Loading...
BCOM2019-0031 Title 24BUILDING ENERGY ANALYSIS REPORT PROJECT: TENANT IMPROVEMENT 79305 HWY. 111 LA QUINTA, CA 92253 Project Designer: AC CITY OF LIJINTA W BUILDING DIVISION o > RE -VIEWED FOR pj W - s CODE r C MPLIANCE U a o o R port Prepared by: W DATF B� RAYMOND M. ZHONG, P.E. PERFECT DESIGN & INVESTMENT 2416 W. VALLEY BLVD ALHAMBRA, CA 91803 (626)289-8808 NOL Job Number: �TgTEn��rtaL D19-1347 �� Date: 7/22/2019 The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2016 Building Energy Efficiency Standards. This program developed by EnergySoft Software — www.energysoft.com. I TABLE OF CONTENTS I Cover Page 1 Table of Contents 2 Form MCH-01-E Prescriptive - Mechanical Systems 3 Form MCH-02-E Prescriptive - HVAC System Requirements 7 Form MCH-03-E Prescriptive - Mechanical Ventilation and Reheat 10 Form MCH-04-E Prescriptive - Required Acceptance Tests 12 Form MCH-05-E Prescriptive - Requirements for Packaged Single Zo 15 Form PLB-01-E Water Heating System 17 HVAC System Heating and Cooling Loads Summary 19 Zone Load Summary 21 Room Load Summary 23 Room Heating Peak Loads 25 Room Cooling Peak Loads 27 Room Cooling Coil Loads 29 STATE OF CALIFORNIA MECHANICAL SYSTEMS CEC-NRCC-MCH-01-E Revised 01116 CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-MCH-01-E Mechanical Systems (Page 1 of 4) Proj—t Name: TENANT IMPROVEMENT Date Prepared: 7/22/2019 A. MECHANICAL COMPLIANCE DOCUMENTS & WORKSHEETS (check box if worksheet is included) For detailed instructions on the use of this and all Energy Efficiency Standards compliance forms, refer to the 2016 Nonresidential Manual Note: The Enforcement Agency may require all farms to be incorporated onto the building plans. YES NO Comp. Doc./Worksheet # Title ❑ ❑ NRCC-MCH-01-E (Part 1 of 3) Certificate of Compliance, Declaration. Required on plans for all submittals. m ❑ NRCC-MCH-01-E (Part 2 of 3) Certificate of Compliance, Required Acceptance Tests (MCH-02-A to 11-A). Required on plans for all submittals. ❑ ❑ NRCC-MCH-01-E (Part 3 of 31 Certificate of Compliance, Required Acceptance Tests (MCH-12-A to 18-A). Required on plans where applicable. ❑ ❑ NRCC-MCH-02-E (Part 1 of 2) Mechanical Dry Equipment Summary is required for all submittals with Central Air Systems. It is optional on plans. C✓J ❑ NRCC-MCH-02-E (Part 2 of 2) Mechanical Wet Equipment Summary is required for all submittals with chilled water, hot water or condenser water systems. It is optional on plans. �] ❑ NRCC-MCH-03-E Mechanical Ventilation and Reheat is required for all submittals with multiple zone heating and cooling systems. It is optional on plans. ❑ ® NRCC-MCH-07-E (Part 1 of 2) jPower Consumption of Fans. Required on plans where applicable ❑ 0 NRCC-MCH-07-E (Part 2 of 2) 1POwer Consumption of Fans, Declaration. Required on plans where applicable CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance January 2016 STATE OF CALIFORNIA MECHANICAL SYSTEMS CEC-NRCC-MCH-01-E (Revised 01116) CALIFORNIA 1=NERGY COMMISSION -14imp— CERTIFICATE OF COMPLIANCE NRCC-MCH-01-E Mechanical Systems (Page 2 of 4) Project Name: TENANT IMPROVEMENT Date Prepared: 7/22/2019 B. MECHANICAL HVAC ACCEPTANCE FORMS (check box for required compliance documents) Test Performed By: Designer: This compliance document is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for HVAC systems. The designer is required to check the applicable boxes for all acceptance tests that apply and list all equipment that requires an acceptance test. All equipment of the same type that requires a test, list the equipment description and the number of systems. Installing Contractor: The contractor who installed the equipment is responsible to either conduct the acceptance test themselves or have a qualified entity run the test for them. If more than one person has _responsibility for the acceptance testing, each person shall sign and submit the Certificate of Acceptance applicable to the portion of the construction or installation for which they are responsible. Enforcement Agency: Plancheck — The NRCC-MCH-01-E compliance document is not considered a completed document and is not to be accepted by the building department unless the correct boxes are checked. Inspector- Before occupancy permit is granted all newly installed process systems must be tested to ensure proper operations. Test Description MCH-02-A MCH-03-A MCH-04-A MCH-05-A MCH-06-A MCH-07-A MCH-08-A MCH-09-A MCH-10-A MCH-11-A Equipment Requiring Testing # of Outdoor Single Zone Air Distribution Economizer Demand Control Supply Fan Valve Leakage Supply Water Hydronic System Automatic or Verification Units Air Unitary Ducts Controls Ventilation VAV Test Temp. Reset Variable Flow Demand Shed Control (DCV) Control ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance January 2016 STATE OF CALIFORNIA MECHANICAL SYSTEMS F06 CEC-NRCC-MCH-01-E Revised 01116 CALIFORNIA ENERGY COMMISSEON CERTIFICATE OF COMPLIANCE NRCC-MCH-01-E Mechanical Systems (Page 3 of 4) P'o;ect Name: TENANT IMPROVEMENT Date Prepared: 7/22/2019 C. MECHANICAL HVAC ACCEPTANCE FORMS (check box for required compliance documents) Test Performed By: Designer: This compliance document is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for HVAC systems. The designer is required to check the applicable boxes for all acceptance tests that apply and list all equipment that requires an acceptance test. All equipment of the same type that requires a test, list the equipment description and the number of systems. Installing Contractor: The contractor who installed the equipment is responsible to either conduct the acceptance test themselves or have a qualified entity run the test for them. If more than one person has responsibility for the acceptance testing, each person shall