Loading...
10-1109 (RC) Title 24BUILDING ENERGY ANALYSIS REPORT PROJECT: Ken Garff Chevrolet/Cadiallac 79225 Highway 111 La Quinta, CA 92253 Project Designer: '- Walt Wagner 815 Civic Center Drive Oceanside, CA 92054 760.729.0533 Report Prepared by: Farzad Tadayon T -Squared Professional -Engineers, Inc. 1340 Specialty Dr., Suite E Vista, CA 92081 760.560.0100 RECEIvED NOV 1.2 2010 Job Number: CITY OF LA QUINTA 10060 BUILDING & SAFETY DEPT. APPROVED Date: FOR CONSTRUCTION i 11/9/2010 DATE « t� ZOtoBY D - Iii The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2008 Building Energy Efficiency Standards. This program developed by EnergySoft, LLC — www.energysoft.com. EnergyPro 5.1 by EnergySoft User Number. 5511 RunCode: 2010-11-09715:40:29 /D: 10060 V TABLE OF CONTENTS Cover Page 1 Table of Contents 2 Nonresidential Performance Title 24 Forms 3 Form ENV -MM Envelope Mandatory Measures 27 Form LTG -MM Lighting Mandatory Measures 28 Form SLTG-1-C Sign Lighting Compliance 29 Form MECH-MM Mechanical Mandatory Measures 31 EnergyPro 5.1 by EnergySoft Job Number. ID: 10060 User Number: 5511 -,+c _.mow - ..,..o.�_� +c..'�•,..Mv.. ..»....�._. _. PERFORMANCE CERTIFICATE OF COMPLIANCE (Part 1 of 3) PERF -1 C Project Name Date Ken Gaff Chevrolet/Cadiallac 11/9/2010 Project Address Climate Zone Total Cond. Floor Area Addition Floor Area 79225 Highway 111 La Quinta CA Climate Zone 15 23,635 7,674 GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Relocatable - indicate ❑ specific climate zone ❑ all climates Phase of Construction: ❑ New Construction ❑ Addition ® Alteration STATEMENT OF COMPLIANCE This certificate of compliance lists the building features and specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies only to a Building using the performance compliance approach. The documentation author hereby certifies that the documentation is accurate and complete. Documentation Author Name Farzad Tadayon Signature Company T -Squared Professional Engineers, Inc. Date 11/9/1010 Address 1340 Specialty Dr., Suite E Phone 760.560.0100 City/State/Zip Vista, CA 92081 The Principal Designer hereby certifies that the proposed building design represented in this set of construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this permit application. The proposed building has been designed to meet the energy efficiency requirements contained in sections 110, 116 through 118, and 140 through 149 of Title 24, Part 6. Please check one: ENV. LTG. MECH. I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to ❑ sign this document as the person responsible for its preparation; and that I am licensed in the State of California as a civil engineer, mechanical engineer, electrical engineer, or I am a licensed architect. I affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code by section ❑ ❑ ❑ 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor performing this work. affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document ❑ ❑ ❑ because it pertains to a structure or type of work described as exempt pursuant to Business and Professions Code Sections 5537, 5538 and 6737.1. Principal Envelope Designer Name Walt Wagner Signature Company Walt Wagner Date Address 815 Civic Center Drive Li ense # City/State/Zip Oceanside, CA 92054 hone 760.729.0533 Principal Mechanical Designer Name Farzad Tadayon Signature Company T -Squared Professional Engineers, Inc. Date 11/09/2010 Address 1340 Specialty Dr., Suite E License # M29230 City/State/Zip Vista, CA 92081 Phone 760.560.0100 Principal Lighting Designer I OF Name Milton Niederhaus Signal Company T -Squared Professional Engineers, Inc. Date 11/09/2010 Address 1340 Specialty Dr., Suite E License # E8636 City/State/Zip Vista, CA 92081 Phone 760.560.0100 INSTRUCTIONS TO APPLICANT COMPLIANCE & WORKSHEETS (check box if worksheets are included) m ENV -1C Certificate of Compliance. Required on plans. m MECH-1C Certificate of Compliance. Required on plans. m LTG -1 C Certificate of Compliance. Required on plans. m MECH-2C AirMater Side/Service Hot Water & Pool Requirements. ❑ LTG -2C Lighting Controls Credit Worksheet. m MECH-3C Mechanical Ventilation and Reheat. ❑ LTG -3C Indoor Lighting Power Allowance. m MECH-5C Mechanical Equipment Details. Energ Pro 5.1 by Energ Soft User Number. 5511 RunCode: 2010-11-09T15:40:29 /D: 10060 Page 3 of 31 t PERFORMANCE CERTIFICATE OF COMPLIANCE Project Name Ken Garff Chevrolet/Cadiallac ANNUAL TDV ENERGY USE SUMMARY (kBtu/sgft-yr) Standard Proposed Compliance Energy Component Design Design Margin Space Heating Space Cooling Indoor Fans Heat Rejection Pumps & Misc. Domestic Hot Water Lighting Receptacle Process Process Lighting TOTALS 42.91 65.90 -22.99 450.47 357.26 93.21 92.80 92.86 -0.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 62.23 70.52 -8.29 65.78 65.78 0.00 0.00 0.00 0.00 0.00 0.001 0.00 714.18 652.32 61.87 Percent better than Standard GENERAL INFORMATION 8.7% 1 1 8.7% Part 2of3 Heating Cooling Fans Heat Rej Pumps DHW Lighting Receptacle Process Process Ltg BUILDING COMPLIES PERF -1 C Date 11/9/2010 Building Orientation (N) 0 deg Conditioned Floor Area 23,635 sqft. Number of Stories 1 Unconditioned Floor Area 0 sqft. Number of Systems 15 Conditioned Footprint Area 0 sqft. Number of Zones 10 Natural Gas Available On Site No Front Elevation Left Elevation Rear Elevation Right Elevation Total Roof Orientation Gross Area (N) Z218 (E) 2,092 (S) 2,213 (K9 2,324 8,847 23,635 Prescriptive Lighting Power Density Prescriptive Envelope TDV Energy Remarks: Standard 0.890 W/sqft 718,653 sqft. sqft. sqft. sqft. sqft. sqft. Glazinn Area 359 956 677 0 1,992 0 Proposed 1.008 W/sqft. 1,260,116 sqft. sqft. sqft. sqft. sqft. sqft. Glazing Ratio 16.2 45.7 30.6 0.0 22.5 0.0 Prescriptive Values for Comparison only. See LTG -1 C for allowed LPD. i tnermawro 6.7 Dy tnergvcoon user NumDer. 6677 RunCode: 2010-11-09T15:40:29 ID: 10060 Page 4 of 31 1 PERFORMANCE CERTIFICATE OF COMPLIANCE (Part 3 of 3) PERF -1 C Project Name Ken Garff Chevrolet/Cadiallac Date 11/9/2010 ZONE INFORMATION System Name Zone Name Occupancy Type Floor Area (sqft.) Inst. LPD W/sf' Ctrl. Credits W/Sf 2 Allowed LPD Proc. Loads W/Sf Area Tailored W/sf 3 W/Sf ° existing 7-1/2 ton retail Tenant Lease Space 5,845 1.458 office —250 sqft Office — 250 sqft 1,009 1.211 office > 250 sgft Office > 250 sqft 437 1.826 corridor/restroom/support Corridor/Restroom/Support 1,736 1.014 existing 4 ton once —250 sqft Office — 250 sqft 358 1.274 Training Classroom, Lecture, Traininc 321 0.773 corridor/restroom/support Corridor/Restroom/Support 142 0.873 new evap cooler 1/2 hp service bay Auto Repair 6,082 0.775 storage Corridor/Restroom/Support 2,129 0.915 new evap cooler 3/4 hp service bay Auto Repair 5,576 0.723 Notes: 1. See LTG -1C 2. See LTG -2C 3. See LTG -3C 4. See LTG -4C items marked with asterisk, see LTG -1 -C by others) (by others Items above require special documentation EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of the justifications, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted. The HVAC System evap cooler 1!2 hp includes an Evaporative Cooling System. The HVAC System evap cooler 1/2 hp has the Supply Fan Motor mounted externally, outside the Conditioned Air Stream. The HVAC System evap cooler 3/4 hp with a/ec heat includes an Evaporative Cooling System. The HVAC System evap cooler 3/4 hp with a/ec heat has the Supply Fan Motor mounted externally, outside the Conditioned Air Stream. The exceptional features listed in this performance approach application have specifically been reviewed. Adequate written justification and documentation for their use have been provided by the applicant. Authorized Signature or Stamp Energ Pro 5.1 by Energ Soft User Number. 