11-0603 (RC) Title 241 BUILDING ENERGY ANALYSIS REPORT
PROJECT:
KOREAN BBQ & GRILL
78-702 HWY 111
LA QUINTA, CA 92253
Project Designer:
SPACE ZEN
3345 WILSHIRE BLVD., #605
LOS ANGELES, CA 90010
(213) 388-0054
Report Prepared by:
Perfect Design.
PERFECT DESIGN & DEVELOPMENT, INC.
2416 W Valley Blvd
Alhambra, Ca 91803
(626)289-8808
CITY OF LAQUINTA '
BUILDING & SAFETY DEPT,
APPROVED
]� � � F� 0 T , N
JUL 19 2011
FOR CONSTRUCTION
Job Number:
l d'
DArE B
Date:
7/8/2011
The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is
authorized by the California Energy Commission for use with both the Residential and Nonresidential 2008 Building Energy Efficiency Standards.
This program developed by EnergySoft, LLC — www.energysoft.com.
Ener Pro 5.1 by EnergySoft User Number. 1919 RunCode: 2011-07-08710:05:26 ID: E11-780
TABLE OF CONTENTS
Cover Page
1
Table of Contents
2
Nonresidential Performance Title 24 Forms
3
Form ENV -MM Envelope Mandatory Measures
17
Form MECH-MM Mechanical Mandatory Measures
18
HVAC System Heating and Cooling Loads Summary
19
Zone Load Summary
20
Room Load Summary
21
Room Heating Peak Loads
22
Room Cooling Peak Loads
23
Room Cooling Coil Loads
24
EnergyPro 5.1 by EnergySoft Job Number: ID: E11-780 User Number: 1919
PERFORMANCE CERTIFICATE OF COMPLIANCE (Part 1 of 3) PERF -1 C
Project Name
Date
KOREAN BBQ & GRILL
7/8/2011
Project Address
Climate ZoneTotal
Cond. Floor Area
Addition Floor Area
78-702 HWY 111 LA QU/NTA
CA Climate Zone 15
1,465
n/a
GENERAL INFORMATION
Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Relocatable - indicate ❑ specific climate zone rI3 all climates
Phase of Construction: ❑ New Construction ❑ Addition 0 Alteration
STATEMENT OF COMPLIANCE
This certificate of compliance lists the building features and specifications needed to ES !,� ~,
comply with Title 24, Parts 1 and 6 of the'California Code of Regulations. This Q fyp z q��i
yc�
certificate applies only to a Building using the performance compliance approach. ,�'�Q o?�,
The documentation author hereby certifies that the documentation is accurate an a I
m
Documentation Author
Name Perfect Design
Signature {S
Company PERFECT DESIGN & DEVELOPMENT, INC. A V/
Address 2416 W Valley Blvd89-8808
City/State/Zip Alhambra, Ca 91803
The Principal Designer hereby certifies that the proposed building design represented in this set of
construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with
any other calculations submitted with this permit application. The proposed building has been designed to meet the energy
efficiency requirements contained in sections 110, 116 through 118, and 140 through 149 of Title 24, Part 6. Please
check one:
ENV. LTG. MECH.
I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to
❑ ❑ ❑ sign this document as the person responsible for its preparation; and that I am licensed in the State of
California as a civil engineer, mechanical engineer, electrical engineer, or I am a licensed architect.
I affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code by section
❑ ❑ ❑ 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed
contractor performing this work.
I affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document
❑ ❑ ❑ because it pertains to a structure or type of work described as exempt pursuant to Business and Professions
Code Sections 5537, 5538 and 6737.1.
Principal Envelope Designer
Name
Signature
Company SPACE ZEN Date
Address 3345 WILSHIRE BLVD., #605 License #
City/State/Zip LOS ANGELES, CA 90010 / I Phone (213) 388-0054
Principal Mechanical Designer
Name PERFECT DESIGN & ENGINEERING, INC
Company Date
Address 2416 W. VALLEY BLVDLicense
cnii a4l 761,5
#
50
City/State/Zip ALHAMBRA, CA 91803
1 .0 30 13
Phone (626) 280-8808
Principal Lighting Designer {�t
Name r' Q�\�
Company Lighting Compliance Not /n The Scope Of This Submittal Date
Address License #
City/State/Zip Phone
INSTRUCTIONS TO APPLICANT COMPLIANCE & WORKSHEETS (check box if worksheets are included)
El ENV -1C Certificate of Compliance. Required on plans. m MECH-1C Certificate of Compliance. Required on plans.
❑ LTG -IC Certificate of Compliance. Required on plans. m MECH-2C Air/Water Side/Service Hot Water & Pool Requirements.
❑ LTG -2C Lighting Controls Credit Worksheet. m MECH-3C Mechanical Ventilation and Reheat.
❑ LTG -3C Indoor Lighting Power Allowance. El MECH-5C Mechanical Equipment Details.
Energ Pro 5.1 by EnergySoft User Number: 1919 RunCode: 2011-07-08710:05:26 ID: E11-780 Page 3 of 24
PERFORMANCE CERTIFICATE OF COMPLIANCE Part 2 of 3) PERF -1C
Project Name . Date
KOREAN BBQ & GRILL 7/8/2011
ANNUAL TDV ENERGY USE SUMMARY (kBtu/soft-vr)
Energy Component
Space Heating
Space Cooling
Indoor Fans
Heat Rejection
Pumps & Misc.
Domestic Hot Water
Lighting
Receptacle
Process
Process Lighting
TOTALS
itandard Proposed compliance
Desian Desian Marain
12.31
12.78
-0.47
792.77
708.66
84.11
215.53
201.21
14.33
0.00
0.00
0.00
0.00
0.00
0.00
129.78
120.28
9.50
76.96
76.96
0.00
32.05
32.05
0.00
96.15
96.15
0.00
0.00
0.001
0.00
1,355.56
1,248.101
107.46
Percent better than Standard
GENERAL INFORMATION
7.9%1 ( 8.5 % excludl
Heating
Cooling
Fans
Heat Rej
Pumps
DHW
Lighting
Receptacle
Process
Process Ltg
BUILDING COMPLIES
Building Orientation (N) 0 deg Conditioned Floor Area 1,465 sqft-
Number of Stories 1 Unconditioned Floor Area 0 sqft.
