11-0867 (RC) Title 24BUILDING ENERGY ANALYSIS REPORT
DSD ,U 2 ?o',
ORR S�
IOR
S
PROJECT:
Burgers & Beer
79-815 Hwy 111, Suite 101
La Quinta, Ca 92253
Project Designer:
Robert H. Ricciardi
75-400 Gerald Ford Ste 115
Palm Desert, Ca 92211
(760) 408-1208
.Report Prepared by:
Tim Scott
Scott Design and Title 24, Inc,
77-085 Michigan Drive
Palm Desert,
Ca 92211
���CEIVEI�
DEC 0 5 2011 afi'O A.�1°�
CITY OF LA QUINTA
BY: BUILDING & SAFETY DEPT.
Job Number: APPROVED
FOR CONSTRUCTION
DATE BY
Date:
12/2/2011
The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is
authorized by the California Energy Commission for use with both the Residential and Nonresidential 2008 Building Energy Efficiency Standards.
• This program developed by EnergySoft, LLC — www.energysoft.com.
Ene Pro5.1 6 Ene Soft User Number. 6712 RunCode: 2011-12-02709:29:28 ID:
•
C]
TABLE OF CONTENTS
Cover Page
1
Table of Contents
2
Nonresidential Performance Title 24 Forms
3
Form ENV -MM Envelope Mandatory Measures
16
Form LTG -MM Lighting Mandatory Measures
17
Form MECH-MM Mechanical Mandatory Measures
18
HVAC System Heating and Cooling Loads Summary
19
Zone Load Summary
20
Room Load Summary
21
Room Heating Peak Loads
22
Room Cooling Peak Loads
23
Room Cooling Coil Loads
24
6;w 5.1 by EnergySoft Job Number: ID: User Number. 6712 :�:d
•
PERFORMANCE CERTIFICATE OF COMPLIANCE Part 1 of 3 PERF -1 C
Project Name
Date
Burgers & Beer '
1 12/2/2011
Project Address
Climate Zone
Total Cond. Floor Area
Addition Floor Area
79-815 Hwy 111, Suite 101 La Quinta
CA Climate Zone 15
7,580
0
GENERAL INFORMATION
Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Relocatable - indicate ❑ specific climate zone ❑ all climates
Phase of Construction: ❑ New Construction ❑ Addition ® Alteration
STATEMENT OF COMPLIANCE
This certificate of compliance lists the building features and specifications needed to
comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This
certificate applies only to a Building using the performance compliance approach.
The documentation author hereby certifies that the documentation is accurate and comijete.
Documentation Author
Name Tim Scott
Signature
Company Scott Design and Title 24, Inc,
Date 12./2/1011
Address 77 -085 -Michigan Drive
200-4780
Phone.
1(760)
City/State/Zip Palm Desert, Ca 92211 C�t� iv Z05 -tel ' 370&
The Principal Designer hereby certifies that the proposed building design represented in this set of
construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with
any other calculations submitted with this permit application. The proposed building has been designed to meet the energy
efficiency requirements contained in sections 110, 116 through 118, and 140 through 149 of Title 24, Part 6. Please
check one:
ENV. LTG. MECH.
I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to
❑ ❑ ❑ sign this document as the person responsible for its preparation; and that I am licensed in the State of
California as a civil engineer, mechanical engineer, electrical engineer, or I am a licensed architect.
I affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code by section
❑ ❑ ❑ 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed
contractor performing this work.
I affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document
❑ ❑ ❑ because it pertains to a structure or type of work described as exempt urs ant to Business and Professions
Code Sections 5537, 5538 and 6737.1.
Principal Envelope Designer
Name
Signatur
Company Envelope Compliance Not In The Scope Of This Document Date 2
2 { I
Address License # G 8�
City/State/Zip hone %60 Db
Principal Mechanical Designer
Name Tim Scott
Signature
Company Scott Design and Title 24, Inc. Date L ��
Address 77-085 Michigan Drive License #
City/State2ip Palm Desert Ca 92211 h0 (760) 200-4780
Principal Lighting Designer
F
Name Robert H. Ricciardi Architect
Signature k_t
Company Date
Robert H. Ricciardi 12
Address 75-400 Gerald Ford Ste 115 License # G
City/State2ip Palm Desert Ca 92211 Phone (760) 408-1208
INSTRUCTIONS TO APPLICANT COMPLIANCE & WORKSHEETS (check box if worksheets are included)
❑ ENV -1C Certificate of Compliance. Required on plans. m MECHAC Certificate of Compliance. Required on plans.
LTG -1C Certificate of Compliance. Required on plans. m MECH-2C Air/Water Side/Service Hot Water & Pool Requirements.
Im
m LTG -2C Lighting Controls Credit Worksheet. m MECH-3C Mechanical Ventilation and Reheat.
❑ LTG -3C Indoor Lighting Power Allowance. m MECH-5C Mechanical Equipment Details.
EnergyPro 5.1 by EnergySoft User Number: 6712 RunCode: 2011-12-02709:29:28 ID: Page 3 of 24
PERFORMANCE CERTIFICATE OF COMPLIANCE Part 2 of 3 PERF -1 C
41Project Name Date
Burgers & Beer 12/2/2011
ANNUAL TDV ENERGY USE SUMMARY kBtu/s ft- r
Standard Proposed Compliance
Energy Component Design Design Margin i---- ;--- - ---- - -i
Space Heating
Space Cooling
Indoor Fans
Heat Rejection
Pumps & Misc.
Domestic Hot Water
Lighting
Receptacle
Process
Process Lighting
TOTALS
0.15
0.10
0.05
261.33
231.85
29.48
81.86
81.86
0.00
0.00
0.00
0.00
0.00
0.00
0.00
82.35
77.96
4.39
74.72
107.88
-33.16
50.64
50.64
0.00
0.00
0.00
0.00
0.00
0.00
0.00
551.05
550.29
0.76
Percent better than Standard 0.1% 0.1 % excluding process)
BUILDING COMPLIES
GENERAL INFORMATION
Building Orientation (tM 270 deg Conditioned Floor Area 7.580 sqft.
Number of Stories 1 Unconditioned Floor Area o sqft.
Number of Systems 3 Conditioned Footprint Area 7,580 sqft.
Number of Zones 1 Natural Gas Available On Site Yes
Orientation Gross Area Glazing Area Glazing Ratio
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Total
Roof
(W
598
(N)
1,723
(E)
727
(S)
1,771
4,819
7,580
sqft.
sqft.
sqft.
sqft.
sqft.
sqft.
399
0
0
240
639
0
sgft.
sqft.
sqft.
sqft.
sqft.
sqft.
