Loading...
BCOM2015-0019 Test & Balance ReportIN -N -OUT Burger La Quinta, CA La Quinta, CA TEST AND, BALANCE REPORT by ZARETSKY ENGINEERING SOLUTIONS 16520 HARBOR BLVD., SUITE F FOUNTAIN VALLEY, CA 92708 PHONE: 714-640-3530 FAX: 714-640-3529 01-12-16 ,%ZARETSKY ENGINEERING SOLUTIONS Table of Contents SECTION ONE: ....................................... TAB REPORT SECTION TWO: ..................................... PROCEDURES SECTION THREE: ................................. COMPANY RESUME SECTION FOUR: ................................... INSTRUMENTATION SECTION FIVE: ..................................... DRAWINGS 0 .0 ZARETS ICY ENGINEERING SOLUTIONS TEST, ADJUST AND BALANCE REPORT 01-12-16 PROJECT IN-N-OUT Burger La Quinta, CA 78611 Hwy. 111 La Quinta, CA 92253 ARCHITECT GHA ARCHITECTURE/ DEVELOPMENT ENGINEER LIPPE AND ASSOCIATES CONSULTING ENGINEERS CONTRACTOR IN-N-OUT BURGER r 1 ZARETSKY 9 19 F_NCa`INEERIN G SOLUTIONS CERTIFICATION 0 PROJECT: IN -N -OUT Burger La Quinta, CA ADDRESS: La Quinta, CA THE DATA PRESENTED IN THIS REPORT IS A RECORD OF SYSTEM MEASUREMENTS AND FINAL ADJUSTMENTS THAT HAVE BEEN OBTAINED IN ACCORDANCE WITH THE CURRENT EDITION OF THE NEBB PROCEDURAL STANDARDS FOR TESTING, ADJUSTING, AND BALANCING OF ENVIRONMENTAL SYSTEMS. ANY VARIANCES FROM DESIGN QUANTITIES, WHICH EXCEED NEBB TOLERANCE, ARE NOTED IN THE TEST -ADJUST -BALANCE REPORT PROJECT SUMMARY. THE AIR DISTRIBUTION SYSTEMS HAVE BEEN TESTED & BALANCED AND FINAL ADJUSTMENTS HAVE BEEN MADE IN ACCORDANCE WITH NEBB "PROCEDURAL STANDARDS FOR TESTING, ADJUSTING, BALANCING OF ENVIRONMENTAL SYSTEMS" AND THE PROJECT SPECIFICATIONS. NEBB TAB FIRM: Zaretsky Engineering Solutions REG. NO.: 3001 CERTIFIED BY: National Environmental Balancing Bureau DATE: 1995 • SUBMITTED & CERTIFIED BY: Roman Zaretsky NEBB TAB FIRM: Zaretsky Engineering Solutions,��,� TAB TECHNICIANS: Ryan Hughes TAB SUPERVISOR: Roman Zaretsky REG. NO.: 3001 SIGNATURE: DATE: 01-12-16 CERTIFICATION EXPIRA 51 r'� vol r 30U1 F;q:3/31/97 y/_, .. 3/31/2017 . . ZARETSKY ����' 00�' m �� .ENGINEERING SOLUTIONS INDEX PAGE |ndmx----------- � .--------------------------------_ Abbreviations '`--------------------' 1 �ndNbtma �EPC��T� -------------------' 2 - Summary -----------� BUULO|�� -----------------'� 4 AH U --------------' AC'1. 5 -Und Outlet8C'1 -------------'------------------------------- GAir AHU Unit ---- -- ' �A�'� -------------------' 7 , A�- ��uoatAC'2. ------------------------- ------' 8 ' AHU Unit ------------ ��'3. -----------'�------' S � �x��t A� - -------------------------'' 8�'8 -----'' 1O ' Fan Test ' _ � --------'�----------------- EF -1 ' -----'� 12 Air Outlet ___ EF -1 -------------------- 13 Fan Test ___________ E� ' --------------------- 14 O�ot '� �-------------------' EF -2— -------------- 15 F�nRectangular------------------------- Test� ------ EF -3 18 Oun� Rectangular__________.� ------------------'17 EF -3 -------------' fan Test EF'4.. --------------------- 18 � Rectan- ________________________ EF'4.......................................................... 19 Fan /�o �' ^ EF'5 —''----' 2O Rectangular` Duo ------------------ EF -5 -------------' 21 Fan st F�-------'��-----------------------, __ 22 � Rectangular Duct ___._______________.. EF'G_------------------------------' 23 �� � ...-----------. 24 ZA R ET KY ENGINEERING SOLUTIONS 9 ABBREVIATIONS AIR DISTRIBUTION CODES AB.................................................................................................AIR BAR CD.................................................................................................CEILING DIFFUSER CG.................................................................................................CEILING GRILLE CR.................................................................................................CEILING REGISTER CV.................................................................................................CONSTANT VOLUME DO.................................................................................................DUCT OPENING DT...............................................................................................:.DUCT TRAVERSE EG.................................................................................................EXHAUST GRILLE ER..............................................................................:..................EXHAUST REGISTER • FC.................................................................................................FAN COIL FG..................................................................................................FLOOR GRILLE FR.................................................................................................FLOOR REGISTER FH.................................................................................................FUME HOOD HO.................................................................................................HOOD OPENING LT..................................................................................................LIGHT TROFFER LD.................................................................................................LINEAR DIFFUSER LR.................................................................................................LINEAR RETURN OA.................................................................................................OUTSIDE AIR RG.................................................................................................RETURN GRILLE RR.................................................................................................RETURN REGISTER SO.................................................................................................SCREENED OPENING • SG.................................................................................................SUPPLY GRILLE ZARETSKY ENCIN`EE6 FNG SOLUTIONS SR............................I................: ., ..................................................SUPPLY REGISTER VAV:.....................................I...................... .........................VARIABLE AIR VOLUME REPORTING CODES DNA.: ................................. ................ ....DATA NOT AVAILABLE DNL:............. ....:...... .......... _ .................................................DATA NOT LISTED DX...................................................... ............................................DIRECT EXPANSION . .......... .................... .............. ..:......................................................... MEASURED WITH F LOW HOOD NG. ..................................................................................................NATURAL GAS NA....................:.:................ .......................................................... NOT APPLICABLE NI.................:.:................................................... .............................NOT INSTALLED NM...........................:.... .....................:.....,......................................NOT MEASURED ON .. ......................... ...:.................................................................... NOT SPECIFIED NT......... ................ :..:....:.:.............................................................. NOT TESTED, DUE TO ABNORMAL CONDITION NVL.........: .:.....:...........................: .................................................NOT VALID LOCATION FOR ACCURATE TEST 0 0 ZARETS KY ENGINEERING SOLUTIONS • General Notes PROJECT NAME: N -N -OUT Burger La Quinta, CA 1. UNLESS OTHERWISE NOTED, INDICATED CFM IS AT STANDARD CONDITIONS. 2. DESIGN CFM OBTAINED FROM THE PLAN DRAWINGS. 3. FLOW HOOD USED ON ALL CEILING SUPPLY AND RETURN TERMINAL UNITS, AND SIDEWALL REGISTER AND GRILLES WHERE APPLICABLE. 4. CORRECTION FACTORS HAVE BEEN APPLIED TO ALL VALUES SHOWN IN TEST FPM COLUMN ON THE OUTLET TEST SHEET. 5. PITOT READINGS ARE SHOWN ON DUCT TRAVERSE TEST SHEET. 6. WHERE FLOW HOOD CANNOT BE USED, VELOCITIES WERE MEASURED WITH A ROTATING VANE ANEMOMETER, OR AN AIRDATA MULTIMETER AND THE PROPER AK FACTOR APPLIED TO ESTABLISH CFM. 7. ALNOR VELGRID USED TO MEASURE FACE VELOCITY AT HOOD SERVED BY EF -3. 8. ALNOR ROTATING VANE ANEMOMETER WAS USED TO MEASURE FACE VELOCITY AT HOOD SERVED BY EF -2, 4, 5, & 6. 9. ALL HOODS WERE SMOKE TESTED FOR CAPTURE USING A 120 SECOND LITTLE SMOKIE ON EACH HOOD. THE HOOD CAPTURED AS FOLLOWS: EF -3 100%, EF -4 100%, EF -5 100%, EF -6 100%. 10. BUILDING DOOR PRESSURES TAKEN AT THREE LOCATIONS WITH THE ROOF HATCH CLOSED AND ALL EQUIPMENT RUNNING. BACK DOOR: 0.007W.C., FRONT DOOR: 0.005"W.C., SIDE DOOR: 0.008"W.C. "BUILDING POSITIVE" • TEST DATE: 01-08-16 READINGS BY: • - ZARETSKY ENGINEERING SOLUTIONS BUILDING SUMMARY PROJECT NAME: IN -N -OUT Burger La Quinta, CA PROJECT LOCATION: La Quinta, CA SYSTEM: BUILDING UNIT HVAC SUPPLY � HVAC RETURN HVAC , �, OUTDOOR HOOD MAKE-UP HOOD EXHAUST BLDG EXHAUST .AREA SERVED DESIGN ACTUAL DESIGN ACTUAL DESIGN ACTUAL DESIGN _ ACTUAL .DESIGN ACTUAL DESIGN ACTUAL TOTAL AC -1 3400 3371 2350 2283 .1050 1088 - - - - - DINING AREA AC -2 3400F 39 2350 A3895 1050 1106 - - DINING AREA AC -3 600009 3900 2100 2114 - - - KITCHEN EF -1 - - - - - - 550 562 ESTROOM EF -2 - - 550 530 - _ ONION HOOD EF -3 - - - - - 985 1009 - - FRYER HOOD 585 570 - _ GRILL HOOD EF -5 - - - - 585 577 - _ GRILL HOOD EF -6 - - - 585 604 - GRILL HOOD TOTAL 12800 12819 8600 8511 4200 4308 3290 _T 3290 550 562 OA 4200 4308. _. 3840 3852 360 456 Offset r cE g� TEST DATE 01-08-16 READINGS BY: Ryan Hughes ZA R ETS KY ENGINEERING SOLUTIONS • AHU PACKAGE UNIT TEST REPORT PROJECT NAME: IN -N -OUT Burger La Quinta, CA PROJECT LOCATION: La Quinta, CA SYSTEM: AC -1 UNIT DATA DESIGN ACTUAL TEST DATA DESIGN ACTUAL UNIT MANUF. CARRIER ICP, LLP SUPPLY CFM TOTAL 3400 3371 MODEL # 48HC08 RGH102HDCA7KAAA SUPPLY CFM REGISTERS 3400 3371 SERIAL # - P154074837 RETURN AIR CFM 2350 2283 FAN SHEAVE'DIAM. - AFD74 OUTSIDE AIR CFM 1050 1088 FAN BORE SIZE - 1 MOTOR HZ 60 60 MTR. SHEAVE DIAM. - 1 VL40 FAN RPM N/A 853 MOTOR BORE SIZE - 5/8 MOTOR RPM 1725 1741 BELT CENTERLINE - 16.5" R.L. VOLTAGE 208 208 /209 /209 BELT SIZE/NO. OF - A48 / 1 R.L. AMPS 6.9 5.3 /5.4 /5.4 FILTER SIZE/NO.OF - 20X2OX2 / 4 FILTER SIZE/NO.OF - N/A / N/A MOTOR DATA DESIGN ACTUAL TEST DATA DESIGN ACTUAL MOTOR MANUF. N/A MARATHON E.S.P. SUCTION N/A -0.36 HORSEPOWER N/A N/A E.S.P. DISCHARGE N/A 0.58 MOTOR RPM N/A 1725 EXTERNAL UNIT S.P. 1.0 0.94 VOLTAGE 208 208 FAN INLET N/A -0.59 F.L. AMPS N/A 6.9 FAN DISCHARGE N/A 0.58 PHASE 3 3 TOTAL FAN S.P. N/A 1.17 SERVICE FACTOR N/A 1.15 OUTDOOR AIR FRAME N/A 1.15 O.A. DAMPER POS. 35% SIZE / AREA N/A / N/A I 38.5"X8" / 2.03 FAN ROTATION VERIFIED TO BE CORRECT YES READINGS 485 / 543 / 592 / N/A / N/A I. TEMP. RETURN/SUPPLY N/A / N/A 71/52 Remarks: I B TEST DATE 01-08-16 READINGS BY: Ryan Hughes ZA R ET KY ® ENGINEERING SOLUTIONS CONSTANT VOLUME