPRESSIVE STRENGTH -CONCRETE ASTM C39 CITY OF LA QUINTA-BLDG & SAFETY 78495 CALLE TAMPICO LA QUINTA, CA 92253 Client: THOMAS ENTERPRISES A . Set No.: •6-1967 File No.: Permit No.: Project No.: 3115I03 Project Name: MAJOR D MARKETPLACE @ LA QUINTA 79-190 HWY 111 @ ADAMS LA QUINTA, CA Age (Days) Date Tested Nominal Size Actual Area (Sq. Inch) Load (lbs.) Strength (psi) Type of Fracture 3 3/10/2006 6X 12 28.37 52,310 1,840 Cone 7 3/14/2006 6X 12 28.37 73,790 2,600 Cone 28 4/4/2006 6X 12 28.27 28 4/4/2006 6X 12 28.27 Specified Strength: 3,000 PSI Sampled By MICHAEL G. Location: S.O.G. (M-10) Concrete Supplier: ASSOCIATED READY MIX Mix No.: 25336 Ticket No.: 3639591 Water added at Site: 0.00 gal. By Cement Type: Mix Time: min. Remarks: Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** ASTM C172 Date Sampled: 3/7/2006 Date Received: 3/8/2006 Concrete Temp: 67 °F ASTM C1064 Ambient Temp: 60 °F ASTM C1064 Slump: 5.00 in. ASTM C143 Tested at: Anaheim Respectfully Submitted, MTGL, Inc. M.B. (Ben) Lo Chief Engineer A "wv^ Corporate: 2992 E. La Palma Ave., Ste Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego/Imperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Emph- 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK 6 11NSPECTOROTECHNICIAN JAV�AILABLE:SOILRT(Y) ARCHITECT (N) SPECS Pn(N) APPROVED SHOP DRAWING (Y) (N) OR WEEK ENDING PROJECT. NO.2�C1 \jENGINEER EPORT NO. PG OF CONTRACTOR PLAN FILE NO. PERMIT N0. SUBCONTRACTOR PROJECT NAME t-\ 0, INSPECTION ADDRESS ADDRESS OF PROJECT REPORTING REQUIREMENTS: ICBG FIELD INSPECTION MANUAUMTGL SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY. OR MISSING MTRS, AND RFIS. ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A'DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): CONTRACTORS EQUIPMENT/ MANPOWER USED; 'S r'\ til r� i ��p�0� L V J Tcc-.rte ta.tJ AREA, GRID LINES, PIECES OBSERVED: STRUCTURAL NOTES. DETAIL, OR RFIS USED: ' REMARKS. INCLUDING NEEnMGS: Lo REWORK S ^EFICENT OF ALL WORK TODAY. PERCENT PROJECT COMPLETION' WEATHER: TAKEN: -49— TEMPERATURE: TESTS REQUIRED: -4L=_- SITE TIME START:_._�e%�_.�i�_ SITE TIME FINISH: LUNCH PERIOD: TRAVEL TIME: VERIFIED BY: — I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT Signature Date of Report ICBG Certification Number Print Name City / County Certification Number Rev: 7/ = MTGL Corporate: 2992 E. La Palma Ave., Ste. A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego/Imperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Empit,.. 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK INSPECTOR O TECHNICIAN rl AVAILABLE: SOIL REPORT (Y) (N) APPROVED PLANS®IN) SPECS oo(N) APPROVED SHOP DRAWING (Y) (N) ARCHITECT '" FOR WEEKENDING PROJECT. NO. _ S _ ENGINEER REPORT NO. PG ` OF CONTRACTOR PLAN FILE NO. PERMIT NO. SUBCONTRACTOR c Nva-�ouR PROJECT NAME Ma' INSPECTION ADDRESS ADDRESS OF PROJECT REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAUMTGL SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY. OR MISSING MTRS. AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUMMIT COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): CONTRACTORS EQUIPMENT/ MANPOWER USED: AREA, GRID LINES. PIECES OBSERVED: STRUCTURAL NOTES. DETAIL. OR RFIS USED: REMARKS. INIX UD/NG MEETINGS: / c REWORK AS PERCENT OF ALL WORK Tnnev PERCENT PROJECT COMPLETION* WEATHER: ��' .�`1` SAMPLES TAKEN: TEMPERATURE: TESTS REQUIRED: SITE TIME START: SITE TIME FINISH:��L'� LUNCH PERIOD: TRAVEL TIME: __— VERIFIED BY: ..__ I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS. AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT /1lry�i/ ��///i�•��c Z / 'Z -?j /a (p �O fit.-�OC�,�-• Sy Signature Dale of Report ICBO Certification Number Print Name City / County Certification Number Rev: 7 Ti L Corporate: 2992 E. La Palma Ave., Ste. A Anaheim. CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego/Imperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Emph.. 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK ,6 INSPECTOR OTECHNICIAN n r AVAILABLE: SOIL REPORT (Y) (N) SPECS 40(N) APPROVED PLANS®(N) APPROVED SHOP DRAWING (Y) (N) ARCHITECT FOR WEEK ENDING _V -k- O PROJECT NO. l S - ENGINEER F 1 REPORT NO. PG OF CONTRACTOR , ! PLAN FILE NO. PERMIT N0. SUB -CONTRACTOR c Nva-�o,�R PROJECT NAME c-�A•. INSPECTION ADDRESS LLQ ADDRESS OF PROJECT REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAUMTGL SOIL MANUAL— REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORKDAY. OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED. SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): C' CONTRACTORS EQUIPMENT/ MANPOWER USED: AREA. GRID LINES, PIECES OBSERVED: .0-A o cx� ��emx LAC ,ar�lS �S'� STRUCTURAL NOTES, DETAIL, OR RFIS USED: REMARKS. INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY* PERCENT PROJECT COMPLETION: WEATHER: QQ_4,,V, SAMPLES TAKEN: Q S 1L� p:�: O S� TEMPERATURE: TESTS REQUIRED: �O SITE TIME START: SITE TIME FINISH:�� LUNCH PERIOD: TRAVEL TIME: ___ VERIFIED BY: ..__ I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND I OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE. UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT Signature Date of Report ICBO Certification Number Print Name City / County Certification Number Rev: 7N Corporate: San Diego/Imperial County: Inland Empit,.. 2992 E. La Palma Ave., Ste. A 7313 Carroll Road, Suite G 14320 Elsworth Street, Ste. C101 Anaheim. CA 92806 San Diego, CA 92121 Moreno Valley, CA 92553 Tel: 714.632.2999 Tel: 858.537.3999 ' Tel: 951.653.4999 Fax: 714.632.2974 Fax: 858.537.3990 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK M INSPECTOR 0 TECHNICIAN n Q, . AVAILABLE: SOIL REPORT (Y)(N) SPECS ®(N) APPROVED PLANS®(N) APPROVED SHOP DRAWING (Y) (N) ARCHITECT FOR WEEKENDING PROJECT. NO. ENGINEER REPORT NO. PG OF CONTRACTOR PLAN FILE NO. PERMIT NO. C -- - SUBCONTRACTOR PROJECT NAME r\ A•. INSPECTION ADDRESS ADDRESS OF PROJECT REPORTING REQUIREMENTS: ICBG FIELD INSPECTION MANUAUMTGL SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OFTHE WORK DAY. OR MISSING MTRS. AND RFIS. ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY. YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): C . �_a.. A5 -t wk 6- :R3 e S 4.1 , CONTRACTORS EQUIPMENT/ MANPOWER USEa AREA, GRID LINES, PIECES OBSERVED: /7.. 'Qa n� c e� CLL V� �•a� C,< 2� 0 3�1 � : v�.'�_ \L�) / STRUCTURAL NOTES. DETAIL, OR RFIS USED: REMARKS, INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: WEATHER: ���`1` TEMPERATURE: �C r` PERCENT PROJECT COMPLETION: SAMPLES TAKEN: TESTS REQUIRED: Cl5�5 SITE TIME START: _ SITE TIME FINISH: ZAn n LUNCH PERIOD: TRAVEL TIME: ____ VERIFIED BY: ..__ 100 CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT Signature Date of Report ICBG Certification Number Print Name City / County Certification Number Rev: 7/9' ,r AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 k, PROJECT NO. 3115103 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO 1 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-3261 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Major'D' Office Max CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego /Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 03/18/2006 PROJECT NO. 3115103 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO 1 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-3261 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Major'D' Office Max INSPECTION ADDRESS: 79-190 Highway 111 La Quinta, CA It ADDRESS OF PROJECT: 79-190 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 & FCAW NR232 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln SAE 350 AREA, GRIDLINES, PIECES OBSERVED: Items Completed: Welding of the entire knife plates between the ends of the top cords of the roof girders on lines 5, 8, & 11/L to O. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: n/a TEMPERATURE: 76 Deg. F TESTS REQUIRED: n/a SITE TIME START: •1:00 PM SITE TIME FINISH: 4:30 PM LUNCH PERIOD: none TRAVEL TIME: rt VERIFIED BY UU D1 1,trc i it T i MA i i nrwt VtKSUNALLY UrtstKVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 03/15/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 03/18/2006 PROJECT NO. 3115103 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO 2 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-3261 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Major'D' Office Max INSPECTION ADDRESS: 79-190 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-190 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 & FCAW Nr232 CONTRACTORS EQUIPMENT/ MANPOWER USED: WELDING MACHINE: Lincoln SAE 3 AREA, GRIDLINES, PIECES OBSERVED: 'Items Completed: (1) Welding the end of the W14x22 beam to the wall embed and reinforcing bars on line 2/K.9 at the roof level. (2) Welding the top cord ends of the roof joists to the wall embeds on lines 1/K to K.9 and 2/L to P. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: n/a TEMPERATURE: 76 Deg. F TESTS REQUIRED: n/a SITE TIME START: 7:00 AM SITE TIME FINISH: 4:30 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: VERIFIED BY —1.1. . I � ,� " rC WIVMLLT vD0crcvtU ALL Ur I tit VVUKK LIb I ED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. Z -u 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 03/16/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number X CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 03/18/2006 PROJECT NO. •3115103 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO 3 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-3261 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Major'D' Office Max INSPECTION ADDRESS: 79-190 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-190 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 & FCAW NR232 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln SAE 350, Miller Trailblazer 301 G, Miller Big Blue 400D AREA, GRIDLINES, PIECES OBSERVED: ' Items Completed: (1) Welding of the top cords of the roof girders to the wall embeds on lines K/5,8 & 11 and P/5,8 & 11. (2) Welding of the top cord ends of the roof joists to the top cord of the roof girders on lines 5,8,&11/K to P. (3) Welding of the splice plates between the ends of the top cords of the roof joists on lines 5,8 & 11/ K to P. (4) Welding of the TS21/2x21/2x1/4 tube steel to the top cord of the roof girders on lines 5,8 & 11%K to L.1. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: n/a TEMPERATURE: 71 Deg. F TESTS REQUIRED: n/a SITE TIME START: 7:00 AM SITE TIME FINISH: 4:30 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: IFIED BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIeS WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. Oz.". 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 03/17/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number Corporate: 2992 E. La Palma Ave., Ste. A Anaheim. CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego/Imperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Empii,,. 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK :INSPECTOR 0 TECHNICIAN AVAILABLE: SOIL REPORT (Y)(N) SPECS ®(N) � L '\"\APPROVED PLANS®(N) APPROVED SHOP DRAWING (Y) (N) ARCHITECT FOR WEEK ENDING PROJECT. NO. ,J, REPORT NO. PIS OF ` ENGINEER CONTRACTOR / t PLAN FILE NO. PERMIT NO. V SUB -CONTRACTOR PROJECT NAME INSPECTION ADDRESS ADDRESS OF PROJECT REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL/MTGI. SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS YON -CONFORMING WORK AT THE END OF THE WORK DAY. OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY. YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): A""IA-\ate CONTRACTORS EQUIPMENT/ MANPOWER USED- AREA, GRID LINES, PIECES OBSERVED: ' � '1'X c`f._» •tel �A � � �� "J' rc C.�'L�1�os � Q`�-SLA C STRUCTURAL NOTES. DETAIL, OR RFIS USED. T REMARKS. INaLIDINQ MEETINGS: t� hC�1 L..:� ��� - 4 \•tom. L_�_•�:-..•4.M.'�C e t'i-\C �•�Cwt:'-1 P j" \Q�6� S �' �i �..�_ IREWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMP) FTIO I• WEATHER: QXe_,;,,VZ_ SAMPLES TAKEN: `7�•—C d& ��` S TEMPERATURE: t_,_) TESTS REQUIRED: i Co SITE TIME START: __..lC�..C'� _ SITE TIME FINISH: LUNCH PERIOD: TRAVEL TIME: VERIFIED BY: ..__ uv �cn i ir, i nrai i nnvc rcnJUNALLT UDatnvttJ ALL Ut I Ht WUHK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT Signature Date of Report ICBO Certification Number Print Name City / County Certification Number Rev: 7/97 1 .......�..« CORPORATE 2992 E. La Palma Ave., Suite A I Anaheim, CA 92806 Tel: 714 632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FlFI n RFP(1RT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) SSW APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects FOR WEEK ENDING 03/25/2006 PROJECT NO. 3115103 12220 EI Camino Real Suite 200 San Diego, CA 92130 ENGINEER: CSSI REPORT NO 2 PG 1 OF 1 2445 Fifth Street Suite 300 San Diego, CA 92102 CONTRACTOR: Vratsinas Construction Co. PLAN FILE NO. PERMIT NO. 05-3261 P.O. Box 2558 Little Rock, AR 72203 SUB -CONTRACTOR: Portola Constructios, Inc. PROJECT NAME: Major'D' Office Max 10722 Edison Court Rancho Cucamonga, CA 91730 INSPECTION ADDRESS: 79-190 Highway 111 ADDRESS OF PROJECT: 79-190 Highway 111 La Quinta, CA La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL I MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT/ MANPOWER USED:- / WELDING MACHINE: Lincoln SAE 350, Miller Trailblazer 301 G AREA, GRIDLINES, PIECES OBSERVED: In Progress: Welding of the bridging angles to the top and bottom cords of the roof joists. Items Completed: Welding of the TS 21/2x21/2x1/4 tube steel to the top cord of the roof girders on lines 2/K to K.9 and 5,8 & 11/0 to P. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: warm SAMPLES TAKEN: n/a TEMPERATURE: 68 Deg. F TESTS REQUIRED: n/a SITE TIME START: 7:00 AM SITE TIME FINISH: 4:30 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: VERIFIED BY 1 nn RV r`CATICV TWAT 1 -111 n - -- -- 1--'11--IcUHDUVCHINU INAI INIZ5WUHKCOMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND I OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT, Signature Steve -W. Bodnar Print Name 03/20/2006 Date Of Report 0849264-85 ICBO Certification Number City Of La Quinta City / County Certification Number CORPORATE 2992 E. La Palma Ave.. Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Fin n RFPOPT Inland Empire 14320 Elsworth Street, Suite C 101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) SSW APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects FOR WEEK ENDING 03/25/2006 PROJECT NO. 3115103 12220 EI Camino Real Suite 200 San Diego. CA 92130 ENGINEER:. CSSI REPORT NO 2 PG 1 OF 1 2445 Fifth Street Suite 300 San Diego, CA 92102 CONTRACTOR: Vratsinas Construction Co. PLAN FILE NO. PERMIT NO. 05-3261 P.O. Box 2558 Little Rock, AR 72203 SUB -CONTRACTOR: Portola Constructios, Inc. PROJECT NAME: Major'D' Office Max 10722 Edison Court Rancho Cucamonga, CA 91730 INSPECTION ADDRESS: 79-190 Highway 111 ADDRESS OF PROJECT: 79-190 Highway 111 La Quinta, CA La Quinta, CA REPORTING REQUIREMENTS: ICSO FIELD INSPECTION MANUAL I MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND FIRS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln SAE 350, Miller Trailblazer 301G AREA, GRIDLINES, PIECES OBSERVED: In Progress: Welding of the bridging angles to the top and bottom cords of the roof joists. Items Completed: Welding of the TS 21/2x2l/2xl/4 tube steel to the top cord of the roof girders on lines 2/K to K.9 and 5,8 & 11/0 to P. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: warm SAMPLES TAKEN: n/a TEMPERATURE: 68 Deg. F TESTS REQUIRED: Na SITE TIME START: 7:00 AM SITE TIME FINISH: 4:30 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: \/E R' BY I rill AV r`MCMCV TU- i - - • -• V C-LL yr i nc VV Vru\ LIS I EU AUUVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND I OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 'S�� ' 0849264-85 Signature ICBG Certification Number Steve W. Bodnar 03/20/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.6322999 Fax: 714.6322974 San Diego / Imperial County 7313 Carroll Road, Suite G Sart Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax.. 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW' AVAILABLE: SOIL REPORT (1) (N) 1 SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 03/252006 PROJECT NO. 3115103 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO 2 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO.' 05-3261 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Major T' Office Max INSPECTION ADDRESS: 79-190 Highway 111. La Quints, CA ADDRESS OF PROJECT: 79-190 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICSO FIELD INSPECTION MANUAL/ MTGL SOIL MANUAL4MMEW PREMUS REPORTS AND LISTS v IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY. OR MISSING MTRS. AND RFIS. ETC.. FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED. SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Uncoln SAE 350, Miller TraM)Iazer 301G AREA, GRIDLINES, PIECES OBSERVED: In Progress: (1) Welding of the bridging angles to the top and bottom cords of the roof joists. (2) Welding of the steel framing from line L to 0.5 between lines 13 and 13.5 at the store front. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: Na TEMPERATURE: 69 Deg. F TESTS REQUIRED: Na SITE TIME START: 7:00 AM SITE TIME FINISH: 4:30 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: NRIFIED BY - —^ • •• • . �... ...� ��R�.na.