Loading...
Proposal - IN-SITE Landscape Architecture Tim Jachlewski, President, PLA, ASLA Licensed Landscape Architect CA #4547, RLA NY#001646 tim@insitelandarch.com CALIFORNIA 2907 Shelter Island Drive #105-417 San Diego, CA 92106 / 619-795-7603 NEW YORK (P.C.) P.O. Box 356 Orchard Park, NY 14127 / 716-508-8341 www.insitelandarch.com 02/17/22 City of La Quinta Attn: Julie Mignogna, Management Analyst 78495 Calle Tampico La Quinta, California 92253 Re: RFP – Master Planning Services for Fritz Burns Park Improvements Project No. 2021-02 Dear Ms. Mignogna, In-Site Landscape Architecture, Inc. is pleased to submit our Statement of Qualifications and Fee Proposal for the Fritz Burns Park Master Plan project. As part of our commitment to the success of this project and as part of our proposal response, we have already begun to analyze the park program elements and relationship to each other, the park’s aesthetic, and park’s sense-of-place within its regional context and the City of La Quinta. Our company is based in San Diego but has been set up since 2007 to have all employees work from their home satellite offices. Ron Moreno, one of the key team members for this project, moved to the La Quinta Cove neighborhood from Colombia when he was 16 years old. As a teenager, Ron spent a lot of time at Fritz Burns Park playing soccer, swimming, skateboarding, and spending time with family and friends. He currently lives and works from his home satellite office in nearby Cathedral City. He is truly local! Our surveyor and environmental subconsultant’s office (MBI) is located nearby in Palm Desert. Our firm is also pleased to have completed the master plan, construction documents, and construction administration for the nearby 6.4-acre “Griffin Club” recreation center within the City of La Quinta. Our team excels at providing creative design solutions while maintaining budget and schedule with outstanding service to our clients. We have assembled a top-notch team that will function as a cohesive unit with the City and look forward to starting this exciting project with you. Our success is attributed to: 1.) relevant knowledge, skills, and abilities; 2.) good professional “chemistry” with clients and team members; 3.) creativity in design and problem solving; 4.) very clear graphic, written, and verbal communication skills; and 5.) exceptional reliability. If you would like to contact us regarding this proposal, you may reach us at 619-795-7603, or email tim@insitelandarch.com. We have the necessary experience, resources, availability, and enthusiasm to begin working with the City of La Quinta immediately. (All information and pricing provided in the proposal is valid for at least ninety (90) days, and any individual who will perform work for the City is free of any conflict of interest.) Sincerely, Tim Jachlewski Jr, President STATEMENT OF QUALIFICATIONS a. thru f. - FIRM BACKGROUND 1 STATEMENT OF QUALIFICATIONS FIRM BACKGROUND In-Site Landscape Architecture, Inc. (In-Site) has been provid- ing planning, construcƟon support, and design services for 15 years. (Tim Jachlewski, President, brings 28 overall years of experience to the project.) In-Site is a California CorporaƟon incorporated on 9/28/07 in the State of California. Taxpayer ID: 26-1197169 Our Mission: To provide creaƟve design soluƟons for outdoor environments while honoring God through client relaƟons, service excellence, and business ethics. Our Vision: To champion the stewardship of the earth by balancing the needs of people and the environment. In-Site Landscape Architecture, Inc. specializes in parks and recreaƟon, trails, environmental restoraƟon, master planned communiƟes, streetscapes, mixed-use, wineries, resorts, hotels, schools, libraries, churches, healthcare facili- Ɵes, commercial, high-end residenƟal, and governmental consulƟng throughout Southern California as well as New York, Arizona, and Oregon. In-Site Landscape Architecture, Inc. breaks convenƟonal design processes by: CreaƟvely engaging the client and project stakeholders; ImplemenƟng imaginaƟve design themes and concepts through technically sound soluƟons; And by bringing heart, passion and enthusiasm into every project. SERVICES • Site Analysis • Site Master Planning • Community Outreach / Workshops • Computer SimulaƟons • Computer 3D Modeling • Computer 3D AnimaƟons • Dynamic Project PresentaƟons • Design Guidelines • Landscape Standards • Agency Approvals • ConstrucƟon Documents • ConstrucƟon AdministraƟon • Storm Water PolluƟon PrevenƟon ConsulƟng (QSD/QSP) CALIFORNIA 2907 Shelter Island Drive #105-417 San Diego, CA 92106 619-795-7603 Local satellite office address: 67-458 Rio Vista Drive Cathedral City, CA 92234 NEW YORK (P.C.) P.O. BOX 356 Orchard Park, NY 14127 www.insitelandarch.com FIRM BACKGROUND STATEMENT OF QUALIFICATIONS g. - KEY PERSONNEL AND RESUMES 1 STATEMENT OF QUALIFICATIONS PROPOSED PERSONNEL In-Site Landscape Architecture, Inc. (In-Site) will provide the majority of the scope of services for the project. Tim Jachlewski (In-Site) will serve as Principal-in-charge/ project manager and Ron Moreno (In-Site), based in Cathedral City, will serve as Co-Project Manager. For the best interest of the project we also brought in Michael Baker InternaƟonal (MBI) with a local office in Palm Desert to provide topographic survey services and the CEQA approach for the project and Newline Skateparks (Newline) for skate park master planning. STATEMENT OF QUALIFICATIONS Peter Minegar Loran Chick Alex Koutzoukis Ron Moreno Pat O’Connor Cheryl Lough Tim Jachlewski Kanten Russell Kyle Dion Chris Long STATEMENT OF QUALIFICATIONS TIM JACHLEWSKI JR. President, PLA, ASLA, QSD/QSP REGISTRATION Licensed Landscape Architect, California (#4547) Registered Landscape Architect, New York (#001646) Qualified SWPPP Developer/ PracƟƟoner (QSD/QSP), California (#01174) EDUCATION B.L.A. (Bachelor of Landscape Architecture) State University of N.Y. College of Environmental Science and Forestry at Syracuse University, 1994 (Rank: 1/55) ASSOCIATIONS American Society of Landscape Architects, 1994-Present • President, SD Chapter, 2012 • President Elect, SD Chapter, 2011 • Vice President of Community Outreach, SD Chapter, 2009-2011 A.C.E. Mentor – Patrick Henry High School, 2009/2010 EXPERIENCE 28 years of landscape architectural professional pracƟce experience 2007-Present: President - In-Site Landscape Architecture, Inc. 2000-2007: Principal/ Project Manager - Van Dyke Landscape Architects, Inc. 1994-2000: Project Manager - Parsons TransportaƟon Group of NY Project related experience includes site analysis, community outreach, planning group and public agency presentaƟons/ approvals (Planning Commissions, City Councils, and California Coastal Commission), master planning, conceptual development, schemaƟc design, construcƟon documents, construcƟon administraƟon/ observaƟon. Experience also includes landscape architectural design for tentaƟve tract maps, specific plans, environmental impact reports, and landscape design guidelines. Project types include parks and recreaƟon, master planned communiƟes, trails, environmental restoraƟon, streetscapes, mixed-use, urban planning, wineries, resorts, hotels, schools, libraries, churches, healthcare faciliƟes, commercial, residenƟal, and governmental consulƟng throughout Southern California and Western New York. Tim’s passion for design, art, and the environment fuel his goal of bringing “nature to people” in urbanized areas and “people to nature” in preserved environments. He understands the mental, emoƟonal, and spiritual benefits of exposure to nature and excels at creaƟng funcƟonal, aestheƟcally pleasing, and arƟsƟc outdoor environments that create, preserve, or enhance each project’s sense of place. Tim served as president of the San Diego Chapter of the American Society of Landscape Architects and served on the Water ConservaƟon Technical CommiƩee as editor, contributor, or author for a number of Chapter posiƟon papers including: “Water ConservaƟon”, “The Value of Parks”, “Regionally Appropriate Landscapes”, “Use of Turf Grass”, “VegetaƟve Erosion Control”, “The Value of Trees”, “Golf Course Water ConservaƟon”, “HOA Water ConservaƟon”, “Reclaimed, Recycled, and Re-purified Water”, “The Value of NaƟve Plants”, “Water Quality”, “Fire Safety and Landscaping”, “Grey Water and Rainwater CollecƟon”, and “RevegetaƟon/ RestoraƟon”. Tim strives to provide creaƟve design soluƟons, clear graphic, wriƩen, and verbal communicaƟon, and posiƟve professional chemistry with team members for all In-Site’s projects. See next page for relevant project list. RESUMES OF KEY PERSONNEL STATEMENT OF QUALIFICATIONS RESUMES OF KEY PERSONNEL Altair Central Park – Temecula, CA Altair Couplet Park – Temecula, CA Altair Village Parks - Temecula, CA Aliso Canyon Park – Aliso Viejo, CA AquaƟc Park at Winchester Ranch - Riverside, CA* Arbor Ridge Community Park - Beaumont, CA* Arboretum Park at Winchester Ranch - Riverside, CA* Buffalo Outer Harbor Development Planning - Buffalo, NY** Delaware Park - Japanese Garden - Buffalo, NY** Diamond Valley Lake - RecreaƟonal Planning - Riverside, CA* Dog Park at Winchester Ranch - Riverside, CA* Edison Avenue Linear Park and Trail – Chino, CA El Caballo Park Master Plan – Escondido, CA Farmers Market Park at Winchester Ranch - Riverside, CA* Front Park - Buffalo, NY** Galleron Park – Riverside, CA* Gorgeview Park - Niagara Falls, NY** Harvest Park – Valley Center, CA JFK Park - Buffalo, NY** Jones Point Park Enhancement Planning - Alexandria, VA** Lake Murray Park - Playground IniƟaƟve - San Diego, CA Larkin Park – Buffalo, NY LaSalle Park - Buffalo, NY** Luz del Sol Park – San Jacinto, CA* Madigan Park – Riverside, CA* McCarthy Park - Buffalo, NY** Mockingbird Ridge Passive Park - Riverside, CA* Morgan Hill Park – Riverside, CA* New York State Office of Parks, RecreaƟon and Historic PreservaƟon – NY** DeVaux State Park** East River Wetlands Enhancement** Ecotourism IniƟaƟve** Goat Island State Park** Joseph Davis State Park** Knox Farm State Park** Saint Mary of the Angels State Park** Woodlawn Beach State Park** Orchard Run Linear Park – Valley Center CA Pacific Highlands Ranch Verana Park – San Diego, CA Pacific Highlands Ranch Unit 27 Park – San Diego, CA Pacific Highlands Ranch Unit 28 Park – San Diego, CA Park Circle Private Linear Park – Valley Center, CA Passive Park at Winchester Ranch - Riverside, CA* Queen Anne’s Park – MD** Rock Academy Preschool Park – San Diego, CA Rock Church and Academy Park – San Diego, CA Sacred Rocks Reserve – Boulevard, CA Santa Rosa Plateau Visitor Center Project – Murrieta, CA Santee Lakes RecreaƟon Preserve – Santee, CA Shearwater Creek Pocket Park – Temecula, CA Sikes Adobe Historic Farmstead Park Master Plan – Escondido Solera Estates Park – Riverside CA South Buffalo Redevelopment Plan - Buffalo, NY** Sperry Park - Buffalo, NY** Sports Ranch at Sommers Bend – Temecula, CA Sunset Cliffs Natural Park Master Plan – San Diego, CA* Sycamore Canyon Park - San Diego, CA* Villages of Old Town - Village Green – Temecula, CA* Tijuana River Valley Regional Park Trails and Habitat En- hancement – San Diego, CA* Underground Railroad “Freedom Memorial” - Bro- derick Park - Buffalo, NY** Veterans Park and Community Center – Chula Vista, CA* Village West Parks and RecreaƟon – Temecula, CA* Willert Park - Buffalo, NY** Winchester Ranch Sports Park - Riverside, CA* Yucaipa Regional Park – RV Campground Expansion – Yu- caipa, CA* Community RecreaƟon Centers Arbor Ridge RecreaƟon Center - Beaumont, CA* Eclipse RecreaƟon Center – Escondido, CA Morgan Hill RecreaƟon Center - Riverside, CA* Orchard Run RecreaƟon Center North – Valley Center Orchard Run RecreaƟon Center South – Valley Center Park Circle RecreaƟon Center – Valley Center, CA Shearwater Creek RecreaƟon Center – Temecula, CA Summerwind Ranch RecreaƟon Center - Calimesa, CA* The Griffin Club RecreaƟon