AIR OUTLET TEST REPORT PROJECT NAME: IN -N -OUT Burger La Quinta, CA PROJECT LOCATION: La Quinta, CA SYSTEM: AC -1 AREA SERVED OUTLET DESIGN PRE PRELIM ACTUAL % OF AK NO. TYPE SIZE AK VEL CFM VEL CFM VEL CFM DSGN SUPPLY 01 RG 18"DIA 1.0 N/A 1175 N/A DINNING ROOM 2 RG 18"DIA DINNING ROOM 01 CD 10"DIA 1.0 N/A 425 N/A 437 /A EN 413 97% DINNING ROOM 2 CD 10"DIA 1.0 N/A 425 N/A 322 /A 422 99% DINNING ROOM 3 CD E10 1.0 N/A 425 N/A 365 /A 430 101% DINNING ROOM 4 CD EIA 1.0 N/A 425 N/A 318 N/A 426 100% DINNING ROOM 5 CD 10"DIA 1.0 N/A 425 N/A 439 N/A 410 96% DINNING ROOM 6 CD 10"DIA 1.0 N/A 425 N/A 577 N/A 412 97% DINNING ROOM 7 CD 10"DIA 1.0 N/A 425 N/A 478 N/A 428 101% VESTIBULE 8 CD 10"DIA 1.0 N/A 425 N/A 377 N/A 430 101% TOTAL 3400 3313 3371 AREA SERVED OUTLET DESIGN PRE NO. TYPE SIZE AK VEL CFM VEL RETURN DINNING ROOM 01 RG 18"DIA 1.0 N/A 1175 N/A DINNING ROOM 2 RG 18"DIA 1.0N/A 1175 N/A TOTAL 2350 gL TEST DATE 01-08-16 READINGS BY LIM ACTUAL %0 CFM VEL CFM DSGN 1217 N/A 1181 101% 1077 N/A 1102 94% 2294 2283 Ryan Hughes Page 7 of 24 ZA R ETS KY ENGINEERING SOLUTIONS • AHU PACKAGE UNIT TEST REPORT PROJECT NAME: IN -N -OUT Burger La Quinta, CA PROJECT LOCATION: La Quinta, CA SYSTEM: AC -2 UNIT DATA DESIGN ACTUAL TEST DATA DESIGN ACTUAL UNIT MANUF. CARRIER ICP, LLP SUPPLY CFM TOTAL 3400 3439 MODEL # 48HC08 RGH102HDCA7KAAA SUPPLY CFM REGISTERS 3400 3439 SERIAL # - P154074836 RETURN AIR CFM 2350 2333 FAN SHEAVE DIAM. - AFD74 OUTSIDE AIR CFM 1050 1106 FAN BORE SIZE - 1 MOTOR HZ 60 60 MTR. SHEAVE DIAM. - 1 VI -40" FAN RPM N/A 869 MOTOR BORE SIZE - 5/8 MOTOR RPM 1725 1733 BELT CENTERLINE - 16.5" R.L. VOLTAGE 208 208 /208 /209 BELT SIZE/NO. OF - A48 / 1 R.L. AMPS 6.9 5.2 /5.2 /5.3 FILTER SIZE/NO. OF - 20X2OX2 / 4 FILTER SIZE/NO. OF - N/A / N/A MOTOR DATA DESIGN ACTUAL TEST DATA DESIGN ACTUAL MOTOR MANUF. N/A MARATHON E.S.P. SUCTION N/A -0.36 HORSEPOWER N/A N/A E.S.P. DISCHARGE N/A 0.63 MOTOR RPM N/A 1725 EXTERNAL UNIT S.P. 1.0 0.99 VOLTAGE 208 208 FAN INLET N/A -0.70 F.L. AMPS N/A 6.9 FAN DISCHARGE N/A 0.63 PHASE 3 3 TOTAL FAN S.P. N/A 1.33 SERVICE FACTOR N/A 1.15 OUTDOOR AIR FRAME N/A 1.15 O.A. DAMPER POS. 35% SIZE / AREA N/A / N/A 38"X8" / 2.03 FAN ROTATION VERIFIED TO BE CORRECT YES READINGS 452 / 585 / 551 / N/A / N/A TEMP. RETURN/SUPPLY N/A / N/A 1 71/52 Remarks: E B TEST DATE: 01-08-16 READINGS BY: Ryan Hughes • ZARETS K ENGINEERING SOLUTIONS p CONSTANT VOLUME AIR OUTLET TEST REPORT PROJECT NAME: IN -N -OUT Burger La Quinta, CA PROJECT LOCATION: La Quinta, CA SYSTEM: AC -2 AREA [:SERVED OUTLET DESIGN PRE NO. TYPE SIZE AK VEL CFM VEL UPPLY 419 N/A 429 101% 397 N/A 430 DINNING ROOM 01 CD 10"DIA 1.0 N/A 425 N/A DINNING ROOM 2 CD 10"DIA 1.0 N/A 425 N/A DINNING ROOM 3 CD 10"DIA 1.0 N/A 425 N/A DINNING ROOM 4 CD 10"DIA 1.0 N/A 425 N/A DINNING ROOM 5 CD 10"DIA 1.0 N/A 425 N/A DINNING ROOM 6 CD 10"DIA 1.0 N/A 425 N/A DINNING ROOM 7 CD 10"DIA 1.0 N/A 425 N/A NING ROOM 8 CD 10"DIA 1.0 N/A 425 N/A TOTAL 3400 AREA SERVED OUTLET DESIGN PRE NO. TYPE SIZE AK VEL CFM VEL RETURN 419 N/A 429 101% 397 N/A 430 101% DINNING ROOM 01 RG 18"DIA 1.0 N/A 1175 N/A DINNING ROOM 2 RG 18"DIA 1.0 N/A 1175 N/A TOTAL 2350 0 gI� TEST DATE 01-08-16 READINGS BY LIM ACTUAL % OF CFM VEL CFM DSGN 448 N/A 428 101% 347 N/A 438 103% 469 N/A 441 104% 419 N/A 429 101% 397 N/A 430 101% 429 N/A 426 100% 344 N/A 418 98% 333 N/A 429 101% 3186 3439 LIM ACTUAL % OF CFM VEL CFM I DSGN 1101 N/A 1117 95% 1149 N/A 1216 103% 2250 2333 Ryan Hughes Page 9 of 24 ZARETS KY ENGINEERING SOLUTIONS • AHU PACKAGE UNIT TEST REPORT PROJECT NAME: IN -N -OUT Burger La Quinta, CA PROJECT LOCATION: La Quinta, CA SYSTEM: AC -3 UNIT DATA DESIGN ACTUAL TEST DATA DESIGN ACTUAL UNIT MANUF. CARRIER ICP, LLP SUPPLY CFM TOTAL 6000 6009 MODEL # 48HC17 RGH181HDCA7KATA SUPPLY CFM REGISTERS 6000 6009 SERIAL # - P154125151 RETURN AIR CFM 3900 3895 FAN SHEAVE DIAM. - BK100 OUTSIDE AIR CFM 2100 2114 FAN BORE SIZE - 1-3/16 MOTOR HZ 60 N/A MTR. SHEAVE DIAM. - 1 VM44 FAN RPM N/A 564 MOTOR BORE SIZE - 7/8 MOTOR RPM 1750 1742 BELT CENTERLINE - 11.25" R.L. VOLTAGE 208 208 /209 /209 BELT SIZE/NO. OF - BX44 / 1 R.L. AMPS 9.6 8.9 /9.0 /9.1 FILTER SIZE/NO. OF - 20X25X2 / 6 FILTER SIZE/NO. OF - N/A / N/A MOTOR DATA DESIGN ACTUAL TEST DATA DESIGN ACTUAL MOTOR MANUF. N/A MARATHON E.S.P. SUCTION N/A -0.22 HORSEPOWER N/A N/A E.S.P. DISCHARGE N/A 0.69 MOTOR RPM N/A 1750 EXTERNAL UNIT S.P. 1.0 0.91 VOLTAGE 208 208 FAN INLET N/A -0.59 F.L. AMPS N/A 9.6 FAN DISCHARGE N/A 0.69 PHASE 3 3 TOTAL FAN S.P. N/A 1.28 SERVICE FACTOR N/A 1.15 OUTDOOR AIR FRAME N/A 1.15 O.A. DAMPER POS. 40%OPEN SIZE / AREA N/A / N/A I 58"X23" / 9.2 FAN ROTATION VERIFIED TO BE CORRECT YES READINGS 193 /213 /218 /254 /273 TEMP. RETURN/SUPPLY N/A / N/A 73/57 Remarks: • RE 8 TEST DATE: 01-08-16 READINGS BY: Ryan Hughes ZARETSKY ENGINEERING SOLUTIONS CONSTANT VOLUME AIR OUTLET TEST REPORT PROJECT NAME: IN -N -OUT Burger La Quinta, CA PROJECT LOCATION: La Quinta, CA SYSTEM: AC -3 AREA SERVED OUTLET DESIGN PRELIM ACTUAL % OF NO. TYPE SIZE AK VEL CFM VEL CFM VEL CFM DSGN SUPPLY KITCHEN 01 CD 10"DIA 1.0 N/A 400 N/A 413 N/A 389 97% KITCHEN 2 CD 10"DIA 1.0 N/A 400 N/A 463 N/A 376 94% KITCHEN 3 CD 10"DIA 1.0 N/A 400 N/A 422 N/A 384 96% KITCHEN 4 CD 10"DIA 1.0 N/A 400 N/A 288 N/A 375 94% KITCHEN 5 CD 10"DIA 1.0 N/A 400 N/A 276 N/A 389 97% KITCHEN 6 CD 10"DIA 1.0 N/A 400 N/A 344 N/A 412 103% KITCHEN 7 CD 10"DIAFl. N/A 400 N/A 359 N/A 411 103% KITCHEN 8 CD 10"DIA N/A 400 N/A 366 N/A 404 