Loading...
05-4855 (RC) Title 241 ' J TITLE 24 REPORT Title 24 Report for: Shops 3A- Famous Footwear The Pavillion at La Quinta La Quinta, Ca Project Designer: Smith Consulting Architects 12220 EI Camino Real, Suite 200 San Diego, Ca 92130 (858)-793-4777 Report Prepared By: Krishna C. Kumar P.E. Guthrie and Associates Inc. 370 S. Crenshaw Blvd., Suite E-104 Torrance, CA 90503 (310) 787-7825 Job Number: 040310-3AF Date: 9/15/2005 CITY OF LA QUINTA BUILDING & SAFETY DEPT. APPROVED F6R CONSTRUCTION 11A1E� ` & W-la- MMhL TheEnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is :authorized by the California Energy Commission for use with both the Residential and Nonresidential 2005 Building Energy Efficiency Standards. This program developed by EnergySoft, LLC - www.energysoft.com. ':� EnergyPro 4.0 by EnergySoft Job Number. 040310-3AF User Number: 1645 u L PERFORMANCE CERTIFICATE OF COMPLIANCE Part 1 of 3 PERF -1 PROJECT NAME This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the DATE 11 Shops 3A- Famous Footwear BUILDING CONDITIONED FLOOR AREA 6,500Sq.Ft. 9/15/2005 PROJECT ADDRESS NONRESIDENTIAL HIGH RISE RESIDENTIAL HOTEL/MOTEL GUEST ROOM PHASE OF CONSTRUCTION ® The Paviliuon at La Quinta La Quinta permit application. The proposed building as designed meets the energy efficiency requirements contained in sections 110, 116, through 118, and 140, 142, 143 or 149 of Title 24, Part 6. PRINCIPAL DESIGNER - ENVELOPE TELEPHONE Building Permit # Smith Consulting Architects (858)-793-4777 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed DOCUMENTATION AUTHOR Guthrie and Associates Inc. TELEPHONE (310) 787-7825 Checked by/Date Code Sections 5537, 5538, and 6737.1. (These sections of the Business and Professions Code are printed in full in the Nonresidential Manual.) Enforcement Agency Use GENERAL INFORMATION This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the DATE OF PLANS The documentation preparer hereby certifies that the documentatio is accurate and complete. BUILDING CONDITIONED FLOOR AREA 6,500Sq.Ft. CLIMATE ZONE 15 BUILDING TYPE ® NONRESIDENTIAL HIGH RISE RESIDENTIAL HOTEL/MOTEL GUEST ROOM PHASE OF CONSTRUCTION ® NEW CONSTRUCTION ❑ ADDITION [:] ALTERATION EXISTING + ADDITION STATEMENT OF COMPLIANCE This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies only to a Building using the performance compliance approach. The documentation preparer hereby certifies that the documentatio is accurate and complete. DOCUMENTATION AUTHOR SI U p Krishna C. Kumar P.E. -�� The Principal Designer hereby certifys that the proposed building design repr Is set of construction documents is consistent with the other compliance forms and worksheets, with the specifications, a with any other calculations submitted with this permit application. The proposed building as designed meets the energy efficiency requirements contained in sections 110, 116, through 118, and 140, 142, 143 or 149 of Title 24, Part 6. ENV LTG. MECH. 1. 1 hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to n this document as the person responsible for its preparation; and that I am licensed in the State of California as a civil engineer, mechanical engineer, or I am a licensed architect. ❑ ❑ F-1 2. 1 affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code Section 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor performing this work. ❑ F-1 F1 3. 1 affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document because it pertains to a structure or type of work described as exempt pusuant to Business and Professions Code Sections 5537, 5538, and 6737.1. (These sections of the Business and Professions Code are printed in full in the Nonresidential Manual.) ENVELOPE COMPLIANCE Indicate location on plans of Note Block for Mandatory Measures . to .