Center – La Quinta, CA Trails and Bikeways Altair Trail and Bikeway System – Temecula, CA Black Bench Community Trails - Banning, CA* Bridlewood Community Trail - Riverside, CA* Buffalo River Trail – Buffalo, NY** Erie County Riverwalk Class I Regional Bikeway – Buffalo and Tonawanda, NY** Estates at StoneBridge Trails Planning - San Diego, CA* Long Valley Wash Trail – Temecula, CA Mission Trails Regional Park – West Sycamore Region - San Diego, CA* Mockingbird Ridge Equestrian Trail - Riverside, CA* Morgan Hill Equestrian Trail – Riverside, CA* Niagara Riverwalk Trail - Niagara Falls, NY** Orchard Run Trail System – Valley Center, CA Pacific Highlands Ranch Trailhead – San Diego, CA Park Circle Trail System – Valley Center, CA Roripaugh Ranch Trail System – Temecula, CA Sacred Rocks Reserve – Boulevard, CA Salt Creek Class I Regional Bikeway and Trail System – Riverside, CA* San Diego River FoundaƟon – Pocket Park/ Trail Head – San Diego, CA Santa Ana River Trail – Riverside, CA Serrano Creek RestoraƟon and Trail – Orange Co., CA * project completed by Tim Jachlewski while Principal/ project manager of Van Dyke Landscape Architects, Inc. ** project completed by Tim Jachlewski while project manager at Parsons TransportaƟon Group of N.Y., Inc. PARKS/RECREATION/TRAILS COMPREHENSIVE LIST OF PROJECTS Tim Jachlewski - ConƟnued STATEMENT OF QUALIFICATIONS RON MORENO Landscape Architecture/ Director of IrrigaƟon Design REGISTRATION California Landscape Architect licensure (in process) EDUCATION B.S. (Bachelor of Science in Landscape Architecture) Cal Poly, Pomona, 2013 EXPERTISE • Water conservaƟon pracƟces • IrrigaƟon design and project management of complex, large- scale projects • IrrigaƟon Water Use Master Plans • IrrigaƟon Demand analysis • Recycled water use irrigaƟon plans and processing EXPERIENCE 9 years of landscape architectural professional pracƟce experience 2017-Present: Director of IrrigaƟon Design and Project Designer In-Site Landscape Architecture, Inc. 2013-2017: Project Manager/ IrrigaƟon Designer - Summers Murphy & Partners, Dana Point, CA 2013: Landscape Consultant Ron is a bilingual self-starter with a background in landscape architecture and irrigaƟon design. He has been involved in projects in California, Nevada and Arizona responsible for irrigaƟon water use master plans, irrigaƟon construcƟon documents, water use calculaƟons, and irrigaƟon field review and reports during construcƟon. Ron is able to manage a landscape project from any phase providing the best soluƟons based on water use efficiency, cost effecƟveness, latest products, and project value. Project types include parks and recreaƟon, master planned commu- niƟes, trails, environmental restoraƟon, streetscapes, mixed-use, urban planning, healthcare faciliƟes, commercial, and residenƟal throughout Southern California. Sports Ranch and Sommers Bend – Temecula, CA Responsible for the irrigaƟon design, construcƟon document support, and construcƟon administraƟon for this 19.7-acre, $8.4-million City of Temecula public park located in the Sommers Bend community. The Park includes two baseball fields, two arƟficial turf soccer fields, two basketball courts, open lawns, picnic areas, playground, “nature play” areas and trails, na- Ɵve plant habitats, concessions building, restrooms, maintenance build- ing and yard, entry monument signage, connecƟons to the Long Valley Wash trail system, storm water management bioretenƟon areas, and parking. ConstrucƟon completed 2022. Also Responsible for irrigaƟon design, construcƟon document support, and construcƟon administraƟon for almost 40 projects including: • Long Valley Wash Habitat CreaƟon and MiƟgaƟon (16 acres) • Park and Ride / Trailhead (50 cars and 6 horse trailers) • Equestrian and mulƟ-use trails (9.75 total miles) • Calle Girasol/ Nicolas Rd Habitat MiƟgaƟon (4.27-acres) • Density Core MulƟ-family including off-leash dog run, ninja warrior fitness course, and parks • NaƟve Slope RestoraƟon and Water Quality Basins • Street Improvement Landscape Plans • Luxury Model Homes • Numerous in-tract landscape plans Harvest Park and Park Circle – Valley Center, CA Responsible for the irrigaƟon construcƟon documents and construcƟon administraƟon for this County of San Diego public park located in the Park Circle master planned community. Also responsible for the irrigaƟon master plan, CD’s and CA for Three Private RecreaƟon Complexes, Four Private Linear Parks, Trails and Pathways, Community Garden, streetscape improve- ments, Moosa Creek NaƟve Riparian Enhancements, and Dog Play Areas. RESUMES OF KEY PERSONNEL STATEMENT OF QUALIFICATIONS ALEX KOUTZOUKIS PLA, ASLA REGISTRATION Licensed Landscape Architect, California (#6327) EDUCATION Bachelor of Science: Landscape Architecture, Minor Landscape RestoraƟon University of California, Davis, 2012 ASSOCIATIONS American Society of Landscape Architects EXPERTISE • Strong design, project manage- ment, and technical skills • Site construcƟon design • Plant material selecƟon • Mixed-Use projects • High-end residenƟal • NaƟve planƟng design • 3D Renderings and AnimaƟons EXPERIENCE 10 years of landscape architectural professional pracƟce experience 2020-Present: Landscape Architect/ Project Manager In-Site Landscape Architecture, Inc. 2014-2020: Project Manager/ Designer MJS Landscape Architecture, Newport Beach, CA 2013-2014: Landscape Designer Molly Wood Garden Design, Costa Mesa, CA 2008-2012 Landscape Staff, Back to NaƟves RestoraƟon, Irvine, CA 2010-2011 Hedgerow Farms, Winters, CA Alex collaborates excepƟonally well with clients, civil engineers, archi- tects, and other consultants to solve design problems. He has developed digital graphic standards and templates for his previous firm currently used by staff in preparaƟon of schemaƟc drawings. He ex- cels in AutoCAD at a highly proficient level to produce conceptual design drawings, permiƫng, and construcƟon documents in as well as 3D ren- derings and animaƟons. He is responsible for management of projects from design through construcƟon and communicates with clients and stakeholders to ensure a quality product within budget. Relevant Experience: • Sommers Bend - Temecula, CA Responsible for design and project management of the linear park including ninja warrior fitness course, playground and picnic areas, as well as Long Valley Wash trailhead overlooks, equestrian trails, naƟve slope restoraƟon, streetscape design, luxury model homes, and construcƟon support services. • Eclipse RecreaƟon Center - Escondido, CA • BDM Mixed Use (including parks and playgrounds) - San Diego, CA • Larkin Park - Buffalo, NY • SCE Warehouse Project - Alhambra, CA • SCE Westminster Admin. Project- Westminster, CA • SCE Building D Parking Project - Alhambra, CA • SCE EOP Expansion - Irwindale, CA • BKM Office Park RenovaƟon Projects - various locaƟons • Village Palos Verdes RenovaƟon Project- Redondo Beach, CA • Echo 56 ResidenƟal Development • Seashore Public Parking Lot #5 • Newport Beach Tennis Club RESUMES OF KEY PERSONNEL STATEMENT OF QUALIFICATIONS PATRICK O’CONNOR PLA REGISTRATION Licensed Landscape Architect, California (#1877) EDUCATION B.L.A. (Bachelor of Landscape Architecture) University of Oregon, 1977 M.L.A.U.D. (Masters of Landscape Architecture in Urban Design and Planning), Harvard University, 1983 EXPERTISE • Public Works projects • Site construcƟon design • Plant material selecƟon • Streetscape/civic facility design • Community parƟcipaƟon • Urban design studies focusing on development implementaƟon strategies • Design legislaƟon/guidelines for public and private faciliƟes. EXPERIENCE 45 years of landscape architectural professional pracƟce experience 2017 – Present Project Manager, In-Site Landscape Architecture, Inc. 1994 – Present Parterre, Landscape Architects and Planners 1987 – 1994 AusƟn Hansen Group, Architects/ Planners/ Engineers; San Diego 1984 – 1987 M. W. Steel Group, Architects/ Planners; San Diego 1983 – 1984 Philips, Brandt, Reddick (PBR), Urban Planners/ Landscape Architects; Irvine 1979 – 1981 Kawasaki, Theilacker and Associates, Landscape Architects; San Diego 1977 – 1979 Wimmer, Yamada, Landscape Architects; San Diego Pat’s professional and academic interests for the past forty years have centered on the planning and design of urban open space projects. The majority of projects he is responsible for direcƟng requires coordinaƟon of mulƟple design disciplines such as architecture, engineering and planning. Pat is parƟcularly knowledgeable in developing design soluƟons where consensus building with private development interests and ciƟzen community groups is a fundamental part of the study process. Exploring methods to fully vest private and public interests in the design process has always been a special interest of Pat’s. Pat also specializes in the design of pedestrian thoroughfares where is- sues of ADA, Title 24 and traffic calming are prominent. Pat has worked throughout San Diego County on public and private open space designs incorporaƟng new sidewalks, lighƟng, furniture, signage, accessibility upgrades, public art, special features and landscaping. Pat extensively researches design methods, product reliability and regulatory standards prior to finalizing construcƟon plans. Pat has been a lecturer by appointment in the Urban Studies and Planning Program at the University of California at San Diego (UCSD). He lectures on the subject of public policy, design and resultant form consequences. Relevant Park and RecreaƟon Experience • Sports Ranch at Sommers Bend - Temecula, CA • Harvest Park - Valley Center, CA • Junior Lifeguard Facility Project - Newport Beach, CA • Park de la Cruz - San Diego, CA • 30th Street Neighborhood Park - San Diego, CA Relevant Community Outreach Experience • Coronado Rotary Plaza - Coronado, CA • Orange Avenue Streetscape - Coronado, CA • Elm Avenue Bike Path and Streetscape - Imperial Beach, CA • Palm Avenue Streetscape - Imperial Beach, CA RESUMES OF KEY PERSONNEL STATEMENT OF QUALIFICATIONS CHERYL LOUGH PLA, LEED AP REGISTRATION Licensed Landscape Architect, California (#6491) EDUCATION Masters of Landscape Architecture, Louisiana State University, 2015 EXPERIENCE 19 years of landscape architectural professional pracƟce experience 2020 - Present In-Site Landscape Architecture, Inc. 2020 - Present UPON Landscape Architecture 2019 - 2020 Hoerr Schaudt Landscape Architects 2016 - 2019 BNIM Architects 2015 - 2016 The Office of James BurneƩ 2015 Instructor, Louisiana State University, 2014 - 2015 Internship Coordinator Assistant, Louisiana St. University 2014 Graduate Assistant, Louisiana State University 2012 - 2014 Indigenous Design, LLC, Alexandria, VA 2012 Studio 39 Landscape Architecture, Alexandria, VA 2008 -2012 HDR Architecture Inc., Alexandria, VA, 2006 - 2008 Earth Design Associates, Inc. (Barry Starke) 2005 -2006 Deep Creek Lake Design Studio, McHenry, MD, Instructor, GarreƩ College, McHenry, MD 2004 - 2005 Good Earth Designs, Annapolis, MD 2003 - 2004 Homestead Gardens, Inc., Davidsonville, MD Experience includes an extensive range of projects involving innovaƟve design soluƟons for residenƟal, mulƟ family, mixed use, public, campus, and healthcare developments. AddiƟonal experience includes: instrucƟng courses, mentoring students and staff, project management, research, RFP’s, preliminary cost esƟmates, discipline coordinaƟon, construcƟon observaƟon, construcƟon documents, construcƟon administraƟon, inter- preƟve signage, LEED and Living Building Challenge documentaƟon, cli- ent relaƟons and interviews, analysis, graphics and presentaƟons. Special interest focuses on balancing the aestheƟcs and funcƟons of a project with the natural biodiversity of the site. ParƟcular aƩenƟon is always given to the overall ecology of an area as well as the intended user’s experience. Relevant Experience • East Village Green, San Diego, CA Located on a 4.1-acre site in the heart of San