66.7%
0.0%
0.0%
13.6%
13.3
0.0 0�
Standard Proposed Prescriptive Values for
Prescriptive Lighting Power Density 1.200 W/sqft. 1.542 W/sqft. Comparison only. See
Prescriptive Envelope TDV Energy 208,3os 477,356 LTG -1C for allowed LPD.
Remarks:
•
Ener.gyPro 5.1 by EnerqySoft User Number.' 6712 RunCode: 2011-12-02709:29:28 ID: Pa e 4 of 24
•
1�
PERFORMANCE CERTIFICATE OF COMPLIANCE Part 3 of 3 PERF -1 C
Project Name
Burgers & Beer
Date
12/2/2011
ZONE INFORMATION
Floor Inst. Ctrl. Allowed LPD Proc.
Area LPD Credits Area Tailored Loads
System Name Zone Name Occupancy Type s ft. W/sf ' W/Sf 2 W/Sf s W/Sf ° W/Sf
HVAC Tenant Improvement Comp Bldg Restaurant 7,580 1.549 0.007
Notes: 1. See LTG -1C 2. See LTG -2C 3. See LTG -3C 4. See LTG -4C Items above require special documentation
items marked with asterisk, see LTG -1 -C by others) (by others
EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST
The local enforcement agency should pay special attention to the Items specified in this checklist. These Items require special written
justification and documentation, and special verification to be used with the performance approach. The local enforcement agency
determines the adequacy of the justifications, and may reject a building or design that otherwise complies based on the adequacy of the
special justification and documentation submitted.
The DHW System BCG3-100T360-8N is a non-NAECA large storage gas water heater. Verify DHW details.
The HVAC System HVAC includes Demand Control Ventilation per Standards Section 121.
The HVAC System HVAC incorporates HERS verified Duct Leakage. Target leakage is calculated and documented on the MECH-4-A.
The exceptional features listed in this performance approach application have specifically been reviewed. Adequate written justification and
documentation for their use have been provided by the applicant.
Authorized Signature or Stamp
EnergyPro 5.1 by EnergySoft User Number: 6712 RunCode: 2011-12-02T09:29:28 ID: Page 5 of 24
•
•
CERTIFICATE OF COMPLIANCE (Part 1 of 3) LTG -1 C
Project Name
Burgers & Beer
Date
1 12/212011
INDOOR LIGHTING SCHEDULE and FIELD INSPECTION ENERGY CHECKLIST
Installation Certificate, LTG -1- INST Retain a copy and verify form is completed and signed.)
Field Inspector ❑
Certificate of Acceptance, LTG -2A and LTG -3A Retain a copy and verify form is completed and signed.)
Field Inspector ❑
A separate Lighting Schedule Must Be Filled Out for Conditioned and Unconditioned Spaces Installed Lighting Power listed on
this Lighting Schedule is only for:
® CONDITIONED SPACE ❑ UNCONDITIONED SPACE
® The actual indoor lighting power listed below includes all installed permanent and portable lighting systems in accordance
with §146(a).
Only for offices: Up to the first 0.2 watts per square foot of portable lighting shall not be required to be included in the
® calculation of actual indoor lighting power density in accordance with the Exception to §146(a). All portable lighting in excess of
0.2 watts per square foot is totaled below.
Luminaire (Type, Lamps, Ballasts
Installed Watts
A
B
C
D
E
F
G
H
None
or
Item
Ta
Complete Luminaire Description+
(i.e, 3 lamp fluorescent troffer,
F32T8, one dimmable electronic ballasts
CL M
N
% E
3
How wattage
Was determined
`—
E E
z J
ti
X
;c
H m
5 3
Field
Ins actor,
CEC
Default
From
NA8
m
o
o ,
ij wo
Q I—
m
a m
a u
A1/A2
(3) 4 If Fluorescent T8
85.0
0
❑
12
1,020
❑ ❑
S
(3) 4 ft Fluorescent T8
85.0
®
❑
3
255
❑ ❑
C
(2) 4 ft Fluorescent T8
58.0
®
❑
5
290
❑ ❑
D
(2) 2 If Fluorescent T8
32.0
IZI
1 ❑
3
96
❑ 1 ❑
G
(1) 26w Compact Fluorescent
28.0
®
❑
11
3081
❑ ❑
H
50w Low Voltage Halogen
54.0
®
❑
15
810
❑ ❑
H -dl
50w Low Voltage Halogen
54.0
®
❑
6
324
❑ ❑
L
150w Low Voltage Halogen
54.0
®
❑
1 6
324
❑ ❑
Lill
50w Low Voltage Halogen
54.0
®
❑
4
216
❑ ❑
Track
8' Track Light
300.0
❑
®
27
8,100
❑ ❑
❑
❑
❑ ❑
❑
1 ❑
❑ ❑
❑
❑
❑ ❑
❑
❑
❑ ❑
❑
❑
❑ ❑
❑
❑
❑ ❑
❑
❑
❑ ❑
❑
❑
❑ ❑
b
❑
❑ ❑
❑
❑
❑ ❑
Installed Watts Page Total:
11,743
Building total number of pages:
Installed Watts Building Total
Sum of all pages)
11,743
Enter into LTG -1C Page 4 of 4
1. Wattage shall be determined according to Section 130 (d and e). Wattage shall be rating of light fixture, not rating of bulb.
2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary.
I
EnemyPro 5.1 by EnergySoft User Number: 6712 RunCode: 2011-12-02709:29:28 ID: Page 6 of 24
•
0
0
CERTIFICATE OF COMPLIANCE Part 2 of 3
LTG -1 C
Project Name
Burgers & Beer
Date
1 1212/2011
INDOOR LIGHTING SCHEDULE and FIELD INSPECTION ENERGY CHECKLIST
Fill in controls for all spaces: a) area controls, b) multi-level controls, c) manual daylighting controls for daylit areas > 250 fe,
automatic daylighting controls for daylit areas > 2,500 fe, d) shut-off controls, e) display lighting controls, f) tailored lighting controls —
general lighting controlled separately from display, ornamental and display case lighting and g) demand responsive automatic
controls for retail stores > 50,000 ftz, in accordance with Section 131.
MANDATORY LIGHTING CONTROLS — FIELD INSPECTION ENERGY CHECKLIST
Field
Ins actor
Number Special
Type/ Description of Units Location in Building Features
Pass
Fail
4(/ ❑
❑
❑
❑
❑
❑
❑
0
❑
a
❑
❑
❑
❑
0
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑.
