06-2634 (CSCS) Geotechnical Investigation Check Set0 Earth Systems �� Southwest 79-811B Country Club Drive Bermuda Dunes, CA 92203 (760)345-1588 (800)924-7015 FAX (760) 345-7315 August 10, 2006 File No.: 10324-01 06-08-753 Thomas Enterprises 45 Ansley Drive Newman, Georgia 30263 Attention: Ms. Amy Bolman Subject: Update.of Geotechnical Investigation Project: The Pavilion Shopping Center Northeast Corner of Adams Street and Highway 111 La Quinta, California References: 1. Sladden Engineering, Geotechnical Investigation for The Pavilion at La Quinta Commercial Complex, NEC Highway 111 and Adams Street, La Quinta, California, dated February 17, 2004, Project No.: 544-4010, Document No.: 04- 02439. 2. Earth Systems Southwest, Report of Testing and Observations, Performed During Grading, The Pavilion at La Quinta, La Quinta, California, File No.: 10324-0 1, 'Document No.: 06-02-700, dated February 1, 2006. As requested, we have reviewed the referenced documents for purposes of updating these documents for use with the subject site. Based on our review and understanding 'of the site development, it is our opinion that the referenced documents are applicable to the proposed site. We make no representation as to the accuracy of the dimensions, measurements, calculations, or any portion of the design. As the Geotechnical Engineer of Record for this project, Earth Systems Southwest [ESSW] has striven to provide our services in accordance with generally accepted geotechnical engineering. practices in this locality at this time. No warranty or guarantee is express or implied. This report was prepared for the exclusive use of the Client and the Client's authorized agents. Should you have any questions concerning our report please give us a call and we will be pleased to assist you. Sincerely, EARTH SYSTEMS Craig S. Hill CE 38234 Letter/csh/dmg k\ CE 38234"z EXP. 3131107 l Distribution: 4/Thomas Enterprises 2/Smith Consulting Architects l/RC File; 2/BD File NFORMATION CITY OF LA QUINTA BUILDING & SAFETY DEPT. Ir y R DATE BY ONLY 71—(Z4 f4tj /// GEOTECHNICAL INVESTIGATION THE PAVILION AT LA QUINTA COMMERCIAL COMPLEX NEC HIGHWAY 111 AND ADAMS STREET LA QUINTA, CALIFORNIA 11111'� 71!�<` s - 7 X' t -Prepared By- Sladden Engineering 39-725 Garand Lane, Suite G Palm Desert, California 92211 (760) 772-3893 i O �-.�`� BUILDING &SAF V�NT'q it ETY DEPT. DATE BY 1. ��� 11200s Sladden Engineering (9 Sladden Engineering 6782 Stanton Ave., Suite A, Buena Park, CA 90621 (714) 523-0952 Fax (714) 523-1369 39-725 Garand Ln., Suite G, Palm Desert, CA 92211 (760) 772-3893 Fax (760) 772-3895 February 17, 2004 Thomas Enterprises, Inc. 300 Village Green Circle Smyrna, Georgia 30080 Attention: Mr. Kevin Case Project: The Pavilion at La Quinta Commercial Complex NEC Highway 111 and Adams Street La Quinta, California Subject: Geotechnical Investigation Project No. 5444010 04-02-139 Presented herewith is the report of our Geotechnical Investigation conducted at the site of the proposed Pavilion at La Quinta commercial complex to be located on the northeast corner of Highway 111 and Adams Street in the City of La Quinta, California. The investigation was performed in order to provide recommendations for site preparation and to assist in foundation design for the proposed commercial development. This report presents the results of our field investigation and laboratory testing along with conclusions and recommendations for foundation design and site preparation. This report completes our original scope of services as described in our proposal dated December 15, 2003. We appreciate the opportunity to provide service to you on this project. If you have any questions regarding this report, please contact the undersigned Respectfully submitted, SLADDEINENGINJ G Brett L. Anderso r Principal Engineer ' — SER/ma 'f.� Copies: 6 / Thomas Enterprises, Inc. 1A a v . -Y1 ... =TJ Sladden Engineering ;1: �;.��-'• a �;�..'; \-•��'��. GEOTECHNICAL INVESTIGATION THE PAVILION AT LA QUINTA COMMERCIAL COMPLEX NEC HIGHWAY 1 I 1 & ADAMS STREET LA QUINTA, CALIFORNIA February 17, 2004 TABLE OF CONTENTS NTRODUCTION....................................................................................................................... 1 SCOPEOF WORK ..................................................................................................................... I PROJECTDESCRIPTION......................................................................................................... 1 SUBSURFACECONDITIONS.................................................................................................. 2 CONCLUSIONS AND RECOMMENDATIONS...................................................................... 2 FoundationDesign............................................................................................................... 3 Settlements................. ..... ............. ......................................................................................... 3 LateralDesign .................................... :.................................................................................. 4 RetainingWalls.................................................................................................................... 4 ExpansiveSoils...................................................................................................................... 