10-1109 (RC) Title 24BUILDING ENERGY ANALYSIS REPORT
PROJECT:
Ken Garff Chevrolet/Cadiallac
79225 Highway 111
La Quinta, CA 92253
Project Designer:
'- Walt Wagner
815 Civic Center Drive
Oceanside, CA 92054
760.729.0533
Report Prepared by:
Farzad Tadayon
T -Squared Professional -Engineers, Inc.
1340 Specialty Dr., Suite E
Vista, CA 92081
760.560.0100
RECEIvED
NOV 1.2 2010
Job Number: CITY OF LA QUINTA
10060 BUILDING & SAFETY DEPT.
APPROVED
Date: FOR CONSTRUCTION
i
11/9/2010 DATE « t� ZOtoBY
D - Iii
The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is
authorized by the California Energy Commission for use with both the Residential and Nonresidential 2008 Building Energy Efficiency Standards.
This program developed by EnergySoft, LLC — www.energysoft.com.
EnergyPro 5.1 by EnergySoft User Number. 5511 RunCode: 2010-11-09715:40:29 /D: 10060
V
TABLE OF CONTENTS
Cover Page 1
Table of Contents 2
Nonresidential Performance Title 24 Forms 3
Form ENV -MM Envelope Mandatory Measures 27
Form LTG -MM Lighting Mandatory Measures 28
Form SLTG-1-C Sign Lighting Compliance 29
Form MECH-MM Mechanical Mandatory Measures 31
EnergyPro 5.1 by EnergySoft Job Number. ID: 10060 User Number: 5511
-,+c _.mow - ..,..o.�_� +c..'�•,..Mv.. ..»....�._. _.
PERFORMANCE CERTIFICATE OF COMPLIANCE (Part 1 of 3) PERF -1 C
Project Name
Date
Ken Gaff Chevrolet/Cadiallac
11/9/2010
Project Address
Climate Zone
Total Cond. Floor Area
Addition Floor Area
79225 Highway 111 La Quinta
CA Climate Zone 15
23,635
7,674
GENERAL INFORMATION
Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Relocatable - indicate ❑ specific climate zone ❑ all climates
Phase of Construction: ❑ New Construction ❑ Addition ® Alteration
STATEMENT OF COMPLIANCE
This certificate of compliance lists the building features and specifications needed to
comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This
certificate applies only to a Building using the performance compliance approach.
The documentation author hereby certifies that the documentation is accurate and complete.
Documentation Author
Name Farzad Tadayon
Signature
Company T -Squared Professional Engineers, Inc. Date 11/9/1010
Address 1340 Specialty Dr., Suite E Phone 760.560.0100
City/State/Zip Vista, CA 92081
The Principal Designer hereby certifies that the proposed building design represented in this set of
construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with
any other calculations submitted with this permit application. The proposed building has been designed to meet the energy
efficiency requirements contained in sections 110, 116 through 118, and 140 through 149 of Title 24, Part 6. Please
check one:
ENV. LTG. MECH.
I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to
❑ sign this document as the person responsible for its preparation; and that I am licensed in the State of
California as a civil engineer, mechanical engineer, electrical engineer, or I am a licensed architect.
I affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code by section
❑ ❑ ❑ 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed
contractor performing this work.
affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document
❑ ❑ ❑ because it pertains to a structure or type of work described as exempt pursuant to Business and Professions
Code Sections 5537, 5538 and 6737.1.
Principal Envelope Designer
Name Walt Wagner
Signature
Company Walt Wagner Date
Address 815 Civic Center Drive Li ense #
City/State/Zip Oceanside, CA 92054 hone 760.729.0533
Principal Mechanical Designer
Name Farzad Tadayon
Signature
Company T -Squared Professional Engineers, Inc. Date 11/09/2010
Address 1340 Specialty Dr., Suite E License # M29230
City/State/Zip Vista, CA 92081 Phone 760.560.0100
Principal Lighting Designer
I OF
Name Milton Niederhaus
Signal
Company T -Squared Professional Engineers, Inc. Date 11/09/2010
Address 1340 Specialty Dr., Suite E License # E8636
City/State/Zip Vista, CA 92081 Phone 760.560.0100
INSTRUCTIONS TO APPLICANT COMPLIANCE & WORKSHEETS (check box if worksheets are included)
m ENV -1C Certificate of Compliance. Required on plans. m MECH-1C Certificate of Compliance. Required on plans.
m LTG -1 C Certificate of Compliance. Required on plans. m MECH-2C AirMater Side/Service Hot Water & Pool Requirements.
❑ LTG -2C Lighting Controls Credit Worksheet. m MECH-3C Mechanical Ventilation and Reheat.
❑ LTG -3C Indoor Lighting Power Allowance. m MECH-5C Mechanical Equipment Details.
Energ Pro 5.1 by Energ Soft User Number. 5511 RunCode: 2010-11-09T15:40:29 /D: 10060 Page 3 of 31
t
PERFORMANCE CERTIFICATE OF COMPLIANCE
Project Name
Ken Garff Chevrolet/Cadiallac
ANNUAL TDV ENERGY USE SUMMARY (kBtu/sgft-yr)
Standard Proposed Compliance
Energy Component Design Design Margin
Space Heating
Space Cooling
Indoor Fans
Heat Rejection
Pumps & Misc.
Domestic Hot Water
Lighting
Receptacle
Process
Process Lighting
TOTALS
42.91
65.90
-22.99
450.47
357.26
93.21
92.80
92.86
-0.06
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
62.23
70.52
-8.29
65.78
65.78
0.00
0.00
0.00
0.00
0.00
0.001
0.00
714.18
652.32
61.87
Percent better than Standard
GENERAL INFORMATION
8.7% 1 1 8.7%
Part 2of3
Heating
Cooling
Fans
Heat Rej
Pumps
DHW
Lighting
Receptacle
Process
Process Ltg
BUILDING COMPLIES
PERF -1 C
Date
11/9/2010
Building Orientation (N) 0 deg Conditioned Floor Area 23,635 sqft.
Number of Stories 1 Unconditioned Floor Area 0 sqft.
Number of Systems 15 Conditioned Footprint Area 0 sqft.
Number of Zones 10 Natural Gas Available On Site No
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Total
Roof
Orientation Gross Area
(N)
Z218
(E)
2,092
(S)
2,213
(K9
2,324
8,847
23,635
Prescriptive Lighting Power Density
Prescriptive Envelope TDV Energy
Remarks:
Standard
0.890 W/sqft
718,653
sqft.
sqft.
sqft.
sqft.
sqft.
sqft.
Glazinn Area
359
956
677
0
1,992
0
Proposed
1.008 W/sqft.
1,260,116
sqft.
sqft.
sqft.
sqft.
sqft.
sqft.
Glazing Ratio
16.2
45.7
30.6
0.0
22.5
0.0
Prescriptive Values for
Comparison only. See
LTG -1 C for allowed LPD.
i tnermawro 6.7 Dy tnergvcoon user NumDer. 6677 RunCode: 2010-11-09T15:40:29 ID: 10060 Page 4 of 31 1
PERFORMANCE CERTIFICATE OF COMPLIANCE (Part 3 of 3) PERF -1 C
Project Name
Ken Garff Chevrolet/Cadiallac
Date
11/9/2010
ZONE INFORMATION
System Name
Zone Name
Occupancy Type
Floor
Area
(sqft.)
Inst.
LPD
W/sf'
Ctrl.
Credits
W/Sf 2
Allowed LPD
Proc.
Loads
W/Sf
Area Tailored
W/sf 3 W/Sf °
existing 7-1/2 ton
retail
Tenant Lease Space
5,845
1.458
office —250 sqft
Office — 250 sqft
1,009
1.211
office > 250 sgft
Office > 250 sqft
437
1.826
corridor/restroom/support
Corridor/Restroom/Support
1,736
1.014
existing 4 ton
once —250 sqft
Office — 250 sqft
358
1.274
Training
Classroom, Lecture, Traininc
321
0.773
corridor/restroom/support
Corridor/Restroom/Support
142
0.873
new evap cooler 1/2 hp
service bay
Auto Repair
6,082
0.775
storage
Corridor/Restroom/Support
2,129
0.915
new evap cooler 3/4 hp
service bay
Auto Repair
5,576
0.723
Notes: 1. See LTG -1C 2. See LTG -2C 3. See LTG -3C 4. See LTG -4C
items marked with asterisk, see LTG -1 -C by others) (by others
Items above require special documentation
EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST
The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written
justification and documentation, and special verification to be used with the performance approach. The local enforcement agency
determines the adequacy of the justifications, and may reject a building or design that otherwise complies based on the adequacy of the
special justification and documentation submitted.
The HVAC System evap cooler 1!2 hp includes an Evaporative Cooling System.
The HVAC System evap cooler 1/2 hp has the Supply Fan Motor mounted externally, outside the Conditioned Air Stream.
The HVAC System evap cooler 3/4 hp with a/ec heat includes an Evaporative Cooling System.
The HVAC System evap cooler 3/4 hp with a/ec heat has the Supply Fan Motor mounted externally, outside the Conditioned Air Stream.