❑
❑
❑
❑
❑
o
a
❑
❑
❑
o
❑
❑
❑
o
❑
❑
0
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
0
0
'SPECIAL FEATURES INSPECTION CHECKLIST See Page 2 of 4 of LTG -1C
The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written
justification and documentation, and special verification. The local enforcement agency determines the adequacy of the justification,
and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation
submitted.
Field Inspector's Notes or Discrepancies:
EnergyPro 5.1 by EnergySoft User Number: 6712 RunCode: 2011-12-02709:29:28 ID:
Page 7 of 24
•
•
CERTIFICATE OF COMPLIANCE Part 3 of 3 LTG -1C
Project Name
Date
Burgers & Beer 1
12/2/2011
CONDITIONED AND UNCONDITIONED SPACE LIGHTING MUST
NOT BE COMBINED FOR COMPLIANCE
Indoor Lighting Power for Conditioned S aces
Indoor Lighting Power for Unconditioned Spaces
Watts
Watts
Installed Lighting
11,743
Installed Lighting
0
from Conditioned LTG -1C, Page 2
from Unconditioned LTG -1C, Page 2
Lighting Control Credit _
56
Lighting Control Credit _
0
Conditioned Spaces from LTG -2C
Unconditioned Spaces from LTG -2C
Adjusted Installed
11687
Adjusted Installed =
0
Lighting Power
Lighting Power
Complies if Installed 5 Allowed
Complies if Installed:5 Allowed
Allowed Lighting Power
11687
Allowed Lighting Power
0
Conditioned Spaces from LTG -3C or PERF -1
Unconditioned Spaces from LTG -3C
Required Acceptance Tests
Designer:
This form is to be used by the designer and attached to the plans. Listed below is the acceptance test for the Lighting system,
LTG -2A and LTG -3A. The designer is required to check the acceptance tests and list all control devices serving the building or space
shall be certified as meeting the Acceptance Requirements for Code Compliance. If all the lighting system or control of a certain type
requires a test, list the different lighting and the number of systems. The NA7 Section in the Appendix of the Nonresidential
Reference Appendices Manual describes the test. Since this form will be part of the plans, completion of this section will allow the
responsible party to budget for the scope of work appropriately. Forms can be grouped by type of Luminaire controlled.
Enforcement Agency:
Systems Acceptance. Before Occupancy Permit is granted for a newly constructed building or space or when ever new lighting
system with controls is installed in the building or space shall be certified as meeting the Acceptance Requirements.
The LTG -2A and LTG -3A forms are not considered complete forms and are not to be accepted by the enforcement agency unless
the boxes are checked and/or filled and signed. In addition, a Certificate of Acceptance forms shall be submitted to the enforcement
agency that certifies plans, specifications, installation certificates, and operating and maintenance information meet the requirements
of §10-103(b) of Title 24 Part 6. The field inspector must receive the properly filled out and signed forms before the building can
receive final occupancy. A copy of the LTG -2A and LTG -3A for each different lighting luminaire control(s) must be provided to the
owner of the building for their records.
LTG -2A and
Luminaires Controlled
LTG -3A
Controls and
Sensors and
Number of
Automatic
Luminaires
Daylighting Controls
Equipment Re uirin Testing
Description
controlled
Location
Acceptance
Occ Sensor- Multi -Level
(1) 26w Compact Fluorescent
10
Tenant Improvement
m
Window Daylighting
50w Low Voltage Halogen
6
Tenant Improvement
m
Window Daylighting
50w Low Voltage Halogen
4
Tenant Improvement
El
❑
❑
❑
EnergyPro 5.1 by EnergySoh User Number: 6712 RunCode: 2011-12-02709:29:28 ID: Page 8 of 24
•
CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C
FIELD INSPECTION ENERGY CHECKLIST
Project Name
Burgers & Beer
Date
12/2/2011
Project Address
79-815 Hwy 111, Suite 101 La Quinta
Climate Zone
15
Total Cond. Floor Area
7,580
Addition Floor Area
0
GENERAL INFORMATION
Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Schools (Public School) ❑ Relocatable Public School Bldg. m Conditioned Spaces ❑ Unconditioned Spaces
affidavit
Phase of Construction: ❑ New Construction ❑ Addition ® Alteration
Approach of Compliance: ❑ Component 13 Overall Envelope TDV ❑ Unconditioned (file affidavit)
Energy
Front Orientation: N; E, S, W or in Degrees:
270 deg
HVAC SYSTEM DETAILS
FIELD INSPECTION ENERGY CHECKLIST
E ui menu
Inspection Criteria
Meets Criteria or Requirements
Pass Fail — Describe Reason
Item or System Tags
AC -1, RTU -1, HP -1
DHW Heater
❑ [3i.e.
Equipment T e3:
Gas Fired DHW Boiler
❑ ❑
Number of Systems
1
❑ ❑
Max Allowed Heating Capacity'
365,000 Btu/hr
❑ ❑
Minimum Heating Efficiency'
89%
❑ ❑
Max Allowed Cooling Capacity'
n/a
❑ ❑
Cooling Efficiency'
n/a
❑ ❑
Duct Location/ R -Value
n/a
❑ ❑
When duct testing is required, submit
MECH-4A & MECH-4-HERS
n/a
❑ ❑
Economizer
n/a
❑ ❑
Thermostat
n/a
❑ ❑
Fan Control
n/a
❑ ❑
E ui menu
Inspection Criteria
FIELD INSPECTION ENERGY CHECKLIST
Pass Fail — Describe Reason 2_
Item or System Tags
i.e. AC -1, RTU -1, HP -1
HVAC
❑ ❑
Equipment T e3:
Packaged DX
❑ ❑
Number of Systems
3
❑ ❑
Max Allowed Heating Capacity'
142,000 Btu/hr
❑ ❑
Minimum Heating Efficiency'
3.20 COP
❑ ❑
Max Allowed Cooling Capacity'
147, 000 Btu/hr
❑ ❑
Cooling Efficiency'
10.6 EER
❑ ❑
Duct Location/ R -Value
Conditioned / 0.0
❑ ❑
When duct testing is required, submit
MECH-4A & MECH-4-HERS
Yes
❑ ❑
Economizer
Diff. Temp (Integrated)
❑ ❑
Thermostat
Setback Required
❑ ❑
Fan Control
Constant Volume
❑ ❑
1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked.
3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other.
