07-0820 (CSCS) Title 24TITLE 24 REPORT
Title 24. Report for:
Komar Desert Center - Bldg B&C
Hway 111 and Jefferson
La Quinta, CA, 92253
Project Designer:
SGPA Architecture Planning
1545 Hotel Circle South, -Studio 200
San Diego, CA, 92108
619.297.0131
Report Prepared By:
Chris French
LSW Engineers California, Inc.
5560 Ruffin Rd., #1
San Diego, CA 92123
(858) 268-3224
Job Number:
2006796.000
CITY OF LA QUINTA
BUILDING & SAFETY DEPT.
APPROVED
FOR CONSTRUCTION
DATE? //
� MAY 3 12007
Date:
5/23/2007 ' [By
The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is
authorized by the California Energy Commission for use with both the Residential and Nonresidential 2005 Building Energy Efficiency Standards.
This program developed by EnergySoft, LLC - www.energysoft.com.
EnergyPro 4.3 by EnergySoft Job Number: 2006796.000 User Number: 3137
,- &?;� hlwy ///
1PERFORMANCE CERTIFICATE OF COMPLIANCE Part 1 of 3 PERF -11
PROJECT NAME
This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the
DATE
Komar Desert Center - Bldg. B&C
DATE OF PLANS
5/23/2007
PROJECT ADDRESS
11,598 Sq.Ft.
Hway 111 and Jefferson La Quinta, CA
BUILDING TYPE ®
NONRESIDENTIAL HIGH RISE RESIDENTIAL
PRINCIPAL DESIGNER - ENVELOPE
TELEPHONE
Building Ienfiit ##
SGPA Architecture Planning
619.297.0131
California as a civil engineer, mechanical engineer, or I am a licensed architect.
DOCUMENTATION AUTHOR
TELEPHONE
Checked 6y/Date
LSW Engineers California, Inc.
858 268-3224
Enforcement Agency Use
GENERAL INFORMATION
This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the
California Code of Regulations. This certificate applies only to a Building using the performance compliance approach.
The documentation preparer hereby certifies that the documentation is accurate and complete.
DATE OF PLANS
SIGN
BUILDING CONDITIONED FLOOR AREA
11,598 Sq.Ft.
CLIMATE ZONE
15
BUILDING TYPE ®
NONRESIDENTIAL HIGH RISE RESIDENTIAL
HOTELtMOTEL GUEST ROOM
PHASE OF CONSTRUCTION
NEW CONSTRUCTION ADDITION
❑ F-� 1. 1 hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to
EXISTING + ADDITION/ALTERATION
STATEMENT OF COMPLIANCE
This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the
California Code of Regulations. This certificate applies only to a Building using the performance compliance approach.
The documentation preparer hereby certifies that the documentation is accurate and complete.
DOCUMENTATION AUTHOR
SIGN
DATE
Chris French
57• 23-v7
The Principal Designer hereby certifys that the proposed bu ng design represented in this set of construction documents is
consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this
permit application. The proposed building as designed meets the energy efficiency requirements contained in sections 110, 116,
through 118, and 140, 142, 143 or 149 of Title 24, Part 6.
ENV. LTG. MECH.
❑ F-� 1. 1 hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to
sign this document as the person responsible for its preparation; and that I am licensed in the State of
California as a civil engineer, mechanical engineer, or I am a licensed architect.
❑ 2. 1 affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code Section
5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed
contractor performing this work.
❑ 3. 1 affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document
because it pertains to a structure or type of work described as exempt pursuant to Business and Professions
Code Sections 5537, 5538, and 6737.1. (These sections of the Business and Professions Code are printed in
full in the Nonresidential Manual.)
ENVELOPE COMPLIANCE
Indicate location on plans of Note Block for Mandatory Measures
-1
Required F
PRINCIPAL ENVELOPE DESIGNER - NAME
SIG NAT
LIC NO.
G/
DAT
SGPA Architecture Planning
/�o
O
LIGHTING COMPLIANCE
Indicate location on plans of Note Block for Mandatory Measures
Lighting Compliance Not In The Scope Of
This Sub Itra1
Required Forms
PRINCIPAL LIGHTING DESIGNER - NAME
SIGNATURE
LIC. NO.
DATE
MECHANICAL COMPLIANCE
Indicate location on plans of Note Block for Mandatory Measures
ECH-1, MECH-2 MECH-3 MECH-5
Required Forms
PRINCIPAL MECHANICAL DESIGNER - NAME
SIG E
NO.
DATE
Devin A. Abellon P.E.- LSW En ineers
]LIC.
31/-l8
S'•2-3 •L7
io
I EnergyPro 4.3 by EnergySoft User Numbe:: 3137 Job Number: 2006796.000 Paoe:2 of 16 1
PERFORMANCE CERTIFICATE OF COMPLIANCE Part 2 of 3 PERF-1�
PROJECT NAME I DATE
Desert Center -
ANNUAL TDV ENERGY USE SUMMARY kBtu/s ft- r
ENERGY COMPONENT
Standard
Design
11,598
Proposed
Design
1
Compliance
Margin
9
Space Heating
Space Cooling
Indoor Fans
Heat Rejection
Pumps & Misc.
Domestic Hot Water
Lighting
Receptacle
Process
TOTALS:
Percent better than Standard:
3.03
0.63
2.40""'"M0''-
°MY'
°t r
0 30 W +9012015018021024OZ7O3W93MW3964904so
process)
466.41
379.89
86.53
119.58
159.34
-39.76
0.00
0.00
0.00
0.00
0.00
0.00
22.94
22.94
000
166.65
166.65
0.00
79.36
79.36
0.00'"`
153.48
153.48
0.00
1,011.46
962.30
49.16
4.9%
( 5.7% excluding
Building Orientation
Number of Stories
Number of Systems
Number of Zones
E 90 deg
Conditioned Floor Area
Unconditioned Floor Area
Conditioned Footprint Area
Fuel Type
11,598
sqn.
sqn.
sqft.
