Loading...
11-0603 (RC) Title 241 BUILDING ENERGY ANALYSIS REPORT PROJECT: KOREAN BBQ & GRILL 78-702 HWY 111 LA QUINTA, CA 92253 Project Designer: SPACE ZEN 3345 WILSHIRE BLVD., #605 LOS ANGELES, CA 90010 (213) 388-0054 Report Prepared by: Perfect Design. PERFECT DESIGN & DEVELOPMENT, INC. 2416 W Valley Blvd Alhambra, Ca 91803 (626)289-8808 CITY OF LAQUINTA ' BUILDING & SAFETY DEPT, APPROVED ]� � � F� 0 T , N JUL 19 2011 FOR CONSTRUCTION Job Number: l d' DArE B Date: 7/8/2011 The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2008 Building Energy Efficiency Standards. This program developed by EnergySoft, LLC — www.energysoft.com. Ener Pro 5.1 by EnergySoft User Number. 1919 RunCode: 2011-07-08710:05:26 ID: E11-780 TABLE OF CONTENTS Cover Page 1 Table of Contents 2 Nonresidential Performance Title 24 Forms 3 Form ENV -MM Envelope Mandatory Measures 17 Form MECH-MM Mechanical Mandatory Measures 18 HVAC System Heating and Cooling Loads Summary 19 Zone Load Summary 20 Room Load Summary 21 Room Heating Peak Loads 22 Room Cooling Peak Loads 23 Room Cooling Coil Loads 24 EnergyPro 5.1 by EnergySoft Job Number: ID: E11-780 User Number: 1919 PERFORMANCE CERTIFICATE OF COMPLIANCE (Part 1 of 3) PERF -1 C Project Name Date KOREAN BBQ & GRILL 7/8/2011 Project Address Climate ZoneTotal Cond. Floor Area Addition Floor Area 78-702 HWY 111 LA QU/NTA CA Climate Zone 15 1,465 n/a GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Relocatable - indicate ❑ specific climate zone rI3 all climates Phase of Construction: ❑ New Construction ❑ Addition 0 Alteration STATEMENT OF COMPLIANCE This certificate of compliance lists the building features and specifications needed to ES !,� ~, comply with Title 24, Parts 1 and 6 of the'California Code of Regulations. This Q fyp z q��i yc� certificate applies only to a Building using the performance compliance approach. ,�'�Q o?�, The documentation author hereby certifies that the documentation is accurate an a I m Documentation Author Name Perfect Design Signature {S Company PERFECT DESIGN & DEVELOPMENT, INC. A V/ Address 2416 W Valley Blvd89-8808 City/State/Zip Alhambra, Ca 91803 The Principal Designer hereby certifies that the proposed building design represented in this set of construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this permit application. The proposed building has been designed to meet the energy efficiency requirements contained in sections 110, 116 through 118, and 140 through 149 of Title 24, Part 6. Please check one: ENV. LTG. MECH. I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to ❑ ❑ ❑ sign this document as the person responsible for its preparation; and that I am licensed in the State of California as a civil engineer, mechanical engineer, electrical engineer, or I am a licensed architect. I affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code by section ❑ ❑ ❑ 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor performing this work. I affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document ❑ ❑ ❑ because it pertains to a structure or type of work described as exempt pursuant to Business and Professions Code Sections 5537, 5538 and 6737.1. Principal Envelope Designer Name Signature Company SPACE ZEN Date Address 3345 WILSHIRE BLVD., #605 License # City/State/Zip LOS ANGELES, CA 90010 / I Phone (213) 388-0054 Principal Mechanical Designer Name PERFECT DESIGN & ENGINEERING, INC Company Date Address 2416 W. VALLEY BLVDLicense cnii a4l 761,5 # 50 City/State/Zip ALHAMBRA, CA 91803 1 .0 30 13 Phone (626) 280-8808 Principal Lighting Designer {�t Name r' Q�\� Company Lighting Compliance Not /n The Scope Of This Submittal Date Address License # City/State/Zip Phone INSTRUCTIONS TO APPLICANT COMPLIANCE & WORKSHEETS (check box if worksheets are included) El ENV -1C Certificate of Compliance. Required on plans. m MECH-1C Certificate of Compliance. Required on plans. ❑ LTG -IC Certificate of Compliance. Required on plans. m MECH-2C Air/Water Side/Service Hot Water & Pool Requirements. ❑ LTG -2C Lighting Controls Credit Worksheet. m MECH-3C Mechanical Ventilation and Reheat. ❑ LTG -3C Indoor Lighting Power Allowance. El MECH-5C Mechanical Equipment Details. Energ Pro 5.1 by EnergySoft User Number: 1919 RunCode: 2011-07-08710:05:26 ID: E11-780 Page 3 of 24 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 2 of 3) PERF -1C Project Name . Date KOREAN BBQ & GRILL 7/8/2011 ANNUAL TDV ENERGY USE SUMMARY (kBtu/soft-vr) Energy Component Space Heating Space Cooling Indoor Fans Heat Rejection Pumps & Misc. Domestic Hot Water Lighting Receptacle Process Process Lighting TOTALS itandard Proposed compliance Desian Desian Marain 12.31 12.78 -0.47 792.77 708.66 84.11 215.53 201.21 14.33 0.00 0.00 0.00 0.00 0.00 0.00 129.78 120.28 9.50 76.96 76.96 0.00 32.05 32.05 0.00 96.15 96.15 0.00 0.00 0.001 0.00 1,355.56 1,248.101 107.46 