Loading...
04-6175 (SOTB) Title 24)e rr'gr 0 2 TITLE 24 REPORT Title 24 Report for: Corner Highway 11 —& Washin La Quinta, Ca 92253 Project Designer: Prest-Vuksic Architects 72625 EI Paseo, Suite 136 Palm Desert, Ca 92260 (760) 779-5393 Report Prepared By: Tim Scott H & H Air Conditioning 74-991 Joni Drive #20 Palm Desert, CA 92260-2043 (760) 340-3088 n CITY OF LA QUINTA Job Number: BUILDING & SAFETY DEPT. APPROVED FOR CONSTRUCTION z c�DE- DA 51u � . g Date: • 4/2/04 61 •� eff'm �y The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission•for use with both the Residential and Nonresidential 2001 Building Energy Efficiency Standards. This program developed by EnergySoft, LLC (415) 883-5900. EnergyPro 3.1 By EnergySoft Job Number: User Number: 5533 7oS UZ V34 1.1(1 - �< x 4 0 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 1 of 3 PERF -1 PROJECT NAME r The Plaza, Buildings A & B, Pointe Happy This Certificate of Compliance lists the building features and performs ce specifications needed to comply with Title 24, Parts 1 and DATE 4/2/04 PROJECT ADDRESS NW Corner Highway 111 & Washington La Quinta r Building Permit # PRINCIPAL D- SI-GNE11-- ENVECOPE Prest-Vuksic Architects TELEPHONE (760) 779-5393 permit application. The proposed building as designed meets the energy efficiency requirements of the State Building Code, Title 15 DOCUMENTATION AUTHOR H & H Air Conditioning TELEPHONE (760) 340-3088 Checked by/Date Enforcement Agency Use Kun Initiation I Ime: U4/U9/U4 U1:43:45 Kun code: lUBUB34225 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page:3 of 69 This Certificate of Compliance lists the building features and performs ce specifications needed to comply with Title 24, Parts 1 and 6, of the State Building Code. This certificate applies only to a Buildi using thelperformance compliance approach. UOC111111ENT"ATION-AQTFiORSIGNAf Tim Scott WE DAT pQ- The Principal Designers hereby certify that the proposed building design represented in the construction documents and knodbiled 37,135 Sq.Ft. permit application. The proposed building as designed meets the energy efficiency requirements of the State Building Code, Title 15 BUILDING TYPE �( NONRESIDENTIAL 1. 1 hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to HIGH RISE RESIDENTIAL [: j HOTEL/MOTEL GUEST ROOM PHASE OF CONSTRUCTION �( NEW CONSTRUCTION contractor, preparing documents for work that I have contracted to perform. ADDITION ❑ ALTERATION ❑ EXISTING + ADDITION Kun Initiation I Ime: U4/U9/U4 U1:43:45 Kun code: lUBUB34225 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page:3 of 69 This Certificate of Compliance lists the building features and performs ce specifications needed to comply with Title 24, Parts 1 and 6, of the State Building Code. This certificate applies only to a Buildi using thelperformance compliance approach. UOC111111ENT"ATION-AQTFiORSIGNAf Tim Scott WE DAT pQ- The Principal Designers hereby certify that the proposed building design represented in the construction documents and knodbiled for this permit application are. consistent with all other forms and worksheets, specifications, and other calculations submitted with this permit application. The proposed building as designed meets the energy efficiency requirements of the State Building Code, Title 24, Part 6. ENV. LTG. MECH. 1. 1 hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am licensed as a civil engineer, mechanical engineer, electrical engineer or architect. m ❑ ❑ 2. 1 affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code Section 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor, preparing documents for work that I have contracted to perform. ❑ ❑ 3. 1 affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document because it pertains to a structure or type of work described as exempt pusuant to Business and Professions Code Sections 5537, 5538, and 6737.1. (These sections of the Business and Professions Code ae printed in full in the Nonresidential Manual.) Indicate location on plans of Note Block for Mandatory Measures Required S ENVA PRINCTPAGENVEI OPE-DESTGNER - NAM STGNATUKE LICYTO. Prest-Vuksic Architects. - G Z10•2- Indicate location on plans of Note Block for MandatGw Meas es Lighting Compliance Not In The Scope Of A- Required Forms �h-W§ mittal PRINCIPAL LIGHTING DESIGNER - NAME SIGNATURE LIC. NO. DATE Indicate location on plans of Note Block for Mandatory Measures Required F rms M CH -1, MECH-2, MECH-3 PRINCIPAL MECHANICAL DESIGNER - NAME IGN LIC. NO. D�410 H & H Air Conditioning -Sfs�6 4— Kun Initiation I Ime: U4/U9/U4 U1:43:45 Kun code: lUBUB34225 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page:3 of 69 PERFORMANCE CERTIFICATE 'OFCOMPLIANCE Part 2 of 3. PER The Plaza, Buildings A & B, Pointe Happy 74/2/04 I u sq -yr ENERGY COMPONENT Standard Design _ - - Proposed Design Compliance Margin sranaad, Propose Roraohan a A p Space Heating , .Space Cooling Indoor Fans Heat Rejection Pumps & Misc: " , Domestic HotWater10.56 Lighting " -.. Receptacle Process TOTALS: 1.53 .1.24 0.30 73.28 72.57 0.71 28.39 28.38 0.01 0.00' 0.00 0.00 0.00 0.00 0.00IMF 10.56 0.00 49.05 49:05 0.00 -20.98 20.98 0.00° 0.00 10.00 0.00 183.79 '.182.78 1.02 40 GENERAL INFORMATION' Building•Orientation.' Number of Stories Number of Systems " Number of Zones ` (North)0,deg Conditioned Floor Area 37,135 sqft. 1 Unconditioned Floor Area o sqft. Conditioned Footprint Area 19,659 sqft. a5 33 ' Orientation Front Elevation (Nath) Left Elevation (East) RearElevation. (South) Right.Elevation (west) Total Roof19,386 Gross Area sqft. sqft. sqft. sqft. sqft. sqft. Glazing Area Glazing sqf. sqft. sqft. sqft. sqft.. Ratio " 6,875 1,368 19.9% 19,590 348 1.8% 6,875 2,848 41.4% 18,535 64 0.3% 51,875 4,628 8.9% E�sqft. 0.0% Standard ; Proposed LiOhting'Power Density 1.666 w/sgft..0.000 wisgft. Prescriptive Env. Heat Loss 7,551 7,323 Prescriptive Ew,,Heat Gain 830,275 .801,576 emar s:.. Run initiationTime: un Code: 1080834225 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number. Page:4 of 69 I 17- PERFORMANCE CERTIFICATE OF COMPLIANCE Part 3 of 3 PERF -1 PROJE T NAME The Plaza, Buildings A & B; Pointe Happy DATE 4/2/04 ZONE INI-UKMA I ION System Name Zone. Name Occupancy Type Floor Area (sqft.) Inst. LPD (W/sf)1 Port. LPD (W/sf)1 Ctrl. Credits (W/sf)2 lailored Proc. Loads (W/sf) (W/S03 HVAC -A1 Zone Al Retail/Wholesale Sales 1,212 0.000 0.000 HVAC -A2 Zone A2 Retail/Wholesale Sales 1,305 0.000 0.000 HVAC -A3 Zone A3 Retail/Wholesale Sales 1,305 0.000 0.000 HVAC -A4 Zone A4 Retail/Wholesale Sales 1,320 0.000 0.000 HVAC -A5 Zone A5 Retail/Wholesale Sales 1,245 0.000 0.000 HVAC -A6 Zone A6 Retail/Wholesale Sales 1,305 0.000 0.000 HVAC A7 Zone A7 Retail/Wholesale Sales 1,255 0.000 0.000 HVAC -A8 Zone A8 Office 999 0.000 0.000 HVAC -A9 Zone A9 Office 1,285 0.000 0.000 HVAC -Al0 Zone A10 Office 1,285 0.000 0.000 HVAC -All Zone All Office 1,280 0.000 0.000 HVAC -Al2 Zone Al2 Office 1,225 0.000 0.000 HVAC -Al3 Zone Al Office 1,229 0.000 0.000 HVAC -A14 Zone A14 Office 729 0.000 0.000 HVAC -A15 Bldg A Restrooms Office 153 0.000 0.000 HVAC -B1 Zone B1 Retail/Wholesale Sales 1,386 0.000 0.000 'HVAC -B2 Zone B2 Retail/Wholesale Sales 1,112 0.000 0.000 HVAC -B3 Zone B3 Retail/Wholesale Sales 839 0.000 0.000 HVAC -B4 Zone B4 Retail/Wholesale Sales 1,112 0.000 0.000 HVAC -B5 Zone B5 Retail/Wholesale Sales 1,027 0.000 0.000 Notes: 1. See LTG -1 (items marked with asterisk, see LTG -2 by others) 2. See LTG -3 3. See LTG4 Items above require special documentation I IIC weal CI I I VI%.CI I ICIII C99VIlLy anVulu Nay QIICIRIVII IV V10 ILVI l la I ICV 111 IIIIa 1 316ldUlal. I IICJC IICIIla ICyullC apWC 101 WI I«CII justification and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification ana aocumentation suDmittea. Plan I Field The exceptional features listed in this performance approach application have specifically been reviewed. Adequate written justification and documentation for their use have been provided by the applicant. Authorized Signature or Stamp Kun Initiation Time: 04/01/04 07:43:45 Run Code: 1080834225 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page:5 of 69 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 3 of 3 PERF -1 PROJECT NAME DATE The Plaza, Buildings A & B, Pointe Happy 4/2/04 JN System Name Zone Name Occupancy Type Floor • Area (sqft.) Inst. LPD (W/sf)1 Port. LPD (W/sf)1 Ctrl. Credits (W/sf)2 I ailorea Proc. Loads (W/sf) (W/sf)3 HVAC -B6 Zone B6 RetaillWholesale Sales 1,027 0.000 0.000 HVAC -B7 Zone B7 Retail/Wholesale Sales 1,370 0.000 0.000 HVAC -B8 Zone B8 Retail/Wholesale Sales 1,370 0.000 0.000 HVAC -B9 Zone B9 Retail/Wholesale Sales 1,211 0.000 0.000 HVAC -B10 Zone B10 Office 730 0.000 0.000 HVAC -B11 Zone B11 Office 1,539 0.000 0.000 HVAC -B12 Zone B12 Office 1,476 0.000 0.000 HVAC -B13 Zone B13 Office 1,022 0.000 0.000 HVAC -B14 Zone B14 Office 1,022 0.000 0.000 HVAC -B15 Zone B15 Office 1,285 0.000 0.000 HVAC -B16 Zone B16 Office 1,285 0.000 0.000 HVAC -B17 Zone B17 Office 1,037 0.000 0.000 HVAC -B18 Bldg B Restrooms Office 153 0.000 0.000 Notes: 1: See LTG -1 (items marked with asterisk, see LTG -2 by others) 2. See LTG -3 3. See LTG -4 Items above require special documentation r ne iocai enrorcemenc agency snouiu pay special auenuon co ure nems specnreu rrr uns cnecreusr. r nese nems require speaai wnraen justification and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justificatior and documentation submitted.Plan Field The exceptional features listed in this performance approach,application. have. specifically been reviewed. Adequate written justification and documentation for their use have been provided by the applicant. 0 ' ' Authorized Signature or Stamp Run Initiation Time: un Code: 1080834225 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page:6 of 69 17, 41 ENVELOPE COMPLIANCE SUMMARY Performance ENV -1 ROJECT NAME The Plaza, Buildings A & B, Pointe Happy DATE 4/2/04 Glazing Type Location / Comments 1 Window 30 0.720 180 0.60 Double Metal Tinted Default # Surface Framing Type Type Act. Area U -Fac. Azm. Solar Gains Tilt Y/N Form 3 Reference Location / Comments 1 Roof Wood 151 0.035 0 0 X I I R-30 Roof(R.30.2xl2.16) Zone Al 2 Wall Wood 226 0.065 0 1 90 X I JR-19Wall (W.19.2x6.16) Zone Al 3 Door None 24 1 0.146 0 90 X1 I Insulate Meta Door Zone Al 4 a o0 585 0.065 90 90 X a x one All 0.59 a oo X a x . one Al 30 0.720 a oo Double Metal Tinted Default one A2 a x . one All 00 oo 180 XRoo x one Wail oo 8 Window 48 0.850 ax . one Double Metal Tinted Default Door None 24 0.146 0 90 X I insulatedMetal oor Zone 180 a oo one A3 X ax one -TO-Window a -WO oo 0.60 X a x one W511 -0-T--645- 48 0.850 80 a x . one one A 00 WoodX 12 Window oo x one 0.60 a oo a x . one 15 Door one Double Metal Tinted Default X insulated MetalDoor Zone a oo 180 0.59 a x . one aoo 15 Window X a x one Double Metal Tinted Default a oo X a x one 00 00 X oo xTo-ne--A-4-- 20 a oo a x . one # Exterior Shade Type SHGC Window Hgt. Wd. Len. Overhang Left Fin Hgt. xE xt. Dist. Len. HgF. Site Assembled Glazing LnecK oox it tsuuaing is - -iuu,uuu squ or LrH ano ;_ -iu,uuu sgrE verucai glazing men ijrrcL. teniTication is requires. Follow NFRC 100 -SB Procedures and submit NFRC Label Certificate Form. # Type. Area U -Fac. Act. Azm. SHGC Glazing Type Location / Comments 1 Window 30 0.720 180 0.60 Double Metal Tinted Default one Al 2 Window 48 0.850 180 0.59 Dou a etal Tinted Default one Al 3 Window 30 0.720 180 0.60 Double Metal Tinted Default one Al 4 Window 30 0.720 180 0.60 Double Metal Tinted Default one A2 5 Window 48 0.850 180 1 0.59 Double Metal Tinted Default one A2 6 Window 30 0.720 180 0.60 Double Metal Tinted Default one A2 7 Window 30 0.720 180 0.60 U-ou-15FeVe-taT-Tinted Default one A3 8 Window 48 0.850 180 0.59 Double Metal Tinted Default one A3 9. Window 30 0.720 180 0.60 Double Metal Tinted Default one A3 -TO-Window 30 0.720 80 0.60 Double Metal Tinted Default one A 11 Window 48 0.850 80 0.59 Double Metal Tinted Default one A 12 Window 30 0.720 180 0.60 Double Metal Tinted Default one A4 13 Window 30 0.720 180 0.60 Double Metal Tinted Default one A5 14 Window 48 0.850 180 0.59 Double Metal Tinted Default one A5 15 Window 30 0.720 180 0.60 Double Metal Tinted Default one A5 # Exterior Shade Type SHGC Window Hgt. Wd. Len. Overhang Left Fin Hgt. xE xt. Dist. Len. HgF. Ig t Dist. Len. In Hgt. 1 None 0.76 2 None 0.76 3 None 0.76 8.0 8.0 0.1 2.0 0 0.1 2.0 0 4 None 0.76 8.0 12.0 2.0 0.1 2.0 2.0 0.1 2.0 0 0.1 2.0 0 None 0.76 8.0 6.0 2.0 0.1 2.0 2.0 0.0 0.0 0 0.1 2.0 0 6 one 0.76 7 one 0.76 8.0 6.0 2.0 0. 2.0 2.0 0.1 2.0 0 0.0 0.0 0 r5 8 one 0.76 9 None 0.76 8.0 2.0 2.0 0. 2.0 2.0 0.1 2.0 0 0.1 2.0 0 10 None 0.76 11 None 0.76 12 None 0.76 8.0 6.0 2.0 0.1. 2.0 2.0 0.1 2.0 0 0.0 0.0 0 T3 None 0.76 1 14 None 0.76 15 None 0.76. Run Initiation Time: 04/01/04 07:43:45 Run Code: 1080834225 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page:7 of 69 ENVELOPE COMPLIANCE SUMMARY Performance ENV -1 151 PROJECT NAME The Plaza, Buildings A & B,.Pointe Happy DATE 4/2/04 SHGC Glazing Type Location / Comments. 16 Window 30 0.720 180 0.60 Double Metal Tinted Default Surface Framing # Type Type Act. Area U -Fac. Azm. Solar Gains Tilt Y/N Form 3 Reference Location / Comments Double Metal Tinted Default 21 Door None 24 0.146 0 90 X11 I Insulated Metal Door Zone A4 one A6 22 Wall Wood 645 0.065 90 90 X11 I R-19 Wall (W.19.2x6.16) Zone A4 20 Window 23 all Wood 92 0.065 180 90 X11 I R-19 Wall (W.19.2x6.16)Zone A4 48 0.850 24 a o0 645 o X a x one 80 25 Root WoodX one A7 23 Window x Zone 0.60 26 a oo 24 Window 48 0.850 a one AS Double Metal Tinted Default oor one 18 0.720 XInsulatede a Door one AS one A7 a Wood -a 0 0.60 x . one AS 27 Window a oo 0.59 X a x one AS 6 1 0.720 W-511-- oo Double Metal Tinted Default one A8 a x . one AS 180 31. 00 Wood one A8 X oo x one 0.59 a Wood- a one 06 or. one XInsulatede a Door one a Wood Overhang Len. Left Fin Right Fin Hgt. xt. xt. Dist. en. gt. Dist. Len. Hgt. a x . 0.76 a X a x . one a X a x one 37 00 'FV. -None. oo x one At a 0.76 X a . . x one 21 None. oor one nsulated MetalDoor Zone 0.76 40- awo-o a x . one ITTRE"IM, 17=9 - 24 one 0.76 17, Site Assembled Glazing l;necK Dox IT uuming is ;= Tuu,uuu sgTt or L r -A ano - -iu,uuu sqn verucai glazing men Nr -KI. Uenmcauon is regwrea. Follow NFRC 100 -SB Procedures and submit NFRC Label Certificate Form. # 'Type Area U -Fac. Act. Azm. SHGC Glazing Type Location / Comments. 