1
201
9
11,598
15
Natural Gas
E
2,396 sqn.
Standard Proposed
Orientation
Gross Area
Glazing Area
Glazing Ratio
1.594
w/sqn.
Prescriptive Env. Heat Loss
Front Elevation
E
2,396 sqn.
130 sqn.
5.4%
Left Elevation
s
1,626 sgft.
0 sqn.
0.0%
Rear Elevation
W
2,242 sqn.
1,026 sqn.
45.8%
Right Elevation
(N)
1,673 sqn.
823 sqn.
49.2%
Total
7,936 sqn.
1,979 sqn.
24.9%
Roof
11,598 sqn.
sqn.
0.0%
Standard Proposed
Lighting Power DensityABtu/h-F
w/sqn.
1.594
w/sqn.
Prescriptive Env. Heat Loss
Bram
3,206
Btu/h
Prescriptive Env. Heat Gain
327,256
Btu/h-F
Remarks:
rtun imuauon i ime: U5/13/U/ U/:25:34 faun code: 1179930394
EnergyPro 4.3 by EnergySoft User Number. 3137 Job Number: 2005796.000 Paae:3 of 16
PERFORMANCE CERTIFICATE OF COMPLIANCE Part 3 of 3 PERF -1
PROJECT NAME
Komar Desert Center - Bldg
B&C
DATE
5/23/2007
ZONE INFORMATION
System Name
Zone Name
Occupancy Type
Floor
Area
(sgft.
Inst. . Ctrl.
LPD Credits
W/s
( o1 (W/sf)2 .
Allowed.LPD .".Proc.
=AreaTailored 'Loads
/s 3 , :W/s 4: .(Vy/sf).
RTU B1-1
Lease Space
Retail Sales, Wholesale
1,719
"1.70
Restrm
Corridor/Restroom/Support
49
'0.60
RTU B2-1
Restrm
Condor/Restroom/Support
49
-0.60
Lease Space
Retail Sales, Wholesale
1,771
'1.70
RTU B1-1
Lease Space
Retail Sales, Wholesale
1,705
'1.70
Restrm
Corridor/Restroom/Support
49
'0.60
RTU C1-1 & RTU C1-2
Lease Space
Comp Bldg Restaurant
1,151
'1.20
16.000
RTU C1-3
Lease Space
Comp Bldg Restaurant
672
"1.20
16.000
RTU C2-1
Restrm
Corridor/Restroom/Support
49
'0.60
Lease Space
Retail Sales, Wholesale
1,271
'1.70
Corridor Uncond.
Corridor/Restroom/Support
201
'0.60
RTU C3-1
Restrm
Corridor/Restroom/Support
49
'0.60
Lease Space
Retail Sales, Wholesale
1,618
'1.70 ;
RTU C4-1
Restrm
Condor/Restroom/Support
49
*0.6001
Lease Space
Retail Sales, Wholesale
1,398
*1.700.
Notes: 1. See LTG -2-C 2. See LTG -4-C 3. See LTG -5-C
(items marked with asterisk, see LTG -2 -C by others) (by others)
4. See LTG -6-C Items above requirespecial.documentation
EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST
..0 w,a� cnw�cemenr agency anuwu pay spmaiii anenaon co me nems specmeo in tms cnecKtlSt. l nese items require special written justification
and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of
the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation
euhmitforl_
The Roof Roof R-30 is a CRRC Certified Roof with Reflectance = 0.30, Emittance = 0.75.
The HVAC System "Carrier 50HJ0006-5 w/ DCV" includes an Economizer. This system has a cooling output < 75,000 Btuh or a supply cfm < 2500.
The HVAC System "Carrier 50HJ0006-5 w/ DCV' is designated as 3 Phase, or is Exempted from the NAECA 13 SEER requirement.
The HVAC System "Carrier 50HJ0006-5 w/ DCV" Includes Demand Control Ventilation per Standards Section 121.
The HVAC System "Carrier 50HJ0007-5 w/ DCV" Includes an Economizer. This system has a cooling output < 75,000 Btuh or a supply cfm < 2500.
The HVAC System "Carrier 50HJQ007-5 w/ DCV" includes Demand Control Ventilation per Standards Section 121.
The HVAC System "Carrier 50HJQ008-5 w/ DCV" includes Demand Control Ventilation per Standards Section 121.
The Zone "Lease Space" has a North/East/South Display Perimeter Credit of 87 ft.
The Zone "Lease Space" has a West Display Perimeter Credit of 14 ft.
The Zone "Lease Space" has a North/East/South Display Perimeter Credit of 87 ft.
The Zone "Lease Space" has a West Display Perimeter Credit of 14 ft.
The Zone "Lease Space" has a North/East/South Display Perimeter Credit of 87 ft.
The Zone "Lease Space" has a West Display Perimeter Credit of 14 ft.
1— cnwpuunm ICawrCs ns"cu in rnrs penormance approacn appncauon nave specimcaoy been reviewers. Adequate written justification and
documentation for their use have been provided by the applicant.
or
EnergyPro 4.3 by EnergySoft User Number. 3137 Job Number: 2006796.000 PageA of 16-1
PERFORMANCE CERTIFICATE OF COMPLIANCE Part 3 of 3 PERF -1
PROJECT NAME
Komar Desert Center - Bldg B&C
DATE
5/23/2007
ZONE INFORMATION
System Name Zone Name Occupancy Type
Floor Inst.