Percent better than Standard GENERAL INFORMATION 7.9%1 ( 8.5 % excludl Heating Cooling Fans Heat Rej Pumps DHW Lighting Receptacle Process Process Ltg BUILDING COMPLIES Building Orientation (N) 0 deg Conditioned Floor Area 1,465 sqft- Number of Stories 1 Unconditioned Floor Area 0 sqft. Number of Systems 2 Conditioned Footprint Area 1,465 sqft. Number of Zones 1 Natural Gas Available On Site Yes Front Elevation Left Elevation Rear Elevation Right Elevation Total Roof Oripntntinn rrncc Aran (N) 361 (E) 841 (S) 361 (V1� 841 2,405 1,465 Prescriptive Lighting Power Density Prescriptive Envelope TDV Energy Remarks: Standard 1.100 W/sqft. 110,759 sqft. sqft. sqft. sqft. sqft. sqft. Glazing Area 198 203 0 0 401 0 Proposed 0.000 W/sqft. 362,128 sqft. sqft. sqft. sqft. sqft. sqft. G1a7inn Rntin 54.8% 24.1% 0.0% 0.0% 16.7% 0.0% Prescriptive Values for Comparison only. See LTG -1 C for allowed LPD. PERFORMANCE CERTIFICATE OF COMPLIANCE. (Part 3 of 3) PERF -1 C Project Name KOREAN BBQ & GRILL Date 7/8/2011 ZONE INFORMATION System Name Zone Name Occupancy Type Floor Area s ft. Inst. LPD W/sf' Ctrl. Credits (W/sf 2 Allowed LPD Proc. Loads W/sf Area Tailored W/sf 3 W/sf 4 DINING AREA DINING AREA Dining 1,465 0.000 1.500 Notes: 1. See LTG -1C 2. See LTG -2C 3. See LTG -3C 4. See LTG -4C items marked with asterisk, see LTG -1 -C b others b others Items above require special documentation EXCEPTIONAL CONDITIONS COMPLIANCE.CHECKLIST The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of the justifications, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted. The DHW System RHEEM HE80-199 is a non-NAECA large storage gas water heater. Verify DHW details. The exceptional features listed in this performance approach application have specifically been reviewed. Adequate written justification and documentation for their use have been provided by the applicant. Authorized Signature or Stamp Energ Pro 5.1 by Energ Soft User Number: 1919 RunCode: 2011-07-08710:05:26 /D: E11-780 Page 5 of 24 CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV -1 C AND FIELD INSPECTION ENERGY CHECKLIST Project Name KOREAN BBQ & GRILL Date 7/8/2011 Project Address 78-702 HKIY 111 LA QUINTA Climate Zone 15 Total Cond. Floor Area 1,465 Addition Floor Area n/a GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Relocatable Public School ® Conditioned Spaces ❑ Unconditioned Spaces Bldg. ❑ Skylight Area for Large Enclosed Space z 8000 ft2 (If checked include the ENV -4C with submittal) Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ® Overall Envelope ❑ Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: 10 deg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION Ta /ID' Assembly Type 2 •p a C rn O z O 5 z d « 7 O¢ O .` W> O Cf .` C W LL O E> OC 5 U. V C -.34 °e N V z v rn N a U. 1 Roof 1,465 (N) 0.075 R-19 4.2.2-A5 Existing ❑ ❑ 2 Wall 841 (W) 0.356 None 4.3.1-A1 Existing ❑ ❑ 3 Wall 639 (E) 0.356 None 4.3.1-A1 Existing ❑ ❑ 4 Wall 163 (N) 0.356 None 4.3.1-A1 Existing ❑ ❑ 5 Wall 361 (S) 0.356 None 4.3.1-A1 Existing ❑ ❑ 6 Slab 1,465 (N) 1 0.730 None 4.4.7-A1 Existing ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/ID' Fenestration Type 2 l0 �' a }: N W O Z> o R m 4 .2 m IVC 4 o' > rn tJ C7 = A CO m V x 'o (n U) rn > O c 7 o ;° v N a m a 1 Window 203 (E) 1.190 Default 0.830 Default ❑ Existing ❑ ❑ 2 Window 198 (N) 1.190 Default 0.830 Default ® Existing ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. Ener Pro 5.1 by Ener Soft User Number: 1919 RunCode: 2011-07-08710:05:26 /D: E11-780 Page 6 of 24 CERTIFICATE OF COMPLIANCE (Part 2 of 3) AND FIELD INSPECTION ENERGY CHECKLIST ENV -1 C Project Name KOREAN BBQ & GRILL Date 7/8/2011 ROOFING PRODUCT COOL ROOFS (Note if the roofing product is not CRRC certified, this compliance approach cannot be used). Go to Overall Envelope Approach or Performance Approach. CHECK APPLICABLE BOX BELOW IF EXEMPT FROM THE ROOFING PRODUCT "COOL ROOF" REQUIREMENTS: Pass Fail' N/A ❑ Roofing compliance not required in Climate Zones 1 andl6 with a Low -Sloped. 2:12 pitch or less. ❑ ❑ ❑ ❑ Roofing compliance not required in Climate Zone 1 with a Steep -Sloped with less than 5 Ib/ft2. Greater than 2:12 pitch. ❑ ❑ ❑ Low -sloped Wood framed roofs in Climate Zones 3 and 5 are exempted, solar reflectance and thermal emittance or ❑ SRI that have a U -factor of 0.039 or lower. See Opaque Surface Details roof assembly, Column H of ENV -2C. ❑ ❑ ❑ ❑ Low -sloped Metal building roofs in Climate Zone 3 and 5 are exempted, solar relectance and thermal emittance or SRI that have a U -factor of 0.048 or lower. See Opaque Surface Details roof assembly below, Column H of ENV -2C. ❑ ❑ ❑ ❑ The roof area covered by building integrated photovoltaic panels and building integrated solar thermal panels are exempted. Solar reflectance and thermal emittance or SRI, seespreadsheet calculator at www.energy.ca.gov/title24/ ❑ ❑ 13 - Roof constructions that have thermal mass over the roof membrane with a weight of at least 25 Ib/ft are exempt from ❑ the Cool Roof criteria below. 