16 Window 30 0.720 180 0.60 Double Metal Tinted Default one A6 17 Window 48 0.850 180 0.59 Double Metal Tinted Default one A6 _P8 -Window 30 0.720 80 0.60 Double Metal TintedDefault one A6 19 Window 96 0.720 90 0.60 Double Metal Tinted Default one A7 20 Window 30 0.720 180 0.60 Double Metal Tinted Default one A7 21 Window 48 0.850 180 0.59 Dou a Metal Tinted Default one A7 22 Window 30 0.720 80 0.60 Double eta Tinted Default one A7 23 Window 18 0.720 180 0.60 Double Metal Tinted Default one A7 24 Window 48 0.850 180 0.59 Double Metal Tinted Default one A7 25 Window 18 0.720 80 0.60 Dou a etal inte Default one A7 26 Window 6 0.720 0 0.60 Dou a eta Tinte Default one A8 27 Window 48 0.850 0 0.59 Double Metal Tinted Default one AS 28 Window 6 1 0.720 0 0:60 Double Metal Tinted Default one A8 29 Window 16 0.720 180 0.60 Double Metal Tinted Default one A8 30 Window 48 0.850 180 0.59 Double metal Tinted Default one A8 # Exterior Shade Type SHGC Window Hgt. Wd. Overhang Len. Left Fin Right Fin Hgt. xt. xt. Dist. en. gt. Dist. Len. Hgt. 16 None 0.76 17 None 0.76 18 None 0.76 'FV. -None. 0.76 20 None 0.76 21 None. 0.76 22 None 0.76 23 None 0.76 24 one 0.76 25 None 0.76 26 . None 0.76 27. None 0.76 28 None 0.76 29 None 0.76 30 None 0.76 Run Initiation Time: 04/01/04 07:435 Run Co e: 1080834225 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Pagel of 69 C ENVELOPE COMPLIANCE SUMMARY Performance ENV -1 EGT NAME The Plaza, Buildings A & B, Pointe Happy DATE 4/2/04 OPAQ Area U -Fac. Act. Azm. SHGC Glazing Type Location / Comments 31 Window 16 0.720 180 Surface # Type Framing Type Act. Area U -Fac. Azm. Tilt Solar Gains y/N Form 3 Reference Location / Comments 41 Wall Wood 148 0.065 180 90 X11 I R-19 Wall (W.19.2x6.16) Zone A7 42 Wall Wood 530 0.065 270 90 X11 I R-19 Wall (W.19.2x6.16) Zone A7 43 Roo Wood 999 -T9 —0 0.035 0 0 X1 I R-30 Roo R.30.2x12.16 Zone A8 44 a oo 37 Window 48 0.850 0 X a x one 45 Wall oo 0 0.60 Double Metal Tinted Default X a x one aWood 0.60 Double Metal Tinted Default one A10 40 Window 30 0.720 a (W.19.2x6.16) one AB aWo—o- one A11 41 Window 48 0.850 0 X a x one WR-66-f—Wo-o-d-1,285oo 30 0.720 0 0.60 Double Metal Tinted Default one A11 x one a oo Double Metal Tinted Default one A11 44 Window X a x one a oo 45 Window 48 0.850 0 0.59 a x . one 51 Wall oo X a x one aWood # Exterior Shade Type X a x one 00 00 0.76 X oo x one a oo 33 None a 9.2x6.16) one a oo 34 None 0.76 X Wall (W.19.2x6.16)one a oo 0.76 a x . one a oo 37 one a (W.19.2x6.16) one jKoot 1wooclX 38 None 0.76 oo x one Al I DU jVVdIj lvvuuu I UL v.vo.7 I V I vu 17,11 lr%-iv vvdll tvv. IV dgAu. Ion Lunt: NII 60 lWall lvvooaa B . one Al I Site Assembled Glazi g Checkox i Building is >_ sq o an >_ sq verticalglazing then UJ Follow NFRC 100 -SS -Procedures and suhmit NFRC LahPI Certificate Form_ # Type Area U -Fac. Act. Azm. SHGC Glazing Type Location / Comments 31 Window 16 0.720 180 0.60 Double Metal Tinted Default one A8 32 Window 30 0.720 0 0.60 Double Metal Tinted Default one A9 33 Window 48 0.850 0 0.59 Dou a etal Tinted Default one 9 34 Window 30 0.720 0 0:60 Double Metal Tinted Default one A9 35 Window 64 0.720 180 0.60 Double Metal Tinted Default one A9 36 Window 30 0.720 0 0.60 Double eta Tinted Default one A10 37 Window 48 0.850 0 0.59 Double Meta Tinted Default one A10 38 Window 30 0.720 0 0.60 Double Metal Tinted Default one A10 39 Window 64 0.720 180 0.60 Double Metal Tinted Default one A10 40 Window 30 0.720 0 0.60 Double Metal Tinted Default one A11 41 Window 48 0.850 0 0.59 Double Metal Tinted Default one A11 42 Window 30 0.720 0 0.60 Double Metal Tinted Default one A11 43 Window 64 0.720 180 0.60 Double Metal Tinted Default one A11 44 Window 30 0.720 0 0.60 Dou a eta anted Default one Al2 45 Window 48 0.850 0 0.59 Double Metal Tinted Default one Al2 # Exterior Shade Type SHGC Window Hgt. Wd. Overhang Len. Left Fin Right Fin Hgt. LExt.RExt. Dist. en. gt. Dist en. 31 None 0.76 32 None 0.76 33 None 0.76 34 None 0.76 35 None 0.76 36 None 0.76 37 one 0.76 38 None 0.76 39 None 0.76 40 None 0.76 41 None 0.76 42 None 0.76 43 None 0.76 44 None 0.76 45 None 0.76 Run Initiation Time: 04/01/64 07:43:45 Run Code: 108083 225 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page:9 of 69 ENVELOPE COMPLIANCE SUMMARY Performance ENV -1 WROJECT NAME DATE The Plaza, Buildings A & B, Pointe Happy 4/2/04 OPAQUE 50=5 Area U -Fac. Act. Azm. SHGC Glazing Type Location / Comments 146 Window 30 0.720 0 0.60 Surface # Type Framing Type Act. Area U -Fac. Azm. Tilt Solar Gains y/N Form 3 Reference Location / Comments 61 Wall Wood 136 0.065 180 90 X I I R-19 Wall (W.19.2x6.16) Zone A11 62 Wall Wood 635 0.065 270 90 X I I R-19 Wall (W.19.2x6.16) Zone A11 63 Roo Wood 1,225 0.035 0 0 X R-30 Roo R.30.2x12.16 Zone Al2 -64--Wall o0 92 48 0.850 180 0.59 X a x one 65 Wall oo 180 0.60 Double Metal Tinted Default one A13 x a . . x one W511- oo Double Metal Tinted Default one A14 55 Window 48 0.850 a ).2x6.16) one a 60 5 30 0.720 90 x a x one 00 o0 48 0.850 180 0.59 Double Metal Tinted Default one A14 oo x one Al 3 ill Woodx 0.59 Double Metal Tinted Default one A14 59 Window a (W.19.2x6.16) one a oo one 131 60 Window 16 0.720 180 a (W.19.2x6.16) one 71 Wall oo x a x one Al 3 a oo a x . one Al 3 00 00 a Hgt. LExt.RExt. D lst. In L en. H gt. RigFt In Dist. Len. HgF 46 None x oo . x one Win- oo 47 None 0.76 x a (W.19.2x6.16) one Wall oo 0.76 x a (W.19.2x6.16) one a oo 50 None a (W.19.2x6.16) one a oo 51 None 0.76 a .(W.19.2x6.16) one 00 o 52 None 0.76 x oo x g A Restroorns its jVVaII lvvoou ilio o.000 o yu x K. -IU vvan tvv.-Ia.cxo.-It)) ts1ag A Kes[rooms 80 oor one x o to o0 oor g A Kestrooms Site Assembled Glazi tg ec ox i Building is >_ sq o an >_ sq verticalglazing then Fnllnw NFRr lnn-SR Prncarlurac and cnhmit MFRr I aha/ rartificata Fnrm # Type Area U -Fac. Act. Azm. SHGC Glazing Type Location / Comments 146 Window 30 0.720 0 0.60 Double Metal Tinted Default one Al2 47 Window 64 0.720 180 0.60 Double Metal Tinted Default one Al2 48 Window 16 0.720 0 0.60 Double Metal Tinted Default one A13 49 Window 48 0.850 0 0.59 'Double Metal Tinted Default one A13 50 Window 16 0.720 0 0.60 Double Metal Tinted Default one A13 5 Win ow 16 0.720 180 0.60 Double Metal Tinted Default one A13 52 Window 48 0.850 180 0.59 Double Metal Tinted Default one A13 53 lWindow 16 0.720 180 0.60 Double Metal Tinted Default one A13 54 Window 30 0.720 90 0.60 Double Metal Tinted Default one A14 55 Window 48 0.850 90 0.59 Double Metal Tinted Default one A14 56 Window 30 0.720 90 0.60 Double Metal Tinted Default one A14 57 Window 48 0.850 180 0.59 Double Metal Tinted Default one A14 58 Window 48 0.850 180 0.59 Double Metal Tinted Default one A14 59 Window 80 0.720 90 0.60 Double Metal Tinted Default one 131 60 Window 16 0.720 180 0.60 Double Metal Tinted Default one 61 # Exterior Shade Type SHGC In Hgt. Wd. OverhangOW• Len. a Hgt. LExt.RExt. D lst. In L en. H gt. RigFt In Dist. Len. HgF 46 None 0.76 47 None 0.76 48 None 0.76 49 None 0.76 50 None 0.76 51 None 0.76 52 None 0.76 53 None 0.76 54 None 0.76 55 None 0.76 56 None 0.76 57 None 0.76 58 None 0.76 59. None 0.76 5.5 6.0 2.0 0.1 2.0 2.0 0.1 2.0 0 0.1 2.0 0 60 None 0.76 Run Initiation. Time: 04/01/64 07:43:45 Run Code: 108083 225 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page: 10 of 69 ENVELOPE COMPLIANCE SUMMARY Performance ENV -1 ROJECT NAME The Plaza, Buildings A & B, Pointe Happy DATE 4/2/04 SHGC OPAQUE SURFACES 61 Window 48 0.850 180 0.59 Double Metal Tinted Default Surface Framing # Type Type Act. Area U -Fac. Azm. Solar Gains Tilt Y/N Form 3 Reference Location / Comments 0.60 81 lWall lWood 90 0.065 1 90 90 X11 JR-19Wall (W.19.2x6.16) Bldg A Restrooms 0.60 82 Wall Wood 170 0.065 1 180 90 X1 JR-19Wall (W.19.2x6.16) Bldg A Restrooms 0.60 83 W-allWood one B1 90 0.065 270 90 X I R-19 Wall ( . 9.2x6.16) Bldg A Restrooms 0.60 84 00 o0 59 X oo x one 0.60 a oo X a x one 51 0.59 a oo 68 Window a (W.19.2x6.16) one 51 0.60 a oo X a x one 0.60 88 a Wood 70indow a x . one 51 0.59 -89 Roof WoodX 71 Window oo x . one 0.60 VV - a Wooda 72 Window (W.19.2x6.16) one 0.60 Wall oo X a x one 0.59 a oo 74 Win ow a (W.19.2x6.16) one 0.60 VV_aTF_VTo_o_d__G46____X one B4 75 Window a x one 0.60 00 00 X oo x . one 95 Wall oo X R-19 Wall f K.2 Zone aWood # Exterior Shade Type SHGC a x one 53 Overhang Left Hgt. LExt.RExt. Dist. a oo 61 None 0.76 Zone 53 a oo 62 None X a x one 0o 00 63 None XRoof x . one a oo 64 None 0.76 a x . one 65 None 0.76 r-- I rhpt-k hny if Rnildinn is >= 10171000 snft of CFA an >= 10.000 soft vertical a azina then NJ r 1 J arse Msse111u1Gu viacul"IJ I Fnllnw NFRC innSFlPrncedures and suhmit NFRC Lahel Certificate Form. tC # Type Area U -Fac. Act. Azm. SHGC Glazing Type Location / Comments 61 Window 48 0.850 180 0.59 Double Metal Tinted Default one B1 62 Window 16 0.720 80 0.60 Dou a Metal Tinted Default one B1 63 Window 30 0.72080 0.60 Double -Metal Tinted Default one B1 64 Window 48 0.720 180 0.60 Double Metal Tinted Default one B1 65 Window 30 0.720 180 0.60 Double Metal Tinted Default one B1 66 Window 16 0.720 180 0.60 Double Meta Tinted De cult one B2 67 Window 48 0.850 180' 0.59 Dou le Metal Tinted Default one B2 68 Window 16 0.720 180 0.60 Double Metal Tinted Default one B2 69 Window 16 0.720 180 0.60 Double Metal Tinted Default one B3 70indow 48 0.850 180 0.59 Double Metal Tinted Default one B3 71 Window 16 0.720 80 0.60 Double Metal Tinted Default one B3 72 Window 16 0.720 180 0.60 Double Metal Tinted Default one B4 73 lWindow 48 0.850 180 0.59 Double Metal Tinted Default one B4 74 Win ow 1 16 0.720 180 0.60 Double Metal Tinted Default one B4 75 Window 1 30 0.720 180 0.60 Double Metal Tinted Default one B5 # Exterior Shade Type SHGC Window Hgt. Wd. Len. Overhang Left Hgt. LExt.RExt. Dist. Fin Len -. g -E. Right Fin Dist. Len. Hgt. 61 None 0.76 62 None 0.76 63 None 0.76 64 None 0.76 65 None 0.76 66 None 0.76 5.5 5.0 2.0 0.1 2.0 2.0 0.1 2.0 0 0.1 2.0 0 67 None 0.76 68one 0.76 69 one 0.76 5.5 5.0 2.0 0.1 2.0 2.0 0.1 2.0 0 0.1 2.0 0 70 None 0.76 5.5 5.0 2.0 0.1 2.0 2.0 0.1 2.0 0 0.1 2.0 0 71 None 0.76 5.5 5.0 2.0 0.1 2.0 2.0 0.1 2.0 0 0.1 2.0 0 72 1 None 0.76 73 None 0.76 74 None 0.76 75 one 0.76 Run InitiationTime: 04/01/54 07:43:45 Run Co e: 108083 225 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page: 11 of 69 41 ENVELOPE COMPLIANCE SUMMARY Performance ENV -1 ROJECT NAME The Plaza, Buildings A & B,. Pointe Happy DATE 4/2/04 SHGC Glazing Type Location / Comments 76 Window 48 0.850 180 0.59 Surface Framing # Type Type Act. Area U -Fac. Azm. Tilt Solar Gains y/N Form 3 Reference Location / Comments 101 Wall Wood 645 0.065 90 90 X11 I R-19 Wall (W.19.2x6.16) Zone B4 102 Wall Wood 90 0.065 180 1 90 X1 JR-19Wall (W.19.2x6.16) Zone B4 all Wood 645 0.065 270 90 80 Window - 9 a 9.2x6.6 Zone B4 00 00 85 X oo x one Wall WoodX one B7 82 Window a x one 1103 a oo one B7 X a x one a oo one B7 X a x one a oo one,68 85 Window a (W.19.2x6.16) one TO o0 00 one 68 86 in ow oo x . one a Wooda one B8 87 Window x . one 56 Wall WoodX one B9 88 Window a x one Wall oo one B9 89 Window a one a oo one B9 X a x one 0.60 o0 one B10 oo x . oneo0 MIT- oo x oneX awood # Exterior Shade Type SHGC a x . one 17 Wal oo R ig t in Mst. I en. H gt. 76 None X a x one 57 a oo 77 None X a x one 00 00 78 None X oo x . one a oo 0.1 2.0 0 79 None 0.76 a x . one Elts 0.1 2.0 2.0 0.1 2.0 0 0.1 2.0 0 80 None 0.76 5.5 5.0 2.0 0.1 2.0 2.0 0.1 2.0 0 Check box if Buildino is >= 100.000 soft of CFA an >= 10.000 soft vertical a azina then NIF • L J aiie fassemoieu viazituJ Follow NFRC 100-SErProcedures and'submit NFRC Label'Certificate Form. # Type AreaIU-Fac. I Act. Azm. SHGC Glazing Type Location / Comments 76 Window 48 0.850 180 0.59 Double Metal Tinted Default one B5 -T7-Window, 30 0.720 180 0.60 ou le eta Tinte Default one B5 78 Window 30 0.720 180 0.60 Double Metal Tinted Default one B6 79 Window 48 0.850 180 0.59 Double Metal Tinted Default one B6 80 Window 30 0.720 180 0.60 Double Metal Tinted Default one B6 91 -Window 30 0.720 180 0.60 Double Metal Tinted Default one B7 82 Window 48 180 0:59 Double Metal Tinted Default one B7 83 Window 30 180 0.60 Double Metal Tinted Default one B7 84 Window 30 180 0.60 Double Metal Tinted Default one,68 85 Window V0.720 48 80 0.59 ou le Metal Tinted De ault one 68 86 in ow 30 180 0.60 ou le etal Tinted Default one B8 87 Window 30 180 0.60 Double Metal Tinted Default one B9 88 Window 48 1 180 0.59 Double Metal Tinted Default one B9 89 Window 30 1 0.720 1 180 0.60 Double Metal Tinted Default one B9 90 Win ow 20 1 0.720 0 0.60 Double Meta ince Default one B10 # Exterior Shade Type SHGC Window Hgt. Wd. Len. Overhang Left Hgt. x . xt. Dist. Len. Fin Hgt. R ig t in Mst. I en. H gt. 76 None 0.76 77 None 0.76 78 None 0.76 5.5 5.0 2.0 0.1 2.0 2.0 0.1 2.0 0 0.1 2.0 0 79 None 0.76 5.5 6.0 2.0 0.1 2.0 2.0 0.1 2.0 0 0.1 2.0 0 80 None 0.76 5.5 5.0 2.0 0.1 2.0 2.0 0.1 2.0 0 0.1 2.0 0 81 None 0.76 82 None 0.76 83 None 0.76 84 None 0.76 85 None 0.76 86 None 0.76 87 None 0.76 88. None 0.76 89 None 0.76 90 None 0.76 Run Initiation Time:. 04/01104 07:43:45 Run Code: 1080834225 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page:12 of 69 C 41 ENVELOPE COMPLIANCE SUMMARY Performance ENV4 PROJECT NAME The Plaza, Buildings A & B, Pointe Happy DATE 4/2/04 OPAQUE 511JKl-Ak;tb Location / Comments 91 Window 24 0.850 0 Surface Framing # Type Type Act. Area U -Fac. Azm. Solar Gains Tilt Y/N Form 3 Reference Location / Comments 121 Wall Wood 645 0.065 90 90 X11 JR-19Wall (W.19.2x6.16) Zone B8 122 Wall Wood 102 0.065 180 90 X11 JR-119Wall (W.19.2x6.16) Zone B8 123 Wall Wood 645 0.065 270 90 X11 I R-19 Wall (W.19.2x6.16) Zone B8 124 Roof W-oo-cF--134 Double Metal Tinted Default X oo x one a oo Double Metal TintedDefault X a x one 59 I oo Double Metal Tinted Default one B1 a (W.19.2x6.16) one TO a I I W -6 -6 -d -X Double Metal Tinted Default one 1311 a x one aWood 0.60 Double Metal Tinted Default one B11 a (W.19.2x6.16) one 89 129 Roof WoodX Dou a Metal Tinted De ault one B11 oo x . one BI 0 a oo Doub a Metal inted De ault one B11 a (W.19.2x6.16) one a oo Double Metal Tinted Default X a x one 2 a oo Double Metal Tinted Default one B12 a x one a ood 406 0.065 270 90 X a x one 510 00 o0 U0111ble Metal Tinted Default one B12 0o x one B1 I 135Wall WoodX JR-19Wall. x Zone Ell I a oo X a x one B1 1 a oo Fin Right Fin Hgt. ist. en. Hgt. X a x one Wall oo X a x one B1 I 00 oo X oo x one a oo 94 None a x . one None 0.76 • • Site Assembled Glazing UnecK box it buuoing is - iuu,uuu sgtt of c:rH ano - iu,uuu sgtt vertical glazing inen NrrcL; L;enitication is requires. Follow NFRC 100 -SB Procedures and submit NFRC Label Certificate Form. # Type Area U -Fac. Act. Azm. SHGC Glazing Type Location / Comments 91 Window 24 0.850 0 0.59 Double Metal Tinted Default one B10 92 Win ow 16 0.720 180 0.60 Double Metal Tinted Default one B10 93 Window 48 0.850 180 0.59 Double Metal Tinted Default one B10 94 Window 16 0.720 180 0.60 Double Metal Tinted Default one B10 95 Window 16 0.720 270 0.60 Double Metal Tinted Default one B10 96 Window 8 0.850 270 0.59 Double Metal TintedDefault one B10 30 0.720 0 0.60 Double Metal Tinted Default one B1 Window 48 0.850 0 0.59 Double Metal Tinted Default one 1311 Window 30 0.720 0 0.60 Double Metal Tinted Default one B11 rWindow Window 24 0.850 80 0:59 Dou a Metal Tinted De ault one B11 Window 56 0.720 80 0.60 Doub a Metal inted De ault one B11 Window 30 0.720 0 0.60 Double Metal Tinted Default one B12 103 Window 1 48 1 0.850 0 0.59 Double Metal Tinted Default one B12 10 Window 1 30 0.720 1 0 0.60 Double Metal Tinted De ault one B12 105Win ow 24 0.850 180 0.59 U0111ble Metal Tinted Default one B12 # Exterior Shade Type SHGC Window Hgt. Wd. en. Overhang eft Hgt. I-Ext.RERU Dist. Len. Fin Right Fin Hgt. ist. en. Hgt. 91 None 0.76 92 None 0.76 93 None 0.76 94 None 0.76 None 0.76 one 0.76 None 0.76 one r97 0.76 one 0.76 None 0.76 101 None 0.76 102 None 0.76 103 None 0.76 104 None 0.76 105 None 0.76 Run Initiation Time: 04/01/04 07:43:45 Run Code: 1080834225 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page: 13 of 69 F� L ENVELOPE COMPLIANCE SUMMARY Performance ENV -1 PROJECT NAME The Plaza, Buildings A & B, Pointe Happy DATE 4/2/04 SHGC Glazing TypeIne Location / Comments 106 Window 56 0.720 180 Surface Framing # Type Type Act. Area U -Fac. Azm. Solar Gains Tilt y/N Form 3 Reference Location / Comments 141 Wall Wood 635 0.065 90 90 X11 JR-19Wall (W.19.2x6.16) Zone B12 142 Wall lWood 150 0.065 180 90 X R-19 Wall (W.19.2x6.16) Zone B12 143 Wall Wood 635 0.065 270 90 X I JR-19Wall (W.19.2x6.16) Zone B12 144 o0 o 1,022 1 0.035. 0 0 X oo x one a oo ou a Metal Tinted De aultB14112Win X a x one a o00.065 90 90 Xa. x one 1313 7 a oo Double Metal Tinted DefaultB1411 X a x one 14.8 Wal oo Double Metal Tinted DefaultB1415Win a (W.19.2x6.16) one Mo -of Wood Double Metal Tinted De aultB X oo x one W -all Wood -X Double etal Tinted De aultB15117Window a x one a oo Double Metal Tinted DefaultB15 X a x one a oo Double Metal Tinted Default one B15 a x . one a oo Double Metal Tinted Default X a I -(W-.f KNT W Zone 154 Roof WoodX Double Metal Tinted De cult one B16 oo x . one Wall oo X a x one a oo X a x one a oo Left Hgt. LExt.RExt. Dist. Fin Right Fin Le-n-.-gt. Dist. Len. Hgt. a x . one 515 a oo X a '(W.19.2x6.16) one roof oo X oo x one a I I Wood -a . x . one 110 None 0.76 Site Assembled Glazing(:necK Dox it uuming is - iuu,uuu sgtt of U -A and >= iu,uuu sgtt verucai glazing then WKU Certmcauon is requires. Follow NFRC 100 -SB Procedures and submit NFRC Label Certificate Form. # Type Area U -Fac. Act. Azm. SHGC Glazing TypeIne Location / Comments 106 Window 56 0.720 180 0.60 Double Metal Tinted Default12 107 Window 30 0.720 0 0.60 Double Metal Tinted Default13 108 Window 48 0.850 0 0.59 Dou a Metal Tinted Default13109Window 30 0.720 0 0.60 Double Metal Tinted DefaultB13110Window 56 0.720 180 0.60 Double Metal Tinted DefaultB13111 Win ow 30 0.720 0 0.60 ou a Metal Tinted De aultB14112Win ow 48 0.850 0 0.59 ou a Meta inted DefaultB14113Window 30 0.720 0 0.60 Double Metal Tinted DefaultB1411 Window 56 0.720 180 0.60 Double Metal Tinted DefaultB1415Win ow 30 0.720 0 0.60 Double Metal Tinted De aultB 516 indow 48 0.850 0 0.59 Double etal Tinted De aultB15117Window 30 0.720 0 0.60 Double Metal Tinted DefaultB15 118Window 1 64 1 0.720 1 180 0.60 Double Metal Tinted Default one B15 119 Window 30 0.720 0 0.60 Double Metal Tinted Default one B16 120 Window 48 0.850 0 0.59 Double Metal Tinted De cult one B16 # Exterior Shade Type SHGC Window Hgt. Wd. Overhang Len. Left Hgt. LExt.RExt. Dist. Fin Right Fin Le-n-.