4 ConcreteSlabs-on-Grade...................:.................................................................................. 4 SolubleSulfates..........................................:......................................................................... 4 TentativePavement Design.................................................................................................. 5 Shrinkageand Subsidence.................................................................................................... 5 GeneralSite Grading............................................................................................................ 5 1. Clearing and Grubbing............................................................................................... 5 2. Preparation of Building Areas..................................................................................... 6 3. Preparation of Surfaces to Receive Compacted Fill ................................................... 6 4. Placement of Compacted Fill...................................................................................... 6 5. Preparation of Slab and Pavement Areas................................................................... 6 6. Testing and Inspection............................................................................................... 6 GENERAL..................:............................................................................................................... 7 t APPENDIX A - Site Plan and Boring Logs Field Exploration APPENDIX B - Laboratory Testing Laboratory Test Results APPENDIX C - 1997 UBC.Seismic Design Criteria Sladden Engineering February 17, 2004 -1- Project No. 544-4010 04-02-139 INTRODUCTION This report presents the results of our Geotechnical Investigation performed in order to provide recommendations for site preparation and the design and construction of the foundations for the proposed Pavilion at La Quinta commercial complex. The property is located on the northeast corner of Highway I l I and Adams Street in the City of La Quinta, California. The preliminary plans provided by Smith Consulting Architects indicate that the proposed commercial complex will include several major retail stores along with attached shop buildings and several detached retail pads. The associated site improvements will include paved driveways and parking lots, underground utilities, and landscape areas. SCOPE OF WORK T'he purpose of our investigation was to determine certain engineering characteristics of the near surface soils on the site in order to develop recommendations for foundation design and site preparation. Our investigation included field exploration, laboratory testing, engineering analysis and the preparation of this report. Evaluation of environmental issues or hazardous materials was not within the scope of services provided. Our investigation was performed in accordance with contemporary geotechnical engineering principles and practice. We make no other warranty, either express or implied. PROJECT DESCRIPTION The proposed project is located on the northeast comer of Highway 111 and Adams Street in the City of La Quinta, California. The preliminary site plan indicates that the project will include a retail complex occupying a total of 170,791 square feet and various associated site improvements. It is our assumption that the proposed commercial buildings will be of relatively lightweight reinforced masonry, steel -frame or wood -frame construction. The associated site improvements will include paved driveways and parking areas, landscape areas and various underground utilities. The project site is presently vacant and the ground surface is covered with sparse weeds. Prior to our field investigation the site was rough graded including cuts and fills that resulted in the creation of relatively level building pads. The previous rough grading is documented within our previous report dated May 3, 2000. Highway 111 and Adams Street are paved adjacent to the site and there are existing underground utilities along the streets. Commerce Way and Postal Road have also been constructed. Based upon our previous experience with similar lightweight commercial/industrial structures, we expect that isolated column loads will be less than 80 kips and wall loading will be less than 4.0 kips per linear Foot. Future grading is expected to include minor cuts and fills to construct a level building pad and to accommodate site drainage. This does not include removal and recompaction of the foundation bearing soils within the building areas. If the anticipated foundation loading or site grading varies substantially from that assumed, the recommendations included in this report should be reevaluated. Sladden Engineering February. 