2019-08-13 thru 2019-10-04 The Wave Email CorrespondenceFrom:Vann, Nicole
To:Cheri Flores
Cc:Brizuela, Christopher
Subject:2553 Andalusia West - The Wave [2553-MSA1.NRzf]
Date:Friday, October 04, 2019 9:18:18 AM
EXTERNAL: This message originated outside of the City of La Quinta. Please use proper judgement and caution
when opening attachments, clicking links or responding to requests for information. **
Good morning Cherie,
I have a quick question about the landscape plan the City would like to see as
part of the TTM submittal for the Wave project. Can we provide a conceptual
landscape plan for just the project’s public frontage and if so, would you want to
see a plan for the whole frontage or can we do typicals? We are just trying to
ascertain the level of detail that will need to be provided at this stage.
Thank you for your help.
Nicole Vann
Planner
MSA CONSULTING, INC.
34200 Bob Hope Drive | Rancho Mirage, CA 92270
office 760.320.9811
website |map |email
From:Steve Libring
To:Vann, Nicole
Cc:John Kain;Marlie Whiteman;Cheri Flores;Bryan McKinney
Subject:Fw: Wave at Coral Mountain TIA Scope
Date:Monday, August 26, 2019 3:35:15 PM
Attachments:image007.png
12615-02 Scope (2019.08.13)_planning notes.pdf
EXTERNAL: This message originated outside of the City of La Quinta. Please use proper judgement and caution
when opening attachments, clicking links or responding to requests for information. **
Nicole here are our comments on the scoping and some related issues
From: Cheri Flores <clflores@laquintaca.gov>
Sent: Monday, August 26, 2019 9:41 AM
To: Steve Libring <SLibring@willdan.com>; Bryan McKinney <Bmckinney@laquintaca.gov>
Subject: RE: Wave at Coral Mountain TIA Scope
Cheri's notes regarding the cumulative projects is in the attached pdf.
I saw possible bust in distribution pattern where 15% WB on Ave 54 becomes 5%w/o
Jefferson ( which is a cul-de-sac ). I think with 25 % or so headed toward the roundabout and
Jefferson/Ave 50, we should add those 3 intersections along Jefferson to the list ( Jefferson /
52, Jefferson / Pomello, and Jefferson / 50 )
They also make a statement that all CIP, DIF & TUMF improvement projects are assumed to
be in place by opening year. I suspect we have little or none in the way of improvements in the
coming years in that area, so don't know if you are doing capacity analysis and LOS, if you are
assuming the existing roadway configurations and lanes, or some future planned roadway
configurations?
The project should be widening the Avenue 58 frontage, widen the EB Avenue 58toadda
2nd EB left turn lane, and paying for a signal or portion of signal as appropriate.
From: Janette Cachola <JCachola@urbanxroads.com>
Sent: Tuesday, August 13, 2019 6:02 PM
To: Steve Libring <SLibring@willdan.com>
Cc: Bryan McKinney <bmckinney@laquintaca.gov>; Rowe, Mike <mrowe@msaconsultinginc.com>;
Vann, Nicole <nvann@msaconsultinginc.com>; Herrera-Cortes, Jesus <jherrera-
cortes@msaconsultinginc.com>; Depalatis, Paul <pdepalatis@msaconsultinginc.com>; Rowe, Allison
arowe@msaconsultinginc.com>; Garrett Simon <gsimon@meriwetherco.com>; Marlie Whiteman
mwhiteman@urbanxroads.com>; John Kain <jkain@urbanxroads.com>; Haseeb Qureshi
hqureshi@urbanxroads.com>
Subject: Wave at Coral Mountain TIA Scope
The scoping agreement for the Wave at Coral Mountain traffic impact analysis is attached for
your review/approval.
Please also provide the signal timing worksheets for existing signal locations within the study
area, which include the following intersections:
Madison St. / Airport Blvd.
Monroe St. / 50th Avenue
Please don’t hesitate to contact us with any questions or concerns.
JANETTE CACHOLA
Analyst
949) 336-5989 Direct
urbanxroads.com
Ofc: 1001 Dove St., #260, Newport Beach CA 92660
Main: 260 E. Baker St., #200, Costa Mesa CA 92626
From:Steve Libring
To:Cheri Flores
Subject:Fw: Wave at Coral Mountain TIA Scope
Date:Thursday, September 05, 2019 12:47:51 PM
Attachments:image002.png
12615-02 Scope (2019.09.04).pdf
12615-02 Scope.docx
EXTERNAL: This message originated outside of the City of La Quinta. Please use proper judgement and caution
when opening attachments, clicking links or responding to requests for information. **
Cheri, it looks like they addressed traffic concerns we mentioned last time, but can you check
the cumulative list, and will you be responding back to them or awaiting others to comment?
I'll be at office Monday if there is any need to discuss.
From: Janette Cachola <JCachola@urbanxroads.com>
Sent: Wednesday, September 4, 2019 5:40 PM
To: Steve Libring <SLibring@willdan.com>; Cheri Flores <clflores@laquintaca.gov>; Bryan McKinney
Bmckinney@laquintaca.gov>
Cc: Vann, Nicole <nvann@msaconsultinginc.com>; Garrett Simon <gsimon@meriwetherco.com>;
Rowe, Mike <mrowe@msaconsultinginc.com>; John Kain <jkain@urbanxroads.com>; Marlie
Whiteman <mwhiteman@urbanxroads.com>; Haseeb Qureshi <hqureshi@urbanxroads.com>
Subject: RE: Wave at Coral Mountain TIA Scope
Pursuant to comments received on August 26th, the attached Wave at Coral Mountain TIA Scope has
been revised. A word doc of the text in track changes mode is also attached so that edits can be
more easily reviewed.
Exhibits 2, 3, 5, and 6 have been modified to include 3 additional intersections, as requested. Table
3 and Exhibit 7 have also been updated to reflect adjustments to the Cumulative Project list.
Please review and approve or send additional comments as soon as possible. If you have any
questions, don’t hesitate to contact John Kain (949.336.5990), Marlie Whiteman (949.336.5991), or
myself (949.336.5989).
Sincerely,
JANETTE CACHOLA
Analyst
949) 336-5989 Direct
urbanxroads.com
Ofc: 1001 Dove St., #260, Newport Beach CA 92660
Main: 260 E. Baker St., #200, Costa Mesa CA 92626
From: Steve Libring [mailto:SLibring@willdan.com]
Sent: Monday, August 26, 2019 3:34 PM
To: Vann, Nicole
Cc: John Kain; Marlie Whiteman; Cheri Flores; Bryan McKinney
Subject: Fw: Wave at Coral Mountain TIA Scope
Nicole here are our comments on the scoping and some related issues
From: Cheri Flores <clflores@laquintaca.gov>
Sent: Monday, August 26, 2019 9:41 AM
To: Steve Libring <SLibring@willdan.com>; Bryan McKinney <Bmckinney@laquintaca.gov>
Subject: RE: Wave at Coral Mountain TIA Scope
Cheri's notes regarding the cumulative projects is in the attached pdf.
I saw possible bust in distribution pattern where 15% WB on Ave 54 becomes 5%w/o
Jefferson ( which is a cul-de-sac ). I think with 25 % or so headed toward the roundabout and
Jefferson/Ave 50, we should add those 3 intersections along Jefferson to the list ( Jefferson /
52, Jefferson / Pomello, and Jefferson / 50 )
They also make a statement that all CIP, DIF & TUMF improvement projects are assumed to
be in place by opening year. I suspect we have little or none in the way of improvements in the
coming years in that area, so don't know if you are doing capacity analysis and LOS, if you are
assuming the existing roadway configurations and lanes, or some future planned roadway
configurations?
The project should be widening the Avenue 58 frontage, widen the EB Avenue 58toadda
2nd EB left turn lane, and paying for a signal or portion of signal as appropriate.
From: Janette Cachola <JCachola@urbanxroads.com>
Sent: Tuesday, August 13, 2019 6:02 PM
To: Steve Libring <SLibring@willdan.com>
Cc: Bryan McKinney <bmckinney@laquintaca.gov>; Rowe, Mike <mrowe@msaconsultinginc.com>;
Vann, Nicole <nvann@msaconsultinginc.com>; Herrera-Cortes, Jesus <jherrera-
cortes@msaconsultinginc.com>; Depalatis, Paul <pdepalatis@msaconsultinginc.com>; Rowe, Allison
arowe@msaconsultinginc.com>; Garrett Simon <gsimon@meriwetherco.com>; Marlie Whiteman
mwhiteman@urbanxroads.com>; John Kain <jkain@urbanxroads.com>; Haseeb Qureshi
hqureshi@urbanxroads.com>
Subject: Wave at Coral Mountain TIA Scope
The scoping agreement for the Wave at Coral Mountain traffic impact analysis is attached for
your review/approval.
Please also provide the signal timing worksheets for existing signal locations within the study
area, which include the following intersections:
Madison St. / Airport Blvd.
Monroe St. / 50th Avenue
Please don’t hesitate to contact us with any questions or concerns.
JANETTE CACHOLA
Analyst
949) 336-5989 Direct
urbanxroads.com
Ofc: 1001 Dove St., #260, Newport Beach CA 92660
Main: 260 E. Baker St., #200, Costa Mesa CA 92626
From:Steve Libring
To:Bryan McKinney;Cheri Flores
Subject:Fw: Wave at Coral Mountain TIA Scope
Date:Thursday, August 15, 2019 12:47:21 PM
Attachments:image001.png
12615-02 Scope (2019.08.13).pdf
EXTERNAL: This message originated outside of the City of La Quinta. Please use proper judgement and caution
when opening attachments, clicking links or responding to requests for information. **
Bryan, Cheri:
You both have more history with this project, just wondering f you see any issues that need to
be specifically discussed now, before they start their analysis?
I saw possible bust in distribution pattern where 15% WB on Ave 54 becomes 5% w/o
Jefferson ( which is a cul-de-sac ). I think with 25 % or so headed toward the roundabout and
Jefferson/Ave 50, we should add those 3 intersections along Jefferson on their list ( Jefferson /
52, Jefferson / Pomello, and Jefferson / 50 )
They also make a statement that all CIP, DIF & TUMF improvement projects are assumed to be
in place by opening year. I suspect we have little or none in the way of improvements in the
coming years in that area, so don't know if when they are doing capacity analysis and LOS, if
they are assuming the existing roadway configurations and lanes, or some future planned
roadway configurations?
Your thoughts on all of the above?
From: Janette Cachola <JCachola@urbanxroads.com>
Sent: Tuesday, August 13, 2019 6:02 PM
To: Steve Libring <SLibring@willdan.com>
Cc: Bryan McKinney <bmckinney@laquintaca.gov>; Rowe, Mike <mrowe@msaconsultinginc.com>;
Vann, Nicole <nvann@msaconsultinginc.com>; Herrera-Cortes, Jesus <jherrera-
cortes@msaconsultinginc.com>; Depalatis, Paul <pdepalatis@msaconsultinginc.com>; Rowe, Allison
arowe@msaconsultinginc.com>; Garrett Simon <gsimon@meriwetherco.com>; Marlie Whiteman
mwhiteman@urbanxroads.com>; John Kain <jkain@urbanxroads.com>; Haseeb Qureshi
hqureshi@urbanxroads.com>
Subject: Wave at Coral Mountain TIA Scope
The scoping agreement for the Wave at Coral Mountain traffic impact analysis is attached for
your review/approval.
Please also provide the signal timing worksheets for existing signal locations within the study
area, which include the following intersections:
Madison St. / Airport Blvd.
Monroe St. / 50th Avenue
Please don’t hesitate to contact us with any questions or concerns.
JANETTE CACHOLA
Analyst
949) 336-5989 Direct
urbanxroads.com
Ofc: 1001 Dove St., #260, Newport Beach CA 92660
Main: 260 E. Baker St., #200, Costa Mesa CA 92626
From:Steve Libring
To:Bryan McKinney; Cheri Flores
Subject:Fw: Wave at Coral Mountain TIA Scope
Date:Thursday, August 15, 2019 12:47:21 PM
Attachments:image001.png
12615-02 Scope (2019.08.13).pdf
EXTERNAL: This message originated outside of the City of La Quinta. Please use proper judgement and caution
when opening attachments, clicking links or responding to requests for information. **
Bryan, Cheri:
You both have more history with this project, just wondering f you see any issues that need to
be specifically discussed now, before they start their analysis?