+. �i uwcrcvtU ALL UV I Nt VVUKK LIS IED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. J' 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 03/21/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number Fhb CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, SuiteG San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIFL n RFpnQT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN. AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) SSW APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects FOR WEEK ENDING 03/25/2006 PROJECT NO. 3115103 12220 EI Camino Real Suite 200 San Diego, CA 92130 ENGINEER: CSSI REPORT NO 3 PG 1 OF 1 2445 Fifth Street Suite 300 San Diego, CA 92102 CONTRACTOR: Vratsinas Construction Co. PLAN FILE NO. PERMIT NO. 05-3261 P.O. Box 2558 Little Rock, AR 72203 SUB -CONTRACTOR: Portola Constructios, Inc. PROJECT NAME: Major'D' Office Max 10722 Edison Court Rancho Cucamonga, CA 91730 INSPECTION ADDRESS: 79-190 Highway 111 JADDRESS OF PROJECT: 79-190 Highway 111 La Quinta, CA La Quinta, CA -• -• • ••-�. nc r.nnc nc�n o: i� o� nuu [Nbrtc I IUN MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED. SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln SAE 350 Miller Trailblazer 301 G AREA, GRIDLINES, PIECES OBSERVED: In Progress: Welding of the bridging angles to the top and bottom cords of the roof joists Items Completed: (1) Welding the ends of the roof joists to the wall embeds on line 13/K to P. (2) Welding the ends of the roof joists to the top of the W14x30 beam on line 13.5/L.9 to N.6. (3) Welding of the splice plates between the ends of the roof joists on line 13/L.9 to N.6. ISTRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: Na TEMPERATURE: 76 Deg. F TESTS REQUIRED: n/a SITE TIME START: 7:00 AM SITE TIME FINISH: 4:30 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: _RI IED BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THF BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. Signature Steve W. Bodnar Print Name 03/22/2006 Date Of Report 0849264-85 ICBO Certification Number City Of La Quinta City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.6322999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: , 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Eisworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951'.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 03/252006 PROJECT NO. 3115103 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO 2 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. OS 3261 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Major'D' Office Max INSPECTION ADDRESS: 79-190 Highway 111. La Quinta, CA ADDRESS OF PROJECT: 79-190 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL ! MTGL SOI. MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVKRIS INSPECTORS, IS CORRECTED, So NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln SAE 350, Miller Trailblazer 301G AREA, GRIDLINES, PIECES OBSERVED: In Progress: , (1) Welding of the bridging angles to the top and bottom cords of the roof joists. (2) Welding of the steel framing from line L to 0.5 between lines 13 and 13.5 at the store front. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Waren SAMPLES TAKEN: Na TEMPERATURE: 69 Deg. F TESTS REQUIRED: n/a SITE TIME START: 7:00 AM SITE TIME FINISH: 4:30 PM LUNCH PERIOD: 12 Hr. TRAVEL TIME: V RIFIED BY ..� .• .�.�I I I r I i n VQ rCMQVr4MLLT V6JtKVtU ALL OF I ret VVUKK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS,'AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 03/21/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN. AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) SSW APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects FOR WEEK ENDING 03/25/2006 PROJECT NO. 3115103 12220 EI Camino Real Suite 200 San Diego, CA 92130 ENGINEER: CSSI REPORT NO 3 PG 1 OF 1 2445 Fifth Street Suite 300 San Diego, CA 92102 CONTRACTOR: Vratsinas Construction Co. PLAN FILE NO. PERMIT NO. 05-3261 P.O. Box 2558 Little Rock, AR 72203 SUB -CONTRACTOR: Portola Constructios, Inc. PROJECT NAME: Major'D' Office Max 10722 Edison Court Rancho Cucamonga, CA 91730 INSPECTION ADDRESS: 79-190 Highway 111 ADDRESS OF PROJECT: 79-190 Highway 111 La Quinta, CA La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln SAE 350 Miller Trailblazer 301 G AREA, GRIDLINES, PIECES OBSERVED: In Progress: Welding of the bridging angles to the top and bottom cords of the roof joists. Items Comoleted: (1) Welding the ends of the roof joists to the wall embeds on line 13/K to P. (2) Welding the ends of the roof joists to the top of the W14x30 beam on line 13.5/L.9 to N.6. (3) Welding of the splice plates between the ends of the roof joists on line 13/L.9 to N.6. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: Na TEMPERATURE: 76 Deg. F TESTS REQUIRED: Na _ SITE TIME START: 7:00 AM LUNCH PERIOD: 1/2 Hr. SITE TIME FINISH: 4:30 PM TRAVEL TIME: BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 03/22/2006 _ City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIFI_ [) RF0nPT Inland Empire 14320 Ellsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 03/25/2006 PROJECT NO. 3115103 ENGINEER: CSSI 2445 Fifth Street Suite 300• San Diego, CA 92102 REPORT NO 4 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-3261 SUB -CONTRACTOR: Portola Construction, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Major'D' Office Max INSPECTION ADDRESS: 79-190 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-190 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICSO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS. ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln SAE 350, Miller Trailblazer 301 G, MQ Whisperweld BLW-400SSW2 AREA, GRIDLINES, PIECES OBSERVED: Items Completed: (1) Welding of the entire bridging angles to the top and bottom cords of the roof joists from line 1 to 13 between line K & P. (2) Welding of the roof decking support frames at the AC units on lines 4.9/L.6 to N.6, 7.9/K.9 and 10.9/L.6 to N.6. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: Na TEMPERATURE: 85 Deg. F TESTS REQUIRED: Na SITE TIME START: 7:00 AM SITE TIME FINISH: 4:30 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: f VERIFIED BY I nn RY CGOT1CV ruer. I uni� - ---- ••---••--•---�••�-vrllLVl- IfICVV MMLIJICUAOVVtANU IHAI 1 H15 WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS. SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. ,'�ke' ZU 0849264-85 Signature ICSO Certification Number Steve W. Bodnar 03/23/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Type Of Work X INSPECTOR TECHNICIAN SSW ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 SUB -CONTRACTOR: Portola Construction, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 INSPECTION ADDRESS: 79-190 Highway 111 La Quinta, CA Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) FOR WEEK ENDING 03/25/2006 PROJECT NO. 3115103 REPORT NO 5 PG 1 OF 1 PLAN FILE NO. IPERMIT NO. 05-3261 PROJECT NAME: Major'D' Office Max ADDRESS OF PROJECT: 79-190 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICSO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln SAE 350, Miller Trailblazer 301 AREA, GRIDLINES, PIECES OBSERVED: Items Completed: (1) Torque tightening of the ASTM A325 High on the roof level. Torque tightening of the ASTM A325 STRUCTURAL NOTES, DETAIL, OR RFIS USED REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: WEATHER: Hot TEMPERATURE 87 Dea. F SITE TIME START: 7:00 AM LUNCH PERIOD: 1/2 Hr. boltson the W8x10 beams at lines 12.9/L.5 to L.9 & 12.9/N.4 to L7 bolts on the W14x22 beam at line 2/K on the roof level. (PER APPROVED PLANS) SAMPLES TAKEN: TESTS REQUIRED: SITE TIME FINISH: 4:30 PM PERCENT PROJECT COMPLETION: Na Na TRAVEL TIME: >-Z`� GG VERIFIED BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 03/24/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim. CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego I Imperial County 7313 Carroll Road, Suite G San Diego. CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD RFpnRT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego. CA 92130 FOR WEEK ENDING 03/25/2006 PROJECT NO. 3115103 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO 4 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-3261 SUB -CONTRACTOR: Portola Construction, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Major'D' Office Max INSPECTION ADDRESS: 79-190 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-190 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICSO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW.E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln SAE 350, Miller Trailblazer 301 G, MQ Whisperweld BLW-400SSW2 AREA, GRIDLINES, PIECES OBSERVED: Items Completed: (1) Welding of the entire bridging angles to the top and bottom cords of the roof joists from line 1 to 13 between line K & P. (2) Welding of the roof decking support frames at the AC units on lines 4.9/L.6 to N.6, 7.9/K.9 and 10.9/L.6 to N.6. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: Na TEMPERATURE: 85 Deg. F TESTS REQUIRED: n/a SITE TIME START: 7:00 AM SITE TIME FINISH: 4:30 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: VERIFIED BY -- - • i nnv� rrMOUIIMLLr UcatKvtU ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK C6MPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDIINNNGG�CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. s Signature Steve W. Bodnar Print Name 03/23/2006 Date Of Report 0849264-85 ICBO Certification Number City Of La Quinta City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 • �• vuoc t VCU MLL Ur I rIt VVUHK LIS FED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS. AND/ OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLF SFr.TInN nc Tuc BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. Signature Steve W. Bodnar Print Name 03/24/2006 Date Of Report 0849264-85 ICBO Certification Number City Of La Quinta City / County Certification Number Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) . ARCHITECT: Smith Consulting Architects APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 03/25/2006 PROJECT NO. 3115103 REPORT NO 5 PG 1 O 11 F 1 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 PLAN FILE NO. PERMIT NO. 05-3261 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PROJECT NAME: Major'D' Office Max SUB -CONTRACTOR: Portola Construction, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 ADDRESS OF PROJECT: 79-190 Highway 111 INSPECTION ADDRESS: 79-190 Highway 111 La Quinta, CA La Quinta, CA REPORTING REQUIREMENTS: ICSO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln SAE 350, Miller Trailblazer 301 G, AREA, GRIDLINES, PIECES OBSERVED: Items Completed: (1) Torque tightening of the ASTM A325 High strength boftson the W8x10 beams at lines 12.9/L.5 to L.9 & 12.9/N.4 to L7 on the roof level. (2) Torque tightening of the ASTM A325 high strength bolts on the W14x22 beam at line 2/K on the roof level. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: n/a TEMPERATURE 87 Deg. F TESTS REQUIRED: Na SITE TIME START: 7:00 AM SITE TIME FINISH: 4:30 PM LUNCH PERIOD: 1/2 Hr.. TRAVEL TIME: �— dljG VERIFIED I I'1fl Rv rcoriry r • �• vuoc t VCU MLL Ur I rIt VVUHK LIS FED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS. AND/ OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLF SFr.TInN nc Tuc BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. Signature Steve W. Bodnar Print Name 03/24/2006 Date Of Report 0849264-85 ICBO Certification Number City Of La Quinta City / County Certification Number Corporate: .?992 ' La Palma Ave. Anall !11*1. CA 92806 Tel: 14.632.2999 Fax: 7 i 4 632.2974 San Diego/Imperial County Ste. A 7313 Carroll Road. Suite G San Diego. CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Empi,.. 14320 Elsworth Street. Ste. C101 Moreno Valley. CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT R'ORK _ :NSPECIOR r• •. [_ iE.,riT11CIAP1 AVAILABLE S01! REPOgI'(V (N) SPECS N �1) APPROVED PIANS . N)' � __ APPROVED SHOP DRAWING {YI (N) FOR WEEK ENDINGs• PRQIECT. N0. F REPORT NO. PG OF q;h Y PLAN FILE NO. PERMIT NO. SUB -CONTRACTOR PROJECT NAME c N� aa�uR e-\ A INSPECTION ADDRESS CL ADDRESS OF PROJECT mow' \\ �• REPORTING REQUIREAIEN'rs: ICBO FIELD INSPECTION N1Ai\UAL/NITGI. SOIL (MANUAL - REVIEN PREVIOUS REPORTS AND LISTS IFTHERE IS NON-CONFORMIN(; WORK ATTHE END OF THE WORK DAL'. OR :MISSING :NITRS. AND RFIS. ETC.. FILL OUT AND ATTACH A DEFICIFNCY' REPORT WHEN A DFFICIENC'Y'. YOURS ORA PREVIOUS INSPECTOR'S. IS CORRECTED. SO NOTE ON THE ORIGINAL DEFICIENCY REPOR'rAND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS UUSSEED- BY CONTRACTOR RESEARCH REPORT NO. OR MATERIALTESTREPORTS): ^INCLUDE Q - `��" ` (� (:2\s CONTRACTORS EQUIPMENT / MANPOWER USED AREA GRID LINES PIECES OBSERVED x STRUCTURAL NOTES DETAIL OR RFIS USED\����) �� REMARKS. INCLUDING MEETFNGS A `l ti ` ��e "�` 7 •\`ice- C. i�l ° v� r2`' \� /i \V, REWORK AS PERCENT OF ALL WORK TODAY PER FNr PROJECT rn nal FTIONI WEATHER: C\�a�` SAMPLES TAKEN: TEMPERATURE: TESTS REQUIRED. ("V% _ SITE TIME FINISH: i =PERIOD:�/ {�� , TRAVEL TIME: =VERIFIED _.__.._.. _ __ /� T T nn r`[nrTry r U M Tr T T nAi HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INV IGATION RECOMMENDATIONS. AND r OR THE APPROVED PLANS. SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE. UNLESS OTHERWISE NOTED IN THE EFICIENCY REPORT Signature Date of Report Print Name ICBO Certification Number City / County Certification Number N MT Corporate: 1 2992 E. La Palma Ave., Ste. A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego/Imperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Empil. 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK INSPECTOR ❑TECHNICIAN AVAILABLE: SOIL REPORT (Y)(N) SPECS 4�(N) ARCHITECT APPROVED PLANS�(N) APPROVED SHOP DRAWING (Y) (N) < _ x •.�».= ENGINEER FOR WEEK ENDING PROJECT. NO. 2� -c-, i��- REPORT NO. PG OF CONTRACTOR \ PLAN FILE N0, PERMIT NO. SUB -CONTRACTOR k--\ A•� ��a� PROJECT NAME ' INSPECTION ADDRESS T-\ P. ADDRESS OF PROJECT REPORTING REQUIREMENTS: ICBG FIELD INSPECTION MANUAUMTGL SOfL MANUAL— REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OFTHE WORKDAY. OR MISSING MTRS, AND RFIS. ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY SUBMIT A COPY WITH YOUR WEEK'S REPORTS. REPORT AND MATERIALS USED BY CONTRACTOR REPORT NO. OR MATERIAL TEST REPORTS): r�(INCLUDE ERRESEARCH CONTRACTORS EQUIPMENT / MANPOWER USED: AREA, GRID LINES. PIECES OBSERVE ' -,-k, STRUCTURAL NOTES. DETAIL, OR RFIS USED:O —z' REMARKS. INCLUDING MEETINGS: Cl REWORK AS PER('FNT OF ALL WORK TODAY: P Rf FNT PRn IFrT COMPLETION' WEATHER: G����` SAMPLES TAKEN: TEMPERATURE: w crN TESTS REQUIRED: ^� SITE TIME START:CC i�� SITE TIME FINISH: D4 LUNCH PE TRAVEL TIME: _ VERIFIED BY: 1i/Ll / r F Ii V I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL N ESTIGATION RECOM CATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED ItNE DEFICIENCY REPORT 71 Signature Date of Report /i ICBG Certification Number Print Name City / County Certification Numher Corporate: San Diego/Imperial County: Inland Empil,.. 2992 E. La Palma Ave.. Ste. A 7313 Carroll Road, Suite G 14320 Elsworth Street, Ste. C 101 Anaheim. CA 92806 San Diego, CA 92121 Moreno Valley. CA 92553 Tel: 714.632.2999 Tel: 858.537.3999 Tel: 951.653.4999 Fax: 714.632.2974 Fax: 858.537.3990 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK ' _, INSPECTOR ❑ TECHNICIAN AVAIIAB E PROJECT NAME INSPECTION ADDRESS ADDRESS OF PROJECT REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAUMTGL SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NONCONFORMING WORK AT THE END OF THE WORK DAY. OR MISSING MTRS. AND RFIS. ETC.. FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY. YOURS OR A PREVIOUS INSPECTOR'S. IS CORRECTED. SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUB;NIITA COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): CONTRACTORS EQUIPMENT/ MANPOWER USED: . O AREA. GRID LINES. PIECES 08SERVED: STRUCTURAL NOTES. DETAIL. OR RFIS REMARKS, IMCLUD/ND MEE17MGS. WEATHER: TEMPERATURE: w 1�cr� SAMPLES TAKEN: 1 l \ c) RZ7-V J�� TESTS REQUIRED: SITE TIME START SITE TIME FINISH: LUNCH PERIOD. TRAVEL TIME: _ _ --- VERIFIED BY: _... I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS. AND /OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE. UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT Signature Dale of Report ICBO Certification Number Print Name City / County Certification Number Rev: 7/97 L SOIL REPORT (Y)(N) SPECS Q(N) ARChITEC i APPROVED PLANS®N) APPROVED SHOP DRAWING If)(N) ` . a. ` FOR WEEK ENDING 2 _. - PROJECT NO ENGINEER k j - _ REPORT NO. PG OF CONTRACTOR PLAN FILE NO. PERMIT NO. SUB-CONTRACTCR I C _ - PROJECT NAME INSPECTION ADDRESS ADDRESS OF PROJECT REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAUMTGL SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NONCONFORMING WORK AT THE END OF THE WORK DAY. OR MISSING MTRS. AND RFIS. ETC.. FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY. YOURS OR A PREVIOUS INSPECTOR'S. IS CORRECTED. SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUB;NIITA COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): CONTRACTORS EQUIPMENT/ MANPOWER USED: . O AREA. GRID LINES. PIECES 08SERVED: STRUCTURAL NOTES. DETAIL. OR RFIS REMARKS, IMCLUD/ND MEE17MGS. WEATHER: TEMPERATURE: w 1�cr� SAMPLES TAKEN: 1 l \ c) RZ7-V J�� TESTS REQUIRED: SITE TIME START SITE TIME FINISH: LUNCH PERIOD. TRAVEL TIME: _ _ --- VERIFIED BY: _... I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS. AND /OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE. UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT Signature Dale of Report ICBO Certification Number Print Name City / County Certification Number Rev: 7/97 SITE TIME START: __ ")i 1Z, LUNCH PERIOD. —_ SITE TIME FINISH: —4cn TRAVEL TIME: VERIFIED BY: .._._ I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS. SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE. UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT Signature Date of Report ICBG Certification Number Print Name City / County Certification Number Rev: 7/97 Corporate: San Diego/Imperial County: Inland Empi,-, 2992 E. La Palma Ave.. Ste. A 7313 Carroll Road. Suite G 14320 Elsworth Street, Ste. C101 Anaheim. CA 92806 San Diego, CA 92121 Moreno Valley. CA 92553 Tel: 714.632.2999 'rax: Tel: 858.537.3999 Tel: 951.653.4999 -e: 714.632.2974 Fax: 858.537.3990 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK `_.INSPECTOR G TECHNICIAN AVAILABLE: SOIL REPORT(Y)(N) SPECS 40(N) ARLFITECT APPROVED PLANS®IN) APPROVED SHOP DRAWING jY)(N! AL �v FOR WEEK ENDING 2-- Z '- PROJECT. NO ENGINEER S - REPORT NO. PG OF CONTRACTOR ` V PLAN FILE NO. PERMIT NO. SUB-CONTRACTCR e C �`� A•��uR PROJECT NAME INSPECTION ADDRESS M A \\. ADDRESS OF PROJECT SITE TIME START: __ ")i 1Z, LUNCH PERIOD. —_ SITE TIME FINISH: —4cn TRAVEL TIME: VERIFIED BY: .._._ I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS. SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE. UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT Signature Date of Report ICBG Certification Number Print Name City / County Certification Number Rev: 7/97 MTGL ice,; Corporate: 2992 E. La Palma Ave. ; milieim. CA 92806 el: 714.632.2999 Fax: 714.632.2974 San Diego/Imperial County Ste. A 7313 Carroll Road. Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Emph_ 14320 Elsworth Street. Ste. C 101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK INSPECTOR ❑ TECHNICIAN AVAILABLE SOIL REPORT Iv)(NJ SPECS 4D(N) APPROVED PLANS&y N) APPROVED SHOP DRAWING Yl N1 (FOR TARC�HlTECT WEEK ENDINGPROJECT. NO E:R REPORT NO. PG OF CONTRACTOR J \ \ v PLAN FILE NO. PERMIT No. SUBCONTRACTOR C ' - t�. PROJECT NAME INSPECTION ADDRESS ADDRESS OF PROJECT REQUIREMENTS: ICBO FIELD INSPECTION MANUAUNITGi- SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS THERE IS NON -CONFORMING WORKATTHE ENDOFTHEWORK [1,PORTING DAYOR MISSING MTRS.AND RFIS. ETC.. FILL OUT AND ATTACH A DEFICIENCY REPORT HEN A DEFICIENCY. YOURS ORA PREVIOUS INSPECTOR'S. IS CORRECTED. SO NOTE ON THE ORIGINAL DEFICIENCY REPORT SUBMITA COPY WITH YOUR WEEK'S REPORTS. AND ERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): Irk CONTRACTORS EQUIPMENT/ MANPOWER USED, AREA. GRID LINES, PIECES OBSERVED: STRUCTURAL NOTES. DETAIL. OR RFIS USED: REMARKS. INCLUDING MEEnNCS: REWORK AS : FR(NT OF ALL WORK TODAY WEATHER: ��+ mil` PERCENT PROJECT T CO epi ETION SAMPLES TAKEN: -C— TEMPERATURE: TESTS REQUIRED: -4EL— SITE TIME START:.._�C� LUNCH PERIOD. SITE TIME FINISH:O TRAVEL TIME: _. _ VERIFIED BY: I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS. AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE. UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT Signature Date of Report ICBO Certification Number �-L1LLIac �i i.% ._�atP Print Name City I County Certification Number Rev: 7/97 • 7 i Date Tested Nominal Size Actual Area (Sq. Inch) Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Type of Fracture 7 Tel: (714) 632-2999 Fax: (714) 632-2974 8 X 8 X 16 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 - N/A Tel: (858) 537-3999 Fax: (858) 537-3990 3/31/2006 8 X 8 X 16 58.60 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 N/A 28 3/31/2006 8 X 8 X 16 Tel: (909) 6534999 Fax: (909) 653-4666 1 162,750 1 2,770 N/A Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of. COMPRESSIVE STRENGTH -MASONRY PRISM ASTM C 1314 * * File No.: CITY OF LA QUINTA-BLDG & SAFETY Permit No.: 78495 CALLE TAMPICO Project No.: 3115I03 LA QUINTA, CA 92253 Project Name: MAJOR D MARKETPLACE @ LA QUINTA 79-190 HWY 111 @ ADAMS LA QUINTA, CA Client: THOMAS ENTERPRISES' Set No.: 6-1953 ` Age (Days) Date Tested Nominal Size Actual Area (Sq. Inch) Load (lbs.) Strength (psi) Type of Fracture 7 3/10/2006 8 X 8 X 16 58.60 128,270 2,190 N/A 28 3/31/2006 8 X 8 X 16 58.60 163,160 2,780 N/A 28 3/31/2006 8 X 8 X 16 58.75 1 162,750 1 2,770 N/A , Specified Strength: 2,500 - PSI Sampled By MICHAEL G. ASTM C172 Date Sampled: 3/3/2006 Date Received: 3/7/2006 Location: 6TH LIFT STOREFRONT PARAPIT Concrete Supplier: ASSOCIATED READY MIX Concrete Temp: 68 OF ASTM C1064 Mix No.: 46511 Ambient Temp: 70 OF ASTM C1064 Ticket No.: 3631152 Water added at Site: 0.00 gal. By Slump: 8.00 in. ASTM C143 Cement Type: Mix Time: 50 min. Tested at: Anaheim Remarks:. Respectfully Submitted, Distribution: THOMAS ENTERPRISES MTGL, Inc. VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** M.B. (Ben) Lo Chief Engineer 2780 PSI 28 -day compression`test complies with the specified strength. Corporate. - San Diego/Imperial County: inland Empi,.. Sie..ti , 3: 3 moll nOaU Suit�"' r � 1 -13 20 EIs!wOrth SirBet. Sir: ,A.92806 San Diego. CA 92121 /I:I' ilk Valley CA 92553 u Tel: 858.537.3999 Tel:' v p 532.297 ! c 951.653.1999 .r w-..... .L ar: 858.537.3990 fax 93. 653.4666 FIELD REPORT _iEfh(llC,4;l AVAILAaIE S"I�RE?r,RT,Y;!N �� _ SPE CS QtNI - ' � � �� �• �_.�. �-� �' r1 AFRO°LED PLAYS .R::; rr ;_ \...__. _ �No — --- APPRCVED SiiOP JRAwIVr: , ; 'Pit .- FOR WEEK ENOI:vG7—TP�OJICT NO -- -----------1-�� c v � _._. 1' • � jam. _ `� . r \ I ?_AN FILE :Nb. PERMIT NO. SU8-f,QN"RACTGR �^..-- . t1 PRCJECT NAME �'� A•�a�iCt iNSPE�=TION AC DRESS � Ar�• ADDRESS OF PROJECT • C ._ w \\ L A �- \' p HF:PORFI\'O RF:QUIRE\IENTS: ]('BO FIELD I\'SPF:CTIOK \t.,\VEAL/�ITGr SOIL :\IANL'AL- REVIEW PREVIOUS REPORTS AND LISTS II- THE:RI-: IS NON -CONFORMING \YORK AT THF EVD OFTHB WORK DAN'. OR, I ISSI\O SITRS. AND RI:IS. ETC.. EIE.L OUT AND ATTACH A DEFICIF:;\'CY REPORT WI -IFN A DI:I-*IYOURS ()R.-\ I'REVIOL'S INSPECTOR'S. IS CORRHCTFI). SO NOTEON THE ORIGINAI. DEFICIENCY RF:PORTAND SUBMIT A COPY" WITH YOL R WE:E.K'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS). � CON I MACTORS EQUIPMENT; MANPOWER USED. AREA. GRID LINES. PIECES OBSERVED: STRUCTURAL NOTES. OETAIL. CR RFIS USED: REMARKS. INCLUDING MEETINGS: WEATHER' // 2 <z C --<i "1% SAMPLES TA.KE!T. O l ter•;, - TESTS RECC:RE'J. Nz 'SITE TIME START �I �,r_ (�` � -- SITE TIME FINISH / LUNCH PERIOC TRAVEL ilAtE. DO VERIFIEC. By I �,cEi lir I' 1AT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND T'1AT THIS WORK COMPLIES WITH THED S I NVESTIGATION RECONIMEN ATIONS. ANO. OR i HE APPROVED PLANS SPECIFICATIONS AND .APPLICABLE SECTION' OF THE BUiLDING CODE. UNLESS OTHERWISE NOT"; DEFICIENCY � I TH_c „E�L,IENCY REPOR? r ICBG Certification Number ?rent 'd:Tnp------ -- -•- - ._ .,. ;,our•:;. ertnnaticr N.unber Corporate: San Diego/Imperial County: Inland Empii-. 2992 E. b Palma Ave.. Ste. A 7313 Carroll Road. Suite G 14320 Elsworth Street. Ste. C101 naneini. CA 92806 - San Diego, CA 92121 Moreno Valley. CA 92553 1z!" !.632.2999 Tel: 858.537.3999 Tel: 951.653.4999 Fax: 714 .632.2974 Fax: 858.537.3990 Fax: 951.6 ~' 53.4666 FIELD REPORT OF WORK INSPECTOR G TECHNICIAi•1 AVAILABLE. APPROVED PLANS�j ?P.CFIiECT FOR WEEK ENDING REPORT NO. uOFiRAC rCF PLAN FILE N0. SUB-CONTRACTORR SOIL REPDRT(y)(N) SPECS 40(N) Y) _ APPROVED SHOP DRAWING iY} IN) PROJECT. NO - P, \ OF ` PERMIT NO. C PROJECT NAME INSPECTION ACDRESS ADDRESS( PROJECT RF.PORTI\(: REQUIRENIENTS: ICBG FIELD INSPECTION -NIANUAL./NITGi. SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE: IS NON-CONFOR:\LINO; WORK ATTHE EVD OF THE WORK DAY. OR NIISSING NITRS. AND RFIS. ETC'.. FILL OUTAND,-\TLACH A DEFICIENCY REPORT WHEN A DFFICIFNC'Y. YOURS OR A PREVIOUS INSPECTOR'S. IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USFD BY CONTRACTOR (INCLUDE RESEARCH REPORT N0. OR MATERIAL TEST REPORTS): C l l a to _ -t t\ CONTRACTORS EQUIPMENT/MANPOWER AREA. GRID LINES. PIECES OBSERVED: c WENIIIIIIII"wa STRUCTURAL NOTES. DETAIL, OR RFIS USED: REMARKS. INCLUDING MEETINGS: WEATHER: (1\, p TEMPERATURE' r SAMPLES TAKEN: - TESTS REQUIRED. - H LLUNCTH'MPE'RIOD. START. .1C�_ t�r� _ SITE TIME FINISH: TRAVEL TIME:.__.__.._. _...__ VERIFIED BY: I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVE IGATION RECOMMENDATIONS. AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT /�!/3�3/./ �� _ice/-��-...