Loading...
10-1282 (CSCS) Title 24BUILDING ENERGY ANALYSIS REPORT PROJECT: Ken Garff Chevrolet/Cadillac 79225 Highway 111 La Quinta, CA 92253 Project Designer: Walt Wagner 815,Civic Center Drive Oceanside, CA 92054 760.729.0533 Report Prepared by: Farzad Tadayon T -Squared Professional Engineers, Inc. 1340 Specialty Dr., Suite E Vista, CA 92081 t " 760.560.0100 CITY OF LA QUINTA 'I DEC 1..6 2010 i By - BUILDING & SAFETY DEPT. APPROVED'..' FOR CONSTRUCTION Job Number: WE I By 10060 + Ip' Date: 12/2/2010 6.1 The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2008 Building Energy Efficiency Standards. This program developed by EnergySoft, LLC — www.energysoft.com. Energ Pro 5. 1 by EnergySoft User Number. 5511 RunCode:,2010-12-02714:37:41 `ID: 10060 TABLE OF CONTENTS Cover Page 1 Table of Contents 2 Nonresidential Performance Title 24 Forms 3 Form ENV -MM Envelope Mandatory Measures 24 Form LTG -MM Lighting Mandatory Measures 25 Form MECH-MM Mechanical Mandatory Measures 26 EnergyPro 5.1 by EnergySoft Job Number. ID: 10060 User Number. 5511 PERFORMANCE CERTIFICATE OF COMPLIANCE (Part 1 of 3) PERF -1 C Project Name Date Ken Garff Chevrolet/Cadillac 12/2/2010 Project Address Climate ZoneTotal Cond. Floor Area Addition Floor Area 79225 Highway 1.11 La Quinta CA Climate Zone 15 3,945 n/a GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Relocatable - indicate ❑ specific climate zone ❑ all climates Phase of Construction: ® New Construction ❑ Addition ❑ Alteration STATEMENT OF COMPLIANCE This certificate of compliance lists the building features and specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies only to a Building using the performance compliance approach. The documentation author hereby certifies that the documentation is accurate and compoeb. Documentation Author Name Farzad Tadayon Signature Z' Company T -Squared Professional Engineers, Inc. Date 12./2/1010 Address 1340 Specialty Dr., Suite E Phone 760.560.0100 City/State/Zip Vista, CA 92081 The Principal Designer hereby certifies that the proposed building design represented in this set of construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this permit application. The proposed building has been designed to meet the energy efficiency requirements contained in sections 110, 116 through 118, and 140 through 149 of Title 24, Part 6. Please check one: ENV. LTG. MECH. I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to [3 sign this document as the person responsible for its preparation; and that I am licensed in the State of California as a civil engineer, mechanical engineer, electrical engineer, or I am a licensed architect. I affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code by section ❑ ❑ ❑ 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor performing this work. I affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document ❑ ❑ ❑ because it pertains to a structure or type of work described as exempt pursuant to Business and Professions Code Sections 5537, 5538 and 6737.1. Principal Envelope Designer Name Waft Wagner Signature Company Waft Wagner Date Address 815 Civic Center Drive Licen # City/State/Zip Oceanside, CA 92054 oft 760.729.0533 Principal Mechanical Designer Name Farzad Tadayon Signature /7 Company T -Squared Professional Engineers, Inc. Date 11/19/10 Address 1340 Specialty Dr., Suite E License # M29230 City/State/Zip Vista, CA 92081 V Phone 760.560.0100 Principal Lighting Designer Name Milton Niederhaus Signat Company T -Squared Professional Engineers, Inc. Date 11/19/10 Address 1340 Specialty Dr., Suite E License # E8636 City/State/Zip Vista, CA 92081 Phone 760.560.0100 INSTRUCTIONS TO APPLICANT COMPLIANCE & WORKSHEETS (check box if worksheets are included) ® ENV -1C Certificate of Compliance. Required on plans. m MECH-1C Certificate of Compliance. Required on plans. ® LTG -1 C Certificate of Compliance. Required on plans. m MECH-2C Air/Water Side/Service Hot Water & Pool Requirements. ® LTG -2C Lighting Controls Credit Worksheet. m MECH-3C Mechanical Ventilation and Reheat. ❑ LTG -3C Indoor Lighting Power Allowance. m MECH-5C Mechanical Equipment Details. EnergyPro 5.1 by Energ Soft User Number: 5511 RunCode: 2010-12-02T14:37:41 /D: 10060 Page 3 of 26 PERFORMANCE CERTIFICATE OF COMPLIANCE Project Name Ken Garff ChevrolebCadillac ANNUAL TDV ENERGY USE SUMMARY kBtu/s ft- r Standard Proposed Compliance Energy Component Design Design Margin Space Heating Space Cooling Indoor Fans Heat Rejection Pumps & Misc. Domestic Hot Water Lighting Receptacle Process Process Lighting TOTALS 1.34 0.71 0.63 283.20 320.98 -37.78 36.99 43.79 -6.80 0.00 0.00 0.00 0.00 0.00 0.00 67.41 65.12 2.29 164.60 119.35 45.24 83.05 83.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 636.59 633.02 3.57 Percent better than Standard GENERAL INFORMATION 0.6%1 ( 0.6 % exclud Part 2 of 3 Heating Cooling Fans Heat Rej Pumps DHW Lighting Receptacle Process Process Ltg BUILDING COMPLIES PERF -1 C Date 12/2/2010 Building Orientation (N) 0 deg Conditioned Floor Area 3,945 sqft. Number of Stories 1 Unconditioned Floor Area 0 sqft. Number of Systems 3 Conditioned Footprint Area 0 sqft. Number of Zones 3 Natural Gas Available On Site No Front Elevation Left Elevation Rear Elevation Right Elevation Total Roof Orientation Grnsc Aran (N) 490 (E) 968 (S) 670 (vv) 720 2,847 3,945 Prescriptive Lighting Power Density Prescriptive Envelope TDV Energy Remarks: Standard 1.482 W/sqft. 160,484 sqft. sqft. sqft. sqft. sqft. sqft. Glazino Area 104 653 498 340 1,595 0 Proposed 1.078W/sqft 247,071 sqft. sqft. sqft. sqft. sqft. sqft. Glazinn Rntin 21.2% 67.4% 74.3% 47.2% 56.0% 0.0% Prescriptive Values for Comparison only. See LTG -1 C for allowed LPD. L, PERFORMANCE CERTIFICATE OF COMPLIANCE (Part 3 of 3) PERF -1 C Project Name Ken Garff Chevrolet/Cadillac Date 12/2/2010 ZONE INFORMATION System Name Zone Name Occupancy Type Floor Area s ft. Inst. LPD W/sf ' Ctrl. Credits W/Sf 2 Allowed LPD Proc. Loads W/sf Area Tailored W/sf 