I saw possible bust in distribution pattern where 15% WB on Ave 54 becomes 5% w/o
Jefferson ( which is a cul-de-sac ). I think with 25 % or so headed toward the roundabout and
Jefferson/Ave 50, we should add those 3 intersections along Jefferson on their list ( Jefferson /
52, Jefferson / Pomello, and Jefferson / 50 )
They also make a statement that all CIP, DIF & TUMF improvement projects are assumed to be
in place by opening year. I suspect we have little or none in the way of improvements in the
coming years in that area, so don't know if when they are doing capacity analysis and LOS, if
they are assuming the existing roadway configurations and lanes, or some future planned
roadway configurations?
Your thoughts on all of the above?
From: Janette Cachola <JCachola@urbanxroads.com>
Sent: Tuesday, August 13, 2019 6:02 PM
To: Steve Libring <SLibring@willdan.com>
Cc: Bryan McKinney <bmckinney@laquintaca.gov>; Rowe, Mike <mrowe@msaconsultinginc.com>;
Vann, Nicole <nvann@msaconsultinginc.com>; Herrera-Cortes, Jesus <jherrera-
cortes@msaconsultinginc.com>; Depalatis, Paul <pdepalatis@msaconsultinginc.com>; Rowe, Allison
arowe@msaconsultinginc.com>; Garrett Simon <gsimon@meriwetherco.com>; Marlie Whiteman
mwhiteman@urbanxroads.com>; John Kain <jkain@urbanxroads.com>; Haseeb Qureshi
hqureshi@urbanxroads.com>
Subject: Wave at Coral Mountain TIA Scope
The scoping agreement for the Wave at Coral Mountain traffic impact analysis is attached for
your review/approval.
Please also provide the signal timing worksheets for existing signal locations within the study
area, which include the following intersections:
Madison St. / Airport Blvd.
Monroe St. / 50th Avenue
Please don’t hesitate to contact us with any questions or concerns.
JANETTE CACHOLA
Analyst
949) 336-5989 Direct
urbanxroads.com
Ofc: 1001 Dove St., #260, Newport Beach CA 92660
Main: 260 E. Baker St., #200, Costa Mesa CA 92626
From:Cheri Flores
To:Vann, Nicole
Cc:Brizuela, Christopher
Subject:RE: 2553 Andalusia West - The Wave [2553-MSA1.NRzf]
Date:Friday, October 04, 2019 3:46:47 PM
Attachments:image001.png
image002.png
image003.png
image004.png
image005.png
image006.png
HI Nicole
For the Landscape Plan, you may submit a conceptual plan. We’d like to have it
for the public frontage and any lettered lots. Will this be a large lot TTM?
Cheri L. Flores | Planning Manager
City of La Quinta
78495 Calle Tampico La Quinta, CA 92253
Ph. 760-777-7067
Website |Map
hwy111LQ.com
From:Vann, Nicole <nvann@msaconsultinginc.com>
Sent: Friday, October 04, 2019 9:18 AM
To: Cheri Flores <clflores@laquintaca.gov>
Cc: Brizuela, Christopher <cbrizuela@msaconsultinginc.com>
Subject: 2553 Andalusia West - The Wave [2553-MSA1.NRzf]
EXTERNAL: This message originated outside of the City of La Quinta. Please use proper judgement and caution
when opening attachments, clicking links or responding to requests for information. **
Good morning Cherie,
I have a quick question about the landscape plan the City would like to see as
part of the TTM submittal for the Wave project. Can we provide a conceptual
landscape plan for just the project’s public frontage and if so, would you want to
see a plan for the whole frontage or can we do typicals? We are just trying to
ascertain the level of detail that will need to be provided at this stage.
Thank you for your help.
Nicole Vann
Planner
MSA CONSULTING, INC.
34200 Bob Hope Drive | Rancho Mirage, CA 92270
office 760.320.9811
website |map |email
From:Rowe, Mike
To:Janette Cachola;Steve Libring;Cheri Flores;Bryan McKinney
Cc:Vann, Nicole;Garrett Simon;Rowe, Mike;John Kain;Marlie Whiteman;Haseeb Qureshi;Depalatis, Paul;Garrett
Simon
Subject:RE: Wave at Coral Mountain TIA Scope [2553-MSA1.NRzf]
Date:Friday, September 06, 2019 8:13:35 AM
Attachments:image001.png
EXTERNAL: This message originated outside of the City of La Quinta. Please use proper judgement and caution
when opening attachments, clicking links or responding to requests for information. **
This looks good. Let's go ahead and start the study and get this done ASAP.
John or Marley, can you give me a schedule on when this can be done so we can start planning on
when we can look at the greenhouse gases as well?
Mike Rowe
Director of Business Development / Vice President
MSA Consulting, Inc.
From: Janette Cachola <JCachola@urbanxroads.com>
Sent: Wednesday, September 04, 2019 5:41 PM
To: Steve Libring <SLibring@willdan.com>; Cheri Flores <clflores@laquintaca.gov>; Bryan McKinney
Bmckinney@laquintaca.gov>
Cc: Vann, Nicole <nvann@msaconsultinginc.com>; Garrett Simon <gsimon@meriwetherco.com>;
Rowe, Mike <mrowe@msaconsultinginc.com>; John Kain <jkain@urbanxroads.com>; Marlie
Whiteman <mwhiteman@urbanxroads.com>; Haseeb Qureshi <hqureshi@urbanxroads.com>
Subject: RE: Wave at Coral Mountain TIA Scope
Pursuant to comments received on August 26th, the attached Wave at Coral Mountain TIA Scope has
been revised. A word doc of the text in track changes mode is also attached so that edits can be
more easily reviewed.
Exhibits 2, 3, 5, and 6 have been modified to include 3 additional intersections, as requested. Table
3 and Exhibit 7 have also been updated to reflect adjustments to the Cumulative Project list.
Please review and approve or send additional comments as soon as possible. If you have any
questions, don’t hesitate to contact John Kain (949.336.5990), Marlie Whiteman (949.336.5991), or
myself (949.336.5989).
Sincerely,
JANETTE CACHOLA
Analyst
949) 336-5989 Direct
urbanxroads.com
Ofc: 1001 Dove St., #260, Newport Beach CA 92660
Main: 260 E. Baker St., #200, Costa Mesa CA 92626
From: Steve Libring [mailto:SLibring@willdan.com]
Sent: Monday, August 26, 2019 3:34 PM
To: Vann, Nicole
Cc: John Kain; Marlie Whiteman; Cheri Flores; Bryan McKinney
Subject: Fw: Wave at Coral Mountain TIA Scope
Nicole here are our comments on the scoping and some related issues
From: Cheri Flores <clflores@laquintaca.gov>
Sent: Monday, August 26, 2019 9:41 AM
To: Steve Libring <SLibring@willdan.com>; Bryan McKinney <Bmckinney@laquintaca.gov>
Subject: RE: Wave at Coral Mountain TIA Scope
Cheri's notes regarding the cumulative projects is in the attached pdf.
I saw possible bust in distribution pattern where 15% WB on Ave 54 becomes 5%w/o
Jefferson ( which is a cul-de-sac ). I think with 25 % or so headed toward the roundabout and
Jefferson/Ave 50, we should add those 3 intersections along Jefferson to the list ( Jefferson /
52, Jefferson / Pomello, and Jefferson / 50 )
They also make a statement that all CIP, DIF & TUMF improvement projects are assumed to
be in place by opening year. I suspect we have little or none in the way of improvements in the
coming years in that area, so don't know if you are doing capacity analysis and LOS, if you are
assuming the existing roadway configurations and lanes, or some future planned roadway
configurations?
The project should be widening the Avenue 58 frontage, widen the EB Avenue 58toadda
2nd EB left turn lane, and paying for a signal or portion of signal as appropriate.
From: Janette Cachola <JCachola@urbanxroads.com>
Sent: Tuesday, August 13, 2019 6:02 PM
To: Steve Libring <SLibring@willdan.com>
Cc: Bryan McKinney <bmckinney@laquintaca.gov>; Rowe, Mike <mrowe@msaconsultinginc.com>;
Vann, Nicole <nvann@msaconsultinginc.com>; Herrera-Cortes, Jesus <jherrera-
cortes@msaconsultinginc.com>; Depalatis, Paul <pdepalatis@msaconsultinginc.com>; Rowe, Allison
arowe@msaconsultinginc.com>; Garrett Simon <gsimon@meriwetherco.com>; Marlie Whiteman
mwhiteman@urbanxroads.com>; John Kain <jkain@urbanxroads.com>; Haseeb Qureshi
hqureshi@urbanxroads.com>
Subject: Wave at Coral Mountain TIA Scope
The scoping agreement for the Wave at Coral Mountain traffic impact analysis is attached for
your review/approval.
Please also provide the signal timing worksheets for existing signal locations within the study
area, which include the following intersections:
Madison St. / Airport Blvd.
Monroe St. / 50th Avenue
Please don’t hesitate to contact us with any questions or concerns.
JANETTE CACHOLA
Analyst
949) 336-5989 Direct
urbanxroads.com
Ofc: 1001 Dove St., #260, Newport Beach CA 92660
Main: 260 E. Baker St., #200, Costa Mesa CA 92626
From:John Kain
To:Rowe, Mike;Janette Cachola;Steve Libring;Cheri Flores;Bryan McKinney
Cc:Vann, Nicole;Garrett Simon;Marlie Whiteman;Haseeb Qureshi;Depalatis, Paul;Garrett Simon
Subject:RE: Wave at Coral Mountain TIA Scope [2553-MSA1.NRzf]
Date:Friday, September 06, 2019 1:37:23 PM
Attachments:image001.png
EXTERNAL: This message originated outside of the City of La Quinta. Please use proper judgement and caution
when opening attachments, clicking links or responding to requests for information. **
Mike – The Madison Street / Avenue 60 peak hour counts will occur next week, and the draft traffic
study report is scheduled to be completed on or before October 4th.
John Kain
949) 375-2435
From: Rowe, Mike <mrowe@msaconsultinginc.com>
Sent: Friday, September 6, 2019 8:13 AM
To: Janette Cachola <JCachola@urbanxroads.com>; Steve Libring <SLibring@willdan.com>; Cheri
Flores <clflores@laquintaca.gov>; Bryan McKinney <Bmckinney@laquintaca.gov>
Cc: Vann, Nicole <nvann@msaconsultinginc.com>; Garrett Simon <gsimon@meriwetherco.com>;
Rowe, Mike <mrowe@msaconsultinginc.com>; John Kain <jkain@urbanxroads.com>; Marlie
Whiteman <mwhiteman@urbanxroads.com>; Haseeb Qureshi <hqureshi@urbanxroads.com>;
Depalatis, Paul <pdepalatis@msaconsultinginc.com>; Garrett Simon <gsimon@meriwetherco.com>
Subject: RE: Wave at Coral Mountain TIA Scope [2553-MSA1.NRzf]
This looks good. Let's go ahead and start the study and get this done ASAP.
John or Marley, can you give me a schedule on when this can be done so we can start planning on
when we can look at the greenhouse gases as well?
Mike Rowe
Director of Business Development / Vice President
MSA Consulting, Inc.
From: Janette Cachola <JCachola@urbanxroads.com>
Sent: Wednesday, September 04, 2019 5:41 PM
To: Steve Libring <SLibring@willdan.com>; Cheri Flores <clflores@laquintaca.gov>; Bryan McKinney
Bmckinney@laquintaca.gov>
Cc: Vann, Nicole <nvann@msaconsultinginc.com>; Garrett Simon <gsimon@meriwetherco.com>;
Rowe, Mike <mrowe@msaconsultinginc.com>; John Kain <jkain@urbanxroads.com>; Marlie
Whiteman <mwhiteman@urbanxroads.com>; Haseeb Qureshi <hqureshi@urbanxroads.com>
Subject: RE: Wave at Coral Mountain TIA Scope
Pursuant to comments received on August 26th, the attached Wave at Coral Mountain TIA Scope has
been revised. A word doc of the text in track changes mode is also attached so that edits can be
more easily reviewed.
Exhibits 2, 3, 5, and 6 have been modified to include 3 additional intersections, as requested. Table
3 and Exhibit 7 have also been updated to reflect adjustments to the Cumulative Project list.
