Subject: Geotechnical Review of Subgrade Densification and Slab Re -Leveling Plan
Legacy Villas at La Quinta HOA
48-785 (Unit 194) and 48-789 (Unit 193)
La Quinta, California
r4 nces:
Q�
A�0
�LUgC��> 0
44
�0ac
C16 0:Z
❑,CLQ
24:� q a. 0
VmLL
4
"Residential Plan Check Correction List," prepared by City of La Quinta
Ppsign & Development Department, dated May 22, 2017.
=gacy Villas HOA Sub -Grade Densification 48-785 & 48-789 Legacy Dr.,
Quinta, CA (Sheets S-1 and S-2)," prepared by Dunn Savoie Inc., date
ued March 3, 2017.
"Limited Geotechnical Evaluation of Earth Fissure, Legacy Villas at La Quinta
HOA, Retention Basin No. 5 and 48-785 through 48-809 Legacy Drive, La
Quinta, California," prepared by TerraPacific Consultants, Inc., dated October
24, 2014.
"Unit 193 and Unit 194 Comparative Manometer Survey," prepared by
TerraPacific Consultants, Inc., dated January 2016.
Dear Mr. Clifford:
Per request, TerraPacific Consultants, Inc. (TCI) has reviewed the above referenced plan
for subgrade densification and slab re -leveling at the subject building within the Legacy
Villas at La Quinta Homeowners Association (HOA) and prepared this response to address
additional comments (number 4 and 6) on the City of La Quinta Design & Development
Department correction list from the geotechnical perspective. TCI performed a limited
geotechnical evaluation at the site at the request of the HOA, including the two
condominium units in the subject building, which had been impacted by an apparent earth
fissure after a flash flood event that occurred on September 8, 2014. Our evaluation was
limited to visual reviews and comparative manometer (floor -level) surveys performed on
two occasions in October 2014 and January 2016. No subsurface exploration was
conducted at the subject building by TCI to expose the as -built foundation and underlying
supporting soil conditions.
4010 Morena Boulevard, Suite 108 • San Diego, CA 92117 • (858) 521-1 190 • (858) 521-1 199 fax • ferrapoc.net at4k
sG�1<.
URETEK ICR
To Whom it May Concern:
Thanks you for considering using URETEK ICR to repair and restore your concrete and soil concerns. We have the best
polymers available for concrete lifting and soil stabilization and veteran operations teams to ensure a quality completion
of your project.
In addition to these factors for consideration, we understand and value your request for environmental factors in regard
to our materials and processes. We trust that the explanations in this document, although not 3rd parry certified, assists
you and your firm to make an informed concrete and soil repair decision with a better understanding of URETEK ICR and
the environmental lengths we have taken to make sure that every element of our operations meet and highly exceed
environmental concerns.
Sincerely,
Ty Taylor
URETEK ICR- Corporate
REC:EIVED
JUL 14 Z017
CM QUINT
COMMUNm DIEVELOPMENT
URETEK ICR 13900 Humble Rd. Tomball, Texas 77377 T 800.240.7868 F 281.290.6202 Work Email info®uretekipr.com �5 e- icr.com
[DUNN S AV O] E I N G. 9UB S cLES, E�� ,au I:
OCEANSID . CA
STPUCTI.IRA.L ENGIN--ERING
iL-G.966,o355 Pry.
"EO.966.0361D FX
usr._"1.SURFLEt.rm�1•i EI.1AIL
July 11, 2017
Re: Legacy Villas Foundation Repair- 48785 Legacy Drive Plan Check Response
City of La Quinta Plan Check No: BRES2017-0093 (1st Check)
item Kesponse _
A.3 please see note added to sheet S1
A.4 please see note added to sheet S1
1.5 please see code references added to sheet S1
3.1 please see structural observation added to sheet S1
Additional comments
1 My signed and dated stamp on sheet S1 and S2 identifies myself as Engineer of
Record
2 The helical piers are solely sacrificial jacks to assist in the lifting of the edges of the low
portions of the foundation, they are not being depended on for permanent support,
therefore calculations will not be provided. The listed lifting load is a conservative
estimate based on rough calculations.
3 Please see item 1 above
4 Please find Soils Review letter dated July 6, 2017
5 No, please find the attached Uretek info attached addressing this concern.
6 No, please see soils letter, Uretek will fill existing voids to uniformly support the building
as well as raise low portions to level
7 Ok, Please note: Helical anchors have been changed from Chance to Ideal, plans
updated accordingly for name, address, part numbers, ESR report, etc at details 1 & 2 &
Helical Pier notes on Sheet S1, as well as notes on sheet S2.
Sincerely,
DUNN V fE INC.
Lam_
N� r r
Rhe vole, P (*C46423)
ice e nur as registered with the Board of Professional Engineers d Land
Survev rs.
a
0
Q E S 5 p...
14
SENT
REC�E�VED
JUL 14 2011
URETEK ICR
CITY 0,r- LA4 ulwl:"'
COMMUNITY DEVELOPMENT
Env�ronmentd Consderafions
URETEK Polymer: Environmentally Inert
"URETEK's patented polymer is a two component polyurethane and when the material is
fully reacted, it is inert and non -hazardous."
"To the best of our knowledge, ridid polyurethane foams do not have any detrimental
effect on the environment due to decomposition or degradation of the polymer."
- Bayer Material Science (URETEK's exclusive polymer provider)
URETEK Solutions: A Better Fit for the Environment
URETEK Environmental Advantages to Traditional Repair Methods
• Minimal to no I ndfill us: URETEK processes use small, 5/8" drilled holes to inject structural polymer through the
concrete foundation into the weak soil strata. URETEK polymers are specifically formulated to cure to 90% strength
within 15 minutes or less of injection, URETEK operators have surgical control on the volume of material being
installed. There is little to no wasted polymer that goes into our landfill system.
• Smaller, Effuceent, Operation: With over 20 years in the structural polymer business, URETEK methods and
processes have been advanced and modified to meet extreme efficiency, both for our business and the client.
Modifications include utilizing higher efficiency pumping equipment, low emission generators and gas powered tools,
and an overall experience factor that allows us to complete the project faster, avoiding additional transit costs, burning
less fuels, minimizing drains on natural resources.
• Restore. Preserve. and Extend the Useful Lifg of Concrete: Avoiding a complete break out and replacement of
the concrete, preserves, restores, and extends the useful life of the concrete that would have been broken out and
place in a landfill. Typically, URETEK can realign and stabilize most concrete foundations and structures experiencing
settlement. Additionally, URETEK's soil stabilization avoids large excavation and any potential hazards to the local
environment.
• • URETEK material is specifically formulated not to mix with
outside liquids during and after injection/curing. Injecting URETEK polymers is safe to use around residential
subdivisions, buildings, and virtually any populated area where water is present in the soil.
URETEK ICR 13900 Humble Rd. Tomball, Texas 77377 T 800.240.7868 F 281.290.6202 Work Email info®uretekicr.com www i iretekicr com
�r�
RC7
D�I\/ ;D
JUL 14 200
1.0 Background CI f1OF LA
COMMUNITY DEVELOPMENT
In general, TCI is of the opinion that the fissure impacting the subject building is a large-
scale subsidence feature that extends well beyond the limits of the HOA. The feature is
likely due to groundwater withdrawal from the Coachella Valley, which is a phenomenon
that has been monitored since 1996 and is discussed in much greater detail within
published United States Geological Survey Scientific Investigations Report 2014-5075,
which was prepared in cooperation with the Coachella Valley Water District.
The fissure appears to project beneath the subject building and has created voids in the
supporting subgrade soils, likely contributing to the approximate 2 inches of floor
differential inside the building (2.8 inches including garage stem walls). TCI performed
comparative manometer (water level) surveys on the slab -on -grade floor in both units of
the building since the fissure initially developed and found essentially no change in the
overall floor differential, i.e. measurements were within the repeatability of the manometer
instrument in October 2014 and January 2016.
2.0 Geotechnical Opinion
Based on our limited evaluation, TCI recommended the voids created by the fissure be
filled and the HOA consider various options for dealing with the measured floor differential,
ranging from underpinning the structure to bedrock (estimated to be 50 feet and deeper),
to localized grade beam/foundation augmentation, to performing cosmetic repairs and
monitoring. It is our opinion the proposed subgrade densification by Eaglelift with the
proprietary foam, Uretek, is a reasonable approach to filling the subgrade voids and re -
leveling the structure. We understand that helical piers being installed are to assist in the
re -leveling process and allow Eaglelift to provide an extended warranty for the re -leveling
procedure that cannot be offered with the use of Uretek alone.
3.0 Limitations
It should be understood that the proposed subgrade densification and re -leveling approach
proposed does not address the root cause of the subsidence because it is a large-scale
phenomenon affecting the earth beyond the limits of the HOA and cannot be addressed
from just the subject building. Regardless of the approach taken, some risk will remain and
as such, the site conditions should be periodically monitored and reassessed to determine if
additional measures are required.
Geotechnical Review of Subgrade Densification • Legacy Villas • FN. 29106.3 • July 6, 2017
-2
WE
4.0 Drainage
Proper site drainage is an integral part to any repair approach. Ponded surface water
should be avoided in the vicinity of the subject building. This can be accomplished by
installing roof gutters with downspouts, sloping the ground surface away from the
perimeter of the building, and directing surface drainage to the yard drain system.
Additionally, adequate clearance between the bottom of the stucco weep screed and
adjacent grades should be checked to provide a minimum of 2 or 4 inches between
impervious or earthen areas, respectively.
Irrigation should be monitored in the vicinity of the building to verify that the duration and
cycling is limited to only what is required to sustain the landscaping. Drip irrigation is
recommended instead of spray heads.
5.0 Closure
It is difficult, in a single report, to address all of the items associated with the varying
conditions. As such, we expect questions may arise that are not covered herein. We
consider it part of our assignment to address any unresolved issues. Our investigation was
performed using the skill and degree of care ordinarily exercised, under similar
circumstances, by reputable soils engineers and engineering geologists practicing in this or
similar localities. Since geotechnical engineering is based in part on experience and
judgment, other consultants could arrive at different conclusions. Since TCI was not
involved in the original design or construction of the project, no warranty either expressed
or implied is provided for the site. ,
Respectfully submitted,
TerraPacific Consultants, Inc.
