Loading...
11-0867 (RC) Title 24BUILDING ENERGY ANALYSIS REPORT DSD ,U 2 ?o', ORR S� IOR S PROJECT: Burgers & Beer 79-815 Hwy 111, Suite 101 La Quinta, Ca 92253 Project Designer: Robert H. Ricciardi 75-400 Gerald Ford Ste 115 Palm Desert, Ca 92211 (760) 408-1208 .Report Prepared by: Tim Scott Scott Design and Title 24, Inc, 77-085 Michigan Drive Palm Desert, Ca 92211 ���CEIVEI� DEC 0 5 2011 afi'O A.�1°� CITY OF LA QUINTA BY: BUILDING & SAFETY DEPT. Job Number: APPROVED FOR CONSTRUCTION DATE BY Date: 12/2/2011 The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2008 Building Energy Efficiency Standards. • This program developed by EnergySoft, LLC — www.energysoft.com. Ene Pro5.1 6 Ene Soft User Number. 6712 RunCode: 2011-12-02709:29:28 ID: • C] TABLE OF CONTENTS Cover Page 1 Table of Contents 2 Nonresidential Performance Title 24 Forms 3 Form ENV -MM Envelope Mandatory Measures 16 Form LTG -MM Lighting Mandatory Measures 17 Form MECH-MM Mechanical Mandatory Measures 18 HVAC System Heating and Cooling Loads Summary 19 Zone Load Summary 20 Room Load Summary 21 Room Heating Peak Loads 22 Room Cooling Peak Loads 23 Room Cooling Coil Loads 24 6;w 5.1 by EnergySoft Job Number: ID: User Number. 6712 :�:d • PERFORMANCE CERTIFICATE OF COMPLIANCE Part 1 of 3 PERF -1 C Project Name Date Burgers & Beer ' 1 12/2/2011 Project Address Climate Zone Total Cond. Floor Area Addition Floor Area 79-815 Hwy 111, Suite 101 La Quinta CA Climate Zone 15 7,580 0 GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Relocatable - indicate ❑ specific climate zone ❑ all climates Phase of Construction: ❑ New Construction ❑ Addition ® Alteration STATEMENT OF COMPLIANCE This certificate of compliance lists the building features and specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies only to a Building using the performance compliance approach. The documentation author hereby certifies that the documentation is accurate and comijete. Documentation Author Name Tim Scott Signature Company Scott Design and Title 24, Inc, Date 12./2/1011 Address 77 -085 -Michigan Drive 200-4780 Phone. 1(760) City/State/Zip Palm Desert, Ca 92211 C�t� iv Z05 -tel ' 370& The Principal Designer hereby certifies that the proposed building design represented in this set of construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this permit application. The proposed building has been designed to meet the energy efficiency requirements contained in sections 110, 116 through 118, and 140 through 149 of Title 24, Part 6. Please check one: ENV. LTG. MECH. I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to ❑ ❑ ❑ sign this document as the person responsible for its preparation; and that I am licensed in the State of California as a civil engineer, mechanical engineer, electrical engineer, or I am a licensed architect. I affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code by section ❑ ❑ ❑ 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor performing this work. I affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document ❑ ❑ ❑ because it pertains to a structure or type of work described as exempt urs ant to Business and Professions Code Sections 5537, 5538 and 6737.1. Principal Envelope Designer Name Signatur Company Envelope Compliance Not In The Scope Of This Document Date 2 2 { I Address License # G 8� City/State/Zip hone %60 Db Principal Mechanical Designer Name Tim Scott Signature Company Scott Design and Title 24, Inc. Date L �� Address 77-085 Michigan Drive License # City/State2ip Palm Desert Ca 92211 h0 (760) 200-4780 Principal Lighting Designer F Name Robert H. Ricciardi Architect Signature k_t Company Date Robert H. Ricciardi 12 Address 75-400 Gerald Ford Ste 115 License # G City/State2ip Palm Desert Ca 92211 Phone (760) 408-1208 INSTRUCTIONS TO APPLICANT COMPLIANCE & WORKSHEETS (check box if worksheets are included) ❑ ENV -1C Certificate of Compliance. Required on plans. m MECHAC Certificate of Compliance. Required on plans. LTG -1C Certificate of Compliance. Required on plans. m MECH-2C Air/Water Side/Service Hot Water & Pool Requirements. Im m LTG -2C Lighting Controls Credit Worksheet. m MECH-3C Mechanical Ventilation and Reheat. ❑ LTG -3C Indoor Lighting Power Allowance. m MECH-5C Mechanical Equipment Details. EnergyPro 5.1 by EnergySoft User Number: 6712 RunCode: 2011-12-02709:29:28 ID: Page 3 of 24 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 2 of 3 PERF -1 C 41Project Name Date Burgers & Beer 12/2/2011 ANNUAL TDV ENERGY USE SUMMARY kBtu/s ft- r Standard Proposed Compliance Energy Component Design Design Margin i---- ;--- - ---- - -i Space Heating Space Cooling Indoor Fans Heat Rejection Pumps & Misc. Domestic Hot Water Lighting Receptacle Process Process Lighting TOTALS 0.15 0.10 0.05 261.33 231.85 29.48 81.86 81.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 82.35 77.96 4.39 74.72 107.88 -33.16 50.64 50.