Area LPD
(sgftJ (W/sf)1
' Ctrl. Allowed LPD 'Proc. f
Credits Arealored 'Loads
'(1N/sf)2 /s 3 W/s: 4
Notes: 1. See LTG -2-C 2. See LTG -4-C 3. See LTG -5-C
(items marked with asterisk, see LTG -2 -C by others) (by others)
4. See LTG -6-C
Items above require special documentation
EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST
The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification
and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of
the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation
submitted.
The Zone "Lease Space" has a North/East/South Display Perimeter Credit of 87 ft.
The Zone "Lease Space' has a West Display Perimeter Credit of 14 ft.
The Zone "Lease Space" has a North/East/South Display Perimeter Credit of 87 ft.
The Zone "Lease Space" has a West Display Perimeter Credit of 14 ft.
The Zone "Lease Space" has a North/East/South Display Perlmeter Credit of 87 ft.
The Zone "Lease Space' has a West Display Perimeter Credit of 14 ft.
The Zone "Lease Space" has a North/East/South Displav Perimeter Credit of 87 ft.
The Zone "Lease Space" has a West Dis la Perimeter Credit of 14 ft.
The Zone "Lease Space" has a North/East/South Display Perimeter Credit of 87 ft.
The Zone "Lease Space" has a West Display Perimeter Credit of 14 ft.
The exceptional features listed in this performance approach application have specifically been reviewed. Adequate written justification and
documentation for their use have been provided by the applicant.
Authorized
I EnergyPro 4.3 by EnergySoft User Number. 3137 Job Number: 2006796.000 Paoe:5 of 16 1
CERTIFICATE OF COMPLIANCE ENV -1-C1
PROJECT NAME DATE
Komar Desert Center - Bldg Bk 5/23/2007
OPAQUE SURFACES
# Surface
Tvpe
Area
U -Fac.
Insulation
Cay. Cont.
Act.
Am.
Tilt
Cond:
Status
Joint Appendix
IV Reference
Location / Comments
1 Roof
1.71
0.036
R-30
R-0.0
0
0
New
02-A9
Lease Space
2 Wall
35
0.074
R-19
R-0.0
90
90
New
09-A5
Lease Space
3 Door
Z
0.700
None
R-0.0
90
90
New
28-A2
Lease S ace .
4 Wall
94
0.074
R-19
R-0.0
180
90
New
09-A5
Lease Space.
5 lWall
1 221
0.074
R-19
R-0.01
270
90
New
09-A5
Lease Space
6 Roof
4
0.036
R-30
R-0.0
0
0
New
02-A9
Restrm
7 Wall
11
0.074
R-19
R-0.0
90
90
New
09-A5
Restrm
8 Roof
4
0.036
R-30
R-0.0
0
0
New
02-A9
Restrm
9 Wall
11
0.074
R-19
R-0.0
90
90
New
09-A5
Restrm
10 Roof
1,77
0.036
R-30
R-0.0
0
0
New
02-A9
Lease Space
11 Wall
1 37
0.074
R-19
R-0.0
90
90
New
09-A5
Lease Space
12 Door
21
0.700
None
R-0.0
90
90
New
28-A2
Lease Space
13 Wall
23a
0.074
R-19
R-0.0
270
90
New
09-A5
Lease Space
14 Roof
1,705
0.036
R-30
R-0.0
0
0
New
02-A9
Lease Space
15 Wall
364
0.074
R-19
R-0.0
90
90
New
09-A5
Lease Space
16 Door
22
0.700
None
R-0.0
90
90
New
28-A2
Lease Space
17 Wall
23
0.074
R-19
R-0.0
270
90
New
09-A5
Lease Space
18 Roof
49
0.036
R-30
R-0.01
0
0
New
02-A9
Restrm
19 Wall
11
0.074
R-19
R-0.01
90
90
New
09-A5
Restrm
20 IRoof
1 1,151
0.036
R-30
R-0.01
0
0
New
02-A9
Lease Space
N. E, A. R
More than or equalto 10,000 sq.ft. of site -built fenestration area must Include a label certificate either Issued by NFRC or provide a CEC Default Label Certificate using the default U -factors from
Standards Table 116-A and B. Certificate shall be filed In the contractor's Drolect office durInn construction and In the b ilding manaciers office after construction
#
lTvDe
Area U -Fac?
SHGCZ
Act.
Am.
Cond.
Stat.
Glazing Type
Location/
Comments
1
Window
Rear
W
223 1.1901116-A
0.83 116-B
270
New
Storefront
Lease Space
2
Window
Rear
W
227 1.190 116-A
0.83 116-B
270
New
Storefront
Lease Space
3
Window
Rear
W
223 1.190 116-A
0.83 116-B
270
New
Storefront
Lease Space
4
Window
Right
N
63 1.190 116-A
0.83 116-B
0
New
Storefront
Lease Space
5
Window
Right
N
127 1.190 116-A
0.83 116-B0
12.8
New
1 Storefront
Lease Space
6
Window
Rear
W
130 1.190 116-A
0.83 116-B
270
New
Storefront
Lease Space
7
Window
Rear
W
223 1.190 116-A
0.83 116-B
270
New
Storefront
Lease Space
8
Window
Right.
N
190 1.190 116-A
0.83 116-B
0
New
Storefront
Lease Space
9
Window
Right
N
253 1.190 116-A
0.83 116-B
0
New
Storefront
Lease S ace
10 Window
Front
E
130 1.190 116-A
0.83 116-B
90
New
Storefront
Lease Space
11 Window
Right
N
190 1.190 116-A
0.83 116-B
0
New
Storefront
Lease Space
(1 U -factor Type: 116-A Default Table from Standards, Table NF1 Default Tabfe from the ACM Manuel Appendix, NFRC Labeled value.
