Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
05-4855 (RC) Field Report
F IT Corporate: 2992 E. La Palma Ave Anaheirn. CA 92806 TPI: 714.632.2999 Fax: .714-632.291-4 San Diego/Imperial County: Ste. A 7313 Carroll Road, Suite G San Diego. CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Empi,-. 14320 Elsworth Street. Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT rrPE 3F WORK .INSPECTOR -TECHNICIAN 5 "(`'ia.:T^ 7� )� .,. 4P.;-FITEC7 f, ENGIFEEH --- r ONTRACTOR ` 1 AVAILABLE SOIL REPORT IYIINI APPROVED PLANSgnIN) FOR WEEK ENDING REPORT N0. PLAN FILE NO. SPECS (MIN) APPROVED SHOP DRAWING (Y) (N) PROJECT. NO PG ` OF�%- PERMIT NO. SUB -CONTRACTOR - C\ PROJECT NAME INSPECTION ADDRESS ADDRESS OFPROJECT REPORTING REQUIREMENTS: ICBG FIELD INSPECTION MANUAUMTG.. SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IFTHERF. IS NON-CONFORIMING WORK ATTHE END OF THE \YORK DAY. OR MISSING MTRS. AND RFIS. ETC.. FILL OUT .AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY. POURS OR A PREVIOUS INSPECTOR'S. IS CORRECTED. SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPi' WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS)' \vnZ tt—\ Q CONTRACTORS EQUIPMENT I MANPOWER USE ' r AREA, GRID LINES. PIECES OBSERVED: - � ro•.a� C`\.v� Co � \'� 2 e+es o � -� � A � sa o � STRUCTURAL NOTES. DETAIL. OR RFIS USED: REMARKS. INCLUDING MEE77NGS: p , REWORK AS PERCENT OF ALL WORK TODAY- PERCENT aR�n�iFrT rn npl FTlnnl WEATHER' C\{,-�� SAMPLES TAKEN. TEMPERATURE TESTS REQUIRED: SITE TIME START: SITE TIME FINISH:. LUNCH PERIOD .___._.._. TRAVEL TIME: -------- VERIFIED BY: .._ , vv Un, in Inw I nMVt rthz)UNALLT 08StHVtU All OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH FYHE SOIL I ESTIGATION RECOMMEND-- A ANC / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE. UNLESS OTHERWISE NOTED INT E DEFICIENCY REPORT cl,_ (��,_� Signature Z / ' / � su C 2, -may Date of Report ICBO Certification Number Pimt Name City ; County Certification Numbe, Corporate: '992 E. La Palma Ave Anaheim. CA 92806 Tel: 714.632.2999 F,lx: 714.632.291-4 San Diego/Imperial County: Ste. A 7313 Carroll Road. Suite G San Diego. CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Empi.-. 14320 Elsworth Street. Ste. C101 Moreno Vallee, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT "'PE OF WORK NNSPECTOR [ TECHNICIAN AVAILABLE SOIL REPORT IYI IN! SPECS (MM) 6"f`•iut` 7, �\ }�� . �. AP,CHITE'" APPROVED PLANSI�!NN) APPROVED SHOP DRAWING (Y) (N C� FOR WEEK ENDING PROJECT. NO ---- EN;aa'EEH REPORT NO. PG OF� - 1 ::ON*RACTOR 1 PLAN FILE NO. PERMIT N0, SUBCONTRACTOR PROJECT NAME r A" •�J j a INSPECTION ADDRESS ADDRESS OF PROJECT REPORTING REQUIREMENTS: ICBO FIELD INSPECTION NIANUAL/MTGI. SOIL MANUAL— REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE EVD OFTHE WORK DAY. OR MISSING MTRS. AND RFIS. ETC.. FILL OL? AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY. YOURS ORA PREVIOUS INSPECTOR'S. IS CORRECTED. SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR W'F-.EK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS)' CONTRACT S EQUIPMENT/ MANPO&tER US ' AREA. GRID LINES. PIECES OBSERVED: �V \mow,► ��\� ��\�rZ STRUCTURAL NOTES DETAIL OR RFIS USED % REMARKS. INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PRO iECT CO ecl ETIONl WEATHER: �� �l�.S �• SAMPLES TAKEN: TEMPERATURE ' TESTS REQUIRED. SITE TIME START. SITE TIME FINISH.�y, LUNCH PERIOD ----__—_-- TRAVEL TIME:.__ _-.---_—_—__ VERIFIED BY .._.. '� / -- I UU ulK I IrT 1HAI 1 HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INJUESTIGATION RECOMMENDATIONS. ANC : OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY RFPnAT Signature Print Name Date of Report ICBG Certification Number City r County Certification Number Corporate: 2992 E. La Palma Ave.. Ste. A Anaheim, CA 92806 Tel: 714.632.2999 F,tx: 714.632.2974 San Diego/Imperial County 7313 Carroll Road, Suite G San Diego. CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Empi.-. 14320 ElSworth Street. Ste. C101 Moreno Vallev. CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT ".'%E -OF WORK .'NSPECTOR C. TECHNICIAN AVAILABLE SOIL REPORT(Y):N! SPECS (M(N) SLL�a:i^ i�\}�`", APPROVEDPLANSgnXN) APPROVED SHOP DRAWING (Y I IN'! ARChITEC- FOR WEEK ENDING PROJECT. NO � C 1 _ REPORTNO- PG OF 1 1 ONTRACTOR 1 PLAN FILE NO. PERMIT NO. SUBCONTRACTOR - PROJECT NAME �` --' a INSPECTION ADDRESS ADDRESS OF PROJECT At REPORTING REQUIREMENTS: ICBG FIELD INSPECTION `TANUALJMTGI. SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NONCONFORMING WORK AT THE END OF THE WORK DAY. OR !MISSING MTRS. AND RFIS. ETC.. FILL OUT AND ATTACH A DF.FICIENCN' REPORT W1'IEN A DEFICIENCY. YOURS OR A PREVIOUS INSPECTOR'S. IS CORRECTED. SO \OTE ON THE ORIGINAL DEFIC!EN'CY REPORT .AND SUBMIT .A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS). \ CONTRACTORS EQUIPMENT /MANPOWER USED: T� AREA. GRID LINES. PIECES OBSERVED: 12 o�,1c A�i�CQ� k-ei Z-SOOQS � STRUCTURAL NOTES. DETAIL. OR FIRS USED: v _- REMARKS. INCLUDINGMEMNGS: REWORK AS PERCENT OF ALL WORK TODAY P RrFn1T PRn IFrT COMPLETION 1 TII,�I WEATHER: SAMPLES TAKEN. V TEMPERATURREE I \-0.LTvC`t-\ TESTS REQUIRED. SITE TIME START �` �; i1 SITE TIME FINISH. LUNCH PERIOD TRAVEL TIME:VERIFIED BY: .._ _ i UU UK I try I HAI I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INV !CATION RECOMMEND7iTfONS, ANC: OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE FIC.IFNr..Y nFPnMT Signature Print Name Z ! �o Date of Report ICBO Certification Number City I County Certification Number Corporate: 2992 E. La Palma Ave.. Ste Anaheim, CA 92806 Tel: 714.632.2999 ' Fax: 714.632.2974 San Diego/Imperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Empi,_ 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK ;ZINSPECTOR O TECHNICIAN AVAILABLE, SOIL REPORT (Y)(N) SPECS (M(N) APPROVED PLANS4CXN) APPROVED SHOP DRAWING (Y)(N) ARCHITECT FOR WEEK ENDING PROJECT. NO. ENGINEER — �� - O ! \ REPORT NO. PG OF ` \ CONTRACTOR PIAN FILE N0. PERMIT N0. SUB -CONTRACTOR -71 PROJECT NAME INSPECTION ADDRESS ADDRESS OF PROJECT REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAUMTGi. SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY. OR MISSING MTRS. AND RFIS. ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S. IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT -NO. OR MATERIAL TEST REPORTS): CONTRACTORS EQUIPMENT/ MANPOWER USED: /' \ AREA. GRID LINES, PIECES OBSERVED: Q'01L §r MEN& STRUCTURAL NOTFC DETAIL. OR unc USED REMARKS. INCLUD/MGMEETINGS: ` REWORK AS PERCENT OF ALL WORK TODAY* PERCENT PROJECT CO ecl GTIOnI WEATHER: ��t�S SAMPLES TAKEN: -� TEMPERATURE:TESTS REQUIRED: �. SITE TIME START: :`'^ SITE TIME FINISH:ly___ LUNCH PERIOD: TRAVEL TIME: __. VERIFIED BY: — I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL IN IGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY RFPnRT AZ to © c Signature Date of Report Print Name ICBO Certification Number City / County Certification Number 1 Corporate: San Diego/Imperial County: Inland Empi,-. 2992 E. La Palma Ave., Ste. A , 7313 Carroll Road, Suite G 14320 Elsworth Street, Ste. C101 Anaheim, CA 92806 San Diego, CA 92121 Moreno Valley, CA 92553 Tel: 714.632.2999 Tel: 858.537.3999 Tel: 951.653.4999 Fax: 714.632.2974 Fax: 858.537.3990 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK '" INSPECTOR 0 TECHNICIAN AVAILABLE: SOIL REPORT (Y)(N) SPECS (M(N) ARCHITECT r ENGINEER • CONTRACTOR APPROVED PLANS44 (N) APPROVED SHOP DRAWING (Y) FOR WEEK ENDING PROJECT. N0. REPORT NO. PG OF PLAN FILE NO. PERMIT NO. SUB -CONTRACTOR h - PROJECT NAME INSPECTION ADDRESS ADDRESS OF PROJECT ' w \n, RTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL/MTG,. SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS ERE IS NON -CONFORMING WORK AT THE END OFTHE WORKDAY. OR MISSING MTRS. AND RFIS. ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT rWHENA DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S. IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND RIvI1TA COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): CONTRACTORS EQUIPMENT/ MANPOWER USED: gg AREA. GRID LINES, PIECES OBSERVED: a STRUCTURAL NOTES. DETAIL. OR RFIS USED: ` REMARKS. INCLUDING MEETINGS, Zl>1z JJ REWORK AS PERCENT OF ALL WORK TODAY' p RQFNT PROJECT CO nal GTION WEATHER: �� �S SAMPLES TAKEN:—� TEMPERATURE: �r TESTS REQUIRED: --%I " SITE TIME START:: i��'_`_SITE TIME FINISH: LUNCH PERIOD. TRAVEL TIME: _ VERIFIED BY: �rnr ti t — -- ., LLT 000FMVtU ALL Ur Int WUHK LIS I ED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL'I`NASTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT f z / —z— Signature Signature Date of Report ICBO CertOication Number Print Name City / County Certification Number Corporate: 2992 E. La Palma Ave.. Ste Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego/Imperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Empi,-. 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 . Fax: 951.653.4666 FIELD REPORT TYPE OF WORK ,INSPECTOR ❑ TECHNICIAN AVAILABLE: SOIL REPORT(Y)(N) SPECS (M(N) �•r ARCHITECT APPROVED PLANS 92(N) APPROVED SHOP DRAWING (Y) (N) FOR WEEK ENDING C \ PROJECT. NO. ENGINEER REPORT NO. PG OF 1 CONTRACTOR PLAN FILE N0. PERMIT NO. SUB -CONTRACTOR PROJECT NAME c INSPECTION ADDRESS ADDRESS OF PROJECT REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL/MTGL SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NUN -CONFORMING WORK AT THE END OFTHE WORK DAY, OR MISSING MTRS, AND RFIS. ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S. IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUMMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): ��ct.,-�c t'\`.w� �i.�.��, cam.=.��3•� CONTRACTORS EQUIPMENT/ MANPOWER USED. O AREA, GRID LINES. PIECES OBSEAX. �F �ALoOZ,- -CNgc . Y\ �.v� ` 3J�1` =C�� �'� . Ca W % STRUCTURAL NOTES. DETAIL, OR RFIS USED. REMARKS. INCLUDING MEEnMG$4V i._ `-�, s� REWORK AS PERCENT OF ALL WORK TODAY: PRC NT M ECT COMPLETION- O P ETIONWEATHER: WEATHER:�l�S SAMPLES TAKEN: O �� �,� C�) �� 5�.. TEMPERATURE: TESTS REQUIRED: SITE TIME START: ��SITE TIME FINISH: �dy_ LUNCH PERIOD: TRAVEL TIME: VERIFIED BY: i 1 DO CERTIFY IrY I HAI 1 HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL I V STIGATION RECOMME ATIONS• AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN DEFICIENCY REPORT Signature �r Date of Report r ICBO Certification Number Print Name City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (`n (N) SPECS. m APPROVED PLANS (Y) APPROVED SHOP DRAWINGS m ARCHITECT Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 04/01/2006 PROJECT NO. 3115J03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NC 2 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO.PERMIT NO. 05-3259 SUB -CONTRACTOR: Portola Construction, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: SHOP 3 Famous Footwear INSPECTION ADDRESS: 79-150 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-150 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODE: SMAW E-6022 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln Classic 300D, Miller Big Blue 302P AREA, GRIDLINES, PIECES OBSERVED: In Progress: Puddle welding of the metal roof decking. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: Na TEMPERATURE: 74 Deg. F TESTS REQUIRED: n/a SITE TIME START: 11:00 AM SITE TIME FINISH: 1:00 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: )VERIFIED BY 1 DO BY CERTIFY THAT 1 HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 04/01/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 Sari Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD RFPnRT Inland Empire 14320 Ellsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. m APPROVED PLANS m APPROVED SHOP DRAWINGS m ARCHITECT Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 04/03/2006 PROJECT NO. 3115K03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NC 1 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-3259 SUB -CONTRACTOR: Portola Construction, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: MAJOR V Drexel Heritage INSPECTION ADDRESS: 79-150 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-150 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 & E-6022 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln SAE 350, Lincoln Classic 300D, Miller Big Blue 302P AREA, GRIDLINES, PIECES OBSERVED: In Progress: Puddle welding and side seam punch locking of the metal roof decking. Items Completed: Welding of the diagonal bracing angles from the bottom flange of the W10x12 roof beams to the wall embeds from line G.3 to G.9 between lines 11.5 and 12. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: n/a TEMPERATURE: 87 Deg. F TESTS REQUIRED: n/a SITE TIME START: 12:00 PM SITE TIME FINISH: 4:30 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: VERIFIED BY I UU UT l:tK I WT I MAI I rtAVt rtKSUNALLY UIJ5ERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. ��� 084926485 Signature ICBO Certification Number Steve W. Bodnar 04/03/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street. Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (1) (N) SPECS. m APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 04/01/2006 PROJECT NO. 311511<03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NC 2 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-3259 SUB -CONTRACTOR: Portola Construction, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: MAJOR V Drexel Heritage INSPECTION ADDRESS: 79-150 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-150 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 & E-6022 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln SAE 350, Lincoln Classic 300D, Miller Big Blue 302P AREA, GRIDLINES, PIECES OBSERVED: In Progress: (1) Puddle welding and side seam punch locking of the metal roof decking. (2) Welding of the steel framing at the store front. Items Completed: Welding the end of the W14x30 beam at the wall embed on line 4/E on the roof level. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: Na TEMPERATURE: 74 Deg F TESTS REQUIRED: n/a SITE TIME START: 1:00 PM SITE TIME FINISH: 5:00 PM LUNCH PERIOD: none TRAVEL TIME: V VERIFIED BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUIL(/DING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN AVAILABLE: SOIL REPORT (1) (N) SPECS. (Y) SSW APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT Smith Consulting Architects FOR WEEK ENDING 04/01/2006 PROJECT NO. 3115K03 12220 EI Camino Real Suite 200 San Diego, CA 92130 ENGINEER: CSSI REPORT NC 1 PG 1 OF 1 2445 Fifth Street Suite 300 San Diego, CA 92102 CONTRACTOR: Vratsinas Construction Co. PLAN FILE NO. PERMIT NO. 05-3259 P.O. Box 2558 Little Rock, AR 72203 SUB -CONTRACTOR: Portola Construction, Inc. PROJECT NAME: MAJOR V Drexel Heritage 10722 Edison Court Rancho Cucamonga, CA 91730 INSPECTION ADDRESS: 79-150 Highway 111 ADDRESS OF PROJECT: 79-150 Highway 111 La Quinta, CA La Quinta, CA norUK I INta KLUUMPINENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS. IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-6022 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln Classic 300D, Miller Big Blue 302P AREA, GRIDLINES, PIECES OBSERVED: In Progress: Puddle welding of the metal roof decking. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: n/a TEMPERATURE: 77.Deg F-. _ _ .--.. _._ _.. _TESTS.REQUIRED: — -- -- n/a .._ _—. _ . _ .�- .. . .. . . ...... .. . SITE TIME START: 1:30 PM SITE TIME FINISH: 5:00 PM LUNCH PERIOD: none TRAVEL TIME: VERIFIED BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. Z61' 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 03/30/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number `,.. ,-,,.r ,.. _).rvr.s.�T."'{�i'1u4 ..aa��a� Y,fi{1�,�,.,1a�.z±`f:"a.�cZ7Jb'1.•F5: ►,.'�X:yrti:�e rYl-.�ovq,n. �Mr > tea-.r•.y..t t, ., �n.. -i+� �' , Earth Systems • ��� southwest �`'` �:< ,��;� DAILY�'F$I3EID REPORT 79-811 B Country Club Drive . Indio, California 92203 - (760) 345-1588 TIME: WEATHER: TEMP: JOB NAME: JOB NO: 1 Z) 5Z DATE: \k "i o LOCATION: Lam. .�T.T�l CLIENT: 1 r- OtOWNER: CONTRACTOR: sem..: , PRESENT AT SITE: LIMITATIONS: This report is to provide information regarding the status of the field conditions and our opinion as to the need for corrective action, additional testing and or observations. No guarantee or warranty of the contractors work is made or implied. This report is subject to review by the project manager. CLIENT REPRESENTATIVE SIGNATURE „�; TECHNICIAN'S SIGNATURE kin 30499 BD -FS -001 (09/03) LOCATION DESCRIPTION DRAWING FIELD TESTING REFERENCE CURVE MOISTURE DRY RELATIVE MAXIMUM OPTIMUM TEST \_ LOT APPROXIMATE REQUIRED NO. of STATION ELEVATION CONTENT DENSITY COMPACTION DRY MOISTURE MINIMUM NUMBER % Ibs/ cu. ft. % DENSITY CONTENT DENSITY %. • Z 1 lbs/cu. ft. IK 9-C c Fs - 1 t 0`( -7 � I�Z75 Z-' G �` r-1 5 1: ZI % ti l�01-1 t z \0 1 C �r LIMITATIONS: This report is to provide information regarding the status of the field conditions and our opinion as to the need for corrective action, additional testing and or observations. No guarantee or warranty of the contractors work is made or implied. This report is subject to review by the project manager. CLIENT REPRESENTATIVE SIGNATURE „�; TECHNICIAN'S SIGNATURE kin 30499 BD -FS -001 (09/03) DRAWING REMARKS: 1. , \_ c A C Fr I / L ?Z 6011..! _ �J 3_.