The exceptional features listed in this performance approach application have specifically been reviewed. Adequate written justification and
documentation for their use have been provided by the applicant.
Authorized Signature or Stamp
Energ Pro 5.1 by Energ Soft User Number. 5511 RunCode: 2010-11-09T15:40:29 /D: 10060 Page 5 of 31
CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV -1 C
AND FIELD INSPECTION ENERGY CHECKLIST
Project Name
Ken Gaff Chevrolet/Cadiallac
Date
1 11/9/2010
Project Address
79225 Highway 111 La Quinta
Climate Zone
15
Total Cond. Floor Area
23,635
Addition Floor Area
7,674
GENERAL INFORMATION
Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Schools (Public School) ❑ RRledlocatable g. Public School ® Conditioned Spaces 13Unconditioned Spaces
❑ Skylight Area for Large Enclosed Space >_ 8000 ft2 (If checked include the ENV -4C with submittal)
Phase of Construction: ❑ New Construction ❑ Addition m Alteration
Approach of Compliance: ❑ Component ® Overall Envelope ❑ Unconditioned (file affidavit)
Front Orientation: N, E, S, W or in Degrees:
0 deg
FIELD INSPECTION ENERGY CHECKLIST
OPAQUE SURFACE DETAILS
INSULATION
Ta /ID'
AssemblyType 2
y
¢
c
cN
d
Oz
M
°°
Rj
U o
«°
x m
w >
°
2—t
x°
w U.
.R
m
>
ll
c
E U.
v
c
o
c) w..
nW
m
a
R
u-
1
Roof
3,336
(N)
0.034
R-30
4.2.2-A40
Existing
❑
❑
2
Wall
211
(E)
0.074
R-19
4.3.1-A5
Existing
❑
❑
3
Wall
89
(N)
0.074
R-19
4.3.1-A5
Existing
❑
❑
4
Wall
126
(S)
0.074
R-19
4.3.1-A5
Existing
❑
❑
5
Roof
1,156
(N)
0.034
R-30
4.2.2-A40
New
❑
❑
6
Wall
299
(E)
0.055
R-30
4.3.1-A10
New
❑
❑
7
Wall
85
(N)
0.055
R-30
4.3.1-A10
New
❑
❑
8
Wall
85
(S)
0.055
R-30
4.3.1-A10
New
❑
❑
❑
❑
❑
❑
1. See Instructions in the Nonresidential Compliance Manual, page 3-96.
2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance.
FENESTRATION SURFACE DETAILS
Tag/ID'
Fenestration
Type 2
C;
¢
C
0 3
C
" w
O Z
M
ALL
2>
M
LL 'o
> rn
V
2
�
2-
ci
_ 'o
co N
c
>
O
y
.c°.
'C
o
v N
y
a
u-
1
Window
557
(E)
0.710
Defauftl
0.600
Default
❑
Existing
❑
❑
2
Window
180
(N)
0.710
Default
0.600
Default
❑
Existing
❑
❑
3
Window
259
(S)
0.710
Default
0.600
Default
❑
Existing
❑
❑
4
Window
399
(E)
0.340
COG
0.380
COG
❑
New
❑
❑
5
Window
179
(N)
0.340
COG
0.380
COG
❑
New
❑
❑
6
Window
179
(S)
0.340
COG
0.380
COG
❑
New
❑
❑
7
Window
239
(S)
0.710
Default
0.600
Default
m
Existing
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
1. See Instructions in the Nonresidential Compliance Manual, page 3-96.
2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary.
EnergyPro 5.1 by EnergySoft User Number. 5511 Run Code: 2010-11-09T15:40:29 /D: 10060 Page 6 of 31
CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV -1 C
AND FIELD INSPECTION ENERGY CHECKLIST
Project Name
Ken Garff Chevrolet/Cadiallac
Date
1 11/9/2010
Project Address
79225 Highway 111 La Quinta
Climate Zone
15
Total Cond. Floor Area
23,635
Addition Floor Area
7,674
GENERAL INFORMATION
Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Schools (Public School) ❑ Bldocatable Public School ® Conditioned Spaces ❑ Unconditioned Spaces
❑ Skylight Area for Large Enclosed Space >_ 8000 ft2 (If checked include the ENV -4C with submittal)
Phase of Construction: ❑ New Construction ❑ Addition m Alteration
Approach of Compliance: ❑ Component m Overall Envelope ❑ Unconditioned (file affidavit)
Front Orientation: N, E, S, W or in Degrees:
0 deg
FIELD INSPECTION ENERGY CHECKLIST
OPAQUE SURFACE DETAILS
INSULATION
Ta /ID'
Assembly Type 2
a
r
UFf0
O z
7'r
0
M:
v o�
N
y O
W
w>
r3
K
w a
'O d
lO
5>
5 u.
xc
a4
a
ON N7
O«
v cn
NV
W
a
.n
.A
a
9
Roof
1,353
(N)
0.034
R-301
4.2.2-A40
Existing
❑
❑
10
Wall
153
(S)
0.074
R-19
4.3.1-A5
Existing
❑
❑
11
Roof
133
(N)
0.034
R-30
4.2.2-A40
Existing
❑
❑
12
Roof
134
(N)
0.034
R-30
4.2.2-A40
Existing
❑
❑
13
Roof
101
(N)
0.034
R-30
4.2.2-A40
Existing
❑
❑
14
Roof
153
(N)
0.034
R-30
4.2.2-A40
Existing
❑
❑
15
Roof
129
(N)
0.034
R-30
4.2.2-A40
Existing
❑
❑
16
Roof
132
(N)
0.034
R-30
4.2.2-A40
Existing
❑
❑
❑•
❑
❑
❑
1. See Instructions in the Nonresidential Compliance Manual, page 3-96.
2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance.
FENESTRATION SURFACE DETAILS
Tag/ID'
Fenestration
Type 2
a
°
W
O Z
0
A
A a
2>
0
A
a 'o
> rn
V
=
N
2—
U
= 'o
N cn
m
c
E
>
O
r-
O
0 7
o :°
v N
a
m
a
,�
LL
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
1. See Instructions in the Nonresidential Compliance Manual, page 3-96.
2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary.
EnergyPro 5.1 by EnergySoft User Number: 5511 RunCode: 2010-11-09T15:40:29 /D: 10060 Page 7 of 31
CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV-1 C
AND FIELD INSPECTION ENERGY CHECKLIST
Project Name
Ken Garff ChevrolebCadiallac
Date
11/9/2010
Project Address
79225 Highway 111 La Quinta
Climate Zone
15
Total Cond. Floor Area
23,635
Addition Floor Area
7,674
GENERAL INFORMATION
Building Type: ® Nonresidential ❑ High-Rise Residential ❑ Hotel/Motel Guest Room
❑ Schools (Public School) ❑ Blellocatable Public School m Conditioned Spaces ❑ Unconditioned Spaces
❑ Skylight Area for Large Enclosed Space >_ 8000 ft2 (If checked include the ENV-4C with submittal)
Phase of Construction: ❑ New Construction ❑ Addition m Alteration
Approach of Compliance: ❑ Component m Overall Envelope ❑ Unconditioned (file affidavit)
Front Orientation: N, E, S, W or in Degrees:
0 deg
FIELD INSPECTION ENERGY CHECKLIST
OPAQUE SURFACE DETAILS
INSULATION
Ta /ID'
AssemblyType 2
a
c
cN
N u
O z
4
n
y�
'>
v of
o°
02
w>
E4)
r
w LL
3
5>
°c
E-
-
LL
v
aci
d
CL
a
°oma
0
U N
a
LL
17
Roof
227
(N)
0.034
R-30
4.2.2-A40
Existing
❑
❑
18
Roof
437
(N)
0.034
R-30
4.2.2-A40
Existing
❑
❑
19
Roof
128
(N)
0.034
R-30
4.2.2-A40
Existing
❑
❑
20
Roof
119
(N)
0.034
R-30
4.2.2-A40
Existing
❑
❑
21
Roof
86
(N)
0.034
R-30
4.2.2-A40
Existing
❑
❑
22
Roof
182
(N)
0.034
R-30
4.2.2-A40
Existing
❑
❑
23
Roof
120
(N)
0.034
R-30
4.2.2-A40
Existing
❑
❑
24
Roof
476
(N)
0.034
R-30
4.2.2-A40
Existing
❑
❑
❑
❑
❑
❑
1. See Instructions in the Nonresidential Compliance Manual, page 3-96.
2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance.
FENESTRATION SURFACE DETAILS
Tag/ID'
Fenestration
Type 2
v
Q
°�
U)
w
O Z>
°
U
LL
0 d
U `
LL o
> rn
U
c7
X
N
2S
d
s 'o
CO N
rn
R
>
O
c
o ;°
V N
W
a
LL
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
1. See Instructions in the Nonresidential Compliance Manual, page 3-96.
2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary.