(2 SHGC Type: 116-B Default Table from Standards, COG Center of Glass, NFRC Labeled Value
EXTERIOR SHADING
#
Exterior Shade Type
SHGC
Window
Hgt. Wd.
Overhang Left Fin Right Fin
Len. H t. LExt.RExt. Dist. Len. H t. Dist. Len. H t.
1
None
0.76
10.0 22.3
14.5
0.1
15.0
4.1 0.0 0.0 0 5.0 11.1 0
2
None
0.76
10.0 22.7
14.5
0.1
15.0
15.0
3
None
0.76
10.0 22.3
14.5
0.1
15.0
15.0
4
None
0.76
10.0 6.3
28.0
0.1
0.0
32.0
5
None
0.76
10.0 12.7
6.0
0.1
20.0
0.1
6
None
0.76
10.0 13.0
12.8
0.1
10.0
10.0
7
None
0.76
10.0 22.3
14.5
0.1
10.0
10.0
8
None
0.76
10.0 19.0
6.0
0.1
0.0
14.0
9
None
0.76
10.0 25.3
7.0
0.1
15.0
0.0
10
None
0.76
10.0 13.0
7.0
0.1
0.1
10.1
11
None
0.76
10.0 19.0
7.0
0.1
10.8
15.0
MINIMUM SKYLIGHT AREA FOR LARGE ENCLOSED SPACES
CERTIFICATE OF COMPLIANCE ENV -1-C1
PROJECT NAME DATE
Komar Desert Center - Bldg B&C 5/23/2007
OPAQUE SURFACES
# Surface
Tvpe
Area
U -Fac.
Insulation
Cay. Cont.
Act.
Azm.
Tilt
Cond:
Status
Joint Appendix
IV Reference
Location / Comments .
21 Wall
301
0.074
R-19
R-0.0
0
90
New
09-A5
Lease Space
22 Wall
521
0.074
R-19
R-0.0
270
90
New
09-A5
Lease Space
23 Roof
67
0.036
R-30
R-0.0
0
0
New
02-A9
Lease Space
24 Demisin
39
0.110
R-11
R-0.0
0
90
New
09-A2
Restrm faces Uncond. Corridor
25 Roof
4
0.036
R-30
R-0.0
0 1
0
New
02-A9
Restrm
26 Roof
1,271
0.036
R-30
R-0.0
0
0
New
02-A9
Lease Space
27 Wall
180
0.074
R-19
R-0.0
0
90
New
09-A5
Lease Space
28 Demising
10
0.110
R-11
R-0.0
0
90
New
09-A2
Restrm faces Uncond. Corridor
29 Roof
4
0.036
R-30
R-0.0
0
0
New
02-A9
Restrm
30 Demising
200
0.110
R-11
R-0.0
0
90
New
09-A2
Lease Space faces Uncond. Corridor
31 Wall
240
0.074
R-19
R-0.01
180
90
New
09-A5
Lease S ace
32 Door
2
0.7001
None
R-0.0
180
90
New
28-A2
Lease Space
33 Roof
1,610
0.036
R-30
R-0.0
0
0
New
02-A9
Lease Space
34 Wall
19
0.074
R-19
R-0.0
0
90
New
09-A5
Lease Space
35 Wall
111
0.074
R-19
R-0.0
180
90
New
09-A5
Restrm
36 Wall
11
0.074
R-19
R-0.0
90
90
New
09-A5
Restrm
37 Roof
4
0.036
R-30
R-0.01
0
0
New
02-A9
iRestrm
38 Wall
65
0.074
R-19
R-0.01
90 1
90
1 New
09-A5
Lease Space
39 Wall
28
0.074
R-19
R-0.01
180 1
90
1 New
09-A5
Lease Space
40 Door
2
0.700
None
I R-0.01
180 1
90
1 New
28-A2
Lease Space
„y, . —r
MON SURFACES
an m equei w iv,uuu sq.n. or ace-oum ienestrauon area must mctuae a lapel cennlcate either Issued by NFRc or provide a CEG Default Label Certificate using the default LI -factors from
Standards Table 116-A end B. Certificate shall be filed In the contractor's project office dudnq construction and in the buildina maneber's office after construction
Stat.
v -rector Type: r to -N verawt tante from siandaros, IaDte NI -1 uetamt table from the AGM Manual Appendix, NFRC Labeled value.
2
SH GC Type: 1168 Default Table from Standards, COG Center of Glass, NFRC Labeled Value
EXTERIOR SHADING
Window Overhang Left Fin Right Fin
# Exterior Shade Type SHGC Hgt. Wd. Len. H t. LExt.RExt. Dist. Len. H t. Dist. Len. H t.
MINIMUM SKYLIGHT AREA FOR LARGE ENCLOSED SPACES
vwl+��av vv�wrrry s m cnmata tunes z mrvugn w anu contains an encrosea space wim floor area greater men 25,000 112, a ceiling height greeter than 15 feet, and an LPD for general
Li lighting of at least 0.5 Wrft2. See Section 143(c). If this box is chocked, ENV -C must be filled out. when submitting under the Prescriptive Compllanee Approach.
1 EnergyPro 4.3 by EnergySoft User Number. 3137 Job Number: 2006796.000 Page:7 of 16
CERTIFICATE OF COMPLIANCE ENV -1-C1
PROJECT NAME DATE
Komar Desert Center - Bldg B&C 5/23/2007
OPAQUE SURFACES
tv, e, A. n thew, txisung, Anerea, Memoveo1
FENESTRATION SURFACES
morn man or aqua, to I u,wu sq.u. or site-ouie renesuauon area must maube a iaosi cemucate enner Issues Dy M -KU or provide a utu uefau¢ Label cenWcete using the default LI -tactors from
Standards Table 116-A and B. Certificate shall be filed In the conlrectors project office during construclion and in the building man.glel. ollice atter construction
Act. Cond- Location/
# Tvoe Area U -Fac SHGC2 Azm- Stat- Glazine Tvne r.nmmoantc
1 U•taCldr type: 11ti-A Lietault Table from Standards, Table NI -1 Default Table from the ACM Manual Appendix, NFRC Labeled value.