sign and submit the Certificate of Acceptance applicable to the portion of the construction or installation for which they are responsible. Enforcement Agency: Plancheck —The NRCC-MCH-01-E compliance document is not considered a completed document and is not to be accepted by the building department unless the correct boxes are checked. Inspector- Before occupancy permit is granted all newly installed process systems must be tested to ensure proper operations. Test Description MCH-12-A MCH-13-A MCH-14-A MCH-15-A MCH-16-A MCH-17-A MCH-18-A Equipment # of Fault Detection & Automatic Fault Detection & Distributed Energy Thermal Energy Supply Air Requiring Testing Units Diagnostics for DX Diagnostics for Air & Storage DX AC Storage (TES) Temperature Reset Condenser Water ECMS or Verification Units Systems Systems Controls Reset Controls Zone ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance January 2016 STATE OF CALIFORNIA MECHANICAL SYSTEMS C E C-N RCC-MCH -0 1 -1- Revised 01/16 CALIFORNIA ENERGY COMMISSION -qQP1 CERTIFICATE OF COMPLIANCE NRCC-MCH-01-E Mechanical Systems (Page 4 of 4) Projec[Name: TENANT IMPROVEMENT Date Prepared: 7/22/2019 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT r _ 1. 1 certify that this Certificate of Compliance documentation is accurate and complete. `� r Documentation Author Name: RAYMOND M. ZHONG, P.E. Documentation /' , Company: PERFECT DESIGN & INVESTMENT Signature Date: 7 7�1 0 * 0 ; _ - k 'r: G7 � Address: 2416 W. VALLEY BLVD CWHERS CertlEica ' ion4ifap icdbl ' ~ R :<r -`/ �m Ctylstatel2ip: ALHAMBRA, CA 91803 Phone: (626)289� ' '�'411111cm RESPONSIBLE PERSON'S DECLARATION STATEMENT r I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Compliance is true and correct. 2. 1 am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible designer). 3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. 5. 1 will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Designer Name: RAYMOND M. ZHONG, P.E. Responsible Designer Signature: WO F Company PERFECT DESIGN & INVESTMENT, INC. Date signed: Address: 2416 W. VALLEY BLVD License: 7 :r► City/state/zip: ALHAMBRA, CA 91803 Phone: �6 � CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance January 2016 STATE OF CALIFORNIA HVAC DRY & WET SYSTEM REQUIREMENTS P� CEC-NRCC-MCH-02-E Revised 01/1Gt CALIFORNIA ENERGY COMMISSION - CERTIFICATE OF COMPLIANCE NRCC-MCH-02-E HVAC Dry & Wet System Requirements (Page 1 of 3) Project Name: TENANT MPROVEMENT Date Prepared: 172212019 A. Equipment Tags and System Description' - Dry Systems MANDATORY MEASURES T-24 Sections Reference to the Requirements in the Contract Documentsz Heating Equipment Efficiency 110.1 or 110.2(a) Cooling Equipment Efficiency 110.1 or 110.2(a) HVAC or Heat Pump Thermostats 110.2(b , 110.2(c) Furnace Standby Loss Control 110.2(d) Low Leakage AHUs 110.2(f) Ventilation 120.1(b) Demand Control Ventilation 120.1(c)4 Occupant Sensor Ventilation Control 120.1(c)5, 120.2(e)3 Shutoff and Reset Controls 120.2(e) Outdoor Air and Exhaust Damper Control 120.2(f) Isolation Zones 120.2(g) Automatic Demand Shed Controls 120.2(h) Economizer FDD 120.2(i) Duct Insulation 120.4 PRESCRIPTIVE MEASURES Equipment is sized in conformance with 140.4(a & b) Y/N Y/N Y/N 140.4(a & b) Supply Fan Pressure Control 140.4(c) Simultaneous Heat/Cool 140.4(d) Economizer 140.4(e) Heat and Cool Air Supply Reset 140.4(f) Electric Resistance Heating 140.4(g) Duct Leakage Sealing and Testing 140.4(1) Notes: 1. Provide equipment tags (e.g. AHU 1 to 10) and system description (e.g. Single Duct VAV reheat) as appropriate. Multiple units with common requirements can be grouped together. 2. Provide references to plans (i.e. Drawing Sheet Numbers) and/or specifications (including Section name/number and relevant paragraphs) where each requirement is specified. Enter "N/A" if the requirement is not applicable to this system. 3. The referenced plans and specifications must include all of the following information: equipment tag, equipment nominal capacity, Title 24 minimum efficiency requirements, and actual rated equipment efficiencies. Where multiple efficiency requirements are applicable (e.g. full- and part -load) include all. Where appliance standards apply (110.1), identify where equipment is required to be listed per Title 201601 et seq. 4. Identify where the ventilation requirements are documented for each central HVAC system. Include references to both central unit schedules and sequences of operation. If one or more spaces is naturally ventilated identify where this is documented in the plans and specifications. Multiple zone central air systems must also provide a MCH-03-E compliance document. 5. If one or more spaces has demand controlled ventilation identify where it is specified including the sensor specifications and the sequence of operation. 6. If one or more space has occupant sensor ventilation control identify where it is specified including the sensor specifications and the sequence of operation 7. If the system is DDC identify the sequences for the system start/stop, optimal start, setback (if required) and setup (if required). For all systems identify the specification for the thermostats and time clocks (if applicable). 8. Identify where the heating, cooling and deadband airflows are scheduled for this system. Include a reference to the specification of the zone controls. Provide a MCH-03-E compliance document. 9. Enter N/A if there is no electric heating. If the system has electric heating indicate which exception to 140.4(g) applies. 