07-2053 (CSCS) Revision 1 Title 24TITLE 24 REPORT
Title 24 Report for:
Mimi's Cafe -La Quinta
797765 Highway 111
La Quinta, CA 92253
Project Designer:
Lee & Sakahara Architects AIA
16842 Von Karman-Avenue, Suite 300
Irvine, CA 92606-4927
949-261-1100
Report Prepared By:
Robert H. Foster
1 FDG Consulting Engineers
17701 Cowan, Suite 230
{ Irvine, CA 92614
(949) 253 9630
Job Number•
07-080
CITY OF LA QUINTA
Date: BUILDING & SAFETY DEPT.
1/16/2008 AF' P ROVrE �
FOR CONSTR TION
The EnergyPro computer program has been used to perform the calculations summarized in th® I a
authorized by the California Energy Commission for use with both the Residential and Nonr� I nd i
This program developed by EnergySoft, LLC - www.energysoft.com. t
EnergyPro 4.4 by EnergySoft Job Number: 07-080 User Number: 5670
TABLE OF CONTENTS
Cover Page 1
Table of Contents 2
Nonresidential Performance Title 24 Forms 3
Form ENV -MM Envelope Mandatory Measures 12
Form MECH?MM Mechanical Mandatory Measures 13
i
EnergyPro 4.4 by EnergySoftJob Number. 07-080 User Number: 5670
r
((f
TABLE OF CONTENTS
Cover Page 1
Table of Contents 2
Nonresidential Performance Title 24 Forms 3
Form ENV -MM Envelope Mandatory Measures 12
Form MECH?MM Mechanical Mandatory Measures 13
i
EnergyPro 4.4 by EnergySoftJob Number. 07-080 User Number: 5670
r
PERFORMANCE CERTIFICATE OF COMPLIANCE Part 1 of 3 PERF -1
PROJECT NAME
This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the
DATE
Mimi's Cafe -La Quinta
DATE OF PLANS BUILDING CONDITIONED FLOOR AREA
06-22-07
1/16/2008
PROJECT ADDRESS
BUILDING TYPE
NONRESIDENTIAL HIGH RISE RESIDENTIAL ❑
79-765 Highway 111 La Quinta
PHASE OF CONSTRUCTION
NEW CONSTRUCTION ADDITION
PRINCIPAL DESIGNER - ENVELOPE
TELEPHONE
Building Permit #
Lee & Sakahara Architects AIA
949-261-1100
California as a civil engineer, mechanical engineer, electrical engineer, or I am a licensed architect.
DOCUMENTATION AUTHOR
TELEPHONE
Checked by/Date
FDG Consulting Engineers
1 (949) 253 9630
Enforcement Agency Use
GENERAL INFORMATION
This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the
California Code of Regulations. This certificate applies only to a Building using the performance compliance approach.
The documentation preparer hereby certifies that the documentation is accurate and complete.
DATE OF PLANS BUILDING CONDITIONED FLOOR AREA
06-22-07
6,102 Sq.Ft.
CLIMATE ZONE
15
BUILDING TYPE
NONRESIDENTIAL HIGH RISE RESIDENTIAL ❑
HOTEUMOTEL GUEST ROOM
PHASE OF CONSTRUCTION
NEW CONSTRUCTION ADDITION
permit application. The proposed building as designed meets the energy efficiency requirements contained in sections 110, 116,
EXISTING + ADDITION/ALTERATION
STATEMENT OF COMPLIANCE
This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the
California Code of Regulations. This certificate applies only to a Building using the performance compliance approach.
The documentation preparer hereby certifies that the documentation is accurate and complete.
DOCUMENTATION AUTHOR
SIGNATURE
DATE
Robert H. Foster
7, L%
The Principal Designer hereby certifys that the proposed building design repres in this set of construction documents is
consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this
permit application. The proposed building as designed meets the energy efficiency requirements contained in sections 110, 116,
through 118, and 140, 142, 143 or 149 of Title 24, Part 6.
ENV. LTG. MECH.
❑ F-1 F-] 1. 1 hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to
sign this document as the person responsible for its preparation; and that I am licensed in the State of
California as a civil engineer, mechanical engineer, electrical engineer, or I am a licensed architect.
❑ ❑ 2. 1 affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code Section
5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed
contractor performing this work.
E . F-1 F] 3. 1 affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document
because it pertains to a structure or type of work described as exempt pursuant to Business and Professions
Code Sections 5537, 5538, and 6737.1. (These sections of the Business and Professions Code are printed in
full in the Nonresidential Manual.)
