Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
08-1316 (RC) Title 24
r -- TITLE 24 REPORT Title 24 Report for: Rosatis Pizza TI 79-630 HWY 111 Suite #102 La Quinta, CA 92253 Project Designer: Michael Hurst Architect 78120 Calle Estado #207 La Quinta, CA 92253 760-799-3729 Report Prepared By: Gina Rose EQS, Inc. 42280 Beacon Hill #D-3 • Palm Desert, CA 92211 (760) 674-2345 CITY OF LA QUINTA BUILDING & SAFETY DEPT. APPROVED FOR CONSTRUCTION DA BY --.&g Job Number: Date: 9/3/2008 The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2005 Building Energy Efficiency Standards. This program developed by EnergySoft, LLC - www.energysoft.com. 9 � 0 � 0 N '[ SEP 0.9 2008 I EnergyPro 4.4 by EnergySoft Job Number: User Number: 5862 1 TABLE OF CONTENTS Cover Page Table of Contents Nonresidential Performance Title 24 Forms Form ENV -MM Envelope Mandatory Measures Form LTG -MM Lighting Mandatory Measures Form MECH-MM Mechanical Mandatory Measures HVAC System Heating and Cooling Loads Summary Room Load Summary 1 2 3 17 18 19 21 23 EnergyPro 4.4 by EnergySoft Job Number: User Number: 5862 :• i PERFORMANCE CERTIFICATE OF COMPLIANCE Part 1 Of 3 PERF - PROJECT NAME Rosatis Pizza TI This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the DATE 9/3/2008 PROJECT ADDRESS 79-630 HWY 111 Suite #102 La Quinta DOCUMENTATION AUTHOR DATE OF PLANS PRINCIPAL DESIGNER - ENVELOPE Michael Hurst Architect TELEPHONE 760-799-3729 'yBuilding Permit # DOCUMENTATION AUTHOR EQS, Inc. TELEPHONE (760) 674-2345 ��£Checked'tiy/Date !.Ennforcem n4'Agency Use GENERAL INFORMATION This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies only to a Building using the performance compliance approach. The documentation preparer hereby certifies that the documentation is accurate and complete. DOCUMENTATION AUTHOR DATE OF PLANS Gina Rose BUILDING CONDITIONED FLOOR AREA 1, 520 Sq.Ft. The Principal Designer hereby certifys that the proposeilding design represented in this set of construction docume is is CLIMATE ZONE 15 BUILDING TYPE ® NONRESIDENTIAL HIGH RISE RESIDENTIAL 0 HOTEL/MOTEL GUEST ROOM PHASE OF CONSTRUCTION California as a civil engineer, mechanical engineer, electrical engineer, or I am a licensed architect. NEW CONSTRUCTION ADDITION E] EXISTING + ADDITION/ALTERATION STATEMENT OF COMPLIANCE This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies only to a Building using the performance compliance approach. The documentation preparer hereby certifies that the documentation is accurate and complete. DOCUMENTATION AUTHOR SIGNATDAJE Gina Rose o 8 The Principal Designer hereby certifys that the proposeilding design represented in this set of construction docume is is consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this permit application. The proposed building as designed meets the energy efficiency requirements contained in sections 110, 116, through 118, and 140, 142, 143 or 149 of Title 24, Part 6. ENV. LTG. MECH. F—] ❑ F] 1. 1 hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am licensed in the State of California as a civil engineer, mechanical engineer, electrical engineer, or I am a licensed architect. ❑ F-� ❑ 2. 1 affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code Section 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor performing this work. R ❑ R 3. 1 affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document because it pertains to a structure or type of work described as exempt pursuant to Business and Professions Code Sections 5537, 5538, and 6737.1. (These sections of the Business and Professions Code are printed in full in the Nonresidential Manual.) ENVELOPE COMPLIANCE Indicate location on plans of Note Block for Mandatory Measures ENV -1 Required Forms PRINCIPAL ENVELOPE DESIGNER -NAME SIGNAT E LIC. NO. DATE Michael Hurst Architect '— f 7 _ att O S LIGHTING COMPLIANCE Indicate location on plans of Note Block for Mandatory Measures LTG -1, LTG -2, LTG -3 Required Forms PRINCIPAL LIGHTING DESIGNER - NAME SIGNATURE LIC. NO. DAT d dG Michael Hurst Archtitect MECHANICAL COMPLIANCE Indicate location on plans of Note Block for Mandatory Measures MECH-1 MECH-2 MECH-3 ECH-5 Required Forms PRINCIPAL MECHANICAL DESIGNER - NAMES IGNATURE LIC. NO. C-10 DqT ©`� Michael Hurst Architect EnergyPro 4.4 by EnergySoft User Number: 5862 Job Number: Page:3 of 24 1 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 2 of 3 PERF -1 PROJECT NAME DATE Rosatis Pizza TI 1 9/3/2008 ANNUAL TDV ENERGY USE SUMMARY kBtu/s ft- r ENERGY COMPONENT Standard Design 1 Proposed Design 1 2 Compliance Margin IQ StandardProposed 240 Space Heating Space Cooling Indoor Fans Heat Rejection Pumps & Misc. Domestic Hot Water Lighting Receptacle Process 2.04 1.40 0.63 d 5=Dam H tirli 7, sc°°a ° sqft. 322.93 262.63 60.30 240 _ 0.00 0.00 0.00 W r 0.00 0.00 0.00 Total 0.00 0.00 0.00 ".W a Mia."