06-3801 (CSCS) Title 24TITLE 24.REPORT
Title 24 Report for:
DUNES SHOP 1
DUNES RETAIL CENTER HIGHWAY 111
LA QUI NTA. CA 92253 _ ..
Project Designer:
KKE ARCHITECTS
525 EAST COLORADO BLVD
PASADENA, CA 91101
626.796.8230
/�pFESS/pN\
Report Prepared By:
S.Y. Lees�
CTR\cP��Q
qTF°F
S.Y. Lee Associates
CAUF�
143 S. Glendale Ave., Sui
GLENDALE,, CA 91 08
(818) 244-4337
do
.-----
CI OF LA QUINTA
Job�Nu er:
BUILDING & SAFETY DEPT.
APPROVED
5383
FOR CONSTRUCTION
DATE 5 �1 BYO% 7-
Date:
4/2/2007
The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is
authorized by the California Energy Commission for use with both the Residential and Nonresidential 2005 Building Energy Efficiency Standards.
This program developed by EnergySoft, LLC - www.energysoft.com.
EnergyPro 4.3 by EnergySoft Job Number. 5383 User Number. 3193
PERFORMANCE CERTIFICATE OF COMPLIANCE Part 1 of 3 PER
PROJECT NAME
This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the
DATE
DUNES SHOP 1
DOCUMENTATION AUTHOR
4/2/2007
PROJECT ADDRESS
BUILDING CONDITIONED FLOOR AREA
DUNES RETAIL CENTER HIGHWAY 111
LA QUINTA
®
NONRESIDENTIAL HIGH RISE RESIDENTIAL
HOTEL/MOTEL GUEST ROOM
PHASE OF CONSTRUCTION
PRINCIPAL DESIGNER -ENVELOPE
NEW CONSTRUCTION ADDITION
TELEPHONE
Builtlmg Permit #
KKE ARCHITECTS
contractor performing this work.
626.796.8230
because it pertains to a structure or type of work described as exempt pursuant to Business and Professions
DOCUMENTATION AUTHOR
full in the Nonresidential Manual.)
TELEPHONE
Checked:by/Date `
S.Y. Lee Associates
ENV -1
I (818) 244-4337
Enforce merit Agency use
GENERAL INFORMATION
This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the
California Code of Regulations. This certificate applies only to a Building using the performance compliance approach.
The documentation preparer hereby certifies that the documentation is accurate and complete.
DOCUMENTATION AUTHOR
DATE OF PLANS
DATE
BUILDING CONDITIONED FLOOR AREA
7,889 Sq.Ft
CLIMATE ZONE
15
BUILDING TYPE
®
NONRESIDENTIAL HIGH RISE RESIDENTIAL
HOTEL/MOTEL GUEST ROOM
PHASE OF CONSTRUCTION
®
NEW CONSTRUCTION ADDITION
❑
EXISTING + ADDITION/ALTERATION
STATEMENT OF COMPLIANCE
This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the
California Code of Regulations. This certificate applies only to a Building using the performance compliance approach.
The documentation preparer hereby certifies that the documentation is accurate and complete.
DOCUMENTATION AUTHOR
SIGNATURE
DATE
S.Y. Lee
-- 62,0
The Principal Designer hereby certifys that the proposed building desig presen d in this set of construction docume is is
consistent with the other compliance forms and worksheets, with the specificatio , and with any other calculations submitted with this
permit application. The proposed building as designed meets the energy efficiency requirements contained in sections 110, 116,
through 118, and 140, 142, 143 or 149 of Title 24, Part 6.
ENV. LTG. MECH.
K-11. 1 hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to
sign this document as the person responsible for its preparation; and that I am licensed in the State of
California as a civil engineer, mechanical engineer, or I am a licensed architect.
❑ F� R 2. 1 affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code Section
5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed
contractor performing this work.
3. 1 affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document
because it pertains to a structure or type of work described as exempt pursuant to Business and Professions
Code Sections 5537, 5538, and 6737.1. (These sections of the Business and Professions Code are printed in
full in the Nonresidential Manual.)
ENVELOPE COMPLIANCE
Indicate location on plans of Note Block for Mandatory Measures
ENV -1
Required Forms
PRINCIPAL ENVELOPE DESIGNER - NAME SIGNATURE LIC. NO. DATE
KKE ARCHITECTS
LIGHTING COMPLIANCE
Indicate location on plans of Note Block for Mandatory Measures
Lighting Compliance Not In The Scope Of
7s-S0bTYiiva
Required Forms
PRINCIPAL LIGHTING DESIGNER - NAME
SIGNATURE LIC. NO. DATE
MECHANICAL COMPLIANCE
Indicate location on plans of Note Block for Mandatory Measures
MECH-1 MECH-2 MECH-3 MECH-5
Required Forms
PRINCIPAL MECHANICAL DESIGNER - NAME SIGNATURE
LIC. NO.
DAT
S.Y. Lee Associates
I.e6
EnergyPro 4.3 by EnergySoft User Number: 3193 Job Number: 5383 Paae:3 of 16
PERFORMANCE CERTIFICATE OF COMPLIANCE Part2 of 3 PERF -1
PROJECT, NAME DATE
DUNES SHOP 1 I 4/2/2007
ANNUAL.TDV ENERGY USE SUMMARY kBtu/s ft- r
Standard
ENERGY COMPONENT Design
Space Heating 1.64
Space Cooling 378.94
Indoor Fans 136.51
Heat Rejection 0.00
Pumps & Misc. 0.00
Domestic Hot Water 0.00
Lighting'- 137.99
Receptacle 71.3s
Process
•
TOTALS: = 726.44
Percent better than Standard:
Proposed
Design
7,889
Compliance
Margin [
1
rWnl arar
� ems"seal,g ac .. c
-0.12
1.75
,
"°°"F'"`�M4
�'""�is
2,586
252.28
126.67
sqft.
161:58
25.07
0.00
0.00VV
0:00
0.00����
0.00
0.00
137.99
0.00'
1.3s
0.00n
Rear Elevation,
623.09
103.35
r -0.0 E30 »y;60''�"� 120 15080 NWA 330 360 :
b
process)
14.2%
( 14.2% excluding
BUILDING COMPLIES
Building Orientation-
Number of Stories' -,-
Number of Systems
Number of Zones
N 0 deg
Conditioned Floor Area
Unconditioned Floor Area
Conditioned Footprint Area
Fuel Type
7,889
sqft.
sgft:
sgft.
1
o
8
0
6
Natural Gas
2,586
sgft.
Standard Proposed
Lighting Power Density 1.404 wisgn. 1.404 wisgft.
Prescriptive Env. Heat Loss 1,536 scum 1,050 stum
Prescriptive Env. Heat Gain 153,165 scum -F 131,606 stuih-F
'Remarks:
Run Initiation Time: 02/25/07 17:07:28 Run Code: 1172452048
EnergyPro 4.3 by EnergySoft User Number. 3193 Job Number. 5383 PageA of 16
Orientation
Gross Area
Glazing Area
Glazing Ratio
Front Elevation
N
2,586
sgft.
597
sqft.
23.10
Left Elevation v
(E)
.
1,385
sgft.
106
sgft.
7.7%
Rear Elevation,
S
1,909
sqft.
171
sqft.