10. If duct leakage sealing and testing is required, a MCH-04-A compliance document must be submitted. CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance January 2016 STATE OF CALIFORNIA HVAC DRY & WET SYSTEM REQUIREMENTS CEC-NRCC-MCW02-E (Revised 01116) CALIFORNIA ENERGY COMMISSION -42P' CERTIFICATE OF COMPLIANCE NRCC-MCH-02-E HVAC Dry & Wet System Requirements (Page 2 of 3) Project Name: TENANT IMPROVEMENT Date Prepared: 7/22/2019 B. Equipment Tags and System Description — Wet Systems MANDATORY MEASURES T-24 Sections Reference to the Requirements in the Contract Documentsz Heating Hot Water Equipment Efficiency 110.1 Cooling Chilled and Condenser Water Equipment EfficienCy3 110.1, 140.4(i) Open and Closed Circuit Cooling Towers 110.2(e) 1 conductivityor flow -based controls Open and Closed Circuit Cooling Towers Maximum Achievable Cycles of 110.2(e) 2 Concentration (LSI)6 Open and Closed Circuit Cooling Towers Flow Meter with analog output 110.2(e) 3 Open and Closed Circuit Cooling Towers 110.2(e) 4 Overflow Alarm Open and Closed Circuit Cooling Towers 110.2(e) 5 Efficient Drift Eliminators Pipe Insulation 120.3 PRESCRIPTIVE MEASURES Cooling Tower Fan Controls 140.4(h)2, 140.4(h)5 Y/N Y/N Y/N Cooling Tower Flow Controls 140.4(h)3 Centrifugal Fan Cooling Towers 140.4(h)4 Air -Cooled Chiller Limitation 140.40) Variable Flow System Design 140.4(k) Chiller and Boiler Isolation 140.4(k) CHW and HHW Reset Controls 140.4(k) WLHP Isolation Valves 140.4(k) VSD on CHW, CW & WLHP Pumps >5HP 140.4(k) DP Sensor Location 140,4(k) Notes: 1. Provide equipment tags (e.g. CH 1 to 3) or system description (e.g. CHW loop) as appropriate. Multiple units with common requirements can be grouped together. 2. Provide references to plans (i.e. Drawing Sheet Numbers) and/or specifications (including Section name/number and relevant paragraphs) where each requirement is specified. Enter "N/A" if the requirement is not applicable to this system. 3. The referenced plans and specifications must include all of the following information: equipment tag, equipment nominal capacity, Title 24 minimum efficiency requirements, and actual rated equipment efficiencies. Where multiple efficiency requirements are applicable (e.g. full- and part -load) include all. For chillers operating at non-standard efficiencies provide the Kadj values. For chillers also note whether the efficiencies are Path A or Path B. 4. Identify if cooling towers have propeller fans. If towers use centrifugal fans document which exception is used. 5. If air-cooled chillers are used, document which exceptions have been used to comply with 140.4(j) and the total installed design capacity of the air-cooled chillers in the chilled water plant. 6. Identify the existence of a completed MCH-06-E when open or closed circuit cooling towers are specified to be installed, otherwise enter "N/A". CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance January 2016 STATE OF CALIFORNIA HVAC SYSTEM REQUIREMENTS ��1 CEC-NRCC-MCH-02-E Revised 06114 CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-MCH-02-E HVAC Wet System Requirements (Page 3 of 3) Project Name: TENANT IMPROVEMENT Date Prepared: 7/22/2019 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT ` 1. 1 certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: RAYMOND M. ZHONG, P.E. Documentation Author Signature: [ Y Company: PERFECT DESIGN & INVESTMENT Signature Date: 7/22/2019 Address: 2416 W. VALLEY BLVD CEA/ HERS Certification Identification ofappll �; Y ki— �YFx3G City/Statejzlp. ALHAMBRA, CA 91803 Phone: (626)289-8808 �� RESPONSIBLE PERSON'S DECLARATION STATEMENT UP r I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Compliance is true and correct. OF 2. 1 am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or Sys em design identified on this Certificate of Compliance (responsible designer). 3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 4- The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. 5. 1 will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand tbat a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides rthe building owner at -occupancy. Responsible Designer Name: RAYMOND M. ZHONG, P.E. R%ponslble Designer Signature: C car -. sjF;,.r•;f- Date signed: Qz o License: '-�-- company: PERFECT DESIGN & INVESTMENT, IP Address: 2416 W. VALLEY BLVD city/stale/zip: ALHAMBRA, CA 91803 Phone: (626)*�801U � or_ilrt�4 CA Building Energy Efficiency Standards- 2016 Nonresidential Compliance January 2016 STATE OF CALIFORNIA MECHANICAL VENTILATION AND REHEAT CERTIFICATE OF COMPLIANCE Mechanical Ventilation & Reheat Project Name: TENANT IMPROVEMENT Date Prepared: 7/22/201 9 NIA ENERGY COMMISSION e N RCC-MCH-03-E (Page 1 of 2) A. Mechanical Ventilation and Reheat ROOM VAV Reheated Primary VAV Deadband ACTUAL DESIGN INFO (FROM EQUIPMENT SCHEDULES, ETC} AREA BASIS OCCUPANCY BASIS BASIS MINIMUM Air CFM Primary Air CFM OI 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 r 3 ag r ao > 3 Qo u o 3 o w w w a Z o zz r w za z ,> m a< �z3 a Q 2� a¢ z w z F z w ¢ m ° mz a m 0 z > O w �'�'� Z p ij s •2 w wz O p m O O w _ Z lZ7 Z lZ7 w G lZ7 Z` E 2 V Z¢_ 2 O a Z U Z p' z u `. 2 z O z¢ [j O u a OU u `. z u Q O> '^ O N O `^ ¢ z z OU z O s¢ a¢ x m} x¢ N U 0= U z �_ z U m < e i� Pass El Pass ❑ Pass PHP-1, 2, 3, 5 A 4,473 0.20 895 74.6 15.0 1,118 1,118 ❑ Fail ❑ Fail ❑ Fail Xl N/A $I N/A ❑ Pass ❑ Pass Total 1,118 ❑ Pass ❑ Fail ❑ Fail ❑Fail ❑ N/A ❑ N/A ❑ Pass ❑ Pass PHP-4, 6 AREA 2,272 0.20 454 37.9 15.0 568 568 14 Pass ❑ Fail ❑Fail ❑Fail $I N/A X N/A ❑ Pass El Pass Total 568 El Pass ❑ Fail ❑Fail ❑ Fail ❑ N/A ❑ N/A ❑ Pass ❑ Pass ❑ Pass ❑ Fail ❑ Fail ❑ Fail ❑ N/A ❑ N/A ❑ Pass ❑ Pass ❑ Pass ❑ Fail ❑ Fail ❑ Fail ❑ N/A ❑ N/A ❑ Pass ❑ Pass ❑ Pass ❑ Fail ❑ Fail ❑ Fail ❑ N/A ❑ N/A CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance May 2016 STATE OF CALIFORNIA MECHANICAL VENTILATION AND REHEAT H CERTIFICATE OF COMPLIANCE NRCC-MCH-03-E Mechanical Ventilation & Reheat (Page 2 of 2) Project Name: TENANT IMPROVEMENT � . --.,�Z12212019 lJVLUFVItNtAl l N AUTHOR'S DECLARATION STATEMENT 1. 