`_ 50.22 42.88 7.35 79.61 118.02 -38.41 48.21 1 48.21 1 0.00 o 4,% o.00 o.00 o.00 TOTALS: 503.01 Percent better than Standard: 47315 2986 0 20 40 60 80 100120140160180200220240260280300320I Mulsgft-yr 5.9% ( 5.9% excluding process) Building Orientation Number of Stories Number of Systems Number of Zones N 0 deg Conditioned Floor Area 1,520 sqft. Unconditioned Floor Area 0 sqft. Conditioned Footprint Area 1,520 sqft. Fuel Type Natural Gas 1 2 1 2 Orientation Gross Area Glazing Area Glazing Ratio Front Elevation N 240 sqft. 150 sqft. 62.4% Left Elevation (E) 0 sqft. 0 sqft. 0.0% Rear Elevation S 240 sqft. 80 sqft. 33.3% Right Elevation (W o 1 sqft. 0 sqft. 0.0% Total 480 sqft. 230 sgn. 47.9% Roof 1,520 sqft. sqft. 0.0% Standard Proposed .Lighting Power Density 1.200 W/sqn. 1.779 W/sgft. Prescriptive Env. Heat Loss 197 Btu/h 227 Btu/h Prescriptive Env. Heat Gain 21,783 Btu/h-F 30,224 Btu/h-F i Remarks: Standard Building (Compliance) EnergyPro 4.4 by EnergySoft User Number: 5862 Job Number: Page:4 of 24 1 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 3 of 3 PERF -1 PROJECT NAME Rosatis Pizza TI DATE 9/3/2008 ZONE INFORMATION System Name Zone Name Occupancy Type Floor Area (sqft.) Inst. LPD (W/sf)1 Ctrl. Credits (W/sf)2 Allowed LPD Proc. Loads (W/sf) AreaTailored W/s 3 (W/S4 Existing 4 Ton Unit (Cl) Pick up Area Comp Bldg Restaurant 790 1.51 Existing 3 Ton Unit Cooking -Prep area Comp Bldg Restaurant 730 1.64 Notes: 1. See LTG -2-C (items marked with asterisk, see LTG -2 -C by others) 2. See LTG -4-C 3. See LTG -5-C (by others) 4. See LTG -6-C Items above require special documentation EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted. The DHW System "A O Smith Water Products BTH 120" is a Large Gas water heater with Pilot Loss = 0 btuh. The HVAC System "Existing 4 Ton Unit (Cl)" incorporates HERS verified Duct Leakage. Target leakage is calculated and documented on the MECH-5 The HVAC Svstem "Existing 3 Ton Unit' incorporates HERS verified Duct Leakaae. Taraet leakaae is calculated and documented on the MECH-5-A. The exceptional features listed in this performance approach application have specifically been reviewed. Adequate written justification and documentation for their use have been provided by the applicant. Authorized Signature or Stam initiation i ime: u/ / 1 -- K n Loge: 9 ZZ 4tf Z 3 EnergyPro 4.4 by EnergySoft User Number: 5862 Job Number: Page:5 of 24 ICERTIFICA'TE''OF COMPLIANCE ENV -1 -C] PROJECT NAME DATE Rosatis Pizza TI 9/3/2008 OPAQUE SURFACES # Surface Type Area U -Fac. Insulation Cay. Cont. Act. Am. Tilt Cond. Stat. Joint Appendix IV Reference Location / Comments 1 Roof 79 .036 R-30 R-0.0 0 0 4Existing 02-A9 Pick u Area 2 Wall 9 0.074 R-19 R-0.0 0 90 Existing 09-A5 Pick u Area 3 Roof 73 0.036 R-30 R-0.0 0 0 Existing 02-A9 Cookin -Pre area 4 Wall 16 0.074 R-19 R-0.0 180 90 Existing 09-A5 Cooking -Prep area Pick up Area 5 Window Front N 37 0.670 NFRC 0.52 NFRC 0 Existing Existing Window/Doors Pick up Area 6 Window Rear S 20 0.670 NFRC 0.52 INFRC 180 Existin Existing Window/Doors Cooking -Prep area 7 lWindow Rear S 60 0.6701 NFRC 0.52 NFRC 180 Existing Existing Window/Doors Cooking -Prep area N, E. A, R (New, Existing, Altered, Removed) FENESTRATION SURFACES I I More than or equal to 10,000 sq.ft. of site -built fenestration area must include a label certificate either issued by NFRC or provide a CEC Default Label Certificate using the default Ll -tactors from Standards Table 116-A and B. Certificate shall be filed in the contractor's oroiect office durino construction and in the building managers office after construction # IType # Exterior Shade Type Window Overhang Left Fin Right Fin SHGC Hgt. Wd. Len. H t. LExt.RExt. Dist. Len. H t. Dist. Len. H t. Area U -Fac' SHGC2 Act. Am. Cond. Stat. Glazing Type Location/ Comments 1 Window Front N 24 0.670 NFRC 0.52 NFRC 0 Existing Existing Window/Doors Pick up Area 2 Window Front N 6 0.670 NFRC 0.52 NFRC 0 Existing Existin Window/Doors Pick up Area 3 Window Front N 47 0.670 NFRC 0.52 NFRC 0 Existing Existing Window/Doors Pick up Area 4 Window Front N 37 0.670 NFRCI 0.52 NFRC 0 Existing Existing Window/Doors Pick up Area 5 Window Front N 37 0.670 NFRC 0.52 NFRC 0 Existing Existing Window/Doors Pick up Area 6 Window Rear S 20 0.670 NFRC 0.52 INFRC 180 Existin Existing Window/Doors Cooking -Prep area 7 lWindow Rear S 60 0.6701 NFRC 0.52 NFRC 180 Existing Existing Window/Doors Cooking -Prep area �1) LI -factor Type: 116-A Default Table from Standards, Table NI -1 Default Table from the ACM Manual Appendix, NFRC Labeled value. 