9.0%
Right Elevation -
Total
Roof
(W)
1,243
7,123
7889
sqft.
sqft..
sqn.sgft.
231
1,105
sqft..
sqft.
18.6%
0.0%
Standard Proposed
Lighting Power Density 1.404 wisgn. 1.404 wisgft.
Prescriptive Env. Heat Loss 1,536 scum 1,050 stum
Prescriptive Env. Heat Gain 153,165 scum -F 131,606 stuih-F
'Remarks:
Run Initiation Time: 02/25/07 17:07:28 Run Code: 1172452048
EnergyPro 4.3 by EnergySoft User Number. 3193 Job Number. 5383 PageA of 16
PERFORMANCE CERTIFICATE OF COMPLIANCE Part 3 of 3 PERF -1
PROJECT NAME
DUNES SHOP 1
DATE
4/2/2007
I ne local entorcement agency should pay special attention to the items specified in this checklist These items require special written justification
and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of
the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation
submitted.
The HVAC System "'Carrier 50HJQ007"includes an Economizer. This system has a cooling output < 75,000 Btuh or a supply cfm < 2500.
The HVAC System "Carrier 50HJQ007" includes Demand Control Ventilation per Standards Section 121.
The HVAC System "Carrier 50HJQ007:-Premium Eff' 2.23 BHP Supply Fan Motor has been specified.
The HVAC System "Carrier 50HJ0006" includes an Economizer. This system has a cooling output < 75,000 Btuh or a supply cfm < 2500.
The HVAC System "Carrier 50HJQ006", is designated as 3 Phase, oris Exempted from the NAECA 13 SEER requirement.
The HVAC System "Carrier 50HJQ006" includes Demand Control Ventilation per Standards Section 121.
The HVAC System "Carrier 50HJQ006: Premium Eff' 1.54 BHP Supply Fan Motor has been specified.
The HVAC System "Carrier 50HJ0005" includes an Economizer. This sy stem has a cooling output < 75,000 Btuh or a supply cfm < 2500.
The HVAC System "Carrier 50HJQ005" is designated as 3 Phase, or is Exempted from the NAECA 13 SEER requirement.
The HVAC System "Carrier 50HJQ005"includes Demand Control Ventilation per Standards Section 121.
The HVAC System "Carrier 50HJ0005:.Premium Eff' 1.08 BHP Supply Fan Motor has been specified.
The HVAC S stem "Carrier 50HJQ004" includes an Economizer. This system has a cooling output < 75,000 Btuh or a sup ly cfm < 2500.
The HVAC System, "Carrier 50HJQ004" is designated as 3 Phase, or is Exempted from the NAECA 13 SEER requirement.
The exceptional features listed in this performance approach application have specifically been reviewed. Adequate written justification and
documentation for their use have been provided by the applicant
Authorized Signature or Stam
Run Initiation Time: 02/25/07 17:07:28 Run Code: 1172452048
EnergyPro 4.3 by EnergySoft User Number. 3193 Job Number. 5383 Paoe:5 of 16
PERFORMANCE CERTIFICATE OF COMPLIANCE Part 3 of 3 PERF -1
The local enforcement agency should pay special attention to the items specified in this checklist These items require special written justification
and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of
the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation
suomittea.
The HVAC System "Carrier 50HJQ004" includes Demand Control Ventilation per Standards Section 121.
The HVAC.System "Carrier 50HJQ004: Premium Eff' 0.67 BHP Supply Fan Motor has been specified.
uocumentauon Tor ineir. use nave peen proviaeo Dy ine appucant
Authorized Signature or Stam
Run Initiation Time: 02/25/07 17:07:28 Run Code: 1172452048
EnergyPro 4.3 by EnergySoft User Number. 3193 Job Number. 5383 Page:6 of 16
CERTIFICATE OF COMPLIANCE ENV -1 -C
PROJECT NAME DATE
DUNES SHOP 1 4/2/2007
OPAQUE SURFACES
# Surface
Type
Area
U -Fac.
Insulation
Cay. Cont.
Act.
Azm.
Tilt
Cond'
Status
Joint Appendix
I IV Reference
Location / Comments
1 Wall
127
0.074
R-19
R-0.0
90
90
New
09-A5
TENANT D
2 Roof
2,15,
0.036
R-30
R-0.0
0
0
1 New
02-A9
TENANT D
3 Wall
614
0.074
R-19
R-0.0
0
90
New
09-A5
TENANT D
4 Wall
792
0.074
R-19
R-0.0
180
90
New
09-A5
TENANT D
5 Roof
838'
0.036
R-30
R-0.0
0
0
New
02-A9
TENANT C
6 Wall
439
0.074
R-19
R-0.0
180
90
New
09-A5
TENANT C
7 Roof
83
0.036
R-30
R-0.0
0
0
New
02-A9
TENANT C
8 Wall
36 1
0.074
R-19
R-0.0
0
90
New
09-A5
TENANT C
9 Roof
7741
0.036
R-30
R-0.0
0
0
New
02-A9
TENANT B
10 Wall
50 1
0.074
R-19
R-0.0
180
90
1 New
09-A5
TE�NANT B
11 IRoof
774
0.036
R-30
R-0,01
0
0
New
02-A9
ITENANT B
12 lWall
422;
0.074.
R-19
R-0.0
0
90
New
09-A5
TENANT B
13 Roof
2,51
0.0361
R-30
R-0.0
0
0
New
02-A9
TENANT A
14 Wall
592
0.074
R-19
R-0.0
0
90
New
09-A5
TENANT A
15 Wall
1,01
0.074
R-19
R-0.0
270
90
New
09-A5
TENANT
N, E, A, R (New, Existing, Altered, Removed)
FENESTRATION SURFACES
More than or equal to 10,000 sq.R. of site -built fenestration area must include a label certificate either issued by NFRC or provide a CEC Default Label Certificate using the default U -factors from
Standards Table 116-A and B. Certificate shall be filed in the contractor's Droiect office durino construction and in the buildino manaaefs office after construction
#
T e:::]
# Exterior Shade Type
Window Overhang Left Fin Right Fin
SHGCJ Hgt. Wd. Len. H t. LExt.RExt. Dist. Len. H t. Dist. Len. Hat.
Area U -Fac'
SHGC2
Act.
Azm.
Cond.
Stat.
Glazing Type
0.76
Location/
Comments
1
indow
Left
E
1061 0.290
NI -11
0.371
COG
90
New
PPG SOLARBAN 60 2
Clear
TENANT D
2[Window
Front
N)
171 0.290
NI -11
0.371
COG
0
New
PPG SOLARBAN 60 (2)
Clear
TENANT D
3
indow
Rear
S)
50 0.290
NI -11
0.37
COG
180
New
PPG SOLARBAN 60 2
Clear
TENANT C
4
lWindow
Front
N
99 0.290
NI -1
0.37
COGI
01
New
PPG SOLARBAN 60 2
Clear
TENANT C
5
Window
Rear
S
121 0.290
NI -1
0.37
COG
1 180
New
PPG SOLARBAN 60 2
Clear
TENANT B
6
Window
Front
N
138 0.290
NI -1
0.37
COGI
0
New
PPG SOLARBAN 60 2
Clear
TENANT B
7
Window
Front
N
189 0.290
NI -1
0.37
COGI
0
New
I PPG SOLARBAN 60 2
Clear
TENANT A
8
Window
Right
23 0.290
NI -11
0.37
COGI
270
New
PPG SOLARBAN 60 2
Clear
TENANT A
(1) U -factor Type: 116-A Default Table from Standards, Table NI -1 Default Table from the ACM Manual Appendix, NFRC Labeled value.