Number of Systems 2 Conditioned Footprint Area 1,465 sqft.
Number of Zones 1 Natural Gas Available On Site Yes
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Total
Roof
Oripntntinn rrncc Aran
(N)
361
(E)
841
(S)
361
(V1�
841
2,405
1,465
Prescriptive Lighting Power Density
Prescriptive Envelope TDV Energy
Remarks:
Standard
1.100 W/sqft.
110,759
sqft.
sqft.
sqft.
sqft.
sqft.
sqft.
Glazing Area
198
203
0
0
401
0
Proposed
0.000 W/sqft.
362,128
sqft.
sqft.
sqft.
sqft.
sqft.
sqft.
G1a7inn Rntin
54.8%
24.1%
0.0%
0.0%
16.7%
0.0%
Prescriptive Values for
Comparison only. See
LTG -1 C for allowed LPD.
PERFORMANCE CERTIFICATE OF COMPLIANCE. (Part 3 of 3) PERF -1 C
Project Name
KOREAN BBQ & GRILL
Date
7/8/2011
ZONE INFORMATION
System Name
Zone Name
Occupancy Type
Floor
Area
s ft.
Inst.
LPD
W/sf'
Ctrl.
Credits
(W/sf 2
Allowed LPD
Proc.
Loads
W/sf
Area Tailored
W/sf 3 W/sf 4
DINING AREA
DINING AREA
Dining
1,465
0.000
1.500
Notes: 1. See LTG -1C 2. See LTG -2C 3. See LTG -3C 4. See LTG -4C
items marked with asterisk, see LTG -1 -C b others b others
Items above require special documentation
EXCEPTIONAL CONDITIONS COMPLIANCE.CHECKLIST
The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written
justification and documentation, and special verification to be used with the performance approach. The local enforcement agency
determines the adequacy of the justifications, and may reject a building or design that otherwise complies based on the adequacy of the
special justification and documentation submitted.
The DHW System RHEEM HE80-199 is a non-NAECA large storage gas water heater. Verify DHW details.
The exceptional features listed in this performance approach application have specifically been reviewed. Adequate written justification and
documentation for their use have been provided by the applicant.
Authorized Signature or Stamp
Energ Pro 5.1 by Energ Soft User Number: 1919 RunCode: 2011-07-08710:05:26 /D: E11-780 Page 5 of 24
CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV -1 C
AND FIELD INSPECTION ENERGY CHECKLIST
Project Name
KOREAN BBQ & GRILL
Date
7/8/2011
Project Address
78-702 HKIY 111 LA QUINTA
Climate Zone
15
Total Cond. Floor Area
1,465
Addition Floor Area
n/a
GENERAL INFORMATION
Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Schools (Public School) ❑ Relocatable Public School ® Conditioned Spaces ❑ Unconditioned Spaces
Bldg.
❑ Skylight Area for Large Enclosed Space z 8000 ft2 (If checked include the ENV -4C with submittal)
Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration
Approach of Compliance: ❑ Component ® Overall Envelope ❑ Unconditioned (file affidavit)
Front Orientation: N, E, S, W or in Degrees:
10 deg
FIELD INSPECTION ENERGY CHECKLIST
OPAQUE
SURFACE DETAILS
INSULATION
Ta /ID'
Assembly Type 2
•p
a
C rn
O z
O
5
z
d
« 7
O¢
O
.`
W>
O Cf
.` C
W LL
O
E>
OC
5 U.
V
C
-.34
°e
N
V z
v rn
N
a
U.
1
Roof
1,465
(N)
0.075
R-19
4.2.2-A5
Existing
❑
❑
2
Wall
841
(W)
0.356
None
4.3.1-A1
Existing
❑
❑
3
Wall
639
(E)
0.356
None
4.3.1-A1
Existing
❑
❑
4
Wall
163
(N)
0.356
None
4.3.1-A1
Existing
❑
❑
5
Wall
361
(S)
0.356
None
4.3.1-A1
Existing
❑
❑
6
Slab
1,465
(N)
1 0.730
None
4.4.7-A1
Existing
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
1. See Instructions in the Nonresidential Compliance Manual, page 3-96.
2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance.
FENESTRATION SURFACE DETAILS
Tag/ID'
Fenestration
Type 2
l0
�'
a
}: N
W
O Z>
o
R
m 4
.2 m
IVC
4 o'
> rn
tJ
C7
=
A CO
m
V
x 'o
(n U)
rn
>
O
c
7
o ;°
v
N
a
m
a
1
Window
203
(E)
1.190
Default
0.830
Default
❑
Existing
❑
❑
2
Window
198
(N)
1.190
Default
0.830
Default
®
Existing
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
1. See Instructions in the Nonresidential Compliance Manual, page 3-96.
2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary.
Ener Pro 5.1 by Ener Soft User Number: 1919 RunCode: 2011-07-08710:05:26 /D: E11-780 Page 6 of 24
CERTIFICATE OF COMPLIANCE (Part 2 of 3)
AND FIELD INSPECTION ENERGY CHECKLIST
ENV -1 C
Project Name
KOREAN BBQ & GRILL
Date
7/8/2011
ROOFING PRODUCT COOL ROOFS
(Note if the roofing product is not CRRC certified, this compliance approach cannot be used). Go to Overall Envelope Approach or
Performance Approach.
CHECK APPLICABLE BOX BELOW IF EXEMPT FROM THE ROOFING PRODUCT "COOL ROOF" REQUIREMENTS:
Pass
Fail'
N/A
❑ Roofing compliance not required in Climate Zones 1 andl6 with a Low -Sloped. 2:12 pitch or less.
❑
❑
❑
❑ Roofing compliance not required in Climate Zone 1 with a Steep -Sloped with less than 5 Ib/ft2. Greater than 2:12 pitch.