2) SHGC Type: 116-8 Default Table from Standards, COG Center of Glass, NFRC Labeled Value EXTERIOR SHADING # Exterior Shade Type Window Overhang Left Fin Right Fin SHGC Hgt. Wd. Len. H t. LExt.RExt. Dist. Len. H t. Dist. Len. H t. 1 None 0.76 2 None 0.76 3 None 0.76 4 None 0.76 5 None 0.76 6 None 0.76 7 None 0.76 MINIMUM SKYLIGHT AREA FOR LARGE ENCLOSED SPACES ❑The proposed building Is In climate zones 2 through 15 and contains an enclosed space with floor area greater than 25,000 ft2, a ceiling height greater than 15 feet, and an LPD for general lighting of at least 0.5 WIft2. See Section 143(c). If this box Is checked, ENV4-C must be filled out. when submitting under the Prescriptive Compliance Approach. I EnergyPro 4.4 by EnergySoft User Number: 5862 Job Number: Pace:6 of 24 1 CERTIFICATE OF COMPLIANCE (Part 1 of 3) LTG -1 -C (PROJECT NAME DATE Rosatis Pizza TI 9/3/2008 INSTALLED INDOOR LIGHTING POWER FOR CONDITIONED AND UNCONDITIONED SPACES 777771 INSTALLED LIGHTING, UNCONDITIONED SPACES (From LTG -2-C) 0 LIGHTING CONTROL CREDIT, UNCONDITIONED SPACES (From LTG -4-C) 0 UNCONDITIONED SPACE ADJUSTED INSTALLED LIGHTING POWER 0 ALLOWED INDOOR LIGHTING POWER FOR CONDITIONED SPACES ❑ COMPLETE BUILDING METHOD (From LTG -5-C) ❑ AREA CATEGORY METHOD (From LTG -5-C) ❑ TAILORED METHOD (From LTG -5-C) ALLOWED LIGHTING POWER INSTALLED ALTERNATE COMPLIANCE WATTS ❑X PERFORMANCE METHOD ❑ - COMMMON LIGHTING SYSTEM (From LTG -8-C) NOTE TO FIELD INSTALLED LIGHTING, CONDITIONED SPACES (From LTG -2-C) 2,400 PORTABLE LIGHTING (From LTG -3-C) 304 LIGHTING CONTROL CREDIT, CONDITIONED SPACES (From LTG -4-C) 0 CONDITIONED SPACE ADJUSTED INSTALLED LIGHTING POWER 2,704 INSTALLED LIGHTING, UNCONDITIONED SPACES (From LTG -2-C) 0 LIGHTING CONTROL CREDIT, UNCONDITIONED SPACES (From LTG -4-C) 0 UNCONDITIONED SPACE ADJUSTED INSTALLED LIGHTING POWER 0 ALLOWED INDOOR LIGHTING POWER FOR CONDITIONED SPACES ❑ COMPLETE BUILDING METHOD (From LTG -5-C) ❑ AREA CATEGORY METHOD (From LTG -5-C) ❑ TAILORED METHOD (From LTG -5-C) ALLOWED LIGHTING POWER ALLOWED WATTS 2,704 ALTERNATE COMPLIANCE SPACE CONTROLLED ❑X PERFORMANCE METHOD ❑ - COMMMON LIGHTING SYSTEM (From LTG -8-C) NOTE TO FIELD ALLOWED INDOOR LIGHTING POWER FOR UNCONDITIONED SPACES From LTG -5-C) 0 MANDATORY INDOOR AND DAYLIGHTING AUTOMATIC CONTROLS CONTROL LOCATION (Room #) CONTROL IDENTIFICATION CONTROL TYPE (Auto Time Switch, Dimming, etc.) SPACE CONTROLLED Check if Daylighting NOTE TO FIELD NOTES TO FIELD - For Building Department Use Only Run Initiation Time: 09/03/08 15:17:33 Run Code: 1220480253 EnergyPro 4.4 by Energysoft User Number: 5862 Job Number: Page:7 of 24 CERTIFICATE OF COMPLIANCE (Part 3 of 3) LTG -1-C PROJECT NAME Rosatis Pizza TI DATE 9/3/2008 Designer: This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for lighting systems. The designer is required to check the boxes by all acceptance tests that apply and list all equipment that require an acceptance test. If all equipment of a certain type requires a test, list the equipment description and the number of systems to be tested in parentheses. The NJ number designates the Section in the Appendix of the Nonresidential ACM Manual that describes the test. Also indicate the person responsible for performing the tests (i.e. the installing contractor, design professional or an agent selected by the owner). Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Building Departments: Before an occupancy permit is granted for a newly constructed building or space, or a new lighting system*system serving a building or space- is operated for normal use, -all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. In addition a Certificate of Acceptance, LTG -1-A, Forms shall be submitted to the building department that: A. Certifies plans, specifications, installation certificates, and operating and maintenance information meet the requirements of§ 10-103(b) and Title 24 Part 6. Test Descri tion Test Performed BY: O LTG -2-A: Lighting Control Acceptance Document - Occupancy Sensor Acceptance - Manual Daylight Controls Acceptance - Automatic Time Switch Control Acceptance Equipment requiring acceptance testing ❑ LTG -3-A: Automatic Daylighting Controls Acceptance Document Equipment requiring acceptance testing I EnergyPro 4.4 by EnergySoft User Number: 5862 Job Number: Page:8 of 24 1 CERTIFICATE OF COMPLIANCE MECH-1-C ROJECT NAME Rosatis Pizza TI DATE 9/3/2008 ueslgner: This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for mechanical systems. The designer is required to check the boxes by all acceptance tests that apply and list all equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the equipment description and the number of systems to be tested in parentheses. The NJ number designates the Section in the Appendix of the Nonresidential ACM Manual that describes the test. Also indicate the person responsible for performing the tests (i.e. the installing contractor, design professional or an agent selected by the owner). Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Building Departments: SYSTEM ACCEPTANCE. Before an occupancy permit is granted for a newly constructed building or space, or a new space -conditioning system serving a building or space is operated for normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. In addition a Certificate of Acceptance, MECH-I-A Form shall be submitted to the building department that certifies plans, specifications, installation certificates. and ooeratina and maintenance information meet the reauirements of Section 10-103(b) and Title 24 Part 6. STATEMENT OF COMPLIANCE ❑ MECH-2-A: Ventilation System Acceptance Document -Variable Air Volume Systems Outdoor Air Acceptance -Constant Air Volume Systems Outdoor Air Acceptance Equipment requiring acceptance testing Test required on all New systems both New Construction and Retrofit. ❑ MECH-3-A: Packaged HVAC Systems Acceptance Document Equipment requiring acceptance testing Test required on all New systems both New Construction and Retrofit. ❑ MECH-4-A: Air -Side Economizer Acceptance Document Equipment requiring acceptance testing Test required on all New systems both New Construction and Retrofit. Units with economizers that are installed at the factory and certified with the commission do not require equipment testing but do require construction inspection. ❑ MECH-5-A: Air Distribution Acceptance Document Equipment requiring acceptance testing This test required If the unit serves 5,000 R2 of space or less and 25% or more of the ducts are in nonconditioned or semiconditioned space like an attic. New systems that meet the above requirements. Retrofit systems that meet the above requirements and either extend ducts, replace ducts or replace the packaged unit. ❑ MECH-6-A: Demand Control Ventilation Acceptance Document Equipment requiring acceptance testing All new DCV controls installed on new or existing packaged systems must be tested. ❑ MECH-7-A: Supply Fan Variable Flow Control Acceptance Document Equipment requiring acceptance testing All new VA V fan volume controls installed on new or existing systems must be tested ❑ MECH-8-A: -Hydronic System Control Acceptance Document -Variable Flow Controls Applies to chilled and hot water systems. -Automatic Isolation Controls Applies to new boilers and chillers and the primary pumps are connected to a common header. -Supply Water Temperature Reset Controls Applies to new constant Bow chilled and hot water systems that have a design capacity greater than or equal to 500,000 Bturhr. -Water-loop Heat Pump Controls Applies to all new watedoop heat pump systems where the combined loop pumps are greater than 5 hp. -Variable Frequency Controls Applies to all new distribution pumps on new variable Bow chilled, hydronic heat pump or condenser water systems where the pumps motors are greater than 5 hp. Equipment re uirin acceptance testing EnergyPro 4.4 by EnergySoft User Number: 5862 Job Number: Page:9 of 24 INDOOR LIGHTING SCHEDULE (Part 1 of 2) LTG -2-C (PROJECT NAME DATE , Rosatis Pizza TI 9/3/2008 INSTALLED LIGHTING POWER FOR CONDITIONED SPACES 77771 Luminaire Lamps/Ballasts Installed Watts C E F G H I J Name Type Description �r <m CDD .30 cmc 333 �vv d0m m `� ° mv� my ��y cmc 3,iu3 9�v °' N c 3,�� 9m°1 y y O CD wm cn r C Z 3, c 503 °'�'Q H N Xm vN(D n (1) 6" Circline (1-4) 1 60 1 60.0 X 4 240 (4) 4 ft Fluorescent T12 ES ElecAO (1-7) F4QT1 2/ES 4 34 2.0 120.0 X 11 ! 1,320 60w Recessed Incandescent (L1, L2, L3) ow 1 60 60.0 X 14 840 PAGE TOTAL 2 4OO BUILDING TOTAL (sum of all pages) 2,400 PORTABLE LIGHTING (From LTG -3-C) 3O4 CONTROL CREDIT (From LTG -4-C) D ADJUSTED ACTUAL WATTS 2 7O4 Run Initiation Time: 09/03/08 15:17:33 Run Code: 1220480253 EnergyPro 4.4 by EnergySoft User Number: 5862 Job Number: Page: 10 of 24 PORTABLE LIGHTING WORKSHEET LTG -3 - PROJECT NAME Rosatis Pizza TI DATE 9/3/2008 FEET BUILDING TOTAL TABLE 1 - PORTABLE LIGHTING NOT SHOWN ON PLANS FOR OFFICE AREAS >26FSQUARE UARE FEET A B C D ROOM # OR ZONE ID DEFAULT /s ft AREA SF TOTAL WATTS B X C Pick up Area 0.2 790 158 Cooking -Prep area 0.2 730 146 TOTAL 1,520 304 TABLE 2 - PORTABLE LIGHTING SHOWN ON PLANS FOR OFFICE AREAS >250 SQUARE FEET BUILDING TOTAL A B C D E F G ROOM # OR ZONE ID PORTABLE LIGHTING Description # OF FIXT. LUMIN. WATTS PER FIXTURE TASK AREA (SF) # OF TASK AREAS TOTAL AREA (SF) (D x E) TOTAL WATTS (C x E) TOTAL 0 1 0 TABLE 3 - PLANS SHOW PORTABLE LIGHTING IS NOT REQUIRED FOR OFFICE AREAS > 250 SQUARE FEET ROOM # TOTAL AREA OR ZONE ID (SF) TOTAL 0 BUILDING SUMMARY - PORTABLE LIGHTING Designer needs to provide detailed documentation that