Diego’s growing East Village neighborhood, East Village Green is a highly programmed urban park that will include with a wide range of public ameniƟes idenƟfied through a series of public workshops led by the Office of James BurneƩ. • Costa Mesa Lions Park Projects - Costa Mesa, CA. A $36 million plan to build a new two-story library and a community center to revitalize Lions Park. The redevelopment of the exisƟng 12.8 acre library property will include a large unobstructed lawn for outdoor community events, new recreaƟon areas, gardens of naƟve / adapƟve plant material, as well as a new park concessions kiosk. RESUMES OF KEY PERSONNEL 32 Project Manager / Skate Park Design Lead Kanten was a professional skateboarder for over 13 years traveling all over the world endorsing his pro model shoes and signature skateboards. His experience has helped him relate to the action sport community to design and develop their dream skate park facilities for the last 10 years. He possesses all the design and technical skills using AutoCAD 2018 and Civil 3D to generate concepts, technical drawings, horizontal control, and grading plans. His knowledge of site develop- ment, park design, and skateboarding has helped him work with communities to formulate the best skate parks on budget in the action sports industry. KANTEN RUSSELL EDUCATION AS, Engineering Survey & CAD Design, Cuyamaca Col- lege, San Diego, California AWARDS 2018 ASLA New York Upstate Chapter Merit Aware, Plan- ning and Analysis (Rochester Urban Skate Park) 2017 American Public Works Association (APWA) Southern California Chapter, Creative & Innovative under 50,000 ft2 (Manhattan Beach Skate Park) 2016 California Parks & Rec- reation Society Award (CPRS) District 12, Best New Facility (Encinitas Community Plaza and Skate Plaza) 2014 California Park & Recre- ation Society Award of Excel- lence, Alga Norte Community Park (Skate Park) 2014 American Public Works Association - San Diego & Imperial Counties Chapter Public Works Project of the Year (Alga Norte Community Park (Skate Park) PROJECT EXPERIENCE Amelia Mayberry Skatepark Whittier, CA Kanten lead as Sr. Designer design of the new 18,000 square foot skatepark at Amelia Mayberry park in Whittier, CA. This skate plaza has a - less is more - open concept with intersecting lanes that address the request from locals to have a variety of ledges and rails. The urban style terrain pays homage to what locals enjoy skating in the streets of Whittier. Having a balance of banks and WUDQVLWLRQVIRUFRQWLQXRXVRSHQÀRZZLWKDYDULHW\RIHOHYDWLRQFKDQJHVDQGDQ RUJDQLFÀRZERZOSURYLGHVDJUHDWULGLQJH[SHULHQFHIRUEHJLQQHUVDQGH[SHUL- enced users throughout the entire skatepark. Alga Norte Community Park Skate Park, Carslbad, CA Kanten managed designs for the City of Carlsbad’s historical Skate Park. This park required a very inclusive community input program, which drive the design to include elements of the existing urban fabric including, a southwestern color SDOHWWHUHÀHFWLQJWKHSUHYDOHQW6SDQLVKVW\OHDUFKLWHFWXUH$GGLWLRQDOO\DWUDQ- sition arch with a doorway was inspired by the shapes of Carlsbad’s historic aesthetic. Milpitas Skatepark Feasibility Study, Milpitas, CA Kanten managed preparation of a feasibility study, working with the City and community in a public facilitation process that drove the planning and concept design for future phases of the project. Manhattan Beach Skate Spot, Manhattan Beach, CA Kanten provided the City of Manhattan Beach with skate park feasibility study services by reviewing and analyzing the history of public outreach process and documents. The study included prioritizing park locations, determining the type of skate park and the means to fund it. As part of Phase 2, Kanten conducted all of the public facilitation, and led the schematic design, construction documents, and construc- tion observation of the skate park completed December 2016. Mid City Skatepark 33 Additional Project Experience Listing Available Upon Request 3RSODU%OXႇ6NDWH3OD]D3RSODU%OXႇ0LVVRXUL .DQWHQKHOSHGGHYHORSWKHFLW\¶V¿UVW³:KHHO)ULHQGO\´6NDWH3OD]DWKDWLVSHGHVWULDQ friendly with spectator viewing. The project has an urban plaza theme that integrates with the existing brick building and adjacent brick walls embracing the city’s historical architecture. Responsibilities include: planning, public facilitation, schematic, concep- tual, 3-D modeling, design development, construction documents and will continue ser- vices through construction administration and grand opening assistance. Encinitas Community Skate Plaza, Encinitas, CA Kanten managed design services for the development of park plans, which included GHYHORSLQJDGHTXDWHFRPPXQLW\LQJUHVVDQGHJUHVVWR$'$&RPSOLDQWIDFLOLWLHVRႇ street parking spaces, Wheel Friendly environments within the park and Green Technol- ogy. Kanten was hired as the lead designer and project manager to perform services from planning, public facilitation, schematic, conceptual, 3-D modeling, design develop- ment, construction documents and will continue services through construction adminis- tration and grand opening assistance. Manhattan Beach Skate Spot, Manhattan Beach, CA Kanten provided the City of Manhattan Beach with skate park feasibility study services by reviewing and analyzing the history of public outreach process and documents. The study included prioritizing park locations, determining the type of skate park and the means to fund it. As part of Phase 2, Kanten conducted all of the public facilitation, and led the schematic design, construction documents, and construction observation of the skate park completed December 2016. Corning Skate and Bike Park, Corning, CA Kanten not only worked on the park planning and design but also public facilitation. We FRQGXFWHGWKUHHSXEOLFPHHWLQJVWRUH¿QHWKHFRQFHSWDQGGHVLJQSUHVHQWLQJFRQFHS- tual design along with 3-D modeling. The Sacramento River and a grove of olive trees ZHUHWKHGRPLQDQWHOHPHQWVLQÀXHQFLQJRXUGHVLJQDQGZHDOVRZDQWHGWRSUHVHUYHWKH trees. To do this, we creatively wrapped the park around the trees, adding more green space to the facility. Our color pallet and materials were selected to represent the Sacra- mento River and mimic the color tones the olive trees. We also developed a fundraising packet for the community. Along with city funding, the project garnered local business donations. We then prepared construction documents, provided construction adminis- tration, and assisted with the grand opening that was covered by Thrasher Magazine. Lindo Lake Skate Park, San Diego, California .DQWHQGHYHORSHGWKH&RXQW\¶V¿UVW³:KHHO)ULHQGO\´6NDWH3OD]DWKDWLVSHGHVWULDQIULHQGO\ZLWKVSHFWDWRUYLHZLQJ7KHVLWH has an open plaza theme that integrates with the adjacent Lindo Lake recreational trail network. The park plans will develop DGHTXDWHFRPPXQLW\LQJUHVVDQGHJUHVVWR$'$&RPSOLDQWIDFLOLWLHVRႇVWUHHWSDUNLQJVSDFHV:KHHO)ULHQGO\HQYLURQPHQWV within the park and Green Technology. Responsibilities include: planning, public facilitation, schematic, conceptual, 3-D mod- eling, design development, construction documents and will continue services through construction administration and grand opening assistance. Corning Skate and Bike Park Alga Norte Community Park Skatepark 3RSODU%OX௺6NDWH3OD]D 34 Mr. Dion is the founder, president and principal designer of New Line Skateparks. He is a seasoned active skateboarder and father of 5 who has tirelessly dedicated himself to the promotion of skateboarding/action sports across North America and throughout the world. Kyle has provided his professional consulting and construction services for over 300 high SUR¿OHPXQLFLSDOVNDWHSDUNVDFURVVWKH8QLWHG6WDWHV&DQDGD(XURSH and Australia. In addition to receiving numerous recognitions for his ZRUN LQFOXGLQJWKHHVWHHPHG&DQDGLDQ6RFLHW\RI/DQGVFDSH$UFKLWHFWV National Honor Award), Mr. Dion is regularly featured in prominent &DQDGLDQDQGLQWHUQDWLRQDOPHGLDSXEOLFDWLRQVIRUKLVXQLTXHFRPPXQLW\ recreation contributions. PROJECT EXPERIENCE (project values $300,000 - $2.5 Million) 1(&RPPXQLW\6NDWHSDUN)ULVFR7; /DID\HWWH6NDWH3OD]D/RV$QJHOHV&$ 620$6NDWH3OD]D6DQ)UDQFLVFR&$ +HOHQ0F&DOO6NDWHSDUN:DOWRQ&RXQW\)/ 3OD]DDWWKH)RUNV:LQQLSHJ0% &DOJDU\6NDWHERDUGLQJ$PHQLWLHV6WUDWHJ\&DOJDU\$% %DQႇ1DWLRQDO3DUN6NDWHSDUN%DQႇ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dditional Project Experience Listing Available Upon Request 3UHVLGHQWDQG&(2'LUHFWRURI6NDWHSDUN'HYHORSPHQW KYLE DION PROFESSIONAL EXPERIENCE New Line Skateparks /DQJOH\%&(GJHZDWHU)/ President / Principal Designer 3UHVHQW Puzzled Skate Movement 0DSOH5LGJH%& President  City of Maple Ridge 0DSOH5LGJH%& <RXWK3URJUDP6SHFLDOLVW  Luxton Designs Perth, Australia Project Manager  PROFESSIONAL AFFILIATIONS American Shotcrete Association 6NDWHERDUG&DQDGD %RDUG0HPEHU 35 EIT / skatepark designer Chris long is a detailed oriented EIT with a passion for action sports. A long time skateboarder himself, his work on countless skateparks / youth SDUNIDFLOLWLHVKDVEXLOWKLVUHSXWDWLRQDVDOHDGHULQWKH¿HOG&KULVUHFHQWO\ made the transition from Stantec Consulting (Action Sports Division) after three years in his role as Civil Designer and joined the team of New Line Skateparks where he now provides civil design support for all US design operations. Chris is driven to design synergistic skatepark / youth park HQYLURQPHQWVWKDWOHDYHDODVWLQJLPSDFWRQWKHORFDOFRPPXQLW\DQGIXO¿OO the overall vision of the client we are serving. CHRIS LONG PROJECT EXPERIENCE (project values $300,000 - $2.5 Million) Amelia Mayberry, CA (2020) Escondido, CA (2020) Town Park Phase 2, Oakland, CA Reservation Road Skate Park, Boston, MA (2019) Skate Corridor & Pump Track at Smith Playground, Boston, MA (2018) Brattleboro Skatepark, Brattleboro, VT (2019) Oakcrest Cove Skatepark and Muti-Use Facility, Sandwich MA T.J. O’Grady Memorial Skate Park Bowl Phase, Acton, MA (2018) T.J. O’Grady Memorial Skate Park Phase Two, Acton, MA (2019) Falmouth Skatepark, Falmouth MA (2018) Jamaica Plain Skatepark, Boston, MA (2018) Ryan Brennan Memorial Skatepark, Salem MA (2018) Washington Park Skate Park, Albany, NY (2017) Fundraising Campaign for the Rochester Urban Skate Park, Rochester, NY (2017- 2018) LaGrange Skatepark, LaGrange, GA (2018) Colgate Action Park Master Plan, Clarksville IN (2018) McIntire Skatepark, Charlottesville VA (2017) Eagan Skate Park, Eagan, MN (2018) Cloquet Skatepark, Cloquet, MN (2018) Burnsville Lions Skatepark, Burnsville MN (2017) Ojibway Skatepark Phase Two, Woodbury, MN (2018) Davis Pump Track, Davis, CA (2018) Serenity Pump Track, Lake Elsinore, CA (2017) Carlsbad Adventure Park Feasibility Study, Carlsbad, CA (2017) EDUCATION Worchester Polytechnic Institute Bachelor of Science in Civil Engineering GPA 3. / .0 PROFESSIONAL EXPERIENCE Newline Skateparks San Diego, CA Civil Park Designer July 2019 Present Stantec Consulting Boston, MA Civil Designer 2016 2019 Tighe & Bond Middletown, CT 6WDႇ(QJLQHHU 2015 2016 PROFESSIONAL AFFILIATIONS Boston Society of Civil Engineers Active General Member Additional Project Experience Listing Available Upon Request STATEMENT OF QUALIFICATIONS LORAN CHICK PLS/ PSM REGISTRATION Professional Land Surveyor, Missouri, 2001001907 Professional Surveyor and Mapper, Florida, FL LS7148 EDUCATION B.S., 1988, Business Management, Northwest Missouri State University CerƟficate, 2015, Project Manage- ment, Saint Louis University EXPERIENCE 28 years of professional pracƟce experience Mr. Chick has several years of experience in field surveying and office mapping. As survey manager, he is responsible for survey support, calcu- laƟons, coordinaƟon and supervision of all field and office operaƟons. With a broad knowledge of Ɵtle research, map preparaƟon including right -of-way documents and legal descripƟons. His experience includes boundary, topographic, control, monitoring, 3D modeling, construcƟon and photogrammetric surveys. Mr. Chick is experienced in using various types of surveying equipment which includes GPS, roboƟc