Loading...
07-0821 (CSCS) Title 24TITLE 24 REPORT Title 24 Report for: Komar Desert Center - Bldg B&C Hway 111 and Jefferson La Quinta, CA, 92253 7 =45 7 Project Designer: SGPA Architecture -Planning 1545 Hotel Circle South, Studio 200 San Diego, CA, 92108 619.297.0131 Report Prepared .By: Chris French LSW Engineers California, Inc. 5560 Ruffin Rd., #1 San Diego, CA 92123 (858) 268-3224 Job Number: 2006796.000 Date: 11/2/2007 CITY OF LA QUINTA BUILDING & SAFETY DEPT. APPROVED FOR CONSTRUCTION DATE IZ !'00 BY�A - �7- 92-) The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and Is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2005 Building Energy Efficiency Standards. This program developed by EnergySoft, LLC - www.energysoft.com. EnergyPro 4.4 by EnergySoft Job Number: 2006796.000 of User Number: 3137 /ALZ&,/",- Y -Jr/ ,—w� PERFORMANCE CERTIFICATE OF COMPLIANCE Part 1 of 3 PERF -1 PROJECT NAME '' '''"" '' DATE Komar Desert Center - Bldg B&C DOCUMENTATION AUTHOR 11/2/2007 PROJECT ADDRESS BUILDING CONDITIONED FLOOR AREA 11,568 Sq.Ft. Hway 111 and Jefferson La Quinta, CA ,. PRINCIPAL DESIGNER -ENVELOPE HOTEL/MOTEL GUEST ROOM TELEPHONE Building Permit # SGPA Architecture Planning California as a civil engineer, mechanical engineer, electrical engineer, or I am a licensed architect. 619.297.0131 5537.2 or'6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed DOCUMENTATION AUTHOR F1 7 3. 1 affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document TELEPHONE Checked by/Date LSW Engineers California, Inc. ENVELOPE COMPLIANCE 858 268-3224 Enforcement Agency. Use GENERAL INFORMATION This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies only to a Building using the performance compliance approach. The documentation preparer hereby certifies that the documentation is rate an tete. DOCUMENTATION AUTHOR DATE OF PLANS DATE BUILDING CONDITIONED FLOOR AREA 11,568 Sq.Ft. CLIMATE ZONE 1 15 BUILDING TYPE ® NONRESIDENTIAL HIGH RISE RESIDENTIAL HOTEL/MOTEL GUEST ROOM PHASE OF CONSTRUCTION F ❑ 1. 1 hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to NEW CONSTRUCTION ADDITION California as a civil engineer, mechanical engineer, electrical engineer, or I am a licensed architect. EXISTING + ADDITION/ALTERATION STATEMENT OF COMPLIANCE This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies only to a Building using the performance compliance approach. The documentation preparer hereby certifies that the documentation is rate an tete. DOCUMENTATION AUTHOR SIG E DATE Chris French Chris 1a —7 The Principal Designer hereby certifys that the proposed b ' design represented in this set of construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this permit application. The proposed building as designed meets the energy efficiency requirements contained in sections 110, 116, through 118, and 140, 142, 143 or 149 of Title 24, Part 6. ENV. LTG. MECH. F ❑ 1. 1 hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am licensed in the State of California as a civil engineer, mechanical engineer, electrical engineer, or I am a licensed architect. ❑ ❑ F1 2. 1 affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code Section 5537.2 or'6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor performing this work. F1 7 3. 1 affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document because it pertains to a structure or type of work described as exempt pursuant to Business and Professions Code Sections 5537, 5538, and 6737.1. (These sections of the Business and Professions Code are printed in. full in the Nonresidential Manual.) ENVELOPE COMPLIANCE Indicate location on plans of Note Block for Mandatory Measures Required For IBJ PRINCIPAL ENVELOPE DESIGNER - NAME SIGNATOR ILIC NOO D/ SGPA Architecture Planning1 / / J Q LIGHTING COMPLIANCE Indicate location on plans of Note Block for Mandatory Measures Lighting Compliance Not In The Scope Of is Submittal Required Forms PRINCIPAL LIGHTING DESIGNER - NAME SIGNATURE LIC. NO. DATE MECHANICAL COMPLIANCE Indicate location on plans of Note Block for Mandatory Measures MKHO, MECH-2 MECH-3 MECH-5 Required Fo s PRINCIPAL MECHANICAL DESIGNER -NAME SIGNAT!j���� LIC. NO. DATE Devin A. Abellon P.E.- LSW Engineers, I 7/1 -/ k-0 j.A2 - i EnergyPro 4.4 by EnergySoft User Number. 