(2 SHGC Type: 116-8 Default Table from Standards, COG Center of Glass, NFRC Labeled Value
EXTERIOR SHADING
# Exterior Shade Type
Window Overhang Left Fin Right Fin
SHGCJ Hgt. Wd. Len. H t. LExt.RExt. Dist. Len. H t. Dist. Len. Hat.
1 None
0.76
2 None
0.76
3 None
0.76
4 1 None
0.76
5 None
0.76
6 None
0.76
7 None
0.76
8 None
0.76
MINIMUM SKYLIGHT AREA FOR LARGE ENCLOSED SPACES
The proposed building is in climate zones 2 through 15 and contains an enclosed space with floor area greater than 25,000 ft2, a ceiling height greater than 15 feet, and an LPD for general
lighting of at least 0.5 WIR2. See Section 143(c). if this box is checked, ENV4-C must be filled ouL when submitting under the Prescriptive Compliance Approach.
EnergyPro 4.3 by EnergySoft User Number: 3193 Job Number. 5383 Paae:7 of 16 1
CERTIFICATE OF COMPLIANCE MECH-1-C
PROJECT NAME DATE
DUNES SHOP 1 4/2/2007
Designer:
This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for mechanical systems. The designer is required to
check the boxes by all acceptance tests that apply and list all equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the
equipment description and the number of systems to be tested in parentheses. The NJ number designates the Section in the Appendix of the Nonresidential
ACM Manual that describes the test. Also indicate the person responsible for performing the tests (i.e. the installing contractor, design professional or an agent
selected by the owner). Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work
appropriately.
Building Departments:
SYSTEM ACCEPTANCE. Before an occupancy permit is granted for a newly constructed building or space, or a new space -conditioning system serving a
building or space is operated for normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for
Code Compliance.
In addition a Certificate of Acceptance, MECH-I-A Form shall be submitted to the building department that certifies plans, specifications, installation
certificates. and oaeratino and maintenance information meet the reauirements of Section 10-103(b) and Title 24 Part 6.
STATEMENT OF COMPLIANCE
❑ MECH-2-A: Ventilation System Acceptance Document
-Variable Air Volume Systems Outdoor Air Acceptance
-Constant Air Volume Systems Outdoor Air Acceptance
Equipment requiring acceptance testing
Test required on all New systems both New Construction and Retrofit.
❑ MECH-3-A: Packaged HVAC Systems Acceptance Document
Equipment requiring acceptance testing
Test required on all New systems both New Construction and Retrofit.
❑ MECH4-A: Air -Side Economizer Acceptance Document
Equipment requiring acceptance testing
Test required on all New systems both New Construction and Retrofit. Units with economizers that are installed at the factory and certified with the
commission do not require equipment testing but do require construction inspection.
❑ MECH-5-A: Air Distribution Acceptance Document
Equipment requiring acceptance testing
This test required If the unit serves 5,000 V of space or less and 25% or more of the duds are in nonconditioned or semiconditioned space like an
attic. New systems that meet the above requirements. Retrofit systems that meet the above requirements and either extend duds, replace duds or
replace the packaged unit.
❑ MECH-6-A: Demand Control Ventilation Acceptance Document
Equipment requiring acceptance testing
All new DCV controls installed on new or existing packaged systems must be tested.
❑ MECH-7-A: Supply Fan Variable Flow Control Acceptance Document
Equipment requiring acceptance testing
All new VA fan volume controls installed on new or existing systems must be tested
❑ MECH-8-A: -Hydronic System Control Acceptance Document
-Variable Flow Controls Applies to chilled and hot water systems.
-Automatic Isolation Controls Applies to new boilers and chillers and the primary pum. ps are connected to a common header.
-Supply Water Temperature Reset Controls
Applies to new constant flow chilled and hot water systems that have a design capacity greater than or equal to 500,000 Btulhr.
,
-Water-loop Heat Pump Controls
Applies to all new watedoop heat pump systems where the combined loop pumps are greater than 5 hp.
-Variable Frequency Controls Applies to all new distribution pumps on new variable flow chilled, hydmnic heat pump
or condenser water systems where the pumps motors are greater than 5 hp.
Equipment requiring acceptance testing
EnergyPro 4.3 by EnergySoft User Number. 3193 Job Number. 5383 Page:8 of 16
AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2-C
PROJECT NAME DATE
DUNES SHOP 1 4/2/2007
SYSTEM FEATURES
ITEM OR SYSTEM TAG(S)
Number of Systems
T-24
MANDATORY MEASURES Section
Heating Equipment Efficiency
Cooling Equipment Efficiency
Heat Pump Thermostat
Furnace Controls
Natural Ventilation
Minimum Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
PRESCRIPTIVE MEASURES
Calculated Heating Capacity x 1.43 2
Proposed Heating Capacity 2
Calculated Sensible Cooling Capacity x 1.212
Proposed Sensible Cooling Capacity 2
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heating Air Supply Reset
Cooling Air Supply Reset
Duct Sealing for Prescriptive Compliance
AIR SYSTEMS, Central or Single Zone
AC -D-1 & AC -D2
I AC -C2
AC -C1
2
1
1
Reference on Plans or Specification 1
112(a)
0.78 HSPF
0.77 HSPF
0.78 HSPF
112(a)
13.0 SEER/ 11.1 EER
13.0 SEER / 11.2 EER
13.0 SEER / 11.1 EER
112(b)
Yes
Yes
Yes
112(c), 115(a)
n/a
n/a
n/a
121(b)
Yes
Yes
Yes
121 b
538 cfm
300 cfm
210 cfm
121 c
No
No
No
121 c
Yes
Yes
Yes
121(c), 122(e)
Pro rammable Switch
Programmable Switch
Programmable Switch
122(e)
Heating & Cooling Required
Heating & Cooling Required
Heating & Cooling Required
122
Auto
Auto
Auto
122(g)
n/a
n/a
n/a
123
124
R-19.0
R-19.0
R-19.0
144 a & b
n/a
n/a
n/a
144 a & b
56,212 btuh
21,735 btuh
28,106 btuh
144 a & b
n/a
n/a
n/a
144 a & b
76,632 btuh
32,193 btuh
37,066 btuh
144 c
Constant Volume
Constant Volume
Constant Volume
144 c
144 c
Yes
Yes
Yes
144 d
No
No
No
144 a
Diff. Tem (Integrated)
Diff. Tem (integrated)
Diff. Tem (Integrated)
144
Constant Temp
Constant Temp
Constant Tem
144 (f)
Constant Temp
Constant Temp
Constant Temp
144 k
No
No
No
1: For each central and single zone air systems (or group of similar units) fill in the reference to sheet number and/or specification section and paragraph number where the
required features are documented. If a requirement is not applicable, put "N/A" in the column.
2: Not required for hydronic heating and cooling. Either enter a value here or put in reference of plans and specificatons per footnote 1.
3: Enter Yes if System is: Constant Volume, Single Zone; Serves < 5,000 sgft; Has > 25% duct in unconditioned space. Dud sealing is required for Prescriptive Compliance,
see PERF -1 for performance method dud sealing requirements.