Please review and approve or send additional comments as soon as possible. If you have any
questions, don’t hesitate to contact John Kain (949.336.5990), Marlie Whiteman (949.336.5991), or
myself (949.336.5989).
Sincerely,
JANETTE CACHOLA
Analyst
949) 336-5989 Direct
urbanxroads.com
Ofc: 1001 Dove St., #260, Newport Beach CA 92660
Main: 260 E. Baker St., #200, Costa Mesa CA 92626
From: Steve Libring [mailto:SLibring@willdan.com]
Sent: Monday, August 26, 2019 3:34 PM
To: Vann, Nicole
Cc: John Kain; Marlie Whiteman; Cheri Flores; Bryan McKinney
Subject: Fw: Wave at Coral Mountain TIA Scope
Nicole here are our comments on the scoping and some related issues
From: Cheri Flores <clflores@laquintaca.gov>
Sent: Monday, August 26, 2019 9:41 AM
To: Steve Libring <SLibring@willdan.com>; Bryan McKinney <Bmckinney@laquintaca.gov>
Subject: RE: Wave at Coral Mountain TIA Scope
Cheri's notes regarding the cumulative projects is in the attached pdf.
I saw possible bust in distribution pattern where 15% WB on Ave 54 becomes 5%w/o
Jefferson ( which is a cul-de-sac ). I think with 25 % or so headed toward the roundabout and
Jefferson/Ave 50, we should add those 3 intersections along Jefferson to the list ( Jefferson /
52, Jefferson / Pomello, and Jefferson / 50 )
They also make a statement that all CIP, DIF & TUMF improvement projects are assumed to
be in place by opening year. I suspect we have little or none in the way of improvements in the
coming years in that area, so don't know if you are doing capacity analysis and LOS, if you are
assuming the existing roadway configurations and lanes, or some future planned roadway
configurations?
The project should be widening the Avenue 58 frontage, widen the EB Avenue 58toadda
2nd EB left turn lane, and paying for a signal or portion of signal as appropriate.
From: Janette Cachola <JCachola@urbanxroads.com>
Sent: Tuesday, August 13, 2019 6:02 PM
To: Steve Libring <SLibring@willdan.com>
Cc: Bryan McKinney <bmckinney@laquintaca.gov>; Rowe, Mike <mrowe@msaconsultinginc.com>;
Vann, Nicole <nvann@msaconsultinginc.com>; Herrera-Cortes, Jesus <jherrera-
cortes@msaconsultinginc.com>; Depalatis, Paul <pdepalatis@msaconsultinginc.com>; Rowe, Allison
arowe@msaconsultinginc.com>; Garrett Simon <gsimon@meriwetherco.com>; Marlie Whiteman
mwhiteman@urbanxroads.com>; John Kain <jkain@urbanxroads.com>; Haseeb Qureshi
hqureshi@urbanxroads.com>
Subject: Wave at Coral Mountain TIA Scope
The scoping agreement for the Wave at Coral Mountain traffic impact analysis is attached for
your review/approval.
Please also provide the signal timing worksheets for existing signal locations within the study
area, which include the following intersections:
Madison St. / Airport Blvd.
Monroe St. / 50th Avenue
Please don’t hesitate to contact us with any questions or concerns.
JANETTE CACHOLA
Analyst
949) 336-5989 Direct
urbanxroads.com
Ofc: 1001 Dove St., #260, Newport Beach CA 92660
Main: 260 E. Baker St., #200, Costa Mesa CA 92626
From:John Kain
To:Rowe, Mike;Janette Cachola;Steve Libring;Cheri Flores;Bryan McKinney
Cc:Vann, Nicole;Garrett Simon;Marlie Whiteman;Haseeb Qureshi;Depalatis, Paul;Garrett Simon
Subject:RE: Wave at Coral Mountain TIA Scope [2553-MSA1.NRzf]
Date:Friday, September 06, 2019 1:37:23 PM
Attachments:image001.png
EXTERNAL: This message originated outside of the City of La Quinta. Please use proper judgement and caution
when opening attachments, clicking links or responding to requests for information. **
Mike – The Madison Street / Avenue 60 peak hour counts will occur next week, and the draft traffic
study report is scheduled to be completed on or before October 4th.
John Kain
949) 375-2435
From: Rowe, Mike <mrowe@msaconsultinginc.com>
Sent: Friday, September 6, 2019 8:13 AM
To: Janette Cachola <JCachola@urbanxroads.com>; Steve Libring <SLibring@willdan.com>; Cheri
Flores <clflores@laquintaca.gov>; Bryan McKinney <Bmckinney@laquintaca.gov>
Cc: Vann, Nicole <nvann@msaconsultinginc.com>; Garrett Simon <gsimon@meriwetherco.com>;
Rowe, Mike <mrowe@msaconsultinginc.com>; John Kain <jkain@urbanxroads.com>; Marlie
Whiteman <mwhiteman@urbanxroads.com>; Haseeb Qureshi <hqureshi@urbanxroads.com>;
Depalatis, Paul <pdepalatis@msaconsultinginc.com>; Garrett Simon <gsimon@meriwetherco.com>
Subject: RE: Wave at Coral Mountain TIA Scope [2553-MSA1.NRzf]
This looks good. Let's go ahead and start the study and get this done ASAP.
John or Marley, can you give me a schedule on when this can be done so we can start planning on
when we can look at the greenhouse gases as well?
Mike Rowe
Director of Business Development / Vice President
MSA Consulting, Inc.
From: Janette Cachola <JCachola@urbanxroads.com>
Sent: Wednesday, September 04, 2019 5:41 PM
To: Steve Libring <SLibring@willdan.com>; Cheri Flores <clflores@laquintaca.gov>; Bryan McKinney
Bmckinney@laquintaca.gov>
Cc: Vann, Nicole <nvann@msaconsultinginc.com>; Garrett Simon <gsimon@meriwetherco.com>;
Rowe, Mike <mrowe@msaconsultinginc.com>; John Kain <jkain@urbanxroads.com>; Marlie
Whiteman <mwhiteman@urbanxroads.com>; Haseeb Qureshi <hqureshi@urbanxroads.com>
Subject: RE: Wave at Coral Mountain TIA Scope
Pursuant to comments received on August 26th, the attached Wave at Coral Mountain TIA Scope has
been revised. A word doc of the text in track changes mode is also attached so that edits can be
more easily reviewed.
Exhibits 2, 3, 5, and 6 have been modified to include 3 additional intersections, as requested. Table
3 and Exhibit 7 have also been updated to reflect adjustments to the Cumulative Project list.
Please review and approve or send additional comments as soon as possible. If you have any
questions, don’t hesitate to contact John Kain (949.336.5990), Marlie Whiteman (949.336.5991), or
myself (949.336.5989).
Sincerely,
JANETTE CACHOLA
Analyst
949) 336-5989 Direct
urbanxroads.com
Ofc: 1001 Dove St., #260, Newport Beach CA 92660
Main: 260 E. Baker St., #200, Costa Mesa CA 92626
From: Steve Libring [mailto:SLibring@willdan.com]
Sent: Monday, August 26, 2019 3:34 PM
To: Vann, Nicole
Cc: John Kain; Marlie Whiteman; Cheri Flores; Bryan McKinney
Subject: Fw: Wave at Coral Mountain TIA Scope
Nicole here are our comments on the scoping and some related issues
From: Cheri Flores <clflores@laquintaca.gov>
Sent: Monday, August 26, 2019 9:41 AM
To: Steve Libring <SLibring@willdan.com>; Bryan McKinney <Bmckinney@laquintaca.gov>
Subject: RE: Wave at Coral Mountain TIA Scope
Cheri's notes regarding the cumulative projects is in the attached pdf.
I saw possible bust in distribution pattern where 15% WB on Ave 54 becomes 5%w/o
Jefferson ( which is a cul-de-sac ). I think with 25 % or so headed toward the roundabout and
Jefferson/Ave 50, we should add those 3 intersections along Jefferson to the list ( Jefferson /
52, Jefferson / Pomello, and Jefferson / 50 )
They also make a statement that all CIP, DIF & TUMF improvement projects are assumed to
be in place by opening year. I suspect we have little or none in the way of improvements in the
coming years in that area, so don't know if you are doing capacity analysis and LOS, if you are
assuming the existing roadway configurations and lanes, or some future planned roadway
configurations?
The project should be widening the Avenue 58 frontage, widen the EB Avenue 58toadda
2nd EB left turn lane, and paying for a signal or portion of signal as appropriate.
From: Janette Cachola <JCachola@urbanxroads.com>
Sent: Tuesday, August 13, 2019 6:02 PM
To: Steve Libring <SLibring@willdan.com>
Cc: Bryan McKinney <bmckinney@laquintaca.gov>; Rowe, Mike <mrowe@msaconsultinginc.com>;
Vann, Nicole <nvann@msaconsultinginc.com>; Herrera-Cortes, Jesus <jherrera-
cortes@msaconsultinginc.com>; Depalatis, Paul <pdepalatis@msaconsultinginc.com>; Rowe, Allison
arowe@msaconsultinginc.com>; Garrett Simon <gsimon@meriwetherco.com>; Marlie Whiteman
mwhiteman@urbanxroads.com>; John Kain <jkain@urbanxroads.com>; Haseeb Qureshi
hqureshi@urbanxroads.com>
Subject: Wave at Coral Mountain TIA Scope
The scoping agreement for the Wave at Coral Mountain traffic impact analysis is attached for
your review/approval.
Please also provide the signal timing worksheets for existing signal locations within the study
area, which include the following intersections:
Madison St. / Airport Blvd.
Monroe St. / 50th Avenue
Please don’t hesitate to contact us with any questions or concerns.
JANETTE CACHOLA
Analyst
949) 336-5989 Direct
urbanxroads.com
Ofc: 1001 Dove St., #260, Newport Beach CA 92660
Main: 260 E. Baker St., #200, Costa Mesa CA 92626
From:Rowe, Mike
To:Janette Cachola;Steve Libring;Cheri Flores;Bryan McKinney
Cc:Vann, Nicole;Garrett Simon;Rowe, Mike;John Kain;Marlie Whiteman;Haseeb Qureshi;Depalatis, Paul;Garrett
Simon
Subject:RE: Wave at Coral Mountain TIA Scope [2553-MSA1.NRzf]
Date:Friday, September 06, 2019 8:13:35 AM
Attachments:image001.png
EXTERNAL: This message originated outside of the City of La Quinta. Please use proper judgement and caution
when opening attachments, clicking links or responding to requests for information. **
This looks good. Let's go ahead and start the study and get this done ASAP.
John or Marley, can you give me a schedule on when this can be done so we can start planning on
when we can look at the greenhouse gases as well?
Mike Rowe
Director of Business Development / Vice President
MSA Consulting, Inc.
From: Janette Cachola <JCachola@urbanxroads.com>
Sent: Wednesday, September 04, 2019 5:41 PM
To: Steve Libring <SLibring@willdan.com>; Cheri Flores <clflores@laquintaca.gov>; Bryan McKinney
Bmckinney@laquintaca.gov>
Cc: Vann, Nicole <nvann@msaconsultinginc.com>; Garrett Simon <gsimon@meriwetherco.com>;
Rowe, Mike <mrowe@msaconsultinginc.com>; John Kain <jkain@urbanxroads.com>; Marlie
Whiteman <mwhiteman@urbanxroads.com>; Haseeb Qureshi <hqureshi@urbanxroads.com>
Subject: RE: Wave at Coral Mountain TIA Scope
Pursuant to comments received on August 26th, the attached Wave at Coral Mountain TIA Scope has
been revised. A word doc of the text in track changes mode is also attached so that edits can be
more easily reviewed.
Exhibits 2, 3, 5, and 6 have been modified to include 3 additional intersections, as requested. Table
3 and Exhibit 7 have also been updated to reflect adjustments to the Cumulative Project list.
Please review and approve or send additional comments as soon as possible. If you have any
questions, don’t hesitate to contact John Kain (949.336.5990), Marlie Whiteman (949.336.5991), or
myself (949.336.5989).