1 certify that this Certificate of Compliance documentation is accurate and complete. -• ', ��t Documentation Author Name: RAYMOND M. ZHONG, P.E. Documentation Author signatuo x,U 11 Company: PERFECT DESIGN & INVESTMENT Signature Date: 7/22/2019t, Address: 2416 W. VALLEY BLVD CEA/ HERS Certification Ident ficatlQa yp Itab }; City/State/Zip: ALHAMBRA, CA 91803 PhD°e' (626)289-8808 0� C A7LIFQ RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California, I. The information provided on this Certificate of Compliance is true and correct. 2. 1 am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible designer). J. I ne energy teatures and pertormance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. 5. 1 will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Designer Name: RAYMOND M. ZHONG, P.E. Responsible Designer Signature: Company: PERFECT DESIGN & INVESTMENT, INC. Date Signed: AA, r" ' D "If � AI ti� Address: 2416 W. VALLEY BLVD License: � - r'� - city/state/zip: ALHAMBRA, CA 91803 Phone: 2 ' 0 S/ CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance May 2016 STATE OF CALIFORNIA REQUIRED ACCEPTANCE TESTS J" ERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-MCH-04-E Required Acceptance Tests (Page 1 of 3) Project Name: TENANT IMPROVEMENT Date Prepared: 7/22/2019 A. MECHANICAL COMPLIANCE FORMS & WORKSHEETS (indicate if worksheet is included) For detailed instructions on the use of this and all Energy Standards compliance documents, refer to the 2016 Nonresidential Manual Note: The Enforcement Agency may require all compliance documents to be incorporated onto the building plans. The NRCC-MCH-04-E and NRCC-MECH-05-E are alternative compliance documents to NRCC-MCH-01-E, NRCC-MCH-02-E and NRCC-MCH-03-E for projects using only single zone packaged HVAC systems. YES NO Form Title ✓ NRCC-MCH-04-E (1 of 2) Certificate of Compliance. Required on plans when used. ✓ NRCC-MCH-04-E (2 of 2) Mechanical Acceptance Tests. Required on plans when used. ✓ NRCC-MCH-05-E (1 of 2) HVAC Prescriptive Requirements. It is required on plans when used. Mechanical SWH Equipment Summary is required for all submittals with service water heating, pools or spas. It is required on plans where applicable. ✓ NRCC-MCH-05-E (2 of 2) CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance January 2016 STATE OF CALIFORNIA REQUIRED ACCEPTANCE TESTS Fr) 1 CEC-NRCC- MC H-04-E Revised 01/16 CALIFORNIA ENERGY COMMISSION '4W CERTIFICATE OF COMPLIANCE NRCC-MCH-04-E Required Acceptance Tests (Page 2 of 3) Project Name: TENANT IMPROVEMENT Date Prepared: 7/22/2019 Designer: This compliance document is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for mechanical systems. The designer is required to check the applicable boxes by all acceptance tests that apply and list all equipment that require an acceptance test. If all equipment of a certain type requires a test, list the equipment description and the number of systems. The NA number designates the Section in the Appendix of the Nonresidential Reference Appendices Manual that describes the test. Since this compliance document will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Enforcement Agency: Systems Acceptance. Before occupancy permit is granted for a newly constructed building or space, or a new space -conditioning system serving a building or space is operated for normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. Systems Acceptance. Before occupancy permit is granted. All newly installed HVAC equipment must be tested using the Acceptance Requirements. The NRCC-MCH-04-E compliance document is not considered a completed document and is not to be accepted by the building department unless the correct boxes are checked. The equipment requiring testing, person performing the test (Example: HVAC installer, TAB contractor, controls contractor, PE in charge of project) and what Acceptance test must be conducted. The following checked -off forms are required for ALL newly installed and replaced equipment. In addition a Certificate of Acceptance documents shall be submitted to the building department that certifies plans, specifications, installation certificates, and operating and maintenance information meet the requirements of Section 10-103(b) and Title 24 Part 6. The building inspector must receive the properly filled out and signed compliance documents before the building can receive final occupancy. Test Description MCH-02-A MCH-03-A MCH-04-A MCH-05-A MCH-06-A MCH-07-A MCH-11-A MCH-12-A MCH-14-A MCH-18-A Test Performed By: Equipment Requiring Testing or Verification # of Units Outdoor Air Single Zone Unitary Air Distribution Ducts Economizer Controls Demand Control Ventilation (DCV) Supply Fan VAV Automatic Demand Shed Control FDD for Packaged DX Units Distributed Energy Storage DX AC Systems Energy Management Control System Ti CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance January 2016 STATE OF CALIFORNIA REQUIRED ACCEPTANCE TESTS GEC-NRCC-MCH-04-E Revised 01116 CALIFORNIA ENERGY COMMISSION 'RIPF' CERTIFICATE OF COMPLIANCE NRCC-MCH-04-E Required Acceptance Tests 3 of 3 (Page ) Project Name: TENANT IMPROVEMENT 4„ePf .,rep-.7j2242019 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. 1 Certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: RAYMOND M. ZHONG, P.E- Documentation AuthorSfgnatu y JY" Company: PERFECT DESIGN & INVESTMENT signatureDate:7/22/2019 CEA/HERS Certification Wentificatforr Address: 2416 W. VALLEY BLVD City/State/Zip: ALHAMBRA, CA 91803 Phone: (626)289-8808 RESPONSIBLE PERSON'S DECLARATION STATEMENT Y• I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Compliance is true and correct. 2. 