ENVELOPE COMPLIANCE
Indicate location on plans of Note Block for Mandatory Measures
ENV -1
Required Forms
PRINCIPAL ENVELOPE DESIGNER - NAME SIGNATURE
LIC. NO. DATE
Lee & Sakahara Architects AIA
LIGHTING COMPLIANCE
Indicate location on plans of Note Block for Mandatory Measures Lighting Compliance Not In The Scope Of
-hiS
Stabmrtta
Required Forms
PRINCIPAL LIGHTING DESIGNER NAME SIGNATURE LIC. NO. DATE
MECHANICAL COMPLIANCE
Indicate location on plans of Note Block for Mandatory Measures
MECH-1, MECH-2, MECH-3, MECH-5�
Required Forms
PRINCIPAL MECHANICAL DESIGNER - NAME
Robert H. Foster.
SIGNATURE
LIC. NO.I DATE
-�jjj J�� IC210
4.4 by EnergySoft — — User Number: 5670 Job Number: 07-080 Page:3 of 14
I PERFORMANCE CERTIFICATE OF COMPLIANCE Part2 of 3 PERFA
PROJECT NAME
Mimi's Cafe -La Quinta
DATE
1/16/2008
ANNUAL TDV ENERGY USE SUMMARY kBtu/s ft- r
Standard
ENERGY COMPONENT Design
Space Heating 0.67
Space Cooling 287.26
Indoor Fans - 92.19
Heat Rejection 0.00
Pumps & Misc. 0.00
r Domestic Hot Water 0.00
Lighting 85.48
Receptacle 53.52
Process o.00
TOTALS: 519.11
Percent better than Standard: '
Proposed
Design
Compliance
Margin
process)
' 0.32
0.35
199.70
87.56
154.20
-62.01
0.00
0.00
0.00
0.00
0.00
0.00
85.48
0.00
53.52
0.00
o.00
o.00
493.22
25.89
5.0%
( 5.0% excluding
BUILDING COMPLIES
GENERAL INFORMATION
Building Orientation
Number of Stories ,
Number of Systems
Number of Zones
N 0 deg
Conditioned Floor Area 6,1021 sqft.
Unconditioned Floor Area 01 sqft.
Conditioned Footprint Area 611021 sqft,
Fuel Type Natural Gasl
1
4
a
Orientation Gross Area
Front Elevation (N) 1,784
Left Elevation (E) 1,075
Rear Elevation (S) 476
Right Elevation (w), 340
Total 3,675
Roof 6,102
sqft.
sqft.
sqft.
sqft.
sqft.
sqft.
Glazing Area
Glazing
sqft.
sgft.10.1%I
sqft.
sgft.
sqft.
sgft.0.0°/a!
Ratio
306
17.2%
20.0%i
8.8%
109
95
30
540
1 14.7%�
Standard Proposed
Lighting Power Density 1.288 W/sgft. 1 1.288 W/sqft.
Prescriptive Env. Heat Loss 885 Blum ! 893 slum
Prescriptive Env. Heat Gain 88,120 Btu/h-F ` 108,689 Brom-F
Remarks
-- -
Run Initiation Time: 01/16/08 14:08:42 Run Code: 1200521322
EnergyPro 4.4 by Energysoft
_ User Number: 5670----- - Job Number. 07-080
__
_ Page:4 of 14 j
a
PERFORMANCE CERTIFICATE OF COMPLIANCE Part 3 of 3 PERF -1
PROJECT NAMEDATE
Mimi's Cafe -La Quinta
1/16/2008
ZONE INFORMATION
System Name
Zone Name Occupancy Type
Floor
Area
(sgft.)
Inst Ctrl. Allowed LPD Proc.
LPD Credits Area Tailored Loads
(W/sf)l (W/sf)2 (W/S3 /s 4 (W/Sq
AC -4
Zone 4 Kitchen, Food Preparation
2,300
`1.60
AC -3
Zone 3 Dining
1,610
'1.10
AC 2
Zone 2 Dining
1,0271
"1.10
AC -1
Zone 1 Dining
1,165
-1.10
l
r
f
Notes: 1. See LTG -2-C 2. See LTG -4-C 3. See LTG -5-C 4. See LTG -6-C Items above require special documentation
(items marked with asterisk, see LTG -2 -C by others) (by others)
EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST
i he local entorcement agency should pay special attention to the items specified in this checklist. These items require special written justification
and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of
the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation
submitted.
The HVAC System 'Trane YHC120" includes Demand Control Ventilation per Standards Section 121.
The HVAC System 'Trane YHC120-2" includes Demand Control Ventilation per Standards Section 121.
The HVAC S stem 'Trane YFD181" includes Demand Control Ventilation per Standards Section 121.
The HVAC System "AC -4" incorporates HERS verified Duct Leakage. Target leakage is calculated and documented on the MECH-5-A.