13 11 13 ❑ High-rise residential buildings and hotels and motels with low -sloped roofs in Climate Zones 1 through 9, 12 and 16 are exempted from the low -sloped roofing criteria. ❑ . ❑ ❑ 1. If Fail then describe on this page of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. CRRC Product ID Number' Roof Slope s 2:12 > 2:12 Product Weight < 51b/fe z 51b/fe Product T e2 Aged Solar Reflectance3 Thermal Emmitance SRI5 Pass Fails ❑ ❑ ❑ ❑ ❑ 4 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ° ❑ ❑ ❑ ❑ ❑ ❑ ❑' ❑ 1 ❑ ❑ ❑ ❑ ❑ ❑ J ❑ ❑ ❑ ❑ ❑ ❑ ❑° ❑ ❑ ❑ ❑ ❑ ❑ ❑ 4 ❑ ❑ 1. The CRRC Product ID Number can be obtained from the Cool Roof Rating Council's Rated Product Directory at www.coolroofs.org/r)roducts/search.iohr) 2. Indicate the type of product is being used for the roof top, i.e. single -ply roof, asphalt roof, metal roof, etc. 3. If the Aged Reflectance is not available in the Cool Roof Rating Council's Rated Product Directory then use the Initial Reflectance value from the same directory and use the equation (0.2+0.7(pi�ival — 0.2) to obtain a calculated aged value. Where p is the Initial Solar Reflectance from the Cool Roof Rating Council's Rated Product Directory. 4. Check box if the Aged Reflectance is a calculated value using the equation above. 5. The SRI value needs to be calculated from a spreadsheet calculator at http://www.energy.ca.00v/title24/ 6. If Fail then describe on this page of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. To apply Liquid Field Applied Coatings, the coating must be applied across the entire roof surface and meet the dry mil thickness or coverage recommended by the coatings manufacturer and meet minimum performance requirements listed in §118(i)4. Select the applicable coating: ❑ Aluminum -Pigmented Asphalt Roof Coating ❑ Cement -Based Roof Coating ❑ Other Discrepancies: Ener Pro 5.1 by EnenqySoft User Number: 1919 RunCode: 2011-07-08710:05:26 /D: E11-780 Pa e 7 of 24 CERTIFICATE OF COMPLIANCE (Part 3 of 3) ENV -1C AND FIELD INSPECTION ENERGY CHECKLIST Project Name KOREAN BBQ & GRILL Date 7/8/2011 Required Acceptance Tests Designer: This form is to be used by the designer and attached to the plans. Listed below is the acceptance test for Envelope Fenestrations system. The designer is required to check the acceptance tests and list all the fenestration products that require an acceptance test. If all the site -built fenestration of a certain type requires a test, list the different fenestration products and the number of systems. The NA7 Section in the Appendix of the Nonresidential Reference Appendices Manual describes the test. Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Enforcement Agency: Systems Acceptance. Before Occupancy Permit is granted for a newly constructed building or space or whenever new fenestration is installed in the building or space shall be certified as meeting the Acceptance Requirements. The ENV -2A form is not considered a complete form and is not to be accepted by the enforcement agency unless the boxes are checked and/or filled and signed. In addition, a Certificate of Acceptance forms shall be submitted to the enforcement agency that certifies plans, specifications, installation certificates, and operating and maintenance information meet the requirements of §10-103(b) of Title 24 Part 6. The field inspector must receive the properly filled out and signed forms before the building can receive final occupancy. A copy of the ENV -2A for each different fenestration product line must be provided to the owner of the building for their records. Test Description ENV -2A Test Performed By: Fenestration Products Name or ID Area of like Building Envelope Requiring Testing or Verification Products Acceptance Test 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 EnergyPro 5.1 by EnergySoft User Number. 1919 RunFode: 2011-07-08710:05:26 ID: E11-780 Page 8 of 24 CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C FIELD INSPECTION ENERGY CHECKLIST Project Name KOREAN BBQ & GRILL Date 7/8/2011 Project Address 78-702 HWY 111 LA QUINTA Climate Zone 15 Total Cond. Floor Area 1,465 Addition Floor Area n/a GENERAL INFORMATION Building Type: ® Nonresidential ❑ High-Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Relocatable Public School Bldg. m Conditioned Spaces ❑ Unconditioned Spaces affidavit Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit) Energy Front Orientation: N, E, S, W or in Degrees: 0 deg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST E ui ment2 Inspection Criteria Meets Criteria or Requirements Pass Fail — Describe Reason Item or System Tags AC-1, RTU-1, HP-1 DHW Heater ❑ 13i.e. Equipment T e3: Gas Fired DHW Boiler ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 199,000 Btu/hr ❑ ❑ Minimum Heating Efficiency' 95% ❑ ❑ Max Allowed Cooling Capacity' n/a ❑ ❑ Cooling Efficiency' n/a ❑ ❑ Duct Location/ R-Value n/a ❑ ❑ When duct testing is required, submit & MECH-4-HERS n/a 13 13MECH-4A Economizer n/a ❑ ❑ Thermostat n/a ❑ ❑ Fan Control n/a ❑ ❑ E ui ment2 Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Pass Fail — Describe Reason Item or System Tags AC-1, RTU-1, HP-1 DINING AREA ❑ 13i.e. Equipment T e3: Packaged DX ❑ ❑ Number of Systems 2 ❑ ❑ Max Allowed Heating Capacity' 70,740 Btu/hr ❑ ❑ Minimum Heating Efficiency' 79% AFUE ❑ ❑ Max Allowed Cooling Capacity' 60,000 Btu/hr ❑ ❑ Cooling Efficiency' 13.0 SEER / 11.0 EER ❑ ❑ Duct Location/ R-Value Attic, Ceiling Ins, vented/ 6.0 ❑ ❑ When duct testing is required, submit & MECH-4-HERS No ❑ 13MECH-4A Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. JEnergyPro5.1byEnergySoft User Number: 1919 RunCode: 2011-07-08710:05:26 ID: E11-780 Pae 9 of 24 CERTIFICATE OF COMPLIANCE and . (Part 2 of 4) MECH-1 C FIELD INSPECTION ENERGY CHECKLIST Project Name Date KOREAN BBQ & GRILL 7/8/2011 DiscreDancies: - ID: E11- CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 3 of .4) MECH-1C Project Name Date KOREAN BBQ & GRILL 7/8/2011 Required Acceptance Tests Designer: This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for mechanical systems. The designer is required to check the applicable boxes by all acceptance tests that apply and listed all equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the equipment description and the number of systems. The NA number designates the Section in the Appendix of the Nonresidential Reference Appendices Manual that describes the test. Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Building Departments: Systems Acceptance: Before occupancy permit is granted for a newly constructed building or space, or a new space-conditioning system serving a building or space is operated for normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. Systems Acceptance: Before occupancy permit is granted. All newly installed HVAC equipment must be tested using the Acceptance Requirements. The MECH-1 C form is not considered a completed form and is not to be accepted by the building department unless the correct boxes are checked. The equipment requiring testing, person performing the test (Example: HVAC installer, TAB contractor, controls contractor, PE in charge of project) and what Acceptance test must be conducted. The following checked-off forms are required for ALL newly installed equipment. In addition a Certificate of Acceptance forms shall be submitted to the building department that certifies plans, specifications, installation, certificates, and operating and maintenance information meet the requirements of §10-103(b) and Title-24 Part 6. The building inspector must receive the properly filled out and signed forms before the building can receive final occupancy. TEST DESCRIPTION MECH-2A MECH-3A MECH-4A MECH-5A MECH-6A MECH-7A MECH-8A MECH-9A MECH-10A MECH-11A Hydronic Outdoor Constant Demand Supply System Automatic Ventilation Volume & Air Control Supply Valve Water Variable Demand For Single-Zone Distribution Economizer Ventilation Fan Leakage Temp. Flow Shed Equipment Re uirin Testing or Verification Qty. VAV & CAV Unitary Ducts Controls DCV VAV Test Reset Control Control CARRIER 48ES-060090 2 ® ® ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ . ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Ener Pro 5.1 by EnergySoft User Number: 1919 RunCode: 2011-07-08710:05:26 ID: E11-780 Pae 11 of 24 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 4 of 4) MECH-1 C Project Name KOREAN BBQ & GRILL - Date 7/8/2011 TEST DESCRIPTION MECH-12A MECH-13A MECH-14A MECH-15A Equipment Re uirin Testing Fault Detection & Diagnostics Qty. for DX Units Automatic Fault Detection & Diagnostics for Air & Zone Distributed Energy Storage DX AC Systems Thermal Energy Storage (TES) Systems Test Performed BY: CARRIER 48ES-060090 2 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑- ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Ener Pro 5.1 by EnergySoft User Number: 1919 RunCode: 2011-07-08710:05:26 ID: El 1-780 Pae 12 of 24 AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2C Project Name Date KOREAN BBQ & GRILL 1 7/8/2011 Indicate Air Systems Type Central, Single Zone, Package, VAV, or etc... Item or System Tags i.e. AC -1, RTU -1, HP -1 DINING AREA Number of Systems 2 Indicate Pa a Reference on Plans or Schedule and indicate the applicable exception(s) MANDATORY MEASURES T-24 Sections Heating Equipment Efficiency 112(a) 79% AFUE Cooling Equipment Efficiency 112 a 13.0 SEER / 11.0 EER HVAC Heat Pump Thermostat 112(b), 112(c) n/a Furnace ControlslThermostat 112(c), 115(a) n/a Natural Ventilation -121(b) No Mechanical