total staƟons, CAD programs, computers and data collecƟon surveying soŌware on vari- ous plaƞorms. Relevant Project Experience Eisenhower Medical Center, Rancho Mirage California. Survey Depart- ment Manager. Michael Baker provided data gathering and modeling ser- vices to determine, map, expose, relocate uƟliƟes for the Eisenhower Medical Center. Michael Baker compiled the exisƟng uƟliƟes into one AutoCAD Civil 3D drawing, modeled the proposed uƟliƟes, combined all models to produce a full 3D model and performed conflict analysis to re- solve locaƟon discrepancies. Salton Sea Improvements, Imperial County, California. Survey Depart- ment Manager. Michael Baker is performing construcƟon surveying ser- vices for the installaƟon of berms, levy’s and holding ponds for improve- ments and cleanup of the Salton Sea. Work also involves potholing, topo- graphic survey/base mapping and construcƟon support services. CV Link, Coachella Valley CommuniƟes, Riverside County, California. Survey Department Manager. Michael Baker is performing surveying ser- vices for the new pedestrian/bicycle route through the Coachella Valley. Work includes geodeƟc control, topographic survey/base mapping and construcƟon support services. Iowa Department of TransportaƟon Photogrammetry Projects. Respon- sible for Project Management of the photogrammetric flights and coordi- naƟon with the Iowa DOT Surveyors to provide the imagery for mapping each project area. From 2015 to 2018, each year there was an average of 75 project areas to be captured for control and mapping varying from 1 mile to 50 miles in length. Missouri Department of TransportaƟon project sites, St. Louis County Responsible for the Project Management of the flights (Orthos and Li- DAR), survey control, mapping and file delivery for 7 project areas of 8 to 12 miles in length. The project improvements included widening road lanes, turning lanes, drainage structures and some curb and guƩer at some intersecƟons. Missouri BapƟst University, Creve Coeur, Missouri. Responsible for the Project Management of the flight, survey control, mapping and file deliv- ery for the 80-acre site to add roadways, parking lots and buildings for future use. RESUMES OF KEY PERSONNEL STATEMENT OF QUALIFICATIONS PETER MINEGAR Environmental Manager CERTIFICATIONS American InsƟtute of CerƟfied Planners (AICP), 2020 EDUCATION M.S., 2019, Environmental Management and Policy (Natural Resources Emphasis), University of Denver B.S., 2014, City and Regional Planning, California State Polytech- nic University, San Luis Obispo AFFILIATIONS American Planning AssociaƟon (APA) AssociaƟon of Environmental Professionals (AEP) EXPERIENCE 9 years of professional pracƟce experience Mr. Minegar oversees and prepares environmental compliance and plan- ning studies for a range of public and private sector clients. He specializes in developing documents in compliance with the California Environmental Quality Act (CEQA) and NaƟonal Environmental Policy Act (NEPA). Mr. Minegar has a broad range of environmental planning experience ranging from project-level analysis of infrastructure improvements to program- level analysis to support a General Plan amendment. He has been in- volved in preparing environmental and planning documentaƟon, as well as represenƟng agency staff for a range of highly controversial projects subject to scruƟny by the general public, environmental organizaƟons, and public agencies. Mr. Minegar also serves as an in-house CEQA man- ager and Senior Planner for several local government agencies through- out Southern California. Relevant Project Experience Comprehensive Planning Services, Eastvale, California. Environmental Planner. Responsible for review of all incoming applica- Ɵons to develop the environmental documentaƟon approach in compli- ance with the California Environmental Quality Act (CEQA). Responsibili- Ɵes include development of CEQA documents, peer review of applicant provided CEQA documents, preparaƟon of staff reports, and public hear- ing support. Michael Baker provided comprehensive planning services for this recently incorporated City in Western Riverside County. Michael Baker served as the City's planning staff, providing current and advance planning processing, counter staffing, Planning Commission meeƟng facil- itaƟon; plan review; staff reports preparaƟon; City funcƟons parƟcipa- Ɵon; CEQA compliance and review; Tribes on SB18 and AB52 coordina- Ɵon; Western Riverside County Regional ConservaƟon Authority (RCA) coordinaƟon for their MulƟple Species Habitat ConservaƟon Plan (MSHCP); and special project work, such as preparaƟon of the City's Eco- nomic Development website. Interstate 10/Avenue 50 Interchange, Coachella, California Environmental Associate. Responsible for managing the development of CEQA and NEPA environmental compliance documentaƟon for the Ave- nue 50 Extension Project. The project required extensive coordinaƟon between local, state, and federal agencies. Michael Baker, as the prime consultant, prepared a project study report and provided state and feder- al environmental documentaƟon for the I-10/Avenue 50 Interchange Pro- ject. The purpose of the project is to relieve forecasted congesƟon on I-10 and S.R. 86, including the Dillon Road interchanges. The interchange im- provements will provide a new gateway into the city and improve access to I-10 for vehicles traveling in and out of the city. • North Basin Recharge Project EIR, Riverside, California • Temecula Creek Inn Wildlife Corridor Study, Temecula, California • Camino Sierra Road Pressure Zone Conversion, Temecula, California. • Griffin Homes Project, Redlands, California. • Cathedral City Development - Desert Housing Ventures, LLC. RESUMES OF KEY PERSONNEL STATEMENT OF QUALIFICATIONS g. - SIMILAR PROJECT EXPERIENCE 1 STATEMENT OF QUALIFICATIONS Set against the backdrop of the breathtaking Santa Rosa Mountains, this $8-million, 6.4-acre luxury Spanish Colonial private recreaƟon center includes a recreaƟon building, series of outdoor verandas, inƟmate courtyards, short-course Olympic sized swimming pool, splash park, tennis stadium, tennis courts, pickleball courts, off-leash dog run, puƫng green, recreaƟonal lawn areas, outdoor kitchen, dining areas, and walking paths that meander through the desert landscape. The grounds incor- porate aestheƟcs that would be found at a high- end luxury resort. Responsible for preparing the site master plan, construcƟon budget, 3D renderings, THE GRIFFIN CLUB La Quinta, CA AWARDS AND RECOGNITION • Merit Award - American Society of Landscape Architects, NY Upstate, 2015 • Published - Landscape Architect & Specifier News Magazine, 2015 RELEVANT EXPERIENCE See SecƟon 2 for Client References STATEMENT OF QUALIFICATIONS Responsible for the park master plan, preliminary grading design, cost esƟmates, construcƟon docu- ments, lighƟng/ civil engineering/ architectural design coordinaƟon, and construcƟon administraƟon for this 19.7-acre, $8.4-million City of Temecula public park located in the Sommers Bend community. The Park includes two baseball fields, two arƟficial turf soccer fields, two basketball courts, open lawns, picnic areas, playground, “nature play” areas and trails, naƟve plant habitats, concessions building, restrooms, maintenance building and yard, entry monument signage, connecƟons to the Long Valley Wash trail system, storm water management biore- tenƟon areas, and parking. ConstrucƟon complet- ed 2022. SPORTS RANCH AT SOMMERS BEND Temecula, CA RELEVANT EXPERIENCE See SecƟon 2 for Client References STATEMENT OF QUALIFICATIONS Santee Lakes RecreaƟon Preserve is a 190-acre linear park situated on a series of lakes that collect, treat, and store recycled water for use within Padre Dam Municipal Water District. Responsible for the site planning and design of the 20-year, $60-million Dynamic Vision Plan, $1.6- million Phase 1 park improvement/ trail/ road/ parking project from concept through construcƟon and $9-million Phase 2 general store/ restaurant/ administraƟon/ lakeside trail/ park improvement/ parking project from concept through ConstrucƟon. In-Site worked closely with the director of Park and RecreaƟon and the building architect (PWA) on the Dynamic Vison Plan that supports the preserve's desire for future growth and funcƟonal needs, including an improved park entrance, outdoor "super site" wedding and event venue, expanded fishing docks, splash park, zipline and landmark water tower, general store and grill area, admin- istraƟon/ teen center/ event area, clubhouse rede- sign including adult pool, family pool, splash park, concert/ performance amphitheater, dog run, pick- leball courts, bocce ball courts, and shuffleboard courts, a yurt cabin village, aquaƟc park with cable ski course, new resort pool facility and numerous picnic areas throughout the park. SANTEE LAKES RECREATION PRESERVE Santee, CA AWARDS AND RECOGNITION • Project of the Year Finalist, San Diego Business Journal, 2021 • Feature ArƟcle - Park and Rec Business Magazine - April 2016 RELEVANT EXPERIENCE See SecƟon 2 for Client References STATEMENT OF QUALIFICATIONS Responsible for the master plan, illustraƟve graphic exhibits, 3D renderings, 3D animaƟon, cost esƟmates, lighƟng/ civil engineering/ architectural design coordinaƟon, construcƟon documents, and construcƟon administraƟon for this central gathering green space within the Park Circle master planned community. This 2.6-acre County of San Diego public park includes a trail system, nature play areas, shade shelters, bandshell, exercise staƟon, basketball courts, horse shoe pits, bocce courts, open lawn areas, restrooms, and an historic water tower from the original on-site dairy that was relocated to the park site and was repurposed as a community landmark and park sign. In-Site designed the park concurrently with an adjacent private recreaƟon center, adjacent green infrastructure ephemeral stream which doubles as a nature play area and a future dining and shopping center that will blur the line between public and private development. ConstrucƟon completed 2022. HARVEST PARK Valley Center, CA 3D Rendering of Park and Future Dining and Shopping RELEVANT EXPERIENCE See SecƟon 2 for Client References STATEMENT OF QUALIFICATIONS RELEVANT EXPERIENCE ALTAIR COMMUNITY PARKS AND RECREATION dĞŵĞĐƵůĂ͕ Responsible for the open space design, landscape ĂƌĐŚŝƚĞĐƚƵƌĂůƐĐŚĞŵĂƟĐƉůĂŶƐ͕ŝůůƵƐƚƌĂƟǀĞƐƉĞĐŝĮĐƉůĂŶ ĞdžŝďŝƚƐ͕ĂŶĚůĂŶĚƐĐĂƉĞĂƌĐŚŝƚĞĐƚƵƌĂůŶĂƌƌĂƟǀĞĨŽƌƚŚŝƐ ŵŝdžĞĚƵƐĞĐŽŵŵƵŶŝƚLJŝŶdĞŵĞĐƵůĂ͕ĨĞĂƚƵƌŝŶŐ;ϲͿ ƵƌďĂŶ ƉĂƌŬƐ ƚŽƚĂůŝŶŐ ϭϬ ĂĐƌĞƐ͕ Ă ƉƌŝǀĂƚĞ ƌĞĐƌĞĂƟŽŶ ĐĞŶƚĞƌ͕ĞůĞŵĞŶƚĂƌLJƐĐŚŽŽů͕ϮŵŝůĞƐŽĨůĂƐƐ/ďŝŬĞǁĂLJƐ͕ ĂŶĚϭŵŝůĞŽĨŚŝŬŝŶŐƚƌĂŝůƐ͘dŚĞĐŽŵŵƵŶŝƚLJŝƐĚŝǀŝĚĞĚ ŝŶƚŽ ǀŝůůĂŐĞƐ ĨĞĂƚƵƌŝŶŐ ƚŚĞŝƌ ŽǁŶ ƉĂƌŬƐ ƉůĂnjĂƐ ĂŶĚ ĐŽŵŵƵŶŝƚLJ ƐƉĂĐĞƐ͘ ůƚĂŝƌ͛Ɛ ĐŽŵŵƵŶĂů ĂŵĞŶŝƟĞƐ ŝŶĐůƵĚĞ͗ ĂĨĠͬZĞƐƚĂƵƌĂŶƚ ZŽŽŌŽƉdĞƌƌĂĐĞ ŵƉŚŝƚŚĞĂƚĞƌ Bandshell >ŝŶŬƐƚŽ'ƌĞĞŶǁĂLJƐ Picnic Areas WůĂLJŐƌŽƵŶĚ EĂƚƵƌĂůWůĂLJƌĞĂƐ Nature Walk Shade Shelters ZĞŶĚĞƌŝŶŐLJKƚŚĞƌƐ STATEMENT OF QUALIFICATIONS dŚĞƌĂƉLJƌĞĂ Feed Storage ŽŶŶĞĐƟŽŶƚŽŽŐWĂƌŬ EĂƚƵƌĂůŝnjĞĚ^ƚƌĞĂŵZĞƐƚŽƌĂƟŽŶ dƌĂŝůŽŶŶĞĐƟŽŶƐ Trailer Parking ͻ͞DĞƌŝƚǁĂƌĚ͕͟ŵĞƌŝĐĂŶ^ŽĐŝĞƚLJŽĨ>ĂŶĚƐĐĂƉĞ  ƌĐŚŝƚĞĐƚƐͲ^ĂŶŝĞŐŽ͕ϮϬϭϲ tZ^ΘZK'E/d/KE EL CABALLO PARK MASTER PLAN Escondido, CA Ɛ Ă ƐƵďĐŽŶƐƵůƚĂŶƚ ƚŽ tLJŶŶͲ^ŵŝƚŚ >ĂŶĚƐĐĂƉĞ ƌĐŚŝƚĞĐƚƵƌĞ͕/ŶͲ^ŝƚĞĂƐƐŝƐƚĞĚǁŝƚŚƚŚĞĐŽŵƉƌĞŚĞŶƐŝǀĞ ƐŝƚĞ ŵĂƐƚĞƌ ƉůĂŶ͕ ƉƵďůŝĐ ǁŽƌŬƐŚŽƉƐ͕ ϯ ŵŽĚĞůŝŶŐ͕ ĂŶĚ ŝůůƵƐƚƌĂƟǀĞ ŐƌĂƉŚŝĐƐ ĨŽƌ ƚŚŝƐ ŝƚLJ ŽĨ ƐĐŽŶĚŝĚŽ ĞƋƵĞƐƚƌŝĂŶƚŚĞŵĞĚŚŽƌƐĞƉĂƌŬ͘WƌĞůŝŵŝŶĂƌLJƉƌŽƉŽƐĞĚ ĂŵĞŶŝƟĞƐŝŶĐůƵĚĞ͗ KƉĞŶ>ĂǁŶ WůĂLJƌĞĂƐ Picnic Areas Round Pen Arena Charreada RELEVANT EXPERIENCE STATEMENT OF QUALIFICATIONS LARKIN PARK Buffalo, NY Larkin Park is slated to be constructed adjacent to the new Mill Race Commons development and the exisƟng Flying Bison Brewery in the "Larkinville"/ “Hydraulic” district of Buffalo, NY. In-Site prepared the park master plan, 3D renderings, and 3D animaƟon for the Larkin Development Group. Site ameniƟes include a sculptural play element, picnic areas, tetherball, open