EnergyPro 5.1 by EnergySoft User Number. 6712 RunCode: 2011-12-02709:29:28 ID: Page 9 of 24
0
•
L�
CERTIFICATE OF COMPLIANCE and (Part 2 of 4) MECH-1 C I
FIELD INSPECTION ENERGY CHECKLIST
Burgers & Beer
12/2/2011
EnemyPro 5.1 by EnerpySoR User Number., 6712 RunCode: 2011-12-02709:29:28 ID: Pape 10 or 24
•
•
•
LIGHTING CONTROLS CREDIT WORKSHEET Part 1 of 2
LTG -2C
Project Name
Burgers & Beer
Date
1 12/212011
POWER ADJUSTMENT FACTORS PAF FOR NON -DAYLIGHT CONTROLS
A Separate PAF Worksheet Must Be Filled Out for Conditioned and Unconditioned Spaces. Control Credits listed on this
schedule are only for:
I21 CONDITIONED SPACES O UNCONDITIONED SPACES
A B C D E F
G
Watts of Power
Room # Zone ID Plan Room Area Control Adjustments
Areas Lighting Control Description' Reference fiz Lighting Factor'
Control
Credit Watts
E x F
Tenant Improvemej Occ Sensor- Multi -Level G 7,580 280 0.20 56
PAGE TOTAL 56
Note:
Conditioned and
Unconditioned
Space shall be
separately
totaled
Building total of non -daylight control credit watts for all pages of LTG -2C Pae 1 of 2
Enter building total of all daylight controls credit watts from LTG -2C Page 2 of 2 0
BUILDING TOTAL OF ALL CONTROL CREDIT WATTS
(FOR BOTH NON -DAYLIGHT AND DAYLIGHT CONTROL CREDITS) 56
Enter in LTG -1C; Page 4: Lighting Control Credit as appropriate for CONDITIONED
or UNCONDITIONED Spaces
1. Description shall be consistent with Type of Control defined in Table 146-C
2. Power Adjustment Factor taken from Table 146-C
EnergyPro5lbyEnergySoft User Number. 6712 RunCode: 2011-12-02709:29:28 ID:
Pae 11 of 24
•
•
AIR SYSTEM REQUIREMENTS
Part 1 of 2 MECH-2C
Project Name
Date
Burgers & Beer
12/212011
Indicate
Air Systems Type Central, Single Zone, Package, VAV, or etc...
Item or System Tags
i.e. AC -1, RTU -1, HP-1)HVAC
Number of Systems
3
Indicate Pa a Reference on Plans or Schedule and indicate the applicable exception(s)
MANDATORY MEASURES
T-24 Sections
Heating Equipment Efficiency
112 a
3.20 COP
Cooling Equipment Efficiency
112 a
10.6 EER
HVAC Heat Pump Thermostat
112(b), 112(c)
Yes
Furnace Controls/Thermostat
112 c,'115 a
n/a
Natural Ventilation
121 b
Yes
Mechanical Ventilation
121 b
2,978cfm
VAV Minimum Position Control
121 c
No
Demand Control Ventilation
121 c
Yes
Time Control
t22(e)
Programmable Switch
Setback and Setup Control
122(e)
Setback Required
Outdoor Damper Control
122(f)
Auto
Isolation Zones
1 22
n/a
Pipe Insulation
123
Duct Location/ R -value
124
Conditioned/0.0
PRESCRIPTIVE MEASURES
Calculated Design Heating Load
144 a
n/a
Proposed Heating Capacity
144 a tb
266,068 Btu/hr
Calculated Design Cooling Load
144 a
n/a
Proposed Cooling Capacity
144(a & b
327,400 Btu/hr
Fan Control
144(c)
Constant Volume
DP Sensor Location
144(c)
Supply Pressure Reset (DDC only)
144(c)
Yes
Simultaneous Heat/Cool
144(d)
No
Economizer
144(e)
Diff. Temp (Integrated)
Heat Air Supply Reset
144(f)
Constant Temp
Cool Air Supply Reset
144(f)
Constant Temp
Electric Resistance Heating'
144
Air Cooled Chiller Limitation
144 i
'
Duct Leakage Sealing. If Yes, a
Yes
MECH-4-A must be submitted
144(k)
1. Total installed capacity (MBtu/hr)
of all electric heat
on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used
explain which exception(s) to §144(g) apply.
EnergyPro 5.1 by EnergySoft User Number: 6712
RunCode: 2011-12-02T09:29:28 ID: Pae 12 of 24
•
•
•
WATER SIDE SYSTEM REQUIREMENTS Part 2 of 2 MECH-2C
Project Name
Date
Burgers & Beer
1 12/2/2011
WATER SIDE SYSTEMS: Chillers, Towers, Boilers, H dronic Loops
Item or System Tags
(i.e. AC -1, RTU -1, HP -1)'
Number of Systems
Indicate Page Reference on Plans or Specification 2
MANDATORY MEASURES T-24 Sections
Equipment Efficiency 112 a
Pipe Insulation 123
PRESCRIPTIVE MEASURES
Cooling Tower Fan Controls 144(a & b
Cooling Tower Flow Controls 144(h)
Variable Flow System Design 144(h)
Chiller and Boiler Isolation 144(i)
CHW and HHW Reset Controls 144 0)
WLHP Isolation Valves 144'
VSD on CHW, CW & WLHP Pumps>5HP 144(j)
DP Sensor Location 144 0)
1. The proposed equipment need to match the building plans schedule or specifications. If a requirement is not applicable, put "N/A" in the column
next to applicable section.
2. For each chiller, cooling tower, boiler, and hydronic loop (or groups of similar equipment) fill in the reference to sheet number and/or specification
section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" in the column next to
applicable section.
Service Hot Water Pool Heating
Item or System Tags
DHWHeater
(i.e. WH -1, WHP, DHW, etc...)'
Number of Systems 1
Indicate Page Reference on Plans or Schedule
MANDATORY MEASURES T-24 Sections
SERVICE HOT WATER
Certified Water Heater 111, 113(a) BCG3-100T360-8N
Water Heater Efficiency 113(b) 89%
Service Water Heating Installation 113(c) Controls Req.
Pipe Insulation 123 Required
POOL AND SPA
Pool and Spa Efficiency and Control 114(a) n/a
Pool and Spa Installation 114 b n/a
Pool Heater — No Pilot Light 115(c) n/a
Spa Heater — No Pilot Light 115(d) n/a
Pipe Insulation 123 n/a
1. The Proposed equipment needs to match the building plans schedule or specifications. If a requirement is not applicable, put "WA" in the column
next to applicable section.
2. For each water heater, pool heater and domestic water loop (or groups of similar equipment) fill in the reference to sheet number and/or
specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" in the
column.