Matthew H. Marqu z, PE 70072
Senior Engineer
QROFH.
fS�s/�0��
70072�' —
w m
Fires 09/30/JZ
�r Civil —
OF CAL1��F`� .
R IV ED
JUL 14 Z017
C11-Y OF i A QUINTA
COMMUNITY DEVELOPMENT
2400
Principal Engineer
�QRpF E S SIO�q�
k A. 'ry.�'r�ry.
2400 m
rn
s Expires 613011$
s� 0
r£ Of NO
Geotechnical Review of Subgrade Densification Legacy Villas • FN. 29106.3 • July 6, 2017
0 NSF International
OFFICIAL LISTING
NSF International Certifies that the products appearing on this Listing conform to the requirements of
NSF/ANSI Standard 61 - Drinking Water System Components - Health Effects
This is the Official Listing recorded on April 20, 2010.
Bayer MaterialScience LLC - BaySystems Spray Insulation & Roofing Materials
2400 Spring Stuebner Road
Spring, TX 77389
800-221-3626
281-350-9000
Facility: Spring, TX
Joining and Sealing Materials
Water Water
Contact Contact
Trade Designation
Size
Temp Material
Grouts
BaySystems 486Star (N-61) /
�17
CLD 23 PUR
Mondur MR Light (N-61)
BaySystems 486Star-4 (N-61) /
(1]
CLD 23 PUR
Mondur MR Light (N-61)
BaySystems 486Star-6 (N-61) /
[1]
CLD 23 PUR
Mondur MR Light (N-61)
BaySystems 486Star-8 (N-61) /
[17
CLD 23 PUR
Mondur MR Light (N-61)
(11 Certified for a maximum
of 0.08 sq. in./L in pipes or tanks.
RE
EIVED
JUL 14 Z017
CITY OF LA QUINTA
COMMUNITY DEVELOPMENT
Note: Additions shall not be made to this document without prior evaluation and acceptance by NSF International.
1 of 1
C0028336
789 N. Dixboro Road, Ann Arbor, Michigan 48105-9723 USA
1-800-NSF-MARK / 734-769-8010
au
o
W
y
o
5
v)
a'
V
cc,
o
O
cG
C
w
Q
V)
r
C
Q,
C r
O
iG f--+
O
+-+
�•.+
�
O
y
O
U
O
bD
+
-
L
cu
E,
0
Q"
C
c
U
v
'rt G
m
[c
7
A'
O
bA y
C
r
�' .
�.
U
r
I
O
Cc
L- N
y
e
W
O
�
U
v
Q
U
to
N
CJ
00
co
cu
O
=
y
sz
'�
C6
p
r
}+
00
s
,
c
a°
�
_
.Fe
a
cz V
r-n
o
0
o
V)�
u�
u
m.
W
w0
C
'.
I
r-=+
U_
cn
iC1S
Q
r,
>
CO'4'�
cv
c6
y
C6
,�
w
O
fib
y
p
O
dJ
•�^
C
L.LI
0
i-.-.
In
6
C6
N
p
J
m
v)
In
O
i
U
C¢
u
b.0
O
C
CC'
C
O
LLJ
Ste.
4.7
'U
r�
--
R.
�
U
Q
O
N
Y
o
z
o
v;
_�
o
o
p-
4-1
--
LL
a.
o
o
3
a
o
rCU
u
cu
Q
`�
I
41
CO
°'
v
�
'�
�
a�
�
°'
�
�
�
�
r-
x
U
�
7o
o°
c�
�_
A
H
rn
CU
vi
f6
N
�
L
fU
cG
v
aJ
ME-
O
O
U
2
0!
a°
2
ro
En
a)
�,
o
bjO
r�
"O
O
O
C
Q O
{�
O
C
O
N
i.
a.1
a
y
i
c6
I ►�
L�
O
w
w
U
1:
cG
Y 1
K
41
■
t
V/
y
Q)
}I
C
N
O
N
y^,
cG
p
E�
w
AV`CD
•_
O
A'
•
EnO
�
CS
y
J
�./
�
[n
rr-
.r.
v
C
o
0
O
p
ca
f
r
b-0
=
U
N
W
'�
U
S
r
cn
a�
"C
M
s
u
V
s
co
�,
4
o
i,
�..r
w
i�
p
O
U)
}I
U
cd
U
O
v ,r
{A
4J
M
C3
uO.
N
O
N
41
41
V
'3`
4-d
^�
O
>
r
Q
>
It
11
L
�."
bA
N
L/)
U
�,
aI
O
F-.
c
>
CL
C)
sco
/ED
6�
O N O N d d d d 0 0
y N N N N N N d O O O
y X X X >X X X X X d d
CD LU W Lu W W LU Cll LU
Y
a 1 0
o :2 o o t
5 a Q com O o U c�
m O Q V p N _o
v Gfj m
F- O t_7 Q a)O O
%J co •C y m Q t
7C 5 C
2 I
JUL. 4 2 W I ,�
QUINTA
COMMUNITY DEVELOPMENT
C
O
`aC
m ,N •Q \ •N •Q ,N •Q •I 'Q c o O
—1 Q CDo O_ O Q ca. \ a7
CD LO O n V Lo p 07 C
N N D7 p N n
C
O
S
C
m
O
a
a
m
o a
S C
CND co N CND (ND n ^ O) Q) W N
N � CV -V
H O U U 0 O
Q
F-
y g
Q o
a
c i
coi j
o J
m
cn
ca
to
O
b
C
'a a
cn VJ cn N O w' O a
> > Cc G1 C O p V
O -b C C r N
m d tocn
to a
CL a — —
E 8__ d cc m d d cc Ox 'G., o
0
2
J��
r t
a, Terra Pacific
Legacy Villas at La Quinta HOA
c/o Ms. Jamie Saldivar
48-800 Legacy Drive
La Quinta, CA 92253
Subject:
Limited Geotechnical Evaluation of Earth Fissure
October 24, 2014
File No. 29106.3
Legacy Villas at La Quinta HOA
Retention Basin No. 5 and 48-785 through 48-809 Legacy Drive
La Quinta, California
Dear Ms. Saldivar:
Per the request of the HOA, TerraPacific Consultants, Inc. (TCI) has completed a limited
geotechnical evaluation of the earth fissure at the Legacy Villas project. The feature was
clearly visible across the west side of Basin No. 5 and caused separations and cracks in
adjacent HOA common area surface improvements. The earth fissure and related distress
was reported after a thunderstorm/flash flood that occurred at the site on September 8,
2014. Understanding surface manifestations of the fissure also developed more than 900
feet to the south within and adjacent Eisenhower Drive, it is our opinion the feature was
likely a result of large-scale subsidence. The most likely causes are due to groundwater
withdrawal or consolidation within the alluvial or lake deposits at depth. With this in mind,
we have completed this preliminary evaluation in order to map the approximate extent of
the surface manifestation of the fissure on -site, determine if adjacent private residential
foundations have been adversely impacted, and to provide preliminary recommendations
and concepts for repairs.
1.0 EARTH FISSURE OBSERVATIONS
Surface manifestations of the earth fissure were observed by our office during site visits
between September 11, 2014 and October 1, 2014. The approximate locations of the
observed manifestations are presented on the Geotechnical Plan, Plate 1 in Appendix A.
The following paragraphs provide descriptions of the observed features.
The largest surface expression transected the west side of Basin No. 5, generally in a
north -south direction, in the form of a depression/opening a maximum of approximately 3
to 8 feet wide near the surface, before bridging with soil typically by a depth of 5 feet.
The contractor working on basin drainage improvements at the time of the flood, Maco
Equipment Rentals, Inc. (Maco), began a temporary repair of the depression/opening on
September 17, 2014 due to a weather forecast indicating the potential for additional flash
flooding. TCI did not observe the operation firsthand, but did provide Maco with
temporary repair recommendations, which included cleaning and roughly squaring out a
trench along the sides and bottom of the fissure, lining the sides and bottom with filter
fabric, and then backfilling with an imported clay layer and on -site soil. Figures 1 and 2 in
Appendix A depict photographs of the location of the fissure across the west side of Basin
No. 5 prior to and after backfilling.
4010 Morena Boulevard, Suite 108 • San Diego, CA 92117 • (858) 521-1 190 - (858) 521-1 199 fax • terrapac.net
Roughly in line with the depression/opening within the basin, three smaller surface voids
off the southeast corner of 48-805 Legacy Drive (Unit 189) were noted. The two features
closest to the residence were noted during our initial review on September 11, 2014 and
measured less than 3 feet in length and approximately 4 to 6 inches wide at the surface,
with depths of approximately 10 to more than 22 feet (limit of tape measure). The third
feature was reported to have opened up sometime during the weekend after the temporary
basin repair, and was measured less than 5 feet in length and up to approximately 2 feet
wide and 8 feet deep. Figures 3 and 4 in Appendix A include photographs of the surface
voids south of the residence.
Further north, the fissure appears to project between 48-805 and 48-809 Legacy Drive, as
numerous separations and displacement of hardscape and separations of the soil and
footings in planter areas between the residences were observed. On the north side of 48-
809 Legacy Drive, the fissure appears to jog northeast underneath the corner of the
building across the driveway and then under the southeast corner and along the east side
of 48-785 Legacy Drive before apparent surface manifestations could no longer be
detected. Figures 5 and 6 show example photographs of the features observed in these
areas.
2.0 VISUAL INSPECTIONS AND MANOMETER SURVEYS OF PRIVATE RESIDENCES
On October 1, 2014 a total of seven of the eight residences within the four buildings
adjacent the west side of Basin No. 5 were visually inspected for evidence of foundation
level movement due to their proximity to the fissure. In addition, manometer (floor -level)
surveys were conducted on the concrete slab -on -grade floors and stem walls of the
residences to measure overall floor differential/tilt in the buildings. The floor -level survey
uses a manometer, which is a simple water -level device used to measure points of relative
elevation on the slab. The survey points are corrected for thickness of floor coverings and
then graphically contoured to illustrate the shape of the slab surface.