-gt. Dist. Len. Hgt. 106 None 0.76 107 None 0.76 108 None 0.76 109 None 0.76 110 None 0.76 111 None 0.76 112 None 0.76 113 None 0.76 114 None 0.76 115 None 0.76 116 None 0.76 117 None 0.76 118 None 0.76 119 None 120 None 0.76 0.76 Run Initiation Time: 04/01/64 07:43:45 Run Co e: 108083 225 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page: 14 of 69 4 ENVELOPE COMPLIANCE SUMMARY Performance ENV -1 ROJECT NAME The Plaza, Buildings A & B, Pointe Happy DATE 4/2/04. SHGC Glazing Type Location / Comments 121 Window 0.720 Surface Framing # Type Type Act. Area U -Fac. Azm. Solar Gains Tilt y/N. Form 3 Reference Location / Comments 161 Wall Wood 635 0.065 90 90 X11 JR-19Wall (W.19.2x6.16) Zone B16 162 Wall Wood 136 0.065 180 90 X11 JR-19Wall (W.19.2x6.16) Zone B16 163 Wall Wood 635 0.065 270 90 X Lj R-19 Wal I ( .19.2x6.16) Zone B16 164 o0 o0 1,037 X oo x one B1 7 a oo 64 0.720 X a x one a o0 5 X all -(W3TTxT.W Zone a I I WoodX Zone B17 a x one 1681wall 1wooda x . one 517 169 Roof WoodX oo x g estrooms a oo X a x g B Restr.00ms oor None X Insulated metalDoor Bldg B Restroorns a oo a x g B Restroorns aWood 'X a x g B Restrooms Waif-- oo a x . g B Restrooms # Exterior Shade Type SHGC Window Hgt. Wd. Overhang Len. Hgt. Left LExt.RExt. Dist. Fin R ig t Min Len-.-R-gt. Dist. Len. gt. 121 None 0.76 122 None 0.76 • gck I I d'❑q s >= 00 000 s ft pf G >= 1 00 $aft ve I�gla Site Assembled G a i IInW 0 -RFr rnr_p urns an c��hmi fa - and I ahp ' .Prtifit-atp nrm # Type U-Fac. Act. Azm. SHGC Glazing Type Location / Comments 121 Window 0.720 0 0.60 Double Metal Tinted Default on�BH 22Wm ow 0.720 E48 80 0.60 Dou a Metal TintedDefault on23 in ow 0.720 0 0.60 Dou a eta Tinted De ault on 12 Window 0.850 0 0.59 Double Metal Tinted Default one B17 125Window 0.720 0 0.60 Double Metal Tinted Default Zone B17 26 Window 64 0.720 90 0.60 Double Metal Tinted Default Zone B17 127 Window 48 0.850 180 0.59 Double Metal Tinted Default Zone B17 # Exterior Shade Type SHGC Window Hgt. Wd. Overhang Len. Hgt. Left LExt.RExt. Dist. Fin R ig t Min Len-.-R-gt. Dist. Len. gt. 121 None 0.76 122 None 0.76 123 None 0.76 124 None 0.76 125 None 0.76 126 None 0.76- 127 None 0.76 Run Initiation Time: 04/01/54 07:43:5 Run Code: 1080834225 EnergyPro 3.1 By EnergySoft User Number: 5533 1 Job Number: Page: 15 of 69 • CERTIFICATE OF COMPLIANCE Performance MECH-1 The Plaza, Buildings A & B, Pointe Happy 4/2/04 SYSTEM NAME TIME CONTROL SETBACK CONTROL ISOLATION ZONES HEAT PUMP THERMOSTAT? ELECTRIC HEAT? FAN CONTROL VAV MINIMUM POSITION CONTROL? SIMULTANEOUS HEAT/COOL? HEATING SUPPLY RESET COOLING SUPPLY RESET HEAT REJECTION CONTROL VENTILATION OUTDOOR DAMPER CONTROL ECONOMIZER TYPE DESIGN O.A. CFM (MECH-3, COLUMN I HEATING EQUIPMENT TYPE HEATING EQUIPMENT EFFICIENCY COOLING EQUIPMENT TYPE COOLING EQUIPMENT EFFICIENCY MAKE AND MODEL NUMBER PIPE INSULATION REQUIRED? PIPE/DUCT INSULATION PROTECTED? HEATING DUCT LOCATION R -VALUE COOLING DUCT LOCATIO R -VALUE CEILING/ROOF SPACE MECH DHW Heater HVAC -A1 HVAC -A2 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a Electric Res 100% AO SMITH ELJF-15* n/a na Yes Yes n/a n/a n/a Na n/a Programmable Switch Heating & Cooling Requir i n/a Yes 7.5 kW Constant Volume No No Constant Temp Constant Temp n/a Air Balance Auto No Economizer 182 cfm Heat Pump 7.20 HSPF Split DX 10.0 SEER / 9.4 EER Yes Yes Ducts in Attic 4.2 Ducts in Attic 4.2 No Programmable Switch Heating & Cooling Requir n/a Yes 7.5 kW Constant Volume No No Constant Temp Constant Temp n/a Air Balance Auto No'Economizer 196 cfm Heat Pump 7.20 HSPF Split DX 10.0 SEER / 9.4 EER Yes Yes Ducts in Attic 4.2 Ducts in Attic 4.2 No CODE TABLES: Enter co a rom to le be ow into columns above. HEAT PUMP THERMOSTAT? ELECTRIC HEAT? VAV MINIMUM POSITION CONTROL? SIMULTANEOUS HEAT / COOL? Y: Yes, N: No HEAT AND COOL SUPPLY RESET? HIGH EFFICIENCY? PIPE INSULATION REQUIRED? PIPE/DUCT INSULATION PROTECTED? SEALED DUCTS IN CEILING/ROOF SPACE ? NOTE TO FIELD TIME CONTROL SETBACK CTRL. ISOLATION ZONES FAN CONTROL S: Prog. Switch H: Heating Enter Number of I: Inlet Vanes O: Occupancy C: Cooling Isolation Zones. P: Variable Pitch Sensor B: Both V: VFD M: Manual Timer O: Other C: Curve VENTILATION OUTDOOR DAMPER ECONOMIZER O.A. CFM Air Balance Auto it Enter Outdoor Air C: Outside Air Cert. G: Gravity W: Water CFM. M: Out. Air Measure N: Not Required Note: This shall be n D: Demand Control EC: Economizer less than Col. H on N: Natural Control See Section MECH-3. 144(e)3 Run InitiationTime: un Code: EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page: 16 of 69 CERTIFICATE OF COMPLIANCE Performance MECH-1 r The Plaza, Buildings A &,B, Pointe Happy 4/2/04 SYSTEM NAME TIME CONTROL SETBACK CONTROL ISOLATION ZONES HEAT PUMP THERMOSTAT? ELECTRIC HEAT? FAN CONTROL VAV MINIMUM POSITION CONTROL? SIMULTANEOUS HEAT/COOL? HEATING SUPPLY RESET COOLING SUPPLY RESET HEAT REJECTION CONTROL VENTILATION OUTDOOR DAMPER CONTROL ECONOMIZER TYPE DESIGN O.A. CFM (MECH-3, COLUMN I • HEATING EQUIPMENT TYPE HEATING EQUIPMENT EFFICIENCY COOLING EQUIPMENT TYPE COOLING EQUIPMENT EFFICIENCY MAKE AND MODEL NUMBER PIPE INSULATION REQUIRED? PIPE/DUCT INSULATION PROTECTED? HEATING DUCT LOCATION R -VALUE COOLING DUCT LOCATIO R-VALIHEU SEALED DUCTS - UE CEILING/ROOF SPACE • MECHANICAL SYSTEMS HVAC -A3 I I HVAC -A4 I I HVAC -A5 Programmable Switch Heatina & Coolina Reaui n/a Yes 7.5 kW Constant Volume No No Constant Temp. Constant Temp n/a 1 ` -1 Air Balance Auto No Economizer 196 cfm Heat Pump 7.20 HSPF Split DX 10.0 SEER/ 9.4 EER Programmable Switch sting & Cooling Requi n/a Yes 7.5 kW Constant Volume No No Constant Temp Constant Temp nla Air Balance Auto No Economizer 198 cfm Heat Pump 7.20 HSPF Split DX 10.0 SEER / 9.4 EER Yes Yes Yes Yes Ducts in Attic 4.2 Ducts in Attic Ducts in Attic 4.2 Ducts in Attic No I No Programmable Switch ating & Cooling Requi n/a Yes 10.0 kW Constant Volume No No Constant Temp Constant Temp n/a Air Balance Auto No Economizer 187 cfm Heat Pump 7.50 HSPF Split DX 10.0 SEER / 9.0 EER Yes Yes 4.2 Ducts in Attic 4.2 4.2 Ducts in Attic , 4.2 No FIELD CODE TABLES: Enter code from table below into columns above. HEAT PUMP THERMOSTAT? Y: Yes N: No ? TIME CONTROL SETBACK CTRL. ISOLATION ZONES FAN CONTROL ELECTRIC HEAT? S: Prog. Switch O: Occupancy Sensor I M: Manual Timer H: Heating C: Cooling B: Both Enter Number of Isolation Zones. I: Inlet Vanes P: Variable Pitch V: VFD 0: Other C: Curve VAV MINIMUM POSITION CONTROL? SIMULTANEOUS HEAT/ COOL? HEAT AND COOL SUPPLY RESET? VENTILATION OUTDOOR DAMPER ECONOMIZER O.A. CFM HIGH EFFICIENCY? it Balance C: Outside Air Cert. M: Out. Air Measure D: Demand Control N: Natural Auto G: Gravity it W: Water N: Not Required EC: Economizer Control See Section 144(e)3 Enter Outdoor it CFM. Note: This shall be n less than Col. H on MECH-3. PIPE INSULATION REQUIRED? PIPE/DUCT INSULATION PROTECTED? SEALED DUCTS IN CEILING/ROOF SPAC Run InitiationTime: un Code: 1080834225 EnergyPro 3.1 By EnergySoft User Number: 5533 . Job Number: Page: 17 of 69 CERTIFICATE OF COMPLIANCE Performance MECH-1 F The Plaza, Buildings A & B, Pointe Happy 1 4/2/04 • IP • SYSTEM NAME TIME CONTROL SETBACK CONTROL ISOLATION ZONES HEAT PUMP THERMOSTAT? ELECTRIC HEAT? FAN CONTROL VAV MINIMUM POSITION CONTROL? SIMULTANEOUS HEAT/COOL? HEATING SUPPLY RESET COOLING SUPPLY RESET HEAT REJECTION CONTROL VENTILATION OUTDOOR DAMPER CONTROL ECONOMIZER TYPE DESIGN O.A. CFM (MECH-3, COLUMN I HEATING EQUIPMENT TYPE HEATING EQUIPMENT EFFICIENCY COOLING EQUIPMENT TYPE COOLING EQUIPMENT EFFICIENCY MAKE AND MODEL NUMBER PIPE INSULATION REQUIRED? PIPE/DUCT INSULATION PROTECTED? HEATING DUCT LOCATION R -VALUE COOLING DUCT LOCATIO R -VALUE CEILING/ROOF SPACE MECHANICAL SYSTEMS HVAC -A6 HVAC A7 HVAC -A8 Programmable Switch Heating & Cooling Require n/a Yes 10.0 kW Constant Volume No No Constant Temp Constant Temp n/a Air Balance Auto No Economizer 196 cfm. Heat Pump 7.50 HSPF Split DX 10.0 SEER / 9.0 EER Yes Yes Yes Ducts in Attic 4.2 Ducts in Attic 4.2 No Programmable Switch Heating & Cooling Requir n/a Yes 7.5 kW Constant Volume No No Constant Temp Constant Temp n/a Air Balance Auto No Economizer 188 cfm Heat Pump 7.20 HSPF Split DX 10.0 SEER/ 9.3 EER Yes Yes Ducts in Attic 4.2 Ducts in Attic 4.2 No Programmable Switch Heating & Cooling Requir n/a Yes 0.0 kW Constant Volume No No Constant Temp Constant Temp n/a Air Balance Auto No Economizer 150 cfm Heat Pump 7.00 HSPF Split DX 10.0 SEER /,9.1 EER Yes Yes Ducts in Attic 4.2 Ducts in Attic 4.2 No CODE TAB nter code from table below into columns above. HEAT PUMP THERMOSTAT? ELECTRIC HEAT? VAV MINIMUM POSITION CONTROL? SIMULTANEOUS HEAT/ COOL? Y: Yes N: No HEAT AND COOL SUPPLY RESET? HIGH EFFICIENCY? PIPE INSULATION REQUIRED? PIPE/DUCT INSULATION PROTECTED? SEALED DUCTS IN CEILING/ROOF SPAC ? TIME CONTROL SETBACK CTRL. ISOLATION ZONES FAN CONTROL S: Prog. Switch H: Heating Enter Number of I: Inlet Vanes O: Occupancy C: Cooling Isolation Zones. P: Variable Pitch Sensor B: Both V: VFD M: Manual Timer O: Other C: Curve VENTILATION OUTDOOR DAMPER ECONOMIZER O.A. CFM Air Balance Auto it Enter Outdoor Air C: Outside Air Cert. G: Gravity W: Water CFM. M: Out. Air Measure N: Not Required Note: This shall be h D: Demand Control EC: Economizer less than Col. H on N: Natural Control See Section MECH-3. 144(e)3 For tsuilding Uepartment Use Unly, Run InitiationTime: un Code: 1080834225 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page: 18 of 69 • CERTIFICATE OF COMPLIANCE Performance MECH-1 The Plaza, Buildings A & B, Pointe Happy 4/2/04 MECHANICAL SYSTEMS SYSTEM NAME HVAC -A9 HVAC -A10 HVAC -All TIME CONTROL SETBACK CONTROL ISOLATION ZONES HEAT PUMP THERMOSTAT? ELECTRIC HEAT? FAN CONTROL VAV MINIMUM POSITION CONTROL? SIMULTANEOUS HEAT/COOL? HEATING SUPPLY RESET COOLING SUPPLY RESET HEAT REJECTION CONTROL VENTILATION OUTDOOR DAMPER CONTROL ECONOMIZER TYPE DESIGN O.A. CFM (MECH-3, COLUMN 1 HEATING EQUIPMENT TYPE HEATING EQUIPMENT EFFICIENCY COOLING EQUIPMENT TYPE COOLING EQUIPMENT EFFICIENCY MAKE AND MODEL NUMBER PIPE INSULATION REQUIRED? PIPE/DUCT INSULATION PROTECTED? HEATING DUCT LOCATION R -VALUE COOLING DUCT LOCATIO R -VALUE CEILING/ROOF SPACE Programmable Switch Heating & Cooling Require n/a Yes 0.0 kW Constant Volume No No Constant Temp Constant Temp n/a Air Balance Auto No Economizer 193 cfm Heat Pump, 7.60 HSPF Split DX 10.0 SEER /"9.0 EER Yes Yes Ducts in Attic 4.2 Ducts in Attic 4.2 No Programmable Switch Heating & Cooling Requir n/a Yes 0.0 kW Constant Volume No No Constant Temp Constant Temp n/a Air Balance Auto No Economizer 193 cfm Heat Pump 7.00 HSPF Split DX 10.0 SEER / 9.0 EER Yes Yes Ducts in Attic 4.2 Ducts in Attic 4.2 No Programmable Switch Heating & Cooling Requir n/a Yes 0.0 kW Constant Volume No No Constant Temp Constant Temp n/a Air Balance Auto No Economizer 192 cfm Heat Pump 7.00 HSPF Split DX 10.0 SEER / 9.0 EER Yes Yes Ducts in Attic 4.2 Ducts in Attic 4.2 No CODE TABLES: Enter code from table below into columns above. HEAT PUMP THERMOSTAT? Y: Yes N: No ? TIME CONTROL SETBACK CTRL. ISOLATION ZONES, FAN CONTROL ELECTRIC HEAT? S: Prog. Switch O: Occupancy Sensor M: Manual Timer H: Heating C: Cooling B: Both Enter Number of Isolation Zones. I: Inlet Vanes P: Variable Pitch V: VFD O: Other C: Curve VAV MINIMUM POSITION CONTROL? SIMULTANEOUS HEAT I COOL? HEAT AND COOL SUPPLY RESET? VENTILATION OUTDOOR DAMPER ECONOMIZER O.A. CFM HIGH EFFICIENCY? it Elaian ce C: Outside Air Cert. M: Out. Air Measure D: Demand Control N: Natural Auto G: Gravity it W: Water N: Not Required EC: Economizer 144 er 3 See Section Enter Outdoor Air CFM. Note: This shall be n less than Col. H on MECH-3. PIPE INSULATION REQUIRED? .PIPE/DUCT INSULATION PROTECTED? SEA4ED DUCTS IN CEILING/ROOF SPAC • NV I Lb I V rItLU -tor t5unai Run Initiation Time: un Code: 1080834225 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page: 19 of 69 • CERTIFICATE OF COMPLIANCE. Performance MECH-1 The Plaza, Buildings A & B, Pointe Happy 4/2/04 SYSTEM NAME TIME CONTROL SETBACK CONTROL ISOLATION ZONES HEAT PUMP THERMOSTAT? ELECTRIC HEAT? FAN CONTROL VAV MINIMUM POSITION CONTROL? SIMULTANEOUS HEAT/COOL? HEATING SUPPLY RESET COOLING SUPPLY RESET HEAT REJECTION CONTROL VENTILATION OUTDOOR DAMPER CONTROL ECONOMIZER TYPE DESIGN O.A. CFM (MECH-3, COLUMN I HEATING EQUIPMENT TYPE HEATING EQUIPMENT EFFICIENCY COOLING EQUIPMENT TYPE COOLING EQUIPMENT EFFICIENCY MAKE AND MODEL NUMBER PIPE INSULATION REQUIRED? PIPE/DUCT INSULATION PROTECTED? HEATING DUCT LOCATION R -VALUE COOLING DUCT LOCATIO R -VALUE CEILING/ROOF SPACE Y51 LIV115 HVAC -Al2 HVAC -A13 HVAC -A14 Programmable Switch Programmable Switch Heating & Cooling Requir Heating & Cooling Requir d n/a n/a Yes Yes 0.0 kW 0.0 kW Constant Volume Constant Volume No No No No Constant Temp Constant Temp Constant Temp Constant Temp n/a . n/a Air Balance Air Balance Auto Auto No Economizer No Economizer 184 cfm 184 cfm Heat Pump Heat Pump 7.00 HSPF 7.00 HSPF Split DX Split DX 10.0 SEER / 9.0 EER 10.0 SEER / 9.0 EER Yes Yes Yes Yes Ducts in Attic. 4.2 Ducts in Attic 4.2 Ducts in Attic 4.2 Ducts in Attic 4.2 No No Programmable Switch Heating & Cooling Requir n/a Yes 0.0 kW Constant.Volume No No Constant Temp Constant Temp n/a Air Balance Auto No Economizer 109 cfm Heat Pump 7.00 HSPF Split DX 10.0 SEER/ 9.1 EER Yes Yes Ducts in Attic 4.2 Ducts in Attic 4.2 No Run Initiation Time: un Code: 1080834225 EnergyPro 3.1 By EnergySoft User Number. 5533 Job Number: Page:20 of 69 CODE TABLES: Enter code from table below into columns above. HEAT PUMP THERMOSTAT? Y: Yes N: No ? .TIME CONTROL SETBACK CTRL. ISOLATION ZONES FAN CONTROL ELECTRIC HEAT? S: Prog. Switch O: Occupancy Sensor M: Manual Timer H: Heating C: Cooling B: Both Enter Number of Isolation Zones. I: Inlet Vanes P: Variable Pitch V: VFD O: Other C: Curve VAV.MINIMUM POSITION CONTROL? SIMULTANEOUS HEAT / COOL? HEAT AND COOL SUPPLY RESET? VENTILATION OUTDOOR DAMPER ECONOMIZER O.A. CFM HIGH EFFICIENCY? it Balance C: Outside Air Cert. M: Out. Air Measure D: Demand Control N: Natural Auto G: Gravity it W: Water N: Not Required EC: Economizer Control See Section 144(e)3 Enter Outdoor Air CFM. Note: This shall be n less than Col. H on MECH-3. PIPE INSULATION REQUIRED? PIPE/DUCT INSULATION PROTECTED? SEALED DUCTS IN CEILING/ROOF SPAC - or tsuilding Uepartment Use Only. Run Initiation Time: un Code: 1080834225 EnergyPro 3.1 By EnergySoft User Number. 5533 Job Number: Page:20 of 69 • is CERTIFICATE OF COMPLIANCE Performance MECH-1 The Plaza, Buildings A & B, Pointe Happy 4/2/04 klUKhb MECHANICAL SYSTEM5 SYSTEM NAME HVAC -A15 DHW Heater HVAC -131 NOTE FIELD TO TIME CONTROL SETBACK CONTROL ISOLATION ZONES HEAT PUMP THERMOSTAT? ELECTRIC HEAT? FAN CONTROL VAV MINIMUM POSITION CONTROL? SIMULTANEOUS HEAT/COOL? HEATING SUPPLY RESET COOLING SUPPLY RESET HEAT REJECTION CONTROL VENTILATION OUTDOOR DAMPER CONTROL ECONOMIZER TYPE DESIGN O.A. CFM (MECH-3, COLUMN I HEATING EQUIPMENT TYPE - HE . ATING YPE•HEATING EQUIPMENT EFFICIENCY COOLING EQUIPMENT TYPE COOLING EQUIPMENT EFFICIENCY MAKE AND MODEL NUMBER PIPE INSULATION REQUIRED? PIPE/DUCT INSULATION PROTECTED? HEATING DUCT LOCATION . R -VALUE COOLING DUCT LOCATIO R -VALUE CEILING/ROOF SPACE Programmable Switch n/a Heating & Cooling Requir n/a n/a n/a Yes n/a 0.0 kW' n/a Constant Volume n/a No n/a No n/a Constant Temp n/a Constant Temp n/a n/a n/a Air Balance n/a Auto n/a No Economizer n/a 51. cfm n/a Heat Pump Electric Res 6.80 HSPF 100% Split DX AO SMITH ELJF-15` 10.0 SEER/ 9.1 EER n/a na Yes Yes Yes Yes Ducts in Attic 4.2 n/a n/a Ducts in Attic 4.2 n/a n/a No n/a Programmable Switch Heating & Cooling Requi n/a Yes 10.0 kW Constant Volume No No Constant Temp Constant Temp n/a Air Balance Auto No Economizer 208 cfm Heat Pump 7.50 HSPF Split DX 10.0 SEER/ 9.0 EER Yes Yes Ducts in Attic Ducts in Attic No CODE TABLES: Enter code from table below into columns above. 