EnergyPro 4.3 by EnergySoft User Number: 3193 Job Number: 5383 Paoe:9 of 16 1
AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2-C
PROJECT NAME DATE
DUNES SHOP 1 4/2/2007
SYSTEM FEATURES
ITEM OR SYSTEM TAG(S)
Number of Systems
T-24
MANDATORY MEASURES Section
Heating Equipment Efficiency
Cooling Equipment Efficiency
Heat Pump Thermostat
Furnace Controls
Natural Ventilation
Minimum Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
PRESCRIPTIVE MEASURES
Calculated Heating Capacity x 1.43 2
Proposed Heating Capacity 2
Calculated Sensible Cooling Capacity x 1.212
Proposed Sensible Cooling Capacity 2
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous HeaUCool
Economizer
Heating Air Supply Reset
Cooling Air Supply Reset
Duct Sealing for Prescriptive Compliance
AIR SYSTEMS, Central or Single Zone
AC -62
AC -61
AC -A1 & AC -A2
1
1
2
Reference on Plans or Specification 1
112(a)
0.78 HSPF
0.77 HSPF
3.40 COP
112(a)
13.0 SEER/ 11.1 EER
13.0 SEER/ 11.0 EER
10.5 EER
112(b)
Yes
Yes
Yes
112(c), 115(a)
n/a
n/a
n/a
121(b)
Yes
Yes
Yes
121 b
300 cfm
194 cfm
1256 cfm
121 c
No
No
No
121 c
Yes
Yes
Yes
121(c), 122(e)
Programmable Switch
Programmable Switch
Pro rammable Switch
122(e)
Heating & Cooling Require
Heating & Cooling Required
Heating & Cooling Required
122
Auto
Auto
Auto
122(g)
n/a
n/a
n/a
123
124
R-19.0
R-19.0
R-19.0
144 a & b
n/a
n/a
n/a
144 a & b
28,106 btuh
34,352 btuh
86,191 btuh
144 a & b
n/a
n/a
n/a
144 a & b
39,436 btuh
50,028 btuh
139,888 btuh
144 c
Constant Volume
Constant Volume
Constant Volume
144 c
144 c
Yes
Yes
Yes
144 d
No
No
No
144 a
Diff. Tem (Integrated)
Diff. Tem (integrated)
Diff. Tem (integrated
144
Constant Temp
Constant Temp
Constant Tem
144 (f)
Constant Temp
Constant Temp
Constant Temp
144 k)
No
No
No
1: For each central and single zone air systems (or group of similar units) fill in the reference to sheet number and/or specification section and paragraph number where the
required features are documented. If a requirement is not applicable, put "N/A" in the column.
2: Not required for hydronic heating and cooling. Either enter a value here or put in reference of plans and specificatons per footnote 1.
3: Enter Yes K System is: Constant Volume, Single Zone; Serves < 5,000 sqft; Has > 25% duct in unconditioned space. Duct sealing is required for Prescriptive Compliance,
see PERF -1 for performance method duct sealing requirements.
I EnergyPro 4.3 by EnergySoft User Number: 3193 Job Number. 5383 Page: 10 of 16 1
MECHANICAL VENTILATION MECH-3-C
NAME
DUNES SHOP 1
DATE
4/2/2007
PRESCRIPTIVE REHEAT
LIMITATION (Section 144(d))
MECHANICAL VENTILATION Section
121(b)2)
AREA
BASIS
OCCUPANCY
BASIS
VAV MINIMUM
A
B
C
D
E
F
G
H
I
J
K
L
M
N
ZONE/SYSTEM
o
ADM
vWa
C
rA
C
fu 0
mm3
-n
o°
W �3
x Dn
ci W -n
`r 0/ 3
vc
m3
°aW
®�
a
m..n
o w3
O
tr
p3
m„�
xcn
T.O �I
., 3
vim
svp
02)
O
-' D
<
nim
3°'m
O
No
m=
n o
acv
•C rD
'o u,
-nv
9
yo
'a p
�
T. 0
°C3
W3tn
oyx
O
T?
�
mlc
=
0_3
-'• P
3
m
D
TENANT D
2,153
0.22
474
35.9
15.0
538
538
538
AC -13-1 & AC -D2
Total
538
538
TENANT C
838
0.22
184
14.0
15.0
210
210
300
AC -C2
Total
210
300
TENANT C
838
0.22
184
14.0
15.01
210
210
210
AC -C1
Total
210
210
TENANT B
774
0.22
170
12.9
15.0
194
194
300
AC -132
Total
194
300
TENANT B
774
0.22
170
12.9
15.0
194
194
194
AC -131
Total
194
194
TENANT
2,512
0.38
955
83.7
15.0
1,256
1,256
1,256
AC -A1 & AC -A2
Total
1,256
1,256
C Minimum ventilation rate per Section 121 Table 121-A
E Based on fixed seat or the greater of the expected number of occupants and 50% of the CBC occupant load foregress purposes fors aces without fixed seating.
H Required Ventilation Air REQ'D V.A. is the larger of the ventilation rates calculated on and AREA or OCCUPANCY BASIS column D or G).
I Must be clreater than orequal to H or use Transfer Air column N to make up the difference.
J Design fan supply cfm Fan CFM x 30%; or
K Condition area ft. sq.) x 04 cfmAL sq.; or
L Maxium of Columns H, J, K, or 300 cfin
M Thim
s must be less than or equal to Column L and greater that or equal to the sum of Columns H + N.
N Transfer air must be provided where the Required Ventilation Air (column 1) is greater than the Design Minimum Air (column M). Where required, transfer air must be greater than or equal
to the difference between the Required Ventilation Air (column I) and the Design Minimum Air (column M), column H - M.
EnergyPro 4.3 by EnergySoft User Number. 3193 Job Number: 5383 Page: 11 of 16
MECHANICAL EQUIPMENT DETAILS
Part 1 of 2 MECH-5-C
PROJECT NAME
DUNES SHOP 1
TANK INSUL.
DATE
4/2/2007
CHILLER AND TOWER SUMMARY
Distribution Type
Qty
Efficiency
Tons
PUMPS
Ext
R -Val.
Output
Equipment Name
Equipment Type
Qty.
Tot.
I Qty
GPM
I BHP
Motor
Eff.
Drive
Eff.
Pump
Control
48,90013.0
SEER/ 11.1 EEF
New
Diff. Temp (Integrated)
Carrier 50HJQ004
Packaged DX
1
34,800
0.0
0.77 HSPF
37,800
13.0 SEER / 11.2 EEF
New
Diff. Temp (Integrated)
Carrier 50HJQ006
Packaged DX
11
55,000
0.U,
0.77 HSPF
63,800
13.0 SEER / 11.0 EE5
New
Diff. Temp (Integrated)
Carrier 50HJQ007
Packa ed DX
2
69,000
0.0
3.40 COP
78,90010.5
EER
New
Diff. Tem (integrated)
DHW / BOILER SUMMARY
CENTRAL SYSTEM RATINGS
Energy
Factor
or RE
Standby
Loss or
Pilot
TANK INSUL.
System Name
System Type
Distribution Type
Qty
Rated
Input
Vol.
(Gals.)
Condition
Status
Ext
R -Val.