❑
❑
❑
Low -sloped Wood framed roofs in Climate Zones 3 and 5 are exempted, solar reflectance and thermal emittance or
❑ SRI that have a U -factor of 0.039 or lower. See Opaque Surface Details roof assembly, Column H of ENV -2C.
❑
❑
❑
❑ Low -sloped Metal building roofs in Climate Zone 3 and 5 are exempted, solar relectance and thermal emittance or SRI
that have a U -factor of 0.048 or lower. See Opaque Surface Details roof assembly below, Column H of ENV -2C.
❑
❑
❑
❑ The roof area covered by building integrated photovoltaic panels and building integrated solar thermal panels are
exempted. Solar reflectance and thermal emittance or SRI, seespreadsheet calculator at www.energy.ca.gov/title24/
❑
❑
13 -
Roof constructions that have thermal mass over the roof membrane with a weight of at least 25 Ib/ft are exempt from
❑ the Cool Roof criteria below.
13
11
13
❑ High-rise residential buildings and hotels and motels with low -sloped roofs in Climate Zones 1 through 9, 12 and 16 are
exempted from the low -sloped roofing criteria.
❑
. ❑
❑
1. If Fail then describe on this page of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary.
CRRC Product ID
Number'
Roof Slope
s 2:12 > 2:12
Product Weight
< 51b/fe z 51b/fe
Product
T e2
Aged Solar
Reflectance3
Thermal
Emmitance
SRI5
Pass
Fails
❑ ❑
❑ ❑
❑ 4
❑
❑
❑ ❑
❑ ❑
❑ °
❑
❑
❑ ❑
❑ ❑
❑'
❑ 1
❑
❑ ❑
❑ ❑
❑ J
❑
❑
❑ ❑
❑ ❑
❑°
❑
❑
❑ ❑
❑ ❑
❑ 4
❑
❑
1. The CRRC Product ID Number can be obtained from the Cool Roof Rating Council's Rated Product Directory at
www.coolroofs.org/r)roducts/search.iohr)
2. Indicate the type of product is being used for the roof top, i.e. single -ply roof, asphalt roof, metal roof, etc.
3. If the Aged Reflectance is not available in the Cool Roof Rating Council's Rated Product Directory then use the Initial Reflectance value from the
same directory and use the equation (0.2+0.7(pi�ival — 0.2) to obtain a calculated aged value. Where p is the Initial Solar Reflectance from the Cool
Roof Rating Council's Rated Product Directory.
4. Check box if the Aged Reflectance is a calculated value using the equation above.
5. The SRI value needs to be calculated from a spreadsheet calculator at http://www.energy.ca.00v/title24/
6. If Fail then describe on this page of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary.
To apply Liquid Field Applied Coatings, the coating must be applied across the entire roof surface and meet the dry mil thickness or coverage
recommended by the coatings manufacturer and meet minimum performance requirements listed in §118(i)4. Select the applicable coating:
❑ Aluminum -Pigmented Asphalt Roof Coating
❑ Cement -Based Roof Coating
❑ Other
Discrepancies:
Ener Pro 5.1 by EnenqySoft User Number: 1919 RunCode: 2011-07-08710:05:26 /D: E11-780
Pa e 7 of 24
CERTIFICATE OF COMPLIANCE (Part 3 of 3) ENV -1C
AND FIELD INSPECTION ENERGY CHECKLIST
Project Name
KOREAN BBQ & GRILL
Date
7/8/2011
Required Acceptance Tests
Designer:
This form is to be used by the designer and attached to the plans. Listed below is the acceptance test for Envelope
Fenestrations system. The designer is required to check the acceptance tests and list all the fenestration products that
require an acceptance test. If all the site -built fenestration of a certain type requires a test, list the different fenestration
products and the number of systems. The NA7 Section in the Appendix of the Nonresidential Reference Appendices
Manual describes the test. Since this form will be part of the plans, completion of this section will allow the responsible
party to budget for the scope of work appropriately.
Enforcement Agency:
Systems Acceptance. Before Occupancy Permit is granted for a newly constructed building or space or whenever new
fenestration is installed in the building or space shall be certified as meeting the Acceptance Requirements.
The ENV -2A form is not considered a complete form and is not to be accepted by the enforcement agency unless the
boxes are checked and/or filled and signed. In addition, a Certificate of Acceptance forms shall be submitted to the
enforcement agency that certifies plans, specifications, installation certificates, and operating and maintenance
information meet the requirements of §10-103(b) of Title 24 Part 6. The field inspector must receive the properly filled
out and signed forms before the building can receive final occupancy. A copy of the ENV -2A for each different
fenestration product line must be provided to the owner of the building for their records.
Test Description ENV -2A Test Performed By:
Fenestration Products Name or ID Area of like Building Envelope
Requiring Testing or Verification Products Acceptance Test
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
EnergyPro 5.1 by EnergySoft User Number. 1919 RunFode: 2011-07-08710:05:26 ID: E11-780 Page 8 of 24
CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C
FIELD INSPECTION ENERGY CHECKLIST
Project Name
KOREAN BBQ & GRILL
Date
7/8/2011
Project Address
78-702 HWY 111 LA QUINTA
Climate Zone
15
Total Cond. Floor Area
1,465
Addition Floor Area
n/a
GENERAL INFORMATION
Building Type: ® Nonresidential ❑ High-Rise Residential ❑ Hotel/Motel Guest Room
❑ Schools (Public School) ❑ Relocatable Public School Bldg. m Conditioned Spaces ❑ Unconditioned Spaces
affidavit
Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration
Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit)
Energy
Front Orientation: N, E, S, W or in Degrees:
0 deg
HVAC SYSTEM DETAILS
FIELD INSPECTION ENERGY CHECKLIST
E ui ment2
Inspection Criteria
Meets Criteria
or Requirements
Pass
Fail — Describe Reason
Item or System Tags
AC-1, RTU-1, HP-1
DHW Heater
❑
13i.e.