The Room "Kitchen" has a Cooling Indoor Design Temperature of 115 degrees F.
The HVAC System "AC -3" incorporates HERS verified Duct Leakage: Target leakage is calculated and documented on the MECH-5-A.
The Room "Bistro Dining" has a Cooling Indoor Design Temperature of 115 degrees F.
The Room "Private Dining" has a Cooling_Indoor Design Temperature of 115 degrees F. _ T I
The HVAC System "AC -2" incorporates HERS verified Duct Leakage. Target leakage is calculated and documented on the MECH-5-A.
The Room "Entry Vestibule" has a Cooling Indoor Design Temperature of 115 degrees F. _
The Room "Bar/Lounge/Waiting" has a Cooling Indoor Design Temperature of 115 degrees F.
The HVAC System "AC -1" incorporates HERS verified Duct Leakage. Target leakage is calculated_and documented on the MECH-5-A.
FThe Room "Garden Dining" has a Cooling In Design Temperature of 115 degrees F.
I
The exceptional features listed in this performance approach application have specifically been reviewed. Adequate written justification and
documentation for their use have been provided by the applicant.
Authorized
EnergyPro 4.4 by EnergySoft _ - User User Number: 5670 Job Number: 07-080 Paoe:5 of 14 1
CERTIFICATE OF COMPLIANCE ENV-1-C�
PROJECT NAME DATE
r Mimi's Cafe -La Quinta 1/16/2008
OPAQUE SURFACES
# Surface
Type
Area
U -Fac.
Insulation
Cay. Cont.
Act.
Am.
Tilt
Cond:
Status
Joint Appendix
IV Reference
Location / Comments
1 Roof
2.30
0.059
None
R-15.0
0
0
New
06-A5
I Zone 4
2 Wall
6501
0.110
R-11
R-0.0
0
90
New
09-A2
IZone 4
3 Roof
11,11
0.059
None
R-15.0
0
0
New
06-A5
I Zone 3
4 Wall
355
0.110
R-11
R-0.0
.0
90
New
09-A2
lZone 3
5 Roof
500,
0.059
None
R-15.01
0
0
New
06-A5
lZone 3
6 Wall
310
0.110
R-11
R-0.0
270 j
90
New
09-A2
lZone 3
7 Wall
19
0.110
R-11
R-0.0
0
90
New
09-A2
Zone 3
8 Roof
9
0.059
None
R-15.0
0
0
New
06-A5
Zone 2
9 Wall
9
0.110
R-11
R-0.0
90
90
New
09-A2
Zone 2
10 Wall
9
0.110
R-11
R-0.0
0
90
New
09-A2
Zone 2
11 Roof
935
0.059
None
R-15.0
0
0
New
06-A5
Zone 2
12 Wall
27
0.110
R-11
R-0.0
90
90
New
09-A2
Zone 2
13 Wall
18
0.110
R-11
R-0.0
0
90
New
09-A2
Zone 2
14 Roof
1,165,
0.059
None
R-15.0
0
0
New
06-A5
Zone 1
15 Wall
595
0.110
R-11
R-0.0
90 j
90
New
09-A2
Zone 1
16 Wall
38 .
0.110
R-11
R-0.0
180
90
New
09-A2
Zone 1
I
I
j
-
I
More than or equal to 10,000 sq.ft. of site -built fenestration area must include a label certificate either issued by NFRC or provide a CEC Default Label Certificate using the default U -factors from
_ _.e__ _n_
# T pe
_
Area U -Fac'
SHGC2
Act.
Am.
Cond.
Stat.
I
GlazingT pe
Location/
Comments
1 Window
Front
N
120 0.350 NFRC
0.62 INFRC
0
New
Low -E Dual Pane
IZone 3
2 Window
Right
(W)
30 0.350 NFRC
0.62 NFRC
270j
New
Low -E Dual Pane
IZone 3
3 Window
Front
(N)
62 -0.3501 NFRC
0.62 NFRC
0
New
Low -E Dual Pane
Zone 3
4 Window
Left
E
12 0.350 NFRC
0.62 NFRC
90
New
Low -E Dual Pane
Zone 2
5 Window
Front
(N)
100 0.350 NFRC
0.62 NFRC
0
New
Low -E Dual Pane
Zone 2
6 Window
Left
(E)
12 0.350 NFRC
0.62 NFRC
90
New
Low -E Dual Pane
Zone 2
7 Window
Front
(N)
24 0.350 NFRC
0.62 NFRC
0
New
Low -E Dual Pane
(Zone 2
8 Window
Left(E)_85
2.0
0.350 NFRC
0.62 NFRC
90
New
Low -E Dual Pane
Zone 1
9 Window
Rear
(S)
95 0.350 NFRC
0.62 NFRC
1801
New
Low -E Dual Pane
Zone 1
I
MINIMUM SKYLIGHT AREA FOR LARGE ENCLOSED SPACES
rr�. ,a ' _ "o'm .o, wr i v n i e i 111 manual nyyenarx, rvrrtt. "Doled value.