lawns, natural planƟngs, walkways, and parking for 70 cars. The design concept plays homage to the hydraulic mill wheels historically prominent in the area through an abstract interpretaƟon of a spinning moƟon. The design also symbolizes the later influence of the railroad through straight walkways that bisect the site and create various outdoor recreaƟonal spaces. RELEVANT EXPERIENCE STATEMENT OF QUALIFICATIONS Responsible, as co-lead consultant, for site analysis, conceptual design, photo simulaƟons, and construcƟon documents/ administraƟon for this 10-acre project. The visitor center is located on the 9,000-acre ecological reserve in southwestern Riverside County. The reserve is a cooperaƟve management project of the Riverside County Regional Park and Open Space District, The Nature Conservancy, California Department of Fish and Game, the U.S. Fish and Wildlife Service, and the Metropolitan Water District of Southern California. The design theme is a layered experience of aestheƟcs/ “sense of place”, fun through exploraƟon, educaƟon for all ages (including 8,000 annual third graders), and environmental stewardship. The scope of services included design for an ADA acces- sible interpreƟve trail, five demonstraƟon naƟve plant communiƟes, entry improvements, monument signage, interpreƟve/ educaƟonal features, covered presentaƟon stage/ plaƞorm, event paƟo, and parking expansion. The project includes contract grown plant species from site cuƫngs to ensure geneƟc compaƟbility, salvaged on site boulders, and masonry features made with local Santa Rosa Basalt to match the Reserve’s Historic Cow- boy Adobe site walls. SANTA ROSA PLATEAU RESERVE VISITOR CENTER Murrieta, CA AWARDS AND RECOGNITION • "Merit Award", American Society of Landscape Architects - SD, 2012 • Honorable MenƟon", California Trails and Greenways CommiƩee, 2011 RELEVANT EXPERIENCE STATEMENT OF QUALIFICATIONS Set against the backdrop of the breathtaking Santa Rosa Mountains, this luxury model home complex includes four model homes, pools, waterfalls, spas, shaded outdoor kitchens, water features, fire features, dining and lounge areas, a puƫng green, and beauƟful desert landscape. In-Site provided conceptual design, 3D renderings, construcƟon documents and construcƟon admin- istraƟon. GRIFFIN RANCH MODEL HOME COMPLEX La Quinta, CA RELEVANT EXPERIENCE STATEMENT OF QUALIFICATIONS h. - UNDERSTANDING AND APPROACH 1 STATEMENT OF QUALIFICATIONS PRELIMINARY PARK PROGRAMMING ASSESSMENT As part of our commitment to the success of this project and as part of our proposal response, we have begun to analyze the park program elements and relaƟonship to each other, the park’s aestheƟc, and the sense-of- place within the park’s regional context. Please note, these are preliminary ideas that we prepared to illus- trate design concepts to the City as part of our proposal and approach. They are not intended to convey the final design of the park. Once selected for the project, our team will work with the City and community to pre- pare the park master plan taking into account all the City’s goals as a coordinated team player with the City. UNDERSTANDING AND APPROACH Our approach to the master plan process first starts with what exisƟng faciliƟes should re- main in place which faciliƟes should be relo- cated or redesigned. In our opinion, since the skate park and dog park would be the least negaƟvely impacted by being located across Avenue 52 in the new park parcel and because the exisƟng faciliƟes are relaƟvely small sized, we recommend those program elements be relocated into the new park parcel along with a new parking lot off Calle Amigo. By siƟng the dog park to the west, parking in the middle, and skate park to the east, a new large lawn picnic area centered on a graceful arc-shaped walkway could organize this space beauƟfully. The exisƟng newly constructed street improve- ment curbs and sidewalks would be able to remain undisturbed and access into the new parcel can be conveniently located at the ex- isƟng crosswalk sidewalk connector. Another arc-shaped walkway may be located south of Avenue 52 which would visually Ɵe the two park parcels into one park. Leading south, a new tree-lined shaded walkway with park benches and picnic tables may hug the east side of the exisƟng lawn and terminate at a new circular splash park. New shade shelters, addiƟonal lawn areas, and lounge seaƟng may be ideally located here serving the splash park, playground and pool complex. The playground area may be redesigned with new equipment, shade trees and seaƟng. The exisƟng parking lot may be expanded back into the current dog park area adding spaces while new tree islands can be added to provide shade and thus re- duce the urban heat island effect. Four new pickleball courts may be added south of the exisƟng tennis at the locaƟon of the current skate park/former parking lot keeping the new courts and exisƟng courts in the same vicinity. Example Preliminary Programming Conceptual Plan Preliminary Program Assessment Summary: ExisƟng Proposed Parking Spaces 59 106 Shade Shelters: 15 27 RecreaƟonal Lawn: +/- 1.4 ac +/- 1.4 ac Skate Park: 4,500 sf 14,116 sf Dog park 5,500 sf 8,385 sf Pickleball courts: 8 12 Improved Playground New Splash Pad Dog Run RecreaƟonal Lawn RecreaƟonal Lawn Skate Park New Pickleball Splash Pad Exist. Pool New Parking w/ Trees Expanded Parking w/ Trees ExisƟng Courts ExisƟng Basin Avenue 52 STATEMENT OF QUALIFICATIONS UNDERSTANDING AND APPROACH In-Site also uses 3D modeling soŌware to provide sƟll frame renderings and virtual fly-through animaƟons of our projects to communicate our designs to clients and the public. Below are some example renderings that we prepared as part of our proposal response to help illustrate the preliminary park programming concepts. Example 3D Rendering - Bird’s eye view of the overall park Example 3D Rendering - New park parcel with parking off Calle Amigo, new dog park to the west, skate park to the east, and lawn picnic area in the center. STATEMENT OF QUALIFICATIONS UNDERSTANDING AND APPROACH Example 3D Renderings - New state-of-the-art skate park with bowls, ramps, ledges, rails, steps, and shade structures. Example 3D Rendering - New dog park with separate areas for large dogs and small dogs including a vesƟbule fenced entry and shade structures Example 3D Rendering - Arc-shaped walkways and planƟng design visually Ɵe the two park parcels together STATEMENT OF QUALIFICATIONS UNDERSTANDING AND APPROACH Example 3D Rendering - Splash park with adjacent shade shelters and lounge seaƟng. The surface of the splash park may also serve as a public art opportunity. In this example shows and abstract flower of the naƟve beavertail prickly pear cactus Example 3D Rendering - New tree-lined shaded walkway with park benches and picnic tables STATEMENT OF QUALIFICATIONS UNDERSTANDING AND APPROACH Example 3D Rendering - Expanded parking lot, tree shading, splash park, new lawn areas, shade shelters, and tree- lined walkway leading to the new park parcel across Avenue 52 Example 3D Rendering - Redesigned playground area with addiƟonal tree shading STATEMENT OF QUALIFICATIONS THE ‘GREEN OFFICE’ Since In-Site Landscape Architecture, Inc. was founded in 2007, the company has pioneered the sustainable “Green Office” model. For the last 15 years, all employees work from home offices to reduce our company’s carbon footprint and to improve employees’ work/life balance and producƟvity by eliminaƟng typical Ɵme-consuming Southern California commuƟng. Without the restricƟon of commuƟng to a designated office locaƟon, this has also allowed us to aƩract top talent in the Southern California region. Our staff works from Cathedral City, San Diego, Costa Mesa, Los Angeles, and New York. Our company seamlessly works together using the web-based MicrosoŌ Teams. This plaƞorm allows our staff to feel a sense of place, presence, and connecƟvity and also provides an online screen sharing and via video chat. While Covid-19 has changed the way most businesses and municipaliƟes operate, there was no change to In-Site’s procedures since we have already adapted and excelled with this business model over the past 15 years. UNDERSTANDING AND APPROACH MicrosoŌ Teams in-house meeƟng Local satellite office address: (Ron Moreno) 67-458 Rio Vista Drive Cathedral City, CA 92234 La Quinta PERSONAL CONNECTION Ron Moreno, one of the key team members for this project moved to the La Quinta Cove neighborhood from Co- lombia when he was 16 years old. As a teenager, Ron spent a lot of Ɵme at Fritz Burns Park playing soccer, swim- ming, skateboarding, and spending Ɵme with family and friends. He currently lives and works from his home sat- ellite office in nearby Cathedral City. Ron is so happy to work with our team on this opportunity to update a space that he enjoyed so much growing up and to serve the City of La Quinta on this exciƟng project! STATEMENT OF QUALIFICATIONS i. - SCOPE OF WORK 1 Tim Jachlewski, President, PLA, ASLA Licensed Landscape Architect CA #4547, RLA NY#001646 tim@insitelandarch.com CALIFORNIA 2907 Shelter Island Drive #105-417 San Diego, CA 92106 / 619-795-7603 NEW YORK (P.C.) P.O. Box 356 Orchard Park, NY 14127 / 716-508-8341 www.insitelandarch.com EXHIBIT A – SCOPE OF SERVICES FRITZ BURNS PARK MASTER PLAN City Project No. 2021-02 Dated: February 17, 2022 Project Understanding: The City of La Quinta (City) reserves the right to negotiate final pricing with In-Site Landscape Architecture, Inc. (Consultant). Pricing shall remain firm for the entire initial term of the agreement. The total project area is 7.5 acres, located on the corner of Avenue 52 and Avenida Bermudas. The Fritz Burns property was donated to the City of La Quinta to serve as noncommercial public space. The property currently has a regional park and is adjacent to the City’s Corporate Yard and Fire Station #32; which sit on an additional four (4) acres. The park contains a swimming pool, children's play area, picnic tables & benches, men’s and women’s restrooms, 6 tennis courts, 8 pickle ball courts, a water feature, a skate park, a dog park, parking lot and off-street parking. The City is proposing to keep all existing park program elements; including courts, dog parks, skate park, playground, and pool and pool building. The potential re-configuration should be considered in the Master Plan and should consider constructing additional park amenities such as but not limited to: pickle ball courts, parking, shade and misting, spectator seating, seating, pedestrian lighting, updated and increased bathrooms, fencing, a splash fountain, and location for trash collection for larger events that can be secured. The City wants to limit turf removal as much as possible. The tear drop property north of the park is to be incorporated for the improvements. Scope of Services: Task 1 – Pre-Design Phase a) Consultant shall review the City’s existing data, reports, record drawings and studies concerning the project. b) Consultant shall attend a kickoff meeting with the City to discuss the goals and objectives for the project. The Consultant and City shall also review the preliminary programming, preliminary plan, and preliminary 3D renderings (prepared as part of the Consultant’s RFP response) to receive initial City feedback and direction if the City feels any of the preliminary ideas are desirable for the Master Plan. Consultant recommends conducting one overall meeting with each of the following City Departments to ensure Department goals and interests do not conflict with each other. • Meeting/Interview with Public Works Director, Maintenance Services Division Manager, Engineering Services/CIP Division Manager and Project Manager; • Meeting/interview with Maintenance Services Division Manager and key staff members; • Meeting/interviews with other stakeholders (i.e. Community Services Department, Building & Safety Department, Code