– ENV -1 Required Forms PRINCIPAL ENVELOPE DESIGNER - NAME SIGNATURE LIC. NO. DATE Smith Consulting Architects LIGHTING COMPLIANCE Indicate location on plans of Note Block for Mandatory Measures Lighting Compliance Not In The Scope Of Required Forms PRINCIPAL LIGHTING DESIGNER - NAME SIGNATURE LIC. NO. DATE MECHANICAL COMPLIANCE Indicate location on plans of Note Block for Mandatory Measures —3 MEC 1 MECH-2 MECH-3 Required Forms PRINCIPAL MECHANICAL DESIGNER - NAMENATURE /� Guthrie LIC. N0. 0 DATE ot and Associates Inc. , 22( 7% EnergyPro 4.0 by EnergySoft User Number: 1645 Job Number: 040310-3AF Page:3 of 16 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 2 of 3 PER PROJECT NAME DATE Shops 3A- Famous Footwear 9/15/2005 ANNUAL TDV ENERGY USE SUMMARY kBtu/s ft- r Standard ENERGY COMPONENT Design Space Heating 0.08 Space Cooling 363.39 Indoor Fans 85.34 Heat Rejection 0.00 Pumps & Misc. 0.00 Domestic Hot Water 69.23 Lighting 187.30 Receptacle 87.43 Process 0.00 TOTALS: 792.76 Percent better than Standard: Proposed Compliance Design Margin 0.00 0.07 361.85 1.53°°""'B 87.31 -1.96 0.00 0.00 0.00 0.00 67.11 2.13 187.30 0.00 87.43 0.00 0.00 0.00 790.99 1.77 0.2% ( 0.2% excluding ° iro 0 PLp2wd -111101111 0 30, 60 90 j120 150 180 210 240 270300 330360 Mweafl•n process) BUILDING COMPLIES GENERAL INFORMATION Building Orientation Number of Stories Number of Systems Number of Zones South 180 deg Conditioned Floor Area Unconditioned Floor Area Conditioned Footprint Area Fuel Type 6,500 sqft. sqft. sqft. 1 0 3 6,500 21 Natural Gas Orientation Front Elevation South Left Elevation (West) Rear Elevation North Right Elevation I (East) Total Roof Gross Area sqft. sqft. sqft. sqft. sqft. Glazing Area Glazing sqft. sqft. sqft. sgft. sqft. sqft. Ratio 1,170 410 35.0% 0 0 0.0% 1,152 0 0.0% 0 0.0% t72,3212sqft. 410 17.7% =iiR E:� 0.0% Standard Proposed Lighting Power Density 1.700 W/sqft. 1.700 W/sqft. Prescriptive Env. Heat Loss 1,300 Btu/h 1,358 Btu/h Prescriptive Env. Heat Gain 102,107 Btum-F 123,394 Btuth-F Remarks: Run Initiation Time: 09/15/0510:22:48 Run Code: 1126804968 EnergyPro 4.0 by EnergySoft User Number: 1645 Job Number: 040310-3AF PageA of 16 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 3 of 3 PERF -1 11 PROJECT NAME Shops 3A- Famous Footwear DATE 9/15/2005 ZONE INFORMATION System Name Zone Name Occupancy Type Floor (Sgft) Inst. (W/D f)1 Ctrl. Credits (W/sf)2 Allowed LPD I Proc. Loads (Wlsf) Area Tailored /s 3 /s 4 Sales/Stock Room -8.5T A/C Sales/Stock Room Retail Sales, Wholesale 2,000 '1.70 Sales/Tits-(2)7.5T A/C Sales/Tlts Retail Sales, Wholesale 4,500 -1.70 Notes: 1. See LTG -2-C 2. See LTG -4-C 3. See LTG -5-C (items marked with asterisk, see LTG -2 -C by others) (by others) 4. See LTG -6-C Items above require special documentation EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST nn wL141 rrnivrceanenc agency 5"01.110 pay special attention to the Mems Specitlea in this checklist. These items require special written justification and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted. The HVAC System "Sales/Stock Room -8.5T A/C' includes Demand Control Ventilation per Standards Section 121. The HVAC System "Sales/Tlts-(2)7.5T A/C' includes Demand Control Ventilation per Standards Section 121. I ne exceptional reatures ustea in tms performance approach application have specifically been reviewed. Adequate written justification and documentation for their use have been provided by the applicant. or EnergyPro 4.0 by EnergySoft User Number: 1645 Job Number. 