3137 Job Number: 2006796.000 Paae:2 of 16 1 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 2 of 3 PERF -1 PROJECT NAME 711/2/2007 Komar Desert Center - Bld B&C ANNUAL TDV ENERGY USE SUMMARY kBtu/s ft- r Standard Proposed Compliance ENERGY COMPONENT Design Design Margin'snndad_ Space Heating 3.44 1.02 2.42 Space Cooling 463.83 400.76 63.07 s - Indoor Fans 119.87 161.10 -41.23 i Heat Rejection 0.00 0.00 0.00 Pumps & Misc. 0.00 0.00 0.00 Domestic Hot Water 22.36 22.36 0.00 Lighting 160.71 160.71 0.00 Receptacle 79.06 79.06 0.00. Process 153.89 153.89 0.00 0 30,60 90.420160160210240270300930880380420450 TOTALS: 1,003.16 978.90 24.26 ;-- --- - ---wr>r=- - Percent better than Standard: 2.4% ( 2.9% excluding process) BUILDING COMPLIES GENERAL INFORMATION Building Orientation E 90 deg Conditioned Floor Area 11,568 sqft. 1 201 Number of Stories Unconditioned Floor Area sqft. 10 11,568 Number of Systems Conditioned Footprint Area sqft. 171 Natural Gas Number of Zones Fuel Type Orientation Gross Area Glazing Area Glazing Ratio 2,396 130 5.4% Front Elevation E sqft. sqft. 1,626 0 0.0% Left Elevation (s) sqft. sqft. 2,242 1,026 45.8% Rear Elevation W sqft. sqft. 1,672 818 48.9% Right Elevation Total Roof (N)l sqft. sqft. ft. sqft' sgft. sqft. 7,936 1,974 24.9% =11,56L [:::::� 0.0% Standard Proposed Lighting Power Density 1.564 w/sgft. 1.564 w/sgft. Prescriptive Env. Heat Loss 2,067 Btu/h 3,199 Btu/h Prescriptive Env. Heat Gain 220,444 Btu/h-F 326,537 Btu/h-F Remarks: Run Initiation Time: 10/09/07 12:01:03 Run Code: 1191956463 EnergyPro 4.4 by EnergySoft User Number. 3137 Job Number: 2006796.000 Page:3 of 16 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 3 of 3 PERF -1 PROJECT NAME Komar Desert Center - Bldg B&C DATE 11/2/2007 ZONE INFORMATION System Name Zone Name Occupancy Type Floor Area (sqft.) Inst. LPD (W/sf)l Ctrl. Credits . (W/sf)2 Allowed LPD Proc. Loads .(VU/sf) Asea. Tailored 1N/s 3 _ W/s 4 RTU C5-1 Lease Space Office 532 *1.20 Restrm Corridor/Restroom/Support 72 *0.60 RTU 81-1 Lease Space Retail Sales, Wholesale 1,719 *1.70 Restrm Corridor/Restroom/Support 49 *0.60 RTU B2-1 Restrm Corridor/Restroom/Support 49 *0.60 Lease Space Retail Sales, Wholesale 1,771 *1.70 RTU 131-1 Lease Space Retail Sales, Wholesale 1,705 -1.7001 Restrm Corridor/Restroom/Support 49 *0.60 RTU C1-1 & RTU C1-2 Lease Space Comp Bldq Restaurant 1,151 -1.20C 16.000 RTU C1-3 Lease Space Comp Bldq Restaurant 672 *1.20C 16.000 RTU C2-1 Restrm Corridor/Restroom/Support 49 *0.60 Lease Space Retail Sales, Wholesale 1,117 *1.70 Corridor (Uncond.) Corridor/Restroom/Support 201 *0.60 RTU C3-1 Restrm Corridor/Restroom/Support 49 *0.60 Lease Space Retail Sales, Wholesale 1,137 *1.70 RTU C4-1 Restrm Corridor/Restroom/Support 49 *0.60 Lease Space Retail Sales, Wholesale 1,398 *1.70 Notes: 1. See LTG -2-C 2. See LTG -4-C 3. See LTG -5-C (items marked with asterisk, see LTG -2 -C by others) (by others) 4. See LTG -6-C Items above require special documentation EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST I ne iocai enforcement agency snouia pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification to be used with the performance approach. The local enforcement agency- determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted. The Roof Roof R-30 is a CRRC Certified Roof with Reflectance = 0.30, Emittance = 0.75. The HVAC System "Carrier 50HJ0004-3/5/6" includes an Economizer. This system has a cooling output < 75,000 Btuh or a supply cfm < 2500. The HVAC System "Carrier 50HJ0006-5 w/ DCV" includes an Economizer. This system has a cooling output < 75,000 Btuh or a supply cfm < 2500. The HVAC System "Carrier 50HJ0006-5 w/ DCV" is designated as 3 Phase, or is Exempted from the NAECA 13 SEER requirement. The HVAC System "Carrier 50HJ0006-5 w/ DCV" includes Demand Control Ventilation per Standards Section 121. The HVAC System "Carrier 50HJ0007-5 w/ DCV" includes an Economizer. This system has a cooling output < 75,000 Btuh or a supply cfm < 2500. The HVAC System "Carrier 50HJ0007-5 w/ DCV" includes Demand Control Ventilation per Standards Section 121. The HVAC System "Carrier 50HJ0008-5 w/ DCV" includes Demand Control Ventilation per Standards Section 121. The Zone "Lease Space" has a North/EasVSouth Display Perimeter Credit of 87 ft. The Zone "Lease Space" has a West Display Perimeter Credit of 14 ft. The Zone "Lease Space" has a North/East/South Display Perimeter Credit of 87 ft. The Zone "Lease Space" has a West Display Perimeter Credit of 14 ft. The Zone "Lease Space" has a North/East/South Display Perimeter Credit of 87 ft. The exceptional features listed in this performance approach application have specifically been reviewed. Adequate written justification and documentation for their use have been provided by the applicant. Authorized Signature or L EnergyPro 4.4 by EnergySoft User Number. 