Most new floor slabs are built to within approximately '/2 to 3A inches of level. Levels of
unevenness due to construction practices may be even higher. However, for most
practical purposes, floor tilt in excess of 1-inch usually indicates post -construction
foundation movement.
An important aspect used when analyzing floor deformation is the tilt ratio. The tilt ratio is
typically defined as the greatest vertical elevation differential taken over a 20-foot
horizontal distance. Most Geotechnical Engineers agree that damages will often begin to
manifest when tilt ratios exceed 1-inch of vertical differential over a 20-foot horizontal
distance, which represents a 1:240 tilt ratio. Results of the manometer surveys and
significant distress features observed that appeared newer and possibly related to the earth
fissure are described in the following sections.
Limited Geotechnical Evaluation of Earth Fissure • Legacy Villas • File No. 29106.3 • October 24, 2014
-2-
AN
2.1 48-785 and 48-789 Legacy Drive
The building containing these residences (Units 193 and 194) exhibited a maximum floor
differential of 1.9 inches (2.8 inches including garage stem walls). The high points are
located along the west side of the building in Unit 193 and low points are in the hall
bathroom, along the east wall of the middle bedroom and southwest garage stem wall in
Unit 194. The corresponding maximum overall tilt ratio is approximately 1:171, with
locally higher ratios of approximately 1:147 measured across shorter horizontal distances.
The contoured results of the manometer survey are presented on Figure 7 in Appendix A.
In general, distress features observed in the building that may be attributable to the recent
earth fissure were fairly limited. Features included a few minor drywall cracks inside Unit
194 and some stucco cracking along the garage walls at both units. In addition, the owner
of Unit 194 reported a new slab crack up to approximately 1/32-inch wide at the southeast
corner of the garage. The approximate locations of these features are also presented on
Figure 7 in Appendix A.
2.2 48-793 and 48-797 Legacy Drive
The building containing these residences (Units 191 and 192) exhibited a maximum floor
differential of 0.9-inch (including garage stem walls). The high points are located inside
the half and full bathrooms of Unit 192 and the low point is located in the hallway of Unit
191. The corresponding maximum overall tilt ratio is approximately 1:533, with locally
higher ratios of approximately 1:300 measured across shorter horizontal distances. The
contoured results of the manometer survey are presented on Figure 8 in Appendix A.
In general, no distress features were observed in the building that appear to be related to
the recent earth fissure. Some fine drywall and stucco cracks were observed at the units;
however, the features were considered minor and likely due to material shrinkage and/or
normal foundation adjustments.
2.3 48-801 and 48-805 Legacy Drive
The building containing these residences (Units 189 and 190) exhibited a maximum floor
differential of 1.2 inches (1.3 inches including garage stem walls). The high point is
located on the west wall of the master bedroom of Unit 189 and the low points are along
the east side of Unit 189. The corresponding maximum overall tilt ratio is approximately
1:398, with locally higher ratios of approximately 1:228 measured across shorter
horizontal distances. The contoured results of the manometer survey are presented on
Figure 9 in Appendix A.
Limited Geotechnical Evaluation of Earth Fissure a Legacy Villas •
File No. 29106.3 • October 24, 2014
-3-
In general, no distress features were observed in the building that appear to be related to
the recent earth fissure. Some fine drywall and stucco cracks were observed at the units;
however, the features were considered minor and likely due to material shrinkage and/or
normal foundation adjustments. It should be noted, there were the exterior features (i.e.
separations and displacement of hardscape and soil) along the east side of Unit 189
described in Section 1.0 above.
2.4 48-809 Legacy Drive
TCI was only able to survey Unit 188 of the building, as access to Unit 187 was not
obtained during our site visit on October 1, 2014. Unit 188 exhibited a maximum floor
differential of 1.9 inches (including garage stem walls). The high point is located at the
northwest corner of the residence and the low points are located at the southern portion of
the residence in the master bedroom. The corresponding maximum overall tilt ratio is
approximately 1:590, with locally higher ratios of approximately 1:175 measured across
shorter horizontal distances. The contoured results of the manometer survey are presented
on Figure 9 in Appendix A.
In general, distress features observed in Unit 188 that appear to be related to the recent
earth fissure were fairly limited. Features included a few fine drywall cracks inside the unit
near the northwest corner and some stucco cracking at the west side of the garage. In
addition, there was a relatively wide crack (3/32-inch or greater) in the tile flooring, concrete
slab in the hallway and middle bedroom with some vertical displacement. However, there
were no drywall cracks in the hall and bedroom area adjacent the slab crack and it is
unknown if the slab crack was present prior to the earth fissure developing. The
approximate locations of these features are also presented on Figure 10 in Appendix A. It
should be noted, there were the exterior features (i.e. separations and displacement of
hardscape and soil) along the west side and driveway in front of the unit described in
Section 1.0 above.
3.0 DISCUSSION
The earth fissure that was discovered after the flash flood event of September 8, 2014 is
most likely caused by large-scale subsidence due to groundwater withdrawal and/or
consolidation of alluvial soils or lake deposits at depth. The United States Geological
Survey (USGS) has been monitoring large scale subsidence associated with groundwater
level declines in the Coachella Valley since 1996. USGS Scientific Investigations Report
2014-5075, prepared in cooperation with the Coachella Valley Water District (CVWD),
presents the results of subsidence monitoring in three areas of the Coachella Valley
between 1995 and 2010. The Legacy Villas project is situated along the northern flank of
an area identified as the La Quinta area, which experienced approximately 2 feet of land
subsidence over the measured time period.
Limited Geotechnical Evaluation of Earth Fissure Legacy Villas • File No. 29106.3 October 24, 2014
4-
4'
Given the earth fissure is likely related to large-scale subsidence beyond the control of the
HOA, we have prepared the following recommendations to help mitigate adverse effects of
the fissure. The following recommendations are considered practical methods for
addressing the geologic phenomenon affecting the site. However, regardless of the
approach taken, some risk will remain and as such, the site conditions should be
periodically monitored and reassessed to determine if additional measures are required.
3.1 Fissure Repair
Regardless of which repair option presented below is selected, it should be understood that
the repair will not prevent additional subsidence and development of additional surface
manifestations of the fissure. The following options are intended to fill in the
openings/voids in order to minimize infiltration of surface run-off into the fissure. Prior to
enacting repairs, it is recommended that the displaced driveway panels between Units 188
and 193 be removed in order to better observe the subgrade soils for presence of fissure
openings/voids and provide additional access for grouting options presented below.
Replacement panels should match the existing driveway concrete thickness and
reinforcement size and spacing. Also, Unit 187 should be inspected and surveyed to
complete the building review. All surface area drain lines around the buildings should be
checked to see they are in working order. The approximate location of driveway panels
and drain lines are presented on the Geotechnical Plan, Plate 1 in Appendix A.
3.1.1 Option 1 — Comprehensive Grouting
This approach would involve grouting of the fissure zone at depth so that it can be
effectively treated from "the bottom up." In order to accomplish this goal, it is
recommended that an experience grouting contractor be contacted to determine an
effective means and method for filling the voids. It is our understanding, that a
representative from a contractor specializing in geotechnical repairs, Hayward Baker, has
already been contacted and visited the site. The information provided on Plate 1 in
Appendix A, may be used as a guide to determine the approximate limits of treatment. TCI
can provide additional geotechnical information, i.e. grading plans, soils reports, boring
logs, etc., that may be requested by the grouting contractor, if ultimately contracted by
the HOA.
3.1.2 Option 2 — Limited Grouting
Another option to minimize surface infiltration and fill voids is to grout "from the top
down" using a 2-sack sand -cement slurry. Essentially, where voids/separations exist at
the soil surface, i.e. south of Unit 189 and along the sides of Units 188, 189, and 194,
they should be cleaned of loose soil and roughly squared out to facilitate filling with slurry.
Limited Geotechnical Evaluation of Earth Fissure • Legacy Villas • File No. 29106.3 October 24, 2014
-5-
The slurry should be applied directly into the excavation/ground crack via gravity flow. A
similar option could be employed at other locations within the Legacy Villas HOA where
sinkholes or voids have locally formed since the flash flood, i.e. adjacent manhole near
southwestern most pool, in Legacy Drive near clubhouse, and adjacent the garage at 48-
660 Classic Drive.
Additionally, where separations between hardscape panels exist which are not elected for
replacement, they should be filled with an elastomeric sealant. Sealant should also be
applied along separations at the interface between planter walls and hardscape panels.
4.0 RESIDENTIAL REPAIRS
Based on the results of our manometer surveys, we measured elevation differentials in
Units 188, 189, 193, and 194 that indicate foundation slab movement potentially related
to the recent fissure development. However, resultant damages to the finishes in the
superstructure were mainly noted in Units 188 and 194 and appear to be relatively low-
level in magnitude at this time. In any case, there are multiple options to consider, which
ultimately will need to be based on the HOA's risk tolerance for future problems and cost
to implement.
Given the relatively limited distress at the residential buildings, it is our opinion a prudent
repair approach would be to enact the cosmetic repairs and monitoring as described in
Section 4.1 below. The following options are presented in order from the least expensive
and higher risk for future problems to the most expensive and lower risk for future
problems. Regardless of the repair approach, some level of risk will remain. This is always
the case.
4.1 Cosmetic Repairs and Monitoring
With this approach, finishes in the superstructure should be cosmetically repaired. Simple
cosmetic patching and painting should be avoided where more rigorous fixes are
appropriate, such as recurring cracks at re-entrant drywall corners. Slab cracks may be
treated with epoxy injection (i.e. Sikadur or similar) or localized saw cut strip replacement
(see Figure 11 in Appendix A). For example, cracked drywall could be removed to the
nearest stud or blocking (or blocking added) and replaced with a new panel section. Prior
to panel replacement, a metal tie could be mortised and screwed (not nailed) across the
framing joint at the crack location. Drywall panel joints should be taped with adhesive -
backed fiberglass (or similar) and joint compound applied in the normal manner before
repainting. Other details within the overall repair may include metal connectors, special
trim, elastic paint, or other items that will help resist or otherwise accommodate minor
movements. Ultimately, all cosmetic repairs should be detailed and implemented by an
experienced repair contractor.