101 KITCHEN 9 CD 10"DIAN/A 400 N/A 533 N/A 416 104% KITCHEN 10 CD 10"DIA 1.0 N/A 400 N/A 429 N/A 402 100% HALLWAY 11 CD 10"DIA 1.0 N/A 300 N/A 217 N/A 316 105% HALLWAY 2 CD 10"DIA 1.0 N/A 300 N/A 284 N/A 321 107% EHAELLWAYYLl'4 3 CD 10"DIA 1.0 N/A 300 N/A 411 N/A 302 � 101 CD 10"DIA 1.0 N/A 300 N/A 317 N/A 309 103% M.DRESSING RM 15 CD 6"DIA 1.0 N/A 45 N/A 234 N/A 43 96% OFFICE 16 CD 6"DIA 1.0 N/A 110 N/A 71 N/A 114 104% W. DRESSING RM 17 CD 6"DIA 1.0 N/A 45 N/A 97 N/A 45 100% HALLWAY 18 CD 10"DIA 1.0 N/A 300 N/A 422 N/A 311 104% WOMEN'S ROOM 19 CD 8"DIA 1.0 N/A 150 N/A 303 N/A 148 99% MEN'S ROOM 20 CD 8"DIA 1.0 N/A 150 N/A 191 N/A 142 95% TOTAL 6000 6440 6009 TEST DATE: 01-08-16 READINGS BY: Ryan Hughes Page 11 of 24 ZARETSKY ENGINEERING SOLUTIONS CONSTANT VOLUME AIR OUTLET TEST REPORT PROJECT NAME: IN -N -OUT Burger La Quinta, CA PROJECT LOCATION: La Quinta, CA SYSTEM: AC -3 AREA OUTLET DESIGN PRELIM ACTUAL % OF SERVED NO. TYPE SIZE AK VEL CFM VEL CFM VEL CFM DSGN RETURN HALLWAY 01 RG 18"DIA 1.0 N/A 975 N/A 986 N/A 959 98% HALLWAY 2 RG 18"DIA 1.0 N/A 975 N/A 1035 N/A 943 97% HALLWAY 3 RG 18"DIA 1.0 N/A 975 N/A 1212 N/A 990 102% HALLWAY 4 RG 18"DIA 1.0 N/A 975 N/A 959 N/A 1003 103% . TOTAL 3900-F--74192 --F3895 TEST DATE: 01-08-16 READINGS BY: Ryan Hughes Page 12 of 24 PROJECT NAME: PROJECT LOCATION: SYSTEM: MANUFACTURER MODEL SERIAL NO. CONDITIONS TOTAL CFM FAN STATIC PRESSURE TOTAL FAN INLET PRESSURE FAN DISCHARGE PRESSURE MOTOR MANUFACTURER MOTOR HP ' TOR RPM / HZ MOTOR VOLTAGE PHASE MOTOR FLA SERVICE FACTOR MOTOR FRAME FAN RPM MOTOR SHEAVE FAN PULLEY CENTER LINE DISTANCE DRIVE BELTS TYPE / SHEAVE POSITION Remarks: • r TEST DATE ZA R ETS KY ENGINEERING SOLUTIONS FAN TEST IN -N -OUT Burger La Quinta, CA La Quinta, CA EF -1 TWIN CITY 13CRU110I33D1B2 F15-000000151623 REQUIRED 550 0.5 N/A N/A N/A 0.25 ` 1750 60 120 1 N/A 4.2 N/A 1.15 48 1977 1 VP34 X 1/2 AK46 X 3/4 6" 31-270 VARIABLE / 3 Turns from Max. 01-08-16 READINGS BY ACTUAL 562 .48 -0.42 0.06 TWIN CITY 0.25 1772 60 119 1 N/A 997 Ryan Hughes Page 13 of 24 ZA R ET KY ENGINEERING SOLUTIONS CONSTANT VOLUME AIR OUTLET TEST REPORT PROJECT NAME: IN -N -OUT Burger La Quinta, CA PROJECT LOCATION: La Quinta, CA SYSTEM: EF -1 AREA SERVED OUTLET DESIGN PRELIM ACTUAL % OF DSGN NO. TYPE SIZE AK VEL CFM VEL CFM VEL CFM EXHAUST MEN'S ROOM 01 EG 10"DIA 1.0 N/A 225 N/A 369 N/A 226 100% WOMENS ROOM 2 EG 10"DIA 1.0 N/A 225 N/A 291 N/A 234 104% M.DRESSING RM 3 EG 10"DIA 1.0 N/A 50 N/A 87 N/A 52 104% W.DRESSING RM 4 EG 8"DIA 1.0 N/A 50 N/A 73 N/A 50 100% TOTAL I I 1 1 550 1 820i 562 i I -:E B[ TEST DATE: 01-08-16 • n LJ READINGS BY: Ryan Hughes Page 14 of 24 AZARETSKY ENGINEERING SOLUTIONS PROJECT NAME: PROJECT LOCATION: SYSTEM: MANUFACTURER MODEL SERIAL NO. CONDITIONS TOTAL CFM FAN STATIC PRESSURE TOTAL FAN INLET PRESSURE FAN DISCHARGE PRESSURE MOTOR MANUFACTURER MOTOR HP TOR RPM / HZ MOTOR VOLTAGE /PHASE MOTOR FLA SERVICE FACTOR MOTOR FRAME FAN RPM MOTOR SHEAVE FAN PULLEY CENTER LINE DISTANCE DRIVE BELTS TYPE / SHEAVE POSITION Remarks: • TEST DATE FAN TEST IN -N -OUT Burger La Quinta, CA La Quinta, CA EF -2 COOK 100 AC RU 1001326 138 S F89625-00/0012701 REQUIRED 550 0.5 N/A N/A N/A 0.17 1725 60 115 1 N/A 3.6 N/A 1.35 1484 3.25" O.D. X 1/2 MA30 X 3/4 5.25" 41-190 VARIABLE / 3 Turns from Max. 01-08-16 READINGS BY ACTUAL 530 .47 -0.40 0.07 MARATHON 0.17 1727 60 119 1 N/A 3.4 N/A 1474 Ryan Hughes Page 15 of 24 ZARETS-KY ENGINEERING SOLUTIONS • RECTANGULAR DUCT TRAVERSE TEST REPORT PROJECT NAME: IN -N -OUT Burger La Quinta, CA PROJECT LOCATION: La Quinta, CA SYSTEM: EF -2 SERVICE: ONION HOOD CORR. FACTOR: 0.75 DUCT SIZE 7 X 14 AREA .51 REQUIRED SCFM(SUS) FPM(M/S) 1078 CFM(US) 550 ACTUAL SCFM(SUS) FPM(M/S) 1038 CFM(L/S) 530 DISTANCE FROM DUCT EDGE DISTANCE FROM POS 1 2 3 4 5 6 7 8 9 10 11 12 BOTTOM 1 678 1255 1280 VELOCITY SUB -TOTALS 678 2112 2398 0 0 0 0 0 0 0 0 0 Remarks: TEST DATE: 01-08-16 n LJ READINGS BY: Ryan Hughes Page 16 of 24 06 ZIA R ET ENGINEERING SOLUTIONS "We Ilaf RS: • BI TEST DATE 01-08-16 READINGS BY: Ryan Hughes Page 17 of 24 FAN TEST PROJECT NAME: IN -N -OUT Burger La Quinta, CA PROJECT LOCATION: La Quinta, CA SYSTEM: EF -3 MANUFACTURER CENTRAL BLOWER MODEL RE -12 SERIAL NO. RE -5078 / CONDITIONS REQUIRED ACTUAL TOTAL CFM 985 1009 FAN STATIC PRESSURE TOTAL 1.3 1.24 FAN INLET PRESSURE N/A -0.84 FAN DISCHARGE PRESSURE N/A 0.4 MOTOR MANUFACTURER N/A BALDOR MOTOR HP 0.5 1 TOR RPM / HZ MOTOR VOLTAGE / PHASE 1725 60 1745 60 3 208 3 209/209/208 MOTOR FLA 3.7 3.7 3.7 3.4 3.5 3.4 SERVICE FACTOR 1.15 MOTOR FRAME 56 FAN RPM 1878 1874 MOTOR SHEAVE 1 VL44X5/8 FAN PULLEY AK41 X1 CENTER LINE DISTANCE 15.75" DRIVE BELTS i4P42 TYPE / SHEAVE POSITION VARIABLE / 2. Turns from Max. "We Ilaf RS: • BI TEST DATE 01-08-16 READINGS BY: Ryan Hughes Page 17 of 24 ZA R ETS K ENGINEERING SOLUTIONS • RECTANGULAR DUCT TRAVERSE TEST REPORT PROJECT NAME: IN -N -OUT Burger La Quinta, CA PROJECT LOCATION: La Quinta, CA SYSTEM: EF -3 SERVICE: KITCHEN HOOD CORR. FACTOR: 0.8 DUCT SIZE 80 X 16 AREA 7.11 REQUIRED SCFM(SL/S) FPM(M/S) 139 CFM(US) 985 ACTUAL SCFM(SUS) - FPM(M/S) 142 CFM(US) 1009 DISTANCE FROM DUCT EDGE DISTANCE FROM POS 1 2 3 4 5 6 7 8 9 10 11 12 BOTTOM 1 163 149 122 140 132 145 VELOCITY SUB -TOTALS 163 149 122 140 132 145 0 0 0 0 0 0 Remarks wcli_ B13 READINGS WAS TAKEN USING VELGRID - EVERY READING ON REPORT IS AVERAGE OF SIXTEEN SPOT VELOCITY READINGS. TEST DATE: 01-08-16 • READINGS BY: Ryan Hughes Page 18 of 24 A,ZARETSKY ENGINEERING SOLUTIONS MANUFACTURER CENTRAL BLOWER MODEL RE -12 SERIAL NO. RE -5066 CONDITIONS + REQUIRED ACTUAL TOTAL CFM 585 570 FAN STATIC PRESSURE TOTAL 1.4 1.42 FAN INLET PRESSURE N/A -1.27 FAN DISCHARGE PRESSURE N/A 0.15 MOTOR MANUFACTURER N/A BALDOR MOTOR HP 0.50 1 TOR RPM / HZ 1725 60 1744 60 MOTOR VOLTAGE /PHASE208 3 209/209/208 3 MOTOR FLA 3.7 3.7 3.7 3.3-7 3.4 3.4 SERVICE FACTOR 1.15 MOTOR FRAME 56 FAN RPM 1676 1593 MOTOR SHEAVE 1VL44 X 5/8 FAN PULLEY AK41X1 CENTER LINE DISTANCE 16.5" DRIVE BELTS AP42 TYPE / SHEAVE POSITION VARIABLE / 2 Turns from Max. ?