Output
Efficiencv
Condition
Status
Economizer T / e
Carrier 50HJQ005
Packaged DX
4
45,000
0.0
0.78 HSPF
48,90013.0
SEER/ 11.1 EEF
New
Diff. Temp (Integrated)
Carrier 50HJQ004
Packaged DX
1
34,800
0.0
0.77 HSPF
37,800
13.0 SEER / 11.2 EEF
New
Diff. Temp (Integrated)
Carrier 50HJQ006
Packaged DX
11
55,000
0.U,
0.77 HSPF
CENTRAL SYSTEM RATINGS
HEATING
COOLING
System Name
System Type
Output.
Aux.
kW
Eff.
Output
Efficiencv
Condition
Status
Economizer T / e
Carrier 50HJQ005
Packaged DX
4
45,000
0.0
0.78 HSPF
48,90013.0
SEER/ 11.1 EEF
New
Diff. Temp (Integrated)
Carrier 50HJQ004
Packaged DX
1
34,800
0.0
0.77 HSPF
37,800
13.0 SEER / 11.2 EEF
New
Diff. Temp (Integrated)
Carrier 50HJQ006
Packaged DX
11
55,000
0.U,
0.77 HSPF
63,800
13.0 SEER / 11.0 EE5
New
Diff. Temp (Integrated)
Carrier 50HJQ007
Packa ed DX
2
69,000
0.0
3.40 COP
78,90010.5
EER
New
Diff. Tem (integrated)
MECHANICAL EQUIPMENT DETAILS Part 2 of 2 MECH-5-Cl
ENVELOPE MANDATORY MEASURES ENV -MM
PROJECT NAME DATE
DUNES SHOP 1 1 4/2/2007
DESCRIPTION
Desi mer
Enforcement
a§ 118(a) Installed Insulating Material shall have been certified by the manufacturer to comply
with the California Quality Standards for insulating material, Title 20, Chapter 4, Article
3.
X] §118(c) All Insulating Materials shall be installed in compliance with the flame spread rating
and smoke density requirements of Sections 2602 and 707 of Title 24, Part 2.
[X—j, § 117(a) All Exterior Joints and openings in the building that are observable sources of air
leakage shall be caulked, gasketed, weatherstripped or otherwise sealed.
§ 116(b) Site Constructed Doors, Windows and Skylights shall be caulked between the unit
and the building, and shall be weatherstripped (except for unframed glass doors and
fire doors).
0 § 116(a)l Manufactured Doors and Windows installed shall have air infiltration rates not
exceeding those shown in Table Number 1-E. of the Standards. Manufactured
fenestration products must be labeled for U -value according to NFRC procedures.
§118(e) Demising Walls in Nonresidential Buildings:
The opaque portions of framed demising walls in nonresidential buildings shall have
insulation with an installed R -value of no less than R-13 between framing members.
EnergyPro By EnergySoft User Number. User Job Number: 5383 Page:14 of 16
MECHANICAL MANDATORY MEASURES Part 1 of 2 MECH-MM
PROJECT NAME
DUNES SHOP 1
DATE
4/2/2007
DESCRIPTION
Designer
Enforcement
Equipment and Systems Efficiencies
❑X § 111 Any appliance for which there is a California standard established in the Appliance
Efficiency Regulations will comply with the applicable standard.
F§ 115(a) Fan type central furnaces shall not have a pilot light.
F§ 123 Piping, except that conveying fluids at temperatures between 60 and 105 degrees
Fahrenheit, or within HVAC equipment, shall be insulated in accordance with
Standards Section 123.
0 § 124 Air handling duct systems shall be installed and insulated in compliance with
Sections 601, 602, 603, 604, and 605 of the 2001 CMC Standards.
Controls
§ 122(e) Each space conditioning system shall be installed with one of the following:
❑ § 122(e)1A Each space conditioning system serving building types such as offices and
manufacturing facilities (and all others not explicitly exempt from the requirements
of Section 112 (d)) shall be installed with an automatic time switch with an
accessible manual override that allows operation of the system during off -hours for
up to 4 hours. The time switch shall be capable of programming different
schedules for weekdays and weekends and have program backup capabilities that
prevent the loss of the device's program and time setting for at least 10 hours if
power is interrupted; or
§ 122(e)1 B An occupancy sensor to control the operating period of the system; or
§ 122(e)1C A 4 -hour timer that can be manually operated to control the operating period of the
system.
X❑ § 122(e)2 Each space conditioning system shall be installed with controls that temporarily
restart and temporarily operate the system as required to maintain a setback
heating and/or a setup cooling thermostat setpoint_
§ 122(g) Each space conditioning system serving multiple zones with a combined
conditioned floor area more than 25,000 square feet shall be provided with isolation
zones. Each zone: shall not exceed 25,000 square feet; shall be provided with
isolation devices, such as valves or dampers, that allow the supply of heating or
cooling to be setback or shut off independently of other isolation areas; and shall
be controlled by a time control device as described above.
® § 122(a&b) Each space conditioning system shall be controlled by an individual thermostat
that responds to temperature within the zone. Where used to control heating, the
control shall be adjustable down to 55 degrees F or lower. For cooling, the control
shall be adjustable up to 85 degrees F or higher. Where used for both heating and
cooling, the control shall be capable of providing a deadband of at least 5 degrees
F within which the supply of heating and cooling is shut off or reduced to a
minimum.
X❑ § 122(c) . Thermostats shall have numeric setpoints in degrees Fahrenheit (F) and adjustable
setpoint stops accessible only to authorized personnel.
§ 112(b) _ Heat pumps shall be installed with controls to prevent electric resistance
supplementary heater operation when the heating load can be met by the heat
pump alone.
EnergyPro By EnergySoft User Number: User Job Number: 5383 Page: 15 of 16
MECHANICAL MANDATORY MEASURES Part 2 of 2 MECH-MM
(PROJECT NAME I DATE
DUNES SHOP 1 4/2/2007
Description Designer lEnforcementl
Ventilation
Controls shall be provided to allow outside air dampers or devices to be operated at
FX § 121(e)
the ventilation rates as specified on these plans.
❑ § 122(f) Gravity or automatic dampers interlocked and closed on fan shutdown shall be
❑ § 121(f)3 Outside Air Measurement: The system shall be equipped with a calibrated local or
remote device capable of measuring the quantity of outside air on a continuous
basis and displaying that quantity on a readily accessible display divice; or
❑ § 121(f)4 Another method approved by the Commission.
Service Water bleating Systems
❑ § 113(b)2 If a circulating hot water system is installed, it shall have a control capable of
automatically turning off the circulating pump(s) when hot water is not required.
❑ § 113(c) Lavatories in restrooms of public facilities shall be equipped with controls to limit the
outlet temperature to 110 degrees F.
9
-I`_ r .a : c..o ure td.e rf!f,."
EnergyPro By EnergySoft User Number. User Job Number: 5383 Pape: 16 of 16 1
provided on the outside air intakes and discharges of all space conditioning and
exhaust systems.
FX § 1440
All gravity ventilating systems shall be provided with automatic or readily accessible
manually operated dampers in all openings to the outside, except for combustion air
openings.