the lighting level provided by the overhead lighting meets the needs of the space. The details include luminaire types and mounting locations relative to work areas. BUILDING SUMMARY TOTAL AREA (SF) (FROM TABLES 1+2+3) TOTAL WATTS BUILDING TOTAL 1,520 304 EnergyPro 4.4 by EnergySoft User Number: 5862 Job Number: Page: 11 of 24 1 MR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2-C (PROJECT NAME DATE Rosatis Pizza TI 9/3/2008 SYSTEM FEATURES ITEM OR SYSTEM TAG(S) Number of Systems T-24 MANDATORY MEASURES Section Heating Equipment Efficiency Cooling Equipment Efficiency Heat Pump Thermostat Furnace Controls Natural Ventilation' Minimum Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation PRESCRIPTIVE MEASURES Calculated Heating Capacity x 1.43 2 Proposed Heating Capacity 2 Calculated Sensible Cooling Capacity x 1.212 Proposed Sensible Cooling Capacity 2 Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heating Air Supply Reset Cooling Air Supply Reset Duct Sealing for Prescriptive Compliance AIR SYSTEMS Central or Single Zone Existing 4 Ton Unit (Cl) Existing 3 Ton Unit 1 1 Reference on Plans or Specification 1 112(a) 8.00 HSPF 7.60 HSPF 112(a) 13.0 SEER / 10.6 EER 13.1 SEER / 10.8 EER 112(b) Yes Yes 112(c), 115(a) n/a n/a 121(b) Yes Yes 121 b 118 cfm 115 cfm 121 c No No 121 c No No 121 c 122(e) Programmable Switch Programmable Switch 122(e) Heating & Cooling Required Heating & Cooling Required 122 Auto Auto 122 n/a n/a 123 124 R-4.2 R-4.2 144 a & b n/a n/a 144 a & b 29,979 btuh 22,485 btuh 144 a & b n/a n/a 144 a & b 26,940 btuh 24,722 btuh 144 c Constant Volume Constant Volume 144 c 144 c Yes Yes 144 d No No 144 a No Economizer No Economizer 144 Constant Ternp Constant Tem 144 (f) Constant Temp Constant Temp 144 k No No 1: For each central and single zone air systems (or group of similar units) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" in the column. 2: Not required for hydronic heating and cooling. Either enter a value here or put in reference of plans and specificatons per footnote 1. 3: Enter Yes if System is: Constant Volume, Single Zone; Serves < 5,000 sgft; Has > 25% duct in unconditioned space. Duct sealing is required for Prescriptive Compliance, see PERF -1 for performance method duct sealing requirements. EnergyPro 4.4 by EnergySoft User Number: 5862 Job Number: Page:12 of 24 1 NATER SIDE SYSTEM REQUIREMENTS Part 2 of 2 MECH-2-C PROJECT NAME DATE Rosatis Pizza TI 1 9/3/2008 ITEM OR SYSTEM TAG(S) Number of Systems MANDATORY MEASURES Equipment Efficiency Pipe Insulation PRESCRIPTIVE MEASURES Calculated Capacity Proposed Capacity Tower Fan Controls Tower Flow Controls Variable Flow System Design Chiller and Boiler Isolation CHW and HHW Reset Controls WLHP Isolation Valves VSD on CHW, CW & WLHP Pumps > 5 HP DP Sensor Location T-24 Section Reference on Plans or Specification' 112(a) 123 144(a&b) 144(a&b) 144 h 144 h 144 144 144 144 144 144 1: For each chiller, cooling tower, boiler, and hydronic loop (or groups of similar equipment) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" in the column. 2: Water side systems include wet side system using other liquids such as glycol or brine. ITEM OR SYSTEM TAG(S) Number of Systems MANDATORY MEASURES Water Heater Certification Water Heater Efficiency Service Water Heating Installation Pool and Spa Efficiency and Control Pool and Spa Installation Pool Heater - No Pilot Light Spa Heater - No Pilot Light 113 (a) 113 b 113 (c) 114 a 114 b 115 (c) 115 d DHW Heater 0 Service Hot Water, Pool Heating Reference on Plans or Specification' A O Smith Water Products BT44o120 n/a n/a n/a n/a 1: For each water heater, pool heat and domestic water loop (or groups of similar equipment) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" ins the column. Run Initiation Time: 09/03/08 15:17:33 Run Code: 1220480253 EnergyPro 4.4 by EnergySoft User Number: 5862 Job Number: Page: 13 of 24 P U M U W ►— Z O J_ Z W Q U Z 2 U W 2 M N N N ca N O iA N N Z Transfer Air N 0 Design Min. Ai Setpoint i a j o M Max of Columns H, J, K or 300 CFM `Z Bx0.4 j� Q Y CFM/sq. ft. W Q >' X m 30% of Design o J Zone Supply 3 m CFM Design °D r° "' "' — Vent. Air o E CFM _ REO'D V.A o o n � c _ Max of M c+> N N Q (D or G) m } s _= d Min CFM z a ` E E by Occupant a a E 8 z Q (ExF) �c0i 0 o m � CFM m `o z rn E � z L.L per 0w =08 _ Person $ - IL , m o m a Number of m s m 12 o m .2 0$ E L) Lu People g o t E m Min CFM Co m „ m mm ".0 - o by Area M N W c E $ O 0 E$ 00 N (BXC) m O v Q CFM Ci m d n m per C) o o E c � E N W Square Foot n> g m" -� z' C a Condition 0) c) N C O¢ m>¢ j 0 m' Area m m .