3 W/Sf 4 HP -1, HP -2, HP -3 retail Retail Sales, Wholesale 3,329 1.205 0.050 corridor/restroom/support Corridor/Restroom/Support 313 0.613 Lounge Lounge, Recreation 303 0.726 Notes: 1. See LTG -1C 2. See LTG -2C 3. See LTG -3C 4. See LTG -4C items marked with asterisk see LTG -1 -C b others b others Items above require special documentation EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of the justifications, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted. The HVAC System HP -1, HP -2, HP -3 includes Demand Control Ventilation per Standards Section 121. The HVAC System HP -1, HP -2, HP -3 (Carrier TCQ08) A Premium Efficiency 0.40 BHP Supply Fan Motor has been specified. The exceptional features listed in this performance approach application have specifically been reviewed. Adequate written justification and documentation for their use have been provided by the applicant. Authorized Signature or Stamp Energ Pro 5.1 by Energ Soft User Number: 5511 RunCode: 2010-12-02T14:37:41 /D: 10060 Page 5 of 26 CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV -1 C AND FIELD INSPECTION ENERGY CHECKLIST Project Name Ken Garff Chevrolet/Cadillac Date 1 12/212010 Project Address 79225 Highway 111 La Quinta Climate Zone 15 Total Cond. Floor Area 3,945 Addition Floor Area n/a GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Bledlocatable g. Public School ® Conditioned Spaces ❑ Unconditioned Spaces ❑ Skylight Area for Large Enclosed Space >_ 8000 ft2 (If checked include the ENV -4C with submittal) Phase of Construction: ® New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ® Overall Envelope ❑ Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees - TO deg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION Ta /ID' Assembly Type 2 y a O C fn d W O z o t;« ti M m 3 j U of C O ® 7 w> ` C C d w LL O O y 7 E> O C d '� E LL V C C G -6 CL -3 a N = R 0 U N N a LL 1 Roof 851 (N) 0.031 R-30 4.2.1-A20 New ❑ ❑ 2 Wall 4 (E) 0.057 R-25 4.3.1-A9 New ❑ ❑ 3 Wall 90 (VV) 0.057 R-25 4.3.1-A9 New ❑ ❑ 4 Wall 102 (S) 0.057 R-25 4.3.1-A9 New ❑ ❑ 5 Roof 1,362 (N) 0.031 R-301 4.2.1-A20 New ❑ ❑ 6 Wall 102 (E) 0.057 R-25 4.3.1-A9 New ❑ ❑ 7 Roof 133 (N) 0.031 R-30 4.2.1-A20 New ❑ ❑ 8 Roof 288 (N) 0.031 R-30 4.2.1-A20 New ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/ID' Fenestration Type 2 a c>i ;a vi W O 2 0 to ALL 2> ° m v U. 'o > N U C7 ^� ¢ d z oo rn rn rn m > O c ° < a o 2 U m > a is LL 1 Window 139 (E) 0.340 COG 0.380 COG ® New ❑ ❑ 2 Window 194 (W) 0.340 COG 0.380 COG ❑ New ❑ ❑ 3 Window 498 (S) 0.340 COG 0.380 COG 0 New ❑ ❑ 4 window 396 (E) 0.340 COG 0.380 COG ❑ New ❑ ❑ 5 Window 118 (E) 0.340 COG 0.380 COG ® New ❑ ❑ 6 Window 104 (N) 0.340 COG 0.380 COG ® New ❑ ❑ 7 Window 146 (IAq 0.340 COG 0.380 COG ❑ New ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. EnergyPro 5.1 by EnergySoft User Number: 5511 Run Code: 2010-12-02T14:37:41 /D: 10060 Pae 6 of 26 CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV -1 C AND FIELD INSPECTION ENERGY CHECKLIST Project Name Ken Garff Chevrolet/Cadillac Date 1 12/2/2010 Project Address 79225 Highway 111 La Quinta Climate Zone 15 Total Cond. Floor Area 3,945 Addition Floor Area n/a GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ RBledlocatable Public School ® Conditioned Spaces ❑ Unconditioned Spaces ❑ Skylight Area for Large Enclosed Space >_ 8000 ft2 (If checked include the ENV -4C with submittal) Phase of Construction: ® New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ® Overall Envelope ❑ Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: 0 deg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION Ta /ID' Assembly Type 2 y Q c o� cN d V% O z o n LL M m z. .2 >> �o c) o[ ¢ c° r x 0 w> �� r x o w LL> °a N �0 �" °� 0- 5 C LL x v aci C CL o 0. -124 c Y v� C o :° U N y ca a m LL 9 Wall 79 (N) 1 0.057 R-25 4.3.1-A9 I New ❑ 1 ❑ 10 Wall 36 (W 0.057 R-25 4.3:1-A9 New ❑ ❑ 11 Roof 133 (N) 0.031 R-30 4.2.1-A20 New ❑ ❑ 12 Roof 126 (N) 0.031 R-30 4.2.1-A20 New ❑ ❑ 13 Wall 86 (N) 0.057 R-25 4.3.1-A9 New ❑ ❑ 14 Wall 114 (E) 0.057 R-25 4.3.1-A9 New ❑ ❑ 15 Roof 117 (N) 0.031 R-30 4.2.1-A20 New ❑ ❑ 16 Wall 82 (N) 0.057 R-25 4.3.1-A9 New ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/ID' Fenestration Type 2 a 03 cN w O Z L v m 4 00 2> L 5 2 4 > <n V = w 02 z o N N rn t > O c v `; o 2 v rn is a ti ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ F ❑ Lo 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. EnergyPro 5.1 by EnergySoft User Number: 5511 RunCode: 2010-12-02T14:37:41 /D: 10060 Pae 7 of 26 CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV -1 C AND FIELD INSPECTION ENERGY CHECKLIST Project Name Ken Garff ChevroletlCadillac Date 1 12/2/2010 Project Address 79225 Highway 111 La Quinta Climate Zone 15 Total Cond. Floor Area 3,945 Addition Floor Area n/a GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ RRledlocatable g. Public School ® Conditioned Spaces 13Unconditioned Spaces ❑ Skylight Area for Large Enclosed Space >_ 8000 ft2 (If checked include the ENV -4C with submittal) Phase of Construction: ® New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ® Overall Envelope ❑ Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degree;'TO deg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION Ta /ID' Assembly Type 2 y L a C fn NW O z U lL Y 7 > j of v cc C CD «7 K ia w> C C W % w LL `p N m > p C d LL C C d p a -2 a N C � o t> rA N a LL 17 Roof 141 (N) 0.031 R-30 4.2.1-A20 New ❑ ❑ 18 Wall 51 (W) 0.057 R-25 4.3.1-A9 New ❑ ❑ 19 Roof 178 (N) 0.031 R-30 4.2.1-A20 New ❑ ❑ 20 Roof 39 (N) 0.031 R-30 4.2.1-A20 New ❑ ❑ 21 Wall 95 (E) 0.057 R-25 4.3.1-A9 New ❑ ❑ 22 Wall 70 (S) 0.057 R-25 4.3.1-A9 New ❑ ❑ 23 Wall 34 (N) 0.057 R-25 4.3.1-A9 New ❑ ❑ 24 Roof 78 (N) 0.031 R-30 4.2.1-A20 New ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/ID' Fenestration Type 2 x Q c 1; W O Z x LL 2> d 1 ii 'o > rn c� cxa N d L i 'o N N C o > O C _°d o U(A is a ii ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. EnergyPro 5.1 by EnergySoft User Number. 