17, 2004 -2- Project No. 544-4010 04-02-139 SUBSURFACE CONDITIONS '[he site is underlain primarily by a generally thin profile of artificial fill soils overlying native fine- grained windblown sands with scattered sandy silt layers. Recovered ring samples and sampler penetration resistance (as measured by blowcounts) indicate that the site soils are somewhat inconsistent k density but density appears to generally increase with depth. Relatively undisturbed samples indicate dry density varying from 81 to 111 pcf. Tile site soils were found to be generally dry throughout the depth of our borings but some of the silty layers were wet. Moisture content varying from 1 to 42 percent was determined for the samples obtained b ithin our borings. laboratory classification testing indicates that the near surface soils consist primarily of fine grained silty sands. Expansion testing indicates that the surface soils are non -expansive and fall within the "very low" expansion category in accordance with the Uniform Building Code classification system. The somewhat inconsistent moisture conditions suggest that some of the near surface native soils underlying the site may be susceptible to settlements due to hydroconsolidation and compression. Groundwater was not encountered in our borings and groundwater is expected to be in excess of 100 feet below the existing ground surface. Groundwater should not be a factor in foundation design or construction. CONCLUSIONS AND RECOMMENDATIONS Based upon our previous and recent field and laboratory investigations, it is our opinion that the proposed Pavilion at La Quinta commercial complex is feasible from a soil mechanic's standpoint provided that the recommendations included in this report are considered in building foundation design and site preparation. Due to the somewhat inconsistent conditions of the near surface soils, remedial grading including overexcavation and recompaction is recommended for the proposed building areas. We recommend that remedial grading within the proposed building areas include overexcavation and recompaction of the primary foundation bearing soils. Specific recommendations for site preparation are presented in the site grading section of this "report. Groundwater was not encountered within our borings and groundwater is expected to be in excess of 100 feet below the existin ground surface Due to the depth to groundwater, spec' c 'que ac ion ana yses re not performed. Based upon the depth to groundwater, the potential for liquefaction and the related surficial affects of liquefaction impacting the site are considered negligible. The site is located within an active seismic area of Southern California within approximately 8.7 kilometers of the San Andreas fault. Strong ground motion resulting from earthquake activity along the nearby San Andreas or San Jacinto fault systems is likely to impact the site during the anticipated lifetime of the structures. Structures should be designed by professionals familiar with the geologic and seismic setting of the site. As a minimum, structure design should conform to Uniform Building Code (UBC) requirements for Seismic Zone 4. Pertinent seismic design criteria as outlined in the 1997 UBC, is summarized in Appendix C. Sladden Engineering February 17, 2004 -3- Project No. 5444010 04-02-139 Caving did occur within each of our exploratory borings and the surface soils will be susceptible to raving within deeper excavations. All excavations should be constructed in accordance with the normal CalOSHA excavation criteria. On the basis of our observations of the materials encountered, we anticipate that the subsoils will conform to those described by CalOSHA as Type C. Soil conditions Jiould be verified in the field by a "Competent person" employed by the Contractor. The surface soils encountered during our investigation were found to be noLaboratory testing indicated an Expansion Index of 0, which corresponds with -%'-very low" category in accordance vith UBC Standard' t_ npnrted soils are to be used during grading, they should have an Expansion hdex of less than 20. The following recommendations present more detailed design criteria that have been developed on the basis of our field and laboratory investigation. Foundation Design: The results of our investigation indicate that either conventional shallow continuous footings or isolated pad footings that are supported upon properly compacted soils may be expected to provide satisfactory support for the proposed structures. Recompaction should be performed as described in the Site Grading Section of this report. Footings should extend at least.LL? riches beneath lowest adjacent grade for single -story structures. Isolated square or rectangular footings at least -2 -feet square mai be designed using an allowable bearing value of 2000 pounds per square foot. Continuous footings at leastast l wide may be designeia using a" n allowable bearing value of 1800 pounds per square foot. Allowable increases of 200 psf for each additional I -foot of width and 200 psf for each additional 6 -inches of depth may be utilized for larger footings. The maximum allowable bearing pressure should be 309Q_j2a& The allowable bearing pressures are for dead and frequently applied live loads an may be increased by 1/3 to resist wind, seismic or other transient loading. Because of the hydroconsolidation potential of some of the soils underlying the site, care should be taken to see that bearing soils are not allowed to become saturated from the ponding of rainwater or irrigation. Drainage from the building areas should be rapid and complete. The recommendations made in the preceding paragraphs are based on the assumption that all footings will be supported upon properly compacted engineered fill soils. All grading shall be performed under the testing and inspection of the Soils Engineer or his representative. Prior to the placement of concrete, we recommend that the footing excavations be inspected in order to verify that they extend into compacted soil and are free of loose and disturbed materials. Settlements: Settlements may result from the anticipated foundation loads. These estimated ultimate settlements are calculated to be a maximum of 1 -inch when using the recommended bearing values. As a practical matter, differential set eme en ootings can be assumed as one-half of the total settlement. Sladden Engineering February 17, 2004 -4- Project No. 544-4010 04-02-139 Lateral Design: Resistance to lateral loads can be provided by a combination of friction acting at the base of the slabs or foundations and passive earth pressure along the sides of the foundations. A coefficient of friction of 0.45 between soil and concrete may be used with dead load forces only. A passive earth pressure e of 275 pounds per square foot, per foot of depth, may be used for the sides of footings, which are poured against properly compacted native soils. Passive earth pressure should be ignored within the upper 1 -foot except where confined (such as beneath a floor slab). When used in combination, either the passive resistance or the coefficient of friction should be reduced by one-third. Retaining Walls: Retaining walls may be required to accomplish the proposed construction. Cantilever retaining walls may be designed using "active" pressures. Active pressures may be estimated using an equivalent fluid weight of 35 pcf for native backfill soils with level free - draining backfill conditions. For walls that are restrained, "at rest" pressures should be utilized in design. At rest pressures may be estimated using an equivalent fluid weight of 55 pcf for native backfill soils with level free -draining backfill conditions. Expansive Soils: Due to the prominence of non -expansive soils on the site, special expansive soil design criteria should not be necessary for the design of foundations and concrete slabs -on - grade. Final design criteria should be established by the Structural Engineer. Concrete Slabs -on -Grade: All surfaces to receive concrete slabs -on -grade should be underlain by recompacted soils as described in the Site Grading Section of this report. Where slabs are to receive moisture sensitive floor coverings or where dampness of the floor slab is not desired, we recommend the use of an appropriate vapor barrier. Vapor barriers should be protected by at least two inches of sand in order to reduce thepossibility of damage and to aid in obtaining uniform concre a curing. Reinforcement of slabs -on -grade in order to resisx exb ans,�„ve soil pre �r . av not be reQuiredt however reinforcement will have a beneficial effect in containing cracking due to concretem�® shrinkage. Temperature and shrinkage related cracking should be anticipated in all concrete slabs -on -grade. Slab reinforcement and the spacing of control joints should be determined by the Structural Engineer. Soluble Sulfates: The soluble sulfate concentrations of the surface soils were determined to be .approximately 555 parts per million (ppm). Soluble sulfate concentration will likely change as a result of the recommended site grading. Soluble sulfate content should be determined after grading and appropriate concrete mix designs should be selected in accordance with UBC Table I 9-A-3. Sladden Engineering February 17, 2004 -5- Project No. 544-4010 04-02-139 Tentative Pavement Design: All paving should be underlain by a minimum compacted fill thickness of 12 inches (excluding aggregate base). This may be performed as described in the Site Grading Section of this report. R -Value testing performed during our previous investigation resulted in an R -Value of 62. On this basis, a pavement section of 3.0 inches of asphalt on 4.0 inches of base material should be applicable for the design of the majority of the onsite pavement. 'rhe appropriate pavement sections for off site improvements will be dependent upon traffic indices determined by the City of La Quinta, California. Aggregate base should conform to the requirements for Class 2 Aggregate base in Section 26 of CalTrans Standard Specifications, January 1992. Asphaltic concrete should conform to Section 39 of the CalTrans Standard Specifications. The recommended sections should be provided with a uniformly compacted subgrade and precise control of thickness and elevations during placement. Pavement and slab designs are tentative and should be confirmed at the completion of site grading when the subgrade soils are in-place. This will include sampling and testing of the actual subgrade soils and an analysis based upon the specific traffic information Shrinkage and Subsidence: Volumetric shrinkage of the material that is excavated and replaced as controlled compacted fill should be anticipated. We estimate that this shrinkage could vary from 15 to 20 percent. Subsidence of the surfaces that are scarified and compacted should be between 0.1 and 0.2 tenths of a foot. This will vary depending upon the type of equipment used, the moisture content of the soil at the time of grading and the actual degree of compaction attained. These values for shrinkage and subsidence are exclusive of losses that will occur due to the stripping of the organic material from the site, the removal of deleterious materials and the removal of debris, and other subsurface obstructions. General Site Grading: All grading should be performed in accordance with the grading ordinance of the City of La Quinta, California. The following recommendations have been developed on the