Loading...
12-0074 (RC) Title 24BUILDING ENERGY ANALYSIS REPORT PROJECT: TENANT IMPROVEMENT -A9640 HIGHWAY 111 LA QUINTA, CA 92210 Project Designer: Report Prepared by: Perfect Design PERFECT DESIGN & DEVELOPMENT, INC. 2416 W Valley Blvd Alhambra, Ca 91803 (626)289-8808 0 � I'l IRECEi.VTED CITY OF LA QUINTA JUN 0 4 2012 BUILDING & SAFETY DEPT, APPROVED BY: VOFES FOR CONSTRUCTION _;{ Job Number: y ND DA ZBY G12 -076R o. -2 635 P. 6-3 -93 Date: l' q 1G ��\P 5/16/2012 FOFCaL o� The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2008 Building Energy Efficiency Standards. This program developed by EnergySoft, LLC — www.energysoft.com. Energ Pro 5.1 by EnergySoft User Number: 1919 RunCode: 2012-05-16708:32:15 /D: G12 -076R TABLE OF CONTENTS Cover Page 1 Table of Contents 2 Nonresidential Performance. Title 24 Forms 3 Form ENV -MM Envelope Mandatory Measures 17 Form MECH-MM Mechanical Mandatory Measures 18 HVAC System Heating and Cooling Loads Summary .19. Zone Load Summary 21 Room Load Summary 23 Room Heating Peak Loads 25 Room Cooling Peak Loads 27 Room Cooling Coil Loads 29 EnergyPro 5.1 by EnergySoft Job Number: ID: G12 -076R User Number: 1919 PERFORMANCE CERTIFICATE OF COMPLIANCE (Part 1 of 3) PERF -1C Project Name Date TENANT IMPROVEMENT 1 5/16/2012 Project Address Climate Zone Total Cond. Floor Area Addition Floor Area 29640 HIGHWAY 111 LA QUINTA CA Climate Zone 15 4,250 0 GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Relocatable - indicate ❑ specific climate zone ❑ all climates Phase of Construction: ❑ New Construction ❑ Addition ® Alteration STATEMENT OF COMPLIANCE This certificate of compliance lists the building features and specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies only to a Building using the performance compliance approach. The documentation author hereby certifies that the documentation is accurate a; '110 ete q� Documentation Author ^ ' (MMI'M Name Perfect Design Signatur f m Company PERFECT DESIGN & DEVELOPMENT, INC. Q30 201' Address 2416 W Valley Blvd VNU lone 6)289-8808 City/State/Zip Alhambra, Ca 91803 H V. of The Principal Designer hereby certifies that the proposed building design represen construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this permit application. The proposed building has been designed to meet the energy efficiency requirements contained in sections 110, 116 through 118, and 140 through 149 of Title 24, Part 6. Please check one: ENV. LTG. MECH. I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to ❑ ❑ ❑ sign this document as the person responsible for its preparation; and that I am licensed in the State of California as a civil engineer, mechanical engineer, electrical engineer, or I am a licensed architect. I affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code by section ❑ ❑ ❑ 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor performing this work. I affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document ❑ ❑ ❑ because it pertains to a structure or type of work described as exempt pursuant to Business and Professions Code Sections 5537, 5538 and 6737.1. Principal Envelope Designer Name Signature Company Date Address License # City/State/ZipQVpF /Q�� \Phone Principal Mechanical Designer Name RAYMOND M. ZHONG, P.E. fti;4-e Company PERFECT DESIGN & DEVELOPMENT, INC. ` i�. `r v� oil 1.3 Address 2416 W. VALLEY BLVD {i Inc se # City/State/Zip ALHAMBRA, CA 91803 J'� C A ne (626) 280-8808 Principal Lighting Designer OF FAQ Name Signature Company Lighting Compliance Not In The Scope Of This Submittal Date rpt' Address License # City/State/Zip Phone INSTRUCTIONS TO APPLICANT COMPLIANCE & WORKSHEETS (check box if worksheets are included) m ENV -1 C Certificate of Compliance. Required on plans. m MECH-1 C Certificate of Compliance. Required on plans. ❑ LTG -1C Certificate of Compliance. Required on plans. m MECH-2C Air/Water Side/Service Hot Water & Pool Requirements. ❑ LTG -2C Lighting Controls Credit Worksheet. m MECH-3C Mechanical Ventilation and Reheat. ❑ LTG -3C Indoor Lighting Power Allowance. m MECH-5C Mechanical Equipment Details. Energ Pro 5.1 by Energ Soft User Number: 1919 RunCode: 2012-05-16T08:32:15 ID: G12 -076R Page 3 of 30 PERFORMANCE CERTIFICATE OF COMPLIANCE TENANT IMPROVEMENT ANNUAL TDV ENERGY USE SUMMARY kBtu/s ft- r Standard Proposed Compliance Energy Component Design Design Margin Space Heating Space Cooling Indoor Fans Heat Rejection Pumps & Misc. Domestic Hot Water Lighting Receptacle Process Process Lighting TOTALS 0.12 0.12 0.00 387.91 387.91 0.00 95.44 95.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 72.64 67.64 5.00 184.10 184.10 0.00 91.38 91.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 831.59 826.59 5.00 Part 2of3 Heating Cooling Fans Heat Rej Pumps DHW Lighting Receptacle Process Process Ltg Percent better than Standard 0.6 0.6 % excluding process) BUILDING COMPLIES PERF -1 C Date 5/16/2012 GENERAL INFORMATION Building Orientation (S)180 deg Conditioned Floor Area 4,250 sqft. Number of Stories 1 Unconditioned Floor Area 0 sqft. Number of Systems 2 Conditioned Footprint Area 4,250 sqft. Number of Zones 2 Natural Gas Available On Site yes Front Elevation . Left Elevation Rear Elevation Right Elevation Total Roof Orientation. Gross Area (S) 738 (M 0 (N) 738 (E) 0 1,476 4, 250 sgft. sqft. sqft. sqft. sqft. sqft. Gla7inn Area 360 0 0 0 360 0 sqft. sqft. sqft. sqft. sqft. sqft. Glazinn Ratio 48.8 0.0% 0.0 0.0% 24.4 0.0 Standard Proposed Prescriptive Values for Prescriptive Lighting Power Density 1.600 W/sgft. 1.600 W/sgft. Comparison only. See Prescriptive Envelope TDV Energy 90,864 348,572 LTG -1 C for allowed LPD. I Remarks: i tnergyrro o.1 by tnergy.�ion user Number. 