Loading...
04-3998 (OFC) Title 24TITLE 24 REPORT Title 24 Report for: La Quinta Valley Plaza, Building 2 _ 79-;�ao Highway 111 La Qu i nta, Ca 92253 hl?#Vi- �'- M Project Designer: (,0-i CE G) Robert Pitchford, Architect 74-835 Fox Hills Palm Desert, Ca 92260 (760) 346-8775 Report Prepared By: Tim Scott H & H Air Conditioning 74-991 Joni Drive #20 Palm Desert, CA 92260-2043 (760) 340-3088 Job Number: Date: 3/2/05 The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2001 Building Energy Efficiency Standards. This program developed by EnergySoft, LLC (415) 883-5900. EnergyPro 3.1 By EnergySoft Job Number: User Number: 5533 TABLE OF CONTENTS Cover Page 1 Table of Contents 2 Nonresidential Performance Title 24 Forms 3 Form ENV-MM Envelope Mandatory Measures 13 Form MECH-MM Mechanical Mandatory Measures 14 HVAC System Heating and Cooling Loads Summary 16 Room Load Summary 17 Room Heating Peak Loads 18 Room Cooling Peak Loads 19 Room Cooling Coil Loads 24 EnergyPro 3.1 By EnergySoft Job Number: User Number: 5533 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 1 of 3 PERF -1 PROJECT NAME This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and DATE La Quinta Valley Plaza, Building 2 STGN-A7���� 3/2/05 PROJECT ADDRESS 7,770 sq.Ft. -7Dz 1 0 Highway 111 La Quinta BUILDING TYPE U NONRESIDENTIAL permit application. The proposed building as designed meets the energy efficiency requirements of the State Building Code, Title PRINCIPACDESfGNER -ENOE -OPE TELEPHONE Building Permit # Robert Pitchford, Architect (760) 346-8775 EXISTING + ADDITION DOCUMENTATION AUTHOR H & H Air Conditioning TELEPHONE (760) 340-3088 Checked by/Date because it pertains to a structure or type of work described as exempt pusuant to Business and Professions Code Sections 5537, 5538, and 6737.1. (These sections of the Business and Professions Code ae printed in Enforcement Agency Use Run Initiation Time: 03/02/05 14:42:38 Run Code: 1109803358 IEnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page:3 of 28 This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6, of the State Building Code. This certificate applies only to a Buildi using th performance compliance approach. O-CIJIVIENTATIOTI-AUTROR STGN-A7���� DATE Tim Scott 7,770 sq.Ft. -7Dz 1 0 15 BUILDING TYPE U NONRESIDENTIAL permit application. The proposed building as designed meets the energy efficiency requirements of the State Building Code, Title HIGH RISE RESIDENTIAL HOTEL/MOTEL GUEST ROOM PHASE OF CONSTRUCTION L"J NEW CONSTRUCTION sign this document as the person responsible for its preparation; and that I am licensed as a civil engineer, ADDITION [:] ALTERATION EXISTING + ADDITION Run Initiation Time: 03/02/05 14:42:38 Run Code: 1109803358 IEnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page:3 of 28 This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6, of the State Building Code. This certificate applies only to a Buildi using th performance compliance approach. O-CIJIVIENTATIOTI-AUTROR STGN-A7���� DATE Tim Scott -7Dz 1 0 The Principal Designers hereby certify that the proposed buil mg esign represented in the construction documents and modelled for this permit application are consistent with all other forms and worksheets, specifications, and other calculations submitted with this permit application. The proposed building as designed meets the energy efficiency requirements of the State Building Code, Title 24, Part 6. ENV. LTG. MECH. 1. 1 hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am licensed as a civil engineer, mechanical engineer, electrical engineer or architect. R o o 2. 1 affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code Section 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor preparing documents for work that I have contracted to perform. F] R 3. 1 affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document because it pertains to a structure or type of work described as exempt pusuant to Business and Professions Code Sections 5537, 5538, and 6737.1. (These sections of the Business and Professions Code ae printed in full in the Nonresidential Manual.) Indicate location on plans of Note Block for Mandatory Measures R uir 0 V-1 PRINCIPA�NVELOPE-DESIGNER - NA G CIC.W07—ATE — Robert Pitchford, Architect Indicate location on plans of Note Block for Mandatory Measures Lighting Compliance Not In The Scope Of his-Submitta Required Forms PRINCIPAL LIGHTING DESIGNER - NAME SIGNATURE LIC. NO. DATE IMIE-CHANICAL-CUMPLIANCE _j Indicate location on plans of Note Block for Mandatory Measures Require Forms MECH-1, MECH-2, MECH-3 PRINCIPAL MECHANICAL DESIGNER -NAME SI URE LIC. NO. DATE — H & H Air Conditioning �'[c7�6 3Z_L0 Run Initiation Time: 03/02/05 14:42:38 Run Code: 1109803358 IEnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page:3 of 28 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 2 of 3 PER La Quinta Valley Plaza, Building 2 3/2/05 ANNUAL SOURCE ENERGY USE SUMMARY u sq -yr ENERGY COMPONENT Standard Design Proposed Design Compliance Margin( stagy a . ""Proposed Space Heating Space Cooling Indoor Fans Heat Rejection Pumps & Misc. Domestic Hot Water Lighting Receptacle Process TOTALS: 1.31 0.73 0.58°" 55.52 50.46 5.06 so -C -0-a 21.58 23.05 -1.47 0.00 0.00 0.00 0.00 0.00 0.00 5.75 5.56 0.19P" 35.33 35.33 0.00 22.70 22.70 0.00 0.00 0.00 142.20 137.84 4.36 0 - 10 20. 30 40- - 50 kaadsgft-yr GENERAL INFORMATION Building Orientation Number of Stories Number of Systems Number of Zones (South)180 deg Conditioned Floor Area 7,770 sqft. Unconditioned Floor Area 0 sqft. Conditioned Footprint Area 7,770 sqft. 1 6 1 Orientation Front Elevation (South) Left Elevation (West) Rear Elevation' (North) Right Elevation (East)l Total Roof Gross Area sqft. sqft. sqft. sqft. sqft. sqft. Glazing Area Glazing sqft. sqft. sqft. sqft. sqft. Ratio 1,050 432 41.1% 740 96 13.0% 1,050 675 64.3% 740 2161 29.2% 3,580 1,419 7,770 Standard Proposed Lighting Power Density 1.200 wisgft. 0.000 w/sgft. Prescriptive Env. Heat Loss 1,316 1,429 Prescriptive Env. Heat Gain 161,307 180,293 Remarks: Run InitiationTime: un Code: 1109803358 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page:4 of 28 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 3 of 3 PERF -11 (PROJECT NAME La Quinta Valley Plaza, Building 2 DATE 3/2/05 System Name Zone Name Occupancy Type Floor Area (sgft.) Inst. LPD (W/sf)1 Port. Ctrl. LPD Credits (W/sf)1 (W/sf)2 lailored Proc. Loads (W/sf) (W/s03 HVAC -1 thru 6 Building 2 Comp Bldg Office 7,770 0.000 0.000 Notes: 1. See LTG -1 (items marked with asterisk, see LTG -2 by others) 2. See LTG -3 3. See LTG -4 Items above require special documentation 1 ne local enrorcement agency snouia pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of the justification; and may reject a building or design that otherwise complies based on the adequacy of the special justification The exceptional features listed in this performance approach application have specifically been reviewed. Adequate written justification and documentation for their use have been provided by the applicant. Authorized Signature or Stamp Run Initiation Time: un Code: 1109803358 EnergyPro 3.1 By EnergySoft User Number. 