2 SHGC Type: 116-B Default Table from Standards, COG Center of Glass, NFRC Labeled Value
EXTERIOR SHADING
Window Overhang Left Fin Right Fin
# Exterior Shade Type SHGC Hgt. Wd. Len. H t. LExt.RExt. Dist. Len. H t. Dist. Len. H t.
MINIMUM SKYLIGHT AREA FOR LARGE ENCLOSED SPACES
I I I ne proposea oulraing is in cremate zones a tnrougn 1s ana contains an enclosed space with floor area greater than 25,000 ft2, a coiling height greater than 15 feet, and an LPD for general
LJ lighting of at least 0.5 WHt2. See Section 143(c). If this box Is checked, ENV -4•C must be filled out. when submitting under the Prescriptive Compliance Approach.
EnergyPro 4.3 by EnergySoft User Number. 3137 Job Number: 2006796.000 Page:8 of 16 1
m��
• l� -
0��
..Lease Space
tv, e, A. n thew, txisung, Anerea, Memoveo1
FENESTRATION SURFACES
morn man or aqua, to I u,wu sq.u. or site-ouie renesuauon area must maube a iaosi cemucate enner Issues Dy M -KU or provide a utu uefau¢ Label cenWcete using the default LI -tactors from
Standards Table 116-A and B. Certificate shall be filed In the conlrectors project office during construclion and in the building man.glel. ollice atter construction
Act. Cond- Location/
# Tvoe Area U -Fac SHGC2 Azm- Stat- Glazine Tvne r.nmmoantc
1 U•taCldr type: 11ti-A Lietault Table from Standards, Table NI -1 Default Table from the ACM Manual Appendix, NFRC Labeled value.
2 SHGC Type: 116-B Default Table from Standards, COG Center of Glass, NFRC Labeled Value
EXTERIOR SHADING
Window Overhang Left Fin Right Fin
# Exterior Shade Type SHGC Hgt. Wd. Len. H t. LExt.RExt. Dist. Len. H t. Dist. Len. H t.
MINIMUM SKYLIGHT AREA FOR LARGE ENCLOSED SPACES
I I I ne proposea oulraing is in cremate zones a tnrougn 1s ana contains an enclosed space with floor area greater than 25,000 ft2, a coiling height greater than 15 feet, and an LPD for general
LJ lighting of at least 0.5 WHt2. See Section 143(c). If this box Is checked, ENV -4•C must be filled out. when submitting under the Prescriptive Compliance Approach.
EnergyPro 4.3 by EnergySoft User Number. 3137 Job Number: 2006796.000 Page:8 of 16 1
CERTIFICATE OF COMPLIANCE MECH-I-C
PROJECT NAME DATE
Komar Desert Center - Bldg B&C 5/23/2007
Designer:
This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for mechanical systems. The designer is required to
check the boxes by all acceptance tests that apply and list all equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the
equipment description and the number of systems to be tested in parentheses. The NJ number designates the Section in the Appendix of the Nonresidential
ACM Manual that describes the test. Also indicate the person responsible for performing the tests (i.e. the installing contractor, design professional or an agent
selected by the owner). Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work
appropriately.
Building Departments:
SYSTEM ACCEPTANCE. Before an occupancy permit is granted for a newly constructed building or space, or a new space -conditioning system serving a
building or space is operated for normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for
Code Compliance.
In addition a Certificate of Acceptance, MECH-I-A Form shall be submitted to the building department that certifies plans, specifications, installation
certificates. and ooeratina and maintenance information meet the reauiremPntP of Sactinn in-innthi nnri Titla 9a Pnrt P
STATEMENT OF COMPLIANCE
❑ MECH-2-A: Ventilation System Acceptance Document
-Variable Air Volume Systems Outdoor Air Acceptance
-Constant Air Volume Systems Outdoor Air Acceptance
Equipment requiring acceptance testing
Test required on all New systems both New Construction and Retrofit.
❑ MECH-3-A: Packaged HVAC Systems Acceptance Document
Equipment requiring acceptance testing
Test required on all New systems both New Construction and Retrofit.
❑ MECH-4-A: Air -Side Economizer Acceptance Document
Equipment requiring acceptance testing
Test required on all New systems both New Construction and Retrofit. Units with economizers that are Installed at the factory and certified with the
commission do not require equipment testing but do require construction inspection.
❑ MECH-5-A: Air Distribution Acceptance Document
Equipment requiring acceptance testing
This test required If the unit serves 5,000 &2 of space or less and 25% or more of the ducts are in nonconditioned or semiconditioned space like an
attic. New systems that meet the above requirements. Retrofit systems that meet the above requirements and either extend ducts, replace ducts or
replace the packaged unit.
❑ MECH-6-A: Demand Control Ventilation Acceptance Document
Equipment requiring acceptance testing
All new DCV controls installed on new or existing packaged systems must be tested.
❑ MECH-7-A: Supply Fan Variable Flow Control Acceptance Document
Equipment requiring acceptance testing
All new VAV len volume controls Installed on new or existing systems must be tested
❑ MECH-8-A:-Hydronic System Control Acceptance Document
-Variable Flow Controls Applies to chilled and hot water systems.
-Automatic Isolation Controls Applies to new boilers and chillers and the primary pumps are connected to a common header.
-Supply Water Temperature Reset Controls
Applies to new constant flow chilled and hot waler systems that have a design capacity greater than or equal to 500,000 Btulhr.