Sincerely,
JANETTE CACHOLA
Analyst
949) 336-5989 Direct
urbanxroads.com
Ofc: 1001 Dove St., #260, Newport Beach CA 92660
Main: 260 E. Baker St., #200, Costa Mesa CA 92626
From: Steve Libring [mailto:SLibring@willdan.com]
Sent: Monday, August 26, 2019 3:34 PM
To: Vann, Nicole
Cc: John Kain; Marlie Whiteman; Cheri Flores; Bryan McKinney
Subject: Fw: Wave at Coral Mountain TIA Scope
Nicole here are our comments on the scoping and some related issues
From: Cheri Flores <clflores@laquintaca.gov>
Sent: Monday, August 26, 2019 9:41 AM
To: Steve Libring <SLibring@willdan.com>; Bryan McKinney <Bmckinney@laquintaca.gov>
Subject: RE: Wave at Coral Mountain TIA Scope
Cheri's notes regarding the cumulative projects is in the attached pdf.
I saw possible bust in distribution pattern where 15% WB on Ave 54 becomes 5%w/o
Jefferson ( which is a cul-de-sac ). I think with 25 % or so headed toward the roundabout and
Jefferson/Ave 50, we should add those 3 intersections along Jefferson to the list ( Jefferson /
52, Jefferson / Pomello, and Jefferson / 50 )
They also make a statement that all CIP, DIF & TUMF improvement projects are assumed to
be in place by opening year. I suspect we have little or none in the way of improvements in the
coming years in that area, so don't know if you are doing capacity analysis and LOS, if you are
assuming the existing roadway configurations and lanes, or some future planned roadway
configurations?
The project should be widening the Avenue 58 frontage, widen the EB Avenue 58toadda
2nd EB left turn lane, and paying for a signal or portion of signal as appropriate.
From: Janette Cachola <JCachola@urbanxroads.com>
Sent: Tuesday, August 13, 2019 6:02 PM
To: Steve Libring <SLibring@willdan.com>
Cc: Bryan McKinney <bmckinney@laquintaca.gov>; Rowe, Mike <mrowe@msaconsultinginc.com>;
Vann, Nicole <nvann@msaconsultinginc.com>; Herrera-Cortes, Jesus <jherrera-
cortes@msaconsultinginc.com>; Depalatis, Paul <pdepalatis@msaconsultinginc.com>; Rowe, Allison
arowe@msaconsultinginc.com>; Garrett Simon <gsimon@meriwetherco.com>; Marlie Whiteman
mwhiteman@urbanxroads.com>; John Kain <jkain@urbanxroads.com>; Haseeb Qureshi
hqureshi@urbanxroads.com>
Subject: Wave at Coral Mountain TIA Scope
The scoping agreement for the Wave at Coral Mountain traffic impact analysis is attached for
your review/approval.
Please also provide the signal timing worksheets for existing signal locations within the study
area, which include the following intersections:
Madison St. / Airport Blvd.
Monroe St. / 50th Avenue
Please don’t hesitate to contact us with any questions or concerns.
JANETTE CACHOLA
Analyst
949) 336-5989 Direct
urbanxroads.com
Ofc: 1001 Dove St., #260, Newport Beach CA 92660
Main: 260 E. Baker St., #200, Costa Mesa CA 92626
From:Bryan McKinney
To:Steve Libring;Cheri Flores
Subject:RE: Wave at Coral Mountain TIA Scope
Date:Thursday, August 15, 2019 1:47:42 PM
Attachments:image001.png
Yes, they would most likely be responsible for ¼ of the signal cost at that intersection.
Bryan McKinney, P.E. | City Engineer
City of La Quinta
78495 Calle Tampico La Quinta, CA 92253
760.777.7045
Email:bmckinney@laquintaca.gov
Website:www.la-quinta.org
From: Steve Libring <SLibring@willdan.com>
Sent: Thursday, August 15, 2019 1:46 PM
To: Bryan McKinney <Bmckinney@laquintaca.gov>; Cheri Flores <clflores@laquintaca.gov>
Subject: Re: Wave at Coral Mountain TIA Scope
EXTERNAL: This message originated outside of the City of La Quinta. Please use proper judgement and caution
when opening attachments, clicking links or responding to requests for information. **
thank you both, I will mention these to them
Bryan, would they also bond for or build a signal at Ave 58 and Madison - or pay some fair
share towards one? I understand there is some sensitivity to future signals, preferences
possibly for roundabouts like Jefferson and 53, etc - so just want to make sure that they know
up front what other type of improvements may be required or contribute towards, if any?.
From: Bryan McKinney <Bmckinney@laquintaca.gov>
Sent: Thursday, August 15, 2019 1:41 PM
To: Steve Libring <SLibring@willdan.com>; Cheri Flores <clflores@laquintaca.gov>
Subject: RE: Wave at Coral Mountain TIA Scope
I think they will be conditioned to add the second eastbound lane on Avenue 58 adjacent to
their frontage.
Bryan McKinney, P.E. | City Engineer
City of La Quinta
78495 Calle Tampico La Quinta, CA 92253
760.777.7045
Email:bmckinney@laquintaca.gov
Website:www.la-quinta.org
From: Steve Libring <SLibring@willdan.com>
Sent: Thursday, August 15, 2019 12:47 PM
To: Bryan McKinney <Bmckinney@laquintaca.gov>; Cheri Flores <clflores@laquintaca.gov>
Subject: Fw: Wave at Coral Mountain TIA Scope
EXTERNAL: This message originated outside of the City of La Quinta. Please use proper judgement and caution
when opening attachments, clicking links or responding to requests for information. **
Bryan, Cheri:
You both have more history with this project, just wondering f you see any issues that need to
be specifically discussed now, before they start their analysis?
I saw possible bust in distribution pattern where 15% WB on Ave 54 becomes 5% w/o
Jefferson ( which is a cul-de-sac ). I think with 25 % or so headed toward the roundabout and
Jefferson/Ave 50, we should add those 3 intersections along Jefferson on their list ( Jefferson /
52, Jefferson / Pomello, and Jefferson / 50 )
They also make a statement that all CIP, DIF & TUMF improvement projects are assumed to
be in place by opening year. I suspect we have little or none in the way of improvements in the
coming years in that area, so don't know if when they are doing capacity analysis and LOS, if
they are assuming the existing roadway configurations and lanes, or some future planned
roadway configurations?
Your thoughts on all of the above?
From: Janette Cachola <JCachola@urbanxroads.com>
Sent: Tuesday, August 13, 2019 6:02 PM
To: Steve Libring <SLibring@willdan.com>
Cc: Bryan McKinney <bmckinney@laquintaca.gov>; Rowe, Mike
mrowe@msaconsultinginc.com>; Vann, Nicole <nvann@msaconsultinginc.com>; Herrera-
Cortes, Jesus <jherrera-cortes@msaconsultinginc.com>; Depalatis, Paul
pdepalatis@msaconsultinginc.com>; Rowe, Allison <arowe@msaconsultinginc.com>; Garrett
Simon <gsimon@meriwetherco.com>; Marlie Whiteman <mwhiteman@urbanxroads.com>;
John Kain <jkain@urbanxroads.com>; Haseeb Qureshi <hqureshi@urbanxroads.com>
Subject: Wave at Coral Mountain TIA Scope
The scoping agreement for the Wave at Coral Mountain traffic impact analysis is attached for
your review/approval.
Please also provide the signal timing worksheets for existing signal locations within the study
area, which include the following intersections:
Madison St. / Airport Blvd.
Monroe St. / 50th Avenue
Please don’t hesitate to contact us with any questions or concerns.
JANETTE CACHOLA
Analyst
949) 336-5989 Direct
urbanxroads.com
Ofc: 1001 Dove St., #260, Newport Beach CA 92660
Main: 260 E. Baker St., #200, Costa Mesa CA 92626
From:Janette Cachola
To:Steve Libring;Cheri Flores;Bryan McKinney
Cc:Vann, Nicole;Garrett Simon;Rowe, Mike;John Kain;Marlie Whiteman;Haseeb Qureshi
Subject:RE: Wave at Coral Mountain TIA Scope
Date:Wednesday, September 04, 2019 5:42:28 PM
Attachments:image002.png
12615-02 Scope (2019.09.04).pdf
12615-02 Scope.docx
EXTERNAL: This message originated outside of the City of La Quinta. Please use proper judgement and caution
when opening attachments, clicking links or responding to requests for information. **
Pursuant to comments received on August 26th, the attached Wave at Coral Mountain TIA Scope has
been revised. A word doc of the text in track changes mode is also attached so that edits can be
more easily reviewed.
Exhibits 2, 3, 5, and 6 have been modified to include 3 additional intersections, as requested. Table
3 and Exhibit 7 have also been updated to reflect adjustments to the Cumulative Project list.
Please review and approve or send additional comments as soon as possible. If you have any
questions, don’t hesitate to contact John Kain (949.336.5990), Marlie Whiteman (949.336.5991), or
myself (949.336.5989).
Sincerely,
JANETTE CACHOLA
Analyst
949) 336-5989 Direct
urbanxroads.com
Ofc: 1001 Dove St., #260, Newport Beach CA 92660
Main: 260 E. Baker St., #200, Costa Mesa CA 92626
From: Steve Libring [mailto:SLibring@willdan.com]
Sent: Monday, August 26, 2019 3:34 PM
To: Vann, Nicole
Cc: John Kain; Marlie Whiteman; Cheri Flores; Bryan McKinney
Subject: Fw: Wave at Coral Mountain TIA Scope
Nicole here are our comments on the scoping and some related issues
From: Cheri Flores <clflores@laquintaca.gov>
Sent: Monday, August 26, 2019 9:41 AM
To: Steve Libring <SLibring@willdan.com>; Bryan McKinney <Bmckinney@laquintaca.gov>
Subject: RE: Wave at Coral Mountain TIA Scope
Cheri's notes regarding the cumulative projects is in the attached pdf.
I saw possible bust in distribution pattern where 15% WB on Ave 54 becomes 5%w/o
Jefferson ( which is a cul-de-sac ). I think with 25 % or so headed toward the roundabout and
Jefferson/Ave 50, we should add those 3 intersections along Jefferson to the list ( Jefferson /
52, Jefferson / Pomello, and Jefferson / 50 )
They also make a statement that all CIP, DIF & TUMF improvement projects are assumed to
be in place by opening year. I suspect we have little or none in the way of improvements in the
coming years in that area, so don't know if you are doing capacity analysis and LOS, if you are
assuming the existing roadway configurations and lanes, or some future planned roadway
configurations?
The project should be widening the Avenue 58 frontage, widen the EB Avenue 58toadda
2nd EB left turn lane, and paying for a signal or portion of signal as appropriate.
From: Janette Cachola <JCachola@urbanxroads.com>
Sent: Tuesday, August 13, 2019 6:02 PM
To: Steve Libring <SLibring@willdan.com>
Cc: Bryan McKinney <bmckinney@laquintaca.gov>; Rowe, Mike <mrowe@msaconsultinginc.com>;
Vann, Nicole <nvann@msaconsultinginc.com>; Herrera-Cortes, Jesus <jherrera-
cortes@msaconsultinginc.com>; Depalatis, Paul <pdepalatis@msaconsultinginc.com>; Rowe, Allison
arowe@msaconsultinginc.com>; Garrett Simon <gsimon@meriwetherco.com>; Marlie Whiteman
mwhiteman@urbanxroads.com>; John Kain <jkain@urbanxroads.com>; Haseeb Qureshi
hqureshi@urbanxroads.com>
Subject: Wave at Coral Mountain TIA Scope
The scoping agreement for the Wave at Coral Mountain traffic impact analysis is attached for
your review/approval.
Please also provide the signal timing worksheets for existing signal locations within the study
area, which include the following intersections:
Madison St. / Airport Blvd.
Monroe St. / 50th Avenue
Please don’t hesitate to contact us with any questions or concerns.
JANETTE CACHOLA
Analyst
949) 336-5989 Direct
urbanxroads.com
Ofc: 1001 Dove St., #260, Newport Beach CA 92660
Main: 260 E. Baker St., #200, Costa Mesa CA 92626
From:John Kain
To:Cheri Flores;Janette Cachola;Steve Libring;Bryan McKinney
Cc:Vann, Nicole;Garrett Simon;Rowe, Mike;Marlie Whiteman;Haseeb Qureshi
Subject:RE: Wave at Coral Mountain TIA Scope
Date:Friday, September 06, 2019 1:27:48 PM
Attachments:image001.png
image002.png
image003.png
image004.png
image005.png
image006.png
image007.png
EXTERNAL: This message originated outside of the City of La Quinta. Please use proper judgement and caution
when opening attachments, clicking links or responding to requests for information. **
Cheri – We will proceed, and the draft report is anticipated to be completed within approximately 4
weeks.