(2) SHGC Type: 116B Default Table from Standards, COG Center of Glass, NFRC Labeled Value
EXTERIOR SHADING
# Exterior Shade Type
SHGCj
Window
Hgt. Wd.
OverhangLeft Fin
Len. Hgt. LEARExt. I Dist. Len. Hgt•
Right Fin
I Dist. Len. Hgt.
1 None
0.76
4.0 30.0
2.5
0.1
2.0
2.0
_
2 None _ _
0.76
4.0 7.5
2.5
0.1
2.0
2.0
3 None
0.76 I
4.0 15.5
2.5
0.1
2.0
2.0
_
4 None _ _
0.76
4.0 3.0
2.5
0.1
2.0
2.0
5 None _
0.76 j
8.0 ,12.5
6.0
0.1
6.0
6.0 l
6 j None ^ _-
0.76 1
4.0 3.0
2.5
0.1
2.0
2.0
7 None ' _
0.76 f
4.0 6.0
I 2.5
0.1
2.0
2.0 !j
8 None -
0.76
4.0 21.0
2.5
0.1
2.0
2.0 1
9 None _
0.76
4.0 24.0
2.5-
0.1
2.0
2.0
_
I
MINIMUM SKYLIGHT AREA FOR LARGE ENCLOSED SPACES
U...a yruyuaea -numg s In Inmate zones c tnrougn tD ano contains an enclosed space with floor area greaterthan 25,000 ft2, a ceiling height greater than 15 feet, and an LPD for general
lighting of at least 0.5 WI111:2. See Section 143(c). If this box is checked, ENV4-C must be filled out. when submitting under the Prescriptive Compliance Approach.
4_4 by EnergySoft User Number: 5670 -- Job Number. 07-080 Page:6 of 14 I
(CERTIFICATE OF COMPLIANCE MECH-1-C I
NAME
Mimi's Cafe -La Quinta
DATE
1/16/2008
Designer:
This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for mechanical systems. The designer is required to
check the boxes by all acceptance tests that apply and list all equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the
equipment description and the number of systems to be tested in parentheses. The NJ number designates the Section in the Appendix of the Nonresidential
ACM Manual that describes the test. Also indicate the person responsible for performing the tests (i.e. the installing contractor, design professional or an agent
selected by the owner). Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work
appropriately.
Building Departments:
SYSTEM ACCEPTANCE. Before an occupancy permit is granted for a newly constructed building or space, or a new space -conditioning system serving a
building or space is operated for normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for
Code Compliance.
In addition a Certificate of Acceptance, MECH-I-A Form shall be submitted to the building department that certifies plans, specifications, installation
certificates, and ODeratinq and maintenance information meet the reauirements of Section 10-103rh1 and TRIP 94 Part R
STATEMENT OF COMPLIANCE
MECH-2-A: Ventilation System Acceptance Document
-Variable Air Volume Systems Outdoor Air Acceptance
Constant Air Volume Systems Outdoor Air Acceptance
Equipment requiring acceptance testing
Test required on all New systems both New Construction and Retrofit.
❑ MECH-3-A: Packaged HVAC Systems Acceptance Document
Equipment requiring acceptance testing _
Test required on all New systems both New Construction and Retrofit.
❑ MECH-4-A: Air -Side Economizer Acceptance Document
Equipment requiring acceptance testing
Test required on all New systems both New Construction and Retrofit. Units with economizers that are installed at the factory and certified with the
commission do not require equipment testing but do require construction inspection.
rfj MECH-5-A: Air Distribution Acceptance Document
Equipment requiring acceptance testing
This test required If the unit serves 5,000 ft2 of space or less and 25% or more of the ducts are in nonconditioned or semiconditioned space like an
attic. New systems that meet the above requirements. Retrofit systems that meet the above requirements and either extend duds, replace ducts or
replace the packaged unit.
MECH-6-A: Demand Control Ventilation Acceptance Document
Equipment requiring acceptance testing
All new DCV controls installed on new or existing packaged systems must be tested. V
MECH-7-A: Supply Fan Variable Flow Control Acceptance Document _
Equipment requiring acceptance testing
All new VA fan volume controls installed on new or existing systems must be tested
_
MECH-8-A: -Hydronic System Control Acceptance Document
'-Variable Flow Controls Applies to chilled and hot water systems.