Limited Geotechnical Evaluation of Earth Fissure • Legacy Villas • File No. 29106.3 a October 24, 2014
-6-
Monitoring of the residences is also recommended via comparative manometer surveys and
visual reviews. It is recommended to perform surveys on affected units after any grouting
repairs to establish a baseline and at approximate 18 to 24-month intervals. If additional
movement is detected, one of the following options may need to be adopted.
4.2 Structural foundation Repairs
Another approach would be to structurally enhance the foundations of the affected units
(i.e. in the vicinity of the fissure zone). This would entail adding stiffening grade beams at
the building perimeters or full or partial replacement of the existing slabs with a thicker,
heavily reinforced mat slab. This would allow the residential foundations to essentially
span the fissure zone or otherwise minimize associated bending stresses caused by
additional subsidence. It is also possible the existing foundations may be underpinned into
the bedrock below the fill and alluvial soils at depth; however, the bedrock may be too
deep to make this repair cost effective. In any case, additional investigation to check as -
built foundation and underlying soil conditions in the area of repair would be required. In
addition, a Structural Engineer would need to be engaged to ultimately develop plans for
submittal to the local building jurisdiction. If the HOA elects to explore this option, a
proposal could be provided upon request.
4.3 Drainage
Regardless of the adopted repair scheme, the potential for future movement can be
reduced if excessive moisture is not allowed to infiltrate the ground. Basically, ponded
surface water should be avoided in the vicinity of the subject residences. This can be
accomplished by sloping the ground surface away from the perimeter of the building and
directing surface drainage to the yard drain system. Additionally, adequate clearance
between the bottom of the stucco weep screed and adjacent grades should be checked to
provide a minimum of 2 or 4 inches between impervious and earthen areas, respectively.
The project civil engineer should be consulted for drainage repair details.
5.0 CLOSURE
It is difficult, in a single report, to address all of the items associated with the varying
conditions. As such, we expect questions to arise that may not be covered herein. We
consider it part of our assignment to address any unresolved issues.
Our investigation was performed using the skill and degree of care ordinarily exercised,
under similar circumstances, by reputable soils engineers and engineering geologists
practicing in this or similar localities. Since geotechnical engineering is based in part on
experience and judgment, other consultants could arrive at different conclusions. Since
TCI was not involved in the original design or construction of the project, no warranty
either expressed or implied in provided for the site.
Limited Geotechnical Evaluation of Earth Fissure • Legacy Villas • File No. 29106.3 • October 24, 2014
-7-
all
This report is prepared for the sole use of our client and may not be assigned to others
without the expressed written consent of the client and TerraPacific Consultants, Inc. The
findings of this report are valid as of this present date. It should be recognized that
conditions can change with the passage of time, whether by natural processes or the
works of man. In addition, changes in applicable standards may occur due to legislation or
the broadening of knowledge. Accordingly, the findings of this report may be invalidated
wholly or partially by changes outside of our control.
We greatly appreciate this opportunity to provide consulting services. Please do not
hesitate to contact us if you require further information.
Respectfully submitted,
TerraPacific Consultants, Inc.
':!C-
Matthew H. Marquez, PE 70072 Scott A. Thoeny, GE 2400
Senior Engineer Principal Engineer
Appendix A: Figures rSSi ,
70072
Expires 09/30/ 1
u 2400
-Ores 6i30/ iq
OF
Limited Geotechnical Evaluation of Earth Fissure - Legacy Villas • File No. 29106.3 - October 24, 2014
-8-
APPENDIX A
Figures
e!wo i e�'e
�::zsye�«a+es jl 17DdDJJ21::,`� �1.1 lulnO el �s
OHH sell" Fae6al y
ajnss13 41e340 uoljenlen3 leoluyoa;oaO paV.wlj
�
�
3
U
�
3
e cf
9
c'o
3'
R�
N
� t
i
o m L.
ZAe P.o
r• r ��• • . r 4 . • . •r;.r. "a Y
""`-
AL NL
Overview of fissure across bottom and south side of Basin No. 5
Overview across north side of Basin No. 5
4010 Moro' Boulevartl Legacy Villas Post
Terra Pacific SanDiego
CA92117 Example Photos Flood Evaluation Figure 1
aseszlalso File No. 29106.3
October 2014
Overview of fissure backfilled by Maco.
Overview of fissure backfilled by Maco.
4010 Mauna IIWOv d Legacy Villas Post
sU 1ge Flood Evaluation
�' Terra aci is san0iegoCA92117 Example Photos File No,29106.3 Figure 2
. 959-621-1190
� October 2014
0
Surface void off southeast comer or 48-805 Legacy Drive.
Surface void off southeast comer or 48-805 Legacy Drive.
ansv x ea,lnre a Legacy Villas Post
Tgrra acific '072 go CA92117 Example Photos Flood Evaluation
a 106.n Figure 3
ase-sz1-11so File No. 29106.3
October 2014
f of filter fabric used
temporary repair
Surface void reportedly opened weekend of September 20-21, 2014
A.
t- t
X ti
Ap k;
End of filter fabric used
for temporary repair
Surface void reportedly opened weekend of September 20-21, 2014
.1010 M— FI-1 --wnd Legacy Villas Post Rood SUR. 108 d Evaluation
TerraPaci is San Diego CA92117 Example Photos Figure 4
. 8SB-521-1190 File No. 29106.3
October 2014
u
f I
. 1Yf •�
t
Soil settlement/voids along west side of 48-809 Legacy Drive.
n
•ry�
h..
Displacement/separation of driveway in front of 48-809 Legacy Drive.
4010 M.— Ci-I—d Legacy Villas Post
Soi1e 10B Example Photos Flood Evaluation Figure 5
Terrc�l�sci�� SanLlicgoCA92117
' ' ' ase-521 ;1so File No. 29106.3
October 2014
Te r r ci Pcic1 1c
Jllfiiltilliiili�li1 � __-
Hardscape separation near entry to 48-785 Legacy Drive.
• _ t a - -t;
• Ili r
" •'r�- •, ' is • l � - .. l�:`� :',�P, �': i
_.ate 1 :'? ` ' -• =� r ' �•5p�^,jc^"y.r +�
r• frr r�r:[: _ !d •T
Soil settlement/voids along east side of 48-785 Legacy Drive.
aoln Mor H-04"b Legacy Villas Post
SWO toe Flood Evaluation
TerraPaci is 4"FllogoCA92117 Example Photos File No.29106.3 Figure 6
85e321.1198
October 2014
EXffiBIT "C"
Manometer Survey dated January 22, 2016 (confirmed by EagleLift on February 9,_2017)
-14-
Z
'I�
i
h �
f �^✓ �
iIL
co
°co
N
o
CC m
o
O
O
O
?a
E
E
pEl
ro o
18.
2
E9
u�
CY
- v J
e.m
02.
O
W
O
}
1((
w
N
O
}
J
o
Co
N �_
rn
LL
0
r
0
z
w
0
J
`#
O
e m
DO
m
m
co
_
Z
S
Cq y
0
qgg� E E.
f
7
i
Q
0 0
L)
\
O
i
m
Z
I
9-J
S
O
f
A'
4 1
o
w
Do
=
y
DO
~
O
C
00
co
•� h
1
� y
°p
�
_ o
N jm
m O
m m
m m
m
Z
a
�
m
E
E3
i Ka
m a
a!
m
e E
1
s�.4
$
(
$t
\�
m)�f»
3,§!|
g] ®f
E
!
\|
\k
\®�
&§§!,
&;2l.
-
-
.§!
ka
o��§§
2!
!
0-6
21
)
)�
24
�,°■
«;
g!
o,:��
§ �q
»
of
,2
!k
■!
a-k
§`!
-
>■(ff
-`
>!�/!,
$}
}f
}\f
�n
\ft�\\
}
j}!�
}�
;
\
(
)
@
S
:
/(
�
EXHIBIT "D"
Ea leLift Construction Contract Rev. 5 dated March 21 2017
-15-
EAGLELIFT
REV. 5
Date: 3/21/17
Name: Legacy Villas at La Quinta HOA
Address:48-800 Legacy Drive, La Quinta, CA 92253
Phone: 710-610-7695
Email: bclifford@drminternet.com
EagIeLIFT, Inc. Representative: Roberto Najera Phone: 619-433-8031
PROPOSAL AND CONSTRUCTION CONTRACT (Home Improvement/Commercial/Industrial):
You are entitled to a fully executed copy of this agreement, signed by both you and the Contractor, before any
work is started.
1. DESCRIPTION OF PROJECT:
EagIeLIFT (also referred herein as "Contractor") will furnish all labor, materials, equipment, supervision, and
contract administration to complete in a good and workmanlike manner the following: Alterations to structures
under the jurisdiction of Legacy Villas HOA (also referred herein as "Customer") located at address 193 and 194
Legacy Drive, La Quinta, CA 92253 (hereinafter the "Project" or "Work"), as described more fully in the scope of
work and drawings, pages S1 and S2, prepared by Dunn Savoie, Inc. dated March 3, 2017. By this reference,
equipment listed and those drawings are incorporated in and made a part of this Contract.
Contractor's scope of work under this Contract does not include any of the following items: Repair or replacement
of any flooring, hardscape or softscape, or any finish work that may be required when the lifting and leveling is
completed. All utilities that may be affected by the install or lift are the responsibility of the customer. Any existing
breaks in plumbing lines may result in polymer infiltration to which EagIeLIFT is not responsible. Water and Sewer
line inspection work starts is recommended.
2. DESCRIPTION OF SCOPE OF WORK, MATERIALS USED AND EQUIPMENT TO BE INSTALLED:
Install 20 Helical Piers in locations as indicated on design plans from DSI. Inject Uretek geopolymer
in locations indicated on DSI design plans to densify soils at depths of -5' and -10' below grade.
DEEP INJECTION:
Based off of the provided reports and/or inspection, Deep Injection Method should be used in attempt to
stabilize the structure. Deep Injections will be placed as noted on drawing to mitigate further settlement.