Equipment T e3:
Gas Fired DHW Boiler
❑
❑
Number of Systems
1
❑
❑
Max Allowed Heating Capacity'
199,000 Btu/hr
❑
❑
Minimum Heating Efficiency'
95%
❑
❑
Max Allowed Cooling Capacity'
n/a
❑
❑
Cooling Efficiency'
n/a
❑
❑
Duct Location/ R-Value
n/a
❑
❑
When duct testing is required, submit
& MECH-4-HERS
n/a
13
13MECH-4A
Economizer
n/a
❑
❑
Thermostat
n/a
❑
❑
Fan Control
n/a
❑
❑
E ui ment2
Inspection Criteria
FIELD INSPECTION ENERGY CHECKLIST
Pass
Fail — Describe Reason
Item or System Tags
AC-1, RTU-1, HP-1
DINING AREA
❑
13i.e.
Equipment T e3:
Packaged DX
❑
❑
Number of Systems
2
❑
❑
Max Allowed Heating Capacity'
70,740 Btu/hr
❑
❑
Minimum Heating Efficiency'
79% AFUE
❑
❑
Max Allowed Cooling Capacity'
60,000 Btu/hr
❑
❑
Cooling Efficiency'
13.0 SEER / 11.0 EER
❑
❑
Duct Location/ R-Value
Attic, Ceiling Ins, vented/ 6.0
❑
❑
When duct testing is required, submit
& MECH-4-HERS
No
❑
13MECH-4A
Economizer
No Economizer
❑
❑
Thermostat
Setback Required
❑
❑
Fan Control
Constant Volume
❑
❑
1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked.
3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other.
JEnergyPro5.1byEnergySoft User Number: 1919 RunCode: 2011-07-08710:05:26 ID: E11-780 Pae 9 of 24
CERTIFICATE OF COMPLIANCE and . (Part 2 of 4) MECH-1 C
FIELD INSPECTION ENERGY CHECKLIST
Project Name Date
KOREAN BBQ & GRILL 7/8/2011
DiscreDancies: -
ID: E11-
CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 3 of .4) MECH-1C
Project Name
Date
KOREAN BBQ & GRILL
7/8/2011
Required Acceptance Tests
Designer:
This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for mechanical systems. The designer is required to check the applicable
boxes by all acceptance tests that apply and listed all equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the equipment description and
the number of systems. The NA number designates the Section in the Appendix of the Nonresidential Reference Appendices Manual that describes the test. Since this form will be
part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately.
Building Departments:
Systems Acceptance: Before occupancy permit is granted for a newly constructed building or space, or a new space-conditioning system serving a building or space is operated for
normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance.
Systems Acceptance: Before occupancy permit is granted. All newly installed HVAC equipment must be tested using the Acceptance Requirements.
The MECH-1 C form is not considered a completed form and is not to be accepted by the building department unless the correct boxes are checked. The equipment requiring testing,
person performing the test (Example: HVAC installer, TAB contractor, controls contractor, PE in charge of project) and what Acceptance test must be conducted. The following
checked-off forms are required for ALL newly installed equipment. In addition a Certificate of Acceptance forms shall be submitted to the building department that certifies plans,
specifications, installation, certificates, and operating and maintenance information meet the requirements of §10-103(b) and Title-24 Part 6. The building inspector must receive the
properly filled out and signed forms before the building can receive final occupancy.
TEST DESCRIPTION
MECH-2A
MECH-3A
MECH-4A
MECH-5A
MECH-6A
MECH-7A
MECH-8A
MECH-9A
MECH-10A
MECH-11A
Hydronic
Outdoor
Constant
Demand
Supply
System
Automatic
Ventilation
Volume &
Air
Control
Supply
Valve
Water
Variable
Demand
For
Single-Zone
Distribution
Economizer
Ventilation
Fan
Leakage
Temp.
Flow
Shed
Equipment Re uirin Testing or Verification Qty.
VAV & CAV
Unitary
Ducts
Controls
DCV
VAV
Test
Reset
Control
Control
CARRIER 48ES-060090 2
®
®
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑ .
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
Ener Pro 5.1 by EnergySoft User Number: 1919 RunCode:
2011-07-08710:05:26
ID: E11-780 Pae 11 of 24
CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST
(Part 4 of 4) MECH-1 C
Project Name
KOREAN BBQ & GRILL
-
Date
7/8/2011
TEST DESCRIPTION
MECH-12A
MECH-13A
MECH-14A
MECH-15A
Equipment Re uirin Testing
Fault
Detection &
Diagnostics
Qty. for DX Units
Automatic Fault
Detection &
Diagnostics for
Air & Zone
Distributed
Energy Storage
DX AC
Systems
Thermal Energy
Storage (TES)
Systems
Test Performed BY:
CARRIER 48ES-060090
2 ❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑-
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
Ener Pro 5.1 by EnergySoft
User Number: 1919
RunCode: 2011-07-08710:05:26 ID: El 1-780
Pae 12 of 24
AIR SYSTEM REQUIREMENTS
Part 1 of 2 MECH-2C
Project Name
Date
KOREAN BBQ & GRILL
1 7/8/2011
Indicate
Air Systems Type Central, Single Zone, Package, VAV, or etc...
Item or System Tags
i.e. AC -1, RTU -1, HP -1
DINING AREA
Number of Systems
2
Indicate Pa a Reference on Plans or Schedule and indicate the applicable exception(s)
MANDATORY MEASURES
T-24 Sections
Heating Equipment Efficiency
112(a)
79% AFUE
Cooling Equipment Efficiency
112 a
13.0 SEER / 11.0 EER
HVAC Heat Pump Thermostat
112(b), 112(c)
n/a
Furnace ControlslThermostat
112(c), 115(a)
n/a
Natural Ventilation
-121(b)
No
Mechanical Ventilation
121 b
733 cim
VAV Minimum Position Control
121 c
No
Demand Control Ventilation
121 c
No
Time Control
122(e)
Programmable Switch
Setback and Setup Control
122(e)
Setback Required
Outdoor Damper Control
122(f)
Auto
Isolation Zones
122
n/a
Pipe Insulation
123
Duct Location/ R -value
124
Attic, Ceiling Ins, vented/ 6.0
PRESCRIPTIVE MEASURES
Calculated Design Heating Load
144(a & b
n/a
Proposed Heating Capacity
144(a & b
141,480 Btu/hr
Calculated Design Cooling Load
144(a & b
n/a
Proposed Cooling Capacity
144(a & b
80,726 Btu/hr
Fan Control
144(c)
Constant Volume
DP Sensor Location
.144(c)
P
Supply Pressure Reset (DDC only)
144(c)
No
Simultaneous Heat/Cool
-144(d)
No
Economizer
144(e)
No Economizer
Heat Air Supply Reset
144(f)
Constant Temp
Cool Air Supply Reset
144(f)
Constant Temp
Electric Resistance Heating'
144
Air Cooled Chiller Limitation
144(i)
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(k)
No
1. Total installed capacity (MBtu/hr) of all electric heat
on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used
explain which exception(s) to §144(g) apply.