basis of our field investigation and laboratory testing: I. Clearing and Grubbing: Proper clearing of any existing vegetation and debris will be very important. All surfaces to receive compacted fill should be cleared of roots, vegetation, debris, and other unsuitable materials which should be removed from the site. Soils that are disturbed due to the removal of the surface vegetation, previous improvements or artificial fill material should be replaced as controlled compacted fill under the direction of the Soils Engineer. Stadden Engineering February 17, 2004 -6- Project No. 544-4010 04-02-139 2. Preparation of Building Areas: Within the building areas, removal and recompaction of the primary foundation bearing soils is recommended. As a minimum, removals within the building areas should extend to a depth of at least 3 feet below existing grade or 3 feet below the bottom of the footings, whichever is deeper. The exposed surface should be scarified, moisture conditioned and compacted so that a minimum of 90% relative compaction is attained. Once deleterious materials are removed, the native soils and artificial fill materials may be placed as controlled compacted fill. Overexcavation should be observed by a representative of Sladden Engineering and compaction should be verified by testing. Overexcavation should extend at least 5 feet laterally beyond the footings. 3.. Preparation of Surfaces to Receive Compacted Fill: Other areas to receive compacted fill should be brought to near optimum moisture content and compacted to a minimum of 90% relative compaction. 4. Placement of Compacted Fill: Fill materials consisting of on-site soils or approved imported granular soils, should be spread in thin lifts, and compacted at near optimum moisture content to a minimum of 90% relative compaction. Imported material shall have an Expansion Index not exceeding 20. The contractor shall notify the Soils Engineer at least 48 hours in advance of importing soils in order to provide sufficient time for the evaluation of proposed import materials. The contractor shall be responsible for delivering material to the site that complies with the project specifications. Approval by the Soils Engineer will be based upon material delivered to the site and not the preliminary evaluation of import sources. Our observations of the material encountered during our investigation indicate that compaction will be most readily obtained by means of heavy rubber -wheeled equipment and/or vibratory compactors. At the time of our investigation, the subsoils were found to be quite dry. A more uniform moisture content should be attained during recompaction and fill placement. 5. Preparation of Slab and Pavement Areas: All surfaces to receive asphalt concrete pavement or concrete slabs -on -grade should he underlain by a minimum compacted fill thickness of 12 inches. This may be accomplished by a combination of scarification and recompaction of the surface soils and placement of the fill material as controlled compacted fill. Compaction of the slab and pavement areas should be to a minimum of 90 percent relative compaction. 6. Testing and Inspection: During grading tests and observations should be performed by the Soils Engineer or his representative in order to verify that the grading is being performed in accordance with the project specifications. Field density testing shall be performed in accordance with acceptable ASTM test methods. The minimum acceptable degree of compaction should be 90 percent of the maximum dry density as obtained by the ASTM D1557-91 test method. Where testing indicates insufficient density, additional compactive effort shall be applied until retesting indicates satisfactory compaction. Sladden Engineering kbruary 17, 2004 -7- Project No. 544-4010 04-02-139 GENERAL The findings and recommendations presented in this report are based upon an interpolation of the soil arnditions between the exploratory boring locations and extrapolation of these conditions throughout the proposed building area. Should conditions encountered during grading appear different than those indicated in this report, this office should be notified. phis report is considered to be applicable for use by Thomas Enterprises, Inc. and its consultants for the specific site and project described herein. The use of this report by other parties or for other projects is not authorized. The recommendations of this report are contingent upon monitoring of the grading operations by a representative of Sladden Engineering. All recommendations are considered to be tentative pending our review of the grading operations and additional testing, if indicated. If others are employed to perform any soil testing, this office should be notified prior to such testing in order to wordinate any required site visits by our representative and to assure indemnification of Sladden Engineering. Our investigation was conducted prior to the completion of plans for the project. We recommend that a pre job conference be held on the site prior to the initiation of site grading. The purpose of this meeting vill be to assure a complete understanding of the recommendations presented in this report as they apply to the actual grading performed. Sladden Engineering 3tgtaatt1211g ttappv/y s80'1 souuog ut'jd aItS d xi(IN21ddb APPENDIX A FIELD EXPLORATION for our field investigation, 10 exploratory borings were excavated on January 