12-0074 (RC) Title 24BUILDING ENERGY ANALYSIS REPORT
PROJECT:
TENANT IMPROVEMENT
-A9640 HIGHWAY 111
LA QUINTA, CA 92210
Project Designer:
Report Prepared by:
Perfect Design
PERFECT DESIGN & DEVELOPMENT, INC.
2416 W Valley Blvd
Alhambra, Ca 91803
(626)289-8808
0 � I'l IRECEi.VTED
CITY OF LA QUINTA JUN 0 4 2012
BUILDING & SAFETY DEPT,
APPROVED BY: VOFES
FOR CONSTRUCTION _;{ Job Number: y ND
DA ZBY G12 -076R o. -2 635
P. 6-3 -93
Date:
l' q 1G ��\P
5/16/2012 FOFCaL o�
The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is
authorized by the California Energy Commission for use with both the Residential and Nonresidential 2008 Building Energy Efficiency Standards.
This program developed by EnergySoft, LLC — www.energysoft.com.
Energ Pro 5.1 by EnergySoft User Number: 1919 RunCode: 2012-05-16708:32:15 /D: G12 -076R
TABLE OF CONTENTS
Cover Page 1
Table of Contents 2
Nonresidential Performance. Title 24 Forms 3
Form ENV -MM Envelope Mandatory Measures 17
Form MECH-MM Mechanical Mandatory Measures 18
HVAC System Heating and Cooling Loads Summary .19.
Zone Load Summary 21
Room Load Summary 23
Room Heating Peak Loads 25
Room Cooling Peak Loads 27
Room Cooling Coil Loads 29
EnergyPro 5.1 by EnergySoft Job Number: ID: G12 -076R User Number: 1919
PERFORMANCE CERTIFICATE OF COMPLIANCE (Part 1 of 3) PERF -1C
Project Name
Date
TENANT IMPROVEMENT
1 5/16/2012
Project Address
Climate Zone
Total Cond. Floor Area
Addition Floor Area
29640 HIGHWAY 111 LA QUINTA
CA Climate Zone 15
4,250
0
GENERAL INFORMATION
Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Relocatable - indicate ❑ specific climate zone ❑ all climates
Phase of Construction: ❑ New Construction ❑ Addition ® Alteration
STATEMENT OF COMPLIANCE
This certificate of compliance lists the building features and specifications needed to
comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This
certificate applies only to a Building using the performance compliance approach.
The documentation author hereby certifies that the documentation is accurate a; '110 ete q�
Documentation Author
^ '
(MMI'M
Name Perfect Design
Signatur f
m
Company PERFECT DESIGN & DEVELOPMENT, INC.
Q30 201'
Address 2416 W Valley Blvd VNU lone 6)289-8808
City/State/Zip Alhambra, Ca 91803 H
V. of
The Principal Designer hereby certifies that the proposed building design represen
construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with
any other calculations submitted with this permit application. The proposed building has been designed to meet the energy
efficiency requirements contained in sections 110, 116 through 118, and 140 through 149 of Title 24, Part 6. Please
check one:
ENV. LTG. MECH.
I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to
❑ ❑ ❑ sign this document as the person responsible for its preparation; and that I am licensed in the State of
California as a civil engineer, mechanical engineer, electrical engineer, or I am a licensed architect.
I affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code by section
❑ ❑ ❑ 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed
contractor performing this work.
I affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document
❑ ❑ ❑ because it pertains to a structure or type of work described as exempt pursuant to Business and Professions
Code Sections 5537, 5538 and 6737.1.
Principal Envelope Designer
Name
Signature
Company Date
Address License #
City/State/ZipQVpF /Q�� \Phone
Principal Mechanical Designer
Name RAYMOND M. ZHONG, P.E.
fti;4-e
Company PERFECT DESIGN & DEVELOPMENT, INC. ` i�. `r v�
oil 1.3
Address 2416 W. VALLEY BLVD {i Inc se #
City/State/Zip ALHAMBRA, CA 91803 J'� C A ne (626) 280-8808
Principal Lighting Designer
OF FAQ
Name
Signature
Company Lighting Compliance Not In The Scope Of This Submittal Date rpt'
Address License #
City/State/Zip Phone
INSTRUCTIONS TO APPLICANT COMPLIANCE & WORKSHEETS (check box if worksheets are included)
m ENV -1 C Certificate of Compliance. Required on plans. m MECH-1 C Certificate of Compliance. Required on plans.
❑ LTG -1C Certificate of Compliance. Required on plans. m MECH-2C Air/Water Side/Service Hot Water & Pool Requirements.
❑ LTG -2C Lighting Controls Credit Worksheet. m MECH-3C Mechanical Ventilation and Reheat.
❑ LTG -3C Indoor Lighting Power Allowance. m MECH-5C Mechanical Equipment Details.
Energ Pro 5.1 by Energ Soft User Number: 1919 RunCode: 2012-05-16T08:32:15 ID: G12 -076R Page 3 of 30
PERFORMANCE CERTIFICATE OF COMPLIANCE
TENANT IMPROVEMENT
ANNUAL TDV ENERGY USE SUMMARY kBtu/s ft- r
Standard Proposed Compliance
Energy Component Design Design Margin
Space Heating
Space Cooling
Indoor Fans
Heat Rejection
Pumps & Misc.
Domestic Hot Water
Lighting
Receptacle
Process
Process Lighting
TOTALS
0.12
0.12
0.00
387.91
387.91
0.00
95.44
95.44
0.00
0.00
0.00
0.00
0.00
0.00
0.00
72.64
67.64
5.00
184.10
184.10
0.00
91.38
91.38
0.00
0.00
0.00
0.00
0.00
0.00
0.00
831.59
826.59
5.00
Part 2of3
Heating
Cooling
Fans
Heat Rej
Pumps
DHW
Lighting
Receptacle
Process
Process Ltg
Percent better than Standard 0.6 0.6 % excluding process)
BUILDING COMPLIES
PERF -1 C
Date
5/16/2012
GENERAL INFORMATION
Building Orientation (S)180 deg Conditioned Floor Area 4,250 sqft.
Number of Stories 1 Unconditioned Floor Area 0 sqft.
Number of Systems 2 Conditioned Footprint Area 4,250 sqft.
Number of Zones 2 Natural Gas Available On Site yes
Front Elevation .
Left Elevation
Rear Elevation
Right Elevation
Total
Roof
Orientation. Gross Area
(S)
738
(M
0
(N)
738
(E)
0
1,476
4, 250
sgft.
sqft.
sqft.
sqft.
sqft.
sqft.
Gla7inn Area
360
0
0
0
360
0
sqft.
sqft.
sqft.
sqft.
sqft.
sqft.
Glazinn Ratio
48.8
0.0%
0.0
0.0%
24.4
0.0
Standard Proposed Prescriptive Values for
Prescriptive Lighting Power Density 1.600 W/sgft. 1.600 W/sgft. Comparison only. See
Prescriptive Envelope TDV Energy 90,864 348,572 LTG -1 C for allowed LPD.
I Remarks:
i tnergyrro o.1 by tnergy.�ion user Number. 1919 RunCode: 2012-05-16708:32:15 /D: G12 -076R Pape 4 of 30
PERFORMANCE CERTIFICATE OF COMPLIANCE (Part 3 of 3) PERF -1 C
Project Name
TENANT IMPROVEMENT
Date
1511612012
ZONE INFORMATION
System Name
Zone Name
Occupancy T
Type
Floor
Area
ft
s .
Inst.
LPD
W/sf 1
Ctrl.
Credits
W/sf 2
Allowed LPD
Proc.