Ventilation 121 b 733 cim VAV Minimum Position Control 121 c No Demand Control Ventilation 121 c No Time Control 122(e) Programmable Switch Setback and Setup Control 122(e) Setback Required Outdoor Damper Control 122(f) Auto Isolation Zones 122 n/a Pipe Insulation 123 Duct Location/ R -value 124 Attic, Ceiling Ins, vented/ 6.0 PRESCRIPTIVE MEASURES Calculated Design Heating Load 144(a & b n/a Proposed Heating Capacity 144(a & b 141,480 Btu/hr Calculated Design Cooling Load 144(a & b n/a Proposed Cooling Capacity 144(a & b 80,726 Btu/hr Fan Control 144(c) Constant Volume DP Sensor Location .144(c) P Supply Pressure Reset (DDC only) 144(c) No Simultaneous Heat/Cool -144(d) No Economizer 144(e) No Economizer Heat Air Supply Reset 144(f) Constant Temp Cool Air Supply Reset 144(f) Constant Temp Electric Resistance Heating' 144 Air Cooled Chiller Limitation 144(i) Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(k) No 1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used explain which exception(s) to §144(g) apply. EnergyPro 5.1 by EnergySoft User Number: 1919 RunCode: 2011-07-08710:05:26 ID: E11-780 Pae 13 of 24 WATER SIDE SYSTEM REQUIREMENTS Part 2 of 2 MECH-2C Project Name Date KOREAN BBQ & GRILL 1 7/8/2011 WATER SIDE SYSTEMS: Chillers, Towers, Boilers, H dronic Loops Item or System Tags (i.e. AC -1, RTU -1, HP -1)' : Number of Systems Indicate Page Reference on Plans or S ecification2 MANDATORY MEASURES T-24 Sections Equipment Efficiency 112(a) Pipe Insulation 123 PRESCRIPTIVE MEASURES Cooling Tower Fan Controls 144(a & b Cooling Tower Flow Controls 144(h) Variable Flow System Design 144(h) Chiller and Boiler Isolation 144 ' CHIN and HHW Reset Controls 144 ' WLHP Isolation Valves 144 0) VSD on CHW, CW & WLHP Pumps>5HP 144 0) DP Sensor Location 144 0) 1. The proposed equipment need to match the building plans schedule or specifications. If a requirement is not applicable, put 'N/A" in the column . next to applicable section. . 2. For each chiller, cooling tower, boiler, and hydronic loop (or groups of similar equipment) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" in the column next to applicable section. Service Hot Water, Pool Heating Item or System Tags (i.e. WH -1, WHP, DHW, etc...)' DHW Heater Number of Systems 1 Indicate Page Reference on Plans or Schedule MANDATORY MEASURES T-24 Sections SERVICE HOT WATER Certified Water Heater 111, 113(a) RHEEM HE80-199 Water Heater Efficiency 113(b) 95% Service Water Heating Installation 113(c) Controls Req. Pipe Insulation 123 n/a POOL AND SPA Pool and Spa Efficiency and Control 114(a) n/a Pool and Spa Installation 114(b) n/a Pool Heater — No Pilot Light 115(c) n/a Spa Heater — No Pilot Light 115 d n/a Pipe Insulation 123 Required 1. The Proposed equipment needs to match the building plans schedule or specifications. If a requirement is not applicable, put "N/A" in the column next to applicable section. 2. For each water heater, pool heater and domestic water loop (or groups of similar equipment) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" in the column. EnergyPro 5.1 by Ener Soft User Number. • 1919 RunCode: 2011-07-08710:05:26 /D: E11-780 Pae 14 of 24 MECHANICAL VENTILATION AND REHEAT MECH-3C Project Name KOREAN BBQ & GRILL Date 7/8/20.11 MECHANICAL VENTILATION §121 b 2 REHEAT LIMITATION (§144(d)) AREA BASIS OCCUPANCY BASIS VAV MINIMUM A B C D E F G H I J K L M N Zone/System Condition Area (ft) CFM per fe Min CFM By Area B X C Number Of People CFM per Person Min CFM by Occupant E X F REQ'D V.A. Max of D or G Design Ventilation Air CFM 50% of Design Zone Supply I CFM B X 0.4 CFM / f 2 Max. of Columns H, J, K, 300 CFM Design Minimum Air Setpoint Transfer 1 Air DINING AREA 1,465 0.50 733 48.8 15.0 733 733 733 DINING AREA Total 733 733 Totals Column I Total Design Ventilation Air C Minimum ventilation rate per Section 121, Table 121-A. E Based on fixed seat or the greater of the expected number of occupants and 50% of the CBC occupant load foregress purposes fors aces without fixed seating. H Required Ventilation Air REQ'D V.A. is the larger of the ventilation rates calculated on an AREA BASIS or OCCUPANCY BASIS Column D or G). I Must be greater than orequal to H, or use Transfer Air column N to make up the difference. J Design fan supply CFM Fan CFM x 50%; or the design zone outdoor airflow rate per 121. K Condition area(ft) x 0.4 CFM / ft2; or L Maximum of Columns H, J, K, or 300 CFM M This must be less than orequal to Column L and greater than orequal to the sum of Columns H plus N. N Transfer Air must be provided where the Required Ventilation Air (Column H) is greater than the Design Minimum Air (Column M). Where required, transfer air must be greater than or equal to the difference between the Required Ventilation Air Column H and the Design Minimum Air Column M), Column H minus M. EnergyPro 5.1 by EnergySoft