77-71 HEAT PUMP THERMOSTAT? Y: Yes ? TIME CONTROL SETBACK CTRL. ISOLATION ZONES FAN CONTROL ELECTRIC HEAT? S: Prog. Switch O; Occupancy Sensor M: Manual Timer H: Heating C: Cooling B: Both Enter Number of Isolation Zones. I: Inlet Vanes P: Variable Pitch V: VFD O: Other C: Curve VAV MINIMUM POSITION CONTROL? SIMULTANEOUS HEAT / COOL? HEAT AND COOL SUPPLY RESET? VENTILATION OUTDOOR DAMPER ECONOMIZER O.A. CFM HIGH EFFICIENCY? it Balance C: Outside Air Cert. M: Out. Air Measure D: Demand Control N: Natural Auto G: Gravity it W: Water N: Not Required EC: Economizer Control See Section 144(e)3 Enter Out oor it CFM. Note: This shall be n less than Col. H on MECH-3. PIPE INSULATION REQUIRED? PIPE/DUCT INSULATION PROTECTED? SEALED DUCTS IN CEILING/ROOF SPAC - or t3uilding Department UseUnry— Run InitiationTime: un Code: 1080834225 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page:21 of 69 CERTIFICATE OF COMPLIANCE Performance MECH-1 W . The Plaza, Buildings A & B, Pointe Happy 4/2/04 klUKhb MECHANICAL SYSTEMS SYSTEM NAME HVAC -B2 HVAC -B3 HVAC -B4 NOTE TO FIELD r- I TIME CONTROL SETBACK CONTROL ISOLATION ZONES HEAT PUMP THERMOSTAT? ELECTRIC HEAT? FAN CONTROL VAV. MINIMUM POSITION CONTROL? SIMULTANEOUS HEAT/COOL? HEATING SUPPLY RESET COOLING SUPPLY RESET HEAT REJECTION CONTROL VENTILATION OUTDOOR DAMPER CONTROL ECONOMIZER TYPE DESIGN O.A. CFM (MECH-3, COLUMN I HEATING EQUIPMENT TYPE HEATING EQUIPMENT EFFICIENCY COOLING EQUIPMENT TYPE COOLING EQUIPMENT EFFICIENCY MAKE AND MODEL NUMBER PIPE INSULATION REQUIRED? PIPE/DUCT INSULATION PROTECTED? HEATING DUCT LOCATIO R -VALUE COOLING DUCT LOCATIO R -VALUE CEILING/ROOF SPACE Programmable Switch Heating & Cooling Requir n/a Yes 10.O.kW Constant Volume No No Constant Temp Constant Temp. n/a Air Balance Auto No Economizer 167 cfm Heat Pump 7.50 HSPF Split DX 10.0 SEER/ 9.0 EER No Yes Yes Ducts in Attic 4.2 Ducts in Attic 4.2 No Programmable Switch Programmable Switch Heating & Cooling Requir Heating & Cooling Requir Y: Yes N: No ? n/a n/a ISOLATION ZONES Yes Yes ELECTRIC HEAT? 7.5 kW 7.5 kW Enter Number of Isolation Zones. Constant Volume Constant Volume SIMULTANEOUS HEAT/ COOL? No No No No VENTILATION Constant Temp Constant Temp O.A. CFM Constant Temp Constant Temp Auto G: Gravity n/a n/a PIPE INSULATION REQUIRED? Air Balance Air Balance Auto Auto Use Unly No Economizer No Economizer 126 cfm 167 cfm Heat Pump Heat Pump . 7.20 HSPF 7.20 HSPF Split DX Split DX 10.0 SEER / 9.4 EER 10.0 SEER / 9.4 EER Yes Yes Yes Yes Ducts in Attic 4.2 Ducts in Attic 4.2 Ducts in Attic 4.2 Ducts in Attic 4.2 No No Run Initiation Time: un Code: 1080834225 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page:22 of 69 CODE TABLES: Enter code from table below into columns above. HEAT PUMP THERMOSTAT? Y: Yes N: No ? TIME CONTROL SETBACK CTRL. ISOLATION ZONES FAN CONTROL ELECTRIC HEAT? S: Prog. Switch O: Occupancy Sensor M: Manual Timer H: Heating C: Cooling B: Both Enter Number of Isolation Zones. I: Inlet. Vanes P: Variable Pitch V: VFD O: Other C: Curve VAV MINIMUM POSITION CONTROL? SIMULTANEOUS HEAT/ COOL? HEAT AND COOL SUPPLY RESET? VENTILATION OUTDOOR DAMPERECONOMIZER O.A. CFM HIGH EFFICIENCY? it a ance C: Outside Air Cert. M: Out. Air Measure D: Demand Control N: Natural Auto G: Gravity it W: Water N: Not Required EC: Economizer Control See Section 144(e)3 Enter u oor it CFM. Note: This shall be n less than Col. H on MECH-3. PIPE INSULATION REQUIRED? PIPE/DUCT INSULATION PROTECTED? SEALED DUCTS IN CEILING/ROOF SPAC - or tsuilding Oepartment Use Unly Run Initiation Time: un Code: 1080834225 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page:22 of 69 • 0 CERTIFICATE OF COMPLIANCE Performance MECH-1 The Plaza, Buildings A & B, Pointe Happy 4/2/04 MECHANICAL SYSTEMS SYSTEM NAME HVAC -B5 HVAC -B6 HVAC -67 NOTE TO FIELD TIME CONTROL SETBACK CONTROL ISOLATION ZONES HEAT PUMP THERMOSTAT? ELECTRIC HEAT? FAN CONTROL VAV MINIMUM POSITION CONTROL? SIMULTANEOUS HEAT/COOL? HEATING SUPPLY RESET COOLING SUPPLY RESET HEAT REJECTION CONTROL VENTILATION OUTDOOR DAMPER CONTROL ECONOMIZER TYPE DESIGN O.A. CFM (MECH-3, COLUMN I HEATING EQUIPMENT TYPE HEATING EQUIPMENT EFFICIENCY COOLING EQUIPMENT TYPE COOLING EQUIPMENT EFFICIENCY MAKE AND MODEL NUMBER PIPE INSULATION REQUIRED? PIPE/DUCT INSULATION PROTECTED? HEATING DUCT LOCATION R -VALUE COOLING DUCT LOCATIO R -VALUE CEILING/ROOF SPACE Programmable Switch Heating & Cooling Requi n/a Yes 7.5 kW Constant Volume No No Constant Temp Constant Temp n/a Air Balance Auto No Economizer 154 cfm Heat Pump 7.20 HSPF Split DX 10.0 SEER / 9.4 EER Programmable Switch Programmable Switch Heating & Cooling Requir Heating & Cooling Requi n/a Yes 7.5 kW Constant Volume No No Constant Temp Constant Temp n/a Air Balance Auto No Economizer 154 cfm Heat Pump 7.20 HSPF Split DX 10.0 SEER / 9.4 EER Yes Yes Yes Yes Ducts in Attic 4.2 Ducts in Attic Ducts in Attic 4.2 Ducts in Attic No No n/a Yes 10.0 kW Constant Volume No No Constant Temp Constant Temp n/a Air Balance Auto No Economizer 206 cfm Heat Pump 7.50 HSPF Split DX 10.0 SEER / 9.0 EER Yes Yes 4.2 Ducts in Attic 4.2 Ducts in Attic No 4.2 • 9 CERTIFICATE OF COMPLIANCE Performance MECH-1 The Plaza, Buildings A & B, Pointe Happy 4/2/04 MECHANICAL SYSTEMS SYSTEM NAME HVAC -138 HVAC -139 HVAC -610 NOTE TO FIELD TIME CONTROL SETBACK CONTROL ISOLATION ZONES HEAT PUMP THERMOSTAT? ELECTRIC HEAT? FAN CONTROL VAV MINIMUM POSITION CONTROL? SIMULTANEOUS HEAT/COOL? HEATING SUPPLY RESET COOLING SUPPLY RESET HEAT REJECTION CONTROL VENTILATION OUTDOOR DAMPER CONTROL ECONOMIZER TYPE DESIGN,O.A. CFM (MECH-3, COLUMN I HEATING EQUIPMENT TYPE HEATING EQUIPMENT EFFICIENCY COOLING EQUIPMENT TYPE COOLING EQUIPMENT EFFICIENCY MAKE AND MODEL NUMBER PIPE INSULATION REQUIRED? PIPE/DUCT INSULATION PROTECTED? HEATING DUCT LOCATION R -VALUE COOLING DUCT LOCATIO R -VALUE [ED -DUCTS- N- CEILING/ROOF SPACE Programmable Switch Heating & Cooling Requirei n/a Yes 7.5 kW Constant Volume No No . Constant Temp Constant Temp n/a Air Balance Auto No Economizer. 500 cfm Heat Pump 7.20 HSPF Split DX 10.0 SEER/ 9.3 EER Yes Yes Ducts in Attic' 4.2 Ducts in Attic 4.2 No Programmable Switch I I Programmable Switch Heating & Cooling Requir Heating & Cooling Requi n/a n/a Yes Yes 10.0 kW 0.0 kW Constant Volume Constant Volume No No No No Constant Temp Constant Temp Constant Temp Constant Temp n/a n/a Air Balance Air Balance Auto Auto No Economizer No Economizer 182 cfm 110 cfm Heat Pump Heat Pump 7.50 HSPF 7.00 HSPF Split DX Split DX 10.0 SEER 19.0 EER 10.0 SEER/ 9.1 EER Yes Yes Yes Yes Ducts in Attic 4.2 Ducts in Attic 4.2 Ducts in Attic 4.2 Ducts in Attic 4.2 No I No I 4. CODE TABLES, Enter code from table below into columns above. HEAT PUMP THERMOSTAT? Y: Yes N: No ? TIME CONTROL SETBACK CTRL. ISOLATION ZONES FAN CONTROL ELECTRIC HEAT? S: Prog. Switch O: Occupancy Sensor M: Manual Timer H: Heating C: Cooling B: Both Enter Number of Isolation Zones. , I: Inlet Vanes P: Variable Pitch V: VFD O: Other C: Curve VAV MINIMUM POSITION CONTROL? SIMULTANEOUS HEAT / COOL? HEAT AND COOL SUPPLY RESET? VENTILATION OUTDOOR DAMPER ECONOMIZER O.A. CFM HIGH EFFICIENCY? it Balance C: Outside Air Cert. M: Out. Air Measure D: Demand Control N: Natural Auto G: Gravity it W: Water N: Not Required EC: Economizer Control See Section 144(e)3 n er u oor it CFM. Note: This shall be n less than Col. H on MECH-3. PIPE INSULATION REQUIRED? PIPE/DUCT INSULATION PROTECTED? SEALED DUCTS IN CEILING/ROOF. SPAC - For Building L)epartment Use Unly, Run InitiationTime: un Code: 1080834225 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page:24 of 69 CERTIFICATE OF COMPLIANCE Performance MECH-1 The Plaza, Buildings A & B, Pointe Happy 4/2/04 MECHANICAL SYSTEMS SYSTEM NAME HVAC -611 HVAC -B12 HVAC -B13 NOTE TO FIELD TIME CONTROL SETBACK CONTROL ISOLATION ZONES HEAT PUMP THERMOSTAT? ELECTRIC HEAT? FAN' CONTROL VAV MINIMUM POSITION CONTROL? SIMULTANEOUS HEAT/COOL? HEATING SUPPLY RESET COOLING SUPPLY RESET HEAT REJECTION CONTROL VENTILATION OUTDOOR DAMPER CONTROL ECONOMIZER TYPE DESIGN O.A. CFM (MECH-3, COLUMN I HEATING EQUIPMENT TYPE, HEATING EQUIPMENT EFFICIENCY COOLING EQUIPMENT TYPE COOLING EQUIPMENT EFFICIENCY MAKE AND MODEL NUMBER PIPE INSULATION REQUIRED? PIPE/DUCT INSULATION PROTECTED? HEATING DUCT LOCATION R -VALUE COOLING DUCT LOCATIO R -VALUE CEILING/ROOF SPACE Programmable Switch Heating & Cooling Requir n/a Yes 0.0 kW ` Constant Volume No No Constant Temp Constant Temp n/a Air Balance Auto No Economizer 231 cfm Heat Pump 7.00 HSPF Split DX 10.0 SEER / 9.0 EER Yes Yes Ducts in Attic 4.2 Ducts in Attic 4.2 No Programmable Switch ating & Cooling Requi n/a Yes 0.0 kW Constant Volume No No Constant Temp Constant Temp n/a Air Balance Auto No Economizer 221 cfm Heat Pump 7.00 HSPF Split DX 10.0 SEER / 9.0 EER Yes Yes Ducts in Attic Ducts in Attic No Programmable Switch ating & Cooling Requi n/a Yes 0.0 kW Constant Volume No No Constant Temp Constant Temp n/a Air Balance Auto No Economizer 153 cfm Heat Pump 7.00 HSPF Split DX 10.0 SEER/ 9.1 EER Yes Yes Ducts in Attic 4.2 Ducts in Attic 4.2 No CODE TABLES: Enter code from table below into columns above. HEAT PUMP THERMOSTAT? ELECTRIC HEAT? VAV MINIMUM POSITION CONTROL? SIMULTANEOUS HEAT / COOL? Y: Yes N: No HEAT AND COOL SUPPLY RESET? HIGH EFFICIENCY? PIPE INSULATION REQUIRED? PIPE/DUCT INSULATION PROTECTED? SEALED DUCTS IN CEILING/ROOF SPACE? 0 TIME CONTROL SETBACK CTRL. ISOLATION ZONES FAN CONTROL S: Prog. Switch H: Heating Enter Number of I: Inlet Vanes O: Occupancy C: Cooling Isolation Zones. P: Variable Pitch Sensor B: Both V: VFD M: Manual Timer O: Other C: Curve VENTILATION OUTDOOR DAMPER ECONOMIZER O.A. CFM Air Balance Auto it Enter Outdoor Air C: Outside Air Cert. G: Gravity W: Water CFM. M: Out. Air Measure N: Not Required Note: This shall be n D: Demand Control EC: Economizer less than Col. H on N: Natural Control See Section MECH-3. 144(e)3 - For t3uilding Uepartment Use Only Run Initiation Time: un Code: 1080834225 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page:25 of 69 • CERTIFICATE OF COMPLIANCE Performance MECH-1 The Plaza, Buildings A & B, Pointe Happy 4/2/04 SYSTEM NAME HVAC -1314 HVAC -1315 HVAC -616 NOTE TO FIELD TIME CONTROL SETBACK CONTROL ISOLATION ZONES HEAT. PUMP THERMOSTAT? ELECTRIC HEAT? FAWCONTROL VAV MINIMUM POSITION CONTROL? SIMULTANEOUS HEAT/COOL? HEATING SUPPLY RESET COOLING SUPPLY RESET HEAT REJECTION CONTROL VENTILATION OUTDOOR DAMPER CONTROL ECONOMIZER TYPE DESIGN O.A. CFM (MECH-3, COLUMN I HEATING EQUIPMENT TYPE HEATING EQUIPMENT EFFICIENCY COOLING EQUIPMENT TYPE COOLING EQUIPMENT EFFICIENCY MAKE AND MODEL NUMBER PIPE INSULATION REQUIRED? PIPE/DUCT INSULATION PROTECTED? HEATING DUCT LOCATION R -VALUE COOLING DUCT LOCATIO R -VALUE CEILING/ROOF SPACE Programmable Switch Programmable Switch Programmable Switch Heating & Cooling Requirec Heating & Cooling Requir d Heating & Cooling Requir, n/a n/a n/a Yes Yes Yes 0.0 kW 0.0 kW 0.0 kW Constant Volume Constant Volume Constant Volume No No No No No No Constant Temp Constant Temp Constant Temp Constant Temp Constant Temp Constant Temp n/a n/a n/a Air Balance Air Balance Air Balance Auto Auto Auto No Economizer No Economizer No Economizer 153 cfm 193 cfm 193 cfm Heat Pump Heat Pump Heat Pump 7.00 HSPF 7.00 HSPF 7.00 HSPF Split DX Split DX Split DX 10.0 SEER 19.1 EER 10.0 SEER/ 9.0 EER 10.0 SEER / 9.0 EER Yes Yes Yes Yes Yes Yes Ducts in Attic 4.2 Ducts in Attic 4.2 Ducts in Attic 4.2 Ducts in Attic 4.2 Ducts in Attic 4.2 Ducts in Attic 4.2 No No No CODE TABLES: Enter code from table below into.columns above. HEAT PUMP THERMOSTAT? TIME CONTROL SETBACK CTRL. ISOLATION ZONES FAN CONTROL ELECTRIC HEAT? S: Prog. Switch O: Occupancy Sensor M: Manual Timer H: Heating C: Cooling B: Both Enter Number of Isolation Zones. I: Inlet Vanes P: Variable Pitch V: VFD O: Other C: Curve VAV MINIMUM POSITION CONTROL? SIMULTANEOUS HEAT / COOL? Y: Yes N: No HEAT AND COOL SUPPLY RESET? VENTILATION OUTDOOR DAMPER ECONOMIZER O.A. CFM HIGH EFFICIENCY? it Balance C: Outside Air Cert. M: Out. Air Measure D: Demand Control N: Natural Auto G: Gravity it W: Water N: Not Required EC: Economizer Control See Section 144(e)3 itnter Uutcloor it CFM. Note: This shall be n less.than Col. H on MECH-3. PIPE INSULATION REQUIRED? PIPE/DUCT INSULATION PROTECTED? SEALED DUCTS IN CEILING/ROOF SPAC ? Use Only - For building Department Run InitiationTime: un Code: 1080834225 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page: 26 of 69 CERTIFICATE OF COMPLIANCE Performance MECH-1 I The Plaza, Buildings A & B, Pointe Happy 4/2/04 • SYSTEM NAME TIME CONTROL SETBACK CONTROL ISOLATION ZONES HEAT PUMP THERMOSTAT? ELECTRIC HEAT? FAN CONTROL VAV MINIMUM POSITION CONTROL? SIMULTANEOUS HEAT/COOL? HEATING SUPPLY RESET COOLING SUPPLY RESET HEAT REJECTION CONTROL VENTILATION OUTDOOR DAMPER CONTROL ECONOMIZER TYPE DESIGN O.A. CFM (MECH-3, COLUMN I HEATING EQUIPMENT TYPE HEATING EQUIPMENT EFFICIENCY COOLING EQUIPMENT TYPE COOLING EQUIPMENT EFFICIENCY MAKE AND MODEL NUMBER PIPE INSULATION REQUIRED? PIPE/DUCT INSULATION PROTECTED? HEATING DUCT LOCATION R -VALUE COOLING DUCT LOCATIO R -VALUE CEILING/ROOF SPACE MECHANICAL SYSTEMS SETBACK CTRL. HVAC -B.17 HVAC -B18 S: Prog. Switch NOTE TO FIELD Enter Number of I: Inlet Vanes O: Occupancy Programmable Switch Programmable Switch P: Variable Pitch Sensor Heating & Cooling Requirec Heating & Cooling Requir V: VFD M: Manual Timer n/a n/a 0: Other C: Curve VENTILATION Yes Yes O.A. CFM EK Air Balance 0.0 kW 0.0 kW Enter Outd6or Air C: Outside Air Cert. Constant Volume Constant Volume CFM. M: Out. Air Measure No No Note: This shall be n D: Demand Control No No less than Col. H on N: Natural Constant Temp Constant Temp MECH-3. Constant Temp Constant Temp n/a n/a Air Balance Air Balance Auto Auto No Economizer • No Economizer 156 cfm 51 cfm Heat Pump Heat Pump 7.00 HSPF 6.80 HSPF Split DX Split DX 10.0 SEER / 9.0 EER 10.0 SEER/ 9.1 EER Yes Yes Yes Yes Ducts in Attic 4.2 Ducts in Attic 4.2 Ducts in Attic 4.2 Ducts in Attic 4.2 No I No HEAT PUMP THERMOSTAT? ELECTRIC HEAT? VAV MINIMUM POSITION CONTROL? SIMULTANEOUS HEAT / COOL? Y: Yes N: No HEAT AND COOL SUPPLY RESET? HIGH EFFICIENCY? PIPE INSULATION REQUIRED? PIPE/DUCT INSULATION PROTECTED? SEALED DUCTS IN CEILING/ROOF SPAC ? ns TIME CONTROL SETBACK CTRL. ISOLATION ZONES FAN CONTROL S: Prog. Switch H: Heating Enter Number of I: Inlet Vanes O: Occupancy C: Cooling Isolation Zones. P: Variable Pitch Sensor B: Both V: VFD M: Manual Timer 0: Other C: Curve VENTILATION OUTDOOR DAMPER ECONOMIZER O.A. CFM EK Air Balance A: Au o it Enter Outd6or Air C: Outside Air Cert. G: Gravity W: Water CFM. M: Out. Air Measure N: Not Required Note: This shall be n D: Demand Control EC: Economizer less than Col. H on N: Natural Control See Section MECH-3. 144(e)3 Run InitiationTime: un Code: 1080834225 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page:27 of 69 MECHANICAL EQUIPMENT SUMMARY Part 1 of 2 MECH-21 j v�+v The Plaza, Buildings A & B, Pointe Happy I DATE 4/2/04 _0 SUPPLY FAN I I RFTIIRN FAN System Name Fan Type Efficiency Tons PURI Motor Eff. Drive Eff. Equipment Name Equipment Type Qty. Tot. Qty GPM BHP Motor Eff. Drive Eff. Pump Control 77.0% 100.0% none BDP C�-fi6TC7060 Constant Volume BlowThrough 2,000 1.00 82.5% 100.0% none CARRIER�8YCC036 Constant Volume Blow -Through 1,250 0.50 77.0%1100.0% none CARR1ER307S-01'i63 Constant Volume Draw -Through 2,000 0.75 77.0% 100.0% none CWRRIER`50JS11 Constant Volume Draw -Through 1;200 0.33 77.0%. 100.0% none CARRIE C50JS6243 Constant Volume Draw -Through 800 0.20 77.0% 100.0% none BOILER SUMMARY Energy Factor or Recovery Efficiency Standby Loss or Pilot -WINSTJL. System Name System Type Distribution Type Qt Rated Input (Gals.) Vol. Ext. R -Val. AO.SMITH ELJF-15' Storage Elec. Standard 1 5,120 14 0.94 n/a n/a O SMITH ELJF-15' Storage Elec. Standard 1 5,120 14 0.94 n/a n/a lUtNTRAL SYSTEM RATINGS OOLITTG System Name System Type Qty. Output Aux. kW Eff. Output Sensible Efficiency Economizer Type CARRIER 38YCCO48 Split DX 8 47,000 7.5 7.20 HSPF 46,000 36,10010.0 SEER/ 9.4 EER No Economizer BDP CO. 661 C 060 Split DX 6 58,000 10.0 7.50 HSPF 56,000 39,20010.0 SEER / 9.0 EER No Economizer CARRIER 38YCC036 Split DX 4 36,000 7.5 7.20 HSPF 34,200 26,33410.0 SEER/ 9.3 EER No Economizer CARRIER 507SOfiO3 Split DX 5 57,000 0.0 7.00 HSPF 57,500 43,90010.0 SEER / 9.1 EER No Economizer CARRIER��JS63fi3 Split DX 20 35,000 .0.0 7.00 HSPF 35,000 27,10010.0 SEER / 9.0 EER No Economizer CARRIER 50JS0243 Split DX 21 23,600 0.0 6.80 HSPF 24,000 17,50010.0 SEER/ 9.1 EER No Economizer _0 SUPPLY FAN I I RFTIIRN FAN System Name Fan Type Motor Location CFM BHP Motor Eff. Drive Eff. CFM BHP Motor Eff. Drive Eff. C7�RRTER�$YCCba$ Constant Volume Blow -Through 1,650 0.75 77.0% 100.0% none BDP C�-fi6TC7060 Constant Volume BlowThrough 2,000 1.00 82.5% 100.0% none CARRIER�8YCC036 Constant Volume Blow -Through 1,250 0.50 77.0%1100.0% none CARR1ER307S-01'i63 Constant Volume Draw -Through 2,000 0.75 77.0% 100.0% none CWRRIER`50JS11 Constant Volume Draw -Through 1;200 0.33 77.0%. 100.0% none CARRIE C50JS6243 Constant Volume Draw -Through 800 0.20 77.0% 100.0% none Run Initiation I Ime: 04/01/04 07:43:45 Run Code: 10BOB34225 EnergyPro 3.1 By EnergySoft User Number: 5533 , Job Number: Page:28 of 69 MECHANICAL EQUIPMENT SUMMARY Part 2 of 2 MECH-2 PROJECT NAME DATE The Plaza, Buildings A & B, Pointe Happy 412/04 L� Zone Name Min. CFM Reheat Coil System Type Qty. Ratio lype DeltaT CFM I BHP I Eff. I Eff. Room Name I Qty: I CFM I BHP I Eff. I Eff. un InitiationTime: un Code: 1080834225 EnergyPro 3.1 By EnergySoft User Number. 