16, 2004, using a truck counted hollow stem auger rig (Mobile B53) in the approximate locations indicated on the site plan included in this appendix. Continuous logs of the materials encountered were made on the site by a npresentative of Sladden Engineering. Boring logs are included in this appendix. lepresentative undisturbed samples were obtained within our borings by driving a thin-walled steel pnetration sampler (California split spoon sampler) or a Standard Penetration Test (SPT) sampler with a 140 pound hammer dropping approximately 30 inches (ASTM D1586). The number of blows required to drive the samplers 18 inches was recorded (generally in 6 inch increments). Blowcounts are indicated on the boring logs. The California samplers are 3.0 inches in diameter, carrying brass sample rings having inner diameters of 2.5 inches. The standard penetration samplers are 2.0 inches in diameter with an inner diameter of 1.5 Taches. Undisturbed samples were removed from the sampler and placed in moisture sealed containers in order to preserve the natural soil moisture content. Bulk samples were obtained from the excavation spoils and samples were then transported to our laboratory for further observations and testing. Samples Mere then transported to our laboratory for further observations and testing. Sadden Engineering rORPORATV vFMTFg ngivp-- ~� — - r _ r Rpm y POSEOFFICEIt Dam Iil ii1.11!•III:r �� 51 J j ' `;, .<; � fin I ''• W _ LL' L�1cJ .J • I �� ' I I _ 3 L11 I i 9iai �, -,,P°4"Cl fiw— 7 1 / r Illu CZ DEMOPME)n nri FUTURE ` _ yr . _;1• I er PAD 1' N/OHWAY North Approximate Boring Locations The Pavilion at La Quinta NWC Highway 111 and Adams Street / La Quinta, California Date: 1-16-04 Boring No. 1 Job No.: 544-4010 3 6 y y rA DESCRIPTION q 2 % REMARKS :• v�] U OCA v°� a o o U 0 Sand: Grey brown, SP/SM slightly silty, fine grained s - 4/13/17 89 2 - 14% passing 0200 :20/31/40 10 Silty Sand: Grey brown, SM 97 11 --- 40% passing 4200 very silty, fine grained 30/30/47 Sand: Grey brown, SP Unrecovered Sample fine grained 20 _ 21 /50-6" 95 6 --- ° /° 3 passing #200 - Recovered Sample Total Depth _ 21.5' ® Disturbed Sample No Bedrock No Groundwater 25 30 35 40 45 s0 _ Note: The stratification lines 55 represent the approximate boundaries between the soil types; the transitions may be gradual. The Pavilion at La Quinta NWC Highway 111 and Adams Street /-La Quinta, California Date: 1-16-04 BoringNo. 3 Job No.: 544-4010 DESCRIPTION p c w a. REMARKS U 0 _ Sand: Grey brown, SP _ fine grained 5 10/16/13 93 3 --- 5% passing #200 10 _ 16/30/44 97 3 --- 3% passing #200 1s - - 22/45/50 „ 105 5 --- 2% passing #200 20 Sandy Silt: Brown, ML 31/42/50 very sandy 99 13 --- 55% passing 4200 - Recovered Sample 'notal Depth = 21.5' No Bedrock No Groundwater 25 30 35 40 45 50 _ Note: The stratification lines 55 represent the approximate boundaries between the soil types; the transitions may be gradual. The Pavilion at La Quinta NWC Highway 111• and Adams Street / La Quinta, California Date: 1-16-04 Borin2 No. 4 Job No.: 544-401 0 3 ;o 'V a y DESCRIPTION F sa c c. REMARKS 0 - Sand: Grey brown, SP fine grained 5 10/13/17 97 2 -- 2% passing #200 10 19/32/40 Silty Sand: Grey brown, SM 101 4 --- 25% passing #200 fine grained �s _ 13/24/25 Clayey Silt: Brown sandY ML 87 17 ___ 83/ passing #200 Sand: Grey brown, SP - 20 18/50-G", fine grained 98 3 --- 2% passing 9200 - Recovered Sample Total Depth = 21.5' No Bedrock - No Groundwater 25 30 35 40 45, 50 - Note: The stratification lines 55 represent the approximate boundaries between the soil types: the transitions may be gradual. The Pavilion at La Quinta NWC Highway 111 and Adams Street / La Quinta, California Date: 1-16-04 Borin2 No.5 Job No.: 544-4010 y y DESCRIPTION A M c. REMARKS E ami y 0 - Sand: Grey brown, SP Eine grained s 6/10/13 92 4 "-• 2% passing 4200 109/23/33 No Recoverey i5 15/23/40 Silty Clay: Brown CL 92 29 -- 96% passing #200 20 Sand: Grey brown, SP _ 27/39/50 tine grained No Recoverey - Recovered Sample Total Depth = 21.5' No Bedrock ® Disturbed Sample No Groundwater 25 30 35 40 45 50 - Note: The stratification lines 55 represent the approximate boundaries between the soil types; the transitions may be gradual, The Pavilion at La Quinta NWC Highway 111 and Adams Street / La Quinta, California Date: 1-16-04 Boring No.7 Job No.: 544-4010 e y as c DESCRIPTION H G c o. REMARKS E & c a E A cn U co ° Sand: Grey brown, SP - fine grained s _ 7/9/11 " 98 3 --- 3% passing #200 10 _ 16/21/40 " 96 2 --- 2% passing 4200 �e _ 16/23/20 Clayey Silt: Brown ML --- 26 -- - passing 87% p g #200 20 21/32/36 Sand: Grey brown, SP ___ 4 ___ 2/ passing #200 _ fine grained 25 _ - 14/24/30 " _.. 3 --- 2% passing #200 30 23/26/26 " " 3 - 3% passing 4200 35 26/24/24 " " " --- 6 - 1% passing #200 40 30/50-6" " " " --- 2 --- 3% passing 9200 45 22/20/29 --- 2 --- 2% passing #200 so 36/50-6" --- I - 1% passing 9200 - Recovered Sample Total Depth = 51.5' No Bedrock Note: The stratification lines represent the approximate No Groundwater ss Standard Penetration Sample boundaries between the soil types; the transitions may be gradual. The Pavilion at La Quinta NWC Highway I I1 and Adams Street / La Quinta, California Date= 1-16-04 BoringNo. 