EnergyPro 5.1 by EnergySoft User Number: 5511 Run Code: 2010-11-09T15:40:29 /D: 10060 Page 8 of 31
CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV -1 C
AND FIELD INSPECTION ENERGY CHECKLIST
Project Name
Ken Garff Chevrolet/Cadiallac
Date
1 111912010
Project Address
79225 Highway 111 La Quinta
Climate Zone
15
Total Cond. Floor Area
23,635
Addition Floor Area
7,674
GENERAL INFORMATION
Building Type: RI Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Schools (Public School) ❑ Bledlocatable g. Public School ® Conditioned Spaces 13 Unconditioned Spaces
❑ Skylight Area for Large Enclosed Space >_ 8000 ft (If checked include the ENV -4C with submittal)
Phase of Construction: ❑ New Construction ❑ Addition to Alteration
Approach of Compliance: ❑ Component ® Overall Envelope ❑ Unconditioned (file affidavit)
Front Orientation: N, E, S, W or in Degrees:
0 deg
FIELD INSPECTION ENERGY CHECKLIST
OPAQUE SURFACE DETAILS
INSULATION
Ta /ID'
Assembly Type 2
V
d
a
c
O
C V1
N W
O z
V
V
LL'j
M
M j
f0
B¢
O O
d 7
X l0
w>
O C
d 'i
7
w a
O d
ce l
l0
I >
O C
iV `
7
c LL
e
x
C
C a
p O.
r
fd
C r
O «
U cn
H
lCip
a
a
25
Roof
71
(N)
0.034
R-301
4.2.2-A40
Existing
❑
❑
26
Roof
204
(N)
0.034
R-30
4.2.2-A40
Existing
❑
❑
27
Roof
350
(N)
0.034
R-30
4.2.2-A40
Existing
❑
❑
28
Roof
200
(N)
0.034
R-30
4.2.2-A40
Existing
❑
❑
29
Roof
158
(N)
0.034
R-30
4.2.2-A40
Existing
❑
❑
30
Roof
321
(N)
0.034
R-30
4.2.2-A40
Existing
❑
❑
31
Wall
90
(N)
0.074
R-19
4.3.1-A5
Existing
❑
❑
32
Roof
72
(N)
0.034
R-30
4.2.2-A40
Existing
❑
❑
❑
❑
❑
❑
1. See Instructions in the Nonresidential Compliance Manual, page 3-96.
2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance.
FENESTRATION SURFACE DETAILS
Tag/ID'
Fenestration
Type 2
N
¢
0
03
Cy
0 w
O Z
r
U
LL
2>
r
U `
LL 'o
> y
V
=
r^
U V
s 'o
N Cl)
r-
C
L
O
c
H
: 7
o
06
a
LL
13
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
1 ❑
1. See Instructions in the Nonresidential Compliance Manual, page 3-96.
2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary.
EnergyPro 5.1 by EnergySoft User Number. 5511 Run Code: 2010-11-09T15:40:29 ID: 10060 Page 9 of 31
CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV -1 C
AND FIELD INSPECTION ENERGY CHECKLIST
Project Name
Ken Garff Chevrolet/Cadiallac
Date
1 11/9/2010
Project Address
79225 Highway 111 La Quinta
Climate Zone
15
Total Cond. Floor Area
23,635
Addition Floor Area
7,674
GENERAL INFORMATION
Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Schools (Public School) ❑ Blldlocatable Public Schoolg. m Conditioned Spaces ❑ Unconditioned Spaces
❑ Skylight Area for Large Enclosed Space >_ 8000 ft2 (If checked include the ENV -4C with submittal)
Phase of Construction: ❑ New Construction ❑ Addition m Alteration
Approach of Compliance: ❑ Component m Overall Envelope ❑ Unconditioned (file affidavit)
Front Orientation: N, E, S, W or in Degrees: 0 deg
FIELD INSPECTION ENERGY CHECKLIST
OPAQUE SURFACE DETAILS
INSULATION
Ta /ID'
Assembly Type 2
^
y
a
cX
C
cN
m ui
6 z
O
ti
:
0)
r
>;
as
U¢
O`
c
m
% �o
W>
`.�
c �
d '�
tK
W LL
° m
m
>
° C
y '�
LL
a
aci
c a
p a
-� a
c
O
v
c
o ..
v N
a
m
a
=
A
LL
33
Wall
66
(N)
0.074
R-19
4.3.1-A5
Existing
❑
❑
34
Roof
70
(N)
0.034
R-30
4.2.2-A40
Existing
❑
❑
35
Wall
64
(N)
0.074
R-19
4.3.1-A5
Existing
❑
❑
36
Wall
1,022
(S)
0.510
None
4.3.6-F1
Existing
❑
❑
37
Wall
1,158
(1M
0.510
None
4.3.6-F1
Existing
❑
❑
38
Roof
6,082
(N)
1 0.034
R-30
4.2.2-A40
Existing
❑
❑
39
Wall
289
(N)
0.510
None
4.3.6-F1
Existing
❑
❑
40
Roof
1,187
(N)
0.034
R-30
4.2.2-A40
Existing
❑
❑
❑
❑
❑
❑
1. See Instructions in the Nonresidential Compliance Manual, page 3-96.
2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance.
FENESTRATION SURFACE DETAILS
Tag/ID'
Fenestration
Type 2
03
;v
a
c
g3
2 vi
c
y W
c
O Z
X 0f
ALL
2>
8 d
LL l0 2
o
> Cl)
V
C7
Z
X rn
m^
2¢
v
C)
is 7
z o
W N
a
E
0)
>
O
c
y
C "'
o :4
06
y
A
a
"
LL
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
1. See Instructions in the Nonresidential Compliance Manual, page 3-96.
2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary.
EnergyPro 5.1 by EnergySoft User Number: 5511 Run Code: 2010-11-09T15:40:29 /D: 10060 Pae 10 of 31
CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV -1 C
AND FIELD INSPECTION ENERGY CHECKLIST
Project Name
Ken Garff ChevrolebCadiallac
Date
11/9/2010
Project Address
79225 Highway 111 La Quinta
Climate Zone
15
Total Cond. Floor Area
23,635
Addition Floor Area
7,674
GENERAL INFORMATION
Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Schools (Public School) ❑ Bldg. Public School ® Conditioned Spaces 13 Unconditioned Spaces
❑ Skylight Area for Large Enclosed Space ? 8000 ft2 (If checked include the ENV -4C with submittal)
Phase of Construction: ❑ New Construction ❑ Addition m Alteration
Approach of Compliance: ❑ Component ® Overall Envelope ❑ Unconditioned (file affidavit)
Front Orientation: N, E, S, W or in Degrees:
0 deg
FIELD INSPECTION ENERGY CHECKLIST
OPAQUE SURFACE DETAILS
INSULATION
Ta /ID'
Assembly Type'
N
Q
C o)
N WIL
O z
U
M
>.
> j
m
c) M
0 O
«
x R
w>
0 C
N`
%
w U.
O d
d
m
>
O C
d`
u-
x
_ C
C O•
o a
-.34
c
O N
C 7
0 :9
L) O
I0
A
a
m
LL
41
Roof
942
(N)
0.034
R-30
4.2.2-A40
New
❑
❑
42
Wall
626
(E)
0.510
None
4.3.6-F1
New
❑
❑
43
Wall
1,176
(N)
0.510
None
4.3.6-F1
New
❑
❑
44
Wall
1,166
(Vv)
0.510
None
4.3.6-F1
New
❑
❑
45
Wall
150
(S)
0.510
None
4.3.6-F1
New
❑
1 ❑
46
Roof
5,576
(N)
0.034
R-30
4.2.2-A40
New
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
1. See Instructions in the Nonresidential Compliance Manual, page 3-96.
2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance.
FENESTRATION SURFACE DETAILS
Tag/ID'
Fenestration
Type 2
n
�
a
c
c�
N
CV
W
O 2
" LL
>
M>
L
o ei
V i'
LL 'o
> y
U
C7
=
^�
°5
v
V`
z 00
N N
rn
�o
-E
O
c
'
D 7
o .4
U to
m
a
LL
13
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
1. See Instructions in the Nonresidential Compliance Manual, page 3-96.
2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary.
EnergyPro 5.1 by EnergySoft User Number.' 5511 RunCode: 2010-11-09T15:40:29 /D: 10060 Pae 11 of 31
CERTIFICATE OF COMPLIANCE (Part 2 of 3)
AND FIELD INSPECTION ENERGY CHECKLIST
ENV -1 C
Project Name
Ken Gaff ChevrolebCadiallac
Date
11/9/2010
ROOFING PRODUCT COOL ROOFS
(Note if the roofing product is not CRRC certified, this compliance approach cannot be used). Go to Overall Envelope Approach or
Performance Approach.
CHECK APPLICABLE BOX BELOW IF EXEMPT FROM THE ROOFING PRODUCT "COOL ROOF" REQUIREMENTS:
Pass
Fail'
N/A
❑ Roofing compliance not required in Climate Zones 1 andl6 with a Low -Sloped. 2:12 pitch or less.
❑
❑
❑
❑ Roofing compliance not required in Climate Zone 1 with a Steep -Sloped with less than 5 Ib/ft2. Greater than 2:12 pitch.
❑
❑
❑
Wood framed roofs in Climate Zones 3 and 5 are exempted, solar reflectance and thermal emittance or
13SRI
SRI that have a U -factor of 0.039 or lower. See Opaque Surface Details roof assembly, Column H of ENV -2C.