User Number: 1919 RunCode: 2011-07-08T10:05:26 ID: E11-780 Pae 15 MECHANICAL EQUIPMENT DETAILS Part 1 of 2 MECH-5C Project Name KOREAN BBQ & GRILL Date 7/8/2011 CHILLER AND TOWER SUMMARY PUMPS Equipment Name Type City. Eff iclency Tons Ot . GPM Premium BHP Eff. Motor Pump Control ❑ DHW / BOILER SUMMARY System Name Type Distribution City. Vol. Energy Factor Rated Input (Gals). or RE Standby Loss Tank Ext. or Pilot R -Value Status RHEEM HE80-199 Large Gas All Pipes Ins 1 199,000 80 0.95 3.80% 12.0 New MULTI -FAMILY CENTRAL WATER HEATING DETAILS Hot Water Pump Hot Water Piping Length ft Control aty. HP Type In Plenum Outside Buried Add 1/2" Insulation CENTRAL SYSTEM RATINGS HEATING COOLING System Name Type of . Output Aux. kW Efficiency Output Eff iclency Status CARRIER 48ES-060090 Packaged DX 2 70,740 0.0 79% AFUE 60,000 13.0 SEER / 11.0 EER New CENTRAL SYSTEM FAN SUMMARY SUPPLY FAN RETURN FAN System Name Fan Type Economizer Type Premium CFM BHP Eff. Motor CFM BHP Premium Eff. Motor CARRIER 48ES-060090 Constant Volume No Economizer 2,000 0.85 ❑ none ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ EnergyPro 5.1 by EnergySoft User Number: 1919 RunCode: 2011-07-08710:05:26 ID: E11-780 Pae 16 of 24 ENVELOPE MANDATORY MEASURES: NONRESIDENTIAL ENV -MM Project Name Date KOREAN BBQ & GRILL 7/8/2011 DESCRIPTION Building Envelope Measures: §118(a): Installed insulating material shall have been certified by the manufacturer to comply with the California Quality Standards for insulating material, Title 20 Chapter 4, Article 3. 18 c All Insulating Materials shall be installed in compliance with the flame spread rating and smoke density requirements of §1 ()' Sections 2602 and 707 of Title 24, Part 2. §118(f): The opaque portions of framed demising walls in nonresidential buildings shall have insulation with an installed R -value of no less than R-13 between framing members. §117(x): All Exterior Joints and openings in the building that are observable sources of air leakage shall be caulked, gasketed, weatherstripped or otherwise sealed. Manufactured fenestration products and exterior doors shall have air infiltration rates not exceeding 0.3 cfm/ft.z of §116(a) 1: window area, 0.3 cfm/ft.2 of door area for residential doors, 0.3 cfm/ft.2 of door area for nonresidential single doors (swinging and sliding), and 1.0 cfm/ft.2 for nonresidential double doors (swinging). §116(a) 2: Fenestration U -factor shall be rated in accordance with NFRC 100, or the applicable default U -factor. §116(a) 3: Fenestration SHGC shall be rated in accordance with NFRC 200, or NFRC 100 for site -built fenestration, or the applicable default SHGC. §116(b): Site Constructed Doors, Windows and Skylights shall be caulked between the unit and the building, and shall be weatherstripped (except for unframed glass doors and fire doors). Ener Pro 5.1 by EnenqySoft User Number: 1919 RunCode: 2011-07-08T10:05:26 ID: E11-780 Pae 17 of 24 MECHANICAL MANDATORY MEASURES: NONRESIDENTIAL MECH-MM Project Name Date KOREAN BBQ & GRILL 7/8/2011 Equipment and System Efficiencies §111: Any appliance for which there is a California standard established in the Appliance Efficiency Regulations will comply with the applicable standard. §115(a): Fan type central furnaces shall not have a pilot light. §123: Piping, except that conveying fluids at temperatures between 60 and 105 degrees Fahrenheit, or within HVAC equipment, shall be insulated in accordance with Standards Section 123. §124: Air handling duct systems shall be installed and insulated in compliance with Sections 601, 602, 603, 604, and 605 of the CMC Standards. Controls §122(e): Each space conditioning system shall be installed with one of the following: 1 A. Each space conditioning system serving building types such as offices and manufacturing facilities (and all others not explicitly exempt from the requirements of Section 112 (d)) shall be installed with an automatic time switch with an accessible manual override that allows operation of the system during off -hours for up to 4 hours. The time switch shall be capable of programming different schedules for weekdays and weekends and have program backup capabilities that prevent the loss of the device's program and time setting for at least 10 hours if power is interrupted; or 1 B. An occupancy sensor to control the operating period of the system; or 1 C. A 4 -hour timer that can'be manually operated to control the operating period of the system. 