5533 Job Number: Page:5 of 28 ENVELOPE COMPLIANCE SUMMARY Performance ENV -1 PROJECT NAME DATE La Quinta Valley Plaza, Building 2 3/2/05 Solar Surface Framing Act. Gains # Type Type Area U -Fac. Azm. Tilt Y/N _Fp[m,3 Referenee" Location /Comments ng .1tf.zxb.1b) tsunaing one one Site Assembled Glazing # Type GhecK box it 13uildin is >= 100,000 sgft of CFA and >= 10,000 sgft vertical glazing then NFF Follow NFRC 100 -SB Procedures and submit NFRC Label Certificate Form. Area U -Fac. Act. Azm. SHGC Glazing Type Location / Comments 1 Window 38 0.720 0 0.56 Double Metal Tinted Default Building 2 2 Window 42 0.850 0 0.56 Double Metal Tinted Default Building 2 3 Window 8 0.720 0 0.56 Double Metal Tinted Default Building 2 4 Window 38 0.720 0 0.56 Double Metal Tinted Default Building 2 5 Window 38 0.720 0 0.56 Double Metal Tinted Default Building 2 6 Window 42 0.850 0 0.56 Double Metal Tinted Default Building 2 7 Window 18 0.720 0 0.56 Double Metal Tinted De cult Building 2 8 Window 38 0.720 0 0.56 Double Metal Tinted Default Building 2 9 Window 38 0.720 0 0.56 Double Metal Tinted Default Building 2 10 Window 42 0.850 0 0.56 Double Metal Tinted Default Building 2 11 Window 18 0.720 0 0.56 Double Metal Tinted Default Building 2 12 Window 38 0.720 0 0.56 Double Metal Tinted Default Buildina 2 # Exterior Shade Type SHGC Hgt. Wd. Len. Hgt. LExt.RExt. Dist. Len. Hgt. Dist. Len. Hgt. 1 None 0.76 10.0 3.8 8.0 0.1 8.0 8.0 2 None 0.76 7.0 6.0 8.0 0.1 8.0 8.0 3 None 0.76 3.0 6.0 8.0 0.1 8.0 8.0 4 None 0.76 10.0 3.8 8.0 0.1 8.0 8.0 5 None 0.76 10.0 3.8 8.0 0.1 8.0 8.0 6 None 0.76 7.0 6.0 8.0 0.1 8.0 8.0 7 None 0.76 3.0 6.0 8.0 0.1 8.0 8.0 8 None 0.76 10.0 3.8 8.0 0.1 8.0 8.0 9 None 0.76 10.0 3.8 8.0 0.1 8.0 -8.0-- 10 None 0.76 7.0 6.0 8.0 0.1 8.0 8.0 11 None 0.76 3.0 6.0 8.0 0.1 8.0 8.0 12 None 0.76 10.0 3.8 8.0 0.1 8.0 8.0 13 None 0.76 10.0 3.8 8.0 0.1 8.0 8.0 14 15 None None 0.76 0.76 7.0 6.0 8.0 0.1 8.0 8.0 Run Initiation Time: 03102/05 4:42:38 Run Code: 1109803358 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page:6 of 28 ENVELOPE COMPLIANCE SUMMARY Performance ENV -1 PROJECT NAME DATE La Quinta Valley Plaza, Building 2 3/2/05 •• VI Solar Gains •Tilt YIN Form 3 Reference FERESTRAT101% • • • • - • • 1 1 1 1 1 • • • 1 1 1 1 • # Type Area U -Fac. Act. Azm. SHGC Glazing Type Location / Comments 16 Window 38 0.720 0 0.56 Double Metal Tinted Default Building 2 17 Window 38 0.720 0 0.56 Double Metal Tinte Default Building 2 18 Window 42 0.850 0 0.56 Doub a Meta inted Default Building 2 19 Window 18 0.720 0 0.56 Double Metal Tinted Default Building 2 20 Window 38 0.720 0 0.56 Double Metal Tinted Default Building 2 21 Window 48 0.720 90 0.56 Double Metal Tinted Default -Building 2 22 Window 78 0.720 90 0.56 Double Metal TintedDefault Building 2 23 Window 30 0.720 90 0.56 Double Metal Tinted Default Building 2 24 Window 21 0.850 90 0.56 Double Metal Tinted Default Building 2 25 Window 9 0.720 90 0.56 Double Meta Tinted Building 2 26 Window 30 0.720 90 0.56 Double Metal Tinted Default Building 2 27 lWindow 81 1 0.720 1 180 1 0.56 Double Metal Tinted Default Building 2 28 Window 30 0.720 -2f 180 0.56 Double Metal Tinted Default Building 2 29 Window 0.850 180 0.56 Double Metal Tinted Default Bui ding 2 30 Window 9 0.720 180 0.56 Double Metal Tinted Default Building 2 # Exterior Shade Type SHGC Window Hgt. Wd. Len. Overhang Left Hgt. LExt.RExt. D ist. L Fin Right Fin en. gt. Dist. Len. - g -t. 16 None 0.76 10.0 3.8 8.0 0.1 8.0 8.0 17 None 0.76 10.0 3.8 8.0 0.1 8.0 8.0 18 None 0.76 7.0 6.0 8.0 0.1 8.0 8.0 19 None 0.76 3.0 6.0 8.0 0.1 8.0 8.0 20 None 0.76 10.0 3.8 8.0 0.1 8.0 8.0 21 None 0.76 22 None 0.76 23 None 0.76 24 None 0.76 25 None 0.76 26 None 0.76 27 None 0.76 28 None 0.76 29 None 0.76 30 None 0.76 Run Initiation Time: 03 02 05 14:42:38 Run Code: 1109803358 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page:7 of 28 ENVELOPE COMPLIANCE SUMMARY Performance ENV_ PROJECT NAME DATE La Quinta Valley Plaza, Building 2 3/2/05 Solar Gains Tilt Y/N Form 3 Reference Location Comments *P • % SIRFACES ••IMP . 1 1 1 1 1 • • . 1 1 1 1 92219 �'MIWI • • �i - # Type Area U -Fac. Act. Azm. SHGC Glazing Type Location / Comments 31 Window 30 0.720 180 0.56 Double Metal Tinted Default Building 2 32 Window 30 0.720 180 0.56 Double Metal Tinted Default Building 2 33 Window 2T— 0.850 180 0.56 Double Metal Tinted Default Building 2 34 Window 9 0.720 180 0.56 Double Metal Tinted Default Building 2 35 Window 30 0.720 180 0.56 Double Metal Tinted Default Building 2 36 Window 30 0.720 180 0.56 Double Metal Tinted Default Building 2 37 Window 21 0.850 180 0.56 Double Metal Tinted Default Building 2 38 Window 9 0.720 180 0.56 Double Metal Tinted Default Building 2 39 Window -40-Window 30 0.720 180 0.56 Double Metal Tinted Default Building 2 81 0.720 180 0.56 Double Metal Tinted Default Building 2 41 Window 48 0.720 270 0.56 Double Metal Tinted Default Building 2- 42 lWindow 48 0.720 270 0.56 Double Metal Tinted Default Building 2 # Exterior Shade Type SHGC Window Hgt. Wd. Len. Overhang Left Hgt. xt. xt. Dist. Len. Fin Ig t In Hgt. Dist. Len. Hgt. 31 None 0.76 32 None 0.76 33 None 0.76 34 None 0.76 35 None 0.76 36 None 0.76 37 None 0.76 38 None 0.76 39 None 0.76 40 None 0.76 41 None 0.76 42 None 0.76 Run Initiation Time: 03/02/05 14:42:38 Run Code: 1 09803358 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Pagel of 28 CERTIFICATE OF COMPLIANCE Performance MECH-1 La Quinta Valley Plaza, Building 2 3/2/05 SYSTEM NAME TIME CONTROL SETBACK CONTROL ISOLATION ZONES HEAT PUMP THERMOSTAT? ELECTRIC HEAT? FAN CONTROL VAV MINIMUM POSITION CONTROL? SIMULTANEOUS HEAT/COOL? HEATING SUPPLY RESET COOLING SUPPLY RESET HEAT REJECTION CONTROL VENTILATION OUTDOOR DAMPER CONTROL ECONOMIZER TYPE DESIGN O.A. CFM (MECH-3, COLUMN I HEATING EQUIPMENT TYPE HEATING EQUIPMENT EFFICIENCY COOLING EQUIPMENT TYPE COOLING EQUIPMENT EFFICIENCY MAKE AND MODEL NUMBER PIPE INSULATION REQUIRED? PIPE/DUCT INSULATION PROTECTED? HEATING DUCT LOCATION R -VALUE COOLING DUCT LOCATIO