10-1282 (CSCS) Title 24BUILDING ENERGY ANALYSIS REPORT
PROJECT:
Ken Garff Chevrolet/Cadillac
79225 Highway 111
La Quinta, CA 92253
Project Designer:
Walt Wagner
815,Civic Center Drive
Oceanside, CA 92054
760.729.0533
Report Prepared by:
Farzad Tadayon
T -Squared Professional Engineers, Inc.
1340 Specialty Dr., Suite E
Vista, CA 92081 t "
760.560.0100
CITY OF LA QUINTA
'I
DEC 1..6 2010 i
By -
BUILDING & SAFETY DEPT.
APPROVED'..'
FOR CONSTRUCTION
Job Number: WE I By
10060 + Ip'
Date:
12/2/2010
6.1
The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is
authorized by the California Energy Commission for use with both the Residential and Nonresidential 2008 Building Energy Efficiency Standards.
This program developed by EnergySoft, LLC — www.energysoft.com.
Energ Pro 5. 1 by EnergySoft User Number. 5511 RunCode:,2010-12-02714:37:41 `ID: 10060
TABLE OF CONTENTS
Cover Page 1
Table of Contents 2
Nonresidential Performance Title 24 Forms 3
Form ENV -MM Envelope Mandatory Measures 24
Form LTG -MM Lighting Mandatory Measures 25
Form MECH-MM Mechanical Mandatory Measures 26
EnergyPro 5.1 by EnergySoft Job Number. ID: 10060 User Number. 5511
PERFORMANCE CERTIFICATE OF COMPLIANCE (Part 1 of 3) PERF -1 C
Project Name
Date
Ken Garff Chevrolet/Cadillac
12/2/2010
Project Address
Climate ZoneTotal
Cond. Floor Area
Addition Floor Area
79225 Highway 1.11 La Quinta
CA Climate Zone 15
3,945
n/a
GENERAL INFORMATION
Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Relocatable - indicate ❑ specific climate zone ❑ all climates
Phase of Construction: ® New Construction ❑ Addition ❑ Alteration
STATEMENT OF COMPLIANCE
This certificate of compliance lists the building features and specifications needed to
comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This
certificate applies only to a Building using the performance compliance approach.
The documentation author hereby certifies that the documentation is accurate and compoeb.
Documentation Author
Name Farzad Tadayon
Signature Z'
Company T -Squared Professional Engineers, Inc.
Date 12./2/1010
Address 1340 Specialty Dr., Suite E
Phone 760.560.0100
City/State/Zip Vista, CA 92081
The Principal Designer hereby certifies that the proposed building design represented in this set of
construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with
any other calculations submitted with this permit application. The proposed building has been designed to meet the energy
efficiency requirements contained in sections 110, 116 through 118, and 140 through 149 of Title 24, Part 6. Please
check one:
ENV. LTG. MECH.
I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to
[3 sign this document as the person responsible for its preparation; and that I am licensed in the State of
California as a civil engineer, mechanical engineer, electrical engineer, or I am a licensed architect.
I affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code by section
❑ ❑ ❑ 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed
contractor performing this work.
I affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document
❑ ❑ ❑ because it pertains to a structure or type of work described as exempt pursuant to Business and Professions
Code Sections 5537, 5538 and 6737.1.
Principal Envelope Designer
Name Waft Wagner
Signature
Company Waft Wagner Date
Address 815 Civic Center Drive Licen #
City/State/Zip Oceanside, CA 92054 oft 760.729.0533
Principal Mechanical Designer
Name Farzad Tadayon
Signature /7
Company T -Squared Professional Engineers, Inc. Date 11/19/10
Address 1340 Specialty Dr., Suite E License # M29230
City/State/Zip Vista, CA 92081 V Phone 760.560.0100
Principal Lighting Designer
Name Milton Niederhaus
Signat
Company T -Squared Professional Engineers, Inc. Date 11/19/10
Address 1340 Specialty Dr., Suite E License # E8636
City/State/Zip Vista, CA 92081 Phone 760.560.0100
INSTRUCTIONS TO APPLICANT COMPLIANCE & WORKSHEETS (check box if worksheets are included)
® ENV -1C Certificate of Compliance. Required on plans. m MECH-1C Certificate of Compliance. Required on plans.
® LTG -1 C Certificate of Compliance. Required on plans. m MECH-2C Air/Water Side/Service Hot Water & Pool Requirements.
® LTG -2C Lighting Controls Credit Worksheet. m MECH-3C Mechanical Ventilation and Reheat.
❑ LTG -3C Indoor Lighting Power Allowance. m MECH-5C Mechanical Equipment Details.
EnergyPro 5.1 by Energ Soft User Number: 5511 RunCode: 2010-12-02T14:37:41 /D: 10060 Page 3 of 26
PERFORMANCE CERTIFICATE OF COMPLIANCE
Project Name
Ken Garff ChevrolebCadillac
ANNUAL TDV ENERGY USE SUMMARY kBtu/s ft- r
Standard Proposed Compliance
Energy Component Design Design Margin
Space Heating
Space Cooling
Indoor Fans
Heat Rejection
Pumps & Misc.
Domestic Hot Water
Lighting
Receptacle
Process
Process Lighting
TOTALS
1.34
0.71
0.63
283.20
320.98
-37.78
36.99
43.79
-6.80
0.00
0.00
0.00
0.00
0.00
0.00
67.41
65.12
2.29
164.60
119.35
45.24
83.05
83.05
0.00
0.00
0.00
0.00
0.00
0.00
0.00
636.59
633.02
3.57
Percent better than Standard
GENERAL INFORMATION
0.6%1 ( 0.6 % exclud
Part 2 of 3
Heating
Cooling
Fans
Heat Rej
Pumps
DHW
Lighting
Receptacle
Process
Process Ltg
BUILDING COMPLIES
PERF -1 C
Date
12/2/2010
Building Orientation (N) 0 deg Conditioned Floor Area 3,945 sqft.
Number of Stories 1 Unconditioned Floor Area 0 sqft.
Number of Systems 3 Conditioned Footprint Area 0 sqft.
Number of Zones 3 Natural Gas Available On Site No
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Total
Roof
Orientation Grnsc Aran
(N)
490
(E)
968
(S)
670
(vv)
720
2,847
3,945
Prescriptive Lighting Power Density
Prescriptive Envelope TDV Energy
Remarks:
Standard
1.482 W/sqft.
160,484
sqft.
sqft.
sqft.
sqft.
sqft.
sqft.
Glazino Area
104
653
498
340
1,595
0
Proposed
1.078W/sqft
247,071
sqft.
sqft.
sqft.
sqft.
sqft.
sqft.
Glazinn Rntin
21.2%
67.4%
74.3%
47.2%
56.0%
0.0%
Prescriptive Values for
Comparison only. See
LTG -1 C for allowed LPD.
L,
PERFORMANCE CERTIFICATE OF COMPLIANCE (Part 3 of 3) PERF -1 C
Project Name
Ken Garff Chevrolet/Cadillac
Date
12/2/2010
ZONE INFORMATION
System Name
Zone Name
Occupancy Type
Floor
Area
s ft.
Inst.
LPD
W/sf '
Ctrl.
Credits
W/Sf 2
Allowed LPD
Proc.