EnergyPro 5.1 by EnergySoft User Number: 1919
RunCode: 2011-07-08710:05:26 ID: E11-780 Pae 13 of 24
WATER SIDE SYSTEM REQUIREMENTS Part 2 of 2 MECH-2C
Project Name
Date
KOREAN BBQ & GRILL
1 7/8/2011
WATER SIDE SYSTEMS: Chillers, Towers, Boilers, H dronic Loops
Item or System Tags
(i.e. AC -1, RTU -1, HP -1)' :
Number of Systems
Indicate Page Reference on Plans or S ecification2
MANDATORY MEASURES T-24 Sections
Equipment Efficiency 112(a)
Pipe Insulation 123
PRESCRIPTIVE MEASURES
Cooling Tower Fan Controls 144(a & b
Cooling Tower Flow Controls 144(h)
Variable Flow System Design 144(h)
Chiller and Boiler Isolation 144 '
CHIN and HHW Reset Controls 144 '
WLHP Isolation Valves 144 0)
VSD on CHW, CW & WLHP Pumps>5HP 144 0)
DP Sensor Location 144 0)
1. The proposed equipment need to match the building plans schedule or specifications. If a requirement is not applicable, put 'N/A" in the column .
next to applicable section. .
2. For each chiller, cooling tower, boiler, and hydronic loop (or groups of similar equipment) fill in the reference to sheet number and/or specification
section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" in the column next to
applicable section.
Service Hot Water, Pool Heating
Item or System Tags
(i.e. WH -1, WHP, DHW, etc...)' DHW Heater
Number of Systems 1
Indicate Page Reference on Plans or Schedule
MANDATORY MEASURES T-24 Sections
SERVICE HOT WATER
Certified Water Heater 111, 113(a) RHEEM HE80-199
Water Heater Efficiency 113(b) 95%
Service Water Heating Installation 113(c) Controls Req.
Pipe Insulation 123 n/a
POOL AND SPA
Pool and Spa Efficiency and Control 114(a) n/a
Pool and Spa Installation 114(b) n/a
Pool Heater — No Pilot Light 115(c) n/a
Spa Heater — No Pilot Light 115 d n/a
Pipe Insulation 123 Required
1. The Proposed equipment needs to match the building plans schedule or specifications. If a requirement is not applicable, put "N/A" in the column
next to applicable section.
2. For each water heater, pool heater and domestic water loop (or groups of similar equipment) fill in the reference to sheet number and/or
specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" in the
column.
EnergyPro 5.1 by Ener Soft User Number. • 1919 RunCode: 2011-07-08710:05:26 /D: E11-780 Pae 14 of 24
MECHANICAL VENTILATION AND REHEAT MECH-3C
Project Name
KOREAN BBQ & GRILL
Date
7/8/20.11
MECHANICAL VENTILATION §121 b 2
REHEAT LIMITATION (§144(d))
AREA BASIS
OCCUPANCY BASIS
VAV MINIMUM
A
B
C
D
E
F
G
H
I
J
K
L
M
N
Zone/System
Condition
Area
(ft)
CFM
per
fe
Min CFM
By Area
B X C
Number
Of
People
CFM
per
Person
Min CFM
by
Occupant
E X F
REQ'D
V.A.
Max of
D or G
Design
Ventilation
Air
CFM
50% of
Design Zone
Supply
I CFM
B X 0.4
CFM / f 2
Max. of
Columns
H, J, K,
300 CFM
Design
Minimum
Air
Setpoint
Transfer
1 Air
DINING AREA
1,465
0.50
733
48.8
15.0
733
733
733
DINING AREA
Total
733
733
Totals Column I Total Design Ventilation Air
C Minimum ventilation rate per Section 121, Table 121-A.
E Based on fixed seat or the greater of the expected number of occupants and 50% of the CBC occupant load foregress purposes fors aces without fixed seating.
H Required Ventilation Air REQ'D V.A. is the larger of the ventilation rates calculated on an AREA BASIS or OCCUPANCY BASIS Column D or G).
I Must be greater than orequal to H, or use Transfer Air column N to make up the difference.
J Design fan supply CFM Fan CFM x 50%; or the design zone outdoor airflow rate per 121.
K Condition area(ft) x 0.4 CFM / ft2; or
L Maximum of Columns H, J, K, or 300 CFM
M This must be less than orequal to Column L and greater than orequal to the sum of Columns H plus N.
N Transfer Air must be provided where the Required Ventilation Air (Column H) is greater than the Design Minimum Air (Column M). Where required, transfer air must be greater than or
equal to the difference between the Required Ventilation Air Column H and the Design Minimum Air Column M), Column H minus M.
EnergyPro 5.1 by EnergySoft User Number: 1919 RunCode: 2011-07-08T10:05:26 ID: E11-780 Pae 15
MECHANICAL EQUIPMENT DETAILS
Part 1 of 2
MECH-5C
Project Name
KOREAN BBQ & GRILL
Date
7/8/2011
CHILLER AND TOWER SUMMARY
PUMPS
Equipment Name Type
City. Eff iclency
Tons Ot . GPM
Premium
BHP Eff. Motor
Pump
Control
❑
DHW / BOILER SUMMARY
System Name Type
Distribution City.