040310-3AF Page:5 of 16 CERTIFICATE OF COMPLIANCE ENV - PROJECT NAME Shops 3A- Famous Footwear OPAQUE SURFACES DATE 9/15/2005 # Surface T e Area U -Fac. Insulation Cay. Cont. Act. Azm. Tilt Cond' Joint Status Appendix IV Reference Location / Comments 1 Wall 272 0.285 None R-7.2 180 90 New 12-A8 Sales/Stock Room 2 Wall 666 0.285 None R-7.2 0 90 New 12-A8 Sales/Stock Room 3 Roof 2,000 0.051 - 180 0 New 02-A5 Sales/Stock Room 4 Wall 488 0.285 None R-7.2 180 90 New 12-A8 Sales/Tlts 5 Wall 465 0.285 None R-7.21 0 90 New 12-A8 Sales/Tits 6 Door 21 1.4501 None R-0.0 0 90 New 28-A1 Sales/Tlts 7 Roof 4,500 0.051 R-19 R-0.0 180 0 New 02-A5 Sales/Tlts ' N. E. A. R (New, Existing, Altered, Removed) FENESTRATION SURFACES ❑More than or equal to 10,000 sq.ft. of site -built fenestration area must include a label certificate either issued by NFRC or provide a CEC Default Label Certificate using the default U -factors from Standards Table 116-A and B. Certificate shall be filed in the contractors Droied office dudna construction and in ma huildinn mnnanare nffim affar — f iMi— Act. # Tvpe Area U -Fac? SHGC2 Am. Cond. Stat. Glazing Type Location/ Comments 1 Window Front South 340 1.190 NFRC 0.80 116-B 180 New Single Clear Glass Sales/Stock Room 2 Window Front South 70 1.190 NFRC 0.80 116-B 180 New Single Clear Glass Salesrrlts 2 None 0.76 10.0 7.0 11.0 0.1 11.0 11.0 (1) U -tactor Type: 116-A Default Table from Standards, Table NI -1 Default Table from the ACM Manual Appendix, NFRC Labeled value. (2) SHGC Type: 116-B Default Table from Standards, COG Center of Glass, NFRC Labeled Value EXTERIOR SHADING # Exterior Shade Type Window HGC Hgt. Wd. Overhang Left Fin Right Fin Len. H t. LExt.RExt. Dist. Len. H t. Dist. Len. H t. 1 None 0.76 10.0 34.0 11.0 0.1 11.0 11.0 2 None 0.76 10.0 7.0 11.0 0.1 11.0 11.0 MINIMUM SKYLIGHT AREA FOR LARGE ENCLOSED SPACES The proposed building contains an enclosed space with floor area greater than 25,000 sq.ft, a ceiling height greater than 16 feet and a LPD for general lighting of at least 0.5 W/sq.ft. If this box Is checked, ENV44 must be filled out when submitting under the Prescriptive Compliance Approach. EnergyPro 4.0 by EnergySoft User Number: 1645 Job Number: 040310-3AF Page: 6 of 16 r� CERTIFICATE OF COMPLIANCE MECH-1-C (PROJECT NAME DATE Shops 3A- Famous Footwear 9/15/2005 esigner: This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for mechanical systems. The designer is required to check the boxes by all acceptance tests that apply and list all equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the equipment description and the number of systems to be tested in parentheses. The NJ number designates the Section in the Appendix of the Nonresidential ACM Manual that describes the test. Also indicate the person responsible for performing the tests (i.e. the installing contractor, design professional or an agent selected by the owner). Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Building Departments: SYSTEM ACCEPTANCE. Before an occupancy permit is granted for a newly constructed building or space, or a new space -conditioning system serving a building or space is operated for normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. In addition a Certificate of Acceptance, MECH-I-A Form shall be submitted to the building department that certifies plans, specifications, installation certificates, and operating and maintenance information meet the reauiements of