Ene KPro 5.1 by EnergySoft User Number.- 6712 RunCode: 2011-12-02709:29:28 ID: Pae 13 of 24
•
MECHANICAL VENTILATION AND REHEAT MECH-3C
Project Name
Burgers & Beer
Date
12/212011
MECHANICAL VENTILATION 121 b 2 REHEAT LIMITATION (§144(d))
AREA BASIS OCCUPANCY BASIS VAV MINIMUM
A
B
C
D E
F
G H
I J
K
L
M N
Zone/System
Condition
Area
ft2
CFM
per
ft2
Min CFM Number
By Area Of
B X C People
CFM
per
Person
Min CFM REO'D
by V.A.
Occupant Max of
E X F D or G
Design 50% of
Ventilation Design Zone
Air Supply
CFM CFM
B X 0.4
CFM / ft2
Max. of
Columns
H, J, K,
300 CFM
Design
Minimum
Air Transfer
Setpoint Air
Tenant Improvement
7,580
0.38
2,880
2,880
2,978
HVAC
Total 2,880
2,978
Totals Column I Total Design Ventilation Air
C Minimum ventilation rate per Section 121, Table 121-A.
E Based on fixed seat or the greater of the expected number of occupants and 50% of the CBC occupant load foregress purposes fors aces without fixed seating.
H Required Ventilation Air REO'D V.A. is the larger of the ventilation rates calculated on an AREA BASIS or OCCUPANCY BASIS Column D or G).
I Must be greater than orequal to H, or use Transfer Air column N to make up the difference.
J Design fan supply CFM Fan CFM x 50%• or the design zone outdoor airflow rate per 121.
K Condition area ft2 x 0.4 CFM / ft2; or
L Maximum of Columns H, J, K, or 300 CFM
M This must be less than orequal to Column L and greater than or equal to the sum of Columns H plus N.
N Transfer Air must be provided where the Required Ventilation Air (Column H) is greater than the Design Minimum Air (Column M). Where required, transfer air must be greater than or
equal to the difference between the Required Ventilation Air Column H and the Design Minimum Air Column M), Column H minus M.
EnerqyPro 5.1 by EnergySoft User Number., 6712 Run Code: 2011-12-02TO9:29:28 ID: Pae 14 of 24
0 0 0
MECHANICAL EQUIPMENT DETAILS
Part 1 of 2 MECH-5C
Project Name
Burgers & Beer
Date
12/212011
CHILLER AND TOWER SUMMARY
PUMPS
E ui ment Name Type
Oty. Efficiency Tons
. Pump
oty. GPM BHP Control
DHW / BOILER SUMMARY
System Name Type
Vol.
Distribution Oty. Rated Input (Gals).
Energy Factor Standby Loss Tank Ext.
or RE or Pilot R -Value Status
BCG3-100T360-8N Large Gas
Recirc/rime+Temp 1 365,000 85
0.89. 1.91 % 0.0 New
MULTI -FAMILY CENTRAL WATER HEATING DETAILS
Hot Water Pump
Hot Water PIping Length ft
Control Ot . HP
Type
In Plenum Outside Buried I Add 1/2" Insulation
CENTRAL SYSTEM RATINGS
HEATING
COOLING
System Name Type
O Output Aux. kW Eff iclency
Output Eff iclency Status
Carrier 50HJQ014 Packaged DX
3 142,000 0.0 3.20 COP 147,000 10.6 EER Existing
CENTRAL SYSTEM FAN SUMMARY
SUPPLY FAN RETURN FAN
System Name Fan Type
Economizer Type
CFM BHP CFM BHP
Carrier 50HJQ014 Constant Volume
Diff. Tem (Integrated)
5,000 2.50 none
Ene Pro 5.1 6 Ene Soff User Number. 6712
RunCode: 2011-12-02709:29:28
ID: Pae 15 of 24
•
0
0
ENVELOPE MANDATORY MEASURES: NONRESIDENTIAL ENV -MM
Project Name
Date
Burgers & Beer
1 ZW2011
DESCRIPTION
Building Envelope Measures:
§118(a): Installed insulating material shall have been certified by the manufacturer to comply with the California Quality
Standards for insulating material, Title 20 Chapter 4, Article 3.
§118(c): All Insulating Materials shall be installed in compliance with the flame spread rating and smoke density requirements of
Sections 2602 and 707 of Title 24, Part 2.
§118(f): The opaque portions of framed demising walls in nonresidential buildings shall have insulation with an installed R -value
of no less than R-13 between framing members.
§117(a): All Exterior Joints and openings in the building that are observable sources of air leakage shall be caulked, gasketed,
weatherstripped or otherwise sealed.
Manufactured fenestration products and exterior doors shall have air infiltration rates not exceeding 0.3 cfm/ft.2 of
§116(a) 1: window area, 0.3 cfm/ft.2 of door area for residential doors, 0.3 cfm/ft.2 of door area for nonresidential single doors
(swingingand sliding),and 1.0 cfm/ft.2 for nonresidential double doors swin in .
§116(a) 2: Fenestration U -factor shall be rated in accordance with NFRC 100, or the applicable default U -factor.
Fenestration SHGC shall be rated in accordance with NFRC 200, or NFRC 100 for site -built fenestration, or the
§116(a) 3:
applicable default SHGC.
§116(b): Site Constructed Doors, Windows and Skylights shall be caulked between the unit and the building, and shall be
weatherstripped (except for unframed glass doors and fire doors).
Ene Pro 5.1 b Ene Soft User Number. 6712 RunCode: 2011-12-02709:29:28 /D: Pae 16 of 24
•
•
•
LIGHTING MANDATORY MEASURES: NONRESIDENTIAL LTG -MM
Project Name
Date
Burgers & Beer
12/2/2011
Indoor Lighting
Measures:
§131(d): Shut-off Controls
For every floor, all interior lighting systems shall be equipped with a separate automatic control to shut off the lighting.
1.
This automatic control shall meet the requirements of Section 119 and may be an occupancy sensor, automatic time
switch, or other device capable of automatically shutting off the lighting.
2
Override for Building Lighting Shut-off: The automatic building shut-off system is provided with a manual, accessible
override switch in sight of the lights. The area of override is not to exceed 5,000 square feet.
§119(h):
Automatic Control Devices Certified: All automatic control devices specified are certified, all alternate equipment shall
be certified and installed as directed by the manufacturer.
§111:
Fluorescent Ballast and Luminaires Certified: All fluorescent fixtures specified for the project are certified and listed in the
Directory. All installed fixtures shall be certified.
§131(a):
Individual Room/Area Controls: Each room and area in this building is equipped with a separate switch or occupancy
sensor device for each area with floor -to -ceiling walls.
Uniform Reduction for Individual Rooms: All rooms and areas greater than 100 square feet and more than 0.8 watts
§131(b):
-per square foot of lighting load shall be controlled with bi-level switching for uniform reduction of lighting within the
room.