`s v (SF) E Z5 W Q o= m v _ O Q O O 0 s m z O m>= m o c X N o s0 J mo ~ tq m W? V Ti Y= m m O m v S N om rn W m 'Eii m z H �_. o m y o '� m E_ E w- lL U W Q N r U v c d •c m m - y m m U E c E a / ii •C N •C D� � J QZ W N c =m� a' mrn ... E : mm vO 0 •E ac E ya m N y d C 2 ca IX M0020 � >, Q Q C w a m m U 7 y N' iZ W X w o X w a U MECHANICAL EQUIPMENT DETAILS Part 1 of 2 MECH:-C PRQJECT NAME Rosatis Pizza TI COOLING DATE 9/3/20OH CHILLER AND TOWER SUMMARY System Type QW Efficiency Tons PUMPS Outout Efficiencv Equipment Name Equipment Type Qty. Tot. Qty GPM BHP Motor Eff. Drive Eff. Pump Control 13.0 SEER / 10.6 EER Existing No Economizer Carrier 50HJQ004--- (5/6)1 Packaged DX 1 36,000 0.0 7.60 HSPF 36.000 13.1 SEER / 10.8 EER Existing No Economizer 1DHW I BOILER SUMMARY System Name O Smith Water Products Rated stem Type Distribution Type' Qty Input Gas All Pipes Ins . 1 . 125,00 Energy Vol. Condition Factor 3als.) ' Status or RE 1201 New Standby TANK INS Loss or Ext. Pilot R -Val. 2.12% CENTRAL SYSTEM RATINGS HEATING COOLING System Name System Type QW output Aux. kW Eff. Outout Efficiencv Condition Status Economizer Type Carrier 50HJ0005 --- (5/6)2 Packaged DX 1 48,000 0.0 8.00 HSPF 45,000 13.0 SEER / 10.6 EER Existing No Economizer Carrier 50HJQ004--- (5/6)1 Packaged DX 1 36,000 0.0 7.60 HSPF 36.000 13.1 SEER / 10.8 EER Existing No Economizer MECHANICAL EQUIPMENT DETAILS Part 2 of 2 MECH-5-Cl ENVELOPE MANDATORY MEASURES ENV - PROJECT NAME Rosatis Pizza TI DATE 9/3/2008 DESCRIPTION Designer Enforcement FX] § 118(a) Installed Insulating Material shall have been certified by the manufacturer to comply with the California Quality Standards for insulating material, Title 20, Chapter 4, Article 3. FX] §118(c) All Insulating Materials shall be installed in compliance with the flame spread rating and smoke density requirements of Sections 2602 and 707 of Title 24, Part 2. X❑ § 117(a) All Exterior Joints and openings in the building that are observable sources of air leakage shall be caulked, gasketed, weatherstripped.or otherwise sealed. . . ` § 116(b) Site Constructed Doors, Windows and Skylights shall be caulked between the unit and the building, and shall be weatherstripped (except for unframed glass doors and fire doors). IAI§ 116(a)1 Manufactured Doors and Windows installed shall have air infiltration rates not exceeding those shown in Table Number 1-E. of the Standards. Manufactured fenestration products must be labeled for U -value according to NFRC procedures. 0 §118(e) Demising Walls in Nonresidential Buildings: The opaque portions of framed demising walls in nonresidential buildings shall have insulation with an installed R -value of no less than R-13 between framing members. EnergyPro 4.4 by EnergySoft User Number: 5862 Job Number: Page: 17 of 24 LIGHTING MANDATORY MEASURES LTG -MM ECT NAME Rosatis Pizza TI DATE 9/3/2008 DESCRIPTION Designer Enforcement FX §131(d)1 For every floor, all interior lighting systems shall be equipped with a separate automatic control to shut off the lighting. This automatic control shall meet the requirements of Section 119 and may be an occupancy sensor, automatic time switch, or other device capable of automatically shutting off the lighting. X❑ §131(d)2Override for Building Lighting Shut-off: The automatic building shut-off system is provided with a manual, accessible override switch in sight of the lights. The area of override is not to exceed 5,000 square feet. 0 §119(h) Automatic Control Devices Certified: All automatic control devices specified are certified, all alternate. equipment shall be certified and installed as. directed by the manufacturer. X] §111 Fluorescent Ballast and Luminaires Certified: All fluorescent fixtures specified for the project are certified and listed in the Directory. All installed fixtures shall be certified. R§132 Tandem Wiring for One and Three Lamp Fluorescent Fixtures: All one and three lamp fluorescent fixtures are tandem wired with two lamp ballasts where required by Standards Section 132; or all one and three lamp fluorescent fixtures are specified with electronic high -frequency ballasts and are exempt from tandem wiring requirements. §131(a) Individual Room/Area Controls: Each room and area in this building is equipped with a separate switch or occupancy sensor device for each area with floor -to - ceiling walls. X] §131(b) Uniform Reduction for Individual Rooms: All rooms and areas greater than 100 square feet and more than 0.8 watts per square foot of lighting load shall be controlled with bi-level switching for uniform reduction of lighting within the room. 0 §131(c) Daylight Area Control: All rooms with windows and skylights that are greater than 250 square feet and that allow for the effective use of daylight in the area shall have 50% of the tamps in each daylit area controlled by a separate switch; or the effective use of daylight cannot be accomplished because the windows are continuously shaded by a building on the adjacent lot. Diagram of shading during different times of the year is included on plans. 