John Kain
949) 375-2435
From: Cheri Flores <clflores@laquintaca.gov>
Sent: Friday, September 6, 2019 12:55 PM
To: Janette Cachola <JCachola@urbanxroads.com>; Steve Libring <SLibring@willdan.com>; Bryan
McKinney <Bmckinney@laquintaca.gov>
Cc: Vann, Nicole <nvann@msaconsultinginc.com>; Garrett Simon <gsimon@meriwetherco.com>;
Rowe, Mike <mrowe@msaconsultinginc.com>; John Kain <jkain@urbanxroads.com>; Marlie
Whiteman <mwhiteman@urbanxroads.com>; Haseeb Qureshi <hqureshi@urbanxroads.com>
Subject: RE: Wave at Coral Mountain TIA Scope
Hi Janette—
Looks like you have incorporated all the revisions we asked for and we have no
further comments. Please go ahead and proceed with preparing the study. If
you have any other questions, just let us know!
Cheri L. Flores | Planning Manager
City of La Quinta
78495 Calle Tampico La Quinta, CA 92253
Ph. 760-777-7067
Website |Map
hwy111LQ.com
From: Janette Cachola <JCachola@urbanxroads.com>
Sent: Wednesday, September 04, 2019 5:41 PM
To: Steve Libring <SLibring@willdan.com>; Cheri Flores <clflores@laquintaca.gov>; Bryan McKinney
Bmckinney@laquintaca.gov>
Cc: Vann, Nicole <nvann@msaconsultinginc.com>; Garrett Simon <gsimon@meriwetherco.com>;
Rowe, Mike <mrowe@msaconsultinginc.com>; John Kain <jkain@urbanxroads.com>; Marlie
Whiteman <mwhiteman@urbanxroads.com>; Haseeb Qureshi <hqureshi@urbanxroads.com>
Subject: RE: Wave at Coral Mountain TIA Scope
EXTERNAL: This message originated outside of the City of La Quinta. Please use proper judgement and caution
when opening attachments, clicking links or responding to requests for information. **
Pursuant to comments received on August 26th, the attached Wave at Coral Mountain TIA Scope has
been revised. A word doc of the text in track changes mode is also attached so that edits can be
more easily reviewed.
Exhibits 2, 3, 5, and 6 have been modified to include 3 additional intersections, as requested. Table
3 and Exhibit 7 have also been updated to reflect adjustments to the Cumulative Project list.
Please review and approve or send additional comments as soon as possible. If you have any
questions, don’t hesitate to contact John Kain (949.336.5990), Marlie Whiteman (949.336.5991), or
myself (949.336.5989).
Sincerely,
JANETTE CACHOLA
Analyst
949) 336-5989 Direct
urbanxroads.com
Ofc: 1001 Dove St., #260, Newport Beach CA 92660
Main: 260 E. Baker St., #200, Costa Mesa CA 92626
From: Steve Libring [mailto:SLibring@willdan.com]
Sent: Monday, August 26, 2019 3:34 PM
To: Vann, Nicole
Cc: John Kain; Marlie Whiteman; Cheri Flores; Bryan McKinney
Subject: Fw: Wave at Coral Mountain TIA Scope
Nicole here are our comments on the scoping and some related issues
From: Cheri Flores <clflores@laquintaca.gov>
Sent: Monday, August 26, 2019 9:41 AM
To: Steve Libring <SLibring@willdan.com>; Bryan McKinney <Bmckinney@laquintaca.gov>
Subject: RE: Wave at Coral Mountain TIA Scope
Cheri's notes regarding the cumulative projects is in the attached pdf.
I saw possible bust in distribution pattern where 15% WB on Ave 54 becomes 5%w/o
Jefferson ( which is a cul-de-sac ). I think with 25 % or so headed toward the roundabout and
Jefferson/Ave 50, we should add those 3 intersections along Jefferson to the list ( Jefferson /
52, Jefferson / Pomello, and Jefferson / 50 )
They also make a statement that all CIP, DIF & TUMF improvement projects are assumed to
be in place by opening year. I suspect we have little or none in the way of improvements in the
coming years in that area, so don't know if you are doing capacity analysis and LOS, if you are
assuming the existing roadway configurations and lanes, or some future planned roadway
configurations?
The project should be widening the Avenue 58 frontage, widen the EB Avenue 58toadda
2nd EB left turn lane, and paying for a signal or portion of signal as appropriate.
From: Janette Cachola <JCachola@urbanxroads.com>
Sent: Tuesday, August 13, 2019 6:02 PM
To: Steve Libring <SLibring@willdan.com>
Cc: Bryan McKinney <bmckinney@laquintaca.gov>; Rowe, Mike <mrowe@msaconsultinginc.com>;
Vann, Nicole <nvann@msaconsultinginc.com>; Herrera-Cortes, Jesus <jherrera-
cortes@msaconsultinginc.com>; Depalatis, Paul <pdepalatis@msaconsultinginc.com>; Rowe, Allison
arowe@msaconsultinginc.com>; Garrett Simon <gsimon@meriwetherco.com>; Marlie Whiteman
mwhiteman@urbanxroads.com>; John Kain <jkain@urbanxroads.com>; Haseeb Qureshi
hqureshi@urbanxroads.com>
Subject: Wave at Coral Mountain TIA Scope
The scoping agreement for the Wave at Coral Mountain traffic impact analysis is attached for
your review/approval.
Please also provide the signal timing worksheets for existing signal locations within the study
area, which include the following intersections:
Madison St. / Airport Blvd.
Monroe St. / 50th Avenue
Please don’t hesitate to contact us with any questions or concerns.
JANETTE CACHOLA
Analyst
949) 336-5989 Direct
urbanxroads.com
Ofc: 1001 Dove St., #260, Newport Beach CA 92660
Main: 260 E. Baker St., #200, Costa Mesa CA 92626
From:Bryan McKinney
To:Steve Libring;Cheri Flores
Subject:RE: Wave at Coral Mountain TIA Scope
Date:Thursday, August 15, 2019 1:47:42 PM
Attachments:image001.png
Yes, they would most likely be responsible for ¼ of the signal cost at that intersection.
Bryan McKinney, P.E. | City Engineer
City of La Quinta
78495 Calle Tampico La Quinta, CA 92253
760.777.7045
Email:bmckinney@laquintaca.gov
Website:www.la-quinta.org
From: Steve Libring <SLibring@willdan.com>
Sent: Thursday, August 15, 2019 1:46 PM
To: Bryan McKinney <Bmckinney@laquintaca.gov>; Cheri Flores <clflores@laquintaca.gov>
Subject: Re: Wave at Coral Mountain TIA Scope
EXTERNAL: This message originated outside of the City of La Quinta. Please use proper judgement and caution
when opening attachments, clicking links or responding to requests for information. **
thank you both, I will mention these to them
Bryan, would they also bond for or build a signal at Ave 58 and Madison - or pay some fair
share towards one? I understand there is some sensitivity to future signals, preferences
possibly for roundabouts like Jefferson and 53, etc - so just want to make sure that they know
up front what other type of improvements may be required or contribute towards, if any?.
From: Bryan McKinney <Bmckinney@laquintaca.gov>
Sent: Thursday, August 15, 2019 1:41 PM
To: Steve Libring <SLibring@willdan.com>; Cheri Flores <clflores@laquintaca.gov>
Subject: RE: Wave at Coral Mountain TIA Scope
I think they will be conditioned to add the second eastbound lane on Avenue 58 adjacent to
their frontage.
Bryan McKinney, P.E. | City Engineer
City of La Quinta
78495 Calle Tampico La Quinta, CA 92253
760.777.7045
Email:bmckinney@laquintaca.gov
Website:www.la-quinta.org
From: Steve Libring <SLibring@willdan.com>
Sent: Thursday, August 15, 2019 12:47 PM
To: Bryan McKinney <Bmckinney@laquintaca.gov>; Cheri Flores <clflores@laquintaca.gov>
Subject: Fw: Wave at Coral Mountain TIA Scope
EXTERNAL: This message originated outside of the City of La Quinta. Please use proper judgement and caution
when opening attachments, clicking links or responding to requests for information. **
Bryan, Cheri:
You both have more history with this project, just wondering f you see any issues that need to
be specifically discussed now, before they start their analysis?
I saw possible bust in distribution pattern where 15% WB on Ave 54 becomes 5% w/o
Jefferson ( which is a cul-de-sac ). I think with 25 % or so headed toward the roundabout and
Jefferson/Ave 50, we should add those 3 intersections along Jefferson on their list ( Jefferson /
52, Jefferson / Pomello, and Jefferson / 50 )
They also make a statement that all CIP, DIF & TUMF improvement projects are assumed to
be in place by opening year. I suspect we have little or none in the way of improvements in the
coming years in that area, so don't know if when they are doing capacity analysis and LOS, if
they are assuming the existing roadway configurations and lanes, or some future planned
roadway configurations?
Your thoughts on all of the above?
From: Janette Cachola <JCachola@urbanxroads.com>
Sent: Tuesday, August 13, 2019 6:02 PM
To: Steve Libring <SLibring@willdan.com>
Cc: Bryan McKinney <bmckinney@laquintaca.gov>; Rowe, Mike
mrowe@msaconsultinginc.com>; Vann, Nicole <nvann@msaconsultinginc.com>; Herrera-
Cortes, Jesus <jherrera-cortes@msaconsultinginc.com>; Depalatis, Paul
pdepalatis@msaconsultinginc.com>; Rowe, Allison <arowe@msaconsultinginc.com>; Garrett
Simon <gsimon@meriwetherco.com>; Marlie Whiteman <mwhiteman@urbanxroads.com>;
John Kain <jkain@urbanxroads.com>; Haseeb Qureshi <hqureshi@urbanxroads.com>
Subject: Wave at Coral Mountain TIA Scope
The scoping agreement for the Wave at Coral Mountain traffic impact analysis is attached for
your review/approval.
Please also provide the signal timing worksheets for existing signal locations within the study
area, which include the following intersections:
Madison St. / Airport Blvd.
Monroe St. / 50th Avenue
Please don’t hesitate to contact us with any questions or concerns.
JANETTE CACHOLA
Analyst
949) 336-5989 Direct
urbanxroads.com
Ofc: 1001 Dove St., #260, Newport Beach CA 92660
Main: 260 E. Baker St., #200, Costa Mesa CA 92626
From:Janette Cachola
To:Steve Libring;Cheri Flores;Bryan McKinney
Cc:Vann, Nicole;Garrett Simon;Rowe, Mike;John Kain;Marlie Whiteman;Haseeb Qureshi
Subject:RE: Wave at Coral Mountain TIA Scope
Date:Wednesday, September 04, 2019 5:42:28 PM
Attachments:image002.png
12615-02 Scope (2019.09.04).pdf
12615-02 Scope.docx
EXTERNAL: This message originated outside of the City of La Quinta. Please use proper judgement and caution
when opening attachments, clicking links or responding to requests for information. **
Pursuant to comments received on August 26th, the attached Wave at Coral Mountain TIA Scope has
been revised. A word doc of the text in track changes mode is also attached so that edits can be
more easily reviewed.
Exhibits 2, 3, 5, and 6 have been modified to include 3 additional intersections, as requested. Table
3 and Exhibit 7 have also been updated to reflect adjustments to the Cumulative Project list.
Please review and approve or send additional comments as soon as possible. If you have any
questions, don’t hesitate to contact John Kain (949.336.5990), Marlie Whiteman (949.336.5991), or
myself (949.336.5989).
Sincerely,
JANETTE CACHOLA
Analyst
949) 336-5989 Direct
urbanxroads.com
Ofc: 1001 Dove St., #260, Newport Beach CA 92660
Main: 260 E. Baker St., #200, Costa Mesa CA 92626
From: Steve Libring [mailto:SLibring@willdan.com]
Sent: Monday, August 26, 2019 3:34 PM
To: Vann, Nicole
Cc: John Kain; Marlie Whiteman; Cheri Flores; Bryan McKinney
Subject: Fw: Wave at Coral Mountain TIA Scope
Nicole here are our comments on the scoping and some related issues
From: Cheri Flores <clflores@laquintaca.gov>
Sent: Monday, August 26, 2019 9:41 AM
To: Steve Libring <SLibring@willdan.com>; Bryan McKinney <Bmckinney@laquintaca.gov>
Subject: RE: Wave at Coral Mountain TIA Scope
Cheri's notes regarding the cumulative projects is in the attached pdf.