5511 RunCode: 2010-11-09T15:40:29 /D: 10060 Page 5 of 31 CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV -1 C AND FIELD INSPECTION ENERGY CHECKLIST Project Name Ken Gaff Chevrolet/Cadiallac Date 1 11/9/2010 Project Address 79225 Highway 111 La Quinta Climate Zone 15 Total Cond. Floor Area 23,635 Addition Floor Area 7,674 GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ RRledlocatable g. Public School ® Conditioned Spaces 13Unconditioned Spaces ❑ Skylight Area for Large Enclosed Space >_ 8000 ft2 (If checked include the ENV -4C with submittal) Phase of Construction: ❑ New Construction ❑ Addition m Alteration Approach of Compliance: ❑ Component ® Overall Envelope ❑ Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: 0 deg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION Ta /ID' AssemblyType 2 y ¢ c cN d Oz M °° Rj U o «° x m w > ° 2—t x° w U. .R m > ll c E U. v c o c) w.. nW m a R u- 1 Roof 3,336 (N) 0.034 R-30 4.2.2-A40 Existing ❑ ❑ 2 Wall 211 (E) 0.074 R-19 4.3.1-A5 Existing ❑ ❑ 3 Wall 89 (N) 0.074 R-19 4.3.1-A5 Existing ❑ ❑ 4 Wall 126 (S) 0.074 R-19 4.3.1-A5 Existing ❑ ❑ 5 Roof 1,156 (N) 0.034 R-30 4.2.2-A40 New ❑ ❑ 6 Wall 299 (E) 0.055 R-30 4.3.1-A10 New ❑ ❑ 7 Wall 85 (N) 0.055 R-30 4.3.1-A10 New ❑ ❑ 8 Wall 85 (S) 0.055 R-30 4.3.1-A10 New ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/ID' Fenestration Type 2 C; ¢ C 0 3 C " w O Z M ALL 2> M LL 'o > rn V 2 � 2- ci _ 'o co N c > O y .c°. 'C o v N y a u- 1 Window 557 (E) 0.710 Defauftl 0.600 Default ❑ Existing ❑ ❑ 2 Window 180 (N) 0.710 Default 0.600 Default ❑ Existing ❑ ❑ 3 Window 259 (S) 0.710 Default 0.600 Default ❑ Existing ❑ ❑ 4 Window 399 (E) 0.340 COG 0.380 COG ❑ New ❑ ❑ 5 Window 179 (N) 0.340 COG 0.380 COG ❑ New ❑ ❑ 6 Window 179 (S) 0.340 COG 0.380 COG ❑ New ❑ ❑ 7 Window 239 (S) 0.710 Default 0.600 Default m Existing ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. EnergyPro 5.1 by EnergySoft User Number. 5511 Run Code: 2010-11-09T15:40:29 /D: 10060 Page 6 of 31 CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV -1 C AND FIELD INSPECTION ENERGY CHECKLIST Project Name Ken Garff Chevrolet/Cadiallac Date 1 11/9/2010 Project Address 79225 Highway 111 La Quinta Climate Zone 15 Total Cond. Floor Area 23,635 Addition Floor Area 7,674 GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Bldocatable Public School ® Conditioned Spaces ❑ Unconditioned Spaces ❑ Skylight Area for Large Enclosed Space >_ 8000 ft2 (If checked include the ENV -4C with submittal) Phase of Construction: ❑ New Construction ❑ Addition m Alteration Approach of Compliance: ❑ Component m Overall Envelope ❑ Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: 0 deg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION Ta /ID' Assembly Type 2 a r UFf0 O z 7'r 0 M: v o� N y O W w> r3 K w a 'O d lO 5> 5 u. xc a4 a ON N7 O« v cn NV W a .n .A a 9 Roof 1,353 (N) 0.034 R-301 4.2.2-A40 Existing ❑ ❑ 10 Wall 153 (S) 0.074 R-19 4.3.1-A5 Existing ❑ ❑ 11 Roof 133 (N) 0.034 R-30 4.2.2-A40 Existing ❑ ❑ 12 Roof 134 (N) 0.034 R-30 4.2.2-A40 Existing ❑ ❑ 13 Roof 101 (N) 0.034 R-30 4.2.2-A40 Existing ❑ ❑ 14 Roof 153 (N) 0.034 R-30 4.2.2-A40 Existing ❑ ❑ 15 Roof 129 (N) 0.034 R-30 4.2.2-A40 Existing ❑ ❑ 16 Roof 132 (N) 0.034 R-30 4.2.2-A40 Existing ❑ ❑ ❑• ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/ID' Fenestration Type 2 a ° W O Z 0 A A a 2> 0 A a 'o > rn V = N 2— U = 'o N cn m c E > O r- O 0 7 o :° v N a m a ,� LL ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. EnergyPro 5.1 by EnergySoft User Number: 5511 RunCode: 2010-11-09T15:40:29 /D: 10060 Page 7 of 31 CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV-1 C AND FIELD INSPECTION ENERGY CHECKLIST Project Name Ken Garff ChevrolebCadiallac Date 11/9/2010 Project Address 79225 Highway 111 La Quinta Climate Zone 15 Total Cond. Floor Area 23,635 Addition Floor Area 7,674 GENERAL INFORMATION Building Type: ® Nonresidential ❑ High-Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Blellocatable Public School m Conditioned Spaces ❑ Unconditioned Spaces ❑ Skylight Area for Large Enclosed Space >_ 8000 ft2 (If checked include the ENV-4C with submittal) Phase of Construction: ❑ New Construction ❑ Addition m Alteration Approach of Compliance: ❑ Component m Overall Envelope ❑ Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: 0 deg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION Ta /ID' AssemblyType 2 a c cN N u O z 4 n y� '> v of o° 02 w> E4) r w LL 3 5> °c E- - LL v aci d CL a °oma 0 U N a LL 17 Roof 227 (N) 0.034 R-30 4.2.2-A40 Existing ❑ ❑ 18 Roof 437 (N) 0.034 R-30 4.2.2-A40 Existing ❑ ❑ 19 Roof 128 (N) 0.034 R-30 4.2.2-A40 Existing ❑ ❑ 20 Roof 119 (N) 0.034 R-30 4.2.2-A40 Existing ❑ ❑ 21 Roof 86 (N) 0.034 R-30 4.2.2-A40 Existing ❑ ❑ 22 Roof 182 (N) 0.034 R-30 4.2.2-A40 Existing ❑ ❑ 23 Roof 120 (N) 0.034 R-30 4.2.2-A40 Existing ❑ ❑ 24 Roof 476 (N) 0.034 R-30 4.2.2-A40 Existing ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/ID' Fenestration Type 2 v Q °� U) w O Z> ° U LL 0 d U ` LL o > rn U c7 X N 2S d s 'o CO N rn R > O c o ;° V N W a LL ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. EnergyPro 5.1 by EnergySoft User Number: 5511 Run Code: 2010-11-09T15:40:29 /D: 10060 Page 8 of 31 CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV -1 C AND FIELD INSPECTION ENERGY CHECKLIST Project Name Ken Garff Chevrolet/Cadiallac Date 1 111912010 Project Address 79225 Highway 111 La Quinta Climate Zone 15 Total Cond. Floor Area 23,635 Addition Floor Area 7,674 GENERAL INFORMATION Building Type: RI Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Bledlocatable g. Public School ® Conditioned Spaces 13 Unconditioned Spaces ❑ Skylight Area for Large Enclosed Space >_ 8000 ft (If checked include the ENV -4C with submittal) Phase of Construction: ❑ New Construction ❑ Addition to Alteration Approach of Compliance: ❑ Component ® Overall Envelope ❑ Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: 0 deg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION Ta /ID' Assembly Type 2 V d a c O C V1 N W O z V V LL'j M M j f0 B¢ O O d 7 X l0 w> O C d 'i 7 w a O d ce l l0 I > O C iV ` 7 c LL e x C C a p O. r fd C r O « U cn H lCip a a 25 Roof 71 (N) 0.034 R-301 4.2.2-A40 Existing ❑ ❑ 26 Roof 204 (N) 0.034 R-30 4.2.2-A40 Existing ❑ ❑ 27 Roof 350 (N) 0.034 R-30 4.2.2-A40 Existing ❑ ❑ 28 Roof 200 (N) 0.034 R-30 4.2.2-A40 Existing ❑ ❑ 29 Roof 158 (N) 0.034 R-30 4.2.2-A40 Existing ❑ ❑ 30 Roof 321 (N) 0.034 R-30 4.2.2-A40 Existing ❑ ❑ 31 Wall 90 (N) 0.074 R-19 4.3.1-A5 Existing ❑ ❑ 32 Roof 72 (N) 0.034 R-30 4.2.2-A40 Existing ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/ID' Fenestration Type 2 N ¢ 0 03 Cy 0 w O Z r U LL 2> r U ` LL 'o > y V = r^ U V s 'o N Cl) r- C L O c H : 7 o 06 a LL 13 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 1 ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. EnergyPro 5.1 by EnergySoft User Number. 