1919 RunCode: 2012-05-16708:32:15 /D: G12 -076R Pape 4 of 30 PERFORMANCE CERTIFICATE OF COMPLIANCE (Part 3 of 3) PERF -1 C Project Name TENANT IMPROVEMENT Date 1511612012 ZONE INFORMATION System Name Zone Name Occupancy T Type Floor Area ft s . Inst. LPD W/sf 1 Ctrl. Credits W/sf 2 Allowed LPD Proc. Loads W/sf AreaTailored W/Sf a W/sf 4 PHP -1 AREA PHP -1 AREA Retail Sales, Wholesale 3,000 '1.600 PHP -2 AREA PHP -2 AREA Retail Sales, Wholesale 1,250 '1.600 Notes: 1. See LTG -1C 2. See LTG -2C 3. See LTG -3C 4. See LTG -4C items marked with asterisk, see LTG -1 -C b others b others Items above require special documentation EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of the justifications, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted. The HVAC System PHP -1 AREA includes Demand Control Ventilation per Standards Section 121. The exceptional features listed in this performance approach application have specifically been reviewed. Adequate written justification and documentation for their use have been provided by the applicant. Authorized Signature or Stamp Ener Pro 5.1 by Energ Soft User Number: 1919 RunCode: 2012-05-16T08:32:15 /D: G12 -076R Page 5 of 30 CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV -1C AND FIELD INSPECTION ENERGY CHECKLIST Project Name TENANT IMPROVEMENT Date 5/16/2012 Project Address 29640 HIGHWAY 111 LA QUINTA Climate Zone 15 Total Cond. Floor Area 4,250 Addition Floor Area 0 GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Relocatable Public School 0 Conditioned Spaces ❑ Unconditioned Spaces Bldg. ❑ Skylight Area for Large Enclosed Space >_ 8000 tt2 (If checked include the ENV -4C with submittal) Phase of Construction: ❑ New Construction ❑ Addition m Alteration Approach of Compliance: ❑ Component ® Overall Envelope ❑ Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: 180 deg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION Ta /ID Assembly Type Q o CN dui O z V n «a•2 g� U M ofof d d2 W> •C C d'c W LL O O _� 5> O C LL X C �a CL a N �� 0 v N a cc LL 1 Roof 3,000 (N) 0.075 R-191 4.2.2-A5 Existing ❑ ❑ 2 Wall 0 (W) 0.356 None 4.3.1-A1 Existing ❑ ❑ 3 Wall 438 (N) 0.356 None 4.3.1-A1 Existing ❑ ❑ 4 Wall 198 (S) 0.356 None 4.3.1-A1 Existing ❑ ❑ 5 Slab 3,000 (N) 0.730 None 4.4.7-A 1 Existing ❑ ❑ 6 Demising 1,524 (N) 0.102 R-13 4.3.1-A3 New ❑ ❑ 7 Roof 1,250 (N) 0.075 R-19 4.2.2-A5 Existing ❑ ❑ 8 Wall 0 (E) 0.356 None 4.3.1-A1 Existing ❑ ❑ ❑ o ❑ ❑ 1. See Instructions -in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/ID Fenestration Type a e C O z d 2 n d V L M y O U LS' Z d V` V) U) of l0 c '.O-. H 7 U in a0 Li 1 Window 240 (S) 1.190 Default 0.830 Default ® Existing ❑ ❑ 2 Window 120 (S) 1.190 Default 0.830 Default ® Existing ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ a ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. Ener Pro 5.1 by EnergySoft User Number. • 1919 RunCode: 2012-05-16708:32:15 /D: G12 -076R Pae 6 of 30 CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV-1 C AND FIELD INSPECTION ENERGY CHECKLIST Project Name TENANT IMPROVEMENT Date 5/16/2012 Project Address 29640 HIGHWAY 111 LA QUINTA Climate Zone 15 Total Cond. Floor Area 4,250 Addition Floor Area 0 GENERAL INFORMATION Building Type: ® Nonresidential ❑ High-Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) [3Blldlocatable Public Schoolg. m Conditioned Spaces ❑ Unconditioned Spaces ❑ Skylight Area for Large Enclosed Space z 8000 ft2 (If checked include the ENV-4C with submittal) Phase of Construction: ❑ New Construction ❑ Addition m Alteration Approach of Compliance: ❑ Component 0 Overall Envelope ❑ Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: 180 deg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION ' /ID AssemblyType c ° 3 c N 01 W O z 01 :3 7 '> 01 v 0 01 7 0 t 01 OC 7 S> E a x c O. 'O O o " y c p N 0 a �— 0 LLTa 9 Wall 180 (S) 0.356 None 4.3.1-A1 Existing ❑ ❑ 10 Wall 300 (N) 0.356 None 4.3.1-A1 Existing ❑ ❑ 11 Slab 1,250 (N) 0.730 None 4.4.7-A 1 Existing ❑ ❑ 12 Demising 1,524 (N) 0.102 R-13 4.3.1-A3 New ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/ID Fenestration Type l0 �' a 03 vj CW a OZ O 00 LL 2> O y 00 0 LL 'o > cn v (7 _ CO iE 0) U 0 = 'o mm rn l0 L > O c O H :O 7 o vut V1 a r LL ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ LO 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. EnergyPro 5.1 by EnergySoft User Number: 1919 RunCode: 2012-05-16T08:32:15 /D: G12-076R Page 7 of 30 CERTIFICATE OF COMPLIANCE (Part 2 of 3) AND FIELD INSPECTION ENERGY CHECKLIST ENV -1 C Project Name TENANT IMPROVEMENT Date 5/16/2012 ROOFING PRODUCT COOL ROOFS (Note if the roofing product is not CRRC certified, this compliance approach cannot be used). Go to Overall Envelope Approach or Performance Approach. CHECK APPLICABLE BOX BELOW IF EXEMPT FROM THE ROOFING PRODUCT "COOL ROOF" REQUIREMENTS: Pass Fail' N/A ❑ . Roofing compliance not required in Climate Zones 1 and16 with a Low -Sloped. 2:12 pitch or less. ❑ ❑ ❑ ❑ Roofing compliance not required in Climate Zone 1 with a Steep -Sloped with less than 5 Ib/ft2. Greater than 2:12 pitch. ❑ ❑ ❑ ❑ Low -sloped Wood framed roofs in Climate Zones 3 and 5 are exempted, solar reflectance and thermal emittance or SRI that have a U -factor of 0.039 or lower. See Opaque Surface Details roof assembly, Column H of ENV -2C. ❑ ❑ ❑ Metal building roofs in Climate Zone 3 and 5 are exempted, solar relectance and thermal emittance or SRI 13thathave a LI -factor of 0.048 or lower. See Opaque Surface Details roof assemblybelow, Column H of ENV -2C. 13 ❑ 13that ❑ The roof area covered by building integrated photovoltaic panels and building integrated solar thermal panels are exempted. Solar reflectance and thermal emittance or SRI, seespreadsheet calculator at www.ener .ca. ov/title24/ ❑ ❑ ❑ Roof constructions that have thermal mass over the roof membrane with a weight of at least 25 Ib/ft are exempt from ❑ the Cool -Roof criteria below. ❑ ❑ ❑ ❑ High-rise residential buildings and hotels and motels with low -sloped roofs in Climate