5511 RunCode: 2010-12-02T14:37:41 ID: 10060 Page 8 of 26 CERTIFICATE OF COMPLIANCE - (Part 1 of 3) ENV -1 C AND FIELD INSPECTION ENERGY CHECKLIST Project Name Ken Garff Chevrolet/Cadillac Date 1 12/2/2010 Project Address 79225 Highway 111 La Quinta Climate Zone 15 Total Cond. Floor Area 3,945 Addition Floor Area n/a GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ BRledlocatable Public School ® Conditioned Spaces ❑ Unconditioned Spaces ❑ Skylight Area for Large Enclosed Space >_ 8000 ft2 (If checked include the ENV -4C with submittal) Phase of Construction: ® New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ® Overall Envelope ❑ Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: 0 deg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION Ta /ID' AssemblyType z ' d Q c CN N O z L50 « U of O « xm w > N` 3 w u- _ > E u- v - pa -z a " N �W C O Urn NI to a -is u- 25 Wall 77 (M 0.057 R-25 4.3.1-A9 New ❑ ❑ 26 Roof 78 (N) 0.031 R-30 4.2.1-A20 New ❑ ❑ 27 Wall 77 W 0.057 R-25 4.3.1-A9 New ❑ ❑ 28 Roof 118 (N) 0.031 R-30 4.2.1-A20 New ❑ ❑ 29 Wall 49 (149 0.057 R-25 14.3.1-A9 New ❑ ❑ 30 Roof 303 (N) 0.031 R-30 4.2.1-A20 New ❑ ❑ 31 Wall 105 (N) 0.057 R-25 4.3.1-A9 New ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/ID' Fenestration Type z i a c 03 C a 2 UJ O Z y V ALL > 2> O V � 4- O cN0 >U) U W_ °C O N N C c O U) o O« Q a m LL [3 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. EnergyPro 5.1 by EnergySoft User Number: 5511 Run Code: 2010-12-02714:37:41 /D: 10060 Page 9 of 26 CERTIFICATE OF COMPLIANCE (Part 2 of 3) AND FIELD INSPECTION ENERGY CHECKLIST, ENV -1 C Project Name Ken Garff Chevrolet/Cadillac Date 12/2/2010 ROOFING PRODUCT (COOL ROOFS (Note if the roofing product is not CRRC certified, this compliance approach cannot be used). Go to Overall Envelope Approach or Performance Approach. CHECK APPLICABLE BOX BELOW IF EXEMPT FROM THE ROOFING PRODUCT "COOL ROOF" REQUIREMENTS: Pass Fail' N/A ❑ Roofing compliance not required in Climate Zones 1 andl6 with a Low -Sloped. 2:12 pitch or less. ❑ ❑ ❑ ❑ Roofing compliance not required in Climate Zone 1 with a Steep -Sloped with less than 5 Ib/ft2. Greater than 2:12 pitch. ❑ ❑ ❑ ❑ Low -sloped Wood framed roofs in Climate Zones 3 and 5 are exempted, solar reflectance and thermal emittance or SRI that have a U -f actor of 0.039 or lower. See Opaque Surface Details roof assembly, Column H of ENV -2C. ❑ ❑ ❑ ❑ Low -sloped Metal building roofs in Climate Zone 3 and 5 are exempted, solar relectance and thermal emittance or SRI that have a U -f actor of 0.048 or lower. See Opaque Surface Details roof assembly below, Column H of ENV -2C. ❑ ❑ ❑ ❑ The roof area covered by building integrated photovoltaic panels and building integrated solar thermal panels are exempted. Solar reflectance and thermal emittance or SRI, seespreadsheet calculator at www.energy.ca.gov/title24/ ❑ ❑ ❑ ❑ Roof constructions that have thermal mass over the roof membrane with a weight of at least 25 Ib/ft are exempt from the Cool Roof criteria below. ❑ ❑ ❑ ❑ High-rise residential buildings and hotels and motels with low -sloped roofs in Climate Zones 1 through 9, 12 and 16 are exempted from the low -sloped roofing criteria. ❑ ❑ ❑ 1. If Fail then describe on this page of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. CRRC Product ID Number' Roof Slope S 2:12 > 2:12 Product Weight < 5lb/ff a 5lb/ft2 Product Type 2 Aged Solar Reflectance Thermal Emmitance SR 15 Pass Fail6 ❑ ❑ ❑ ❑ ❑ 4 ❑ ❑ ❑ ❑ ❑ ❑ ❑ 4 ❑ ❑ ❑ ❑ 1 ❑ ❑ ❑4 1❑ 1 ❑ ❑ ❑ ❑ ❑ 1❑ 4 ❑ ❑ ❑ ❑ ❑ ❑ ❑ 4 ❑ ❑ ❑ ❑ ❑ ❑ ❑ 4 ❑ ❑ 1. The CRRC Product ID Number can be obtained from the Cool Roof Rating Council's Rated Product Directory at www.coolroofs.orci/i)roducts/search.[)hl) 2. Indicate the type of product is being used for the roof top, i.e. single -ply roof, asphalt roof, metal roof, etc. 3. If the Aged Reflectance is not available in the Cool Roof Rating Council's Rated Product Directory then use the Initial Reflectance value from the same directory and use the equation (0.2+0.7(p,Nt,a, — 0.2) to obtain a calculated aged value. Where p is the Initial Solar Reflectance from the Cool Roof Rating Council's Rated Product Directory. 4. Check box if the Aged Reflectance is a calculated value using the equation above. 5. The SRI value needs to be calculated from a spreadsheet calculator at htto://www.energy.ca.00v/title24/ 6. If Fail then describe on this page of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. To apply Liquid Field Applied Coatings, the coating must be applied across the entire roof surface and meet the dry mil thickness or coverage recommended by the coatings manufacturer and meet minimum performance requirements listed in §118(i)4. Select the applicable coating: ❑ Aluminum -Pigmented Asphalt Roof Coating ❑ Cement -Based Roof Coating ❑ Other Discrepancies: EnergyPro 5.1 by EnerqySoft User Number: 5511 RunCode: 2010-12-02714:37:41 /D: 10060 Pae 10 of 26 CERTIFICATE OF COMPLIANCE (Part 3 of 3) ENV -1 C AND FIELD INSPECTION ENERGY CHECKLIST Project Name Ken Garff Chevrolet/Cadillac Date 12/2/2010 Required Acceptance Tests Designer: This form is to be used by the designer and attached to the plans. Listed below is the acceptance test for Envelope Fenestrations system. The designer is required to check the acceptance tests and list all the fenestration products that require an acceptance test. If all the site -built fenestration of a certain type requires a test, list the different fenestration products and the number of systems. The NA7 Section in the Appendix of the Nonresidential Reference Appendices Manual describes the test. Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Enforcement Agency: Systems Acceptance. Before Occupancy Permit is granted for a newly constructed building or space or whenever new fenestration is installed in the building or space shall be certified as meeting the Acceptance Requirements. The ENV -2A form is not considered a complete form and is not to be accepted by the enforcement agency unless the boxes are checked and/or filled and signed. In addition, a Certificate of Acceptance forms shall be submitted to the enforcement agency that certifies plans, specifications, installation certificates, and operating and maintenance information meet the requirements of §10-103(b) of Title 24 Part 6. The field inspector must receive the properly filled out and signed forms before the building can receive final occupancy. A copy of the ENV -2A for each different fenestration product line must be provided to the owner of the building for their records. Test Description ENV -2A Test Performed By: Fenestration Products Name or ID Area of like Building Envelope Requiring Testing or Verification Products Acceptance Test new Double Metal Tinted 1,595 13 13 ❑ 13 13 ❑ EnergyPro 5.1 by EnergySoft User Number: 5511 RunCode: 2010-12-02714:37:41 /D: 10060 Pae 11 of 26 'CERTIFICATE OF COMPLIANCE (Part 1 of 3) LTG -1 C Project Name Ken Garff Chevrolet/Cadillac Date 12/2/2010 INDOOR LIGHTING SCHEDULE and FIELD INSPECTION ENERGY CHECKLIST Installation Certificate, LTG -1- INST Retain a copy and'verify form is completed and signed.) Field Inspector ❑ Certificate of Acceptance, LTG -2A (Retain a copy and verify form is completed and signed.) Field Inspector ❑ A separate Lighting Schedule Must Be Filled Out for Conditioned and Unconditioned Spaces Installed Lighting Power listed on this Lighting Schedule is only for: m CONDITIONED SPACE ❑ UNCONDITIONED SPACE m The actual indoor lighting power listed below includes all installed permanent and portable lighting systems in accordance with §146(a). Only for offices: Up to the first 0.2 watts per square foot of portable lighting shall not be required to be included in the m calculation of actual indoor lighting power density in accordance with the Exception to §146(a). All portable lighting in excess of 0.2 watts per square foot is totaled below. Luminaire (Type, Lamps, Ballasts Installed Watts A B C D E F G H None or Item Ta Complete Luminaire Description ' i.e, 3 lam fluorescent troffer, F32T8, one dimmable electronic ballasts co li .5 �, a U a �_ c E `° � J How wattage Was determined J0 c E E > > Z J LL N y N i° 5 3: Field Ins ectorz Z5 v m CEC v n Default coy �' From o NA8 ¢ ~ vi co o- co u. C (1) 4 It Fluorescent T8 Rapid Start Elec ❑ 32.0 ® ❑ 1 32 ❑ ❑ F 70w Metal Halide ❑ 86.0 ® ❑ 30 2,580 ❑ ❑ G (2) 28w Linear Fluorescent T5 Elec ❑ 60.0 ® ❑ 14 840 ❑' ❑ J (1) 32w Compact Fluorescent Triple 4 Pin Elec ❑ 35.0 ® ❑ 6 210 ❑, ❑ L (2) 39w Linear Fluorescent T5 HO Elec ❑ 85.0 ® ❑ 4 340 ❑ ❑ N 20w LED ❑ 20.0 ® ❑ 21 420 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 01 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 1 ❑ ❑ ❑ ❑ Installed Watts Page Total: 4,422 Building total number of pages: Installed Watts Building Total Sum of all pages) 4,422 Enter into LTG -1 C Pa e 4 of 4 1. Wattage shall be determined according to Section 130 (d and e). Wattage shall be rating of light fixture, not rating of bulb. 2 . If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. EnergyPro 5.1 by EnergySoft User Number. 5511 Run Code: 2010-12-02714:37:41 ID: 10060 Pae 12 of 26 CERTIFICATE OF COMPLIANCE (Part 2 of 3) LTG -1 C" Project Name Ken Garff Chevrolet/Cadillac Date 12/2/2010 INDOOR LIGHTING SCHEDULE and FIELD INSPECTION ENERGY CHECKLIST Fill in controls for all spaces: a) area controls, b) multi-level controls, c) manual daylighting controls for daylit areas > 250 ft2, automatic daylighting controls for daylit areas > 2,500 ft2, d) shut-off controls, e) display lighting controls, f) tailored lighting controls — general lighting controlled separately from display, ornamental and display case lighting and g) demand responsive automatic controls for retail stores > 50,000 ft2, in accordance with Section 131. MANDATORY LIGHTING CONTROLS — FIELD INSPECTION ENERGY CHECKLIST Field Ins actor Number Special Type/ Description of Units Location in Building Features Pass Fail LCP/ TIME CLOCK F&I OFFICE ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ o ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ SPECIAL FEATURES INSPECTION CHECKLIST See Page 2 of 4 of LTG -1C The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification. The local enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted. Field Inspector's Notes or Discrepancies: EnergyPro 5.1 by EnergySoft User Number: 5511 RunCode: 2010-12-02T14.37:41 ID: 10060 Pae 13 of 26 CERTIFICATE OF COMPLIANCE - Part 3 of 3 LTG-1C Project Name Date Ken Gaff Chevrolet(Cadillac 12/2/2010 CONDITIONED AND UNCONDITIONED SPACE LIGHTING MUST NOT BE COMBINED FOR COMPLIANCE Indoor Lighting Power for Conditioned S aces Indoor Lighting Power for Unconditioned Spaces Watts Watts Installed Lighting 4,422 Installed Lighting 0 from Conditioned LTG-1 C, Page 2 from Unconditioned LTG-1 C, Page 2 Lighting Control Credit - 168 Lighting Control Credit 0 Conditioned Spaces from LTG-2C Unconditioned Spaces from LTG-2C Adjusted Installed 4,254 Adjusted Installed = 0 Lighting Power Lighting Power Complies if Installed:5 Allowed Complies if Installed:5 Allowed Allowed Lighting Power Allowed Lighting Power Conditioned Spaces from LTG-3C or PERF-1 4,254 Unconditioned Spaces from LTG-3C)0 Required Acceptance Tests Designer: This form is to be used by the designer and attached to the plans. Listed below is the acceptance test for the Lighting system, LTG-2A. The designer is required to check the acceptance tests and list all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. If all the lighting system or control of a certain type requires a test, list the different lighting and the number of systems. The NA7 Section in the Appendix of the Nonresidential Reference Appendices Manual describes the test. Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Forms can be grouped by type of Luminaire controlled. Enforcement Agency: Systems Acceptance. Before Occupancy Permit is granted for a newly constructed building or space or when ever new lighting system with controls is installed in the building or space shall be certified as meeting the Acceptance Requirements. The LTG-2A form is not considered a complete form and is not to be accepted by the enforcement agency unless the boxes are checked and/or filled and signed. In addition, a Certificate of Acceptance forms shall be submitted to the enforcement agency that certifies plans, specifications, installation certificates, and operating and maintenance information meet the requirements of §10-103(b) of Title 24 Part 6. The field inspector must receive the properly filled out and signed forms before the building can receive final occupancy. A copy of the LTG-2A for each different lighting luminaire control(s) must be provided to the owner of the building for their records. Controls for Credits LTG-2A Controls and Sensors and Automatic Number of Daylighting Luminaire Controls Equipment Re uirin Testing Description controls Location Acceptance Occ Sensor- Multi-Level (2) 28w Linear Fluorescent T5 Elec 2 F&I sales Occ Sensor - Mufti-Level (2) 28w Linear Fluorescent T5 Elec 2 sales 108 Occ Sensor - Multi-Level (2) 28w Linear Fluorescent T5 Elec 2 sales 116 Occ Sensor- Mufti-Level (2) 28w Linear Fluorescent T5 Elec 2 sales 115 Occ Sensor- Mufti-Level (2) 28w Linear Fluorescent T5 Elec 2 sales 107 Occ Sensor- Mufti-Level (2) 28w Linear Fluorescent T5 Elec 41 sales manager ❑ Ener Pro 5.1 by Ene Soh User Number: 5511 RunCode: 2010-12-02714:37:41 ID: 10060 Pae 14 of 26 CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C FIELD INSPECTION ENERGY CHECKLIST Project Name Ken Garff Chevrolet/Cadillac Date 12/2/2010 Project Address 79225 Highway 111 La Quinta Climate Zone 15 Total Cond. Floor Area 3,945 Addition Floor Area n/a GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Relocatable Public School Bldg. m Conditioned Spaces ❑ Unconditioned Spaces affidavit Phase of Construction: ® New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit) Energy Front Orientation: N, E, S, W or in Degrees: 0 deg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST E ui menu Inspection Criteria Meets Criteria or Requirements Pass Fail — Describe Reason Item or System Tags AC -1, RTU -1 HP -1 DHW Heater ❑ [3i.e. Equipment T e3: Electric Res DHW Boiler ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 20,478 Btu/hr ❑ ❑ Minimum Heating Efficiency' 0.95 EF ❑ ❑ Max Allowed Cooling Capacity' n/a ❑ ❑ Cooling Efficiency' n/a ❑ ❑ Duct Location/ R -Value n/a ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS n/a ❑ Economizer n/a ❑ ❑ Thermostat n/a ❑ ❑ Fan Control n/a ❑ ❑ E ui ment2 Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Pass Fail — Describe Reason Item or System Tags i.e. AC -1, RTU -1, HP -1 HP -1, HP -2, HP -3 ❑ ❑ Equipment T e3: Packaged DX ❑ ❑ Number of Systems 3 ❑ ❑ Max Allowed Heating Capacity' 36,400 Btu/hr ❑ ❑ Minimum Heating Efficiency' 3.30 COP ❑ ❑ Max Allowed Cooling Capacity' 84,900 Btu/hr ❑ ❑ Cooling Efficiency' 11.2 EER ❑ ❑ Duct Location/ R -Value R-8.0 ❑ ❑ When duct testing is required, submit & MECH-4-HERS No 13 13MECH-4A Economizer Diff. Enth (Integrated) ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EnergyPro 5.1 by EnergySoft User Number: 5511 Run Code: 2010-12-02T14:37:41 /D: 10060 Pae 15 of 26 d CERTIFICATE OF COMPLIANCE and (Part 2 of 4) MECH-1 C FIELD INSPECTION ENERGY CHECKLIST Project Name Date Ken Garff Chevrolet/Cadillac 12/2/2010 Discrepancies: 11 Ene Pro 5.1 by EnergySoft User Number. 5511 RunCode: 2010-12-02T14:37:41 ID: 10060 Pae 16 of 26 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 3 of 4) MECH-1 C Project Name Date Ken GanT ChevroleNCadillac 12/2/2010 Required Acceptance Tests Designer: This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for mechanical systems. The designer is required to check the applicable boxes by all acceptance tests that apply and listed all equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the equipment description and the number of systems. The NA number designates the Section in the Appendix of the Nonresidential Reference Appendices Manual that describes the test. Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Building Departments: Systems Acceptance: Before occupancy permit is granted for a newly constructed building or space, or a new space -conditioning system serving a building or space is operated for normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. Systems Acceptance: Before occupancy permit is granted. All newly installed HVAC equipment must be tested using the Acceptance Requirements. The MECH-1 C form is not considered a completed form and is not to be accepted by the building department unless the correct boxes are checked. The equipment requiring testing, person performing the test (Example: HVAC installer, TAB contractor, controls contractor, PE in charge of project) and what Acceptance test must be conducted. The following checked -off forms are required for ALL newly installed equipment. In addition a Certificate of Acceptance forms shall be submitted to the building department that certifies plans, specifications, installation, certificates, and operating and maintenance information meet the requirements of §10-103(b) and Title -24 Part 6. The building inspector must receive the properly filled out and signed forms before the building can receive final occupancy. TEST DESCRIPTION MECH-2A MECH-3A MECH-4A MECH-5A MECH-6A MECH-7A MECH-8A MECH-9A MECH-10A MECH-11A Hydronic Outdoor Constant Demand Supply System Automatic Ventilation Volume & Air Control Supply Valve Water Variable Demand For Single -Zone Distribution Economizer Ventilation Fan Leakage Temp. Flow Shed Equipment Re uirin Testing or Verification Ot . VAV & CAV Unitary Ducts Controls DCV VAV Test Reset Control Control HP -1, HP -2, HP -3 (Carrier TCQ08) 3 ® ® ❑ m m ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ '❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑. ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ EnergyPro 5.1 by EnergySoft User Number: 5511 Run Code: 2010-12-02T14:37:41 0:10060 Pae 17 of 26 ir-. CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 4 of 4) MECH-1 C Project Name Ken Garff ChevrolebCadillac Date 12/2/2010 TEST DESCRIPTION MECH-12A MECH-13A MECH-14A MECH-15A Equipment Re uirin Testing Fault Detection & Diagnostics Qty. for DX Units Automatic Fault Detection & Diagnostics for Air & Zone Distributed Energy Storage DX AC Systems Thermal Energy Storage (TES) Systems Test Performed By: HP -1, HP -2, HP -3 (Carrier TCQ08) 3 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ .❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ EnergyPro 5.1 by EnergySoft User Number: 5511 Run Code: 2010.12-02T14:37:41 ID: 10060 Pae 18 of 26 LIGHTING CONTROLS CREDIT WORKSHEET (Part 1 of 2) LTG -2C Project Name Ken Gafff Chevrolet/Cadillac Date 12/2/2010. POWER ADJUSTMENT FACTORS PAF FOR NON -DAYLIGHT CONTROLS A Separate PAF Worksheet Must Be Filled Out for Conditioned _and Unconditioned Spaces. Control Credits listed on this schedule are only for: m CONDITIONED SPACES ❑ UNCONDITIONED SPACES A B C D E F G Watts of Power Room # Zone ID Plan Room Area Control Adjustments Areas Lighting Control Description' Reference ftp Lighting Factor' Control Credit Watts E x F F&I sales Occ Sensor- Multi -Level G 133 120 0.20 24 sales 108 Occ Sensor- Multi -Level G 133 120 0.20 24 sales 116 Occ Sensor- Multi -Level G 126 120 0.20 24 sales 115 Occ Sensor- Mufti -Level G 117 120 0.20 24 sales 107 Occ Sensor- Mufti -Level G 141 120 0.20 24 sales manager Occ Sensor- Mufti -Level G 178 240 0.20 48 PAGE TOTAL 168 Note: Building total of non -da licht control credit watts for all pages of LTG -2C Pae 1 of 2 Conditioned and Unconditioned Enter building total of all daylight controls credit watts from LTG -2C Page 2 of 2 0 Space shall be separately totaled BUILDING TOTAL OF ALL CONTROL CREDIT WATTS (FOR BOTH NON -DAYLIGHT AND DAYLIGHT CONTROL CREDITS) 168 Enter in LTG -1C; Page 4: Lighting Control Credit as appropriate for CONDITIONED or UNCONDITIONED Spaces 1. Description shall be consistent with Type of Control defined in Table 146-C 2. Power Adjustment Factor taken from Table 146-C EnergyPro5.1byEnergySoft User Number. 5511 RunCode: 2010-12-02T14:37:41 ID: 10060 Pae 19 of 26 AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2C Project Name Date Ken Garff ChevroletlCadillac 1 121212010 Indicate Air Systems Type Central, Single Zone, Package, VAV, or etc... Item or System Tags i.e. AC -1, RTU -1, HP -1 HP -1, HP -2, HP -3 Number of Systems 3 Indicate Pa a Reference on Plans or Schedule and indicate the applicable exception(s) MANDATORY MEASURES T-24 Sections Heating Equipment Efficiency 112(a) 3.30 COP Cooling Equipment Efficiency 112(a) 11.2 EER HVAC Heat Pump Thermostat 112(b), 112(c) Yes Furnace Controls/Thermostat 112(c),115(a) Na Natural Ventilation 121 b No Mechanical Ventilation 121 b 787 cfm VAV Minimum Position Control 121 c No Demand Control Ventilation 121 c Yes Time Control 122(e) Programmable Switch Setback and Setup Control 122(e) Setback Required Outdoor Damper Control 122(f) Auto Isolation Zones 122 n/a Pipe Insulation 123 Duct Insulation 124 R-8.0 PRESCRIPTIVE MEASURES Calculated Design Heating Load 144(a & b n/a Proposed Heating Capacity 144(a & b 68,203 Btu/hr Calculated Design Cooling Load 144(a & b n/a Proposed Cooling Capacity 144(a & b 201,916 Btu/hr Fan Control 144(c) Constant Volume DP Sensor Location 144(c) Supply Pressure Reset (DDC only) 144(c) No Simultaneous Heat/Cool 144(d) No Economizer 144(e) Diff. Enth (Integrated) Heat Air Supply Reset 144(f) Constant Temp Cool Air Supply Reset 144(f) Constant Temp Electric Resistance Heating' 144 Air Cooled Chiller Limitation 144(i) Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(k) No 1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used explain which exception(s) to §144(g) apply. EnergyPro 5.1 by EnergySoR User Number: 5511 RunCode: 2010-12-02714:37:41 ID: 10060 Page 20 of 26 WATER SIDE SYSTEM REQUIREMENTS Part 2 of 2 MECH-2C Project Name Date Ken Garff Chevrolet/Cadillac 1 12/2/2010 WATERZ SIDE SYSTEMS: Chillers, Towers, Boilers, H dronic Loops Item or System Tags .` (i.e. AC -1, RTU -1, HP -1)' Number of Systems Indicate Page Reference on Plans or Specification 2 MANDATORY MEASURES T-24 Sections Equipment Efficiency 112(a) Pipe Insulation 123 PRESCRIPTIVE MEASURES Cooling Tower Fan Controls 144(a & b Cooling Tower Flow Controls 144(h) Variable Flow System Design 144(h) Chiller and Boiler Isolation 144 CHW and HHW Reset Controls 1446; WLHP Isolation Valves 144(j) VSD on CHW, CW & WLHP Pumps>5HP 144(j) DP Sensor Location 144 1. The proposed equipment need to match the building plans schedule or specifications. If a requirement is not applicable, put "N/A" in the column next to applicable section. . , 2. For each chiller, cooling tower, boiler, and hydronic loop (or groups of similar equipment) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" in the column next to applicable section. Service Hot Water, Pool Heating Item or System Tags 1 (i.e. WH -1, WHP, DHW, etc...)' DHW Heater Number of Systems 1 Indicate Page Reference on Plans or Schedule MANDATORY MEASURES T-24Sections SERVICE HOT WATER Certified Water Heater 111, 113 a Smith Water Products DEL Water Heater Efficiency 113(b) 0.95 EF Service Water Heating Installation 113(c) Controls Req. Pipe Insulation 123 n/a POOL AND SPA Pool and Spa Efficiency and Control 114(a) n/a Pool and Spa Installation 114(b) n/a Pool Heater — No Pilot Light 115(c) n/a Spa Heater — No Pilot Light 115(d) n/a Pipe Insulation 123 Required 1. The Proposed equipment needs to match the building plans schedule or specifications. If a requirement is not applicable, put "N/A" in the column next to applicable section. 