Sertinn 1 n-1 nsrhl nnri Titip 9d Pnrt a STATEMENT OF COMPLIANCE ❑ MECH-2-A: Ventilation System Acceptance Document -Variable Air Volume Systems Outdoor Air Acceptance -Constant Air Volume Systems Outdoor Air Acceptance Equipment requiring acceptance testing ❑ MECH-3-A: Packaged HVAC Systems Acceptance Document Equipment requiring acceptance testing ❑ MECH-4-A: Air Distribution Acceptance Document Equipment requiring acceptance testing ❑ MECH-5-A: Air -Side Economizer Acceptance Document Equipment requiring acceptance testing ❑ MECH-6-A: Demand Control Ventilation Acceptance Document Equipment requiring acceptance testing ❑ MECH-7-A: Supply Fan Variable Flow Control Acceptance Document Equipment requiring acceptance testing ❑ MECH-8-A:-Hydronic System Control Acceptance Document -Variable Flow Controls -Automatic Isolation Con-trols -Water-loop Heat Pump Controls -Variable Frequency Controls Equipment requiring acceptance testing EnergyPro 4.0 by EnergySoft User Number: 1645 Job Number: 040310-3AF Page:7 of 16 AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2-C ECT NAME Shops 3A- Famous Footwear ITEM OR SYSTEM TAG(S) Number of Systems T-24 MANDATORY MEASURES Section Heating Equipment Efficiency Cooling Equipment Efficiency Heat Pump Thermostat Furnace Controls Natural Ventilation Minimum Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation •Duct Insulation PRESCRIPTIVE MEASURES Calculated Heating Capacity x 1.43 2 Proposed Heating Capacity 2 Calculated Sensible Cooling Capacity x 1.212 Proposed Sensible Cooling Capacity 2 Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heating Air Supply Reset Cooling Air Supply Reset Duct Sealing for Prescriptive Compliance DATE 9/15/2005 AIR SYSTEMS, Central or Single Zone Sales/Stock Room -8.5T A/C Saleslrlts-(2)7.5T A/C 1 1 2 Reference on Plans or Specification 1 112(a) 80% AFUE 83% AFUE 112(a) 10.8 EER 11.0 EER 112(b) n/a n/a 112(c), 115(a) n/a n/a 121(b) No No 121(b) 519 cfm 1125 cfm 121 c No No 121(c) Yes Yes 121(c), 122(e) Programmable Switch Programmable Switch 122(e) Heating & Cooling Required Heating & Cooling Required 122 Gravity Gravity 122(g) n/a n/a 123 124 R-4.2 R-4.2 144 a & b n/a n/a 144 a & b 100,000 btuh 200,000 btuh 144 a & b n/a n/a 144 a & b 81,569 btuh 139,509 btuh 144 c Constant Volume Constant Volume 144 (c) 144 c Yes Yes 144 d No No 144 a No Economizer Fixed Tem (Integrated) 144 Constant Temp Constant Tem 144(f) Constant Temp Constant Temp 144 (k No No 1: For each central and single zone air systems (or group of similar units) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" in the column. 2: Not required for hydronic heating and cooling. Either enter a value here or put in reference of plans and specficatons per footnote 1. 3: Enter Yes if System is: Constant Volume, Single Zone; Serves < 5,000 sqft; Has > 25% duct in unconditioned space. Duct sealing is required for Prescriptive Compliance, see PERF -1 for performance method duct sealing requirements. EnergyPro 4.0 by EnergySoft User Number: 1645 Job Number: 040310-3AF Pape:8 of 16 WATER SIDE SYSTEM REQUIREMENTS Part 2 of 2 MECH-2-C PROJECT NAME 3A- Famous Footwear 2 WATER SIDE SYSTEMS: Chi ITEM OR SYSTEM TAG(S) Number of Systems DATE 9/15/2005 T-24 MANDATORY MEASURES Section Reference on Plans or Specification Equipment Efficiency 112(a) Pipe Insulation 123 PRESCRIPTIVE MEASURES Calculated Capacity Proposed Capacity Tower Fan Controls Tower Flow Controls Variable Flow System Design Chiller and Boiler Isolation CHW and HHW Reset Controls WLHP Isolation Valves VSD on CHW, CW & WLHP Pumps > 5 HP DP Sensor Location •1: For each chiller, cooling tower, boiler, and hydronic loop (or groups of similar equipment) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" in the column. 