-Automatic Isolation Controls Applies to new boilers and chillers and the primary pumps are connected to a common header.
-Supply Water Temperature Reset Controls
Applies to new constant flow chilled and hot water systems that have a design capacity greater than or equal to 500,000 atu/hr.
Water -loop Heat Pump Controls
Applies to all new waterloop heat pump systems where the combined loop pumps are greater than 5 hp.
-Variable Frequency Controls Applies to all new distribution pumps on new variable flow chilled, hydronic heat pump
1. or condenser water systems where the pumps motors are greater than 5 hp.
_ Equipment requiring acceptance testing
u
I EnergyPro 4.4 by EnergySoft User Number: 5670 Job Number: 07-080 A ge 7 of 1 4 l
y _ Pa-
JAIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2-CI
(PROJECT NAME DATE
IL Mimi's Cafe -La Quinta 1/16/2008
SYSTEM FEATURES
ITEM OR SYSTEM TAG(S)
Number of Systems
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
Heat Pump Thermostat
Furnace Controls
Natural Ventilation
Minimum Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
PRESCRIPTIVE MEASURES
Calculated Heating Capacity x 1.43 2
Proposed Heating Capacity 2 -
Calculated Sensible Cooling Capacity x 1.212
Proposed Sensible Cooling Capacity 2
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heating Air Supply Reset
Cooling Air Supply Reset
Duct Sealing for Prescriptive Compliance
1: For each central and single zone air systems (or group of similar units) fill in the reference to sheet number and/or specification section and paragraph number where the
required features are documented. If a requirement is not applicable, put "N/A" in the column.
2: Not required for hydronic heating and cooling. Either enter a value here or put in reference of plans and specificatons per footnote 1.
3: Enter Yes if System is: Constant Volume, Single Zone; Serves < 5.000 sgft; Has > 25% duct in unconditioned space. Duct sealing is required for Prescriptive Compliance,
see PERF -1 for performance method duct sealing requirements.
T-24
Section
AIR SYSTEMS, Central or Single Zone
AC -4
AC -3
AC -2
1
1
1
Reference on Plans or Specification 1
112(a)
2.20 COP
2.20 COP
2.20 COP
112(aa)
11.3 EER
11.5 EER
11.2 EER
112(b)
Yes
Yes
Yes
112(c), 115(a)
n/a
n/a
n/a
121(b)
Yes
Yes
Yes
121(b)
345 cfm
805 cfm
514 cfm
121(c)
No
No
No
121(c)
No
Yes
Yes
121 (c), 1, 22(e)
Programmable Switch
Programmable Switch
Programmable Switch
122(e)
I Heating & Cooling Required
Heating & Cooling Required
Heating & Cooling Required
122
Auto
Auto
Auto
122(g)
n/a
n/a
n/a
123
124
R-8.0
R-8.0
R-8.0
144 a & b
n/a
n/a n/a —�
144 a & b
76,198 btuh
126,788 btuh 75,886 btuh
144 a & b
-� n/a
n/a n/a
144 (a & b)
160,908 btuh
215,894 btuh 123,937 btuh
144 U
Constant Volume
Constant Volume Constant Volume
144 (c)
144 c)
Yes
Yes Yes
144 L
No
No No
144 (e)
Diff. Temp (Integrated
Diff. Temp Integrated) Diff. Temp (Integrated)
144 (f)
I Constant Temp _
Constant Temp Constant Temp
144 (f)
j Constant Temp
Constant Temp Constant Temp
144 (k) A
No
No No
4.4
User Number: 5670
Job Number: 07-080 _ Page:8 of 14
FAIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2-CI
PROJECT NAME DATE
Mimi's Cafe -La Quinta 1/16/2008
SYSTEM FEATURES
ITEM OR SYSTEM TAG(S)
Number of Systems
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
Heat Pump Thermostat
Furnace Controls
Natural Ventilation
Minimum Ventilation
VAV Minimum Position Control
Demand Control Ventilation y
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
PRESCRIPTIVE MEASURES
Calculated Heating Capacity x 1.43 2
Proposed Heating Capacity 2
Calculated Sensible Cooling Capacity x 1.212
Proposed Sensible Cooling Capacity 2
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer f
Heating Air Supply Reset
Cooling Air Supply Reset
Duct Sealing for Prescriptive Compliance3
T-24
Section
AIR SYSTEMS, Central or Sin le Zone
AC -1
1
Reference on Plans or Specification 1
112(a)
2.20 COP
112(a)
11.2 EER
112(b)
Yes
112(c), 115(a)
n/a
i
121(b)
Yes
121(b)
j 582 cfm
121(c)
No
—_
121(c)
I Yes
121(c), 1. 22(e)T
Programmable Switch
122(e)
j�-Heating & Cooling Required
122(f)
Auto
_
122(g)
n/a
144 (f) _t
Constant Temp
123
144 (k) ---
— No
124
I' R-8.0
1: For each central and single zone air systems (or group of similar units) fill in the reference to sheet number and/or specification section and paragraph number where the
required features are documented. If a requirement is not applicable, put "NIX in the column.