3137 Job Number: 2006796.000 Page:4 of 16 1 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 3 of 3 PER PROJECT NAMEDATE . Komar Desert Center - Bldq B&C Zone "Lease Space" has a West Display Perimeter Credit of 14 ft. 11/2/2007 ZONE INFORMATION has a North/East/South Display Perimeter Credit of 87 ft. The System Name Zone Name Occupancy Type Floor Area (sgft.) Inst. LPD (W/sf)l . Ctrl. Allowed LPD Credits . Aeea Tailored (W/sf)2VV/s 3 W/s 4 . Proc. Loads (W/sf) Zone "Lease Space" has a West Display Perimeter Credit of 14 ft. The Zone "Lease Space" has a North/EasVSouth Display Perimeter Credit of 87 ft. The Zone "Lease Space" has a West Display Perimeter Credit of 14 ft. The Zone "Lease Space" has a North/EasVSouth Display Perimeter Credit of 87 ft. The Zone "Lease Space" has a West Display Perimeter Credit of 14 ft. The Zone "Lease Space" has a North/EasVSouth Display Perimeter Credit of 87 ft. The Zone "Lease Space" has a West Display Perimeter Credit of 14 ft. The Zone "Lease Space' has a North/East/South Display Perimeter Credit of 87 ft. The Zone "Lease Space" has a West Display Perimeter Credit of 14 ft. Notes: 1. See LTG -2-C 2. See LTG -4-C 3. See LTG -5-C (items marked with asterisk, see LTG -2 -C by others) (by others) 4. See LTG -6-C Items above require special documentation EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST I he local enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted. The Zone "Lease Space" has a West Display Perimeter Credit of 14 ft. The Zone "Lease Space" has a North/East/South Display Perimeter Credit of 87 ft. The Zone "Lease Space" has a West Display Perimeter Credit of 14 ft. The Zone "Lease Space" has a North/EasVSouth Display Perimeter Credit of 87 ft. The Zone "Lease Space" has a West Display Perimeter Credit of 14 ft. The Zone "Lease Space" has a North/EasVSouth Display Perimeter Credit of 87 ft. The Zone "Lease Space" has a West Display Perimeter Credit of 14 ft. The Zone "Lease Space" has a North/EasVSouth Display Perimeter Credit of 87 ft. The Zone "Lease Space" has a West Display Perimeter Credit of 14 ft. The Zone "Lease Space" has a North/EasVSouth Display Perimeter Credit of 87 ft. The Zone "Lease Space" has a West Display Perimeter Credit of 14 ft. The Zone "Lease Space' has a North/East/South Display Perimeter Credit of 87 ft. The Zone "Lease Space" has a West Display Perimeter Credit of 14 ft. The exceptional features listed in this performance approach application have specifically been reviewed. Adequate written justification and documentation for their use have been provided by the applicant. Authorized Signature or Stam v.b= I EnergyPro 4.4 by EnergySoft User Number: 3137 Job Number: 2006796.000 Paae:5 of 16 CERTIFICATE OF COMPLIANCE ENV -1 -C (PROJECT NAME DATE Komar Desert Center - Bldg B&C 11/2/2007 OPAQUE SURFACES # Surface Type Area U -Fac. Insulation Cay. Cont. Act. Am. Tilt Cond: Status Joint Appendix IV Reference I Location / Comments 1 Roof 532 0.036 R-30 R-0.0 0 0 New 02-A9 Lease Space 2 Wall 14 0.074 R-19 R-0.0 -0 90 New 09-A5 Lease Space 3 Roof 7 0.036 R-30 R-0.0 0 0 New 02-A9 Restrm 4 Roof 1,71 0.036 R-30 R-0.0 0 0 New 02-A9 Lease Space 5 lWall 35d 0.074 R-19 R-0.0 90 90 New 09-A5 Lease Space 6 IDoor 2A 0.700 None R-0.0 90 90 New 28-A2 Lease Space 7 Wall 94 0.074 R-19 R-0.0 180 90 New 09-A5 Lease Space 8 Wall 224 0.074 R-19 R-0.0 270 90 New 09-A5 Lease Space 9 Roof 4 0.036 R-30 R-0.0 0 0 New 02-A9 Restrm 10 Wall ill 0.074 R-19 R-0.01 90 90 New 09-A5 Restrm 11 Roof 4 0.036 R-30 R-0.0 0 0 New 02-A9 Restrm 12 Wall ill 0.074 R-19 R-0.0 90 90 New 09-A5 Restrm 13 lRoof 1,77 0.036 R-30 R-0.0 0 0 New 02-A9 Lease Space 14 Wall 37 0.074 R-19 R-0.0 90 90 New 09-A5 Lease Space 15 Door 22 0.700 None R-0.0 90 90 New 28-A2 Lease Space 16 Wall 231 0.074 R-19 R-0.0 270 90 New 09-A5 Lease Space 17 Roof 1,70 0.036 R-30 R-0.01 0 0 New 02-A9 Lease Space 18 Wall 36 0.074 R-19 R-0.01 90 90 1 New 09-A5 Lease Space 19 Door 2 0.7001 None R-0.0 90 90 New 28-A2 Lease Space 20 lWall 23 0.074 R-19 R-0.01 270 90 New 09-A5 Lease Space - N, t_, A. H (New, ExiSting, Altered, Removed) FENESTRATION SURFACES More than or equal to 10,000 sq.ft. of site -built fenestration area must include a label certificate either Issued by NFRC or provide a CEC Default Label