Vol. Energy Factor
Rated Input (Gals). or RE
Standby Loss Tank Ext.
or Pilot R -Value
Status
RHEEM HE80-199 Large Gas
All Pipes Ins 1
199,000 80 0.95
3.80% 12.0
New
MULTI -FAMILY CENTRAL WATER HEATING DETAILS
Hot Water Pump
Hot Water Piping Length ft
Control aty. HP
Type
In Plenum
Outside Buried Add 1/2" Insulation
CENTRAL SYSTEM RATINGS
HEATING
COOLING
System Name Type
of . Output
Aux. kW Efficiency Output
Eff iclency
Status
CARRIER 48ES-060090 Packaged DX
2 70,740
0.0 79% AFUE 60,000
13.0 SEER / 11.0 EER
New
CENTRAL SYSTEM FAN SUMMARY
SUPPLY FAN
RETURN FAN
System Name Fan Type
Economizer Type
Premium
CFM BHP Eff. Motor CFM BHP
Premium
Eff. Motor
CARRIER 48ES-060090 Constant Volume
No Economizer
2,000 0.85 ❑
none
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
EnergyPro 5.1 by EnergySoft User Number: 1919
RunCode: 2011-07-08710:05:26 ID: E11-780
Pae 16 of 24
ENVELOPE MANDATORY MEASURES: NONRESIDENTIAL ENV -MM
Project Name
Date
KOREAN BBQ & GRILL
7/8/2011
DESCRIPTION
Building Envelope Measures:
§118(a): Installed insulating material shall have been certified by the manufacturer to comply with the California Quality
Standards for insulating material, Title 20 Chapter 4, Article 3.
18 c All Insulating Materials shall be installed in compliance with the flame spread rating and smoke density requirements of
§1 ()'
Sections 2602 and 707 of Title 24, Part 2.
§118(f): The opaque portions of framed demising walls in nonresidential buildings shall have insulation with an installed R -value
of no less than R-13 between framing members.
§117(x): All Exterior Joints and openings in the building that are observable sources of air leakage shall be caulked, gasketed,
weatherstripped or otherwise sealed.
Manufactured fenestration products and exterior doors shall have air infiltration rates not exceeding 0.3 cfm/ft.z of
§116(a) 1: window area, 0.3 cfm/ft.2 of door area for residential doors, 0.3 cfm/ft.2 of door area for nonresidential single doors
(swinging and sliding), and 1.0 cfm/ft.2 for nonresidential double doors (swinging).
§116(a) 2: Fenestration U -factor shall be rated in accordance with NFRC 100, or the applicable default U -factor.
§116(a) 3: Fenestration SHGC shall be rated in accordance with NFRC 200, or NFRC 100 for site -built fenestration, or the
applicable default SHGC.
§116(b): Site Constructed Doors, Windows and Skylights shall be caulked between the unit and the building, and shall be
weatherstripped (except for unframed glass doors and fire doors).
Ener Pro 5.1 by EnenqySoft User Number: 1919 RunCode: 2011-07-08T10:05:26 ID: E11-780 Pae 17 of 24
MECHANICAL MANDATORY MEASURES: NONRESIDENTIAL MECH-MM
Project Name
Date
KOREAN BBQ & GRILL
7/8/2011
Equipment and System Efficiencies
§111:
Any appliance for which there is a California standard established in the Appliance Efficiency Regulations will comply
with the applicable standard.
§115(a):
Fan type central furnaces shall not have a pilot light.
§123:
Piping, except that conveying fluids at temperatures between 60 and 105 degrees Fahrenheit, or within HVAC
equipment, shall be insulated in accordance with Standards Section 123.
§124:
Air handling duct systems shall be installed and insulated in compliance with Sections 601, 602, 603, 604, and 605 of
the CMC Standards.
Controls
§122(e):
Each space conditioning system shall be installed with one of the following:
1 A.
Each space conditioning system serving building types such as offices and manufacturing facilities (and all others not
explicitly exempt from the requirements of Section 112 (d)) shall be installed with an automatic time switch with an
accessible manual override that allows operation of the system during off -hours for up to 4 hours. The time switch
shall be capable of programming different schedules for weekdays and weekends and have program backup
capabilities that prevent the loss of the device's program and time setting for at least 10 hours if power is interrupted; or
1 B.
An occupancy sensor to control the operating period of the system; or
1 C.
A 4 -hour timer that can'be manually operated to control the operating period of the system.
2
Each space conditioning system shall be installed with controls that temporarily restart and temporarily operate the
system as required to maintain a setback heating and/or a setup cooling thermostat setpoint.
Each space- conditioning system serving multiple zones with a combined conditioned floor area more than 25,000
§122(g).
square feet shall be provided with isolation zones. Each zone: shall not exceed 25,000 square feet; shall be provided
with isolation devices, such as valves or dampers that allow the supply of heating or cooling to be setback or shut off
independently of other isolation areas; and shall be controlled by a time control device as described above.
§122(c):
Thermostats shall have numeric setpoints in degrees Fahrenheit (F) and adjustable setpoint stops accessible only to
authorized personnel.
§122(b):
Heat pumps shall be installed with controls to prevent electric resistance supplementary heater operation when the
heating load can be met by the heat pump alone
Each space conditioning system shall be controlled by an individual thermostat that responds to temperature within the
zone. Where used to control heating, the control shall be adjustable down to 55 degrees F or lower. For cooling, the
§122(a&b):
control shall be adjustable up to 85 degrees F or higher. Where used for both heating and cooling, the control shall be
capable of providing a deadband of at least 5 degrees F within which the supply of heating and cooling is shut off or
reduced to a minimum.
Ventilation
§121(e):
Controls shall be provided to allow outside air dampers or devices to be operated at the ventilation rates as specified
on these plans.
§122(f):
All gravity ventilating systems shall be provided with automatic or readily accessible manually operated dampers in all
openings to the outside, except for combustion air openings.
Ventilation System Acceptance. Before an occupancy permit is granted for a newly constructed building or space, or a
§121(f):
new ventilating system serving a building or space is operated for normal use, all ventilation systems serving the
building ors ace shall be certified as meeting the Acceptance Requirements for Code Compliance
Service Water Heating Systems
§113(c)
Installation
3.