� 8113 TEST DATE: 01708-16 READINGS BY: Ryan Hughes Page 19 of 24 ZARETSKY ENGINEERING SOLUTIONS RECTANGULAR DUCT TRAVERSE TEST REPORT PROJECT NAME: IN -N -OUT Burger La Quinta, CA PROJECT LOCATION: La Quinta, CA SYSTEM: EF -4 SERVICE: HOOD CORR. FACTOR: 0.8 DUCT SIZE 40 X 10 AREA 2.22 REQUIRED SCFM(SL/S) FPM(M/S) 263 CFM(L/S) 585 ACTUAL SCFM(SL/S) FPM(M/S) 256 CFM(L/S) 570 DISTANCE FROM DUCT EDGE DISTANCE FROM POS 1 2 3 4 5 6 7 8 9 10 11 12 BOTTOM 1 268 255 248 239 249 280 VELOCITY SUB -TOTALS 268 255 248 239 249 280 0 0 0 0 0 0 Remarks: RE B� TEST DATE: 01-08-16 • READINGS BY: Ryan Hughes Page 20 of 24 '19 ZARETS KY 19 ENGINEERING SOLUTIONS MANUFACTURER CENTRAL BLOWER MODEL RE -12 SERIAL NO. RE -5062 CONDITIONS REQUIRED ACTUAL TOTAL CFM 585 577 FAN STATIC PRESSURE TOTAL 1.4 1.43 FAN INLET PRESSURE N/A -1.32 FAN DISCHARGE PRESSURE N/A 0.11 MOTOR MANUFACTURER BALDOR BALDOR MOTOR HP 0.50 1 TOR RPM / HZ 1725 60 1752 60 MOTOR VOLTAGE / PHASE 208 3 209/209/208 3 MOTOR FLA—F-33.7 3.7 3.7 3.4 .4 3.2 SERVICE FACTOR 1.15 MOTOR FRAME 56 FAN RPM 1676 1670 MOTOR SHEAVE 1 VL44 X 5/8 FAN PULLEY AK41X1 CENTER LINE DISTANCE 16.5" DRIVE BELTS AP42 TYPE / SHEAVE POSITION VARIABLE / 2 Turns from Max. ■ l�i���pl Ap• • 1 TEST DATE 01-08-16 READINGS BY: Ryan Hughes Page 21 of 24 ZARETS KY ENGINEERING SOLUTIONS • RECTANGULAR DUCT TRAVERSE TEST REPORT PROJECT NAME: IN -N -OUT Burger La Quinta, CA PROJECT LOCATION: La Quinta, CA SYSTEM: EF -5 SERVICE: HOOD CORR. FACTOR: 0.8 DUCT SIZE 40 X 10 AREA 2.22 REQUIRED SCFM(SL/S) FPM(M/S) 263 CFM(US) 585 ACTUAL SCFM(SUS) FPM(M/S) 260 CFM(US) 577 DISTANCE FROM DUCT EDGE DISTANCE FROM POS 1 2 3 4 5 6 7 8 9 10 11 12 BOTTOM 1 268 244 258 230 281 277 VELOCITY SUB -TOTALS 268 244 258 230 281 277 0 0 0 0 0 0 Remarks: TEST DATE: 01-08-16 • READINGS BY: Ryan Hughes Page 22 of 24 Nome L9 ZARETSKY M 0 ENGINEERING SOLUTIONS MANUFACTURER MODEL SERIAL NO. CONDITIONS TOTAL CFM FAN STATIC PRESSURE TOTAL FAN INLET PRESSURE FAN DISCHARGE PRESSURE MOTOR MANUFACTURER MOTOR HP TOR RPM / HZ MOTOR VOLTAGE / PHASE MOTOR FLA SERVICE FACTOR MOTOR FRAME FAN RPM MOTOR SHEAVE FAN PULLEY CENTER LINE DISTANCE DRIVE BELTS TYPE / SHEAVE POSITION Remarks: iBI TEST DATE CENTRAL BLOWER RE -12 RE -5063 1.15 56 REQUIRED ACTUAL 585 604 1.4 1.32 N/A -1.20 N/A 0.12 BALDOR BALDOR 0.50 1 1725 60 1735 208 3 209/209/208 3.7 3.7 3.7 3.4 1 3.4 1676 1 VL44 X 5/8 AK41 X1 16.5" AP42 VARIABLE / 2 Turns from Max. 01-08-16 READINGS BY: 1667 Ryan Hughes e 3.3 Page 23 of 24 ZARETSKY lf.�l ENGINEERING SOLUTIONS n U RECTANGULAR DUCT TRAVERSE TEST REPORT PROJECT NAME: IN -N -OUT Burger La Quinta, CA PROJECT LOCATION: La Quinta, CA SYSTEM: EF -6 SERVICE: HOOD CORR. FACTOR: 0.8 DUCT SIZE 40 X 10 AREA 2.22 REQUIRED SCFM(SL/S) FPM(M/S) 263 CFM(L/S) 585 ACTUAL SCFM(SL/S) FPM(M/S) 272 CFM(L/S) 604 DISTANCE FROM DUCT EDGE DISTANCE FROM POS 1 2 3 4 5 6 7 8 9 10 11 12 BOTTOM 1 262 258 279 268 293 270 VELOCITY SUB -TOTALS 262 258 279 268 293 270 0 0 0 0 0 0 Remarks TEST DATE: 01-08-16 • READINGS BY: Ryan Hughes Page 24 of 24 0 SECTION TWO: Procedures Ar IFL' KY ENGINEERING SOLUTIONS SECTION THREE: COMPANY RESUME 0 ZA ETS KY ENGINEERING SOLUTIONS • r)17A ZAPF'T'SKY F7014 D 1NCd ISrl I, t.1T'I ntl C OINIPANY RESL11•IE Zaretsky Ene iileeiing Solutions Inc. (-ZES') was founded by Roman Zaretsky in 2013 with the goal of providing superior eilgileei'ilg Gild collsti-tictiolls se11%lces. These include Building Systems Conuit ssloliing. Test and Balance of En-,miuneutil systems. Ftulle Hood Certification. and installation of Building Energy Management Sy'tenns. Prior to launching ZES. Rolllittn Zal-etsky was President of Ymi iley :Zaretsky. Inc. since its inception in 1994 avid has been an active participant ill this space for nearly 30 years. This experience is a testaiuent of our expertise. ZES certified by the National Emironnlental Balancing Bureau (NEBB) to peifonnn complete testing and banking of heating, ventilation mid air-conditiorning systenns. acoustic and sibiution iueasiuerlients. aid fiulle hood testing. ZES is 1\TEBB certified Building System Commissioning agency. We specialize in testing and bal<vlcing of complex HVAC systems in laboratories. tivarituns and healthcare facilities. our diverse knowledge and experience gives us a unique ability better understand build'12 requirements pith complex system integration and all of these allOXV us to peifor i test and balance services acctuately; efficiently and cost-effectively. we leave peifoinled Building Systems C'onullissionine aind TAB in conullercial and industrial facilities. office buildings and hospitals and our customers are u llivelsities. colleges, pharmaceutical companies. IC -12 schools. Federal. State and local goverlruent entities ZES Inas extensive experience in design. construction. start-up. testing and balancing of eonunereial and 'industrial HVAC