5533 Job Number: Page:29 of 69 Room Name Qty, CFM BHP Motor Eff. Drive Eff. Zone 68 4 125 0.10 77.0°/ 97.0% CFM I BHP I Eff. I Eff. Room Name I Qty: I CFM I BHP I Eff. I Eff. un InitiationTime: un Code: 1080834225 EnergyPro 3.1 By EnergySoft User Number. 5533 Job Number: Page:29 of 69 MECHANICAL VENTILATION MECH-3 The Plaza, Buildings A & B, Pointe Happy 1 4/2/04 FA © a o a o© o a o a EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page: 30 of 69 1 • MECHANICAL VENTILATION MECH-3 The Plaza, Buildings A & B, Pointe Happy 4/2/04 o a a o a o© a 0 0 0 ZONE/SYSTEM 3ldg A Restrooms HVAC -A15 _one 131 HVAC -61 !one B2 HVAC -62 '--one B3 HVAC -B3 Zone.B4 HVAC -64 Zone B5 HVAC -65 Zone 66 HVAC -B6 Zone 67' HVAC -67 Zone 68' HVAC -B8 Zone B9 HVAC -B9 Zone B16 HVAC -B10 one B11 HVAC -B11 one B12 HVAC -1312 one B13 HVAC -B13 AREA BASIS AREA (SF) CFM PER SF CFM (B x C) 153 0.15 23 1,386 0.25 346 1,112 0.25 278 839 0.25 210 1,112 0.25 278 1,027 0.25 257 1,027 0.25 257 1,370 .0.25 , 342 1,370 0.25 342 1,211 0.25 303 730 0.15 110 1,5391 0.15 231 1,476 0.15 221 1,022 0.15 153 VAV MIN. RATH C .Minimum Ventilation Rate per Section 121, Table 1-F. E Based on Expected Number of Occupants or at least 50% of Chapter 10 1997 UBC Occupant Density. I Must be greater than or equal to H, or use Transfer Air. Design Outdoor Air includes ventilation from Supply Air System & Room Exhaust Fan; K Must be greater than or equal to (H minus 1), and, for VAV, greater than or equal to (H -J). EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page:31 of 69 MECHANICAL VENTILATION MECH-3 The Plaza, Buildings A &B, Pointe Happy 4/2/04 o ©, © a a o© o a o a • AREA BASIS OCCUPANCY BASIS REQ'D O.A. (MAX OF D OR G) DESIGN OUTDOO AIR CFM COND. AREA (SF) CFM PER SF MIN. CFM (B x C) No.GFM OF PEOPL PER PERSON MIN. CFM (ExF) 1,022 0.15 153 153 153 Total 153 153 1,285 0.15 193 193 193 Total 193 193 1,285 0.15 193 193 193 Totall 193 193 1,037 0.15 156 156 156 Total 156 156 153 0.15 23 23 51 Total 23 51 C Minimum Ventilation Rate per Section 121, Table 1-F. E Based on Expected Number of Occupants or at least 50% of Chapter 10 1997 UBC Occupant Density. I Must be greater than or equal to H, or use Transfer Air. Design Outdoor Air includes ventilation from Supply Air System & Room Exhaust Fans. K :Must be greater than or equal to (H minus 1), and, for VAV, greater than or equal to (H -J). I' EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page:32 of 69 1 • ENVELOPE MANDATORY MEASURES ENV -MM The Plaza, Buildings A & B, Pointe Happy 4/2/04 DESCRIPTION Designer Enforcement �( § 118(a) Installed Insulating Material shall have been certified by the manufacturer to comply with the California Quality Standards for insulating material, Title 20, Chapter 4, Article 3. "§ 118(c) All Insulating Materials shall be installed in compliance with the flame spread rating and smoke density requirements of Sections 2602 and 707 of Title 24, Part 2. [I § 117(a) All Exterior Joints and openings in the building that are observable sources of air leakage shall be caulked, gasketed, weatherstripped or otherwise sealed. 116(b) Site Constructed Doors, Windows and Skylights shall be caulked between the unit and the building, and shall be weatherstripped (except for unframed glass doors and fire doors). § 116(a)1 Manufactured Doors and Windows installed shall have air infiltration rates not exceeding those shown in Table Number 1-E. of the Standards. Manufactured fenestration products must be labeled for U -value according to NFRC procedures. I §118(e) Demising Walls in Nonresidential Buildings: The opaque portions of framed demising walls in nonresidential buildings shall have insulation with an installed R -value of no less. than R-11 between framing members. EnergyPro 3.1 By EnergySoft User Number. 5533 Job Number: Page: 33 of 69 • LIGHTING MANDATORY MEASURES LTG -MM The Plaza, Buildings A & B, Pointe Happy 4/2/04 DESCRIPTION Designer Enforcement �( § 131(d)1 For every floor, all interior lighting systems shall be equipped with a separate automatic control to shut off the lighting. This automatic control shall meet the requirements of Section 119 and may be an occupancy sensor, automatic time switch, or other device capable of automatically shutting off the lighting. § 131(d)20verride for Building Lighting Shut-off: The automatic building shut-off system is 'a provided withmanual, accessible override switch in sight of the lights. The area of override is not to exceed 5,000 square feet. . - G �( § 119(h) Automatic Control Devices Certified: All automatic control devices specified are certified, all alternate equipment shall be certified and installed as directed by the manufacturer. § 111 Fluorescent Ballast and Luminaires Certified: All fluorescent fixtures specified for the project are certified and listed in the Directory. All installed fixtures shall be certified. 1XJ § 132 Tandem Wiring for One and Three Lamp Fluorescent Fixtures: All one and three lamp fluorescent fixtures are tandem wired with two lamp ballasts where required by Standards Section 132; or all one and three lamp fluorescent fixtures are specified with electronic high -frequency ballasts and are exempt from tandem wiring requirements. § 131(a) Individual Room/Area Controls: Each room and area in this building is equipped with a separate switch or occupancy sensor device for each area with floor -to -ceiling walls. ' [XI § 131(b) Uniform Reduction for Individual Rooms: All rooms and areas greater than 100 square feet and more than 0.8 watts per square foot of lighting load shall be controlled with bi-level switching for uniform reduction of lighting within the room. § 131(c) Daylight Area Control: All rooms with windows and skylights that are greater than 250 square feet and that allow fdr the effective use of daylight In the area shall have 50% of the lamps in each daylit area controlled by a separate switch; or the effective use of daylight cannot be accomplished because the windows are continuously shaded by a building on the adjacent lot. Diagram of shading during different times of the year.is included on plans. § 131(f) Control of Exterior Lights: Exterior mounted fixtures served from the electrical panel inside the building are controlled with a directional photo cell control on the roof and a corresponding relay in the electrical panel, or uses an astronomical time clock. § 131(e) Display Lighting. Display lighting shall be separately switched on circuits that are 20 amps or less. § 130(c) Efficacy of Exterior Lights: Exterior mounted fixtures with lamps over 100 Watts served from the electrical panel inside the building have a source efficacy of at least 60 lumens per Watt, or are controlled by a motion sensor. EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page:34 of 69 1� MECHANICAL MANDATORY MEASURES Part 1 of 2 MECH-MM The Plaza, Buildings A & B, Pointe Happy 4/2/04 DESCRIPTION Designer Enforcement Equipment and Systems Efficiencies 011 Any appliance for which there is a California standard established in the Appliance Efficiency Regulations will comply with the applicable standard. § 115(a) Fan type central furnaces shall not have a pilot light. X § 123 Piping, except that conveying fluids at temperatures between 60 and 105 degrees Fahrenheit, or within HVAC equipment, shall be insulated in accordance with Standards Section 123. U § 124 Air handling duct systems shall be installed and insulated in compliance with Sections 601, 603 and 604 of the Uniform Mechanical Code. Controls § 122(e) Each space conditioning system shall be installed with one of the following: . § 122(e)1A Each space conditioning system serving building types such as offices and manufacturing facilities (and all others not explicitly exempt from the requirements of Section 112 (d)) shall be installed with an automatic time switch with an accessible manual override that allows operation of the system during off -hours for up to 4 hours. The time switch shall be capable of programming different schedules for weekdays and weekends; Incorporate an automatic holiday "shut- off' feature that turns off all loads for at least 24 hours, then resumes the normally scheduled operation; and has program backup capabilities that prevent the loss of the device's program and time setting for at least 10 hours if power is interrupted; or. § 122(e)1 B An occupancy sensor to control the operating period of the system; or F§ 122(e)1C A 4 -hour timer that can be manually operated to control the operating period of the system. § 122(e)2 Each space conditioning system shall be Installed with controls that temporarily restart and temporarily operate the system as required to maintain a setback heating and/or a setup cooling thermostat setpoint. a§ 122(g) Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000 square feet shall be provided with isolation zones. Each zone: shall not exceed 25,000 square feet; shall be provided with isolation devices, such as valves or dampers, that allow the supply of heating or cooling to be setback or shut off independently of other isolation areas; and shall be controlled by a time control device as described above. § 122(a&b) Each space conditioning system shall be controlled by an individual thermostat that responds to temperature within the zone. Where used to control heating, the control shall be adjustable down to 55 degrees F or lower. For cooling, the control shall be adjustable up to 85 degrees F or higher. Where used for both heating and cooling, the control shall be capable of providing a deadband of at least 5 degrees F within which the supply of heating and cooling is shut off or reduced to a minimum. § 122(c) Thermostats shall have numeric setpoints in degrees Fahrenheit (F) and adjustable setpoint stops accessible only to authorized personnel. I a § 112(b) Heat pumps shall be installed with controls to prevent electric resistance supplementary heater operation when the heating load can be met by the heat pump alone: EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page: 35 of 69 C MECHANICAL MANDATORY MEASURES Part 2 0.2 MECH-MM The Plaza, Buildings A & B, Pointe Happy 4/2104 Description Designer Enforcement Ventilation �( § 121(e) Controls shall be provided to allow outside air dampers or devices to be operated at the ventilation rates as specified on these plans. § 122(f) Gravity or automatic dampers interlocked and closed on fan shutdown shall be provided on the outside air intakes and discharges of all space conditioning and exhaust systems. § 122(f) All gravity ventilating systems shall be provided with automatic or readily accessible manually operated dampers in all openings to the outside, except for combustion air openings. �( § 121(f)l Air Balancing: The system shall be balanced in.accordance with the National Environmental Balancing Bureau (NEBB) Procedural Standards (1983), or Associated Air Balance Council (AABC) National"Standards (1989); or F-1§ 121(f)2 Outside Air Certification: The system shall provide the minimum outside air as shown on the mechanical drawings, and shall be measured and certified by the installing licensed C-20 mechanical contractor and certified by (1) the design mechanical engineer, (2) the installing licenced C-20 mechanical contractor, or (3) the person with overall responsibility for the design of the ventilation system; or U § 121(f)3 Outside Air Measurement: The system shall be equipped with a calibrated local or remote device capable of measuring the quantity of outside air on a continuous basis and displaying that quantity on a readily accessible display divice; or I §121 (f)4 Another method approved by the Commission. u .Service Water Heating Systems § 113(b)2 If a circulating hot water system is installed, it shall have a control capable of automatically turning off the circulating pump(s) when hot water is not required. LX § 113(b)3B Lavatories in restrooms of public facilities shall be equipped with controls to limit the outlet temperature to 110 degrees F. m , § fYl .. . . 113public facilities (b)3C Lavatories in restrooms of puc faces shall be equipped with one of the following: Outlet devices that limit the flow of, hot water to a maximum of 0.5 gallons per minute. Foot actuated control valves, and outlet devices that'limit the flow of hot water to a maximum of 0.75 gallons per minute. Proximity sensor actuated control valves, and outlet devices that limit the flow of hot water to,a maximum of 0.75 gallons per minute. Self-closing valves, and outlet devices that limit the flow of hot water to a maximum of 2.5 gallons per minute, and 0.25 gallons/cycle (circulating system). Self-closing valves, and outlet devices that limit the flow of hot water to a maximum of 2.5 gallons per minute, and 0.50 gallons/cycle (non -circulating system). Self-closing valves, and outlet devices that limit the flow of hot water to a maximum of 2.5 gallons per minute, and 0.75 gallons/cycle (foot switches and proximity sensor controls). EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number, Page: 36 of 69 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY I.. The NAME DATE The Plaza, Buildings A & B, Pointe Happy 412/04 SYSTEM NAME FLOOR AREA HVAC -A1 1,212 Number of Systems Heating System Output per System Total Output (Btuh) Output (Btuh/sqft) Cooling System Output per System Total Output (Btuh) Total. Output (Tons) Total Output (Btuh/sqft) Total Output (sgftrron) Air System CFM per System Airflow (cfm) Airflow (cfm/sgft) Airflow (cfm/Ton) Outside Air (%) Outside Air (cfm/sqft) Note: values above given at ARI conditions . 26.0 OF Outsir 182 cfm 69.4 OF 07.0/73.6OF Outside A 182 cfm 74.6 / 63.5 °F •i E 47,000 Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts 47,000 38.8 Latent 46,000 46,000 3.8 3�I I TOTAL SYSTEM LOAD 316.2 COIL COOLING PEAK COIL HTG. PEAK CFM I Sensiblel Latent CFM I Sensible 1,269 21,221 4,283 746 20,805 35,991 0 1,650 7.5 kW Supplemental Electric 1,061 1,040 0 0 182 6,268 229 182 8,398 Total Adjusted System Output 35,991 5,728 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Sep 3 pm 0 11.0 0 1,061 1,040 29161 4,512 31,283 1,650 30,911 CARRIER 38YCCO48 35,991 5,728 1,650 7.5 kW Supplemental Electric 25,598 1.36 430.4 Total Adjusted System Output 35,991 5,728 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Sep 3 pm 56,508 11.0 0.15 Jan 12 am SYt;HKUMt I Klt;S (Airstream I emperatures at I Ime OT meating 64.6 OF 64.6 OF 82.2. ro 96.8 OF Supply Fan Heating Coil Aux. Heat Coil 1650 cfm Return Air Ducts E ISYCHRUMETRICS (Airstream I empera ures at Time of Coolini 78.2/64.7OF 78.2/64.7OF 57.7/56.6OF Supply Fan Cooling Coil 1650 cfm Supply Air Ducts 96.2 OF ROOMS 70.0 OF Supply Air Ducts 58.3 / 56.8 of 55.9% R.H. ROOMS 74.0 / 63.3 of EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page: 37 of 69 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE . The Plaza, Buildings A & B, Pointe Happy 4/2/04 SYSTEM NAME FLOOR AREA HVAC -A2 1,305 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 Heating System Output per System 47,000 Total Output (Btuh) 47,000 Output (Btuh/sgft) 36.0 Cooling System Output per System 46,000 Total Output (Btuh) 46,000 Total Output (Tons) 3.8 Total Output (Btuh/sgft) 35.2 Total Output (sgft/Ton) 340.4 Air. System CFM per System 1,650 Airflow (cfm) 1,650 Airflow (cfm/sgft) 1.26 Airflow (cfm/Ton) 430.4 Outside Air (%) 11.9 Outside Air (cfm/sgft) 0.15 26.0 OF 64.3 OF Outside Air Q 196 cfm Supply Fan 1650 cfm 69.4 OF 64.3 of Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM Sensible Latent CFM I Sensible 1,254 20,618 4,61 767 21,072 0 1,031 1,054 0 0 196 6,752 111 196 9,041 0 0 1,031 1,054 29,432 4,722 32,220 CARRIER 38YCCO48 35,952 5,949 30,911 7.5 kW Supplemental Electric 25,598 Total Adjusted System Output 35,952 5,949 56,508 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Sep 3 pm Jan 12 am aam Temperatures at Time ot Heating ea 81.9 OF ,—, 96.4 OF Heating Coil Aux. Heat Coil 6, Return Air Ducts V Supply Air Ducts 95.8 OF ROOMS 70.0 OF 107.0/73.6OF 78.4/65.0OF 78.4/65.0OF 58.0/56.9OF O Supply Air Ducts Outside Air r k196. cfm Supply Fan 'Cooling Coil 58.5 / 57.1 OF 1650 cfm 56.6% R.H. ROOMS 74.6 /63.7 of 74.0 / 63.5 of • Return Air Ducts EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page:38 W69 • HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY The Plaza, Buildings A & B, Pointe Happy HVAC -A3 Number of Systems 1 Heating System Output per System 47,000 Total Output (Btu h) 47,000 Output (Btuh/sgft) 36.0 Cooling System Output per System 46,000 Total Output (Btuh) 46,000 Total Output (Tons) 3.8 Total Output (Btuh/sgft) 35.2 Total Output (sgft/Ton) 340.4 Air System .CFM per System 1,650 Airflow (cfm) 1,650 Airflow (cfm/sqft) 1.26 Airflow (cfm/Ton) 430.4 Outside Air (%) 11.9 Outside Air (cfm/sqft) 0.15 Note: values above given at ARI conditions 26.0 OF utsi_ de A 196 cfm 64.3 of 64.3 OF Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD TE 4/2/04 OOR AREA 1,305 COIL COOLING PEAK COIL HTG. PEAK CFM Sensible Latent CFM I Sensible 1,25 20,583 4,61 767 21,072 0 1,029 1,054 0 0 196 6,752 11 196 9,041 0 0 1,029 1,054 29,394 4,723 32,220 CARRIER 38YCCO48 35,952 5,950 30,911 7.5 kW Supplemental Electric 25,598 Total Adjusted System Output 35,952 5,950 56,508 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Sep3 pm Jan 12 am earn I empera ures at Time of Heating ea 81.9 OF 96.4 OF . Supply Air Ducts 95 8 of .11 Supply Fan Heating Coil Aux. Heat Coil 1650 cfm ROOMS 69.4 OF 70.0 OF Return Air Ducts (Airstream I empera ures at Time of Goolinq ea 107.0 / 73.6 of Outside Aii 196 cfm 74.6 / 63.7 of 78.4 / 65.0 of 78.4 / 65.0 of 0 58.0/56.9 OF Supply Fan Cooling Coil 1650 cfm �, Return Air Ducts 14 Supply Air Ducts 58.5 / 57.1 OF 56.6% R:H. ROOMS 74.0 163.5 OF EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page:39 of 69 t: HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE The Plaza, Buildings A & B, Pointe Happy 4/2/04 SYSTEM NAME FLOOR AREA HVAC -A4 1,320 0 (Number of Systems 11 Heating System Output per System 47,000 Total Output (Btuh) 47,000 Output (Btuh/sgft) 35.6 Cooling System Output per System 46,000 Total Output (Btuh) 46,000 Total Output (Tons) 3.8 Total Output (Btuh/sgft) 34.8 Total Output (sgftrron) 344.3 Air System CFM per System 1,650 Airflow (cfm) 1,650 Airflow (cfm/sgft) 1.25 Airflow (cfmrron) 430.4 Outside Air (%) 12.0 Outside Air (cfm/sgft) 0.15 Note: values above given at ARI conditions 26.0 OF 64.2 OF utside Air Q 198 cfm Supply Fan 1650 cfm 69.4 OF 07.0' / 73.6 of OutsideA 198 cfm 74:6 ! 