0 § 121(f)1
Air Balancing: The system shall be balanced in accordance with the National
Environmental Balancing Bureau (NEBB) Procedural Standards (1983), or
Associated Air Balance Council (AABC) National Standards (1989); or
IAI §121(f)2
Outside Air Certification: The system shall provide the minimum outside air as
shown on the mechanical drawings, and shall be measured and certified by the
installing licensed C-20 mechanical contractor and certified by (1) the design
mechanical engineer, (2) the installing licenced C-20 mechanical contractor, or. (3) the
person with overall responsibility for the design of the ventilation system; or
❑ § 121(f)3 Outside Air Measurement: The system shall be equipped with a calibrated local or
remote device capable of measuring the quantity of outside air on a continuous
basis and displaying that quantity on a readily accessible display divice; or
❑ § 121(f)4 Another method approved by the Commission.
Service Water bleating Systems
❑ § 113(b)2 If a circulating hot water system is installed, it shall have a control capable of
automatically turning off the circulating pump(s) when hot water is not required.
❑ § 113(c) Lavatories in restrooms of public facilities shall be equipped with controls to limit the
outlet temperature to 110 degrees F.
9
-I`_ r .a : c..o ure td.e rf!f,."
EnergyPro By EnergySoft User Number. User Job Number: 5383 Pape: 16 of 16 1
CERTIFICATE OF COMPLIANCE (Part 1 of 4) LTG -1 -CI
PROJECT NAME
DATE
RETAIL 1 BLDG
10/20/2006
PROJECT ADDRESS
LA QUINTA
PRINCIPAL DESIGNER - LIGHTING
TELEPHONE
Building Permit #
SOTHOLROEUNG
Checked by/Date
DOCUMENTATION AUTHOR
S.Y. Lee Associates
TELEPHONE
818 244-4337 1
Enforcement Agency Use
GENERAL INFORMATION
DATE OF PLANS
BUILDING CONDITIONED FLOOR AREA
CLIMATE ZONE
10/19/06
8,200 sq.Ftr
15
BUILDING TYPE ® NONRESIDENTIAL ❑ HIGH RISE RESIDENTIAL ❑ HOTEL/MOTEL GUEST ROOM
❑X CONDITIONED SPACES ❑ UNCONDITIONED SPACES ❑ INDOOR & OUTDOOR SIGNS
PHASE OF CONSTRUCTION ® NEW CONSTRUCTION ❑ ADDITION ❑ ALTERATION
METHOD OF LIGHTING ® COMPLETE BUILDING ❑ AREA CATEGORY . ❑ TAILORED ❑PERFORMANCE
COMPLIANCE ❑ COMMON LIGHTING
STATEMENT OF COMPLIANCE
This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24,
Parts 1 and 6 of the California Code of Regulations. This certificate applies only to building lighting requirements.
The documentation preparer hereby certifies that the documentation is accurate an complete.
DOCUMENTATION AUTHOR
SIGNATURE
DA
SOTHOLROEUNG
1
D
The Principal Lighting Designer hereby certifies that the proposed building design represented in this set of contt6urt'A d unil
is consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitte
this permit application. The proposed building has been designed to meet the lighting requirements contained in Sections 110, 1
130 - 132, 146, 148 8r 149 of Title 24, Part 6.
❑ The plans & specifications meet the requirements of Part 6 (Sections 10-103a).
❑ The installation certificates meet the requirements of Part 6 (10-103a 3).
❑ The operation & maintenance information meet the requirements of Part 6 (10-103c).
Please Check One: (These sections of the Business and Professions Code are printed in full in the Nonresidential Manual.)
hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person
responsible for its preparation; and that I am licensed in the State of California as a civil engineer or electrical engineer, or I am a licensed archite
❑ I affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code by Section 5537.2 or 6737.3 to sign this documc ni
as the person responsible for its preparation; and that I am a licensed contractor performing this work.
❑ I affirm that I am eligible under the exemption to Division 3 of the Business and Professions Code to sign this document because it pertains to a
structure or type of work described as exempt pursuant to Business and Professio ode Sections 5537, 5538 and 6737.1.
PRINCIPAL LIGHTING DESIGNER - NAME
SIGNATURE
DA
LIC
SOTHOLROEUNG
C> G
LIGHTING MANDATORY MEASURES
Indicate location on plans of Note Block for Mandatory Measure
LIGHTING COMPLIANCE FORMS & WORKSHEET Check box if worksheet is included
®LTG -1-C, Parts 1 of 4 and 2 of 4Certificate of Compliance. Part 1 of 4 and 2 of 4 are required for all submittals
❑LTG -1-C, Part 3 of 4: Certificate of Compliance. Part 3 of 4 submittal is required only if Control Credits are claimed
19LTG-1-C, Part 4 of 4: Certificate of Compliance. Part 4 of 4 submittal is required when lighting controls are installe
®LTG -2-C: Indoor Lighting Schedule
❑LTG -3-C: Portable Lighting Worksheet
❑LTG -4-C: Lighting Controls Credit Worksheet
®LTG -5-C: Indoor Lighting Power Allowance
OLTG-6-C: Tailored Method Worksheet
❑LTG -7-C: Room Cavity Ratio Worksheet
❑LTG -8-C: Common Lighting Systems Method Worksheet
❑LTG -9-C: Line Voltage Track Lighting Worksheet
EnergyPro 4.2 by Energysoft User Number. 3193 Job Number. Page:1 of 6
ants
with
19,
CERTIFICATE OF COMPLIANCE (Part 2 of 4) LTG -1 -
PROJECT NAME DATE
RETAIL 1 BLDG 10/20/2006
INSTALLED INDOOR LIGHTING POWER FOR CONDITIONED AND UNCONDITIONED SPACES
INSTALLED LIGHTING, UNCONDITIONED SPACES (From LTG -2-C) 0
LIGHTING CONTROL CREDIT, UNCONDITIONED SPACES (From LTG -4-C) 0
UNCONDITIONED SPACE ADJUSTED INSTALLED LIGHTING POWER 0
ALLOWED INDOOR LIGHTING POWER FOR CONDITIONED SPACES
❑R COMPLETE BUILDING METHOD (From LTG -5-C) ALLOWED
❑ AREA CATEGORY METHOD (From LTG -5-C) WATTS
❑ TAILORED METHOD (From LTG -5-C) ALLOWED LIGHTING POWER 12,300
ALTERNATE COMPLIANCE
❑ PERFORMANCE METHOD
❑ COMMMON LIGHTING SYSTEM (From LTG -8-C)
ALLOWED INDOOR LIGHTING POWER FOR UNCONDITIONED SPACES From LTG -5-C) 0771
MANDATORY INDOOR AND DAYLIGHTING AUTOMATIC CONTROLS
CONTROL LOCATIOI CONTROL CONTROL TYPE
(Room #) IDENTIFICATION (Auto Time Switch, Dimming, etc.)