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 551.05 550.29 0.76 Percent better than Standard 0.1% 0.1 % excluding process) BUILDING COMPLIES GENERAL INFORMATION Building Orientation (tM 270 deg Conditioned Floor Area 7.580 sqft. Number of Stories 1 Unconditioned Floor Area o sqft. Number of Systems 3 Conditioned Footprint Area 7,580 sqft. Number of Zones 1 Natural Gas Available On Site Yes Orientation Gross Area Glazing Area Glazing Ratio Front Elevation Left Elevation Rear Elevation Right Elevation Total Roof (W 598 (N) 1,723 (E) 727 (S) 1,771 4,819 7,580 sqft. sqft. sqft. sqft. sqft. sqft. 399 0 0 240 639 0 sgft. sqft. sqft. sqft. sqft. sqft. 66.7% 0.0% 0.0% 13.6% 13.3 0.0 0� Standard Proposed Prescriptive Values for Prescriptive Lighting Power Density 1.200 W/sqft. 1.542 W/sqft. Comparison only. See Prescriptive Envelope TDV Energy 208,3os 477,356 LTG -1C for allowed LPD. Remarks: • Ener.gyPro 5.1 by EnerqySoft User Number.' 6712 RunCode: 2011-12-02709:29:28 ID: Pa e 4 of 24 • 1� PERFORMANCE CERTIFICATE OF COMPLIANCE Part 3 of 3 PERF -1 C Project Name Burgers & Beer Date 12/2/2011 ZONE INFORMATION Floor Inst. Ctrl. Allowed LPD Proc. Area LPD Credits Area Tailored Loads System Name Zone Name Occupancy Type s ft. W/sf ' W/Sf 2 W/Sf s W/Sf ° W/Sf HVAC Tenant Improvement Comp Bldg Restaurant 7,580 1.549 0.007 Notes: 1. See LTG -1C 2. See LTG -2C 3. See LTG -3C 4. See LTG -4C Items above require special documentation items marked with asterisk, see LTG -1 -C by others) (by others EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST The local enforcement agency should pay special attention to the Items specified in this checklist. These Items require special written justification and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of the justifications, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted. The DHW System BCG3-100T360-8N is a non-NAECA large storage gas water heater. Verify DHW details. The HVAC System HVAC includes Demand Control Ventilation per Standards Section 121. The HVAC System HVAC incorporates HERS verified Duct Leakage. Target leakage is calculated and documented on the MECH-4-A. The exceptional features listed in this performance approach application have specifically been reviewed. Adequate written justification and documentation for their use have been provided by the applicant. Authorized Signature or Stamp EnergyPro 5.1 by EnergySoft User Number: 6712 RunCode: 2011-12-02T09:29:28 ID: Page 5 of 24 • • CERTIFICATE OF COMPLIANCE (Part 1 of 3) LTG -1 C Project Name Burgers & Beer Date 1 12/212011 INDOOR LIGHTING SCHEDULE and FIELD INSPECTION ENERGY CHECKLIST Installation Certificate, LTG -1- INST Retain a copy and verify form is completed and signed.) Field Inspector ❑ Certificate of Acceptance, LTG -2A and LTG -3A Retain a copy and verify form is completed and signed.) Field Inspector ❑ A separate Lighting Schedule Must Be Filled Out for Conditioned and Unconditioned Spaces Installed Lighting Power listed on this Lighting Schedule is only for: ® CONDITIONED SPACE ❑ UNCONDITIONED SPACE ® The actual indoor lighting power listed below includes all installed permanent and portable lighting systems in accordance with §146(a). Only for offices: Up to the first 0.2 watts per square foot of portable lighting shall not be required to be included in the ® calculation of actual indoor lighting power density in accordance with the Exception to §146(a). All portable lighting in excess of 0.2 watts per square foot is totaled below. Luminaire (Type, Lamps, Ballasts Installed Watts A B C D E F G H None or Item Ta Complete Luminaire Description+ (i.e, 3 lamp fluorescent troffer, F32T8, one dimmable electronic ballasts CL M N % E 3 How wattage Was determined `— E E z J ti X ;c H m 5 3 Field Ins actor, CEC Default From NA8 m o o , ij wo Q I— m a m a u A1/A2 (3) 4 If Fluorescent T8 85.0 0 ❑ 12 1,020 ❑ ❑ S (3) 4 ft Fluorescent T8 85.0 ® ❑ 3 255 ❑ ❑ C (2) 4 ft Fluorescent T8 58.0 ® ❑ 5 290 ❑ ❑ D (2) 2 If Fluorescent T8 32.0 IZI 1 ❑ 3 96 ❑ 1 ❑ G (1) 26w Compact Fluorescent 28.0 ® ❑ 11 3081 ❑ ❑ H 50w Low Voltage Halogen 54.0 ® ❑ 15 810 ❑ ❑ H -dl 50w Low Voltage Halogen 54.0 ® ❑ 6 324 ❑ ❑ L 150w Low Voltage Halogen 54.0 ® ❑ 1 6 324 ❑ ❑ Lill 50w Low Voltage Halogen 54.0 ® ❑ 4 216 ❑ ❑ Track 8' Track Light 300.0 ❑ ® 27 8,100 ❑ ❑ ❑ ❑ ❑ ❑ ❑ 1 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ b ❑ ❑ ❑ ❑ ❑ ❑ ❑ Installed Watts Page Total: 11,743 Building total number of pages: Installed Watts Building Total Sum of all pages) 11,743 Enter into LTG -1C Page 4 of 4 1. Wattage shall be determined according to Section 130 (d and e). Wattage shall be rating of light fixture, not rating of bulb. 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. I EnemyPro 5.1 by EnergySoft User Number: 6712 RunCode: 2011-12-02709:29:28 ID: Page 6 of 24 • 0 0 CERTIFICATE OF COMPLIANCE Part 2 of 3 LTG -1 C Project Name Burgers & Beer Date 1 1212/2011 INDOOR LIGHTING SCHEDULE and FIELD INSPECTION ENERGY CHECKLIST Fill in controls for all spaces: a) area controls, b) multi-level controls, c) manual daylighting controls for daylit areas > 250 fe, automatic daylighting controls for daylit areas > 2,500 fe, d) shut-off controls, e) display lighting controls, f) tailored lighting controls — general lighting controlled separately from display, ornamental and display case lighting and g) demand responsive automatic controls for retail stores > 50,000 ftz, in accordance with Section 131. MANDATORY LIGHTING CONTROLS — FIELD INSPECTION ENERGY CHECKLIST Field Ins actor Number Special Type/ Description of Units Location in Building Features Pass Fail 4(/ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 0 ❑ a ❑ ❑ ❑ ❑ 0 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑. ❑ ❑ ❑ ❑ ❑ o a ❑ ❑ ❑ o ❑ ❑ ❑ o ❑ ❑ 0 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 0 0 'SPECIAL FEATURES INSPECTION CHECKLIST See Page 2 of 4 of LTG -1C The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification. The local enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted. Field Inspector's Notes or Discrepancies: EnergyPro 5.1 by EnergySoft User Number: 6712 RunCode: 2011-12-02709:29:28 ID: Page 7 of 24 • • CERTIFICATE OF COMPLIANCE Part 3 of 3 LTG -1C Project Name Date Burgers & Beer 1 12/2/2011 CONDITIONED AND UNCONDITIONED SPACE LIGHTING MUST NOT BE COMBINED FOR COMPLIANCE Indoor Lighting Power for Conditioned S aces Indoor Lighting Power for Unconditioned Spaces Watts Watts Installed Lighting 11,743 Installed Lighting 0 from Conditioned LTG -1C, Page 2 from Unconditioned LTG -1C, Page 2 Lighting Control Credit _ 56 Lighting Control Credit _ 0 Conditioned Spaces from LTG -2C Unconditioned Spaces from LTG -2C Adjusted Installed 11687 Adjusted Installed = 0 Lighting Power Lighting Power Complies if Installed 5 Allowed Complies if Installed:5 Allowed Allowed Lighting Power 11687 Allowed Lighting Power 0 Conditioned Spaces from LTG -3C or PERF -1 Unconditioned Spaces from LTG -3C Required Acceptance Tests Designer: This form is to be used by the designer and attached to the plans. Listed below is the acceptance test for the Lighting system, LTG -2A and LTG -3A. The designer is required to check the acceptance tests and list all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. If all the lighting system or control of a certain type requires a test, list the different lighting and the number of systems. The NA7 Section in the Appendix of the Nonresidential Reference Appendices Manual describes the test. Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Forms can be grouped by type of Luminaire controlled. Enforcement Agency: Systems Acceptance. Before Occupancy Permit is granted for a newly constructed building or space or when ever new lighting system with controls is installed in the building or space shall be certified as meeting the Acceptance Requirements. The LTG -2A and LTG -3A forms are not considered complete forms and are not to be accepted by the enforcement agency unless the boxes are checked and/or filled and signed. In addition, a Certificate of Acceptance forms shall be submitted to the enforcement agency that certifies plans, specifications, installation certificates, and operating and maintenance information meet the requirements of §10-103(b) of Title 24 Part 6. The field inspector must receive the properly filled out and signed forms before the building can receive final occupancy. A copy of the LTG -2A and LTG -3A for each different lighting luminaire control(s) must be provided to the owner of the building for their records. LTG -2A and Luminaires Controlled LTG -3A Controls and Sensors and Number of Automatic Luminaires Daylighting Controls Equipment Re uirin Testing Description controlled Location Acceptance Occ Sensor- Multi -Level (1) 26w Compact Fluorescent 10 Tenant Improvement m Window Daylighting 50w Low Voltage Halogen 6 Tenant Improvement m Window Daylighting 50w Low Voltage Halogen 4 Tenant Improvement El ❑ ❑ ❑ EnergyPro 5.1 by EnergySoh User Number: 6712 RunCode: 2011-12-02709:29:28 ID: Page 8 of 24 • CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C FIELD INSPECTION ENERGY CHECKLIST Project Name Burgers & Beer Date 12/2/2011 Project Address 79-815 Hwy 111, Suite 101 La Quinta Climate Zone 15 Total Cond. Floor Area 7,580 Addition Floor Area 0 GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Relocatable Public School Bldg. m Conditioned Spaces ❑ Unconditioned Spaces affidavit Phase of Construction: ❑ New Construction ❑ Addition ® Alteration Approach of Compliance: ❑ Component 13 Overall Envelope TDV ❑ Unconditioned (file affidavit) Energy Front Orientation: N; E, S, W or in Degrees: 270 deg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST E ui menu Inspection Criteria Meets Criteria or Requirements Pass Fail — Describe Reason Item or System Tags AC -1, RTU -1, HP -1 DHW Heater ❑ [3i.e. Equipment T e3: Gas Fired DHW Boiler ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 365,000 Btu/hr ❑ ❑ Minimum Heating Efficiency' 89% ❑ ❑ Max Allowed Cooling Capacity' n/a ❑ ❑ Cooling Efficiency' n/a ❑ ❑ Duct Location/ R -Value n/a ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS n/a ❑ ❑ Economizer n/a ❑ ❑ Thermostat n/a ❑ ❑ Fan Control n/a ❑ ❑ E ui menu Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Pass Fail — Describe Reason 2_ Item or System Tags i.e. AC -1, RTU -1, HP -1 HVAC ❑ ❑ Equipment T e3: Packaged DX ❑ ❑ Number of Systems 3 ❑ ❑ Max Allowed Heating Capacity' 142,000 Btu/hr ❑ ❑ Minimum Heating Efficiency' 3.20 COP ❑ ❑ Max Allowed Cooling Capacity' 147, 000 Btu/hr ❑ ❑ Cooling Efficiency' 10.6 EER ❑ ❑ Duct Location/ R -Value Conditioned / 0.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS Yes ❑ ❑ Economizer Diff. Temp (Integrated) ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EnergyPro 5.1 by EnergySoft User Number. 