The injection locations will be placed on 5 foot centers per DSI design plans. The urethanes will be
installed at depths of -5' and -10' per DSI design plans, where the allowable soil bearing pressure is usually
greater than 1000 pounds per square foot. The yield compressive strength,of the URETEK polyurethane
486 is about 60 psi (8600psf), according to test results obtained using ASTM D 1621. The grout is much
lighter than soil, and generally weighs between about 3 and 5 Ibs per cubic feet. Therefore, settlement of
compressible soils below the grout generally does not occur. Typical allowable foundation bearing
10410 Trademark Street
Rancho Cucamonga, CA 91730
877.752.2522 Toil -Free
eaglelifting.com
CA 778157 A7 ROC 179618 NVSS910
Eaglei.JT, Inc is a participant of the Economic Recovery Fund in AZ and NV, Statutory Limit of $500,000
- 1 -
pressures of soil range from about 1000 psf to 2000 psf, which is less than 33% of the compressive
strength of the grout.
The expansion of resins will consolidate base soils and underpin the immediate surrounding area to fill
voids and improve soil bearing capacity.
Helical Piers
Helical piles will be installed specifically based upon engineering and design. Engineering and geologist reports can only
determine an estimation of the final depth and torque. Actual depth can only be determined after a pull test is completed by
the installer. Therefore, all anchors may have a tendency to be driven farther than the depth estimated. Prior to signing this
proposal, please verify the estimated depths with us. Please note, any additional footage after the estimated scope per
contract will be an additional charge of 550.00 / foot.
Design:
install (20) helical pier anchors to 15 ft.
PRODUCT:
• 20 Ideal Group 1-1/2" RCS hot rolled -square Lead, 60" w 3/8" x 6"-8" helix, galv.
• 40 Ideal Group 1-1/2" x 60" RCS Extension, galy.
• 20 Ideal Group foundation brackets
INSTALLATION:
• Size & number of helical blades shall be determined by the Engineer of Record in order to achieve the required torque
and tensile/bearing capacity.
• Helical will be installed using Torque motor using a Drive tool.
• Constant axial force (crowd) shall be applied while rotating Helical anchors into the ground.
■ The Manufacturer's tensional strength rating of the Helical Anchor shall not be exceeded during installation.
• Bolt hole elongation due to torsion of the shaft of the Helical Anchor at the drive tool shall be limited to Y•". Helical
anchors with bolt hole damage exceeding this criterion shall be uninstalled, removed, and discarded.
■ When the Termination Criteria of a helical anchor is obtained, the Contractor shall adjust the elevation of the top end
of the shaft to the elevation shown on the drawings
• All helical anchor components including the shaft shall be isolated from making a direct electrical contact with any
concrete reinforcing bars or other non -galvanized metal objects since these may alter corrosion rates.
ADDITIONAL NOTES:
• No Compression / Pull Test Included (Add $5,000.00 if necessary)
• Helical pile anchors are total of 15 LF in depth and will be installed at approximate 2 degrees off vertical.
• Install vertical helical piles as specified.
• Install pile shaft extensions to reach design depth and couple with manufacturer supplied hardware.
• Monitor and document installation torque for each pile. Installation torque is then used to estimate ultimate soil
capacity.
• Provide installation data for each pile, including correlation of torque to capacity, to the client.
• install all necessary threaded bar adaptors.
• No open trenches are allowed to be left open after close of work.
• If pile locations must be adjusted in the field, the new locations will be approved by the client prior to pile installation.
10410 Trademark Street
Rancho Cucamonga, CA 91730
877.752.2522 Toil -Free
eaglelifiing.com
CA 7781S7 A7 ROC 179G18 NVSS910
aglel.IFT, Inc is a participant of the Economic Recovery Fund in A7 and NV, Statutory Limit of $S00,000
�2
• An additional charge of 50 foot will be added if piles must be installed to a depth more than that specified in order
to achieve the specified capacity/torque.
• If any piles are needed beyond what is stated in this proposal or shown on the drawings, and additional charge will be
added per pier. Additional piers will only be installed following client approval.
• Install helical piles with a hydraulic -powered, rotary -torque drive unit to a torque of at least 2,000 ft-lbs.
• EagleLIFT reserves the right to revise the pile configuration and negotiate in good faith with the client for any change
in associated costs based upon the results of the load test.
Termination Criteria.
1. Axial capacity is verified by achieving the final installation torque as shown on the Drawings or as provided by the
Anchor Design Professional.
2. Minimum depth is obtained. The minimum depth shall be as shown on the drawings, that which corresponds to the
planned bearing stratum, or the depth at which the final installations torque is measured, whichever is greater. In
addition, Helical anchors shall be advanced until the average torque over the last three (3) feet equals or exceeds the
required final installation torque.
What if:
If the tensional strength rating of the Helical Anchor and/or the maximum torque of the installation equipment has
been reached or "Augering" occurs prior to achieving the minimum depth required, the Contractor shall have the
following options:
1. Terminate the installation at the depth obtained subject to the review and acceptance of the Engineer and State's
Representative.
2. Remove the Helical Anchor and install a new one with fewer and/or smaller diameter helical plates or with dual
cutting edge helical bearing plates. The new helical configuration shall be subject to review and acceptance of the
Engineer and acceptance of the Engineer and State's Representative.
3. Remove the Helical Anchor and pre -drill a 4-inch diameter pilot hole in the same location and reinstall the anchor.
This is an additional charge at $95.00 per work hour.
4. If obstruction is shallow, remove the Helical Anchor and remove the obstruction by surface excavation. Backfill and
compact the resulting excavation and reinstall the anchor.
5. Remove the Helical anchor and relocate 1-foot to either side of the installation location subject to the review and
acceptance of Engineer and State's Representative.
6. Reverse the direction of torque, back -out the Helical anchor distance of 1 to 2 feet and attempt to reinstall by
decreasing crowd and augering through the obstruction.
7. Remove the Helical anchor and sever the uppermost helical bearing plate from the lead section if more than one
helical bearing plate is in use, or reshape the helical bearing plate to create a special tapered edge by cutting with a
band saw. Reinstall the anchor with revised helical bearing plate configuration.
10410 Trademark Street
Rancho Cucamonga, CA 91/30
877.752.2522 Toil -Free
eaglelifting.com
CA 778157 AZ ROC 1796.1,8 NVSS910
"aglel.IFT, Inc is a participant of the Economic Recovery Fund in AZ and NV, Statutory Limit of $500,000
-3-
Quality Assurance:
if the minimum installation torque as shown on the working drawing is not achieved at
the minimum overall length, and there is no maximum length constraint, the Client
shall/can elect the following options:
1. Install the Helical Anchor deeper using additional extension sections. This will be an additional charge of $50.00 per foot.
2. Remove the existing Helical Anchor and install a new one with additional and/or larger diameter helix plates. The new
helix configuration shall be subject to review and acceptance of the State's Representative. If re -installing the same
location, the top -most helix of the new Helical Anchor shall be terminated at least (3) three feet beyond the terminating
depth of the original helical Anchor. This will be at an attritional charge of the materials -cost plus overhead and profit.
The material invoice will be provided upon request.
3. De -rate the load capacity of the Helical anchor(s). The de -rated capacity and additional Helical Anchor location shall be
subject to the review and acceptance of the State's Representative.
*Contract may change based upon on the actual conditions noted when work is started. Assumptions are normal
footings with no additions to footings that require additional work. This includes caissons, additional concrete,
deep footings etc.
Any additional labor outside of the original SCOPE OF WORK will be charged at a rate of $95 per hour per man.
3. CONTRACT PRICE:
Owner shall pay Contractor the sum of $ 95,160.00 (the Contract Price) for the Project/work to be performed
under this Contract, subject to additions and deductions pursuant to change orders agreed upon in writing by the
parties, and subject to 'allowances' as provided below.
The Contract Price can include specific dollar amounts that are set aside for certain materials, finishes, fixtures, and
other items that have not been selected or decided upon by the Owner. These allowances from the Contractor
include all overhead and profit, plus all applicable sales taxes. Any contract changes/adjustments will be handled
with change order(s).
PRICE
PRODUCT & SERVICE
20 Helical Piers - manufactured by Ideal Group
$43,000.00
Geopolymer Soil Stabilization — Deep Injection — (04000)
$50,000.00
GPR Scan — Interior utility / PT cable locating
$1,000.00
Mobilization
$1,160.00
TOTAL
$95,160.00
10410 Trademark Street
Rancho Cucamonga, CA 91730
877,752,252.2 Toil -Free
eagleliffing.com
CA 778157 AZ ROC 17961.8 NV55910
"agleLIFT, Inc is a participant of the Economic Recovery Fund in A7 and NV, Statutory Limit of $500,000
^'4"'
4. DOWNPAYMENT: IT IS AGAINST THE LAW FOR A CONTRACTOR TO COLLECT PAYMENT FOR WORK NOT YET
COMPLETED, OR FOR MATERIALS NOT YET DELIVERED. HOWEVER, A CONTRACTOR MAY REQUIRE A DOWN
PAYMENT. THE DOWN PAYMENT MAY NOT EXCEED $1000 OR 10% OF THE CONTRACT PRICE, WHICHEVER IS LESS.
Payment schedule may be negotiated between Customer and EagleLIFT
Initial Down Payment $1,000.00
Payment for Materials Delivered (Due upon material delivery)
$42,320.00
Progressive Payment - Due upon installation of 20' helical pier
$28,220.00
Progressive Payment — Due upon completion of DI soil stabilization
$14,100.00
Final Payment for Completed Work (Due in full upon completion of work)
$9,520.00
CONTRACT TOTAL
$95,160.00
5. WORK TIME FRAME
The work to be performed under this Contract shall be commenced on approximately 5/8/17, as long as any
required building permits are received and any agreed upon funds are paid to the Contractor. The Project shall be
completed by approximately 5/19/17, subject to permissible delays as defined in this contract.
6. LIST OF DOCUMENTS TO BE INCORPORATED INTO THE CONTRACT
A. Proof of Commercial General Liability and Workers Compensation is attached to this document.
B. Drawings consisting of 2 pages, showing scope of work.
C. Warranty for Products
Customer acknowledges and warrants that he/she has provided or disclosed to EagIeLIFT, Inc. any and all known
prior work associated with the above mentioned repair. This includes any geotechnical and/or geological reports,
engineering reports, soils stabilization or work that has been done similar to the work subject to this proposal,
plans, or drawings relating to foundations, soils or structural components, that pertain to, or would affect or be
affected by the work proposed to be done by EagIeLIFT, Inc.