Zones 1 through 9, 12 and 16 are exempted from the low -sloped roofing criteria. ❑ ❑ ❑ 1. If Fail then.describe on this page of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. CRRC Product ID Number' Roof Slope s 2:12 > 2:12 Product Weight < 5Ib/fe z 5Ib/ff Product Type 2 Aged Solar Reflectance Thermal Emmitance SRI5 Pass Fails ❑ ❑ ❑ ❑ ❑ 4 ❑ ❑ ❑ ❑ ❑ ❑ ❑ 4 ❑ ❑ ❑ ❑ 1 ❑ ❑ 4 134 ❑ ❑ ❑ ❑ ❑ ❑ ❑ 4 ❑ ❑ ❑ ❑ ❑ ❑ ❑ 4 ❑ ❑ ❑ ❑ ❑ ❑ ❑ 4 ❑ ❑ 1. The CRRC Product ID Number can be obtained from the Cool Roof Rating Council's Rated Product Directory at www.coolroofs.ora/products/search 'PhhP 2. Indicate the type of product is being used for the roof top, i.e. single -ply roof, asphalt roof, metal roof, etc. 3. If the Aged Reflectance is not available in the Cool Roof Rating Council's Rated Product Directory then use the Initial Reflectance value from the same directory and use the equation (0.2+0.7(p;niw — 0.2) to obtain a calculated aged value. Where p is the Initial Solar Reflectance from the Cool Roof Rating Council's Rated Product Directory. 4. Check box if the Aged Reflectance is a calculated value using the equation above. 5. The SRI value needs to be calculated from a spreadsheet calculator at htto://www.eneroy.ca.00v/title24/ 6. If Fail then describe on this page of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. To apply Liquid Field Applied Coatings, the coating must be applied across the entire roof surface and meet the dry mil thickness or coverage recommended by the coatings manufacturer and meet minimum performance requirements listed in §118(i)4. Select the applicable coating: ❑ Aluminum -Pigmented Asphalt Roof Coating ❑ Cement -Based Roof Coating ❑ Other Discrepancies: Ener Pro 5.1 by EnerqySoft User Number: 1919 RunCode: 2012-05-16T08:32:15 ID: G12 -076R Page 8 of 30 CERTIFICATE OF COMPLIANCE (Part 3 of 3) ENV -1C AND FIELD INSPECTION ENERGY CHECKLIST Project Name TENANT IMPROVEMENT Date 1511612012 Required Acceptance Tests Designer:. This form is to be used by the designer and attached to the plans. Listed below is the acceptance test for Envelope Fenestrations system. The designer is required to check the acceptance tests and list all the fenestration products that require an acceptance test. If all the site -built fenestration of a certain type requires a test, list the different fenestration products and the number of systems. The NA7 Section in the Appendix of the Nonresidential Reference Appendices Manual describes the test. Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Enforcement Agency: Systems Acceptance. Before Occupancy Permit is granted for a newly constructed building or space or whenever new fenestration is installed in the building or space shall be certified as meeting the Acceptance Requirements. The ENV -2A form is not considered a complete form and is not to be accepted by the enforcement agency unless the boxes are checked and/or filled and signed. In addition, a Certificate of Acceptance forms shall be submitted to the enforcement agency that certifies plans, specifications, installation certificates, and operating and maintenance information meet the requirements of §10-103(b) of Title 24 Part 6. The field inspector must receive the properly filled out and signed forms before the building can receive final occupancy. A copy of the ENV -2A for each different fenestration product line must be provided to the owner of the building for their records. Test Description ENV -2A Test Performed By: Fenestration Products Name or ID Area of like Building* Envelope Requiring Testing or Verification Products Acceptance Test 13 13 13 13 13 13 13 13 13 13 13 13 ❑ EnergyPro 5.1 by EnergySoft User Number: 1919 RunCode: 2012-05-16T08:32:15 /D: G12 -076R Page 9 of 30 CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1C FIELD INSPECTION ENERGY CHECKLIST Project Name TENANT IMPROVEMENT Date 5/16/2012 Project Address . 29640 HIGHWAY 111 LA QUINTA Climate Zone 15 Total Cond. Floor Area 4,250 Addition Floor Area 0 GENERAL INFORMATION Building Type: ® Nonresidential ❑ High-Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Relocatable Public School Bldg. m Conditioned Spaces ❑ Unconditioned Spaces affidavit Phase of Construction: ❑ New Construction ❑ Addition ® Alteration Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit) Energy Front Orientation: N, E, S, W or in Degrees: 180 deg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST E ui ment2 Inspection Criteria Meets Criteria or Requirements Pass Fail — Describe Reason Item or System Tags i.e. AC-1, RTU-1, HP-1 DHW Heater [3 ❑ Equipment T e3: Electric Res DHW Boiler ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 15,720 Btu/hr ❑ ❑ Minimum Heating Efficiency' 1.00 EF ❑ ❑ Max Allowed Cooling Capacity' n/a ❑ ❑ Cooling Efficiency' n/a ❑ ❑ Duct Location/ R-Value n/a ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS n/a 13 ❑ Economizer n/a ❑ ❑ Thermostat n/a ❑ ❑ Fan Control n/a ❑ ❑ E ui ment2 Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Pass Fail — Describe Reason Item or System Tags AC-1, RTU-1, HP-1 PHP-1 AREA 13 13i.e. E ui ment'T e3: Packaged DX ❑ ❑ Number of Systems 1 ❑ - ❑ Max Allowed Heating Capacity' 114,000 Btu/hr ❑ ❑ Minimum Heating Efficiency' 3.30 COP ❑ ❑ Max Allowed Cooling Capacity' 116,000 Btu/hr ❑ ❑ Cooling Efficiency' 10.3 EER ❑ ❑ Duct Location/ R-Value Conditioned / 0.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No 13 ❑ Economizer Fixed Temp (Non-Integ) ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. 