6712 RunCode: 2011-12-02709:29:28 ID: Page 9 of 24 0 • L� CERTIFICATE OF COMPLIANCE and (Part 2 of 4) MECH-1 C I FIELD INSPECTION ENERGY CHECKLIST Burgers & Beer 12/2/2011 EnemyPro 5.1 by EnerpySoR User Number., 6712 RunCode: 2011-12-02709:29:28 ID: Pape 10 or 24 • • • LIGHTING CONTROLS CREDIT WORKSHEET Part 1 of 2 LTG -2C Project Name Burgers & Beer Date 1 12/212011 POWER ADJUSTMENT FACTORS PAF FOR NON -DAYLIGHT CONTROLS A Separate PAF Worksheet Must Be Filled Out for Conditioned and Unconditioned Spaces. Control Credits listed on this schedule are only for: I21 CONDITIONED SPACES O UNCONDITIONED SPACES A B C D E F G Watts of Power Room # Zone ID Plan Room Area Control Adjustments Areas Lighting Control Description' Reference fiz Lighting Factor' Control Credit Watts E x F Tenant Improvemej Occ Sensor- Multi -Level G 7,580 280 0.20 56 PAGE TOTAL 56 Note: Conditioned and Unconditioned Space shall be separately totaled Building total of non -daylight control credit watts for all pages of LTG -2C Pae 1 of 2 Enter building total of all daylight controls credit watts from LTG -2C Page 2 of 2 0 BUILDING TOTAL OF ALL CONTROL CREDIT WATTS (FOR BOTH NON -DAYLIGHT AND DAYLIGHT CONTROL CREDITS) 56 Enter in LTG -1C; Page 4: Lighting Control Credit as appropriate for CONDITIONED or UNCONDITIONED Spaces 1. Description shall be consistent with Type of Control defined in Table 146-C 2. Power Adjustment Factor taken from Table 146-C EnergyPro5lbyEnergySoft User Number. 6712 RunCode: 2011-12-02709:29:28 ID: Pae 11 of 24 • • AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2C Project Name Date Burgers & Beer 12/212011 Indicate Air Systems Type Central, Single Zone, Package, VAV, or etc... Item or System Tags i.e. AC -1, RTU -1, HP-1)HVAC Number of Systems 3 Indicate Pa a Reference on Plans or Schedule and indicate the applicable exception(s) MANDATORY MEASURES T-24 Sections Heating Equipment Efficiency 112 a 3.20 COP Cooling Equipment Efficiency 112 a 10.6 EER HVAC Heat Pump Thermostat 112(b), 112(c) Yes Furnace Controls/Thermostat 112 c,'115 a n/a Natural Ventilation 121 b Yes Mechanical Ventilation 121 b 2,978cfm VAV Minimum Position Control 121 c No Demand Control Ventilation 121 c Yes Time Control t22(e) Programmable Switch Setback and Setup Control 122(e) Setback Required Outdoor Damper Control 122(f) Auto Isolation Zones 1 22 n/a Pipe Insulation 123 Duct Location/ R -value 124 Conditioned/0.0 PRESCRIPTIVE MEASURES Calculated Design Heating Load 144 a n/a Proposed Heating Capacity 144 a tb 266,068 Btu/hr Calculated Design Cooling Load 144 a n/a Proposed Cooling Capacity 144(a & b 327,400 Btu/hr Fan Control 144(c) Constant Volume DP Sensor Location 144(c) Supply Pressure Reset (DDC only) 144(c) Yes Simultaneous Heat/Cool 144(d) No Economizer 144(e) Diff. Temp (Integrated) Heat Air Supply Reset 144(f) Constant Temp Cool Air Supply Reset 144(f) Constant Temp Electric Resistance Heating' 144 Air Cooled Chiller Limitation 144 i ' Duct Leakage Sealing. If Yes, a Yes MECH-4-A must be submitted 144(k) 1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used explain which exception(s) to §144(g) apply. EnergyPro 5.1 by EnergySoft User Number: 6712 RunCode: 2011-12-02T09:29:28 ID: Pae 12 of 24 • • • WATER SIDE SYSTEM REQUIREMENTS Part 2 of 2 MECH-2C Project Name Date Burgers & Beer 1 12/2/2011 WATER SIDE SYSTEMS: Chillers, Towers, Boilers, H dronic Loops Item or System Tags (i.e. AC -1, RTU -1, HP -1)' Number of Systems Indicate Page Reference on Plans or Specification 2 MANDATORY MEASURES T-24 Sections Equipment Efficiency 112 a Pipe Insulation 123 PRESCRIPTIVE MEASURES Cooling Tower Fan Controls 144(a & b Cooling Tower Flow Controls 144(h) Variable Flow System Design 144(h) Chiller and Boiler Isolation 144(i) CHW and HHW Reset Controls 144 0) WLHP Isolation Valves 144' VSD on CHW, CW & WLHP Pumps>5HP 144(j) DP Sensor Location 144 0) 1. The proposed equipment need to match the building plans schedule or specifications. If a requirement is not applicable, put "N/A" in the column next to applicable section. 2. For each chiller, cooling tower, boiler, and hydronic loop (or groups of similar equipment) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" in the column next to applicable section. Service Hot Water Pool Heating Item or System Tags DHWHeater (i.e. WH -1, WHP, DHW, etc...)' Number of Systems 1 Indicate Page Reference on Plans or Schedule MANDATORY MEASURES T-24 Sections SERVICE HOT WATER Certified Water Heater 111, 113(a) BCG3-100T360-8N Water Heater Efficiency 113(b) 89% Service Water Heating Installation 113(c) Controls Req. Pipe Insulation 123 Required POOL AND SPA Pool and Spa Efficiency and Control 114(a) n/a Pool and Spa Installation 114 b n/a Pool Heater — No Pilot Light 115(c) n/a Spa Heater — No Pilot Light 115(d) n/a Pipe Insulation 123 n/a 1. The Proposed equipment needs to match the building plans schedule or specifications. If a requirement is not applicable, put "WA" in the column next to applicable section. 2. For each water heater, pool heater and domestic water loop (or groups of similar equipment) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" in the column. Ene KPro 5.1 by EnergySoft User Number.