systems. The follOwing is a partial list of recently completed projects: •• VA Long beach HVAC' upgrade B-138 AND B-126. Long Beach. California • VA Manner HVAC' upgrade Mather AFB. • P-117'+ combat vehicle maintenance shop.. C'anlp Pendleton, California • M. A.T.E.S Fort Il-xvin California • P.726/P-1003 11 th Marines Armoq Camp Pendleton. California • P-745 Naval Air Weapons Station China Lake, California • P982. Facility Energy Improvements MC' AS Miramar • General Instruction Buildulg PN46622. Monterey The following are key filll-tine elllployees involved in TAB: • Roman Zaretsky - NEBB CP • Patrick Drayton — NEBB CP • Rom:in Kleyman — NEBB CP • Juan Serna - NEBB TAB Certified Technician • Micah Daley — NrEBB TAB Certified Technician • Ashot Mikhaylyants - TAB Lead Technician We are eonlluitted to delivering safe. flazi lessly operating, fillly tested aid balanced HV :AC systellis which meet and exceed the owller's requirements. Our track record of Satisfied Owners. Contractors and engineers is the best proof of our qualifications and ability to deliver, • 16,ti20 HARBOR EtO UL.EV'AR[) 51111 E F I F*OI IN7AIN �At t EY. (A 5427W OFFICE 1 714 640 iF1,1 t FkX 1 114 I='40 3g:;1s,I WVW ZARETSK`r`ENGINEf= RING (..Or I (1:11'ertiffCFittAtt THIS IS TO CERTIFY THAT Zaretsky Engineering Solutions, Inc. HAS MET ALL REQUIREMENTS FOR NEBB CERTIFICATION IN THE FOLLOWING DISCIPLINE 9'esting �c�justing anc��alancing o��nvi�ionmenta`cSysterrts March 31, 2017 Expiration Date 3001 NEBB Certification Number FOR THE NEBB BOARD OF DIRECTORS B P esident NEBB President -Elect 0 Tertifirattlin THIS IS TO CERTIFY THAT Zaretsky Engineering Solutions, Inc. HAS MET ALL REQUIREMENTS FOR NESE CERTIFICATION IN THE FOLLOWING DISCIPLINE Soundneasutement .March 31, 2017 Expiration Date 3001 NEBB Certification Number FOR THE NEBB BOARD OF DIRECTORS NEBB Pr ident NEBB President -Elect THIS IS TO CERTIFY THAT Zaretsky Engineering Solutions, Inc. HAS MET ALL REQUIREMENTS FOR NEBB CERTIFICATION IN THE FOLLOWING DISCIPLINE (T&ation c%easule►nent Narch 31, 2017 Expiration Date 3001 NEBB Certification Number FOR THE NEBB BOARD OF DIRECTORS NEBB P ident NEBB President -Elect a• � I 5j[ s v r NEBB Certification Board QjqT NEBB Certified Professional .Roman Zare tsk HAS MET ALL THE NEBB REQUIREMENTS FOR NEBB CERTIFIED PROFESSIONAL STATUS IN 9esting, Agustin and ,,,Balancin o envilonraenta`g g SYS terns This Certificate, as well as individual affiliation with a NEBB Certified Firm and associated NEBB Certification stump are REQUIRED to provide a NEBB Certified Report. Participation in the NEBB Quality Assurance Program requires that the holder of this certification also be affiliated with a NEBB Certified Firm. Narch 31, 2017 Expiration Date 22823 NEBB Certficant Number NEBB Certification Board Chairman NEBB Certification Director • The NEBB Certification Board retains sole ownership of all certificates. Use of this certificate is governed by the NEBB Certification Board Policy Manual. NEBB Certification Board NEBB Certified Professional Roman Zaretsky HAS MET ALL THE NEBB REQUIREMENTS FOR NEBB CERTIFIED PROFESSIONAL STATUS IN Soundneasulement This Certificate, as well as individual affiliation with a NEBB Certified Firm and associated NEBB Certification stamp are REQUIRED to provide a NEBB Certified Report. Participation in the NEBB Quality Assurance Program requires that the holder of this certification also be affiliated with a NEBB Certified Firm. March 31, 2017 GU& / 41,- Expiration Date 22823 NEBB Certificant Number NEBB Certification Board Chairman J�E-'VLL.P.c .lam_ NEBB Certific:ltiWn Director The NEBB Certification Board retains sole ownership of all certificates. Use of this certificate is governed by the NEBB Certification Board Policy Manual. 0 • NEBB''Cer'fification Board NEBB Certified Professional Roman; Zare tsk HAS MET ALL THE NEBB REQUIREMENTS FO NEBB CERTIFIED PROFESSIONAL STATUS IR N C6iatiOn c%easu gement This Certificate, as well as individual affiliation with a NEBB Certified Firm and associated NEBB Certification stain are REQUIRED to provide a NEBB Certified Report. Participation in the NEBB Quality p p p Q ty Assurance. Program requires that the holder of this certification also be affiliated with a NEBB Certified Firm. JWarch 31, 20I7 Expiration Date it uGf / Zoe ' 22823 NEBB Certification Board Chairman NEBB Certificant Number NEBB Certificat n Director • The NEBB Certification Board retains sole ownership of all certificates. Use of this certificate is governed by the NEBB Certification Board Poli Manual. ual. NATIONAL ENVIRONMENTAL BALANCING BUREAU • ,ate. of Techotician c�t -Ryan .mug es Virlf Zaretsky TngineeriV S®futams, Inc. has certified as a NEBB Testing, Adjusting and Balancing (TAB) Technician for Air and Hydronic Environmental Systems 'March 31, 2015 Expiration Date NEBB President February 24, 2014 Date hapter President Date • Certified Professional's Stamp L • 0 NATIONAL ENVIRONMENTAL. BALANCING BUREAU iIVINIP, of Ted, t, kiwar Rw atm kali Dale � zarets,ofV Evfnee?yng So& mom Ine, has certified as a NEBB Testing, Adjusting and Balancing (TAB) Technician for Air and Hydronic Environmental Systems March 31, 2015 Expiration Date NEBB President Chapter President ,February 24, 2014 Date ate Certified Professional's Stamp ZARETS KY ENC3INEF_RING SOLUTIONS Ashot Mikhaylyants SUMMARY Over 6 years of experience in Testing, Adjusting and Balancing of