-Water-loop Heat Pump Controls
Applies to all new watedoop heat pump systems where the combined loop pumps are greater than 5 hp.
-Variable Frequency Controls Applies to all new distribution pumps on new variable flow chilled, hydronic heat pump
or condenser water systems where the pumps motors are greater than Shp.
Equipment re uirin acceptance testing
EnergyPro 4.3 by EnergySoft User Number. 3137 Job Number: 2006796.000 Page:9 of 16
JAIR SYSTEM REQUIREMENTS . Part 1 of 2 MECH-2-CI
PROJECT NAME DATE
Komar Desert Center - Bldg B&C 5/23/2007
SYSTEM FEATURES
ITEM OR SYSTEM TAG(S)
Number of Systems
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
Heat Pump Thermostat
Furnace Controls
Natural Ventilation
Minimum Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
PRESCRIPTIVE MEASURES
Calculated Heating Capacity x 1.43 2
Proposed Heating Capacity 2
Calculated Sensible Cooling Capacity x 1.212
Proposed Sensible Cooling Capacity 2
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heating Air Supply Reset
Cooling Air Supply Reset
Duct Sealing for Prescriptive Compliance
T-24
Section
AIR SYSTEMS Central or Single Zone
RTU 81-1
RTU B2-1 RTU Bi -1
1
1 1
Reference on Plans or Specification 1
112(a)
7.70 HSPF
7.70 HSPF
7.70 HSPF
112 a
13.0 SEER / 11.0 EER
13.0 SEER / 11.0 EER
13.0 SEER / 11.0 EER
112 b
Yes
Yes
Yes
112(c), 115(a)
n/a
n/a
n/a
121(b)
Yes
Yes
Yes
121 b
358 cfm
366 cfm
526 cfm
121 c
No
No.
No
121 c
Yes
Yes
Yes
121 c 122(e)
Programmable Switch
Programmable Switch
Programmable Switch
122(e)
Heating & Cooling Required
Heating & Cooling Required Heating & Cooling Required
122(f)
Auto
Auto
Auto
122
n/a
n/a
n/a
123
124
R-8.0
R-8.0
R-8.0
144 a & b
n/a
n/a
n/a
144 a & b
35,101 btuh
35,101 btuh
35,101 btuh
144 a & b
n/a
n/a
n/a
144 a & b
46,981 btuh
47,102 btuh
45,838 btuh
144 c
Constant Volume
Constant Volume
Constant Volume
144 c
144 c
Yes
Yes
Yes
144 d
No
No
No
144 a
Diff. Enth (Integrated)
Diff. Enth (Integrated)
Diff. Enth (Integrated)
144 f
Constant Temp
Constant Temp
Constant Tem
144 (f)
Constant Temp
Constant Temp
Constant Temp
144 k
No
No
No
1: For each central and single zone air systems (or group of similar units) fill In the reference to sheet number and/or specification section and paragraph number where the
required features are documented. If a requirement is not applicable, put °N/A° in the column.
2: Not required for hydronic heating and cooling. Either enter a value here or put in reference of plans and specificatons per footnote 1.
3: Enter Yes if System is: Constant Volume, Single Zone; Serves < 5,000 sgft; Has > 25% duct In unconditioned space. Duct sealing is required for Prescriptive Compliance,
see PERF -1 for performance method duct sealing requirements.
I EnergyPro 4.3 by EnergySoft User Number. 3137 Job Number: 2006796.000 Page: 10 of 16 1
JAIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2-CI
PROJECT NAME DATE
Komar Desert Center - Bldg B&C 5/23/2007
SYSTEM FEATURES
ITEM OR SYSTEM TAG(S)
Number of Systems
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
Heat Pump Thermostat
Furnace Controls
Natural Ventilation
Minimum Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
PRESCRIPTIVE MEASURES
Calculated Heating Capacity x 1.43 2
Proposed Heating Capacity 2
Calculated Sensible Cooling Capacity x 1.212
Proposed Sensible Cooling Capacity 2
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heating Air Supply Reset
Cooling Air Supply Reset
Duct Sealing for Prescriptive Compliance
T-24
Section
AIR SYSTEMS Central or Single Zone
RTU C1-1 & RTU C1-2
RTU C1-3
RTU C2-1
2
1
1
Reference on Plans or Specification t
112(a)
2.20 COP
2.20 COP
7.70 HSPF
112(a)
11.0 EER
10.5 EER
13.0 SEER / 11.0 EER
112(b)
Yes
Yes
Yes
112(c), 115(a)
n/a
n/a
n/a
121(b)
Yes
Yes
Yes
121 b
.437 cfm
255 cfm
418 cfm
121 c
No
No
No
121 c
Yes
Yes
Yes
121(c). 122(e)
Programmable Switch
Programmable Switch
Pro rammable Switch
122(e)
Heating & Cooling Required Heating & Cooling Required Heating & Cooling Required
122(f)
Auto
Auto
Auto
122
n/a
n/a
n/a
123
No
124
R-8.0
R-8.0
R-8.0
144 a & b
n/a
n/a
n/a
144 a & b
86,191 btuh
54,650 btuh
35,101 btuh
144 a & b
n/a
n/a
n/a
144 a & b
110,581 btuh
62,334 btuh
45,117 btuh
144 c
Constant Volume
Constant Volume
Constant Volume
144 c
144 c
Yes
Yes
Yes
144 d
No
No
No
144 a
Diff. Tem (Integrated)
Diff. Tem (integrated)
Diff. Enth (Integrated)
144 f
Constant Temp
Constant Temp
Constant Tem
144 (f)
Constant Temp
Constant Temp
Constant Temp
144 k
No
No
No
1: For each central and single zone air systems (or group of similar units) fill In the reference to sheet number and/or specification section and paragraph number where the
required features are documented. If a requirement is not applicabe, put "N/A' in the column.