Daylight Area Control: All rooms with windows and skylights that are greater than 250 square feet and that allow for
§131(c):
the effective use of daylight in the area shall have 50% of the lamps in each daylit area controlled by a separate switch;
or the effective use of daylight cannot be accomplished because the windows are continuously shaded by a building on
the adjacent lot. Diagram of shading during different times of the year is included on plans.
§131(c):
Display Lighting. Display lighting shall be separately switched on circuits that are 20 amps or less.6.
Outdoor Lighling LightingMeasures:
§130(c)1:
Mandatory lighting power determination for medium base sockets without permanently installed ballasts
§132(a):
All permanently installed luminaires with lamps rated over 100 Watts either have a lamp efficacy of at least 60 lumens
per Watt or are controlled by a motion sensor.
§132(b):
All Luminaires with lamps rated greater than 175 Watts in hardscape area, including parking lots, building entrances,
canopies, and all outdoor sales areas meet the Cutoff Requirements.
§132(c)1:
All permanently installed outdoor lighting meets the control requirements listed.
§132(c):
Building facades, parking lots, garages, canopies, and outdoor sales areas meet the Multi -Level Lighting Requirements
listed.
EnergyPro 5.1 by EnergySoft User Number: 6712 RunCode: 2011-12-02709:29:28 ID: Pae 17 of 24
•
•
MECHANICAL MANDATORY MEASURES: NONRESIDENTIAL MECH-MM
Project Name
Date
Burgers & Beer
12/2/2011
Equipment and System Efficiencies
§111:
Any appliance for which there is a California standard established in the Appliance Efficiency Regulations will comply
with the applicable standard.
§115(a):
Fan type central furnaces shall not have a pilot light.
§123:
Piping, except that conveying fluids at temperatures between 60 and 105 degrees Fahrenheit, or within HVAC
equipment, shall be insulated in accordance with Standards Section 123.
§124:
Air handling duct systems shall be installed and insulated in compliance with Sections 601, 602, 603, 604, and 605 of
the CMC Standards.
Controls
§122(e):
Each space conditioning system shall be installed with one of the following:
1A.
Each space conditioning system serving building types such as offices and manufacturing facilities (and all others not
explicitly exempt from the requirements of Section 112 (d)) shall be installed with an automatic time switch with an
accessible manual override that allows operation of the system during off -hours for up to 4 hours. The time switch
shall be capable of programming different schedules for weekdays and weekends and have program backup
capabilities that prevent the loss of the device's program and time setting for at least 10 hours if power is interrupted; or
1 B.
An occupancy sensor to control the operating period of the system; or
1C.
A 4 -hour timer that can be manually operated to control the operating period of the system.
Each space conditioning system shall be installed with controls that temporarily restart and temporarily operate the
2
system as required to maintain a setback heating and/or a setup cooling thermostat setpoint.
Each space conditioning system serving multiple zones.with a combined conditioned floor area more than 25,000
square feet shall be provided with isolation zones. Each zone: shall not exceed 25,000 square feet; shall be provided
§122(g).
with isolation devices, such as valves or dampers that allow the supply of heating or cooling to be setback or shut off
independently of other isolation areas; and shall be controlled by a time control device as described above.
Thermostats shall have numeric setpoints in degrees Fahrenheit (F) and adjustable setpoint stops accessible only to
§122(c):
authorized personnel.
Heat pumps shall be installed with controls to prevent electric resistance supplementary heater operation when the
§122(b):
heating load can be met by the heat pump alone
Each space conditioning system shall be controlled by an individual thermostat that responds to temperature within the
zone. Where used to control heating, the control shall be adjustable down to 55 degrees F or lower. For cooling, the
§122(a&b):
control shall be adjustable up to 85 degrees F or higher. Where used for both heating and cooling, the control shall be
capable of providing a deadband of at least 5 degrees F within which the supply of heating and cooling is shut off or
reduced to a minimum.
Ventilation
§121(e):
Controls shall be provided to allow outside air dampers or devices to be operated at the ventilation rates as specified
on these plans.
All gravity ventilating systems shall be provided with automatic or readily accessible manually operated dampers in all
§122(f):
openings to the outside, except for combustion air openings.
Ventilation System Acceptance. Before an occupancy permit is granted for a newly constructed building or space, or a
§121(f):
new ventilating system serving a building or space is operated for normal use, all ventilation systems serving the
building ors ace shall be certified as meeting the Acceptance Requirements for Code Compliance
Service Water Heating Systems
§113(c)
Installation
3.
Temperature controls for public lavatories. The controls shall limit the outlet Temperature to 110° F.
2
Circulating service water -heating systems shall have a control capable of automatically turning off the circulating pump
when hot water is not required.
EnergyPro 5.1 by EnergySoft User Number: 6712 RunCode: 2011-12-02T09:29:28 ID: Pae 18 of 24
HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
Project Name
Burgers & Beer
Date
12/2/2011
System Name
HVAC
Floor Area
7,580
ENGINEERING CHECKS
SYSTEM LOAD
Number of Systems
3
COIL
CFM
Total Room Loads 18,605
Return Vented Lighting
Return Air Ducts
Return Fan
Ventilation 2,978
Supply Fan
Supply Air Ducts
TOTAL SYSTEM LOAD 1
COOLING PEAK
Sensible
245,061
0
12,253
0
105,317
0
12,253
374,883
COIL HTG.
Latent CFM
91,498 2,485
-11,1651 2,978
80,333
PEAK
Heating System
Sensible
Output perSystem 142,000
104,894
Total Output Btuh 426,000
Output Btuh/s ft 56.2
5,245
Cooling System
0
Output perS tem 147,000
138,399
Total Output Btuh 441,000
0
Total Output ons 36.8
5,245
Total Output Stuh/s ft 58.2
Total Output s ft/Ton 206.31
253,783
Air System
CFM perSystem
5,000
HVAC EQUIPMENT SELECTION
Airflow cfm
15,000
Carrier 50HJ0014
327,400
109,213
266,068
Airflow cfm/s ft
1.98
1 266,068
F.Jan 1 AM
Airflow cfm/Ton 408.2
Outside Air % 19.9%
Total Adjusted System Output 1 327,400
(Adjusted for Peak Design conditions)
TIME OF SYSTEM PEAK
109,213
Aug 3 PM
Outside Air cfm/s ft 0.39
Note: values above given at ARI conditions
HEATING SYSTEM PSYCHROMETRICS
Airstream Temperatures at Time of Heating
Peak
26 OF 61 OF
Outside Air
2,978 ch, Supply Fan
15,000 cfm
70 OF
61 OF 110 OF
Heating Coil
,
110 °F
ROM
70 OF
COOLING SYSTEM PSYCHROMETICS Airstream Temperatures at Time of Cooling Peak
112 / 78 OF 85171 OF 85 / 72 OF 65 / 64 OF
10 0
Outside Air
2,978 cfm Supply Fan Cooling Coil
15,000 cfm
79 / 70 OF
66 / 64 OF
66.1% ROOM
78/ 70 OF
EnergyPro 5.1 by EnergySoft
User Number.- 6712 RunCode: 2011-12-02709:29:28
ID:
Page 19 of 24
ZONE •SUMMARY
Project
Burgerste
-
..