13
13
❑
❑ Low -sloped Metal building roofs in Climate Zone 3 and 5 are exempted, solar relectance and thermal emittance or SRI
that have a U -f actor of 0.048 or lower. See Opaque Surface Details roof assembly below, Column H of ENV -2C.
❑
❑
❑
❑ The roof area covered by building integrated photovoltaic panels and building integrated solar thermal panels are
exempted. Solar reflectance and thermal emittance or SRI, seespreadsheet calculator at www.energy.ca.gov/title24/
❑
❑
❑
❑ Roof constructions that have thermal mass over the roof membrane with a weight of at least 25 Ib/ft are exempt from
the Cool Roof criteria below.
❑
❑
❑
❑ High-rise residential buildings and hotels and motels with low -sloped roofs in Climate Zones 1 through 9, 12 and 16 are
exempted from the low -sloped roofing criteria.
❑
❑
❑
1. If Fail then describe on this page of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary.
CRRC Product ID
Number'
Roof Slope
s 2:12 > 2:12
Product Weight
< 51b/ft2 a 51b/ft2
Product
Type 2
Aged Solar
Reflectance
Thermal
Emmitance
SRI5
Pass
Fai16
❑ ❑
❑ ❑
❑ 4
❑
❑
❑ ❑
❑ ❑
❑ 4
❑
❑
❑ ❑
❑ ❑
❑ 4
❑
❑
❑ ❑
❑ ❑
W 1
❑
❑ ❑
❑ ❑
❑ 4
❑
❑
❑ 1 ❑
❑ 1 ❑
❑ 4
❑
❑
1. The CRRC Product ID Number can be obtained from the Cool Roof Rating Council's Rated Product Directory at
www.coolroofs.orq/products/search.php
2. Indicate the type of product is being used for the roof top, i.e. single -ply roof, asphalt roof, metal roof, etc.
3. If the Aged Reflectance is not available in the Cool Roof Rating Council's Rated Product Directory then use the Initial Reflectance value from the
same directory and use the equation (0.2+01(p;r;,;a, — 0.2) to obtain a calculated aged value. Where p is the Initial Solar Reflectance from the Cool
Roof Rating Council's Rated Product Directory.
4. Check box if the Aged Reflectance is a calculated value using the equation above.
5. The SRI value needs to be calculated from a spreadsheet calculator at http://www.enerov.ca.aov/title24/
6. If Fail then describe on this page of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary.
To apply Liquid Field Applied Coatings, the coating must be applied across the entire roof surface and meet the dry mil thickness or coverage
recommended by the coatings manufacturer and meet minimum performance requirements listed in §118(i)4. Select the applicable coating:
❑ Aluminum -Pigmented Asphalt Roof Coating
❑ Cement -Based Roof Coating
❑ Other
Discrepancies:
EnemyPro 5.1 by Enem YSoft User Number: 5511 RunCode: 2010-11-09T15:40:29 /D: 10060
Pae 12 of 31
CERTIFICATE OF COMPLIANCE (Part 3 of 3) ENV -1 C
AND FIELD INSPECTION ENERGY CHECKLIST
Project Name
Ken Garff Chevrolet/Cadiallac
Date
11/9/2010
Required Acceptance Tests
Designer:
This form is to be used by the designer and attached to the plans. Listed below is the acceptance test for Envelope
Fenestrations system. The designer is required to check the acceptance tests and list all the fenestration products that
require an acceptance test. If all the site -built fenestration of a certain type requires a test, list the different fenestration
products and the number of systems. The NA7 Section in the Appendix of the Nonresidential Reference Appendices
Manual describes the test. Since this form will be part of the plans, completion of this section will allow the responsible
party to budget for the scope of work appropriately.
Enforcement Agency:
Systems Acceptance. Before Occupancy Permit is granted for a newly constructed building or space or whenever new
fenestration is installed in the building or space shall be certified as meeting the Acceptance Requirements.
The ENV -2A form is not considered a complete form and is not to be accepted by the enforcement agency unless the
boxes are checked and/or filled and signed. In addition, a Certificate of Acceptance forms shall be submitted to the
enforcement agency that certifies plans, specifications, installation certificates, and operating and maintenance
information meet the requirements of §10-103(b) of Title 24 Part 6. The field inspector must receive the properly filled
out and signed forms before the building can receive final occupancy. A copy of the ENV -2A for each different
fenestration product line must be provided to the owner of the building for their records.
Test Description ENV -2A Test Performed By:
Fenestration Products Name or ID Area of like Building Envelope
Requiring Testing or Verification Products Acceptance Test
new Double Metal Tinted 757
13
13
11
11
EnergyPro 5.1 by EnergySoft User Number. 5511 Run Code: 2010-11-09715:40:29 /D: 10060 Pae 13 of 31
CERTIFICATE OF COMPLIANCE (Part 1 of 3) LTG-1 C
Project Name
Ken Garff Chevroleb'Cadiallac
Date
1 11/9/2010
INDOOR LIGHTING SCHEDULE and FIELD INSPECTION ENERGY CHECKLIST
Installation Certificate, LTG-1- INST Retain a copy and verify form is completed and signed.)
Field Inspector ❑
Certificate of Acceptance, LTG-2A (Retain a coy and verify form is completed and signed.)
Field Inspector ❑
A separate Lighting Schedule Must Be Filled Out for Conditioned and Unconditioned Spaces Installed Lighting Power listed on
this Liqhtinq Schedule is only for:
m CONDITIONED SPACE ❑ UNCONDITIONED SPACE
m The actual indoor lighting power listed below includes all installed permanent and portable lighting systems in accordance
with §146(a).
Only for offices: Up to the first 0.2 watts per square foot of portable lighting shall not be required to be included in the
m calculation of actual indoor lighting power density in accordance with the Exception to §146(a). All portable lighting in excess of
0.2 watts per square foot is totaled below.
Luminaire (Type, Lamps, Ballasts
Installed Watts
A
B
C
D
E
F
G
H
None
or
Item
Ta
Complete Luminaire Description
i.e, 3 lam fluorescent troffer,
F32T8 one dimmable electronic ballasts
a
LL
5
0
U
4i 2
a m
4_ •S
1: �
J
How wattage
Was determined
N
O N
E
3
Z J
X
w m
c
Field
Ins ectoe
CEC
Default
From
NA8
m
��
v co
o w,
v o
Q~
rn
0 W
LL LL
A
150w Metal Halide
❑
168.0
®
❑
44
7,392
❑ ❑
BABE
(3) 2 k Fluorescent T8 Elec
❑
53.0
®
❑
31
1,643
❑ ❑
B11B1E
(3) 2 ft Fluorescent T8 Elec
❑
53.0
®
❑
5
265
❑ ❑
C/CE
(1) 4 It Fluorescent T8 Rapid Start Elec
❑
32.0
®
❑
261
832
❑ ❑
D/DE
(2) 4 ft Fluorescent T8 Rapid Start Elec
❑
62.0
®
❑
72
4,464
❑ ❑
existing
(2) 2 ft U-Tube T8 Elec
❑
62.0
®
❑
4
248
❑ ❑
existing
(4) 4 ft Fluorescent T8 Rapid Start Elec
❑
114.0
0
❑
18
2,052
❑ ❑
existing
(2) 4 ft Fluorescent T8 Rapid Start Elec
❑
62.0
®
❑
105
6,510
❑ ❑
F
(1) 32w Compact Fluorescent Triple 4 Pin Elec
❑
35.0
®
❑
5
175
❑ ❑
GE
(2) 4 ft Fluorescent T8 Rapid Start Elec
❑
62.0
®
❑
2
124
❑ ❑
HE
(4) 4 ft Fluorescent T8 Rapid Start Elec
❑
114.0
®
❑
1
114
❑ ❑
❑
❑
❑
❑ ❑
❑
❑
❑
❑ ❑
❑
❑
❑
❑ ❑
❑
❑
❑
❑ ❑
❑
❑
❑
❑ ❑
❑
❑
❑
❑ ❑
❑
❑
❑
❑ ❑
❑
❑
❑
❑ ❑
Installed Watts Page Total:
23,819
Building total number of pages:
Installed Watts Building Total
Sum of all pages)
23,819
Enter into LTG-1 C Page 4 of 4
1. Wattage shall be determined according to Section 130 (d and e). Wattage shall be rating of light fixture, not rating of bulb.
2 . If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary.
EnergyPro 5.1 by EnergySoft User Number: 5511 Run Code: 2010-11-09T15:40:29 ID: 10060 Pae 14 of 31
CERTIFICATE OF COMPLIANCE (Part 2 of 3)
LTG -1 C
Project Name
Ken Garff ChevrolebCadiallac
Date
1 11/9/2010
INDOOR LIGHTING SCHEDULE and FIELD INSPECTION ENERGY CHECKLIST
Fill in controls for all spaces: a) area controls, b) multi-level controls, c) manual daylighting controls for daylit areas > 250 ftZ,
automatic daylighting controls for daylit areas > 2,500 ftZ, d) shut-off controls, e) display lighting controls, f) tailored lighting controls —
general lighting controlled separately from display, ornamental and display case lighting and g) demand responsive automatic
controls for retail stores > 50,000 ftZ, in accordance with Section 131.