SPACE CONTROLLED
Check if
NOTES TO FIELD - For Buildingg
INSTALLED
WATTS
INSTALLED LIGHTING, CONDITIONED SPACES (From LTG -2-C)
—4,000
PORTABLE LIGHTING (From LTG�3 )
0
LIGHTING CONTROL CREDIT, CONDITIONED SPACES (From LTG -4-C)
0
CONDITIONED SPACE ADJUSTED INSTALLED LIGHTING POWER
4,000
INSTALLED LIGHTING, UNCONDITIONED SPACES (From LTG -2-C) 0
LIGHTING CONTROL CREDIT, UNCONDITIONED SPACES (From LTG -4-C) 0
UNCONDITIONED SPACE ADJUSTED INSTALLED LIGHTING POWER 0
ALLOWED INDOOR LIGHTING POWER FOR CONDITIONED SPACES
❑R COMPLETE BUILDING METHOD (From LTG -5-C) ALLOWED
❑ AREA CATEGORY METHOD (From LTG -5-C) WATTS
❑ TAILORED METHOD (From LTG -5-C) ALLOWED LIGHTING POWER 12,300
ALTERNATE COMPLIANCE
❑ PERFORMANCE METHOD
❑ COMMMON LIGHTING SYSTEM (From LTG -8-C)
ALLOWED INDOOR LIGHTING POWER FOR UNCONDITIONED SPACES From LTG -5-C) 0771
MANDATORY INDOOR AND DAYLIGHTING AUTOMATIC CONTROLS
CONTROL LOCATIOI CONTROL CONTROL TYPE
(Room #) IDENTIFICATION (Auto Time Switch, Dimming, etc.)
SPACE CONTROLLED
Check if
NOTES TO FIELD - For Buildingg
Department Use Only
EnergyPro 4.2 by EnergySoft
User Number. 3193 Job Number. Paget of 6
CERTIFICATE OF COMPLIANCE (Part 4 of 4) LT
PROJECT NAME
RETAIL 1 BLDG
DATE
10/20/2006
Designer:
This form is to be used by the designer and attached to the plans. Listed below are all the acceptan
tests for lighting systems. The designer is required to check the boxes by all acceptance tests that
apply and list all equipment that require an acceptance test. If all equipment of a certain type require
a test, list the equipment description and the number of systems to be tested in parentheses. The N
number designates the Section in the Appendix of the Nonresidential ACM Manual that describes th
test. Also indicate the person responsible for performing the tests (i.e. the installing contractor, desi i
professional or an agent selected by the owner). Since this form will be part of the plans, completion
of this section will allow.the responsible party to budget for the scope of work appropriately.
Building Departments:
Before an occupancy permit is granted for a newly constructed building or space, or a new lighting
system system serving a building or space is operated for normal use, all control devices serving the
building or space shall be certified as meeting the Acceptance Requirements for Code Compliance.
In addition a Certificate of Acceptance, LTG-1-A, Forms shall be submitted to the building departmert
that:
A. Certifies plans, specifications, installation certificates, and operating and maintenance
information meet the requirements of 10-103(b) and Title 24 Part 6.
Test Description
Test Performed BY:
❑ LTG-2-A: Lighting Control Acceptance Document
- Occupancy Sensor Acceptance
- Manual Daylight Controls Acceptance
- Automatic Time Switch Control Acceptance
Equipment requiring acceptance testing
❑ LTG-3-A: Automatic Daylighting Controls Acceptance Document
Equipment requiring acceptance testing
I EnergyPro 4.2 by EnergySoft User Number. 3193 Job Number. Page3 of 6
JINDOOR LIGHTING SCHEDULE (Part 1 of 2) LTG -2-C1
NAME
RETAIL 1 BLDG
INSTALLED LIGHTING POWER FOR CONDITIONED SPACES
Luminaire
Lam s/Ballasts
Installed Watts
D
E
F
G
H
I
J
Name
Type Description
�m
'n3
CD M
F -mc
3.33
M..0'
om
mv�
3fp°'
H
coo3iz
3m3
��v
m•v
o
c
�vm
oma
to
m
O
mn
mm
C n
r
Z
3. 0�
5�3
0 C
y
xmm
i N m
a
A/A1�4e4
ft Fluorescent T8 Energy Savings
4
31C
1.
104.0
X
1
33
3,432
B
(2) 4 ft Fluorescent T8 Rapid Start Elec
F
(2eC ft Fluorescent T8 Energy Savings
2
3
IS
54.0
X
8
432
PAGE TOTAL 4 OOO
BUILDING TOTAL (sum of all pages) 4,000
PORTABLE LIGHTING (From LTG-3-C)C�
CONTROL CREDIT (From LTG4-C)
ADJUSTED ACTUAL WATTS 4 OOO
I EnergyPro 4.2 by EnergySoft User Number. 3193 Job Number. Page:4 of 6 1
JINDOOR LIGHTING POWER ALLOWANCE LTG -5 -CI
PROJECT NAME DATE
RETAIL 1 BLDG 1 10/20/2006
BUILDING CATEGORY (From Section 146 Table 146-B)
WATT
COMPLETE
ALLOWED
AREA
(SF)
PER SF
BLDG. AREA
WATTS
Comp Bldg Retail and Wholesale
1.50
8 200
12 300
AREA CATEGORY METHOD - CONDITIONED SPACES
AREA CATEGORY (From Section 146 Table 146-0)
WATTS
PER SF
AREA
(SF)
ALLOWED
WATTS
PAGE TOTAL
BUILDING TOTAL��
AREA WATTS
TAILORED METHOD -UNCONDITIONED SPACES
TOTAL UNCONDITIONED SPACES ALLOWED WA
(From LTG -5-C and LTG -6-C)
PAGE TOTAL
BUILDING TOTAL
AREA WATTS
TAILORED METHOD - CONDITIONED SPACES
TOTAL ALLOWED WATTS
(From LTG -6-C or from computer run.
UNCONDITIONED SPACES
Complete Building and Area Catagory Methods
Category (From Section 146 Table 146 -B&C)
WATTS
PER SF
AREA
(SF)
ALLOWED
WATTS
PAGE TOTAL
BUILDING TOTAL��
AREA WATTS
TAILORED METHOD -UNCONDITIONED SPACES
TOTAL UNCONDITIONED SPACES ALLOWED WA
(From LTG -5-C and LTG -6-C)
I EnergyPro 4.2 by EnergySoft User Number. 3193 Job Number. Page$ of 6
SLIGHTING MANDATORY MEASURES LTG-MM1
PROJECT NAME DATE
RETAIL 1 BLDG _ 10/20/2006
DESCRIPTION
Designer
lEnforcement
0 131(d)1For every floor, all interior lighting systems shall be equipped with a separate auton
atic
control to shut off the lighting. This automatic control shall meet the requirements
Section 119 and may be an occupancy sensor, automatic time switch, or other devi
capable of automatically shutting off the lighting.
131(d)20verride for Building Lighting Shut-off: The automatic building shut-off system is
provided with a manual, accessible override switch in sight of the lights. The area
of override is not to exceed 5,000 square feet
0 119(h) Automatic Control Devices Certified: All automatic control devices specified are
certified, all alternate equipment shall be certified and installed as directed by the
manufacturer.
X❑ 111 Fluorescent Ballast and Luminaires Certified: All fluorescent fixtures specified for
the project are certified and listed in the Directory. All installed fixtures shall be
certified.
E] 132 Tandem Wiring for One and Three Lamp Fluorescent Fixtures: All one and three
lamp fluorescent fixtures are tandem wired with two lamp ballasts where required
by Standards Section 132; or all one and three lamp fluorescent fixtures are
specified with electronic high -frequency ballasts and are exempt from tandem
wiring requirements.
'131(a)
0 Individual Room/Area Controls: Each room and area in this building is equipped
with a separate switch or occupancy sensor device for each area with floor -to -
ceiling walls.
rVi 131(b) Uniform Reduction for Individual Rooms: All rooms and areas greater than 100
square feet and more than 0.8 watts per square foot of lighting load shall be
controlled with bi-level switching for uniform reduction of lighting within the room.