8 Job No.: 544-4010 Q ::, rn U e6 it b DESCRIPTION ° tip A a s d 'o e a a, o P. o e U REMARKS 0 s 10 15 14/23/17 '-4/32/40 Sand: Grey brown, fine grained " " SP " " 98 105 1 3 --- --- 2% passing 4200 3% passing #200 , Unrecovered Sam le :25/30/32 20 25 30 35 40 45 50 - 55 - Recovered Sample , Total Depth = 16.5' No Bedrock No Groundwater Note: The stratification lines represent the approximate boundaries between the soil types; the transitions may be gradual. The Pavilion at La Quinta NWC Highway 111 and Adams Street / La Quinta, California Date: 1-16-04 Borine No. 9 Job No.: 44-4010 r v a` G'=' o it cnlu 6 I ° M DESCRIPTIONA v> >v o �U REMARKS 0 5 10 15 20 16/37/40 13/20/25 13/21/41 Sand: Grey brown, fine grained " " SP " 111 98 --- 89 2 4 7 9 --- --- --- --- 2% passing #200 2% passing #200 5% passing 9200 3% passing 41200 :15/24/30 - 25 30 35 40 45 50 _ 55 Recovered Sample ® Disturbed Sample Total Depth = 21.5' No Bedrock No Groundwater Note: The stratification lines represent the approximate boundaries between the soil types; the transitions may be gradual. Lo )CS: APPENDIX B Laboratory Testing Laboratory Test Results Sladden Engineering APPENDIX B LABORATORY TESTING Representative bulk and relatively undisturbed soil samples were obtained in the field and returned to our laboratory for additional observations and testing. Laboratory testing was generally performed in two liiases. The first phase consisted of testing in order to determine the compaction of the existing natural Buil and the general engineering classifications of the soils underlying the site. This testing was lerfonned in order to estimate the engineering characteristics of the soil and to serve as a basis for electing samples for the second phase of testing. The second phase consisted of soil mechanics testing. this testing including consolidation, shear strength and expansion testing was performed in order to 1rovide a means of developing specific design recommendations based on the mechanical properties of the soil. CLASSIFICATION AND COMPACTION TESTING unit Weight and Moisture Content Determinations: Each undisturbed sample was weighed and measured in order to determine its unit weight. A small portion of each sample was then subjected to testing in order to determine its moisture content. This was used in order to determine the dry density of the soil in its natural condition. The results of this testing are shown on the Boring Logs. Maximum Density -Optimum Moisture Determinations: Representative soil types were selected for maximum density determinations. This testing was performed in accordance with the ASTM Standard D1557-91, Test Method A. The results of this testing are presented graphically in this appendix. The maximum densities are compared to the field densities of the soil in order to determine the existing relative compaction to the soil. This is shown on the Boring Logs, and is useful in estimating the strength and compressibility of the soil. Classification Testing: Soil samples were selected for classification testing. This testing consists of mechanical grain size analyses and Atterberg Limits determinations. These provide information for developing classifications for the soil in accordance with the Unified Classification System. This classification system categorizes the soil into groups having similar engineering characteristics. The results of this testing are very useful in detecting variations in the soils and in selecting samples for further testing. SOIL MECHANIC'S TESTING Direct Shear Testing: Two bulk samples were selected for Direct Shear Testing. This testing measures the shear strength of the soil under various normal pressures and is used in developing parameters for foundation design and lateral design. Testing was performed using recompacted test specimens, which were saturated prior to testing. Testing was performed using a strain controlled test apparatus with normal pressures ranging from 800 to 2300 pounds per square foot. Expansion Testing: These bulk samples were selected for Expansion testing. Expansion testing was performed in accordance with the UBC Standard 18-2. This testing consists of remolding 4 -inch diameter by 1 -inch thick test specimens to a moisture content and dry density corresponding to approximately 50 percent saturation. The samples are subjected to a surcharge of 144 pounds per square foot and allowed to reach equilibrium. At that point the specimens are inundated with distilled water. The linear expansion is then measured until complete. ' Sladden Engineering 1997 UBC Seismic Design Criteria Sladden Engineering 1997 UNIFORM BUILDING CODE SEISMIC DESIGN INFORMATION The International Conference of Building Officials 1997 Uniform Building Code contains substantial revisions and additions to the earthquake engineering section in Chapter 16. New concepts contained in (fie updated code that will likely be relevant to construction of the proposed structures are summarized telow. Ground shaking is expected to be the primary hazard most likely to affect the site, based upon proximity Io significant faults capable of generating large earthquakes. Major fault zones considered to be most likely to create strong ground shaking at the site are listed below. Fault Zone Approximate Distance From Site Fault Type 1997 UBC San Andreas 8.7 km A San Jacinto 32 km A Based on our held observations and understanding of local geologic conditions, the soil profile type judged applicable to this site is Sp, generally described as stiff or dense soil. The site is located within UBC Seismic Zone 4. The following table presents additional