environmental systems for commercial, educational, institutional and military facilities. Working knowledge of Electrical and Mechanical systems as well as various DDC systems. EXPERIENCE Zaretsky Engineering Solutions, Fountain Valley, CA Present • Testing, adjusting, and balancing of HVAC air and hydronic systems. • Working independently and leading teams to meet field objectives within a deadline. • Communicating and coordinating field work with various trades. • Reviewing plans and submittals, preparing projects. • Troubleshooting the mechanical systems as necessary. • Preparing final TAB reports. Yardley-Zaretsky, Inc., Santa Ana, California Lead TAB Technician Work Duties: 2006-2013 • Testing, adjusting, and balancing of HVAC air and hydronic systems. • Working independently and leading teams to meet field objectives within a deadline. • Communicating and coordinating field work with various trades. • Reviewing plans and submittals, preparing projects. • Troubleshooting the mechanical systems as necessary. • Preparing final TAB reports. The following is a partial list of recently completed TAB projects: • Sharp Memorial Mary Birch Hospital, San Diego, CA (Lead Tech, 2012) • VA Long Beach HVAC Upgrade B-138 and B-126, 'Long Beach, CA (Lead Tech, 2012) • Presbyterian Intercommunity Hospital, Whittier, CA (Lead Tech, 2012) • NASMOD ATC Building 355 Renovation, NB Ventura County, CA (Lead Tech, 2012) • UCR Health Science Surge Building, Riverside, CA (Lead Tech, 2011) • UCR Materials Science & Engineering, Riverside, CA (Lead Tech, 2011) • NAWS China Lake Rapid Prototyping Weapons Laboratory, China Lake, CA (Field Tech, 2011) • BEQ 4103, Camp Pendleton, CA (Field Tech, 2011) • UCI Gross Hall Stem Cell Research Center, Irvine, CA (Lead Tech, 2010) • Infantry Training Command, Camp Pendleton, CA (Field Tech, 2010) • NAS Lemoore Child Development Center, Lemoore, CA (Field Tech, 20.10) • Qualcomm Building L, San Diego, CA (Field Tech, 2009) • Building 8456 Tactical Ops, MCAS Miramar, CA (Field Tech, 2009) EDUCATION / TRAINING • Degree in Mechanical Engineering • NEBB TAB Training (2007) • Teletrol Controls Training (2011) • Asbestos Awareness Training (2012) • OSHA 10 Hour (2012) • First Aid / CPR (2012) CERTIFICATIONS: In the process of obtaining NEBB TAB Technician Certification 0 • ZARETSKY ENGINEERING SOLUTIONS Micah Daley SUMMARY Over 10 years of experience in installation: start-up, troubleshooting. and balancing of HI AC systems for counnercial. educational. institutional and military facilities. Working knowledge of Electrical and Mechanical systems as well as various DDC systems. EXPERItNCE Zaretskv Engineering Solutions Present • Testing. adjusting, and balancing of M7AC air and hydroilic systems.. • Working independently and leading field teams to meet project objectives. • Comilnunicating and consulting with contractors. design engiIleers and oll`iler representatives. • Obtaining pertinent literattu'e for field work. • Reviewma plans and submittals and prepalvlg projects. • Troubleshooting the mechailical systems as necessary. • Compiling final TAB reports gild dratrings. Yardlev-Zaretsky, Inc., Santa Ana, California 412012 — 112013 Lead TAB Technician Work Duties: • Testing. adjusting. and balancing of H'%• -'AC air and hydronie systems. • Working independently and leading field teams to meet project objectives. • Coi1nini nlc1ting and consliltine with contractors. desiep engineers and owner` i'epl'25elltati� e.s. • Obtaining pertinent I''terattu a for field Work. • Reviewing plans and submittals and preparing projects. • Troubleshooting the inechanical systems as IneC2Ssa]y. • Compiling final TAB reports and draiavilgs. The following is a partial list of recently completed TAB projects: • Sharp Memorial Maly Birch Hospital. Sall Diego. CA (Lead Tech; "2012) • Blilldmlgs 17 &17A Renovation, STB Point Loma. CA (Lead Tech' 2012) • Presbyterian hitercon1 nun ty Hospital. Whittier. CIA (Lead Tech. )012) • 111111111na Buildings 1 RC 2. Sam Diego. C.A (Lead Tech. '.01'2) • C'3 diail Inc.. Marina del Rey. CA. (Lead Tech. 2012) _ Site Consulting Services TAB, Inc., Ramona, California April 2011 - 2NIIarch 2011 TAB Technician ambient air Control S};stoms, Inc., San Diego, California April 2009 - AprIl 2011 TAB Technician BenchtnArcx, San Diego, California August 2008 - lWarrh 2009 .Starttp Technician California Comfort Svstems, San Diego, California July 2007 - august 2008 Startup Technician C'alifol'uia C.Onnfol't Systems, San Diego, California November 2006 - Jul 2007 • Sheet lletallnstaller Robinson Heating and Cooling, .San Diego. California June 2002 - November 2006 Lend Installer ZARETS KY ENGINEERING SOLUTIONS EDUCATIOn r` TRAININ • High School Diploma (2006) • San Diego Cit} College (2008) Basic R Advanced AC. HVAC Designs. Controls. Fluid Dylianucs • NEBB TAB Training (''009) • Asbestos Awareness Training (2012) • OSHA 10 Hour (2012) • First Aid i CPR (2012) CERTIFICATIONS • EPA Universal Certification • NEBB Certified TAB Technician (NEBB Cert. No. 3001, Exp. 3/3112015) ZA R ETS KY © ENGiNEERING SOLUTIONS Ryan Hughes StiMMARY Over 7 years of experience ill Testing. Adjusting and Balancing of environmental systems for coninlercialeducational, institutional and militaky facilities. Working knowledge of Electrical and Mechanical systems as well as vaiious DDC systems. EXPERIENCE Zaretsky Engineering Solutions TAB Surpera7soV Present