System Name
iHV•
..
:0
ZONE LOAD SUMMARY
COOLINGZONAL SYSTEM
(BLOCK LOAD)
1-71 v
•
•
•
ROOM LOAD SUMMARY
Project Name Date
Burgers & Beer 12/2/2011
System Name Floor Area
HVAC 7,580
ROOM LOAD SUMMARY
ROOM COOLING PEAK COIL COOLING PEAK I COIL HTG. PEAK
Zone Name Room Name Mult. CFM Sensible Latent CFM Sensible Latent CFM Sensible
Tenant Improvement Tenant Improvement 1 18,653 245,696 91,526 18,605 245,061 91,498 2,485 104,894
1 ' Total includes ventilation load
PAGE TOTAL
TOTAL`
18,605
245,061
91,498
2,485
104,894
18,605
245, 061
91,4981
2,4851
104, 894
•
r�
r�
ROOM HEATING PEAK LOADS
Project Name
Date
Burgers & Beer
12/2/2011
ROOM INFORMATION
DESIGN CONDITIONS
Room Name Tenant Improvement
Time of Peak
Jan 1 AM
Floor Area 7,580.0 ftz
Outdoor Dry Bulb Temperature
26 OF
Indoor Dry Bulb Temperature 70 OF
Conduction Area
U -Value
AT °F
Btu/hr
Default Roof 1978 to Present 7,580.0
X 0.0420
X
44 =
14,008
R-13 Partition Wall 1,723.0
X 0.1020
X
44 =
7,733
8" Solid Grout CMU Wall 2,457.1
X 0.1020
X
44 =
11,027
Double Metal Tinted 638.9
X 0.7100
X
44 =
19,959
Slab -On -Grade psrim = 427.0
X 0.7300
X
44 =
13,715
X
X
o
X
X
=
X
X
=
X
X
=
X
X
=
X
X
=
X
X
=
X
X
=
X
X
=
X
X
=
X
X
=
X
X
=
X
X
=
X
X
=
X
X
=
X
X
=
X
X
=
X
X
=
X
X
=
X
X
=
X
X
=
X
X
=
X
X
=
X
X
=
X
X
=
X
X
=
Items shown with an asterisk (') denote conduction through an interior surface to another room
Page TotalF
66,443
i
Infiltration:[ 1.00 X 1.064 X 7,580 X 13.00 X 0.500
/60] X 44
= 38,452
Schedule Air Sensible Area
Ceiling Height ACH
AT
Fraction
TOTAL HOURLY HEAT LOSS FOR ROOM
104 894
Energ Pro 5.1 by Energ Soft User Number: 6712 RunCode: 2011-12-02709:29:28
ID:
Page 22 of 24
•
•
ROOM COOLING PEAK LOADS I
rroleot rvarne
Burgers & Beer
12/2/2011
ROOM INFORMATION
X
X
X
X
X
X
X
X
X
DESIGN CONDITIONS
X
X
X
X
X
X
X
X
X
0.668
Room Name
Tenant Improvement
Time of Peak
35
Aug 4 PM
Floor Area
7,580.0 ft'
Outdoor Dry Bulb Temperature
0.668
111 OF
Indoor Dry Bulb Temperature
78 OF
Outdoor Wet Bulb Temperature
261
78 OF
Conduction
Area
U -Value
DETD'
261
Btu/hr
Default Roof 1978 to Present
7,580.0 X 0.0420
X
49.5 =
15,758
R-13 Partition Wall
1,723.0 X 0.1020
X
31.4 =
5,514
8" Solid Grout CMU Wall
727.0 X 0.1020
X
33.5 =
2,482
8" Solid Grout CMU Wall
1,531.0 X 0.1020
X
35.7 =
5,581
Double Metal Tinted
494.0 X 0.7100
X
23.8 =
8,350
8" Solid Grout CMU Wall
199.1
X 0.1020
X
54.8 =
1,113
Double Metal Tinted
63.6 X 0.7100
X
23.8 =
1,075
Double Metal Tinted
81.3 X 0.7100
X
23.8 =
1,374
X
X
I =
Page Total
1. Design Equivalent Temperature Difference (DETD)
Items shown with an asterisk (•) denote conduction through an interior surface to another room.