1 am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible designer). 3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. 5. 1 will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to he documentation the builder provides to the building owner at occupancy. Responsible Designer Name: RAYMOND M. ZHONG, P.E. Responsible Designer Signature:, Oq{(y fY(' !dam Company. PERFECT DESIGN & INVESTMENT, INC- Date Signed: Address: 2416 W. VALLEY BLVD License: city/state/zip: ALHAMBRA, CA 91803 �' Phone: wiu"S—MooAN/ Q%O CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance January 2016 STATE OF CALIFORNIA REQUIREMENTS FOR PACKAGED SINGLE ZONE UNITS CERTIFICATE OF COMPLIANCE Requirements for Packaged Single -Zone Units Project Name: TENANT I M P Equipment Tag(s)' MANDATORY MEASURES T-24Sections Requirement° As Heating Equipment Efficiency° 110.1 or 110.2(a) Cooling Equipment Efficiency 110.1 or 110.2(a) Thermostats 110.2(b), 110.2(c) Furnace Standby Loss Contro16 110.2(d) Low Leakage AHU 110.2(f) Ventilation' 120.1(b) Demand Control Ventilation 120.1(c)4 Occupant Sensor Ventilation Control 120.1(c)5, 120.2(e)3 Shutoff and Reset Controls' 120.2(e) Outdoor Air and Exhaust Damper Control 120.2(f) Automatic Demand Shed Controls 120.2(h) Economizer FDD 120.2(i) Duct Insulation 120.4 PRESCRIPTIVE MEASURES Equipment is sized in conformance with 140.4(a & b) 140.4(a&b) Economizer 140.4(e) Electric Resistance Heating 140.4(g) Duct Leakage Sealing and Testine.11 14n Am NRCC-MCH-05-E (Page 1 of 2) Date Prepared:7 As Scheduled' I Requirement' I As Notes: 1. Provide equipment tags (e.g. ACI orAC1 to 10). Multiple units of the some make and model with thesame applicotion and accessories can be grouped together. 2. Enter the following information as appropriate: Unit Manufacturer; Unit Model Number (including all accessoriesl; Description of the unit (e.g. gas -pack or heat pump; rated heating capacity (enter "N/A" if no heating); and, rated cooling capacity (enter "N/A" if no coaling). For unit capacities include the units (e.g. kBtuh or tons). 3. For each requirement, enter the minimum requirement from the Standard In the left column (under "Standard Requirement"). In the right column (under "As Scheduled") enter the value for the units as specified. 4. Where there is more than one requirement (e.g. full and part load efficiency) enter both with the appropriate labels (e.g. COP and IEER). 5. In the left column identify the thermostatic requirements from the standard (e.g. programmable setback thermostat or heat pump with electric heat), . In the right column indicate the capabilities of the thermostat as scheduled. 6. If the unit has a furnace which is rated at 2225,000 Btuh of capacity, indicate the rated standby loss and ignition source (e.g. IID). If there is no furnace or the unit is rated for <225,000 Btuh indicate "N/A". 7, In the left column, enter both the required ventilation value from Table 120.1A and for the number of occupants times 15 cfm/person. In the right column enter the actual minimum ventilation as scheduled. If the space is naturally ventilated enter "N/A" in the left column and "the space is naturally ventilated" in the right column. 8. If the space is required to hove either DCV or Occupant Sensor Ventilation Control indicate "required" in the left column (otherwise indicate "N/A" in the left column). If either DCV or Occupant Sensor Ventilation Control is provided indicate "provided" in the right column (otherwise indicate "N/A" in the right column) 9. In the left column indicate the required time controls from the standard. In the right column identify the device that provides this functionality (e.g. EMCS or programmable timeclock). 10. Enter N/A if there is no electric heating. If the system has electric heating indicate which exception to 140.4(g) applies. 11. I,` duct leakage sealing and testing is required, a MCH-04-A compliance document must be submitted. CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance January 2016 STATE OF CALIFORNIA REQUIREMENTS FOR PACKAGED SINGLE ZONE UNITS CEC-NRCC-MCH-05-€ Revised 01116) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-MCH-05-E Requirements for Packaged Single -Zone Units (Page 2 of 2) Project Name: TENANT IMPROVEMENT Date Prepared: 7/22/2019 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT G C. 1. 1 certify that this Certificate of Compliance documentation is accurate and complete. vr•` ' i Documentation Author Name: Documentation Author Signature: RAYMOND M. ZHONG, P.E. Company: PERFECT DESIGN & INVESTMENT signature Date: 7/22/2019 1�- `; 76 Address: 2416 W. VALLEY BLVD CEA/HERS Certification identification (ifa katii�];: City/State/Zip: Phone: ALHAMBRA, CA 91803 (626)289-8808 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Compliance is true and correct. 2. 1 am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible designer). 3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. 5. 1 will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Designer Name: RAYMOND M. ZHONG, P.E. Responsible Designer Signature: Company: PERFECT DESIGN & INVESTMENT, INC. I Date Signed Address: 2416 W. VALLEY BLVD License: M-27 City/state/zip: ALHAMBRA, CA 91803 Phone: (626) CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance January 2016 STATE OF CALIFORNIA WATER HEATING SYSTEM GENERAL INFORMATION CEC-Nr:CC-PLB-B9-E Revised 0111E CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-PLB-01-E Water Heating System General Information (Page 1 of 2) Project Name: TENANT IMPROVEMENT Date Prepared: 712 j2019 B. WATER HEATER INFORMATION Each water heater type requires a separate compliance document. 