5511 Run Code: 2010-11-09T15:40:29 ID: 10060 Page 9 of 31 CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV -1 C AND FIELD INSPECTION ENERGY CHECKLIST Project Name Ken Garff Chevrolet/Cadiallac Date 1 11/9/2010 Project Address 79225 Highway 111 La Quinta Climate Zone 15 Total Cond. Floor Area 23,635 Addition Floor Area 7,674 GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Blldlocatable Public Schoolg. m Conditioned Spaces ❑ Unconditioned Spaces ❑ Skylight Area for Large Enclosed Space >_ 8000 ft2 (If checked include the ENV -4C with submittal) Phase of Construction: ❑ New Construction ❑ Addition m Alteration Approach of Compliance: ❑ Component m Overall Envelope ❑ Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: 0 deg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION Ta /ID' Assembly Type 2 ^ y a cX C cN m ui 6 z O ti : 0) r >; as U¢ O` c m % �o W> `.� c � d '� tK W LL ° m m > ° C y '� LL a aci c a p a -� a c O v c o .. v N a m a = A LL 33 Wall 66 (N) 0.074 R-19 4.3.1-A5 Existing ❑ ❑ 34 Roof 70 (N) 0.034 R-30 4.2.2-A40 Existing ❑ ❑ 35 Wall 64 (N) 0.074 R-19 4.3.1-A5 Existing ❑ ❑ 36 Wall 1,022 (S) 0.510 None 4.3.6-F1 Existing ❑ ❑ 37 Wall 1,158 (1M 0.510 None 4.3.6-F1 Existing ❑ ❑ 38 Roof 6,082 (N) 1 0.034 R-30 4.2.2-A40 Existing ❑ ❑ 39 Wall 289 (N) 0.510 None 4.3.6-F1 Existing ❑ ❑ 40 Roof 1,187 (N) 0.034 R-30 4.2.2-A40 Existing ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/ID' Fenestration Type 2 03 ;v a c g3 2 vi c y W c O Z X 0f ALL 2> 8 d LL l0 2 o > Cl) V C7 Z X rn m^ 2¢ v C) is 7 z o W N a E 0) > O c y C "' o :4 06 y A a " LL ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. EnergyPro 5.1 by EnergySoft User Number: 5511 Run Code: 2010-11-09T15:40:29 /D: 10060 Pae 10 of 31 CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV -1 C AND FIELD INSPECTION ENERGY CHECKLIST Project Name Ken Garff ChevrolebCadiallac Date 11/9/2010 Project Address 79225 Highway 111 La Quinta Climate Zone 15 Total Cond. Floor Area 23,635 Addition Floor Area 7,674 GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Bldg. Public School ® Conditioned Spaces 13 Unconditioned Spaces ❑ Skylight Area for Large Enclosed Space ? 8000 ft2 (If checked include the ENV -4C with submittal) Phase of Construction: ❑ New Construction ❑ Addition m Alteration Approach of Compliance: ❑ Component ® Overall Envelope ❑ Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: 0 deg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION Ta /ID' Assembly Type' N Q C o) N WIL O z U M >. > j m c) M 0 O « x R w> 0 C N` % w U. O d d m > O C d` u- x _ C C O• o a -.34 c O N C 7 0 :9 L) O I0 A a m LL 41 Roof 942 (N) 0.034 R-30 4.2.2-A40 New ❑ ❑ 42 Wall 626 (E) 0.510 None 4.3.6-F1 New ❑ ❑ 43 Wall 1,176 (N) 0.510 None 4.3.6-F1 New ❑ ❑ 44 Wall 1,166 (Vv) 0.510 None 4.3.6-F1 New ❑ ❑ 45 Wall 150 (S) 0.510 None 4.3.6-F1 New ❑ 1 ❑ 46 Roof 5,576 (N) 0.034 R-30 4.2.2-A40 New ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/ID' Fenestration Type 2 n � a c c� N CV W O 2 " LL > M> L o ei V i' LL 'o > y U C7 = ^� °5 v V` z 00 N N rn �o -E O c ' D 7 o .4 U to m a LL 13 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. EnergyPro 5.1 by EnergySoft User Number.' 5511 RunCode: 2010-11-09T15:40:29 /D: 10060 Pae 11 of 31 CERTIFICATE OF COMPLIANCE (Part 2 of 3) AND FIELD INSPECTION ENERGY CHECKLIST ENV -1 C Project Name Ken Gaff ChevrolebCadiallac Date 11/9/2010 ROOFING PRODUCT COOL ROOFS (Note if the roofing product is not CRRC certified, this compliance approach cannot be used). Go to Overall Envelope Approach or Performance Approach. CHECK APPLICABLE BOX BELOW IF EXEMPT FROM THE ROOFING PRODUCT "COOL ROOF" REQUIREMENTS: Pass Fail' N/A ❑ Roofing compliance not required in Climate Zones 1 andl6 with a Low -Sloped. 2:12 pitch or less. ❑ ❑ ❑ ❑ Roofing compliance not required in Climate Zone 1 with a Steep -Sloped with less than 5 Ib/ft2. Greater than 2:12 pitch. ❑ ❑ ❑ Wood framed roofs in Climate Zones 3 and 5 are exempted, solar reflectance and thermal emittance or 13SRI SRI that have a U -factor of 0.039 or lower. See Opaque Surface Details roof assembly, Column H of ENV -2C. 13 13 ❑ ❑ Low -sloped Metal building roofs in Climate Zone 3 and 5 are exempted, solar relectance and thermal emittance or SRI that have a U -f actor of 0.048 or lower. See Opaque Surface Details roof assembly below, Column H of ENV -2C. ❑ ❑ ❑ ❑ The roof area covered by building integrated photovoltaic panels and building integrated solar thermal panels are exempted. Solar reflectance and thermal emittance or SRI, seespreadsheet calculator at www.energy.ca.gov/title24/ ❑ ❑ ❑ ❑ Roof constructions that have thermal mass over the roof membrane with a weight of at least 25 Ib/ft are exempt from the Cool Roof criteria below. ❑ ❑ ❑ ❑ High-rise residential buildings and hotels and motels with low -sloped roofs in Climate Zones 1 through 9, 12 and 16 are exempted from the low -sloped roofing criteria. ❑ ❑ ❑ 1. If Fail then describe on this page of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. CRRC Product ID Number' Roof Slope s 2:12 > 2:12 Product Weight < 51b/ft2 a 51b/ft2 Product Type 2 Aged Solar Reflectance Thermal Emmitance SRI5 Pass Fai16 ❑ ❑ ❑ ❑ ❑ 4 ❑ ❑ ❑ ❑ ❑ ❑ ❑ 4 ❑ ❑ ❑ ❑ ❑ ❑ ❑ 4 ❑ ❑ ❑ ❑ ❑ ❑ W 1 ❑ ❑ ❑ ❑ ❑ ❑ 4 ❑ ❑ ❑ 1 ❑ ❑ 1 ❑ ❑ 4 ❑ ❑ 1. The CRRC Product ID Number can be obtained from the Cool Roof Rating Council's Rated Product Directory at www.coolroofs.orq/products/search.php 2. Indicate the type of product is being used for the roof top, i.e. single -ply roof, asphalt roof, metal roof, etc. 3. If the Aged Reflectance is not available in the Cool Roof Rating Council's Rated Product Directory then use the Initial Reflectance value from the same directory and use the equation (0.2+01(p;r;,;a, — 0.2) to obtain a calculated aged value. Where p is the Initial Solar Reflectance from the Cool Roof Rating Council's Rated Product Directory. 4. Check box if the Aged Reflectance is a calculated value using the equation above. 5. The SRI value needs to be calculated from a spreadsheet calculator at http://www.enerov.ca.aov/title24/ 6. If Fail then describe on this page of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. To apply Liquid Field Applied Coatings, the coating must be applied across the entire roof surface and meet the dry mil thickness or coverage recommended by the coatings manufacturer and meet minimum performance requirements listed in §118(i)4. Select the applicable coating: ❑ Aluminum -Pigmented Asphalt Roof Coating ❑ Cement -Based Roof Coating ❑ Other Discrepancies: EnemyPro 5.1 by Enem YSoft User Number: 5511 RunCode: 2010-11-09T15:40:29 /D: 10060 Pae 12 of 31 CERTIFICATE OF COMPLIANCE (Part 3 of 3) ENV -1 C AND FIELD INSPECTION ENERGY CHECKLIST Project Name Ken Garff Chevrolet/Cadiallac Date 11/9/2010 Required Acceptance Tests Designer: This form is to be used by the designer and attached to the plans. Listed below is the acceptance test for Envelope Fenestrations system. The designer is required to check the acceptance tests and list all the fenestration products that require an acceptance test. If all the site -built fenestration of a certain type requires a test, list the different fenestration products and the number of systems. The NA7 Section in the Appendix of the Nonresidential Reference Appendices Manual describes the test. Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Enforcement Agency: Systems Acceptance. Before Occupancy Permit is granted for a newly constructed building or space or whenever new fenestration is installed in the building or space shall be certified as meeting the Acceptance Requirements. The ENV -2A form is not considered a complete form and is not to be accepted by the enforcement agency unless the boxes are checked and/or filled and signed. In addition, a Certificate of Acceptance forms shall be submitted to the enforcement agency that certifies plans, specifications, installation certificates, and operating and maintenance information meet the requirements of §10-103(b) of Title 24 Part 6. The field inspector must receive the properly filled out and signed forms before the building can receive final occupancy. A copy of the ENV -2A for each different fenestration product line must be provided to the owner of the building for their records. Test Description ENV -2A Test Performed By: Fenestration Products Name or ID Area of like Building Envelope Requiring Testing or Verification Products Acceptance Test new Double Metal Tinted 757 13 13 11 11 EnergyPro 5.1 by EnergySoft User Number. 5511 Run Code: 2010-11-09715:40:29 /D: 10060 Pae 13 of 31 CERTIFICATE OF COMPLIANCE (Part 1 of 3) LTG-1 C Project Name Ken Garff Chevroleb'Cadiallac Date 1 11/9/2010 INDOOR LIGHTING SCHEDULE and FIELD INSPECTION ENERGY CHECKLIST Installation Certificate, LTG-1- INST Retain a copy and verify form is completed and signed.) Field Inspector ❑ Certificate of Acceptance, LTG-2A (Retain a coy and verify form is completed and signed.) Field Inspector ❑ A separate Lighting Schedule Must Be Filled Out for Conditioned and Unconditioned Spaces Installed Lighting Power listed on this Liqhtinq Schedule is only for: m CONDITIONED SPACE ❑ UNCONDITIONED SPACE m The actual indoor lighting power listed below includes all installed permanent and portable lighting systems in accordance with §146(a). Only for offices: Up to the first 0.2 watts per square foot of portable lighting shall not be required to be included in the m calculation of actual indoor lighting power density in accordance with the Exception to §146(a). All portable lighting in excess of 0.2 watts per square foot is totaled below. Luminaire (Type, Lamps, Ballasts Installed Watts A B C D E F G H None or Item Ta Complete Luminaire Description i.e, 3 lam fluorescent troffer, F32T8 one dimmable electronic ballasts a LL 5 0 U 4i 2 a m 4_ •S 1: � J How wattage Was determined N O N E 3 Z J X w m c Field Ins ectoe CEC Default From NA8 m �� v co o w, v o Q~ rn 0 W LL LL A 150w Metal Halide ❑ 168.0 ® ❑ 44 7,392 ❑ ❑ BABE (3) 2 k Fluorescent T8 Elec ❑ 53.0 ® ❑ 31 1,643 ❑ ❑ B11B1E (3) 2 ft Fluorescent T8 Elec ❑ 53.0 ® ❑ 5 265 ❑ ❑ C/CE (1) 4 It Fluorescent T8 Rapid Start Elec ❑ 32.0 ® ❑ 261 832 ❑ ❑ D/DE (2) 4 ft Fluorescent T8 Rapid Start Elec ❑ 62.0 ® ❑ 72 4,464 ❑ ❑ existing (2) 2 ft U-Tube T8 Elec ❑ 62.0 ® ❑ 4 248 ❑ ❑ existing (4) 4 ft Fluorescent T8 Rapid Start Elec ❑ 114.0 0 ❑ 18 2,052 ❑ ❑ existing (2) 4 ft Fluorescent T8 Rapid Start Elec ❑ 62.0 ® ❑ 105 6,510 ❑ ❑ F (1) 32w Compact Fluorescent Triple 4 Pin Elec ❑ 35.0 ® ❑ 5 175 ❑ ❑ GE (2) 4 ft Fluorescent T8 Rapid Start Elec ❑ 62.0 ® ❑ 2 124 ❑ ❑ HE (4) 4 ft Fluorescent T8 Rapid Start Elec ❑ 114.0 ® ❑ 1 114 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Installed Watts Page Total: 23,819 Building total number of pages: Installed Watts Building Total Sum of all pages) 23,819 Enter into LTG-1 C Page 4 of 4 1. Wattage shall be determined according to Section 130 (d and e). Wattage shall be rating of light fixture, not rating of bulb. 2 . If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. EnergyPro 5.1 by EnergySoft User Number: 5511 Run Code: 2010-11-09T15:40:29 ID: 10060 Pae 14 of 31 CERTIFICATE OF COMPLIANCE (Part 2 of 3) LTG -1 C Project Name Ken Garff ChevrolebCadiallac Date 1 11/9/2010 INDOOR LIGHTING SCHEDULE and FIELD INSPECTION ENERGY CHECKLIST Fill in controls for all spaces: a) area controls, b) multi-level controls, c) manual daylighting controls for daylit areas > 250 ftZ, automatic daylighting controls for daylit areas > 2,500 ftZ, d) shut-off controls, e) display lighting controls, f) tailored lighting controls — general lighting controlled separately from display, ornamental and display case lighting and g) demand responsive automatic controls for retail stores > 50,000 ftZ, in accordance with Section 131. MANDATORY LIGHTING CONTROLS — FIELD INSPECTION ENERGY CHECKLIST Field Ins ector Number Special Type/ Description of Units Location in Building Features Pass Fail ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ O ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ SPECIAL FEATURES INSPECTION CHECKLIST See Page 2 of 4 of LTG -1C The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification. The local enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted. Field Inspector's Notes or Discrepancies: EnergyPro 5.1 by EnergySoft User Number: 5511 RunCode: 2010-11-09715:40:29 /D: 10060 Pae 15 of 31 CERTIFICATE OF COMPLIANCE Part 3 of 3 LTG -1 C Project Name Date Ken Garff Chevrolet/Cadiallac 11/9/2010 CONDITIONED AND UNCONDITIONED SPACE LIGHTING MUST NOT BE COMBINED FOR COMPLIANCE Indoor Lighting Power for Conditioned S aces Indoor Lighting Power for Unconditioned Spaces Watts Watts Installed Lighting 23,819 Installed Lighting 0 from Conditioned LTG -1C, Page 2 from Unconditioned LTG -1 C, Page 2 Lighting Control Credit 0 Lighting Control Credit 0 Conditioned Spaces from LTG -2C Unconditioned Spaces from LTG -2C Adjusted Installed — 23,819 Adjusted Installed = 0 Lighting PowerLighting Power Complies if Installed:5 Allowed Complies if Installed:5 Allowed Allowed Lighting Power Allowed Lighting Power Conditioned Spaces from LTG -3C or PERF -1 23.819 Unconditioned Spaces from LTG -3C)0 Required Acceptance Tests Designer: This form is to be used by the designer and attached to the plans. Listed below is the acceptance test for the Lighting system, LTG -2A. The designer is required to check the acceptance tests and list all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. If all the lighting system or control of a certain type requires a test, list the different lighting and the number of systems. The NA7 Section in the Appendix of the Nonresidential Reference Appendices Manual describes the test. Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Forms can be grouped by type of Luminaire controlled. Enforcement Agency: Systems Acceptance. Before Occupancy Permit is granted for a newly constructed building or space or when ever new lighting system with controls is installed in the building or space shall be certified as meeting the Acceptance Requirements. The LTG -2A form is not considered a complete form and is not to be accepted by the enforcement agency unless the boxes are checked and/or filled and signed. In addition, a Certificate of Acceptance forms shall be submitted to the enforcement agency that certifies plans, specifications, installation certificates, and operating and maintenance information meet the requirements of §10-103(b) of Title 24 Part 6. The field inspector must receive the properly filled out and signed forms before the building can receive final occupancy. A copy of the LTG -2A for each different lighting luminaire control(s) must be provided to the owner of the building for their records. Controls for Credits LTG -2A Controls and Sensors and Automatic Number of Daylighting Luminaire Controls Equipment Re uirin Testing Description controls Location Acceptance ❑ EnemyPro 5.1 by EneMySoh User Number: 5511 RunCode: 2010-11-09715:40:29 /D: 10060 Pae 16 of 31 CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C FIELD INSPECTION ENERGY CHECKLIST Project Name Ken Gaff ChevrolebCadiallac Date 11/9/2010 Project Address 79225 Highway 111 La Quinta Climate Zone 15 —723,635 Total Cond. Floor Area Addition Floor Area 7,674 GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Relocatable Public School Bldg. m Conditioned Spaces ❑ Unconditioned Spaces affidavit Phase of Construction: ❑ New Construction ❑ Addition ® Alteration Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit) Energy Front Orientation: N, E, S, W or in Degrees: 1 0 deg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST E ui ment2 Inspection Criteria Meets Criteria or Requirements Pass Fail — Describe Reason Item or System Tags i.e. AC -1 RTU -1, HP -1 existing 7-1/2 ton ❑ ❑ Equipment T e3: Packaged DX ❑ ❑ Number of Systems 6 ❑ ❑ Max Allowed Heating Capacity' 78,000 Btu/hr ❑ ❑ Minimum Heating Efficiency' 3.00 COP ❑ ❑ Max Allowed Cooling Capacity' 8 6, 000 Btu/hr ❑ ❑ Cooling Efficiency' 9.0 EER ❑ ❑ Duct Location/ R -Value R-8.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No ❑ ❑ Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ E ui ment2 Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Pass Fail — Describe Reason Item or System Tags i.e. AC -1, RTU -1, HP -1 existing 4 ton ❑ ❑ Equipment T e3: Packaged DX ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 46,500 Btu/hr ❑ ❑ Minimum Heating Efficiency' 7.00 HSPF ❑ ❑ Max Allowed Cooling Capacity' 46,500 Btu/hr ❑ ❑ Cooling Efficiency' 10.0 SEER / 9.0 EER ❑ ❑ Duct Location/ R -Value R-8.0 ❑ ❑ When duct testing is required, submit & MECH-4-HERS NO ❑ 13MECH-4A Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EnergyPro 5.1 by EnergySoft User Number: 5511 RunCode: 2010-11-09715:40:29 /D: 10060 Pae 17 of 31 CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C FIELD INSPECTION ENERGY CHECKLIST Project Name Ken Garff ChevrolebCadiallac Date 11/9/2010 Project Address 79225 Highway 111 La Quinta Climate Zone 15 Total Cond. Floor Area 23,635 Addition Floor Area 7,674 GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Relocatable Public School Bldg. m Conditioned Spaces ❑ Unconditioned Spaces affidavit Phase of Construction: ❑ New Construction ❑ Addition ® Alteration Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit) Energy Front Orientation: N, E, S, W or in Degrees: 0 deg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST E ui ment2 Inspection Criteria Meets Criteria or Requirements Pass Fail — Describe Reason Item or System Tags i.e. AC -1 RTU -1 HP -1 new evap cooler 1/2 hp ❑ ❑ Equipment T e3: Evap Cooler ❑ ❑ Number of Systems 5 ❑ ❑ Max Allowed Heating Capacity' 0 Btu/hr ❑ ❑ Minimum Heating Efficiency' n/a ❑ ❑ Max Allowed Cooling Capacity' 0 Btu/hr ❑ ❑ Cooling Efficiency' n/a ❑ ❑ Duct Location/ R -Value R-0.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No ❑ ❑ Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ E ui ment2 Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Pass Fail — Describe Reason Item or System Tags i.e. AC -1, RTU -1, HP -1 new evap cooler 3/4 hp ❑ ❑ Equipment T e3: Evap Cooler ❑ ❑ Number of Systems 3 ❑ ❑ Max Allowed Heating Capacity' 25,600 Btu/hr ❑ ❑ Minimum Heating Efficiency' 3.40 HSPF ❑ ❑ Max Allowed Cooling Capacity' 0 Btu/hr ❑ ❑ Cooling Efficiency' n/a ❑ ❑ Duct Location/ R -Value R-0.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No [3 ❑ Economizer No Economizer ❑ ❑ Thermostat Setback Required 1 ❑ ❑ Fan Control Constant Volume 1 ❑ ❑ 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EnergyPro 5.1 by EnergySoft User Number: 5511 Run Code: 2010-11-09T15:40:29 /D: 10060 Pae 18 of 31 CERTIFICATE OF COMPLIANCE and (Part 2 of 4) MECH-1 C FIELD INSPECTION ENERGY CHECKLIST Project Name Date Ken Garff ChevroleNCadiallac 11/9/2010 Discreaancies: EnergyPro 5.1 by EnerpySoft User Number: 5511 RunCode: 2010.11-09T15:40:29 /D: 10060 Page 19 of 31 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 3 of 4) MECH-1 C Project Name Date Ken Garff Chevrolet/Cadiallac 11/9/2010 Required Acceptance Tests Designer: This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for mechanical systems. The designer is required to check the applicable boxes by all acceptance tests that apply and listed all equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the equipment description and the number of systems. The NA number designates the Section in the Appendix of the Nonresidential Reference Appendices Manual that describes the test. Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Building Departments: Systems Acceptance: Before occupancy permit is granted for a newly constructed building or space, or a new space -conditioning system serving a building or space is operated for normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. Systems Acceptance: Before occupancy permit is granted. All newly installed HVAC equipment must be tested using the Acceptance Requirements. The MECH-1 C form is not considered a completed form and is not to be accepted by the building department unless the correct boxes are checked. The equipment requiring testing, person performing the test (Example: HVAC installer, TAB contractor, controls contractor, PE in charge of project) and what Acceptance test must be conducted. The following checked -off forms are required for ALL newly installed equipment. In addition a Certificate of Acceptance forms shall be submitted to the building department that certifies plans, specifications, installation, certificates, and operating and maintenance information meet the requirements of §10-103(b) and Title -24 Part 6. The building inspector must receive the properly filled out and signed forms before the building can receive final occupancy. TEST DESCRIPTION MECH-2A MECH-3A MECH-4A MECH-5A MECH-6A MECH-7A MECH-8A MECH-9A MECH-10A MECH-11 A Hydronic Outdoor Constant Demand Supply System Automatic Ventilation Volume & Air Control Supply Valve Water Variable Demand For Single -Zone Distribution Economizer Ventilation Fan Leakage Temp. Flow Shed Equipment Re uirin Testing or Verification Ot . VAV & CAV Unitary Ducts Controls DCV VAV Test Reset Control Control evap cooler 12 hp 5 ® ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ evap cooler 3/4 hp with a/ec heat 3 ® ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ EnergyPro 5.1 by EnergySoft User Number: 5511 Run Code: 2010-11-09T15:40:29 0:10060 Page 20 of 31 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 4 of 4) MECH-1 C Project Name Ken Garff Chevrolet/Cadiallac Date 11/9/2010 TEST DESCRIPTION MECH-12A MECH-13A MECH-14A MECH-15A Equipment Re uirin Testing Fault Detection & Diagnostics Ot . for DX Units Automatic Fault Detection & Diagnostics for Air & Zone Distributed Energy Storage DX AC Systems Thermal Energy Storage (TES) Systems Test Performed By: evap cooler 12 hp 5 ❑ ❑ ❑ ❑ evap cooler 3/4 hp with e/ec heat 3 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ EnergyPro 5.1 by EnergySoft User Number: 5511 RunCode: 2010-11-09715:40:29 /D: 