Loads
W/sf
AreaTailored
W/Sf a W/sf 4
PHP -1 AREA
PHP -1 AREA
Retail Sales, Wholesale
3,000
'1.600
PHP -2 AREA
PHP -2 AREA
Retail Sales, Wholesale
1,250
'1.600
Notes: 1. See LTG -1C 2. See LTG -2C 3. See LTG -3C 4. See LTG -4C
items marked with asterisk, see LTG -1 -C b others b others
Items above require special documentation
EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST
The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written
justification and documentation, and special verification to be used with the performance approach. The local enforcement agency
determines the adequacy of the justifications, and may reject a building or design that otherwise complies based on the adequacy of the
special justification and documentation submitted.
The HVAC System PHP -1 AREA includes Demand Control Ventilation per Standards Section 121.
The exceptional features listed in this performance approach application have specifically been reviewed. Adequate written justification and
documentation for their use have been provided by the applicant.
Authorized Signature or Stamp
Ener Pro 5.1 by Energ Soft User Number: 1919 RunCode: 2012-05-16T08:32:15 /D: G12 -076R Page 5 of 30
CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV -1C
AND FIELD INSPECTION ENERGY CHECKLIST
Project Name
TENANT IMPROVEMENT
Date
5/16/2012
Project Address
29640 HIGHWAY 111 LA QUINTA
Climate Zone
15
Total Cond. Floor Area
4,250
Addition Floor Area
0
GENERAL INFORMATION
Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Schools (Public School) ❑ Relocatable Public School 0 Conditioned Spaces ❑ Unconditioned Spaces
Bldg.
❑ Skylight Area for Large Enclosed Space >_ 8000 tt2 (If checked include the ENV -4C with submittal)
Phase of Construction: ❑ New Construction ❑ Addition m Alteration
Approach of Compliance: ❑ Component ® Overall Envelope ❑ Unconditioned (file affidavit)
Front Orientation: N, E, S, W or in Degrees:
180 deg
FIELD INSPECTION ENERGY CHECKLIST
OPAQUE SURFACE DETAILS
INSULATION
Ta /ID
Assembly Type
Q
o
CN
dui
O z
V
n
«a•2
g�
U M
ofof
d
d2
W>
•C C
d'c
W LL
O O
_�
5>
O C
LL
X
C
�a
CL
a
N
��
0
v N
a
cc
LL
1
Roof
3,000
(N)
0.075
R-191
4.2.2-A5
Existing
❑
❑
2
Wall
0
(W)
0.356
None
4.3.1-A1
Existing
❑
❑
3
Wall
438
(N)
0.356
None
4.3.1-A1
Existing
❑
❑
4
Wall
198
(S)
0.356
None
4.3.1-A1
Existing
❑
❑
5
Slab
3,000
(N)
0.730
None
4.4.7-A 1
Existing
❑
❑
6
Demising
1,524
(N)
0.102
R-13
4.3.1-A3
New
❑
❑
7
Roof
1,250
(N)
0.075
R-19
4.2.2-A5
Existing
❑
❑
8
Wall
0
(E)
0.356
None
4.3.1-A1
Existing
❑
❑
❑
o
❑
❑
1. See Instructions -in the Nonresidential Compliance Manual, page 3-96.
2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance.
FENESTRATION SURFACE DETAILS
Tag/ID
Fenestration
Type
a
e
C
O z
d
2 n
d
V L
M y
O
U
LS'
Z
d
V`
V) U)
of
l0
c
'.O-. H
7
U in
a0
Li
1
Window
240
(S)
1.190
Default
0.830
Default
®
Existing
❑
❑
2
Window
120
(S)
1.190
Default
0.830
Default
®
Existing
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
a
❑
❑
❑
❑
❑
❑
1. See Instructions in the Nonresidential Compliance Manual, page 3-96.
2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary.
Ener Pro 5.1 by EnergySoft User Number. • 1919 RunCode: 2012-05-16708:32:15 /D: G12 -076R Pae 6 of 30
CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV-1 C
AND FIELD INSPECTION ENERGY CHECKLIST
Project Name
TENANT IMPROVEMENT
Date
5/16/2012
Project Address
29640 HIGHWAY 111 LA QUINTA
Climate Zone
15
Total Cond. Floor Area
4,250
Addition Floor Area
0
GENERAL INFORMATION
Building Type: ® Nonresidential ❑ High-Rise Residential ❑ Hotel/Motel Guest Room
❑ Schools (Public School) [3Blldlocatable Public Schoolg. m Conditioned Spaces ❑ Unconditioned Spaces
❑ Skylight Area for Large Enclosed Space z 8000 ft2 (If checked include the ENV-4C with submittal)
Phase of Construction: ❑ New Construction ❑ Addition m Alteration
Approach of Compliance: ❑ Component 0 Overall Envelope ❑ Unconditioned (file affidavit)
Front Orientation: N, E, S, W or in Degrees:
180 deg
FIELD INSPECTION ENERGY CHECKLIST
OPAQUE SURFACE DETAILS
INSULATION
'
/ID
AssemblyType
c
° 3
c N
01 W
O z
01
:3
7
'> 01
v
0
01 7
0 t
01
OC
7
S>
E
a
x
c O.
'O O
o
" y
c
p
N
0
a
�—
0
LLTa
9
Wall
180
(S)
0.356
None
4.3.1-A1
Existing
❑
❑
10
Wall
300
(N)
0.356
None
4.3.1-A1
Existing
❑
❑
11
Slab
1,250
(N)
0.730
None
4.4.7-A 1
Existing
❑
❑
12
Demising
1,524
(N)
0.102
R-13
4.3.1-A3
New
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
1. See Instructions in the Nonresidential Compliance Manual, page 3-96.
2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance.
FENESTRATION SURFACE DETAILS
Tag/ID
Fenestration
Type
l0
�'
a
03
vj
CW
a
OZ
O
00
LL
2>
O y
00 0
LL 'o
> cn
v
(7
_
CO
iE
0)
U 0
= 'o
mm
rn
l0
L
>
O
c
O H
:O 7
o
vut
V1
a
r
LL
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
LO
1. See Instructions in the Nonresidential Compliance Manual, page 3-96.
2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary.
EnergyPro 5.1 by EnergySoft User Number: 1919 RunCode: 2012-05-16T08:32:15 /D: G12-076R Page 7 of 30
CERTIFICATE OF COMPLIANCE (Part 2 of 3)
AND FIELD INSPECTION ENERGY CHECKLIST
ENV -1 C
Project Name
TENANT IMPROVEMENT
Date
5/16/2012
ROOFING PRODUCT COOL ROOFS
(Note if the roofing product is not CRRC certified, this compliance approach cannot be used). Go to Overall Envelope Approach or
Performance Approach.
CHECK APPLICABLE BOX BELOW IF EXEMPT FROM THE ROOFING PRODUCT "COOL ROOF" REQUIREMENTS:
Pass
Fail'
N/A
❑ . Roofing compliance not required in Climate Zones 1 and16 with a Low -Sloped. 2:12 pitch or less.
❑
❑
❑
❑ Roofing compliance not required in Climate Zone 1 with a Steep -Sloped with less than 5 Ib/ft2. Greater than 2:12 pitch.
❑
❑
❑
❑ Low -sloped Wood framed roofs in Climate Zones 3 and 5 are exempted, solar reflectance and thermal emittance or
SRI that have a U -factor of 0.039 or lower. See Opaque Surface Details roof assembly, Column H of ENV -2C.
❑
❑
❑
Metal building roofs in Climate Zone 3 and 5 are exempted, solar relectance and thermal emittance or SRI
13thathave a LI -factor of 0.048 or lower. See Opaque Surface Details roof assemblybelow, Column H of ENV -2C.
13
❑
13that
❑ The roof area covered by building integrated photovoltaic panels and building integrated solar thermal panels are
exempted. Solar reflectance and thermal emittance or SRI, seespreadsheet calculator at www.ener .ca. ov/title24/
❑
❑
❑
Roof constructions that have thermal mass over the roof membrane with a weight of at least 25 Ib/ft are exempt from
❑ the Cool -Roof criteria below.