Loads
W/sf
Area Tailored
W/sf 3 W/Sf 4
HP -1, HP -2, HP -3
retail
Retail Sales, Wholesale
3,329
1.205
0.050
corridor/restroom/support
Corridor/Restroom/Support
313
0.613
Lounge
Lounge, Recreation
303
0.726
Notes: 1. See LTG -1C 2. See LTG -2C 3. See LTG -3C 4. See LTG -4C
items marked with asterisk see LTG -1 -C b others b others
Items above require special documentation
EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST
The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written
justification and documentation, and special verification to be used with the performance approach. The local enforcement agency
determines the adequacy of the justifications, and may reject a building or design that otherwise complies based on the adequacy of the
special justification and documentation submitted.
The HVAC System HP -1, HP -2, HP -3 includes Demand Control Ventilation per Standards Section 121.
The HVAC System HP -1, HP -2, HP -3 (Carrier TCQ08) A Premium Efficiency 0.40 BHP Supply Fan Motor has been specified.
The exceptional features listed in this performance approach application have specifically been reviewed. Adequate written justification and
documentation for their use have been provided by the applicant.
Authorized Signature or Stamp
Energ Pro 5.1 by Energ Soft User Number: 5511 RunCode: 2010-12-02T14:37:41 /D: 10060 Page 5 of 26
CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV -1 C
AND FIELD INSPECTION ENERGY CHECKLIST
Project Name
Ken Garff Chevrolet/Cadillac
Date
1 12/212010
Project Address
79225 Highway 111 La Quinta
Climate Zone
15
Total Cond. Floor Area
3,945
Addition Floor Area
n/a
GENERAL INFORMATION
Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Schools (Public School) ❑ Bledlocatable g. Public School ® Conditioned Spaces ❑ Unconditioned Spaces
❑ Skylight Area for Large Enclosed Space >_ 8000 ft2 (If checked include the ENV -4C with submittal)
Phase of Construction: ® New Construction ❑ Addition ❑ Alteration
Approach of Compliance: ❑ Component ® Overall Envelope ❑ Unconditioned (file affidavit)
Front Orientation: N, E, S, W or in Degrees -
TO deg
FIELD INSPECTION ENERGY CHECKLIST
OPAQUE SURFACE DETAILS
INSULATION
Ta /ID'
Assembly Type 2
y
a
O
C fn
d W
O z
o
t;«
ti
M
m
3
j
U of
C O
® 7
w>
`
C C
d
w LL
O O
y 7
E>
O C
d '�
E LL
V
C
C G
-6 CL
-3 a
N
= R
0
U N
N
a
LL
1
Roof
851
(N)
0.031
R-30
4.2.1-A20
New
❑
❑
2
Wall
4
(E)
0.057
R-25
4.3.1-A9
New
❑
❑
3
Wall
90
(VV)
0.057
R-25
4.3.1-A9
New
❑
❑
4
Wall
102
(S)
0.057
R-25
4.3.1-A9
New
❑
❑
5
Roof
1,362
(N)
0.031
R-301
4.2.1-A20
New
❑
❑
6
Wall
102
(E)
0.057
R-25
4.3.1-A9
New
❑
❑
7
Roof
133
(N)
0.031
R-30
4.2.1-A20
New
❑
❑
8
Roof
288
(N)
0.031
R-30
4.2.1-A20
New
❑
❑
❑
❑
❑
❑
1. See Instructions in the Nonresidential Compliance Manual, page 3-96.
2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance.
FENESTRATION SURFACE DETAILS
Tag/ID'
Fenestration
Type 2
a
c>i
;a vi
W
O 2
0
to ALL
2>
° m
v
U. 'o
> N
U
C7
^�
¢
d
z oo
rn rn
rn
m
>
O
c
° <
a
o 2
U m
>
a
is
LL
1
Window
139
(E)
0.340
COG
0.380
COG
®
New
❑
❑
2
Window
194
(W)
0.340
COG
0.380
COG
❑
New
❑
❑
3
Window
498
(S)
0.340
COG
0.380
COG
0
New
❑
❑
4
window
396
(E)
0.340
COG
0.380
COG
❑
New
❑
❑
5
Window
118
(E)
0.340
COG
0.380
COG
®
New
❑
❑
6
Window
104
(N)
0.340
COG
0.380
COG
®
New
❑
❑
7
Window
146
(IAq
0.340
COG
0.380
COG
❑
New
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
1. See Instructions in the Nonresidential Compliance Manual, page 3-96.
2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary.
EnergyPro 5.1 by EnergySoft User Number: 5511 Run Code: 2010-12-02T14:37:41 /D: 10060 Pae 6 of 26
CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV -1 C
AND FIELD INSPECTION ENERGY CHECKLIST
Project Name
Ken Garff Chevrolet/Cadillac
Date
1 12/2/2010
Project Address
79225 Highway 111 La Quinta
Climate Zone
15
Total Cond. Floor Area
3,945
Addition Floor Area
n/a
GENERAL INFORMATION
Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Schools (Public School) ❑ RBledlocatable Public School ® Conditioned Spaces ❑ Unconditioned Spaces
❑ Skylight Area for Large Enclosed Space >_ 8000 ft2 (If checked include the ENV -4C with submittal)
Phase of Construction: ® New Construction ❑ Addition ❑ Alteration
Approach of Compliance: ❑ Component ® Overall Envelope ❑ Unconditioned (file affidavit)
Front Orientation: N, E, S, W or in Degrees:
0 deg
FIELD INSPECTION ENERGY CHECKLIST
OPAQUE SURFACE DETAILS
INSULATION
Ta /ID'
Assembly Type 2
y
Q
c
o�
cN
d V%
O z
o
n
LL
M
m
z. .2
>>
�o
c) o[
¢
c°
r
x 0
w>
��
r
x o
w LL>
°a
N
�0
�"
°�
0-
5
C LL
x
v
aci
C CL
o 0.
-124
c
Y
v�
C
o :°
U N
y
ca
a
m
LL
9
Wall
79
(N)
1 0.057
R-25
4.3.1-A9
I New
❑ 1
❑
10
Wall
36
(W
0.057
R-25
4.3:1-A9
New
❑
❑
11
Roof
133
(N)
0.031
R-30
4.2.1-A20
New
❑
❑
12
Roof
126
(N)
0.031
R-30
4.2.1-A20
New
❑
❑
13
Wall
86
(N)
0.057
R-25
4.3.1-A9
New
❑
❑
14
Wall
114
(E)
0.057
R-25
4.3.1-A9
New
❑
❑
15
Roof
117
(N)
0.031
R-30
4.2.1-A20
New
❑
❑
16
Wall
82
(N)
0.057
R-25
4.3.1-A9
New
❑
❑
❑
❑
❑
❑
1. See Instructions in the Nonresidential Compliance Manual, page 3-96.
2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance.
FENESTRATION SURFACE DETAILS
Tag/ID'
Fenestration
Type 2
a
03
cN
w
O Z
L
v
m 4
00
2>
L
5 2
4
> <n
V
=
w
02
z o
N N
rn
t
>
O
c
v `;
o 2
v rn
is
a
ti
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
F
❑
Lo
1. See Instructions in the Nonresidential Compliance Manual, page 3-96.
2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary.
