05-0303 (CSCS) Field ReportIm CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Or Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS m ARCHITECT Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING PROJECT NO. 3115E03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO. PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-303 SUB -CONTRACTOR: Portola Construction, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Pad 3 INSPECTION ADDRESS: 79-174 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-174 Highway 111 I La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND FIRS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES: SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Miller Trailblazer 301G AREA, GRIDLINES, PIECES OBSERVED: Items Completed: Welding of the steel buckets on the tube steel'columns to accept the wood beams at the storefront. (10) buckets total. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: n/a TEMPERATURE: 79 Deg. F TESTS REQUIRED: n/a SITE TIME START: 7:00 AM SITE TIME FINISH: 3:30 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: (VERIFIE6 BY I uU t5Y UtK I It -Y I NA I I HAVE NEKNUNALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. p 0849264-85 Signature ICBG Certification Number Steve W. Bodnar 04/11/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number �t MTG�h� CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Ellsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (1) (N) SPECS. (Y) APPROVED PLANS m APPROVED SHOP DRAWINGS m ARCHITECT Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 04/15/2006 PROJECT NO. 3115L03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO. 1 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-273 SUB -CONTRACTOR: Portola Construction, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: SHOP 2 INSPECTION ADDRESS: 79-070 Highway 11.1 La Quinta, CA ADDRESS OF PROJECT: 79-070 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODE SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Miller Trailblaier 301 G AREA, GRIDLINES, PIECES OBSERVED: Items Completed: Welding of the knife plate between the top cord of the roof girders on line 13/2. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: n/a TEMPERATURE: 80 Deg. F TESTS REQUIRED: Na SITE TIME START: 7:00 AM SITE TIME FINISH: 11:00 AM LUNCH PERIOD: none TRAVEL TIME: WERIFIED BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 T Signature ICBO Certification Number Steve W. Bodnar 04/10/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS M APPROVED SHOP DRAWINGS (Y) ARCHITECT Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 04/15/2006 PROJECT NO. 31151-03 1 . ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO. 2 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PE RMIT NO. 05-273 SUB -CONTRACTOR: Portola Construction, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: SHOP 2 INSPECTION ADDRESS: 79-070 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-070 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODE: SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Miller Trailblazer 301 G AREA, GRIDLINES, PIECES OBSERVED: Stand By Time. Steel erector could not access the area to work in. STRUCTURAL NOTES, DETAIL, OR RAS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: Na TEMPERATURE: 85 Deg. F TESTS REQUIRED: n/a SITE TIME START: 7:00 AM SITE TIME FINISH: 11:00 AM LUNCH PERIOD: none TRAVEL TIME: ERIFIED BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. iW11 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 04/12/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 _. Type Or Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (1) (N) SPECS. (Y) APPROVED PLANS (1) APPROVED SHOP DRAWINGS m ARCHITECT Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 04/15/2006 PROJECT NO. 31151-03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO. 3 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05 273 SUB -CONTRACTOR: Portola Construction, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: SHOP 2 INSPECTION ADDRESS: 79-070 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-070 Highway 111 - - La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODE: SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Miller Trailblazer 301G AREA, GRIDLINES, PIECES OBSERVED: In Progress: Welding the ends of the top cord of the roof joists to the top cord fo the roof girders along line 2, STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY:. PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: n/a TEMPERATURE: 79 Deg. F TESTS REQUIRED: n/a SITE TIME START: 7:00 AM SITE TIME FINISH: 3:30 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: V IED BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 04/13/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: I SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 02/2512006 PROJECT NO. 3115E03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO 1 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-303 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Pad 3 INSPECTION ADDRESS: 79-174 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-174 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: (CBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 & E-6022 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln SAE -350 AREA, GRIDLINES, PIECES OBSERVED: Items Completed: (1) Welding of the entire C6x10.5 channels to the top cord of the roof trusses and roof joists from line A to E between lines 1 & 3. (2) Puddle.welding and side seam punch locking of the entire metal roof decking from line A to E between lines 1 & 3. STRUCTURAL NOTES, DETAIL, OR RFIS USED: _ (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: n/a TEMPERATURE: 70 deg. F TESTS REQUIRED: n/a SITE TIME START: 11:30 AM SITE TIME FINISH: 4:30 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: VERIFIED BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK GUMI LIt5 VVI I H THE SOIL INVESTIGATION RECOMMENDATIONS, AND I OR THE APPROVED -PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 2(/ 0849264-85 Signature ICBO Certification Number Steve W. -Bodnar 02/22/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego I Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects' 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 02/25/2006 PROJECT NO. 3115E03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO 2 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-303 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME:. Pad 3 INSPECTION ADDRESS: 79-174 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-174 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBG FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018. CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln SAE -350 AREA, GRIDUNES, PIECES OBSERVED: Items Completed: Welding of the seismic sway bracing angles at the bottom cords of the roof joists to the roof girder joists on lines 2/A.5 , B.5 , C.5 & D.5./ STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: n/a TEMPERATURE: 73 Deg. F TESTS REQUIRED: n/a SITE TIME START: 7:00 AM SITE TIME FINISH: 8:30 AM ' LUNCH PERIOD: none TRAVEL TIME: VERIFIED BY I DO BYCERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE .BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 02/23/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Ellsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 02125/2006 PROJECT NO. 3115EO3 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO 3 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-303 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Pad 3 INSPECTION ADDRESS: 79-174 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-174 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBG FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RRS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 -CONTRACTORS EQUIPMENT/ MANPOWER USED: WELDING MACHINE: Lincoln Shieldarc SAE 350 AREA, GRIDLINES, PIECES OBSERVED: Items Completed: Welding of saddles to the tops of the TS 8x8x5/16 tube steel columns on lines 0.1/A.8, B.4, 6.9, C.1, C.5, D.1 & D.5. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER. APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: n/a TEMPERATURE: 85 Deg. F TESTS REQUIRED: Na SITE TIME START: 7:00 AM SITE TIME FINISH: 9:00 AM r LUNCH PERIOD: none TRAVEL TIME: VERIFIED BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 02/24/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego I Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of -Work X INSPECTOR TECHNICIAN SSW . AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 02/1812006 PROJECT NO. 3115E03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO 1 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O..Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-303 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Pad 3 INSPECTION ADDRESS: 79-174 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-174 Highway 111 La Quinta, CA REPORTiNQ REQUIREMENTS: ICBO FIELD INSPECTION MANUAL/ MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORKDAY, OR MISSING MTRS, AND RFIS,.ETC_ FILLOUT AND ATTACH. A. DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT -A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-6022 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: MQ Whisperweld BTW30OSS AREA; GRIDLINES, PIECES OBSERVED: In Progress: Puddle welding of the metal roof decking. STRUCTURAL NOTES, DETAIL; OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: n/a TEMPERATURE: + 85 Deg. F TESTS REQUIRED: Na SITE TIME START: 7:00 AM SITE TIME FINISH: 10:00 AM .LUNCH PERIOD: none TRAVEL TIME: VERIFIED BY I UU aY GER I o -Y I HAI I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH jTHE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE ?BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 02/13/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIFLn RFP[)RT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIANAVAILABLE: SSW • SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 02/18/2006 PROJECT NO. 3115EO3 ENGINEER: CSSI 2445_Fifth Street Suite 300 San Diego, CA 92102 REPORT NO 2 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-303 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Pad 3 'INSPECTION ADDRESS: 79-174 Highway 111 f La Quinta, CA ADDRESS OF PROJECT: 79-174 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICSO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT 'WHEN A'DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND I SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 & E6022 CONTRACTORS EQUIPMENT/ MANPOWER USED: WELDING. MACHINE: MQ Whisperweld BLW-400SSW2, Miller trailblazer 301G AREA,,GRIDLINES, PIECES OBSERVED: In Progress Puddle welding of the metal roof decking. Items Completed: Welding of the splice plates between the ends of the ledger angles on line A/1 to 3 at the roof leve(. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: -REWORK AS -PERCENT- OF -ALL WORK TODAY: - — — — PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: Na TEMPERATURE` 83 Deg. F TESTS REQUIRED: Na SITE TIME START: 7:00 AM SITE TIME FINISH: 11:00 AM • ciJ. C LUNCH PERIOD: -none TRAVEL TIME: VERIFIED BY _ 1 1 -MyG rGROUNIALLT U00tKVtL1 ALL VF IN h VVUHK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE -SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING ODE; UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 02/14/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax. 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 02118!2006 PROJECT NO. 3115E03 ENGINEER: CSSI N45,Fiffh Street Suite 300 San Diego, CA 92102 REPORT NO 3 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O.`Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-303 SUB -CONTRACTOR: Portola Constructios, Inc. 14722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Pad 3 INSPECTION ADDRESS: 79-174 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-174 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IFTHLkE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMITACOPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Miller trailblazer 301G AREA,, GRIDLINES, PIECES OBSERVED: Items Completed; Welding of the splice plates between the ends of the ledger angles on line Ell to 3 at the roof level. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENTOF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: , Warm SAMPLES TAKEN: n/a TEMPERATURE: 70 Deg F TESTS REQUIRED: n/a SITE TIME START: 7:00 AM SITE TIME FINISH: 9:00 AM LUNCH.PERIOD:... none TRAVEL TIME: VERIFIED BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND 1 OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 02/15/2006 City Of La Quinta ?•=-i;i; Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego I Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax:.858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) SSW t 1 APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects FOR WEEK ENDING 02/18/2006 PROJECT NO. 3115EO3 M261'6 Camino Real Suite 200 San Diego, CA 92130 }ENGINEER: CSSI REPORT NO . 4 PG 1 OF 1 2445;Fifth Street Suite 300 San Diego, CA 92102 ic6NTRACTOR: Vratsinas Construction Co. PLAN FILE NO. PERMIT NO. 05-303 P`.'O:'Boxl 2558 Little Rock, AR 72203 -SUB-CONTRACTOR: Portola Constructios, Inc. PROJECT NAME: Pad 3 10722'Edison Court Rancho Cucamonga, CA 91730 yINSPECTI'ON ADDRESS: 79-174 Highway 111 ADDRESS OF PROJECT: 79-174 Highway 111 La Quinta, CA La Quinta, CA .REPORTING REQUIREMENTS: ICSO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS I ! IF;THERE IS NON -CONFORMING WORK AT THE END OF THE WORKDAY, OR MISSING MTRS, AND FIRS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-6022 q, CONTRACTORS EQUIPMENT/ MANPOWER USED: WELDING MACHINE: MQ Whisperweld TLW-30OSS :AREA,;GRIDLINES, PIECES OBSERVED: In Progress: Puddle welding of the metal roof decking. t ;STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: 'REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: ;WEATHER: - Cool SAMPLES TAKEN: n/a TEMPERATURE: 66 Deg. F TESTS REQUIRED: n/a SITE TIMEjf START; 7:00 AM SITE TIME FINISH: 11:00 AM _LL1.NCH PFMOD: none ic - a I TRAVEL TIME:ERIFIED BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 02/16/2006 City Of La Quinta " $ Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego I Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elswonh Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type (5 Work X INSPECTOR TECHNICIAN SSW-' AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220; EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 02!1812006 PROJECT NO. 3115E03 ENGINEER: CSSI 2445 -,Fifth Street Suite 300 San Diego, CA 92102 REPORT NO 5 PG 1 OF 1 ' C6NftCTOR: Vratsinas Construction Co. P.O. Box, 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-303 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Pad 3 'INSPECTION ADDRESS: 79-174 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-174 Highway 111 La Quinta, CA _REPORTING i EQUIREMENTS: ICBG FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF,THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHENA DtFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND . i SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-6022 CONTRACTORS EQUIPMENT / MANPOWER USED: 'WELDING MACHINE: MQ Whisperweld TLW-30OSS AREA,,, GRIDLINES, PIECES OBSERVED: In Progress: Puddle welding and side .seam punch locking of the metal roof decking. I STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: -WEATHER: Cool SAMPLES TAKEN: Na TEMPERATURE: 65 Deg. F TESTS REQUIRED: Na SITE TIME START: 11:30 AM SITE TIME FINISH: 4:30 PM LU-NCH,PFRIOD: 1/2 Hr. TRAVEL TIME: ALM VERIFIED BY I DO BY,CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. /161 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 02/17/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 .Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 6534999 Fax: (909) 6534666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of. COMPRESSIV&STRENGTH-CONCRETE ASTM C39 • j ** VCC 4425 JAMBOREE ROAD, SUITE 180 NEWPORT BEACH, CA 92660 Client: THOMAS ENTERPRISES A Set No.: 5-7989 File No.: Permit No.: 05-303 Project No.: 3115E03 Project Name: PAD 3 MARKET PLACE @ LA QUINTA HWY 111 @ ADAMS LA QUINTA, CA Age (Days) Date Nominal Tested Size Actual Area Load (Sq. Inch) (lbs.) Strength (psi) Type of Fracture 7 12/30/2005 6X 12 28.37 72,400 2,550 Cone 28 1/20/2006 6X 12 28.37 110,940 3,910 Cone 28 1/20/2006 6X 12 28.37 113,090 3,990 Cone Specified Strength: 3,000 PSI Sampled By MICHAEL G. Location: PIER FOOTINGS FIRST 3 FROM, EAST @ STORE FRONT Concrete Supplier: ASSOCIATED READY MIX Mix No.: 16031 Ticket No.: Water added at Site: 0.00 gal. By Cement Type:. Mix Time: min. Remarks: Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** .0 A ASTM C172 Date Sampled: 12/23/2005 Date Received: 12/28/2005 Concrete Temp: 69 °F ASTM C1064 Ambient Temp: 70 of ASTM C1064 Slump: 5.00 in. ASTM C143 Tested at: Anaheim Respectfully Submitted, MTGL, Inc. l M.B. (Ben) Lo Chief Engineer 3950 PSI . 28 -day compression test complies with the specified strength. Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 'fel: (909) 653-4999 Fax: (909) 6534666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of. COMPRESSIVE STRENGTH -CONCRETE ASTM C39 CITY OF LA QUINTA-BLDG & SAFETY 78495 CALLE TAMPICO LA QUINTA, CA 92253 Client: THOMAS ENTERPRISES A Set No.: 6-1368 File No.: ` Permit No.: 05-303 Project No.: 3115E03 Project Name: PAD 3 MARKET PLACE @ LA QUINTA HWY 111 -@ -ADAMS LA QUINTA; CA-�S�' Age (Days) Date Tested Nominal Size Actual Area Load (Sq. Inch) (lbs.) Strength Type of (psi) Fracture 7 1/30/2006 6X 12 28.37 78,850 2,780 Cone 28 2/20/2006 6X 12 28.27 28 2/20/2006 6X 12 28.27 28 H 2/20/2006 6X 12 28.27 Specified Strength: 3,000 PSI Sampled By MICHAEL G. Location: PERIMETER FOOTINGS @ SHOPS # 3 LINE A Concrete Supplier: ASSOCIATED READY MIX Mix No.: 15331' Ticket No.: 36627643 Water added at Site: 0.00 gal. By Cement Type: Mix Time: min. Remarks: Distribution: THOMAS ENTERPRISES VCC CITY OF LA GUINTA-BLDG & SAFETY **LAB COPY** 1l ASTM C172 Date Sampled: 1/23/2006 Date Received: 1/26/2006 Concrete Temp: 70 • °F ASTM C1064 Ambient Temp: 60 °F ASTM C1064 Slump: 4.00 in. ASTM C143 Tested at: Anaheim Respectfully Submitted, MTGL, Inc. M.B. (Ben) Lo Chief Engineer w Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 653-4999 Fax: (909) 653-4666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of. COMPRESSIVE STRENGTH -CONCRETE ASTM C39 VCC 4425 JAMBOREE ROAD, SUITE 180 NEWPORT BEACH, CA 92660 Client: THOMAS ENTERPRISES A Set No.: 5-7801 r File No.: Permit No.: 05-303 Project No.: 3115E03 Project Name:`-�P D 3 MARKET.P_LACE_@UAQUINTA HWY 111 @ ADAMS LA QUINTA, CA Age (Days) Date Tested Nominal. Size Actual Area (Sq. Inch) Load Strength (lbs.) (psi) Type of Fracture 7 12/22/2005 6X 12 28.37 73,000 2,570 Cone 28 1/12/2006 6X 12 28.37 110,170 3,880 Cone 28 1/12/2006 6X 12 28.37 105,540 3,720 Shear 28 H 1/12/2006 6X 12 28.27 Specified Strength: 3,000 PSI SampledYBy MICHAEL G Location: S.O.G. LAST 10' OF EAST END PAD 4 3 Concrete Supplier: ASSOCIATED READY MIX Mix No.: 25336 - Ticket No.: 3602058 Water added at Site: 0.00 gal. By Cement Type: Mix Time: Remarks: Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** A ASTM C172 Date Sampled: 12/15/2005 Date Received: 12/16/2005 Concrete Temp: 70 °F ASTM C1064 Ambient Temp: 83 °F ASTM C1064 Slump: 4.25 in. ASTM C143 min. Tested at: Anaheim Respectfully Submitted, MTGL, Inc. 1 M.B. (Ben) Lo Chief Engineer 3800 PSI 28 -day compression test complies with the specified strength. CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego I Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 02/18/2006 PROJECT NO. 3115E03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO 4 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PE RMIT NO. 05-303 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Pad 3 INSPECTION ADDRESS: 79-174 Highway 1111,' La Quinta, CA ADDRESS OF PROJECT: 79-174 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: (C80 FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS i IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-6022 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: MQ Whisperweld TLW-30OSS AREA, GRIDLINES, PIECES OBSERVED: In Progress: Puddle welding of the metal roof decking. STRUCTURAL NOTES, DETAIL, OR RFIS USED: REMARKS: INCLUDING MEETINGS: (PER APPROVED PLANS) REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Cool TEMPERATURE: 66 Deg. F SAMPLES TAKEN: n/a TESTS REQUIRED: n/a SITE TIME START: 7:00 AM SITE TIME FINISH: 11:00 AM LUNCH PERIOD: none TRAVEL TIME:ERIFIED BY I UO t5Y UhK I IrY I HAI I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. �- 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 02/16/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego I Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (`/) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 02/18/2006 PROJECT NO. 3115EO3 ENGINEER: CSSI 2445 Fifth Street Suite 306 San Diego, CA 92102 REPORT NO 5 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-303 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Pad 3 INSPECTION ADDRESS:�79-174 Highway 111___;x; La Quinta, CA ADDRESS OF PROJECT: 79-174 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: K:BO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH'A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-6022 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: MQ Whisperweld TLW-30OSS AREA, GRIDUNES, PIECES OBSERVED: In Progress: Puddle welding and side seam punch locking of the metal roof decking. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Cool SAMPLES TAKEN: Na TEMPERATURE: 65 Deg. F TESTS REQUIRED: Na SITE TIME START: 11:30 AM SITE TIME FINISH: 4:30 PM LUNCH PERIOD: 112 Hr. TRAVEL TIME: VERIFIED BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. Signature Steve W. Bodnar 02/17/2006 Print Name Date Of Report 0849264-85 ICBO Certification Number City Of La Quinta City / County Certification Number CORPORATE. 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIFI n Ri=PnPT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR • TECHNICIAN SSW• ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) FOR WEEK ENDING 02/18/2006 PROJECT NO. 3115E03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO 2 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-303 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Pad 3. INSPECTION ADDRESS: 79-174 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-174 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RAS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 81 E6022 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: MQ Whisperweld BLW-400SSW2, Miller trailblazer 301G AREA, GRIDLINES, PIECES OBSERVED: In Progress Puddle welding of the metal roof decking. Items Completed: Welding of the splice plates between the ends of the ledger angles on line AM to 3 at the roof level. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: n/a TEMPERATURE: 83 Deg. F TESTS REQUIRED: n/a SITE TIME START: 7:00 AM SITE TIME FINISH: 11:00 AM LUNCH PERIOD: none TRAVEL TIME: VERIFIED BY I r1n Rv r`COTIN TU wT 1 - - -•• �.��..�.+..��yr Inr- VVVMr%uaitUACUVtANUTHATTHISWORKCOMPLIESWITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING ODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 02/14/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego I Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653:4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 02118/2006 7 PROJECT NO. 3115E03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, -CA 92102 REPORT NO 1 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-303 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Pad 3 INSPECTION ADDRESS: 79-174 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-174 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBG FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILLOUT AND ATTACRA DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES* SMAW E-6022 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: MQ Whisperweld BTW30OSS AREA, GRIDLINES, PIECES OBSERVED: In Progress: Puddle welding of the metal roof decking. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: n/a TEMPERATURE: 85 Deg. F TESTS REQUIRED:. Na 51 la SITE TIME START: 7:00 AM SITE TIME FINISH: 10.00 AM LUNCH PERIOD: none TRAVEL TIME: VERIFIED BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH ' THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 02/13/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 02/04/2006 PROJECT NO. 3115EO3 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO. 5 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-303 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Pad 3 INSPECTION ADDRESS: 79-174 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-174 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln Shield -Arc SA -250, Miller trailblazer 301G AREA, GRIDLINES, PIECES OBSERVED: In Progress: Welding of the roof joist bridging angles along lines 1.9/A to E, 2.3/A to E & 2.9/A to E at the roof level. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS; REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: Na TEMPERATURE: 80 Deg. F TESTS REQUIRED: n/a SITE TIME START: 7:00 AM SITE TIME FINISH: 11:30 AM LUNCH PERIOD: none TRAVEL TIME: VERIFIED BY i vv o j �cn i it i I nm 1 1 nfiV G rtKdUI1J/1LLT Ut5btKVtU ALL OF I Ht WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. y2ze-, oev.' 'ama/ 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 02/03/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 02104/2006 PROJECT NO. 3115E03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO. 4 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-303 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Pad 3 INSPECTION ADDRESS: 79-174 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-174 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln Shield -Arc SAE 350, Miller trailblazer 301G AREA, GRIDLINES, PIECES OBSERVED: In Progress: Welding of the roof joist bridging. STRUCTURAL NOTES, DETAIL, OR RAS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: n/a TEMPERATURE: 76 Deg. F TESTS REQUIRED: n/a . SITE TIME START: 7:00 AM SITE TIME FINISH: 11:30 AM LUNCH PERIOD: none TRAVEL TIME: VERIFIED BY / J., u I vcrt i IF I i n� 1 i nrwc rr-MOUIVALLT UwtK VtU ALL UI- I HE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. -2 J0849264-85 Signature ICBO Certification Number Steve W. Bodnar 02/02/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego I Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIFLD RFPC)RT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) 12220 EI Camino Real Suite 200 San Diego, CA 92130 ARCHITECT: Smith Consulting Architects FOR WEEK ENDING PROJECT NO. 3115E03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO. 3 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-303 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Pad 3 INSPECTION ADDRESS: 79-174 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-174 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL! MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RRS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 & FCAW NR232 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: MQ Whisperweld BLW-400SSW2, Lincoln Shield -Arc SA -250, Miller trailblazer 301G AREA, GRIDLINES, PIECES OBSERVED: Items Completed: (1) Welding of the truss and joist ends to the top cord of the roof girders on line 2 from line A to E. (2) Welding of the splice plates at the roof girder to girder, truss to truss and joist to joist end connections on line 2 form A to E. (3) Welding of the tube steel to the top cord of the roof girders on line 2 from line A to E. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: n/a TEMPERATURE: 77 Deg F TESTS REQUIRED: n/a SITE TIME START: 11:30 AM SITE TIME FINISH: 2:30 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: VERIFIED BY . i —i , -nv= rMM0%J1VMLLT UDatrcvtU ALL UF• I Fit VVUKK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS /OTHERWISE NOTED IN THE DEFICIENCY REPORT. Wi Signature Steve W. Bodnar Print Name 0849264-85 ICBO Certification Number 02/01/2006 City Of La Quinta Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 02/04/2006 PROJECT NO. 3115EO3 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO. 1 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-303 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Pad 3 INSPECTION ADDRESS: 79-174 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-174 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBG FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 & FCAW NR232 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: MQ Whisperweld BLW-4OOSSW2, Lincoln Shield -Arc SA -250, Miller trailblazer 301G AREA, GRIDLINES, PIECES OBSERVED: In Progress Welding of the truss and joist ends to the top cord of the roof girders on line 2. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: n/a TEMPERATURE: 74 Deg F TESTS REQUIRED: n/a SITE TIME START: 11:30 AM SITE TIME FINISH: 4:30 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: VE IFIED BY +� +I - i I - 1 -VC rCR0U111MLLT UaacrcvtU ALL Ur I Ht WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 01/30/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD RFPC)RT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 02/04/2006 PROJECT NO. 3115E03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO. 2 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PE RMIT NO. 05-303 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Pad 3 INSPECTION ADDRESS: 79-174 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-174 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICSO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 & FCAW NR232 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln SAE 350, Miller trailblazer 302 AREA, GRIDLINES, PIECES OBSERVED: In Progress: (1) Welding of the splice plates at the roof girder to girder, truss to truss and joist to joist end connections on line 2. (2) Welding of the steel tubes to the top cord of the roof girders on line 2. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: Na TEMPERATURE: 75 Deg. F TESTS REQUIRED: n/a SITE TIME START: 11:30 AM SITE TIME FINISH: 4:30 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: VERIFIED BY — o I SMR I it y i MMI i nr%Vr- rtKJUNALLT UtsstHVtU ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 4e4e I z'l%� i` izG'2��t�tJ 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 01/31/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego I Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 02/11/2006 PROJECT N0. 3115E03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO. 1 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-303 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Pad 3 INSPECTION ADDRESS: 79-174 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-174 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND FIRS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln SAE -350, Miller Big Blue 400D, Miffer Big Blue 402P AREA, GRIDLINES, PIECES OBSERVED: Items Completed: 1) Welding of the top cord of the roof trusses and joists to the wall plates on line 3/A to E. (2) Welding of the splice plates between the ends of the ledger angles on line 3/A to E. (3) Welding of the W8x10 roof beams to the top cord of the roof joists on lines 1.3/A.3 to A.9, 2.5 to 2.9/B.7 to C, 2.6 to 2.9/C.5 to C.7, and 2.9/A.1 to A.3. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: Na TEMPERATURE: 81 Deg F TESTS REQUIRED: n/a SITE TIME START: 7:00 AM SITE TIME FINISH: 11:30 AM &AA,tl -r)-l— LUNCH PERIOD: none TRAVEL TIME: 7 VERIFIED Y -- – • --• • • •• • • •• • •—I I I W0QMMvcU /ALL yr 1 rnt NVUKR LIS I tU AbUVt AND THAT THIS WORK COMPLIES WITH " THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. Signature Steve W. Bodnar Print Name 02/07/2006 Date Of Report 0849264-85 ICBO Certification Number City Of La Quinta City / County Certification Number obi CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIFI n RFpr PT Inland Empire '14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) SSW APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects FOR WEEK ENDING PROJECT NO. 3115E03 12220 EI Camino Real Suite 200 San Diego, CA 92130 ENGINEER: CSSI REPORT NO. 3 PG 1 OF 1 2445 Fifth Street Suite 300 San Diego, CA 92102 CONTRACTOR: Vratsinas Construction Co. PLAN FILE NO. PERMIT NO. 05-303 P.O. Box 2558 Little Rock, AR 72203 SUB -CONTRACTOR: Portola Constructios, Inc. PROJECT NAME: Pad 3 10722 Edison Court Rancho Cucamonga, CA 91730 INSPECTION ADDRESS: 79-174 Highway 111 ADDRESS OF PROJECT: 79-174 Highway 111 La Quinta, CA La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 & FCAW NR232 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: MQ Whisperweld BLW-400SSW2, Lincoln Shield -Arc SA -250, Miller trailblazer 301G AREA, GRIDLINES, PIECES OBSERVED: Items Completed: (1) Welding of the truss and joist ends to the top cord of the roof girders on line 2 from line A to E. (2) Welding of the splice plates at the roof girder to girder, truss to truss and joist to joist end connections on line 2 form A to E. (3) Welding of the tube steel to the top cord of the roof girders on line 2 from line A to E. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: n/a TEMPERATURE: 77 Deg F TESTS REQUIRED: n/a SITE TIME START: 11:30 AM SITE TIME FINISH: 2:30 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: VERIFIED BY 1 nn RV rP0TICV TUAT 1 LI 11 n I NIb WUHK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND 1 OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBG Certification Number Steve W. Bodnar 02/01/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) SSW ARCHITECT: Smith Consulting Architects APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) FOR WEEK ENDING 02/04/2006 12220 EI Camino Real Suite 200 San Diego, CA, 92130 PROJECT NO. 3115E03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 INSPECTION ADDRESS: 79-174 Highway 111 La Quinta, CA REPORT NO. 4 PLAN FILE NO. PROJECT NAME: Pad 3 PG 1 PERMIT NO. 05-303 ADDRESS OF PROJECT: 79-174 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICSO FIELD INSPECTION MANUAL /MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln Shield -Arc SAE 350, Miller trailblazer 301 G AREA, GRIDLINES, PIECES OBSERVED: In Proaress- of the roof STRUCTURAL NOTES, DETAIL, OR RFIS USED. REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: WEATHER: Hot TEMPERATURE: 76 Dep. F SITE TIME START: 7:00 AM LUNCH PERIOD: none (PER APPROVED PLANS) SAMPLES TAKEN: TESTS REQUIRED SITE TIME FINISH: 11:30 AM TRAVEL TIME: PERCENT PROJECT COMPLETION: n/a n/a OF 1 /A1. o VERIFIED BY 100 BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. J 0849264-85 Signature Steve W. Bodnar .02/02/2006 ICBO Certification Number _ City Of La Quinta Print Name Date Of Report P City / County Certification Number r'. CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Type Of Work X INSPECTOR TECHNICIAN SSW ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison CourtRancho Cucamonga, CA 91730 INSPECTION ADDRESS: 79-174 Highway 111 La Quinta, CA Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) FOR WEEK ENDING 02/04/2006 PROJECT NO. 3115E03 REPORT NO. 5 PG 1 OF 1 PLAN FILE NO. PERMIT NO. 05-303 PROJECT NAME: Pad 3 ADDRESS OF PROJECT: 79-174 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT/ MANPOWER USED: WELDING MACHINE: Lincoln Shield -Arc SA -250, Miller traifblazer 301G AREA, GRIDLINES, PIECES OBSERVED: In Proaress- of the roof joist bridging angles along lines 1.91A to E 2.3/A to E & 2.9/A to E at the roof level. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: n/a TEMPERATURE: 80 Deg. F TESTS REQUIRED: n/a SITE TIME START: 7:00 AM SITE TIME FINISH: 11:30 AM LUNCH PERIOD: none TRAVEL TIME: VERIFIED BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS. AND / OR THE APPROVED PLANS. SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. r' Signature 0849264-85 ICBO Certification Number Steve Bodnar 02/03/2006 _ City Of La Quinta Prinntt Name Date Of Report P City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 02/11/2006 PROJECT NO. 3115E03 1. ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO. 3 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-303 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Pad 3 INSPECTION ADDRESS: 79-174 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-174 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBG FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 & FCAW NR232 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln Shield -Arc SA -250, Miller trailblazer 301 G AREA, GRIDLINES, PIECES OBSERVED: Items Completed: Welding of the 8x10 roof beams to the top cord of the roof girders and joists on line 1 to 2.7 from D.5 to E. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: n/a TEMPERATURE: 84 Dog. F TESTS REQUIRED: Na SITE TIME START: 7:00 AM SITE TIME FINISH: 10:00 AM LUNCH PERIOD: none TRAVEL TIME: c VERIFIED BY .. „„ I I I — , I I^V C r MQWIN/ LLT VOOCMVCU ALL Vr• r nt NVVKR Lrs I tU ACUVF AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. oe'• 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 02/09/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIFI n PFPC)PT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 02/11/2006 PROJECT NO. 3115E03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO. 2 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-303 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Pad 3 INSPECTION ADDRESS: 79-174 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-174 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICSO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Miller Big Blue 400D, Miller Big Blue 402P AREA, GRIDLINES, PIECES OBSERVED: Item Completed: Welding of thr beam to column moment connections on lines 0.!/A.3, .A.7, 0.6 & E. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: Na TEMPERATURE: 85 Deg. F TESTS REQUIRED: n/a SITE TIME START: 7:00 AM SITE TIME FINISH: 11:00 AM LUNCH PERIOD: none TRAVEL TIME: V RIFIED BY I nr) RY CERTIFY TWAT I ueve Off— w�. ...,..�.,..� - ------•--- • --� � ..v,.r� civ cu ^DvvC Hrvu I NA I I Nib VVUKK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. ' ���'-� 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 02/08/2006 _ City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 02/11/2006 PROJECT NO. 3115E03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO. 2 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-303 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Pad 3 INSPECTION ADDRESS: 79-174 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-174 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: IC80 FIELD INSPECTION MANUAL ! MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS. IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Miller Big Blue 400D, Miller Big Blue 402P AREA, GRIDLINES, PIECES OBSERVED: Item Completed: Welding of thr beam to column moment connections on fines 0.!/A.3, .A.7, D.6 & E. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: Na TEMPERATURE: 85 Deg. F TESTS REQUIRED: Na SITE TIME START: 7:00 AM SITE TIME FINISH: 11:00 AM ' LUNCH PERIOD: none TRAVEL TIME: V RIFIED BY I nr% RV rCOTICV Tul1T 1 ---------•-•--•----••-�.-���.., i�vvvnl�upICVADVVCNIVUInH1IrII5WOHKCOMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. ` �'��-� 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 02/08/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) SSW APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects FOR WEEK ENDING 02/11/2006 PROJECT NO. 3115E03 12220 EI Camino Real Suite 200 San Diego, CA 92130 ENGINEER: CSSI REPORT NO. 1 PG 1 OF 1 2445 Fifth Street Suite 300 San Diego, CA 92102 CONTRACTOR: Vratsinas Construction Co. PLAN FILE NO. PERMIT NO. 05-303 P.O. Box 2558 Little Rock, AR 72203 SUB -CONTRACTOR: Portola Constructios, Inc. PROJECT NAME: Pad 3 10722 Edison Court Rancho Cucamonga, CA 91730 INSPECTION ADDRESS: 79-174 Highway 111 ADDRESS OF PROJECT: 79-174 Highway 111 La Quinta, CA La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln SAE -350, Miller Big Blue 400D, Miller Big Blue 402P AREA, GRIDLINES, PIECES OBSERVED: - Items Completed. (1) Welding of the top cord of the roof trusses and joists to the wall plates on line 3/A to E. (2) Welding of the splice plates between the ends of the ledger angles on line 3/A to E. (3) Welding of the W8x10 roof beams to the top cord of the roof joists on lines 1.3/A.3 to A.9, 2.5 to 2.9/B.7 to C, 2.6 to 2.9/C.5 to C.7, and 2.9/A.1 to A.3. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: Na TEMPERATURE: 81 Deg F TESTS REQUIRED: n/a SITE TIME START: 7:00 AM SITE TIME FINISH: 11:30 AM 'Z� LUNCH PERIOD: none TRAVEL TIME: VERIFIED Y 1 IVY CV 1-1- r - --...... ---•-•---•�••--• �•-..�•..�..r.��vr ­WMNL101CUMCUVtANU Ir1AI IrilswOHKCOMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. '6" 0849264-85 9 Signature ICBO Certification Number Steve W. Bodnar 02/07/2006 City Of La Quinta Print Name . , Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Type Of Work X INSPECTOR TECHNICIAN SSW ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 INSPECTION ADDRESS: 79-174 Highway 111 - La Quinta, CA Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) FOR WEEK ENDING 02104/2006 PROJECT NO. 3115E03 REPORT NO. 4 PLAN FILE NO. PROJECT NAME: Pad 3 PG 1 PERMIT NO. 05-303 ADDRESS OF PROJECT:. 79-174 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 ICONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln Shield -Arc SAE 350, Miller trailblazer 301 G AREA, GRIDLINES, PIECES OBSERVED: In Progress: Welding of the roof joist bridainn STRUCTURAL NOTES, DETAIL, OR RFIS USED REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: WEATHER: Hot TEMPERATURE: 76 Dea. F SITE TIME START: 7:00 AM LUNCH PERIOD: none (PER APPROVED PLANS) SAMPLES TAKEN: TESTS REQUIRED: SITE TIME FINISH: 11:30 AM TRAVEL TIME: PERCENT PROJECT COMPLETION: n/a n/a OF 1 144 G VERIFIED BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND I OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. Signature 0849264-85 � ' ICBO Certification Number Steve W. Bodnar 02/02/2006 _ City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave.. Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Type Of Work X INSPECTOR TECHNICIAN SSW ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 INSPECTION ADDRESS: 79-174 Highway 111 La Quinta, CA Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) FOR WEEK ENDING 02/04/2006 PROJECT NO. 3115EO3 REPORT NO. 5 PG 1 OF 1 PLAN FILE NO. PERMIT NO. 05-303 PROJECT NAME: Pad 3 ADDRESS OF PROJECT: 79-174 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBG FIELD INSPECTION MANUAL ! MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln Shield -Arc SA -250, Miller trailblazer 301G AREA, GRIDLINES, PIECES OBSERVED: In Progress: Welding of the roof joist bridging angles along lines 1-9/A to E 2.3/A to E & 2.9/A to E at the roof level. STRUCTURAL NOTES, DETAIL, OR RFIS USED REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: WEATHER: Hot 'EMPERATURE: 80 Deq. F SITE TIME START: 7:00 AM LUNCH PERIOD: none (PER APPROVED PLANS) SAMPLES TAKEN: TESTS REQUIRED: SITE TIME FINISH: 11:30 AM TRAVEL TIME: PERCENT PROJECT COMPLETION n/a n/a VERIFIED BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. Signature 0849264-85 Steve W. Bodnar 02/03/2006 ICBO Certification Number City Of La Quinta Print Name Date Of Report F City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIFI n RGpnOT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of'vVork X INSPECTOR TECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) SSW APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects FOR WEEK ENDING PROJECT NO. 3115E03 12220 EI Camino Real Suite 200 San Diego, CA 92130 ENGINEER: CSSI REPORT NO. 3 PG 1 OF 1 2445 Fifth Street Suite 300 San Diego, CA 92102 CONTRACTOR: Vratsinas Construction Co. PLAN FILE NO. PERMIT NO. 05-303 P.O. Box 2558 Little Rock, AR 72203 SUB -CONTRACTOR: Portola Constructios, Inc. PROJECT NAME: Pad 3 10722 Edison Court Rancho Cucamonga, CA 91730 INSPECTION ADDRESS: 79-174 Highway 111 ADDRESS OF PROJECT: 79-174 Highway 111 La Quinta, CA La Quinta, CA REPORTING REQUIREMENTS: ICBG FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 & FCAW NR232 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: MQ Whisperweld BLW-4OOSSW2, Lincoln Shield -Arc SA -250, Miller trailblazer 301G AREA, GRIDLINES, PIECES OBSERVED: Items Completed: (1) Welding of the truss and joist ends to the top cord of the roof girders on line 2 from line A to E. (2) Welding of the splice plates at the roof girder to girder, truss to truss and joist to joist end connections on line 2 form A to E. (3) Welding of the tube steel to the top cord of the roof girders on line 2 from line A to E. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: n/a TEMPERATURE: 77 Deg F TESTS REQUIRED: n/a SITE TIME START: 11:30 AM SITE TIME FINISH: 2:30 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: VERIFIED BY I DORY CFRTIFV TWAT i WAXIC Deoenrani - -- - ------••-�•r••-..., ''I'v 11r 101CUMDUVtMNU JrJAI IHISWORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 02/01/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 02/11/2006 PROJECT NO. 3115E03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO. 3 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-303 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 - PROJECT NAME: Pad 3 INSPECTION ADDRESS: 79-174 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-174 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RAS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 & FCAW NR232 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln Shield -Arc SA -250, Miller trailblazer 301G AREA, GRIDLINES, PIECES OBSERVED: Items Completed: Welding of the 8x10 roof beams to the top cord of the roof girders and joists on line 1 to 2.7 from D.5 to E. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: hVCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: n/a TEMPERATURE: 84 Deq. F TESTS REQUIRED: Na SITE TIME START: 7:00 AM SITE TIME FINISH: 10:00 AM LUNCH PERIOD: none TRAVEL TIME: VERIFIED BY i uw o j ��m i ir T a n i i nmvr- rtnJUNALLr UtsstKvtU ALL UP I HE V11UHK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264=85 Signature ICBO Certification Number Steve W. Bodnar Print Name 02109/2006 Date Of Report City Of La Quinta City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego I Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (`t) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 02/1812006 PROJECT NO. 3115E03 ENGINEER: CSSI 2445 Fifth Street Suite 306 San Diego, CA 92102 REPORT NO 5 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE N0. PERMIT NO. 05-303 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court tRancho Cucamonga, CA 91730 PROJECT NAME W Pad'3� _ INSPECTION ADDRESS:79'-,17.4 Highweyr111 La Quinta, CA ADDRESS OF PROJECT: 79-174 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: tCBO FIELD INSPECTION MANUAL. / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-6022 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: MQ Whisperweld TLW-30OSS AREA, GRIDUNES, PIECES OBSERVED: In Progress: Puddle welding and side seam punch locking of the metal roof decking. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Cool SAMPLES TAKEN: n/a TEMPERATURE: 65 Deg. F TESTS REQUIRED: n/a A le SITE TIME START: 11:30 AM SITE TIME FINISH: 4:30 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: VERIFIED BY 11x7 BY CERTIFY THAT 1 HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 02/17/2006 City Of La Quinta Print Name Date Of Report City I County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego I Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 02/1812006 PROJECT NO. 3115E03 ENGINEER: CSSI, 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO 3 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co, P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-303 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME' Pad 3,--? INSPECTION ADDRESS: 79-174 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-174 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBG FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON-CONFORMENG WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Miller trailblazer 301 G AREA, GRIDLINES, PIECES OBSERVED: Items Completed: Welding of the splice plates between the ends of the ledger angles on line Ell to 3 at the roof level. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: n1a TEMPERATURE: 70 Deg F TESTS REQUIRED: nta 47 SITE TIME START: 7:00 AM SITE TIME FINISH: 9:00 AM LUNCH PERIOD: none TRAVEL TIME: VERIFIED BY I uU aT ctK i m T INA i i NAVt rtKbUNALLY o95tRVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND ! OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. tel. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 02/15/2006 City Of La Quinta Print Name Date Of Report City 1 County Certification Number F<r CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego I Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (`r) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 02/18/2006 PROJECT NO. 3115E03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO 4 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-303 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Pad 3 INSPECTION ADDRESS: 79-174 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-174 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBG FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-6022 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: MQ Whisperweld TLW-30OSS AREA, GRIDLINES, PIECES OBSERVED: In Progress: Puddle welding of the metal roof decking. STRUCTURAL NOTES, DETAIL, OR RFIS USED: REMARKS: INCLUDING MEETINGS: (PER APPROVED PLANS) REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Cool TEMPERATURE: 66 Deg. F SAMPLES TAKEN: n/a TESTS REQUIRED: n/a SITE TIME START: 7:00 AM SITE TIME FINISH: 11:00 AM 14 LUNCH PERIOD: none TRAVEL TIME:ERIFIED BY I UO t3Y CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 02/16/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax. 714.632.2974 San Diego I Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 02/18/2006 PROJECT NO. 3115E03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO 3 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-303 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME:'_.Pad 3 ", INSPECTION ADDRESS 76=174 Highway i 11� La Quinta, CA ADDRESS OF PROJECT: 79-174 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBG FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON-CONFORMWG WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT /MANPOWER USED: WELDING MACHINE: Miller trailblazer 301G AREA, GRIDLINES, PIECES OBSERVED: ' Items Completed: Welding of the splice plates between the ends of the ledger angles on line E/1 to 3 at the roof level. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: n/a TEMPERATURE: 70 Deg F TESTS REQUIRED: n/a SITE TIME START: 7:00 AM SITE TIME FINISH: 9:00 AM LUNCH PERIOD:. none TRAVEL TIME: VERIFIED BY 100 BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBG Certification Number Steve W. Bodnar 02/15/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego I Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 02/11/2006 PROJECT NO. 3115EO3 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO 4 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-303 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Pad 3 INSPECTION ADDRESS: 479-174 Highway 111`, La Quinta, CA ADDRESS OF PROJECT: 79-174 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBG FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS -CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 & FCAW NR232 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln Shield -Arc SA -250 AREA, GRIDLINES, PIECES OBSERVED: Items Completed: (1) Welding of the entire roof joist bridging angles on lines A to E from 1 to 3. (2) Torque tightening of the ASTM A325 High Strength Bolts on the entire W8x10 roof beams on lines A to E from 1 to 3 on the roof level and on the beam to column moment connections on lines 0.1/A.3, A.7, 0.6 & E. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: Na TEMPERATURE: 84 Deg. F TESTS REQUIRED: Na SITE TIME START: 9:00 AM SITE TIME FINISH: 11:30 AM / -- 1, LUNCH PERIOD: none TRAVEL TIME: VERIFkBiy I UU bT UtK I WY I HAI I HAVE F'EKbONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. "A' -z�. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 02/10/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW P AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith. Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 02/18/2006 PROJECT NO. 3115EO3 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102' REPORT NO 1 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-303 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Pad 3 INSPECTION ADDRESS: 79-174 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-174 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC.,. FILLOUT AND ATTACHA DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-6022 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: MQ Whisperweld BTW30OSS AREA, GRIDLINES, PIECES OBSERVED: In Progress: Puddle welding of the metal roof decking. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: n/a TEMPERATURE: 85 Deg. F TESTS REQUIRED:, n/a SITE TIME START: 7:00 AM SITE TIME FINISH: 10:00 AM LUNCH PERIOD: none TRAVEL TIME: VERIFIED BY I DO BY CERTIFY THAT I HAVE ERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 02/13/2006 _ City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego I Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C 10 1 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 02/11/2006 PROJECT NO. 3115E03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO 4 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PE RMIT NO. 05-303 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Pad 3 INSPECTION ADDRESS: 79-174 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-174 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 & FCAW NR232 CONTRACTORS EQUIPMENT/ MANPOWER USED: WELDING MACHINE: Lincoln Shield -Arc SA -250 AREA, GRIDLINES, PIECES. OBSERVED: Items Completed: (1) Welding of the entire roof joist bridging angles on lines A to E from 1 to 3. (2) Torque tightening of the ASTM A325 High Strength Bolts on the entire W8x10 roof beams on lines A to E from 1 to 3 on the roof level and on the beam to column moment connections on lines 0.1/A.3, A.7, 0.6 & E. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: Na TEMPERATURE: 84 Deg. F TESTS REQUIRED: n/a SITE TIME START: 9:00 AM SITE TIME FINISH: 11:30 AM / LUNCH PERIOD: none TRAVEL TIME: VERIF Y I uv Dr %,r -n I Ir T I MINI I MAVt rtHSUNALLY Ot35LKVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. I "&' 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 02/10/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Flm n Ri=PnPT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) SSW APPROVED PLANS (l) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects FOR WEEK ENDING 02/18/2006 PROJECT NO. 3115EO3 12220 EI Camino Real Suite 200 San Diego, CA 92130 ENGINEER: CSSI REPORT NO 2 PG 1 OF 1 2445 Fifth Street Suite 300 San Diego, CA 92102 CONTRACTOR: Vratsinas Construction Co. PLAN FILE NO.PERMIT NO. 05-303 P.O. Box 2558 Little Rock, AR 72203 SUB -CONTRACTOR: Portola Constructios, Inc. PROJECT NAME: Pad 3 10722 Edison Court Rancho Cucamonga, CA 91730 INSPECTION ADDRESS: 79-174 Highway 111 ADDRESS OF PROJECT: 79-174 Highway 111 La Quinta, CA La Q -rota, CA REPORTING REQUIREMENTS: ICBG FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RRS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 & E6022 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: MQ Whisperweld BLW-400SSW2, Miller trailblazer 301G AREA, GRIDLINES, PIECES OBSERVED: In Progress Puddle welding of the metal roof decking. Items Completed: Welding of the splice plates between the ends of the ledger angles on line All to 3 at the roof level. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: Na TEMPERATURE: 83 Deg. F TESTS REQUIRED: n/a SITE TIME START: 7:00 AM SITE TIME FINISH: 11:00 AM LUNCH PERIOD: none TRAVEL TIME: VERIFIED BY I nn RV RGATICV TWAT i UA%— 000e�uw.. -- — -- -----•----••- - CArvu INAf I Nib WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING ODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. d 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 02/14/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 653-4999 Fax: (909) 6534666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of: COMPRESSIVE STRENGTH -CONCRETE ASTM C39 *s CITY OF LA QUINTA-BLDG & SAFETY 78495 CALLE TAMPICO LA QUINTA, CA 92253 Client: THOMAS ENTERPRISES' A Set No.: 6-1368 - File No.: Permit No.: 05-303 Project No.: 3115E03 Project Name: PAD 3 MARKET PLACE @ LA QUINTA HWY 111 @ ADAMS LA QUINTA, CA Age (Days) Date Tested Nominal Size Actual Area (Sq. Inch) Load (lbs.) Strength (psi) Type of Fracture 7 1/30/2006 6X 12 28.37 78,850 2,780 Cone 28 2/20/2006 6X 12 28.37 106,580 3,760 Cone 28 2/20/2006 6X 12 28.37 106,740 3,760 Cone 28H 2/20/2006 6X 12 28.27 Specified Strength: 3,000 PSI Sampled By MICHAEL G Location: PERIMETER FOOTINGS @ SHOPS # 3 LINE A Concrete Supplier: ASSOCIATED READY MIX Mix No.: 15331 Ticket No.: 36627643' Water added at Site: 0.00 gal. By Cement Type: Mix Time: Remarks: Distribution: THOMAS ENTERPRISES VCC CITY OF LA GUINTA-BLDG & SAFETY **LAB COPY". ASTM C172 Date Sampled: 1/23/2006 Date Received: 1/26/2006 Concrete Temp: 70 °F ASTM C1064 Ambient Temp: 60 °F ASTM C1064 Slump: 4.00 in. ASTM C143 min. Tested at: Anaheim Respectfully Submitted, MTGL, Inc. 1 M.B.(Ben) Lo Chief Engineer 3760 PSI 28 -day compression test complies with the specified strength. Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 653-4999 Fax: (909) 6534666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of. COMPRESSIVE STRENGTH -CONCRETE ASTM C39 CITY OF LA QUINTA-BLDG & SAFETY 78495 CALLE TAMPICO LA QUINTA, CA 92253 Client: THOMAS ENTERPRISES A Set No.: 5-7801 File No.: Date Nominal Tested Size Permit No.: 05-303 Project No.: 3115E03 Project Name: PAD 3 MARKET PLACE @ LA QUINTA 28.37 HWY 111 @ ADAMS 2,570 LA QUINTA, CA '7q -114 4w,' m Age (Days) Date Nominal Tested Size Actual Area (Sq. Inch) Load (lbs.) Strength (psi) Type of Fracture 7 12/22/2005 6X 12 28.37 73,000 2,570 Cone 28 1/12/2006 6X 12 28.37 110,170 3,880 Cone 28 1/12/2006 6X 12 28.37 105,540 3,720 Shear 28 H 1/12/2006 6 X 12 28.27 Specified Strength: 3,000 PSI Sampled By MICHAEL G. Location: S.O.G. LAST 10' OF EAST END PAD # 3 Concrete Supplier: ASSOCIATED READY MIX Mix No.: 25336 Ticket No.: 3602058 Water added at Site: 0.00 gal. By Cement Type: Mix Time: Remarks: Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** A ASTM C172 Date Sampled: 12/15/2005 Date Received: 12/16/2005 Concrete Temp: 70 °F ASTM C1064 Ambient Temp: 83 °F ASTM C1064 Slump: 4.25 in. ASTM C143 min. Tested at: Anaheim Respectfully Submitted, MTGL, Inc. M.B.(Ben) Lo Chief Engineer 3800 PSI 28 -day compression test complies with the specified strength. CORPORATE San Diego I Imperial County a. 2992 E. La Palma Ave., Suite A 7313 Carroll Road, Suite G Anaheim, CA 92806 San Diego, CA 92121 } Tel: 714.632.2999 Tel: 858.537.3999 :.-------- -<>. Fax: 714.632.2974 Fax: 858.537.3990 FIELD REPORT Type Of Work X INSPECTOR TECHNICIAN ' SSW ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 INSPECTION ADDRESS: 79-174 Highway 111 La Quinta, CA Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) FOR WEEK ENDING 02/04/2006 1 PROJECT NO. 3115E03 REPORT NO. t PLAN FILE NO. PROJECT NAME: Pad 3 PG 1 PERMIT NO. 05-303 ADDRESS OF PROJECT: 79-174 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICSO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RMS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 & FCAW NR232 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: MQ Whisperweld BLW-4OOSSW2, Lincoln Shield -Arc SA -250, Miller trailblazer 301G AREA, GRIDLINES, PIECES OBSERVED: In Progress Welding of the truss and joist ends to the top cord of the roof girders on line 2. STRUCTURAL NOTES, DETAIL, OR RFIS USED REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: WEATHER: Warm TEMPERATURE: 74 Deq F SITE TIME START LUNCH PERIOD: 11:30 AM 1/2 Hr. (PER APPROVED PLANS) SAMPLES TAKEN: TESTS REQUIRED: SITE TIME FINISH: 4:30 PM TRAVEL TIME: PERCENT PROJECT COMPLETION: n/a n/a OF 1 BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND I OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 s Ignature ICBO Certification Number Steve W. Bodnar 01/30/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number ...............:> t.:,... CORPORATE 2992 E. La Palma Ave.. Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego I Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIFI n RFpnt?T Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICiAN SSW ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) FOR WEEK ENDING 02/04/2006 PROJECT NO. 3115E03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO. 2 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-303 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Pad 3 INSPECTION ADDRESS: 79-174 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-174 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICSO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 & FCAW NR232 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln SAE 350, Miller trailblazer 302 AREA, GRIDLINES, PIECES OBSERVED: In Progress: (1) Welding of the splice plates at the roof girder to girder, truss to truss and joist to joist end connections on line 2. (2) Welding of the steel tubes to the top cord of the roof girders on line 2. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: n/a TEMPERATURE: 75 Deg. F TESTS REQUIRED: n/a SITE TIME START: 11:30 AM SITE TIME FINISH: 4:30 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: VERIFIED BY 1 flfl 4V !`CDTiN T - - - -- • •• •-- • •-+•�• ���+.-..cu ��� yr 1 nc VVUrtn ua 1 tU HCV Vt ANU I HAI I HI5 WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS. SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. - 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 01/31/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2914 San. Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIFI n R1=pnQT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) SSW ARCHITECT: Smith Consulting Architects APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 02/04/2006 PROJECT NO. 3115E03 REPORT NO. 1 PG 1 OF 1 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 CONTRACTOR: Vratsinas Construction Co. PLAN FILE NO. PERMIT NO. 05-303 P.O. Box 2558 Little Rock, AR 72203 SUB -CONTRACTOR: Portola Constructios, Inc. PROJECT NAME: Pad 3 10722 Edison Court Rancho Cucamonga, CA 91730 ADDRESS OF PROJECT: 79-174 Highway 111 INSPECTION ADDRESS: 79-174 Highway 111 La Quinta, CA La Quinta, CA REPORTING REQUIREMENTS: ICSO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RRS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS. IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND s SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 & FCAW NR232 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: MQ Whisperweld BLW-400SSW2, Lincoln Shield -Arc SA -250, Miller trailblazer 301G AREA, GRIDLINES, PIECES OBSERVED: In Progress Welding of the truss and joist ends to the top cord of the roof girders on line 2. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETYNGS: REWORK AS PERCENT OF ALL WORK TODAY PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: n/a TEMPERATURE: 74 Deg F TESTS REQUIRED: n/a SITE TIME START: 11:30 AM SITE TIME FINISH: 4:30 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: VE IFIED BY I nn AV r1CCMCW T - • - ��n vcu MLL Ur i Nt VVUHK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND I OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 01/30/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE San Diego / Imperial County 2992 E. La Palma Ave.; Suite A 7313 Carroll Road, Suite G "`' Anaheim, CA 92806 San Diego; CA 92121 s f:.:.,'Y:.. Tel: 714.632.2999 ............. ........ Tel: 858.537.3999 Fax: 714.632.2974 Fax: 858.537.3990 FIELD REPORT Type Of Work X INSPECTOR TECHNICiAN SSW ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 ENGINEER: CSSI 2445 Fifth Street Suite 300 • San Diego, CA 92102' CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 INSPECTION ADDRESS: 79-174 Highway 111 La Quinta, CA Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) FOR WEEK ENDING 02104/2006 7 PROJECT NO. 3115E03 REPORT NO, 2 PG 1 OF 1 PLAN FILE NO. 1PERMIT NO. 05-303 PROJECT NAME: Pad 3 ADDRESS OF PROJECT: 79-174 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES - SMAW E-7018 & FCAW NR232 ICONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln SAE 350, Miller trailblazer 302 AREA, GRIDLINES, PIECES OBSERVED: In Prooress- (1) Welding of the splice plates at the roof girder to girder, truss to truss and joist to joist end connections on line 2 L (2) Welding of the steel tubes to the top cord of the roof girders on line 2. STRUCTURAL NOTES, DETAIL, OR RFIS USED REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: WEATHER: Warm TEMPERATURE: 75 Deq. F SITE TIME START: - 11:30 AM LUNCH PERIOD: 1/2 Hr. (PER APPROVED PLANS) SAMPLES TAKEN: TESTS REQUIRED: SITE TIME FINISH: 4:30 PM TRAVEL TIME: PERCENT PROJECT COMPLETION: n/a n/a VERIFIED BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS. AND I OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. t �� � ,�ji r1, TC. L �� •�L/ 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 01/31/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number Corporate: ' San Diego/Imperial County: Inland Emp'i,...,' 2992 E. La Palma Ave., Ste. A 7313 Carroll Road, Suite G 14320 Elsworth Street, Ste. C101 Anaheim, CA 92806 San Diego, CA 92121 Moreno Valley, CA 92553 Tel: 714.632.2999 Tel: 858.537.3999 Tel: 951.653.4999 Fax: 714.632.2974 Fax: 858.537.3990 Fax: 951.653.4666 FIELD REPORT'22 TYPE TYPE OF WORK ZINSPECTOR ❑ TECHNICIAN s Is,,, y.r-4"\ AVAILABLE: SOIL REPORT (Y) (N) SPECS 15N) APPROVED PLANSdDN) APPROVED SHOP DRAWING (Y) (N) ARCHITECT FOR WEEK ENDING \ -'Z-- '�' (" - 0 5 PROJECT. N0- 0.\''Z- ENGINEER � � � � REPORT N0. PG l OF CONTRACTOR �! PLAN FILE NO. PERMIT NO. (3 SUBCONTRACTOR P PROJECT NAME INSPECTION ADDRESS ADDRESS OF PROJECT 1� REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAI/MTGL SOIL MANUAL- REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): co CONTRACTORS EQUIPMENT/ MANPOWER USED: ei��i«+��ctiSL AREA, GRID LINES, PIECES OBSERVED: ��i`11c-• ZL� �� � � e � � � \ ` C�..�_ b S� � T � � a.r� ��lC.rL �O m"! t '^� STRUCTURAL NOTES, DETAIL. OR RFIS USED: REMARKS, INCLUDING MEETINGS: ^ REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: ���fitJZ TEMPERATURE: �. SAMPLES TAKEN: (Z:) -, TESTS REQUIRED: SITE TIME START: ��� 5—" SITE TIME FINISH: \Z C5 C. -I LUNCH PERIOD: TRAVEL TIME: VERIFIED BY: I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT � P \ 5 / a 5 CoR A Signature Date of Report ICBO Certification Number Print Name City / County Certification Number Rev: 7/97 Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 - Tel: (909) 653A999 Fax: (909) 653-4666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 a Report of. COMPRESSIVE STRENGTH -CONCRETE ASTM C39 * * File No.: —7 7] CITY OF LA QUINTA-BLDG & SAFETY Permit No.: 05-303 / q.I / 78495 CALLE TAMPICO Project No.: 3115E03 LA QUINTA, CA 92253 Project Name: PAD 3 MARKET PLACE @ LA QUINTA HWY 111 @ ADAMS LA QUINTA, CA Client: THOMAS ENTERPRISES Set No.: 54989 Age (Days) Date Tested Nominal Size Actual Area (Sq. Inch) Load (lbs.) Strength (psi) Type of Fracture 7 12/30/2005 6X 12 28.37 72,400 2,550 Cone 28 1/20/2006 6X 12 28.37 110,940 3,910 Cone 28 1/20/2006 6X 12 28.37 113,090 3,990 Cone 9 Specified Strength: 3,000 PSI . Sampled By MICHAEL G. Location: PIER FOOTINGS FIRST 3 FROM EAST @ STORE FRONT Concrete Supplier: ASSOCIATED,READY MIX Mix No.: 16031 Ticket No.: Water added at Site: 0.00 gal. By Cement Type: Mix Time: min. Remarks Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** ASTM C172 Date Sampled: 12/23/2005 Date Received: 12/28/2005 Concrete Temp: 69 °F ASTM C1064 Ambient Temp: 70 °F ASTM C1064 Slump: 5.00 in. ASTM C143 Tested at: Anaheim Respectfully Submitted, MTGL, Inc. . XA6 M.B. (Ben) Lo Chief Engineer 3950 PSI 28 -day compression test complies with the specified strength. Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3 Branch: 14320 Elsworth Street, Suite CI01, Moreno Valley, CA 925 j) Tel: (909) 653-4999 Fax: (909) 653-4 �+ Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0 Report of. COMPRESSIVE STRENGTH -CONCRETE ASTM C39 VCC 4425 JAMBOREE ROAD, SUITE 180 NEWPORT BEACH, CA 92660 Client: THOMAS ENTERPRISES A Set No.: 5-7802 JAN X 3 2006 U File No.: ` l� Permit No.: Project No.: 3115E03. ly, Project Namec�PAD 31v1ARKET PLACE@ LA QUINTA___`.'_2 HWY 1 I 1 @ ADAMS LA QUINTA, CA Age (Days) Date Tested Nominal Size Actual Area (Sq. Inch) Load Strength (lbs.) (psi) Type of Fracture 14 12/21/2005 6X 12 28.37 75,530 2,660 Cone 28 1/4/2006 6X 12 28.27 28 1/4/2006 6X 12 28.27 28H 1/4/2006 6X 12 28.27 Specified Strength: 3,000 PSI Sampled By MICHAEL G. Location: INT. SPREAD FOOTINGS (PAD # 3) Concrete Supplier: ASSOCIATED READY MIX Mix No.: 25336 Ticket No.: 3594427 Water added at,Site: 0.00 gal. By Cement Type: Mix Time: min. Remarks: Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** A ASTM C172 Date Sampled: 12/7/2005 Date Received: 12/16/2005 Concrete Temp: 71 OF ASTM C1064 Ambient Temp: 68 OF ASTM C1064 Slump: 5.00 in. ASTM C143 Tested at: Anaheim Respectfully Submitted, MTGL, Inc. M.B. (Ben) Lo Chief Engineer Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite CI01, Moreno Valley, CA 92553 Tel: (909) 6534999 Fax: (909) 6534666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of: COMPRESSIVE STRENGTH -CONCRETE ASTM C39 ss CITY OF LA QUINTA-BLDG & SAFETY 78495 CALLE TAMPICO LA QUINTA, CA 92253 File No.: jq l - r N Permit No.: Project No.: 3115E03 Project Name: PAD 3 MARKET PLACE @ LA QUINTA HWY 111 @ ADAMS LA QUINTA, CA Client: THOMAS ENTERPRISES A - — Set No.: - 5-7802 A Age. (Days) Date Tested Nominal Actual Area Size (Sq. Inch) Load (lbs.) Strength (psi) Type of Fracture 14 12/21/2005 6X 12 28.37 75,530 2,660 Cone 28 1/4/2006 6X 12 28.37 95,180 3,360 Cone 28 1/4/2006 6X 12 1 28.37 1 92,650 1 3,270 1 Cone 28 H 1/4/2006 6X 12 1 28.27 Specified Strength: 3,000 PSI Sampled By MICHAEL G. Location: INT. SPREAD FOOTINGS (PAD # 3) Concrete Supplier: ASSOCIATED READY MIX Mix No.: 25336 Ticket No.: 3594427 Water added at Site: 0.00 gal. By Cement Type: Mix Time: min. Remarks: r ASTM C172 Date Sampled: 12/7/2005 Date Received: 12/16/2005 Concrete Temp: 71 °F ASTM C1064 Ambient Temp: 68 °F ASTM C1064 Slump: 5.00 in. ASTM C143 Tested at: Anaheim Distribution: THOMAS ENTERPRISES Respectfully Submitted,MTGL, Inc. VCC � CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** M.B. (Ben) Lo Chief Engineer 3320 PSI 28 -day compression test complies with the specified strength. Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 6534999 Fax: (909) 653-4666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of. COMPRESSIVE STRENGTH -CONCRETE ASTM C39 * * File No.: CITY OF LA QUINTA-BLDG & SAFETY Permit No.: 78495 CALLE TAMPICO Project No.: 3115E03 LA QUINTA,' CA 92253 Project Name: PAD 3 MARKET PLACE @ LA QUINTA HWY 111 @ ADAMS Client: THOMAS ENTERPRISES LA QUINTA, CA Set No.: 5-7989 Age (Days) Date Tested Nominal Size Actual Area Load (Sq. Inch) (lbs.) Strength (psi) Type of Fracture 7 12/30/2005 6X 12 28.37 72,400 2,550 Cone 28 1/20/2006 6X 12 28.27 28 1/20/2006 6X 12 28.27 Specified Strength: 3,000 PSI Sampled By MICHAEL G. Location: PIER FOOTINGS FIRST 3 FROM EAST @ STORE FRONT Concrete Supplier: ASSOCIATED READY MIX Mix No.: 16031' Ticket No.: Water added at Site: 0.00 gal. By Cement Type: Mix Time: min. Remarks: Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** ASTM C172 Date Sampled: 12/23/2005 Date Received: 12/28/2005 Concrete Temp: 69 °F ASTM C1064 Ambient Temp: 70 °F ASTM C1064 Slump: 5.00 in. ASTM C143 Tested at: Anaheim Respectfully Submitted, MTGL, Inc. M.B. (Ben) Lo Chief Engineer Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Nominal Size Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Type of Fracture Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 28.37 Tel: (909) 6534999 Fax: (909) 653-4666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 28 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of. COMPRESSIVE STRENGTH -CONCRETE ASTM C39 ss CITY OF LA QUINTA-BLDG & SAFETY 78495 CALLE TAMPICO LA QUINTA, CA 92253 Client: THOMAS ENTERPRISES Set No.: 5-7801 File No.: Permit No.: Project No.: 3115E03 Project Name: PAD 3 MARKET PLACE @ LA QUINTA HWY 111 @ADAMS LA QUINTA, CA loom Age (Days) Date Tested Nominal Size Actual Area (Sq. Inch) Load (lbs.) Strength (psi) Type of Fracture 7 12/22/2005 6 X 12 28.37 73,000 2,570 Cone 28 1/12/2006 6X 12 28.27 28 1/12/2006 6X 12 28.27 28H 1/12/2006 6X 12 28.27 Specified Strength: 3,000 PSI Sampled By MICHAEL G Location: S.O.G. LAST 10' OF EAST END PAD # 3 Concrete Supplier: ASSOCIATED READY MIX Mix No.: 25336 Ticket No.: 3602058 Water added at Site: 0.00 gal. By Cement Type: Mix Time: Remarks: Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** ASTM C172 Date Sampled: 12/15/2005 Date Received: 12/16/2005 Concrete Temp: 70 OF ASTM C1064 Ambient Temp: 83 OF ASTM C1064 Slump: 4.25 in. ASTM C143 min. Tested at: Anaheim Respectfully Submitted, MTGL, Inc. 1 M.B. (Ben) Lo Chief Engineer Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 653-4999 Fax: (909) 653-4666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 t Report of. COMPRESSIVE STRENGTH -CONCRETE ASTM C39 ** CITY OF LA QUINTA-BLDG & SAFETY 78495 CALLE TAMPICO LA QUINTA, CA 92253 Client: THOMAS ENTERPRISES Set No.: 5-7802 File No.: Permit No.: Project No.: 3115E03 Project.Name:CPAD 3 MARKET PLACE @ CA QUINT— HWY 111 @ ADAMS LA QUINTA, CA Age (Days) Date Nominal Tested Size Actual Area (Sq. Inch) Load (lbs.) Strength Type of (psi) Fracture 14 12/21/2005 6X 12 28.37 75,530 2,660 Cone 28 1/4/2006 6X 12 28.27 28 1/4/2006 6X 12 28.27 28 H 1/4/2006 6X 12 28.27 Specified Strength: 3,000 * PSI Sampled By MICHAEL G. Location: INT. SPREAD FOOTINGS (PAD # 3) Concrete Supplier: ASSOCIATED READY MIX Mix No.: 25336 Ticket No.: 3594427 Water added at Site: 0.00 gal. By Cement Type: Mix Time: min. Remarks: 1 • Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** ASTM C172 Date Sampled: 12/7/2005 Date Received: 12/16/2005 Concrete Temp: 71 °F ASTM C1064 Ambient Temp: 68 °F ASTM C1064 Slump: 5.00 in. ASTM C143 Tested at: Anaheim Respectfully Submitted, 1 MTGL, Inc. M.B. (Ben) Lo Chief Engineer 5 ASTM C172 Date Sampled: 12/7/2005 Date Received: 12/16/2005 Concrete Temp: 71 °F ASTM C1064 Ambient Temp: 68 °F ASTM C1064 Slump: 5.00 in. ASTM C143 Tested at: Anaheim Respectfully Submitted, 1 MTGL, Inc. M.B. (Ben) Lo Chief Engineer CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 02/11/2006 PROJECT NO. 3115EO3 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO. 1 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PE05 303 RMIT NO. SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 10722 AME--Pdd'3— PROJECT NAME--Pd-d'3— X.