Work Duties: • Supervision of TAB 1vork inn the field. • Leading team, of TAB field technicians. Testing, adjusting, and balancing of HVAC air and hydroinic systems. Conuntunicating and consi.ilting with contractors; design engineers and onmer representatives. • Preparing projects. arranging access and obtaining pertinent literature for field work. Troubleshooting the mechanical systems when a problem arises. • Working independently to meet project objectives and deadlines. • Compiling final TAB reports and drawings. Yardley-Zaretsk11, Inc., Santa Ana, California 2006 — 3/2014 Learn TAB Technicirin Work Duties: • Supervision of TAB work in the field. MLeading team of TAB field technicians. Testing, adjusting, and balancing of HVAC air and hydronic systems. • Coillinllinicatill , and consulting with contractors; design engineers and owner representatives. • Preparing projects. arranging access and obtaiiningpertinent literature for field 1 *ofk. • Troubleshooting tine mechanical systems when a problem arises. • Work -iiia independently to meet project objectives and deadlines. • Compiling final TAB reports and drawings The following is a partial fist of recently completed TAB projects: Desiall Build Quality of Life Facilities — Package of 4. 29 Palms. CA (Lead Tech. 2013-2014) • P-173 Armory and Missile Equipment Maintenance Shop. 29 Palms. CA (Lead Tech. 2013) • California Proton Treatment Center. Safi Diego: CA (Lead Tech. 2012) • P-5IS Child Development Center. NB Point Loiva, CA (Lead Tech. 2012) • CSU San Marcos Social Behavioral Sciences Building. San Marcos. CA (Lead Tech. 2011) ISIS Pharmaceuticals. Carlsbad. CA (Lead Tech. 2011) Qualconun Building Ali, San Diego. CA (Lead Tech. 2011) • Sonny Corporate Headquarters. Rancho Bernardo, CA (Lead Tech. 2010) • BEQ 4103. Cannp Pendleton, CA (Lead Tech. 2011) • Infantry Training Command. C'ainnp Pendleton. CA (Lead Tech. 2010) • Qiialconinn Building L. San Diego. CA (Lead Tech. 2009) • Building 8456 Tactical Ops. MCAS Miramar. CA (Lead Tech. 2009) • Fire Station Building 10, Naval AIC (Lead Tech.'2005 • California Proton Treatment Center. Sail Diego. CA (Lead Tech. _'012) • P-518 Child Development Center. NTB Point Lonna. CA (Lead Tech. 201 _') • • CSU Sail Marcos Social Behavioral Sciences Building. San Marcos. CA ( Lead Tech. 2011) IE—'20 HARb[3}2 E'.JLJL.EVAR1_;, �.UITE r ( Ff:]UNTAIN VAL_LE'r, EA'-32,7rE-1 Gt.E=1Cc 1 '714.2+1_3.66 5CJ WWW.ZARE-1- KYEN 1=1NE'__RIWGG S�:)LUT!E:NS.C[')t-1 ZARETS KY ENGINEERING SOLUTIONS • ISIS Pliannaceuticals, Carlsbad. CA (Lead Tech. 2011) EDUCATION rl TRAII\`II\G • High School Diploma (2003) • NEBB TAB Training (;200' • Teletrol Controls Training (2011) • Asbestos Awareness Trainiuig (2012) • OSHA 10 Hour (2012) • First aid,,'C'PR (2012) CERTIFICATIONS •NEBB Certified TAB Technician (NEBB Cert. No. 3001, Exp. 313112015) L oov, y !�NG11�4EERIIN!G SOLUTIONS SECTION FOUR: INSTRUMENTATION r� u ZARETS KY ENGINEERING SOLUTIONS PROJECT IN -N -OUT Burger La Quinta CA INSTRUMENT/SERIAL # APPLICATION DATES OF USE CALIBRATION TEST DATE SHORTRIDGE-ADM-860C / M10775 Air Data Multimeter 12/18/15 08/12/15 MONARCH-DBx / 2565630 Tachometer 12/18/15 11/02/15 *Please note: Calibration due date is 1 year after calibration date. 40 u 8 P, 9� y goy ktl�f�5�§ gggggg =�8 Y8�'W 8W .1 �< SM 0 o fit m J i+ • ���I 'fc, � � II �f � I ; •��Da ■1 i° _� 1■ FRE EDS �E©; �■ ■ .� �.� � n � �. ;■dao g fie' m O3 z : Tpig yE- � RI 8H. �8g g3�k ���� yTj� � N Y Nil l f � oh YP1§511 lag Ya y WGg9gg� : g 0 0 0 00 0 0 0 0O (D 0 OQ 0 0 (D0 0 0 0 EMI • ®EM� z�F§ v CIL W Izzo) NIP IR g tltl UU �� 3 c ng �� y g3g 11,199, u 8 P, 9� y goy ktl�f�5�§ gggggg =�8 Y8�'W 8W .1 �< SM 0 o fit m J i+ • ���I 'fc, � � II �f � I ; •��Da ■1 i° _� 1■ FRE EDS �E©; �■ ■ .� �.� � n � �. ;■dao g fie' m O3 z : Tpig yE- � RI 8H. �8g g3�k ���� yTj� � N Y Nil l f � oh YP1§511 lag Ya y WGg9gg� : g 0 0 0 00 0 0 0 0O (D 0 OQ 0 0 (D0 0 0 0 EMI • ®EM� z�F§ 9 CIL W Lila NIP IR g tltl UU �� 3 c ng �� y g3g 11,199, logo� �'�,�.` T,II,IIIIIIIIiL'lllll lllli llinnunlui I Ta -i � l®'iiij �i i e�x'a 1�=R��m • � u 8 P, 9� y goy ktl�f�5�§ gggggg =�8 Y8�'W 8W .1 �< SM 0 o fit m J i+ • ���I 'fc, � � II �f � I ; •��Da ■1 i° _� 1■ FRE EDS �E©; �■ ■ .� �.� � n � �. ;■dao g fie' m O3 z : Tpig yE- � RI 8H. �8g g3�k ���� yTj� � N Y Nil l f � oh YP1§511 lag Ya y WGg9gg� : g 0 0 0 00 0 0 0 0O (D 0 OQ 0 0 (D0 0 0 0 EMI • $_g= z�F§ 9 CIL W Lila NIP IR g u 8 P, 9� y goy ktl�f�5�§ gggggg =�8 Y8�'W 8W .1 �< SM 0 o fit m J i+ • ���I 'fc, � � II �f � I ; •��Da ■1 i° _� 1■ FRE EDS �E©; �■ ■ .� �.� � n � �. ;■dao g fie' m O3 z : Tpig yE- � RI 8H. �8g g3�k ���� yTj� � N Y Nil l f � oh YP1§511 lag Ya y WGg9gg� : g 0 0 0 00 0 0 0 0O (D 0 OQ 0 0 (D0 0 0 0 EMI • 9 CIL W Lila NIP IR g tltl UU �� 3 c ng �� y g3g 11,199, u 8 P, 9� y goy ktl�f�5�§ gggggg =�8 Y8�'W 8W .1 �< SM 0 o fit m J i+ • ���I 'fc, � � II �f � I ; •��Da ■1 i° _� 1■ FRE EDS �E©; �■ ■ .� �.� � n � �. ;■dao g fie' m O3 z : Tpig yE- � RI 8H. �8g g3�k ���� yTj� � N Y Nil l f � oh YP1§511 lag Ya y WGg9gg� : g 0 0 0 00 0 0 0 0O (D 0 OQ 0 0 (D0 0 0 0 EMI • 9 CIL W �Q NIP IR g tltl UU �� 3 c ng �� y g3g u 8 P, 9� y goy ktl�f�5�§ gggggg =�8 Y8�'W 8W .1 �< SM 0 o fit m J i+ • ���I 'fc, � � II �f � I ; •��Da ■1 i° _� 1■ FRE EDS �E©; �■ ■ .� �.� � n � �. ;■dao g fie' m O3 z : Tpig yE- � RI 8H. �8g g3�k ���� yTj� � N Y Nil l f � oh YP1§511 lag Ya y WGg9gg� : g 0 0 0 00 0 0 0 0O (D 0 OQ 0 0 (D0 0 0 0 EMI •