EnergyPro 5.1 by EnergySoft User Number: 5511 RunCode: 2010-12-02T14:37:41 /D: 10060 Pae 7 of 26
CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV -1 C
AND FIELD INSPECTION ENERGY CHECKLIST
Project Name
Ken Garff ChevroletlCadillac
Date
1 12/2/2010
Project Address
79225 Highway 111 La Quinta
Climate Zone
15
Total Cond. Floor Area
3,945
Addition Floor Area
n/a
GENERAL INFORMATION
Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Schools (Public School) ❑ RRledlocatable g. Public School ® Conditioned Spaces 13Unconditioned Spaces
❑ Skylight Area for Large Enclosed Space >_ 8000 ft2 (If checked include the ENV -4C with submittal)
Phase of Construction: ® New Construction ❑ Addition ❑ Alteration
Approach of Compliance: ❑ Component ® Overall Envelope ❑ Unconditioned (file affidavit)
Front Orientation: N, E, S, W or in Degree;'TO deg
FIELD INSPECTION ENERGY CHECKLIST
OPAQUE SURFACE DETAILS
INSULATION
Ta /ID'
Assembly Type 2
y
L
a
C fn
NW
O z
U
lL
Y 7
> j
of
v cc
C
CD
«7
K ia
w>
C C
W
%
w LL
`p
N
m
>
p C
d
LL
C
C d
p a
-2 a
N
C �
o
t> rA
N
a
LL
17
Roof
141
(N)
0.031
R-30
4.2.1-A20
New
❑
❑
18
Wall
51
(W)
0.057
R-25
4.3.1-A9
New
❑
❑
19
Roof
178
(N)
0.031
R-30
4.2.1-A20
New
❑
❑
20
Roof
39
(N)
0.031
R-30
4.2.1-A20
New
❑
❑
21
Wall
95
(E)
0.057
R-25
4.3.1-A9
New
❑
❑
22
Wall
70
(S)
0.057
R-25
4.3.1-A9
New
❑
❑
23
Wall
34
(N)
0.057
R-25
4.3.1-A9
New
❑
❑
24
Roof
78
(N)
0.031
R-30
4.2.1-A20
New
❑
❑
❑
❑
1. See Instructions in the Nonresidential Compliance Manual, page 3-96.
2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance.
FENESTRATION SURFACE DETAILS
Tag/ID'
Fenestration
Type 2
x
Q
c
1;
W
O Z
x LL
2>
d
1
ii 'o
> rn
c�
cxa N
d
L
i 'o
N N
C
o
>
O
C
_°d
o
U(A
is
a
ii
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
1. See Instructions in the Nonresidential Compliance Manual, page 3-96.
2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary.
EnergyPro 5.1 by EnergySoft User Number. 5511 RunCode: 2010-12-02T14:37:41 ID: 10060 Page 8 of 26
CERTIFICATE OF COMPLIANCE - (Part 1 of 3) ENV -1 C
AND FIELD INSPECTION ENERGY CHECKLIST
Project Name
Ken Garff Chevrolet/Cadillac
Date
1 12/2/2010
Project Address
79225 Highway 111 La Quinta
Climate Zone
15
Total Cond. Floor Area
3,945
Addition Floor Area
n/a
GENERAL INFORMATION
Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Schools (Public School) ❑ BRledlocatable Public School ® Conditioned Spaces ❑ Unconditioned Spaces
❑ Skylight Area for Large Enclosed Space >_ 8000 ft2 (If checked include the ENV -4C with submittal)
Phase of Construction: ® New Construction ❑ Addition ❑ Alteration
Approach of Compliance: ❑ Component ® Overall Envelope ❑ Unconditioned (file affidavit)
Front Orientation: N, E, S, W or in Degrees:
0 deg
FIELD INSPECTION ENERGY CHECKLIST
OPAQUE SURFACE DETAILS
INSULATION
Ta /ID'
AssemblyType z
'
d
Q
c
CN N
O z
L50
«
U of
O
«
xm
w >
N`
3
w u-
_ >
E u-
v
-
pa
-z a
" N
�W
C
O
Urn
NI
to
a
-is
u-
25
Wall
77
(M
0.057
R-25
4.3.1-A9
New
❑
❑
26
Roof
78
(N)
0.031
R-30
4.2.1-A20
New
❑
❑
27
Wall
77
W
0.057
R-25
4.3.1-A9
New
❑
❑
28
Roof
118
(N)
0.031
R-30
4.2.1-A20
New
❑
❑
29
Wall
49
(149
0.057
R-25
14.3.1-A9
New
❑
❑
30
Roof
303
(N)
0.031
R-30
4.2.1-A20
New
❑
❑
31
Wall
105
(N)
0.057
R-25
4.3.1-A9
New
❑
❑
❑
❑
❑
❑
1. See Instructions in the Nonresidential Compliance Manual, page 3-96.
2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance.
FENESTRATION SURFACE DETAILS
Tag/ID'
Fenestration
Type z
i
a
c
03
C
a 2 UJ
O Z
y
V
ALL
>
2>
O
V �
4- O
cN0
>U)
U
W_
°C
O
N N
C
c
O
U)
o
O«
Q
a
m
LL
[3
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
1. See Instructions in the Nonresidential Compliance Manual, page 3-96.
2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary.
EnergyPro 5.1 by EnergySoft User Number: 5511 Run Code: 2010-12-02714:37:41 /D: 10060 Page 9 of 26
CERTIFICATE OF COMPLIANCE (Part 2 of 3)
AND FIELD INSPECTION ENERGY CHECKLIST,
ENV -1 C
Project Name
Ken Garff Chevrolet/Cadillac
Date
12/2/2010
ROOFING PRODUCT (COOL ROOFS
(Note if the roofing product is not CRRC certified, this compliance approach cannot be used). Go to Overall Envelope Approach or
Performance Approach.
CHECK APPLICABLE BOX BELOW IF EXEMPT FROM THE ROOFING PRODUCT "COOL ROOF" REQUIREMENTS:
Pass
Fail'
N/A
❑ Roofing compliance not required in Climate Zones 1 andl6 with a Low -Sloped. 2:12 pitch or less.
❑
❑
❑
❑ Roofing compliance not required in Climate Zone 1 with a Steep -Sloped with less than 5 Ib/ft2. Greater than 2:12 pitch.
❑
❑
❑
❑ Low -sloped Wood framed roofs in Climate Zones 3 and 5 are exempted, solar reflectance and thermal emittance or
SRI that have a U -f actor of 0.039 or lower. See Opaque Surface Details roof assembly, Column H of ENV -2C.
❑
❑
❑
❑ Low -sloped Metal building roofs in Climate Zone 3 and 5 are exempted, solar relectance and thermal emittance or SRI
that have a U -f actor of 0.048 or lower. See Opaque Surface Details roof assembly below, Column H of ENV -2C.
❑
❑
❑
❑ The roof area covered by building integrated photovoltaic panels and building integrated solar thermal panels are
exempted. Solar reflectance and thermal emittance or SRI, seespreadsheet calculator at www.energy.ca.gov/title24/
❑
❑
❑
❑ Roof constructions that have thermal mass over the roof membrane with a weight of at least 25 Ib/ft are exempt from
the Cool Roof criteria below.
❑
❑
❑
❑ High-rise residential buildings and hotels and motels with low -sloped roofs in Climate Zones 1 through 9, 12 and 16 are
exempted from the low -sloped roofing criteria.