10060 Page 21 of 31 AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2C Project Name Date Ken Garff ChevrolebCadiallac 11/9/2010 Item or System Tags Indicate Air Systems Type Central, Single Zone, Packa e, VAV, or etc... i.e. AC -1, RTU -1, HP -1 existing 7-12 ton existing 4 ton new evap cooler 12 hp Number of Systems 6 1 5 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controlsffhermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation PRESCRIPTIVE MEASURES Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted Ind T-24 112( Lx Page Reference on Plans or Schedule and indicate the 112(b), 11 112(c), 11 121 b 121 b 121(c) 121(c) 122(e) 122(e) 122(f) 122(8) 123 124 144(a & 144(a & 144(c) 144(c) 144(c) 144(d) 144(e) 0 3.00 COP 9.0 EER Yes n/a No 1,832 cfm No No Programmable Switch Setback Required Auto n/a R-8.0 n/a 292,300 Btu/hr n/a 431,551 Btu/hr Constant Volume Yes No No Economizer Constant Temp Constant Temp 7.00 HSPF 10.0 SEER 19.0 EER Yes n/a No 283 cfm No No Programmable Switch Setback Required Auto n/a R-8.0 n/a 29,043 Btu/hr n/a 40,358 Btu/hr Constant Volume Yes No No Economizer Constant Temp Constant Temp n/a n/a n/a n/a No 15,319 cfm No No Programmable Switch Setback Required Auto n/a R-0.0 n/a 0 Btu/hr n/a 0 Btu/hr Constant Volume Yes No No Economizer Constant Temp Constant Temp 144(i) 144(k) I No No No AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2C Project Name Date Ken Garff Chevrolet/Cadiallac 11/9/2010 Indicate Air Systems Type Central, Single Zone, Package, VAV, or etc... Item or System Tags i.e. AC -1, RTU -1, HP -1 new evap cooler 3/4 hp Number of Systems 3 Indicate Page Reference on Plans or Schedule and indicate the applicable exception(s) MANDATORY MEASURES T-24 Sections Heating Equipment Efficiency 112(a) 3.40 HSPF Cooling Equipment Efficiency 112(a) n/a HVAC Heat Pump Thermostat 112(b), 112(c) n/a Furnace Controls/Thermostat 112(c), 115(a) n/a Natural Ventilation 121 b No Mechanical Ventilation 121 b 15,000 clm VAV Minimum Position Control 121 c No Demand Control Ventilation 121 c No Time Control 122(e) Programmable Switch Setback and Setup Control 122(e) Setback Required Outdoor Damper Control 122(f) Auto Isolation Zones 122 n/a Pipe Insulation 123 Duct Insulation 124 R-0.0 PRESCRIPTIVE MEASURES Calculated Design Heating Load 144(a & b n/a Proposed Heating Capacity 144(a & b 76,800 Btu/hr Calculated Design Cooling Load 144(a & b n/a Proposed Cooling Capacity 144(a & b 0 Btulhr Fan Control 144(c) Constant Volume DP Sensor Location 144(c) Supply Pressure Reset (DDC only) 144(c) Yes Simultaneous Heat/Cool 144(d) No Economizer 144(e) No Economizer Heat Air Supply Reset 144(f) Constant Temp Cool Air Supply Reset 144(f) Constant Temp Electric Resistance Heating' 144 Air Cooled Chiller Limitation 144(i) Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(k) No 1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used explain which exception(s) to §144(g) apply. EnergyPro 5.1 by EnergySoft User Number.' 5511 Run Code: 2010-11-09T15:40:29 /D: 10060 Page 23 of 31 MECHANICAL VENTILATION AND REHEAT MECH-3C Project Name Ken Garff Chevrolet/Cadiallac Date 11/9/2010 MECHANICAL VENTILATION 121 b 2 REHEAT LIMITATION (§144(d)) AREA BASIS OCCUPANCY BASIS VAV MINIMUM A B C D E F G H I J K L M N Zone/System Condition Area (ft2 CFM per ft Min CFM By Area B X C Number Of People CFM per Person Min CFM by Occupant E X F REQ'D V.A. Max of D or G Design Ventilation Air CFM 50% of Design Zone Supply CFM B X 0.4 CFM / ft2 Max. of Columns H, J, K, 300 CFM Design Minimum Air Setpoint Transfer Air retail 5,845 0.15 877 877 1,253 office —250 sqft 1,009 0.15 151 14.0 15.0 210 210 210 office > 250 sgft 437 0.15 66 6.2 15.0 94 94 94 corridoNrestroom/support 1,736 0.15 260 18.4 15.0 276 276 276 existing 7-1/2 ton Total 1,456 1,832 office —250 sgft 358 0.15 54 5.1 15.0 77 77 77 Training 321 0.38 122 122 185 corridor/restroom/support 142 0.15 21 1.4 15.0 21 21 21 existing 4 ton Total 220 283 service bay 6,082 1.50 9,123 9,123 15,000 storage 2,129 0.15 319 21.3 15.0 319 319 319 new evap cooler 112 hp Total 9,442 15,319 service bay 5,576 1.50 8,364 55.8 247.5 13,801 13,8011 15,000 new evap cooler 3/4 hp Total 13,801 15,000 Totals Column I Total Design Ventilation Air C Minimum ventilation rate per Section 121, Table 121-A. E Based on fixed seat or the greater of the expected number of occupants and 50% of the CBC occupant load foregress purposes fors aces without fixed setting. H Required Ventilation Air REQ'D V.A. is the larger of the ventilation rates calculated on an AREA BASIS or OCCUPANCY BASIS Column D or G). I Must be greater than orequal to H, or use Transfer Air column N to make up the difference. J Desi n fan supply CFM Fan CFM x 50%; or the design zone outdoor airflow rate per 121. K Condition area(ft) x 0.4 CFM / ftz; or L Maximum of Columns H, J, K, or 300 CFM M This must be less than orequal to Column L and greater than orequal to the sum of Columns H plus N. N Transfer Air must be provided where the Required Ventilation Air (Column H) is greater than the Design Minimum Air (Column M). Where required, transfer air must be greater than or equal to the difference between the Required Ventilation Air Column H and the Design Minimum Air Column M), Column H minus M. 'by Ene Pro 5.1 EnergySoft User Number: 5511 Run Code: 2010-11-09715:40:29 /D: 10060 Page 24 of 31 MECHANICAL EQUIPMENT DETAILS Part 1 of 2 MECH-5C Project Name Ken Garff Chevrolet/Cadiallac Date 11/9/2010 CHILLER AND TOWER SUMMARY PUMPS Equipment Name Type Ot . Eff iciency Premium Tons aty. GPM BHP Eff. Motor Pump Control ❑ DHW / BOILER SUMMARY System Name Type Distribution Ot . Vol. Energy Factor Rated Input (Gals). or RE Standby Loss Tank Ext. or Pilot R -Value Status MULTI -FAMILY CENTRAL WATER HEATING DETAILS Hot Water Pump Hot Water iping Length ft Control Ot . HP Type In Plenum Outside Buried I Add'/z" Insulation 13 CENTRAL SYSTEM RATINGS HEATING COOLING System Name Type Ot . Output Aux, kW Eff iclency Output Eff iciency Status existing 7-1/2 ton Packaged DX 6 78,000 0.0 3.00 COP 86,000 9.0 EER Existing existing 4 ton Packaged DX 1 46,500 0.0 7.00 HSPF 46,500 10.0 SEER /9.0 EER Existing evap cooler 12 hp Evap Cooler 5 0.0 n/a 0 n/a New evap cooler 3/4 hp with alec heat Evap Cooler 3 25,600 0.0 3.40 HSPF 0 n/a New CENTRAL SYSTEM FAN SUMMARY SUPPLY FAN RETURN FAN System Name Fan Type Economizer Type Premium CFM BHP Eff. Motor CFM BHP Premium Eff. Motor existing 7-12 ton Constant Volume No Economizer 3,000 2.40 ❑ none ❑ existing 4 ton Constant Volume No Economizer 1,600 0.75 ❑ none ❑ evap cooler 12 hp Constant Volume No Economizer 4,000 0.75 ❑ none ❑ evap cooler 3/4 hp with alec heat Constant Volume No Economizer 4,000 0.75 ❑ none ❑ ❑ ❑ ❑ ❑ ❑ ❑ EnergyPro 5.1 by EnergySoft User Number.' 