INITIAL
Engineering and Permits
City permits, engineering plans, geotechnical reports and special inspections are the responsibility of the customer
and the customer shall pay all costs associated with these items upon the signing of the contract. EagIeLIFT can
assist you in obtaining these items. Engineering and permitting costs are non-refundable as upon their
completion, all documents are delivered to the client.
INITIAL
Items EagIeLIFT not responsible for and 100% Lateral Movement Exclusion
This is a construction project and although EagIeLIFT will take appropriate precautions and work in a good and
workmanlike manner, customer is responsible for any finish carpentry, painting, paneling, drywall, etc. that may be
required after our operations are completed. As this repair is a structured lift of settled property, it may cause
some interior/exterior cracks to appear/reappear, windows to crack, doors to misalign or utility lines to break.
These are to be expected and are not the responsibility of EagIeLIFT to repair. EagIeLIFT is not responsible for any
pipes the become damaged or broken through the installation process, the cleaning out of polyurethane, due to
product's intrusion into any broken or damaged pipes, any concrete replacement or finish work unless specified in
the project description.
10410 Trademark Street
Rancho Cucamonga, CA 91730
877.752.2522 Toll -Free
eaglelifting,com
CA 7781.S7 AZ ROC 179618 NVSS910
F.agieLIFT, Inc. is a participant of the Economic Recovery Fund in A7. and NV, Statutory Limit of $500,000
.,. 5 ,�,
EagIeLIFT is not responsible for any lateral movement on any of our completed scopes of work on any structure(s)-
The client has been informed and completely understands our 100% lateral movement exclusion and by initialing,
affirms and agrees. The technology used by EagIeLIFT deals only with the vertical movement of the structure
required to bring it back to or near original grade.
INITIAL
There remains a potential for future movement of the foundation after EagIeLIFT, Inc. has finished the work.
EagIeLIFT, Inc. is in no way responsible for such future movement and does not warrant the completed work
against such movement.
a) Areas of Structure Not Treated — Areas of the structure that have not been treated by EagIeLIFT may
experience movement in the future. These areas will be considered outside the scope of work and will be
considered a new scope of work.
b) Foundation Constructed on Dry Soils —All dry expansive clay soils are subject to uplift as the underlying
support soils take on moisture. This type of movement is usually caused by slow moisture migration and
often continues for 5-years, but may continue for as long as 10-years after new construction. A Soils test
is strongly recommended for any foundation less than 5-years old.
c) Foundations Repaired on Dry Soils — Foundations repaired on dry soils are subject to additional uplift as
the underlying soils take on moisture.
d) Foundations Constructed on Wet Soils — Foundations constructed on wet expansive clay soils will settle
when the soil begins to lose moisture through natural capillary and evaporative processes. This type of
movement may last several years.
e) Foundations Located on Seasonally Wet Soils — Foundations located on expansive clay soils are subject to
sub -surface moisture migration from uphill gradient, underground springs, water traps, fluctuating water
tables or improper grading and have a high potential for movement during seasonal moisture cycles.
These conditions may influence isolated areas or the entire foundation/slab structure.
f) Plants — Trees and large shrubbery, located near the foundation, often desiccate the soils under the
slab/foundation during periods of dry weather and may cause the interior floor slab or exterior
foundation to settle.
g) Plumbing Leaks — Plumbing leaks in expansive clay soils may cause the soils to swell and heave or lift the
slab/foundation. Wet expansive clay soils, caused by previous plumbing leaks, will often shrink after the
plumbing has been repaired and cause the slab/foundation to settle. Such shrinkage may occur over long
periods of time.
h) Improperly Compacted Fill Soils — Soils used as fill in order to provide a level building site should be
compacted in layers under the supervision of a Geotechnical Engineer and according to the procedure's
arrived at by laboratory tests. If these procedures are not followed, the foundation may be supported by
improperly compacted fill, and may allow the foundation to experience additional settlement.
i) Sandy, Silty Soils — Sandy, silty soils that overlay expansive clay may provide an avenue for rapid moisture
migration. Seasonal movement of the interior slab or seasonal uplift of the perimeter foundation beam
may occur.
j) The project work does not provide a remedy for the items a-h above. Additional work in the future
may be required and is not covered by any further warranty, express or implied, under the terms of this
contract.
INITIAL
I have reviewed this Proposal of Services, accept the proposed price, specifications, all terms & conditions,
including all additional wording on the reverse of the forms, and find it to be satisfactory. I am aware that this
Proposal of Services expires 30 days from the date received and can be withdrawn any time after the expiration
date.
10,110 Trademark Street
Rancho Cucamonga, CA 9-1730
877.752.2522 Toil -Free
eaglelifting.com
CA 778157 AZ ROC.179618 NV559.10
EagIeLIFT, Inc is a participant of the Economic Recovery Fund in AZ and NV, Statutory limit of $500,000
-6-
INITIAL
7. CONSUMER NOTICES AND DISCLOSURE STATEMENTS
A. Performance of Extra or Change Order Work Notice
1. Any additional material or work required beyond the original Scope of Work guidelines will result in a
change order, presented to customer for signed approval and payable upon completion of job.
2. A change order is not enforceable against a buyer unless the change order also identifies all of the
following in writing prior to any work covered by the new change order;
I. The scope of work encompassed by the order
II. The amount to be added or subtracted from the contract.
III. The effect the order will make in the progress payments or the completion date.
IV. Signatures of customer and contractor.
3. Contractor's failure to comply with the requirements of this paragraph does not preclude the recovery
of compensation for work performed based upon legal or equitable remedies designed to prevent
unjust enrichment.
B. Mechanics' Lien Warning
Anyone who helps improve your property, but who is not paid, may record what is called a mechanic's lien on your
property. A mechanic's lien is a claim, like a mortgage or home equity loan, made against your property and
recorded with the county recorder.
Even if you pay your contractor in full, unpaid subcontractors, suppliers, and laborers who helped to improve your
property may record mechanics liens and sue you in court to foreclose the lien. If a court finds the lien is valid, you
could be forced to pay twice or have a court officer sell your home to pay the lien. Liens can also affect your
credit.
To preserve their right to record a lien, each subcontractor and material supplier must provide you with a
document called a "20 day Preliminary Notice." This notice is not a lien. The purpose of the notice is to let you
know that the person who sends you the notice has the right to record a lien on your property if he or she has not
paid.
BE CAREFUL. The Preliminary Notice can be sent up to 20 days after the subcontractor starts work or the supplier
provides material. This can be a big problem if you pay your contractor before you have received the Preliminary
Notice. You will not get Preliminary Notices from your Prime Contractor or from laborers who work on your
project. The law assumes that you already know they are improving your property.
PROTECT YOURSELF FROM LIENS. You can protect yourself from liens by getting a list from your contractor of all
the subcontractors and material suppliers that work on your project. Find out from your contractor when these
subcontractors started work and when these suppliers delivered goods or materials. Then wait 20 days, paying
attention to the Preliminary Notices you receive.
PAY WITH JOINT CHECKS. One way to protect yourself is to pay with a joint check. When your contractor tells you
it is time to pay for the work of a subcontractor or supplier who has provided you with a Preliminary Notice, write
a joint check payable to both the contractor and the subcontractor or material supplier.
For other ways to prevent liens, visit CSLB's website at www.csib.ca.gov or call CSLB at 1-800-321-2752
Remember, if you do nothing, you risk having a lien placed on your home. This can mean that you may have to pay
twice, or face the forced sale of your home to pay what you owe.
C. Contractors Board Notice
"Information about the Contractors State License Board (CSLB)"
CSLB is the state consumer protection agency that licenses and regulates construction contractors. Contact CSLB
for information about the licensed contractor you are considering, including information about disclosable
complaints, disciplinary actions, and civil judgments that are reported to the CSLB. Use only licensed contractors.
10410 Trademark Street
Rancho Cucamonga, CA 917.30
877.752.2522 Toll -Free
eaglelifting.com
CA 7781.57 AZ ROC 179618 NVSS910
Fagiet.IFT, Inc. is a participant of the Fconomic Recovery Fund in A7. and NV, Statutoiy Limit of $.500,000
- 7 -
If you file a complaint against a licensed contractor within the legal deadline (usually four years), CSLB has the
authority to investigate the complaint. If you use an unlicensed contractor, CSLB may not be able to help you
resolve your complaint. Your only remedy may be in Civil Court, and you may be liable for damages arising out of
any injuries to the unlicensed contractor or the unlicensed contractor's employees.
For more information: Visit CSLB website at www.cslb.ca.gov
Call CSLB at 1-800-321-2752
Write CSLB at P.O. Box 26000, Sacramento, CA 95826
D. Three Day Right to Cancel
You, the buyer, have the right to cancel this contract within three business days. You may cancel by emailing,
mailing, faxing, or delivering a written notice to the contractor at the contractor's place of business by midnight
of the third business day after you received a signed and dated copy of the contract that includes this notice.
Include your name, your address, and the date you received the signed copy of the contract and this notice.
If you cancel, the contractor must return to you anything you paid within 10 days of receiving the notice of
cancellation. For your part, you must make available to the contractor at your residence, in substantially as
good condition as you received it, any goods delivered to you under this contract or sale. Or, you may, if you
wish, comply with the contractor's instructions on how the return the goods at the contractor's expense and
risk. If you do make the goods available to the contractor and the contractor does not pick them up within 20
days of the date of your notice of cancellation, you may keep them without any further obligation. If you fail to
make the goods available to the contractor, or if you agree to return the goods to the contractor and fail to do
so, then you remain liable for performance of all obligations under the contract.
E. Attorney's Fees
If any amount of the contract remains unpaid and collections made by EagIeLIFT, Inc. and/or its hired attorneys,
lead to demand in collection, original prices, based on pre -approved terms will be forfeited. A twenty percent
(20%) charge on the entire unpaid amount will be incurred as liquidated damages for labor, materials, and
additional administrative efforts to collect delayed payment. Said liquidated damages are in addition to interest
and attorney fees further provide for hereunder. Customer understands and agrees to pay 1.5% finance charges
per month for any and all past due amounts. If for any reason EagIeLIFT, Inc. must begin mediation, arbitration,
collections or actions in law whether based in contract or tort, to enforce this agreement or any other between
EagIeLIFT, Inc. and customer, the prevailing party in such mediation, arbitration, collections or actions in law shall
recover reasonable actual attorney fees in addition to other legal and related costs, or other remedies.