❑
❑
❑
1. If Fail then describe on this page of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary.
CRRC Product ID
Number'
Roof Slope
S 2:12 > 2:12
Product Weight
< 5lb/ff a 5lb/ft2
Product
Type 2
Aged Solar
Reflectance
Thermal
Emmitance
SR 15
Pass
Fail6
❑ ❑
❑ ❑
❑ 4
❑
❑
❑ ❑
❑ ❑
❑ 4
❑
❑
❑ ❑
1 ❑ ❑
❑4
1❑
1
❑
❑ ❑
❑ ❑
1❑ 4
❑
❑
❑ ❑
❑ ❑
❑ 4
❑
❑
❑ ❑
❑ ❑
❑ 4
❑
❑
1. The CRRC Product ID Number can be obtained from the Cool Roof Rating Council's Rated Product Directory at
www.coolroofs.orci/i)roducts/search.[)hl)
2. Indicate the type of product is being used for the roof top, i.e. single -ply roof, asphalt roof, metal roof, etc.
3. If the Aged Reflectance is not available in the Cool Roof Rating Council's Rated Product Directory then use the Initial Reflectance value from the
same directory and use the equation (0.2+0.7(p,Nt,a, — 0.2) to obtain a calculated aged value. Where p is the Initial Solar Reflectance from the Cool
Roof Rating Council's Rated Product Directory.
4. Check box if the Aged Reflectance is a calculated value using the equation above.
5. The SRI value needs to be calculated from a spreadsheet calculator at htto://www.energy.ca.00v/title24/
6. If Fail then describe on this page of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary.
To apply Liquid Field Applied Coatings, the coating must be applied across the entire roof surface and meet the dry mil thickness or coverage
recommended by the coatings manufacturer and meet minimum performance requirements listed in §118(i)4. Select the applicable coating:
❑ Aluminum -Pigmented Asphalt Roof Coating
❑ Cement -Based Roof Coating
❑ Other
Discrepancies:
EnergyPro 5.1 by EnerqySoft User Number: 5511 RunCode: 2010-12-02714:37:41 /D: 10060
Pae 10 of 26
CERTIFICATE OF COMPLIANCE (Part 3 of 3) ENV -1 C
AND FIELD INSPECTION ENERGY CHECKLIST
Project Name
Ken Garff Chevrolet/Cadillac
Date
12/2/2010
Required Acceptance Tests
Designer:
This form is to be used by the designer and attached to the plans. Listed below is the acceptance test for Envelope
Fenestrations system. The designer is required to check the acceptance tests and list all the fenestration products that
require an acceptance test. If all the site -built fenestration of a certain type requires a test, list the different fenestration
products and the number of systems. The NA7 Section in the Appendix of the Nonresidential Reference Appendices
Manual describes the test. Since this form will be part of the plans, completion of this section will allow the responsible
party to budget for the scope of work appropriately.
Enforcement Agency:
Systems Acceptance. Before Occupancy Permit is granted for a newly constructed building or space or whenever new
fenestration is installed in the building or space shall be certified as meeting the Acceptance Requirements.
The ENV -2A form is not considered a complete form and is not to be accepted by the enforcement agency unless the
boxes are checked and/or filled and signed. In addition, a Certificate of Acceptance forms shall be submitted to the
enforcement agency that certifies plans, specifications, installation certificates, and operating and maintenance
information meet the requirements of §10-103(b) of Title 24 Part 6. The field inspector must receive the properly filled
out and signed forms before the building can receive final occupancy. A copy of the ENV -2A for each different
fenestration product line must be provided to the owner of the building for their records.
Test Description ENV -2A Test Performed By:
Fenestration Products Name or ID Area of like Building Envelope
Requiring Testing or Verification Products Acceptance Test
new Double Metal Tinted 1,595
13
13
❑
13
13
❑
EnergyPro 5.1 by EnergySoft User Number: 5511 RunCode: 2010-12-02714:37:41 /D: 10060 Pae 11 of 26
'CERTIFICATE OF COMPLIANCE (Part 1 of 3) LTG -1 C
Project Name
Ken Garff Chevrolet/Cadillac
Date
12/2/2010
INDOOR LIGHTING SCHEDULE and FIELD INSPECTION ENERGY CHECKLIST
Installation Certificate, LTG -1- INST Retain a copy and'verify form is completed and signed.)
Field Inspector ❑
Certificate of Acceptance, LTG -2A (Retain a copy and verify form is completed and signed.)
Field Inspector ❑
A separate Lighting Schedule Must Be Filled Out for Conditioned and Unconditioned Spaces Installed Lighting Power listed on
this Lighting Schedule is only for:
m CONDITIONED SPACE ❑ UNCONDITIONED SPACE
m The actual indoor lighting power listed below includes all installed permanent and portable lighting systems in accordance
with §146(a).
Only for offices: Up to the first 0.2 watts per square foot of portable lighting shall not be required to be included in the
m calculation of actual indoor lighting power density in accordance with the Exception to §146(a). All portable lighting in excess of
0.2 watts per square foot is totaled below.
Luminaire (Type, Lamps, Ballasts
Installed Watts
A
B
C
D
E
F
G
H
None
or
Item
Ta
Complete Luminaire Description '
i.e, 3 lam fluorescent troffer,
F32T8, one dimmable electronic ballasts
co
li
.5
�,
a
U
a
�_ c
E
`° �
J
How wattage
Was determined
J0 c
E E
> >
Z J
LL
N
y
N i°
5 3:
Field
Ins ectorz
Z5
v
m
CEC v n
Default
coy �'
From o
NA8 ¢ ~
vi
co
o-
co
u.
C
(1) 4 It Fluorescent T8 Rapid Start Elec
❑
32.0
® ❑
1
32
❑
❑
F
70w Metal Halide
❑
86.0
® ❑
30
2,580
❑
❑
G
(2) 28w Linear Fluorescent T5 Elec
❑
60.0
® ❑
14
840
❑'
❑
J
(1) 32w Compact Fluorescent Triple 4 Pin Elec
❑
35.0
® ❑
6
210
❑,
❑
L
(2) 39w Linear Fluorescent T5 HO Elec
❑
85.0
® ❑
4
340
❑
❑
N
20w LED
❑
20.0
® ❑
21
420
❑
❑
❑
❑ ❑
❑
❑
❑
❑ ❑
❑
❑
❑
❑ ❑
❑
❑
❑
❑ ❑
❑
❑
❑
❑ ❑
❑
❑
❑
❑ ❑
❑
❑
❑
❑ ❑
01
❑
❑
❑ ❑
❑
❑
❑
❑ ❑
❑
❑
❑
❑ ❑
❑
❑
❑
❑ ❑
❑
❑
❑
❑ ❑
❑
❑
❑
1
❑ ❑
❑
❑
Installed Watts Page Total:
4,422
Building total number of pages:
Installed Watts Building Total
Sum of all pages)
4,422
Enter into LTG -1 C Pa e 4 of 4
1. Wattage shall be determined according to Section 130 (d and e). Wattage shall be rating of light fixture, not rating of bulb.
2 . If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary.
EnergyPro 5.1 by EnergySoft User Number. 5511 Run Code: 2010-12-02714:37:41 ID: 10060 Pae 12 of 26
CERTIFICATE OF COMPLIANCE (Part 2 of 3)
LTG -1 C"
Project Name
Ken Garff Chevrolet/Cadillac
Date
12/2/2010
INDOOR LIGHTING SCHEDULE and FIELD INSPECTION ENERGY CHECKLIST
Fill in controls for all spaces: a) area controls, b) multi-level controls, c) manual daylighting controls for daylit areas > 250 ft2,
automatic daylighting controls for daylit areas > 2,500 ft2, d) shut-off controls, e) display lighting controls, f) tailored lighting controls —
general lighting controlled separately from display, ornamental and display case lighting and g) demand responsive automatic
controls for retail stores > 50,000 ft2, in accordance with Section 131.