1EnergyPro5.1byEnerpySoft User Number: 1919 RunCode: 2012-05-16T08:32:15 ID: G12-076R Pae 10 of 30 CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1C FIELD INSPECTION ENERGY CHECKLIST Project Name TENANT IMPROVEMENT Date 5/16/2012 Project Address 29640 HIGHWAY 111 LA QUINTA Climate Zone 15 Total Cond. Floor Area 4,250 Addition Floor Area 0 GENERAL INFORMATION Building Type: ® Nonresidential ❑ High-Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) . ❑ Relocatable Public School Bldg. m Conditioned Spaces ❑ Unconditioned Spaces affidavit Phase of Construction: ❑ New Construction ❑ Addition ® Alteration Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit) Energy Front Orientation: N, E, S, W or in Degrees: 180 deg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST E ui ment2 Inspection Criteria Meets Criteria or Requirements Pass Fail — Describe Reason Item or System Tags i.e. AC-1, RTU-1, HP-1 PHP-2 AREA ❑ ❑ Eq ui ment Type 3: Packaged DX ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 55,000 Btu/hr ❑ ❑ Minimum Heating Efficiency' 7.00 HSPF ❑ ❑ Max Allowed Cooling Capacity' 5 7, 000 Btu/hr ❑ ❑ Cooling Efficiency' 10.0 SEER/ 10.0 EER ❑ ❑ Duct Location/ R-Value Conditioned / 0.0 ❑ ❑ When duct testing is required, submit & MECH-4-HERS No [3 [3MECH-4A Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ E ui ment2 Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Pass Fail — Describe Reason Item or System Tags AC-1, RTU-1, HP-1 ❑ 13i.e. Equipment T e3 ❑ ❑ Number of Systems ❑ ❑ Max Allowed Heating Capacity' ❑ ❑ Minimum Heating Efficiency' ❑ ❑ Max Allowed Cooling Capacity' ❑ ❑ Cooling Efficiency' ❑ ❑ Duct Location/ R-Value ❑ ❑ When duct testing is required, submit & MECH-4-HERS 13 13MECH-4A Economizer ❑ ❑ Thermostat ❑ ❑ Fan Control ❑ ❑ 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. Ener Pro5.1 b Ene Soft User Number: 1919 RunCode: 2012-05-16T08:32:15 ID: G12-076R Pae 11 of 30 CERTIFICATE OF COMPLIANCE and (Part 2 of 4) MECH-1 C FIELD INSPECTION ENERGY CHECKLIST Project Name Date TENANT IMPROVEMENT 5/16/2012 Discrepancies: Ener Pro 5.1 by EnerqySoft User Number: 1919 RunCode: 2012-05-16T08:32:15 ID: G12 -076R Pae 12 of 30 AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2C Project Name Date TENANT IMPROVEMENT 5/16/2012 Indicate Air Systems Type Central, Single Zone, Package, VAV, or etc... Item or System Tags i.e. AC -1, RTU -1, HP -1). PHP -1 AREA PHP -2 AREA Number of Systems 1 1 Indicate Pa a Reference on Plans or Schedule and indicate the applicable exception(s) MANDATORY MEASURES T-24 Sections Heating Equipment Efficiency 112(a) 3.30 COP 7.00 HSPF Cooling Equipment Efficiency 112 (6) 10.3 EER 10.0 SEER/ 10.0 EER HVAC Heat Pump Thermostat 112(b), 112(c) Yes Yes Furnace Controls/Thermostat 112(c), 115(a) n/a n/a Natural Ventilation 121 b No No Mechanical Ventilation 121 b 900 cfm 375 cfm VAV Minimum Position Control 121 c No No Demand Control Ventilation 121 c Yes No Time Control .122(e) Programmable Switch Programmable Switch . Setback and Setup Control '122(e) Setback Required Setback Required Outdoor Damper Control 122(f) Auto Auto Isolation Zones 122W n/a n/a .Pipe Insulation 123 Duct Location/ R -value 124 Conditioned /.0.0 Conditioned / 0.0 PRESCRIPTIVE MEASURES Calculated Design Heating Load 144(a & b n/a n/a Proposed Heating Capacity 144(a & b 105,331 Btu/hr 34,352 Btu/hr Calculated Design Cooling Load 144(a & b n/a n/a Proposed Cooling Capacity 144(a & b 77,872 Btu/hr 39,024 Btu/hr Fan Control 4 144(c) Constant Volume Constant Volume DP Sensor Location 144(c) Supply Pressure Reset (DDC only) 144(c) No No Simultaneous Heat/Cool 144(d) No No Economizer 144(e) Fixed Temp (Non-Integ) No Economizer Heat Air Supply Reset 144(f) Constant Temp Constant Temp Cool Air Supply Reset 144(f) Constant Temp Constant Temp Electric Resistance Heating' 144 Air Cooled Chiller Limitation 144(i) Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted I 144(k) No No 1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used explain which exception(s) to §144(g) apply.. EnergyPro 5.1 by EnergySoft User Number: 1919 RunCode: 2012-05-16708:32:15 ID: G12 -076R Pae 13 of 30 WATER SIDE SYSTEM REQUIREMENTS Part 2 of 2 MECH-2C Project Name Date TENANT IMPROVEMENT k 5/16/2012 WATER SIDE SYSTEMS: Chillers, Towers, Boilers, H dronic Loops Item or System Tags (i.e. AC -1, RTU -1, HP -1)' Number of Systems Indicate Page Reference on Plans or Specification 2 MANDATORY MEASURES T-24 Sections Equipment Efficiency 112(a) Pipe Insulation 123 PRESCRIPTIVE MEASURES Cooling Tower Fan Controls 144(a & b Cooling Tower Flow Controls 144(h) Variable Flow System Design 144(h) Chiller and Boiler Isolation 144 CHW and HHW Reset Controls 144 WLHP Isolation Valves 144 VSD on CHW, CW & WLHP Pumps>5HP 144 DP Sensor Location 144 1. The proposed equipment need to match the building plans schedule or specifications. If a requirement is not applicable, put "N/A" in the column next to applicable section. 2. For each chiller, cooling tower, boiler, and hydronic loop (or groups of similar equipment) fill in theyeference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" in the column next to applicable section. Service Hot Water, Pool Heating, Item or System Tags (i.e. WH -1, WHP, DHW, etc...)' DHW Heater Number of Systems 1 Indicate Page Reference on Plans or Schedule MANDATORY MEASURES T-24 Sections SERVICE HOT WATER Certified Water Heater 111, 113 a RHEEM 72V30-3 Water Heater Efficiency 113(b) 1.00 EF Service Water Heating Installation 113(c) Controls Req. Pipe Insulation 123 n/a POOL AND SPA Pool and Spa Efficiency and Control 114(a) n/a Pool and Spa Installation 114(b) n/a Pool Heater — No Pilot Light 115(c) n/a Spa Heater — No Pilot Light 115(d) n/a Pipe Insulation 123 Required 1. The Proposed equipment needs to match the building plans schedule or specifications. If a requirement is not applicable, put "N/A" in the column next to applicable section. 