2: Not required for hydronic heating and cooling. Either enter a value here or put in reference of plans and specificatons per footnote 1.
3: Enter Yes if System is: Constant Volume. Single Zone; Serves < 5,000 sgft; Has > 25% duct in unconditioned space. Duct sealing is required for Prescriptive Compliance,
see PERF -1 for performance method duct sealing requirements.
EnergyPro 4.4 by EnergySoft `_ User Number: 5670 Job Number: 07-080 Page:9 of 14
144 (a& b) j
n/a
144 a & b
75,886 btuh
144 a & b
n/a
i
144 a & b) _I
128,164 btuh
144 c
Constant Volume
144 (c) I_
—_
144 (c)- !—
Yes
1
144 (d) ;;�
No
144 (e) I
Diff. Temp (Integrated)!_
144 fL_ i- Constant Temp
,
Y
144 (f) _t
Constant Temp
144 (k) ---
— No
--
1: For each central and single zone air systems (or group of similar units) fill in the reference to sheet number and/or specification section and paragraph number where the
required features are documented. If a requirement is not applicable, put "NIX in the column.
2: Not required for hydronic heating and cooling. Either enter a value here or put in reference of plans and specificatons per footnote 1.
3: Enter Yes if System is: Constant Volume. Single Zone; Serves < 5,000 sgft; Has > 25% duct in unconditioned space. Duct sealing is required for Prescriptive Compliance,
see PERF -1 for performance method duct sealing requirements.
EnergyPro 4.4 by EnergySoft `_ User Number: 5670 Job Number: 07-080 Page:9 of 14
MECHANICAL VENTILATION MECH-3-CI
PROJECT NAME
Mimi's Cafe -La Quinta
DATE
1/16/2008
EnergyPro 4.4 by EnergySoft User Number: 5670 Job Number: 07-080
—._ � _ -- _ - __ Page: 10 of 14
PRESCRIPTIVE REHEAT
LIMITATION (Section 144(d))
MECHANICAL VENTILATION Section
121(b)2)
AREA
BASIS
OCCUPANCY
BASIS
VAV MINIMUM
A
B
C
D
E
F
G
H
I
J
K
L I
M
N
ZONE/SYSTEM
n
a�
.nA �'
a
0
din
AN -n
0
c3
W`�3
X Dn
nM�
3
-0c
03
CQ
��
0
v
roman
r%i f3 -n
3�3
�.3
m�;
Xr7
TAT
9
m
O&M
00X
p�<
�- y
<p
0=M
TI ..y
3D�
-
0N C4 0
o
OMS
'i1y�
3-0o
v y,
�t0
3
0
30D
In X
Do
x a
� n
43o3i
�7X
oy0
-n?
3c_
p
lny
`»�
.0
03
.�. ?
D
w
m
D
Zone 4
2,300
0.15
345
345
345
AC -4
Total
345
345
Zone 3
1,610
0.50
8051
1
1
805
805
AC -3
Total
805
805
Zone 2
1,027
0.50
514
514
514
AC -2
Total
514
514
Zone 1
1,16q
0.50
5821
582
582
AC -1
i
I
Total
582
582
i
•
I
I
I
I
C _ Minimum ventilation rete per Section 121, Table 121-A
E _ Based on fixed seat or the greater of the expected number of occupants and 50% of the CBC occupant load for egress purposes for spaces without fixed seating.
H Required Ventilation Air (REO'D V.A.) is the larger of the ventilation rates calculated on and AREA or OCCUPANCY BASIS (column D or G).
Must be greater than orequal to H,or use Transfer Air (column N) to make up the difference.
J _ Design fan supply drn (Fan CFM) x 30%; or
T_
K iCondition area (ft. sq.) x 04 cfmlft. sq.; or -- - '
L Maximum of Columns H, J, K, or 300 cfm - —
M _ !This must be less than or equal to Column L an_tl greater that or equal to the sum of Columns H + N.
N Transfer air must be provided where the Required Ventilation Air (column 1) is greater than the Design Minimum Air (column M). Where required, transfer air must be greater than or equal
to the difference between the Required Ventilation Air (column 1) and the Design Minimum Air (column M), column H - M.