MANDATORY LIGHTING CONTROLS — FIELD INSPECTION ENERGY CHECKLIST
Field
Ins actor
Number Special
Type/ Description of Units Location in Building Features
Pass
Fail
LCP/ TIME CLOCK F&I OFFICE ❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
o
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
SPECIAL FEATURES INSPECTION CHECKLIST See Page 2 of 4 of LTG -1C
The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written
justification and documentation, and special verification. The local enforcement agency determines the adequacy of the justification,
and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation
submitted.
Field Inspector's Notes or Discrepancies:
EnergyPro 5.1 by EnergySoft User Number: 5511 RunCode: 2010-12-02T14.37:41 ID: 10060
Pae 13 of 26
CERTIFICATE OF COMPLIANCE - Part 3 of 3 LTG-1C
Project Name
Date
Ken Gaff Chevrolet(Cadillac
12/2/2010
CONDITIONED AND UNCONDITIONED SPACE LIGHTING MUST
NOT BE COMBINED FOR COMPLIANCE
Indoor Lighting Power for Conditioned S aces
Indoor Lighting Power for Unconditioned Spaces
Watts
Watts
Installed Lighting
4,422
Installed Lighting
0
from Conditioned LTG-1 C, Page 2
from Unconditioned LTG-1 C, Page 2
Lighting Control Credit -
168
Lighting Control Credit
0
Conditioned Spaces from LTG-2C
Unconditioned Spaces from LTG-2C
Adjusted Installed
4,254
Adjusted Installed =
0
Lighting Power
Lighting Power
Complies if Installed:5 Allowed
Complies if Installed:5 Allowed
Allowed Lighting Power
Allowed Lighting Power
Conditioned Spaces from LTG-3C or PERF-1
4,254
Unconditioned Spaces from LTG-3C)0
Required Acceptance Tests
Designer:
This form is to be used by the designer and attached to the plans. Listed below is the acceptance test for the Lighting system,
LTG-2A. The designer is required to check the acceptance tests and list all control devices serving the building or space shall be
certified as meeting the Acceptance Requirements for Code Compliance. If all the lighting system or control of a certain type requires
a test, list the different lighting and the number of systems. The NA7 Section in the Appendix of the Nonresidential Reference
Appendices Manual describes the test. Since this form will be part of the plans, completion of this section will allow the responsible
party to budget for the scope of work appropriately. Forms can be grouped by type of Luminaire controlled.
Enforcement Agency:
Systems Acceptance. Before Occupancy Permit is granted for a newly constructed building or space or when ever new lighting
system with controls is installed in the building or space shall be certified as meeting the Acceptance Requirements.
The LTG-2A form is not considered a complete form and is not to be accepted by the enforcement agency unless the boxes are
checked and/or filled and signed. In addition, a Certificate of Acceptance forms shall be submitted to the enforcement agency that
certifies plans, specifications, installation certificates, and operating and maintenance information meet the requirements of
§10-103(b) of Title 24 Part 6. The field inspector must receive the properly filled out and signed forms before the building can receive
final occupancy. A copy of the LTG-2A for each different lighting luminaire control(s) must be provided to the owner of the building
for their records.
Controls for Credits
LTG-2A
Controls and
Sensors and
Automatic
Number of
Daylighting
Luminaire
Controls
Equipment Re uirin Testing
Description
controls
Location
Acceptance
Occ Sensor- Multi-Level
(2) 28w Linear Fluorescent T5 Elec
2
F&I sales
Occ Sensor - Mufti-Level
(2) 28w Linear Fluorescent T5 Elec
2
sales 108
Occ Sensor - Multi-Level
(2) 28w Linear Fluorescent T5 Elec
2
sales 116
Occ Sensor- Mufti-Level
(2) 28w Linear Fluorescent T5 Elec
2
sales 115
Occ Sensor- Mufti-Level
(2) 28w Linear Fluorescent T5 Elec
2
sales 107
Occ Sensor- Mufti-Level
(2) 28w Linear Fluorescent T5 Elec
41
sales manager
❑
Ener Pro 5.1 by Ene Soh User Number: 5511 RunCode: 2010-12-02714:37:41 ID: 10060 Pae 14 of 26
CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C
FIELD INSPECTION ENERGY CHECKLIST
Project Name
Ken Garff Chevrolet/Cadillac
Date
12/2/2010
Project Address
79225 Highway 111 La Quinta
Climate Zone
15
Total Cond. Floor Area
3,945
Addition Floor Area
n/a
GENERAL INFORMATION
Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Schools (Public School) ❑ Relocatable Public School Bldg. m Conditioned Spaces ❑ Unconditioned Spaces
affidavit
Phase of Construction: ® New Construction ❑ Addition ❑ Alteration
Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit)
Energy
Front Orientation: N, E, S, W or in Degrees:
0 deg
HVAC SYSTEM DETAILS
FIELD INSPECTION ENERGY CHECKLIST
E ui menu
Inspection Criteria
Meets Criteria
or Requirements
Pass
Fail — Describe Reason
Item or System Tags
AC -1, RTU -1 HP -1
DHW Heater
❑
[3i.e.
Equipment T e3:
Electric Res DHW Boiler
❑
❑
Number of Systems
1
❑
❑
Max Allowed Heating Capacity'
20,478 Btu/hr
❑
❑
Minimum Heating Efficiency'
0.95 EF
❑
❑
Max Allowed Cooling Capacity'
n/a
❑
❑
Cooling Efficiency'
n/a
❑
❑
Duct Location/ R -Value
n/a
❑
❑
When duct testing is required, submit
MECH-4A & MECH-4-HERS
n/a
❑
Economizer
n/a
❑
❑
Thermostat
n/a
❑
❑
Fan Control
n/a
❑
❑
E ui ment2
Inspection Criteria
FIELD INSPECTION ENERGY CHECKLIST
Pass
Fail — Describe Reason
Item or System Tags
i.e. AC -1, RTU -1, HP -1
HP -1, HP -2, HP -3
❑
❑
Equipment T e3:
Packaged DX
❑
❑
Number of Systems
3
❑
❑
Max Allowed Heating Capacity'
36,400 Btu/hr
❑
❑
Minimum Heating Efficiency'
3.30 COP
❑
❑
Max Allowed Cooling Capacity'
84,900 Btu/hr
❑
❑
Cooling Efficiency'
11.2 EER
❑
❑
Duct Location/ R -Value
R-8.0
❑
❑
When duct testing is required, submit
& MECH-4-HERS
No
13
13MECH-4A
Economizer
Diff. Enth (Integrated)
❑
❑
Thermostat
Setback Required
❑
❑
Fan Control
Constant Volume
❑
❑
1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked.
3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other.