coefficients and factors relevant to seismic mitigation for new construction upon adoption of the 1997 code. 0 Sladden Engineering Near -Source Near -Source Seismic Seismic Seismic Acceleration Velocity Coefficient Coefficient Source Factor, Na Factor Nv Ca Cv San Andreas 1.1 1.3 0.44 Na 0.64 N,, San Jacinto 1.0 1.0 0.44 N,, 0.64 N,, 0 Sladden Engineering d: 4- is k 4,i*:6.1..4 •-a.r r}rF* r i f E Q F A U L T v :6 Version 3.00 4 � DETERMINISTIC ESTIMATION OF PEAK Ar.CE-ERATION FROM DIGITIZED FAULTS JOB NUMBER: 544-4010 DATE: 02-06-2004 JOB NAME: NWC Highway III & Adams Street La Quinta, California CALCULA'T'ION NAME: Test Run Analysis FAULT -DATA -FILE NAME: CDMGFLTE.DAT SITE COORDINATES: SITE LATITUDE: 33.7094 SITE LONGITUDE: 116.2.844 SEARCH RADI`.iS: 100 m= ATTENUATION RELATION: 5) Boore et al. (1997) Horiz. - SOIL (310) UNCERTAINTY (M=Median, S=Sigma): M Number of Sigmas: 0.0 DISTANCE MEASURE: cd_2drp SCOND: 0 Basement Depth: 5.00 km Campbell SSR: Campbell SHR: COMPUTE PEAK HORIZONTAL ACCELERATION FAULT -DATA FILE USED: CDMGFLTE.DAT MINIMUM DEPTH VALUE (km): 0.0 --------------- EQFAULT SUMMARY --------------- ------------------------------ DETERMINISTIC SITE PARAMETERS ----------------------------- Page I IESTIMATED MAX. EARTHQUAKE EVENT I APPROXIMATE I ------------------------------- ABBREVIATED I DISTANCE I MAXIMUM I PEAK JEST. SITE FAULT NAME I mi (km) IEARTHQUAKEJ SITE JINTENSITY -=---------- - MAG.(Mw) I ACCEL. g JMOD.MERC. SAN ANDREAS - Coachella 1 5.4( 8.7)1 7.1 1 0.371 1 IX SAN ANDREAS - Southern 1 5.4( 8.7)1 7.4 1 0.434 1 X BURNT MTN. 1 17.1( 27.6)1 6.4 1 0.118 1 VII EUREKA PEAK 1 18.1( 29.1)1 6.4 1 0.113 1 VII SAN ANDREAS - San -Bernardino J 18.5( 29.8)1 7.3 1 0.178 1 VIII SAN JACINTO-ANZA 1 21.3( 34.3)1 7.2 1 0.152 J VIII SAN JACINTO-COYOTE CREEK 1 21.7( 34.9)1 6.8 1 0.122 I VTI PINTO MOUNTAIN• 1 29.9( 48.1)! 7.0 1 0.106 J VII EMERSON So. - COPPER MTN. 1 •31.5( 50.7)1 6.9 J 0.096 J VII LANDERS 1 32.2( 51.9)1 7.3 J 0.117 I VI1 PISGAH-BULLION MTN.-MESQUITE LK 1 33.7( 54.2)1 7.1 1 0.102 1 VII SAN JACTNTO - BORREGO 1 35.6( 57.3)1 6.6 J 0.075 1 VII SAP: JACINTO-SAN JACINTO VALLEY J 36.4( 58.6)1 6.9 1 0.086 I VII NORTH FRONTAL FAULT ZONE (East) J 37.2( 59.8)1 6.7 1 0.093 J VII EARTHQUAKE VALLEY 1 40.3( 64.8)1 6.5 0.065 J VI BRAWLEY SEISMIC ZONE 1 41.6( 66.9)1 6.4 1 0.060 1 VI JOHNSON VALLEY (Northern) 1 43.1( 69.3)1 6.7 1 0.068 1 VI ELSINORE-JULIAN I 43.6( 70.2)1 7.1 1 0.083 1 VII CALICO - HIDALGO 1 44.8( 72.1)1 7.1 1 0.082 I VII ELSINORE-TEMECULA 1 47.8( 76.9)1 6.8 1 0.066 1 VI LENWOOD-LOCKHART-OLD WOMAN SPRGSJ 48.8( 78.6)1 7.3 1 0.085 1 VII ELMORE RANCH J 49.0( 78.8)1 6.6 1 0.059 1 VI NORTH FRONTAL FAULT -ZONE (West) J 49.2( 79.2)1 7.0 J 0.088 J VII ELSINORE-COYOTE MOUNTAIN 1 51.6( 83.1)1 6.8 1 0.062 J VI SUPERSTITION MTN. (San Jacinto) I 53.7( 86.4)1 6.6 1 0.055 J VI SUPERSTITION HILLS (San Jacinto)I 54.6( 87.8)1 6.6 1 0.054 J VI HELENDALE - S. LOCKHARDT 1 56.7( 91.3)1 7.1 1 0.068 1 VI SAN JACINTO-SAN BERNARDINO 1 58.7( 94.5)1 6.7 J 0.054 J VI ELSINORE-GLEN IVY 1 61.3( 98.7)1 6.8 1 0.055 J VI CLEGHORN J 66.1( 106.3)1 6.5 J 0.044 1 VI -_MPERIAL 1 68.7( 110.6)1 7.0 J 0.056 1 VI LAGUNA SALADA J 71.8( 115.6)1 7.0 1 0.054 J VI CUCAMONGA 1 73.8( 7.18.7)1 7.0 1 0.064 1 VI CHINO -CENTRAL AVE. (Elsinore) J 74.3( 119.5)1 6.7 1 0.054 1 VI NEWPORT-INGLEWOOD (Offshore) 1 76.1( 122.5)1 6.9 1 0.049 J VI ROSE CANYON 1 76.2( 122.6)1 6.9 1 0.049 J VI WHITTIER 1 78.4( 126.1)1 6.8 1 0.045 J VI SAN ANDREAS - Mojave J 82.8( 133.2)1 7.1 1 0.051 1 VI SAN ANDREAS - 1857 Rupture 1 82.8( 133.2)1 7.8 I 0.073 J VII SAN JOSE 1 85.5( 137.6)1 6.5 1 0.044 1 VI ----------------------------- DETEERMINiSTIC SITE PARAMEETF.RS ----------------------------- Pace 2 I ! ESTIMATED MAX. EARTHQUAKE EVENT I APPROXIMATE i ------------------------------- ABBRE7VIATED I DISTANCE ! MAXIMUM_ I PEAL JEST. S_TE -Ar-)I,- NA14E I Tri i ( km) l EARTHQUAKE I SITE I INTE..NS- TY I MAG.(Mw) I ACCEL. g IMOD.MERC. GRAVEL HILLS - HARPER LAKE 1 88.2( 142.0); 6.9 1 0.043 1 Vi SIERRA MADRE 1 88.4( 142.3)1 7.0 1 0.056 1 VI ELYSIAN PARK THRUST 1 90.6( 195.8): 6.7 1 0.047 i VI CORONAD,,-) BANK 1 91.3( 14 7 . 0) 1 7 . 4 1 0.05", 1 V' NEWPORT-INGLEWOOD (L.A.Basir:) 1 94.6( 152.21%.1 6.9 1 0.041. I V CLA.MSHELT.-SAWPIT 1 96.9( 156.0)1 6.5 1 0.040 I V COMPTON THRUS.' 1 97.3( "56.6)1 6.8 1 (31.046 V1 PALOS `)ERDES 99.5 ( ':60.2)1 7.1! I 0.044 V= -END OF SEARCH- 48 FAULTS FOUND 'WITFIN THE SPECIFIED SEARCH RADIUS. THE SAN ANDRE'.AS - Coachella FAULT IS CLOSEST TO THE, SITE. IT IS ABOUT 5.4 MILES (8.7 km) AWAY. LARGEST PJLAXIMUM-EART9QUAKE SITE ACCELERATION: 0.4345 g 1100 1000 900 800 700 600 500 400 300 200 100 0 CALIFORNIA FAULT MAP NWC Highway I I I & Adams Street / La Quinta 00 00 00 00 00 0 100 200 300 400 500 .1 STRIKE -SLIP FAULTS 5) Boore et al. (1997) Horiz. - SOIL (3 10) 1 !•z o .1 L M=5 M=6 M=7 M=8 .001 1 10 100 Distance [adistl (km) DIP -SLIP FAULTS 5) Boore et al. (1997) Horiz. - SOIL (3 10) M=5 M=6 M=7 M=8 1 .01 " � 1 0 c� 0 a� 'U U :001 1 10 100 Distance [adistl (km) 1% 2 BLIND -THRUST FAULTS 5) Boore et al. (1997) Horiz. - S01L (3 10) 1 .1 .01 told M=5 M=6 M=7 M=8 1 10 100 Distance [adist] (km) q MAXIMUM EARTHQUAKES NWC Highway 111 & Adams Street / La Quinta 7 2 .01 .001 i .1 1 10 100 Distance (mi) o .1 M a� U U 2 .01 .001 i .1 1 10 100 Distance (mi) EARTHQUAKE MAGNITUDES & DISTANCES NWC Highway ] 1 1 & Adams Street / La Quinta 7.75 7.50 7.25 a� 7.00 ca 6.75 6.50 .1 1 10 100 Distance (mi)