2: Water side systems include wet side system using other liquids such as glycol or brine. Service Hot Water, Pool Heating ITEM OR SYSTEM TAG(S) DHW Heater Number of Systems 2 ]E MANDATORY MEASURES Reference on Plans or Specification Water Heater Certification 113 (a) Water Heater Efficiency 113 b Service Water Heating Installation 113 (c) Pool and Spa Efficiency and Control 114 a Pool and Spa Installation 114 b Pool Heater - No Pilot Light 115 (c) Spa Heater - No Pilot Light 115 d Chronomite Instant WH 99% n/a n/a 1: For each water heater, pool heat and domestic water loop (or groups of similar equipment) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" ins the column. Run Initiation Time: 09/15/05 10:22:48 Run Code: 1126804968 EnergyPro 4.0 by EnergySoft User Number: 1645 Job Number: 040310-3AF Page:9 of 16 Om LO O O N U') r O) U- a 49 Z Transfer Air `o 0 Design Min. Ai Q Setpoint ° � d o L c Max of X.0 Columns H, J, 2 L 6 K or 300 CFM a l z 2 B x 0.4 h E X 0 a Y CFM/sq. ft g m .0 i g 30% of Design _i Zone Supply CFM g �? Design °' °' N N m N ° a — Vent. Air `" '" Ea CFM m o g C? o REQ'D V.A o o Nto N = v -i E x o = Max of LO to E (D or G) N Min CFM m m o a E$ E vs C9 by Occupant a 0 E. E z= m (E x F) o g v CFM Z IL LL per Person = m a ? o E $ = U m�� E s w Number of $ o o O People m m c- o-° E Min CFM o LO `1' 3 $ p by Area m S� N ti (BxC) o o4 Q CFM N N 0 E ro = ar m 0 per O O o E c s E !V Square Foot a m g $ a _ z c a7Condi.tion o ;= 9 o m> �. N t 0•Q> VI m m ° OO°�= o X O S = r d O 0 m _ m m LL p 3 E- La m L) 'a C = vm O m m w= ¢ 21 H Z W `o c ,E G" c io n c W N V a o y o 6 -_ E = N a m W > Q N E m u° �_ E v O O c o .� ziB O c>> 0 IX n = v a "c1O. c o< a _. --a o Z= N o 0 y - umi m�1o�� = y- c 'Z m m d a o 21 _ D5 t w IUm -6 N Z- W Y f Z a 49 MECHANICAL EQUIPMENT DETAILS Part 1 of 2 MECH-5-C PROJECT NAME Shops 3A- Famous Footwear th ft DATE 9/15/2005 HILLER AND TOWER SUMMARY Control # HP Type In Plenum Outside Buried Efficiency Tons PUMPS Equipment Name Equipment Type Qty. Tot. Qty GPM I BHP Motor Eff. Drive Eff. Pump Control CENTRAL SYSTEM RATINGS HEATING COOLING System Name System Type Qty Output- Aux. kW Eff. Output Efficiencv Condition Status Economizer Type Carrier 48HJD009- A/C Packaged DX 1 100,000 QHW / BOILER SUMMARY 80%AFUE Energy Standby ITANK INSUL. Rated Vol. Condition Factor Loss or Ext. System Name System Type Distribution Type Qty Input I (Gals.) Status or RE Pilot I R -Val. Chronomite Instant WH Instant Elec Parallel Piping 2 10,329 0 New 0.96 n/a n/a System Name Fan Type Carrier 48HJD009- A/C Constant Volume Carrier 48HJDF008- A/C Constant Volume Motor Location Hot Water P mp Hot Water Piping Long th ft Drive Eff. CFM Control # HP Type In Plenum Outside Buried Add 1/2" Insulation none Draw -Through 3,000 1.30 82.5% 97.0% none CENTRAL SYSTEM RATINGS HEATING COOLING System Name System Type Qty Output- Aux. kW Eff. Output Efficiencv Condition Status Economizer Type Carrier 48HJD009- A/C Packaged DX 1 100,000 0.0 80%AFUE 102,00010.8 EER New No Economizer Carrier 48HJDF008- A/C Packaged DX 2 100,000 10.4 83%AFUE 90,000 11.0 EER New Fixed Temp (Integratec) System Name Fan Type Carrier 48HJD009- A/C Constant Volume Carrier 48HJDF008- A/C Constant Volume Motor Location SUPPLY CFM N BHP Motor Eff. Drive Eff. CFM RETURN BHP FAN Motor Eff. Drive Eff. Draw -Through 3,400 2.42 84.0% 97. %% none Draw -Through 3,000 1.30 82.5% 97.0% none EnergyPro 