Weighting
Solar Gain Orientation Area SGF Sc Factor
Window
Window
Window
Window
Window
Window
Window
Window
Window
1 41,2471
80.0
80.0
X
X
X
X
X
X
X
X
X
35
X
X
X
X
X
X
X
X
X
0.668
X
X
X
X
X
X
X
X
X
1.821
=
=
=
=
=
=
=
=
=
35
0.668
1.821
80.0
127.0
31.8
65.0
16.3
127.0
31.81
35
0.668
1.821
261
0.668
0.434
261
0.668
0.434
261
0.668
0.434
261
0.668
0.434
261
0.668
0.434
261
0.668
0.434
Page Total L
Sched. Weighting
Internal Gain Frac. Area Heat Gain Factor
Lights 1.00 X 7,580 X 1.549 Watts/Sgft X 3.413 Btu/Watt X 0.999 =
Occupants 1.00 X 7,580 X 300 Btu/occ. / 28 Sqft/occ. X 1.000 =
Receptacle 1.00 X 7,580 X 0.500 Watts/Sgft X 3.413 Btu/Watt X 1.000 =
Process 1.00 X 7,580 X 0.000 Watts/Sgft X 3.413 Btu/Watt X 1.000 =
Process Ughting 1 1.00 X 1 7,580 X 1 0.000 Watts/Sgft X 3.413 BtuMlatt X 1 0.000 =
Infiltration:[ 1.00 X 1.064 X 7,580 X 13.00 X 0.50 / 60 ] X 34 =
Schedule Air Sensible Area Ceiling Height ACH AT
TOTAL HOURLY SENSIBLE
Latent Gain Frac. Area Heat Gain
Occupants 1.00 X 7,580 X 300 Btuh/occ. / 28 Sgtt/occ. =
Receptacle 1.00 X 7,580 X o.000 Watts/Sgft X 3.413 Btu/Watt =
Process 1.00 X 7,580 X 0.000 Watts/Sgft X 3.413 Btu/Watt =
Btu/hr
3,446
3,446
3,446
9,617
Z408
1,234
9,617
2,408
40,543
Whr
40,044
81,214
12,935
0
0
29, 713
Btu/hr
81,214
0
0
Infiltration:[ 1.00 X 4,771 X 7,580 X 13.00 X 0.50 /60] X 0.00263 = 10,311
Schedule Air Sensible Area Ceiling Height ACH AW
Fraction
TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 91,526
EnergyPro 5.1 by EnergySoft User Number. 6712 RunCode: 2011-12-02709:29:28 ID: Page 23 of 24
•
011
ROOM COOLING COIL LOADS
Project Name Date
Burgers & Beer 12/2/2011
ROOM INFORMATION
0.0420
DESIGN CONDITIONS
56.8
Room Name
Tenant Improvement
Time of Peak
Aug 3 PM
Floor Area
7,580.0 ft'
Outdoor Dry Bulb Temperature
112 OF
Indoor Dry Bulb Temperature
78 OF
Outdoor Wet Bulb Temperature
78 OF
Conduction
Area
U -Value DETD'
Btu/hr
Default Roof 1978 to Present
R-13 Partition Wall
8" Solid Grout CMU Wall
8" Solid Grout CMU Wall
Double Metal Tinted
8" Solid Grout CMU Wall
Double Metal Tinted
Double Metal Tinted
Double Metal Tinted
Page Total
1. Design Equivalent Temperature Difference (DETD)
Items shown with an asterisk (') denote conduction through an interior surface to another room.
Weighting
Snlar Gain Orientation Area SGF SC Factor
7,580.0
1,723.0
727.0
1,531.0
240.0
199.1
254.0
79.9
65.0
X
)(
X
X
X
X
X
X
X
0.0420
X
X
X
X
X
X
X
X
X
56.8
=
=
=
0.1020
32.8
0.1020
35.1
0.1020
39.9
0.7100
23.3
0.1020
53.4
0.7100
23.3
0.7100
23.3
0.71001
23.3
Window
Window
Window
Window
Window
Window
Window
Window
Window
Internal Gain
Process
Process Uohtina
1.00 X 7,580 X 1.549 Watts/Sgft X 3.413 Btu/Watt X 0.999
1.00 X 7,580 X 300 Btu/OCC. / 28 Sgft/OCC. X 1.000
1.00 X 7,580 X 0.500 Watts/Sgft - X 3.413 BtuMatt X 1.000
1.00 X 7,580 X 0.000 Watts/Sgft X 3.413 Btu/Watt X 1.000
1.00 X1 7,580 X1 0.000 Watts/Sgft X1 3.413 Btu/Watt X 0.000
5,761
2,604
6, 228
3,975
1,085
4,207
1,323
1.076
Btu/hr
3,'812
3,812
3,812
8,075
2,022
4,133
1,036
8,075
2, 022.
36,800
Btu/hr
40,040
81,214
12,935
0
0
Infiltration:[ 1.00 X 1.064 X 7,580 X 13.00 X 0.50 /60] X 34 = 29,713
Schedule Air Sensible Area Ceiling Height ACH AT
Fraction
TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 245,061
Sched.
Latent Gain Frac. Area Heat Gain Btu/hr
Occupants 1.00 X 7,580 X 300 Btuh/occ. / 28 SgfUocc. = 81,214
Receptacle 1.00 X 7,580 X 0.000 Watts/Sgft X 3.413 Btu/Watt = 0
Process 1.00 X 7,580 X 0.000 Watts/Sgft X 3.413 Btu/Watt = 0
Infiltration:[ 1.00 X 4,771 X 7,580 X 13.00 X 0.50 /60] X 0.00262 = 10,284
Schedule Air Sensible Area Ceiling Height ACH AW
Fraction
TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 91,4
EnergyPro 5.1 by EnergySoft User Number: 6712 RunCode: 2011-12-02709:29:28 ID: Page 24 of 24
(S)
80.0
X
71
X
0.668
X
1.004
=
(S)
80.0
X
71
X
0.668
X
1.004
=
(S)
80.0
X
71
X
0.668
X
1.004
=
I'm .
127.0
X
249
X
0.668
X
0.382
=
(14931.8
X
249
X
0.668
X
0.382
=
(►M
65.0
X
249
X
0.668
X
0.382
=
(16916.3
X
249
X
0.668
X
0.382
=
127.0
X
249
X
0.668
X
0.382
=
31.8
X
249
X
0.668
X
0.382
=
Page Total
Schad.
Weighting
Frac. Area
Heat Gain
Factor
1.00 X 7,580 X 1.549 Watts/Sgft X 3.413 Btu/Watt X 0.999
1.00 X 7,580 X 300 Btu/OCC. / 28 Sgft/OCC. X 1.000
1.00 X 7,580 X 0.500 Watts/Sgft - X 3.413 BtuMatt X 1.000
1.00 X 7,580 X 0.000 Watts/Sgft X 3.413 Btu/Watt X 1.000
1.00 X1 7,580 X1 0.000 Watts/Sgft X1 3.413 Btu/Watt X 0.000
5,761
2,604
6, 228
3,975
1,085
4,207
1,323
1.076
Btu/hr
3,'812
3,812
3,812
8,075
2,022
4,133
1,036
8,075
2, 022.
36,800
Btu/hr
40,040
81,214
12,935
0
0
Infiltration:[ 1.00 X 1.064 X 7,580 X 13.00 X 0.50 /60] X 34 = 29,713
Schedule Air Sensible Area Ceiling Height ACH AT
Fraction
TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 245,061
Sched.
Latent Gain Frac. Area Heat Gain Btu/hr
Occupants 1.00 X 7,580 X 300 Btuh/occ. / 28 SgfUocc. = 81,214
Receptacle 1.00 X 7,580 X 0.000 Watts/Sgft X 3.413 Btu/Watt = 0
Process 1.00 X 7,580 X 0.000 Watts/Sgft X 3.413 Btu/Watt = 0
Infiltration:[ 1.00 X 4,771 X 7,580 X 13.00 X 0.50 /60] X 0.00262 = 10,284
Schedule Air Sensible Area Ceiling Height ACH AW
Fraction
TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 91,4
EnergyPro 5.1 by EnergySoft User Number: 6712 RunCode: 2011-12-02709:29:28 ID: Page 24 of 24