EnergyPro 5.1 by EnergySoft User Number: 5511 Run Code: 2010-12-02T14:37:41 /D: 10060 Pae 15 of 26
d
CERTIFICATE OF COMPLIANCE and (Part 2 of 4) MECH-1 C
FIELD INSPECTION ENERGY CHECKLIST
Project Name Date
Ken Garff Chevrolet/Cadillac 12/2/2010
Discrepancies:
11
Ene Pro 5.1 by EnergySoft User Number. 5511 RunCode: 2010-12-02T14:37:41 ID: 10060 Pae 16 of 26
CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 3 of 4) MECH-1 C
Project Name
Date
Ken GanT ChevroleNCadillac
12/2/2010
Required Acceptance Tests
Designer:
This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for mechanical systems. The designer is required to check the applicable
boxes by all acceptance tests that apply and listed all equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the equipment description and
the number of systems. The NA number designates the Section in the Appendix of the Nonresidential Reference Appendices Manual that describes the test. Since this form will be
part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately.
Building Departments:
Systems Acceptance: Before occupancy permit is granted for a newly constructed building or space, or a new space -conditioning system serving a building or space is operated for
normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance.
Systems Acceptance: Before occupancy permit is granted. All newly installed HVAC equipment must be tested using the Acceptance Requirements.
The MECH-1 C form is not considered a completed form and is not to be accepted by the building department unless the correct boxes are checked. The equipment requiring testing,
person performing the test (Example: HVAC installer, TAB contractor, controls contractor, PE in charge of project) and what Acceptance test must be conducted. The following
checked -off forms are required for ALL newly installed equipment. In addition a Certificate of Acceptance forms shall be submitted to the building department that certifies plans,
specifications, installation, certificates, and operating and maintenance information meet the requirements of §10-103(b) and Title -24 Part 6. The building inspector must receive the
properly filled out and signed forms before the building can receive final occupancy.
TEST DESCRIPTION
MECH-2A
MECH-3A
MECH-4A
MECH-5A
MECH-6A
MECH-7A
MECH-8A
MECH-9A
MECH-10A
MECH-11A
Hydronic
Outdoor
Constant
Demand
Supply
System
Automatic
Ventilation
Volume &
Air
Control
Supply
Valve
Water
Variable
Demand
For
Single -Zone
Distribution
Economizer
Ventilation
Fan
Leakage
Temp.
Flow
Shed
Equipment Re uirin Testing or Verification Ot .
VAV & CAV
Unitary
Ducts
Controls
DCV
VAV
Test
Reset
Control
Control
HP -1, HP -2, HP -3 (Carrier TCQ08) 3
®
®
❑
m
m
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
'❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑.
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
EnergyPro 5.1 by EnergySoft User Number: 5511 Run Code: 2010-12-02T14:37:41 0:10060 Pae 17 of 26
ir-.
CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST
(Part 4 of 4) MECH-1 C
Project Name
Ken Garff ChevrolebCadillac
Date
12/2/2010
TEST DESCRIPTION
MECH-12A
MECH-13A
MECH-14A
MECH-15A
Equipment Re uirin Testing
Fault
Detection &
Diagnostics
Qty. for DX Units
Automatic Fault
Detection &
Diagnostics for
Air & Zone
Distributed
Energy Storage
DX AC
Systems
Thermal Energy
Storage (TES)
Systems
Test Performed By:
HP -1, HP -2, HP -3 (Carrier TCQ08)
3 ❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
.❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
EnergyPro 5.1 by EnergySoft
User Number: 5511
Run Code: 2010.12-02T14:37:41 ID: 10060
Pae 18 of 26
LIGHTING CONTROLS CREDIT WORKSHEET (Part 1 of 2)
LTG -2C
Project Name
Ken Gafff Chevrolet/Cadillac
Date
12/2/2010.
POWER ADJUSTMENT FACTORS PAF FOR NON -DAYLIGHT CONTROLS
A Separate PAF Worksheet Must Be Filled Out for Conditioned _and Unconditioned Spaces. Control Credits listed on this
schedule are only for:
m CONDITIONED SPACES ❑ UNCONDITIONED SPACES
A B C D E F
G
Watts of Power
Room # Zone ID Plan Room Area Control Adjustments
Areas Lighting Control Description' Reference ftp Lighting Factor'
Control
Credit Watts
E x F
F&I sales Occ Sensor- Multi -Level G 133 120 0.20 24
sales 108 Occ Sensor- Multi -Level G 133 120 0.20 24
sales 116 Occ Sensor- Multi -Level G 126 120 0.20 24
sales 115 Occ Sensor- Mufti -Level G 117 120 0.20 24
sales 107 Occ Sensor- Mufti -Level G 141 120 0.20 24
sales manager Occ Sensor- Mufti -Level G 178 240 0.20 48
PAGE TOTAL 168
Note:
Building total of non -da licht control credit watts for all pages of LTG -2C Pae 1 of 2
Conditioned and
Unconditioned
Enter building total of all daylight controls credit watts from LTG -2C Page 2 of 2 0
Space shall be
separately
totaled
BUILDING TOTAL OF ALL CONTROL CREDIT WATTS
(FOR BOTH NON -DAYLIGHT AND DAYLIGHT CONTROL CREDITS) 168
Enter in LTG -1C; Page 4: Lighting Control Credit as appropriate for CONDITIONED
or UNCONDITIONED Spaces
1. Description shall be consistent with Type of Control defined in Table 146-C
2. Power Adjustment Factor taken from Table 146-C
EnergyPro5.1byEnergySoft User Number. 5511 RunCode: 2010-12-02T14:37:41 ID: 10060
Pae 19 of 26
AIR SYSTEM REQUIREMENTS
Part 1 of 2 MECH-2C
Project Name
Date
Ken Garff ChevroletlCadillac
1 121212010
Indicate
Air Systems Type Central, Single
Zone, Package, VAV, or etc...
Item or System Tags
i.e. AC -1, RTU -1, HP -1
HP -1, HP -2, HP -3
Number of Systems
3
Indicate Pa a Reference on Plans or Schedule and indicate the applicable exception(s)
MANDATORY MEASURES
T-24 Sections
Heating Equipment Efficiency
112(a)
3.30 COP
Cooling Equipment Efficiency
112(a)
11.2 EER
HVAC Heat Pump Thermostat
112(b), 112(c)
Yes
Furnace Controls/Thermostat
112(c),115(a)
Na
Natural Ventilation
121 b
No
Mechanical Ventilation
121 b
787 cfm
VAV Minimum Position Control
121 c
No
Demand Control Ventilation
121 c
Yes
Time Control
122(e)
Programmable Switch
Setback and Setup Control
122(e)
Setback Required
Outdoor Damper Control
122(f)
Auto
Isolation Zones
122
n/a
Pipe Insulation
123
Duct Insulation
124
R-8.0
PRESCRIPTIVE MEASURES
Calculated Design Heating Load
144(a & b
n/a
Proposed Heating Capacity
144(a & b
68,203 Btu/hr
Calculated Design Cooling Load
144(a & b
n/a
Proposed Cooling Capacity
144(a & b
201,916 Btu/hr
Fan Control
144(c)
Constant Volume
DP Sensor Location
144(c)
Supply Pressure Reset (DDC only)
144(c)
No
Simultaneous Heat/Cool
144(d)
No
Economizer
144(e)
Diff. Enth (Integrated)
Heat Air Supply Reset
144(f)
Constant Temp
Cool Air Supply Reset
144(f)
Constant Temp
Electric Resistance Heating'
144
Air Cooled Chiller Limitation
144(i)
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(k)
No
1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary
heat for heat pumps. If electric heat is used
explain which exception(s) to §144(g) apply.