4.0 by EnergySoft User Number: 1645 Job Number: 040310-3AF Paw: 11 of 16� 41 ENVELOPE MANDATORY MEASURES ENV -AAM PROJECT NAME Shops 3A- Famous Footwear DATE 9/15/2005 DESCRIPTION Designer Enforcement F§ 118(a) Installed Insulating Material shall have been certified by the manufacturer to comply with the California Quality Standards for insulating material, Title 20, Chapter 4, Article 3. X❑ § 118(c) All Insulating Materials shall be installed in compliance with the flame spread rating and smoke density requirements of Sections 2602 and 707 of Title 24, Part 2. § 117(a) All Exterior Joints and openings in the building'that are observable sources of air leakage shall be caulked, gasketed, weatherstripped or otherwise sealed. XJ § 116(b) Site Constructed Doors, Windows and Skylights shall be caulked between the unit and the building, and shall be weatherstripped (except for unframed glass doors and fire doors). a§ 116(a)1 Manufactured Doors and Windows installed shall have air infiltration rates not exceeding those shown in Table Number 1-E. of the Standards. Manufactured fenestration products must be labeled for U -value according to NFRC procedures. X] .§118(e) Demising Walls in Nonresidential Buildings: The opaque portions of framed demising walls in nonresidential buildings shall have insulation with an installed R -value of no less than R-11 between framing members. EnergyPro By EnergySoft User Number:.User Job Number: 040310-3AF Page: 12 of 16 is MECHANICAL MANDATORY MEASURES Part 1 of 2 MECH-MM PROJECT NAME Shops 3A- Famous Footwear DATE 9/15/2005 DESCRIPTION Designer Enforcement Equipment and Systems Efficiencies a §111 Any appliance for which there is a California standard established in the Appliance Efficiency Regulations will comply with the applicable standard. X❑ § 115(a) Fan type central furnaces shall not have a pilot light. X❑ § 123 Piping, except that conveying fluids at temperatures between 60 and 105 degrees Fahrenheit, or within HVAC equipment, shall be insulated in accordance with Standards Section 123. X❑ § 124 Air handling duct systems shall be installed and insulated in compliance with Sections 601, 603 and 604 of the Uniform Mechanical Code. Controls § 122(e) Each space conditioning system shall be installed with one of the following: FXJ § 122(e)1A Each space conditioning system serving building types such as offices and manufacturing facilities (and all others not explicitly exempt from the requirements of Section 112 (d)) shall be installed with an automatic time switch with an accessible manual override that allows operation of the system during off -hours for up to 4 hours. The time switch shall be capable of programming different schedules for weekdays and weekends and have program backup capabilities that prevent the loss of the device's program and time setting for at least 10 hours if power is interrupted; or ❑ § 122(e)1 B An occupancy sensor to control the operating period of the system; or ❑X § 122(e)1C A 4 -hour timer that can be manually operated to control the operating period of the system. § 122(e)2 Each space conditioning system shall be installed with controls that temporarily restart and temporarily operate the system as required to maintain a setback heating and/or a setup cooling thermostat setpoint. X❑ § 122(g) Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000 square feet shall be provided with isolation zones. Each zone: shall not exceed 25,000 square feet; shall be provided with isolation devices, such as valves or dampers, that allow the supply of heating or cooling to be setback or