Temperature controls for public lavatories. The controls shall limit the outlet Temperature to 110° F.
2
Circulating service water -heating systems shall have a control capable of automatically turning off the circulating pump
when hot water is not required.
Ener Pro 5.1 by
EnergySoft User Number: 1919 RunCode: 2011-07-08710:05:26 ID: E11-780 Pae 18 of 24
HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
Project Name
KOREAN BBQ & GRILL
Date
7/8/2011
System Name
DINING AREA
Floor Area
1,465
ENGINEERING CHECKS
SYSTEM LOAD
Number of Systems
2
COIL
CFM
Total Room Loads 9,036
Return Vented Lighting
Return Air Ducts
Return Fan
Ventilation 733
Supply Fan
Supply Air Ducts
TOTAL SYSTEM LOAD
COOLING
PEAK COIL HTG.
PEAK
Heating System
Sensible
Latent CFM
Sensible
Output per System 70,740
95,785
13,429 2,510
63,637
Total Output Btuh 141,480
0
Output Btuh/s ft 96.6
4,789
3,182
Cooling System
01
0
Output per System 60,000
28,746
2,027 733
33,717
Total Output Btuh 120,000
0
15,456
0
Total Output Tons 10.0
4,789
3,182
Total Output Btuh/s ft 81.9
Total Output s ft/Ton 146.5
134,109
103,718
Air System
CFM per System
2,000
HVAC EQUIPMENT SELECTION
Airflow cfm
4,000
CARRIER48ES-060090
80,726
33,386
141,480
Airflow cfm/s ft
2.73
Airflow cfm/Ton
400.0
Outside Air %
18.3%
Total Adjusted System Output
(Adjusted for Peak Design conditions)
TIME OF SYSTEM PEAK
80,726
33,386
Jul 3 PM
141,480
Outside Air cfm/s ft 0.50
Note: values above given at ARI conditions
Jan 1 AM
HEATING SYSTEM PSYCHROMETRICS
Airstream Temperatures at Time of Heating
Peak
26 OF 61 OF
O
Outside Air
733 cfm Supply Fan
4,000 cfm
69 OF
61 OF 95 OF
Heating Coil
94 OF
Roots
70 OF
COOLING SYSTEM PSYCHROMETICS. Airstream Temperatures at Time of Cooling Peak
112/78°F 82/69°F 82/69°F 63/62°F
o
Outside Air Ar 2-1
733 cfm Supply Fan Cooling Coil
4,000 cfm
75 / 67 OF
a
4 .-*1 , 4 H I
64 / 62 OF
°
68.2 /° Roots
74 / 67 OF
I
EnergyPro5.1 by EnergySoft User Number: 1919 RunCode: 2011-07-08T10:05:26
ID: E11-780 Page 19 of 24
ZONE LOAD SUMMARY
Project Name
KOREAN BBQ • GRILL
Date
71812011A
Name
DINING AREA
FloorSystem
•
ZONE LOAD SUMMARY
ZONAL SYSTEM
COOLING
AREA
(BLOCKDINING
LOAD)
ROOM LOAD SUMMARY
Project Name
KOREAN BBQ & GRILL
System Name
DINING AREA
ROOM LOAD SUMMARY
R
Zone Name Room Name Mult. CF
DINING AREA FLOOR PLAN 1 91
* Total includes ventilation load
EnergyPro 5.1 by EnergySo(t
7/8/2011
Floor Area
1,465
)OLING PEAK COIL COOLING PEAK COIL HTG. PEAK
isible Latent CFM Sensible Latent CFM Sensible
95,7851 13, 429 9,0361 95,7851 13, 429 2,5101 63,637
PAGE TOTAL
TOTAL*
2011-07-08710:6
9,036
95,7851
13,4291
2,5101
63, 637
9,036
95,7851
13,4291
2,5101
63,637
ROOM HEATING PEAK LOADS
Project Name
KOREAN BBQ & GRILL
Date
7/8/2011
ROOM INFORMATION
DESIGN CONDITIONS
Room Name FLOOR PLAN
Floor Area 1,465.0 ft'
Indoor Dry Bulb Temperature 70 °F
Time of Peak Jan 1 AM
Outdoor Dry Bulb Temperature 26 OF
Conduction
Area
U -Value
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
AT °F
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
44
Btu/hr
Default Roof Prior to 1978
1,465.0
X
0.0750
44
4,835
Default Wall Prior to 1978
2,004.3
X
0.3560
44
31,395
Single Metal Clear
400.5
X
1.1900
44
20,970
Slab -On -Grade
perim = 200.4
X
X
X
X
X
0.7300
44
6,437
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
through an interior surface to
X 1,465 X
Area Ceiling
Items shown with an asterisk (') denote conduction
Infiltration:[ 1.00 X 1.064
Schedule Air Sensible
Fraction
another room
12.00 X 0.000
Height ACH
Page Total
/60] X
AT
63,637
= 0
TOTAL HOURLY HEAT LOSS FOR ROOM 63,637
EnefqyPro 5.1 by Energ Soft User Number: 1919 RunCode: 2011-07-08710:05:26 ID: E11-780 Page 22 of 24
ROOM COOLING PEAK LOADS
Project Name
Date
KOREAN BBQ & GRILL
7/8/2011
ROOM INFORMATION
DESIGN CONDITIONS
Room Name FLOOR PLAN
Time of Peak
Jul 3 PM
Floor Area 1,465.0 ft2
Outdoor Dry Bulb Temperature
112 OF
Indoor Dry Bulb Temperature 74 OF
Outdoor Wet Bulb Temperature
78 OF
Conduction Area U-Value DETD'
Btu/hr
Default Roof Prior to 1978 1,465.0 X 0.0750 X
71.5 =
7,861
Default Wall Prior to 1978 841.2 X 0.3560 X
55.1 =
16,508
Default Wall Prior to 1978 638.7 X 0.3560 X
38.1 =
8,657
Single Metal Clear 202.5 X 1.1900 X
24.9 =
5,996
Default Wall Prior to 1978 163.2 X 0.3560 X
35.9 =
2,086
Single Metal Clear 198.0 X 1.1900 X
24.9 =
5,863
Default Wall Prior to 1978 361.2 X 0.3560 X
39.2 =
5,035
X X
X X
=
Page Total
52,006
1. Design Equivalent Temperature Difference (DETD)
Items shown with an asterisk (') denote conduction through an interior surface to another room.