�S S i i 1 I NL^� 1` PCr Z 1 LIMITATIONS: This report is to provide information regarding the status of the field conditions and our opinion as to the need for corrective action, additional testing and or observations. No guarantee or warranty of the contractors work is made or implied. This report is subject to review by the project manager. CLIENT REPRESENTATIVE SIGNATURE „�; TECHNICIAN'S SIGNATURE kin 30499 BD -FS -001 (09/03) Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll' Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 6534999 Fax: (909) 653-4666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Reportof: COMPRESSIVE STRENGTH -GROUT ASTM C1019 * * File No.: CITY OF LA QUINTA-BLDG & SAFETY Permit No.: 78495 CALLE TAMPICO Project No.: 3115J03 LA QUINTA, CA 92253 Project Nal e�S`HOP 3 MARKETPLACE @ LA QUINTA ; HWY 111 -@—ADAMS — LA QUINTA, CA "��/� 150 Client: THOMAS ENTERPRISES (` " Set No..�6-1608 Age (Days) Date Tested Nominal Size Actual Area Load (Sq. Inch) (lbs.) Strength (psi) Type of Fracture 7 2/13/2006 3 X 3 X 6 9.58 24,070 2,510 N/A 28 3/6/2006 3 X 3 X 6 9.00 28 3/6/2006 3 X 3 X 6 9.00 Specified Strength: 2,500 PSI Sampled By MICHAEL G. Location: 2ND LIFT SHOP # 3 LINE 2 Concrete Supplier: ASSOCIATED READY MIX Mix No.v 46511 Ticket No.: 3634028 Water added at Site: 0.00 gal. By Cement Type: Mix Time: min. Remarks Distribution: THOMAS ENTERPRISES. VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** ASTM C172 Date Sampled: 2/6/2006 Date Received: 2/10/2006 Concrete Temp: 66 °F ASTM C1064 Ambient Temp: 80 °F ASTM C1064 Slump: 10.00 in. ASTM C143 Tested at: Anaheim Respectfully Submitted, MTGL, Inc. 40� /46 M.B. (Ben) Lo Chief Engineer Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 6534999 Fax: (909) 6534666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 'Tel: (818) 833-8100 Fax: (818) 833-0085 Reportof: COMPRESSIVE STRENGTH -GROUT ASTM C1019 CITY OF LA QUINTA-BLDG & SAFETY 78495 CALLE TAMPICO LA QUINTA, CA 92253 Client: THOMAS ENTERPRISES A Set No.: 6-1507 File No.: Date Tested Permit No.: Load Strength (lbs.) (psi) Project No.: 3115J03 Project Name: SHOP 3 MARKETPLACE @ LA QUINTA 13,290 1,390 HWY 111 @ ADAMS 28 LA QUINTA, CA Age (Days) Date Tested Nominal Actual Area Size (Sq. Inch) Load Strength (lbs.) (psi) Type of Fracture 7 2/7/2006 3 X 3 X 6 9.58 13,290 1,390 N/A 28 2/28/2006 3 X 3 X 6 9.00 28 2/28/2006 3 X 3 X 6 9.00 Specified Strength: 2,000 PSI Sampled By Location: 1 ST LIFT LINEA Concrete Supplier: ASSOCIATED READY MIX Mix No.: 46002 Ticket No.: - Water added at Site: 0.00 ` . gal. By Cement Type: Mix Time: Remarks: Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** J ASTM C172 Date Sampled: 1/31/2006 Date Received: 2/6/2006 Concrete Temp: 69 °F ASTM C1064 Ambient Temp: 65 °F ASTM C1064 Slump: 9.00 in. ASTM C143 min. Tested at: Anaheim Respectfully Submitted, MTGL, Inc. l M.B.(Ben) Lo Chief Engineer A Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 6534999 Fax: (909) 6534666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Reportof: COMPRESSIVE STRENGTH -GROUT ASTM C1019 CITY OF LA QUINTA-BLDG & SAFETY 78495 CALLE TAMPICO LA QUINTA, CA 92253 Client: THOMAS ENTERPRISES Set No.: 6-1609 File No.: Permit No.: Project No.: 3115.103 Project Name:-*rSHOP 3 MARKETPLACE@ LA QUINTA HWY 111 @ ADAMS LA QUINT& CA Age (Days) Date Tested Nominal Size Actual Area Load (Sq. Inch) (lbs.) Strength Type of (psi) Fracture 7 2/15/2006 3 X 3 X 6 9.64 16,510 1,710 N/A 28 3/8/2006 3 X 3 X 6 9.00 28 1 3/8/2006 1 3 X-3 X 6 1 9.00 Specified Strength: 2,500 PSI Sampled By MICHAEL G. Location: 3RD LIFT SHOP # 3 LINE A Concrete Supplier: ASSOCIATED READY MIX Mix No.: 46511 Ticket No.: 3634585 Water added at Site: 0.00 gal. By Cement Type: Mix Time: min. Remarks Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** ASTM C172 Date Sampled: 2/8/2006 Date Received: 2/10/2006 Concrete Temp: °F ASTM C1064 Ambient Temp: °F ASTM C1064 Slump: 10.00 in. ASTM C143 Tested at: Anaheim Respectfully Submitted, MTGL, Inc. 1 M.B.(Ben) Lo Chief Engineer Corporate: San Diego/Imperial County: Inland Emp'ii-. 2992 E. La Palma Ave., Ste. A 7313 Carroll Road, Suite G 14320 Elsworth Anaheim, CA 92806 San Diego, CA 92121 Moreno Valley, Tel: 714.632.2999 Tel: 858.537.3999 Tel: 951.653. Fax: 714.632.2974 Fax: 858.537.3990 Fax: 951.653. SUB -CONTRACTOR PROJECT NAME INSPECTION ADDRESS ADDRESS OF PROJECT_ REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAUMTGL SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): \ kC) Street, Ste. C101 CONTRACTORS EQUIPMENT / MANPOWER USED: ,*.A 4111-A CA 92553 AREA, GRID LINES. PIECES OBSERVED: 4999 4666 STRUCTURAL NOTES, DETAIL, OR RFIS USED: FIELD REPORT�`���� REMARKS, INC(UO/NG ME%#Gs. TYPE OF WORK INSPECTOR 0 TECHNICIAN AVAILABLE: SOIL REPORT (Y)(N) SPECS (Y)(N) APPROVED PLANS(M(N) APPROVED SHOP DRAWING (Y) (N) ARCHITECT + / WEATHER: C `�t�S� SAMPLES TAKEN: ®� *`� �� � TEMPERATURE: TESTS REQUIRED: 4 " v FOR WEEK ENDING \ �- `� _C PROJECT. `3 � NO. ENGINEER Z REPORT NO. PG `` OF CONTRACTOR V CL PLAN FILE NO. PERMIT N0. ^ Mz s->_ SUB -CONTRACTOR PROJECT NAME INSPECTION ADDRESS ADDRESS OF PROJECT_ REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAUMTGL SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): \ kC) CONTRACTORS EQUIPMENT / MANPOWER USED: ,*.A 4111-A AREA, GRID LINES. PIECES OBSERVED: STRUCTURAL NOTES, DETAIL, OR RFIS USED: REMARKS, INC(UO/NG ME%#Gs. �ti\ IL —Z ��ee Sov e-��-c e S REWORK AS PERCENT OF ALL WORK TODAY: PERCEN ROJECT COMPLETTION• / WEATHER: C `�t�S� SAMPLES TAKEN: ®� *`� �� � TEMPERATURE: TESTS REQUIRED: 4 " v SITE TIME START:')LL r.- - SITE TIME FINISH: (3y - LUNCH PERIOD: TRAVEL TIME: VERIFIED BY: I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SO11 KIVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT Signatures Date of Report ICBO Certification Number "Ile Yii�Gc's�iu e Print Name City / County Certification Number Rev: 7/97 M s. MTG L Corporate: 2992 E. La Palma Ave., Ste. A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego/Imperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Empii.. 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK 10INSPECTOR O TECHNICIAN C C AVAILABLE: SOIL REPORT (N) APPROVED PLANS (N) SPECS(M (N) APPROVED SHOP DRAWING (Y) (N) ARCHITECT FOR WEEK ENDING c. PROJECT. N0. ENGINEER REPORT NO. PG OF CONTRACTOR \l L PLAN FILE NO. PERMIT NO. O SUBCONTRACTOR v,Cn PROJECT NAME INSPECTION ADDRESS ADDRESS_OF PROJECT REPORTING REQUIREMENTS: ICBG FIELD INSPECTION MANUAUMTGL SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): CONTRACTORS EQUIPMENT/ MANPOWER UM 1 sp 49 L��4:.-SAS s \_`J �'OF e-�•^---aatJ AREA, GRID LINES, PIECES OBSERVED: n�'S1 STRUCTURAL NOTES, DETAIL. OR RFIS USED: REMARKS. INCLUDING MEETINGS. o REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: TEMPERATURE: v--�-- SAMPLES TAKEN: .�- TESTS REQUIRED: SITE TIME START:4"w'�cr� q" LUNCH PERIOD: SITE TIME FINISH?ZCCS� r• -- TRAVEL TIME: VERIFIED BY: I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INAITIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT Signature Date of Report ICBO Certification Number Print Name City / County Certification Number Rev: 7/97 Corporate: San Diego/Imperial County: Inland Empi,,,. 2992 E. La Palma Ave., Ste. A 7313 Carroll Road, Suite G 14320 Elsworth Street: Ste. C101 Anaheim. CA 92806 San Diego, CA 92121 Moreno Valley. CA 92553 Tel: 714.632.2999 Tel: 858.537.3999 Tel: 951.653.4999 Fax: 714.632.2974 Fax: 858.537.3990 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK INSPECTOR OTECHNICIAN AVAILABLE' SOIL REPORTdY ARCHITECT APPROVED PLANSV (N) FOR WEEK ENDING ENGINEER �, --Z ^ -, REPORT NO. , J CONTRACTOR c- �, PLAN FILE N0. SUBCONTRACTOR �• (j e PROJECT NAME INSPECTION ADDRESS r` - SI,, -_q_ADDRESS OF PROJECT SO LA \ (N) SPECSQ (N) APPROVED SHOP DRAWING (Y) (N) PROD CT PG OF PERMIT NO.cl REPORTING REQUIREMENTS: ICBG FIELD INSPECTION MANUAUMTGL SOIL MANUAL- REVIEW PREVIOUS REPORTS ANDLISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS. AND RF1S. ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S. IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT .A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT N0. OR MATERIAL TEST REPORTS): `=� e N C _ n cz r. /r,'•- \ . — . CONTRACTORS EQUIPMENT / MANPOWER AREA. GRID LINES. PIECES OBSERVED: NE -NE Irk STRUCTURAL NOTES. DETAIL. OR RFS USED REMARKS. INCLUG/NG MEETINGS: iEWORK Aq PER MT (-IC: At I \AIORK TODAY' P Rf FNT PRn I�r� WEATHER: Q �yyT SAMPLES TAKEN: TEMPERATURE: TESTS REQUIRED: SITE TIME START: -1_____ SITE TIME FINISH:-T%'C-7� r- - LUNCH PERIOD: TRAVEL TIME: ----------- VERIFIED BY: .. _ I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE S INVESTIGATION RECOMMENDATIONS. AND // OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT F' (r r . Signature Se8- 9 Date of Report ICBG Certification Number Print Name City / County Certification Number Rev: 7/97 Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 'Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 653-4999 Fax: (909) 653-4666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of: COMPRESSIVE STRENGTH -GROUT ASTM C1019 ss CITY OF LA QUINTA-BLDG & SAFETY 78495 CALLE TAMPICO LA QUINTA, CA 92253 Client: THOMAS ENTERPRISES . - Set No.: 6-1688 - File No.: Permit No.: Project No.: 3115]03 Project Name: SHOP 3 MARKETPLACE @ LA QUINTA_3 79-150 HWY 111 @ ADAMS LA QUINTA, CA Age (Days) Date Tested Nominal Size Actual Area (Sq. Inch) Load (lbs.) Strength (psi) Type of Fracture 7 2/17/2006 3 X 3 X 6 9.92 21,990 2,220 N/A 28 3/10/2006 3 X 3 X 6 9.00 28 1 3/10/2006 1 3 X 3 X 6 1 9.00 Specified Strength: 2,000 PSI Sampled By Location: 4TH LIFT A LINE Concrete Supplier: ASSOCIATED READY MIX Mix No.: 46511 Ticket No.: . Water added at Site: 0.00 gal. By Cement Type: Mix Time: Remarks: Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** I ASTM C172 Date Sampled: 2/10/2006 Date Received: 2/16/2006 Concrete Temp: 64 °F ASTM C1064 Ambient Temp: 68 °F ASTM C1064 Slump: 9.00 in. ASTM C143 min. Tested at: Anaheim Respectfully Submitted, MTGL, Inc. 1 . /A64 M.B. (Ben) Lo Chief Engineer � bYM Earth Systems V' Southwest ~� 79-811 B Country Club Drive Indio, California 92203 - (760) 345-1588 •,.tf fr� y Y DAILYFtI-ELD REPORT TIME: WEATHER: TEMP: JOB NAME: JOB NO: t >"S- Z DATE: LOCATION: �.�..r: ,; ,i �' �V (CLIENT: ! hL��Ytila `a OWNER: CONTRACTOR: PRESENT AT SITE: LIMITATIONS: This report is to provide information regarding the status of the field conditions and our opinion as to the need for corrective action, additional testing and or observations. No guarantee or warranty of the contractors work is made or implied. This report is subject to review by the project manager. CLIENT REPRESENTATIVE SIGNATURE TECHNICIAN'S SIGNATURE • j 30499 BD -FS -001 (09/03) � , LOCATION DESCRIPTION -7 DRAWING y` FIELD TESTING REFERENCE CURVE MOISTURE DRY RELATIVE MAXIMUM OPTIMUM TEST LOT APPROXIMATE REQUIRED NO. Imo! or STATION ELEVATION CONTENT DENSITY COMPACTION DRY MOISTURE MINIMUM i^ NUMBER % Ibstcu. ft. % DENSITY CONTENT DENSITY ! t ---= _ lbs/cu. ft. % '' C � s 1 C I I S. "r � t t y S;" l y 6 ' ty, C, 6 r -N 5 2 1 t.l LI Ga LIMITATIONS: This report is to provide information regarding the status of the field conditions and our opinion as to the need for corrective action, additional testing and or observations. No guarantee or warranty of the contractors work is made or implied. This report is subject to review by the project manager. CLIENT REPRESENTATIVE SIGNATURE TECHNICIAN'S SIGNATURE • j 30499 BD -FS -001 (09/03) � , DRAWING y` REMARKS: LIJ � Imo! t 3 L "! D L L- _ s LIMITATIONS: This report is to provide information regarding the status of the field conditions and our opinion as to the need for corrective action, additional testing and or observations. No guarantee or warranty of the contractors work is made or implied. This report is subject to review by the project manager. CLIENT REPRESENTATIVE SIGNATURE TECHNICIAN'S SIGNATURE • j 30499 BD -FS -001 (09/03) � , MTG L Corporate: 2992 E. La Palma Ave Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San DiegoAmperial County: Inland Empi,_ Ste. A 7313 Carroll Road, Suite G 14320 Elsworth Street, Ste. C101 San Diego, CA 92121 Moreno Valley, CA 92553 Tel: 858.537.3999 Tel: 951.653.4999 Fax: 858.537.3990 Fax: 951.653.4666 FIELD REPORT 1I-' `1��If TYPE OF WORK "- INSPECTOR C TECHNICIAN C. AVAILABLE: SOIL REPORT (Y) (N) APPROVED PLANSeNN) SPECS ®(N) APPROVED SHOP DRAWING (Y) (N) ARCHITECT �'� ' GAJ» � . FOR WEEK ENDING - -OCQ PROJECT. NO. - :v Z •, ENGINEER REPORT NO. PG OF CONTRACTOR 1 PLAN FILE NO. PERMIT NO. SUB -CONTRACTOR PROJECT NAME -s n INSPECTION ADDRESS ADDRESS OF PROJECT REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL/MTGL SOIL MANUAL — REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS. ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S. IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): CONTRACTORS EQUIPMENT/ MANPOWER USE AREA. GRID LINES. PIECES OBSERVED: �Re��o�t STRUCTURAL NOTES. DETAIL. OR RFIS USE6: REMARKS. INaUDING MEETINGS: ��, �.� >; �.�. �..�► � lam ��.�:��, REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPI ETIOM WEATHER: C� Qty` TEMPERATURE:�� SAMPLES TAKEN: TESTS REQUIRED. e. SITE TIME START: :'`�:�N�SITE TIME FINISH:A�jy_-__._.____ LUNCH PERIOD: TRAVEL TIME: _ VERIFIED BY: I UU L:tHI IFY fHAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS. AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT Af Signature Date of Report Certification NGbe� Print Name City / County Certification Number Rev: 7/9i CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Ellsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 03/11/2006PROJECT NO. 3115J03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO 2 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-3259 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: SHOP 3 Famous Footwear INSPECTION ADDRESS: 79-150 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-150 Highway 111 I La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Miller trailblazer 301 G, Miller Big Blue 400D AREA, GRIDLINES, PIECES OBSERVED: In Progress: (1) Welding the ends of the roof joists to the top cord of the roof girders along lines B and C. (2) Welding the splice plates between the ends of the top cord of the roof joists along lines B and C. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: n/a TEMPERATURE: 74 Deg. F TESTS REQUIRED: n/a SITE TIME START: 10:00 AM SITE TIME FINISH: 1:00 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: VERIFIED BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING ODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. Z� 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 03/08/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 03/1112006 PROJECT NO. 3115.103 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO 4 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-3259 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: SHOP 3 Famous Footwear INSPECTION ADDRESS: 79-150 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-150 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Miller Big Blue 400D, Miller Big Blue 401 P AREA, GRIDLINES, PIECES OBSERVED: In Progress: Welding of the bridging angles to the top and bottom cords of the roof joists. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Cool SAMPLES TAKEN: Na TEMPERATURE: 63 Deg. F TESTS REQUIRED: Na SITE TIME START: 7:00 AM SITE TIME FINISH: 10:30 AM LUNCH PERIOD: none TRAVEL TIME: VE IED BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE ANU I MA I I niti VVUKK UVMVLltti VVI i n THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. zj, 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 03/10/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 03/11/2006 PROJECT NO. 3115JO3 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO 3 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-3259 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: SHOP 3 Famous Footwear INSPECTION ADDRESS: 79-150 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-150 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT, A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 & FCAW NR232 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln SAE 350, Lincoln Trailblazer 301 G, Miller Big Blue 400D, Miller Big Blue 401 P AREA, GRIDLINES, PIECES OBSERVED: Items Completed: (1) Welding the ends of the top cord of the roof joists to the wall embeds on lines A/3 to 12, 3/A to C and 12/A to C. (2) Welding of the knife plates between the ends of the roof girders at the top cordon lines 6/3 to12 and C/3 to12. (3) Welding of the splice plates between the ends of the top cord of the roof joists on lines B/3 to12 and C/3 to12. (4) Welding the ends of the roof joists to the top cords of the roof girders on lines B/3 to 12 and C/3 to 12. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: n/a TEMPERATURE: 73 Deg. F TESTS REQUIRED: Na SITE TIME START: 7:00 AM SITE TIME FINISH: 11:30 AM LUNCH PERIOD: none TRAVEL TIME: VERIFIED BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. Signature Steve W. Bodnar 03/09/2006 Print Name Date Of Report 0849264-85 ICBO Certification Number City Of La Quinta City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego I Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 03/11/2006 PROJECT NO. 3115J03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO 1 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-3259 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: SHOP 3 Fatuous Footwear INSPECTION ADDRESS: 79-150 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-150 Highway 111 I La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL! MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 & FCAW NR232 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Miller Big Blue 4000, Lincoln SAE 350 AREA, GRIDLINES, PIECES OBSERVED: In Progress: Welding of the knife plates between the ends of the roof girders at the top cords. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: n/a TEMPERATURE: 74 Deg. F TESTS REQUIRED: n/a SITE TIME START: 7:00 AM SITE TIME FINISH: 4:30 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: VERIFIED BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. �. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 03/06/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 03/18/2006 PROJECT NO. 3115JO3 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO 1 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-3259 1 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 - PROJECT NAME: SHOP 3 Famous Footwear INSPECTION ADDRESS: 79-150 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-150 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7098 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Miller Trailblazer 301 G, AREA, GRIDLINES, PIECES OBSERVED: Items Completed: Welding of the entire bridging angles to the top and bottom cords of the roof joists from line A to D between lines 4 & 12. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: Na TEMPERATURE: 68 Deg. F TESTS REQUIRED: Na SITE TIME START: 7:00 AM SITE TIME FINISH: 10:30 AM LUNCH PERIOD: none TRAVEL TIME: VERIFIED BY , �,�. o T . marc i it i t nA i i nAV r_rrK0UNALLT UcZAtnvtU ALL OF I Ht WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. I " &�— g' 0, A"g.I, " 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 03/14/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C 101, Moreno Valley, CA 92553 Tel: (909) 6534999 Fax: (909) 6534666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Reportof: COMPRESSIVE STRENGTH-GROUTASTM C1019 1 CITY OF LA QUINTA-BLDG & SAFETY 78495 CALLE TAMPICO LA QUINTA, CA 92253 Client: THOMAS ENTERPRISES Set No.: 64872 File No.: Permit No.: Project No.: 3115J03 Project Name: SHOP 3 MARKETPLACE @ LA QUINTA 79-150 HWY 111 @ ADAMS ` LA QUINTA, CA Age (Days) Date Tested Nominal Actual Area Load Size (Sq. Inch) (lbs.) Strength (psi) Type of Fracture 7 3/2/2006 3 X 3 X 6 9.42 19,880 2,110 N/A 28 3/23/2006 3 X 3 X 6 9.67 24,550 2,540 N/A 28 3/23/2006 1 3 X 3 X 6 9.86 23,960 2,430 N/A Specified Strength: 2,500 ' PSI Sampled By MICHAEL G. Location: 6TH LIFT (PARAPET) LINE A Concrete Supplier: ASSOCIATED READY MIX Mix No.: 46511 Ticket No.: 3637918 Water added at Site: 0.00 gal. By Cement Type: Mix Time: min. Remarks: Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** 3 ASTM C172 Date Sampled: 2/23/2006 Date Received: 2/27/2006 Concrete Temp: 64 °F ASTM C1064 Ambient Temp: 77 °F ASTM C1064 Slump: 9.00 in. ASTM C143 Tested at: Anaheim Respectfully Submitted, MTGL, Inc. 1 M.B. (Ben) Lo Chief Engineer 2480 PSI 28 -day compression test does not comply with the specified strength. CORPORATE San Diego I Imperial County 2992 E. La Palma Ave.. Suite A 7313 Carroll Road, Suite G Anaheim, CA 92806 San Diego, CA 92121 Tel: 714.632.2999 Tel: 858.537.3999 Fax: 714.632.2974 Fax: 858.537.3990 FIELD REPORT Inland Empire '14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 03/11/2006 PROJECT NO. 3115JO3 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO 4 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-3259 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: SHOP 3 Famous Footwear INSPECTION ADDRESS: 79-150 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-150 Highway 111 I La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL I MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Miller Big Blue 400D, Miller Big Blue 401P AREA, GRIDLINES, PIECES OBSERVED: In Progress: Welding of the bridging angles to the top and bottom cords of the roof joists. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Cool SAMPLES TAKEN: n/a TEMPERATURE: 63 Deg. F TESTS REQUIRED: n/a SITE TIME START: 7:00 AM SITE TIME FINISH: 10:30 AM LUNCH PERIOD: none TRAVEL TIME: VERI� IED BY 100 BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. " ��'L' i(1. /�}�w2 a'' 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 03/10/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIFI n RGDnDT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 - -- • •• • • •. • �• . 14MLL r UDacnvtU ALL Ur I Ht WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION nF THF BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. t Signature Steve W. Bodnar Print Name 0849264-85 ICBO Certification Number 03/09/2006 City Of La Quinta Date Of Report City/ County Certification Number Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) ARCHITECT: Smith Consulting Architects APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 03/11/2006 PROJECT NO. 3115JO3 REPORT NO 3 PG 1 OF 1 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 CONTRACTOR: Vratsinas Construction Co. PLAN FILE NO. PERMIT NO. 05-3259 P.O. Box 2558 Little Rock, AR 72203 PROJECT NAME: SHOP 3 Famous Footwear SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 INSPECTION ADDRESS: 79-150 Highway 111 ADDRESS OF PROJECT: 79-150 Highway 111 La Quinta, CA La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND FIRS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 & FCAW NR232 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln SAE 350, Lincoln Trailblazer 301 G, Miller Big Blue 400D, Miller Big Blue 401 P AREA, GRIDLINES, PIECES OBSERVED: Items Completed: (1) Welding the ends of the top cord of the roof joists to the wall embeds on lines A/3 to 12, 3/A to C and 12/A to C. (2) Welding of the knife plates between the ends of the roof girders at the top cord on lines B/3 to12 and C/3 to12. 3) Welding of the splice plates between the ends of the top cord of the roof joists on lines B/3 to12 and C/3 to12. (4) Welding the ends of the roof joists to the top cords of the roof girders on lines B/3 to 12 and C/3 to 12. STRUCTURAL NOTES, DETAIL, OR RAS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: Na TEMPERATURE: 73 Deg. F TESTS REQUIRED: n/a I SITE TIME START: 7:00 AM SITE TIME FINISH: 11:30 AM ✓ 8. v LUNCH PERIOD: none TRAVEL TIME: VERIFIED BY - -- • •• • • •. • �• . 14MLL r UDacnvtU ALL Ur I Ht WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION nF THF BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. t Signature Steve W. Bodnar Print Name 0849264-85 ICBO Certification Number 03/09/2006 City Of La Quinta Date Of Report City/ County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 03/11/2006 PROJECT NO. 3115.103 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO 2 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-3259 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: SHOP 3 Famous Footwear INSPECTION ADDRESS: 79-150 Highway 111 La Quinta, CA I ADDRESS OF PROJECT: 79-150 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBG FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Miller trailblazer 301 G, Miller Big Blue 400D AREA, GRIDLINES, PIECES OBSERVED: In Progress: (1) Welding the ends of the roof joists to the top cord of the roof girders along lines B and C. 2) Welding the splice plates between the ends of the top cord of the roof joists along lines B and C. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: Na TEMPERATURE: 74. Deg. F TESTS REQUIRED: Na SITE TIME START: 10:00 AM SITE TIME FINISH: 1:00 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: VERIFIED BY - �•.,,.. -, .., , F I- V CRJ V^LL T VD0rMVr_U MLL Ur I r t: VVUHK us I tU ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING ODE, UNLESS.OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 03/08/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FiF1 n RFPnRT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR. TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 03/18/2006 PROJECT NO. 3115J03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO 1 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-3259 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: SHOP 3 Famous Footwear INSPECTION ADDRESS: 79-150 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-150 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC.. FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Miller Trailblazer 301 G, AREA, GRIDLINES, PIECES OBSERVED: Items Completed: Welding of the entire bridging angles to the top and bottom cords of the roof joists from line A to D between lines 4 & 12. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: Na TEMPERATURE: 68 Deg. F TESTS REQUIRED: Na SITE TIME START: 7:00 AM SITE TIME FINISH: 10:30 AM LUNCH PERIOD: none TRAVEL TIME: VERIFIED BY I no RV CFRTICV THAT I uAkic ❑C Dcnuwi --------- •-�.-r.��— 11— InuaIr_JADUVtANUIHAI IMRS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS. AND I OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THF BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. Signature Steve W. Bodnar Print Name 03/14/2006 Date Of Report 0849264-85 iCBO Certification Number City Of La Quinta City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIFI n RI=anQT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN AVAILABLE: SOIL REPORT (1) (N) SPECS. (`n SSW ARCHITECT Smith Consulting Architects APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) FOR WEEK ENDING 04/08/2006 PROJECT NO. 3115J03 12220 EI Camino Real Suite 200 San Diego, CA 92130 ENGINEER: CSSI REPORT NC 2 PG 1 OF 1 2445 Fifth Street Suite 300 San Diego, CA 92102 CONTRACTOR: Vratsinas Construction Co. PLAN FILE NO. PERMIT NO. 05-3259 P.O. Box 2558 Little Rock, AR 72203 SUB -CONTRACTOR: Portola Construction, Inc. PROJECT NAME: SHOP 3 FamousFootwear 10722 Edison Court Rancho Cucamonga, CA 91730 INSPECTION ADDRESS: 79-150 Highway 111 ADDRESS OF PROJECT: 79-150 Highway 111 La Quinta, CA La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 & FCAW NR232 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln SAE 350, Miller Trailblazer 301G AREA, GRIDLINES, PIECES OBSERVED: Items Completed: (1) Welding of the beam to column moment connections on lines 12.5/6.1 & 12.5/B.9 on the roof level. (2) Welding of the entire seismic sway bracing angles from the bottom cord of the roof joists to the bottom cord of the roof girders from line 4 to 11 between lines A & D. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: Na TEMPERATURE: 87 Deg. F TESTS REQUIRED: n/a SITE TIME START: 7:00 AM SITE TIME FINISH: 11:30 AM LUNCH PERIOD: none TRAVEL TIME: V RIFTED BY I nn ov !-co- - - - • �• •�•...�� I voocR V cu MLL Ur 1 Flt VVUHK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 04/04/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number dq�jaA•;y`t ^ CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN - - - --• • • •• • • �.� c AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) SSW APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects FOR WEEK ENDING 03/18/2006 PROJECT NO. 3115.103 12220 EI Camino Real Suite 200 San Diego, CA 92130 ENGINEER: CSSI REPORT NO 1 PG 1 OF 1 2445 Fifth Street Suite 300 San Diego, CA 92102 CONTRACTOR: Vratsinas Construction Co. PLAN FILE NO. PERMIT NO. 05-3259 P.O. Box 2558 Little Rock, AR 72203 SUB -CONTRACTOR: Portola Constructios, Inc. PROJECT NAME: SHOP 3 Famous Footwear 10722 Edison Court Rancho Cucamonga, CA 91730 INSPECTION ADDRESS: 79-150 Highway 111 ADDRESS OF PROJECT: 79-150 Highway 111 La Quinta, CA La Quinta, CA REPORTING REQUIREMENTS: ICBG FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Miller Trailblazer 301 G, AREA, GRIDLINES, PIECES OBSERVED: Items Completed: Welding of the entire bridging angles to the top and bottom cords of the roof joists from line A to D between lines 4 & 12. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: Na TEMPERATURE: 68 Deg. F TESTS REQUIRED: n/a SITE TIME START: 7:00 AM SITE TIME FINISH: 10:30 AM LUNCH PERIOD: none TRAVEL TIME: `" VERIFIED BY --LLT vwtK VtU ALL UF I Ht WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND I OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 03/14/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego I Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 03/11/2006 PROJECT NO. 3115J03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO 2 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-3259 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: SHOP 3 Famous Footwear INSPECTION ADDRESS: 79-150 Highway 111 La Quinta, CA J- ADDRESS OF PROJECT: 79-150 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Miller trailblazer 301 G, Miller Big Blue 400D AREA, GRIDLINES, PIECES OBSERVED: In Progress: (1) Welding the ends of the roof joists to the top cord of the roof girders along lines B and C. (2) Welding the splice plates between the ends of the top cord of the roof joists along lines B and C. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: Na TEMPERATURE: 74. Deg. F TESTS REQUIRED: n/a SITE TIME START: 10:00 AM SITE TIME FINISH: 1:00 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: VERIFIED BY -- - • --• — -000MV CV NLL Vr i r- vvvrcn us i tU AtlUvt AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING ODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. -z% 0849264-85 Signature ICBO Certification Number Steve W. Bodnar Print Name 03/08/2006 City Of La Quinta Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego; CA 92130 FOR WEEK ENDING 03/1112006 PROJECT NO. 3115JO3 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO 4 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-3259 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: SHOP 3 Famous Footwear INSPECTION ADDRESS: 79-150 Highway 111 La Quinta, CA 7 ADDRESS OF PROJECT: 79-150 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RRS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT ACOPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Miller Big Blue 400D, Miller Big Blue 401P AREA, GRIDLINES, PIECES OBSERVED: In Progress: Welding of the bridging angles to the top and bottom cords of the roof joists. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Cool SAMPLES TAKEN: Na TEMPERATURE: 63 Deg. F TESTS REQUIRED: n/a SITE TIME START: 7:00 AM SITE TIME FINISH: 10:30 AM / C LUNCH PERIOD: none TRAVEL TIME: VERI IED BY °r I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING %CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. r Signature Steve W. Bodnar 03/10/2006 Print Name Date Of Report 0849264-85 ICBO Certification Number City Of La Quinta City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego I Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Gi=i n RI=PnRT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW ARCHITECT. Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) FOR WEEK ENDING 03/11!2006 PROJECT NO. 3115J03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO 1 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-3259 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: SHOP 3 Famous Footwear INSPECTION ADDRESS: 79-150 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-150 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBG FIELD INSPECTION MANUAL ! MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY. OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 & FCAW NR232 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Miller Big Blue 4000, Lincoln SAE 350 AREA, GRIDLINES, PIECES OBSERVED: In Progress: Welding of the knife plates between the ends of the roof girders at the top cords. STRUCTURAL NOTES, DETAIL, OR RAS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: Na TEMPERATURE: 74 Deg. F TESTS REQUIRED: nfa SITE TIME START: 7:00 AM SITE TIME FINISH: 4:30 PM LUNCH PERIOD: 112 Hr. TRAVEL TIME: VERIFIED BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL UI- I HE WUKK LIZ) 1 EU ADUVC mill I nr I I — "-- .