MANDATORY LIGHTING CONTROLS — FIELD INSPECTION ENERGY CHECKLIST
Field
Ins ector
Number Special
Type/ Description of Units Location in Building Features
Pass
Fail
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
O
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
SPECIAL FEATURES INSPECTION CHECKLIST See Page 2 of 4 of LTG -1C
The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written
justification and documentation, and special verification. The local enforcement agency determines the adequacy of the justification,
and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation
submitted.
Field Inspector's Notes or Discrepancies:
EnergyPro 5.1 by EnergySoft User Number: 5511 RunCode: 2010-11-09715:40:29 /D: 10060
Pae 15 of 31
CERTIFICATE OF COMPLIANCE Part 3 of 3 LTG -1 C
Project Name
Date
Ken Garff Chevrolet/Cadiallac
11/9/2010
CONDITIONED AND UNCONDITIONED SPACE LIGHTING MUST
NOT BE COMBINED FOR COMPLIANCE
Indoor Lighting Power for Conditioned S aces
Indoor Lighting Power for Unconditioned Spaces
Watts
Watts
Installed Lighting
23,819
Installed Lighting
0
from Conditioned LTG -1C, Page 2
from Unconditioned LTG -1 C, Page 2
Lighting Control Credit
0
Lighting Control Credit
0
Conditioned Spaces from LTG -2C
Unconditioned Spaces from LTG -2C
Adjusted Installed —
23,819
Adjusted Installed =
0
Lighting PowerLighting
Power
Complies if Installed:5 Allowed
Complies if Installed:5 Allowed
Allowed Lighting Power
Allowed Lighting Power
Conditioned Spaces from LTG -3C or PERF -1
23.819
Unconditioned Spaces from LTG -3C)0
Required Acceptance Tests
Designer:
This form is to be used by the designer and attached to the plans. Listed below is the acceptance test for the Lighting system,
LTG -2A. The designer is required to check the acceptance tests and list all control devices serving the building or space shall be
certified as meeting the Acceptance Requirements for Code Compliance. If all the lighting system or control of a certain type requires
a test, list the different lighting and the number of systems. The NA7 Section in the Appendix of the Nonresidential Reference
Appendices Manual describes the test. Since this form will be part of the plans, completion of this section will allow the responsible
party to budget for the scope of work appropriately. Forms can be grouped by type of Luminaire controlled.
Enforcement Agency:
Systems Acceptance. Before Occupancy Permit is granted for a newly constructed building or space or when ever new lighting
system with controls is installed in the building or space shall be certified as meeting the Acceptance Requirements.
The LTG -2A form is not considered a complete form and is not to be accepted by the enforcement agency unless the boxes are
checked and/or filled and signed. In addition, a Certificate of Acceptance forms shall be submitted to the enforcement agency that
certifies plans, specifications, installation certificates, and operating and maintenance information meet the requirements of
§10-103(b) of Title 24 Part 6. The field inspector must receive the properly filled out and signed forms before the building can receive
final occupancy. A copy of the LTG -2A for each different lighting luminaire control(s) must be provided to the owner of the building
for their records.
Controls for Credits
LTG -2A
Controls and
Sensors and
Automatic
Number of
Daylighting
Luminaire
Controls
Equipment Re uirin Testing
Description
controls
Location
Acceptance
❑
EnemyPro 5.1 by EneMySoh User Number: 5511 RunCode: 2010-11-09715:40:29 /D: 10060 Pae 16 of 31
CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C
FIELD INSPECTION ENERGY CHECKLIST
Project Name
Ken Gaff ChevrolebCadiallac
Date
11/9/2010
Project Address
79225 Highway 111 La Quinta
Climate Zone
15 —723,635
Total Cond. Floor Area
Addition Floor Area
7,674
GENERAL INFORMATION
Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Schools (Public School) ❑ Relocatable Public School Bldg. m Conditioned Spaces ❑ Unconditioned Spaces
affidavit
Phase of Construction: ❑ New Construction ❑ Addition ® Alteration
Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit)
Energy
Front Orientation: N, E, S, W or in Degrees:
1 0 deg
HVAC SYSTEM DETAILS
FIELD INSPECTION ENERGY CHECKLIST
E ui ment2
Inspection Criteria
Meets Criteria
or Requirements
Pass
Fail — Describe Reason
Item or System Tags
i.e. AC -1 RTU -1, HP -1
existing 7-1/2 ton
❑
❑
Equipment T e3:
Packaged DX
❑
❑
Number of Systems
6
❑
❑
Max Allowed Heating Capacity'
78,000 Btu/hr
❑
❑
Minimum Heating Efficiency'
3.00 COP
❑
❑
Max Allowed Cooling Capacity'
8 6, 000 Btu/hr
❑
❑
Cooling Efficiency'
9.0 EER
❑
❑
Duct Location/ R -Value
R-8.0
❑
❑
When duct testing is required, submit
MECH-4A & MECH-4-HERS
No
❑
❑
Economizer
No Economizer
❑
❑
Thermostat
Setback Required
❑
❑
Fan Control
Constant Volume
❑
❑
E ui ment2
Inspection Criteria
FIELD INSPECTION ENERGY CHECKLIST
Pass
Fail — Describe Reason
Item or System Tags
i.e. AC -1, RTU -1, HP -1
existing 4 ton
❑
❑
Equipment T e3:
Packaged DX
❑
❑
Number of Systems
1
❑
❑
Max Allowed Heating Capacity'
46,500 Btu/hr
❑
❑
Minimum Heating Efficiency'
7.00 HSPF
❑
❑
Max Allowed Cooling Capacity'
46,500 Btu/hr
❑
❑
Cooling Efficiency'
10.0 SEER / 9.0 EER
❑
❑
Duct Location/ R -Value
R-8.0
❑
❑
When duct testing is required, submit
& MECH-4-HERS
NO
❑
13MECH-4A
Economizer
No Economizer
❑
❑
Thermostat
Setback Required
❑
❑
Fan Control
Constant Volume
❑
❑
1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked.
3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other.
EnergyPro 5.1 by EnergySoft User Number: 5511 RunCode: 2010-11-09715:40:29 /D: 10060 Pae 17 of 31
CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C
FIELD INSPECTION ENERGY CHECKLIST
Project Name
Ken Garff ChevrolebCadiallac
Date
11/9/2010
Project Address
79225 Highway 111 La Quinta
Climate Zone
15
Total Cond. Floor Area
23,635
Addition Floor Area
7,674
GENERAL INFORMATION
Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Schools (Public School) ❑ Relocatable Public School Bldg. m Conditioned Spaces ❑ Unconditioned Spaces
affidavit
Phase of Construction: ❑ New Construction ❑ Addition ® Alteration
Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit)
Energy
Front Orientation: N, E, S, W or in Degrees:
0 deg
HVAC SYSTEM DETAILS
FIELD INSPECTION ENERGY CHECKLIST
E ui ment2
Inspection Criteria
Meets Criteria
or Requirements
Pass
Fail — Describe Reason
Item or System Tags
i.e. AC -1 RTU -1 HP -1
new evap cooler 1/2 hp
❑
❑
Equipment T e3:
Evap Cooler
❑
❑
Number of Systems
5
❑
❑
Max Allowed Heating Capacity'
0 Btu/hr
❑
❑
Minimum Heating Efficiency'
n/a
❑
❑
Max Allowed Cooling Capacity'
0 Btu/hr
❑
❑
Cooling Efficiency'
n/a
❑
❑
Duct Location/ R -Value
R-0.0
❑
❑
When duct testing is required, submit
MECH-4A & MECH-4-HERS
No
❑
❑
Economizer
No Economizer
❑
❑
Thermostat
Setback Required
❑
❑
Fan Control
Constant Volume
❑
❑
E ui ment2
Inspection Criteria
FIELD INSPECTION ENERGY CHECKLIST
Pass
Fail — Describe Reason
Item or System Tags
i.e. AC -1, RTU -1, HP -1
new evap cooler 3/4 hp
❑
❑
Equipment T e3:
Evap Cooler
❑
❑
Number of Systems
3
❑
❑
Max Allowed Heating Capacity'
25,600 Btu/hr
❑
❑
Minimum Heating Efficiency'
3.40 HSPF
❑
❑
Max Allowed Cooling Capacity'
0 Btu/hr
❑
❑
Cooling Efficiency'
n/a
❑
❑
Duct Location/ R -Value
R-0.0
❑
❑
When duct testing is required, submit
MECH-4A & MECH-4-HERS
No
[3
❑
Economizer
No Economizer
❑
❑
Thermostat
Setback Required
1 ❑
❑
Fan Control
Constant Volume
1 ❑
❑
1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked.
3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other.