❑
❑
❑
❑ High-rise residential buildings and hotels and motels with low -sloped roofs in Climate Zones 1 through 9, 12 and 16 are
exempted from the low -sloped roofing criteria.
❑
❑
❑
1. If Fail then.describe on this page of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary.
CRRC Product ID
Number'
Roof Slope
s 2:12 > 2:12
Product Weight
< 5Ib/fe z 5Ib/ff
Product
Type 2
Aged Solar
Reflectance
Thermal
Emmitance
SRI5
Pass
Fails
❑ ❑
❑ ❑
❑ 4
❑
❑
❑ ❑
❑ ❑
❑ 4
❑
❑
❑ ❑
1 ❑ ❑
4
134
❑
❑
❑ ❑
❑ ❑
❑ 4
❑
❑
❑ ❑
❑ ❑
❑ 4
❑
❑
❑ ❑
❑ ❑
❑ 4
❑
❑
1. The CRRC Product ID Number can be obtained from the Cool Roof Rating Council's Rated Product Directory at
www.coolroofs.ora/products/search 'PhhP
2. Indicate the type of product is being used for the roof top, i.e. single -ply roof, asphalt roof, metal roof, etc.
3. If the Aged Reflectance is not available in the Cool Roof Rating Council's Rated Product Directory then use the Initial Reflectance value from the
same directory and use the equation (0.2+0.7(p;niw — 0.2) to obtain a calculated aged value. Where p is the Initial Solar Reflectance from the Cool
Roof Rating Council's Rated Product Directory.
4. Check box if the Aged Reflectance is a calculated value using the equation above.
5. The SRI value needs to be calculated from a spreadsheet calculator at htto://www.eneroy.ca.00v/title24/
6. If Fail then describe on this page of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary.
To apply Liquid Field Applied Coatings, the coating must be applied across the entire roof surface and meet the dry mil thickness or coverage
recommended by the coatings manufacturer and meet minimum performance requirements listed in §118(i)4. Select the applicable coating:
❑ Aluminum -Pigmented Asphalt Roof Coating
❑ Cement -Based Roof Coating
❑ Other
Discrepancies:
Ener Pro 5.1 by EnerqySoft User Number: 1919 RunCode: 2012-05-16T08:32:15 ID: G12 -076R
Page 8 of 30
CERTIFICATE OF COMPLIANCE (Part 3 of 3) ENV -1C
AND FIELD INSPECTION ENERGY CHECKLIST
Project Name
TENANT IMPROVEMENT
Date
1511612012
Required Acceptance Tests
Designer:.
This form is to be used by the designer and attached to the plans. Listed below is the acceptance test for Envelope
Fenestrations system. The designer is required to check the acceptance tests and list all the fenestration products that
require an acceptance test. If all the site -built fenestration of a certain type requires a test, list the different fenestration
products and the number of systems. The NA7 Section in the Appendix of the Nonresidential Reference Appendices
Manual describes the test. Since this form will be part of the plans, completion of this section will allow the responsible
party to budget for the scope of work appropriately.
Enforcement Agency:
Systems Acceptance. Before Occupancy Permit is granted for a newly constructed building or space or whenever new
fenestration is installed in the building or space shall be certified as meeting the Acceptance Requirements.
The ENV -2A form is not considered a complete form and is not to be accepted by the enforcement agency unless the
boxes are checked and/or filled and signed. In addition, a Certificate of Acceptance forms shall be submitted to the
enforcement agency that certifies plans, specifications, installation certificates, and operating and maintenance
information meet the requirements of §10-103(b) of Title 24 Part 6. The field inspector must receive the properly filled
out and signed forms before the building can receive final occupancy. A copy of the ENV -2A for each different
fenestration product line must be provided to the owner of the building for their records.
Test Description ENV -2A Test Performed By:
Fenestration Products Name or ID Area of like Building* Envelope
Requiring Testing or Verification Products Acceptance Test
13
13
13
13
13
13
13
13
13
13
13
13
❑
EnergyPro 5.1 by EnergySoft User Number: 1919 RunCode: 2012-05-16T08:32:15 /D: G12 -076R Page 9 of 30
CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1C
FIELD INSPECTION ENERGY CHECKLIST
Project Name
TENANT IMPROVEMENT
Date
5/16/2012
Project Address .
29640 HIGHWAY 111 LA QUINTA
Climate Zone
15
Total Cond. Floor Area
4,250
Addition Floor Area
0
GENERAL INFORMATION
Building Type: ® Nonresidential ❑ High-Rise Residential ❑ Hotel/Motel Guest Room
❑ Schools (Public School) ❑ Relocatable Public School Bldg. m Conditioned Spaces ❑ Unconditioned Spaces
affidavit
Phase of Construction: ❑ New Construction ❑ Addition ® Alteration
Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit)
Energy
Front Orientation: N, E, S, W or in Degrees:
180 deg
HVAC SYSTEM DETAILS
FIELD INSPECTION ENERGY CHECKLIST
E ui ment2
Inspection Criteria
Meets Criteria
or Requirements
Pass
Fail — Describe Reason
Item or System Tags
i.e. AC-1, RTU-1, HP-1
DHW Heater
[3
❑
Equipment T e3:
Electric Res DHW Boiler
❑
❑
Number of Systems
1
❑
❑
Max Allowed Heating Capacity'
15,720 Btu/hr
❑
❑
Minimum Heating Efficiency'
1.00 EF
❑
❑
Max Allowed Cooling Capacity'
n/a
❑
❑
Cooling Efficiency'
n/a
❑
❑
Duct Location/ R-Value
n/a
❑
❑
When duct testing is required, submit
MECH-4A & MECH-4-HERS
n/a
13
❑
Economizer
n/a
❑
❑
Thermostat
n/a
❑
❑
Fan Control
n/a
❑
❑
E ui ment2
Inspection Criteria
FIELD INSPECTION ENERGY CHECKLIST
Pass
Fail — Describe Reason
Item or System Tags
AC-1, RTU-1, HP-1
PHP-1 AREA
13
13i.e.
E ui ment'T e3:
Packaged DX
❑
❑
Number of Systems
1
❑ -
❑
Max Allowed Heating Capacity'
114,000 Btu/hr
❑
❑
Minimum Heating Efficiency'
3.30 COP
❑
❑
Max Allowed Cooling Capacity'
116,000 Btu/hr
❑
❑
Cooling Efficiency'
10.3 EER
❑
❑
Duct Location/ R-Value
Conditioned / 0.0
❑
❑
When duct testing is required, submit
MECH-4A & MECH-4-HERS
No
13
❑
Economizer
Fixed Temp (Non-Integ)
❑
❑
Thermostat
Setback Required
❑
❑
Fan Control
Constant Volume
❑
❑
1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked.
3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other.
1EnergyPro5.1byEnerpySoft User Number: 1919 RunCode: 2012-05-16T08:32:15 ID: G12-076R Pae 10 of 30
CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1C
FIELD INSPECTION ENERGY CHECKLIST
Project Name
TENANT IMPROVEMENT
Date
5/16/2012
Project Address
29640 HIGHWAY 111 LA QUINTA
Climate Zone
15
Total Cond. Floor Area
4,250
Addition Floor Area
0
GENERAL INFORMATION
Building Type: ® Nonresidential ❑ High-Rise Residential ❑ Hotel/Motel Guest Room
❑ Schools (Public School) . ❑ Relocatable Public School Bldg. m Conditioned Spaces ❑ Unconditioned Spaces
affidavit
Phase of Construction: ❑ New Construction ❑ Addition ® Alteration
Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit)
Energy
Front Orientation: N, E, S, W or in Degrees:
180 deg
HVAC SYSTEM DETAILS
FIELD INSPECTION ENERGY CHECKLIST
E ui ment2
Inspection Criteria
Meets Criteria
or Requirements
Pass
Fail — Describe Reason
Item or System Tags
i.e. AC-1, RTU-1, HP-1
PHP-2 AREA
❑
❑
Eq ui ment Type 3:
Packaged DX
❑
❑
Number of Systems
1
❑
❑
Max Allowed Heating Capacity'
55,000 Btu/hr
❑
❑
Minimum Heating Efficiency'
7.00 HSPF
❑
❑
Max Allowed Cooling Capacity'
5 7, 000 Btu/hr
❑
❑
Cooling Efficiency'
10.0 SEER/ 10.0 EER
❑
❑
Duct Location/ R-Value
Conditioned / 0.0
❑
❑
When duct testing is required, submit
& MECH-4-HERS
No
[3
[3MECH-4A
Economizer
No Economizer
❑
❑
Thermostat
Setback Required
❑
❑
Fan Control
Constant Volume
❑
❑
E ui ment2
Inspection Criteria
FIELD INSPECTION ENERGY CHECKLIST
Pass
Fail — Describe Reason
Item or System Tags
AC-1, RTU-1, HP-1
❑
13i.e.