-1.. , THE SOIL INVESTIGATION RECOMMENDATIONS, AND I OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 03/06/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) ARCHITECT: Smith Consulting Architects APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) FOR WEEK ENDING 03/11/2006 PROJECT NO. 3115J03 12220 EI Camino Real Suite 200 San Diego, CA 92130 ENGINEER: CSSI REPORT NO 3 PG 1 2445 Fifth Street Suite 300 San Diego, CA 92102 OF 1 PLAN FILE NO. PERMIT NO. 05-3259 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PROJECT NAME: SHOP 3 Famous Footwear SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 INSPECTION ADDRESS: 79-150 Highway 111 ADDRESS OF PROJECT: 79-150 Highway 111 La Quinta, CA La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 & FCAW NR232 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln SAE 350, Lincoln Trailblazer 301 G, Miller Big Blue 400D, Miller Big Blue 401 P AREA, GRIDLINES, PIECES OBSERVED: Items Completed: (1) Welding the ends of the top cord of the roof joists to the wall embeds on lines A/3 to 12, 3/A to C and 12/A to C. (2) Welding of the knife plates between the ends of the roof girders at the top cord on lines B/3 to12 and C/3 to12. (3) Welding of the splice plates between the ends of the top cord of the roof joists on lines B/3 to12 and C/3 to12. (4) Welding the ends of the roof joists to the top cords of the roof girders on lines B/3 to 12 and C/3 to 12. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: Na TEMPERATURE: 73 Deg. F TESTS REQUIRED: Na 1 SITE TIME START: 7:00 AM SITE TIME FINISH: 11:30 AM v LUNCH PERIOD: none TRAVEL TIME:VERIFIED BY - - _.0ar%Vr_u MLL Ur i rit VVUHK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 1_ 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 03/09/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number J Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: •14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 653-4999 Fax: (909) 653-4666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of: COMPRESSIVE STRENGTH -GROUT ASTM C1019 *s CITY OF LA QUINTA-BLDG & SAFETY 78495 CALLE TAMPICO LA QUINTA, CA 92253 Client: THOMAS ENTERPRISES Set No.: 6-1609 File No.: Permit No.: Project No.: 3115J03 Project Name: SHOP 3 MARKETPLACE @ LA QUINTA 79-150 HWY 111 @ ADAMS LA QUINTA, CA Age (Days) Date Tested Nominal Size Actual Area (Sq. Inch) Load (lbs.) Strength (psi) Type of Fracture 7 2/15/2006 3 X 3 X 6 9.64 16,510 1,710 N/A 28 3/8/2006 3 X 3 X 6 10.17 26,090 2,570 N/A 28 3/8/2006 3 X 3 X 6 10.08 1 24,960 2,480 N/A Specified Strength: 2,500 PSI Sampled By MICHAEL G. Location: 3RD LIFT SHOP # 3. LINE A Concrete Supplier: . ASSOCIATED READY MIX Mix No.: 46511 Ticket No.: 3634585 Water added at Site: 0.00 gal. By Cement Type: Mix Time: min. Remarks: Distribution: THOMAS ENTERPRISES VCC CITY OF LA OUINTA-BLDG & SAFETY **LAB COPY** a ASTM C172 Date Sampled: 2/8/2006 Date Received: 2/10/2006 Concrete Temp: °F ASTM C1064 Ambient Temp: °F ASTM C1064 Slump: 10.00 in. ASTM C143 Tested at: Anaheim Respectfully Submitted, MTGL, Inc. j M.B.(Ben) Lo Chief Engineer 2520 PSI 28 -day compression test complies with the specified strength. Corporate: 2992 E. La Palma Ave., Ste. A Anaheim, CA 92806. Tel: 714.632.2999 Fax: 714.632.2974 San Diego/Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 t Inland Empir_. 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK '. INSPECTOR O TECHNICIAN AVAILABLE: SOIL REPORT (Y)(N) APPROVED PLANS®(N) SPECS (M(N) APPROVED SHOP DRAWING(Y) ARCHITEC� _ FOR WEEK ENDING PROJECT N0. ENGINEER REPORT NO. PG OF CONTRACTOR PLAN FILE NO. PERMIT NO. C1 SUB=CONTRACTOR PROJECT NAME 7 INSPECTION ADDRESS ADDRESS OF PROJECT REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAUMTGL SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY. YOURS OR A PREVIOUS INSPECTOR'S. IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): \ CONTRACTORS EQUIPMENT/ MANPOWER USED: Ao�:;c5�c ZOw.aJ �rZ�3 G�) Foy¢ Mca�1 1 AREA. GRID LINES, PIECES OBSERVED: STRUCTURAL NOTES. DETAIL. OR RFIS USED: \ti C�.7 � �•\ S'!Z\� C���ti.� �j� '� � �.y LKS �� � ����Cr REMARKS. INCIUDINC AIEE77NGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPI ETION4 WEATHER: C�qS� TEMPERATURE:t`r1� SAMPLES TAKEN:- TESTS REQUIRED. �. SITE TIME START:.�_'v — SITE TIME FINISH: ,LUNCH PERIOD: TRAVEL TIME: _ VERIFIED BY: I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SO VESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN�THE �DEFICIENCY REPORT Signature Date of Report ICBO Certification Number Print Name City / County Certification Number Rev: 7/97 Corporate: San Diego/Imperial County: Inland Empit- 2992 E. La Palma Ave., Ste. A 7313 Carroll Road, Suite G 14320 Elsworth Street, Ste. C101 Anaheim, CA 92806 San Diego, CA 92121 Moreno Valley, CA 92553 Tel: 714.632.2999 Tel: 858.537.3999 Tel: 951.653.4999 Fax: 714.632.2974 Fax: 858.537.3990 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK XINSPECTOR C TECHNICIAN AVAILABLE' SOIL REPORT (Y) (N) APPROVED PLANS 4b(N) SPECS (MM APPROVED SHOP DRAWING (Y) (N) ARCHITEC� FOR WEEK ENDING PROJECT. NO. ENGINEER C REPORT NO. PG ; OF CONTRACTOR PLAN FILE NO. PERMIT NO. SUBCONTRACTOR � N A �J PROJECT NAME > n INSPECTION ADDRESS ADDRESS OF PROJECT REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUALJMTGL SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): CONTRACTORS EQUIPMENT / MANPOWER USED: /ems Z AREA. GRID LINES, PIECES OBSERVED: STRUCTURAL NOTES. DETAIL. OR RFIS USED: REMARKS. INCLUDING MEETINGS: G-'� e_ \IQ cam. m S _C_ REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION' WEATHER: TEMPERATURE:nC TAKEN: -�- TESTS REQUIRED: �. SITE TIME START: .._l`i1.��� SITE TIME FINISH: LUNCH PERIOD: TRAVEL TIME: VERIFIED BY: I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE S AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTE Signature M Date of Report Print Name 01 I ESTIGATION RECOMMENDATIONS, D INKHE DEFICIENCY REPORT ICBO Certification Number City / County Certification Number Rev: 7/97 r� MTG� Corporate: 2992 E. La Palma Ave., Ste. A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego/Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Empi,,. 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Te l: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK ' INSPECTOR G TECHNICIAN AVAILABLE: SOIL REPORT (Y)(N) SPECS (M(N) • APPROVED PLANS4L9D(N) APPROVED SHOP DRAWING (Y) (N ARCHITECT FOR WEEK ENDING PROJECT. N0. ENGINEER ` REPORT NO. PG OF CONTRACTOR 1 PLAN FILE NO. PERMIT NO. SUB -CONTRACTOR PROJECT NAME r a INSPECTION ADDRESS ADDRESS OF PROJECT REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL/MTGL SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS. AND RFIS, ETC.. FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY. YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED. SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): CONTRACTORS EQUIPMENT / MANPOWER USED* i � \r' J AREA. GRID LINES, PIECES OBSERVED: R STRUCTURAL NOTES, DETAIL. OR RFIS USED: REMARKS, INCLUDING MEETINGS: (A REWORK AS PERCENT OF ALL WORK TODAY" PER ENT PR/O�JECT COMPLETION- OMPI ETIO IWEATHER: WEATHER:�\ �C�S� SAMPLESTAKEN: TEMPERATURE:�C TESTS REQUIRED: (tn ` SITE TIME START: _�'��'�_. SITE TIME FINISH: LUNCH PERIOD: TRAVEL TIME: VERIFIED BY: _ 1 DO CERTIFY IFY I HAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH �HE SOIL ESTIGATION RECOM ODA IONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED I HE DEFICIENCY REPORT Signature Date of Report Print Name ��yGy ICBO Certification Number City / County Certification Number Rev: 7/97 Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 65311999 Fax: (909) 6534666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of: COMPRESSIVE STRENGTH -GROUT ASTM C1019 CITY OF LA QUINTA-BLDG & SAFETY 78495 CALLE TAMPICO LA QUINTA, CA 92253 i Client: THOMAS ENTERPRISES A Set No.: 6-1608 File No.: Permit No.: Project No.: 3115.103 Project Name: SHOP 3 MARKETPLACE @ LA QUINTA 79-150 HWY 111 @ ADAMS UA QUINTA, CA Age (Days) Date Tested Nominal Size Actual Area (Sq. Inch) Load (lbs.) Strength (psi) Type of Fracture 7 2/13/2006 3 X 3 X 6 9.58 24,070 2,510 N/A 28 3/6/2006 3 X 3 X 6 9.49 26,900 2,840 N/A 28 3/6/2006 3 X 3 X 6 9.70• 25,860 1 2,670 1 N/A Specified Strength: 2,500 PSI Sampled By MICHAEL G Location: 2ND LIFT SHOP # 3 LINE 2 Concrete Supplier: ASSOCIATED READY MIX Mix No.: 46511 Ticket No.: 3634028 Water added at Site: 0.00 gal. By Cement Type: Mix Time: Remarks: Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** . A ASTM C172 Date Sampled: 2/6/2006 Date Received: 2/10/2006 Concrete Temp: 66 °F ASTM C1064 Ambient Temp:' 80 °F ASTM C1064 Slump: 10.00 in. ASTM C143 min. Tested at: Anaheim Respectfully Submitted, MTGL, Inc. 1 M.B.(Ben) Lo Chief Engineer 2760 PSI 28 -day compression test complies with the specified strength. r Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 653-4999 Fax: (909) 653-4666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of: COMPRESSIVE STRENGTH -GROUT ASTM C1019 *s CITY OF LA QUINTA-BLDG & SAFETY 78495 CALLE TAMPICO LA QUINTA, CA 92253 Client: THOMAS ENTERPRISES Set No.: 6-1872 File No.: Permit No.: Project No.: 3115.103 Project Name: SHOP 3 MARKETPLACE @ LA QUINTA 79-150 HWY 111 @ ADAMS LA QUINTA, CA Age Date (Days) Tested Nominal Size Actual Area (Sq. Inch) Load (lbs.) Strength (psi) Type of Fracture 7 3/2/2006 3 X 3X 6 9.42 19,880 2,110 N/A 28 3/23/2006 3 X 3 X 6 9.00 28 3/23/2006 3 X 3 X 6 9.00 Specified Strength: 2,500 PSI Sampled By MICHAEL G. Location: 6TH LIFT (PARAPET) LINE A Concrete Supplier: ASSOCIATED READY MIX Mix No.: 46511 Ticket No.: 3637918 Water added at Site: 0.00 gal. By Cement Type: ` • Mix Time: min. Remarks; Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** ASTM C172 Date Sampled: 2/23/2006 Date Received: 2/27/2006 Concrete Temp: 64 °F ASTM C1064 Ambient Temp: 77 °F ASTM C1064 Slump: 9.00 in. ASTM C143 Tested at: Anaheim Respectfully Submitted, MTGL, Inc. 1 M.B.(Ben) Lo Chief Engineer Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim; CA 92806 Tel: (714) 632-2999 . Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 653-4999 Fax: (909) 653-4666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of. COMPRESSIVE STRENGTH -GROUT ASTM C 1019 CITY OF LA QUINTA-BLDG & SAFETY. 78495 CALLE TAMPICO LA QUINTA, CA 92253 Client: THOMAS ENTERPRISES A Set No.: 6-1507 File No.: Permit No.: Project No.: _ 3115.103 Project Name: SHOP 3 MARKETPLACE @ LA QUINTA 79-150 HWY 111 @ ADAMS LA QUINTA, CA Age (Days) Date Tested Nominal Size Actual Area (Sq. Inch) Load (lbs.) Strength (psi) Type of Fracture 7 2/7/2006 3 X 3 X 6 9.58 13,290 1,390 N/A 28 2/28/2006 3 X 3 X 6 9.42 28,620 3,040 N/A 28 2/28/2006 3 X 3 X 6 9.70 30,180 3,110 N/A Specified Strength: 2,000 PSI Sampled By Location: 1 ST LIFT LINEA Concrete Supplier: ASSOCIATED READY MIX Mix No.: 46002 Ticket No.: Water added at Site: 0.00 gal. By Cement Type: Mix Time: Remarks: Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY' **LAB COPY** ASTM C172 Date Sampled: 1/31/2006 Date Received: 2/6/2006 Concrete Temp: 69 °F ASTM C1064 Ambient Temp: 65 °F ASTM C1064 Slump: 9.00 in. ASTM C143 min. Tested at: Anaheim Respectfully Submitted, MTGL, Inc. 1 M.B. (Ben) Lo Chief Engineer 3080 PSI 28 -day compression test complies with the specified strength. A C. MTG L Corporate: San Diego/Imperial County: Inland Empir,.. 2992 E. La Palma Ave., Ste. A 7313 Carroll Road, Suite G 14320 Elsworth Street, Ste. C101 Anaheim, CA 92806 San Diego, CA 92121 Moreno Valley, CA 92553 Tel: 714.632.2999 Tel: 858.537.3999 Tel: 951.653.4999 Fax: 714.632.2974 Fax: 858.537.3990 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK "',INSPECTOR Q TECHNICIAN AVAILABLE SOIL REPORT (Y)(N) SPECS (M(N) �• . APPROVED PLANS®(N) APPROVED SHOP DRAWING (Y) (N) ARCHITECT FOR WEEK ENDING 3 � - O PROJECT. NO. ENGINEER REPORT NO. PG OF CONTRACTOR l PLAN FILE NO, PERMIT N0. SUB -CONTRACTOR PROJECT NAME 1% MP, a INSPECTION ADDRESS ADDRESSOF PROJECT REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAUMTGL SOIL MANUAL — REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY. OR MISSING MTRS, AND RFIS. ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S. IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): V� to P �1�� is �� r� CL R� �2;` �` �? 'f� kn CONTRACTORS EQUIPMENT/ MANPOWER USEr"� AREA, GRID LINES, PIECES OBSERVED: C5 V% c � STRUCTURAL NOTES, DETAIL. OR RFIS USED: -- Q � � �•��.� o�� , �-� � � ���©tib a�a�.� REMARKS. INCLUDING MEETINGS: Vo 0f�1` REWORK AS PERCENT OF ALL WORK TODAY* p RQENT PRO ECT COMP) ETIO ! WEATHER: C� QqS SAMPLES TAKEN: TEMPERATURE: TESTS REQUIRED. SITE TIME START: .�.��SITE TIME FINISH:-��______ LUNCH PERIOD: TRAVEL TIME: VERIFIED BY: .._ 100 CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS. AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT '�', Signature CDate of Report ICBO Certification Number /1�/�is�l" CJIi �/lir •�.0 Print Name City / County Certification Number Rev: 7/9) CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 03/11/2006 PROJECT NO. 3115K03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO 2 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-3259 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Major 'C' Drexel Heritage INSPECTION ADDRESS: 79-150 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-150 Highway 111 I La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: MQ Whisperweld BLW-400SSW2, Miller Big Blue 401P AREA, GRIDLINES, PIECES OBSERVED: In Progress: 1) Welding the ends of the roof joists to the top cord of the roof girders along lines F and G. (2) Welding of the splice plates between the ends of the top cord of the roof joists along lines F and G. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: n/a TEMPERATURE: 74 Deg. F TESTS REQUIRED: Na SITE TIME START: 1:00 PM SITE TIME FINISH: 4:30 PM LUNCH PERIOD: none TRAVEL TIME: VERIFIED BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. za' 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 03/08/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 03/11/2006 PROJECT NO. 3115K03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO 1 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-3259 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Major'C' Drexel Heritage INSPECTION ADDRESS: 79-150 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-150 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 & FCAW NR232 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: MQ Whisperweld BLW-400SSW2, Miller Big Blue 400 D AREA, GRIDLINES, PIECES OBSERVED: In Progress: Welding of the knife plates between the ends of the roof girders at the top cords. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: n/a TEMPERATURE: 74 Deg. F TESTS REQUIRED: n/a SITE TIME START: 7:00 AM SITE TIME FINISH: 10:00 AM LUNCH PERIOD: none TRAVEL TIME: VERIFIED BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 03/07/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIFI n RFpnRT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 03/11/2006 PROJECT NO. 3115K03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO 3 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-3259 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Major'C' Drexel Heritage INSPECTION ADDRESS: 79-150 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-150 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RRS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 & FCAW NR232 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: MQ Whisperweld BLW-400SSW2, Lincoln SAE 350, Lincoln Big Blue 401 P AREA, GRIDLINES, PIECES OBSERVED: Items Completed: (1) Welding of the knife plates between the ends of the top cord of the roof girders on lines F, G, H & 1/3 to 12. (2) Welding the ends of the top cord of the roof joists to the top cord of the roof girders on line F, G, H & 1/3 to 12. (3) Welding of the splice plates between the ends of the top cord of the roof joists on lines F, G, H & 1/3 to 12. (4) Welding of the top cord of the roof joists to the wall embeds on lines 3/D to J, 12/D to J and J/3 to 12. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: Na TEMPERATURE: 73 Deg. F TESTS REQUIRED: n/a SITE TIME START: 11:30 AM SITE TIME FINISH: 4:30 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: ERIFIED BY - - - -- -� • �• �U nL.L Ur 1 nr- VVUKr, uZ� I tU ACUVt AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. -zo.' Signature Steve W. Bodnar Print Name 03/09/2006 Date Of Report 0849264-85 ICBG Certification Number City Of La Quinta City / County Certification Number kq CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIFLn RFPr)PT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of prk X INSPECTOR TECHNICIAN SSW ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 - - - - --• •• • • •• • • • • • •- �•+v� wcu AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) FOR WEEK ENDING 03/11/2006 PROJECT NO. 3115KO3 ENGINEER: CSSI 2445'Fifth Street Suite 300 San Diego, CA 92102 REPORT NO 4 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-3259 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Afa-ior'C' Drexel Heritage INSPECTION ADDRESS: 79-150 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-150 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION -MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY. OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NgYf ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: MQ Whisperweld BLW-400SSW2, Lincoln SAE 350 AREA, GRIDLINES, PIECES OBSERVED: In Progress: Welding of the bridging angles to the top and bottom cords of the roof joists. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Cool SAMPLES TAKEN: Na TEMPERATURE: 63 Deg. F TESTS REQUIRED: Na SITE TIME START: 10:30 AM SITE TIME FINISH: 3:30 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: ERIFIED BY -LL Ur i nr- vwrcn ua I tU AtlUVt AN I HAI THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. ,g&� 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 03/10/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 6534999 Fax: (909) 6534666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of: COMPRESSIVE STRENGTH -MASONRY PRISM ASTM C1314 *s CITY OF LA QUINTA-BLDG & SAFETY 78495 CALLE TAMPICO LA QUINTA, CA 92253 Client: THOMAS ENTERPRISES Set No.: 6-1952 _ File No.: Permit No.: Project No.: 3115J03 Project Name: SHOP 3 MARKETPLACE @ LA QUINTA 79-150 HWY 111 @ ADAMS LA QUINTA, CA Age (Days) Date Tested Nominal Size Actual Area Load (Sq. Inch) (lbs.) Strength (psi) Type of Fracture 7 3/10/2006 8 X 8 X 16 58.83 140,300 2,380 N/A 28 3/31/2006 8 X 8 X 16 64.00 28 3/31/2006 8 X 8 X 16 64.00 Specified Strength: 2,500 PSI Sampled By MICHAEL G. Location: 6TH LEFT STOREFRONT CROSSOVER (LINTEL) Concrete Supplier: ASSOCIATED READY MIX Mix No.: 46511 Ticket No.: 3631152 Water added at Site: 0.00. gal. By Cement Type: Mix Time: 50 min. Remarks: Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** ASTM C172 Date Sampled: 3/3/2006 Date Received: 3/7/2006 Concrete Temp: °F ASTM C1064 Ambient Temp: °F ASTM C1064 Slump: 8.00 in. ASTM C143 Tested at: Anaheim Respectfully Submitted, MTGL, Inc. 1 M.B.(Ben)Lo Chief Engineer Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 6534999 Fax: (909) 6534666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of. COMPRESSIVE STRENGTH -GROUT ASTM C1019 s* CITY OF LA QUINTA-BLDG & SAFETY. 78495 CALLE TAMPICO LA QUINTA, CA 92253 Client: THOMAS ENTERPRISES A Set No.: 6-1688 File No.: Permit No.: Project No.: 3115J03 Project Name: SHOP 3 MARKETPLACE @ LA QUINTA 79-150 HWY 111 @ ADAMS LA QUINTA, CA Age (Days) Date Nominal Tested Size Actual Area (Sq. Inch) Load (lbs.) Strength Type of (psi) Fracture 7 2/17/2006 3 X 3 X 6 9.92 21,990 2,220 N/A 28 3/10/2006 3 X 3 X 6 9.73 25,780 2,650 N/A .28 3/10/2006 3 X 3 X 6 9.83 1 26,650 1 2,710 1 N/A Specified Strength: 2,000 PSI Sampled By Location: 4TH LIFT A LINE Concrete Supplier: ASSOCIATED READY MDC Mix No.: 46511 Ticket No.: Water added at Site: 0.00 gal. By Cement Type: Mix Time: Remarks: Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** A ASTM C172 Date Sampled: 2/10/2006 Date Received: 2/16/2006' Concrete Temp: 64 °F ASTM C1064 Ambient Temp: 68 °F ASTM C1064 i . Slump: 9.00 in. ASTM C143 min. Tested at: Anaheim Respectfully Submitted, MTGL, Inc. 1. M.B. (Ben) Lo Chief Engineer 2680 PSI 28 -day compression test complies with the specified strength. K JTG i.A. Corporate: 2992 E. La Palma Ave., Ste. A Anaheim, CA 92806 Tel: 714.632.2999 ' Fax: 714.632.2974 San DiegoAmperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Empi,_. 14320 Elsworth Street, Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK "..INSPECTOR ❑ TECHNICIAN AVAILABLE SOIL REPORT (Y)(N) SPECS (M(N) Fs S f APPROVED PLANS®(N) APPROVED SHOP DRAWING (Y) (N) ARCHITECT FOR WEEKENDING PROJECT. N0. _ ENGINEER REPORT N0. PG OF CONTRACTOR 1 ` PLAN FILE N0. t j PERMIT N0. Za SUB -CONTRACTOR C -h PROJECT NAME �►. INSPECTION ADDRESS ADDRESS OF PROJECT T*%C� - O II,a.,., REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MA,NUAVlTGL SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IFTHERE IS NON -CONFORMING WORK AT THE END OFTHE WORK DAY. OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN .A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): CONTRACTORS EQUIPMENT/ MANPOWER USED: AREA. GRID LINES, PIECES OBSERVED: STRUCTURAL NOTES. DETAIL. OR FINS USED: REMARKS, IMCLUDIMG MEETINGS. ar-. REWORK AS PERCENT OF ALL WORK TODAY P R ENT PROJECT COMP t:Ttnnl WEATHER: C� ��5,, SAMPLES TAKEN: ��- TEMPERATURE: \..�j TESTS REQUIRED. SITE TIME FINISH:_'_------ - LUNCH PERIOD: TRAVEL TIME: VERIFIED BY: .._ I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND/ OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT Z / Z l / Signature 5Q29 . Icl y� �J Date of Report ICBO Certification Number Print Name City / County Certification Number Rev: 7/97 Corporate: San Diego/imperial County: Inland Emph- 2992 E. La Palma Ave., Ste. A 7313 Carroll Road, Suite G 14320 Elsworth Street, Ste. C101 Anaheim, CA 92806 San Diego, CA 92121 Moreno Valley, CA 92553 Tel: 714.632.2999 Tel: 858.537.3999 Tel: 951.653.4999 Fax: 714.632.2974 Fax: 858.537.3990 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK (INSPECTOR O TECHNICIAN AVAILABLE SOIL REPORT (Y)(N) SPECSI(N) — t, APPROVED PLANSgI]?D(N) APPROVED SHOP DRAWING (Y) (N) ARCHITECT FOR WEEK ENDING PROJECT. NO. �i •� GAJ`;,-.:.. � . —Z — O v ENGINEER REPORT NO. PG OF C RACTOR PLAN FILE N0. PERMIT N0. CONTRACTOR PROJECT NAME L ECTION ADDRESS ADDRESS OF PROJECT REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAUMTGL SOIL MANUAL—REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR'S. IS CORRECTED. SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): CONTRACTORS EQUIPMENT /MANPOWER USED: AREA, GRID LINES. PIECES OBSERVED: r -ft P STRUCTURAL NOTES. DETAIL. OR RFIS USED' REMARKS. INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: �� �l�S SAMPLES TAKEN: TEMPERATURE:�� TESTS REQUIRED: SITE TIME START:SITE TIME FINISH: LUNCH PERIOD: TRAVEL TIME: VERIFIED BY: I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT Signature Date of Report ICBO Certification Number Print Name City / County Certification Number A Rev: 7197 Corporate: San Diego/Imperial County: Inland Empii- 2992 E. La Palma Ave., Ste. A 7313 Carroll Road, Suite G 14320 Elsworth Street, Ste. C101 Anaheim, CA 92806 San Diego, CA 92121 Moreno Valley, CA 92553 Tel: 714.632.2999 Tel: 858.537.3999 Tel: 951.653.4999 Fax: 714.632.2974 Fax: 858.537.3990 Fax: 951.653.4666 FIELD REPORT S I TYPE OF WORK 21INSPECTOR 0 TECHNICIAN �.tN k4 AVAILABLE' SOIL REPORT (Y)(N) SPECS (M(N) APPROVED PLANS4=(N) APPROVED SHOP DRAWING (Y) (N) ARCHITECT FOR WEEK ENDING PROJECT. No. `v ENGINEER REPORT NO. PG OF CONTRACTOR C,Cl- PLAN FILE NO. PERMIT NO. SUBCONTRACTOR SUB-CONTRACTOR PROJECT NAME INSPECTION ADDRESS ADDRESS OF PROJECT REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAUMTGL SOIL MANUAL- REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORKDAY. OR MISSING MTRS. AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY. YOURS OR A PREVIOUS INSPECTOR'S, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): CONTRACTORS EQUIPMENT/ MANPOWER USED: AREA. GRID LINES, PIECES OBSERVED: ll E 2so ps tacet> o� Co'� \. --,;z- C STRUCTURAL NOTES. DETAIL. OR RFIS USED: REMARKS. INCLUDING MEETINGS: `AA``` A ` ` A -_ REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: �` TEMPERATURE:��,� SAMPLES TAKEN: TESTS REQUIRED: ` SITE TIME START:SITE TIME FINISH: LUNCH PERIOD: TRAVEL TIME: VERIFIED BY: 100 CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS. AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT Signature Date of Reporl ICBO Certification Number Print Name City / County Certification Number Rev: 7197 CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) �. 'PSri. PROJECT NO. 3115K03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO 1 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-3259 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Major'C' Drexel Heritage CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 03/18/2006 PROJECT NO. 3115K03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO 1 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-3259 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Major'C' Drexel Heritage INSPECTION ADDRESS: 79-150 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-150 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT/ MANPOWER USED: WELDING MACHINE: - MQ Whisperweld BLW-400SSW2, Miller Big Blue 400D AREA, GRIDLINES, PIECES OBSERVED: In Progress: Welding of the bridging angles to the top and bottom cords of the roof joists. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: n/a TEMPERATURE: 68 Deg. F TESTS REQUIRED: n/a SITE TIME START: 10:30 AM SITE TIME FINISH: 4:30 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: VERIFIED BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. a zl�rl 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 03/14/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 03/18/2006 PROJECT NO. 3115K03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO 2 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-3259 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Major 'C' Drexel Heritage INSPECTION ADDRESS: 79-150 Highway 111 La Quinta, CA ADDRESS OF. PROJECT: 79-150 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL I MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Miller Big Blue 400D AREA, GRIDLINES, PIECES OBSERVED: Items Completed: Welding of the entire bridging angles to the top and bottom cords of the roof joists from line E to J between lines 3 and 12. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: Na TEMPERATURE: 76 Deg. F TESTS REQUIRED: n/a SITE TIME START: 7:00 AM SITE TIME FINISH: 1:00 PM r4utl LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: VERIFIED BY -- - • �• • • •• •,-• • • •�-� . �Vr � VOQCRVCU ALL Ur i nt VVUHK us 1 EU ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 03/15/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number Corporate: %992 E. La Patina Ave.. Ste. A Anaheim, CA 92806 Fel: 714.632.2999 Fax: 714.632.2974 San Diego/Imperial County: 7313 Carroll Road. Suite G San Diego. CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Empir,,. 14320 Elsworth Street. Ste. C101 (Moreno Valley, CA 92553 Tel: 95 1.653.4999 Fax: 951.653.4666 FIELD REPORT %�Lf/' act .�_ �_ ✓_ �/..� =, �._�' l �(����� Signature — CT_ 5�:�. ' , — C'= k Date of Report ICBG Certification Number Print Name City i County Certification Number MTGL Corporate: 1992 E. La P;Ilm-i Ave :.:Iiil rllll. CA 92806. 714.6322999 1 1-!.632.29, 4 San Diego/Imperial County Ste A 7313 Carroll Road, SUIte G San Diegc. CA 92121 Tel: 858-53-1.3999 Fax: 858.537.3990 Inland Empi,,,. 1.1320 Els:•/orm Street. Sle C:(3i Ibinra,�n Vallev. CA 92553 I'I 3 J' Fax: 951.653.41666 FIELD REPORT II '"F. F NhSK NSPECTOR - L r1EPCFi cel :N! SPECS (nm: � L`•ia '[_:�\--- Y\1\�'a 2�lZy APPROVED PL?NS "✓ N: APPROVED S't0?DRA1h'I N`; I`: IN'• . II ?RCJEC T 40 -- - ...... 71, C~� REP�F7.VO—-^----- "S OF T 'LAN FILE NO PERMIT .NO. SUB-CON-RACT•SR 7- PROJECT NAME INSPECTION ADDRESS C ADDRESS OF PRCX,; REQL'IRENIEN'"IC: ICHO FIELD INSPECTION' kIANL:AL/NIT(;i. SOIL N9:\\UAL - RE\IE\Y PREVIOUS RF.PORTS:\:NI) LISTS HF.RF. IS NO\-CONFORNIINC, WORKATTFIE E.ND OFTFII: WORK DAY.OkSASSINGNITRS. ANI) RHS. ETC'.. FILL OL'TAXDATT,ACH A DEF'ICIE'NCY REPORT {N A DF.FICIENC'Y. YOL'RS OR A PREVIOUS INSPEC'TOR'S. IS CORRECTED. SOVOTE ONTHE ORIGIN,\L IMATERIALS UHMITA COPY\PITH POUR WEEK'S REPORTS. I)EFICIF.NCY REPORTAND USED BY CONTRACTOR (INCLUDE RESEARCH REPORT N0. OR MATERIAL TEST REPORiSj CONTRACTORS EQUIPMENT /MANPOWER USED: AREA. GAM LINES. PIECES OBSERVED: 2c1 C -N- T \ STRUCTURAL NOTES OE AILOR FINS USED REMARKS. INC(UD)NG MEE7rNGS: flEWORK AS PERG NT OF AI I WORK TODAY' WEATHER' P R('FNT PRn IcrT rnnnol rTION SaMP;ES TAKEN: 'ER;PFHArURE \��� TESTSREOU;FEJ SITE T Ir.IF. STAP.T SITE Ti +AE FINISH. _ry i!dCH. PERIOD -'-----._—'— 7RAVF1 i!ME --- _._ yy1 pa i /� _.. - _---'------- :'EniFI-D Sy I DO CERTiFI' THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE 4ND CR THE a?PROVED PLANS. SPECIFICATIONS AND APPLICABLE SECTION OFF THE BUD DING CODE. „NLD f SOIL INVf1IGATION RECOMME R r ^rncII ^T• ISE vGTED' S L ERIN IN THEENCY REPORT !t.HO Certificatlon Number C-!': %011n!`, P. r:lllt ^llt(111 Nunit)•1 Corporate. I ' -992 E La Paima Ave :j);ih1eif1I. CA 92806 71-! 632.2999 714-632.297-1 San Diego/imperial County S t --, A 7313 Carroll Road. Suite IS Sar, Diego. CA 92? 21 Tel: 858-537.3999 Fax: 858 - 5 3 -1 3 9 9 0 Inland Empi,-. 1 J320 Em Is,!ljorm Street. Sie. CIO? 11V1OrF,!10 Va!ley. CA 92553 fel- 9:,1.653.4999 Fax: 951.653.-!666 FIELD REPORT 'NSPEC TOR .7 -- AVAIL.42LE SOIL !N, SPECS ct�—\ (N) APP�ROVEO PLANSe. APPROVED Sno� DRAWIIN�� FOR WEEK ENDING ----------- - ��RWECT NO RE -CRT NO PG OF PLAN FILE NO. ---FPERMI, No. PPOJECT NAME on iNSPECTION ADDRESS QADDRESS OF PROJECT I% N, REPOR-rcN(; REQUIREMENTS: ICBO FIELD INSPECTION N11ANIJAUNIT(ji SOIL NIANUAL - REVIEW PREVIOUS REPORTS .AND LISTS 11: THf:kF IS -NO.'1;-CONFOk.\I INC, WORK AT THE END OFTHI: WORK DAY. ORVIISSINGNITRS. AND RFIS. ETC.. FILL OUT AND ATTACH A DEFICIENCY REPORT �vlfl:N A DEFICIENCY. YOVRS OR A PREVIOUS INSPECTOR -S-. IS CORRECTED. SO -NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY%viTti YOUR \\ I--.EK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS). o CONTRACTORS EQUIPMENT / MANPOWER USED AREA. GR;O LINES, PIECES OBSERVED: X— STRUCTURAL NOTES. DETAIL. OR RFIS USED: REMARKS. INCLUDING KE-MNGS: \J - REWORK AS PER CENT DE ALL WORK TQQ8y• PFBCENT PROJECT COMP) ETION- SAMPLES TA!(E.N: IESTS;kF0--NRFD SITE TIME FINISH. SITE TIME START 'LUNCH FER!"D TRAVEL TIME: VERIFIED BY I DO CEPfiFY THAT IIHAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL I',,P ESTIGAT ION RECOMMENDATI AN!, , THE APPRILIVED PLANS. SPECIFICATIONS AND APPLICABLE SECTION OV EHE BUILDING CODE. UNLESS OTHERWISEfDE: ICIENC'f REPORT UO Cenification Number MTOL A Corporate. E La Palma Ave. ?:Iahcnn. Cr. 92806 1rr 714.632 2999 it rr: 714.632.2974 San Diego/Imperial County: Sle A 7313) Carroll Read. SUfte G San Diego. CA 92121 Tel: 858.537.3999 Fax: 858.53 71.3990 Inland Empi,,.- 11320 Elsvvorm Street. Sie C 1 U fvlarPno VallPv. CA 92553 Tel: 95 1.653.4999 Fax: 951.653.-!1,66 FIELD REPORT II `•'E :)F 'NDFK 'NSPEC rOR _..:; IdIC IA F' 4VAtLABLE SCI!FlEP')PI cel ' N' SPECS (OIN) Ar,i.hl TE:' `. APPROVED PLANS •:Vi APPP.CVEO S'+0°URAW:N ; --__..._. I f.' +v. — %OR 'WEEK ENDING PROJECT NO VVREPORT r 71) - AO PG OF i;Nii?:;TOR , �! AN FILE :NO. PERMIT NO. SUB-CON"RAC TCR C _ 'ROJECT NAME NSPEC ADDRESS n^TION ADDRESS OF PROJECT REPORTING RE.QI:IRE\IENTS: ICBG FIELD INSPECTIO\ \IANL::\U%ITGI. SOIL \1ANUA1_ - REVIE\\' PREVIOUS REPORTS AND LISTS IFTHERF IS NO.-N-CO\FORMING WORK ATTHE END OF TI IT: \YORK D:\l'. ORMISSING \ITRS..AN[) RFIS. ETC.. FILL OUT AND ATTACH A I)F.F'ICIENCI' REPORT \\III::N A DF.FICIE:NC'1'. YOURS ORA PREVIOUS INSPEC'TOR'S. IS COItRECTE!). SO Stili\IIT.-\ Cl>I')' \%'ITII )'UL:R %\'IiEK'S REPOR-rs. NOTE ON THE ORIGINAL DL:I-'ICIE:NC1' REPORT:\ND MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS) Uig tJ Cr . M a'[ N\ (` —ql. An, CONTRACT S EQUIPMENT/ MANP ER US AREA. GRID LINES. PIECES OBSERVED: , sz ' rk ti It s. L\• STRUCTURAL NOTES. DETAIL. OR RFIS USED: Ci\�,c 3v'LG� r REMARKS. INCLUDING MEETINGS: Q�� : ♦r.p� O�aL % �y REWORK AS PERCENT OF ALL WORK TODAY r)RrFNT PRn IFrr rn nvI �TInNI WEATHER: C�-�C�S SAMP,ES TAKEN. "i.L:PFRA�URE TESTS REQUIRED. �l } SITE TIME. START � �� � N` SITE TIME FINISH. . LUNCH PERIOD .__ ... _...-....__..—__--.-- TRAVEL TIME: _.... _ _ ---- i _ VERIFIED BY ----- -- �cI11oL L cam' I DO CERTIFY 7)1aT IHAVE PERSONALLY OBSERVED All OF THE WORK LISTEDABOVE AND THAT THIS WORK COMPLIES WITH THESOIL I ' ESTIGATION RECOMMENDATIONS. AND ',,!R THE APPRCVEO PLANS. SPECIFICATIONS AND APPLICABLE SECTION OF THE 91U LDING CODE. UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT Dare of ReUart ICBG Certification Number Gly. County Cerrflramn Num Ler L .. MTG L Corporate: 2992 E. La Palma Ave.. Ste. A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego/Imperial County 7313 Carroll Road, Suite G San Diego. CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Empi,-. 14320 Elsworth Street. Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TYPEEEJ OFF.WORK •,INSPECTOR C TECHNICIAN AVAILABLE SOIL REPORI(Y)IN) SPECS ®IN) I. °• 1&=&t ;4- ` ARCHITECT APPROVED PLANSIn)N) APPROVED SHOP DRAWING (YI (N) FOR WEEK ENDING PROJECT NO. ,NGINEER ^ G / � REPORT NO. PG OF 1 \ CCNTRACiOR - 1 PLAN FILE NO. PERMIT NO. SUBCONTRACTOR PROJECT NAME , INSPECTION ADDRESS ADDRESS OF PROJECT REPORTING REQUIRENIENTS: ICBO FIELD INSPECTION MANUAUMTGI. SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IFTHERF. IS NON-CONFORNIING WORK ATTHE END OFTHE WORK DAY. OR MISSING MTRS. AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTOR IS CORRECTED. SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT .A COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): e- r CONTRACTORS EQUIPMENT/ MANPOWER USED: ICS / Awl �l 'L S �O� AREA, GRID LINES. PIECES OBSERVED: �e S • Vic `..� �i `�.i. Z. F1 Q"1Q ` `!.Z .� STRUCTURAL NOTES. DETAIL. OR RAS USED. (� REMARKS. INCLUDING MEETINGS: ` % d/� ,\ REWORK AS PERCENT OF ALL WORK TODAY PER ENI PRO IFCT COMPI FTIO I WEATHER: C��t\S SAMPLES TAKEN: TEMPERATURE. _i r,, -r TESTS REQUIRED: SITE TIME START: I'N,-t; �. SITE TIME FINISH: LUNCH PERIOD: TRAVEL TIME: _ _ VERIFIED BY: --- I nn rCDTiCV TV er i vDQr:nvcu ALL yr Inc vvunn LtJ I tU ABUVI: AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS. AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE. UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT Signature )0(.'P` -!