EnergyPro 4.4 by EnergySoft User Number: 5670 Job Number: 07-080
—._ � _ -- _ - __ Page: 10 of 14
MECHANICAL EQUIPMENT DETAILS
Part 1 of 2 MECH-5-C
PROJECT NAME
Mimi's Cafe -La Quinta
TANK INSUL.
DATE 1/16/2008
CHILLER AND TOWER SUMMARY
Distribution Type
Qty
Efficiency
Tons
PUMPS
Ext.
R -Val.
Equipment Name
Equipment Type
Qty.
Tot
Qty
JGPM
BHP
Motor
Eff.
Drive
Eff.
Pump
Control
T--1
r•
MULTI -FAMILY CENTRAL WATER HEATING DETAILS
Hot Water Pump Hot Water Piping Length ft
Control
#
HP
Type_ In Plenum
Outside
DHW / BOILER SUMMARY
Add 1/2"
Insulation
I tnergyrro 4.4 Dy tnergybott _ User Number: 5670 _ –_ Job Number: 07-080 _ — Page: 11 of 14
Energy
Factor
or RE
Standby
Loss or
Pilot
TANK INSUL.
System Name
System Type
Distribution Type
Qty
Rated
Input
Vol.
(Gals.)
Condition
Status
Ext.
R -Val.
T--1
MULTI -FAMILY CENTRAL WATER HEATING DETAILS
Hot Water Pump Hot Water Piping Length ft
Control
#
HP
Type_ In Plenum
Outside
Buried
Add 1/2"
Insulation
CENTRAL SYSTEM RATINGS
HEATING
COOLING
System Name
System Tye
Q
Out ut
Aux.
kW
Eff.
Output
Efficiency
Condition
Status
Economizer Throe I
Trane YFD151
Packaged DX
1
122,000
0.0
2.20 COP
143,110
11.3 EER
New
Diff. Temp (Integrated)1
Trane YFD181
Packaged DX
1
203,000
0.0
2.20 COP
188,660
11.5 EER
New
Diff. Temp (Integrated)
Trane YHC120-2
Packaged DX
1
121,500
0.0
2.20 COP
108,410
11.2 EER
New
Diff. Temp (Integrated)
Trane YHC120
Packa 'ed DX
1
121,500
0.0
2.20 COP
111,780
11.2 EER
New
Diff. Temp (Integrated)
a
-
1
J
CENTRAL SYSTEM FAN SUMMARY
System Name _ Fan Type
UPPLY
Motor Location CFM
FAN
Motor Drive
BHP Eff. I Eff.
RETURN FAN _—
Motor Drive
CFM I BHP Eff. Eff.
Trane YFD151
Constant Volume
Draw -Through
5,000
2.81(
84.0%
97.0%
none
-
Trane YFD181
_
Constant Volume
Draw -Through
6,000
3.05
86.5%
97.0%
none
-
_ji
Trane YHC120-2
Constant Volume Volume
Draw -Through
4,000
—
2.74
84.0%
-
97.0%
none
-
L
Trane YHC120
Constant Volume
Draw -Through
4,000
2.74
84.0%
97.0%
none)
I
-
Run Initiation Time: 01/16/08 14:08:42 Run Code: 1200521322
I tnergyrro 4.4 Dy tnergybott _ User Number: 5670 _ –_ Job Number: 07-080 _ — Page: 11 of 14
(ENVELOPE MANDATORY MEASURES ENV -MMI
PROJECT NAME DATE
Mimi's Cafe -La Quinta 1/16/2008
DESCRIPTION
Designer
Enforcement
§ 118(a) Installed Insulating Material shall have been certified by the manufacturer to
comply with the California Quality Standards for insulating material, Title 20,
Chapter 4, Article 3.
F] § 118(c) All Insulating Materials shall be installed in compliance with the flame spread rating
and smoke density requirements of Sections 2602 and 707 of Title 24, Part 2.
§ 117(a) All Exterior Joints and openings in the building that are observable sources of air
leakage shall be caulked, gasketed, weatherstripped or otherwise sealed.
' r
§ 116(b) Site Constructed Doors, Windows and Skylights shall be caulked between the unit
and the building, and shall be weatherstripped (except for unframed glass doors
and fire doors).
§ 116(a)1 Manufactured Doors and Windows installed shall have air infiltration rates not
exceeding those shown in Table Number 1-E. of the Standards. Manufactured
fenestration products must be labeled for U -value according to NFRC procedures.
§118(e) Demising Walls in Nonresidential Buildings:
The opaque portions of framed demising walls in nonresidential buildings shall
have insulation with an installed R -value of no less than R-13 between framing
members.