R -VALUE CEILING/ROOF SPACE MECHANICAL SYSTEMS DHW Heater HVAC -1 thru 6 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a Electric Res 99% AO SMITH ELJF-10 n/a na Yes Yes n/a n/a n/a n/a n/a Programmable Switch Heating & Cooling Requir n/a Yes 0.0 kW Constant Volume No No Constant Temp Constant Temp n/a Air Balance Auto No Economizer 777 cfm Heat Pump 7.20 HSPF Split DX 12.0 SEER / 10.2 EER Yes Yes Ducts in Attic 4.2 Ducts in Attic 4.2 No NOTE TO FIELD CODE TABLE : Enter code from table below into columns above. HEAT PUMP THERMOSTAT? Y: Yes N: NoVENTILATION TIME CONTROL SETBACK CTRL. ISOLATION ZONES FAN CONTROL ELECTRIC HEAT? S: Prog. Switch 0: Occupancy Sensor M: Manual Timer H: Heating C: Cooling B: Both Enter Number of Isolation Zones. I: Inlet Vanes P: Variable Pitch V: VFD 0: Other C: Curve VAV MINIMUM POSITION CONTROL? SIMULTANEOUS HEAT / COOL? HEAT AND COOL SUPPLY RESET? OUTDOOR DAMPER ECONOMIZER O.A. CFM HIGH EFFICIENCY? it Balance C: Outside Air Cert. M: Out. Air Measure D: Demand Control N: Natural 1 Auto G: Gravity it W: Water N: Not Required EC: Economizer Control See Section 4AA1-1" Enter Outdoor Air CFM. Note: This shall be n less than Col. H on MECH-3. PIPE INSULATION REQUIRED? PIPE/DUCT INSULATION PROTECTED? SEALED DUCTS IN CEILING/ROOF SPACE? - ror esu Run Initiation Time: un Code: 1109803358 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page:9 of 28 MECHANICAL EQUIPMENT SUMMARY Part 1 of 2 MECH-2 PROJECT NAME La Quinta Valley Plaza, Building 2 DATE 3/2/05 Motor Location CFM Efficiency Tons PUMPS CFM BHP Equipment Name Equipment Type Qty. Tot. Qty GPM BHP Motor Eff. Drive Eff. Pump Control none Energy Factor or Recovery Efficiency Standby Loss or Pilot TANK- UL. System Name System Type Distribution Type Qt Rated Input (Gals.) Vol. Ext. R -Val. AO SMITH ELJF-10 Storage Elec. Standard 5 5,120 10 0.95 n/a n/a HEAT COOZIRG System Name System Type Qty. Output Aux. kW Eff. Output Sensible Efficiency Economizer Type CARRIER 50JX0605 Split DX 6 57,000 0.0 7.20 HSPF 60,000 42,00012.0 SEER 110.2 EEF No Economizer SUPPLY FAN I F-RFTLIRN FAN System Name Fan Type Motor Location CFM BHP Motor Eff. Drive Eff. CFM BHP Motor Eff. Drive Eff. CARRIER 50JX0_ 03 Constant Volume Draw -Through 2,000 0.70 77.0% 100.0% none Kun Initiation I Ime: U3/UZ/U5 14:42:38 Run Code: 1109803358 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page:10 of 28 MECHANICAL EQUIPMENT SUMMARY Part 2 of 2 MECH-2 PROJECT NAME La Quinta Valley Plaza, Building 2 DATE 3/2/05 Zone Name System Type Qty. Min. CFM Ratio Reheat Coil CFM BHP Motor Eff. Drive Eff. Type Output lype DeltaT Room Name Qty, CFM BHP Motor Eff. Drive Eff. Room Name Qty. CFM BHP Moto Eff. Drive Eff. Run InitiationTime: un Code: 1109803358 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page: 11 of 28 MECHANICAL VENTILATION MECH-3 La Quinta Valley Plaza, Building 2 I 3/2/05 FA] a© a o o a a a o a ZONE/SYSTEM Building 2 HVAC -1 thru 6 AREA CFM CFM (SF) PER SF I (B x C) 7,770 0.15 1,166 OCCUPANCY BASIS NO. CFM MIN. OF PER CFM PEOPL PERSON (EXF) T REQ'D O.A. (MAX OF D OR G) DESIGN OUTDOO AIR CFM VAV MIN. RATIO 1,166 777 1,166 777 TRANS. FER AIR 388 C Minimum Ventilation Rate per Section 121, Table 1-F. E Based on Expected Number of Occupants or at least 50% of Chapter 10 1997 UBC Occupant Density. I Must be greater than or equal to H, or use Transfer Air. Design Outdoor Air includes ventilation from Supply Air System & Room Exhaust Fans K Must be greater than or equal to (H minus 1), and, for VAV, greater than or equal to (H -J). EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page: 12 of 28 ENVELOPE MANDATORY MEASURES ENV -MM La Quinta Valley Plaza, Building 2 3/2/05 DESCRIPTION Designer Enforcement U§118(a) Installed Insulating Material shall have been certified by the manufacturer to comply with the California Quality Standards for insulating material, Title 20, Chapter 4, Article 3. L'J § 118(c) All Insulating Materials shall be installed in compliance with the flame spread rating and smoke density requirements of Sections 2602 and 707 of Title 24, Part 2. [XI § 117(a) All Exterior Joints and openings in the building that are observable sources of air leakage shall be caulked, gasketed, weatherstripped or otherwise sealed. § 116(b) Site Constructed Doors, Windows and Skylights shall be caulked between the unit and the building, and shall be weatherstripped (except for unframed glass doors and fire doors). § 116(a)1 Manufactured Doors and Windows installed shall have air infiltration rates not exceeding those shown in Table Number 1-E. of the Standards. Manufactured fenestration products must be labeled for U -value according to NFRC procedures. §118(e) Demising Walls in Nonresidential Buildings: The opaque portions of framed demising walls In nonresidential buildings shall have insulation with an installed R -value of no less than R-11 between framing members. EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page: 13 of 28 MECHANICAL MANDATORY MEASURES Part 1 of 2 MECH-MM La Quinta Valley Plaza, Building 2 3/2/05 DESCRIPTION Designer Enforcement Equipment and Systems Efficiencies §111 Any appliance for which there is a California standard established in the Appliance Efficiency Regulations will comply with the applicable standard. § 115(a) Fan type central furnaces shall not have a pilot light. U§ 123 Piping, except that conveying fluids at temperatures between 60 and 105 degrees Fahrenheit, or within HVAC equipment, shall be insulated in accordance with Standards Section 123. LJ § 124 Air handling duct systems shall be installed and Insulated in compliance with Sections 601, 603 and 604 of the Uniform Mechanical Code. Controls § 122(e) Each space conditioning system shall be installed with one of the following: u § 122(e)1A Each space conditioning system serving building types such as offices and manufacturing facilities (and all others not explicitly exempt from the requirements of Section 112 (d)) shall be installed with an automatic time switch with an accessible manual override that allows operation of the system during off -hours for up to 4 hours. The time switch shall be capable of programming different schedules for weekdays and weekends; incorporate an automatic holiday "shut- off' feature that turns off all loads for at least 24 hours, then resumes the normally scheduled operation; and has program backup capabilities that prevent the loss of the device's program and time setting for at least 10 hours if power is interrupted; or § 122(e)1 B An occupancy sensor to control the operating period of the system; or r] § 122(e)1C A 4 -hour timer that can be manually operated to control the operating period of the system. 