^N1 Date of Report ICBO Certification Number Print Name City / County Certification Number Rev: 7197 Corporate: 2992 E. La Palma Avenue, Suite A, Anaheim, CA 92806 r Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Type of Fracture Tel: (858) 537-3999 Fax: (858) 537-3990 3/10/2006 8 X 8 X 16 58.83 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 •!L 28 3/31/2006 Tel: (909) 653-4999 Fax: (909) 653-4666 165,880 2,830 N/A Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 8 X 8 X 16 Tel: (818) 833-8100 Fax: (818) 833-0085 Report of: COMPRESSIVE STRENGTH-MASONRY PRISM ASTM C1314 * * File No.: CITY OF LA QUINTA-BLDG & SAFETY Permit No.: 78495 CALLE TAMPICO Project No.: 3115J03 LA QUINTA, CA 92253 Project Name: SHOP 3 MARKETPLACE @ LA QUINTA 79-150 HWY 111 @ ADAMS LA QUINTA, CA Client: THOMAS ENTERPRISES -- - --- r - Set No.: 6-1952' Age (Days) Date Tested Nominal Size Actual Area (Sq. Inch) Load (lbs.) Strength (psi) Type of Fracture 7 3/10/2006 8 X 8 X 16 58.83 140,300 2,380 N/A 28 3/31/2006 8 X 8 X 16 58.52 165,880 2,830 N/A 28 3/31/2006 8 X 8 X 16 58.52 163,500 2,790 N/A Specified Strength: 2,500 PSI Sampled By MICHAEL G. Location: 6TH LIFT STOREFRONT CROSSOVER (LINTEL) Concrete Supplier: ASSOCIATED READY MIX Mix No.: 46511 Ticket No.: 3631152 Water added at Site: 0.00 gal. By Cement Type: Mix Time: 50 min. Remarks: Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** ASTM C172 Date Sampled: 3/3/2006 Date Received: 3/7/2006 Concrete Temp: OF ASTM C1064 Ambient Temp: OF ASTM C1064 Slump: 8.00 in. ASTM C143 Tested at: Anaheim Respectfully Submitted, MTGL, Inc. M.B. (Ben) Lo Chief Engineer 2810 PSI 28 -day compression test complies with the specified strength. n Corporate: 2992 E. La Palma Ave.. Ste. A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego/Imperial County: 7313 Carroll Road. Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Empi,_. 14320 EISworth Street. Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT I- - - c IImt J[AM 1:. _ N _ _ __ _ SITE TIME FINISH: _ LUNCH PERIOD TRAVEL TIME:._._.._. ---- VERIFIED BY: I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE. UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT iZ1- -r Signature Z / -Z Date of Report ICBO Certificat.f �Gy i ion Number Print Name City / County Certification Number Rev: 7/97 MTGL Corporate: 2992 E. La Palma Ave.. Ste. A Anaheim. CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego/Imperial County 7313 Carroll Road, Suite G San Diego. CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Empi,-. 14320 Elsworth Street. Ste. C101 Moreno Valley. CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT TYPE OF WORK INSPECTOR p TECHNICIAN AVAILABLE SOIL REPORT (Y) (N) SPECS ®(N)� "`• T ARGiiITEC T APPROVED PLANS Y ��i1 I APPROVED SHOP DRAWING i'fl (N) •��- FOR WEEK ENDING PROJECT. NO Z -L( -7;- "� ENGINEER _---_ -,3Zv REPORT NO, PG ` OF CONTRACTOR PLAY RLE N0. PERMIT NO \ SUBCONTRACTOR - T NAME f\ � d INSPECTION ADDRESS ADDRESS OF PROJECT . a- G \A -- REPORTING REQUIREMENTS: ICHO FIELD INSPECTION NIANUAL/A'ITGI. SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY. OR MISSING N1TRS. AND RFIS. ETC.. FILL OUT AND ATTACH A DEFICIENCY REPORT WHF_N A DEFICIENCY. YOURS OR A PREVIOUS INSPECTOR'S. IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBNIIT A COPT' WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): �_L? R (t CONTRACTORS EQUIPMENT / MANPOWER USED: O AREA GRID LINES PIECES OBSERVED O ^ '� �-•�/ Com. �O✓•�•1, STRUCTURAL NOTES. DETAIL. OR RFIS USED: REMARKS. INaUO/NG AtEfnNGS: `\tz� L REWORK AS PERCENT OF ALL WORK TODAY- p Rf FNT PRS ECT COMPLETION- O Cpl ETIONWEATHER: WEATHER:CA-q,�s SAMPLES TAKEN: .41pt.- TEMPERATURE: \?�,Lr%,r %�-N TESTS REQUIRED: SITE TIME START:.`------ SITE TIME FINISH:�►y_. LUNCH PERIOD TRAVEL TIME:VERIFIED BY: nn rcDTICV TUAT i uAuc nr non.... -- - • • UooLnvCu Au ur Int WUhK u�) I tU AHUVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND; OR THE APPROVED PLANS. SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE. UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT Signature Z Print Name Date of Report ICBO Certification Number City / County Certif ication Number Rev: 7/97 Corporate: 2992 E. La Palma Ave.. Ste. A Anaheim. CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego/Imperial County: 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Inland Empir,,. 14320 Elsworth Street. Ste. C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 FIELD REPORT r'FE OF WORK ' .;NSPECTOR C TECHNICIAN AVAILABLE' SOIL REPORT (Y) SPECS (M(N) ARr.Hl1tGi� APPROVED PLANS�iNI APPROVED SHOP DRAWING jY1 (N) � 1-----�- FOR WEEK ENDING ROJ � P ECT. NO --------------- �1 RE?ORI NO PG OF :AIL'RACTDR PLAN FILE N0. PERMIT NO. SUR -CONTRACTOR PROJECT NAME INSPECTION ADDRESS ' Ca - ADDRESS OF PROJECT REPORTING REQUIREMENTS: ICBO FIELD INSPECTION \1ANUAUMTGI. SOIL :MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IFTHFRE IS \ON-CONFOR:NIIN'G WORK AT THE END OFTHE WORK DAY. OR \11SSING \ITRS. AND RFIS. ETC.. FILL OUT ANDATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY. NC'Y. YOURS OR A PREVIOUS INSPECTOR'S. IS CORRECTED. SO I\OTE ON THE ORIGINAL DEFICIENCY REPORTAND SUB\irrA COPY WITH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): \\ CONTRACTORS EQUIPMENT/ MANPOWER USED AREA. GRID LINES. PIECES OBSEB : STRUCTURAL NOTES DETAIL OR RFIS USED REMARKS. INCLUDING NEETItNq it J \vim REWORK AS PERCENT OF ALL WORK TODAY• p RrFNT PRO ECT COMPLETION. WEATHER: C� �l�S SAMPLES TAKEN: �\ TEMPERATURE. TESTS REQUIRED: Wit IIMt SIAHI. LUNCH PERIOD: SITE TIME FINISH:_ay.__.....-. TRAVEL TIME: _—....... _ VERIFIED BY: ..__ I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOILVV'STI'GA1ION RECOMMEN ATIONS. AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE. UNLESS OTHERWISE NOTED INNCY REPORT Signature Date of Re ort D IC80 Certification Number Print Name City / County Certification Number Corporate: San Diego/Imperial County: Inland Empi,-. AL 2992 E. La Palnra Ave.. Ste. A 7313 Carroll Road. Suite G 14320 Elsworth Street. Ste. C 10 1 Anaheim. CA 92806 San Diego. CA 92121 Moreno Valley, CA 92553 ry Tel: 714.632.2999 Tel: 858.537.3999 Tel: 951.653.4999 Fax: 714.632.2974 fax: 858.537.3990 Fax: 951.653.4666 .. FIELD REPORT T'.?F. OF WORK. INSPECTOR ❑TECHNICIAN AVAILABLE SOIL REPORT (Y)(N`, SPECS (M(N) APPROVED PLANSCIN) ARCHITECT APPROVED APPROVED SHOP DRAWING i'i i 1141 < FOR WEEK ENDING PROJECT. NO 71, q ` C REPORT NO. PG O \ F :ONIRACT0R PLAN FILE NO. �( PERMIT N0. SUB CONTRACTOR c _e - PROJECT NAME c� r P. - �. INSPECTION ADDRESS ci A ADDRESS OF PROJECT REPORTING REQUIREMENTS: ICBO FIELD INSPECTION NlANUAL/\4TGi. SOIL MANUAL - REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON-CONFOR\DING WORK AT THE END OFTHE WORK DAY. OR A1ISSING NITRS. AND RFIS. ETC.. FILL OUT AND ATTACH A DEFICIENCY REPORT WFIEN A DEFICIENCY. YOURS ORA PREVIOUS INSPECTOR'S. IS CORRECTED, SO NOTE ON T1 HE ORIGINAL DEFICIENCY REPORT AND SUBNIIT A COPY WI'rH YOUR WEEK'S REPORTS. MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL tEST REPORTS): CONTRACTORS EQUIPMENT/ MANPOWER USED: AREA. GRID LINES. PIECES OBSERVED: STRUCTURAL NOTES. DETAIL. OR RFIS USED: REMARKS. INCLUDING MEMNGS: \\ WEATHER: Q'VIZ-5.5; TEMPERATURE: \,j,C� e..'t- a. . �,v SAMPLES TAKEN:•-44Ej- TESTS REQUIRED: --� LNCHMPE START: ��� SITE TIME FINISH._ RIOD. TRAVEL TIME: __.__ _ ----- -- VERIFIED BY: .._ 100 CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL N ESTIGATION RECOMMENDATIONS, AND /0 . R THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE. UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT Signature Z ` C, Date of Report ICBG Certification Number Print Name City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIJI I'1 RGDr%DT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) ARCHITECT: Smith Consulting Architects APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) FOR WEEK ENDING 03/11/2006 PROJECT NO. 3115KO3 12220 EI Camino Real Suite 200 San Diego, CA 92130 ENGINEER: CSSI REPORT NO 4 PG 1 OF 1 2445 fifth Street Suite 300 San Diego, CA 92102 PLAN FILE NO. PERMIT NO. 05-3259 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PROJECT NAME: Major 'C' Drexel Heritage SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 INSPECTION ADDRESS: 79-150 Highway 111 ADDRESS OF PROJECT: 79-150 Highway 111 La Quinta, CA La Quinta, CA REPORTING REQUIREMENTS: ICBG FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT/ MANPOWER USED: WELDING MACHINE: MQ Whisperweld BLW-40OSSW2, Lincoln SAE 350 AREA, GRIDLINES, PIECES OBSERVED: In Progress: Welding of the bridging angles to the top and bottom cords of the roof joists. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Cool SAMPLES TAKEN: n/a TEMPERATURE: 63 Deg. F TESTS REQUIRED: n/a �M : : - __ M - .. z -" - ' " '� �•�� ^Jvl JI I t I IMt I-INI5H: 3:30 PM LUNCH PERIOD: - 1/2 Hr. TRAVEL TIME: FIED BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPUES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. ��- 0849264-85 Signature ICBO Certification Number Steve W. Bodnar - 03/10/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number 4 CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIFI n DPDnQr Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) . SPECS. (Y) SSW ARCHITECT: Smith Consulting Architects APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) FOR WEEK ENDING 03/11/2006PROJECT NO. 31151<03 12220 EI Camino Real Suite 200 San Diego, CA 92130 ENGINEER: CSSI REPORT NO 3 PG 1 OF 1 2445 Fifth Street Suite 300 San Diego, CA 92102 CONTRACTOR: Vratsinas Construction Co. PLAN FILE NO. PERMIT NO. 05-3259 P.O. Box 2558 Little Rock, AR 72203 SUB -CONTRACTOR: Portola Constructios, Inc. PROJECT NAME: Major'C' Drexel Heritage 10722 Edison Court Rancho Cucamonga, CA 91730 INSPECTION ADDRESS: 79-150 Highway 111 ADDRESS OF PROJECT: 79-150 Highway 111 La Quinta, CA La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 & FCAW NR232 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: MQ Whisperweld BLW-400SSW2, Lincoln SAE 350, Lincoln Big Blue 401 P AREA, GRIDLINES, PIECES OBSERVED: Items Completed: (1) Welding of the knife plates between the ends of the top cord of the roof girders on lines F, G, H & 1/3 to 12. (2) Welding the ends of the top cord of the roof joists to the top cord of the roof girders on line F, G, H & 1/3 to 12. (3) Welding of the splice plates between the ends of the top cord of the roof joists on lines F, G, H & 1/3 to 12. (4) Welding of the top cord of the roof joists to the wall embeds on lines 3/D to J, 12/D to J and J/3 to 12. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: n/a TEMPERATURE: 112 73 Deg. F TESTS REQUIRED: n/a SITE TIME START: 11:30 AM SITE TIME FINISH: 4:30 PM -zA- LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: 4ERIFIED BY I nn RV r:FRTICV TWAT I U-11 „ ,� ...J X U r 0V V r MrvU I MM I I NIJ VVUHK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. !� .r!rf Ots �GCiG�GLG .. 0849264-85, Signature ICBO Certification Number Steve W. Bodnar 03/09/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, SuiteG San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X 'INSPECTOR TECHNICIAN SSW • AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 . FOR WEEK ENDING 03/11/2006 PROJECT N0. 3115K03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO 2 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PE RMIT NO. 05-3259 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Major'C' Drexel Heritage INSPECTION ADDRESS: 79-150 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-150 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICSO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: MQ Whisperweld BLW-400SSW2, Miller Big Blue 401P AREA, GRIDLINES, PIECES OBSERVED: In Progress: 1 Welding the ends of the roof joists to the top cord of the roof girders along lines F and G. (2) Welding of the splice plates between the ends of the top cord of the roof joists along lines F and G. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: I Na TEMPERATURE: 74 Deg. F TESTS REQUIRED: Na SITE TIME START: 1:00 PM SITE TIME FINISH: 4:30 PM LUNCH PERIOD: none TRAVEL TIME: VERIFIED BY 1 n!1 CV ICOTICV T - -- - • • • • •• •-- • �•• -,. ��., ..., �� .mow nLL yr 1 nr- VVUKr, LIZ) I to Atfwt AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 9 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 03/08/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD RFPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 03/11/2006 PROJECT NO. 31ISK03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO 1 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-3259 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Major 'C' Drexel Heritage INSPECTION ADDRESS: 79-150 Highway 111 La Quinta, CA ADDRESS OF PROJECT: .79-150 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 & FCAW NR232 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: MQ Whisperweld BLW-400SSW2, Miller Big Blue 400 D AREA, GRIDLINES, PIECES OBSERVED: In Progress: Welding of the knife plates between the ends of the roof girders at the top cords. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: n/a TEMPERATURE: 74 Deg. F TESTS REQUIRED: n/a SITE TIME START: 7:00 AM SITE TIME FINISH: 10:00 AM E LUNCH PERIOD: none TRAVEL TIME: �� VERIFIED BY int VVUPVn ua tU AtlUVt AND ]HAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 03/07/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego I Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 03/18/2006 PROJECT NO. 311 SK03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO 1 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05 3259 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Major'C' Drexel Heritage INSPECTION ADDRESS: 79-150 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-150 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICSO FIELD INSPECTION MANUAL r MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT/ MANPOWER USED: WELDING MACHINE: MQ Whisperweld BLW-400SSW2, Miller Big Blue 400D AREA, GRIDLINES, PIECES OBSERVED: In Progress: Welding of the bridging angles to the top and bottom cords of the roof joists. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: Na TEMPERATURE: 68 Deg. F TESTS REQUIRED: n/a SITE TIME START: 10:30 AM SITE TIME FINISH: 4:30 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: VERIFIED BY I UU OT UtH I It -Y I HAI I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. Qom' 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 03/14/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR 'TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San. Diego, CA 92130 FOR WEEK ENDING 03/18/2006 PROJECT NO. 3115K03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO 2 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-3259 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Major 'C' Drexel Heritage INSPECTION ADDRESS: 79-150 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-150 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL! MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Miller Big Blue 400D AREA, GRIDLINES, PIECES OBSERVED: Items Completed: Welding of the entire bridging angles to the top and bottom cords of the roof joists from line E to J between lines 3 and 12. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: Na TEMPERATURE: 76 Deg. F TESTS REQUIRED: Na SITE TIME START: 7:00 AM SITE TIME FINISH: 1:00 PM C LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: VERIFIED BY - - . • ,F I I nn I I nrvc rrMZ UNALLY UCStKVFD ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. '--�' 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 03/15/2006 City Of La Quintal Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County Suite A 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIFI n RFPnRT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 03/18/2006 PROJECT NO. 3115K03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO 2 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO.PERMIT NO. 05-3259 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Major 'C' Drexel Heritage INSPECTION ADDRESS: 79-150 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-150 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Miller Big Blue 400D AREA, GRIDLINES, PIECES OBSERVED: Items Completed: Welding of the entire bridging angles to the top and bottom cords of the roof joists from line E to J between lines 3 and 12. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: Na TEMPERATURE: 76 Deg. F TESTS REQUIRED: Na SITE TIME START: 7:00 AM SITE TIME FINISH: 1:00 PM .0 LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: VERIFIED BY DO RV CFRTIFV TWAT i uevc -- ---- -- � ••�+.. � , cv novvc hlvu MAI I NIS WUKK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. Signature Steve W. Bodnar Print Name 03/15/2006 Date Of Report 0849264-85 ICBO Certification Number City Of La Quinta City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 03/18/2006 PROJECT NO. 3115K03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO 1 PG I OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-3259 SUB -CONTRACTOR: Portola Construdos, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Major'C' Drexel Heritage INSPECTION ADDRESS: 79-150 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-150 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL I MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: MQ Whisperweld BLW-400SSW2, Miller Big Blue 400D AREA, GRIDLINES, PIECES OBSERVED: In Progress: Welding of the bridging angles to the top and bottom cords of the roof joists. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: n/a TEMPERATURE: 68 Deg. F TESTS REQUIRED: n/a SITE TIME START: 10:30 AM SITE TIME FINISH: 4:30 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: VERIFIED BY +I -r. 11 T I nr+i 1 nrAVt rtKJUNALLY UCSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. Signature Steve W. Bodnar Print Name 03/14/2006 Date Of Report 0849264-85 ICBO Certification Number City Of La Quinta City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 i Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIFI n RFpnRT Inland Empire 14320 Ellsworth Street, Suite C 101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 03111/2006 rOJECTNO. 311SK03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO 1 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-3259 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Major 'C' Drexel Heritage INSPECTION ADDRESS: 79-150 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-150 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICSO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 & FCAW NR232 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: MQ Whisperweld BLW-400SSW2, Miller Big Blue 400 D AREA, GRIDLINES, PIECES OBSERVED: In Progress: Welding of the knife plates between the ends of the roof girders at the top cords. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: n/a TEMPERATURE: 74 Deg. F TESTS REQUIRED: n/a SITE TIME START: 7:00 AM SITE TIME FINISH: 10:00 AM f LUNCH PERIOD: none TRAVEL TIME: e VERIFIED BY n�L yr 1 nt VVUrcn ua I tU AbUVt ANU I HAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. Signature Steve W. Bodnar 03/07/2006 Print Name Date Of Report 0849264-85 ICBO Certification Number City Of La Quinta City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (`() APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 . FOR WEEK ENDING 03/11/2006 PROJECT NO. 3115K03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA. 92102 REPORT NO 2 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO.PERMIT NO. 05-3259 SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: Major'C' Drexel Heritage INSPECTION ADDRESS: 79-150 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-150 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: MQ Whisperweld BLW-40OSSW2, Miller Big Blue 401 P AREA, GRIDLINES, PIECES OBSERVED: In Progress: 1) Welding the ends of the roof joists to the top cord of the roof girders along lines F and G. (2) Welding of the splice plates between the ends of the top cord of the roof joists along lines F and G. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS.- EETINGS:REWORK REWORKAS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN:I Na TEMPERATURE: 74 Deg. F TESTS REQUIRED: Na SITE TIME START: 1:00 PM SITE TIME FINISH: 4:30 PM LUNCH PERIOD: none TRAVEL TIME: VERIFIED BY 11911 � - - - - .. _ .......-_ . ,,,,,,—l— , n —WMM LIQ I CU ADUVC ANU INA I I MIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. ' 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 03/08/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego I Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) ARCHITECT: Smith Consulting Architects APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 03/11/2006 PROJECT NO. 3115KO3 REPORT NO 4 PG 1 OF 1 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 PLAN FILE NO. PERMIT NO. 05-3259 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PROJECT NAME: Major'C' Drexel Heritage SUB -CONTRACTOR: Portola Constructios, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 INSPECTION ADDRESS: 79-150 Highway 111 ADDRESS OF PROJECT: 79-150 Highway 111 La Quinta, CA La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: MQ Whisperweld BLW-400SSW2, Lincoln SAE 350 AREA, GRIDLINES, PIECES OBSERVED: In Progress: Welding of the bridging angles to the top and bottom cords of the roof joists. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Cool SAMPLES TAKEN: n/a TEMPERATURE: 63 Deg. F TESTS REQUIRED: n/a I W.JV rim 51 I E I IME FINISH: 3:30 PM LUNCH PERIOD: 1/2 Hr, TRAVEL TIME: # ERIFIED BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS; AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THF BUILDING CODE, UNLESS OTHERWISE /NOTED IN THE DEFICIENCY REPORT. Signature Steve W. Bodnar Print Name 03/10/2006 Date Of Report 0849264-85 ICBO Certification Number City Of La Quinta City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIFI r1 RGDnoir Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) SSW ARCHITECT: Smith Consulting Architects APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) FOR WEEK ENDING 03/11/2006 PROJECT NO. 31151<03 12220 EI Camino Real Suite 200 San Diego, CA 92130 ENGINEER: CSSI REPORT NO 3 PG 1 OF 1 2445 Fifth Street Suite 300 San Diego, CA 92102 CONTRACTOR: Vratsinas Construction Co. PLAN FILE NO.PERMIT NO. 05-3259 P.O. Box 2558 Little Rock, AR 72203 SUB -CONTRACTOR: Portola Constructios, Inc. PROJECT NAME: Major 'C' Drexel Heritage 10722 Edison Court Rancho Cucamonga, CA 91730 INSPECTION ADDRESS: 79-150 Highway 111 ADDRESS OF PROJECT: 79-150 Highway 111 La Quinta, CA La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 & FCAW NR232 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: MQ Whisperweld BLW-400SSW2, Lincoln SAE 350, Lincoln Big Blue 401 P AREA, GRIDLINES, PIECES OBSERVED: Items Completed: (1) Welding of the knife plates between the ends of the top cord of the roof girders on lines F, G, H & 1/3 to 12. (2) Welding the ends of the top cord of the roof joists to the top cord of the roof girders on line F, G, H & 1/3 to 12. (3) Welding of the splice plates between the ends of the top cord of the roof joists on lines F, G, H & 1/3 to 12. (4) Welding of the top cord of the roof joists to the wall embeds on lines 3/D to J, 12/0 to J and J/3 to 12. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: n/a TEMPERATURE: 73 Deg. F TESTS REQUIRED: n/a SITE TIME START: 11:30 AM SITE TIME FINISH: 4:30 PM l /N LUNCH PERIOD: 1/2 Hr. TRAVEL TIME:ERIFIED BY I nn RY rPPTICV TWAT 1 uAic [fcec��w, , - - -- ----• •-�� • -- vvwu1 i cU MDvvr MIVU I nAl i rub VVUKK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 03/09/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Firma n Q=DnoT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW ARCHITECT Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 AVAILABLE: SOIL REPORT (1) (N) SPECS. (1) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS m FOR WEEK ENDING 04/08/2006 PROJECT NO. 31151K03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NC 2 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-3259 SUB -CONTRACTOR: Portola Construction, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: MAJOR 'C' Drexel Heritage INSPECTION ADDRESS: 79-150 Highway 111 ADDRESS OF PROJECT: 79-150 Highway 111 La Quinta, CA La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 & FCAW NR232 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln SAE 350, Miller trailblazer 301 G AREA, GRIDLINES, PIECES OBSERVED: Items Completed: (1) Welding of the beam to column moment connections on lines 12.5/G.1 & 12.5/G.9 on the roof level. (2) Welding of the entire seismic sway bracing angles from the bottom cord of the roof joists to the bottom cord of the roof girders from line 3 to 11 between lines E & J. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: n/a TEMPERATURE: 87 Deg F TESTS REQUIRED: n/a SITE TIME START: 11:30 AM SITE TIME FINISH: 4:30 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: E IFIED BY I nn RV rLATICV TueT 1 UAV- — ' ----'---11—'11— v WMM LIQ I CU A6U V C ANU [MAI I HI5 WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS. AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDINgCODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBG Certification Number Steve W. Bodnar 04/04/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number Corporate: 2992 E. La Palma Avenue, Suite A Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 ��' '�• ''`'` ` i. Branch: 7313 Carroll Road, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elsworth Street, Suite C101, Moreno Valley, CA 92553 Tel: (909) 653-4999 Fax: (909) 653-4666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 (q Tel: (818) 833-8100 Fax: (818) 833-0085 D U FEB " 'i MJb L Report of: COMPRESSIVE STRENGTH -CONCRETE ASTM C39 . LBY VCC 4425 JAMBOREE ROAD, SUITE 180 NEWPORT BEACH, CA 92660 Client: THOMAS ENTERPRISES A Set No.: 6-1260 0 File No.: Permit No.: 046-326 Project No.: 31151303 Project Name: BED, BATH & BEYOND MARKET PLACE @ LA Q HWY 1 I 1 @ ADAMS LA QUINTA, CA Age (Days) Date Tested Nominal Size Actual Area (Sq. Inch) Load (lbs.) • Strength (psi) Type of Fracture 9 1/18/2006 6X 12 28.37 118,390 4,170 Cone 28 2/6/2006 6X 12 28.37 161,210 5,680 Cone & Split 28 2/6/2006 6X 12 28.37 157,460 5,550 Cone & Split Specified Strength: 4,500 PSI Sampled By MICHAEL G. Location: S.O.G. AND DOCK LEVELER @ LOADING DOCK Concrete Supplier: ASSOCIATED READY MIX Mix No.: 17231 Ticket No.: 3617611 Water added at Site: 0.00 gal. By Cement Type: Mix Time: min. Remarks: r� ASTM C172 Date Sampled: 1/9/2006 Date Received: 1/17/2006 Concrete Temp: °F ASTM C1064 Ambient Temp: °F ASTM C1064 Slump: 4.50 in. ASTM C143 Tested at: Anaheim Respectfully Submitted, Distribution: THOMAS ENTERPRISES MTGL, Inc. VCC j CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** M.B. (Ben) Lo Chief Engineer 5620 PSI 28 -day compression test complies with the specified strength. r CORPORATE San Diego / Imperial County Inland Empire 2992 E. La Palma Ave., Suite A 7313 Carroll Road, Suite G 14320 Elsworth Street, Suite C101 Anaheim, CA 92806 San Diego, CA 92121 Moreno Valley, CA 92553 Tel: 714.632.2999 Tel: 858.537.3999 Tel: 951.653.4999 Fax: 714.632.2974 Fax: 858.537.3990 Fax: 951.653.4666 FIELD REPORT Type Of Work X INSPECTOR TECHNICIAN AVAILABLE: SOIL REPORT m (N) SPECS. (Y) SSW APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT Smith Consulting Architects FOR WEEK ENDING 04/01/2006 PROJECT NO. 31151<03 12220 EI Camino Real Suite 200 San Diego, CA 92130 ENGINEER: CSSI REPORT NC 2 PG 1 OF 1 2445 Fifth Street Suite 300 San Diego, CA 92102 CONTRACTOR: Vratsinas Construction Co. PLAN FILE NO. PERMIT NO. 05-3259 P.O. Box 2558 Little Rock, AR 72203 SUB -CONTRACTOR: Portola Construction, Inc. PROJECT NAME: MAJOR V Drexel Heritage 10722 Edison Court Rancho Cucamonga, CA 91730 INSPECTION ADDRESS: 79-150 Highway 111 ADDRESS OF PROJECT: 79-150 Highway 111 La Quinta, CA I La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS) WELDING ELECTRODE: SMAW E-6022 CONTRACTORS EQUIPMENT/ MANPOWER USED: WELDING MACHINE: Miller Big Blue 302P, Lincoln Classic 300D AREA, GRIDLINES, PIECES OBSERVED: In Progress: Puddle welding of the metal roof decking. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: Na TEMPERATURE: 69 Deg. F TESTS REQUIRED: n/a SITE TIME START: 9:30 AM LUNCH PERIOD: 1/2 Hr. SITE TIME FINISH: 12:30 PM TRAVEL TIME: VERIFIED BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS. AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 03/31/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number 11 4- Corporate: 2992 E. La Pal�1' Avenue, Suite A, Anaheim, CA 92806 Tel: (714) 632-2999 Fax: (714) 632-2974 Branch: 7313 Carroll Riad, Suite G, San Diego, CA 92121 Tel: (858) 537-3999 Fax: (858) 537-3990 Branch: 14320 Elswo'rth Street, Suite C101, Moreno Valley, CA 92553 s• Tel: (909) 6534999 Fax: (909) 653-4666 Branch: 13010 San Fernando Road, Unit 1, Sylmar, CA 91342 Tel: (818) 833-8100 Fax: (818) 833-0085 Reportof: COMPRESSIVE STRENGTH -GROUT ASTM C1019 GEORGE* File No.: VCC ! Permit No.: P.O. BOX 5883 Project No.: 3115J03 LA QUINTA, CA 92248 Project Name: SHOP 3 MARKETPLACE @ LA QUINTA 79-150 HWY 11 I @ ADAMS LA QUINTA, CA Client: THOMAS ENTERPRISES Set No.: 6-1872 Age (Days) .- Date Tested Nominal Size Actual Area (Sq. Inch) Load (lbs.) Strength (psi) Type of Fracture 7 3/2/2006 3 X 3 X 6 9.42 19,880 2,110 N/A 28 3/23/2006 3 X 3 X 6 9.67 24,550 2,540 N/A 28 3/23/2006 3 X 3 X 6 9.86 23,960 2,430 , N/A Specified Strength:`2,500� PSI Sampled By MICHAEL G. Location: 6TH LIFT (PARAPET) LINE A Concrete Supplier: ASSOCIATED READY MDC Mix No.: 46511 Ticket No.: 3637918 Water added at Site: 0.00 gal. By Cement Type: Mix Time: min. Remarks: Distribution: THOMAS ENTERPRISES VCC CITY OF LA QUINTA-BLDG & SAFETY **LAB COPY** ASTM C172 Date Sampled: 2/23/2006 Date Received: 2/27/2006 Concrete Temp: 64 °F ASTM C1064 Ambient Temp: 77 °F ASTM C1064 Slump: 9.00 in. ASTM C143 Tested at: Anaheim Respectfully Submitted, MTGL, Inc. 1 M.B.(Ben)Lo Chief Engineer 2480 PSI 28 -day compression test does not comply with the specified strength. J• CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Fwi n REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT m (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 04/08/2006 PROJECT NO. 3115K03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NC 3 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-3259 SUB -CONTRACTOR: Portola Construction, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: MAJOR V Drexel Heritage INSPECTION ADDRESS: 79-150 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-150 Highway 111 I La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS. AND FIRS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODE: SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln SAE 350, Miller Trailblazer 301 G AREA, GRIDLINES, PIECES OBSERVED: Items Completed: (1) Welding and torque tightening of the of the ASTM A325 high strength bolts on the entire steel framing from line F to I between lines 11.5 & 12.5 at the store front. (2) Puddle welding and side seam punch locking of the entire metal roof decking from line E to J between lines 3 & 12.5. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: Na TEMPERATURE: 67 Deg. F TESTS REQUIRED: n/a SITE TIME START: 9:00 AM SITE TIME FINISH: 12:30 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: VERIFIED BY w.. o . �cn I Ir r i rw I i nAvt rrKOUNALLT UtlJEKVEU ALL OF f HE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 04/05/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIFI n RFPnRT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (1) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (1') ARCHITECT Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 04/08/2006 PROJECT NO. 31151K03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO. 4 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-3259 SUB -CONTRACTOR: Portola Construction, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: MAJOR 'C' Drexel Heritage INSPECTION ADDRESS: 79-150 Highway 111 La Quinta, CA I ADDRESS OF PROJECT: 79-150 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES: SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln SAE 350, Miller Trailblazer 301G AREA, GRIDLINES, PIECES OBSERVED: Items Completed: Welding of the metal roof decking support angles at the roof drain locations on lines 3/F.1, 3/G.5 & 3/H.9. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: n/a TEMPERATURE: 77 Deg. F TESTS REQUIRED: n/a SITE TIME START: 11:00 AM SITE TIME FINISH: 3:30 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: VERIFIED BY I UU t$T t:trt I Ir T I MA I I MAVt rtI15UNALLY UB5ERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. �J 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 04/06/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number M CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 Fim n RFPnPT Inland Empire \ 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. m APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 04/03/2006 TPROJECT NO. 3115K03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NC 1 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-3259 SUB -CONTRACTOR: Portola Construction, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: MAJOR V Drexel Heritage INSPECTION ADDRESS: 79-150 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-150 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODE: SMAW E-7018 & E-6022 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln SAE 350, Lincoln Classic 300D, Miller Big Blue 302P AREA, GRIDLINES, PIECES OBSERVED: In Progress: Puddle welding and side seam punch locking of the metal roof decking. Items Completed: Welding of the diagonal bracing angles from the bottom flange of the W10x12 roof beams to the wall embeds from line G.3 to G.9 between lines 11.5 and 12. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: n/a TEMPERATURE: 87 Deg. F TESTS REQUIRED: n/a SITE TIME START: 12:00 PM SITE TIME FINISH: 4:30 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: VERIFIED BY 1 •1.. 1 1 V- IV I v rQMaWV +LL T voacrc V r_u ru yr i Mr wutcR LIS I to At5VVt AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. zt�l' 0849264-85 Signature ICBG Certification Number Steve W. Bodnar 04/03/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street. Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (1r) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (1) ARCHITECT Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 04/01/2006 PROJECT NO. 3115K03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NC 2 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO.PERMIT NO. 05-3259 SUB -CONTRACTOR: Portola Construction, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: MAJOR 'C' Drexel Heritage INSPECTION ADDRESS: 79-150 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-150 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODE: SMAW E-7018 & E-6022 CONTRACTORS EQUIPMENT/ MANPOWER USED: WELDING MACHINE: Lincoln SAE 350, Lincoln Classic 300D, Miller Big Blue 302P AREA, GRIDLINES, PIECES OBSERVED: In Progress: (1) Puddle welding and side seam punch locking of the metal roof decking. (2) Welding of the steel framing at the store front. Items Completed: Welding the end of the W14x30 beam at the wall embed on line 4/E on the roof level. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: n/a TEMPERATURE: 74 Deg F TESTS REQUIRED: n/a SITE TIME START: 1:00 PM SITE TIME FINISH: 5:00 PM LUNCH PERIOD: none TRAVEL TIME: VERIFIED BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. jjkb �' 0849264-85 Signature ICBO Certification Number Steve W. Bodnar City Of La Quinta Print Name Date Of Report City / County Certification Number Mi - , " -, "MT�a I CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax. 858.537.3990 FIELD REPORT Inland Empire 14467 Meridian Parkway Bldg. 2A Riverside, CA 92518 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (1) APPROVED SHOP DRAWINGS (Y) ARCHITECT Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 06/24/2006 PROJECT NO. 3115.103 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO. 1 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-3259 SUB -CONTRACTOR: Portola Construction, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: SHOP 3 Famous Footwear INSPECTION ADDRESS: 79-150 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-150 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL I MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH, REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln SAE 350 AREA, GRIDLINES, PIECES OBSERVED: Items Completed: (1) Welding of the relocation of the support framing to the top cord of the roof joists for the metal roof decking openings at the HVAC units on lines A.9/9.1, 8.5/4.5, C.2/2.9 & C.2/9.3. (2) Welding and torque tightening of the ASTM A325 high strength bolts of the radiused channel framing to the top cord of the roof joists from line 10 to 10.5 between lines A.9 & C.1. STRUCTURAL NOTES, DETAIL, OR RAS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: n/a TEMPERATURE: 111 Deg. F TESTS REQUIRED: Na SITE TIME START: 9:00 AM SITE TIME FINISH: 2:30 PM Al 1;4 LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: RI Y I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. -5a 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 06/26/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego I Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14467 Meridian Bldg. 2A Riverside, CA 92518 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (`() (N) SPECS.- (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 07/01/2006 PROJECT NO. 3115J03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO. 2 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-3259 SUB -CONTRACTOR: Portola Construction, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: SHOP 3 Famous Footwear INSPECTION ADDRESS: 79-150 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-150 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBG FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RMS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln SAE 350 AREA, GRIDLINES, PIECES OBSERVED: In Progress: Welding for the relocation of the radiused channel framing to the top cord of the roof joists from line 10 to 10.1 between lines A.9 to C.1. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: n/a TEMPERATURE: 110 Deg F TESTS REQUIRED: nta SITE TIME START: 6:00 AM SITE TIME FINISH: 230 PM LUNCH PERIOD: 112 Hr. TRAVEL TIME: VERIFIED BY 1 DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND I OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. �!J 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 06/30/2006 City Of La Quinta Print Name Date Of Report City I County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego I Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax. 858.537.3990 FIELD REPORT Inland Empire 14467 Meridian Bldg. 2A Riverside, CA 92518 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (`/) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 07101/2006 PROJECT NO. 3115J03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO. 3 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-3259 SUB -CONTRACTOR: Portola Construction, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: SHOP 3 Famous Footwear INSPECTION ADDRESS: 79-150 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-150 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICAO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln SAE 350 AREA, GRIDLINES, PIECES OBSERVED: Items Completed: Welding for the relocation of the radiused channel framing to the top cord of the roof joists from line 10 to 10.1 between lines A.9 to C.1. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: n/a TEMPERATURE: 112 Deg F TESTS REQUIRED: n/a SITE TIME START: 6:00 AM SITE TIME FINISH: 10:00 AM LUNCH PERIOD: none TRAVEL 11ME: VERIFIEDEIN I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING ODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. %r 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 07/01/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tei: 714.632.2999 Fax: 714.632.2974 1 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14467 Meridian Bldg. 2A Riverside, CA 92518 Tel: 95.1.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (`t7 ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 06/24/2006 PROJECT NO. MUM ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO. 1 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 tittle Rock, AR 72203 PLAN FILE NO.PERMIT NO. 05-3259 SUB -CONTRACTOR: Portola Construction, tnc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: .SHOP 3 Famous Footwear INSPECTION ADDRESS: 79-150 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-150 Highway 111 La Quints CA REPORTING REQUIREMENTS: ICBG FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NONCONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln SAE 350 AREA, GRIDLINES, PIECES OBSERVED: In Progress: Welding of the radiused channel framing to the top cord of the roof joists from line 10 to 10.5 between lines A.9 & C.1. STRUCTURAL NOTES, DETAIL, OR RFIS. USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: Na TEMPERATURE: 108 Deg. F TESTS REQUIRED: n/a SITE TIME START: 10:00 AM SITE TIME FINISH: 2:30 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: VERIFIED BY I UU MT l t:K 1,rT I "AI I MAVt Ft_t(bUNALLY Ob5ERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS /OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 06/20/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14467 Meridian Parkway Bldg. 2A Riverside, CA 92518 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (`1) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS m ARCHITECT: Smith Consulting Architects 12220 EI Camino Real Suite 200. San Diego,.CA 92130 FOR WEEK ENDING 06/2412006 PROJECT NO. 3115J03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO. 2 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co.. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PE RMIT NO. 05 -3259 SUB -CONTRACTOR: Portola Construction, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: SHOP 3 Famous Footwear INSPECTION ADDRESS: 79-150 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-150 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICSO FIELD INSPECTION MANUAL l MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln SAE 350 AREA, GRIDLINES, PIECES OBSERVED: In Progress: Welding of the relocation of the support framing to the top cord of the roof joists for the metal roof decking openings at the HVAC units on lines A.9/9.1, 8.5/4.5, C.2/2.9 & C.2/9.3. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: n/a TEMPERATURE: 114 Deg. F TESTS REQUIRED: Na SITE TIME START: 10:30 AM SITE TIME FINISH: 2:30 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: VERIFIED BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. ow. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 06/23/2006 City Of La Quinta Print Name Date Of Report City I County Certification Number A �NFT�:A CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FiFi n RFPnRT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (1) (N) SPECS. (Y) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (Y) ARCHITECT Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 04/22/2006 PROJECT NO. 3115J03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO. 1 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-3259 SUB -CONTRACTOR: Portola Construction, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: SHOP 3 Famous Footwear INSPECTION ADDRESS: 79-150 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-150 Highway 111 I La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln SAE 350 AREA, GRIDLINES, PIECES OBSERVED: Items Completed: Welding of the C6x18.2 channels to the top cord of the roof joists on line 12.4/131.1 to B.9. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: Na TEMPERATURE: 85 Deg. F TESTS REQUIRED: Na SITE TIME START: 7:00 AM SITE TIME FINISH: 3:30 PM LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: VERIFIED BY .. , I. r I n^ 9 1 mr VC rcrtJUnAL LT Ursatrcvtu ALL UY r Ht WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. f 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 04/18/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (`r) APPROVED PLANS (1) APPROVED SHOP DRAWINGS (1) ARCHITECT Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 04/08/2006 PROJECT NO. 3115J03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NC 4 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 - PLAN FILE NO. PERMIT NO. 05-3259 SUB -CONTRACTOR: Portola Construction, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: SHOP 3 Famous Footwear INSPECTION ADDRESS: 79-150 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-150 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBG FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODE: SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln SAE 350, Miller Trailblazer 301 G AREA, GRIDLINES, PIECES OBSERVED: Items Completed: Welding of the metal roof decking support angles at the roof drain locations on lines 4/A.5 & 4/C.9. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: n/a .. TEMPERATURE: 77 Deg. F TESTS REQUIRED: n/a = ' SITE TIME START: 7:00 AM SITE TIME FINISH: 11:00 AM' � i K LUNCH PERIOD: none TRAVEL TIME: VERIFIED BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. Jf� --7�� 0849264-85 Signature ICBG Certification Number Steve W. Bodnar 04/06/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 F1Fi n RFPnRT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (Y) (N) SPECS. (Y) APPROVED PLANS m APPROVED SHOP DRAWINGS m ARCHITECT Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 04/08/2006 PROJECT NO. 3115J03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NO. 3 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-3259 SUB -CONTRACTOR: Portola Construction, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: SHOP 3 Famous Footwear INSPECTION ADDRESS: 79-150 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-150 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES: SMAW E-7018 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln SAE 350, Miller Trailblazer 301 G AREA, GRIDLINES, PIECES OBSERVED: Items Completed: (1) Welding and torque tightening of the ASTM A325 high strength bolts on the entire steel framing from line A to D between lines 11.5 8 12.5 at the store front. (2) Puddle welding and side seam punch locking of the entire metal roof decking from line A to D between lines 4 8 12.5. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: n/a TEMPERATURE: 67 Deg. F TESTS REQUIRED: n/a SITE TIME START: 12:30 PM SITE TIME FINISH: 4:30 PM / LUNCH PERIOD: none TRAVEL TIME: L VERIFIED BY - - - - -- • • • • - • • • • •• • - +..,...�� • �..,.auwcv n�� yr I nc vvvRn LIJ I tU AtlUVt AN INA I I HIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. A!% 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 04/05/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego I Imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT (1) (N) SPECS. (Y) APPROVED PLANS m APPROVED SHOP DRAWINGS (Y) ARCHITECT Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 04/08/2006 PROJECT NO. 3115J03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NC 1 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05-3259 SUB -CONTRACTOR: Portola Construction, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: SHOP 3 Famous Footwear INSPECTION ADDRESS: 79-150 Highway 111 La Quinta, CA - ADDRESS OF PROJECT: 79-150 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL I MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-7018 & E-6022 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln SAE 350, Lincoln Classic 300D, Miller Big Blue 302P AREA, GRIDLINES, PIECES OBSERVED: In Progress: Puddle welding and side seam punch locking of the metal roof decking. Items Completed: Welding of the diagonal bracing angles from the bottom flange of the W10x12 roof beams to the wall embeds from line B.3 to B.9 between lines 11.5 and 12. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Hot SAMPLES TAKEN: n/a TEMPERATURE: 87 Deg. F TESTS REQUIRED: n/a SITE TIME START: 8:30 AM SITE TIME FINISH: 12:00 PM LUNCH PERIOD: none TRAVEL TIME: VERIFIED BY I DO BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 04/03/2006 City Of La Quinta Print Name Date Of Report City / County Certification Number CORPORATE 2992 E. La Palma Ave., Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 San Diego / imperial County 7313 Carroll Road, Suite G San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 FIELD REPORT Inland Empire 14320 Elsworth Street, Suite C101 Moreno Valley, CA 92553 Tel: 951.653.4999 Fax: 951.653.4666 Type Of Work X INSPECTOR TECHNICIAN SSW AVAILABLE: SOIL REPORT m (N) SPECS. (1) APPROVED PLANS (Y) APPROVED SHOP DRAWINGS (1) ARCHITECT Smith Consulting Architects 12220 EI Camino Real Suite 200 San Diego, CA 92130 FOR WEEK ENDING 04/01/2006 PROJECT NO. 3115J03 ENGINEER: CSSI 2445 Fifth Street Suite 300 San Diego, CA 92102 REPORT NC 2 PG 1 OF 1 CONTRACTOR: Vratsinas Construction Co. P.O. Box 2558 Little Rock, AR 72203 PLAN FILE NO. PERMIT NO. 05 3259 SUB -CONTRACTOR: Portola Construction, Inc. 10722 Edison Court Rancho Cucamonga, CA 91730 PROJECT NAME: SHOP 3 Fatuous Footwear INSPECTION ADDRESS: 79-150 Highway 111 La Quinta, CA ADDRESS OF PROJECT: 79-150 Highway 111 La Quinta, CA REPORTING REQUIREMENTS: ICBO FIELD INSPECTION MANUAL / MTGL SOIL MANUAL -REVIEW PREVIOUS REPORTS AND LISTS IF THERE IS NON -CONFORMING WORK AT THE END OF THE WORK DAY, OR MISSING MTRS, AND RFIS, ETC., FILL OUT AND ATTACH A DEFICIENCY REPORT WHEN A DEFICIENCY, YOURS OR A PREVIOUS INSPECTORS, IS CORRECTED, SO NOTE ON THE ORIGINAL DEFICIENCY REPORT AND SUBMIT A COPY WITH YOUR WEEKS REPORTS. MATERIALS USED BY CONTRACTOR: (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS): WELDING ELECTRODES SMAW E-6022 CONTRACTORS EQUIPMENT / MANPOWER USED: WELDING MACHINE: Lincoln Classic 300D, Miller Big Blue 302P AREA, GRIDLINES, PIECES OBSERVED: In Progress: Puddle welding of the metal roof decking. STRUCTURAL NOTES, DETAIL, OR RFIS USED: (PER APPROVED PLANS) REMARKS: INCLUDING MEETINGS: REWORK AS PERCENT OF ALL WORK TODAY: PERCENT PROJECT COMPLETION: WEATHER: Warm SAMPLES TAKEN: Na TEMPERATURE: 74 Deg. F TESTS REQUIRED: n/a SITE TIME START: 11:00 AM SITE TIME FINISH: 1:00 PM �41k& LUNCH PERIOD: 1/2 Hr. TRAVEL TIME: ERIFIED BY I UU BY CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE SOIL INVESTIGATION RECOMMENDATIONS, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. 0849264-85 Signature ICBO Certification Number Steve W. Bodnar 04/01/2006 — City Of La Quinta Print Name Date Of Report City / County Certification Number