0 §131(e) Display Lighting. Display lighting shall be separately switched on circuits that are 20 amps or less. EnergyPro 4.4 by EnergySoft User Number: 5862 Job Number: Page: 18 of 24 MECHANICAL MANDATORY MEASURES Part 1 of 2 MECH-MM NAME Rosatis Pizza TI DATE 9/3/2008 DESCRIPTION Designer Enforcement Equipment and Systems Efficiencies X❑ § 11 Any appliance for which there is a California standard established in the Appliance Efficiency Regulations will comply with the applicable standard. §115(a) Fan type central furnaces shall not have a pilot light. rX§123 Piping, except that conveying fluids at temperatures between 60 and 105 degrees_ Fahrenheit, or within HVAC equipment, shall be insulated in accordance with Standards Section 123. X❑ §124 - Air handling duct systems shall be installed and insulated in compliance with Sections 601, 602, 603, 604, and 605 of the 2001 CMC Standards. Controls §122(e) Each space conditioning system shall be installed with one of the following: R§122(e)1A Each space conditioning system serving building types such as offices and manufacturing facilities (and all others not explicitly exempt from the requirements of Section 112 (d)) shall be installed with an automatic time switch with an accessible manual override that allows operation of the system during off -hours for up to 4 hours. The time switch shall be capable of programming different schedules for weekdays and weekends and have program backup capabilities that prevent the loss of the device's program and time setting for at least 10 hours if power is interrupted; or §122(e)1 B An occupancy sensor to control the operating period of the system; or §122(e)1C A 4 -hour timer that can be manually operated to control the operating period of the system. 0. §122(e)2 Each space conditioning system shall be installed with controls that temporarily restart and temporarily operate the system as required to maintain a setback heating and/or a setup cooling thermostat setpoint. §122(g) Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000 square feet shall be provided with isolation zones. Each zone: shall not exceed 25,000 square feet; shall be provided with isolation devices, such as valves or dampers, that allow the supply of heating or cooling to be setback or shut off independently of other isolation areas; and shall be controlled by a time control device as described above. ® §122(a&b) Each space conditioning system shall be controlled by an individual thermostat that responds to temperature within the zone. Where used to control heating, the control shall be adjustable down to 55 degrees F or lower. For cooling, the control shall be adjustable up to 85 degrees F or higher. Where used for both heating and cooling, the control shall be capable of providing a deadband of at least 5 degrees F within which the supply of heating and cooling is shut off or reduced to a minimum. X❑ §122(c) Thermostats shall have numeric setpoints in degrees Fahrenheit (F) and adjustable setpoint stops accessible only to authorized personnel. §112(b) Heat pumps shall be installed with controls to prevent electric resistance supplementary heater operation when the heating load can be met by the heat pump alone. EnergyPro 4.4 by EnergySoft User Number: 5862 Job Number: Page: 19 of 24 4 MECHANICAL MANDATORY MEASURES Part 2 of 2 MECH-MM PROJECT NAME DATE Rosatis Pizza TI 9/3/2008 A Description Designer Enforcement Ventilation §121(e) Controls shall be provided to allow outside air dampers or devices to be operated at the ventilation rates as specified on these plans. 0, §122(f) Gravity or automatic dampers interlocked and closed on fan shutdown shall be provided on the outside air intakes and discharges of all space conditioning and exhaust systems. 0 , §4 22(f) All gravity ventilating systems shall be provided with automatic or readily accessible manually operated dampers in all openings to the outside, except for combustion air openings. §121(01 Air Balancing: The system shall be balanced in accordance with the National Environmental Balancing Bureau (NEBB) Procedural Standards (1983), or Associated Air Balance Council (AABC) National Standards (1989); or X] §121(f)2 Outside Air Certification: The system shall provide the minimum outside air as shown on the mechanical drawings, and shall be measured and certified by the installing licensed C-20 mechanical contractor and certified by (1) the design mechanical engineer, (2) the installing licenced C-20 mechanical contractor, or (3) the person with overall responsibility for the design of the ventilation system; or §121(f)3 Outside Air Measurement: The system shall be equipped with a calibrated local or remote device capable of measuring the quantity of outside air on a continuous basis and displaying that quantity on a readily accessible display divice; or §121(f)4 Another method approved by the Commission. Service Water Heating Systems X] §113(b)2 If a circulating hot water system is installed, it shall have a control capable of - automatically turning off the circulating pump(s) when hot water is not required. §113(c) Lavatories in restrooms of public facilities shall be equipped with controls to limit the outlet temperature to 110 degrees F. EnergyPro 4.4 by EnergySoft User Number: 5862 Job Number: Page:20 of 24 A HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE Rosatis Pizza TI 9/3/2008 SYSTEM NAME FLOOR AREA Existing 4 Ton Unit(Cl)790 Output (Btuh/sgft) NGINEERING CH Number of Systems 1 Heating System Output per System 48,000 Total Output (Btuh) 48,000 Output (Btuh/sgft) 60.8 Cooling System Output per System 45,000 Total Output (Btuh) 45,000 Total Output (Tons) 3.8 Total Output (Btuhlsgft) 57.0 Total Output (sgft/Ton) 210.7 Air System CFM per System 1,600 Airflow (cfm) 1,600 Airflow (cfmisgft) 2.03 Airflow (cfm/Ton) 426.7 Outside Air (%) 7.4 Outside Air (cfm/sgft) 0.15 Note: values above given at ARI conditions Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM I Sensiblel Latent I CFM I Sensible 1,30 16,703 1,580 L 453 6,732 0 835 337 0 0 118 4,730 905 118 5,524 b 0 .835 337 23,81 2,4851 12 929 Carrier 50HJQ005--- (5/6)2 26,940 13,958 29,979 Total Adjusted System Output 26,940 13,958 29,979 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Jul 3 pm I Jan 12 am HEATING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Heating Peak) 26.0 OF 66.6 °F 84.2 OF 84.2 OF OSupply Air Ducts Outside Air 118 cfmo Heating Coil Supply Fan 84.0 F 1600 cfm ROOMS 69.8 OF 70.0 OF Return Air Ducts I (COOLING SYSTEM PSYCHROMETRICS (Airstream Temoeratures at Time of Coolina Peak) I 12.0 / 77.9 OF Outside Air 118 cfm 74.5/65.3 °F 77.3/66.4°F 61.4/60.6°F Cooling Coil Supply Fa 1600 cfm 61.4 / 60.6 of Supply Air Ducts Fan 61.9/60.7OF 62.7% R.H. ROOMS 74.0/65.1°F >% Return Air Ducts `i EnergyPro 4.4 by EnergySoft User Number: 5862 Job Number: Page:21 of 24 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE Rosatis Pizza TI 9/3/2008 SYSTEM NAME FLOOR AREA Existing 3 Ton Unit 730 Number of Sy stems 1 Heating System Output per System 36,000 Total Output (Btuh) 36,000 Output (Btuh/sqft) 49.3 Cooling System Output per System 36,000 Total Output (Btuh) 36,000 Total Output (Tons) 3.0 Total Output (Btuhlsgft) 49.3 Total Output (sgft/Ton) 243.3 Air System CFM per System 1,200 Airflow (cfm) 1,200 Airflow (cfmisqft) 1.64 Airflow (cfmlTon) 400.0 Outside Air (%) 9.6 Outside Air (cfm/sgft) 0.16 Note: values above given at ARI conditions Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM I Sensiblel Latent 1, CFM I Sensible 1,062 16,984 1,460 347 4,806 0 849 240 0 0 115 3,832 186 115 5,362 0 10 849 240 23 11 1 646 10 649 Carrier 50HJQ004 --- (5/6)1 24,722 8,004 22,485 Total Adjusted System Output 2x,722 8=004 22,485 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Oct 2 pm Jan 12 am HEATING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Heating Peak) 26.0 of 65.6 of 83.2 of 83.2 of O Supply Air Ducts Outside Air 115 cfm 83.0 of Heating Coil Supply Fan 1200 cfm ROOMS 69.8 of 70.0 of Return Air Ducts I 06.0 / 73.4 of Outside Air 115 cfm 74.7/63.4 of res at Time of Coolina Pea 77.7 / 64.5 of 1111111 58.3 / 57.2 of Cooling Coil 0 Supply Fan 1200 cfm 58.3 / 57.2 of Supply Air Ducts 59.0/57 . 5 of 55.6% R.H. FROOMS 74.0 / 63.2 of h Return Air Ducts `S EnergyPro 4.4 by EnergySoft User Number: 5862 Job Number: Page: 22 of 24 1 ROOM LOAD SUMMARY PROJECT NAME Rosatis Pizza TI DATE 9/3/2008 SYSTEM NAME ` Existinq 4 Ton Unit(Cl)790 FLOOR AREA ROOM LOAD SUMMARY ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK ZONE NAME ROOM NAME Mult. CFM SENSIBLE LATENT CFM SENSIBLE LATENT CFM SENSIBLE Pick up Area Pick Up Area 1 1,301 16,703 1,580 1,301 16,703 1,580 453 6,732 PAGE TOTAL 1 1,301 16,703 1,580 453 6,732 TOTAL 1,301 16,703 1,580 453 6,732 EnergyPro 4.4 by EnergySoft User Number: 5862 Job Number: Page: 23 of 24 ROOM LOAD SUMMARY PROJECT NAME DATE Rosatis Pizza TI 9/3/2008 SYSTEM NAME FLOOR AREA Existing 3 Ton Unit 730 ROOM LOAD SUMMARY ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK ZONE NAME ROOM NAME Mult. CFM SENSIBLE LATENT CFM SENSIBLE LATENT CFM SENSIBLE Cookin -Pre area Cooking -Prep Area 1 140 6 2 16 984 1,460 1 062 16,984 1,460 347 4,806 PAGE TOTAL 1 1,062 16,984 1,460 347 4,806 TOTAL 1 1,062 16,984 1,460 347 4,806 EnergyPro 4.4 by EnergySoft User Number: 5862 Job Number: Page: 24 of 24