EnergyPro 5.1 by EnergySoR User Number: 5511
RunCode: 2010-12-02714:37:41
ID: 10060 Page 20 of 26
WATER SIDE SYSTEM REQUIREMENTS Part 2 of 2 MECH-2C
Project Name
Date
Ken Garff Chevrolet/Cadillac
1 12/2/2010
WATERZ SIDE SYSTEMS: Chillers, Towers, Boilers, H dronic Loops
Item or System Tags .`
(i.e. AC -1, RTU -1, HP -1)'
Number of Systems
Indicate Page Reference on Plans or Specification 2
MANDATORY MEASURES T-24 Sections
Equipment Efficiency 112(a)
Pipe Insulation 123
PRESCRIPTIVE MEASURES
Cooling Tower Fan Controls 144(a & b
Cooling Tower Flow Controls 144(h)
Variable Flow System Design 144(h)
Chiller and Boiler Isolation 144
CHW and HHW Reset Controls 1446;
WLHP Isolation Valves 144(j)
VSD on CHW, CW & WLHP Pumps>5HP 144(j)
DP Sensor Location 144
1. The proposed equipment need to match the building plans schedule or specifications. If a requirement is not applicable, put "N/A" in the column
next to applicable section. . ,
2. For each chiller, cooling tower, boiler, and hydronic loop (or groups of similar equipment) fill in the reference to sheet number and/or specification
section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" in the column next to
applicable section.
Service Hot Water, Pool Heating
Item or System Tags 1
(i.e. WH -1, WHP, DHW, etc...)' DHW Heater
Number of Systems 1
Indicate Page Reference on Plans or Schedule
MANDATORY MEASURES T-24Sections
SERVICE HOT WATER
Certified Water Heater 111, 113 a Smith Water Products DEL
Water Heater Efficiency 113(b) 0.95 EF
Service Water Heating Installation 113(c) Controls Req.
Pipe Insulation 123 n/a
POOL AND SPA
Pool and Spa Efficiency and Control 114(a) n/a
Pool and Spa Installation 114(b) n/a
Pool Heater — No Pilot Light 115(c) n/a
Spa Heater — No Pilot Light 115(d) n/a
Pipe Insulation 123 Required
1. The Proposed equipment needs to match the building plans schedule or specifications. If a requirement is not applicable, put "N/A" in the column
next to applicable section.
2. For each water heater, pool heater and domestic water loop (or groups of similar equipment) fill in the reference to sheet number and/or
specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" in the
column.
EnergyPro 5.1 by EnergySoft User Number. 5511 RunCode: 2010-12-02T14:37:41 /D: 10060 Page 21 of 26
MECHANICAL VENTILATION AND REHEAT MECH-3C
Project Name
Ken Garff ChevrolebCadillac
Date
12/2/2010
MECHANICAL VENTILATION 121 b 2
REHEAT LIMITATION (§144(d))
AREA BASIS
OCCUPANCY BASIS
VAV MINIMUM -
A
B
C
D
E
F
G
H
I
J
K
L
M
N
Zone/System
Condition
Area
(ft2)ft2
CFM
per
Min CFM
By Area
B X C
Number
Of
People
CFM
per
Person
Min CFM
by
Occupant
E X F
REQ'D
V.A.
Max of
D or G
Design
Ventilation
Air
CFM
50% of
Design Zone
Supply
I CFM
B X 0.4
CFM / ft2
Max. of
Columns
H, J, K,
300 CFM
Design
Minimum
Air
Setpoint
Transfer
Air
retail
3,329
0.25
832
832
666
166
corridodrestroom/support
313
0.15
47
4.0
15.0
60
60
60
Lounge
303
0.50
152
152
61
91
HP -1, HP -2, HP -3
Total
1,0441
787
Totals Column I Total Design Ventilation Air
C Minimum ventilation rate per Section 121, Table 121-A.
E Based on fixed seat or the greater of the expected number of occupants and 50% of the CBC occupant load foregress purposes fors aces without fixed setting.
H Required Ventilation Air REQ'D V.A. is the larger of the ventilation rates calculated on an AREA BASIS or OCCUPANCY BASIS Column D or G).
I Must be greater than orequal to H, or use Transfer Air column N to make up the difference.
J Design fan supply CFM Fan CFM x 50%; or the design zone outdoor airflow rate per 121.
K Condition area ft2 x 0.4 CFM / ft2; or
L Maximum of Columns H, J, K, or 300 CFM
M This must be less than orequal to Column L and greater than orequal to the sum of Columns H plus N.
N Transfer Air must be provided where the Required Ventilation Air (Column H) is greater than the Design Minimum Air (Column M). Where required, transfer air must be greater than or
equal to the difference between the Required Ventilation Air Column H and the Design Minimum Air Column M), Column H minus M.
EnergyPro 5.1 by EnergySoft User Number: 5511 RunCode: 2010-12-02714.37.41 ID: 10060 Page 22 of 26
MECHANICAL EQUIPMENT DETAILS
Part 1 of 2
MECH-5C
Project Name
Ken Garff Chevrolet/Cadillac
Date
12/2/2010
CHILLER AND TOWER SUMMARY
PUMPS
Equipment Name Type
aty. Eff Iclency
Tons
Ot . GPM
Premium
BHP Eff. Motor
Pump
Control
DHW / BOILER SUMMARY
System Name Type
Distribution Ot .
Rated Input (Gals).
Vol. Energy Factor
or RE
Standby Loss Tank Ext.
or Pilot R -Value
Status
A O Smith Water Products DEL 40 Small Elec.
Kitchen Pipe Ins 1
20,478
40 0.95
n/a n/a
New
MULTI -FAMILY CENTRAL WATER HEATING DETAILS
Hot Water Pump
Hot Water Piping Length ft
Control Ot . HP
Type
In Plenum
Outside Buried Add Yz" Insulation
CENTRAL SYSTEM RATINGS
HEATING
COOLING
System Name Type
Ot . Output
Aux. kW Eff lciency Output
Eff iciency
Status
HP -1, HP -2, HP -3 (Carrier TCQ08) Packaged DX
3 36,400
0.0
3.30 COP 84,900
11.2 EER
New
CENTRAL SYSTEM FAN SUMMARY
SUPPLY FAN
RETURN FAN
System Name Fan Type
Economizer Type
CFM
Premium
BHP Eff. Motor CFM BHP
Premium
Eff. Motor
HP -1, HP -2, HP -3 (Carrier TCQ08) Constant Volume
Diff. Enth (Integrated)
3,000
0.40 m
none
❑
❑
❑
❑
❑
❑
❑
EnergyPro 5.1 by EnergySoft User Number- 5511
Run Code: 2010-12-02T14:37:41
ID: 10060
Pa a 23 of 26
3
ENVELOPE MANDATORY MEASURES: NONRESIDENTIAL ENV -MM
Project Name
Date
Ken Garff Chevrolet/Cadillac
12IV2010
DESCRIPTION
Building Envelope Measures:
§118(a): Installed insulating material shall have been certified by the manufacturer to comply with the California Quality
Standards for insulating material, Title 20 Chapter 4, Article 3.
§118(c): All Insulating Materials shall be installed in compliance with the flame spread rating and smoke density requirements of
Sections 2602 and 707 of Title 24, Part 2.