Certificate using the default Ll -factors from Standards Table 116-A and B. Certificate shall be filed in the contractors Drolect office durinn construction and in ma hnudlnn mann eft office after construcuo„ # 1TvDe Area U -Fac' SHGC2 Act. Am. Cond. Stat. Glazinq Type Location/ Comments 1 Window Right N 82 1.190 116-A 0.83 116-B 0 New Storefront Lease Space 2 lWindow Rear W 223 1.1901116-A 0.83 116-B 270 New Storefront Lease Space 3 lWindow Rear W 227 1.1901116-A 0.83 116-B 270 New Storefront Lease Space 4 lWindow Rear W 223 1.190 116 -Al 0.83 116-B 270 New Storefront Lease Space 5 lWindow Right N 63 1.190 116-A 0.83 116 -BI 0 New I Storefront Lease Space 6 Window Right N 127 1.190 116-A 0.83 116-B 0 New Storefront Lease Space 7 Window Rear W 130 1.190 116-A 0.83 116-B 270 New Storefront Lease Space 8 Window Rear W 223 1.190 116-A 0.83 116-B 270 New I Storefront Lease Space 9 Window Right N 190 1.190 116-A 0.83 116-B 0 New IStorefront Lease Space 10 Window Right N 167 1.190 116 -Al 0.83 116-B 0 New I Storefront I Lease Space 11 Window Front E 130 1.190 116-A 0.83 116-B 90 New IStorefront IlLease Space 12 lWindow Right N 190 1.1901116 -Al 0.83 116 -BI 0 New I Storefront Lease Space MINIMUM SKYLIGHT AREA FOR LARGE ENCLOSED SPACES (1) Ll -factor Type: 116-A Default Table from Standards, Table NI -1 Default Table from the ACM Manual Appendix, NFRC Labeled value. (2) SHGC Type: 116-B Default Table from Standards, COG Center of Glass, NFRC Labeled Value EXTERIOR SHADING # Exterior Shade Type �SHGC� Window Hgt. Wd. Overhang Len. H t. LExt.RExt. Left Fin Dist. Len. H t. Right Fin Dist. Len. H t. 1 None 0.76 10.0 25.3 7.0 0.1 15.0 0.0 2 None 0.76 10.0 22.3 14.5 0.1 15.0 4.1 0.0 0.0 0 5.0 11.1 0 3 None 0.76 10.0 22.7 14.5 0.1 15.0 15.0 4 None 0.76 10.0 22.3 14.5 0.1 15.0 15.0 5 None 0.76 10.0 6.3 28.0 0.1 0.0 32.0 6 None 0.76 10.0 12.7 6.0 0.1 20.0 0.1 7 None 0.76 10.0 13.0 12.8 0.1 10.0 10.0 8 None 0.76 10.0 22.3 14.5 0.1 10.0 10.0 9 None 0.76 10.0 19.0 6.0 0.1 0.0 14.0 10 None 0.76 10.0 25.3 7.0 0.1 15.0 0.0 11 None 0.76 10.0 13.0 7.0 0.1 0.1 10.1 12 None 1 0.76 10.0 19.0 7.0 0.1 10.8 15.0 MINIMUM SKYLIGHT AREA FOR LARGE ENCLOSED SPACES The proposed building Is in climate zones 2 through 15 and contains an enclosed space with floor area greater than 25,000 ft2, a ceiling height greater than 15 feet, and an LPD for general lighting of at least 0.5 W/142. See Section 143(c). If this box Is checked, ENV -4-C must be filled out. when submitting under the Prescriptive Compliance Approach. EnergyPro 4.4 by EnergySoft User Number. 3137 Job Number: 2006796.000 Pape:6 of 16 CERTIFICATE OF COMPLIANCE ENV -1-C (PROJECT NAME DATE Komar Desert Center - Bldg B&C 11/2/2007 OPAQUE SURFACES # Surface Type I Area U -Fac. Insulation Cay. Cont. Act. Am. Tilt Cond: Status Joint Appendix IV Reference Location / Comments 21 Roof 1 49 0.036 R-30 R-0.0 0 0 New 02-A9 Restrm 22 Wall 1 113 0.074 R-19 R-0.0 90 90 New 09-A5 Restrm 23 Roof 1 1,15- 0.036 R-301 R-0.0 0 0 New 02-A9 Lease Space 24 Wall 304 0.074 R-19 R-0.0 0 90 New 09-A5 Lease Space 25 lWall 52 0.074 R-19 R-0.0 270 90 New 09-A5 Lease Space 26 Roof 672 0.036 R-30 R-0.0 0 0 New 02-A9 Lease Space 27 Demising 390, 0.110 R-11 R-0.0 0 90 New 09-A2 Restrm faces Uncond. Corridor 28 Roof 4 0.036 R-30 R-0.0 0 0 New 02-A9 Restrm 29 Roof 1,11 1 0.036 R-30 R-0.01 0 0 New 02-A9 Lease Space 30 Wall 10 0.074 R-191. R-0.0 0 90 New 09-A5 Lease Space 31 Demising 10 0.110 R-11 R-0.0 0 1 90 New 09-A2 Restrm faces Uncond. Corridor 32 lRoof 45, 0.0361 R-30 R-0.0 0 0 New 02-A9 Restrm misin 20 0.110 R-11 R-0.0 0 90 New09 A2 LeaseS ace faces Uncond. Corridorl 24 0.074 R-19 R-0.0 180 90 New 09-A5 LeaseS ace r 2 0.700 None R-0.0 180 90 New 28-A2 LeaseS ace f E 1,13 0.0361 R-30 R-0.0 0 0 New 02-A9 LeaseS ace ll 126 0.074 R-19 R-0.0 0 90 New 09-A5 LeaseS ace l 11 0.074 R-19 R-0.0 180 90 New 09-A5 Restrm ll 11 0.074 R-19 R-0.0 90 90 New 09-A5 Restrm f 1 4 0.036 R-30 R-0.0 0 0 1 New 02-A9 Restrm v, c, n. , t'—, caisnng, Nrtereu, nemoveu) FENESTRATION SURFACES u e r-1-1ior equar - LV,Vua 5WL or bile-ouin renesirauon area must incivae a 1aoel cenlllcale enner Issueo Oy NYMU or provide a ctt: Uetault Label Gertitiople using the default U -factors from Standards Table 116-A and B. Certificate shall be filed in the contractor's project office dudn constructlon and in the building manager's office after construction Act. Cond. Location/ # Tvpe Area I -Fac? I SHGC' Am. Stat. Glazing Tvne CnmmPnts 1 u -rector type: 11U -A uetawt table from standards, i able NI -1 Default Table from the ACM Manual Appendix, NFRC Labeled value. 