2. For each water heater, pool heater and domestic water loop (or groups of similar equipment) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" in the column. EnergyPro 5.1 by EnergySoft User Number. 5511 RunCode: 2010-12-02T14:37:41 /D: 10060 Page 21 of 26 MECHANICAL VENTILATION AND REHEAT MECH-3C Project Name Ken Garff ChevrolebCadillac Date 12/2/2010 MECHANICAL VENTILATION 121 b 2 REHEAT LIMITATION (§144(d)) AREA BASIS OCCUPANCY BASIS VAV MINIMUM - A B C D E F G H I J K L M N Zone/System Condition Area (ft2)ft2 CFM per Min CFM By Area B X C Number Of People CFM per Person Min CFM by Occupant E X F REQ'D V.A. Max of D or G Design Ventilation Air CFM 50% of Design Zone Supply I CFM B X 0.4 CFM / ft2 Max. of Columns H, J, K, 300 CFM Design Minimum Air Setpoint Transfer Air retail 3,329 0.25 832 832 666 166 corridodrestroom/support 313 0.15 47 4.0 15.0 60 60 60 Lounge 303 0.50 152 152 61 91 HP -1, HP -2, HP -3 Total 1,0441 787 Totals Column I Total Design Ventilation Air C Minimum ventilation rate per Section 121, Table 121-A. E Based on fixed seat or the greater of the expected number of occupants and 50% of the CBC occupant load foregress purposes fors aces without fixed setting. H Required Ventilation Air REQ'D V.A. is the larger of the ventilation rates calculated on an AREA BASIS or OCCUPANCY BASIS Column D or G). I Must be greater than orequal to H, or use Transfer Air column N to make up the difference. J Design fan supply CFM Fan CFM x 50%; or the design zone outdoor airflow rate per 121. K Condition area ft2 x 0.4 CFM / ft2; or L Maximum of Columns H, J, K, or 300 CFM M This must be less than orequal to Column L and greater than orequal to the sum of Columns H plus N. N Transfer Air must be provided where the Required Ventilation Air (Column H) is greater than the Design Minimum Air (Column M). Where required, transfer air must be greater than or equal to the difference between the Required Ventilation Air Column H and the Design Minimum Air Column M), Column H minus M. EnergyPro 5.1 by EnergySoft User Number: 5511 RunCode: 2010-12-02714.37.41 ID: 10060 Page 22 of 26 MECHANICAL EQUIPMENT DETAILS Part 1 of 2 MECH-5C Project Name Ken Garff Chevrolet/Cadillac Date 12/2/2010 CHILLER AND TOWER SUMMARY PUMPS Equipment Name Type aty. Eff Iclency Tons Ot . GPM Premium BHP Eff. Motor Pump Control DHW / BOILER SUMMARY System Name Type Distribution Ot . Rated Input (Gals). Vol. Energy Factor or RE Standby Loss Tank Ext. or Pilot R -Value Status A O Smith Water Products DEL 40 Small Elec. Kitchen Pipe Ins 1 20,478 40 0.95 n/a n/a New MULTI -FAMILY CENTRAL WATER HEATING DETAILS Hot Water Pump Hot Water Piping Length ft Control Ot . HP Type In Plenum Outside Buried Add Yz" Insulation CENTRAL SYSTEM RATINGS HEATING COOLING System Name Type Ot . Output Aux. kW Eff lciency Output Eff iciency Status HP -1, HP -2, HP -3 (Carrier TCQ08) Packaged DX 3 36,400 0.0 3.30 COP 84,900 11.2 EER New CENTRAL SYSTEM FAN SUMMARY SUPPLY FAN RETURN FAN System Name Fan Type Economizer Type CFM Premium BHP Eff. Motor CFM BHP Premium Eff. Motor HP -1, HP -2, HP -3 (Carrier TCQ08) Constant Volume Diff. Enth (Integrated) 3,000 0.40 m none ❑ ❑ ❑ ❑ ❑ ❑ ❑ EnergyPro 5.1 by EnergySoft User Number- 5511 Run Code: 2010-12-02T14:37:41 ID: 10060 Pa a 23 of 26 3 ENVELOPE MANDATORY MEASURES: NONRESIDENTIAL ENV -MM Project Name Date Ken Garff Chevrolet/Cadillac 12IV2010 DESCRIPTION Building Envelope Measures: §118(a): Installed insulating material shall have been certified by the manufacturer to comply with the California Quality Standards for insulating material, Title 20 Chapter 4, Article 3. §118(c): All Insulating Materials shall be installed in compliance with the flame spread rating and smoke density requirements of Sections 2602 and 707 of Title 24, Part 2. §118(f): The opaque portions of framed demising walls in nonresidential buildings shall have insulation with an installed R -value of no less than R-13 between framing members. §117(a): All Exterior Joints and openings in the building that are observable sources of air leakage shall be caulked, gasketed, weatherstripped or otherwise sealed. Manufactured fenestration products and exterior doors shall have air infiltration rates not exceeding 0.3 cfm/ft.2 of §116(a) 1: window area, 0.3 cfm/ft.2 of door area for residential doors, 0.3 cfm/ft.2 of door area for nonresidential single doors (swingingand sliding),and 1.0 cfm/ft.2 for nonresidential double doors (swinging). §116(a) 2: Fenestration U -factor shall be rated in accordance with NFRC 100, or the applicable default U -factor. §116(a) 3: Fenestration SHGC shall be rated in accordance with NFRC 200, or NFRC 100 for site -built fenestration, or the applicable default SHGC. 16 b Site Constructed Doors, Windows and Skylights shall be caulked between the unit and the building, and shall be §1 ()' weatherstripped (except for unframed glass doors and fire doors). i a • k 1 j - I r e F 1 1 i 'f Enerqyfro 5.1 by EnerqySft User Number.• 5511 Run Code: 2010-12-02T14:37:41 ID: 10060 Page 24 of 26 M LIGHTING MANDATORY MEASURES: NONRESIDENTIAL LTG -MM Project Name Date Ken Garff ChevroletlCadillac 12/2/2010 Indoor Lighting Measures: §131(d): Shut-off Controls For every floor, all interior lighting systems shall be equipped with a separate automatic control to shut off the lighting. 1.. This automatic control shall meet the requirements of Section 119 and may be an occupancy sensor, automatic time switch or other device capable of automatically shutting off the lighting. 