shut off independently of other isolation areas; and shall be controlled by a time control device as described above. ® § 122(a&b) Each space conditioning system shall be controlled by an individual thermostat that responds to temperature within the zone. Where used to control heating, the control shall be adjustable down to 55 degrees F or lower. For cooling, the control shall be adjustable up to 85 degrees F or higher. Where used for both heating and cooling, the control shall be capable of providing a deadband of at least 5 degrees F within which the supply of heating and cooling is shut off or reduced to a minimum. X❑ § 122(c) Thermostats shall have numeric setpoints in degrees Fahrenheit (F) and adjustable setpoint stops accessible only to authorized personnel. §112(b) Heat pumps shall be installed with controls to prevent electric resistance supplementary heater operation when the heating load can be met by the heat pump alone. EnergyPro By EnergySoft User Number: User Job Number. 040310-3AF Page: 13 of 16 MECHANICAL MANDATORY MEASURES Part 2 of 2 MECH-MM NAME Shops 3A- Famous Footwear DATE 9/15/2005 Description Designer Enforcement Ventilation F. § 121(e) Controls shall be provided to allow outside air dampers or devices to be operated at the ventilation rates as specified on these plans. R§ 122(f) Gravity or automatic dampers interlocked and closed on fan shutdown shall be provided on the outside air intakes and discharges of all space conditioning and exhaust systems. § 124(f) All gravity ventilating systems shall be provided with automatic or readily accessible manually operated dampers in all openings to the outside, except for combustion air openings. .0 § 121(f)1 Air Balancing: The system shall be balanced in accordance with the National Environmental Balancing Bureau (NEBB) Procedural Standards (1983), or Associated Air Balance Council (AABC) National Standards (1989); or ❑ § 121(f)2 Outside Air Certification: The system shall provide the minimum outside air as shown on the mechanical drawings, and shall be measured and certified by the installing licensed C-20 mechanical contractor and certified by (1) the design mechanical engineer, (2) the installing licenced C-20 mechanical contractor, or (3) the person with overall responsibility for the design of the ventilation system; or ❑ § 121(f)3 Outside Air Measurement: The system shall be equipped with a calibrated local or remote device capable of measuring the quantity of outside air on a continuous basis and displaying that quantity on a readily accessible display divice; or X❑ § 121(f)4 Another method approved by the Commission. Service Water Heating Systems ❑ § 113(b)2 If a circulating hot water system is installed, it shall have a control capable of automatically turning off the circulating pump(s) when hot water is not required. F § 113(b)3B Lavatories in restrooms of public facilities shall be equipped with controls to limit the outlet temperature to 110 degrees F. § 113(b)3C Lavatories in restrooms of public facilities shall be equipped with one of the following: Outlet devices that limit the flow of hot water to a maximum of 0.5 gallons per minute. Foot actuated control valves, and outlet devices that limit the flow of hot water to a maximum of 0.75 gallons per minute. Proximity sensor actuated control valves, and outlet devices that limit the flow of hot water to a maximum of 0.75 gallons per minute. Self-closing valves, and outlet devices that limit the flow of hot water to a maximum of 2.5 gallons per minute, and 0.25 gallons/cycle (circulating system). Self-closing