2 SHGC Type: 116-B Default Table from Standards, COG Center of Glass, NFRC Labeled Value EXTERIOR SHADING Window Overhang Left Fin Right Fin # Exterior Shade Type SHGC Hgt. Wd. Len. H t. LExt.RExt. Dist. Len. H t. Dist. Len. H t. I I MINIMUM SKYLIGHT AREA FOR LARGE ENCLOSED SPACES Urnu proposed ouuamg is in cnmate zones z mrougn 10 and contains an enclosed space with floor area greater than 25,000 ft2, a ceiling height greater than 15 feet, and an LPD for general lighting of at least 0.5 W/ft2. See Section 143(c). If this box is checked, ENVA-C must be filled out. when submitting under the Prescriptive Compliance Approach. I EnergyPro 4.4 by EnergySoft User Number: 3137 Job Number: 2006796.000 Page:7 of 16 1 CERTIFICATE OF COMPLIANCE ENV -1-C' PROJECT NAME DATE Komar Desert Center - Bldg B&C 11/2/2007 OPAQUE SURFACES # Surface Type Area 6Fac. Insulation Cay. Cont. Act. Am. Tilt Cond: Status Joint Appendix IV Reference Location / Comments 41 Wall 65& 0.074 R-19 R-0.0 90 90 New 09-A5 Lease Space 42 Wall 284 0.074 R-19 R-0.0 180 90 New 09-A5 Lease Space 43 Door 2A 0.700 None R-0.0 180 90 New 28-A2 Lease Space 44 Roof 1,398 0.036 R-30 R-0.0 0 0 New 02-A9 Lease Space 45 Wall 17C 0.074 R-19 R-0.0 0 90 New 09-A5 Lease Space I I ' N. E, A, R (New, Existing, P FENESTRATION More than or equal to 10,000 sq.h. of site -built fenestration area must Include a label certificate either issued by NFRC or provide a CEC Default Label Certificate using the default Ll -factors from Standards Table 116-A and B. Certificate shall be filed In the contractor's project office during construction and In the building manager's office after construction Act. Cond. Location/ # Tvpe Area U -Fac' SHGC2 Am. Stat. Glazi'n_q Type Comments I i I I u-iaclor i ype: 11 b -A ueraun I able from tiumoaras, cable NH uelault Iable from the AGM Manual Appendix, NFRC Labeled value. 2 SHGC Type: 116-B Default Table from Standards, COG Center of Glass, NFRC Labeled Value EXTERIOR SHADING Window Overhang Left Fin Right Fin # Exterior Shade Type SHGC Hgt. Wd. Len. H t. LExt.RExt. Dist. Len. H t. Dist. Len. H t. MINIMUM SKYLIGHT AREA FOR LARGE ENCLOSED SPACES The proposed building is in climate zones 2 through 15 and contains an enclosed space with floor area greater than 25,000 ft2, a calling height greater than 15 feet, and an LPD for general lighting of at least 0.5 Wtft2. See Section 143(c). If this box is checked, ENV -4-C must be filled out. when submitting under the Prescriptive Compliance Approach. EnergyPro 4.4 by EnergySoft User Number. 3137 Job Number: 2006796.000 Paae:8 of 16 1 CERTIFICATE OF COMPLIANCE MECH-I-C ECT NAME Komar Desert Center - Blda B DATE 11/2/2007 Designer: This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for mechanical systems. The designer is required to check the boxes by all acceptance tests that apply and list all equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the equipment description and the number of systems to be tested in parentheses. The NJ number designates the Section in the Appendix of the Nonresidential ACM Manual that describes the test. Also indicate the person responsible for performing the tests (i.e. the installing contractor, design professional or an agent selected by the owner). Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Building Departments: SYSTEM ACCEPTANCE. Before an occupancy permit is granted for a newly constructed building or space, or a new space -conditioning system serving a building or space is operated for normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. In addition a Certificate of Acceptance, MECH-I-A Form shall be submitted to the building department that certifies plans, specifications, installation certificates, and operating and maintenance information meet the requirements of Section 10-103(b) and Title 24 Part 6. STATEMENT OF COMPLIANCE ❑ MECH-2-A: Ventilation System Acceptance Document -Variable Air Volume Systems Outdoor Air Acceptance -Constant Air Volume Systems Outdoor Air Acceptance Equipment requiring acceptance testing Test required on all New systems both New Construction and Retrofit. ❑ MECH-3-A: Packaged HVAC Systems Acceptance Document Equipment requiring acceptance testing Test required on all New systems both New Construction and Retrofit. ❑ MECH-4-A: Air -Side Economizer Acceptance Document Equipment requiring acceptance