� l ' •-• Signature Date of Report sop. IC80 Certification Number r Print Name City J County Certification Number Rev' 7/97 :NSr,C IO? I_TE%riIIClAdi 7 rh SUB-CON'RAC?CP INSPECTION ACORESS FIELD REPORT AVAILA?LE SOIL P. EPF* --. aP'ROVED PL?N5 A71 FOR WEEK ENDING PLAN FILE .VO PROJECT NAME ADDRESS OF SPECS (!2:N) APPRCVED SMCP DRAWIN(: jv.N; PROJECT NO \ OF PERMIT N0. �' �i\ PROJECT L A '• �FP �OU mow•P\(; HEQCII:�IE\'"I :ti: I('BO FIELD I\;SPCTIL/�1TGOIL A1ANL:1L-kEEPUHTS:\�DLISTSIPrHliklIti00\RTTHE�D OF'THE �Y'ORK DAY'.0k SIISSIG \ITRSA\D kP15ETC.. F'ILI-OUT -\U ATT.ICFI.APORT YY'flli\:\ I)I:EICY". YOl'kS l)k.A PkEVIOUS INSPECTOk'S. IS C') TF.D. SO:\0TE O\ THF:ORIGI\°:\L UFFICIE\Cl' kFPORT:\\'O SL'I(>IIT:YN'HIiK'S REPORTS. MATERIALS USED SY CONTRACTOR pNCLUDE RESEARCH REPORT No. OR MATERIAL TEST REPORTS): to :ka N� C` �,�� CONTRACTORS EQUIPMENTr MANPOWER AREA. GRID LINES. PIECES OBSERVED: STRUCTURAL NOTES. DETAIL, CR RFIS USED: —v q�� :%.:,: REMARKS. INCLUOfNC AIEETTNGS: A� WEATHER SAMPLES TAKEN--Fj-• i EFd PERA?URE IESTS RF0-,!RFO tt 1 S ITESITE TIME FINISH TRAVEL 7 VER L IME: ... -. — EIEC {, —..— - .... I DO-PTIF'f THA I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE ANO. OA THE .arPFI;VE^ SPECIFICATIONS AND APPLICABLE SECTInN 4BOV_ AND THAT THIS WORK COMP! IES WITH THE SOIL INVE IGATION RECOMMENDATIOAS, PLANS F THE BUILDi, L- LODE. UNLESS OTHERWISE F:OTED IN .rc DEFICIENCY P,EPORT r�•-',rl' •- r' 'CBO Certificallon Number --- ;P' , Count}' Cerllflrallon Numher Corporate _!J" San Diego/Imperial County: Inland Em I, VIII I AV: . Ste A ;t'.;n•;I;I. r A. 92306 73'•3 Carroll Road SUile u p q. ;�, -•-ZO ElsvJor;h Sire I. S ri C:�I - 0>22999 gall Diego. CA 9212; p - 3 T21. 3Sb.5J/. 999 I ='n-' 'Valle! CA 92553 Tel. 951.653.1999 ;:.... _�......_1.-._..n:�. 632.297 Fax: 355.537.3990 c , g_ x: .,1 653 4666 :NSr,C IO? I_TE%riIIClAdi 7 rh SUB-CON'RAC?CP INSPECTION ACORESS FIELD REPORT AVAILA?LE SOIL P. EPF* --. aP'ROVED PL?N5 A71 FOR WEEK ENDING PLAN FILE .VO PROJECT NAME ADDRESS OF SPECS (!2:N) APPRCVED SMCP DRAWIN(: jv.N; PROJECT NO \ OF PERMIT N0. �' �i\ PROJECT L A '• �FP �OU mow•P\(; HEQCII:�IE\'"I :ti: I('BO FIELD I\;SPCTIL/�1TGOIL A1ANL:1L-kEEPUHTS:\�DLISTSIPrHliklIti00\RTTHE�D OF'THE �Y'ORK DAY'.0k SIISSIG \ITRSA\D kP15ETC.. F'ILI-OUT -\U ATT.ICFI.APORT YY'flli\:\ I)I:EICY". YOl'kS l)k.A PkEVIOUS INSPECTOk'S. IS C') TF.D. SO:\0TE O\ THF:ORIGI\°:\L UFFICIE\Cl' kFPORT:\\'O SL'I(>IIT:YN'HIiK'S REPORTS. MATERIALS USED SY CONTRACTOR pNCLUDE RESEARCH REPORT No. OR MATERIAL TEST REPORTS): to :ka N� C` �,�� CONTRACTORS EQUIPMENTr MANPOWER AREA. GRID LINES. PIECES OBSERVED: STRUCTURAL NOTES. DETAIL, CR RFIS USED: —v q�� :%.:,: REMARKS. INCLUOfNC AIEETTNGS: A� WEATHER SAMPLES TAKEN--Fj-• i EFd PERA?URE IESTS RF0-,!RFO tt 1 S ITESITE TIME FINISH TRAVEL 7 VER L IME: ... -. — EIEC {, —..— - .... I DO-PTIF'f THA I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE ANO. OA THE .arPFI;VE^ SPECIFICATIONS AND APPLICABLE SECTInN 4BOV_ AND THAT THIS WORK COMP! IES WITH THE SOIL INVE IGATION RECOMMENDATIOAS, PLANS F THE BUILDi, L- LODE. UNLESS OTHERWISE F:OTED IN .rc DEFICIENCY P,EPORT r�•-',rl' •- r' 'CBO Certificallon Number --- ;P' , Count}' Cerllflrallon Numher CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIFI n RFPnRT Inland Empire 14320 Elsworth Street. Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (1) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (`n ARCHITECT Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 04/01/2006 PROJECT NO. 3115103 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NC 5 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-3261 SUB -CONTRACTOR: Portola Construction, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Major 'D' Office Max INSPECTION ADDRESS: 79-190 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-190 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBG FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND FIRS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODE: SMAW E-7018, FCAW NR232 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln SAE 350 AREA, GRIDLINES, PIECES OBSERVED: Items Completed: (1) Welding of the beam to column moment connections at lines 13.5/M3 & 13.5/N on the roof level. (2) Welding of the tube steel to the top flange of the beams on line 13.5/L.6 to N.9 on the roof level. (3) Welding of the entire seismic sway bracing angles from the bottom cord of the roof joists to the bottom cord of the roof girders from line 1 to 13 between lines K & P. STRUCTURAL NOTES, DETAIL, OR RAS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: n/a TEMPERATURE: 69 Deg. F TESTS REQUIRED: n/a SITE TIME START: 12:30 PM SITE TIME FINISH: 4:30 PM LUNCH PERIOD: none TRAVEL TIME: VERIFIED BY - �• • •• • • •r • • • ­ V —W—LL, v00crwr_U rLL Ur i Mt: wUKK LIS I LU A130VF AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS. AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 03/31/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Fin n RFP[1RT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT m (N) SPECS. (Y) APPROVED PLANS m APPROVED SHOP DRAWINGS (1') ARCHITECT Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 04/01/2006 PROJECT NO. 3115103 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NC 5 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO.PERMIT NO. 05-3261 SUB -CONTRACTOR: Portola Construction, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Major'D' Office Max INSPECTION ADDRESS: 79-190 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-190 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICSO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODE: SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln SAE 350 AREA, GRIDLINES, PIECES OBSERVED: Items Completed: Welding of the steel channels to the top cords of the roof joists at the AC units on lines 4/L.6 & 11.6, 7/K.6 and 10/L.6 & 11.6. STRUCTURAL NOTES, DETAIL, OR RAS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: n/a TEMPERATURE: 74 Deg. F TESTS REQUIRED: n/a / , SITE TIME START: 8:00 AM SITE TIME FINISH: 11:00 AM . LUNCH PERIOD: none TRAVEL TIME: ly VERIFIED BY , --- -- • `�• • • •• • • • •-. • • • •�� �- L�JV LL I VOJCRV CU ALL UI' i nE VVL)KK us I ED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS: AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 04/01/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT Type Of Work X INSPECTOR TECHNICIAN AVAILABLE: SOIL REPORT m (N) SPECS. (Y) SSW APPROVED PLANS m APPROVED SHOP DRAWINGS m ARCHITECT Smith Consulting Architects FOR WEEK ENDING 04/01/2006 1 PROJECT NO. 3115K03 12220 EI Camino Real Suite 200 . San Diego, CA 92130 'ENGINEER: CSSI REPORT NC 2 PG 1 OF 1 2445 Fifth Street Suite 300 San Diego, CA 92102 CONTRACTOR: Vratsinas Construction Co. PLAN FILE NO. PERMIT NO. 05-3259 P.O. Box 2558 Little Rock, AR 72203 SUB -CONTRACTOR: Portola Construction, Inc. PROJECT NAME: MAJOR V Drexel Heritage 10722 Edison Court Rancho Cucamonga, CA 91730 INSPECTION ADDRESS: 79-150 Highway 111 ADDRESS OF PROJECT: 79-150 Highway 111 La Quinta, CA I La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS) WELDING ELECTRODE: SMAW E-6022 ICONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Miller Big Blue 302P, Lincoln Classic 300D AREA, GRIDLINES, PIECES OBSERVED: In Progress: Puddle welding of the metal roof decking. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: n/a TEMPERATURE: 69 Deg. F TESTS REQUIRED: n/a I SITE TIME START: 9:30 AM SITE TIME FINISH: 12:30 PM ll A? LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: VERIFIED BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. o -el, 0849264-85 Signature ICBO Certification Number Steve W: Bodnar 03/31/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE ?• 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT Type Of Work X INSPECTOR TECHNICIAN AVAILABLE: SOIL REPORT m (N) SPECS. (Y) SSW APPROVED PLANS m APPROVED SHOP DRAWINGS m ARCHITECT Smith Consulting Architects FOR WEEK ENDING 04/01/2006 1 PROJECT NO. 3115K03 12220 EI Camino Real Suite 200 . San Diego, CA 92130 'ENGINEER: CSSI REPORT NC 2 PG 1 OF 1 2445 Fifth Street Suite 300 San Diego, CA 92102 CONTRACTOR: Vratsinas Construction Co. PLAN FILE NO. PERMIT NO. 05-3259 P.O. Box 2558 Little Rock, AR 72203 SUB -CONTRACTOR: Portola Construction, Inc. PROJECT NAME: MAJOR V Drexel Heritage 10722 Edison Court Rancho Cucamonga, CA 91730 INSPECTION ADDRESS: 79-150 Highway 111 ADDRESS OF PROJECT: 79-150 Highway 111 La Quinta, CA I La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS) WELDING ELECTRODE: SMAW E-6022 ICONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Miller Big Blue 302P, Lincoln Classic 300D AREA, GRIDLINES, PIECES OBSERVED: In Progress: Puddle welding of the metal roof decking. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: n/a TEMPERATURE: 69 Deg. F TESTS REQUIRED: n/a I SITE TIME START: 9:30 AM SITE TIME FINISH: 12:30 PM ll A? LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: VERIFIED BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. o -el, 0849264-85 Signature ICBO Certification Number Steve W: Bodnar 03/31/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street. Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) SPECS. m SSW APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (1) ARCHITECT Smith Consulting Architects FOR WEEK ENDING 04/01/2006 PROJECT NO. 31151K03 12220 EI Camino Real Suite 200 San Diego, CA 92130 ENGINEER: CSSI REPORT NC 1 PG 1 OF 1 2445 Fifth Street Suite 300 San Diego, CA 92102 CONTRACTOR: Vratsinas Construction Co. PLAN FILE NO. PERMIT NO. 05-3259 P.O. Box 2558 Little Rock, AR 72203 SUB -CONTRACTOR: Portola Construction, Inc. PROJECT NAME: MA.IOR V Drexel Heritage 10722 Edison Court Rancho Cucamonga, CA 91730 INSPECTION ADDRESS: 79-150 Highway 111 ADDRESS OF PROJECT: 79-150 Highway 111 La Quinta, CA La Quinta, CA KLVORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS) WELDING ELECTRODES SMAW E-6022 CONTRACTORS EQUIPMENT/ MANPOWER USED: WELDING MACHINE: Lincoln Classic 300D, Miller Big Blue 302P AREA, GRIDLINES, PIECES OBSERVED: In Progress: Puddle welding of the metal roof decking. ISTRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: n/a TEMPERATURE:.. 77.DegF--___,.,________•-,___„__..—..__TESTS.REQUIRED_______ Na_________�..._-.•-._--•---.._..___. _..._._-- _-- SITE TIME START: 1:30 PM SITE TIME FINISH: 5:00 PM LUNCH PERIOD: none TRAVEL TIME: VERIFIED BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS. AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. �• 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 03/30/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number M CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIFI n RFPnRT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW' AVAILABLE: SOIL REPORT (Y) (N) SPECS. (1) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 04/01/2006 PROJECT NO. 3115J03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NC 1 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-3259 SUB -CONTRACTOR: Portola Construction, Inc. 10722 Edison Court ' Rancho Cucamonga, CA 91730 PROJECT NAME: SHOP 3 FaRlous Footwear INSPECTION ADDRESS: 79-150 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-150 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODE: SM AW E-7018 CONTRACTORS EQUIPMENT/ MANPOWER USED: WELDING MACHINE: Lincoln SAE 350 AREA, GRIDLINES, PIECES OBSERVED: Items Completed: (1) Welding of mthe steel tubes between the roof'oists and wall embed on line E/4 to 6. (2) Welding of the metal roof decking support frames at the AC units on lines 5?B.3 and 9/A.9. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: n/a TEMPERATURE: 77 Deg. F TESTS REQUIRED: n/a SITE TIME START: 7:00 AM SITE TIME FINISH: 11:00 AM . . 2 24 LUNCH PERIOD: none TRAVEL TIME: VERIFIED BY F-9- - 1 r V C Vr-M0VPI/iLL T VDJtKVtU ALL VI' I ME WUKK LIS IED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 03/28/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 F1Fi n RFP()RT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (`t) ARCHITECT Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 04/01/2006 PROJECT NO. 3115J03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NC 1 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-3259 SUB -CONTRACTOR: Portola Construction, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: SHOP 3 Fatuous Footwear INSPECTION ADDRESS: 79-150 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-150 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODE: SMAW E-7018 CONTRACTORS EQUIPMENT/ MANPOWER USED: WELDING MACHINE: Lincoln SAE 350 AREA, GRIDLINES, PIECES OBSERVED: Items Completed: (1) Welding of mthe steel tubes between the roof joists and wall embed on line E/4 to 6. (2) Welding of the metal roof decking support frames at the AC units on lines 5?B.3 and 9/A.9. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: n/a TEMPERATURE: 77 Deg. F TESTS REQUIRED: n/a -17 SITE TIME START: 7:00 AM SITE TIME FINISH: 11:00 AM LUNCH PERIOD: none TRAVEL TIME: VERIFIED BY I DV BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. ' 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 03/28/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number N 'S'�'•n Corporate: 2992 E. La Palma Ave. Ananeim. CA 92806 Tel: 714.632.2999 Fax: 711 4.632.2974 San Diegoilmperial County Ste. A 7313 Carroll Road. Suite G San Diego. CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Empil,,. 14320 Elsworth Street, Ste. C101 Moreno Valley. CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT "!PE OF WORK MbPECIOR 0 TECHNICIAN AVAILABLE SOIL REPORT (Y)IN! SPECS Q(N) APPROVED ARCHITECT ^ P.LANSd!�(N) APPROVED SHOP DRAWING (Y) (N) r FOR WEEK ENDING PROJECT N0. _ C� REPORT NO. PG OF L�N:RA„•OF Y v PLAN FILE NO. PERMIT NO. -- SUB-CON'RACIOR C C`, A•���R PROJECT NAME (M. R..� INSPECTION ACDRESS 1 •• � ' d -- w 'Lit LA •, ADDRESS OF PROJECT — �- � �!w' , \\ � -- �' •P. REPORTING REQCIR—NIENTS: ICBG FIELD INSPECTION \1ANUAL/MTGL SOIL NiANUAL — REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON-CONFOR\11NC; WORK AT THE END OFTHE WORK DAY. OR MISSING NITRS. AND RFIS. ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY. YOURS OR A PREVIOUS INSPECTOR'S. IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY SUBMIT A COPY \PITH YOUR WEEK -S REPORTS. RFPORT AND MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT N0. OR MATERIAL TEST REPORTS): s CONTRACTORS EQUIPMENT/ MANPOWER US Z— Ai�1 h AREA. GRID LINES. PIECES OBSERVED: VAC' S t> M°.x STRUCTURAL NOTES. DETAIL. OR RFIS USED: REMARKS. INCLUDING NEETINGS: REWORK AS PERCENT 0: ALLWORK TODAY' WEATHER\�' .��` . p Rf FNT PRn IFrT rn�npl GTlnnl SAMPLES TAKEN: •--�-• ' TEMPERATURE TESTS REOUIRED �_ SITE TIME START SITE TIME FINISH:G LUNCH PERIOD —------.—_ TRAVEL TIME:.__._.. ----- _— VERIFIED BY: I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE S0�INVEIGATION R�ECOMME�ND�S. AND ,'OR THE APPROVED PLANS. SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE. UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT Signature Print Name Date of Report ICBO Certification Number City; County Certification Number Corporate: 2992 E. La Palma Ave 4113116-n, CA 92806 Fel. 71.1.632.2999 Fax: 714.632.2974 San Diego/Imperial County: Ste. A 7313 Carroll Road. Suite G San Diego. CA 92121 Tel: 858.537.3999 - Fax: 858.537.3990 Inland Empil,,. 14320 Elsworth Street, Ste. 0101 Moreno Valley. CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT "rPE OF WORK ' ,: INSPECTOR. GTECHNICIAN '\ P, AVAILABLE SOIL REPORT iYj!W SPECS <D(N) y -� ' ,-I, ARCWTECT APPROVED APPROVED PLANS NI APPROVED SHOP DRAWING (Y) fN) �' �' i ` (i ----•. Lie Fy� \ i `� jV.\� \ 1\r-� FOR WEEK ENDING 2 " Q PROJECT. N0. e° r ENGIkEEP. ---- 4 REPORT NO. PG Of ` CONTRACTOR PLAN FILE NO PERMIT NO. - SUBCONTRACTOR C PROJECT NAME INSPECTION ADDRESS 1 ' Q - w �i\ LA ', ADDRESS OF PROJECT �- �" mow' \\ .• REPORTING REQCIREAIEN'TS: ICBG FIELD INSPECTION NIANLIAUMTGI SOIL ?-,1ANUAL - REVIEW PREVIOUS REPORTS AND LISTS IFTHERE IS NON -CONFORMING \YORK AT THE END OFTHE WORK DAY. OR ,MISSING NITRS, AND RFIS. ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY. YOURS OR A PREVIOUS INSPECTOR'S. IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY" WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): �t��__ � � l � a to 5� r•� -S�� � � e S �-����.�.� CONTRACTORS EQUIPMENT; MANPOWER USE AREA, GRID LINES. PIECES OBSERVED: Y ZOO S Z�Eb STRUCTURAL NOTES DETAIL OR FIRS USED REMARKS. INCLUDING MEETINGS: ��� U�`SOC � C.1�) O ��•�j fiEWORK AS PERCENT OF ALL WORK TODAY' P R FNT PRO ECT COMP) FTlnnt WEATHERJ� SAMPLES TAKEN: l � Y S TEMPERATURE: �J TESTS REQUIRED. SITE TIME START SITE TIME FINISH:GG. LUNCH PERIOD TRAVEL TIME:._-_.. -------- VERIFIED BY. _ I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL IN STIGATION RECOMMENDATIONS. AND OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION of THE BUILDING CODE. UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT /�6fY•�i/./ _ -''ice/ •��- .c - Signature Print Name Z i Date of eponl 0� ����� ��,�•. &A ICBO Certification Number City i County Certification Number .i.::4wlwlr2 } MTG� Corporate: 2992 E. La Palma Ave., Ste Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego/Imperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 -ll Inland Empit,.. 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK INSPECTOR O TECHNICIAN AVAILABLE. SOIL REPORT (Y) (N) SPECS 3(N) APPROVED PLANSCUN) APPROVED SHOP DRAWING (Y) (N ARCHITECT FOR WEEK ENDING �• x PROJECT. N0. � ENGINEER REPORT NO. PG OF CONTRACTOR ' I PLAN FILE NO. PERMIT NO. SUB -CONTRACTOR v PROJECT NAME INSPECTION ADDRESS ADDRESS OF PROJECT REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAUMTGL SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END,OFTHE WORK DAY. OR MISSING MTRS. AND RFIS. ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S. IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): CONTRACTORS EQUIPMENT/MANPOWER USED 2, AREA. GRID LINES. PIECES OBSERVED: v-1 STRUCTURAL NOTES. DETAIL. OR RFIS USED: REMARKS. INCLUDING NEETINGS: REWORK AS PERCENT OF ALL WORK TODAY P RCFNT PRO IFCI CO ncl ETIOM WEATHER: ���n` SAMPLES TAKEN: TEMPERATURE:�Cr.\ TESTS REQUIRED: Pig SITE TIME START:.___1CC t��� SITE TIME FINISH: ?-'OCN S� _ LUNCH PERIOD: TRAVEL TIME: _ VERIFIED BY: _ � nn r�nrry z 1 HAI i nNvc FERSONALLY OBSERM ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVE IGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT Signature 50200( S- Sy Date of Report ICBO Certification Number Print Name City / County Certification Number FIELD REPORT 'e PE OF WORK 'WSPECT:R C- TECHNICIAN AVAILABLE SGIL REPORT jY) iN! sP,i;f,l � �` T— \ `�-• APPROVED PLANS] NI n FOR WEEK ENDING I—' C! �_ REPORT NO. PG PLAN FILE NO. SUB -CONTRACTOR INSPECTION ADDRESS PROJECT NAME ADDRESS OF PROJECT �- \ SPECS 4M(N) APPROVED SHOP DRAWING iY) PROJECT. NO. OF \ PERMIT NO. — w REPORTING REQCIRENIENTS: ICBG FIELD INSPECTION NIANUAL/MTCI. SOIL,NIANUAL - REVIEWPREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK ATTHE END OF THE WORKDAY. OR NIISSING NITRS. AND RFIS. ETC.. FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY. YOURS ORA PREVIOUS INSPECTOR'S. IS CORRECTED. SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUB\IIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): YY �C�in z N (' �\ M l t , -, S't N\ ��.fine i-...rLA,n CONTRACTORS EQUIPMENT MANPOWER USED: AREA. GRID LINES. PIECES OBSERVED: STRUCTURAL NOTES. DETAIL. OR RFIS USED. REMARKS. INCLUDING MEETINGS: C WEATHER TEMPERATURE: S/, SAMPLES TAKEN: O S�T Q� TESTS REQUIRED: C®� SITE TIME START _� r' ..� _ SITE TIME FINISH:GG_ LUNCH PERIOD TRAVEL TIME:.__._. . ------ --- VERIFIED BY. _ I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE S I NVESTIGATION RECOMMEN ATIONS. AND: OR THE APPROVED PLANS. SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE. UNLESS OTHERWISE NOTED I THE DEFICIENCY REPORT , Signature Z C�r�C (, ,•-•,\ Dale of Report ICBO Certification Number Print Name City i County Certification Number Corporate: San Diego/Imperial County: Inland Empil,,. \ 2992 F. La Palma Ave.. Ste. A 7313 Carroll Road. Suite G 14320 Elsworth Street. Ste. C101 Ananeion. CA 92806 Te 1. 714.632.2999 San Diego. CA 92121 Tel: 858.537.3999 Moreno Valley. CA 92553 Tel: 951.653.4999 4, Fax: 711.632.2974 Fax: 858.537.3990 fax: 951.653.4666 FIELD REPORT 'e PE OF WORK 'WSPECT:R C- TECHNICIAN AVAILABLE SGIL REPORT jY) iN! sP,i;f,l � �` T— \ `�-• APPROVED PLANS] NI n FOR WEEK ENDING I—' C! �_ REPORT NO. PG PLAN FILE NO. SUB -CONTRACTOR INSPECTION ADDRESS PROJECT NAME ADDRESS OF PROJECT �- \ SPECS 4M(N) APPROVED SHOP DRAWING iY) PROJECT. NO. OF \ PERMIT NO. — w REPORTING REQCIRENIENTS: ICBG FIELD INSPECTION NIANUAL/MTCI. SOIL,NIANUAL - REVIEWPREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK ATTHE END OF THE WORKDAY. OR NIISSING NITRS. AND RFIS. ETC.. FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY. YOURS ORA PREVIOUS INSPECTOR'S. IS CORRECTED. SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUB\IIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): YY �C�in z N (' �\ M l t , -, S't N\ ��.fine i-...rLA,n CONTRACTORS EQUIPMENT MANPOWER USED: AREA. GRID LINES. PIECES OBSERVED: STRUCTURAL NOTES. DETAIL. OR RFIS USED. REMARKS. INCLUDING MEETINGS: C WEATHER TEMPERATURE: S/, SAMPLES TAKEN: O S�T Q� TESTS REQUIRED: C®� SITE TIME START _� r' ..� _ SITE TIME FINISH:GG_ LUNCH PERIOD TRAVEL TIME:.__._. . ------ --- VERIFIED BY. _ I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE S I NVESTIGATION RECOMMEN ATIONS. AND: OR THE APPROVED PLANS. SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE. UNLESS OTHERWISE NOTED I THE DEFICIENCY REPORT , Signature Z C�r�C (, ,•-•,\ Dale of Report ICBO Certification Number Print Name City i County Certification Number MTGL Corporate: 2992 E. La Palma Ave., Ste. A Anaheim, CA 92806 - Tel: 714.632.2999 Fax: 714.632.2974 San Diego/Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Empii- 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK ' INSPECTOR OTECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) SPECS �M(N) L C-" n ARCHITECT APPROVED PLANSi9 (N) APPROVED SHOP DRAWING (Y) (N) - .,x• FOR WEEK ENDING PRQJECT. N0. � ••�». = - 2-- - C) � \ S .ENGINEER REPORT N0. PG OF y CONTRACTOR PLAN FILE N0. PERMIT N0. SUBCONTRACTOR e ~ c k-,\ PROJECT NAME k-\ MA� INSPECTION ADDRESS ADDRESS OF PROJECT ck- REPORTING REQUIRENIENTS: [CBO FIELD INSPECTION MANUAUMTGL SOIL MANUAL- REVIEW PREVIOUS REPORTS AND LISTS IF THERE'IS NON -CONFORMING WORK AT THE END OF THE WORK DAY. OR MISSING MTRS. AND RFIS. ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED. SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): CONTRACTORS EQUIPMENT/ MANPOWER USED: \? I AREA. GRID LINES, PIECES OBSERVEC,—, ` � �� `21•� r0. �'•. �1 \�' \ �=� � �� -�c �.��...�- STRUCTURAL NOTES. DETAIL, OR RFIS USED: REMARKS. INCLUDING MEEnMGS, C REWORK AS PERCENT OF ALL WORK TODAY PERCENT PROJECT Q MP GTIM WEATHER: \�a�l` SAMPLES TAKEN: TEMPERATURE: TESTS REQUIRED: ^- SITE TIME START: __�C '.\ SITE TIME FINISH: OG LUNCH PERIOD: TRAVEL TIME: VERIFIED BY: _ -w ,Ani it r i nAi i HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOILYE ESTIGATION RECON DATIONS. AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN DEFICIENCY REPORT Signature — D ate of Report Print Name ICBG Certification Number City / County Certification Number Corporate: 2992 E. La Palma Ave., Ste. A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego/Imperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Emph... 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK INSPECTOR O TECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) SPECS(MN) APPROVED PLANS&N) APPROVED SHOP DRAWING (Y) (N) ARCHITECTy� `,lei` i ``�<5 FOR WEEK ENDING C-� `V117 PROJECT. NO. \ \ r ENGINEER REPORT NO. PG OF CONTRACTOR � PLAN FILE NO. PERMIT N0. ��- SUBCONTRACTOR �L\ PROJECT NAME o.° c� 2 INSPECTION ADDRESS '12"A-k.11 ADDRESS OF PRAJECT REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAUMTGL SOIL MANUAL — REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE \RESEARCH REPORT NO.. OR� MATERIAL TEST REPORTS): CONTRACTORS EQUIPMENT] MANPOWER USC\ AREA, GRID LINES. PIECES OBSERVED' y-) ta\ , S ������•.^� l \lam\�� C.hL� �Q... S�LA�\f��.`.�� p /^C�J�iv'���-�+�L STRUCTURAL NOTES. DETAIL. OR RFIS USED: PSV l�5 6 REMARKS, INCLUDING MEETINGS: t REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: U. TEMPERATURE: SAMPLES TAKEN: TESTS REQUIRED: $� SITE TIME START: LUNCH PERIOD: SITE TIME FINISHS�b TRAVEL TIME: VERIFIED BY: I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE S AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED Signature Date of Report Print Name 9NVESTIGATION RECOMMENDATIONS, THE DEFICIENCY REPORT ICBO Certification Number City / County Certification Number Rev: 7/97 tr'kti['A%3.�ri �xyMTG� �j Corporate: 2992 E. La Palma Ave., Ste. A Anaheim, CA 92806 Tel: 71=1.632.2999 Fax: 714.632.2974 San Diego/Imperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 1 Inland Empil,,. 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK ' INSPECTOR O TECHNICIAN �- Q. AVAILABLE: SOIL REPORT (Y) (N) SPECS ®(N) APPROVED PLANS�9 {N) APPROVED SHOP DRAWING (Y) (N) ARCHITECT FOR WEEK ENDING PROJECT N0. ENGINEER REPORT NO. PG ; OF ` 1 CONTRACTOR PLAN FILE NO. PERMIT NO. SUB -CONTRACTOR PROJECT NAME r-\ A INSPECTION ADDRESS ADDRESS OF PROJECT REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAUMTGi. SOIL MANUAL- REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OFTHE WORK DAY. OR MISSING MTRS. AND RFIS. ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY. YOURS OR A PREVIOUS INSPECTOR'S,'IS CORRECTED. SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): Y A - E --z CONTRACTORS EQUIPMENT / MANPOWER USED. AREA. GRID LINES. PIECES OBSERVED: -X 'tom �� \,• ii \ �� o n w � i�\:�� �\vim,..-_ �I � : "-.•-2k �- �e�.,--�� "����,y-cus C..Q `� STRUCTURAL NOTES. DETAIL. OR RFIS USED i REMARKS.IMCLUD/MG MEE7IMGS- REWORK AS PERCENT OF ALL WORK TODAY* PERCENT PROJECT COMPI ETIOM WEATHER:\L♦ �j�` SAMPLES TAKEN: TEMPERATURE: TESTS REQUIRED: SITE TIME START: �._I.CC-i3C�_�..____ SITE TIME FINISH: -aOr s--\ — \71V4'7� LUNCH PERIOD: TRAVEL TIME: __ VERIFIED BY: __ I UU L to I II -Y 1 HAI 1 HAVt PtRSUNALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVfOIGATION RECOMMENDAI IONS. AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE EFICIENCY REPORT Signature Dale of Report ICBG Certification Number Print Name City / County Certification Number