63.7 of Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM Sensible Latent CFM I Sensible 1,308 21,403 4,664 770 21,131 0 1,070 1,057 0 0 198 6,825 86 198 9,145 0 0 1,070 1,057 30,369 4,750 32,388 CARRIER 38YCCO48 35,961 5,979 30,911 7.5 kW Supplemental Electric 25,598 Total Adjusted System Output 35,961 5,979 56,508 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Sep 3 pm Jan 12 am ream I empera ures at Time of Heating ea 64.2 OF 81.8 of 96.4 OF Su I Air D t Heating Coil Aux. Heat Coil 78.5/65.0 OF 78.5/65.0 OF Return Air Ducts ratures at I ime 58.0/56.9OF Supply Fan. Cooling Coil 1650 cfm �, Return Air Ducts �4 pp y uc s 95.8 of ROOMS 70.0 OF Supply Air Ducts 58.6 / 57.2 of 56.8% R.H. ROOMS 74.0 / 63.5 of i EnergyPro 3.1 By EnergySoft User Number: '5533 Job Number: Page:40 of 69 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY The Plaza, Buildings A & B, Pointe Happy HVAC -A5 Number of Systems Heating System Output per System Total Output (Btuh) O.utput(Btuh/sqft) Cooling System Output per System Total Output (Btuh) Total Output (Tons) Total Output (Btuh/sgft) Total Output (sgft/Ton) Air. System CFM per System Airflow (cfm) Airflow (cfm/sgft) Airflow (cfm/Ton) .6utside Air (%) Outside Air (cfm/sqft) Note: values above given at ARI conditions 26.0 of Outsir 18Z cfm 69.5 ok 07.0_173.6 of Outside Ai 187 cfm • 74.5/65.2 °F 58,000 Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts 58,000 46.6 Latent 56,000 56,000 4.7 65.5 OF 65.5 OF 45.U� 11 TOTAL SYSTEM LOAD DATE 4/2/04 FLOOR AREA 1,245 COIL COOLING PEAK COIL HTG. PEAK CFM Sensible Latent I CFM I Sensible 1,635 21,647 4,399 662 20,398 16,813 0 10.0 kW Supplemental Electric 1,082 1,020 0 0 187 6,457 -846 187 8,649 0 (Airstream Temperatures at Time of Heating ea 0 1,082 1,020 30,269 3,553 1 31,087 2,000 38,145 34,130 72,275 Jan 12 am BDP CO. 661CJ060 35,095 16,813 2,000 10.0 kW Supplemental Electric 1.61 428.6 Total Adjusted System Output (Adjusted for Peak Design Conditions) 16,813 TIME OF SYSTEM PEAK Sep 3 pm 135,095 9.3 0.15 (Airstream Temperatures at Time of Heating ea r-•, 83.4 of n 99.4 OF Supply Fan Heating Coil Aux. Heat Coil 2000 cfm S. Return Air Ducts 14 77.5/66.0 OF _ 77.5/66.0 OF = 61.1/60.0 OF Supply Fan Cooling Coil 2000 cfm '% Return Air Ducts Y Supply Air Ducts 98.9 of ROOMS 70.0 OF Supply Air Ducts 61.6 / 60.1 of 62.4% R.H. ROOMS 74.0 / 65.0 OF EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page:41 of 69 I -IVAC SYSTEM HEATING AND COOLING LOADS SUMMARY •PROJECT NAME DATE The Plaza, Buildings A & B, Pointe Happy 4/2/04 SYSTEM NAME FLOOR AREA HVAC -A6 1,305 Number of Systems 1 Heating System . Output per System 58,000 Total Output (Btuh) 58,000 Output (Btuh/sqft) 44.4 Cooling System Output per System 56,000 Total Output (Btuh) 56,000 'Total Output (Tons) 4.7 Total Output (Btuh/sgft) 42.9 Total Output (sgftrron) 279.6 Air System CFM per System 2,000 Airflow (cfm) 2,000 Airflow (cfm/sqft) 1.53 Airflow (cfm/Ton) 428.6 Outside Air (%) 9.8 Outside Air (cfm/sqft) 0.15 Note: values above given at ARI conditions 26.0 of 65.2 OF Outside Air 196 cfm Supply Fan 2000 cfm 69.5 OF 107.0 /'73.6 of Outside A 196 cfm • 1 74.5/65.3 °F E Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM Sensible Latent CFM Sensible 1,692 22,196 4,61 690 21,072 10.0 kW Supplemental Electric 0 34,130 1,110 1,054 0 0 196 6,766 -925 196 9,063 0 0 1,110 1,054 31,182 3,687 32,242 BDP CO.661CJ060 35,228 16,760 38,145 10.0 kW Supplemental Electric 34,130 Total Adjusted System Output (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK 35,228 16,760 Sep 3 pm 72,275 Jan 12 am -CIGJ (Airstream I emperatures at I ime OT flea 65.2 OF 83.2 OF 99.2 OF Heating Coil Aux. Heat Coil Return Air Ducts 77.7 / 66.1 °F 77.71.66.10F . 61.1/60.00F Supply Fan 2000 cfm Cooling Coil �, Return Air Ducts q Supply Air Ducts 98.7 OF ROOMS 70.0 OF Supply Air Ducts 61.7 / 60.2 OF 62.6% R.H. ROOMS 74.0 / 65.1 of EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page:42 of 69 iVAC SYSTEM HEATING AND COOLING LOADS SUMMARY •PROJECT NAME DATE The Plaza, Buildings A & B, Pointe Happy 4/2/04 SYSTEM NAME FLOOR AREA HVAC A7 1,255 (Number of Systems Heating System Output per System Total Output (Btuh) Output (Btuh/sgft) Cooling System Output per System Total Output (Btuh) Total Output (Tons) Total Output (Btuh/sgft) Total Output (sgft/Ton) Air System CFM per System Airflow (cfm) Airflow (cfm/sqft) • Airflow (cfmrron) 4 Outside Air (%) Outside Air (cfm/sgft) Note: values above given at ARI conditions 36,000 72,000 57.4 5.711 Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK�COILHTG.PEAKI CFM Sensible Latent CFM Sensible 2,122 34,543 4,435 771 26,879 50,649 0 2,500 7.5 kW Supplemental Electric 1,727 1,344 0 0 188 6,480 24 188 8,714 Total Adjusted System Output 50,649 11,013(Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Sep 3 pm 0 ]7.5 0 1,727 1,344 44,495 4,676 F 38,281 1,250 47,353 CARRIER 38YCCO36 50,649 11,013 2,500 7.5 kW Supplemental Electric 51,195 1.99 438.6 Total Adjusted System Output 50,649 11,013(Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Sep 3 pm ]7.5 F Jan 12 am HLA I INU STS I tM PSTGHKUMt I KIDS (Airstream I emperatures at Mme of Heating Peak) 26.0 of 66.2 of 66.2 OF 84.0 of 103.3 OF 40 Supply Air Ducts Outside Air 188 cfm " 102.8 °F Supply Fan Heating Coil 'Aux. Heat Coil 2500 cfm ROOMS 69:5 OF 70.0 °F 107.0/73.6OF Outside Aii 188 cfm •74.7/63.5 °F Return Air Ducts TGnKUMC I KlUb (Airstream I emperatures at I Ime Ot (;ooimg Peak) 77.1 / 64.3 of 77.1 / 64.3 OF 58.1 / 57.0 of O Supply Air Ducts • Supply Fan Cooling Coil 58.7 157.3 of 2500 cfm 55.8% R.H. ROOMS 74.0 ! 63.3 of Return Air Ducts EnergyPro 3.1 . By EnergySoft User Number: 5533 Job Number: Page:43 of 69 • HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY ECT NAME The Plaza, Buildings A & B, Pointe Happy EM NAME HVAC -A8 Number of Systems 1' Heating System Output per System 57,000 Total Output (Btuh) 57,000 Output (Btuh/sqft) 57.1 Cooling System Output per System 57,500 Total Output (Btuh) 57,500 Total Output (Tons) 4.8 Total Output (Btuh/sqft) 57.6 Total Output (sgftrron). 208.5 Air System CFM per System 2,000 Airflow (cfm) 2,000 Airflow (cfm/sqft) 2.00 Airflow (cfm/Ton) 417.4 Outside Air (%) 7.5 Outside Air (cfm/sqft) 0.15 Note: values above given at ARI conditions 26.0 of Outside Ai 150 cfm 69.7 ck 12.0 177.9 of �l Outside Ai 150 cfm • 74.5 ! 63.5 of EnergyPro 3.1 By EnergySoft Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD DATE 4/2/04 FLOOR AREA 999 COIL COOLING PEAK COIL HTG. PEAK CFM Sensible Latent CFM I Sensible 1,268 21,210 4,560 1 1,016 14,758 0 1,061 738 0 0 150 5,979 2,029 150 6,962 0 0 1,061 738 29,352 6,589 23,195 CARRIER SOJS0603 41,585 9,266 37,488 Total Adjusted System Output 41,585 9,266 37,488 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK17 Aug 3 pm Jan 12 am 'earn I emoera ures at Time of Heatina ea 66.4 of 84.0 of Heating Coil Supply Fan 2000 cfm 84.0 of Supply Air Ducts 83.6 of ROOMS 70.0 of S, Return Air Ducts q irstream I emperatures at I Ime OT L;oonng veaK) 77.3 ! 64.7 of 57.8 / 56.8 of 57.8 / 56.8 of O Supply Air Ducts • Cooling Coil Supply Fan 58.3 / 57.0 of 2000 cfm 56.0% R.H. ROOMS 74.0 / 63.3 of User Number: '5533 k Return Air Ducts 4 Job Number. Page:44 of 69 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE The Plaza, Buildings A &.B, Pointe Happy 4/2/04 SYSTEM NAME FLOOR AREA HVAC -A9 1,285 Number of Systems Heating System Output per System Total Output. (Btuh) Output (Btuh/sqft) Cdoling System Output per System Total Output (Btuh) Total Output (Tons) Total Output (Btuh/sqft) Total Output (sgft/Ton) Air System CFM per System Airflow (cfm) Airflow (cfm/sgft) Airflow (cfmrron) Outside Air (%) Outside Air (cfm/sqft) Note:.values above given at ARI conditions 26.0 OF Outside Air 193 cfm 69.7 OF 112.0 / 77.9 of ),-=;l Outside Ai 193 cfm 74.5/63.0 of 2 COIL COOLING PEAK 11COILHTG.PEAK CFMISensiblel Latent 11CFM1 Sensible 35,000 Total Room Loads1,375 24,459 5,866 70,000 Return Vented Lighting 0 54.5 Return Air Ducts 1,223 Return Fan 0 35,000 Ventilation 193 7,697 2,924 70,000 Supply Fan 0 5.8 Supply Air Ducts 1,223 '5 TOTAL SYSTEM LOAD 34,60 8,790 27,674 2203. 66.2 OF 1,200 2,400 CARRIER 50JS0363 52,845 8,687 46,037 1.87 411.4 108150 Total Adjusted System Output 52,845 8,687(Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Aug 3 pm Jan 12 am Heating Coil 84.2 of me 84.2 OF Supply Air Ducts �c ,r• Supply Fan 83'9 of 2400 cfm ROOMS 70.0 of Return Air Ducts I 77.5 / 64.3 OF . 56.8 155.8 OF EnergyPro 3.1 By EnergySoft User Number: 5533 me 56.8 155.8 of -� Supply Air Ducts Cooling Coil Supply Fan 57.3 / 56.0 -t- 2400 f2400 cfm 54.1% R.H. ROOMS 74.0 / 62.8 of �. Return Air Ducts t4 Job Number: Page:45 of 69 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME The Plaza, Buildings A & B, Pointe Happy SYSTEM NAME HVAC -A10 (Number of Systems Heating System Output per System Total Output (Btuh) Output(Btuh/sgft) Cooling System Output per System Total Output (Btuh) Total Output (Tons) Total Output (Btuh/sqft) Total Output (sgft/Ton) Air System CFM per System Airflow (cfm) Airflow (cfm/sgft) Airflow (cfmrron) I Outside Air (%) Outside Air (cfm/sgft) Note: values above given at ARI conditions 2 35,000 Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts 70,000 54.5 Latent 35,000 70,000 5.8 nII TOTAL SYSTEM LOAD 4/2/04 1REA 1,285 COIL COOLING PEAK COIL HTG. PEAK CFM Sensible Latent CFM I Sensible 1,375 24,459 5,866 1,154 17,015 0 1,223 851 0 0 193 7,697 2,924 193 8,957 0 0 1,223 851 34,60 8,790 27,674 HVAC EQUIPMENT SELECTION 1,200 2,400 CARRIER 50JS0363 52,845 8,687 46,037 1.87 411.4 8.0 Total.Adjusted System Output 52,845 8,687 46,037 (Adjusted for Peak Design Conditions) 0.15 TIME OF SYSTEM PEAK Aug 3 pm Jan 12 am HEATING SYSTEM PSYCHRUMETRIGS (Airstream Temperatures at Time of Heating ea 26.0 OF 66.2 OF 84.2 OF 84.2 OF Supply Air Ducts Outside Air O 193'.cfm. o Heating Coil Supply Fan 83.9 F 2400 cfm ROOMS 69.7 9F 70.0 OF 12.0 / 77.9 OF -OutsideA 193 cfm 74.5/63.0 °F r � k Return Air Ducts u 77.5 164.3 OF . 56.8 / 55.8 OF 56.8 / 55.8 OF Supply Air Ducts Cooling Coil Supply Fan 57.3 / 56.0 -1- 2400 F2400 cfm 54.1% R.H. ROOMS 74.0 162.8 OF �, Return Air Ducts %4 EnergyPro 3.1 By EnergySoft User Number: 5533 . Job Number: Page:46 of 69 1 HVAC SYSTEM HEATING AND' COOLING LOADS SUMMARY 'ROJECT NAME The Plaza, Buildings A & B, Pointe Happy ;YSTEM NAME HVAC -A11 Number of Systems Heating System Output per System Total Output (Btuh) Output (Btuh/sgft) Cooling System Output per System Total Output (Btuh) Total.Output (Tons) Total Output (Btuh/sqft) Total Output (sgftrron) Air System CFM per System Airflow (cfm) Airflow (cfm/sqft) Airflow (cfmrron) Outside Air (%) Outside Air (cfm/sqft) Note: values above given at ARI conditions 26.0 OF Outside Ai 192 cfm 69.6 -OF 112.0 /.77 .-9 of 2 5,000 Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD 0,000 54.7 Latent 5,000 0,000 5.8 '7 219.4 4/2/04 AREA 1,280 COIL COOLING PEAK COIL HTG. PEAK CFM Sensible Latent CFM I Sensible 1,460 25,930 5,843 1,280 18,802 0 1,296 940 0 0 192 7,661 2,915 192 8,915 0 0 1,296 940 36,184 8,758 29,598 HVAC EQUIPMENT SELECTION 1,200 . 2,400 CARRIER 50JS0363 52,878 8,655 46,037 1.88 411.4 8.0 Total Adjusted System Output 52,878 8,655 46,037 (Adjusted f& Peak Design Conditions) 0.15 TIME OF SYSTEM PEAK Aug 3 pm Jan 12 am (IC:J (Airstream I eml 66.1 OF Heating Coil 84.2 of O Supply Air Ducts • Supply Fan 83.8 OF 2400 cfm ROOMS 70.0 OF Return Air Ducts I 77.5 /64.3 of 56.8 / 55.8 of 56.8 / 55.8 of Supply Air Ducts Outside Air 192 cfm -Cooling Coil Supply Fan 57.3 / 56.0 OF 2400 cfm 54.1% R.H. ROOMS 74.5 i 63.0 OF 74.0 / 62.8 OF �% Return Air Ducts Y EnergyPro 3.1 By Energysoft User Number: 5533 Job Number: Page:47 of 69 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY ECT NAME The Plaza, Buildings A & B, Pointe Happy EM NAME HVAC -Al2 Number of Systems Heating System Output per System Total.Output (Btuh) Output(Btuh/sqft) Cooling System Output per System Total Output (Btuh) Total Output (Tons) Total Output (Btuh/sqft) Total Output (sgft/Ton) Air System `CFM per System Airflow (cfm) Airflow (cfm/sgft) Airflow (cfm/Ton) .Outside Air N Outside Air (cfm/sqft) Note: values above given at ARI conditions 26.0 of . -0 Outside Air 184 cfm 69.7 OF 66.3 of 2 5,000 Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts. TOTAL SYSTEM LOAD 0,000 57.1 Latent 5,000 0,000 5.8 57'1 210.0 DATE 4/2/04 FLOOR AREA 1,225 COIL COOLING PEAK COIL HTG. PEAK CFM Sensible Latent CFM I Sensible 1,317 23,755 5,592 1,106 16,517 0 1,188 826 0 0 184 7,340 2,878 184 8,541 0 0 1,188 826 33,47 8,470 26,709 HVAC EQUIPMENT SELECTION 1,200 2,400 CARRIER 50JS0363 53,001 8,329 46,037 1.96 411.4 ]7.7 Total Adjusted System Output 53,001 8,329 46,037. (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK F Aug 3 pm Jan 12 am Heating Coil 84.4 of 0 Supply Fan 2400 cfm 84.4 of Supply Air Ducts 84.0 of ROOMS 70.0 of '„ Return Air Ducts 4 "UULINti 5TS I tM I-bTUNKUMt I KII:J (Airstream I emperatures at I Ime Ot GOOling NeaK) 112.0/77.9OF 77.3/64.1OF 56.6/55.5OF 56.6/55.5OF O Supply Air Ducts Outside Air 184 cfm Cooling Coil Supply Fan 57.1 / 55.7 of 2400 cfm 53.5% R.H. ROOMS 74.5/6 . 2.8 of 74.0 / 62.7 of ', Return Air Ducts 4 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page:48 of 69 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY .PROJECT NAME DATE The Plaza, Buildings A & B, Pointe Happy 4/2/04 SYSTEM NAME FLOOR AREA HVAC -Al3 1,229 Number of Systems 2 Heating System Output per System 35,000 Total Output (Btuh) 70,000 Output (Btuhlsgft) 57.0 Cooling System Output per System 35,000 Total Output (Btuh) 70,000 Total Output (Tons) 5.8 Total Output (Btuh/sgft) 57.0 Total Output (sgft/Ton) 210.7 Air System CFM per System 1,200 Airflow .