2. For each water heater, pool heater and domestic water loop (or groups of similar equipment) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" in the column. EnergyPro 5.1 by Ener Soft User Number: 1919 RunCode: 2012-05-16708:32:15 /D: G12 -076R Pae 14 of 30 MECHANICAL VENTILATION AND REHEAT MECH-3C Project Name TENANT IMPROVEMENT Date 5/16/2012 MECHANICAL VENTILATION §121 b 2 REHEAT LIMITATION (§144(d)) AREA BASIS OCCUPANCY BASIS VAV MINIMUM A B C D E F G H I J K L M N Zone/System(ft) Condition Area CFM per ft2 Min CFM By Area B X C Number Of People CFM per Person Min CFM by Occupant E X F REQ'D V.A. Max of D or G Design Ventilation Air CFM 50% of Design Zone Supply CFM B X 0.4 CFM / ft2 Max. of Columns H, J, K, 300 OFM Design Minimum Air Setpoint Transfer Air PHP -1 AREA 3,000 0.25 750 60.0 15.0 900 900 900 PHP -1 AREA Total 900 900 PHP -2 AREA 1,250 0.25 313 25.0 15.0 375 375 375 PHP -2 AREA Total 375 375 Totals Column I Total Design Ventilation Air C Minimum ventilation rate per Section 121, Table 121-A. E Based on fixed seat or the greater of the expected number of occupants and 50% of the CBC occupant load foregress purposes fors aces without fixed seating. H Required Ventilation Air REQ'D V.A. is the larger of the ventilation rates calculated on an AREA BASIS or OCCUPANCY BASIS Column D or G). I Must be greater than orequal to H, or use Transfer Air column N to make up the difference. J Design fan supply CFM Fan CFM x 50%• or the design zone outdoor airflow rate per 121. K Condition area ft2 x 0.4 CFM / ft2; or L Maximum of Columns H, J, K, or 300 CFM M This must be less than orequal to Column L and greater than orequal to the sum of Columns H plus N. N Transfer Air must be provided where the Required Ventilation Air (Column H) is greater than the Design Minimum Air (Column M). Where required, transfer air must be greater than or equal to the difference between the Required Ventilation Air Column H and the Design Minimum Air Column M), Column H minus M. EnergyPro 5.1 by EnergySoft User Number: 1919 Run Code: 2012-05-16T08:32:15 ID: G12 -076R Paa 15 of 30 MECHANICAL EQUIPMENT DETAILS Part 1 of 2 MECH-5C Project Name TENANT IMPROVEMENT Date 5/16/2012 CHILLER AND TOWER SUMMARY PUMPS Equipment Name Type Qty. Efficiency Tons I.Pump Qty. GPM BHP Control DHW / BOILER SUMMARY System Name Type Vol. Distribution City. Rated Input (Gals). Energy Factor or RE Standby Loss Tank Ext. or Pilot R -Value Status RHEEM 72V30-3 Small Elec. All Pipes Ins 1 15,720 30 1.00 n/a n/a Ne MULTI -FAMILY CENTRAL WATER HEATING DETAILS Hot Water Pump Hot Water Piping Length ft Control Qty. HP Type In Plenum Outside Buried Add 1/2" Insulation CENTRAL SYSTEM RATINGS HEATING COOLING System Name Type aty. Output Aux. kW Eff iciency Output Eff iciency Status EXISTING A/C UNIT (10 TON) Packaged DX 1 114,000 10.0 3.30 COP 116,000 10.3 EER Existing EXISTING A/C UNIT (5 TON) Packaged DX 1 55,000 0.0 7.00 HSPF 57,000 10.0 SEER/ 10.0 EER Existing CENTRAL SYSTEM FAN SUMMARY SUPPLY FAN RETURN FAN System Name Fan Type Economizer Type CFM BHP CFM BHP EXISTING A/C UNIT (10 TON) Constant Volume Fixed Temp (Non-Integ) 4,000 2.00 none EXISTING A/C UNIT 5 TON Constant Volume No Economizer 2,000 0.85 none Ener Pro 5.1 by EnergySoft User Number: 1919 RunCode: 2012-05-16708:32:15 ID: G12 -076R Pae 16 of 30 ENVELOPE MANDATORY MEASURES: NONRESIDENTIAL ENV -MM Project Name Date TENANT. IMPROVEMENT 5/16/2012 DESCRIPTION Building Envelope Measures: §118(a): Installed insulating material shall have been certified by the manufacturer to comply with the California Quality Standards for insulating material, Title 20 Chapter 4,. Article 3. §118(c): All Insulating Materials shall be installed in compliance with the flame spread rating and smoke density requirements of Sections 2602 and 707 of Title 24, Part 2. §118(f): The opaque portions of framed demising walls in nonresidential buildings shall have insulation with an installed R -value of no less than R-13 between framing members. §117(a): All Exterior Joints and openings in the building that are observable sources of air leakage shall be caulked, gasketed, weatherstripped or otherwise sealed. Manufactured fenestration products and exterior doors shall have air infiltration rates not exceeding 0.3 cfm/ft.2 of §116(a) 1: window area, 0.3 cfm/ft.2 of door area for residential doors, 0.3 cfm/ft.2 of door area for nonresidential single doors (swinging and sliding), and 1.0 cfm/ft.2 for nonresidential double doors swin in . §116(a) 2: Fenestration U -factor shall be rated in accordance with NFRC 100, or the applicable default U -factor. §116(a) 3: Fenestration SHGC shall be rated in accordance with NFRC 200, or NFRC 100 for site -built fenestration, or the applicable default SHGC. 16 b Site Constructed Doors, Windows and Skylights shall be caulked between the unit and the building, and shall be §1 ()' weatherstripped (except for unframed glass doors and fire doors). Ener Pro 5.1 6k EnerqySoft User Number: 1919 RunCode: 2012-05-16708:32:15 /D: G12 -076R Pae 17 of 30 MECHANICAL MANDATORY MEASURES: NONRESIDENTIAL MECH-MM Project Name Date TENANT IMPROVEMENT 5/16/2012 Equipment and System Efficiencies §111: Any appliance for which there is a California standard established in the Appliance Efficiency Regulations will comply with the applicable standard. §115(a): Fan type central furnaces shall not have a pilot light. §123: Piping, except that conveying fluids at temperatures between 60 and 105 degrees Fahrenheit, or within HVAC equipment, shall be insulated in accordance with Standards Section 123. §124: Air handling duct systems shall be installed and insulated in compliance with Sections 601, 602, 603, 604, and 605 of the CMC Standards. Controls §122(e): Each space conditioning system shall be installed with one of the following: 1A. Each space conditioning system serving building types such as offices and manufacturing facilities (and all others not explicitly exempt from the requirements of Section 112 (d)) shall be installed with an automatic time switch with an accessible manual override that allows operation of the system during off -hours for up to 4 hours. The time switch shall be capable of programming different schedules for weekdays and weekends and have program backup capabilities that prevent the loss of the device's program and time setting for at least 10 hours if power is interrupted; or 1 B. An occupancy sensor to control the operating period of the system; or 1C. A 4 -hour timer that can be manually operated to control the operating period of the system. 