Equipment T e3
❑
❑
Number of Systems
❑
❑
Max Allowed Heating Capacity'
❑
❑
Minimum Heating Efficiency'
❑
❑
Max Allowed Cooling Capacity'
❑
❑
Cooling Efficiency'
❑
❑
Duct Location/ R-Value
❑
❑
When duct testing is required, submit
& MECH-4-HERS
13
13MECH-4A
Economizer
❑
❑
Thermostat
❑
❑
Fan Control
❑
❑
1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked.
3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other.
Ener Pro5.1 b Ene Soft User Number: 1919 RunCode: 2012-05-16T08:32:15 ID: G12-076R Pae 11 of 30
CERTIFICATE OF COMPLIANCE and (Part 2 of 4) MECH-1 C
FIELD INSPECTION ENERGY CHECKLIST
Project Name Date
TENANT IMPROVEMENT 5/16/2012
Discrepancies:
Ener Pro 5.1 by EnerqySoft User Number: 1919 RunCode: 2012-05-16T08:32:15 ID: G12 -076R Pae 12 of 30
AIR SYSTEM REQUIREMENTS
Part 1 of 2 MECH-2C
Project Name
Date
TENANT IMPROVEMENT
5/16/2012
Indicate
Air Systems Type Central,
Single Zone, Package, VAV, or etc...
Item or System Tags
i.e. AC -1, RTU -1, HP -1).
PHP -1 AREA
PHP -2 AREA
Number of Systems
1
1
Indicate Pa a Reference on Plans or Schedule and indicate the applicable exception(s)
MANDATORY MEASURES
T-24 Sections
Heating Equipment Efficiency
112(a)
3.30 COP
7.00 HSPF
Cooling Equipment Efficiency
112 (6)
10.3 EER
10.0 SEER/ 10.0 EER
HVAC Heat Pump Thermostat
112(b), 112(c)
Yes
Yes
Furnace Controls/Thermostat
112(c), 115(a)
n/a
n/a
Natural Ventilation
121 b
No
No
Mechanical Ventilation
121 b
900 cfm
375 cfm
VAV Minimum Position Control
121 c
No
No
Demand Control Ventilation
121 c
Yes
No
Time Control
.122(e)
Programmable Switch
Programmable Switch .
Setback and Setup Control
'122(e)
Setback Required
Setback Required
Outdoor Damper Control
122(f)
Auto
Auto
Isolation Zones
122W
n/a
n/a
.Pipe Insulation
123
Duct Location/ R -value
124
Conditioned /.0.0
Conditioned / 0.0
PRESCRIPTIVE MEASURES
Calculated Design Heating Load
144(a & b
n/a
n/a
Proposed Heating Capacity
144(a & b
105,331 Btu/hr
34,352 Btu/hr
Calculated Design Cooling Load
144(a & b
n/a
n/a
Proposed Cooling Capacity
144(a & b
77,872 Btu/hr
39,024 Btu/hr
Fan Control 4
144(c)
Constant Volume
Constant Volume
DP Sensor Location
144(c)
Supply Pressure Reset (DDC only)
144(c)
No
No
Simultaneous Heat/Cool
144(d)
No
No
Economizer
144(e)
Fixed Temp (Non-Integ)
No Economizer
Heat Air Supply Reset
144(f)
Constant Temp
Constant Temp
Cool Air Supply Reset
144(f)
Constant Temp
Constant Temp
Electric Resistance Heating'
144
Air Cooled Chiller Limitation
144(i)
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
I 144(k)
No
No
1. Total installed capacity (MBtu/hr) of all electric heat
on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used
explain which exception(s) to §144(g) apply..
EnergyPro 5.1 by EnergySoft User Number: 1919
RunCode: 2012-05-16708:32:15 ID: G12 -076R Pae 13 of 30
WATER SIDE SYSTEM REQUIREMENTS Part 2 of 2 MECH-2C
Project Name
Date
TENANT IMPROVEMENT k
5/16/2012
WATER SIDE SYSTEMS: Chillers, Towers, Boilers, H dronic Loops
Item or System Tags
(i.e. AC -1, RTU -1, HP -1)'
Number of Systems
Indicate Page Reference on Plans or Specification 2
MANDATORY MEASURES T-24 Sections
Equipment Efficiency 112(a)
Pipe Insulation 123
PRESCRIPTIVE MEASURES
Cooling Tower Fan Controls 144(a & b
Cooling Tower Flow Controls 144(h)
Variable Flow System Design 144(h)
Chiller and Boiler Isolation 144
CHW and HHW Reset Controls 144
WLHP Isolation Valves 144
VSD on CHW, CW & WLHP Pumps>5HP 144
DP Sensor Location 144
1. The proposed equipment need to match the building plans schedule or specifications. If a requirement is not applicable, put "N/A" in the column
next to applicable section.
2. For each chiller, cooling tower, boiler, and hydronic loop (or groups of similar equipment) fill in theyeference to sheet number and/or specification
section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" in the column next to
applicable section.
Service Hot Water, Pool Heating,
Item or System Tags
(i.e. WH -1, WHP, DHW, etc...)' DHW Heater
Number of Systems 1
Indicate Page Reference on Plans or Schedule
MANDATORY MEASURES T-24 Sections
SERVICE HOT WATER
Certified Water Heater 111, 113 a RHEEM 72V30-3
Water Heater Efficiency 113(b) 1.00 EF
Service Water Heating Installation 113(c) Controls Req.
Pipe Insulation 123 n/a
POOL AND SPA
Pool and Spa Efficiency and Control 114(a) n/a
Pool and Spa Installation 114(b) n/a
Pool Heater — No Pilot Light 115(c) n/a
Spa Heater — No Pilot Light 115(d) n/a
Pipe Insulation 123 Required
1. The Proposed equipment needs to match the building plans schedule or specifications. If a requirement is not applicable, put "N/A" in the column
next to applicable section.
2. For each water heater, pool heater and domestic water loop (or groups of similar equipment) fill in the reference to sheet number and/or
specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" in the
column.
EnergyPro 5.1 by Ener Soft User Number: 1919 RunCode: 2012-05-16708:32:15 /D: G12 -076R Pae 14 of 30
MECHANICAL VENTILATION AND REHEAT
MECH-3C
Project Name
TENANT IMPROVEMENT
Date
5/16/2012
MECHANICAL VENTILATION §121 b 2
REHEAT LIMITATION (§144(d))
AREA BASIS
OCCUPANCY
BASIS
VAV MINIMUM
A
B
C
D
E
F
G
H
I
J
K
L
M
N
Zone/System(ft)
Condition
Area
CFM
per
ft2
Min CFM
By Area
B X C
Number
Of
People
CFM
per
Person
Min CFM
by
Occupant
E X F
REQ'D
V.A.