(cfm) 2,400 Airflow (cfm/sgft) 1.95 Airflow (cfm/Ton) 411.4 Outside Air (%) 7.7 Outside Air (cfm/sgft) 0.15 Note: values above given at ARI conditions 26.0 OF lutside Air 184 cfm 69.7 OF 66.3 OF Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM Sensible Latent CFM I Sensible 1,338 24,085 5,610 11115 16,640 0 1,204 832 0 0 184 7,362 2,879 184 8,568 0 0 1,204 832 33,873 8,490 26,873 HVAC EQUIPMENT SELECTION CARRIER SOJS0363 52,996 8,352 46,037 Total Adjusted System Output 52,996 8,352 46,037 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Aug 3 pm Jan 12 am :ream Temperatures at Time o ea Ing ea 84.3 OF 84.3 OF O Supply Air Ducts • Heating Coil Supply Fan 84.0 °F 2400 cfm ROOMS 70.0 OF Return Air Ducts VVLINU OTO I CIVI-f JTl.r1KVIVlt I Kit Z) tAlrstream I emperatures at lime oT coonng PeaK) 112.0 / 77.9 OF 77.4 / 64.2 OF 56.6 / 55.6 OF 56.6 155.6 OF Supply Air Ducts Outside Air 0" 184 cfm Cooling Coil Supply Fan 57.1 /55.8 of 2400 cfm 53.6% R.H. ROOMS 74.5/62.8 °F ` 74.0 / 62.7 OF Return Air Ducts EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page: 49 of 69 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE The Plaza, Buildings A & B, Pointe Happy 4/2/04 SYSTEM NAME FLOOR AREA HVAC -A14 729 Number of Systems 1 Heating System Output per System 57,000 Total Output (Btuh) 57,000 Output (Btuh/sgft) 78.2 Cooling System Output per System 57,500 Total Output (Btuh) 57,500 Total Output (Tons) 4.8 Total Output (Btuh/sqft) 78.9 Total Output (sgft/Ton) 152.1 Air System CFM per System 2,000 Airflow (cfm) 2,000 Airflow (cfm/sgft) 2.74 Airflow (cfm/Ton) 417.4 Outside Air (%) 5.5 Outside Air (cfm/sqft) 0.15 Note: values above given at ARI conditions 26.0 OF Outside Air 109-cfm 69.7 111.0 / 77.6 of Outside Aii 109 cfm 74.6 / 62.6 of 67.3 of Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM Sensible Latent CFM I Sensible 1,326 23,770 3,330 903 13,998 0 1,188 700 0 0 109 4,237 1,785 109 5,082 0 0 1,188 700 30,424 5,115 20,480 HVAC EQUIPMENT SELECTION CARRIER.50JS0603 42,496 7,702 37,488 Total Adjusted System Output 42,496 7,702 37,488 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Aug 2 pm Jan 12 am earn I empera ures at Time ot Heating ea 84.9 OF 84.9 OF OSupply Air Ducts • Supply Fan 84.6 OF 2000 cfm ROOMS 70.0 of Heating Coil Rotiirn Air n,irtc 76.6/63.6 OF, 56.6/55.6 OF 56.6/55.6 OF O Supply Air Ducts • Cooling Coil Supply Fan 57.2 / 55.8 of 2000 cfm. 52.8% R.H. ROOMS 74.0 / 62.5 of Roti irn Air rL irta EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page: 50 of 69 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY CT NAME The Plaza, Buildings A & B, Pointe Happy M NAME HVAC -A15 Number of Systems 1 Heating System Output per System 23,600 Total Output (Btuh) 23,600 Output (Btuh/sgft) 154.2 Cooling System Output per System 24,000 Total Output (Btuh) 24,000 Total Output (Tons) 2.0 Total Output (Btuh/sgft) 156.9 Total Output (sgft/Ton) 76.5 Air System CFM per System 800 Airflow (cfm) 800 Airflow (cfm/sqft) 5.23 Airflow (cfm/Ton) 400.0 Outside Air (%) 6.4 Outside Air (cfm/sqft) 0.33 Note: values above given at ARI conditions 26.0 OF Outside Ai 51 cfm 69.8 OF Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD Heating Coil DATE 4/2/04 FLOOR AREA 153 COIL COOLING PEAK COIL HTG. PEAK CFM Sensible Latent CFM Sensible 206 3,727 1,091 204 3,265 0 186 163 0 0 5 2,051 828 51 2,378 0 0 186 163 6,15 1,919 5,969 4RRIER 50JS0243 16,872 4,000 15,521 Total Adjusted System Output 16,8:7:2[::::4,000 15,521 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK F Aug 3 pm Jan 12 am m Temperatures at Time of Heating ea 85.2 OF 85.2 OF O Supply Air Ducts • Supply Fan 85.1 OF 800 cfm ROOMS 70.0 of -� Return Air Ducts O (Airstream Temperatures at Time ot Cooling ea 112.0/77.9 OF 76.6/63.7 OF 56.8/55.8 OF 56.8/55.8 OF O Supply Air Ducts Outside Air • 51 cfm Cooling Coil Supply Fan 57.0 55.9 of 800 cfm 52.9% R.H. ROOMS 74.2/62.5 °F 74.0 / 62.5 of Return Air Ducts EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number. Page: 51 of 69 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY 71 PROJECT NAME DATE The Plaza, Buildings A & B, Pointe Happy 4/2/04 7SYSTEM NAME FLOOR AREA HVAC -B1 1,386 Number of Systems Heating System Output per System Total Output (Btuh) 'Output (Btuh/sqft) Cooling System Output per System Total Output (Btuh) Total Output (Tons) Total Output (Btuh/sqft) Total Output (sgft/ron) Air System CFM per System Airflow (cfm) Airflow (cfm/sqft) Airflow (cfm/Ton) Outside Air (%) Outside Air (cfm/sgft) Note: values above given at ARI conditions 1 COIL COOLING PEAK Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD 58,000 41.8 Latent 56,000 56,000 4.7 40.4 297.0 COIL COOLING PEAK COIL HTG. PEAK CFM Sensible Latent CFM I Sensible 2,68 33,802 4,898 896 26,867 0 2,000 1,690 1,343 0 0 208 7,126 -1,036 208 9,595 0 0 1,690 1,343 44,309 3,861 39,149 tAI INN JTJ I t1V1 rJTL r1KVmt 1 KiUb (Airstream I emperatures at I Ime OT Beating reaK) 26.0 of 64.9 of 64.9 of 82.8 of 98.8 OF O Supply Air Ducts Outside Air � 208 cfm 98.2 of Supply Fan Heating Coil Aux. Heat Coil c+ 2000 cfm ROOMS 70.0 of 69.4 OF 07.0/73.6OF Outside.4 '208 cfm 74.8 % 65.4 of M 78.1 / 66.3 of 78.1 / 66.3 of _b Return Air Ducts ra ures at Time of Go 61.4 l 60.1 of Supply Fan. 'Cooling'Coil 2000 cfm �. Return Air Ducts Y Supply Air Ducts 62.2/60.4 of 62.9% R.H. ROOMS 74.0/65.2 of EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page: 52 of 69 J BDP CO. 661CJ060 35,720 16,436 38,145 2,000 10.0 kW Supplemental Electric 34,130 1.44 428.6 10.4 Total Adjusted System Output 35,720 16,436 72,275 (Adjusted for Peak Design Conditions) 0.15 TIME OF SYSTEM PEAK Sep 3 pm Jan 12 am tAI INN JTJ I t1V1 rJTL r1KVmt 1 KiUb (Airstream I emperatures at I Ime OT Beating reaK) 26.0 of 64.9 of 64.9 of 82.8 of 98.8 OF O Supply Air Ducts Outside Air � 208 cfm 98.2 of Supply Fan Heating Coil Aux. Heat Coil c+ 2000 cfm ROOMS 70.0 of 69.4 OF 07.0/73.6OF Outside.4 '208 cfm 74.8 % 65.4 of M 78.1 / 66.3 of 78.1 / 66.3 of _b Return Air Ducts ra ures at Time of Go 61.4 l 60.1 of Supply Fan. 'Cooling'Coil 2000 cfm �. Return Air Ducts Y Supply Air Ducts 62.2/60.4 of 62.9% R.H. ROOMS 74.0/65.2 of EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page: 52 of 69 J `IVAC SYSTEM HEATING AND COOLING LOADS SUMMARY 0 -... PROJECT NAME DATE The Plaza, Buildings A & B, Pointe Happy 4/2/04 YSTEM NAME FLOOR AREA HVAC -B2 1,112 Number of Systems Heating System Output per System Total Output (Btuh) Output (Btuh/sgft) Cooling System Output per System Total Output. (Btuh) Total Output (Tons) Total Output (Btuh/sgft) Total Output (sgftrron) Air Svstem CFM per System Airflow (cfm) Airflow (cfm/sgft) Airflow (cfm/Ton) Outside Air (%) Outside Air (cfm/sgft) Note: values above given at ARI conditions 26.0 OF Outside Ai 167 cfm 69.6 OF 12.0 /.77.9 OF .Outside Ai 167 cfm 74.4 /.66.3 OF 58,000 Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts 58,000 52.2 Latent 56,000 516,000 4.7 65.9 OF 65.9 of D A. Supply Fan 2000 cfm !0--51 TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM I Sensible Latent CFM I Sensible 1,42 16,908 5,076 606 18,980 2,000 0 34,130 845 949 0 0 167 6,671 65 167 7,731 72,275 0 0 845 949 25,357 5,727 28,609 c,uuu BDP CO.'661CJ060 32,249 19,498 38,145 2,000 10.0 kW Supplemental Electric 34,130 1.80 428.6 Total Adjusted System Output 32,249 19,498 72,275 8 3 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Aug 3 pm Jan 12 am 0.15 83.8 of 11 99.9 OF Heating Coil Aux. Heat Coil �% Return Air Ducts q m I emoeratures 77.6 167.4 of 77.6 / 67.4 °F. 62.4 / 61.6 OF % --- ul� -r- Supply Fan 2000 cfm Cooling Coil �. Return Air Ducts Y Supply Air Ducts 99.4 of ROOMS 70.0 OF Supply Air Ducts 62.8 / 61.7 of 66.9% R.H. ROOMS 74.0/66.2 of EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page: 53 of 69 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE The Plaza, Buildings A & B, Pointe Happy 4/2/04 SYSTEM NAME FLOOR AREA HVAC -B3 839 ENGINEERING CHECKS SYSTEM LOAD (Number of Systems 1 Heating System Output per System 47,000 Total Output (Btuh) 47,000 Output (Btuh/sgft) 56.0 Cooling System Output per System 46,000 Total Output (Btuh) 46,000 Total Output (Tons) 3.8 Total Output (Btuh/sgft) 54.8 Total Output (sgft/Ton) 218.9 Air System CFM per System 1,650 Airflow (cfm) 1,650 Airflow (cfm/sqft) 1.97 Airflow (cfmlron) 430.4 Outside Air (%) 7.6 Outside Air (cfm/sqft) 0.15 Note: values above aiven at ARI conditions 26.0 OF Outs 126 cfm 6915 OF 112.0 / 77.9 OF Outside 126 cfm 74.4 / 63.5 °F Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAKCOIL HTG. PEAK CFM Sensible Latent CFM I Sensible 797 13,333 3,830 583 17,301 0 667 865 0 0 126 5,038 1,667 126 5,827 0 0 667 865 19,710 5,497 24,858 HVAC EQUIPMENT SELECTION CARRIER 38YCCO48 33,967 6,758 .30,911 7.5 kW Supplemental Electric 25,598 Total Adjusted System Output 33,967 6,758 56,508 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Aug 3 pm Jan 12 am 66.2 OF 66.2 OF 83.8 °F 98.4 OF O Supply Fan Heating Coil Aux. Heat Coil 1650 cfm k Return Air Ducts t4 ng 77.3/64.8°F 77.3/64.8OF 57.9/56.9OF Supply Fan Cooling Coil 1650 cfm �% Return Air Ducts Y Supply Air Ducts 97.9 OF ROOMS 70.0 OF Supply Air Ducts 58.3 / 57.1 OF 56.3% R.H. ROOMS 74.0/63.4 OF 1 • EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page: 54 of 69 1 3 A HVAC SYSTEM HEATING AND"COOLING LOADS SUMMARY •PROJECT NAME DATE The Plaza, Buildings A & B, Pointe Happy 4/2/04 SYSTEM NAME FLOOR AREA HVAC -B4 1,112 Number of Systems Heati rig System Output per System Total Output (Btuh) Output (Btuh/sqft) Cooling System Output per System Total Output (Btuh) Total Output (Tons) Total Output (Btuh/sgft) Total Output (sgft/Ton) Air System CFM per System Airflow (cfm) Airflow (cfm/sgft) Airflow (cfmrron) Outside Air (%) Outside Air (cfm/sqft) Note: values above given at ARI conditions 47,000 Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD 47,000 42.3 Latent 46,000 46,000 3.8 41.4 290.1 COIL COOLING PEAK COIL HTG. PEAK CFM Sensible Latent CFM I Sensible 1,067 18,358 3,929 668 18,980 35,997 0 1,650 7.5 kW Supplemental Electric 918 949 0 0 167 5,765 353 167 7,715 Total Adjusted System Output 35,997 5,484 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK F Sep 3 pm 0 0 918 949 25,959 4,282 28,592 1,650 30,911 CARRIER 38YCCO48 35,997 5,484 1,650 7.5 kW Supplemental Electric 25,598 1.48 430.4 Total Adjusted System Output 35,997 5,484 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK F Sep 3 pm 56,508 A0.15 Jan 12 am HLA I INU JYJ I tM PJYGHKUMt I KIGJ (Airstream I emperatures at Time of Heating Peak) 26.0 OF 65.1 of 65.1 OF 82.7 of 97.2 OF 0 Supply Air Ducts Outside Air • 167 cfm 96.7 of Supply Fan Heating Coil Aux. Heat Coil 1650 cfm ROOMS 69.5 OF 70.0 °F �, Return Air Ducts V 107.0 / 73.6 of 77.8 / 64.3 of 77.8 164.3 of 57.3 / 56.2 of Supply Air Ducts Outside Air' 167 cfm Supply Fan Cooling Coil 57.8 / 56.4 of 1650 cfm 54.9% R.H. ROOMS 74.5163.2 of 74.0163.0 OF Return Air Ducts EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page: 55 of 99 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE • The Plaza, Buildings A & B, Pointe Happy 4/2/04 r YSTEM NAME FLOOR AREA HVAC -B5 1,027 Number of Systems Heating System Output per System Total Output (Btuh) Output(Btuh/sqft) Cooling System Output per System Total Output (Btuh) Total Output (Tons) Total Output (Btuh/sgft) Total Output (sgft/Ton) Air System CFM per System Airflow (cfm) Airflow (cfm/sqft) Airflow (cfm/Ton) Outside Air (%) Outside Air (cfm/sgft) Note: values above given at ARI conditions 26.0 of 65.4 of Outside Air Q..; 154.cfm Supply Fan 1650 cfm 69.5 9F 107.0 / 73.6 of Outside Air 154 cfm •74.6/63.0 °F 47,000 Total Room Loads 47,000 Return Vented Lighting 45.8 Return Air Ducts. Return Fan 46,000 Ventilation 46,000 Supply Fan 3.8 Supply Air Ducts COIL COOLING PEAK COIL HTG. PEAK CFM Sensible Latent CFM I Sensible 1,14 19,891 3,629 650 18,722 36,074 0 30,911 995 936 0 0 154 5,317 423 154 7,126 0 . ' Total Adjusted System Output 36,074 5,243 (Adjusted for Peak Design Conditions) TIME. OF SYSTEM PEAK Sep 3 pm 0 995 936 44. TOTAL SYSTEM LOAD 27,198 4,052 27,720 267.9 'CR.J tAirsiream I emperazures az I Ime or rteazfng 65.4 °F 83.0 of 97.6 OF Heating Coil Aux: Heat Coil Return Air Ducts F Irs ream Temperatures at Time ot cooling 77.6 / 64.1 of 77.6 / 64.1°F, ■ 57.1 / 56.0 OF: Supply Fan Cooling Coil 1650 cfm. Supply Air Ducts 97.1 OF ROOMS 70.0 of Supply Air Ducts 57.6 / 56.2 of 54.2% R.H. ROOMS 74.0 ! 62.8 of Return Air Ducts EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page: 56 of 69 HVAC EQUIPMENT SELECTION 1,650 CARRIER 38YCCO48 36,074 5,243 30,911 1,650 7.5 kW Supplemental Electric 25,598 1.61 430.4 . ' Total Adjusted System Output 36,074 5,243 (Adjusted for Peak Design Conditions) TIME. OF SYSTEM PEAK Sep 3 pm 56,508 •9 3 0.15 Jan 12 am 'CR.J tAirsiream I emperazures az I Ime or rteazfng 65.4 °F 83.0 of 97.6 OF Heating Coil Aux: Heat Coil Return Air Ducts F Irs ream Temperatures at Time ot cooling 77.6 / 64.1 of 77.6 / 64.1°F, ■ 57.1 / 56.0 OF: Supply Fan Cooling Coil 1650 cfm. Supply Air Ducts 97.1 OF ROOMS 70.0 of Supply Air Ducts 57.6 / 56.2 of 54.2% R.H. ROOMS 74.0 ! 62.8 of Return Air Ducts EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page: 56 of 69 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY .PROJECT NAME The Plaza, Buildings A & B, Pointe Happy DATE 4/2/04 SYSTEM NAME HVAC -B6 FLOOR AREA 1,027 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL COOLING PEAK COIL HTG. PEAK CFM Sensible Latent CFM I Sensible Total Room Loads 896 14,090 4,688 606 17,498 Return Vented Lighting 0 Return Air Ducts 705 875 Return Fan 0 0 Ventilation 154 6,159 1,709 154 7,132 Supply Fan 0 0 Supply Air Ducts 705 875 TOTAL SYSTEM LOAD 21,7581 6,398 26,379 Heating System Output per System 47,000 Total Output (Btuh) 47,000 Output (Btuh/sgft) 45.8 Cooling System Output per System 46,000 Total Output (Btuh) 46,000 Total Output (Tons) 3.8 Total Output (Btuh/sqft) 44.8 Total Output (sgft/Ton) 267.9 Air System HVAC EQUIPMENT SELECTION CFM per System 1,650 CARRIER 38YCCO48 33,625 7,678 • 30,911 Airflow (cfm) 1,650 7.5 kW Supplemental Electric 25,598 Airflow (cfm/sgft) 1.61 Airflow (cfm/Ton) 430.4 Total Adjusted System Output (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK 33,625 7,678 Aug 3 pm 56,508 ( ) Outside Air• % 9'3 Outside Air (cfm/sgft) 0.15 Jan 12 am Note: values above given at ARI conditions (Airstream Temperatures at Time of Heating ea 26.0 OF 65.4 of 65.4 of 83.0 OF 97.6 OF Outside Aii• � O ' 154 cfm - Supply Fan Heating Coil Aux. Heat Coil 1650 cfm 69.5 OF Return Air Ducts Supply Air Ducts g7.1 °F ROOMS 70.0 °F COOLING SYSTEM PSYCH] (Airstream Temperatures at I ime of Cooling ea 112.0/71.9 OF 77.9/65.6 OF 77.9/65.6 OF 58.8/57.8 OF Outside Air 154 cfm Supply.Fan Cooling Coil 1650 cfm 74:4 / 64, 2 °F Return Air Ducts . Supply Air Ducts 59.2158.0 OF 58.7% R.H. ROOMS 74.0 / 64.1 of I EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page: 57 of 69 -IVAC SYSTEM HEATING AND COOLING LOADS SUMMARY •PROJECT NAME DATE The Plaza, Buildings A & B, Pointe Happy 4/2/04 SYSTEM NAME FLOOR AREA HVAC -B7 1,370 Number of Systems Heating System Output per System Total Output (Btuh) Output (Btuh/sgft) Cooling System Output per System Total Output (Btuh) Total Output (Tons) Total Output (Btuh/sgft) Total Output (sgft/Ton) Air System CFM per System Airflow (cfm) Airflow (cfm/sgft) Airflow (cfm/Ton) Outside Air (%) butside Air (cfm/sgft) Note: values above given at ARI conditions 26.0 of Outside Ai 206 cfm 69.5 OF COIL COOLING PEAK COIL HTG. PEAK CFM Sensible Latent CFM I Sensible 58,000 Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD 58,000 42.3 21,406 56,000 56,000 4.7 40.9 65.0 of 65.0 of Supply Fan 2000 cfm 1,740 22,624 4184 706 21,406 38,145 0 10.0 kW Supplemental Electric 1,131 1,070 0 0 206 7,101 -1,014 206 9,513 72,275 0 0.15 0 1,131 1,070 31,987 3,827 33,060 m I emperatures at i 82.9 of w 99.0 OF Heating Coil Aux. Heat Coil k Return Air Ducts V res 07.0/73.6 OF 77.9/66.2 OF 77.9/66.2 OF . 61:3/60.1 OF 41' JW Outside Air 206 cfm Supply Fan 2000 cfm 74.5/65.3 of Cooling Coil S, Return Air Ducts q Supply Air Ducts 98.5 OF ROOMS 70.0 of Supply Air Ducts 61.8 / 60.3 of 62.9% R.H. ROOMS 74.0/65.2OF EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page: 58 of 69 BDP CO. 661CJ060 35,368 16,705 38,145 ,000 10.0 kW Supplemental Electric 34,130 1.46 28.6 Total Adjusted System Output 35,368 16,705 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Sep 3 pm 72,275 10.3 0.15 Jan 12 am m I emperatures at i 82.9 of w 99.0 OF Heating Coil Aux. Heat Coil k Return Air Ducts V res 07.0/73.6 OF 77.9/66.2 OF 77.9/66.2 OF . 