2 Each space conditioning system shall be installed with controls that temporarily restart and temporarily operate the system as required to maintain a setback heating and/or a setup cooling thermostat setpoint. Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000 §122(8)' square feet shall be provided with isolation zones. Each zone: shall not exceed 25,000 square feet; shall be provided with isolation devices, such as valves or dampers that allow the supply of heating or cooling to be setback or shut off independently of other isolation areas; and shall be controlled by a time control device as described above. §122(c): Thermostats shall have numeric setpoints in degrees Fahrenheit (F) and adjustable setpoint stops accessible only to authorized personnel. §122(b): Heat pumps shall be installed with controls to prevent electric resistance supplementary heater operation when the heating load can be met by the heat pump alone Each space conditioning system shall be controlled by an individual thermostat that responds to temperature within the zone. Where used to control heating, the control shall be adjustable down to 55 degrees F or lower. For cooling, the §122(a&b): control shall be adjustable up to 85 degrees F or higher. Where used for both heating and cooling, the control shall be capable of providing a deadband of at least 5 degrees F within which the supply of heating and cooling is shut off or reduced to a minimum. Ventilation §121(e): Controls shall be provided to allow outside air dampers or devices to be operated at the ventilation rates as specified on these plans. §122(f): All gravity ventilating systems shall be provided with automatic or readily accessible manually operated dampers in all openings to the outside, except for combustion air openings. Ventilation System Acceptance. Before an occupancy permit is granted for a newly constructed building or space, or a §121(f): new ventilating system serving a building or space is operated for normal use, all ventilation systems serving the building ors ace shall be certified as meeting the Acceptance Requirements for Code Compliance Service Water Heating Systems §113(c) Installation 3. Temperature controls for public lavatories. The controls shall limit the outlet Temperature to 110° F. 2 Circulating service water -heating systems shall have a control capable of automatically turning off the circulating pump when hot water is not required. Ener Pro 5.1 by En ergySoft User Number: 1919 RunCode: 2012-05-16T08:32:15 ID: G12 -076R Pae 18 of 30 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name TENANT IMPROVEMENT Date 5/16/2012 System Name PHP -1 AREA Floor Area 3,000 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL CFM Total Room Loads 7.929 Return Vented Lighting Return Air Ducts Return Fan Ventilation 900 Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COOLING PEAK COIL HTG. PEAK Heating System Sensible Latent CFM Sensible Output perSystem 114,000 71,563 12,000 800 40,459 Total Output Btuh 114,000 0 Output Btuh/s ft 38.0 3,578 2,023 Cooling System 0 0 Output perSystem 116,000 34,614 -492 900 41,688 Total Output Btuh 116,000 0 3,5781 113,333 11,508 0 Total Output Tons 9.7 2,023 Total Output Btuh/s ft 38.7 Total Output s ft/Ton 310.3 86,192 Air System CFM perSystem 4,000 HVAC EQUIPMENT SELECTION Airflow cfm 4,000 EXISTING A/C UNIT (10 TON) 77,872 34,968 71,201 Airflow cfm/s ft 1.33 10.0 kW Supplemental Electric 34,130 Airflow cfm/Ton 413.8 Outside Air % 22.5 % Total Adjusted System Output 77,872 34,968 105,331 (Adjusted for Peak Design conditions) TIME OF SYSTEM PEAK Aug 2 PM Jan 1 AM Outside Air cfm/s ft 0.30 Note: values above givin at ARI conditions . HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak 26 OF 60 OF Outside Air 900 cfm Supply Fan 4.000 cfm 70 OF • 60 OF 110 OF 118 OF G Heating Coil Aux. Heat Coil 118 OF ROOM 70 OF COOLING SYSTEM PSYCHROMETICS Airstream Temperatures at Time of Cooling Peak 111178°F 83/70°F 83/70°F 65/64°F Outside Air Ar 900 cfm Supply Fan Cooling Coil 66 / 64 OF 4,000 cfm--------- ........ ..... _........ 71.9% ROOM 75168 OF 74 ! 67 OF EnergyPro 5.1 by EnergySoft User Number: 1919 RunCode: 2012-05-18708:32:15 ID: G12 -076R Page 19 of 30 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name TENANT IMPROVEMENT Date 5/16/2012 System Name PHP -2 AREA' Floor Area 1,250 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL CFM Total Room Loads 3,277 Return Vented Lighting Return Air Ducts Return Fan Ventilation 375 Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COOLING PEAK Sensible 34,621 0 1,731 0 14,433 0 1,731 52,517 COIL HTG. Latent CFM 5,000 619 1,093 375 6,093 PEAK Heating System Sensible Output per System 55,000 25,957 Total Output Btuh 55,000 Output Btuh/s ft 44.0 1,298 Cooling System 0 Output per System 57,0001 17,316 Total Output Btuh 57,000 0 Total Output Tons 4.8 1,298 Total Output Btuh/s ft 45.6 Total Output s ft/Ton 2632 45,869 Air System CFM per System 2,000 HVAC EQUIPMENT SELECTION Airflow cfm 2,000 EXISTING A/C UNIT (5 TON) 39,024 15,365 34,352 Airflow cfm/s ft 1.60 Airflow cfm/Ton 421.1 .Outside Air % 18.8%1 Total Adjusted System Output (Adjusted for Peak Design conditions) TIME OF SYSTEM PEAK 39,024 15,365 Aug 2 PM 34,352 I Jan 1 AM Outside Air cfm/s ft 0.30 Note: values above given at ARI conditions . HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak 26 OF 61 OF 0 Outside Air AV - 375 cfm Supply Fan 2,000 cfm 69 OF 61 OF 110 OF Heating Coil 109 OF ROOM M 70 OF COOLING SYSTEM PSYCHROMETICS Airstream Temperatures at Time of Cooling Peak 111 / 78 °F 82 / 69 OF 82 ! 