Max of
D or G
Design
Ventilation
Air
CFM
50% of
Design Zone
Supply
CFM
B X 0.4
CFM / ft2
Max. of
Columns
H, J, K,
300 OFM
Design
Minimum
Air
Setpoint
Transfer
Air
PHP -1 AREA
3,000
0.25
750
60.0
15.0
900
900
900
PHP -1 AREA
Total
900
900
PHP -2 AREA
1,250
0.25
313
25.0
15.0
375
375
375
PHP -2 AREA
Total
375
375
Totals Column I Total Design Ventilation Air
C
Minimum ventilation rate per Section 121, Table 121-A.
E
Based on fixed seat or the greater of the expected number of occupants and 50% of the CBC occupant load foregress purposes fors aces without fixed seating.
H
Required Ventilation Air REQ'D V.A. is the larger of the ventilation rates calculated on an AREA BASIS or OCCUPANCY BASIS Column D or G).
I
Must be greater than orequal to H, or use Transfer Air column N to make up the difference.
J
Design fan supply CFM Fan CFM x 50%• or the design zone outdoor airflow rate per 121.
K
Condition area ft2 x 0.4 CFM / ft2; or
L
Maximum of Columns H, J, K, or 300 CFM
M
This must be less than orequal to Column L and greater than orequal to the sum of Columns H plus N.
N
Transfer Air must be provided where the Required Ventilation Air (Column H) is greater than the Design Minimum Air (Column M). Where required, transfer air must be greater than or
equal to the difference between the Required Ventilation Air Column H and the Design Minimum Air Column M), Column H minus M.
EnergyPro 5.1 by EnergySoft User Number: 1919 Run Code: 2012-05-16T08:32:15 ID: G12 -076R
Paa 15 of 30
MECHANICAL EQUIPMENT DETAILS
Part 1 of 2 MECH-5C
Project Name
TENANT IMPROVEMENT
Date
5/16/2012
CHILLER AND TOWER SUMMARY
PUMPS
Equipment Name Type
Qty. Efficiency Tons
I.Pump
Qty. GPM BHP Control
DHW / BOILER SUMMARY
System Name Type
Vol.
Distribution City. Rated Input (Gals).
Energy Factor
or RE
Standby Loss Tank Ext.
or Pilot R -Value Status
RHEEM 72V30-3 Small Elec.
All Pipes Ins 1 15,720 30
1.00
n/a n/a Ne
MULTI -FAMILY CENTRAL WATER HEATING DETAILS
Hot Water Pump
Hot Water Piping Length ft
Control Qty. HP
Type In Plenum
Outside Buried Add 1/2" Insulation
CENTRAL SYSTEM RATINGS
HEATING
COOLING
System Name Type
aty. Output Aux. kW Eff iciency
Output
Eff iciency Status
EXISTING A/C UNIT (10 TON) Packaged DX
1 114,000 10.0 3.30 COP
116,000
10.3 EER Existing
EXISTING A/C UNIT (5 TON) Packaged DX
1 55,000 0.0 7.00 HSPF
57,000
10.0 SEER/ 10.0 EER Existing
CENTRAL SYSTEM FAN SUMMARY
SUPPLY FAN
RETURN FAN
System Name Fan Type
Economizer Type CFM
BHP CFM BHP
EXISTING A/C UNIT (10 TON) Constant Volume
Fixed Temp (Non-Integ)
4,000
2.00 none
EXISTING A/C UNIT 5 TON Constant Volume
No Economizer
2,000
0.85 none
Ener Pro 5.1 by EnergySoft User Number: 1919
RunCode: 2012-05-16708:32:15
ID: G12 -076R
Pae 16 of 30
ENVELOPE MANDATORY MEASURES: NONRESIDENTIAL ENV -MM
Project Name
Date
TENANT. IMPROVEMENT
5/16/2012
DESCRIPTION
Building Envelope Measures:
§118(a): Installed insulating material shall have been certified by the manufacturer to comply with the California Quality
Standards for insulating material, Title 20 Chapter 4,. Article 3.
§118(c): All Insulating Materials shall be installed in compliance with the flame spread rating and smoke density requirements of
Sections 2602 and 707 of Title 24, Part 2.
§118(f): The opaque portions of framed demising walls in nonresidential buildings shall have insulation with an installed R -value
of no less than R-13 between framing members.
§117(a): All Exterior Joints and openings in the building that are observable sources of air leakage shall be caulked, gasketed,
weatherstripped or otherwise sealed.
Manufactured fenestration products and exterior doors shall have air infiltration rates not exceeding 0.3 cfm/ft.2 of
§116(a) 1: window area, 0.3 cfm/ft.2 of door area for residential doors, 0.3 cfm/ft.2 of door area for nonresidential single doors
(swinging and sliding), and 1.0 cfm/ft.2 for nonresidential double doors swin in .
§116(a) 2: Fenestration U -factor shall be rated in accordance with NFRC 100, or the applicable default U -factor.
§116(a) 3: Fenestration SHGC shall be rated in accordance with NFRC 200, or NFRC 100 for site -built fenestration, or the
applicable default SHGC.
16 b Site Constructed Doors, Windows and Skylights shall be caulked between the unit and the building, and shall be
§1 ()'
weatherstripped (except for unframed glass doors and fire doors).
Ener Pro 5.1 6k EnerqySoft User Number: 1919 RunCode: 2012-05-16708:32:15 /D: G12 -076R Pae 17 of 30
MECHANICAL MANDATORY MEASURES: NONRESIDENTIAL MECH-MM
Project Name
Date
TENANT IMPROVEMENT
5/16/2012
Equipment and System Efficiencies
§111:
Any appliance for which there is a California standard established in the Appliance Efficiency Regulations will comply
with the applicable standard.
§115(a):
Fan type central furnaces shall not have a pilot light.
§123:
Piping, except that conveying fluids at temperatures between 60 and 105 degrees Fahrenheit, or within HVAC
equipment, shall be insulated in accordance with Standards Section 123.
§124:
Air handling duct systems shall be installed and insulated in compliance with Sections 601, 602, 603, 604, and 605 of
the CMC Standards.
Controls
§122(e):
Each space conditioning system shall be installed with one of the following:
1A.
Each space conditioning system serving building types such as offices and manufacturing facilities (and all others not
explicitly exempt from the requirements of Section 112 (d)) shall be installed with an automatic time switch with an
accessible manual override that allows operation of the system during off -hours for up to 4 hours. The time switch
shall be capable of programming different schedules for weekdays and weekends and have program backup
capabilities that prevent the loss of the device's program and time setting for at least 10 hours if power is interrupted; or
1 B.
An occupancy sensor to control the operating period of the system; or
1C.
A 4 -hour timer that can be manually operated to control the operating period of the system.
2
Each space conditioning system shall be installed with controls that temporarily restart and temporarily operate the
system as required to maintain a setback heating and/or a setup cooling thermostat setpoint.
Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000
§122(8)'
square feet shall be provided with isolation zones. Each zone: shall not exceed 25,000 square feet; shall be provided
with isolation devices, such as valves or dampers that allow the supply of heating or cooling to be setback or shut off
independently of other isolation areas; and shall be controlled by a time control device as described above.
§122(c):
Thermostats shall have numeric setpoints in degrees Fahrenheit (F) and adjustable setpoint stops accessible only to
authorized personnel.
§122(b):
Heat pumps shall be installed with controls to prevent electric resistance supplementary heater operation when the
heating load can be met by the heat pump alone
Each space conditioning system shall be controlled by an individual thermostat that responds to temperature within the
zone. Where used to control heating, the control shall be adjustable down to 55 degrees F or lower. For cooling, the
§122(a&b):
control shall be adjustable up to 85 degrees F or higher. Where used for both heating and cooling, the control shall be
capable of providing a deadband of at least 5 degrees F within which the supply of heating and cooling is shut off or
reduced to a minimum.
Ventilation
§121(e):
Controls shall be provided to allow outside air dampers or devices to be operated at the ventilation rates as specified
on these plans.
§122(f):
All gravity ventilating systems shall be provided with automatic or readily accessible manually operated dampers in all
openings to the outside, except for combustion air openings.