1XIu § 122(e)2 Each space conditioning system shall be installed with controls that temporarily restart and temporarily operate the system as required to maintain a setback heating and/or a setup cooling thermostat setpoint. § 122(g) Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000 square feet shall be provided with isolation zones. Each zone: shall not exceed 25,000 square feet; shall be provided with isolation devices, such as valves or dampers, that allow the supply of heating or cooling to be setback or shut off independently of other isolation areas; and shall be controlled by a time control device as described above. § 122(a&b) Each space conditioning system shall be controlled by an individual thermostat that responds to temperature within the zone. Where used to control heating, the control shall be adjustable down to 55 degrees F or lower. For cooling, the control shall be adjustable up to 85 degrees F or higher. Where used for both heating and cooling, the control shall be capable of providing a deadband of at least 5 degrees F within which the supply of heating and cooling is shut off or reduced to a minimum. U§ 122(c) Thermostats shall have numeric setpoints in degrees Fahrenheit (F) and adjustable setpoint stops accessible only to authorized personnel. § 112(b) Heat pumps shall be installed with controls to prevent electric resistance supplementary heater operation when the heating load can be met by the heat pump alone. EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page: 14 of 28 MECHANICAL MANDATORY MEASURES Part 2 of 2 MECH-MM La Quinta Valley Plaza, Building 2 3/2/05 Description Designer Enforcement Ventilation [XI XI § 121(e) Controls shall be provided to allow outside air dampers or devices to be operated at the ventilation rates as specified on these plans. a§ 122(f) Gravity or automatic dampers interlocked and closed on fan shutdown shall be provided on the outside air intakes and discharges of all space conditioning and exhaust systems. [] § 122(f) All gravity ventilating systems shall be provided with automatic or readily accessible L I manually operated dampers in all openings to the outside, except for combustion air openings. L'J § 121(f)1 Air Balancing: The system shall be balanced in accordance with the National Environmental Balancing Bureau (NEBB) Procedural Standards (1983), or Associated Air Balance Council (AABC) National Standards (1989); or F§ 121(f)2 Outside Air Certification: The system shall provide the minimum outside air as shown on the mechanical drawings, and shall be measured and certified by the Installing licensed C-20 mechanical contractor and certified by (1) the design mechanical engineer, (2) the installing licenced C-20 mechanical contractor, or (3) the person with overall responsibility for the design of the ventilation system; or u § 121(f)3 Outside Air Measurement: The system shall be equipped with a calibrated local or remote device capable of measuring the quantity of outside air on a continuous basis and displaying that quantity on a readily accessible display divice; or U§ 121(04 Another method approved by the Commission. Service Water Heating Systems § 113(b)2 If a circulating hot water system is installed, it shall have a control capable of automatically turning off the circulating pump(s) when hot water is not required. XU § 113(b)3B Lavatories in restrooms of public facilities shall be equipped with controls to limit the outlet temperature to 110 degrees F. [XIU § 113(b)3C Lavatories in restrooms of public facilities shall be equipped with one of the following: Outlet devices that limit the flow of hot water to a maximum of 0.5 gallons per minute. Foot actuated control valves, and outlet devices that limit the flow of hot water to a maximum of 0.75 gallons per minute. Proximity sensor actuated control valves, and outlet devices that limit the flow of hot water to a maximum of 0.75 gallons per minute. Self-closing valves, and outlet devices that limit the flow of hot water to a maximum of 2.5 gallons per minute, and 0.25 gallons/cycle (circulating system). Self-closing valves, and outlet devices that limit the flow of hot water to a maximum of 2.5 gallons per minute, and 0.50 gallons/cycle (non -circulating system). Self-closing valves, and outlet devices that limit the flow of hot water to a maximum of 2.5 gallons per minute, and 0.75 gallons/cycle (foot switches and proximity sensor controls). EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page: 15 of 28 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE La Quinta Valley Plaza, Building 2 3/2/05 SYSTEM NAME FLOOR AREA HVAC -1 thru 6 7,770 Total Room Loads teturn Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts I-OTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM Sensible Latent CFM I Sensible Total Adjusted System Output (Adjusted for Peak Design Conditions) 225,:3:47]:::96,657 9,232 138,850 27,6991 D,378 109,416 0 6,942 5,471 0 0 777 30,973 8,146 777 36,029 0 0 6,942 5,471 �kl 183,707 35,845 156,387 CARRIER 50JX0605 225,347 96,657 Total Adjusted System Output (Adjusted for Peak Design Conditions) 225,:3:47]:::96,657 224,925 224,925 TIME OF SYSTEM PEAK I Aug 3pm Jan 12 am (Airstream Temperatures at Time of Heating ea 26.0 of 66.8 of 84.4 of 84.4 of O Supply Air Ducts Outside Air • 777 cfm Heating Coil Supply Fan 83'9 °F 12000 cfm ROOMS 69.6 70.0 of 12.0 / 77.9 OF Outside Ai 777 cfm 74.5/64.4 of 77.0 / 65.4 of 6, Return Air Ducts 14 me 59.3 / 58.4 of 59.3 / 58.4 of Oh Supply Air Ducts • Cooling Coil Supply Fan 59.9 / 58.6 -111- 12000 f12000 cfm 59.4% R.H. ROOMS 74.0/64.2 of �% Return Air Ducts Y EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page: 16 of 28 ROOM LOAD SUMMARY PROJECT NAME La Quinta Valley Plaza, Building 2 DATE 3/2/05 SYSTEM NAME HVAC -1 thru 6 FLOOR AREA 7,770 IROOM LOAD SUMMARY ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK ZONE NAME ROOM NAME Mult. CFM SENSIBLE LATENT CFM SENSIBLE LATENT CFM SENSIBLE Building 2 ui mg 1 9,232 138,850 27,699 9,232 138,850 27,699 7,378 109,416 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page: 17 of 28 ROOM HEATING PEAK LOADS Project Title Date La Quinta Valley Plaza, Building 2 3/2/05 Room Information Design Conditions Room Name Building 2 Time of Peak Jan 12 am Floor Area 7,770 Outdoor Dry Bulb Temperature 26°F Indoor Dry Bulb Temperature 70°F Conduction Area U -Value AT of Btu/hr Metal/R-13/Air Space/R-17/T-Bar R-19 Wall (W.19.2x6.16) Double Metal