valves, and outlet devices that limit the flow of hot water to a maximum of 2.5 gallons per minute, and 0.50 gallons/cycle (non -circulating system). Self-closing valves, and outlet devices that limit the flow of hot water to a maximum of 2.5 gallons per minute, and 0.75 gallons/cycle (foot switches and proximity sensor controls). EnergyPro By EnergySoft User Number: User Job Number: 040310-3AF Page: 14 of 16 1HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE Shops 3A- Famous Footwear 9/15/2005 YSTEM NAME FLOOR AREA Sales/Stock Room -8.5T A/C 2,000 Number of Systems 1 Heating System Output per System 100,000 Total Output (Btuh) 100,000 Output (Btuh/sgft) 50.0 Cooling System Output per System 102,000 Total Output (Btuh) 102,000 Total Output (Tons) 8.5 Total Output (Btuhlsgft) 51.0 Total Output (sgft/Ton) 235.3 Air System CFM per System 3,400 Airflow (cfm) 3,400 Airflow (cfm/sgft) 1.70 Airflow (cfm/Ton) 400.0 Outside Air (%) 15.3 Outside Air (cfm/sgft) 0.26 Note: values above given at ARI conditions (EATING SYSTEM PSYCHROMETRIi 26.0 OF Outside —�—� 519 cfm 69.9 of 63.2 OF Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM I Sensible Latent CFM Sensible 3,400 60,946 6,042 1,729 38,206 0 305 191 0 0 519 20,003 6,02 519 24,476 0 0 305 191 81,5:6]::12 063 63 064 Carrier 48HJD009- A/C 81,569 11,245 100,000 Total Adjusted System Output 81,569 11,245 100,000 (Adjusted for Peak Design Conditions) Heating Coil TIME OF SYSTEM PEAK I Jul 3 pm I I Jan 12 am im Temperatures at Time of Heating Peak) 90.7 OF 90.7 of 0 Supply Air Ducts Supply Fan 90.6 OF 3400 cfm ROOMS 70.0 OF h Return Air Ducts 4 DOLING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Cooling Peak 112.0 / 77.7 of 81.6 / 66.5 of 59.2 / 57.9 OF 59.2 / 57.9 of Supply Air Ducts Outside Air 519 cfm Cooling Coil Supply Fan 59.3 / 57.9 of 3400 cfm 53.3% R.H. ROOMS 76.1/64.3 of 76.0 / 64.3 OF o_...__ .:-'..-.- U! EnergyPro 4.0 by EnergySoft User Number: 1645 Job Number: 040310-3AF Pane: 15 of 16 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE Shops 3A- Famous Footwear 9/15/2005 SYSTEM NAME FLOOR AREA Sa1es/T1ts- 2 7.5T A/C 4,500 NE Number of Systems 2 Heating System Output per System 100,000 Total Output (Btuh) 200,000 Output (Btuh/sgft) 44.4 Cooling System Output per System 90,000 Total Output (Btuh) 180,000 Total Output (Tons) 15.0 Total Output (Btuh/sqft) 40.0 Total Output (sgftrTon) 300.0 Air System CFM per System 3,000 Airflow (cfm) 6,000 Airflow (cfm/sgft) 1.33 Airflow (cfm/Ton) 400.0 Outside Air (%) 18.8 Outside Air (cfm/sgft) 0.25 Note: values above (EATING SYSTE 26.0 of Outside Al, 1125 cfm 70.0 of at ARI conditions 61.7 of Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM Sensible Latent CFM Sensible 5,290 84,036 17,072 1,488 36,360 0 420 182 0 0 1,125 43,339 7,698 1,125 53,034 0 0 420 182 128,2 24 770 89 757 Carrier 48HJDF008- A/C 139,509 28,597 200,000 10.4 kW Supplemental Electric 0 Total Adjusted System Output 139,509 28,597 200,000 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Jul 3 pm Jan 12 am im Temperatures at Time of Heating Peak) 92.8 of 92.8 of 92.8 of 0 Supply Air Ducts Wv0 Heating Coil Aux. Heat Coil Supply Fan 92.8 r- 6000 6000 cfm ROOMS 70.0 of o..a...., n:. n.. -a - (COOLING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Coolina Peak► 12.0 / 77.7 of Outside Air 1125 cfm 76.1/65.7 OF 82.8 / 68.0 of M 61.1/59.80F Cooling Coil Supply Fa 6000 cfm 61.1 / 59.8 of -� Supply Air Ducts Fan 61.2/59.8OF 58.3% R.H. ROOMS 76.0 / 65.7 of h Return Air Ducts `S EnergyPro 4.0 by EnergySoft User Number. 1645 Job Number: 040310-3AF Page: 16 of 16