- 6712 RunCode: 2011-12-02709:29:28 ID: Pae 13 of 24 • MECHANICAL VENTILATION AND REHEAT MECH-3C Project Name Burgers & Beer Date 12/212011 MECHANICAL VENTILATION 121 b 2 REHEAT LIMITATION (§144(d)) AREA BASIS OCCUPANCY BASIS VAV MINIMUM A B C D E F G H I J K L M N Zone/System Condition Area ft2 CFM per ft2 Min CFM Number By Area Of B X C People CFM per Person Min CFM REO'D by V.A. Occupant Max of E X F D or G Design 50% of Ventilation Design Zone Air Supply CFM CFM B X 0.4 CFM / ft2 Max. of Columns H, J, K, 300 CFM Design Minimum Air Transfer Setpoint Air Tenant Improvement 7,580 0.38 2,880 2,880 2,978 HVAC Total 2,880 2,978 Totals Column I Total Design Ventilation Air C Minimum ventilation rate per Section 121, Table 121-A. E Based on fixed seat or the greater of the expected number of occupants and 50% of the CBC occupant load foregress purposes fors aces without fixed seating. H Required Ventilation Air REO'D V.A. is the larger of the ventilation rates calculated on an AREA BASIS or OCCUPANCY BASIS Column D or G). I Must be greater than orequal to H, or use Transfer Air column N to make up the difference. J Design fan supply CFM Fan CFM x 50%• or the design zone outdoor airflow rate per 121. K Condition area ft2 x 0.4 CFM / ft2; or L Maximum of Columns H, J, K, or 300 CFM M This must be less than orequal to Column L and greater than or equal to the sum of Columns H plus N. N Transfer Air must be provided where the Required Ventilation Air (Column H) is greater than the Design Minimum Air (Column M). Where required, transfer air must be greater than or equal to the difference between the Required Ventilation Air Column H and the Design Minimum Air Column M), Column H minus M. EnerqyPro 5.1 by EnergySoft User Number., 6712 Run Code: 2011-12-02TO9:29:28 ID: Pae 14 of 24 0 0 0 MECHANICAL EQUIPMENT DETAILS Part 1 of 2 MECH-5C Project Name Burgers & Beer Date 12/212011 CHILLER AND TOWER SUMMARY PUMPS E ui ment Name Type Oty. Efficiency Tons . Pump oty. GPM BHP Control DHW / BOILER SUMMARY System Name Type Vol. Distribution Oty. Rated Input (Gals). Energy Factor Standby Loss Tank Ext. or RE or Pilot R -Value Status BCG3-100T360-8N Large Gas Recirc/rime+Temp 1 365,000 85 0.89. 1.91 % 0.0 New MULTI -FAMILY CENTRAL WATER HEATING DETAILS Hot Water Pump Hot Water PIping Length ft Control Ot . HP Type In Plenum Outside Buried I Add 1/2" Insulation CENTRAL SYSTEM RATINGS HEATING COOLING System Name Type O Output Aux. kW Eff iclency Output Eff iclency Status Carrier 50HJQ014 Packaged DX 3 142,000 0.0 3.20 COP 147,000 10.6 EER Existing CENTRAL SYSTEM FAN SUMMARY SUPPLY FAN RETURN FAN System Name Fan Type Economizer Type CFM BHP CFM BHP Carrier 50HJQ014 Constant Volume Diff. Tem (Integrated) 5,000 2.50 none Ene Pro 5.1 6 Ene Soff User Number. 6712 RunCode: 2011-12-02709:29:28 ID: Pae 15 of 24 • 0 0 ENVELOPE MANDATORY MEASURES: NONRESIDENTIAL ENV -MM Project Name Date Burgers & Beer 1 ZW2011 DESCRIPTION Building Envelope Measures: §118(a): Installed insulating material shall have been certified by the manufacturer to comply with the California Quality Standards for insulating material, Title 20 Chapter 4, Article 3. §118(c): All Insulating Materials shall be installed in compliance with the flame spread rating and smoke density requirements of Sections 2602 and 707 of Title 24, Part 2. §118(f): The opaque portions of framed demising walls in nonresidential buildings shall have insulation with an installed R -value of no less than R-13 between framing members. §117(a): All Exterior Joints and openings in the building that are observable sources of air leakage shall be caulked, gasketed, weatherstripped or otherwise sealed. Manufactured fenestration products and exterior doors shall have air infiltration rates not exceeding 0.3 cfm/ft.2 of §116(a) 1: window area, 0.3 cfm/ft.2 of door area for residential doors, 0.3 cfm/ft.2 of door area for nonresidential single doors (swingingand sliding),and 1.0 cfm/ft.2 for nonresidential double doors swin in . §116(a) 2: Fenestration U -factor shall be rated in accordance with NFRC 100, or the applicable default U -factor. Fenestration SHGC shall be rated in accordance with NFRC 200, or NFRC 100 for site -built fenestration, or the §116(a) 3: applicable default SHGC. §116(b): Site Constructed Doors, Windows and Skylights shall be caulked between the unit and the building, and shall be weatherstripped (except for unframed glass doors and fire doors). Ene Pro 5.1 b Ene Soft User Number. 6712 RunCode: 2011-12-02709:29:28 /D: Pae 16 of 24 • • • LIGHTING MANDATORY MEASURES: NONRESIDENTIAL LTG -MM Project Name Date Burgers & Beer 12/2/2011 Indoor Lighting Measures: §131(d): Shut-off Controls For every floor, all interior lighting systems shall be equipped with a separate automatic control to shut off the lighting. 1. This automatic control shall meet the requirements of Section 119 and may be an occupancy sensor, automatic time switch, or other device capable of automatically shutting off the lighting. 