5511 Run Code: 2010-11-09T15:40:29 0: 10060 Page 25 of 31 MECHANICAL EQUIPMENT DETAILS Part 2 of 2 MECH-5C Project Name Ken Garff Chevrolet/Cadiallac Date 11/9/2010 ZONE SYSTEM SUMMARY SYSTEM VAV Fan E $ 7 O �' a w y d A T LL 0 v c W -- Min CFM Zone Name System Name Type Ot . Heating_Cooling Ratio Reheat Coil CFM BHP Outside Air ❑ Cl ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 1 ❑ ❑ ❑ 1 ❑ ❑ EXHAUST FAN SUMMARY EXHAUST FAN E °E o EM T*i LL W EXHAUST FAN ° o M 23� a W EXHAUST FAN E ° 2 o E2 2:1� a w Room Name Ot . CFM BHP Room Name Ot . CFM BHP Room Name Ot . CFM BHP 140,141 existing service and wast 2.0 7,500 0.60 ❑ Cl ❑ new service 137 2.0 7,500 0.60 ❑ ❑ 1 ❑ ❑ ❑ ❑ ❑ ❑ ❑ EnergyPro 5.1 by EnergySoft User Number: 5511 RunCode: 2010-11-09715:40:29 /D: 10060 Page 26 of 31 ENVELOPE MANDATORY MEASURES: NONRESIDENTIAL ENV -MM Project Name Date Ken Garff ChevrolebCadiallac 11/9/2010 DESCRIPTION Building Envelope Measures: §118(a): Installed insulating material shall have been certified by the manufacturer to comply with the California Quality Standards for insulating material, Title 20 Chapter 4, Article 3. §118(c): All Insulating Materials shall be installed in compliance with the flame spread rating and smoke density requirements of Sections 2602 and 707 of Title 24, Part 2. §118(f): The opaque portions of framed demising walls in nonresidential buildings shall have insulation with an installed R -value of no less than R-13 between framing members. 17 a All Exterior Joints and openings in the building that are observable sources of air leakage shall be caulked, gasketed, §1 ()' weatherstripped or otherwise sealed. Manufactured fenestration products and exterior doors shall have air infiltration rates not exceeding 0.3 cfm/ft.2 of §116(a),1: window area, 0.3 cfm/ft.2 of door area for residential doors, 0.3 cfm/ft.2 of door area for nonresidential single doors (swinging and sliding),and 1.0 cfm/ft.2 for nonresidential double doors (swinging). §116(a) 2: Fenestration U -factor shall be rated in accordance with NFRC 100, or the applicable default U -factor. §116(a) 3: Fenestration SHGC shall be rated in accordance with NFRC 200, or NFRC 100 for site -built fenestration, or the applicable default SHGC. §116(b): Site Constructed Doors, Windows and Skylights shall be caulked between the unit and the building, and shall be weatherstripped (except for unframed glass doors and fire doors). d Enem YPro 5.1 by EnemySoft User Number: 5511 RunCode: 2010-11-09715:40:29 ID: 10060 Page 27 of 31 N J LIGHTING MANDATORY MEASURES: NONRESIDENTIAL LTG -MM Project Name Date Ken Garff ChevroletlCadiallac 11/9/2010 Indoor Lighting Measures: §131(d): Shut-off Controls For every floor, all interior lighting systems shall be equipped with a separate automatic control to shut off the lighting. 1. This automatic control shall meet the requirements of Section 119 and may be an occupancy sensor, automatic time switch or other device capable of automatically shutting off the lighting. 2 Override for Building Lighting Shut-off: The automatic building shut-off system is provided with a manual, accessible override switch in sight of the lights. The area of override is not to exceed 5,000 square feet. §119(h): Automatic Control Devices Certified: All automatic control devices specified are certified, all alternate equipment shall be certified and installed as directed by the manufacturer. §111: Fluorescent Ballast and Luminaires Certified: All fluorescent fixtures specified for the project are certified and listed in the Directory. All installed fixtures shall be certified. §131(a): Individual Room/Area Controls: Each room and area in this building is equipped with a separate switch or occupancy sensor device for each area with floor -to -ceiling walls. Uniform Reduction for Individual Rooms: All rooms and areas greater than 100 square feet and more than 0.8 watts §131(b): per square foot of lighting load shall be controlled with bi-level switching for uniform reduction of lighting within the room. Daylight Area Control: All rooms with windows and skylights that are greater than 250 square feet and that allow for §131(c): the effective use of daylight in the area shall have 50% of the lamps in each daylit area controlled by a separate switch; or the effective use of daylight cannot be accomplished because the windows are continuously shaded by a building on the adjacent lot. Diagram of shading during different times of the year is included on plans. §131(c): Display Lighting. Display lighting shall be separately switched on circuits that are 20 amps or less.6. Outdoor Lighting Measures: §130(c)1: Mandatory lighting power determination for medium base sockets without permanently installed ballasts §132(a): All permanently installed luminaires with lamps rated over 100 Watts either have a lamp efficacy of at least 60 lumens per Watt or are controlled by a motion sensor. §132(b): All Luminaires with lamps rated greater than 175 Watts in hardscape area, including parking lots, building entrances, canopies, and all outdoor sales areas meet the Cutoff Requirements. §132(c)1: All permanently installed outdoor lighting meets the control requirements listed. §132(c): Building facades, parking lots, garages, canopies, and outdoor sales areas meet the Multi -Level Lighting Requirements listed. EnergyPro 5.1 by EnergySoft User Number. 5511 Run Code: 2010-11-09715:40:29 /D: 10060 Page 28 of 31 I; CERTIFICATE OF COMPLIANCE SIGN LIGHTING Part 1 of 2 SLTG-1 C Project Name Phase of Construction: ❑ New Construction ❑ Addition m Alteration Date Ken Galff ChevrolebCadiallac Function Type: ❑Outdoor Signs ❑Indoor Signs 111912010 Project Address Compliance Method Used 79225 Highway 111 La Quinta, CA 92253 ❑ Maximum Allowed Lighting Power ❑ Alternate Lighting Sources Documentation Author's Declaration Statement I certify that this Certificate of Compliance documentation is accurate and complete. Signature Name Farzad Tadayon Company Date T -Squared Professional Engineers, Inc. 11/92010 Address EA # 1340 Specialty Dr., Suite E CEPE # City/State/Zip Phone Vista, CA 92081 760.560.0100 Principal Lighting Designer's Declaration Statement • 1 am eligible under Division 3 of the California Business and Professional Code to accept responsibility for the lighting design. • This Certificate of Compliance identifies the lighting features and performance specifications required for compliance with Title 24, Pages 1 and 6 of the California Code of Regulations. • The design features represented on this Certificate of Compliance are consistent with the information provided to document this design on the other applicable compliance forms, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. Name Signature Milton Niederhaus Company Phone T -Squared Professional Engineers, Inc. 760.560.0100 Address License # 1340 Specialty Dr., Suite E E8636 City/State/Zip Date Vista, CA 92081 11/09/2010 Sign Mandatory Measures E0.2 Indicate location on building plans of Mandatory Sign Measures Note Block: Ma datory Sign Lighting Controls YES No 1 §133(a)1. All signs with permanently connected lighting are controlled with an authomatic time switch control that complies with the applicable requirements of 119. ❑ ❑ §133(a)2. All outdoor signs are controlled with a photo control or outdoor astronomical time 2 switch control. ❑ ❑ Exception to §133(a)2. Outdoor signs are in tunnels or large covered areas that require illumination during daylight hours. ❑ ❑ §133(a)3. All outdoor signs are controlled with a dimmer that provides the ability to automatically reduce sin power by a minimum of 65 percent during nighttime hours. ❑ ❑ Exception 1 to §133(a)3. Signs are illuminated for less than one hour per day during daylight 3 hours. ❑ ❑ Exception 2 to §133(a)3. Outdoor signs are in tunnels or large covered areas that require illumination during daylight hours. ❑ ❑ Exception 3 to §133(a)3. Only metal halide, high pressure sodium, cold cathode, or neon lamps are used to illuminated signs or parts of signs. ❑ ❑ §133(a)4. An Electronic Message Center (EMC) having a new connected lighting power load greater than 15 kW has a control installed is capable of reducing the lighting power by a Y N N/A 4 minimum of 30 percent when receiving a demand response signal that is sent out by the local ❑ ❑ ❑ utilit . Exception to §133(a)4. The EMC is required by a health or life safety statue, ordinance, or Y N N/A regulation, including but not limited to exit signs and traffic signs. 