Tinted Default Double Metal Tinted Default Insulated Metal Door Slab -On -Grade 7,770.0 x X x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x 0.0297 x X x x X x x x x X x x x x x x x x x x x x x x x x x x x x x x x x x x x x x 44.0 = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = 10,158 2,119.0 0.0655 44.0 6,102 1,125.0 0.7200 44.0 35,640 294.0 0.8500 44.0 10,996 42.0 0.1460 44.0 270 perimeter = 358.0 44.5 15,931 Items shown with an asterisk ('r) denote conduction through an interior surface to another room. —i Page Total: T9,097 Infiltration: I 1.00 x 1.064 x 7,770 x 10.00 x 0.50 160J x Sch:ed u a it Sensible Area CeilingHeight ACff Fraction TOTAL HOURLY HEAT LOSS FOR ROOM 109,416 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page: 18 of 28 ROOM COOLING PEAK LOADS Project TitleDate La Quinta Valley Plaza, Building 2 - 3/2/05 IROOM INFORMATION DESIGN CONDITIONS Room Name Building 2 Time of Peak Aug 3 pm Floor Area 7,770 Outdoor Dry Bulb Temperature 112 11: Indoor Dry Bulb Temperature 74`� Outdoor Wet Bulb Temperature 78 Conduction Metal/R-13/Air Space/11-17/T-Bar R-19 Wall (W.19.2x6.16) Double Metal Tinted Default Double Metal Tinted Default Double Metal Tinted Default R-19 Wall (W.19.2x6.16) Double Metal Tinted Default ouble Metal Tinted Default R-19 Wall (W.19.2x6.16) Area 7,770.0 375.0 537.0 294.0 204.0 524.0 144.0 240.0 618.0 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Solar Gain naow . ndow ndow ndow ndow ndow ndow U -Value 0.0297 0.0655 0.7200 0.8500 0.7200 0.0655 0.7200 0.7200 0.0655 Orientation Area SGF SC X X X X x x x x X DETD 1 = = = = = = = = 68.3 36.7 27.1 26.2 27.1 39.1 27.1 27.1 45.1 (North) 37.5 X X X x x X x X X X 38 x X X x x X X X x X 0.623 (North) 42.0 38 0.623 (North) 18.0 38 0.623 (North) 37.5 38 0.623 (North) 37.5 38 0.623 (North) 42.0 38 0.623 (North) 18.0 38 0.623 (North) 37.5 38 0.623 (North) 37.5 38 0.623 (North) 42.0 38 0.623 Page Total Weighting Factor x 0.752 = x 0.752 = x 0.751 = x 0.752 = X 0.752 = x 0.752 = X 0.751 c x 0.752 = X 0.752 = X 0.752 = Page Total Btu/hr 15,763 902 10,464 6,545 3,975 1,340 2,806 4,677 1,824 48,296 Btu/hr 668 748 320 668 668 748 320 668 668 748 6,225 Sched. Weighting Internal Gain Frac. Area Heat Gain Factor Btu /hr fights 1.0 x 7,770 x 0.000 Watts/sqft x 3.41 Btuh[Watt x 0.000 = 0 Occupants 1.0 X 7,770 X 300 Btuh/occ. / 15 sgft/occ. X 1.00 = 15,540 .receptacle 1.0 x 7,770 X 0.000 Watts/sgft x 3.41 BtuhfWatt X 1.00 = 0 Process 1.0 x 7,770 X 0.000 Wafts/sqft X 3.41 BtuhfWatt x 1.00 = 0 Infiltration: cnea� e X Air Sen she x r a77o X eilmg leigfi x Aco.So / 60] x Q 38 = 26,185 Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 138,850 Sched. Latent Gain Frac. Area Heat Gain Btu/hr ccup�0 ants - 1.00 X 7,770 X 300 Btuh/occ. / 150 sqft/occ. = 15,540 Receptacle 1.00 X 7,770 x 0.000 Watts/sgft X 3.413 Btuh[Watt = p Process Lhei'd 1.00 x 7770 x 0.000 Watts/sqft x 3413 Btuh[WattInfiltration: 00 x 4t771 x 7 770 x 10.00 x 0.50 /60 x e i� en Area L.1. -.g Reigoi xc Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 27,699 EnergyPro 3.1 By EnergySoft User Number: 5533 Page: 19 of 28 ROOM COOLING PEAK LOADS Project Title La Quinta Valley Plaza, Building 2 Date 3/2/05 ROOM INFORMATION Ur-blUN CONDITIONS Room Name Building 2 Time of Peak Aug 3 pm Floor Area 7,770 Outdoor Dry Bulb Temperature 112 `k Indoor Dry Bulb Temperature 74"� Outdoor Wet Bulb Temperature 78 Conduction R-19 Wall (W.19.2x6.16) Insulated Metal Door Area 602.0 42.0 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Solar Gain naow ndow ndow U -Value 0.0655 0.1460 Orientation Area SGF Sc (North) 18.0 X x x x x x X x X X 38 x X x x X X X X X X 0.623 (North) 37.5 38 0.623 (North) 37.5 38 0.623 (North) 42.0 38 0.623 (North) 18.0 38 0.623 (North) 37.5 38 0.623 (North) 37.5 38 0.623 (North) 42.0 38 0.623 (North) 18.0 38 0.623 (North) 1 37.5 381 0.623 DETD 1 56.4 = 70.7 = Page Total Weighting Factor x 0.751 = x 0.752 = x 0.752 = x 0.752 = x 0.754 = x 0.752 = X 0.752 = X 0.752 = X 0.751 = x 0.752 = Page Total Btu/hr 2,224 434 2,657 Btu/hr 320 668 668 748 321 668 668 748 320 668 5,798 Sched. Weighting Internal Gain Frac. Area Heat Gain Factor Btu/hr fights �1.0( x 7,770 x 0.000 Watts/sqft x 3.413 Btuh/Watt x 0.000 = 0 Occupants 1.0( X 7,770 X 300 Btuhlocc. / 150 sgft/occ. x 1.00 = 15,540 Receptacle X 7,770 X 0.000 Wattslsgft x 3.413 Btuh[Watt X 1.00 = 0 Process 11.0 x 7,770 X 0.000 Watts/sgft x 3.413 Btuh/Watt x 1.00 = 0 Infiltration: IF. aM, x xrsenobe x Ar a77o x e1ling_flQ19F x AC 0.50 16] x o 38 = 26,185 Fraction J TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 138,850 Sched. Latent Gain Frac. Area Heat Gain Btu/hr ccupants 1.00 x7.770 x 300 Btuh/occ. /150 sgft/occ. = 15,540 Receptacle 1.00 x 1 7,770 X 0.000 Watts/sgft X 3.413 Btuh[Watt = 0 Process r 1.00 X 1 7,770 x 0.000 Wattslsgft X 3.413 Btuh/Watt = o Infiltration: I 1.00 x 4 771 x 7 770 x 10.00 X 0.50 / 60� x OQ00394 = 12 159 sc�dule Air Latent Area CeilingHeightC Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 27.699 I EnergyPro 3.1 By EnergySoft User Number: 5533 Page: 20 of 28 1 ROOM COOLING PEAK LOADS Project Title La Quinta Valley Plaza, Building 2 Date 3/2/05 x X X X X x X X X x Room Name Building 2 Time of Peak Aug 3 pm Floor Area 7,770 Outdoor Dry Bulb Temperature 112 '� Indoor Dry Bulb Temperature 74c� Outdoor Wet Bulb Temperature 78 c� Conduction Area 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Solar Gain ndow ndow LI -Value Orientation Area SGF SC (East) 48.0 x X X X X x X X X x 38 x X x x x X x x X x 0.623 (East) 78.0 38 0.623 (East) 30.0 38 0.623 (East) 21.0 38 0.623 (East) 9.0 38 0.623 (East) 30.0 38 0.623 (South) 81.0 80 0.623 (South) 30.0 80 0.623 (South) 21.0 80 0.623 (South) 9.0 80 0.623 DETD 1 Page Total Weighting Factor x 1.901 = X 1.901 = X 1.901 = X 1.901 = x 1.901 = X 1.901 = x 0.887 = X 0.887 = x 0.887 = x 0.887 = Page Total Btu/hr 0 Btu/hr 2,161 3,512 1,351 945 405 1,351 3,582 1,327 929 398 15,961 Sched. Weighting Btu/hr Internal Gain Frac. Area Heat Gain Factor fights 1.0( x 7,770 x omo Watts/sqft x 3.41 BtuhlWatt x 0.000 = o Occupants 1.0( x 7,770 x 300 Btuhlocc. / 150 sgft/occ. X 1.00 = 15,540 receptacle -- 1�.0( x 7,770 x 0.000 Watts/sqft x 3.4v BtuhlWatt x 1.00 = 0 rocess IFS: -c 1.0 X 7,770 X 0.000 Wafts/sgft x 3.413 BtuhlWatt X 1.00 = 0 Infiltration: 1.00 x 1.064 x 7770 x 10.00 x 0.50 / 60 x 38 =hedu a fir Sensi6 a Area edm"�leigfi AC p Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 138,850 Sched. Latent Gain Frac. Area Heat Gain Btu/hr Occupants 1.00 X 7,770 X 300 Btuh/occ. I 150 sgft/OCc. = 15,540 Receptacle 1.00 X 7,770 x 0.000 