EnergyPro 4.4 by EnergySoft User Number: 5670 Job Number: 07-080 Page: 12 of 14
a
MECHANICAL MANDATORY MEASURES Part 1 of 2 MECH-MM
PROJECT NAME DATE
Mimi's Cafe -La Quinta 1/16/2008
DESCRIPTION
Designer
Enforcement
Equipment and Systems Efficiencies
§11 Any appliance for which there is a California standard established in the
Appliance Efficiency Regulations will comply with the applicable standard.
§115(a) Fan type central furnaces shall not have a pilot light.
§123 Piping, except that conveying fluids at temperatures between 60 and 105 degrees
Fahrenheit, or within HVAC equipment, shall be insulated in accordance with
Standards Section 123.
❑ §124 Air handling duct systems shall be installed and insulated in compliance with
Sections 601, 602, 603, 604, and 605 of the 2001 CMC Standards.
Controls
§122(e) Each space conditioning system shall be installed with one of the following:
❑' §122(e)1A Each space conditioning system serving building types such as offices and
manufacturing facilities (and all others not explicitly exempt from the
requirements of Section 112 (d)) shall be installed with an automatic time switch
with an accessible manual override that allows operation of the system during
off -hours for up to 4 hours. The time switch shall be capable of programming
different schedules for weekdays and weekends and have program backup
capabilities that prevent the loss of the device's program and time setting for at
least 10 hours if power is interrupted; or
§122(e)1B An occupancy sensor to control the operating period of the system; or
§122(e)1C A 4 -hour timer that can be manually operated to control the operating period of
• the system.
❑ §122(e)2 Each space conditioning system shall be installed with controls that temporarily
restart and temporarily operate the system as required to maintain a setback
heating and/or a setup cooling thermostat setpoint.
F] §122(g) Each space conditioning system serving multiple zones with a combined
conditioned floor area more than 25,000 square feet shall be provided with
isolation zones. Each zone: shall not exceed 25,000 square feet; shall be
provided with isolation devices, such as valves or dampers, that allow the supply
of heating or cooling to be setback or shut off independently of other isolation
areas; and shall be controlled by a time control device as described above.
§122(a&b) Each space conditioning system shall be controlled by an individual thermostat
that responds to temperature within the zone. Where used to control heating, the
control shall be adjustable down to 55 degrees F or lower. For cooling, the
control shall be adjustable up to 85 degrees F or higher. Where used for both
heating and cooling, the control shall be capable of providing a deadband of at
least 5 degrees F within which the supply of heating and cooling is shut off or
reduced to a minimum.
§22(c) Thermostats shall have numeric setpoints in degrees Fahrenheit (F) and
adjustable setpoint stops accessible only to authorized personnel.
F. §112(b) Heat pumps shall be installed with controls to prevent electric resistance
supplementary heater operation when the heating load can be met by the heat
pump alone.
EnergyPro 4.4 by EnergySoft User Number: 5670 Job Number: 07-080 Page: 13 of 14
MECHANICAL MANDATORY MEASURES
PROJECT NAME
Mimi's Cafe -La Quinta
r
Part 2 of 2 MECH-MMS
DATE
1/16/2008
Description
Designer
Enforcement
Ventilation
§121(e) Controls shall be provided to allow outside air dampers or devices to be operated
at the ventilation rates as specified on these plans.
§122(f) Gravity or automatic dampers interlocked and closed on fan shutdown shall be
provided on the outside air intakes and discharges of all space conditioning and
exhaust systems.
§1 22(q All gravity ventilating systems shall be provided with automatic or readily
accessible manually operated dampers in all openings to the outside, except for
combustion air openings.
§121(f)1 Air Balancing: The system shall be balanced in accordance with the National
Environmental Balancing Bureau (NEBB) Procedural Standards (1983), or
Associated Air Balance Council (AABC) National Standards (1989); or
§121 (f)2 Outside Air Certification: The system shall provide the minimum outside air as
shown on the mechanical drawings, and shall be measured and certified by the
installing licensed C-20 mechanical contractor and certified by (1) the design
mechanical engineer, (2) the installing licenced C-20 mechanical contractor, or (3)
the person with overall responsibility for the design of the ventilation system; or
❑ §121(f)3 Outside Air Measurement: The system shall be equipped with a calibrated local or
remote device capable of measuring the quantity of outside air on a continuous
- basis and displaying that quantity on a readily accessible display divice; or
§121(f)4 Another method approved by the Commission.
.
Service Water Heating Systems
❑ §113(b)2 If a circulating hot water system is installed, it shall have a control capable of
automatically turning off the circulating pump(s) when hot water is not required.
F] §113(c) Lavatories in restrooms of public facilities shall be equipped with controls to limit
the outlet temperature to 110 degrees F.
1
EnergyPro 4.4 by EnergySoft User Number: 5670 Job Number: 07-080 Page: 14 of 14