Ventilation System Acceptance. Before an occupancy permit is granted for a newly constructed building or space, or a
§121(f):
new ventilating system serving a building or space is operated for normal use, all ventilation systems serving the
building ors ace shall be certified as meeting the Acceptance Requirements for Code Compliance
Service Water Heating Systems
§113(c)
Installation
3.
Temperature controls for public lavatories. The controls shall limit the outlet Temperature to 110° F.
2
Circulating service water -heating systems shall have a control capable of automatically turning off the circulating pump
when hot water is not required.
Ener Pro 5.1 by En ergySoft User Number: 1919 RunCode: 2012-05-16T08:32:15 ID: G12 -076R Pae 18 of 30
HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
Project Name
TENANT IMPROVEMENT
Date
5/16/2012
System Name
PHP -1 AREA
Floor Area
3,000
ENGINEERING CHECKS
SYSTEM LOAD
Number of Systems
1
COIL
CFM
Total Room Loads 7.929
Return Vented Lighting
Return Air Ducts
Return Fan
Ventilation 900
Supply Fan
Supply Air Ducts
TOTAL SYSTEM LOAD
COOLING PEAK COIL HTG.
PEAK
Heating System
Sensible
Latent CFM
Sensible
Output perSystem
114,000
71,563
12,000 800
40,459
Total Output Btuh
114,000
0
Output Btuh/s ft
38.0
3,578
2,023
Cooling System
0
0
Output perSystem
116,000
34,614
-492 900
41,688
Total Output Btuh
116,000
0
3,5781
113,333 11,508
0
Total Output Tons
9.7
2,023
Total Output Btuh/s ft
38.7
Total Output s ft/Ton
310.3
86,192
Air System
CFM perSystem
4,000
HVAC EQUIPMENT SELECTION
Airflow cfm
4,000
EXISTING A/C UNIT (10 TON) 77,872 34,968
71,201
Airflow cfm/s ft
1.33
10.0 kW Supplemental Electric
34,130
Airflow cfm/Ton
413.8
Outside Air %
22.5 %
Total Adjusted System Output 77,872 34,968 105,331
(Adjusted for Peak Design conditions)
TIME OF SYSTEM PEAK Aug 2 PM Jan 1 AM
Outside Air cfm/s ft 0.30
Note: values above givin at ARI conditions .
HEATING SYSTEM PSYCHROMETRICS
Airstream Temperatures at Time of Heating Peak
26 OF 60 OF
Outside Air
900 cfm Supply Fan
4.000 cfm
70 OF •
60 OF 110 OF 118 OF
G
Heating Coil Aux. Heat Coil
118 OF
ROOM
70 OF
COOLING SYSTEM PSYCHROMETICS Airstream Temperatures at Time of Cooling Peak
111178°F 83/70°F 83/70°F 65/64°F
Outside Air
Ar
900 cfm Supply Fan Cooling Coil 66 / 64 OF
4,000 cfm--------- ........ ..... _........
71.9% ROOM
75168 OF 74 ! 67 OF
EnergyPro 5.1 by EnergySoft User Number: 1919 RunCode: 2012-05-18708:32:15 ID: G12 -076R Page 19 of 30
HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
Project Name
TENANT IMPROVEMENT
Date
5/16/2012
System Name
PHP -2 AREA'
Floor Area
1,250
ENGINEERING CHECKS
SYSTEM LOAD
Number of Systems
1
COIL
CFM
Total Room Loads 3,277
Return Vented Lighting
Return Air Ducts
Return Fan
Ventilation 375
Supply Fan
Supply Air Ducts
TOTAL SYSTEM LOAD
COOLING PEAK
Sensible
34,621
0
1,731
0
14,433
0
1,731
52,517
COIL HTG.
Latent CFM
5,000 619
1,093 375
6,093
PEAK
Heating System
Sensible
Output per System 55,000
25,957
Total Output Btuh 55,000
Output Btuh/s ft 44.0
1,298
Cooling System
0
Output per System 57,0001
17,316
Total Output Btuh 57,000
0
Total Output Tons 4.8
1,298
Total Output Btuh/s ft 45.6
Total Output s ft/Ton 2632
45,869
Air System
CFM per System
2,000
HVAC EQUIPMENT SELECTION
Airflow cfm
2,000
EXISTING A/C UNIT (5 TON)
39,024
15,365
34,352
Airflow cfm/s ft
1.60
Airflow cfm/Ton 421.1
.Outside Air %
18.8%1
Total Adjusted System Output
(Adjusted for Peak Design conditions)
TIME OF SYSTEM PEAK
39,024
15,365
Aug 2 PM
34,352
I Jan 1 AM
Outside Air cfm/s ft 0.30
Note: values above given at ARI conditions .
HEATING SYSTEM PSYCHROMETRICS
Airstream Temperatures at Time of Heating
Peak
26 OF 61 OF
0
Outside Air
AV -
375 cfm Supply Fan
2,000 cfm
69 OF
61 OF 110 OF
Heating Coil
109 OF
ROOM M
70 OF
COOLING SYSTEM PSYCHROMETICS Airstream Temperatures at Time of Cooling Peak
111 / 78 °F 82 / 69 OF 82 ! 69 OF 63 / 62 OF
o
Outside Air
375 cfm Supply Fan Cooling Coil
2.000 cfm
75/67°F
68.0%
64 / 63 OF
_......-......................_................
ROOM
74/66°F
EnergyPro 5.1 by EnergySoft User Number: 1919 RunCode: 2012-05-16708:32:15
ID: G12 -076R Page 20 of 30
• •��i
Project
DaTENANT te
Name
PHP-1-AAREA
FloorSystem
III
'ZONE•
• .. NAM
SYSTEM NAME
M
(BLOCK LOAD)
SUMMARY
-ZONE•AD
Project
--•
Date.TENANT
System Name
PHP -2 AREA
..
.1,250
ZONE LOAD SUMMARY
m
•COOLING
(BLOCKCFM
LOAD)
ROOM LOAD SUMMARY
Project Name Date
TENANT IMPROVEMENT 5/16/2012
System Name Floor Area
PHP -1 AREA 3, 000
ROOM LOAD SUMMARY
ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK
Zone Name Room Name Mult. CFM Sensible I Latent CFM I Sensible I Latent I CFM I Sensible
PHP -1 AREA FLOOR PLAN 1 1 8,2431 74,3951 12,000 1 7,929 1 71,5631 12,0001 8001 40,459
PAGE TOTAL
TOTAL"
7,929
71,5631
12,0001
800
40,459
7,929
71,5631
12,0001
800
40,45d
Total includes. ventilation load for zonal systems. I
Ener Pro 5.1 by EnerqySoft User Number: 1919 RunCode: 2012-05-16708:32:15 ID: G12 -076R Page 23 of 30
ROOM LOAD SUMMARY
Project Name Date
TENANT IMPROVEMENT 5/16/2012
System Name Floor Area
PHP -2 AREA. 1,250
ROOM LOAD SUMMARY
ROOM COOLING PEAK I COIL COOLING PEAK COIL HTG. PEAK
Zone Name Room Name Mult. CFM I Sensible Latent CFM Sensible Latent CFM Sensible
PHP -2 AREA FLOOR PLAN 1 3,417 36,0931 5,0001 3,2771 34,6211 5,0001 619 25, 957
I" Total includes ventilation load for zonal
PAGE TOTAL
TOTAL*
3,277
34,621
5,000
619
25,957
3,277
34,621
5,000
619
25,957
ROOM HEATING PEAK LOADS
Project Name
TENANT IMPROVEMENT.