testing Test required on all New systems both New Construction and Retrofit. Units with economizers that are installed at the factory and certified with the commission do not require equipment testing but do requ!re construction inspection. ❑ MECH-5-A: Air Distribution Acceptance Document Equipment requiring acceptance testing This test required If the unit serves 5.000 V of space or less and 25% or more of the ducts are in nonconditioned or semiconditioned space like an attic. New systems that meet the above requirements. Retrofit systems that meet the above requirements and either extend ducts, replace ducts or replace the packaged unit. ❑ MECH-6-A: Demand Control Ventilation Acceptance Document Equipment requiring acceptance testing All new DCV controls installed on new or existing packaged systems must be tested. ❑ MECH-7-A: Supply Fan Variable Flow Control Acceptance Document Equipment requiring acceptance testing All new VA fan volume controls installed on new or existing systems must be tested ❑ MECH-8-A: -Hydronic System Control Acceptance Document -Variable Flow Controls Applies to chilled and hot water systems. -Automatic Isolation Controls Applies to new boilers and chillers and the primary pumps are connected to a common header. -Supply Water Temperature Reset Controls Applies to new constant flow chilled and hot water systems that have a design capacity greater than or equal to 500,000 Bfu/hr. -Water-loop Heat Pump Controls Applies to all new watedoop heat pump systems where the combined loop pumps are greater than 5 hp. -Variable Frequency Controls Applies to all new distribution pumps on new variable flow chilled, hydronic heat pump or condenser water systems where the pumps motors are greater than 5 hp. Equipment requirin acceptance testing EnergyPro 4.4 by EnergySoft User Number. 3137 Job Number: 2006796.000 Page:9 of 16 AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2-C PROJECT NAME DATE Komar Desert Center - Bldg B&C 11/2/2007 SYSTEM FEATURES . ITEM OR SYSTEM TAG(S) Number of Systems T-24 MANDATORY MEASURES Section Heating Equipment Efficiency Cooling Equipment Efficiency Heat Pump Thermostat Furnace Controls Natural Ventilation Minimum Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation PRESCRIPTIVE MEASURES Calculated Heating Capacity x 1.43 2 Proposed Heating Capacity 2 Calculated Sensible Cooling Capacity x 1.212 Proposed Sensible Cooling Capacity 2 Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heating Air Supply Reset Cooling Air Supply Reset Duct Sealing for Prescriptive Compliance AIR SYSTEMS Central or Single Zone RTU C5-1. RTU B1-1 RTU 132-1 1 1 1 Reference on Plans or Specification 1 112(a) 7.70 HSPF 7.70 HSPF 7.70 HSPF 112(a) 13.1 SEER / 11.0 EER 13.0 SEER / 11.0 EER 13.0 SEER / 11.0 EER 112(b) Yes Yes Yes 112(c), 115(a) n/a n/a n/a 121(b) Yes Yes Yes 121 b 230 cfm 358 cfm 366 cfm 121 c No No No 121 c No Yes Yes 121 c 122(e) Programmable Switch Programmable Switch Programmable Switch 122(e) Heating & Cooling Required Heating & Cooling Required Heating & Cooling Required 122(f) Auto Auto Auto 122 n/a n/a n/a 123 124 R-8.0 R-8.0 R-8.0 144 a & b n/a n/a n/a 144 a & b 21,610 btuh 35,101 btuh 35,101 btuh 144 a & b n/a n/a n/a 144 a & b 26,921 btuh 46,981 btuh 47,102 btuh 144 c Constant Volume Constant Volume Constant Volume 144 (c 144 c Yes Yes Yes 144 d No No No 144 a Diff. Enth Non-Inte Diff. Enth Non-Inte Diff. Enth Non-Inte 144 f Constant Temp Constant Temp Constant Tem 144 (f) Constant Temp Constant Temp Constant Temp 144 k No No No 1: For each central and single zone air systems (or group of similar units) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" in the column. 2: Not required for hydronic heating and cooling. Either enter a value here or put in reference of plans and specificatons per footnote 1. 3: Enter Yes if System is: Constant Volume, Single Zone; Serves < 5,000 sqft; Has > 25% duct in unconditioned space. Duct sealing is required for Prescriptive Compliance, see PERF -1 for performance method duct sealing requirements. stun Inniatlon Ilme: iumumt iz:ui:u3 Faun code: 1191956463 EnergyPro 4.4 by EnergySoft User Number. 