I saw possible bust in distribution pattern where 15% WB on Ave 54 becomes 5%w/o
Jefferson ( which is a cul-de-sac ). I think with 25 % or so headed toward the roundabout and
Jefferson/Ave 50, we should add those 3 intersections along Jefferson to the list ( Jefferson /
52, Jefferson / Pomello, and Jefferson / 50 )
They also make a statement that all CIP, DIF & TUMF improvement projects are assumed to
be in place by opening year. I suspect we have little or none in the way of improvements in the
coming years in that area, so don't know if you are doing capacity analysis and LOS, if you are
assuming the existing roadway configurations and lanes, or some future planned roadway
configurations?
The project should be widening the Avenue 58 frontage, widen the EB Avenue 58toadda
2nd EB left turn lane, and paying for a signal or portion of signal as appropriate.
From: Janette Cachola <JCachola@urbanxroads.com>
Sent: Tuesday, August 13, 2019 6:02 PM
To: Steve Libring <SLibring@willdan.com>
Cc: Bryan McKinney <bmckinney@laquintaca.gov>; Rowe, Mike <mrowe@msaconsultinginc.com>;
Vann, Nicole <nvann@msaconsultinginc.com>; Herrera-Cortes, Jesus <jherrera-
cortes@msaconsultinginc.com>; Depalatis, Paul <pdepalatis@msaconsultinginc.com>; Rowe, Allison
arowe@msaconsultinginc.com>; Garrett Simon <gsimon@meriwetherco.com>; Marlie Whiteman
mwhiteman@urbanxroads.com>; John Kain <jkain@urbanxroads.com>; Haseeb Qureshi
hqureshi@urbanxroads.com>
Subject: Wave at Coral Mountain TIA Scope
The scoping agreement for the Wave at Coral Mountain traffic impact analysis is attached for
your review/approval.
Please also provide the signal timing worksheets for existing signal locations within the study
area, which include the following intersections:
Madison St. / Airport Blvd.
Monroe St. / 50th Avenue
Please don’t hesitate to contact us with any questions or concerns.
JANETTE CACHOLA
Analyst
949) 336-5989 Direct
urbanxroads.com
Ofc: 1001 Dove St., #260, Newport Beach CA 92660
Main: 260 E. Baker St., #200, Costa Mesa CA 92626
From:Bryan McKinney
To:Steve Libring;Cheri Flores
Subject:RE: Wave at Coral Mountain TIA Scope
Date:Thursday, August 15, 2019 1:41:53 PM
Attachments:image001.png
I think they will be conditioned to add the second eastbound lane on Avenue 58 adjacent to their
frontage.
Bryan McKinney, P.E. | City Engineer
City of La Quinta
78495 Calle Tampico La Quinta, CA 92253
760.777.7045
Email:bmckinney@laquintaca.gov
Website:www.la-quinta.org
From: Steve Libring <SLibring@willdan.com>
Sent: Thursday, August 15, 2019 12:47 PM
To: Bryan McKinney <Bmckinney@laquintaca.gov>; Cheri Flores <clflores@laquintaca.gov>
Subject: Fw: Wave at Coral Mountain TIA Scope
EXTERNAL: This message originated outside of the City of La Quinta. Please use proper judgement and caution
when opening attachments, clicking links or responding to requests for information. **
Bryan, Cheri:
You both have more history with this project, just wondering f you see any issues that need to
be specifically discussed now, before they start their analysis?
I saw possible bust in distribution pattern where 15% WB on Ave 54 becomes 5% w/o
Jefferson ( which is a cul-de-sac ). I think with 25 % or so headed toward the roundabout and
Jefferson/Ave 50, we should add those 3 intersections along Jefferson on their list ( Jefferson /
52, Jefferson / Pomello, and Jefferson / 50 )
They also make a statement that all CIP, DIF & TUMF improvement projects are assumed to
be in place by opening year. I suspect we have little or none in the way of improvements in the
coming years in that area, so don't know if when they are doing capacity analysis and LOS, if
they are assuming the existing roadway configurations and lanes, or some future planned
roadway configurations?
Your thoughts on all of the above?
From: Janette Cachola <JCachola@urbanxroads.com>
Sent: Tuesday, August 13, 2019 6:02 PM
To: Steve Libring <SLibring@willdan.com>
Cc: Bryan McKinney <bmckinney@laquintaca.gov>; Rowe, Mike <mrowe@msaconsultinginc.com>;
Vann, Nicole <nvann@msaconsultinginc.com>; Herrera-Cortes, Jesus <jherrera-
cortes@msaconsultinginc.com>; Depalatis, Paul <pdepalatis@msaconsultinginc.com>; Rowe, Allison
arowe@msaconsultinginc.com>; Garrett Simon <gsimon@meriwetherco.com>; Marlie Whiteman
mwhiteman@urbanxroads.com>; John Kain <jkain@urbanxroads.com>; Haseeb Qureshi
hqureshi@urbanxroads.com>
Subject: Wave at Coral Mountain TIA Scope
The scoping agreement for the Wave at Coral Mountain traffic impact analysis is attached for
your review/approval.
Please also provide the signal timing worksheets for existing signal locations within the study
area, which include the following intersections:
Madison St. / Airport Blvd.
Monroe St. / 50th Avenue
Please don’t hesitate to contact us with any questions or concerns.
JANETTE CACHOLA
Analyst
949) 336-5989 Direct
urbanxroads.com
Ofc: 1001 Dove St., #260, Newport Beach CA 92660
Main: 260 E. Baker St., #200, Costa Mesa CA 92626
From:Cheri Flores
To:Steve Libring;Bryan McKinney
Subject:RE: Wave at Coral Mountain TIA Scope
Date:Thursday, August 15, 2019 1:26:52 PM
Attachments:image002.png
image003.png
image004.png
image005.png
image006.png
image007.png
image008.png
Hi Steve
I have some comments on some of their cumulative projects in their list which
may affect their cumulative analysis. I will comment in the PDF and send it
over to you.
Cheri L. Flores | Planning Manager
City of La Quinta
78495 Calle Tampico La Quinta, CA 92253
Ph. 760-777-7067
Website |Map
hwy111LQ.com
From: Steve Libring <SLibring@willdan.com>
Sent: Thursday, August 15, 2019 12:47 PM
To: Bryan McKinney <Bmckinney@laquintaca.gov>; Cheri Flores <clflores@laquintaca.gov>
Subject: Fw: Wave at Coral Mountain TIA Scope
EXTERNAL: This message originated outside of the City of La Quinta. Please use proper judgement and caution
when opening attachments, clicking links or responding to requests for information. **
Bryan, Cheri:
You both have more history with this project, just wondering f you see any issues that need to
be specifically discussed now, before they start their analysis?
I saw possible bust in distribution pattern where 15% WB on Ave 54 becomes 5% w/o
Jefferson ( which is a cul-de-sac ). I think with 25 % or so headed toward the roundabout and
Jefferson/Ave 50, we should add those 3 intersections along Jefferson on their list ( Jefferson /
52, Jefferson / Pomello, and Jefferson / 50 )
They also make a statement that all CIP, DIF & TUMF improvement projects are assumed to
be in place by opening year. I suspect we have little or none in the way of improvements in the
coming years in that area, so don't know if when they are doing capacity analysis and LOS, if
they are assuming the existing roadway configurations and lanes, or some future planned
roadway configurations?
Your thoughts on all of the above?
From: Janette Cachola <JCachola@urbanxroads.com>
Sent: Tuesday, August 13, 2019 6:02 PM
To: Steve Libring <SLibring@willdan.com>
Cc: Bryan McKinney <bmckinney@laquintaca.gov>; Rowe, Mike <mrowe@msaconsultinginc.com>;
Vann, Nicole <nvann@msaconsultinginc.com>; Herrera-Cortes, Jesus <jherrera-
cortes@msaconsultinginc.com>; Depalatis, Paul <pdepalatis@msaconsultinginc.com>; Rowe, Allison
arowe@msaconsultinginc.com>; Garrett Simon <gsimon@meriwetherco.com>; Marlie Whiteman
mwhiteman@urbanxroads.com>; John Kain <jkain@urbanxroads.com>; Haseeb Qureshi
hqureshi@urbanxroads.com>
Subject: Wave at Coral Mountain TIA Scope
The scoping agreement for the Wave at Coral Mountain traffic impact analysis is attached for
your review/approval.
Please also provide the signal timing worksheets for existing signal locations within the study
area, which include the following intersections:
Madison St. / Airport Blvd.
Monroe St. / 50th Avenue
Please don’t hesitate to contact us with any questions or concerns.
JANETTE CACHOLA
Analyst
949) 336-5989 Direct
urbanxroads.com
Ofc:1001 Dove St., #260, Newport Beach CA 92660
Main: 260 E. Baker St., #200, Costa Mesa CA 92626
From:Cheri Flores
To:Steve Libring;Bryan McKinney
Subject:RE: Wave at Coral Mountain TIA Scope
Date:Monday, August 26, 2019 9:41:00 AM
Attachments:12615-02 Scope (2019.08.13)_planning notes.pdf
image001.png
image002.png
image003.png
image004.png
image005.png
image006.png
image007.png
Hi Steve
My notes regarding the cumulative projects is in the attached pdf.
Cheri L. Flores | Planning Manager
City of La Quinta
78495 Calle Tampico La Quinta, CA 92253
Ph. 760-777-7067
Website |Map
hwy111LQ.com
From:Cheri Flores
Sent: Thursday, August 15, 2019 1:27 PM
To: Steve Libring <SLibring@willdan.com>; Bryan McKinney <Bmckinney@laquintaca.gov>
Subject: RE: Wave at Coral Mountain TIA Scope
Hi Steve
I have some comments on some of their cumulative projects in their list which
may affect their cumulative analysis. I will comment in the PDF and send it
over to you.
Cheri L. Flores | Planning Manager
City of La Quinta
78495 Calle Tampico La Quinta, CA 92253
Ph. 760-777-7067
Website |Map
hwy111LQ.com
From:Steve Libring <SLibring@willdan.com>
Sent: Thursday, August 15, 2019 12:47 PM
To: Bryan McKinney <Bmckinney@laquintaca.gov>; Cheri Flores <clflores@laquintaca.gov>
Subject: Fw: Wave at Coral Mountain TIA Scope
EXTERNAL: This message originated outside of the City of La Quinta. Please use proper judgement and caution
when opening attachments, clicking links or responding to requests for information. **
Bryan, Cheri:
You both have more history with this project, just wondering f you see any issues that need to
be specifically discussed now, before they start their analysis?
I saw possible bust in distribution pattern where 15% WB on Ave 54 becomes 5% w/o
Jefferson ( which is a cul-de-sac ). I think with 25 % or so headed toward the roundabout and
Jefferson/Ave 50, we should add those 3 intersections along Jefferson on their list ( Jefferson /
52, Jefferson / Pomello, and Jefferson / 50 )
They also make a statement that all CIP, DIF & TUMF improvement projects are assumed to
be in place by opening year. I suspect we have little or none in the way of improvements in the
coming years in that area, so don't know if when they are doing capacity analysis and LOS, if
they are assuming the existing roadway configurations and lanes, or some future planned
roadway configurations?
Your thoughts on all of the above?
From: Janette Cachola <JCachola@urbanxroads.com>
Sent: Tuesday, August 13, 2019 6:02 PM
To: Steve Libring <SLibring@willdan.com>
Cc: Bryan McKinney <bmckinney@laquintaca.gov>; Rowe, Mike <mrowe@msaconsultinginc.com>;
Vann, Nicole <nvann@msaconsultinginc.com>; Herrera-Cortes, Jesus <jherrera-
cortes@msaconsultinginc.com>; Depalatis, Paul <pdepalatis@msaconsultinginc.com>; Rowe, Allison
arowe@msaconsultinginc.com>; Garrett Simon <gsimon@meriwetherco.com>; Marlie Whiteman
mwhiteman@urbanxroads.com>; John Kain <jkain@urbanxroads.com>; Haseeb Qureshi
hqureshi@urbanxroads.com>
Subject: Wave at Coral Mountain TIA Scope
The scoping agreement for the Wave at Coral Mountain traffic impact analysis is attached for
your review/approval.