EnergyPro 5.1 by EnergySoft User Number: 5511 Run Code: 2010-11-09T15:40:29 /D: 10060 Pae 18 of 31
CERTIFICATE OF COMPLIANCE and (Part 2 of 4) MECH-1 C
FIELD INSPECTION ENERGY CHECKLIST
Project Name Date
Ken Garff ChevroleNCadiallac 11/9/2010
Discreaancies:
EnergyPro 5.1 by EnerpySoft User Number: 5511 RunCode: 2010.11-09T15:40:29 /D: 10060 Page 19 of 31
CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 3 of 4) MECH-1 C
Project Name
Date
Ken Garff Chevrolet/Cadiallac
11/9/2010
Required Acceptance Tests
Designer:
This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for mechanical systems. The designer is required to check the applicable
boxes by all acceptance tests that apply and listed all equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the equipment description and
the number of systems. The NA number designates the Section in the Appendix of the Nonresidential Reference Appendices Manual that describes the test. Since this form will be
part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately.
Building Departments:
Systems Acceptance: Before occupancy permit is granted for a newly constructed building or space, or a new space -conditioning system serving a building or space is operated for
normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance.
Systems Acceptance: Before occupancy permit is granted. All newly installed HVAC equipment must be tested using the Acceptance Requirements.
The MECH-1 C form is not considered a completed form and is not to be accepted by the building department unless the correct boxes are checked. The equipment requiring testing,
person performing the test (Example: HVAC installer, TAB contractor, controls contractor, PE in charge of project) and what Acceptance test must be conducted. The following
checked -off forms are required for ALL newly installed equipment. In addition a Certificate of Acceptance forms shall be submitted to the building department that certifies plans,
specifications, installation, certificates, and operating and maintenance information meet the requirements of §10-103(b) and Title -24 Part 6. The building inspector must receive the
properly filled out and signed forms before the building can receive final occupancy.
TEST DESCRIPTION
MECH-2A
MECH-3A
MECH-4A
MECH-5A
MECH-6A
MECH-7A
MECH-8A
MECH-9A
MECH-10A
MECH-11 A
Hydronic
Outdoor
Constant
Demand
Supply
System
Automatic
Ventilation
Volume &
Air
Control
Supply
Valve
Water
Variable
Demand
For
Single -Zone
Distribution
Economizer
Ventilation
Fan
Leakage
Temp.
Flow
Shed
Equipment Re uirin Testing or Verification Ot .
VAV & CAV
Unitary
Ducts
Controls
DCV
VAV
Test
Reset
Control
Control
evap cooler 12 hp 5
®
❑
❑
❑
❑
❑
❑
❑
❑
❑
evap cooler 3/4 hp with a/ec heat 3
®
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
EnergyPro 5.1 by EnergySoft User Number: 5511 Run Code: 2010-11-09T15:40:29 0:10060 Page 20 of 31
CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST
(Part 4 of 4) MECH-1 C
Project Name
Ken Garff Chevrolet/Cadiallac
Date
11/9/2010
TEST DESCRIPTION
MECH-12A
MECH-13A
MECH-14A
MECH-15A
Equipment Re uirin Testing
Fault
Detection &
Diagnostics
Ot . for DX Units
Automatic Fault
Detection &
Diagnostics for
Air & Zone
Distributed
Energy Storage
DX AC
Systems
Thermal Energy
Storage (TES)
Systems
Test Performed By:
evap cooler 12 hp
5 ❑
❑
❑
❑
evap cooler 3/4 hp with e/ec heat
3 ❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
EnergyPro 5.1 by EnergySoft User Number: 5511
RunCode: 2010-11-09715:40:29 /D: 10060
Page 21 of 31
AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2C
Project Name Date
Ken Garff ChevrolebCadiallac 11/9/2010
Item or System Tags Indicate Air Systems Type Central, Single Zone, Packa e, VAV, or etc...
i.e. AC -1, RTU -1, HP -1 existing 7-12 ton existing 4 ton new evap cooler 12 hp
Number of Systems 6 1 5
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thermostat
Furnace Controlsffhermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
PRESCRIPTIVE MEASURES
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
Ind
T-24
112(
Lx Page Reference on Plans or Schedule and indicate the
112(b), 11
112(c), 11
121 b
121 b
121(c)
121(c)
122(e)
122(e)
122(f)
122(8)
123
124
144(a &
144(a &
144(c)
144(c)
144(c)
144(d)
144(e)
0
3.00 COP
9.0 EER
Yes
n/a
No
1,832 cfm
No
No
Programmable Switch
Setback Required
Auto
n/a
R-8.0
n/a
292,300 Btu/hr
n/a
431,551 Btu/hr
Constant Volume
Yes
No
No Economizer
Constant Temp
Constant Temp
7.00 HSPF
10.0 SEER 19.0 EER
Yes
n/a
No
283 cfm
No
No
Programmable Switch
Setback Required
Auto
n/a
R-8.0
n/a
29,043 Btu/hr
n/a
40,358 Btu/hr
Constant Volume
Yes
No
No Economizer
Constant Temp
Constant Temp
n/a
n/a
n/a
n/a
No
15,319 cfm
No
No
Programmable Switch
Setback Required
Auto
n/a
R-0.0
n/a
0 Btu/hr
n/a
0 Btu/hr
Constant Volume
Yes
No
No Economizer
Constant Temp
Constant Temp
144(i)
144(k) I No No No
AIR SYSTEM REQUIREMENTS
Part 1 of 2 MECH-2C
Project Name
Date
Ken Garff Chevrolet/Cadiallac
11/9/2010
Indicate
Air Systems Type Central, Single
Zone, Package, VAV, or etc...
Item or System Tags
i.e. AC -1, RTU -1, HP -1
new evap cooler 3/4 hp
Number of Systems
3
Indicate Page Reference on Plans or Schedule and indicate the applicable exception(s)
MANDATORY MEASURES
T-24 Sections
Heating Equipment Efficiency
112(a)
3.40 HSPF
Cooling Equipment Efficiency
112(a)
n/a
HVAC Heat Pump Thermostat
112(b), 112(c)
n/a
Furnace Controls/Thermostat
112(c), 115(a)
n/a
Natural Ventilation
121 b
No
Mechanical Ventilation
121 b
15,000 clm
VAV Minimum Position Control
121 c
No
Demand Control Ventilation
121 c
No
Time Control
122(e)
Programmable Switch
Setback and Setup Control
122(e)
Setback Required
Outdoor Damper Control
122(f)
Auto
Isolation Zones
122
n/a
Pipe Insulation
123
Duct Insulation
124
R-0.0
PRESCRIPTIVE MEASURES
Calculated Design Heating Load
144(a & b
n/a
Proposed Heating Capacity
144(a & b
76,800 Btu/hr
Calculated Design Cooling Load
144(a & b
n/a
Proposed Cooling Capacity
144(a & b
0 Btulhr
Fan Control
144(c)
Constant Volume
DP Sensor Location
144(c)
Supply Pressure Reset (DDC only)
144(c)
Yes
Simultaneous Heat/Cool
144(d)
No
Economizer
144(e)
No Economizer
Heat Air Supply Reset
144(f)
Constant Temp
Cool Air Supply Reset
144(f)
Constant Temp
Electric Resistance Heating'
144
Air Cooled Chiller Limitation
144(i)
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(k)
No
1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary
heat for heat pumps. If electric heat is used
explain which exception(s) to §144(g) apply.
EnergyPro 5.1 by EnergySoft User Number.' 5511
Run Code: 2010-11-09T15:40:29
/D: 10060 Page 23 of 31
MECHANICAL VENTILATION AND REHEAT
MECH-3C
Project Name
Ken Garff Chevrolet/Cadiallac
Date
11/9/2010
MECHANICAL VENTILATION 121 b 2
REHEAT LIMITATION (§144(d))
AREA BASIS
OCCUPANCY BASIS
VAV MINIMUM
A
B
C
D
E
F
G
H
I
J
K
L
M
N
Zone/System
Condition
Area
(ft2
CFM
per
ft
Min CFM
By Area
B X C
Number
Of
People
CFM
per
Person
Min CFM
by
Occupant
E X F
REQ'D
V.A.
Max of
D or G
Design
Ventilation
Air
CFM
50% of
Design Zone
Supply
CFM
B X 0.4
CFM / ft2
Max. of
Columns
H, J, K,
300 CFM
Design
Minimum
Air
Setpoint
Transfer
Air
retail
5,845
0.15
877
877
1,253
office —250 sqft
1,009
0.15
151
14.0
15.0
210
210
210
office > 250 sgft
437
0.15
66
6.2
15.0
94
94
94
corridoNrestroom/support
1,736
0.15
260
18.4
15.0
276
276
276
existing 7-1/2 ton
Total
1,456
1,832
office —250 sgft
358
0.15
54
5.1
15.0
77
77
77
Training
321
0.38
122
122
185
corridor/restroom/support
142
0.15
21
1.4
15.0
21
21
21
existing 4 ton
Total
220
283
service bay
6,082
1.50
9,123
9,123
15,000
storage
2,129
0.15
319
21.3
15.0
319
319
319
new evap cooler 112 hp
Total
9,442
15,319
service bay
5,576
1.50
8,364
55.8
247.5
13,801
13,8011
15,000
new evap cooler 3/4 hp
Total
13,801
15,000
Totals
Column I Total Design Ventilation Air
C Minimum ventilation rate per Section 121, Table 121-A.