Enforcement). c) Consultant shall conduct a site visit in association with the City and assess the project’s existing conditions, opportunities, and challenges. (This meeting may be combined with the above meeting). EXHIBIT A – SCOPE OF SERVICES Page 2 of 4 Deliverable: Memorandum identifying existing park amenities to remain, existing park amenities to be enhanced, existing park amenities to be relocated, and new park amenities and City’s goals and objectives for the project. Deliverable: Meeting minutes. Task 2 – Base Map Preparation a) Consultant shall prepare a base map of the project limit-of-work based Google Maps satellite imagery, site photographs, and City’s existing plans. (Depending on the City’s Master Plan budget, the City may consider this level of base map detail sufficient for master planning purposes. See example concept plan prepared as part of the Consultant’s RFP response). An aerial topographic map prepared by licensed Land Surveyor is included as an optional scope of service item and fee if it is in the best interest of the City to have a topographic survey map that will also be suitable for future construction documents.) Deliverable: CAD drafted base map based on Google Maps satellite imagery. Optional Task A – Aerial Topographic Map Subconsultant (MBI) shall prepare an Aerial Topographic Map of the project site, at a scale of 1” = 40’, with one foot contour intervals and shall provide the completed Aerial Topographic Map in an AutoCAD digital format. The work will include the following tasks: 1. Preparation of a flight plan and layout of ground control targets; 2. Field surveying services to set ground control panels and survey their precise positions on the appropriate coordinate system basis; 3. Establishment of horizontal and vertical geodetic control on appropriate published datum; 4. Aerial photogrammetric and aero triangulation services; 5. Compilation of plannimetric and topographic features to digital medium; 6. Completion of field survey check profile observations and office analysis of said observations to check ground truth of the compiled map. EXCLUSIONS: 1. Potholing or underground exploration of utilities 2. Record of Survey Mapping 3. Field Topographic Mapping 4. Anything else not specifically included in the Scope of Services above Optional Task Deliverable: CAD drafted aerial topographic map Task 3- Community Outreach a) Consultant shall attend and assist City with two community meetings. (It is assumed the City will provide the venue and invite the public to the meetings). b) The first meeting shall present the existing site conditions, City’s goals for the project, and initial park programming and will provide the opportunity for the community to provide feedback on each of the above. c) The second meeting will present the results of the first meeting and the draft park master plan for community feedback. Deliverable: Community Meeting #1 memorandum of results. Deliverable: Community Meeting #2 memorandum of results. EXHIBIT A – SCOPE OF SERVICES Page 3 of 4 Task 4- Draft Site Master Plan a) Consultant shall prepare a Prioritized Phased Master Plan for Fritz Burns Park. It shall be based on the City goals and objectives in combination with the proposed programming and the results of the site opportunities and constraints analysis. It shall include the general layout of areas such as pathways, parking, park amenities, light standards, planting areas, turf areas, and key landscape elements. The Master plan shall identify existing park amenities to remain, existing park amenities to be enhanced, existing park amenities to be relocated, and new park amenities. (It is assumed in the base fee that the preliminary skate park design included in our proposed response will be sufficient for the project or that the existing skate park will remain as-is. A new skate park master plan is included as an optional scope of service item and fee.) b) Consultant shall prepare a conceptual 3D computer model of the proposed plan and prepare at ten still frame views of the proposed design. Deliverable: Draft Site Master Plan Deliverable: Draft Site Master Plan incorporating City Staff feedback Deliverable: Draft Site Master Plan incorporating Community feedback Deliverable: 3D Renderings (ten views) Optional Task B – New Skate Park Master Plan 1. Consultant/ Subconsultant (Newline Skateparks) shall attend Kick-Off Scope Meeting. 2. Consultant/ Subconsultant shall prepare Data Collection and Existing Conditions Analysis. 3. Consultant/ Subconsultant shall Create Site Analysis Diagrams. 4. Consultant and Subconsultant shall Develop Preliminary Concepts for Skate Park Master Plan (Estimated 2 Coordination Meetings. One In-Person and One Virtual). 5. Consultant/ Subconsultant shall Develop Conceptual Skate Park Layout Plans (assume 2 concepts). 6. Consultant/ Subconsultant shall Present Updated Skate Park Design. 7. Consultant/ Subconsultant shall prepare Concept Summary Report. 8. Consultant/ Subconsultant shall provide Advisory Team Review. 9. Consultant/ Subconsultant shall prepare Final Schematic Skate Park Master Plan and 3D Graphics. 10. Consultant/ Subconsultant shall prepare Skate Park opinion of probable construction cost estimate. 11. Consultant/ Subconsultant shall incorporate Client Review. 12. Consultant/ Subconsultant shall Submit Final Schematic Master Plan Design for approval. Deliverable: New Skate Park Master Plan and 3D Graphics Task 5 – Opinion of Probable Construction Cost Estimate a) Consultant shall prepare an opinion of probable construction cost estimate for each phase and option. Deliverable: Opinion of probable construction cost estimate for each phase and option Task 6 – Develop CEQA Approach a) There is no “one size fits all” approach to CEQA compliance. Subconsultant (MBI) will work collaboratively with Consultant and City staff to outline the best path forward based on the overall objectives of the City and proposed activities for the project site. Once the preliminary site design is complete, our team will review relevant documents, and prepare a brief CEQA EXHIBIT A – SCOPE OF SERVICES Page 4 of 4 Approach Memorandum that details the CEQA compliance path, key data needs to meet milestones, and a budget. This scope of work is limited to developing a CEQA Approach, preparation of the CEQA document is not included in this scope of work and can be provided under a separate scope and fee once the approach has been defined. Deliverable: CEQA Approach Memorandum Task 7 – Meetings a) Consultant shall prepare for and attend Monthly PDT Meetings with all Stakeholders. b) Consultant shall prepare for and present at two (2) City Council Study Sessions and one (1) Community Services Commission Meeting. Deliverable: Meeting minutes for each meeting. Task 8 - City Approval of Master Plan a) Consultant shall submit twelve (12) copies and one (1) electronic copy of the draft master plan for review and comment by City staff. b) Based upon comments received from the City, consultant will revise the draft master plan and resubmit twenty (20) copies. c) Staff approved master plan will be presented to the City Council as a study session item for review and comment and Community Services Commission Meeting. d) Consultant will make final changes and submit twenty (20) copies of the final version of the master plan. Consultant will provide electronic version compatible with existing City software. Exclusions: a) Construction Documents b) Architectural plans c) Grading and drainage plans d) Hydrology and drainage reports e) Lighting and electrical plans f) Structural engineering and calculations g) Geotechnical studies and pavement recommendations h) Splash Park mechanical, electrical, and plumbing plans i) Permitting j) Agencies fees k) Phase 2 or Phase 3 Environmental Audits l) Anything else not specifically included in the Scope of Services above STATEMENT OF QUALIFICATIONS j. - SCHEDULE 1 STATEMENT OF QUALIFICATIONS Below is the proposed schedule for the project. The In-Site team is willing to work with the City regarding the schedule to meet the City’s goals. PROPOSED SCHEDULE STATEMENT OF QUALIFICATIONS REFERENCES 2 STATEMENT OF QUALIFICATIONS Sports Ranch at Sommers Bend City of Temecula Stacy Fox, Park & Landscape Maintenance Supervisor In-Site staff: Completed: 41000 Main Street Tim Jachlewski 2016-2022 Temecula, CA 92590 Ron Moreno (951) 308-6306 Pat O’Connor Stacy.Fox@TemeculaCA.gov Alex Koutzoukis Santee Lakes Dynamic Vision Plan / Ph. I Park Project / Ph. 2 General Store Project Santee Lakes RecreaƟon Preserve Laura Koval, Director of Park and RecreaƟon 9310 Fanita Parkway In-Site staff: Completed: Santee, CA 92071 Tim Jachlewski 2015-2021 (619) 258-4617 Ron Moreno levans@padre.org Pat O’Connor County of San Diego Harvest Park at Park Circle Kerry Garza, President In-Site staff: Completed: 9909 Mira Mesa Boulevard, Suite 150 Tim Jachlewski 2014-2022 San Diego, CA 92131 Ron Moreno (858) 248-4951 Pat O’Connor kerry@touchstonecommuniƟes.com County of San Diego Parks and RecreaƟon Emmet Aquino, Park Project Manager 5500 Overland Avenue, Suite 410 San Diego, CA 92123 Email: Emmet.Aquino@sdcounty.ca.gov Cell: (619) 318-6929 The Griffin Club RecreaƟon Center In-Site staff: Completed: Decatur Advisors (Owner’s RepresentaƟve) Tim Jachlewski 2011-2014 ScoƩ McFerran P.O. Box 2016 Carlsbad, California 92018 (619) 818-3596 scoƩ.mcferran@decatur-advisors.com Sommers Bend (over 40 projects) City of Temecula In-Site staff: Completed: ScoƩ Cooper, Associate Planner II Tim Jachlewski 2016-2022 41000 Main Street Ron Moreno Temecula, CA 92590 Alex Koutzoukis (951) 506-5137 scoƩ.cooper@TemeculaCA.gov CLIENT REFERENCES See SecƟon 1 g. for Project DescripƟons STATEMENT OF QUALIFICATIONS CLIENT REFERENCES “I have worked with In-Site Landscape Architecture, Inc for the past 5 years on the Sommers Bend residenƟal development that includes over 460 acres, 1,506 residenƟal units spread over 22 planning areas, and a sports park. During both the enƟtlement and construcƟon documents period of the project In-Site has been organized, responsive, and has addressed comments that has kept the project moving forward with delay. In-Site has worked close with City Staff and the City’s landscape consultant to produce appealing street scenes, front yard landscap- ing, and HOA maintained areas that are of the highest quality” ScoƩ Cooper, Associate Planner II City of Temecula “Having designed over 30 parks, plan checked over 70 parks and built over 50 parks over the last 25 years, I can truly say, In-Site Landscape Architecture is the highest quality design firm in the industry. Their overall profession- alism is second to none. Great quality control, clear and legible accurate plans and expedient response Ɵmes is unparalleled. Their ability to balance quality architecture with funcƟonal sustainable park designs, without incur- ring unnecessary expenses, provide value to the end user. In-Site has set a standard in landscape architecture that few can compare to.” James PoƩer, Vice President, ConstrucƟon Division Adame Landscape, Inc. “As the lead landscape architect on design and implementaƟon at the Sommers Bend Master planned community, In-Site Landscape Architecture was instrumental in bringing the vision and needs of the client to reality. Their aƩenƟon to detail and ability to work seamlessly with all approval agencies and contractors lead to faster turna- round Ɵmes on plan check approvals and the client’s construcƟon schedule. The team offered cross funcƟonality at our development team meeƟngs with consultants and city that lead to being proacƟve to future issues that may have risen in the field. We are grateful to have In-Site involved in the design from the beginning to set the tone and look of the community that the residents will enjoy for years.” Trent Heiner, Senior Project Manager Woodside Homes Southern California Division “In Site was retained to be a key part of designing and construcƟng the Griffin Club in La Quinta, CA. Working with Tim and his team was a real joy. Their design and technical skills are second to none, and they consistently work to keep any detail from falling through the cracks. What a great addiƟon to the team.” ScoƩ McFerran, Owner’s RepresentaƟve Decatur Advisors LLC “The lion’s share of the Griffin Club design fell on In-Site. It was such a pleasure working with your company. That enƟre team was awesome and a truly unique experience in my career. You are one of our best consultants.” Larry Liebel, Project Manager Lennar “When interviewing companies to partner with us on our Dynamic Vision Plan (our 20-year Park and Campground Vision Plan), In-Site Landscape Architecture, Inc. was the unanimous pick due to their reputaƟon in the industry, quality work, and enthusiasƟc interest in our project. The In-Site team did not disappoint. Personally, it was a thrill to work with a team who understood vision planning and embraced exploring our Park's future through an innova- Ɵve lens.” Laura Evans, Director of Park and RecreaƟon Santee Lakes RecreaƟon Preserve STATEMENT OF QUALIFICATIONS “I would like to express my full support and unreserved recommendaƟon for In-Site Landscape Architecture. As co-lead designers of the Santa Rosa Plateau Ecological Reserve Visitor Center Improvement Project, they were instrumental in helping to enhance visitors’ experiences to the Reserve. With their experƟse in structural and public use design, a keen knowledge and appreciaƟon of educaƟonal/interpreƟve methods, and a personable and professional demeanor that was evident throughout the enƟre project, they made the venture both successful and fulfilling. I would highly recommend their organizaƟon and their skilled employees for any and all future projects.” Robert Hicks, Park Interpreter Riverside County Regional Park and Open-Space District “It has been a pleasure working with the team at In-Site Landscape Architecture, Inc. Together we have worked on some very high profile projects that demanded a sophisƟcated experƟse in land design. The professional staff at In -Site has been extremely aƩenƟve to our client's program requirements and have integrated seamlessly with our architectural team to produce highly successful and creaƟve landscape design soluƟons. Their contribuƟons at cli- ent meeƟngs and in the preparaƟon of presentaƟon materials is the most professional consulƟng experience I've encountered in my over 40 years of pracƟcing architecture.” Jake Schneider, AIA, CEO Schneider Architectural Services, PC Schneider Real Estate Services, LLC Schneider Development Services, LLC Schneider ConstrucƟon Services, LLC “We highly recommend working with In-Site Landscape Architecture. From park planning to parking lots, In-Site is a one stop shop for tasteful, pracƟcal and creaƟve design soluƟons for exterior land and streetscapes. They are able to understand the client’s big picture plan and execute it with the required details. Tim is easy to work with and really listens to his clients to find the best soluƟons.” Leslie Zemsky, Vice President Larkin Development Group “Adding In-site Landscape Architecture to our project team has be a truly great benefit to our firm, and our clients. Tim and his team brings stunning design and rendering imagery to the site and building exterior development of projects. In-site is our go to Landscape Architect firm.” Thomas R. Kujawa, AIA Schneider Architectural Services, PC “We have uƟlized In-Site and Tim Jachlewski before he formed In-Site for over 19 years. He is always creaƟve and reliable. Schedules and budgets on large projects are key elements in keeping Ɵmelines and project financial pro- jecƟons on plan. Beyond the numbers is the interacƟon with other consultants and most importantly the govern- ment agencies. In all areas In-Site has and conƟnues to excel. In the school of thought that a consultant doesn’t cost you but saves you money, we are fortunate to have the availability of their services.” Rob Honer, Principal and Wade Hall, Principal Ambient CommuniƟes “Thank you for your integrity and experƟse. Not only have you been a true pleasure to work with but the results are above and beyond expectaƟons. You have captured my vision.” Debera Nelson Fossanova Vineyards and Estate CLIENT REFERENCES STATEMENT OF QUALIFICATIONS CLIENT REFERENCES “It has been a pleasure to work with In-Site Landscape Architecture. They are the type of Firm that you can truly call a partner; they honor their commitments and are there to assist you every step of the way. I can truly tell you that having In-Site on the team helped the project move forward smoothly in the midst of some very tough chal- lenges. We look forward to working with In-Site again in the near future”. Samer K. Kawar, AIA, CDT, Associate / Lead Architect BCA Architects “The Rock Church and Academy Project was a 206,000 square-foot re-use of the exisƟng Naval Training Center. Tim was the Landscape Architect that took an original landscape concept that was prepared by a third party and completely redesigned the exterior component of the project so that it took on the same level of Biblical signifi- cance as the sanctuary and other key elements in the building design. We now have an exterior with a purpose. It does everything we wanted it to do and it serves as a beauƟful entry point into Liberty StaƟon as well. We are well pleased.” Miles McPherson, Senior Pastor Rock Church “I’ve worked with In-Site Landscape Architecture on Winery projects in the Temecula Wine Country. The firm has provided high quality experƟse and aƩenƟon to detail that has made our projects stand out from the rest. The company’s hands on approach and commitment to the success of the project are second to none.” Bradley Hay Hunsaker & Associates Engineers “My leadership team had the pleasure of working with In-Site Landscape Architecture to redesign our preschool playground. Tim also worked with our previous leadership to successfully design our Elementary and Upper School playgrounds. We found him to be a man of his word, conscious of meeƟng deadlines, and staying within our schools budgetary constraints. He and his staff have the knowledge and creaƟve ability to be cuƫng edge, while being mindful of student safety, and meeƟng or exceeding specific school building code requirements. We look forward to working with him in the near future.” ScoƩ Marshall, Headmaster Rock Academy “We knew we loved the locaƟon of our newly purchased building, but the property offered nothing aestheƟcally pleasing. In-Site Landscape Architecture, Inc. took the Ɵme to listen to our vision for the property and to under- stand our business. The result is a beauƟfully landscaped and serene outdoor area that supports our work with families and our love of nature. Our employees love to relax outdoors during breaks. Most importantly, however, this area created an extension of our usable space for entertaining clients and the women who help inferƟle fami- lies have babies. They even brought in some fun aspects for the children who oŌen visit. We highly recommend In-Site Landscape Architecture, Inc. as a company that values your vision and ideas while bringing in their own ex- perƟse to design and transform your property.” Darlene M. Pinkerton, Founder and CEO A Perfect Match, Inc., Allison Avenue Office Building “We worked with In-Site Landscape Architecture on two design/build proposals (schemaƟc phases) for Sharp Can- cer Center and Sharp Downtown Wellness Center and were very pleased with their commitment to the team and their creaƟvity. Tim has an excepƟonal ability to read an owner and transform that understanding into a beauƟful design while remaining vigilant of the budget.” Dennis J. Uthe, LEED AP, Hensel Phelps ConstrucƟon Co. STATEMENT OF QUALIFICATIONS STAFFING AND ORGANIZATION 3 * This informaƟon has already been included in SecƟon 1 g. - “Key Personnel and Resumes” STATEMENT OF QUALIFICATIONS SUBCONSULTANT SERVICES 4 In-Site Landscape Architecture, Inc. (In-Site) will provide the majority of the scope of services for the project. For the best interest of the project we also brought in Michael Baker InternaƟonal (MBI) with a local office in Palm Desert to provide topographic survey services and the CEQA approach for the project and Newline Skateparks (Newline) for skate park master planning. The following pages include their firm backgrounds. Firm Profile Established in 1940, Michael Baker International, Inc. (Michael Baker) is one of the largest planning, engineering, design and construction management firms in the nation. Our company has more than 3,500 professionals with local offices in Riverside, San Bernardino, Orange, San Diego, and Ventura Counties. The combined resources serve local, national and international markets, with the capability to provide a comprehensive range of services on a national scale for all sizes and categories of projects. Expertise includes civil, structural, mechanical, and electrical engineering; transportation and traffic engineering; water and wastewater engineering; planning, architecture and landscape architecture; environmental; survey/mapping; GIS; and construction management. Our work delivers differentiating innovations and dedicated experts who challenge the status quo and share a world of diverse experience and an impassioned entrepreneurial spirit. We deliver quality of life! Michael Baker is currently ranked #31 in the top 500 design firms in the nation by Engineering News Record (ENR). Services Michael Baker has provided civil engineering and related services for parks throughout the region. This has included the following:  Grading and Site Improvements  Structural Design  Water / Sewer Design  Stormwater / Drainage Design  Water Quality  Lighting and Electrical Design  Utility Coordination and Design  Landscape Architecture  Surveying  Environmental (environmental planning, permitting, compliance, and monitoring)  Construction Management and Support Representative Park Projects  Bonsall Community Park Project Bonsall, CA  Calavera Hills Community Park Gateway Improvements, Carlsbad, CA  Canyon Hills Community Park Lake Elsinore, CA  Ildica County Park San Diego County, CA  Irvine Regional Park Maintenance Building Replacement, Orange County, CA  Lincoln Acres Park Improvement San Diego County, CA  Malibu Bluffs Parkland Master Plan and EIR, Malibu, CA  Marblehead Coastal Development, 5 Parks and 4 miles of Public Trails San Clemente, CA  Martin Luther King, Jr. Park San Diego, CA  North Chollas Community Park Open Space Improvements, San Diego, CA  Peters Canyon Regional Park Orange County, CA  Prado Regional Park Master Plan Chino, CA  Salk Neighborhood Park and Joint Use Development, San Diego County, CA  Sweetwater Park, San Diego County, CA  Veterans Memorial Park Coachella, CA  Waterfront Park Improvements Project San Diego, CA  West Creek Park Rehabilitation Project Santa Clarita, CA 4 New Line Skateparks is committed to the improvement of natural and built environments for all generations. Our goal is to promote environ- mental quality as a way to protect what we value in our unique region. We carry this philosophy in any Skatepark development. Through lis- tening, watching and testing ideas, we create youth park solutions that work in harmony with existing environments and ultimately lead to fully integrated places. Plaza at the Forks, Winnipeg, MB New Line Skateparks (established 2001) is North America’s Premier Youth Park/Skatepark Development Firm. With over 350 highly recognized projects around the world, we are proud to serve as one of the Nation’s longest running and most experienced concrete youth multi-use park design-build teams. “The quality of the design is demonstrated by the international recognition the Plaza received from the skateboarding