3137 Job Number: 2006796.000 Page:10 of 16 AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2-C (PROJECT NAME DATE Komar Desert Center - Bldg B&C 11/2/2007 SYSTEM FEATURES ITEM OR SYSTEM TAG(S) Number of Systems T-24 MANDATORY MEASURES Section Heating Equipment Efficiency Cooling Equipment Efficiency Heat Pump Thermostat Furnace Controls Natural Ventilation Minimum Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation PRESCRIPTIVE MEASURES Calculated Heating Capacity x 1.43 2 Proposed Heating Capacity 2 Calculated Sensible Cooling Capacity x 1.212 Proposed Sensible Cooling Capacity 2 Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heating Air Supply Reset Cooling Air Supply Reset Duct Sealing for Prescriptive Compliance 1: For each central and single zone air systems (or group of similar units) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" in the column. 2: Not required for hydronic heating and cooling. Either enter a value here or put in reference of plans and specificatons per footnote 1. 3: Enter Yes if System is: Constant Volume, Single Zone; Serves < 5,000 sgft; Has > 25% duct in unconditioned space. Duct sealing is required for Prescriptive Compliance, see PERF -1 for performance method duct sealing requirements. AIR SYSTEMS Central or Single Zone RTU 61-1 RTU C1-1 &RTU C1-2 RTU C1-3 1 1 2 1 Reference on Plans or Specification 1 112(a) 7.70 HSPF 2.20 COP 2.20 COP 112(a) 13.0 SEER / 11.0 EER 11.0 EER 10.5 EER 112 b Yes Yes Yes 112(c), 115(a).n/a 46,667 btuh n/a n/a 121(b) Yes Yes Yes 121 b 229 cfm 97 cfm 57 cfm 121 c No No No 121 c Yes Yes Yes 121 c 122(e) Pro rammable Switch Programmable Switch Programmable Switch 122(e) Heating & Cooling Required Heating & Cooling Required Heating & Cooling Required 122(f) Auto Auto Auto 122 n/a n/a n/a 123 124 R-8.0 R-8.0 R-8.0 144 a & b n/a n/a n/a 144 a & b 35,101 btuh 86,191 btuh 54,650 btuh 144 a & b n/a n/a n/a 144 a & b 46,667 btuh 121,929 btuh 67,959 btuh 144 c Constant Volume Constant Volume Constant Volume 144 (c) 144 c Yes Yes Yes 144 d No No No 144 a Diff. Enth Non-Inte Diff. Enth Non-Inte) Diff. Enth Non-Inte 144 f Constant Temp Constant Temp Constant Tem 144 (f) Constant Temp Constant Temp Constant Temp 144 k No No No EnergyPro 4.4 by EnergySoft User Number: 3137 Job Number: 2006796.000 Page: 11 of 16 AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2-C (PROJECT NAME DATE Komar Desert Center - Bldg B&C 11/2/2007 SYSTEM FEATURES ITEM OR SYSTEM TAG(S) Number of Systems T-24 MANDATORY MEASURES Section Heating Equipment Efficiency Cooling Equipment Efficiency Heat Pump Thermostat Furnace Controls Natural Ventilation Minimum Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation PRESCRIPTIVE MEASURES Calculated Heating Capacity x 1.43 2 Proposed Heating Capacity 2 Calculated Sensible Cooling Capacity x 1.212 Proposed Sensible Cooling Capacity 2 Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heating Air Supply Reset Cooling Air Supply Reset Duct Sealing for Prescriptive Compliance 1: For each central and single zone air systems (or group of similar units) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" in the column. 2: Not required for hydronic heating and cooling. Either enter a value here or put in reference of plans and specificatons per footnote 1. 3: Enter Yes if System is: Constant Volume, Single Zone; Serves < 5,000 sqft; Has > 25% duct in unconditioned space. Duct sealing is required for Prescriptive Compliance, see PERF -1 for performance method duct sealing requirements. AIR SYSTEMS, Central or Sin le Zone RTU C2-1 RTU C3-1 RTU C4-1 1 1 1 Reference on Plans or Specification 1 112(a) 7.70 HSPF 7.70 HSPF 7.70 HSPF 112(a) 13.0 SEER / 11.0 EER 13.0 SEER / 11.0 EER 13.0 SEER / 11.0 EER 112 b Yes Yes Yes 112(c), 115 a n/a n/a n/a 121(b) Yes Yes Yes 121 b 185 cfm 186 cfm 206 cfm 121 c No No No 121 c Yes Yes Yes 121 c 122(e) Programmable Switch I Programmable Switch Programmable Switch 122(e) Heating & Cooling Re uired Heating & Cooling Required Heatinq & Cooling Required 122(f) Auto I Auto Auto 122 n/a n/a n/a 123 124 R-8.0 R-8.0 R-8.0 144 a & b n/a n/a n/a 144 a & b 35,101 btuh 35,101 btuh 35,101 btuh 144 a & b n/a n/a n/a 144 a & b 46,703 btuh 46,681 btuh 46,600 btuh 144 c Constant Volume Constant Volume Constant Volume 144 c 144 c Yes Yes Yes 144 d No No No' 144 a Diff. Enth Non-Inte Diff. Enth Non-Inte ) Diff. Enth Non-Inte 144 f Constant Temp Constant Temp Constant Tem 144 (f) Constant Temp Constant Temp Constant Temp 144 k No No No Run Initiation Time: 10/09/07 12:01:03 Run Code: 1191956463 EnergyPro 4.4 by EnergySoft User Number: 3137 Job Number: 2006796.000 Page: 12 of 16 MECHANICAL VENTILATION MECH-3-C (PROJECT NAME DATE Komar Desert Center - Bldg B&C 11/2/2007 PRESCRIPTIVE REHEAT LIMITATION (Section 144(d)) MECHANICAL