2: Not required for hydronic heating and cooling. Either enter a value here or put in reference of plans and specificatons per footnote 1.
3: Enter Yes If System is: Constant Volume, Single Zone; Serves < 5,000 sgft; Has > 25% duct in unconditioned space. Duct sealing is required for Prescriptive Compliance,
see PERF -1 for performance method duct sealing requirements.
EnergyPro 4.3 by EnergySoft User Number. 3137 Job Number: 2006796.000 Page:11 of 16 1
JAIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2-C�
PROJECT NAME DATE
Komar Desert Center - Bldg B&C I
5/23/2007
ITEM OR SYSTEM TAG(S)
Number of Systems
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
Heat Pump Thermostat
Furnace Controls
Natural Ventilation
Minimum Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
PRESCRIPTIVE MEASURES
Calculated Heating Capacity x 1.43 2
Proposed Heating Capacity 2
Calculated Sensible Cooling Capacity x 1.212
Proposed Sensible Cooling Capacity 2
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous HeaUCool
Economizer
Heating Air Supply Reset
Cooling Air Supply Reset
Duct Sealing for Prescriptive Compliance
T-24
Section
AIR SYSTEMS, Central or Single Zone
RTU C3-1 RTU C4-1
1 1
Reference on Plans or Specification t
112(a)
7.70 HSPF
7.70 HSPF
112(a)
13.0 SEER / 11.0 EER
13.0 SEER / 11.0 EER
112(b)
Yes
Yes
112(c), 115(a)
n/a
n/a
121(b)
Yes
Yes
121 b
505 cfm
450 cfm
121 c
No
No
121 c
Yes
Yes
121 c 122(e)
Programmable Switch
Programmable Switch
122(e)
Heatinq & Cooling Required Heating & Cooling Required
122(f)
Auto
Auto
122(g)
n/a
Na
123
124
R-8.0 I
R-8.0
144 a & b
n/a
n/a
144 a & b
35,101 btuh
35,101 btuh
144 a & b
Na
n/a
144 a & b
45,631 btuh
45,444 btuh
144 c
Constant Volume
Constant Volume
144 c
144(c)
Yes
Yes
144 d
No
No
144 a
Diff. Enth (Integrated)
Diff. Enth (Integrated)
144 f
Constant Temp
Constant Tem
144(l)
Constant Temp
Constant Temp
144 k
No
No
1: For each central and single zone air systems (or group of similar -units) fill in the reference to sheet number and/or specification section and paragraph number.where the
required features are documented. If a requirement Is not applicable, put °N/A° In the column.
2: Not required for hydronic heating and cooling. Either enter a value here or put in reference of plans and specificatons per footnote 1.
3: Enter Yes If System is: Constant Volume, Single Zone; Serves < 5,000 sgft; Has > 25% duct in unconditioned space. Duct seating Is required for Prescriptive Compliance,
see PERF -1 for performance method duct sealing requirements.
Faun Initiation l Ime: 05123107 07:26:34 Run Code: 1179930394
EnergyPro 4.3 by EnergySoft User Number. 3137 Job Number: 2006796.000 Paae:12 of 16
MECHANICAL VENTILATION MECH-3-CI
PROJECT NAME DATE
Komar Desert Center - Bldg B&C I
5/23/2007
PRESCRIPTIVE REHEAT
LIMITATION (Section 144 d )
MECHANICAL VENTILATION Section
121
b 2
AREA
BASIS
OCCUPANCY
BASIS
VAV MINIMUM
A
B
C
D
E
F I
G
H
1
J
K
L
M
N
ZONE/SYSTEM
0
NDS
O.
.. 0
Cl)
a
min
ro
-
Q�
��3
% D
n 0 C
a c
M
0 0-
too
-U
��n
N N -n
6
m03
x 0
`" 7
m
oma
G1 a
<
OM�O
T N
D'
N o
3
002
-n rn '�
a
to
9m
x
x A
A n
$ c
w3d
p
_ 0
U)
; 2
•O
?
D
i
'tn
3
N
D
Lease Space
1,719
0.25
430
17.2
15.0
258
430
258
172
Restrm
49
0.15
7
7
100
RTU B1-1
Total
437
358
Restrm
49
0.15
7
7
100
Lease Space
1,77
0.25
443
17.7
15.0
266
443
266
177
RTU 132-1
Total
450
366
Lease Space
1,70q
0.25
426
56.31
7.6
4261
426
426
1
1
Restrm
49
0.151
7
7
100
RTU 131-1
Total
434
526
Lease Space
1,15
0.38
43751.8
8.41
437
437
437
RTU Ci -1 8 RTU C1 -2
Total
437
437
Lease Space
67
0.38
255
30.2
8.4
255
255
255
RTU C1-3
I
Total
255
255
Restrm
49
0.15
7
7
100
Lease Space
1,27
0.25
318
42.0
7.6
318
318
318
RTU C2-1
Total
325
418
Restrm
49
0.15
7
7
100
Lease Space
1,616
0.25
405
53.4
7.6
405
405
405
RTU C3-1
I
Total
412
505
Restrm
49
0.15
7
7
100
Lease Space
1,396
0.25
350
46.1
7.6
350
350
350
RTU C4-1
I
I Total
357
450
C Minimum ventilation rete per Section 121 Table 121-A
E Based on fixed seat or the greater of the expected number of occupants and 50% of the CBC occupant load foregress purposes fors aces without fixed seating.
H Required Ventilation Air REQ'D V.A. is the larger of the ventliatlon rates calculated on and AREA or OCCUPANCY BASIS column D or G).