community. The Plaza at the Forks sets the bar for other cities throughout North America which are struggling to respond to similar issues.” CSLA Jury Comments Canadian Society of Landscape Architects National Honour Award Skateparks are changing. The days of the stereotypical ‘grey square’ have long passed as a new era of concrete facility design responds to far more than purely function. When designed and constructed with strong community input and sensitivity to the surrounding context, Skateparks not only become beloved destinations for local youth but celebrated public spaces for all to enjoy! “The Plaza at the Forks is proving to be one of the top skateboard facilities known to man. This project had the right decisions made from top to bottom: siting, budget, design and construction.” Chad Balcom, SPS Regional Director Skaters for Public Skateparks Public Space Award What We Believe We love what we do. When we engage a community in the development process we bring a professional, organized and fun attitude. The design journey is important and our approach is inclusive. We spare no resource to ensure youth and affected stakeholders truly become part of each project solution. Our staff is comprised of registered landscape architects, engineers, planning experts, and construction professionals who are passionate active skateboarders. This passion inspires us to deliver cutting edge designs and authentic finished environments that create a meaningful connection between youth and the communities in which they live. Let Us Introduce Ourselves FIRM PROFILE 5 Services... The Art of Shaping Space Master Planning and Feasibility Studies - NLS provides planning expertise to municipal governments for action sports networks as well as individual project developments. Through completing the award winning Calgary Skateboarding Amenities Strategy in 2012, as well as Skateboarding/Action Sports Master Plans for Lethbridge AB, Arlington TX, Port Coquitlam BC, and Waterloo ON, we have established a proven, transparent and credible planning process that has been widely recognized as a benchmark for our industry. Whether it be site selection, feasibility studies, fundraising programs, or long term facility development strategies, we strive to offer the best mix of qualified personnel and specialized resources for each unique planning challenge. Public Consultation - NLS provides comprehensive consultation services to facilitate community input in the design of Skateparks and other progressive public spaces. As passionate skateboarders and avid park users ourselves, we know how important participation by youth and other members of the community will be to the long term success of each project. No matter what project size, we deliver a tailored program of hands-on, interactive design workshops and public presentations facilitated by principal members of our team. Outside of our scheduled meetings, youth and other stakeholders are encouraged to continue to submit written comments, sketches, pictures etc. through our specially developed custom web portal for immediate and ongoing feedback. Overall, we believe engaging the community in a meaningful way is one of the most critical aspects of any Skatepark design journey and a key factor to our team’s continued success.1st design workshop - Portland, OR (Ed Benedict Skate Plaza) Pre-construction community info session - Edgewater, FL Callingwood Youth Park Concept Master Plan Edmonton, AB Site Selection Boards Brantford, ON City of Arlington Skatepark Master Plan Texas Recreation and Parks Society Planning Excellence Award 6 Construction - New Line Skateparks is one of North America’s most experienced providers of large-scale municipal Skatepark construction services - serving as the General Contractor on a significant portion of the 350 + designs completed by our team. Whether it be complete turnkey project solutions or specialty services/products, we are recognized as a global leader in the development of site-built concrete Skatepark construction technology and techniques. Our team has also worked hard to lead the industry in cost and schedule control, safety, and concrete quality accreditation - with a guarantee of construction budget certainty, on-time project performance, and ACI (American Concrete Institute) certified team members overseeing all shotcrete operations Finally, New Line Skateparks has been fully bonded and insured for over 18 years and employs approximately 30 dedicated field staff leading municipal Skatepark projects across the world. Design - NLS designs award winning municipal concrete Skateparks and other wheeled sport environments that continually set the bar for international Skatepark development. From day one, we have chosen to think outside the ‘concrete square’ by leading the industry in introducing a site and community- specific design approach, integrated art/sculptural installations, green/sustainable development initiatives, CPTED principles, innovative materials and aesthetic detailing, progressive lighting schemes, skateable donor recognition signage, and architecturally striking Skatepark roof structures. We believe that every project and community has a unique ‘story’ that can be told through authentic and enduring Skatepark architecture. To realize our unique designs, we take great pride in delivering photorealistic 3D facility modeling, animated project ‘fly-through’ experiences, and certified technical drawings to ensure complete project understanding and a thorough construction process for each park. Plaza at the Forks - Winnipeg, MB Chinook Winds Youth Park - Airdrie, AB NE Community Skatepark - Frisco, TX Chemainus Skatepark - Chemainus, BC Services... The Art of Shaping Space 7 New Line Skateparks Inc. has worked extensively in the planning, design and construction of concrete skateparks, pump tracks, BMX parks, mountain bike courses and other progressive ‘casual recreation’ facilities. Although this emerging area of recreation is not new, the participation levels associated with inline, BMX, mountain biking and skateboarding have climbed to exceptional levels over the last 18 years. The inclusion of ‘Action Sports’ in the planning process benefits the whole community by making children, youth and adults that participate in these activities feel valued. Developing a youth park strategy that includes action sports programs and facilities will introduce new experiences and challenges for a broad demographic that is often difficult to engage and/or overlooked in community parks planning. Developing a successful youth park design requires a consultant to think and act in a way that respects the desires of future park users. This respect must be balanced with an understanding of construction tolerances, safety standards, community needs, security, and budget. NLS has a diverse and qualified staff who consistently seek new ways to achieve the expectations of the target user group while setting realistic goals, limits and dead- lines. Youth Park Design Philosophy.... Vancouver Skate Plaza - CSLA Regional Honour Award Plaza at the Forks - Winnipeg, MB - CSLA National Honour Award / SPS Public Space Award Youth Park Design Philosophy... Youth Park Design Philosophy... Marina Park Skate Plaza - Thunder Bay, ON - Parks and Recreation Ontario Excellence in Design Award STATEMENT OF QUALIFICATIONS DISCLOSURES 5 In-Site Landscape Architecture, Inc. (In-Site) has no significant prior or ongoing agreement failure, any civil or criminal liƟgaƟon or invesƟgaƟon pending, which involved In-Site or in which In-Site has been judged guilty or liable within the last five (5) years. This affirmaƟvely states there is no negaƟve history. STATEMENT OF QUALIFICATIONS ACKNOWLEDGEMENT OF INSURANCE 6 In-Site Landscape Architecture, Inc. (In-Site), if selected, will provide the minimum insurance coverage and indemnificaƟon noted in Exhibits E and F, respecƟvely, of the City’s Professional Service Agreement included as AƩachment 1 of the RFP. ATTACHMENT 2 INSURANCE REQUIREMENTS ACKNOWLEDGEMENT Must be executed by proposer and submitted with the proposal I, ________________________________________ (name) hereby acknowledge and confirm that __________________________________ (name of company) has reviewed the City’s indemnification and minimum insurance requirements as listed in Exhibits E and F of the City’s Professional Services Agreement (Attachment 1); and declare that insurance certificates and endorsements verifying compliance will be provided if an agreement is awarded. I am _________________________________ of ______________________________, (Title)(Company) Commercial General Liability (at least as broad as ISO CG 0001) $1,000,000 (per occurrence); $2,000,000 (general aggregate) Must include the following endorsements: General Liability Additional Insured General Liability Primary and Noncontributory Commercial Auto Liability (at least as broad as ISO CA 0001) $1,000,000 (per accident) Personal Auto Declaration Page if applicable Errors and Omissions Liability $1,000,000 (per claim and aggregate) Worker’s Compensation (per statutory requirements) Must include the following endorsements: Worker’s Compensation Waiver of Subrogation Worker’s Compensation Declaration of Sole Proprietor if applicable Timothy Jachlewski Jr In-Site Landscape Architecture, Inc. President In-Site Landscape Architecture, Inc. STATEMENT OF QUALIFICATIONS NON COLLUSION AFFIDAVIT 7 See next page. ATTACHMENT 3 NON-COLLUSION AFFIDAVIT FORM Must be executed by proposer and submitted with the proposal I, ________________________________________ (name) hereby declare as follows: I am _________________________________ of ______________________________, (Title) (Company) the party making the foregoing proposal, that the proposal is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the proposal is genuine and not collusive or sham; that the proposer has not directly or indirectly induced or solicited any other proposer to put in a false or sham proposal, and has not directly or indirectly colluded, conspired, connived, or agreed with any proposer or anyone else to put in a sham proposal, or that anyone shall refrain from proposing; that the proposer has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the proposal price of the proposer or any other proposer, or to fix any overhead, profit, or cost element of the proposal price, or of that of any other proposer, or to secure any advantage against the public body awarding the agreement of anyone interested in the proposed agreement; that all statements contained in the proposal are true; and, further, that the proposer has not, directly or indirectly, submitted his or her proposal price or any breakdown thereof, or the contents thereof, or divulged information or data relative hereto, or paid, and will not pay, any fee to any corporation, partnership, company, association, organization, proposal depository, or to any member or agent thereof to effectuate a collusive or sham proposal. I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct. Proposer Signature: __________________________________________________ Proposer Name: __________________________________________________ Proposer Title: __________________________________________________ Company Name: __________________________________________________ Address: __________________________________________________ Timothy Jachlewski Jr President In-Site Landscape Architecture, Inc. Timothy Jachlewski Jr President In-Site Landscape Architecture, Inc. 2907 Shelter Island Drive #105-417 San Diego, CA 92106 STATEMENT OF QUALIFICATIONS ADDENDA ACKNOWLEDGEMENT 8 Not applicable. ATTACHMENT 4 ACKNOWLEDGEMENT OF RECEIPT OF ADDENDA Must be executed by proposer and submitted with the proposal; If no addenda has been issued, mark “N/A” under Addendum No. indicating Not Applicable and sign ADDENDUM NO.SIGNATURE INDICATING RECEIPT N/A