61:3/60.1 OF 41' JW Outside Air 206 cfm Supply Fan 2000 cfm 74.5/65.3 of Cooling Coil S, Return Air Ducts q Supply Air Ducts 98.5 OF ROOMS 70.0 of Supply Air Ducts 61.8 / 60.3 of 62.9% R.H. ROOMS 74.0/65.2OF EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page: 58 of 69 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE 10 - The Plaza, Buildings A & B, Pointe Happy 4/2/04 SYSTEM NAME FLOOR AREA HVAC -B8 1,370 Number of Systems 2 Heating System Output per System 36,000 Total Output (Btuh) 72,000 Output (Btuh/sqft) 52.6 Cooling System Output per System 34,200 Total Output (Btuh) 68,400 Total Output (Tons) 5.7 Total Output (Btuh/sqft) 49.9 Total Output (sgft/Ton) 240.4 Air. System CFM per System 1,250 Airflow (cfm) 2,500 Airflow (cfm/sqft) 1.82 Airflow (cfmrron) 438.6 Outside Air (%) 20.0 Outside Air (cfm/sgft) 0.36 Note: values above given at ARI conditions .26.0 OF 60.9 OF Outside Air 0 500 cfm Supply Fan 2500 cfm 69.6 OF Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM Sensible Latent CFM I Sensible 1,839 20,973 6,254 731 21,406 0 1,049 1,070 0 0 500 19,994 1,919 500 23,199 0 0 1,049 1,070 43,230 8,173 46,746 CARRIER 38YCCO36 50,766 13,999 47,352 7.5 kW Supplemental Electric 51,195 Total Adjusted System Output 50,766 13,999 98,547 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Aug 3 pm Jan 12 am ream I empera ures at Time of Heating ea 60.9 OF 78.7 °F1197.9 OF Heating Coil Aux. Heat Coil S, Return Air Ducts V Supply Air Ducts 97.5 OF ROOMS 70.0 OF VUUM3 JTJ I ttV1 f JTW1KUlVIt I Klub (Airstream temperatures at time OT cooling veaK) 112.0/77.9 OF 81.9/68.9 OF 81.9/68.9 OF 62.9/61.8 OF O Supply Air Ducts Outside Air r 500• cfm Supply Fan Cooling Coil 63.3/61.9 °F 2500 cfm 66.9% R.H. ROOMS 74.4 /,66.3 of 74.0 166.2 OF �% Return Air Ducts q - I EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page: 59 of 69 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY NAME The Plaza, Buildings A & B, Pointe Happy AME HVAC -B9 Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD DATE 4/2/04 FLOOR AREA 1,211 COIL COOLING PEAK COIL HTG. PEAK CFM Sensible Latent CFM Sensible 1,624 21,592 4,279 674 20,825 0 Airflow (cfm) 1,080 1,041 0 0 182 6,281 -803 182 8,411 0 0 1,080 1,041 30,032 .3,476 31,319 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page:60 of 69 2,000 BDP. CO..661CJ060 35,028 16,836 38,145. Airflow (cfm) 1.65 10.0 kW Supplemental Electric 34,130 Airflow (cfm/sgft) (cfmrron) 428.6 9.1 Total Adjusted System Output 35,028 16,836 72,275 'Airflow Outside Air (%) (Adjusted for Peak Design Conditions) Outside Air (cfm/sgft) 0.15 given at ARI conditions TIME OF SYSTEM PEAK Sep 3 pm Jan 12 am Note: values above irs ream Temperatures at Time of Heating ea 26.0 of 65.6 of 65.6 of 83.5 of 99.5 OF Supply Air Ducts Outside Air 182 cfm 99.0 of Supply Fan Heating Coil Aux. Heat Coil 2000 cfm ROOMS 69.5 of 70.0 OF Return Air Ducts COOLING SYSTEM PSYCHRUMETRICS (Airstream Temperatures at I ime of Cooling Pe7a 107.0 173.6 OF 77.5 / 66.0 OF 77.5 / 66.0 OF 61.0 / 59.9 OF Jow Outside Air Supply Air Ducts 182 cfm Supply Fan Cooling Coil 61.5 60.1 of 2000 cfm 62.3% R.H. ROOMS 74.5/65. . 2 of 'I 74.0 / 65.0 of Return Air Ducts EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page:60 of 69 HVAC' SYSTEM HEATING AND COOLING LOADS SUMMARY •PROJECT NAME DATE The Plaza, Buildings A & B, Pointe Happy 4/2/04 7 SYSTEM NAME FLOOR AREA HVAC -B10 730 Number of Systems Heating System Output per System Total Output (Btuh) Output (Btuh/sqft) Cooling System '.Output per System Total Output (Btuh) Total Output (Tons) Total Output (Btuh/sqft) Total Output (sgft/Ton) Air System . CFM per System Airflow (cfm) Airflow (cfm/sqft) Airflow (cfm/Ton) Outside Air (%) .Outside Air (cfm/sqft) Note: values above given at ARI conditions 26.0 OF Outside -A 110 cfm 69.7 OF E� 1 1 57,000 Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD 57,000 78.1 Latent 57,500 57,500 4.8 78.8 152.3 67.3 OF COIL COOLING PEAK COIL HTG. PEAK CFMSensible 876 Latent CFM I Sensible 1,242 22,337 3,334 876 13,589 0 1,117 679 0 0 110 4,2481,79 110 5,090 0 0 1,117 679 28,837 5,125 20,038 HVAC EQUIPMENT SELECTION 2,000 2,000 CARRIER 50JS0603 42,471 7,711 37,488 2.74 417.4 5.5 Total Adjusted System Output 42,471 7,711 37,488 (Adjusted for Peak Design Conditions) 0.15 TIME OF SYSTEM PEAK Aug 4 pm Jan 12 am Mrs ream I emoera ures at Time of Heatina ea 84.9 of Heating Coil. Supply Fan 2000 cfm 84.9 OF Supply Air Ducts 84.6 OF ROOMS 70.0 OF k Return Air Ducts V VVLINU .IT01 tIV1 YJTGI'1KVIVIC I KIGJ (Airstream I emperatures at 1 Ime OT cooling real() 111.0%77.6 OF 76.5/63.6 OF 56.6/55.5 OF 56.6/55.5 OF Supply Air Ducts Outside Air 110 cfm Cooling Coil Supply Fan 57.1 / 55.8 OF 2000 cfm 52.8% R.H. ROOMS 74.5 / 62.6 of 74.0 / 62.4 OF Return Air Ducts EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page:61 of 69 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY &ROJECT NAME DATE The Plaza, Buildings A & B, Pointe Happy 4/2/04 SYSTEM NAME FLOOR AREA HVAC -B11 1,539 Number of Systems Heating System Output per System Total Output (Btuh) 'Output (Btuh/sgft) Cooling System Output per System Total Output (Btuh) Total Output (Tons) Total Output (Btuh/sqft) Total Output (sqf tion) Air System CFM per System Airflow (cfm) Airflow (cfm/sqft) Airflow (cfm/Ton) Outside Air (%) Outside Air (cfm/sqft) Note: values above given at ARI conditions 2 ,000 Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD ,000 45.5. Latent ,000 ,000 5.8 45.5 COIL COOLING PEAK COIL HTG. PEAK CFM Sensible Latent CFM I Sensible 1,668 27,998 7,025 1,381 19,223 0 1,400 961 0 0 23 9,201 3,029 231 10,717 0 0 1,400 961 39,998 10,055 HVAC EQUIPMENT SELECTION 1,200 2,400 CARRIER.50JS0363 52,274 10,105 1.56 411.4 9.6 Total Adjusted System Output 52,274 10,105 (Adjusted for Peak Design Conditions) 0.15 TIME OF SYSTEM PEAK Aug 3 pm 26.0 of - 65.4 OF Ia . 83.5 of Outside E 231 cfm 69.6 12.0 / 77.9 of Outside A '231 cfm 74.5/63.6 of • E , Heating Coil 83.5 of Supply Fan 2400 cfm �, Return Air Ducts V 78.2/65.2OF ■ 57.7/56.7OF Cooling Coil 31,863 46,037 46,037 Jan 12 am Supply Air Ducts 83.1 of ROOMS 70.0 OF 57.7 / 56.7 of Supply Air Ducts Supply Fan 58.2 / 56.9 of 2400 cfm 56.4% R.H. ROOMS 74.0 / 63.4 of Return Air Ducts I J EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page:62 of 69 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY •PROJECT NAME DATE The Plaza, Buildings A & B, Pointe Happy 4/2/04 SYSTEM NAME FLOOR AREA HVAC -B12 1,476 ENGINEERING CHECKS 11SYSTEM LOAD Number of Systems 2 Heating System Output per System 35,000 Total Output (Btuh) 70,000 Output (Btuh/sqft) 47.4 Cooling System Output per System 35,000 Total Output (Btuh) 70,000 Total Output (Tons) 5.8 Total Output (Btuh/sqft) 47.4 Total Output (sgftrron) 253.0 Air System CFM per System 1,200 Airflow (cfm) 2,400 Airflow (cfm/sqft) 1.63 Airflow (cfmrron) 411.4 Outside Air (%) 9.2 Outside Air (cfm/sgft) 0.15 Note: values above given at ARI conditions 26.0 of Outside Ai 221 cfm 69.6 OF 12.0 / 77.9 OF ) ;0 Outside Air '221 cfm •174.5 / 63.5 of E. a ag a of Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM Sensible Latent CFM Sensible 1,610 27,397 6,738 1,334 18,823 0 1,370 941 0 0 22 8,827 3,015 221 10,280 0 0 1,370 941 38,964 9,753 30,986 HVAC EQUIPMENT SELECTION CARRIER 50JS0363 52,408 9,768 46,037 Total Adjusted System Output 52,408 9,768 46,037 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK F Aug 3 pm Jan 12 am earn I emoera ures at Time of Heatinci ea Heating Coil 83.6 of 83.6 of OSupply Air Ducts • Supply Fan 83.3 OF 2400 cfm ROOMS 70.0 of Return Air Ducts 78.0 / 65.0 of 57.5 / 56.5 of 57.5 / 56.5 of OSupply Air Ducts • Cooling Coil Supply Fan 58.0 / 56.7 of 2400 cfm 55.9% R.H. ROOMS 74.0 / 63.3 of Return Air Ducts EnergyPro 3.1 By EnergySoft User Number: .5533 Job Number: Page:63 of 69 1 a Y, iVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE The Plaza, Buildings A &.B, Pointe Happy 412104 SYSTEM NAME FLOOR AREA HVAC -B13 1,022 Number of Systems Heating System Output per System Total Output (Btuh) Output (Btuh/sqft) Cooling System Output per System Total Output (Btuh) Total Output (Tons) Total Output (Btuh/sqft) Total Output (sgft/Ton) Air System CFM per System Airflow (cfm) Airflow (cfm/sgft) Airflow (cfm/Ton) Outside Air (%) Outside Air (cfm/sqft) Note: values above given at ARI conditions 57,000 Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts 57,000 55.8 Latent 57,500 57,500 4.8 TOTAL SYSTEM LOAD 2,000 COIL COOLING PEAK COIL HTG. PEAK CFM Sensible Latent CFM Sensible 1,266 21,073 4,665 1,025 14,810 0 1.96 1,054 740 0 0 153 6,119 2,045 1 153 7,122 0.15 0 0 1,054 740 29,300 6,710 2,000 CARRIER 50JS0603 41,5251 9,392 1.96 417.4 Total Adjusted System Output (Adjusted for Peak Design Conditions) I - TIME OF SYSTEM PEAK 41,525 9,392 Aug 3 pm 7.7 0.15 23,412 37,488 37,488 Jan 12 am to I INU 5Y5 I tM F5Yk;HKVMt I Klt;b (Airstream t emperatures at I Ime of Heating I-eaK) 26.0 of 66.3 OF 83.9 of 83.9 of O Supply Air Ducts Outside Air • 153 cfm Heating Coil Supply Fan 83.6 OF 2000 cfm ROOMS 69.7 OF 70.0 °F 12.0 / 77.9 of Outside Air 153 cfm 74.5/63.5 of k Return Air Ducts 14 77.4 / 64.8 OF 57.9 / 56.9 of 57.9 / 56.9 of O Supply Air Ducts • Cooling Coil Supply Fan 58.4 / 57.1 of 2000 cfm 56.2% R.H. ROOMS 74.0 / 63.4 of �% Return Air Ducts Y EnergyPro 3.1 By EnergySoft User Number. 5533 Job Number: Page:=4.69 AVAC SYSTEM HEATING AND COOLING LOADS SUMMARY 4130JECT NAME DATE The Plaza, Buildings A & B, Pointe Happy 4/2/04 SYSTEM NAME FLOOR AREA HVAC -B14 1,022 Number of Systems Heating System Output per System Total Output (Btuh) Output(Btuh/sgft) Cooling System Output per System Total Output (Btuh) Total Output (Tons) Total Output (Btuh/sgft) Total Output (sgft/Ton) Air System CFM per System Airflow (cfm) Airflow (cfm/sgft) Airflow (cfm/Ton) Outside Air (%) Outside Air (cfm/sqft) Note: values above given at ARI conditions 26.0 OF Outside 153 cfm 69.7 OF 12.0 / 77.9 OF Outside Air 153 cfm • 74.5 / 63.5 OF 1 COIL COOLING PEAK COIL HTG. PEAK CFM Sensible Latent CFM I Sensible 66.3 OF HVAC EQUIPMENT SELECTION 2,000 2,000 CARRIER 50JS0603 41,525 9,392 1.96 417.4 7.7 Total Adjusted System Output 41,525 9,392 (Adjusted for Peak Design Conditions) 0.15 TIME OF SYSTEM PEAK Aug 3 pm Heating Coil 83.9 OF 83.9 OF 0 Supply Fan 2000 cfm Return Air Ducts E res at Time of Coolini 77.4 / 64.8 OF 57.9 / 56.9 OF 37,488 37,488 Jan 12 am Supply Air Ducts 83.6 OF ROOMS 70.0 OF 57.9 / 56.9 of -� Supply Air Ducts Cooling Coil Supply Fan 58.4 / 57.1 °F 2000 cfm 56.2% R.H. ROOMS 74.0/63.4 of ', Return Air Ducts %4 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page:65 of 69 57,000 Total Room Loads 1,266 21,073 4,665 1,025 14,810 57,000 Return Vented Lighting 0 55.8 Return Air Ducts 1,054 740 Return Fan . 0 0 57,500 Ventilation 153 6,119 2,045 153 7,122 57,500 Supply Fan 0 0 4,8 Supply Air Ducts 1,054 740 56.3 TOTAL SYSTEM LOAD 29,300 6,710 23,412 213.3 66.3 OF HVAC EQUIPMENT SELECTION 2,000 2,000 CARRIER 50JS0603 41,525 9,392 1.96 417.4 7.7 Total Adjusted System Output 41,525 9,392 (Adjusted for Peak Design Conditions) 0.15 TIME OF SYSTEM PEAK Aug 3 pm Heating Coil 83.9 OF 83.9 OF 0 Supply Fan 2000 cfm Return Air Ducts E res at Time of Coolini 77.4 / 64.8 OF 57.9 / 56.9 OF 37,488 37,488 Jan 12 am Supply Air Ducts 83.6 OF ROOMS 70.0 OF 57.9 / 56.9 of -� Supply Air Ducts Cooling Coil Supply Fan 58.4 / 57.1 °F 2000 cfm 56.2% R.H. ROOMS 74.0/63.4 of ', Return Air Ducts %4 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page:65 of 69 -IVAC SYSTEM HEATING AND COOLING LOADS SUMMARY .PROJECT NAME DATE The Plaza, Buildings A & B, Pointe Happy 4/2/04 SYSTEM NAME FLOOR AREA HVAC -B15 1,285 Number of Systems 2 Heating System Output per System 35,000 Total Output (Btuh) 70,000 Output (Btuh/sgft) 54.5 Cooling System Output per System 35,000 Total Output (Btuh) 70,000 Total Output (Tons) 5.8 Total Output (Btuh/sgft) 54.5 Total Output (sgft/Ton) 220.3 Air System CFM per System 1,200 Airflow (cfm) 2,400 Airflow (cfm/sgft) 1.87 Airflow (cfm/Ton) 411.4 Outside Air (%) 8.0 Outside Air (cfm/sgft) 0.15 Note: values above given at ARI conditions 26.0 OF Outside E 193.cfm 69.7 OF Total Room Loads Return Vented Lighting Return Air Ducts. Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK IICOILHTG.PEAK 6 FMSensiblel 1,154 Latent I I CFM I Sensible 1,375 24,459 5,866 1,154 17,015 0 1,223 851 0 0 193 7,697 2,924 193 8,957 0 0 1,223 851 34,60 8,790 27,674 CARRIER SOJS0363 52,845 8,687 46,037 Total Adjusted System Output 52,845 8,687 46,037 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Aug 3 pm Jan 12 am rows (Airsiream i eml 66.2 OF Heating Coil 84.2 of Supply Fan 2400 cfm li. Return Air Ducts ;4 res 12.0/77.9OF - 77.5/64.30F,. 56.8/55.80F 56.8/55.8OF Outside Air 193 cfm • 74.5'/ 63.0 °F Cooling Coil Supply Air Ducts 83.9 OF ROOMS 70.0 OF SlArD Ouppy r ucts • Supply Fan 57.3 / 56.0 of 2400 cfm. 54.1% R.H. ROOMS 74.0 162.8 of �, Return Air Ducts Y EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page:66 of 69 f. 4 (HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY I •PROJECT NAME DATE The Plaza, Buildings A & B, Pointe Happy 4/2/04 SYSTEM NAME FLOOR AREA HVAC -B16 1,285 (Number of Systems Heating System Output per System Total Output (Btuh) Output (Btuh/sqft) Cooling System Output per System Total Output (Btuh) Total Output (Tons) Total Output (Btuh/sqft) Total Output (sgftrron) Air System CFM per System Airflow (cfm) Airflow (cfm/sqft) I Airflow (cfm/Ton) Outside Air (%) Outside Air (cfm/sqft) Note: values above given at ARI conditions 26.0 OF Out'—?_side A 193 cfm 69.7 OF 12.0 / i7.9 of ) . A Outside Air 193 cfm 74.5 / 63.0 °F 2 35,000 Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts 70,000 54.5 Latent 35,000 70,000 5.8 66.2 of nII TOTAL'SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM Sensible Latent CFM I Sensible 1,375 24,459 5,866 1,154 17,015 0 1,223 851 0 0 193 7,697 2,924 193 8,957 0 0 1,223 851 34,60 8,790 27,674 HVAC EQUIPMENT SELECTION 1,200 2,400 CARRIER 50JS0363 52,845 8,687 46,037 1.87 411.4 8.0 Total Adjusted System Output 52,845 8,687 46,037 (Adjusted for Peak Design Conditions) 0.15 TIME OF SYSTEM PEAK Aug 3 pm Jan 12 am Heating Coil 84.2 OF Supply Fan 2400 cfm 84.2 of -� Supply Air Ducts 83.9 of ROOMS 70.0 of k Return Air Ducts t4 res ng 77.5/64.30F . 56.8/55.80F 56.8/55.8 OF S I A' D t Cooling Coil 7�!f�� r) upp y it uc s Supply Fan 57.3/56 . 0 OF 2400 cfm 54.1% R.H. ROOMS. 74.0/62.8 of Return Air Ducts EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page: 67 of 69 r' 40 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY ROJECT NAME DATE The Plaza, Buildings A & B, Pointe Happy 412/04 71 YSTEM NAME FLOOR AREA HVAC -B17 1,037 Number of Systems T77772 Heating System Output per System 35,000 Total Output (Btuh) 70,000 Output (Btuh/sqft) 67.5 Cooling System Output per System 35,000 Total Output (Btuh) 70,000 Total Output (Tons) 5.8 Total Output (Btuh/sqft) 67.5 Total Output (sgft/Ton) 177.8 Air System CFM per System Airflow (cfm) Airflow (cfm/sgft) Airflow (cfm/Ton) Outside Air (%) Outside Air (cfm/sqft) Note: values above given at ARI conditions 26.0 of Outside 1 156 cfm 69.7 OF 1,200 Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM I Sensible Latent I CFM I Sensible 1,361 25,426 4,734 1,118 17,268 2400 cfm 0 74.0 / 62.2 of 1,271 863 0 0 156 6,208 2,665 156 7,228 0 0 1,271 863 34,177 7,399 2,400 CARRIER 50JS0363 53,5831 7,142 Cooling Coil Supply Fan 56.4 / 55.1 of 2400 cfm 2.31 74.0 / 62.2 of 411.4 Total Adjusted System Output (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK 53,583 7,142 Aug 3 pm 6.5 0.15 66.8 of 84.9 of Heating Coil 26,223 46,037 46,037 Jan 12 ann 84.9 of O Supply Air Ducts • Supply Fan 84.5 of 2400 cfm ROOMS 70.0 of Return Air Ducts < I me of t;ooung 112.0/77.9OF 76.9/63.5OF 55.9/54.9OF 55.9/54.9OF Supply Air Ducts Outside A 156'cfm /62.4 of �, Return Air Ducts 114 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page: 68 of 69 Cooling Coil Supply Fan 56.4 / 55.1 of 2400 cfm 51.9% R.H. ROOMS 74.0 / 62.2 of �, Return Air Ducts 114 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page: 68 of 69 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY OJECT NAME DATE The Plaza, Buildings A & B, Pointe Happy 4/2/04 YSTEM NAME FLOOR AREA HVAC -B18 153 ENGINEERING CHECKS 11SYSTEM LOAD Number of Systems 1 Heating System Output per System 23,600 Total Output (Btuh) 23,600 Output (Btuh/sqft) 154.2 Cooling System Output per System 2 Total Output (Btuh) 2 Total Output (Tons) Total Output (Btuh/sqft) Total Output (sgft/Ton) Air System CFM per System Airflow (cfm) Airflow (cfm/sgft) Airflow (cfm/Ton) ' Outside Air (%) Outside Air (cfm/sqft) Note: values above given at ARI conditions EATING SYSTEM P5YGHRUffETR= 26.0 of 67.0 of Outside Air 51. cfm 69.8 9F Total Room Loads Return Vented Lighting Return Air Ducts Return Fan 4,000 Ventilation 4,000 Supply Fan 2.0 Supply Air Ducts 156.9 TOTAL SYSTEM LOAD 76.5 HVAC EQUIPMENT SELE 800 COIL COOLING PEAK COIL HTG. PEAK CFM Sensible Latent I CFM Sensible 195 3,521 1,09 188 3,010 0 176 151 0 0 5 2,051 828 51 2,379 0 0 176 151 5,924 1,9191 5,690 800 CARRIER 50JS0243 16,869 4,000 15,521 5.23 400.0 6.4 Total Adjusted System Output 16,869 4,000 15,521 (Adjusted for Peak Design Conditions) 0.33 1TIME OF SYSTEM PEAK Aug 3 pm Jan 12 am Heating Coil 85.3 of 85.3 of O Supply Air Ducts • Supply Fan 85.1 of 800 cfm ROOMS 70.0 of Return Air Ducts (Airstream Temperatures at Time of Cooling ea 12.0 / 77.9 OF 76.6 / 63.7 OF 56.8155.8 OF 56.8 / 55.8 OF O Supply Air01 Ducts Outside Air • 51 cfm Cooling Coil Supply Fan 57.0 / 55.9 of 800 cfm 52.9% R.H. ROOMS 74.2 / 62.5 of 74.0/62.5 OF Return Air Ducts I EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page:69 of 69