01 Water Heater Type: Small Instantaneous Electric 02 Fuel Type: Electric Res 03 Manufacture Name: EXISTING EEMAX SP3208 04 Model Number: 05 Number of Identical Water Heaters: 2 06 Installed Water Heater System Efficiency: 0.94 07 Required Minimum Efficiency: 0.94 08 Standby Loss Percent or Standby Loss Total: 0.027 09 Rated Input: 10,236 10 Pilot Energy: 11 Water Heater Tank Storage Volume: 0 12 Exterior Insulation on Water Heater: 0 13 Volume of Supplemental Storage: 14 Internal Insulation on Supplemental Storage: 15 Exterior Insulation on Supplemental Storage: KW, 208-1 PLUMBING COMPLIANCE FORMS & WORKSHEETS heck box if worksheet is included. -ar detailed instructions on the use of this and all Energy Standards compliance documents, refer to the 2016 Nonresidential Manual Note: The Enforcement Agency may require all compliance documents to be incorporated onto the building plans. YES NO Doc/Worksheet # Title 14 ❑ NRCC-PLB-01-E Certificate of Compliance, Declaration. Required on plans for all submittals. El ❑ NRCI-PLB-01-E Certificate of Installation Re luired on laps f II b ' I ❑ ❑ NRCI-PLB-02-E NRCI-PLB-03-E p or a su mltta s. Certificate of Installation, required on central systems in high-rise residential, hotel/motel application. Certificate of Installation, required on single dwelling unit systems in high-rise ❑ ❑ residential, hotel/motel application. ❑ ❑ NRCI-PLB-21-H Certificate of Installation, required on HERS verified central systems in high-rise residential, hotel/motel application. ❑ ❑ NRCI-PLB-22-H Certificate of Installation, required on HERS verified single dwelling unit systems in high rise residential, hotel/motel application. ❑ ❑ NRCI-STH-01-E Certificate of Installation, required on any solar water heating CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance January 2016 STATE OF CALIFORNIA WATER HEATING SYSTEM GENERAL INFORMATION CEC-NRCC-PLB-01-E (Revtsad 01,16) _ CALIFORNIA ENERGY COMMISSION "� CERTIFICATE OF COMPLIANCE NRCC-PLB-01-E Water Heating System General Information (Page 2 of 2) Project Name: TENANT IMPROVEMENT Date Prepared: 7/22/2019 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. 1 certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: RAYMOND M. ZHONG, P.E. Documentation Author Signature: ti� Nl6NG q� Company: PERFECT DESIGN & INVESTMEN Signature Date: 7/22/2019 p co n7 Address: 2416 W. VALLEY BLVD CEA/HERS Ce rtific a tio n I d en ti ficildait appl �hlei'�� City/State/Zip: ALHAMBRA, CA 91803 Phone: (626)289-8808 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Compliance is true and correct. , 2. 1 am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible designer). 3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. 5. 1 will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the U entation the builder provides to the building t" owner at occupancy. Responsible Designer Name: RAYMOND M. ZHONG, P.E. Responsible Designer signature: �(�?T 01 �N�• , Company; PERFECT DESIGN & INVESTMEN" Date Signed: •G a t r• Address: 2416 W. VALLEY BLVD License: 21) 27635 f City/State/Zip: ALHAMBRA, CA 91803 Phone: is; � 62 8f�-8808 � CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance January 2016 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name TENANT IMPROVEMENT Date 7/22/2019 System Name PHP-1, 2, 3, 5 AREA Floor Area 4,473 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 4 COIL CFM Total Room Loads 6,873 Return Vented Lighting Return Air Ducts Return Fan Ventilation 1,118 Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COOLING PEAK COIL HTG. PEAK Heating System Sensible Latent CFM Sensible OWput perSystem 47,000 130,613 29.820 968 42.938 Total Output Btuh 188,000 0 Output Btuh/s ft 42-0 6,531 2,147 Cooling System 0 0 Output perSystem 47,000 32,157 -9,646 1,118 49,608 Total Output Btuh 188,000 0 20,174 0 Total Output Tons 15.7 6,531 2,147 Total Output Btuh/s ft 42.0 Total Output s ft/Ton 285.5 1 175,832 96,839 Air System CFM perSystem 1.600 HVAC EQUIPMENT SELECTION Airflow cfm 6,400 EXISTING A/C UNIT (4 TON) 166,846 0 117,420 Airflow cfm/s ft 1-43 Airflow cfm/Ton) 408.5 166,846 0 117,420 F Jan 1 AM Outside Air (%) 17.5 % Total Adjusted System Output (Adjusted for Peak Design conditions) I TIME OF SYSTEM PEAK Outside Air cfm/s ft 0.25 Note: values above given at ARI conditions Sep 2 PM HEATING SYSTEM PSYCHROMETRICS Airstream Tem eratures at Time of Heating Peak 26 OF 60 OF Outside Air 1,118 cfm Supply Fan 6,400 cfm 68 IF 60 IF 110 °F Heating Coil j 110 OF p � ROOM 68 OF COOLING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Cooling Peak 106/68OF 84/63OF 84/63OF 59/53OF Outside Air 1,118 cfm Supply Fan Cooling Coil 6,400 cfm 79 / 62 IF 60 / 53 OF p ...�, 39.2 % ROOM 78 / 62 IF HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name Date TENANT IMPROVEMENT 7/22/2019 System Name Floor Area PHP-4, 6 AREA 2,272 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 2 COIL CFM Total Room Loads 3.522 Return Vented Lighting Return Air Ducts Return Fan Ventilation 568 Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COOLING PEAK COIL HTG. PEAK Heating System Sensible Latent CFM Sensible Output r System 55,000 67,736 15,147 552 24,483 Total Output Stuh 110,000 0 Output etuhls ft 48.4 3,387 1,224 Cooling System 0 0 Output per System 57,000 16,432 -4,050 568 25,214 Total Output Stuh 114,000 0 11,086 0 Total Output Tons 9.5 3,387 1.224 Total Output Stuhls ft 50.2 Total Output s ftlTon 239.2 90,942 52,145 Air System CFM per System 2.000 HVAC EQUIPMENT SELECTION Airflow cfm 4.000 EXISTING A/C UNIT (5 TON) 100,136 0 68,703 Airflow cfmis ft 1.76 68,703 Jan 1 AM Airflow cfm/Ton 421.1 Total Adjusted System Output (Adjusted for Peak Design conditions) TIME OF SYSTEM PEAK Outside Air °Io 14.2 % 100,136 0 Outside Air cfmis ft 0.25 Note. values above given at ARI cond€tions Sep 2 PM HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak 26 IF 62 OF 62 OF 110 IF 1 1 Outside Air 568 cfm Supply Fan Heating Coil 110 IF AL 4,000 cfm ROOM 68 IF 68 OF COOLING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Cooling Peak) 106 / 68 OF 83 / 62 OF 83 / 62 OF 59 / 53 IF O Outside Air Ar ' 1 568 cfm AL Supply Fan Cooling Coil 60 / 53 IF 4,000 cfm 37.7 % ROOM 79 / 61 IF 78 /`°F ZONE LOAD SUMMARY Project Name TENANT IMPROVEMENT Date 712212019 System Name PHP-1, 2, 3, 5 AREA Floor Area 4,473 ZONE LOAD SUMMARY ZONAL SYSTEM COOLING PEAK HEATING PEAK ZONE NAME SYSTEM NAME Mult. CFM Sensible Latent Heating OA CFM Peak Hr CFM Sensible Latent CFM Sensible PHP-1, 2, 3, 5 AREA 1.0 1,118 Aug 2 PM I 6,584 164,367 20,145 968 92,920 TOTALS 01 0 0 1,118 Sep 2 PM 163,9111 8,023 92,920 (BLOCK LOAD) ZONE LOAD SUMMARY Project Name TENANT IMPROVEMENT Date 712212019 System Name PHP-4, 6 AREA Floor Area 2,272 ZONE LOAD SUMMARY ZONAL SYSTEM COOLING PEAK HEATING PEAK ZONE NAME SYSTEM NAME Mult. CFM Sensible Latent Heating OA CFM Peak Hr CFM Sensible Latent CFM I Sensible PHP-4, 6 AREA 1.0 568 Aug 2 PM 3,378 84,895 10,233 552 49,871 I TOTALS 0 0 0 5681 Sep 2 PM 1 84,6491 4,075 49,871 (BLOCK LOAD) ROOM LOAD SUMMARY Projecl Name TENANT IMPROVEMENT Date 712212019 System flame PHP-1, 2, 3, 5 AREA Floor Area 4,473 ROOM LOAD SUMMARY ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK Zone Name Room Name Mult. CFM Sensible Latent CFM Sensible Latent CFM Sensible PHP-1, 2, 3, 5AREA PHP-1, 2, 3, 5AREA 1 6,873 130,613 29,820 6,873 130,613 29,820 968 42,938 PAGE TOTAL 6,873 130,613 29,820 968 42,938 TOTAL " 6, 873 130, 613 29, 820 968 42, 938 *Total includes ventilation load for zonal systems. ROOM LOAD SUMMARY Project Name TENANT IMPROVEMENT System Name PHP-4, 6 AREA ROOM LOAD SUMMARY ROOM COOLING PEAK COIL Zone Name Room Name Mult. CFM Sensible I Latent CFM ­] PHP-4, 6 AREA I PHP-4, 6 AREA 1 1 3,5221 67,7361 15,147 3,522 PAGE TOTAL TOTAL* * Total includes ventilation load for zonal Date 712212019 Floor Area 2, 272 DLING PEAK COIL HTG. PEAK isible I Latent CFM Sensible 67,7361 15,147 5521 24,483 3,522 67,736 15.147 552 24,483 3,522 fi7.73S 15,147 552 24,483 ROOM HEATING PEAK LOADS Project Name Date TENANT IMPROVEMENT 7/22/2019 ROOM INFORMATION DESIGN CONDITIONS Room Name PHP-1, 2, 3, 5 AREA Floor Area 4,473.00 ft2 Indoor Dry Bulb Temperature 68 OF Time of Peak Jan 1 AM Outdoor Dry Bulb Temperature 26 OF Conduction Area X X X X x x x x x x x x x x x x x x x x x x x x x x x x x x x to Ceiling U-Value X X X X x x x x x x x x x x x x x x x x x x x x x x x x x x x AT °F = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = 42 Btu/hr Default Roof Prior to 1976 4,473.0 0.0510 42 9,581 Default Wall Prior to 1978 2,188.8 0.1100 42 10,112 DefaWR Single Metal Clear 336.0 1.1900 42 16,793 Slab -On -Grade perim = 210.4 0.7300 42 6,451 Items shown with an asterisk (") denote conduction Infiltration:[ 1.00 X 1.064 Schedule Air Sensible Fraction through an interior surface X 4,473 X Area another room 12.00 X 0.000 Height ACH Page Total / 60 ] X AT 42,938 = 0 TOTAL HOURLY HEAT LOSS FOR ROOM 42,938 ROOM HEATING PEAK LOADS Project Name Date TENANT IMPROVEMENT 712212019 ROOM INFORMATION DESIGN CONDITIONS Room Name PHP-4, 6 AREA Time of Peak Jan 1 AM Floor Area 2,272.00 ftZ Outdoor Dry Bulb Temperature 26 OF Indoor Dry Bulb Temperature 68 OF Conduction Default Roof Prior to 1978 Default Wall Prior to 1978 Default Single Metal Clear Slab -On -Grade Area U-Value X X 0.0510 0.1100 X 1.1900 X 0.7300 X X X X X X X X X X X X X X X X X X X X X X X X X X X Items shown with an asterisk (') denote conduction through an Interior surface to another room AT °F Page Total Btu/hr 4,867 6,542 8,996 4,0781 1 24,4831 Infiltration:[ X 1.064 X 2,272 X 12.00 X 0.000 / 60 ] X 42 Schedule Air Sensible Area Ceiling Height ACH aT Fraction TOTAL HOURLY HEAT LOSS FOR ROOM 24,483 ROOM COOLING PEAK LOADS Project Name-7 Date TENANT IMPROVEMENT 712212019 ROOM INFORMATION DESIGN CONDITIONS Room Name PHP-1, 2, 3, 5 AREA Time of Peak Sep 2 PM Floor Area 4,473.00 ft' Outdoor Dry Bulb Temperature 106 OF Indoor Dry Bulb Temperature 78 OF Outdoor Wet Bulb Temperature 68 OF Conduction Area U-Value DETD1 Btu/hr Default Roof Prior to 1978 4,473.0 x 0.0510 x 54.5 = 12,424 Default Wall Prior to 1978 720.0 x 0.1100 x 42.1 = 3,334 Default Wall Prior to 1978 902.4 x 0.1100 x 25.4 c 2,526 Default Wall Prior to 1978 566.4 x 0.1100 x 42.0 = 2,615 Default Single Metal Clear 336.0 x 1.1900 x 16.4 = 6,561 x x _ x x _ x x x x Page Total 27,460 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (") denote conduction through an interior surface to another room. Weighting Solar Gain Orientation Area SGF SC Factor Btu/hr WINDOWS (S) 336.0 x 163 x 0.864 x 0.684 = 32,317 X X X = X X X = X X X = X X X = X X X = X X X = X X X = X X X = Page Total 32,317 Sched. Weighting Internal Gain Frac. Area Heat Gain Factor Btu/hr Lights 1.00 x 4,473 x 1.200 Watts/Sgft X 3.413 Btu/Watt X 0.999 = 18,295 OCcu ants 1.00 x 4,473 x 250 Btu/occ. / 30 Sgft/OCc. X 1,000 = 37,275 Rece tacle 1.00 x 4,473 x 1.000 Watts/Sgft X 3.413 Btu/Watt X 1.000 = 15,266 Process 1.00 x 4,473 x 0.000 1 Watts/Sgft X 3.413 Btu/Watt X 1.000 = 0 Process Li hti 1.00 x 4,473 x 0.000 Watts/Sgft X 3.413 Btu/Watt X 0.0001- J 0 Infiltration:[ 1.00 x 1.064 x 4,473 x 12.00 x 0.00 / 60 X 34 = 0 Schedule Air Sensible Area Ceiling Height ACH :\T Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 130.613 Sched. Latent Gain Frac. Area Heat Gain Btuthr Occupants 1.00 x 4,473 x 200 Btuh/OCc. / 30 _ Sgft/occ. _ 2s,82o Receptacle 1.00 x 4,473 x o.000 Watts/Sgft X 3.413 Btu/Watt = 0 Process 1.00 x 4,473 x 0.000 Watts/Sgft X 3.413 Btu/Watt = 0 Infiltration:[ 1.00 x 4,771 x 4,473 x 12.00 x 0.00 /60] X 0.00000 � 0 Schedule Air Latent Area Ceiling Height ACH