I Must be greater than ore ual to H or use Transfer Air column N to make up the difference.
J Design tan supply cfm Fan CFM x 30%; or
K Condillon area It. sq.) x 04 cfnVft. sq.; or
L Maximum of Columns H, J, K, or 300 cim
M This must be less than orequal to Column L and greater that ore ual to the sum of Columns H + N.
N Transfer air must be provided where the Required Ventilation Air (column 1) is greater than the Design Minimum Air (column M). Where required, transfer air must be greater than or equal
to the difference between the Required Ventilation Air (column 1) and the Design Minimum Air (column M), column H - M.
EnergyPro 4.3 by EnergySoft User Number. 3137 Job Number: 2006796.000 Page: 13 of 16
MECHANICAL EQUIPMENT DETAILS
Part 1 of 2 MECH-5-C
PROJECT NAME
Komar Desert Center - Bldg B&C
DATE 5/23/2007
CHILLER AND TOWER SUMMARY
System Type
Distribution Type
Efficiency
Tons
PUMPS
Status
Equipment Name
Equipment Type
Qty.
FT-t—F
I Qty
jGPM
BHP
Motor
Eff.
Drive
Eff.
Pump
Control
MULTI -FAMILY CENTRAL WATER HEATING DETAILS
Hot Water P mp Hot Water Piping Len th ft
Control
#
HP
Type In Plenum
Outside
Buried
Add 1/2"
Insulation
DHW/ BOILER SUMMARY
Energy
Factor
I or RE
Standby
Loss or
Pilot
TANK INSUL.
System Name
System Type
Distribution Type
Qty
Rated
Input
Vol.Condition
(Gals.)
Status
Ext.
R -Val.
MULTI -FAMILY CENTRAL WATER HEATING DETAILS
Hot Water P mp Hot Water Piping Len th ft
Control
#
HP
Type In Plenum
Outside
Buried
Add 1/2"
Insulation
CENTRAL SYSTEM RATINGS
HEATING
COOLING
System Name
System Type
9ty
Output
Aux.
kW
i Eff.
Out ut
Efficiency
Condition
Status
I EconomizerType
Carrier 50HJ0006-5 w/
DCV
Packaged DX
6
56,200
0.0
7.70 HSPF
61,000
13.0 SEER / 11.0 EER
New
Diff. Enth (Integrated)
Carrier 50HJQ007-5 w/
DCV
Packaged DX
2
69,000
0.
. 2.20 COP
76,000
11.0 EER
New
Diff. Temp (Integrated)
Carrier 50HJQOOS-5 w/
DCV
Packaged DX
1
87,500
O.0
2.20 COP
91,300
10.5 EER
New
Diff. Temp (Integrated)
CENTRAL SYSTEM FAN SUMMARY
SUPPLY FAN
RFTURN
FAN
System Name
Fan Type
Motor Location
CFM
BHP
Motor
Eff.
Drive
Eff.
CFM I
BHP
Motor
Eff.
Drive
Eff.
Carrier 50HJ0006-5 w/
DCV
Constant Volume
Draw -Through
2,000
1.07
82.5%
97.0%
none
Carrier 50HJQ007-5 w/
DCV
Constant Volume
Draw -Through
2,400
1.65
84.0%
97.0%
none
Carrier 50HJ0008-5 w/
DCV
Constant Volume
Draw -Through
3,000
1.44
82.5%
97.0%
none
Run InitiationTime: 7 7.26:34 Run Code: 1179930394
EnergyPro 4.3 by EnergySoft User Number: 3137 Job Number: 2006796.000 Page: 14 of 16
t t } n. - - • I rJ. A
MECHANICAL EQUIPMENT DETAILS
PROJECT NAME
Knmar nnQzrt ( ontar _ Rlrin RP.('
Part 2of2 ME
DATE _ . _ _
VAV TERMINAL BOX TERMINAL FAN
Min. CFM Rehe t Coil Motor Drive
System Type -Qty, Ratio Type DeltaT CFM BHP Eff. Eff.
FXHAIISI
FAN
FXHAllqT
FAN
Room Name
of .
CFM
BHP
Motor
Eff.
Drive
Eff.
Room Name
Ot .
CFM
BHP
Motor
Eff.
Drive
I Eff.
B-1 Restrm
1.0
10C
0.10
49.0°/
97.0%
C2 Restrm
1.0
100
0.10
49.0°/
97.0%
B-2 Restrm
1.0
10C
0.10
49.00/
97.0%
Uncond. Corridor
1.0
100
0.10
49.0°/
97.0%
B-3 Restrml
1.0
1 10q
0.10
1 49.00/
97.0%11
C3 Restrm
1.0
1 10
0.10
Run Initiation Time: 05/23/07 07:26:34 Run Code: 1
4.3 by EnergySoit User Number: 3137 Job Number: 2006796.000
Output
5ot16
MECHANICAL EQUIPMENT DETAILS Part 2 of 2 MECH-5-C�
PROJECT NAME
Knmar Ilacart f'anfnr - Rhin RfL(: DATE r, /0':) 10 An -7
VAV TERMINAL BOX TERMINAL FAN
Min. CFM Reheat oil Motor Drive
Sy -stem Type peltaT CFM BHP Eff. Eff.
Type I Output
EnergyPro 4.3 by EnergySoft User Number: 3137 Job Number: 2006796.000 Paae16 of 16 1
Room Name
"'M
BHP
Motor
I Eff.
Drive
Eff.
Room Name
Ot .
CFM
BHP
Motor
Eff.
Drive
Eff.
C4 Restrm
1.0
10C
0.10
49.09/
97.0%
EnergyPro 4.3 by EnergySoft User Number: 3137 Job Number: 2006796.000 Paae16 of 16 1