69 OF 63 / 62 OF o Outside Air 375 cfm Supply Fan Cooling Coil 2.000 cfm 75/67°F 68.0% 64 / 63 OF _......-......................_................ ROOM 74/66°F EnergyPro 5.1 by EnergySoft User Number: 1919 RunCode: 2012-05-16708:32:15 ID: G12 -076R Page 20 of 30 • •��i Project DaTENANT te Name PHP-1-AAREA FloorSystem III 'ZONE• • .. NAM SYSTEM NAME M (BLOCK LOAD) SUMMARY -ZONE•AD Project --• Date.TENANT System Name PHP -2 AREA .. .1,250 ZONE LOAD SUMMARY m •COOLING (BLOCKCFM LOAD) ROOM LOAD SUMMARY Project Name Date TENANT IMPROVEMENT 5/16/2012 System Name Floor Area PHP -1 AREA 3, 000 ROOM LOAD SUMMARY ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK Zone Name Room Name Mult. CFM Sensible I Latent CFM I Sensible I Latent I CFM I Sensible PHP -1 AREA FLOOR PLAN 1 1 8,2431 74,3951 12,000 1 7,929 1 71,5631 12,0001 8001 40,459 PAGE TOTAL TOTAL" 7,929 71,5631 12,0001 800 40,459 7,929 71,5631 12,0001 800 40,45d Total includes. ventilation load for zonal systems. I Ener Pro 5.1 by EnerqySoft User Number: 1919 RunCode: 2012-05-16708:32:15 ID: G12 -076R Page 23 of 30 ROOM LOAD SUMMARY Project Name Date TENANT IMPROVEMENT 5/16/2012 System Name Floor Area PHP -2 AREA. 1,250 ROOM LOAD SUMMARY ROOM COOLING PEAK I COIL COOLING PEAK COIL HTG. PEAK Zone Name Room Name Mult. CFM I Sensible Latent CFM Sensible Latent CFM Sensible PHP -2 AREA FLOOR PLAN 1 3,417 36,0931 5,0001 3,2771 34,6211 5,0001 619 25, 957 I" Total includes ventilation load for zonal PAGE TOTAL TOTAL* 3,277 34,621 5,000 619 25,957 3,277 34,621 5,000 619 25,957 ROOM HEATING PEAK LOADS Project Name TENANT IMPROVEMENT. Date 5/16/2012 ROOM INFORMATION DESIGN CONDITIONS Room Name FLOOR PLAN Floor Area 3,000.0 ft' Indoor Dry Bulb Temperature 70 OF Time of Peak Jan 1 AM Outdoor Dry Bulb Temperature 26 OF Conduction Area X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X to Ceiling U -Value AT °F Btu/hr X 44 = 9,900 X 44 = 9,962 X 44 = 12,566 X 44 = 8,030 X 0 = 0 X = X = X = X - X = X = X _ X = X = X = X = X = X = X = X = X = X = X = X = X = X = X = X = X = X = X = Page Total 40,459 / 60 ] X 44 = 0 AT Default Roof Prior to 1978 3,000.0 0.0750 Default Wall Prior to 1978 636.0 0.3560 Single Metal Clear 240.0 1.1900 Slab -On -Grade pen .m = 250.0 0.7300 'R-13 Wall 1,524.0 0.1020 Items shown with an asterisk (') denote conduction Infiltration:[ 1.00 X 1.064 Schedule Air Sensible Fraction through an interior surface X 3,000 X Area another room 12.00 X 0.000 Height ACH TOTAL HOURLY HEAT LOSS FOR ROOM 40,459 Energ Pro 5.1 by Ener Soft User Number: 1919 RunCode: 2012-05-16708:32:15 ID: G12 -076R Page 25 of 30 ROOM HEATING PEAK LOADS Project Name TENANT IMPROVEMENT Date 5/16/2012 ROOM INFORMATION DESIGN CONDITIONS Room Name FLOOR PLAN Floor Area 1,250.0 ft' Indoor Dry Bulb Temperature 70 °F Time of Peak Jan 1 AM Outdoor Dry Bulb Temperature 26 OF Conduction Area X X X X X X X X X X X X X X X X X X X X X X X X X X X X .X X X to Ceiling U -Value X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X AT *F Btu/hr 44 = 4,125 44 = 7,519 44 = 6,283 44 = 8,030 0 = 0 = = = = = = = _ = = = = = = = = = = = = = = = = = = Page Total 25,957 /60] X 44 = 0 AT Default Roof Prior to 1978 1,250.0 0.0750 Default Wall Prior to 1978 480.0 0.3560 Single Metal Clear 120.0 1.1900 Slab -On -Grade perim = 250.0 0.7300 *R-13 Wall 1,524.0 0.1020 Items shown with an asterisk (*) denote conduction Infiltration:[ X 1.064 Schedule Air Sensible Fraction through an interior surface X 1,250 X Area another room 12.00 X 0.000 Height ACH TOTAL HOURLY HEAT LOSS FOR ROOM 25,957 EnefqyPro 5.1 by Energ Soft User Number: 1919 RunCode: 2012-05-16T08:32:15 ID: G12 -076R Page 26 of 30 ROOM COOLING PEAK LOADS Project Name Date TENANT IMPROVEMENT 5/16/2012 ROOM INFORMATION DESIGN CONDITIONS Room Name FLOOR PLAN Time of Peak Sep 2 PM Floor Area 3,000.Oft' Outdoor Dry Bulb Temperature 106 OF Indoor Dry Bulb Temperature 74 OF, Outdoor Wet Bulb Temperature 73 OF Conduction - Area U -Value DETD' Btu/hr Default Roof Prior to 1978 3,000.0 X 0.0750 X 57.7 = 12,988 Default Wall Prior to 1978 438.0 X 0.3560 X 28.6 = 4,460 Default Wall Prior to 1978 198.0 X 0.3560 X 43.6 = 3,072 Single Metal Clear 240.0 X 1.1900 X 19.4 = 5,553 *R-13 Wall 1,524.0 X 0.1020 X 0.0 = 0 X X = X X = X X = X X = Page Total 26,072 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Weighting Solar Gain Orientation Area SGF SC Factor Btu/hr WINDOWS (S) 240.0 X 163 X 0.864 X 0.684 = 23,084 X X X = X X X = X X X = X X X = X X X = X X X = X X X = X X X = Page Total 23,084 Sched. Weighting Internal Gain Frac. Area Heat Gain Factor Btu/hr Li hts 1.00 X 3,000 X 0.000 Watts/Sgft X 3.413 Btu/Watt X 0.000 = 0 Occupants 1.00 X '3,000 X 250 Btu/occ. / 50 Sqf /occ. X 1.000 = 15,000 Receptacle 1.00 .X 3,000 X 1.000 Watts/Sgft X 3.413 Btu/Watt X 1.000 = 10,239 Process 1.00 X 3,000 X 0.000 Watts/Sgft X 3.413 Btu/Watt X 1.000 = 0 Process Lighting 1.00 X 3,000 X 0.000 Watts/Sgft X 3.413 Btu/Watt X 0.0001 = 0 Infiltration:[ 1.00 X 1.064 X 3,000 X 12.00 X 0.00 / 60 X 38 = 0 Schedule Air Sensible Area Ceiling Height ACH AT ` Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 74,395 Sched. Latent Gain Frac. Area Heat Gain Btu/hr Occupants- 1.00 X 3,000 X 200 Btuh/OCc. / 50 Sgft/OCc. = 12,000 Receptacle 1.00 X 3,000 X 0.000 Watts/Sgft X 3.413 Btu/Watt = 0 Process 1.00 X 3,000 X 0.000 Watts/Sgft X 3.413 Btu/Watt = 0 Infiltration:[ 1.00 'X 4,771 X 3,000 X 12.00 X 0.00 /60] X 0.00000 - 0 r Schedule Air Sensible Area Ceiling Height ACH AIN Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 12 000 Ene Pro 5.1 b Ene Soft User Number: 1919 RunCode: 2012-05-16708:32:15 ID: G12 -076R Page 27 of 30 ROOM COOLING PEAK LOADS Project Name Date TENANT IMPROVEMENT 5/16/2012 ROOM INFORMATION DESIGN CONDITIONS Room Name FLOOR PLAN Time of Peak Sep 2 PM Floor Area 1,250.0 ft2 Outdoor Dry Bulb Temperature 106 OF Indoor Dry Bulb Temperature 74 OF, Outdoor Wet Bulb Temperature 73 OF Conduction Area U -Value DETD' Btu/hr Default Roof Prior to 1978 1,250.0 X 0.0750 X 57.7 = 5,412 Default Wall Prior to 1978 180.0 X 0.3560 X 43.6 = 2,792 Single Metal Clear 120.0 X 1.1900 X 19.4 = 2,777 Default Wall Prior to 1978 300.0 X 0.3560 X 28.6 = 3,054 'R-13 Wall 1,524.0 X 0.1020 X 0.0 = 0 X X = X X = X X = X I X = Page Total 14,035 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Weighting Solar Gain Orientation Area SGF SC Factor Btu/hr WINDOWS (S) 120.0 X 163 X . 