2 Each space conditioning system shall be installed with controls that temporarily restart and temporarily operate the system as required to maintain a setback heating and/or a setup cooling thermostat setpoint. Each space- conditioning system serving multiple zones with a combined conditioned floor area more than 25,000 §122(g). square feet shall be provided with isolation zones. Each zone: shall not exceed 25,000 square feet; shall be provided with isolation devices, such as valves or dampers that allow the supply of heating or cooling to be setback or shut off independently of other isolation areas; and shall be controlled by a time control device as described above. §122(c): Thermostats shall have numeric setpoints in degrees Fahrenheit (F) and adjustable setpoint stops accessible only to authorized personnel. §122(b): Heat pumps shall be installed with controls to prevent electric resistance supplementary heater operation when the heating load can be met by the heat pump alone Each space conditioning system shall be controlled by an individual thermostat that responds to temperature within the zone. Where used to control heating, the control shall be adjustable down to 55 degrees F or lower. For cooling, the §122(a&b): control shall be adjustable up to 85 degrees F or higher. Where used for both heating and cooling, the control shall be capable of providing a deadband of at least 5 degrees F within which the supply of heating and cooling is shut off or reduced to a minimum. Ventilation §121(e): Controls shall be provided to allow outside air dampers or devices to be operated at the ventilation rates as specified on these plans. §122(f): All gravity ventilating systems shall be provided with automatic or readily accessible manually operated dampers in all openings to the outside, except for combustion air openings. Ventilation System Acceptance. Before an occupancy permit is granted for a newly constructed building or space, or a §121(f): new ventilating system serving a building or space is operated for normal use, all ventilation systems serving the building ors ace shall be certified as meeting the Acceptance Requirements for Code Compliance Service Water Heating Systems §113(c) Installation 3. Temperature controls for public lavatories. The controls shall limit the outlet Temperature to 110° F. 2 Circulating service water -heating systems shall have a control capable of automatically turning off the circulating pump when hot water is not required. Ener Pro 5.1 by EnergySoft User Number: 1919 RunCode: 2011-07-08710:05:26 ID: E11-780 Pae 18 of 24 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name KOREAN BBQ & GRILL Date 7/8/2011 System Name DINING AREA Floor Area 1,465 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 2 COIL CFM Total Room Loads 9,036 Return Vented Lighting Return Air Ducts Return Fan Ventilation 733 Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COOLING PEAK COIL HTG. PEAK Heating System Sensible Latent CFM Sensible Output per System 70,740 95,785 13,429 2,510 63,637 Total Output Btuh 141,480 0 Output Btuh/s ft 96.6 4,789 3,182 Cooling System 01 0 Output per System 60,000 28,746 2,027 733 33,717 Total Output Btuh 120,000 0 15,456 0 Total Output Tons 10.0 4,789 3,182 Total Output Btuh/s ft 81.9 Total Output s ft/Ton 146.5 134,109 103,718 Air System CFM per System 2,000 HVAC EQUIPMENT SELECTION Airflow cfm 4,000 CARRIER48ES-060090 80,726 33,386 141,480 Airflow cfm/s ft 2.73 Airflow cfm/Ton 400.0 Outside Air % 18.3% Total Adjusted System Output (Adjusted for Peak Design conditions) TIME OF SYSTEM PEAK 80,726 33,386 Jul 3 PM 141,480 Outside Air cfm/s ft 0.50 Note: values above given at ARI conditions Jan 1 AM HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak 26 OF 61 OF O Outside Air 733 cfm Supply Fan 4,000 cfm 69 OF 61 OF 95 OF Heating Coil 94 OF Roots 70 OF COOLING SYSTEM PSYCHROMETICS. Airstream Temperatures at Time of Cooling Peak 112/78°F 82/69°F 82/69°F 63/62°F o Outside Air Ar 2-1 733 cfm Supply Fan Cooling Coil 4,000 cfm 75 / 67 OF a 4 .-*1 , 4 H I 64 / 62 OF ° 68.2 /° Roots 74 / 67 OF I EnergyPro5.1 by EnergySoft User Number: 1919 RunCode: 2011-07-08T10:05:26 ID: E11-780 Page 19 of 24 ZONE LOAD SUMMARY Project Name KOREAN BBQ • GRILL Date 71812011A Name DINING AREA FloorSystem • ZONE LOAD SUMMARY ZONAL SYSTEM COOLING AREA (BLOCKDINING LOAD) ROOM LOAD SUMMARY Project Name KOREAN BBQ & GRILL System Name DINING AREA ROOM LOAD SUMMARY R Zone Name Room Name Mult. CF DINING AREA FLOOR PLAN 1 91 * Total includes ventilation load EnergyPro 5.1 by EnergySo(t 7/8/2011 Floor Area 1,465 )OLING PEAK COIL COOLING PEAK COIL HTG. PEAK isible Latent CFM Sensible Latent CFM Sensible 95,7851 13, 429 9,0361 95,7851 13, 429 2,5101 63,637 PAGE TOTAL TOTAL* 2011-07-08710:6 9,036 95,7851 13,4291 2,5101 63, 637 9,036 95,7851 13,4291 2,5101 63,637 ROOM HEATING PEAK LOADS Project Name KOREAN BBQ & GRILL Date 7/8/2011 ROOM INFORMATION DESIGN CONDITIONS Room Name FLOOR PLAN Floor Area 1,465.0 ft' Indoor Dry Bulb Temperature 70 °F Time of Peak Jan 1 AM Outdoor Dry Bulb Temperature 26 OF Conduction Area U -Value X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X AT °F = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = 44 Btu/hr