2 Override for Building Lighting Shut-off: The automatic building shut-off system is provided with a manual, accessible override switch in sight of the lights. The area of override is not to exceed 5,000 square feet. §119(h): Automatic Control Devices Certified: All automatic control devices specified are certified, all alternate equipment shall be certified and installed as directed by the manufacturer. §111: Fluorescent Ballast and Luminaires Certified: All fluorescent fixtures specified for the project are certified and listed in the Directory. All installed fixtures shall be certified. §131(a): Individual Room/Area Controls: Each room and area in this building is equipped with a separate switch or occupancy sensor device for each area with floor -to -ceiling walls. Uniform Reduction for Individual Rooms: All rooms and areas greater than 100 square feet and more than 0.8 watts §131(b): per square foot of lighting load shall be controlled with bi-level switching for uniform reduction of lighting within the room. Daylight Area Control: All rooms with windows and skylights that are greater than 250 square feet and that allow for §131(c): the effective use of daylight in the area shall have 50% of the lamps in each daylit area controlled by a separate switch; or the effective use of daylight cannot be accomplished because the windows are continuously shaded by a building on the adjacent lot. Diagram of shading during different times of the year is included on plans. §131(c): Display Lighting. Display lighting shall be separately switched on circuits that are 20 amps or less.6. Outdoor Lighting Measures: §130(c)1: Mandatory lighting power determination for medium base sockets without permanently installed ballasts §132(a): All permanently installed luminaires with lamps rated over 100 Watts either have a lamp efficacy of at least 60 lumens per Watt or are controlled by a motion sensor. §132(b): All Luminaires with lamps rated greater than 175 Watts in hardscape area, including parking lots, building entrances, canopies, and all outdoor. sales areas meet the Cutoff Requirements. §132(c)1: All permanently installed outdoor lighting meets the control requirements listed. §132(c): Building facades, parking lots, garages, canopies, and outdoor sales areas meet the Multi -Level Lighting Requirements listed. I EnergyPro 5.1 by EnergySoft User Number: 5511 RunCode: 2010-12-02714:37:41 /D: 10060 Page 25 of 26 MECHANICAL MANDATORY MEASURES: NONRESIDENTIAL MECH-MM Project Name Date Ken Garff Chevrolet/Cadillac 12/2/2010 Equipment and System Efficiencies §111: Any appliance for which there is a California standard established in the Appliance Efficiency Regulations will comply with the applicable standard. §115(a): Fan type central furnaces shall not have a pilot light. §123: Piping, except that conveying fluids at temperatures between 60 and 105 degrees Fahrenheit, or within HVAC equipment, shall be insulated in accordance with Standards Section 123. §124: Air handling duct systems shall be installed and insulated in compliance with Sections 601, 602, 603, 604, and 605 of the CMC Standards. Controls §122(e): Each space conditioning system shall be installed with one of the following: 1 A. Each space conditioning system serving building types such as offices and manufacturing facilities (and all others not explicitly exempt from the requirements of Section 112 (d)) shall be installed with an automatic time switch with an accessible manual override that allows operation of the system during off -hours for up to 4 hours. The time switch shall be capable of programming different schedules for weekdays and weekends and have program backup capabilities that prevent the loss of the device's program and time setting for at least 10 hours if power is interrupted; or 1 B. An occupancy sensor to control the operating period of the system; or 1 C. A 4 -hour timer that can be manually operated to control the operating period of the system. 2 Each space conditioning system shall be installed with controls that temporarily restart and temporarily operate the system as required to maintain a setback heating and/or a setup cooling thermostat setpoint. Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000 square feet shall be provided with isolation zones. Each zone: shall not exceed 25,000 square feet; shall be provided §� 22(g). with isolation devices, such as valves or dampers that allow the supply of heating or cooling to be setback or shut off independently of other isolation areas; and shall be controlled by a time control device as described above. §122(c): Thermostats shall have numeric setpoints in degrees Fahrenheit (F) and adjustable setpoint stops accessible only to authorized personnel. §122(b): Heat pumps shall be installed with controls to prevent electric resistance supplementary heater operation when the heating load can be met by the heat pump alone Each space conditioning system shall be controlled by an individual thermostat that responds to temperature within the zone. Where used to control heating, the control shall be adjustable down to 55 degrees F or lower. For cooling, the §122(a&b): control shall be adjustable up to 85 degrees F or higher. Where used for both heating and cooling, the control shall be capable of providing a deadband of at least 5 degrees F within which the supply of heating and cooling is shut off or reduced to a minimum. Ventilation §121(e): Controls shall be provided to allow outside air dampers or devices to be operated at the ventilation rates as specified on these plans. §122(f): All gravity ventilating systems shall be provided with automatic or readily accessible manually operated dampers in all openings to the outside, except for combustion air openings. TllVlE)rcWQKn System AcceptanckM6WrlEil0zccupancy permit is granted for a newly constructed building or space, or a §121(f): new ventilating system serving a building or space is operated for normal use, all ventilation systems serving the building ors ace shall be certified as meeting the Acceptance Requirements for Code Compliance Service Water Heating Systems §113(c) Installation 3. Temperature controls for public lavatories. The controls shall limit the outlet Temperature to 110° F. 2 Circulating service water -heating systems shall have a control capable of automatically turning off the circulating pump when hot water is not required. EnergyPro 5.1 by EnergySoft User Number. 5511 RunCode: 2010-12-02T14:37:41 /D: 10060 Page 26 of 26