8. AGREEMENT TERMS & CONDITIONS
ITEMS WHICH CUSTOMER IS RESPONSIBLE
When trenching and excavation is required, Contractor will backfill and tamp dirt to the best of its ability.
However, Customer may need to add more top soil at a later date if the area excavated settles. Customer is also
responsible for any landscaping, reseeding and re -sodding as EagIeLIFT is not responsible for replacing affected
landscaping unless specified in the project description.
Proper drainage must be installed and/or maintained in order for the EagIeLIFT warranty to be enacted or
remain in effect. Once proper drainage is install/maintained, such warranty is immediately effective once full
payment is received and all funds cleared bank. EagIeLIFT does not provide drainage solutions. EagleLIFT's only
responsibility is for foundation lifting/leveling and/or soil densification and/or stabilization as stated in the
designated scope of work described in Section 2. Any work outside of what is specifically listed in Section 2 is
outside our scope of work and not included in that scope of work even if there are additional requirements made
by City Approved Plans and/or Engineering.
10410 Trademark Street
Rancho Cucamonga, CA 9.1730
877,752.2522 Toil -Free
eaglelifting,com
CA 778157 AZ ROC 179618 NVS5910
EagIeLIFT, Inc is a participant of the Economic Recovery Fund in A7 and NV, Statutory Limit of $500,000
- 8 -
Contractor calls "Diggers Hotline" to have all public underground utilities located. If Customer lives at a rural
address, public lines will only be located to the pole or Customer's property line. Customer is responsible for
marking any private lines such as satellite dish cables, propane lines, sprinkler system lines, etc. Customer
assumes all responsibility and will hold EagIeLIFT, Inc. harmless for damages due to breakage of any hidden or
unmarked fuel/utility/service/private lines, though Contractor will do its best to avoid such damage.
CUSTOMER
Any and all discrepancies must be in writing to EagIeLIFT, Inc. within five (5) days of completion. Failure to notify
EagIeLIFT, Inc. constitutes approval of all work completed.
TERMINATION OF THE AGREEMENT
Termination by the General Contractor. If the Work/Project is stopped for a period of thirty (30) days under an
order of any court or other public authority having jurisdiction, or as a result of an act of government, such as a
declaration of a national emergency making materials unavailable, through no act or fault of Contractor, or if the
Work/Project should be stopped for a period of fourteen (14) days by Contractor for the Owner's failure to make
payment under this agreement, then Contractor may, at Contractor's sole discretion, upon seven (7) days' written
notice to Owner, terminate this Agreement and recover from Owner payment for all work executed, Contractor's
Fee earned to date, and for the cost of any proven loss sustained on any materials, equipment, tools, construction
equipment, and machinery.
Termination by Owner without Cause. If Owner terminates this Agreement for any reason other than Contractor's
failure to perform its obligations under this Agreement, it shall reimburse Contractor for any unpaid Cost of the
Work/Project that may have been due, if any, plus reasonable costs in connection with products, services, and
labor furnished or rendered to the date of termination. Owner also shall pay Contractor fair compensation, either
by purchase or rental at the election of Owner, for any materials or equipment retained. Contractor shall, as a
condition of receiving the payment referred to in this provision, execute and deliver all such papers and take all
such steps, including the legal assignment of these contractual rights, as Owner may require for the purpose of
fully vesting in Owner the rights and benefits of Contractor under such obligations or commitments.
MEDIATION
Any dispute arising out of, relating to, or in connection with this Agreement, including without limitation, the
meaning or application of any provision of this Agreement, or the performance of any obligation under this
Agreement, shall first be submitted to mediation in an informal attempt to resolve such dispute. The mediation
shall be conducted by IVAMS, or similar Alternative Dispute Resolution Service mutually selected by the parties,
with a mediator experienced in the area of construction and construction contracts. Any party who first files any
claim, including a complaint, without first seeking in good faith to participate in mediation, shall not be entitled to
recover its attorney's fees pursuant to of this Agreement, regardless of whether such party is the "prevailing party"
in any such action.
ARBITRATION OF DISPUTES
In the event that parties are unable to resolve their respective disputes at Mediation, all claims, disputes, and
other matters in question arising out of, relating to, or in connection with this Agreement, including without
limitation, the meaning or application of any provision of this Agreement, or the performance of any obligation
under this Agreement, excepting claims that have been waived by the making or acceptance of final payment, shall
be decided by arbitration in accordance with the Construction Industry Arbitration Rules of the American
Arbitration Association, or pursuant to an alternate Alternative Dispute Resolution Service mutually selected by
the parties.
10410 Trademark Street
Rancho Cucamonga, CA 91'730
877.752.2522 ToH-Free
eaglelifiing.com
CA 7781 S7 A7 ROC 179618 NV55910
F.agleUFT, Inc is a participant of the Economic Recovery Fund in A7 and NV, Statutory Limit of $S00,000
-9-
The award rendered by the arbitrators shall be final, and judgment may be entered on it in accordance with
applicable law in any court having jurisdiction thereof.
Unless otherwise agreed in writing, General Contractor shall carry on the Work and maintain the Contract
Completion Date during any arbitration proceedings, and Owner shall continue to make payments in accordance
with this Agreement.
All claims that are related to or dependent on each other, shall be heard by the same arbitrator or arbitrators,
even though the parties are not the same, unless a specific contract prohibits such consolidation.
"NOTICE: BY INITIALING IN THE SPACE BELOW YOU ARE AGREEING TO HAVE ANY DISPUTE ARISING OUT OF THE
MATTERS INCLUDED IN THE'ARBITRATION OF DISPUTES' PROVISION DECIDED BY NEUTRAL ARBITRATION AS
PROVIDED BY CALIFORNIA LAW AND YOU ARE GIVING UP ANY RIGHTS YOU MIGHT POSSESS TO HAVE THE DISPUTE
LITIGATED IN A COURT OR JURY TRIAL. BY INITIALING IN THE SPACE BELOW YOU ARE GIVING UP YOUR JUDICIAL
RIGHTS TO DISCOVERY AND APPEAL, UNLESS THOSE RIGHTS ARE SPECIFICALLY INCLUDED IN THE'ARBITRATION OF
DISPUTES' PROVISION. IF YOU REFUSE TO SUBMIT TO ARBITRATION AFTER AGREEING TO THIS PROVISION, YOU
MAY BE COMPELLED TO ARBITRATE UNDER THE AUTHORITY OF THE BUSINESS AND PROFESSIONS CODE OR OTHER
APPLICABLE LAWS. YOUR AGREEMENT TO THIS ARBITRATION PROVISION IS VOLUNTARY."
WE HAVE READ AND UNDERSTAND THE FOREGOING AND AGREE TO SUBMIT DISPUTES ARISING OUT OF THE
MATTERS INCLUDED IN THE'ARBITRATION OF DISPUTES' PROVISION TO NEUTRAL ARBITRATION.
INITIAL
LIMITATION OF LIABILITY
Except as expressly stated in the accompanying Limited Warranty Agreement, no warranties or representations
have been made by Contractor concerning the Project and/or the material and services furnished, including
without limitation any implied warranties of merchantability or fitness for a specific purpose. To the fullest extent
permitted by law, Customer acknowledges and agrees that upon completion of the Project, Customer's sole and
exclusive remedies for breach of any and all warranties and for contractor's liability of any kind under this
Agreement shall be limited to the remedies expressly set forth in the Limited Warranty Agreement. Customer
further agrees that the total liability, in the aggregate, of the Contractor for any and all claims, losses, costs or
damages, of any nature whatsoever arising from, or in any way related to, the Project and/or the this Agreement
shall not exceed the total compensation received by the Contractor under this Agreement. It is intended that this
limitation apply to any and all liability or cause of action however alleged or arising, unless otherwise prohibited by
law. Customer further agrees that in no event shall Contractor be responsible for special, indirect, incidental, or
consequential damages of any kind, even if Contractor has been advised of the possibility of such potential losses
and/or damages.
INITIAL
MODIFICATIONS
This Agreement cannot be changed nor can any provision of this Agreement, or any right or remedy of any party,
be waived orally. Changes and waivers can only be made in writing and the change or waiver must be signed by
the party against whom the change or waiver is sought to be enforced. Any waiver of any provision of this
Agreement, or any right or remedy, given on any one or more occasions shall not be deemed a waiver with respect
to any other occasion.
10410 Trademark Street
Rancho Cucamonga, CA 91/30
877.752.2522 Toil -Free
eagielifl-ing.com
CA 778157 AZ ROC 179618 NVSS9:10
EagieLIFT, Inc. is a participant of the Economic Recovery Fund in AZ and NV, Statutory Limit of $SOQ,000
It I
EXTENT OF AGREEMENT
This Agreement is signed by the parties as a final expression of all of the terms, covenants, and conditions of their
agreement and as a complete and exclusive statement of its terms, covenants, and conditions and is intended to
supersede all prior agreements and understandings concerning the subject matter of this Agreement. As drawings
and specifications are completed, they shall be identified by amendment to this Agreement. This Agreement shall
not be superseded by any provisions of the documents for construction and may be amended only by written
instructions signed by both Owner and Contractor.
SEVERABILITY
In the event that any provision of this Agreement be declared or be determined by any court of competent
jurisdiction to be illegal, invalid, or unenforceable, the legality, validity and enforceability of the remaining parts,
terms or provisions shall not be effected thereby and said illegal, unenforceable, or invalid term, part or provision
shall be deemed not to be a part of this Agreement.
GOVERNING LAW
This Agreement was prepared, negotiated, and delivered in the State of California. In the event of any dispute
concerning or arising out of this Agreement, the laws of the State of California shall govern and control the
construction and enforcement of this Agreement. In the event of such dispute, the parties agree and acknowledge
that San Bernardino County in the State of California is the lawful jurisdiction.