Default Roof Prior to 1978 1,465.0 X 0.0750 44 4,835 Default Wall Prior to 1978 2,004.3 X 0.3560 44 31,395 Single Metal Clear 400.5 X 1.1900 44 20,970 Slab -On -Grade perim = 200.4 X X X X X 0.7300 44 6,437 X X X X X X X X X X X X X X X X X X X X X X X through an interior surface to X 1,465 X Area Ceiling Items shown with an asterisk (') denote conduction Infiltration:[ 1.00 X 1.064 Schedule Air Sensible Fraction another room 12.00 X 0.000 Height ACH Page Total /60] X AT 63,637 = 0 TOTAL HOURLY HEAT LOSS FOR ROOM 63,637 EnefqyPro 5.1 by Energ Soft User Number: 1919 RunCode: 2011-07-08710:05:26 ID: E11-780 Page 22 of 24 ROOM COOLING PEAK LOADS Project Name Date KOREAN BBQ & GRILL 7/8/2011 ROOM INFORMATION DESIGN CONDITIONS Room Name FLOOR PLAN Time of Peak Jul 3 PM Floor Area 1,465.0 ft2 Outdoor Dry Bulb Temperature 112 OF Indoor Dry Bulb Temperature 74 OF Outdoor Wet Bulb Temperature 78 OF Conduction Area U-Value DETD' Btu/hr Default Roof Prior to 1978 1,465.0 X 0.0750 X 71.5 = 7,861 Default Wall Prior to 1978 841.2 X 0.3560 X 55.1 = 16,508 Default Wall Prior to 1978 638.7 X 0.3560 X 38.1 = 8,657 Single Metal Clear 202.5 X 1.1900 X 24.9 = 5,996 Default Wall Prior to 1978 163.2 X 0.3560 X 35.9 = 2,086 Single Metal Clear 198.0 X 1.1900 X 24.9 = 5,863 Default Wall Prior to 1978 361.2 X 0.3560 X 39.2 = 5,035 X X X X = Page Total 52,006 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Weighting Solar Gain Orientation Area SGF SC Factor Btu/hr WINDOWS (E) 202.5 X 41 X 0.864 X 1.946 = 14,036 WINDOWS (N) 198.0 X 41 X 0.864 X 0.895 = 6,314 X X X = X X X = X X X = X X X X X X X X X = X X X = Page Total 20,350 Sched. Weighting Internal Gain Frac. Area Heat Gain Factor Btu/hr Li hts 1.00 X 1,465 X 0.000 Watts/Sgft X 3.413 Btu/Watt X 0.000 = 0 Occupants 1.00 X 1,465 X 275 Btu/OCC. / 30 Sqft/occ. X 1.000 = 13,429 Receptacle 1.00 X 1,465 X 0.500 Watts/Sgft X 3.413 Btu/Watt X 1.000 = 2,500 Process 1.00 _X 1,465 X 1.500 Watts/Sgft X 3.413 Btu/Watt X 1.000 = 7,500 Process Lighting 1.00 X 1,465 X 0.000 Watts/Sgft X 3.413 Btu[Watt X1 0.000 = 0 Infiltration:[ 1.00 X 1.064 X 1,465 X 12.00 X 0.00 / 60 ] X 38 = 0 Schedule Air Sensible Area Ceiling Height ACH AT Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 95 785 Sched. Latent Gain Frac. Area Heat Gain Btu/hr Occupants 1.00 X 1,465 X 275 Btuh/OCC. / 30 Sgft/occ. = 13,429 Receptacle 1.00 X 1,465 X 0.000 Watts/Sgft X 3.413 Btu/Watt = 0 Process 1.00 X 1,465 X 0.000 Watts/Sgft X 3.413 Btu/Watt = 0 Infiltration:[ 1.00 X 4,771 X 1,465 X 12.00 X 0.00 ./60] X 0.00000 = 0 Schedule Air Sensible Area Ceiling Height ACH AW Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 13,429 EnergyPro 5.1 by EnergySoft User Number. 1919 RunCode: 2011-07-08710:05:26 ID: E11-780 Page 23 of 24 ROOM COOLING COIL LOADS Project Name Date KOREAN BBQ & GRILL 7/8/2011 ROOM INFORMATION DESIGN CONDITIONS Room Name FLOOR PLAN Time of Peak Jul 3 PM Floor Area 1,465.0 ft' Outdoor Dry Bulb Temperature 112 OF Indoor Dry Bulb Temperature 74 OF Outdoor Wet Bulb Temperature 78 OF Conduction Area U-Value DETD' Btu/hr Default Roof Prior to 1978 1,465.0 X 0.0750 X 71.5 = 7,861 Default Wall Prior to 1978 841.2 X 0.3560 X 55.1 = 16,508 Default Wall Prior to 1978 638.7 X 0.3560 X 38.1 = 8,657 Single Metal Clear 202.5 X 1.1900 X 24.9 = 5,996 Default Wall Prior to 1978 163.2 X 0.3560 X 35.9 = 2,086 Single Metal Clear 198.0 X 1.1900 X 24.9 = 5,863 Default Wall Prior to 1978 361.2 X 0.3560 X 39.2 = 5,035 X X X X = Page Total 52,006 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Weighting Solar Gain Orientation Area SGF SC Factor Btu/hr WINDOWS (E) 202.5 X 41 X 0.864 X 1.946 = 14,036 WINDOWS (N) 198.0 X 41 X 0.864 X 0.895 = 6,314 X X X X X X = X X X X X X = X X X = X X X = X I X X = Page Total 20,350 Sched. Weighting Internal Gain Frac. Area Heat Gain Factor Btu/hr Lights 1.00 X 1,465 X 0.000 Watts/Sgft X 3.413 Btu/Watt X 0.000 = 0 Occupants 1.00 X 1,465 X 275 Btu/OCC. / 30 Sgft/OCc. X 1.000 = 13,429 Receptacle 1.00 X 1,465 X 0.500 Watts/Sgft X 3.413 Btu/Watt X 1.000 = 2,500 Process 1.00 X 1,465 X 1.500 Watts/Sgft X 3.413 Btu/Watt X 1.000 = 7,500 Process Lighting 1.00 X 1,465 X 0.000 Watts/Sgft X 3.413 Btu/Watt X 0.000 = 0 Infiltration:[ 1.00 X 1.064 X 1,465 X 12.00 X 60 ] X 38 = 0 Schedule Air Sensible Area Ceiling Height ACH AT Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 95 785 Sched. Latent Gain Frac. Area Heat Gain Btu/hr Occupants 1.00 X 1,465 X 275 Btuh/OCC. / 30 Sqf /occ. = 13,429 Receptacle 1.00 X 1,465 X 0.000 Watts/Sgft X 3.413 Btu/Watt = 0 Process 1.00 X 1,465 X 0.000 Watts/Sgft X 3.413 Btu/Watt = 0 Infiltration:[ 1.00 X 4,771 X 1,465 X 12.00 X 0.00 /60] X 0.00000 = 0 Schedule Air Sensible Area Ceiling Height ACH pW Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 13,429 EnergyPro 5.1 by EnergySoft User Number: 1919 RunCode: 2011-07-08T10:05:26 ID: E11-780 Page 24 of 24