Watts/sgft X 1 3.413 Btuh/Watt = 0 Process 1.00 x 7,770 X 0.000 Watts/sgft x 3.413 BtuhlWatt = 0 Infiltration: 1.00 x _ 4771 x J770 x 10.00 x 0.50 /6 x 0.00394 = 12159 Schedu a Air Iat n Area eiling eigF ACR �yy (TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 27,6991 EnergyPro 3.1 By EnergySoft User Number: 5533 Page: 21 of 28 ROOM COOLING PEAK LOADS Project TitleDate La Quinta Valley Plaza, Building 2 3/2/05 ROOM INFORMATION DESIGN CONDITIONS Room Name Building 2 Time of Peak Aug 3 pm Floor Area 7,770 Outdoor Dry Bulb Temperature 112 1: Indoor Dry Bulb Temperature 74c� Outdoor Wet Bulb Temperature 78 c� Conduction Area 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Solar Gain Window Window iW ndow Window indow indow I indow indow Window Window U -Value Orientation Area SGF SC (South) 30.0 X X X X x X X X X X 80 X X X x x X X X X X 0.623 (South) 30.0 80 0.623 (South) 21.0 80 0.623 (South) 9.0 80 0.623 (South) 30.0 80 0.623 (South) 30.0 80 0.623 (South) 21.0 80 0.623 (South) 9.0 80 0.623 (South) 30.0 80 0.623 (South) 81.0 80 0.623 DETD 1 Page Total Weighting Factor x 0.887 = x 0.887 = X 0.887 = X 0.887 = X 0.887 = X 0.887 = X 0.887 = x 0.887 = x 0.887 x 0.887 = Page Total Btu/hr 0 Btu/hr 1,327 1,327 929 398 1,327 1,327 929 398 1,327 3,582 12,870 Sched. Weighting Btu/hr Internal Gain Frac. Area Heat Gain Factor Lights 1.0 x 7,770 X 0.000 Watts/sqft x 3.41 Btuh/Watt x 0.000 = 0 Occupants 1.0 x 7,770 x 300 Btuhlocc. / 150 sgft/occ. x 1.00 = 15,540 Receptacle 1.00 x 7,770 X 0.000 Wattslsgft x 3.41 Btuh/Watt x 1.00 = 0 rocess IFSI.e�dluo]eo 10 x 7,770 X 0.000 Watts/sqft x 3.413 BtuhlWatt x 1.00 = 0 Infiltration: x 1.064 x 7,770 x ^1.00 x0.50 /60� x Air Sensible Area edmg flei ACA JJJ p Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 138,850 Sched. Latent Gain Frac. Area Heat Gain Btu/hr Occupants 1.00 X 7,770 X 300 Btuh/OCc. I150 sgft/occ. = 15,540 Receptacle 1.00 x 7,770 X 0.000 Wattslsgft x 3.413 Btuh[Watt = 0 Process r 1.00 x 7,770 x 0.000 Watts/sgft x 3.413 BtuhlWatt = 0 Infiltration: I 1.00 x 4,771 x 7,770 x 10.00 x 0.50 160 x 0.00394 = 12 159 Scnedu�e Amen Area eilm' g Heigh ACH Dyy Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 27,ggg EnergyPro 3.1 By EnergySoft User Number: 5533 Page: 22 of 28 ROOM COOLING PEAK LOADS Project TitleDate La Quinta Valley Plaza, Building 2 3/2/05 IROOM INFORMATION DESIGN CONDITIONS Room Name Building 2 Time of Peak Aug 3 pm Floor Area 7,770 Outdoor Dry Bulb Temperature 112 '� Indoor Dry Bulb Temperature 74'� Outdoor Wet Bulb Temperature 78 '� Conduction Area 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Solar Gain - ndow ndow U -Value Orientation Area SGF SC (West) 48.0 x 239 x 0.623 (West) 48.0 x 239 X 0.623 X X X X X X X X X X x X X X X X DETD 1 Page Total Weighting Factor x 0.372 = x 0.372 = X X = X X X = X x = X Page Total Btu/hr 0 Btu/hr 2,659 2,659 5,317 Sched. Weighting Internal Gain Frac. Area Heat Gain Factor Btu/hr ights 1.0 x 7,770 X 0.000 Watts/sqft x 3.41 Btuh/Watt x 0.000 = 0 ccupants 1.0 x 7,770 x 300 Btuh/OCC. / 15 sgft/occ. X 1.00 = 15,540 Receptacle 1.0 X 7,770 x 0.000 Watts/sgft x 3.41 Btuh/Watt X 1.00 = 0 rocess 1.0 x 7,770 X 0.000 Watts/sgft x 3.413 Btuh/Watt x 1.00 = 0 Infiltration: 1.00 X 1.064 X 7,770 X 10.00 x 0.50 / 6] X 38 = 26,185 chedu a Air Sensible rea ailing Fright AC p Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 138,850 Sched. Latent Gain Frac. Area Heat Gain Btu/hr cuc pants 1.00 X 7,770 X 300 Btuh/OCC. /150 sgft/occ. = 15,540 Receptacle 1.00 X 7,770 x 0.000 Watts/sgft xJ 3.413 Btuh[Watt = 0 Process =c.1 1.00 X 7770 X 0.000 Watts/sqft X 3.413 Btuh/WattInfiltration: x 4 771 x 7 770x x50 / 60� x AirTa en rea ceiling HeightC �yy Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 27,699 EnergyPro 3.1 By EnergySoft User Number: 5533 Page: 23 of 28 ROOM COOLING COIL LOADS Project Title La Quinta Valley Plaza, Building 2 Date 3/2/05 ROOM INFORMATION DESIGN CONDITIONS Room Name Building 2 Time of Peak Aug 3 pm Floor Area 7,770 Outdoor Dry Bulb Temperature 112 Indoor Dry Bulb Temperature 74'�: Outdoor Wet Bulb Temperature 78 Conduction Metal/R-13/Air Space/R-17/T-Bar R-19 Wall (W.19.2x6.16) Double Metal Tinted Default Double Metal Tinted Default Double Metal Tinted Default R-19 Wall (W.19.2x6.16) Double Metal Tinted Default Double Metal Tinted Default R-19 Wall (W.19.2x6.16) Area 7,770.0 X 375.0 X 537.0 X 294.0 X 204.0 X 524.0 X 144.0 X 240.0 X 618.0 X 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Solar Gain ndow ndow ndow ndow ow ow ow ow ow LI -Value 0.0297 0.0655 0.7200 0.8500 0.7200 0.0655 0.7200 0.7200 0.0655 Orientation Area SGF SC X X X X X x X x X DETD 1 = = = = = = = = 68.3 36.7 27.1 26.2 27.1 39.1 27.1 27.1 45.1 (North) 37.5 X X x X X x x x X X 38 x X X X X x X X X X 0.623 (North) 42.0 38 0.623 (North) 18.0 38 0.623 (North) 37.5 38 0.623 (North) 37.5 38 0.623 (North) 42.0 38 0.623 (North) 18.0 38 0.623 (North) 37.5 38 0.623 (North) 37.5 38 0.623 (North) 42.0 38 0.623 Page Total Weighting Factor x 0.752 = x 0.752 = X 0.751 = X 0.752 = x 0.752 = x 0.752 = x 0.751 = X 0.752 = x 0.752 = X 0.752 = Page Total Btu/hr 15,763 902 10,464 6,545 3,975 1,340 2,806 4,677 1,824 48,296 Btu/hr 668 748 320 668 668 748 320 668 668 748 6,225 Sched. Weighting Internal Gain Frac. Area Heat Gain Factor Btu/hr Lights 1.0( x 7,770 X 0.000 Watts/sgft x 3.41 Btuh/Waft x 0.000 = 0 Occupants 1.0( x 7,770 X 300 Btuh/occ. / 15 sgft/occ. X 1.00 = 15,540 Receptacle 1.0( x 7,770 x 0.000 Wafts/sgft x 3:41 Btuh/Watt X 1.00 = 0 rocess f-1.0( x 7,770 x 0.000 Watts/sgft X 3.41 Btuh/Watt�I x 1.00 = 0 Infiltration: I _ 1.00 x 1.064 x 7,770 x _ 10.00 x 0.50 / 60 x 38 = 26,185 c e u e Air sensible Area eihng HeigF /CCH n T Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 138,850 Sched. Latent Gain Frac. Area Heat Gain Btu/hr Occupants 1.00 X 7,770 x 300 Btuh/occ. / 150 sgft/occ. = 15,540 Receptacle 1.00 x 7,770 X 0.000 WattslSgft x 3.4131BtuhlWaft = 0 Process r 1.00 X 7,770 X 0.000 Watts/sqft X 3.413 Btuh/Watt = o Infiltration: I 1.00 x 4,771 x 7770 x 10.00 x 0.50 /6] x OQ00394 = 12159 I�chedule Xiir Oaten Area ei mg o C Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 27,6991 EnergyPro 3.1 By Energy8oft User Number: 5533 Page:24 of 28 ROOM COOLING COIL LOADS Project TitleDate La Quinta Valley Plaza, Building 2 3/2/05 -:)N DESIGN CONDITIONS Room Name Building 2 Time of Peak Aug 3 prn Floor Area 7,770 Outdoor Dry Bulb Temperature 112 `k Indoor Dry Bulb Temperature 74'� Outdoor Wet Bulb Temperature 78 Conduction R-19 Wall (W.19.2x6.16) Insulated Metal Door Area 42.0 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Solar