Date
5/16/2012
ROOM INFORMATION
DESIGN CONDITIONS
Room Name FLOOR PLAN
Floor Area 3,000.0 ft'
Indoor Dry Bulb Temperature 70 OF
Time of Peak Jan 1 AM
Outdoor Dry Bulb Temperature 26 OF
Conduction
Area
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
to
Ceiling
U -Value
AT °F Btu/hr
X 44 = 9,900
X 44 = 9,962
X 44 = 12,566
X 44 = 8,030
X 0 = 0
X =
X =
X =
X -
X =
X =
X _
X =
X =
X =
X =
X =
X =
X =
X =
X =
X =
X =
X =
X =
X =
X =
X =
X =
X =
X =
Page Total 40,459
/ 60 ] X 44 = 0
AT
Default Roof Prior to 1978
3,000.0
0.0750
Default Wall Prior to 1978
636.0
0.3560
Single Metal Clear
240.0
1.1900
Slab -On -Grade
pen .m = 250.0
0.7300
'R-13 Wall
1,524.0
0.1020
Items shown with an asterisk (') denote conduction
Infiltration:[ 1.00 X 1.064
Schedule Air Sensible
Fraction
through an interior surface
X 3,000 X
Area
another room
12.00 X 0.000
Height ACH
TOTAL HOURLY HEAT LOSS FOR ROOM 40,459
Energ Pro 5.1 by Ener Soft User Number: 1919 RunCode: 2012-05-16708:32:15 ID: G12 -076R Page 25 of 30
ROOM HEATING PEAK LOADS
Project Name
TENANT IMPROVEMENT
Date
5/16/2012
ROOM INFORMATION
DESIGN CONDITIONS
Room Name FLOOR PLAN
Floor Area 1,250.0 ft'
Indoor Dry Bulb Temperature 70 °F
Time of Peak Jan 1 AM
Outdoor Dry Bulb Temperature 26 OF
Conduction
Area
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
.X
X
X
to
Ceiling
U -Value
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
AT *F Btu/hr
44 = 4,125
44 = 7,519
44 = 6,283
44 = 8,030
0 = 0
=
=
=
=
=
=
=
_
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
Page Total 25,957
/60] X 44 = 0
AT
Default Roof Prior to 1978
1,250.0
0.0750
Default Wall Prior to 1978
480.0
0.3560
Single Metal Clear
120.0
1.1900
Slab -On -Grade
perim = 250.0
0.7300
*R-13 Wall
1,524.0
0.1020
Items shown with an asterisk (*) denote conduction
Infiltration:[ X 1.064
Schedule Air Sensible
Fraction
through an interior surface
X 1,250 X
Area
another room
12.00 X 0.000
Height ACH
TOTAL HOURLY HEAT LOSS FOR ROOM 25,957
EnefqyPro 5.1 by Energ Soft User Number: 1919 RunCode: 2012-05-16T08:32:15 ID: G12 -076R Page 26 of 30
ROOM COOLING PEAK LOADS
Project Name
Date
TENANT IMPROVEMENT
5/16/2012
ROOM INFORMATION
DESIGN CONDITIONS
Room Name FLOOR PLAN
Time of Peak
Sep 2 PM
Floor Area 3,000.Oft'
Outdoor Dry Bulb Temperature
106 OF
Indoor Dry Bulb Temperature 74 OF,
Outdoor Wet Bulb Temperature
73 OF
Conduction - Area U -Value DETD' Btu/hr
Default Roof Prior to 1978 3,000.0 X 0.0750 X
57.7 = 12,988
Default Wall Prior to 1978 438.0 X 0.3560 X
28.6 = 4,460
Default Wall Prior to 1978 198.0 X 0.3560 X
43.6 = 3,072
Single Metal Clear 240.0 X 1.1900 X
19.4 = 5,553
*R-13 Wall 1,524.0 X 0.1020 X
0.0 = 0
X X
=
X X
=
X X
=
X X
=
Page
Total 26,072
1. Design Equivalent Temperature Difference (DETD)
Items shown with an asterisk (') denote conduction through an interior surface to another room.
Weighting
Solar Gain Orientation Area SGF SC
Factor Btu/hr
WINDOWS (S) 240.0 X 163 X 0.864 X
0.684 = 23,084
X X X
=
X X X
=
X X X
=
X X X
=
X X X
=
X X X
=
X X X
=
X X X
=
Page Total 23,084
Sched.
Weighting
Internal Gain Frac. Area Heat Gain
Factor Btu/hr
Li hts 1.00 X 3,000 X 0.000 Watts/Sgft X 3.413 Btu/Watt
X 0.000 = 0
Occupants 1.00 X '3,000 X 250 Btu/occ. / 50 Sqf /occ.
X 1.000 = 15,000
Receptacle 1.00 .X 3,000 X 1.000 Watts/Sgft X 3.413 Btu/Watt
X 1.000 = 10,239
Process 1.00 X 3,000 X 0.000 Watts/Sgft X 3.413 Btu/Watt
X 1.000 = 0
Process Lighting 1.00 X 3,000 X 0.000 Watts/Sgft X 3.413 Btu/Watt
X 0.0001 = 0
Infiltration:[ 1.00 X 1.064 X 3,000 X 12.00 X 0.00 / 60
X 38 = 0
Schedule Air Sensible Area Ceiling Height ACH
AT
` Fraction
TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM
74,395
Sched.
Latent Gain Frac. Area Heat Gain
Btu/hr
Occupants- 1.00 X 3,000 X 200 Btuh/OCc. / 50
Sgft/OCc. = 12,000
Receptacle 1.00 X 3,000 X 0.000 Watts/Sgft X 3.413
Btu/Watt = 0
Process 1.00 X 3,000 X 0.000 Watts/Sgft X 3.413
Btu/Watt = 0
Infiltration:[ 1.00 'X 4,771 X 3,000 X 12.00 X 0.00 /60]
X 0.00000 - 0
r Schedule Air Sensible Area Ceiling Height ACH
AIN
Fraction
TOTAL HOURLY LATENT HEAT GAIN FOR ROOM
12 000
Ene Pro 5.1 b Ene Soft User Number: 1919 RunCode: 2012-05-16708:32:15 ID: G12 -076R Page 27 of 30
ROOM COOLING PEAK LOADS
Project Name
Date
TENANT IMPROVEMENT
5/16/2012
ROOM INFORMATION
DESIGN CONDITIONS
Room Name FLOOR PLAN
Time of Peak
Sep 2 PM
Floor Area 1,250.0 ft2
Outdoor Dry Bulb Temperature
106 OF
Indoor Dry Bulb Temperature 74 OF,
Outdoor Wet Bulb Temperature
73 OF
Conduction Area U -Value DETD' Btu/hr
Default Roof Prior to 1978 1,250.0 X 0.0750 X
57.7 = 5,412
Default Wall Prior to 1978 180.0 X 0.3560 X
43.6 = 2,792
Single Metal Clear 120.0 X 1.1900 X
19.4 = 2,777
Default Wall Prior to 1978 300.0 X 0.3560 X
28.6 = 3,054
'R-13 Wall 1,524.0 X 0.1020 X
0.0 = 0
X X
=
X X
=
X X
=
X I X
=
Page Total 14,035
1. Design Equivalent Temperature Difference (DETD)
Items shown with an asterisk (') denote conduction through an interior surface to another room.
Weighting
Solar Gain Orientation Area SGF SC
Factor Btu/hr
WINDOWS (S) 120.0 X 163 X . 0.864 X
0.684 = 11,541
X X X
=
X X X
=
X X X
=
X X X
=
X X X
=
X X X
=
X X X
=
X X X
=
Page Total 11,541
Sched.
Weighting
Internal Gain Frac. Area Heat Gain
Factor Btu/hr
Lights 1.00 X 1;250 X 0.000 Watts/Sgft X 3.413 Btu/Watt
X 0.000 = 0
Occupants 1.00 X 1,250 X 250 Btu/OCC. / 50 SgfVocc.