2 Override for Building Lighting Shut-off: The automatic building shut-off system is provided with a manual, accessible override switch in sight of the lights. The area of override is not to exceed 5,000 square feet. §119(h): Automatic Control Devices Certified: All automatic control devices specified are certified, all alternate equipment shall be certified and installed as directed by the manufacturer. §111: Fluorescent Ballast and Luminaires Certified: All fluorescent fixtures specified for the project are certified and listed in the Directory. All installed fixtures shall be certified. §131(a): Individual Room/Area Controls: Each room and area in this building is equipped with a separate switch or occupancy sensor device for each area with floor -to -ceiling walls. Uniform Reduction for Individual Rooms: All rooms and areas greater than 100 square feet and more than 0.8 watts §131(b): -per square foot of lighting load shall be controlled with bi-level switching for uniform reduction of lighting within the room. Daylight Area Control: All rooms with windows and skylights that are greater than 250 square feet and that allow for §131(c): the effective use of daylight in the area shall have 50% of the lamps in each daylit area controlled by a separate switch; or the effective use of daylight cannot be accomplished because the windows are continuously shaded by a building on the adjacent lot. Diagram of shading during different times of the year is included on plans. §131(c): Display Lighting. Display lighting shall be separately switched on circuits that are 20 amps or less.6. Outdoor Lighling LightingMeasures: §130(c)1: Mandatory lighting power determination for medium base sockets without permanently installed ballasts §132(a): All permanently installed luminaires with lamps rated over 100 Watts either have a lamp efficacy of at least 60 lumens per Watt or are controlled by a motion sensor. §132(b): All Luminaires with lamps rated greater than 175 Watts in hardscape area, including parking lots, building entrances, canopies, and all outdoor sales areas meet the Cutoff Requirements. §132(c)1: All permanently installed outdoor lighting meets the control requirements listed. §132(c): Building facades, parking lots, garages, canopies, and outdoor sales areas meet the Multi -Level Lighting Requirements listed. EnergyPro 5.1 by EnergySoft User Number: 6712 RunCode: 2011-12-02709:29:28 ID: Pae 17 of 24 • • MECHANICAL MANDATORY MEASURES: NONRESIDENTIAL MECH-MM Project Name Date Burgers & Beer 12/2/2011 Equipment and System Efficiencies §111: Any appliance for which there is a California standard established in the Appliance Efficiency Regulations will comply with the applicable standard. §115(a): Fan type central furnaces shall not have a pilot light. §123: Piping, except that conveying fluids at temperatures between 60 and 105 degrees Fahrenheit, or within HVAC equipment, shall be insulated in accordance with Standards Section 123. §124: Air handling duct systems shall be installed and insulated in compliance with Sections 601, 602, 603, 604, and 605 of the CMC Standards. Controls §122(e): Each space conditioning system shall be installed with one of the following: 1A. Each space conditioning system serving building types such as offices and manufacturing facilities (and all others not explicitly exempt from the requirements of Section 112 (d)) shall be installed with an automatic time switch with an accessible manual override that allows operation of the system during off -hours for up to 4 hours. The time switch shall be capable of programming different schedules for weekdays and weekends and have program backup capabilities that prevent the loss of the device's program and time setting for at least 10 hours if power is interrupted; or 1 B. An occupancy sensor to control the operating period of the system; or 1C. A 4 -hour timer that can be manually operated to control the operating period of the system. Each space conditioning system shall be installed with controls that temporarily restart and temporarily operate the 2 system as required to maintain a setback heating and/or a setup cooling thermostat setpoint. Each space conditioning system serving multiple zones.with a combined conditioned floor area more than 25,000 square feet shall be provided with isolation zones. Each zone: shall not exceed 25,000 square feet; shall be provided §122(g). with isolation devices, such as valves or dampers that allow the supply of heating or cooling to be setback or shut off independently of other isolation areas; and shall be controlled by a time control device as described above. Thermostats shall have numeric setpoints in degrees Fahrenheit (F) and adjustable setpoint stops accessible only to §122(c): authorized personnel. Heat pumps shall be installed with controls to prevent electric resistance supplementary heater operation when the §122(b): heating load can be met by the heat pump alone Each space conditioning system shall be controlled by an individual thermostat that responds to temperature within the zone. Where used to control heating, the control shall be adjustable down to 55 degrees F or lower. For cooling, the §122(a&b): control shall be adjustable up to 85 degrees F or higher. Where used for both heating and cooling, the control shall be capable of providing a deadband of at least 5 degrees F within which the supply of heating and