0.864 X 0.684 = 11,541 X X X = X X X = X X X = X X X = X X X = X X X = X X X = X X X = Page Total 11,541 Sched. Weighting Internal Gain Frac. Area Heat Gain Factor Btu/hr Lights 1.00 X 1;250 X 0.000 Watts/Sgft X 3.413 Btu/Watt X 0.000 = 0 Occupants 1.00 X 1,250 X 250 Btu/OCC. / 50 SgfVocc. X 1.000 = 6,250 Receptacle 1.00 X 1,250 X 1.000 Watts/Sgft X 3.413 Btu/Watt X 1.000 = 4,266 Process 1.00 X 1,250 X 0.000 Watts/Sgft X 3.413 Btu/Watt X 1.000 = 0 Process Lighting 1.00 X 1,250 X 0.000 Watts/Sgft X 3.413 Btu/Watt X 0.0001 = 0 Infiltration:[ 1.00 X 1.064 X 1,250 X 12.00 X 0.00 / 60 X 38 = 0 Schedule Air Sensible Area Ceiling Height ACH AT Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 36,093 Sched. Latent Gain- Frac. Area Heat Gain Btu/hr Occupants 1.00 X 1,250 X 200 Btuh/OCC. / 50 Sgft/OCc. = 5,000 Receptacle 1.00 X 1,250 X 0.000 Watts/Sgft X 3.413 Btu/Watt = 0 Process 1.00 X 1,250 X 0.000 Watts/Sgft X 3.413 Btu/Watt = 0 Infiltration:[ 1.00 X 4,771 X 1,250 X 12.00 X 0.00 /60] X 0.00000 = 0 Schedule Air Sensible Area Ceiling Height ACH AW Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 5,000 EnergyPro 5.1 by EnergySoft User Number: 1919 RunCode: 2012-05-16708:32:15 ID: G12 -076R Page 28 of 30 ROOM COOLING COIL LOADS Project Name Date TENANT IMPROVEMENT 5/16/2012 ROOM INFORMATION DESIGN CONDITIONS Room Name FLOOR PLAN Time of Peak Aug 2 PM Floor Area 3,000.0 ft' Outdoor Dry Bulb Temperature 111 OF Indoor Dry Bulb Temperature 74 °F Outdoor Wet Bulb Temperature 78 OF Conduction Area U -Value DETD' Btu/hr Default Roof Prior to 1978 3,000.0 X 0.0750 X 70.2 = 15,785 Default Wall Prior to 1978 438.0 X 0.3560 X 34.4 = 5,368 Default Wall Prior to 1978 198.0 X 0.3560 X 43.9 = 3,096 Single Metal Clear 240.0 X 1.1900 X 23.4 = 6,674 'R-13 Wall 1,524.0 X 0.1020 X 0.0 = 0 X X X X = X X = X X = Page Total 30,922 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Weighting Solar Gain Orientation Area SGF SC Factor Btu/hr WINDOWS (S) 240.0 X 110 X 0.864 X 0.676 = 15,402 X X X = X X X = X X X X X X = X X X = X X X X X X X X X Page Total 1 15,402 Sched. Weighting Internal Gain Frac. Area Heat Gain Factor Btu/hr Lig hts 1.00 X 3,000 X 0.000 Watts/Sgft X 3.413 Btu/Watt X 0.000 = 0 Occupants 1.00 X 3,000 X 250 Btu/OCC. / 50 SgfVocc. X 1.000 = 15,000 Receptacle 1.00 X 3,000 X 1.000 Wafts/Sgft X 3.413 Btu/Watt X 1.000 = 10,239 Process 1.00 X 3,000 X 0.000 Watts/Sgft X 3.413 Btu/Watt X 1.000 = 0 Process Lighting 1.00 X 3,000 X 0.000 Watts/Sgft X 3.413 Btu/Wan X 0.000 = 0 Infiltration:[ 1.00 X 1.064 X 3,000 X 12.00 X 0.00 / 60 ] X 38 = 0 Schedule Air Sensible Area Ceiling Height ACH AT Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 71,563 Sched. Latent Gain Frac. Area Heat Gain Btu/hr Occupants 1.00 X 3,000 X 200 Btuh/occ. / 50 Sqft/occ. = 12,000 Receptacle 1.00 X 3,000 X 0.000 Watts/Sgft X 3.413 Btu/Watt = 0 Process 1.00 X 3,000 X 0.000 Watts/Sgft X 3.413 Btu/Watt = 0 Infiltration:[ 1.00 X 4,771 X 3,000 X 12.00 X 0.00 /60] X 0.00000 = 0 Schedule Air Sensible Area Ceiling Height ACH AW Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 12,000 Ener Pro 5.1 by Ener Soft User Number: 1919 RunCode: 2012-05-16T08:32:15 /D: G12 -076R Page 29 of 30 ROOM COOLING COIL LOADS Project Name Date TENANT IMPROVEMENT 5/16/2012 ROOM INFORMATION DESIGN CONDITIONS Room Name FLOOR PLAN Time of Peak Aug 2 PM Floor Area 1,250.0 ft' Outdoor Dry Bulb Temperature 111 OF Indoor Dry Bulb Temperature 74 OF, Outdoor Wet Bulb Temperature 78 OF Conduction Area U -Value DETD' Btu/hr Default Roof Prior to 1978 1,250.0 X 0.0750 X 70.2 = 6,577 Default Wall Prior to 1978 180.0 X 0.3560 X 43.9 = 2,814 Single Metal Clear • - 120.0 X 1.1900 X 23.4 = 3,337 Default Wall Prior to 1978 300.0 X 0.3560 X 34.4 = 3,677 'R-13 Wall 1,524.0 X 0.1020 X 0.0 = 0 X X X X X X = X X = Page Total 16,405 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Weighting Solar Gain Orientation Area SGF SC Factor Btu/hr WINDOWS (S) 120.0 X 110 X 0.864 X 0.676 = 7,700 X X X X X X X X X = X X X X X X = X X X X X X = X X X Page Total 7,700 Sched. Weighting Internal Gain Frac. Area Heat Gain Factor Btu/hr Lights 1.00 X 1,250 X 0.000 Watts/Sgft X 3.413 Btu/Watt X 0.000 = 0 Occupants 1.00 X 1,250 X 250 Btu/OCC. / 50 SgfUOCc. X 1.000 = 6,250 Receptacle 1.00 X 1,250 X 1.000 Watts/Sgft X 3.413 Btu/Watt X 1.000 = 4,266 Process 1.00 X 1,250 X 0.000 Watts/Sgft X 3.413 Btu/Watt X 1.000 = 0 Process Lighting 1.00 X 1,250 X 0.000 Watts/Sgft X 3.413 Btu/Watt X 0.0001 = 0 Infiltration:[ 1.00 X 1.064 X 1,250 X 12.00 X 0.00 / 60 X 38 = 0 Schedule Air Sensible Area Ceiling Height ACH AT Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 34,621 Sched. Latent Gain Frac. Area Heat Gain Btu/hr Occupants, 1.00 X 1,250 X 200 Btuh/OCC. / 50 SgfUOCc. = 5,000 Receptacle 1.00 X 1,250 X o.000 Watts/Sgft X 3.413 Btu/Watt = 0 Process 1.00 X 1,250 X 0.000 Watts/Sgft X 3.413 Btu/Watt = 0 Infiltration:[ 1.0o X 4,771 X 1,250 X 12.00 X 0.00 760] X 0.00000 = 0 Schedule Air Sensible Area Ceiling Height ACH AW Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 5,000 EnergyPro 5.1 by Ene Soft User Number: 1919 RunCode: 2012-05-16708:32:15 /D: G12 -076R Page 30 of 30