Weighting
Solar Gain Orientation Area SGF SC
Factor
Btu/hr
WINDOWS (E) 202.5 X 41 X 0.864 X
1.946 =
14,036
WINDOWS (N) 198.0 X 41 X 0.864 X
0.895 =
6,314
X X X
=
X X X
=
X X X
=
X X X
X X X
X X X
=
X X X
=
Page Total
20,350
Sched.
Weighting
Internal Gain Frac. Area Heat Gain
Factor
Btu/hr
Li hts 1.00 X 1,465 X 0.000 Watts/Sgft X 3.413 Btu/Watt
X 0.000
= 0
Occupants 1.00 X 1,465 X 275 Btu/OCC. / 30 Sqft/occ.
X 1.000
= 13,429
Receptacle 1.00 X 1,465 X 0.500 Watts/Sgft X 3.413 Btu/Watt
X 1.000
= 2,500
Process 1.00 _X 1,465 X 1.500 Watts/Sgft X 3.413 Btu/Watt
X 1.000
= 7,500
Process Lighting 1.00 X 1,465 X 0.000 Watts/Sgft X 3.413 Btu[Watt
X1 0.000
= 0
Infiltration:[ 1.00 X 1.064 X 1,465 X 12.00 X 0.00 / 60 ]
X 38
= 0
Schedule Air Sensible Area Ceiling Height ACH
AT
Fraction
TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM
95 785
Sched.
Latent Gain Frac. Area Heat Gain
Btu/hr
Occupants 1.00 X 1,465 X 275 Btuh/OCC. / 30
Sgft/occ.
= 13,429
Receptacle 1.00 X 1,465 X 0.000 Watts/Sgft X 3.413
Btu/Watt
= 0
Process 1.00 X 1,465 X 0.000 Watts/Sgft X 3.413
Btu/Watt
= 0
Infiltration:[ 1.00 X 4,771 X 1,465 X 12.00 X 0.00 ./60]
X 0.00000
= 0
Schedule Air Sensible Area Ceiling Height ACH
AW
Fraction
TOTAL HOURLY LATENT HEAT GAIN FOR ROOM
13,429
EnergyPro 5.1 by EnergySoft User Number. 1919 RunCode: 2011-07-08710:05:26 ID: E11-780
Page 23 of 24
ROOM COOLING COIL LOADS
Project Name
Date
KOREAN BBQ & GRILL
7/8/2011
ROOM INFORMATION
DESIGN CONDITIONS
Room Name FLOOR PLAN
Time of Peak
Jul 3 PM
Floor Area 1,465.0 ft'
Outdoor Dry Bulb Temperature
112 OF
Indoor Dry Bulb Temperature 74 OF
Outdoor Wet Bulb Temperature
78 OF
Conduction Area U-Value DETD'
Btu/hr
Default Roof Prior to 1978 1,465.0 X 0.0750 X
71.5 =
7,861
Default Wall Prior to 1978 841.2 X 0.3560 X
55.1 =
16,508
Default Wall Prior to 1978 638.7 X 0.3560 X
38.1 =
8,657
Single Metal Clear 202.5 X 1.1900 X
24.9 =
5,996
Default Wall Prior to 1978 163.2 X 0.3560 X
35.9 =
2,086
Single Metal Clear 198.0 X 1.1900 X
24.9 =
5,863
Default Wall Prior to 1978 361.2 X 0.3560 X
39.2 =
5,035
X X
X X
=
Page Total
52,006
1. Design Equivalent Temperature Difference (DETD)
Items shown with an asterisk (') denote conduction through an interior surface to another room.
Weighting
Solar Gain Orientation Area SGF SC
Factor
Btu/hr
WINDOWS (E) 202.5 X 41 X 0.864 X
1.946 =
14,036
WINDOWS (N) 198.0 X 41 X 0.864 X
0.895 =
6,314
X X X
X X X
=
X X X
X X X
=
X X X
=
X X X
=
X I X X
=
Page Total
20,350
Sched.
Weighting
Internal Gain Frac. Area Heat Gain
Factor
Btu/hr
Lights 1.00 X 1,465 X 0.000 Watts/Sgft X 3.413 Btu/Watt
X 0.000
= 0
Occupants 1.00 X 1,465 X 275 Btu/OCC. / 30 Sgft/OCc.
X 1.000
= 13,429
Receptacle 1.00 X 1,465 X 0.500 Watts/Sgft X 3.413 Btu/Watt
X 1.000
= 2,500
Process 1.00 X 1,465 X 1.500 Watts/Sgft X 3.413 Btu/Watt
X 1.000
= 7,500
Process Lighting 1.00 X 1,465 X 0.000 Watts/Sgft X 3.413 Btu/Watt
X 0.000
= 0
Infiltration:[ 1.00 X 1.064 X 1,465 X 12.00 X 60 ]
X 38
= 0
Schedule Air Sensible Area Ceiling Height ACH
AT
Fraction
TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM
95 785
Sched.
Latent Gain Frac. Area Heat Gain
Btu/hr
Occupants 1.00 X 1,465 X 275 Btuh/OCC. / 30
Sqf /occ.
= 13,429
Receptacle 1.00 X 1,465 X 0.000 Watts/Sgft X 3.413
Btu/Watt
= 0
Process 1.00 X 1,465 X 0.000 Watts/Sgft X 3.413
Btu/Watt
= 0
Infiltration:[ 1.00 X 4,771 X 1,465 X 12.00 X 0.00 /60]
X 0.00000
= 0
Schedule Air Sensible Area Ceiling Height ACH
pW
Fraction
TOTAL HOURLY LATENT HEAT GAIN FOR ROOM
13,429
EnergyPro 5.1 by EnergySoft User Number: 1919 RunCode: 2011-07-08T10:05:26 ID: E11-780
Page 24 of 24