1 ❑ ❑ ❑ EnemyPro 5.1 by EnemySoft User Number: 5511 RunCode: 2010-11-09T15:40:2 /D: 10060 Page 29 of 31 41 CERTIFICATE OF COMPLIANCE (SIGN LIGHTING) (Part 2 of 2) and Field Inspection Energy Checklist SLTG-1 C Project Name Ken Garff ChevroleVCadiallac Date 11/9/2010 Fill-in Columns A and B for all signs. Fill-in Columns C through H only if using the Maximum Allowed Lighting Power compliance method. Fill-in Column I only if using the Alternate Light Source compliance method. Compliance Method Maximum Allowed Lighting Power Alt. Light Source A B C D E F G H 1 J' Sign Symbol or Code Description or location and plan location(ft) Allowed Watts Design Watts' Complies? Y/N Light Source Field Ins ector2 Sign Area Internally (1) or Allowed Externally (E) (I = 12 W/ftz) Allowed Watts = Illuminated E= 2.3 W/ft C x E Total Installed watts for sin Complies if G s F From List Below N a LL J -box Signage Alternate 910 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Total Sign Area 1. Design Watts = total connected lighting load installed in the sign, including power used by lamps, ballasts, transformers, power supplies, etc. 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. Use additional sheets if necessary. Alternate Lighting Source Compliance Method: The si n s identified above; use only one or more of the following technologies: list all applicable numbers that apply in column I above 1 High pressure sodium lamps 2 Pulse start or ceramic metal halide lamps served by a ballast with z 88% efficiency 3 Pulse start metal halide lamps that are 5 320 watts, are not 250 watt or 175 watt lamps, and are served by a ballast with a 80% efficiency 4 Neon or cold cathode lamps with transformer or power supply efficiency a 75% with rated output current < 50 mA 5 Neon or cold cathode lamps with transformer or power supply efficiency ? 68% with rated output current >_ 50 mA 6 Fluorescent lamps with a minimum color rendering index CRI of 80 7 Light emitting diodes LEDs with a power supply with ? 80% efficiency Single voltage LED external power supplies designed to convert 120 volt AC input into lower voltage DC or AC output, having a nameplate output power less than or equal to 250 watts, and 8 certified to the Energy Commission as complying with the applicable requirements of the Appliance Efficiency Regulations Title 20 9 Compact fluorescent lamps that do not contain a medium screw base sockets E24/E26 10 Electronic ballasts with a fundamental output frequency z 20 kHz Field Inspector Notes or Discrepancies EnergyPro 5.1 by EnerqySoft User Number: 5511 Run Code: 2010-11-09T15:40:29 /D: 10060 Page 30 of 31 L 4 MECHANICAL MANDATORY MEASURES: NONRESIDENTIAL MECH-MM Project Name Date Ken Garff ChevroletlCadiallac 11/9/2010 Equipment and System Efficiencies §111: Any appliance for which there is a California standard established in the Appliance Efficiency Regulations will comply with the applicable standard. §115(a): Fan type central furnaces shall not have a pilot light. §123: Piping, except that conveying fluids at temperatures between 60 and 105 degrees Fahrenheit, or within HVAC equipment, shall be insulated in accordance with Standards Section 123. §124: Air handling duct systems shall be installed and insulated in compliance with Sections 601, 602, 603, 604, and 605 of the CMC Standards. Controls §122(e): Each space conditioning system shall be installed with one of the following: 1 A. Each space conditioning system serving building types such as offices and manufacturing facilities (and all others not explicitly exempt from the requirements of Section 112 (d)) shall be installed with an automatic time switch with an accessible manual override that allows operation of the system during off -hours for up to 4 hours. The time switch shall be capable of programming different schedules for weekdays and weekends and have program backup capabilities that prevent the loss of the device's program and time setting for at least 10 hours if power is interrupted; or 1 B. An occupancy sensor to control the operating period of the system; or 1 C. A 4 -hour timer that can be manually operated to control the operating period of the system. 2 Each space conditioning system shall be installed with controls that temporarily restart and temporarily operate the system as required to maintain a setback heating and/or a setup cooling thermostat setpoint. Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000 §122(8)' square feet shall be provided with isolation zones. Each zone: shall not exceed 25,000 square feet; shall be provided with isolation devices, such as valves or dampers that allow the supply of heating or cooling to be setback or shut off independently of other isolation areas; and shall be controlled by a time control device as described above. §122(c): Thermostats shall have numeric setpoints in degrees Fahrenheit (F) and adjustable setpoint stops accessible only to authorized personnel. 22 b §1 ()' Heat pumps shall be installed with controls to prevent electric resistance supplementary heater operation when the heating load can be met by the heat pump alone Each space conditioning system shall be controlled by an individual thermostat that responds to temperature within the zone. Where used to control heating, the control shall be adjustable down to 55 degrees F or lower. For cooling, the §122(a&b): control shall be adjustable up to 85 degrees F or higher. Where used for both heating and cooling, the control shall be capable of providing a deadband of at least 5 degrees F within which the supply of heating and cooling is shut off or reduced to a minimum. Ventilation §121(e): Controls shall be provided to allow outside air dampers or devices to be operated at the ventilation rates as specified on these plans. §122(f): All gravity ventilating systems shall be provided with automatic or readily accessible manually operated dampers in all openings to the outside, except for combustion air openings. Ventilation System Acceptance. Before an occupancy permit is granted for a newly constructed building or space, or a §121(f): new ventilating system serving a building or space is operated for normal use, all ventilation systems serving the building ors ace shall be certified as meeting the Acceptance Requirements for Code Compliance Service Water Heating Systems §113(c) Installation 3. Temperature controls for public lavatories. The controls shall limit the outlet Temperature to 110° F. 2 Circulating service water -heating systems shall have a control capable of automatically turning off the circulating pump when hot water is not required. EnergyPro 5.1 by EnergySoft User Number. 5511 RunCode: 2010-11-09T15:40:29 /D: 10060 Page 31 of 31