§118(f): The opaque portions of framed demising walls in nonresidential buildings shall have insulation with an installed R -value
of no less than R-13 between framing members.
§117(a): All Exterior Joints and openings in the building that are observable sources of air leakage shall be caulked, gasketed,
weatherstripped or otherwise sealed.
Manufactured fenestration products and exterior doors shall have air infiltration rates not exceeding 0.3 cfm/ft.2 of
§116(a) 1: window area, 0.3 cfm/ft.2 of door area for residential doors, 0.3 cfm/ft.2 of door area for nonresidential single doors
(swingingand sliding),and 1.0 cfm/ft.2 for nonresidential double doors (swinging).
§116(a) 2: Fenestration U -factor shall be rated in accordance with NFRC 100, or the applicable default U -factor.
§116(a) 3: Fenestration SHGC shall be rated in accordance with NFRC 200, or NFRC 100 for site -built fenestration, or the
applicable default SHGC.
16 b Site Constructed Doors, Windows and Skylights shall be caulked between the unit and the building, and shall be
§1 ()'
weatherstripped (except for unframed glass doors and fire doors).
i
a
• k
1
j
- I
r
e
F
1
1
i
'f
Enerqyfro 5.1 by EnerqySft User Number.• 5511 Run Code: 2010-12-02T14:37:41 ID: 10060 Page 24 of 26
M
LIGHTING MANDATORY MEASURES: NONRESIDENTIAL LTG -MM
Project Name
Date
Ken Garff ChevroletlCadillac
12/2/2010
Indoor Lighting
Measures:
§131(d): Shut-off Controls
For every floor, all interior lighting systems shall be equipped with a separate automatic control to shut off the lighting.
1..
This automatic control shall meet the requirements of Section 119 and may be an occupancy sensor, automatic time
switch or other device capable of automatically shutting off the lighting.
2
Override for Building Lighting Shut-off: The automatic building shut-off system is provided with a manual, accessible
override switch in sight of the lights. The area of override is not to exceed 5,000 square feet.
§119(h):
Automatic Control Devices Certified: All automatic control devices specified are certified, all alternate equipment shall
be certified and installed as directed by the manufacturer.
§111:
Fluorescent Ballast and Luminaires Certified: All fluorescent fixtures specified for the project are certified and listed in the
Directory. All installed fixtures shall be certified.
§131(a):
Individual Room/Area Controls: Each room and area in this building is equipped with a separate switch or occupancy
sensor device for each area with floor -to -ceiling walls.
Uniform Reduction for Individual Rooms: All rooms and areas greater than 100 square feet and more than 0.8 watts
§131(b):
per square foot of lighting load shall be controlled with bi-level switching for uniform reduction of lighting within the
room.
Daylight Area Control: All rooms with windows and skylights that are greater than 250 square feet and that allow for
§131(c):
the effective use of daylight in the area shall have 50% of the lamps in each daylit area controlled by a separate switch;
or the effective use of daylight cannot be accomplished because the windows are continuously shaded by a building on
the adjacent lot. Diagram of shading during different times of the year is included on plans.
§131(c):
Display Lighting. Display lighting shall be separately switched on circuits that are 20 amps or less.6.
Outdoor Lighting Measures:
§130(c)1:
Mandatory lighting power determination for medium base sockets without permanently installed ballasts
§132(a):
All permanently installed luminaires with lamps rated over 100 Watts either have a lamp efficacy of at least 60 lumens
per Watt or are controlled by a motion sensor.
§132(b):
All Luminaires with lamps rated greater than 175 Watts in hardscape area, including parking lots, building entrances,
canopies, and all outdoor. sales areas meet the Cutoff Requirements.
§132(c)1:
All permanently installed outdoor lighting meets the control requirements listed.
§132(c):
Building facades, parking lots, garages, canopies, and outdoor sales areas meet the Multi -Level Lighting Requirements
listed.
I
EnergyPro 5.1 by EnergySoft User Number: 5511 RunCode: 2010-12-02714:37:41 /D: 10060 Page 25 of 26
MECHANICAL MANDATORY MEASURES: NONRESIDENTIAL MECH-MM
Project Name
Date
Ken Garff Chevrolet/Cadillac
12/2/2010
Equipment and System Efficiencies
§111: Any appliance for which there is a California standard established in the Appliance Efficiency Regulations will comply
with the applicable standard.
§115(a): Fan type central furnaces shall not have a pilot light.
§123: Piping, except that conveying fluids at temperatures between 60 and 105 degrees Fahrenheit, or within HVAC
equipment, shall be insulated in accordance with Standards Section 123.
§124: Air handling duct systems shall be installed and insulated in compliance with Sections 601, 602, 603, 604, and 605 of
the CMC Standards.
Controls
§122(e): Each space conditioning system shall be installed with one of the following:
1 A. Each space conditioning system serving building types such as offices and manufacturing facilities (and all others not
explicitly exempt from the requirements of Section 112 (d)) shall be installed with an automatic time switch with an
accessible manual override that allows operation of the system during off -hours for up to 4 hours. The time switch
shall be capable of programming different schedules for weekdays and weekends and have program backup
capabilities that prevent the loss of the device's program and time setting for at least 10 hours if power is interrupted; or
1 B. An occupancy sensor to control the operating period of the system; or
1 C. A 4 -hour timer that can be manually operated to control the operating period of the system.
2 Each space conditioning system shall be installed with controls that temporarily restart and temporarily operate the
system as required to maintain a setback heating and/or a setup cooling thermostat setpoint.
Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000
square feet shall be provided with isolation zones. Each zone: shall not exceed 25,000 square feet; shall be provided
§� 22(g).
with isolation devices, such as valves or dampers that allow the supply of heating or cooling to be setback or shut off
independently of other isolation areas; and shall be controlled by a time control device as described above.
§122(c): Thermostats shall have numeric setpoints in degrees Fahrenheit (F) and adjustable setpoint stops accessible only to
authorized personnel.
§122(b): Heat pumps shall be installed with controls to prevent electric resistance supplementary heater operation when the
heating load can be met by the heat pump alone
Each space conditioning system shall be controlled by an individual thermostat that responds to temperature within the
zone. Where used to control heating, the control shall be adjustable down to 55 degrees F or lower. For cooling, the
§122(a&b): control shall be adjustable up to 85 degrees F or higher. Where used for both heating and cooling, the control shall be
capable of providing a deadband of at least 5 degrees F within which the supply of heating and cooling is shut off or
reduced to a minimum.
Ventilation
§121(e): Controls shall be provided to allow outside air dampers or devices to be operated at the ventilation rates as specified
on these plans.
§122(f): All gravity ventilating systems shall be provided with automatic or readily accessible manually operated dampers in all
openings to the outside, except for combustion air openings.
TllVlE)rcWQKn System AcceptanckM6WrlEil0zccupancy permit is granted for a newly constructed building or space, or a
§121(f): new ventilating system serving a building or space is operated for normal use, all ventilation systems serving the
building ors ace shall be certified as meeting the Acceptance Requirements for Code Compliance
Service Water Heating Systems
§113(c) Installation
3. Temperature controls for public lavatories. The controls shall limit the outlet Temperature to 110° F.
2 Circulating service water -heating systems shall have a control capable of automatically turning off the circulating pump
when hot water is not required.
EnergyPro 5.1 by EnergySoft User Number. 5511 RunCode: 2010-12-02T14:37:41 /D: 10060 Page 26 of 26