X❑ 131(c) Daylight Area Control: All rooms with windows and skylights that are greater than
250 square feet and that allow for the effective use of daylight in the area shall,
have 50% of the lamps in each daylit area controlled by a separate switch; or the
effective use of daylight cannot be accomplished because the windows are
continuously shaded by a building on the adjacent lot. Diagram of shading during
different times of the year Is Included on plans.
F _ 131(e) Display Lighting. Display lighting shall be separately switched on circuits that
are 20 amps or less.
E
EnergyPro 4.2 by EnergySoft User Number. 3193 Job Number. Page£ of 6
CERTIFICATE OF COMPLIANCE (Part 1 of 2) OLTG-1-d
PROJECT NAME
DATE
BLDG 1 RETIAL BLDG
1/11/2007
PROJECT ADDRESS
QUI NTA
Building Permit #
PRINCIPAL DESIGNER - LIGHTING
TELEPHONE
SOTHOLROEUNG
Checked by/Date
DOCUMENTATION AUTHOR
TELEPHONE
S.Y. Lee Associates
(818) 244-4337
Enforcement Agency Use
GENERAL INFORMATION
DATE OF PLANS
LIGHTING ZONE
10/19/06
rUTDOOR
[_] LZ1 LZ2 ® LZ3 LZ4
FUNCTION TYPE ® OUTDOOR LIGHTING 0 OUTDOOR SIGNS ❑ INDOOR SIGNS
PHASE OF CONSTRUCTION ® NEW CONSTRUCTION F-1 ADDITION F-1 ALTERATION
STATEMENT OF COMPLIANCE
This Certificate of Compliance lists the outdoor lighting system specifications need to comply with Title 24, Parts 1 and 6 of the
Califomia Code of Regulations.
This certificate applies only to building lighting requirements.
The documentation preparer hereby certifies that the documentation is accurate and complete.
DOCUMENTATION AUTHOR
SIGNATURE
DATE
SOTHOL ROEUNG
1
1/11/2007
The Principal Lighting Designer hereby certifies that the proposed outdoor lighting and signs design represented in this set of
construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with any other
calculations submitted with this permit application. The proposed building has been designed to meet the lighting requirements
contained in Sections 110, 119, 130 through 132, and 146,and 149 of Title 24, Part 6.
Please Check One: (These sections of the Business and Professions Code are printed in full in the Nonresidential Manual.)
I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this
document as the person responsible for its preparation; and that I am licensed in the State of California as a civil engineer
or electrical engineer, or I am a licensed architect.
I affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code by Section 5537.2 or
6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor performing
this work.
❑ I affirm that I am eligible under the exemption to Division 3 of the Business and Professions Code to sign this document
because it pertains to a structure or type of work described as exempt pursuant to Business and Professions Code
Sections 5537, 5538 and 6737.1.
PRINCIPAL LIGHTING DESIGNER - NAME
SIGNATURE
DATE
LIC. #
SOTHOL ROEUNG
1/11/2007 116927
LIGHTING COMPLIANCE FORMS & WORKSHEET Check box if worksheet is included
®OLTG-I-C: Certificate of Compliance. Required on plans for all submittals for outdoor lighting. Part 2 of 2 may be incorporated in schedules oi tl
Either LTG -1 -C or OLTG-I-C may be used for signs as follows:
1. Use LTG -1 -C if the project consists solely of indoor signs.
2. Use LTG -1 -C if the project consists of indoor lighting, outdoor or indoor signs, but no other outdoor lighting.
3. Use OLTG-I-C if the project consists solely of outdoor signs.
4. Use OLTG-I-C if the project consists of outdoor lighting, outdoor or indoor signs, but no other indoor lighting.
®OLTG-2-C: LIGHTING COMPLIANCE SUMMARY. Applicable parts required for ALL outdoor lighting allowances (Except Signs).
®OLTG-3-C: AREA CALCULATIONS WORKSHEET. Applicable parts required for all outdoor area calculations.
❑OLTG-4-C: SIGN LIGHTING COMPLIANCE. Required for all internally and externally illuminated signs, for both indoor and outdoor
signs.
EnergyPro 4.2 by EnergySoft User Number. 3193 Job Number. Page£ of 10
ie plans.
LIGHTING COMPLIANCE SUMMARY
Project Name ,
BLDG 1 RETIAL BLDG
rt 1 of 4) OLTG-2
Date
1/11/2007
LIGHTING POWER ALLOWANCES - GENERAL
SITE ILLUMINATION
- able 147-A
Allotted Watts
Luminaire
Lamps/Ballasts
Installed Watts
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
Lighting Application
Category
(Table 147-A)
m a
mm
o„
s'�'
r x
`�D
°
m
wa
-p r
0-0
D
o
x m
xa
c1
m
x
n
o
a
m
Description
m
n
me
�o
d°
o
0
.�r
.�d
v3
m y
rd
c3
3
�H
m
®W
'
rm
mx
3�
.o .0
0
roo
°°'
3d
��+
m ••
m®
r
cm
3
d 9
m
m
0
m
n
®
;
c Z
3c
3
5v
w CD
W o
a
1P
x m
Z n
SIDEWALK
431
4.00
1,728
D
(1) 42w Compact Fluorescen
Trip/Quad 4 in Elec
1
42
1.1
46.01
X
11
50
E
50w Metal Halide
M50
1
50
1-C
58.0
X
1
87
Total Allotted Watts 1,728
Total Installed Watts F,317
EnergyPro 4.2 by EnergySoft User Number. 3193 Job Number. Paget of 10
ILLUMINATED AREA CALCULATION WORKSHE$Tart 2 of 5) OLTG-3-0
PROJECT NAME DATE
BLDG 1 RETIAL BLDG 1 1/11/2007
A. Hardsca a Method ii
Hardsca a for driveways, site roads, sidewalks, walkways and bikeways
A
B
List Specific Application able 147-A
Length o 25' wide path incorporating
much of he paved area as possible.
SIDEWALK
432
Checklist
❑ Section 147 (c)1 B - Each portion of all illuminated areas has been assigned only one lighting application, and the applications are consistent with actual use of the qr
❑ Section 147 (c)1 B Method ii -General illumination areas for site roadway, driveway, sidewalk, walkway, or bikeway includes only those illuminated areas that are in
bounds of the lication and includes a 25 foot wide area rennin alon the .isof the ath of travel and much of the aved area as ossible.
B. Building Entrances without Canopies
A
B
C
Width of Door plus 3 feet on each side
Smaller of 18 ft or distance to the edge of th
property line
Area s
(Ax )
Checklist
0 Section 147 (c)1 B - Each portion of all illuminated areas has been assigned only one lighting application, and the applications are consistent with the actual use of t 11
areas.
Section 147 (c)1 A - General illumination areas includes only those illuminated areas that in the bounds of the Application and are with a square pattern around a
Cl luminaire that is six times the luminaire mounting height, with the luminaire in the middle of the pattern, less any areas that are within buildings, under canopies, beyi if
property lines, or obstructed by a signs or other structures.
I EnergyPro 4.2 by EnergySoft User Number. 3193 Job Number. Page9 of 10 1
eas.