SPECIALIST
I have discussed and reviewed with the customer regarding the proposed services for this repair, proposed price,
specifications, terms & conditions.
REP INITIALS
CUSTOMER
Customer Signature
Customer Name & Title
Date
CA 778157 A7 ROC 179618 NVSS910
EAGLELIFT, INC.
EagIeLIFT, Inc. Authorized Signature
EagIeLIFT, Inc. Authorized Name
Date
10410 Trademark Street
Rancho Cucamonga, CA 9V30
877,752.2522 Toll -Free
eaglelifting.com
FagieLIFT, Inc is a participant of the Economic Recovery Fund in A7 and NV, Statutory Limit of $500,000
-11-
v 4 , i
ESL iiBIT "E"
Limited Warranty
-16-
EAGLELIFT LIMITED WARRANTY CERTIFICATE
This Limited Warranty is made in lieu of all other warranties, express or implied, and of all other obligations on the part of EagIeLIFT, Inc. (the "Contractor") the customer (the Customer")
and any subsequent purchaser(s) upon completion of the attached warranty transfer agreement, as this is a transferable warranty. There are no other verbal or written warranties. There are
no warranties which extend beyond the description on the face hereof, including no warranties of express or implied merchantability and no warranties of express or implied fitness for a
particular purpose, including foundation repair. This Warranty is in effect if the job has been completed, paid in full and proper drainage has been installed and maintained. Alternatively, this
Warranty is null and void if job is not completed, full payment is not received, nor proper drainage installed or maintained. Contractor does not warrant products not mentioned below, but
some of such products maybe covered by a manufacturer's warranty. All material used is warranted as specified on the proposal.
Foundation Piers -Contractor warrants that the foundation piers will stabilize the affected area(s) against further appreciable vertical settlement for a period of twenty-five (25) years
from the date of installation, or else Contractor will correct the problem at Contractor's expense. Contractor DOES NOT WARRANT, to close cracks, to render doors and windows operational
or to move walls back to their original position, but will do its best to achieve positive results in this regard. Some of the reasons Contractor cannot warrant to lift the area(s) in question are
as follows: 1) Skin Friction: The soil's tendency to cling to your foundation in its new settled position; 2) Obstructions; Items such as mortar, concrete or soil failing between the cracks or
behind the veneer which will physically prevent the wall or chimney from moving back to its original position; and 3) Brick or Stone Veneer: The veneer of the home or other building is not
part of the "structure" Contractor is attempting to affect, rather, it is merely a cosmetic covering similar to siding. Thus, a lifting operation on Customer's foundation mayor may not affect
the veneer of the structure. Customer should also know that the possibility of further damages exist during a lifting operation. Contractor IS NOT RESPONSIBLE for damages caused by the
lifting. All of the Contractor's efforts will be concentrated on obtaining the optimum results with a minimum of damage. Subsidence caused by extreme weather conditions like severe
drought and/or extreme rainfall, are not covered by the warranty.
Slab Piers -Contractor warrants that the slab piers will stabilize the affected area against further appreciable vertical settlement for a period often (10) years from the date of
installation, or the Contractor will correct the problem at Contractor's expense. Contractor DOES NOT WARRANT TO LIFT the slab back to its original position, but will do its best to achieve
positive results in the regard. Subsidence caused by extreme weather conditions like severe drought and/or extreme rainfall, are not covered by the warranty.
Crawlspace Stabilizers -contractor warrants that Stabilizers will, under normal use and service is free from defects in material and workmanship for ten (10) years from the date of
installation. Contractor cannot warranty any interior pier/post movement due to soils conditions out of Contractor's control, however Contractor can adjust interior piers/posts as needed
for $125 per adjustment with a minimum charge of $1,500.00. Subsidence caused by extreme weather conditions like severe drought and/or extreme rainfall, are not covered by the
warranty.
Wall Anchors - Contractor hereby warrants that the wall anchors will stop further appreciable inward horizontal movement of the wall(s) repaired for five (5) yea rs from the date of
installation, or else Contractor will provide the labor and materials, at no cost to Customer, to correct the problem with the wall anchors. Walls that are not anchored entirely from corner to
corner, by Contractor, are not warranted. Anchors are warranted only to stabilize the affected wall(s) and not straighten them. If Customer desires further movement in the wall(s)
repaired, Customer may tighten the installed anchors every 3-4 weeks during the dryer months of the year, which are typically July, August and September. Do not tighten the anchors in the
winter, when the ground is wet, or when the repaired wall is straight. When tightening anchors, settingfor a torque wrench should be BO lbs., for a block wall and 90lbs. for a poured wa ll.
Contractor recommends that Customer maintain the wall anchors annually as annual maintenance can prevent most foundation problems. The cost of maintenance is not included in the
proposal or Warranty, but maintenance is available from Contractor at an additional charge. When anchors are installed behind garage walls, saw cuts and expansion joints are sometimes
necessary to relieve pressure on the affected wall(s). Saw cuts and expansion joints are not warranted and may need to be repeated in the future if the joint compresses. Subsidence caused
by extreme weather conditions like severe drought and/or extreme rainfall, are not covered by the warranty.
Uretek Method/Deep Injection - The Contractor warrants that the injected URETEK materials will not shrink or deteriorate for a period of ten (10) years from the date of
completion. The Contractor will replentish, during the warranty period, by re -injection, any materials, which fail to perform as warranted. This limited warranty supersedes any other
warranties, expressed or implied. The Contractor guarantees, adjustments necessary due to the loss of the size stability or failure of the mechanical resistance of the injected material, in
the injected areas during two (2) years from the date of completion of the work. The Contractor will adjust the settled area, by re -injection, at no cost to the owner. Should the treated area
settle a second time, the Contractor will recommend that geotechnical testing be conducted as the problem is at a deeper depth in the sub grade. Further adjustments will not be at
the Contractor's cost should Client refuse the geotechnical testing. This guarantee does not include external causes not dependent on our material, for example, ground subsidence or
settlement of deeper soils, structural problems, dynamic or static load much higher than the design load at the time of URETEK intervention, damages caused by excavations, product
tampering, natural catastrophes such as storms, floods, drought, tides, earthquakes, explosions orfire. Subsidence caused by extreme weather conditions like severe drought and/or
extreme rainfall, are not covered by the warranty.
Proper drainage must be installed and/or maintained in order for the EagIeLIFT warranty to be enacted or remain in effect. Such
warranty is immediately effective once full payment is received and all funds cleared bank and proper drainage has been installed. EagIeLIFT does not provide drainage services. Customer
agrees to maintain positive drainage away from the wall(s), slab(s) repaired by foundation push piers or the Uretek process. If proper drainage is not installed within the first 60 day period
from the completion date, the warranty will be voided and unenforceable for any future dates. If proper drainage is installed within the first 60 day period from the date of completion, proof
of installation supplied to EagIeLIFT, the warranty will be considered as in force from the EagIeLIFT date of completion for the initial project. Especially when trenching or excavation is done
during structural repair, Contractor recommends a waterproofing membrane to be applied to exposed wall(s) to reduce the chance of water seepage into the basement if basement is
present. Water seepage into any area of the basement or foundation is NOT covered by this Warranty and may require a waterproofing system at an additional cost to Customer. EagIeLIFT's
only responsibility is for foundation lifting/leveling and/or soil densification and/or stabilization as stated in the designated scope of work described in Section 2 of our proposal/contract.
Any work outside of what is specifically listed in Section 2 is outside our scope of work, is not included in our scope of work and is excluded from our scope of work and warranty. Any
additional requirements called for by City Approved Plans and/or Engineering but are not specifically listed in Section 2, are outside our scope of work, are not included in our scope of work
and are excluded from our scope of work.
UnSupported Warranty Call Back - Should EagIeLIFT, Inc. be contacted to re -inspect for an alleged warranty service, company representative completes the call back service
and inspection reveals there has been,1. No change(s) to work area, 2. Change(s) caused by improper drainage, 3. Change(s) caused by a ny condition which is not covered under this
warranty, customer will be charged a $350 fee for our inspection services.
10410 Trademark Street, Rancho Cucamonga, CA. 91730
(877) 752-2522
www.eagielifting.com
CA LIC# 778157 AZROC LIC#179618 NV LIC# 0055910
-
EXHIBIT " F"
Contractor's Code of Conduct
1. Contractors working or providing services on Association property shall not expose
residents to injury or cause property damage from unsafe practices.
2. All Contractor personnel will keep tools, equipment and work areas clean and orderly.
During the course of construction, alteration or repairs, form and scrap lumber with protruding
nails and all debris shall be kept reasonably cleared from work areas, walkways, and in and
around buildings or other structures.
3. Combustible debris accumulated within the job site shall be removed promptly during the
course of work. All debris, rubbish, and wastes shall be removed from the property and properly
disposed of at authorized waste disposal areas.
4. All Contractor personnel will drive vehicles and equipment with caution on Association
property. MAXIMUM SPEED on Association streets is 25 mph. Where streets are congested or
vision is limited, proceed with caution at a safe rate of speed and be watchful for people, slow
moving golf carts, vehicles or equipment. Contractor agrees that if Contractor, Contractor's
personnel, subcontractors, agents, invitees, etc., are determined (in the sole discretion of the
Association) to be in violation of California Vehicle Codes and/or the Association's Rules and
Regulations, Contractor's fees shall be reduced by $100.00 per instance. Contractor further
agrees that for repeated infractions the Association may permanently bar any individual violator
from driving on the Association properties.
5. Contractor and personnel vehicles parked on the street shall be parked in the direction of
traffic. Parked vehicles shall not block access to mailboxes, fire hydrants, golf cart paths or
driveways.
6. All Contractor's personnel, agents and sub -contractors must register with the gate guard
on a daily basis and display the appropriate vendor pass on vehicle dashboards or equivalent
means of access control as established by the Association.
7. All Contractor and subcontractor personnel shall perform in compliance with all
applicable laws, rules, regulations and standards, including those issued under the Occupational
Safety and Health Act of 1970 (OSHA), including any additions or amendments.
I acknowledge that I have read the above, understand and agree to comply with the Association's
contractor requirements.
Name of Contractor Company State License No.
Contractor Authorized Representative
Date
-17-