E Based on fixed seat or the greater of the expected number of occupants and 50% of the CBC occupant load foregress purposes fors aces without fixed setting.
H Required Ventilation Air REQ'D V.A. is the larger of the ventilation rates calculated on an AREA BASIS or OCCUPANCY BASIS Column D or G).
I Must be greater than orequal to H, or use Transfer Air column N to make up the difference.
J Desi n fan supply CFM Fan CFM x 50%; or the design zone outdoor airflow rate per 121.
K Condition area(ft) x 0.4 CFM / ftz; or
L Maximum of Columns H, J, K, or 300 CFM
M This must be less than orequal to Column L and greater than orequal to the sum of Columns H
plus N.
N Transfer Air must be provided where the Required Ventilation Air (Column H) is greater than the Design Minimum Air (Column M). Where required, transfer air must be greater than or
equal to the difference between the Required Ventilation Air Column H and the Design Minimum Air Column M), Column H minus M.
'by
Ene Pro 5.1 EnergySoft User Number: 5511 Run Code: 2010-11-09715:40:29
/D: 10060
Page 24 of 31
MECHANICAL EQUIPMENT DETAILS
Part 1 of 2
MECH-5C
Project Name
Ken Garff Chevrolet/Cadiallac
Date
11/9/2010
CHILLER AND TOWER SUMMARY
PUMPS
Equipment Name Type
Ot . Eff iciency
Premium
Tons aty. GPM BHP Eff. Motor
Pump
Control
❑
DHW / BOILER SUMMARY
System Name Type
Distribution Ot .
Vol. Energy Factor
Rated Input (Gals). or RE
Standby Loss Tank Ext.
or Pilot R -Value
Status
MULTI -FAMILY CENTRAL WATER HEATING DETAILS
Hot Water Pump
Hot Water iping Length ft
Control Ot . HP
Type
In Plenum Outside Buried I Add'/z" Insulation
13
CENTRAL SYSTEM RATINGS
HEATING
COOLING
System Name Type
Ot . Output
Aux, kW Eff iclency Output
Eff iciency
Status
existing 7-1/2 ton Packaged DX
6 78,000
0.0 3.00 COP 86,000
9.0 EER
Existing
existing 4 ton Packaged DX
1 46,500
0.0 7.00 HSPF 46,500
10.0 SEER /9.0 EER
Existing
evap cooler 12 hp Evap Cooler
5
0.0 n/a 0
n/a
New
evap cooler 3/4 hp with alec heat Evap Cooler
3 25,600
0.0 3.40 HSPF 0
n/a
New
CENTRAL SYSTEM FAN SUMMARY
SUPPLY FAN
RETURN FAN
System Name Fan Type
Economizer Type
Premium
CFM BHP Eff. Motor
CFM BHP
Premium
Eff. Motor
existing 7-12 ton Constant Volume
No Economizer
3,000 2.40 ❑
none
❑
existing 4 ton Constant Volume
No Economizer
1,600 0.75 ❑
none
❑
evap cooler 12 hp Constant Volume
No Economizer
4,000 0.75 ❑
none
❑
evap cooler 3/4 hp with alec heat Constant Volume
No Economizer
4,000 0.75 ❑
none
❑
❑
❑
❑
❑
❑
❑
EnergyPro 5.1 by EnergySoft User Number.' 5511
Run Code: 2010-11-09T15:40:29 0: 10060
Page 25 of 31
MECHANICAL EQUIPMENT DETAILS Part 2 of 2 MECH-5C
Project Name
Ken Garff Chevrolet/Cadiallac
Date
11/9/2010
ZONE SYSTEM SUMMARY
SYSTEM VAV Fan
E $
7 O
�'
a w
y
d
A T
LL 0
v c
W --
Min CFM
Zone Name System Name Type Ot . Heating_Cooling Ratio Reheat Coil CFM BHP
Outside
Air
❑
Cl
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
1 ❑
❑
❑
1 ❑
❑
EXHAUST FAN SUMMARY
EXHAUST FAN
E °E
o
EM
T*i
LL W
EXHAUST FAN
°
o
M
23�
a W
EXHAUST FAN
E °
2 o
E2
2:1�
a w
Room Name Ot . CFM
BHP
Room Name Ot .
CFM BHP
Room Name Ot . CFM BHP
140,141 existing service and wast 2.0 7,500
0.60
❑
Cl
❑
new service 137 2.0 7,500
0.60
❑
❑
1
❑
❑
❑
❑
❑
❑
❑
EnergyPro 5.1 by EnergySoft User Number: 5511 RunCode: 2010-11-09715:40:29 /D: 10060 Page 26 of 31
ENVELOPE MANDATORY MEASURES: NONRESIDENTIAL ENV -MM
Project Name
Date
Ken Garff ChevrolebCadiallac
11/9/2010
DESCRIPTION
Building Envelope Measures:
§118(a): Installed insulating material shall have been certified by the manufacturer to comply with the California Quality
Standards for insulating material, Title 20 Chapter 4, Article 3.
§118(c): All Insulating Materials shall be installed in compliance with the flame spread rating and smoke density requirements of
Sections 2602 and 707 of Title 24, Part 2.
§118(f): The opaque portions of framed demising walls in nonresidential buildings shall have insulation with an installed R -value
of no less than R-13 between framing members.
17 a All Exterior Joints and openings in the building that are observable sources of air leakage shall be caulked, gasketed,
§1 ()'
weatherstripped or otherwise sealed.
Manufactured fenestration products and exterior doors shall have air infiltration rates not exceeding 0.3 cfm/ft.2 of
§116(a),1: window area, 0.3 cfm/ft.2 of door area for residential doors, 0.3 cfm/ft.2 of door area for nonresidential single doors
(swinging and sliding),and 1.0 cfm/ft.2 for nonresidential double doors (swinging).
§116(a) 2: Fenestration U -factor shall be rated in accordance with NFRC 100, or the applicable default U -factor.
§116(a) 3: Fenestration SHGC shall be rated in accordance with NFRC 200, or NFRC 100 for site -built fenestration, or the
applicable default SHGC.
§116(b): Site Constructed Doors, Windows and Skylights shall be caulked between the unit and the building, and shall be
weatherstripped (except for unframed glass doors and fire doors).
d
Enem YPro 5.1 by EnemySoft User Number: 5511 RunCode: 2010-11-09715:40:29 ID: 10060 Page 27 of 31
N
J
LIGHTING MANDATORY MEASURES: NONRESIDENTIAL LTG -MM
Project Name
Date
Ken Garff ChevroletlCadiallac
11/9/2010
Indoor Lighting
Measures:
§131(d): Shut-off Controls
For every floor, all interior lighting systems shall be equipped with a separate automatic control to shut off the lighting.
1.
This automatic control shall meet the requirements of Section 119 and may be an occupancy sensor, automatic time
switch or other device capable of automatically shutting off the lighting.
2
Override for Building Lighting Shut-off: The automatic building shut-off system is provided with a manual, accessible
override switch in sight of the lights. The area of override is not to exceed 5,000 square feet.
§119(h):
Automatic Control Devices Certified: All automatic control devices specified are certified, all alternate equipment shall
be certified and installed as directed by the manufacturer.
§111:
Fluorescent Ballast and Luminaires Certified: All fluorescent fixtures specified for the project are certified and listed in the
Directory. All installed fixtures shall be certified.
§131(a):
Individual Room/Area Controls: Each room and area in this building is equipped with a separate switch or occupancy
sensor device for each area with floor -to -ceiling walls.
Uniform Reduction for Individual Rooms: All rooms and areas greater than 100 square feet and more than 0.8 watts
§131(b):
per square foot of lighting load shall be controlled with bi-level switching for uniform reduction of lighting within the
room.
Daylight Area Control: All rooms with windows and skylights that are greater than 250 square feet and that allow for
§131(c):
the effective use of daylight in the area shall have 50% of the lamps in each daylit area controlled by a separate switch;
or the effective use of daylight cannot be accomplished because the windows are continuously shaded by a building on
the adjacent lot. Diagram of shading during different times of the year is included on plans.
§131(c):
Display Lighting. Display lighting shall be separately switched on circuits that are 20 amps or less.6.
Outdoor Lighting Measures:
§130(c)1:
Mandatory lighting power determination for medium base sockets without permanently installed ballasts
§132(a):
All permanently installed luminaires with lamps rated over 100 Watts either have a lamp efficacy of at least 60 lumens
per Watt or are controlled by a motion sensor.
§132(b):
All Luminaires with lamps rated greater than 175 Watts in hardscape area, including parking lots, building entrances,
canopies, and all outdoor sales areas meet the Cutoff Requirements.
§132(c)1:
All permanently installed outdoor lighting meets the control requirements listed.
§132(c):
Building facades, parking lots, garages, canopies, and outdoor sales areas meet the Multi -Level Lighting Requirements
listed.