cooling is shut off or reduced to a minimum. Ventilation §121(e): Controls shall be provided to allow outside air dampers or devices to be operated at the ventilation rates as specified on these plans. All gravity ventilating systems shall be provided with automatic or readily accessible manually operated dampers in all §122(f): openings to the outside, except for combustion air openings. Ventilation System Acceptance. Before an occupancy permit is granted for a newly constructed building or space, or a §121(f): new ventilating system serving a building or space is operated for normal use, all ventilation systems serving the building ors ace shall be certified as meeting the Acceptance Requirements for Code Compliance Service Water Heating Systems §113(c) Installation 3. Temperature controls for public lavatories. The controls shall limit the outlet Temperature to 110° F. 2 Circulating service water -heating systems shall have a control capable of automatically turning off the circulating pump when hot water is not required. EnergyPro 5.1 by EnergySoft User Number: 6712 RunCode: 2011-12-02T09:29:28 ID: Pae 18 of 24 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name Burgers & Beer Date 12/2/2011 System Name HVAC Floor Area 7,580 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 3 COIL CFM Total Room Loads 18,605 Return Vented Lighting Return Air Ducts Return Fan Ventilation 2,978 Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD 1 COOLING PEAK Sensible 245,061 0 12,253 0 105,317 0 12,253 374,883 COIL HTG. Latent CFM 91,498 2,485 -11,1651 2,978 80,333 PEAK Heating System Sensible Output perSystem 142,000 104,894 Total Output Btuh 426,000 Output Btuh/s ft 56.2 5,245 Cooling System 0 Output perS tem 147,000 138,399 Total Output Btuh 441,000 0 Total Output ons 36.8 5,245 Total Output Stuh/s ft 58.2 Total Output s ft/Ton 206.31 253,783 Air System CFM perSystem 5,000 HVAC EQUIPMENT SELECTION Airflow cfm 15,000 Carrier 50HJ0014 327,400 109,213 266,068 Airflow cfm/s ft 1.98 1 266,068 F.Jan 1 AM Airflow cfm/Ton 408.2 Outside Air % 19.9% Total Adjusted System Output 1 327,400 (Adjusted for Peak Design conditions) TIME OF SYSTEM PEAK 109,213 Aug 3 PM Outside Air cfm/s ft 0.39 Note: values above given at ARI conditions HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak 26 OF 61 OF Outside Air 2,978 ch, Supply Fan 15,000 cfm 70 OF 61 OF 110 OF Heating Coil , 110 °F ROM 70 OF COOLING SYSTEM PSYCHROMETICS Airstream Temperatures at Time of Cooling Peak 112 / 78 OF 85171 OF 85 / 72 OF 65 / 64 OF 10 0 Outside Air 2,978 cfm Supply Fan Cooling Coil 15,000 cfm 79 / 70 OF 66 / 64 OF 66.1% ROOM 78/ 70 OF EnergyPro 5.1 by EnergySoft User Number.- 6712 RunCode: 2011-12-02709:29:28 ID: Page 19 of 24 ZONE •SUMMARY Project Burgerste - .. System Name iHV• .. :0 ZONE LOAD SUMMARY COOLINGZONAL SYSTEM (BLOCK LOAD) 1-71 v • • • ROOM LOAD SUMMARY Project Name Date Burgers & Beer 12/2/2011 System Name Floor Area HVAC 7,580 ROOM LOAD SUMMARY ROOM COOLING PEAK COIL COOLING PEAK I COIL HTG. PEAK Zone Name Room Name Mult. CFM Sensible Latent CFM Sensible Latent CFM Sensible Tenant Improvement Tenant Improvement 1 18,653 245,696 91,526 18,605 245,061 91,498 2,485 104,894 1 ' Total includes ventilation load PAGE TOTAL TOTAL` 18,605 245,061 91,498 2,485 104,894 18,605 245, 061 91,4981 2,4851 104, 894 • r� r� ROOM HEATING PEAK LOADS Project Name Date Burgers & Beer 12/2/2011 ROOM INFORMATION DESIGN CONDITIONS Room Name Tenant Improvement Time of Peak Jan 1 AM Floor Area 7,580.0 ftz Outdoor Dry Bulb Temperature 26 OF Indoor Dry Bulb Temperature 70 OF Conduction Area U -Value AT °F Btu/hr Default Roof 1978 to Present 7,580.0 X 0.0420 X 44 = 14,008 R-13 Partition Wall 1,723.0 X 0.1020 X 44 = 7,733 8" Solid Grout CMU Wall 2,457.1 X 0.1020 X 44 = 11,027 Double Metal Tinted 638.9 X 0.7100 X 44 = 19,959 Slab -On -Grade psrim = 427.0 X 0.7300 X 44 = 13,715 X X o X X = X X = X X = X X = X X = X X = X X = X X = X X = X X = X X = X X = X X = X X = X X = X X = X X = X X = X X = X X = X X = X X = X X = X X = X X = Items shown with an asterisk (') denote conduction through an interior surface to another room Page TotalF 66,443 i Infiltration:[ 1.00 X 1.064 X 7,580 X 13.00 X 0.500 /60] X 44 = 38,452 Schedule Air Sensible Area Ceiling Height ACH AT Fraction TOTAL HOURLY HEAT LOSS FOR ROOM 104 894 Energ Pro 5.1 by Energ Soft User Number: 6712 RunCode: 2011-12-02709:29:28 ID: Page 22 of 24 • • ROOM COOLING PEAK LOADS I rroleot rvarne Burgers & Beer 12/2/2011 ROOM INFORMATION X X X X X X X X X DESIGN CONDITIONS X X X X X X X X X 0.668 Room Name Tenant Improvement Time of Peak 35 Aug 4 PM Floor Area 7,580.0 ft' Outdoor Dry Bulb Temperature 0.668 111 OF Indoor Dry Bulb Temperature 78 OF Outdoor Wet Bulb Temperature 261 78 OF Conduction Area U -Value DETD' 261 Btu/hr Default Roof 1978 to Present 7,580.0 X 0.0420 X 49.5 = 15,758 R-13 Partition Wall 1,723.0 X 0.1020 X 31.4 = 5,514 8" Solid Grout CMU Wall 727.0 X 0.1020 X 33.5 = 2,482 8" Solid Grout CMU Wall 1,531.0 X 0.1020 X 35.7 = 5,581 Double Metal Tinted 494.0 X 0.7100 X 23.8 = 8,350 8" Solid Grout CMU Wall 199.1 X 0.1020 X 54.8 = 1,113 Double Metal Tinted 63.6 X 0.7100 X 23.8 = 1,075 Double Metal Tinted 81.3 X 0.7100 X 23.8 = 1,374 X