Gain ndow ndow ndow ndow ndow U -Value 0.0655 0.1460 Orientation Area SGF SC (North) 18.0 x X x x X X X x x X 38 x X x X X X X X x X 0.623 (North) 37.5 38 0.623 (North) 37.5 38 0.623 (North) 42.0 38 0.623 (North) 18.0 38 0.623 (North) 37.5 38 0.623 (North) 37.5 38 0.623 (North) 42.0 38 0.623 (North) 18.0 38 0.623 (North) 37.51 38 0.623 DETD 1 56.4 = 70.7 = Page Total Weighting Factor x 0.751 = X 0.752 = X 0.752 = x 0.752 = x 0.754 = X 0.752 = X 0.752 = X 0.752 = X 0.751 = x 0.752 = Page Total Btu/hr 2,224 434 2,657 Btu/hr 320 668 668 748 321 668 668 748 320 668 5,798 Sched. Weighting Internal Gain Frac. Area Heat Gain Factor Btu/hr fights �1.0 X 7,770 X 0.000 Wattslsgft X 3.413 BtuhlWaft X 0.000 = 0 Occupants 1.0( x 7,770 X 300 Btuh/OCC. / 15 sgft/occ. X 1.00 = 15,540 Receptacle 1.0 x 7,770 x 0.000 Watts/sqft x 3.41 Btuh/Watt x 1.00 = 0 Process 1.00 x 7,770 X 0.000 Watts/sqft x 3.41 Btuh/Wattx 1.00 = 0 Infiltration: [scneduoo X Airsensible x Area 77o x eilmg Reigfi X L-AcN.50 / 60] x QT 38 = 26,185 Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 138,850 Sched. Latent Gain Frac. Area Heat Gain Btu/hr Occupants 1.00 X 7,770 X 300 Btuhlocc. Jr 150 sgft/occ. = 15,540 Receptacle 1.00 X 7,770 X 0.000 Wattslsgft X 1 3.4131 BtuhlWatt = 0 Process 1.00 x 7,770 x 0.000 Watts/sqft x 3.413 Btuh/Watt = 0 Infiltration: 1.00 X 4,771 x 7 770 X ^10.00 x 0.50 / 60� x 0.00394 = 12 159 Schedu a Air Laten Area eiling Fleight Ac Z�,yy Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 27,699 EnergyPro 3.1 By EnergySoft User Number: 5533 Page: 25 of 28 ROOM COOLING COIL LOADS Project Title La Quinta Valley Plaza, Building 2 Date 3/2/05 ROOM INFORMATION DESIGN CONDITIONS Room Name Building 2 Time of Peak Aug 3 pm Floor Area 7,770 Outdoor Dry Bulb Temperature 112 Indoor Dry Bulb Temperature 74�: Outdoor Wet Bulb Temperature 78 11: Conduction Area 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Solar Gain ndow ndow ndow U -Value Orientation Area SGF Sc (East) 48.0 X x X X x x X X X x 38 X x X x X x x x x X 0.623 (East) 78.0 38 0.623 (East) 30.0 38 0.623 (East) 21.0 38 0.623 (East) 9.0 38 0.623 (East) 30.0 38 0.623 (South) 81.0 80 0.623 (South) 30.0 80 0.623 (South) 21.0 80 0.623 (South) 9.0 80 0.623 DETD Page Total Weighting Factor x 1.901 = X 1.901 = x 1.901 = x 1.901 = X 1.901 = x 1.901 = x 0.887 = x 0.887 = x 0.887 = x 0.887 = Page Total Btu/hr 0 Btu/hr 2,161 3,512 1,351 945 405 1,351 3,582 1,327 929 398 15,961 Sched. Weighting Internal Gain Frac. Area Heat Gain Factor Btu/hr ights 1.0 x 7,770 X 0.000 Watts/sqft X 3.41 Btuh[Watt X 0.000 = 0 Occupants 1.0 x 7,770 x 300 Btuhlocc. / 15 sqft/occ. x 1.00 = 15,540 Receptacle 1.0 X 7,770 x 0.000 Wattslsgft x 3.41 BtuhlWatt X 1.00 = 0 rocess Irs 1.0 X 7,770 x 0.000 Wafts/sgft x 3.41 Btuh[Watt X 1.00 = 0 Infiltration: 1.00 x 1.064 x 7770 x 10.00x 0.50 / 60 x 38 =cher a Air Sensible Area eihn' g ReiLgOMO AC p Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 138,850 Sched. Latent Gain Frac. Area Heat Gain Btu/hr Occupants 1.00 X 7,770 X 300 Btuh/Occ. / 150 sgft/occ. = 15,540 Receptacle 1.00 x 7,770 x 0.000 Watts/sgft X1 3.413 Btuh/Waft = 0 Process 1.00 x 7,770 x 0.000 Watts/sgft x 3.413 Btuh[Watt = 0 Infiltration: _ 1.00 x _ 4,771 x 7 770 x 4 10.00 x 0.50 / 60� x 0.00394 = 12,159 che�lr u e Air Viten Area eilmg ii gfit ACFi n w Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 27,699 EnergyPro 3.1 By EnergySoft User Number: 5533 Page: 26 of 28 ROOM COOLING COIL LOADS Project Title La Quinta Valley Plaza, Building 2 Date 3/2/05 ROOM INFORMATION DESIGN CONDITIONS Room Name Building 2 Time of Peak Aug 3 pm Floor Area 7,770 Outdoor Dry Bulb Temperature 112 Indoor Dry Bulb Temperature 74cl� Outdoor Wet Bulb Temperature 78 Conduction Area 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Solar Gain ndow ndow ndow ow U -Value Orientation Area SGF SC (South) 30.0 x x x x x x x x X X 80 X x x x x x X x x x 0.623 (South) 30.0 80 0.623 (South) 21.0 80 0.623 (South) 9.0 80 0.623 (South) 30.0 80 0.623 (South) 30.0 80 0.623 (South) 21.0 80 0.623 (South) 9.0 80 0.623 (South) 30.0 80 0.623 (South) 81.0 80 0.623 DETD 1 Page Total Weighting Factor x 0.887 = X 0.887 = x 0.887 = x 0.887 = x 0.887 = x 0.887 = x 0.887 = X 0.887 = x 0.887 = x 0.887 = Page Total Btu/hr 0 Btu/hr 1,327 1,327 929 398 1,327 1,327 929 398 1,327 3,582 12,870 Sched. Weighting Internal Gain Frac. Area Heat Gain Factor Btu/hr Lights 1.0 X 7,770 X 0.000 Watts/sgft x 3.413 Btuh/Watt X 0.000 = 0 Occupants 1.0 x 7,770 X 300 Btuh/OCc. / 15 sgft/occ. X 1.00 = 15,540 Receptacle 1.00 x 7,770 x 0.000 Watts/sgft x 3.413 Btuh/Watt x 1.00 = 0 rocess 1.0 x 7,770 X 0.000 Watts/sqft x 3.41 BtuhlWatt�1 x 1.00 = 0 Infiltration: _ 1.00 x _ 1.064 x 7,770 x 10.00 x 0.50 I60 x 38 = 26,185 IF,. le u e 1,- Sensible Area e�rng Height ACH p Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 138,850 Sched. Latent Gain Frac. Area Heat Gain Btu/hr Occupants 1.00 x 7,770 x 300 Btuh/Occ. / 150 sqft/occ. = 15,540 Receptacle 1.00 x 7,770 x 0.000 Watts/sgft x 1 3.4131 Btuh/Watt = p Process f 1.00 x 7,770 x o.000 Watts/sqft x 3.413 Btuh[Watt = o Infiltration: I _ 1.00 X 4 771 X 7 770 X _ 10.00 x 0.50 / 60x 0.00394 = 12 159 cnedule Ai► Late Area eiling -e ggF ACH Zyy Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 27,699 EnergyPro 3.1 By EnergySoft User Number: 5533 Page: 27 of 28 s ROOM COOLING COIL LOADS Project Title La Quinta Valley Plaza, Building 2 Date 3/2/05 ROOM INFORMATION DESIGN CONDITIONS Room Name Building Time of Peak Aug 3 pm Floor Area 7,770 Outdoor Dry Bulb Temperature 112 Indoor Dry Bulb Temperature 741: Outdoor Wet Bulb Temperature 78 Conduction Area 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Solar Gain U -Value Orientation Area SGF SC (West) 48.0 x 239 x 0.623 (West) 48.0 x 239 X 0.623 X X x X X X X X X X X X X X X X DETD 1 Page Total Weighting Factor x 0.372 = x 0.372 = x = x = X = X = X = x = X = X = Page Total Btu/hr 0 Btu/hr 2,659 2,659 5,317 Sched. Weighting Internal Gain Frac. Area Heat Gain Factor Btu/hr -ights 1.0 x 7,770 X 0.000 Watts/sqft x 3.413 Btuh[Watt x 0.000 = 0 Occupants 1.0c x 7,770 x 300 Btuh/occ. / 150 sgft/occ. x 1.00 = 15,540 Receptacle 1.0 x 7,770 x 0.000 Watts/sqft x 3.41 Btuh[Watt x 1.00 = 0 rocess 1.0 x 7,770 X 0.000 Watts/sgft X 3.413 Btuh[Watt x 1.00 = 0 Infiltration: 1_00 x _ 1.064 x 7,770 x 10.00 x 0.50 / 60 x 38 = 26,185 Schedule Air Sensi a Area eilm" g Neignt ACH pT Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 138,850 Sched. Latent Gain Frac. Area Heat Gain Btu/hr Occupants 1.00 x 7,770 X 300 Btuh/occ. / 150 sqft/occ. = 15,540 Receptacle 1.00 x 7,770 X 0.000 Watts/sgft xJ 3.4131 Btuh/Waft = 0 Process 1.00 x 7,770 x 0.000 Watts/sgft x 1 3.413 Btuh[Watt = 0 Infiltration:Lh-eliooe x _ 4,771 x 7770 x 10.00x 0.50 /6]x it C ent Area eding Aeig C J Z�,yy Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 27 699 EnergyPro 3.1 By EnergySok User Number: 5533 Page: 28 of 28 ��1.:a:+T'f"'x' 4�'�►'�;r'?E'-A�i'X'�'rr+x�'r��t'.