EnergyPro 5.1 by EnergySoft User Number. 5511 Run Code: 2010-11-09715:40:29 /D: 10060 Page 28 of 31
I;
CERTIFICATE OF COMPLIANCE
SIGN LIGHTING Part 1 of 2 SLTG-1 C
Project Name
Phase of Construction: ❑ New Construction ❑ Addition m Alteration
Date
Ken Galff ChevrolebCadiallac
Function Type: ❑Outdoor Signs ❑Indoor Signs
111912010
Project Address
Compliance Method Used
79225 Highway 111 La Quinta, CA 92253
❑ Maximum Allowed Lighting Power ❑ Alternate Lighting Sources
Documentation Author's Declaration Statement
I certify that this Certificate of Compliance documentation is accurate and complete.
Signature
Name
Farzad Tadayon
Company
Date
T -Squared Professional Engineers, Inc.
11/92010
Address
EA #
1340 Specialty Dr., Suite E
CEPE #
City/State/Zip
Phone
Vista, CA 92081
760.560.0100
Principal Lighting Designer's Declaration Statement
• 1 am eligible under Division 3 of the California Business and Professional Code to accept responsibility for the
lighting design.
• This Certificate of Compliance identifies the lighting features and performance specifications required for
compliance with Title 24, Pages 1 and 6 of the California Code of Regulations.
• The design features represented on this Certificate of Compliance are consistent with the information provided
to document this design on the other applicable compliance forms, worksheets, calculations, plans and
specifications submitted to the enforcement agency for approval with this building permit application.
Name
Signature
Milton Niederhaus
Company
Phone
T -Squared Professional Engineers, Inc.
760.560.0100
Address
License #
1340 Specialty Dr., Suite E
E8636
City/State/Zip
Date
Vista, CA 92081
11/09/2010
Sign Mandatory Measures E0.2
Indicate location on building plans of Mandatory Sign Measures Note Block:
Ma
datory Sign Lighting Controls
YES
No
1
§133(a)1. All signs with permanently connected lighting are controlled with an authomatic time
switch control that complies with the applicable requirements of 119.
❑
❑
§133(a)2. All outdoor signs are controlled with a photo control or outdoor astronomical time
2
switch control.
❑
❑
Exception to §133(a)2. Outdoor signs are in tunnels or large covered areas that require
illumination during daylight hours.
❑
❑
§133(a)3. All outdoor signs are controlled with a dimmer that provides the ability to
automatically reduce sin power by a minimum of 65 percent during nighttime hours.
❑
❑
Exception 1 to §133(a)3. Signs are illuminated for less than one hour per day during daylight
3
hours.
❑
❑
Exception 2 to §133(a)3. Outdoor signs are in tunnels or large covered areas that require
illumination during daylight hours.
❑
❑
Exception 3 to §133(a)3. Only metal halide, high pressure sodium, cold cathode, or neon
lamps are used to illuminated signs or parts of signs.
❑
❑
§133(a)4. An Electronic Message Center (EMC) having a new connected lighting power load
greater than 15 kW has a control installed is capable of reducing the lighting power by a
Y
N
N/A
4
minimum of 30 percent when receiving a demand response signal that is sent out by the local
❑
❑
❑
utilit .
Exception to §133(a)4. The EMC is required by a health or life safety statue, ordinance, or
Y
N
N/A
regulation, including but not limited to exit signs and traffic signs.
1 ❑
❑
❑
EnemyPro
5.1 by EnemySoft User Number: 5511 RunCode: 2010-11-09T15:40:2 /D: 10060 Page 29 of 31
41
CERTIFICATE OF COMPLIANCE (SIGN LIGHTING) (Part 2 of 2)
and Field Inspection Energy Checklist
SLTG-1 C
Project Name
Ken Garff ChevroleVCadiallac
Date
11/9/2010
Fill-in Columns A and B for all signs. Fill-in Columns C
through H only if using the Maximum Allowed Lighting
Power compliance method. Fill-in Column I only if
using the Alternate Light Source compliance method.
Compliance Method
Maximum Allowed Lighting Power
Alt. Light
Source
A
B
C D E F
G
H
1
J'
Sign
Symbol
or Code
Description or location and plan location(ft)
Allowed Watts
Design
Watts'
Complies?
Y/N
Light Source
Field
Ins ector2
Sign Area
Internally (1) or Allowed
Externally (E) (I = 12 W/ftz) Allowed Watts =
Illuminated E= 2.3 W/ft C x E
Total Installed
watts for sin
Complies if
G s F
From List
Below
N
a
LL
J -box
Signage
Alternate
910
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
Total Sign Area
1. Design Watts = total connected lighting load installed in the sign, including power used by lamps, ballasts, transformers, power supplies, etc.
2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. Use additional sheets if necessary.
Alternate Lighting Source Compliance Method:
The si n s identified above; use only one or more of the following technologies: list all applicable numbers that apply in column I above
1 High pressure sodium lamps
2 Pulse start or ceramic metal halide lamps served by a ballast with z 88% efficiency
3 Pulse start metal halide lamps that are 5 320 watts, are not 250 watt or 175 watt lamps, and are served by a ballast with a 80% efficiency
4 Neon or cold cathode lamps with transformer or power supply efficiency a 75% with rated output current < 50 mA
5 Neon or cold cathode lamps with transformer or power supply efficiency ? 68% with rated output current >_ 50 mA
6 Fluorescent lamps with a minimum color rendering index CRI of 80
7 Light emitting diodes LEDs with a power supply with ? 80% efficiency
Single voltage LED external power supplies designed to convert 120 volt AC input into lower voltage DC or AC output, having a nameplate output power less than or equal to 250 watts, and
8 certified to the Energy Commission as complying with the applicable requirements of the Appliance Efficiency Regulations Title 20
9 Compact fluorescent lamps that do not contain a medium screw base sockets E24/E26
10 Electronic ballasts with a fundamental output frequency z 20 kHz
Field Inspector Notes or Discrepancies
EnergyPro 5.1 by EnerqySoft User Number: 5511 Run Code: 2010-11-09T15:40:29 /D: 10060
Page 30 of 31
L
4
MECHANICAL MANDATORY MEASURES: NONRESIDENTIAL MECH-MM
Project Name
Date
Ken Garff ChevroletlCadiallac
11/9/2010
Equipment and System Efficiencies
§111:
Any appliance for which there is a California standard established in the Appliance Efficiency Regulations will comply
with the applicable standard.
§115(a):
Fan type central furnaces shall not have a pilot light.
§123:
Piping, except that conveying fluids at temperatures between 60 and 105 degrees Fahrenheit, or within HVAC
equipment, shall be insulated in accordance with Standards Section 123.
§124:
Air handling duct systems shall be installed and insulated in compliance with Sections 601, 602, 603, 604, and 605 of
the CMC Standards.
Controls
§122(e):
Each space conditioning system shall be installed with one of the following:
1 A.
Each space conditioning system serving building types such as offices and manufacturing facilities (and all others not
explicitly exempt from the requirements of Section 112 (d)) shall be installed with an automatic time switch with an
accessible manual override that allows operation of the system during off -hours for up to 4 hours. The time switch
shall be capable of programming different schedules for weekdays and weekends and have program backup
capabilities that prevent the loss of the device's program and time setting for at least 10 hours if power is interrupted; or
1 B.
An occupancy sensor to control the operating period of the system; or
1 C.
A 4 -hour timer that can be manually operated to control the operating period of the system.
2
Each space conditioning system shall be installed with controls that temporarily restart and temporarily operate the
system as required to maintain a setback heating and/or a setup cooling thermostat setpoint.
Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000
§122(8)'
square feet shall be provided with isolation zones. Each zone: shall not exceed 25,000 square feet; shall be provided
with isolation devices, such as valves or dampers that allow the supply of heating or cooling to be setback or shut off
independently of other isolation areas; and shall be controlled by a time control device as described above.
§122(c):
Thermostats shall have numeric setpoints in degrees Fahrenheit (F) and adjustable setpoint stops accessible only to
authorized personnel.
22 b
§1 ()'
Heat pumps shall be installed with controls to prevent electric resistance supplementary heater operation when the
heating load can be met by the heat pump alone
Each space conditioning system shall be controlled by an individual thermostat that responds to temperature within the
zone. Where used to control heating, the control shall be adjustable down to 55 degrees F or lower. For cooling, the
§122(a&b):
control shall be adjustable up to 85 degrees F or higher. Where used for both heating and cooling, the control shall be
capable of providing a deadband of at least 5 degrees F within which the supply of heating and cooling is shut off or
reduced to a minimum.
Ventilation
§121(e):
Controls shall be provided to allow outside air dampers or devices to be operated at the ventilation rates as specified
on these plans.
§122(f):
All gravity ventilating systems shall be provided with automatic or readily accessible manually operated dampers in all
openings to the outside, except for combustion air openings.
Ventilation System Acceptance. Before an occupancy permit is granted for a newly constructed building or space, or a
§121(f):
new ventilating system serving a building or space is operated for normal use, all ventilation systems serving the
building ors ace shall be certified as meeting the Acceptance Requirements for Code Compliance
Service Water Heating Systems
§113(c)
Installation
3.
Temperature controls for public lavatories. The controls shall limit the outlet Temperature to 110° F.
2
Circulating service water -heating systems shall have a control capable of automatically turning off the circulating pump
when hot water is not required.
EnergyPro 5.1 by EnergySoft User Number. 5511 RunCode: 2010-11-09T15:40:29 /D: 10060 Page 31 of 31