- `.- INSPECTION ADDRESS: 79-174 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-174 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT/ MANPOWER USED: WELDING MACHINE: Lincoln SAE -350, Miller Big Blue 400D, Miller Big Blue 402P AREA, GRIDLINES, PIECES OBSERVED: Items Completed: (1) Welding of the top cord of the roof trusses and joists to the wall plates on line 3/A to E. (2) Welding of the splice plates between the ends of the ledger angles on line 3/A to E. (3) Welding of the W8x10 roof beams to the top cord of the roof joists on lines 1.3/A.3 to A.9, 2.5 to 2.9/13.7 to C, 2.6 to 2.9/C.5 to C.7, and 2.9/A.1 to A.3. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: n/a TEMPERATURE: 81 Deg F TESTS REQUIRED: n/a SITE TIME START: 7:00 AM SITE TIME FINISH: 11:30 AM 4-ql PA LUNCH PERIOD: none TRAVEL TIME: VERIFIED/11Y/ I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH v THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 02/07/2006 City Of La Quinta Print Name I Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN . , SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 02/11/2006 PROJECT NO. 3115E03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO. 2 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-303 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Pad 3 INSPECTION ADDRESS: 79-174 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-174 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBG FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Miller Big Blue 400D, Miller Big Blue 402P AREA, GRIDLINES, PIECES OBSERVED: Item Completed: Welding of thr beam to column moment connections on lines 0.1/A.3, A.7, 0.6 & E. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: Na TEMPERATURE: 85 Deg. F TESTS REQUIRED: n/a SITE TIME START: 7:00 AM SITE TIME FINISH: 11:00 AM LUNCH PERIOD: none TRAVEL TIME: L67 V RIFIED BY 1 UU by ULK I IFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 02/08/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego I Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 02111/2006 PROJECT NO. 3115E03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO. 3 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PE RMIT NO. 05-303 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Pad 3 INSPECTION ADDRESS: 79-174 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-174 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 & FCAW NR232 CONTRACTORS EQUIPMENT 1 MANPOWER USED: WELDING MACHINE: Lincoln Shield -Arc SA -250, Miller trailblazer 301 G AREA, GRIDLINES, PIECES OBSERVED: Items Completed: Welding of the 8x10 roof beams to the top cord of the roof girders and joists on line 1 to 2.7 from D.5 to E. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: nla TEMPERATURE: 84 Deg. F TESTS REQUIRED: nfa SITE TIME START: 7:00 AM SITE TIME FINISH: 10:00 AM LUNCH PERIOD: none TRAVEL TIME: VERIFIED BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0e, 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 02/09/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego I Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951:653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 02/11/2006 PROJECT NO. 3115EO3 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO 4 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-303 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Pad 3 INSPECTION ADDRESS: 79-174 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-174 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBG FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 & FCAW NR232 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln Shield -Arc SA -250 AREA, GRIDLINES, PIECES OBSERVED: Items Completed: (1) Welding of the entire roof joist bridging angles on lines A to E from 1 to 3. (2) Torque tightening of the ASTM A325 High Strength Bolts on the entire W8x10 roof beams on lines A to E from 1 to 3 on the roof level and on the beam to column moment connections on lines 0.1/A.3, A.7, D.6 & E. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: n/a TEMPERATURE: 84 Deg. F TESTS REQUIRED: n/a SITE TIME START: 9:00 AM SITE TIME FINISH: 11:30 AM �20- 07 LUNCH PERIOD: none TRAVEL TIME: VERIF BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH * THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. , A 'r— v i �/, 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 02/10/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number ' ' MTG 7� war Corporate: 2992 E. La Palma Ave., Ste. A Anaheim, CA 92806 Tel: 714.632.2999 , Fax: 714.632.2974 San Diego/Imperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 t i Inland Empirt: 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK(( INSPECTOR OTECHNICIAN 1`2�LJ�C� C P`� AVAILABLE: SOIL REPORT (Y) (N) SPECS 4;M (N)' APPROVED PLANSO(N) APPROVED SHOP DRAWING (Y) (N) ARCHITECT IV �v\ FOR WEEK ENDINGPRQIECT. \��� NO. ENGINEER REPORT NO. PG OF CONTRACTOR PLAN FILE NO. PERMIT NO. SUB -CONTRACTOR PROJECT NAME INSPECTION ADDRESS L�n ct - kr,\q it"y'k k ADDRESS OF PROJECT "*'\(��" -- 0'\1-k \\\ \_ p\ A REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAUMTGL SOIL MANUAL- REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): ZC3 CONTRACTORS EQUIPMENT/ '�/\%p�'Upl R USED: AREA, GRID LINES, PIECES OBSERVED: STRUCTURAL NOTES, DETAIL, OR RFIS USED: REMARKS, INCLUDING MEETINGS: f\� e P. � o\vim � t___c • �r- k�`�-� � Q ��.-�r � REWORK AS PERCENT OF ALL WORK TODAY PERCENT PROJECT COMPI FTION• WEATHER: �\,�i�.S� TEMPERATURE: SAMPLES TAKEN: �� �'^� �� Cx\" ° TESTS REQUIRED: �D C. SITE TIME'START: ._\_\(n C'D "+� LUNCH PERIOD: SITE TIME FINISH: —Z TRAVEL TIME: VERIFIED BY: I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT Signature Date of Report ICBO Certification Number Print Name City / County Certification Number Rev: 7/97 x'f RMTGL.:�'- Corporate: ' San Diego/Imperial County: Inland Empt 2992 E. La Palma Ave., Ste. A 7313 Carroll Road, Suite G 14320 Elsworth Street, Ste. C101 Anaheim, CA 92806 San Diego, CA 92121 Moreno Valley, CA 92553 Tel: 714.632.2999 Tel: 858.537.3999 Tel: 951.653.4999 Fax: 714.632.2974 Fax: 858.537.3990 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK 16INSPECTOR ❑ TECHNICIAN SC"`�ar�T �a,c� Q_�� AVAILABLE: SOIL REPORT (Y) (N) SPECSON) N) APPROVED PLANSON) APPROVED SHOP DRAWING (Y) (N) ARCHITECT ` FOR WEEK ENDING PROJECT. NO. ENGINEER � � � � REPORT N0. PG i OF CONTRACTOR �! PLAN FILE NO. PERMIT NO. o 7s ' 30 SUB -CONTRACTOR P PROJECT NAME 1z" INSPECTION ADDRESS p ADDRESS OF PROJECT REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL/MTGL SOIL MANUAL — REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE OR DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): CONTRACTORS EQUIPMENT/MANPOWER USED: AREA, GRID LINES, PIECES OBSERVED: �><J � =Z� �. r � e �� ` f:�...�1� � � �` ♦ waw Q.�C,P� �O m''! � +�� C Ct up, STRUCTURAL NOTES, DETAIL, OR RFIS USED: 65 REMARKS, INCLUDING NEE71NGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETIONO WEATHER: ��tJL TEMPERATURE: SAMPLES TAKEN: S q� C��.•' TESTS REQUIRED: SITE TIME START: "�)0 N SITE TIME FINISH: LUNCH PERIOD: TRAVEL TIME: VERIFIED BY: 100 CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT Signature Date of Report ICBO Certification Number Print Name City / County Certification Number Rev: 7/97 Corporate: t'� San Diego/Imperial County: Inland Empltc:'I 2992 E. La Palma Ave., Ste. A 7313 Carroll Road, Suite G 14320 Elsworth Street, Ste. C101 Anaheim, CA 92806 San Diego, CA 92121 Moreno Valley, CA 92553 Tel: 714.632.2999 Tel: 858.537.3999 Tel: 951.653.4999 Fax: 714.632.2974 Fax: 858.537.3990 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK ZINSPECTOR ❑ TECHNICIAN AVAILABLE: SOIL REPORT (Y)(N) SPECS ®(N) APPROVED PLANSQPD(N) APPROVED SHOP DRAWING (Y) (N) ARCHITECT a t� FOR WEEK ENDING -CN PROJECT. NO. ENGINEER S S REPORT NO. PG OF \ \ CONTRACTOR V cal PLAN FILE NO. PERMIT NO. SUB -CONTRACTOR --T % b%'_-, �t_\ \� PROJECT NAME 'S'yx Z4.% \ Qom, iINSPECTION ADDRESS e� `1 'Ac L1=.*-� - l "E .ta � � w ADDRESS 01"PROJECT {�' �P JO � L�.aI►L\ Q 'O � �' -/ REPORTING REQUIREMENTS: 1CBO FIELD INSPECTION MANUALMTGL SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): 0-A itZs13ea ?'©C=' �C> CONTRACTORS EQUIPMENT/ MANPOWER USED: AREA, GRID LINES, PIECES OBSERVED: �at�• ra m 5Irs(P o�g. 3����. o� otc.��.. �• IrJ�S �.\ �iy�a Ca-��s>, �, �coc'S�•".v�gS �CIiZ \moo �/ STRUCTURAL NOTES, DETAIL. OR RFIS USE REMARKS, INCLUDING MEETINGS. CQ S O.��S �� �4y'���� (I Vii[-Q�c_'CX' S Q e�Z S? .r n �• �.\S REWORK AS PERCENT OF ALL WORK TODAY PERCENT PROJECT COMPLETION' WEATHER: C`�asZ TEMPERATURE: SAMPLES TAKEN: C) TESTS REQUIRED: SITE TIME START: SITE TIME FINISH: LUNCH PERIOD: TRAVEL TIME: P VERIFIED BY:/ ` I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT Signature Date of Report ICBO Certification Number — Print Name City / County Certification Number Rev 7/97 CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 17/17/2005 PROJECT NO. 31113303 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego. CA 92102 REPORT NO. 1 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 04-6326 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Bed bath & Beyond INSPECTION ADDRESS: 79-110 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-110 Highway 111 La Quints, CA REPORTING REQUIREMENTS: ICBG FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY. OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT ACOPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: MQ Whisperweld BLW-400SSW2, Lincoln Shield -Arc SA -250, Miller trailblazer 301G AREA, GRIDLINES, PIECES OBSERVED: (1) In Progress: Erection of Canopy framing from line B.2 to F.3 between 1ines6 & T. (2) Completed Welding: a) Tube steel to top of roof joists on line 4 from A to C. b) Tube steel to top of roof joists on line 5 from A to C. c) Square plates to wall embeds at bottom cord of roof joists at lines A3, A4 and A5. STRUCTURAL NOTES, DETAIL, OR RAS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: cool SAMPLES TAKEN: nla TEMPERATURE: 73 deg. F TESTS REQUIRED: n/a SITE TIME START: 7:00 AM SITE TIME FINISH: 4:30 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: ERIFIED BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 12/15/2005 City Of La Quinta Print Name Date Of Report City / County Certification Number