� Earth S stems , 79-811B Country Club Drive Y Bermuda Dunes, CA 92201 >} S u est O tI1W (760) 345-1588 • (800) 924-7015 x,• �� DAILY REPORT OF INSPECTION OF STRUCTURAL STEEL SB/R.S CO. GOV. UBC TITLE 21/24 OTHER Building Permit No.: moi" - 3t)22. DSA Application No.: Date of Inspection: G'19 104, Project Name: LA Q L.t1 r.lTA VAt..t_ y 4?- Job No.: (V%2S4 - Boa Project Address: 1,51 -24 (T Lo Qu 1 tTA Architect: gT, -Pr T'C-N lwtzm Structural'Engineer: l cj -_c0 A>,e C ,1 SL. tk_: r.,g" General Contractor: ILL -r- Sub Contractor: 0,AtZD-A-1A s. TYPE OF INSPECTION: Field hop Welding o i Other Description of Work Inspected: �� A 325 "f7oLT5 C� T7J V' '6(..I i l.t�:) I rJ c, "Pr'iLIM(�TEA % To w� 'r�>15AM CF,.ITGtL L1,,IF r'r,tiIt, IIEC.TIo&IS --rn v./tz • 1 `F.�oC..TS v�/E'TZ�--i"1FSTt~ � -I'c--� �'�(� >rT: L'u-sS, Nn / F -1z r T F S T F n To S CZE' 1; T• L'bs� -E;, tLTS v.i E -77-t --r EST's- n m 355 t` -r L16s KID Unresolved • Items: Welding Operators & Certification Numbers: Type of Electrodes: I I hereby certify that I have inspected all of the above reported work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved plans, specifications & applicable building laws. Final report issued at project completion. t Inspector's Name/No. Inspector's Signature. All inspections based on a minimum of 4 hours; over 4 hours will be an 8 hour minimum. In addition, any inspection extending past 12 pm will be an 8 hour minimum. BD -M-400 (10/98) Copy 1 ESC Lab Contractor's Representative. Copy 2 Project Superintendent Copy 3 Governing -Agency, ;9b �' 79-811B Country Club Drive Earth Systems Bermuda Dunes, CA 92201 (760) 345-1588 • (800) 924-7015 Southwest DAILY REPORT OF INSPECTION OF STRUCTURAL STEEL SB/R.S CO. GOV.. UBC - J.ITLE 21/24 OTHER Building Permit No.: 9 DSA Application No.: Project Name: Project Address: Y"7 " 12, b x.-92 Date of Inspection: 8 Job No.: 03 Architect- Structural EngineeJr:' (=-1 C C- AME QT 11—T\1\/AG c)t�F General Contractor: 44E 1,1F -Bun$. 7�E\/tE t - Sub Contractor:. l� Z TYPE OF INSPECTION: Field hop Wel in� Bolting Other Description of. Work Inspected: "Q C t r= N. �1Z� M Crn es T'R-AC-"j o trJC Ccs jam- es r= .4 iX/ R L ti 5 r' fr M1:21:115 1 La T I o eJ - C_TLA,rz-A (— iL A u l t rJ S fro r— I- I S L F c_Tir. rn, T:'11 t- L C T t= L A'P--1` TY; d E lr L-1!;;4 M -f 1�-1 Me k er =:,F (C� (1 Unresolved Items: Welding. Operators & Certification Numbers: -TA IMlE S '774V-1 b c Z Type of Electrodes: I hereby certify'that l have inspected all of the above reported work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved plans, specifications & applicable building laws. Final report issued at project completion. ANNS c�rZ tii 9 Inspectors Name/No. '.�V'� "i2 Inspector's Signature All inspections based on a minimum of 4 hours; over 4 hours will be an 8 hour minimum. In addition, any inspection extending past 12 pm will be an 8 hour minimum. Contractor's Representative BD -M-400 (10/98) Copy 1 ESC Lab Copy 2 Project Superintendent F- � �;,, ,x,+71 � '� 4^�`�Wrs�r„;�,,,f +�-, �•+.�-•�+'�.w•�y,.�,,y,�:�,t # t4 , t t •% ' i.+xs �.rtrti) AKI � t „� r �•1 i°u tj• �j'� (, Earth Systems' 79-811B Country Club Drive Y Bermuda Dunes, CA 92201 T a`` t (760) 345-1588 • (800) 924-7015 Southwest . DAILY REPORT OF INSPECTION OF STRUCTURAL STEEL SB/R.S CO.' GOV. UBC TITLE 21/24' OTHER Building Permit No.:�n�_�?z�c k DSA Application, No.: Date of Inspection: . 6/3,1 IM4. Project Name: a Int i�I ,-,4 �I_t � -/ 7P_A-7-A Job No.: 9 M -,L> Project Address: Architect: Structural Engineer: F-- I(" r-.AT>F JTZ \(A0GOtiT(Z General Contractor: ILLF I &IF= 'fix-1Y-� • ` AL Sub Cbntractor:�lC� TYPE OF INSPECTION: "Field/Shop Welding Bolting Other Description of Work Inspected: =rJ FI I.L._ T wU i ��_ (�'rP� V�'l. 1,&/ L; Til C [ _ f r- Lit A r- G7' r L i r,- /-1. IJP t S _'Fet'z-.L- I r�j cc -3 K I-. z -,- 4-A C "F -L. r--, Cc- r c o k T-4-1 r-' C IJ 7-1 R.I-= . - T I.= c `: (- . I 1 I c I I �r�/ �'�.Ic.- � 15 Co 1✓IpLC'TC � <'� M � L I +�S W t T,�J T�-�l�' � . I - t� 17> 2.1a%I fir C, . M Unresolved Items: .Welding Operators & Certification Numbers: Type of Electrodes: I hereby certify that I have inspected all of the above reported work, unless otherwise noted, and to the best of my ability I have found this work to. comply with the approved plans, specifications & applicable building laws. Final report issued at project completion. A Inspector's Name/No. —T-AV1 �►�,� �' E'T"L- Inspector's Signature _U I I All inspections based on a minimum of 4 hours; over 4 hours will be an 8 hour minimum. In addition, any inspection extending past 12 pm will be an 8 hour minimum. G Contractor's Representative /l BD -M-400 (10/98) Copy 1 ESC Lab Copy'2 Project Superintendent coy 3`G overning,-Agency . Earth -Systems 79-811B Country Club Drive y�-" % Bermuda Dunes, CA 92201 Southwest t' (760) 345-1588 • (800) 924-7015 I Qz%ftM71 DAILY REPORT OF INSPECTION OF STRUCTURAL STEEL SB/R.S CO. GOV. UBC TITLE 21/24 OTHER Building Permit No.: DSA Application No.: Date of Inspection: Project Name: LA n U I kl+A VA LLt%�J -PLA-z.& Job No.: 0,G25 - (Z)3 Project Address: 9 - `t' `t✓�� 111 + �u,C • 2 _,ia Q U 14-r"/A Architect: -7-=rN-m--F"i-'c. ►4 F-om,,b Structural Engineer: a rJ CoTz M F C! ? -J S LA L:rf $J C, General Contractor: -LE I -E:LT> C., - Sub Contractor: n'R-"P�a-T•�a TYPE OF INSPECTION: le /Shop Welding oltin Other Description of Work Inspected: � �' T -J IG . .4 325 N • S --'Fa.��I�TS - ,f ..�. . ' I�o FA I l_UYz•�' S t Unresolved Items: a Welding Operators & Certification Numbers: Type of Electrodes: I hereby certify that I have inspected all of the above reported work, unless otherwise noted, and to the best of my ability I have found this work to co ply with the approved plans, specifications & applicable building laws. Final report issued at project completion. .�vv S- cwt• '� � (�1rlJll.2S1 Inspector's Name/No. ? -E? -: Inspector's Signature 1 All inspections based on a minimum of 4 hours; over 4 hours will be an 8 hour minimum. In addition, any inspection extending past 12 pm will be an 8 hour minimum. Contractor's Representative BD -M-400 (10/98) Copy.1 ESC Lab Copy 2 Project Superintendent, , Copy 3 Governing Agency