Please also provide the signal timing worksheets for existing signal locations within the study
area, which include the following intersections:
Madison St. / Airport Blvd.
Monroe St. / 50th Avenue
Please don’t hesitate to contact us with any questions or concerns.
JANETTE CACHOLA
Analyst
949) 336-5989 Direct
urbanxroads.com
Ofc: 1001 Dove St., #260, Newport Beach CA 92660
Main: 260 E. Baker St., #200, Costa Mesa CA 92626
From:Cheri Flores
To:Steve Libring
Subject:RE: Wave at Coral Mountain TIA Scope
Date:Thursday, September 05, 2019 2:24:53 PM
Attachments:image001.png
image003.png
image004.png
image005.png
image006.png
image007.png
image008.png
Hi Steve,
I will take a look. I can respond back to them if you like.
Cheri L. Flores | Planning Manager
City of La Quinta
78495 Calle Tampico La Quinta, CA 92253
Ph. 760-777-7067
Website |Map
hwy111LQ.com
From:Steve Libring <SLibring@willdan.com>
Sent: Thursday, September 05, 2019 12:45 PM
To: Cheri Flores <clflores@laquintaca.gov>
Subject: Fw: Wave at Coral Mountain TIA Scope
EXTERNAL: This message originated outside of the City of La Quinta. Please use proper judgement and caution
when opening attachments, clicking links or responding to requests for information. **
Cheri, it looks like they addressed traffic concerns we mentioned last time, but can you check
the cumulative list, and will you be responding back to them or awaiting others to comment?
I'll be at office Monday if there is any need to discuss.
From: Janette Cachola <JCachola@urbanxroads.com>
Sent: Wednesday, September 4, 2019 5:40 PM
To: Steve Libring <SLibring@willdan.com>; Cheri Flores <clflores@laquintaca.gov>; Bryan McKinney
Bmckinney@laquintaca.gov>
Cc: Vann, Nicole <nvann@msaconsultinginc.com>; Garrett Simon <gsimon@meriwetherco.com>;
Rowe, Mike <mrowe@msaconsultinginc.com>; John Kain <jkain@urbanxroads.com>; Marlie
Whiteman <mwhiteman@urbanxroads.com>; Haseeb Qureshi <hqureshi@urbanxroads.com>
Subject: RE: Wave at Coral Mountain TIA Scope
Pursuant to comments received on August 26th, the attached Wave at Coral Mountain TIA Scope has
been revised. A word doc of the text in track changes mode is also attached so that edits can be
more easily reviewed.
Exhibits 2, 3, 5, and 6 have been modified to include 3 additional intersections, as requested. Table
3 and Exhibit 7 have also been updated to reflect adjustments to the Cumulative Project list.
Please review and approve or send additional comments as soon as possible. If you have any
questions, don’t hesitate to contact John Kain (949.336.5990), Marlie Whiteman (949.336.5991), or
myself (949.336.5989).
Sincerely,
JANETTE CACHOLA
Analyst
949) 336-5989 Direct
urbanxroads.com
Ofc: 1001 Dove St., #260, Newport Beach CA 92660
Main: 260 E. Baker St., #200, Costa Mesa CA 92626
From: Steve Libring [mailto:SLibring@willdan.com]
Sent: Monday, August 26, 2019 3:34 PM
To: Vann, Nicole
Cc: John Kain; Marlie Whiteman; Cheri Flores; Bryan McKinney
Subject: Fw: Wave at Coral Mountain TIA Scope
Nicole here are our comments on the scoping and some related issues
From: Cheri Flores <clflores@laquintaca.gov>
Sent: Monday, August 26, 2019 9:41 AM
To: Steve Libring <SLibring@willdan.com>; Bryan McKinney <Bmckinney@laquintaca.gov>
Subject: RE: Wave at Coral Mountain TIA Scope
Cheri's notes regarding the cumulative projects is in the attached pdf.
I saw possible bust in distribution pattern where 15% WB on Ave 54 becomes 5%w/o
Jefferson ( which is a cul-de-sac ). I think with 25 % or so headed toward the roundabout and
Jefferson/Ave 50, we should add those 3 intersections along Jefferson to the list ( Jefferson /
52, Jefferson / Pomello, and Jefferson / 50 )
They also make a statement that all CIP, DIF & TUMF improvement projects are assumed to
be in place by opening year. I suspect we have little or none in the way of improvements in the
coming years in that area, so don't know if you are doing capacity analysis and LOS, if you are
assuming the existing roadway configurations and lanes, or some future planned roadway
configurations?
The project should be widening the Avenue 58 frontage, widen the EB Avenue 58toadda
2nd EB left turn lane, and paying for a signal or portion of signal as appropriate.
From:Janette Cachola <JCachola@urbanxroads.com>
Sent: Tuesday, August 13, 2019 6:02 PM
To: Steve Libring <SLibring@willdan.com>
Cc: Bryan McKinney <bmckinney@laquintaca.gov>; Rowe, Mike <mrowe@msaconsultinginc.com>;
Vann, Nicole <nvann@msaconsultinginc.com>; Herrera-Cortes, Jesus <jherrera-
cortes@msaconsultinginc.com>; Depalatis, Paul <pdepalatis@msaconsultinginc.com>; Rowe, Allison
arowe@msaconsultinginc.com>; Garrett Simon <gsimon@meriwetherco.com>; Marlie Whiteman
mwhiteman@urbanxroads.com>; John Kain <jkain@urbanxroads.com>; Haseeb Qureshi
hqureshi@urbanxroads.com>
Subject: Wave at Coral Mountain TIA Scope
The scoping agreement for the Wave at Coral Mountain traffic impact analysis is attached for
your review/approval.
Please also provide the signal timing worksheets for existing signal locations within the study
area, which include the following intersections:
Madison St. / Airport Blvd.
Monroe St. / 50th Avenue
Please don’t hesitate to contact us with any questions or concerns.
JANETTE CACHOLA
Analyst
949) 336-5989 Direct
urbanxroads.com
Ofc: 1001 Dove St., #260, Newport Beach CA 92660
Main: 260 E. Baker St., #200, Costa Mesa CA 92626
From:Cheri Flores
To:Steve Libring
Subject:RE: Wave at Coral Mountain TIA Scope
Date:Thursday, September 05, 2019 2:28:04 PM
Attachments:image001.png
image002.png
image003.png
image004.png
image005.png
image006.png
image007.png
Steve,
So if they have addressed everything, should I tell them to proceed with their
study?
Cheri L. Flores | Planning Manager
City of La Quinta
78495 Calle Tampico La Quinta, CA 92253
Ph. 760-777-7067
Website |Map
hwy111LQ.com
From: Steve Libring <SLibring@willdan.com>
Sent: Thursday, September 05, 2019 2:26 PM
To: Cheri Flores <clflores@laquintaca.gov>
Subject: Re: Wave at Coral Mountain TIA Scope
EXTERNAL: This message originated outside of the City of La Quinta. Please use proper judgement and caution
when opening attachments, clicking links or responding to requests for information. **
yes please
From: Cheri Flores <clflores@laquintaca.gov>
Sent: Thursday, September 5, 2019 2:24 PM
To: Steve Libring <SLibring@willdan.com>
Subject: RE: Wave at Coral Mountain TIA Scope
Hi Steve,
I will take a look. I can respond back to them if you like.
Cheri L. Flores | Planning Manager
City of La Quinta
78495 Calle Tampico La Quinta, CA 92253
Ph. 760-777-7067
Website |Map
hwy111LQ.com
From: Steve Libring <SLibring@willdan.com>
Sent: Thursday, September 05, 2019 12:45 PM
To: Cheri Flores <clflores@laquintaca.gov>
Subject: Fw: Wave at Coral Mountain TIA Scope
EXTERNAL: This message originated outside of the City of La Quinta. Please use proper judgement and caution
when opening attachments, clicking links or responding to requests for information. **
Cheri, it looks like they addressed traffic concerns we mentioned last time, but can you check
the cumulative list, and will you be responding back to them or awaiting others to comment?
I'll be at office Monday if there is any need to discuss.
From: Janette Cachola <JCachola@urbanxroads.com>
Sent: Wednesday, September 4, 2019 5:40 PM
To: Steve Libring <SLibring@willdan.com>; Cheri Flores <clflores@laquintaca.gov>; Bryan McKinney
Bmckinney@laquintaca.gov>
Cc: Vann, Nicole <nvann@msaconsultinginc.com>; Garrett Simon <gsimon@meriwetherco.com>;
Rowe, Mike <mrowe@msaconsultinginc.com>; John Kain <jkain@urbanxroads.com>; Marlie
Whiteman <mwhiteman@urbanxroads.com>; Haseeb Qureshi <hqureshi@urbanxroads.com>
Subject: RE: Wave at Coral Mountain TIA Scope
Pursuant to comments received on August 26th, the attached Wave at Coral Mountain TIA Scope has
been revised. A word doc of the text in track changes mode is also attached so that edits can be
more easily reviewed.
Exhibits 2, 3, 5, and 6 have been modified to include 3 additional intersections, as requested. Table
3 and Exhibit 7 have also been updated to reflect adjustments to the Cumulative Project list.
Please review and approve or send additional comments as soon as possible. If you have any
questions, don’t hesitate to contact John Kain (949.336.5990), Marlie Whiteman (949.336.5991), or
myself (949.336.5989).
Sincerely,
JANETTE CACHOLA
Analyst
949) 336-5989 Direct
urbanxroads.com
Ofc: 1001 Dove St., #260, Newport Beach CA 92660
Main: 260 E. Baker St., #200, Costa Mesa CA 92626
From: Steve Libring [mailto:SLibring@willdan.com]
Sent: Monday, August 26, 2019 3:34 PM
To: Vann, Nicole
Cc: John Kain; Marlie Whiteman; Cheri Flores; Bryan McKinney
Subject: Fw: Wave at Coral Mountain TIA Scope
Nicole here are our comments on the scoping and some related issues
From: Cheri Flores <clflores@laquintaca.gov>
Sent: Monday, August 26, 2019 9:41 AM
To: Steve Libring <SLibring@willdan.com>; Bryan McKinney <Bmckinney@laquintaca.gov>
Subject: RE: Wave at Coral Mountain TIA Scope
Cheri's notes regarding the cumulative projects is in the attached pdf.
I saw possible bust in distribution pattern where 15% WB on Ave 54 becomes 5%w/o
Jefferson ( which is a cul-de-sac ). I think with 25 % or so headed toward the roundabout and
Jefferson/Ave 50, we should add those 3 intersections along Jefferson to the list ( Jefferson /
52, Jefferson / Pomello, and Jefferson / 50 )
They also make a statement that all CIP, DIF & TUMF improvement projects are assumed to
be in place by opening year. I suspect we have little or none in the way of improvements in the
coming years in that area, so don't know if you are doing capacity analysis and LOS, if you are
assuming the existing roadway configurations and lanes, or some future planned roadway
configurations?
The project should be widening the Avenue 58 frontage, widen the EB Avenue 58toadda
2nd EB left turn lane, and paying for a signal or portion of signal as appropriate.
From: Janette Cachola <JCachola@urbanxroads.com>
Sent: Tuesday, August 13, 2019 6:02 PM
To: Steve Libring <SLibring@willdan.com>
Cc: Bryan McKinney <bmckinney@laquintaca.gov>; Rowe, Mike <mrowe@msaconsultinginc.com>;
Vann, Nicole <nvann@msaconsultinginc.com>; Herrera-Cortes, Jesus <jherrera-
cortes@msaconsultinginc.com>; Depalatis, Paul <pdepalatis@msaconsultinginc.com>; Rowe, Allison
arowe@msaconsultinginc.com>; Garrett Simon <gsimon@meriwetherco.com>; Marlie Whiteman
mwhiteman@urbanxroads.com>; John Kain <jkain@urbanxroads.com>; Haseeb Qureshi
hqureshi@urbanxroads.com>
Subject: Wave at Coral Mountain TIA Scope
The scoping agreement for the Wave at Coral Mountain traffic impact analysis is attached for
your review/approval.
Please also provide the signal timing worksheets for existing signal locations within the study
area, which include the following intersections:
Madison St. / Airport Blvd.
Monroe St. / 50th Avenue
Please don’t hesitate to contact us with any questions or concerns.