OW Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 2g 820 ROOM COOLING PEAK LOADS Project Name Date TENANT IMPROVEMENT 7/22/2019 ROOM INFORMATION DESIGN CONDITIONS Room Name PHP-4, 6 AREA Time of Peak Sep 2 PM Floor Area 2,272.00 ft2 Outdoor Dry Bulb Temperature 106 OF Indoor Dry Bulb Temperature 78 OF Outdoor Wet Bulb Temperature 68 OF Conduction Area U-Value DETD' Btu/hr Default Roof Prior to 1978 2,272.0 X 0.0510 X 54.5 = 6,311 Default Wall Prior to 1978 720.0 X 0.1100 X 27.8 = Z200 Default Wall Prior to 1978 438.0 X 0.1100 X 25.4 = 1,226 Default Wall Prior to 1978 258.0 X 0.1100 X 42.0 = 1,191 Default Single Metal Clear 180.0 X 1.1900 X 16.4 = 3,515 X X = X X X X = X X Page Total 14,443 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Weighting SOIarGain Orientation Area SGF SC Factor Btu/hr WINDOWS (S) 180.0 X 163 X 0.864 X 0.684 = 17,313 XI X X = X X X X X X X X X = X X X X X X X X X = X X X Page Total 17,313 Sched. Weighting Internal Gain Frac. Area Heat Gain Factor Btu/hr Lig hts 1.00 X Z272 X 1.200 Watts/Sgft X 3.413 Btu/Watt X 0.999 = 9,293 Occu ants 1.00 X Z272 X 250 Btu/occ. / 30 Sqft/occ. X 1.000 = 18,933 Receptacle 1.00 X Z272 X 1.000 Watts/Sgft X 3.413 Btu/Watt X 1.000 = 7,754 Process 1.00 X 2,272 X 0.000 Watts/Sgft X 3.413 Btu/Watt X 1.000 = 0 Process Lighting 1.00 X 2,272 X 0. 000J Watts/Sgft X 3.413J Btu/Watt X 0.000 = 0 Infiltration:[ 1.00 X 1.064 X 2,272 X 1 12.00 X 0.00 / 60 X 34 = 0 Schedule Air Sensible Area Ceiling Height ACH :�T Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 67.736 Sched. Latent Gain Frac. Area Heat Gain Btu/hr Occupants 1.00 X 2,272 X 200 Btuh/oCC. / 30 Sgft/OCC. = 15,147 Receptacle 1.00 X 2,272 X 0.000 Watts/Sgft X 3.413 Btu/Watt = 0 Process 1.00 X 2,272 X o.000 Watts/Sgft X 3.413 Btu/Watt = 0 Infiltration:[ 1.00 X 4,771 X 2,272 X 12.00 X 0.00 /60] X 0.00000 = 0 Schedule Air Latent Area Ceiling Height ACH AW Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 15,147 ROOM COOLING COIL LOADS Project Name Date TENANT IMPROVEMENT 7/22/2019 ROOM INFORMATION DESIGN CONDITIONS Room Name PHP-1, 2, 3, 5 AREA Time of Peak Sep 2 PM Floor Area 4,473.00 ft' Outdoor Dry Bulb Temperature 106 OF Indoor Dry Bulb Temperature 78 OF Outdoor Wet Bulb Temperature 68 OF Conduction Area U-Value DETD' Btu/hr Default Roof Prior to 1978 4,473.0 j[ 0.0510 X 54.5 = 12,424 Default Wall Prior to 1978 720.0 X 0.1100 Default Wall Prior to 1978 902.4 X 0,1100 X 25.4 = 2,526 Default Wall Prior to 1978 566.4 X 0.1100 X 42.0 c 2,615 Default Single Metal Clear 336.0 X 1.1900 X 16.4 = 6,561 x X = x x = x x = x x = Page Total 27,460 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Weighting Solar Gain Orientation Area SGF SC Factor Btu/hr WINDOWS (S) 336.0 X 163 X 0.864 X 0.684 = 32,317 X X X = X X X = X X X = X X X = X X X = X X X = X X X = X X X = Page Total 32,317 Sched. Weighting Internal Gain Frac. Area Heat Gain Factor Btu/hr 1 Btu/Watt Lights 1.00 X 4,473 X 1.200 Watts/Sgft X ��30. X 0.999 = 18,295 Occu ants 1.00 X4,473 X 250 Btu/Occ. / Sgft/occ. ~ X 1.000 = 37,275 Receptacle 1.00 X 4,473 X 1.000 Watts/Sgft X 3.413 Btu/Watt X 1.000 = 15,266 Process 1.00 X 4,473 X 0.000 Watts/Sgft X 3.413 Btu/Watt X 1.000 = 0 Process Lighting 1.00 x 4,473 X 0.000 Watts/Sgft X `j 3.413 Btu/Watt X L 0.000 = 0 Infiltration:[ 1.00 X 1.064 X 4,473 X 12.00 X E—o OCJ / 60 ] X Schedule Air Sensible Area Ceiling Height ACH AT Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 130,613 Sched. Latent Gain Frac. Area Heat Gain Btu/hr Occupants 1.00 X 4,473 X 200 Btuh/occ. / 30 _ Sgft/occ. _ _ � 820 Receptacle 1.00 X 4,473 X o.000 Watts/Sgft X 3.413 Btu/Watt = 0 Process 1.00 X 4,473 x 0.000 Watts/Sgft X L 3.413 Btu/Watt = P-0 Infiltration:[ 1.00 x 4,771 X 4,473 X 12.0o X 0.00 /60] X 0.00000 Schedule Air Latent Area Ceiling Height ACH AW Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 29.820 ROOM COOLING COIL LOADS Project Name Date TENANT IMPROVEMENT 7/22/2019 ROOM INFORMATION DESIGN CONDITIONS Room Name PHP-4, 6 AREA Time of Peak Sep 2 PM Floor Area 2,272.00 ft2 Outdoor Dry Bulb Temperature 106 OF Indoor Dry Bulb Temperature 78 OF Outdoor Wet Bulb Temperature 68 OF Conduction Area U-Value DETD' Btu/hr Default Roof Prior to 1978 2,272.0 X 0.0510 X 54.5 c 6,311 Default Wall Prior to 1978 720.0 X 0.1100 X 27.8 = 2,200 Default Wall Prior to 1978 438,0 X a 1100 X 25.4 = 1,226 Default Wall Prior to 1978 258.0 X 0.1100 X 42.0 = 1,191 Default Single Metal Clear 180.0 X 1.1900 X 16.4 = 3,515 x x = x x = x x = f x x = Page Total 14,443 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Weighting Solar Gain Orientation Area SGF SC Factor Btu/hr WINDOWS (S) 180.0 X 163 X 0.864 X 0.684 W 17,313 X X X = X X X _ X X X _ X X X _ X X X = X X X _ X X X _ X X I X L= Page Total 17,313 Sched. Weighting Internal Gain Frac. Area Heat Gain Factor Btu/hr Lights 1.00 x Z272 X 1.200 Watts/Sgft X 3.413 Btu/Watt X 0.999 = 9,293 Occupants 1.00 x Z272 X 250 Btu/OCc. / 30 Sgft/occ. X 1.000 = 18,933 Receptacle 1.00 X 2,272 X 1.000 Watts/Sgft X 3.413 Btu/Watt X 1.000 = 7,754 Process 1.00 x Z272 X 0.0001 Watts/Sgft X . 3.413 Btu/Watt X 1.000 = 0 Process Lighting 1.00 X Z272 X 0.000 Watts/Sgft X 3.413 Btu/Watt X 0.0001 = 0 Infiltration:[ 1.00 x =IN x 2,272 x 12.00 X E:_�-001 / 60 X 34 = 0 Schedule Air Sensible Area Ceiling Height ACH AT Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 67,736 Sched. Latent Gain Frac. Area Heat Gain Btu/hr Occupants 1.00 X 2,272 X 200 Btuh/occ. / 30 Sqft/OCc. = 15,147 Receptacle 1.00 x 2,272 x 0.000 Watts/Sgft X 3.413 Btu[Watt = 0 Process 1.00 x 2,272 x 0.000 Watts/Sgft X 3.413 Btu/Watt = 0 Infiltration:[ 1.00 x 4,771 x 2,272 x 12.00 x 0.00 /60] X 0.00000 = 0 Schedule Air Latent Area Ceiling Height ACH Aw Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 15,147