X I = Page Total 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (•) denote conduction through an interior surface to another room. Weighting Solar Gain Orientation Area SGF Sc Factor Window Window Window Window Window Window Window Window Window 1 41,2471 80.0 80.0 X X X X X X X X X 35 X X X X X X X X X 0.668 X X X X X X X X X 1.821 = = = = = = = = = 35 0.668 1.821 80.0 127.0 31.8 65.0 16.3 127.0 31.81 35 0.668 1.821 261 0.668 0.434 261 0.668 0.434 261 0.668 0.434 261 0.668 0.434 261 0.668 0.434 261 0.668 0.434 Page Total L Sched. Weighting Internal Gain Frac. Area Heat Gain Factor Lights 1.00 X 7,580 X 1.549 Watts/Sgft X 3.413 Btu/Watt X 0.999 = Occupants 1.00 X 7,580 X 300 Btu/occ. / 28 Sqft/occ. X 1.000 = Receptacle 1.00 X 7,580 X 0.500 Watts/Sgft X 3.413 Btu/Watt X 1.000 = Process 1.00 X 7,580 X 0.000 Watts/Sgft X 3.413 Btu/Watt X 1.000 = Process Ughting 1 1.00 X 1 7,580 X 1 0.000 Watts/Sgft X 3.413 BtuMlatt X 1 0.000 = Infiltration:[ 1.00 X 1.064 X 7,580 X 13.00 X 0.50 / 60 ] X 34 = Schedule Air Sensible Area Ceiling Height ACH AT TOTAL HOURLY SENSIBLE Latent Gain Frac. Area Heat Gain Occupants 1.00 X 7,580 X 300 Btuh/occ. / 28 Sgtt/occ. = Receptacle 1.00 X 7,580 X o.000 Watts/Sgft X 3.413 Btu/Watt = Process 1.00 X 7,580 X 0.000 Watts/Sgft X 3.413 Btu/Watt = Btu/hr 3,446 3,446 3,446 9,617 Z408 1,234 9,617 2,408 40,543 Whr 40,044 81,214 12,935 0 0 29, 713 Btu/hr 81,214 0 0 Infiltration:[ 1.00 X 4,771 X 7,580 X 13.00 X 0.50 /60] X 0.00263 = 10,311 Schedule Air Sensible Area Ceiling Height ACH AW Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 91,526 EnergyPro 5.1 by EnergySoft User Number. 6712 RunCode: 2011-12-02709:29:28 ID: Page 23 of 24 • 011 ROOM COOLING COIL LOADS Project Name Date Burgers & Beer 12/2/2011 ROOM INFORMATION 0.0420 DESIGN CONDITIONS 56.8 Room Name Tenant Improvement Time of Peak Aug 3 PM Floor Area 7,580.0 ft' Outdoor Dry Bulb Temperature 112 OF Indoor Dry Bulb Temperature 78 OF Outdoor Wet Bulb Temperature 78 OF Conduction Area U -Value DETD' Btu/hr Default Roof 1978 to Present R-13 Partition Wall 8" Solid Grout CMU Wall 8" Solid Grout CMU Wall Double Metal Tinted 8" Solid Grout CMU Wall Double Metal Tinted Double Metal Tinted Double Metal Tinted Page Total 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Weighting Snlar Gain Orientation Area SGF SC Factor 7,580.0 1,723.0 727.0 1,531.0 240.0 199.1 254.0 79.9 65.0 X )( X X X X X X X 0.0420 X X X X X X X X X 56.8 = = = 0.1020 32.8 0.1020 35.1 0.1020 39.9 0.7100 23.3 0.1020 53.4 0.7100 23.3 0.7100 23.3 0.71001 23.3 Window Window Window Window Window Window Window Window Window Internal Gain Process Process Uohtina 1.00 X 7,580 X 1.549 Watts/Sgft X 3.413 Btu/Watt X 0.999 1.00 X 7,580 X 300 Btu/OCC. / 28 Sgft/OCC. X 1.000 1.00 X 7,580 X 0.500 Watts/Sgft - X 3.413 BtuMatt X 1.000 1.00 X 7,580 X 0.000 Watts/Sgft X 3.413 Btu/Watt X 1.000 1.00 X1 7,580 X1 0.000 Watts/Sgft X1 3.413 Btu/Watt X 0.000 5,761 2,604 6, 228 3,975 1,085 4,207 1,323 1.076 Btu/hr 3,'812 3,812 3,812 8,075 2,022 4,133 1,036 8,075 2, 022. 36,800 Btu/hr 40,040 81,214 12,935 0 0 Infiltration:[ 1.00 X 1.064 X 7,580 X 13.00 X 0.50 /60] X 34 = 29,713 Schedule Air Sensible Area Ceiling Height ACH AT Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 245,061 Sched. Latent Gain Frac. Area Heat Gain Btu/hr Occupants 1.00 X 7,580 X 300 Btuh/occ. / 28 SgfUocc. = 81,214 Receptacle 1.00 X 7,580 X 0.000 Watts/Sgft X 3.413 Btu/Watt = 0 Process 1.00 X 7,580 X 0.000 Watts/Sgft X 3.413 Btu/Watt = 0 Infiltration:[ 1.00 X 4,771 X 7,580 X 13.00 X 0.50 /60] X 0.00262 = 10,284 Schedule Air Sensible Area Ceiling Height ACH AW Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 91,4 EnergyPro 5.1 by EnergySoft User Number: 6712 RunCode: 2011-12-02709:29:28 ID: Page 24 of 24 (S) 80.0 X 71 X 0.668 X 1.004 = (S) 80.0 X 71 X 0.668 X 1.004 = (S) 80.0 X 71 X 0.668 X 1.004 = I'm . 127.0 X 249 X 0.668 X 0.382 = (14931.8 X 249 X 0.668 X 0.382 = (►M 65.0 X 249 X 0.668 X 0.382 = (16916.3 X 249 X 0.668 X 0.382 = 127.0 X 249 X 0.668 X 0.382 = 31.8 X 249 X 0.668 X 0.382 = Page Total Schad. Weighting Frac. Area Heat Gain Factor 1.00 X 7,580 X 1.549 Watts/Sgft X 3.413 Btu/Watt X 0.999 1.00 X 7,580 X 300 Btu/OCC. / 28 Sgft/OCC. X 1.000 1.00 X 7,580 X 0.500 Watts/Sgft - X 3.413 BtuMatt X 1.000 1.00 X 7,580 X 0.000 Watts/Sgft X 3.413 Btu/Watt X 1.000 1.00 X1 7,580 X1 0.000 Watts/Sgft X1 3.413 Btu/Watt X 0.000 5,761 2,604 6, 228 3,975 1,085 4,207 1,323 1.076 Btu/hr 3,'812 3,812 3,812 8,075 2,022 4,133 1,036 8,075 2, 022. 36,800 Btu/hr 40,040 81,214 12,935 0 0 Infiltration:[ 1.00 X 1.064 X 7,580 X 13.00 X 0.50 /60] X 34 = 29,713 Schedule Air Sensible Area Ceiling Height ACH AT Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 245,061 Sched. Latent Gain Frac. Area Heat Gain Btu/hr Occupants 1.00 X 7,580 X 300 Btuh/occ. / 28 SgfUocc. = 81,214 Receptacle 1.00 X 7,580 X 0.000 Watts/Sgft X 3.413 Btu/Watt = 0 Process 1.00 X 7,580 X 0.000 Watts/Sgft X 3.413 Btu/Watt = 0 Infiltration:[ 1.00 X 4,771 X 7,580 X 13.00 X 0.50 /60] X 0.00262 = 10,284 Schedule Air Sensible Area Ceiling Height ACH AW Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 91,4 EnergyPro 5.1 by EnergySoft User Number: 6712 RunCode: 2011-12-02709:29:28 ID: Page 24 of 24