X 1.000 = 6,250
Receptacle 1.00 X 1,250 X 1.000 Watts/Sgft X 3.413 Btu/Watt
X 1.000 = 4,266
Process 1.00 X 1,250 X 0.000 Watts/Sgft X 3.413 Btu/Watt
X 1.000 = 0
Process Lighting 1.00 X 1,250 X 0.000 Watts/Sgft X 3.413 Btu/Watt
X 0.0001 = 0
Infiltration:[ 1.00 X 1.064 X 1,250 X 12.00 X 0.00 / 60
X 38 = 0
Schedule Air Sensible Area Ceiling Height ACH
AT
Fraction
TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM
36,093
Sched.
Latent Gain- Frac. Area Heat Gain
Btu/hr
Occupants 1.00 X 1,250 X 200 Btuh/OCC. / 50
Sgft/OCc. = 5,000
Receptacle 1.00 X 1,250 X 0.000 Watts/Sgft X 3.413
Btu/Watt = 0
Process 1.00 X 1,250 X 0.000 Watts/Sgft X 3.413
Btu/Watt = 0
Infiltration:[ 1.00 X 4,771 X 1,250 X 12.00 X 0.00 /60]
X 0.00000 = 0
Schedule Air Sensible Area Ceiling Height ACH
AW
Fraction
TOTAL HOURLY LATENT HEAT GAIN FOR ROOM
5,000
EnergyPro 5.1 by EnergySoft User Number: 1919 RunCode: 2012-05-16708:32:15 ID: G12 -076R Page 28 of 30
ROOM COOLING COIL LOADS
Project Name
Date
TENANT IMPROVEMENT
5/16/2012
ROOM INFORMATION
DESIGN CONDITIONS
Room Name FLOOR PLAN
Time of Peak
Aug 2 PM
Floor Area 3,000.0 ft'
Outdoor Dry Bulb Temperature
111 OF
Indoor Dry Bulb Temperature 74 °F
Outdoor Wet Bulb Temperature
78 OF
Conduction Area U -Value DETD' Btu/hr
Default Roof Prior to 1978 3,000.0 X 0.0750 X
70.2 = 15,785
Default Wall Prior to 1978 438.0 X 0.3560 X
34.4 = 5,368
Default Wall Prior to 1978 198.0 X 0.3560 X
43.9 = 3,096
Single Metal Clear 240.0 X 1.1900 X
23.4 = 6,674
'R-13 Wall 1,524.0 X 0.1020 X
0.0 = 0
X X
X X
=
X X
=
X X
=
Page
Total 30,922
1. Design Equivalent Temperature Difference (DETD)
Items shown with an asterisk (') denote conduction through an interior surface to another room.
Weighting
Solar Gain Orientation Area SGF SC
Factor Btu/hr
WINDOWS (S) 240.0 X 110 X 0.864 X
0.676 = 15,402
X X X
=
X X X
=
X X X
X X X
=
X X X
=
X X X
X X X
X X X
Page Total 1 15,402
Sched.
Weighting
Internal Gain Frac. Area Heat Gain
Factor Btu/hr
Lig hts 1.00 X 3,000 X 0.000 Watts/Sgft X 3.413 Btu/Watt
X 0.000 = 0
Occupants 1.00 X 3,000 X 250 Btu/OCC. / 50 SgfVocc.
X 1.000 = 15,000
Receptacle 1.00 X 3,000 X 1.000 Wafts/Sgft X 3.413 Btu/Watt
X 1.000 = 10,239
Process 1.00 X 3,000 X 0.000 Watts/Sgft X 3.413 Btu/Watt
X 1.000 = 0
Process Lighting 1.00 X 3,000 X 0.000 Watts/Sgft X 3.413 Btu/Wan
X 0.000 = 0
Infiltration:[ 1.00 X 1.064 X 3,000 X 12.00 X 0.00 / 60 ]
X 38 = 0
Schedule Air Sensible Area Ceiling Height ACH
AT
Fraction
TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM
71,563
Sched.
Latent Gain Frac. Area Heat Gain
Btu/hr
Occupants 1.00 X 3,000 X 200 Btuh/occ. / 50
Sqft/occ. = 12,000
Receptacle 1.00 X 3,000 X 0.000 Watts/Sgft X 3.413
Btu/Watt = 0
Process 1.00 X 3,000 X 0.000 Watts/Sgft X 3.413
Btu/Watt = 0
Infiltration:[ 1.00 X 4,771 X 3,000 X 12.00 X 0.00 /60]
X 0.00000 = 0
Schedule Air Sensible Area Ceiling Height ACH
AW
Fraction
TOTAL HOURLY LATENT HEAT GAIN FOR ROOM
12,000
Ener Pro 5.1 by Ener Soft User Number: 1919 RunCode: 2012-05-16T08:32:15 /D: G12 -076R Page 29 of 30
ROOM COOLING COIL LOADS
Project Name
Date
TENANT IMPROVEMENT
5/16/2012
ROOM INFORMATION
DESIGN CONDITIONS
Room Name FLOOR PLAN
Time of Peak
Aug 2 PM
Floor Area 1,250.0 ft'
Outdoor Dry Bulb Temperature
111 OF
Indoor Dry Bulb Temperature 74 OF,
Outdoor Wet Bulb Temperature
78 OF
Conduction Area U -Value DETD'
Btu/hr
Default Roof Prior to 1978 1,250.0 X 0.0750 X
70.2 =
6,577
Default Wall Prior to 1978 180.0 X 0.3560 X
43.9 =
2,814
Single Metal Clear • - 120.0 X 1.1900 X
23.4 =
3,337
Default Wall Prior to 1978 300.0 X 0.3560 X
34.4 =
3,677
'R-13 Wall 1,524.0 X 0.1020 X
0.0 =
0
X X
X X
X X
=
X X
=
Page Total
16,405
1. Design Equivalent Temperature Difference (DETD)
Items shown with an asterisk (') denote conduction through an interior surface to another room.
Weighting
Solar Gain Orientation Area SGF SC
Factor
Btu/hr
WINDOWS (S) 120.0 X 110 X 0.864 X
0.676 =
7,700
X X X
X X X
X X X
=
X X X
X X X
=
X X X
X X X
=
X X X
Page Total
7,700
Sched.
Weighting
Internal Gain Frac. Area Heat Gain
Factor
Btu/hr
Lights 1.00 X 1,250 X 0.000 Watts/Sgft X 3.413 Btu/Watt
X 0.000
= 0
Occupants 1.00 X 1,250 X 250 Btu/OCC. / 50 SgfUOCc.
X 1.000
= 6,250
Receptacle 1.00 X 1,250 X 1.000 Watts/Sgft X 3.413 Btu/Watt
X 1.000
= 4,266
Process 1.00 X 1,250 X 0.000 Watts/Sgft X 3.413 Btu/Watt
X 1.000
= 0
Process Lighting 1.00 X 1,250 X 0.000 Watts/Sgft X 3.413 Btu/Watt
X 0.0001
= 0
Infiltration:[ 1.00 X 1.064 X 1,250 X 12.00 X 0.00 / 60
X 38
= 0
Schedule Air Sensible Area Ceiling Height ACH
AT
Fraction
TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM
34,621
Sched.
Latent Gain Frac. Area Heat Gain
Btu/hr
Occupants, 1.00 X 1,250 X 200 Btuh/OCC. / 50
SgfUOCc.
= 5,000
Receptacle 1.00 X 1,250 X o.000 Watts/Sgft X 3.413
Btu/Watt
= 0
Process 1.00 X 1,250 X 0.000 Watts/Sgft X 3.413
Btu/Watt
= 0
Infiltration:[ 1.0o X 4,771 X 1,250 X 12.00 X 0.00 760]
X 0.00000
= 0
Schedule Air Sensible Area Ceiling Height ACH
AW
Fraction
TOTAL HOURLY LATENT HEAT GAIN FOR ROOM
5,000
EnergyPro 5.1 by Ene Soft User Number: 1919 RunCode: 2012-05-16708:32:15 /D: G12 -076R
Page 30 of 30