JANETTE CACHOLA
Analyst
949) 336-5989 Direct
urbanxroads.com
Ofc: 1001 Dove St., #260, Newport Beach CA 92660
Main: 260 E. Baker St., #200, Costa Mesa CA 92626
From:Cheri Flores
To:Janette Cachola;Steve Libring;Bryan McKinney
Cc:Vann, Nicole;Garrett Simon;Rowe, Mike;John Kain;Marlie Whiteman;Haseeb Qureshi
Subject:RE: Wave at Coral Mountain TIA Scope
Date:Friday, September 06, 2019 12:54:46 PM
Attachments:image001.png
image003.png
image004.png
image005.png
image006.png
image007.png
image008.png
Hi Janette—
Looks like you have incorporated all the revisions we asked for and we have no
further comments. Please go ahead and proceed with preparing the study. If
you have any other questions, just let us know!
Cheri L. Flores | Planning Manager
City of La Quinta
78495 Calle Tampico La Quinta, CA 92253
Ph. 760-777-7067
Website |Map
hwy111LQ.com
From:Janette Cachola <JCachola@urbanxroads.com>
Sent: Wednesday, September 04, 2019 5:41 PM
To: Steve Libring <SLibring@willdan.com>; Cheri Flores <clflores@laquintaca.gov>; Bryan McKinney
Bmckinney@laquintaca.gov>
Cc: Vann, Nicole <nvann@msaconsultinginc.com>; Garrett Simon <gsimon@meriwetherco.com>;
Rowe, Mike <mrowe@msaconsultinginc.com>; John Kain <jkain@urbanxroads.com>; Marlie
Whiteman <mwhiteman@urbanxroads.com>; Haseeb Qureshi <hqureshi@urbanxroads.com>
Subject: RE: Wave at Coral Mountain TIA Scope
EXTERNAL: This message originated outside of the City of La Quinta. Please use proper judgement and caution
when opening attachments, clicking links or responding to requests for information. **
Pursuant to comments received on August 26 th, the attached Wave at Coral Mountain TIA Scope has
been revised. A word doc of the text in track changes mode is also attached so that edits can be
more easily reviewed.
Exhibits 2, 3, 5, and 6 have been modified to include 3 additional intersections, as requested. Table
3 and Exhibit 7 have also been updated to reflect adjustments to the Cumulative Project list.
Please review and approve or send additional comments as soon as possible. If you have any
questions, don’t hesitate to contact John Kain (949.336.5990), Marlie Whiteman (949.336.5991), or
myself (949.336.5989).
Sincerely,
JANETTE CACHOLA
Analyst
949) 336-5989 Direct
urbanxroads.com
Ofc: 1001 Dove St., #260, Newport Beach CA 92660
Main: 260 E. Baker St., #200, Costa Mesa CA 92626
From: Steve Libring [mailto:SLibring@willdan.com]
Sent: Monday, August 26, 2019 3:34 PM
To: Vann, Nicole
Cc: John Kain; Marlie Whiteman; Cheri Flores; Bryan McKinney
Subject: Fw: Wave at Coral Mountain TIA Scope
Nicole here are our comments on the scoping and some related issues
From: Cheri Flores <clflores@laquintaca.gov>
Sent: Monday, August 26, 2019 9:41 AM
To: Steve Libring <SLibring@willdan.com>; Bryan McKinney <Bmckinney@laquintaca.gov>
Subject: RE: Wave at Coral Mountain TIA Scope
Cheri's notes regarding the cumulative projects is in the attached pdf.
I saw possible bust in distribution pattern where 15% WB on Ave 54 becomes 5%w/o
Jefferson ( which is a cul-de-sac ). I think with 25 % or so headed toward the roundabout and
Jefferson/Ave 50, we should add those 3 intersections along Jefferson to the list ( Jefferson /
52, Jefferson / Pomello, and Jefferson / 50 )
They also make a statement that all CIP, DIF & TUMF improvement projects are assumed to
be in place by opening year. I suspect we have little or none in the way of improvements in the
coming years in that area, so don't know if you are doing capacity analysis and LOS, if you are
assuming the existing roadway configurations and lanes, or some future planned roadway
configurations?
The project should be widening the Avenue 58 frontage, widen the EB Avenue 58toadda
2nd EB left turn lane, and paying for a signal or portion of signal as appropriate.
From:Janette Cachola <JCachola@urbanxroads.com>
Sent: Tuesday, August 13, 2019 6:02 PM
To: Steve Libring <SLibring@willdan.com>
Cc: Bryan McKinney <bmckinney@laquintaca.gov>; Rowe, Mike <mrowe@msaconsultinginc.com>;
Vann, Nicole <nvann@msaconsultinginc.com>; Herrera-Cortes, Jesus <jherrera-
cortes@msaconsultinginc.com>; Depalatis, Paul <pdepalatis@msaconsultinginc.com>; Rowe, Allison
arowe@msaconsultinginc.com>; Garrett Simon <gsimon@meriwetherco.com>; Marlie Whiteman
mwhiteman@urbanxroads.com>; John Kain <jkain@urbanxroads.com>; Haseeb Qureshi
hqureshi@urbanxroads.com>
Subject: Wave at Coral Mountain TIA Scope
The scoping agreement for the Wave at Coral Mountain traffic impact analysis is attached for
your review/approval.
Please also provide the signal timing worksheets for existing signal locations within the study
area, which include the following intersections:
Madison St. / Airport Blvd.
Monroe St. / 50th Avenue
Please don’t hesitate to contact us with any questions or concerns.
JANETTE CACHOLA
Analyst
949) 336-5989 Direct
urbanxroads.com
Ofc: 1001 Dove St., #260, Newport Beach CA 92660
Main: 260 E. Baker St., #200, Costa Mesa CA 92626
From:Cheri Flores
To:Steve Libring;Bryan McKinney
Cc:Danny Castro
Subject:RE: Wave at Coral Mountain TIA Scope
Date:Thursday, August 15, 2019 1:12:03 PM
Attachments:PREV2019-0001 PRE APP COMMENTS 19-01-22.pdf
image002.png
image003.png
image004.png
image005.png
image006.png
image007.png
image008.png
Hi Steve,
We don’t know much more that you do but I do have a letter I provided to
them on the types of entitlements they appeared to need. I will attach that. It
looks like they have added a commercial corner on 58th and Madison since we
last talked to them. Some of the land use patterns may have changed as well.
Cheri L. Flores | Planning Manager
City of La Quinta
78495 Calle Tampico La Quinta, CA 92253
Ph. 760-777-7067
Website |Map
hwy111LQ.com
From: Steve Libring <SLibring@willdan.com>
Sent: Thursday, August 15, 2019 12:47 PM
To: Bryan McKinney <Bmckinney@laquintaca.gov>; Cheri Flores <clflores@laquintaca.gov>
Subject: Fw: Wave at Coral Mountain TIA Scope
EXTERNAL: This message originated outside of the City of La Quinta. Please use proper judgement and caution
when opening attachments, clicking links or responding to requests for information. **
Bryan, Cheri:
You both have more history with this project, just wondering f you see any issues that need to
be specifically discussed now, before they start their analysis?
I saw possible bust in distribution pattern where 15% WB on Ave 54 becomes 5% w/o
Jefferson ( which is a cul-de-sac ). I think with 25 % or so headed toward the roundabout and
Jefferson/Ave 50, we should add those 3 intersections along Jefferson on their list ( Jefferson /
52, Jefferson / Pomello, and Jefferson / 50 )
They also make a statement that all CIP, DIF & TUMF improvement projects are assumed to
be in place by opening year. I suspect we have little or none in the way of improvements in the
coming years in that area, so don't know if when they are doing capacity analysis and LOS, if
they are assuming the existing roadway configurations and lanes, or some future planned
roadway configurations?
Your thoughts on all of the above?
From:Janette Cachola <JCachola@urbanxroads.com>
Sent: Tuesday, August 13, 2019 6:02 PM
To: Steve Libring <SLibring@willdan.com>
Cc: Bryan McKinney <bmckinney@laquintaca.gov>; Rowe, Mike <mrowe@msaconsultinginc.com>;
Vann, Nicole <nvann@msaconsultinginc.com>; Herrera-Cortes, Jesus <jherrera-
cortes@msaconsultinginc.com>; Depalatis, Paul <pdepalatis@msaconsultinginc.com>; Rowe, Allison
arowe@msaconsultinginc.com>; Garrett Simon <gsimon@meriwetherco.com>; Marlie Whiteman
mwhiteman@urbanxroads.com>; John Kain <jkain@urbanxroads.com>; Haseeb Qureshi
hqureshi@urbanxroads.com>
Subject: Wave at Coral Mountain TIA Scope
The scoping agreement for the Wave at Coral Mountain traffic impact analysis is attached for
your review/approval.
Please also provide the signal timing worksheets for existing signal locations within the study
area, which include the following intersections:
Madison St. / Airport Blvd.
Monroe St. / 50th Avenue
Please don’t hesitate to contact us with any questions or concerns.
JANETTE CACHOLA
Analyst
949) 336-5989 Direct
urbanxroads.com
Ofc: 1001 Dove St., #260, Newport Beach CA 92660
Main: 260 E. Baker St., #200, Costa Mesa CA 92626
From:Bryan McKinney
To:Steve Libring;Cheri Flores
Subject:RE: Wave at Coral Mountain TIA Scope
Date:Thursday, August 15, 2019 1:41:53 PM
Attachments:image001.png
I think they will be conditioned to add the second eastbound lane on Avenue 58 adjacent to their
frontage.
Bryan McKinney, P.E. | City Engineer
City of La Quinta
78495 Calle Tampico La Quinta, CA 92253
760.777.7045
Email:bmckinney@laquintaca.gov
Website:www.la-quinta.org
From: Steve Libring <SLibring@willdan.com>
Sent: Thursday, August 15, 2019 12:47 PM
To: Bryan McKinney <Bmckinney@laquintaca.gov>; Cheri Flores <clflores@laquintaca.gov>
Subject: Fw: Wave at Coral Mountain TIA Scope
EXTERNAL: This message originated outside of the City of La Quinta. Please use proper judgement and caution
when opening attachments, clicking links or responding to requests for information. **
Bryan, Cheri:
You both have more history with this project, just wondering f you see any issues that need to
be specifically discussed now, before they start their analysis?
I saw possible bust in distribution pattern where 15% WB on Ave 54 becomes 5% w/o
Jefferson ( which is a cul-de-sac ). I think with 25 % or so headed toward the roundabout and
Jefferson/Ave 50, we should add those 3 intersections along Jefferson on their list ( Jefferson /
52, Jefferson / Pomello, and Jefferson / 50 )
They also make a statement that all CIP, DIF & TUMF improvement projects are assumed to
be in place by opening year. I suspect we have little or none in the way of improvements in the
coming years in that area, so don't know if when they are doing capacity analysis and LOS, if
they are assuming the existing roadway configurations and lanes, or some future planned
roadway configurations?
Your thoughts on all of the above?
From: Janette Cachola <JCachola@urbanxroads.com>
Sent: Tuesday, August 13, 2019 6:02 PM
To: Steve Libring <SLibring@willdan.com>
Cc: Bryan McKinney <bmckinney@laquintaca.gov>; Rowe, Mike <mrowe@msaconsultinginc.com>;
Vann, Nicole <nvann@msaconsultinginc.com>; Herrera-Cortes, Jesus <jherrera-
cortes@msaconsultinginc.com>; Depalatis, Paul <pdepalatis@msaconsultinginc.com>; Rowe, Allison
arowe@msaconsultinginc.com>; Garrett Simon <gsimon@meriwetherco.com>; Marlie Whiteman
mwhiteman@urbanxroads.com>; John Kain <jkain@urbanxroads.com>; Haseeb Qureshi
hqureshi@urbanxroads.com>
Subject: Wave at Coral Mountain TIA Scope
The scoping agreement for the Wave at Coral Mountain traffic impact analysis is attached for
your review/approval.
Please also provide the signal timing worksheets for existing signal locations within the study
area, which include the following intersections:
Madison St. / Airport Blvd.
Monroe St. / 50th Avenue
Please don’t hesitate to contact us with any questions or concerns.
JANETTE CACHOLA
Analyst
949) 336-5989 Direct
urbanxroads.com
Ofc: 1001 Dove St., #260, Newport Beach CA 92660