VENTILATION Section 121(b)2) AREA BASIS OCCUPANCY BASIS VAV MINIMUM A B C D E F G H I J K L M N ZONE/SYSTEM o DO �1 fD n' C U)Q c dvn W tD -h '111 E o a� ��O' K >0 0; -A `� d vr- mB L Q' �� ° v n N <D -n �' � mph O x n -n T EM D 0 X � O 0 `- D p n ro 'n ,fin N � D10 IV p A O -n N �a9 a o w T� 9 y K A O a A 0 W3fv 0 7 x O N O T= 0 mcc > 09 ^ P > T T. D Lease Space 532 0.15 80 5.3 15.0 80 80 80 Restrm 72 0.15 11 11 150 RTU C5-1 Total 91 230 Lease Space 1,719 0.25 430 17.2 15.0 258 430 258 172 Restrm 49 0.15 7 7 100 RTU 61-1 Total 437 358 Restrm 49 7 100 Lease Space 1,77 0.25 443 17.7 15.0 266 443 266 177 RTU B2-1 Total 450 366 Lease Space 1,705 0.25 426 17.1 7.6 129 426 129 297 Restrm 4S 0.151 7 7 100 RTU 131-1 Total 434 229 Lease Space 1,15 0.38 437 11.5 8.4 97 437 97 340 RTU C1-1 & RTU C1-2 Total 437 97 II I Lease Space 672 0.381 255 6.7 8.4 57 255 57 199 RTU C1-3 Total 255 57 Restrm 49 0.15 7 7 100 Lease Space 1,117 0.25 279 11.2 7.6 85 279 85 195 RTU C2-1 Total 287 185 Restrm 49 0.15 7 7 100 Lease Space 1,137 0.25 284 11.4 7.6 86 284 86 198 RTU C3-1 Total 292 186 Restrm 49 0.15 7 7 100 Lease Space 11398 0.25 350 14.0 7.6 106 350 106 244 RTU C4-1 r Total 357 206 C Minimum ventilation rate per Section 121 Table 121-A E Based on fixed seat or the greater of the expacted number of occupants and 50% of the CBC occupant load foregress purposes fors aces Without fixed seating. H Required Ventilation Air REO'D V.A. is the larger of the ventilation rates calculated on and AREA or OCCUPANCY BASIS column D or G). I Must be greater than orequal to H or use Transfer Air column N to make up the difference. J Design tan supply cfm Fan CFM x 30%; or K Condition area ft. s x 04 cfm/(t. sq.; or L Maximum of Columns H, J. K, or 300 cfm M This must be less than orequal to Column L and greater that orequal to the sum of Columns H + N. N Transfer air must be provided where the Required Ventilation Air (column 1) is greater than the Design Minimum Air (column M). Where required, transfer air must be greater than or equal to the difference between the Required Ventilation Air (column 1) and the Design Minimum Air (column M), column H - M. EnergyPro 4.4 by EnergySoft User Number: 3137 Job Number: 2006796.000 Page: 13 of 16 a>w MECHANICAL EQUIPMENT DETAILS Part 1 of 2 MECH-5-C PROJECT NAME Komar Desert Center - Bld-q B&C DATE 11/2/2007 CHILLER AND TOWER SUMMARY System Name System Type Efficiency Tons PUMPS Eff. Equipment Name Equipment TypeQty. Condition Status Tot. Qty GPM BHP Motor Eff. Drive Eff. Pump Control 7.70 HSPF 36,700 13.1 SEER/ 11.0 EER New Diff. Enth (Non-Integ) Carrier 50HJQ006-5 w/ DCV Packaged DX 6 56,200 0.0 7.70 HSPF 61,000 13.0 SEER / 11.0 EER New Diff. Enth (Non-Integ) Carrier 50HJ0007-5 w/ DCV Packaged DX 2 69,000 0. 2.20 COP 76,000 11.0 EER New Diff. Enth (Non-Integ) Carrier 50HJ0008-5 w/ DCV Packaged DX 1 87,500 0.0 2.20 COP 91,300 10.5 EER New Diff. Enth Non-Inte DH BOILER SUMMARY Energy I Standby rrANK INSUL. Rated Vol. I Condition Factor Loss or Ext. System Name System Type Distribution Type QtyInput I (Gals.) ' Status or RE Pilot I R -Val. CENTRAL SYSTEM RATINGS HEATING COOLING System Name System Type PW Output Aux. kW Eff. Out ut Efficiency Condition Status Economizer Type Carrier 50HJ0004-3/5/6 Packaged DX 1 34,600 0.0 7.70 HSPF 36,700 13.1 SEER/ 11.0 EER New Diff. Enth (Non-Integ) Carrier 50HJQ006-5 w/ DCV Packaged DX 6 56,200 0.0 7.70 HSPF 61,000 13.0 SEER / 11.0 EER New Diff. Enth (Non-Integ) Carrier 50HJ0007-5 w/ DCV Packaged DX 2 69,000 0. 2.20 COP 76,000 11.0 EER New Diff. Enth (Non-Integ) Carrier 50HJ0008-5 w/ DCV Packaged DX 1 87,500 0.0 2.20 COP 91,300 10.5 EER New Diff. Enth Non-Inte MECHANICAL EQUIPMENT DETAILS Part 2 of 2 MECH-5-C PROJECT NAME Komar Desert Center - Bldg B&C DATE 11/2/2007 ZONE TERMINAL SUMMARY TERMINAL UNIT VAV RMI 4AL EA N Zone Name System Name System Type Heating Cooling oty. Min CFM Ratio I Reheat Coil CFM BHP Motor Eff. Drive Eff. EXHAUST FAN SUMMARY EXHAUSTFAN EXHAUST AN Room Name aty. CFM BHP Motor Eff. Drive Eff. Room Name CFM BHP Motor Eff. Drive Eff. C3 Restrm 1.0 15 0.12 49.0°/ 97.0% B-3 Restrm t 10 0.10 49.0°/ 97.0% B-1 Restrm 1.0 10 0.10 49.0°/ 97.0% C2 Restrm 100 0.10 49.0°/ 97.0% B-2 Restrm 1.0 100 0.10 49.0% 97.0% Uncond. Corridor. 1.0 10 0.10 49.00/ 97.0% Run Initiation Time: 10/09/07 12:01:03 Run Code: 1191956463 EnergyPro 4.4 by EnergySoft User Number. 3137 Job Number: 2006796.000 Page: 15 of 16 MECHANICAL EQUIPMENT DETAILS Part 2 of 2 MECH-S-C