Loading...
2021-01-11 2553 The Wave CEQA Inital Study UpdateWednesday, February 24, 2021 at 14:41:07 Pacific Standard Time Page 1 of 3 Subject:RE: 2553 The Wave CEQA Ini4al Study Update [2553-MSA1.NRzf] Date:Monday, January 11, 2021 at 3:30:25 PM Pacific Standard Time From:Witherspoon, Michelle To:Nicole Criste ACachments:image001.jpg, image002.jpg Nicole, Thank you I will let her know. 8:30 or 9:00 am tomorrow would work best for me. Thanks! Michelle Witherspoon Director of Environmental Services MSA Consul4ng, Inc. mwitherspoon@msaconsul4nginc.com 760-320-9811 From: Nicole Criste <ncriste@terranovaplanning.com> Sent: Monday, January 11, 2021 3:22 PM To: Witherspoon, Michelle <mwitherspoon@msaconsul4nginc.com>; Nicole Criste <Ncriste@laquintaca.gov> Subject: Re: 2553 The Wave CEQA Ini4al Study Update [2553-MSA1.NRzf] Michelle, I am sorry to hear about Nicole, and hope that all will be well. I am at the office, see below, 7 AM to 5 PM. I have a 3.30 and a 4 yet today, but can talk tomorrow before 9.30 AM, or at 1 PM. Let me know what works for you. Nicole Sauviat Criste Principal TERRA NOVA PLANNING & RESEARCH, INC.® 42635 Melanie Place, Ste 101 PALM DESERT, CA. 92211 760) 341-4800 FAX#: 760-341-4455 E-Mail: ncriste@terranovaplanning.com Page 2 of 3 From: Witherspoon, Michelle <mwitherspoon@msaconsul4nginc.com> Sent: Monday, January 11, 2021 2:02 PM To: Nicole Criste <Ncriste@laquintaca.gov> Subject: RE: 2553 The Wave CEQA Ini4al Study Update [2553-MSA1.NRzf] Hi Nicole, Garree asked me to contact you regarding some language in the CEQA Document for The Wave. Nicole Vann is out indefinitely for a family emergency; I believe all her email is currently forwarded to Paul D. Do you have a phone number you prefer that I u4lize? Michelle Witherspoon Director of Environmental Services MSA Consul4ng, Inc. mwitherspoon@msaconsul4nginc.com 760-320-9811 From: Nicole Criste <Ncriste@laquintaca.gov> Sent: Tuesday, February 11, 2020 12:01 PM To: Vann, Nicole <nvann@msaconsul4nginc.com> Cc: Witherspoon, Michelle <mwitherspoon@msaconsul4nginc.com>; Cheri Flores <clflores@laquintaca.gov> Subject: RE: 2553 The Wave CEQA Ini4al Study Update [2553-MSA1.NRzf] Nicole, Your approach is correct, as IID has been asking us to cover all their work for private projects in our IS’s. You have the op4on of forwarding the document to them before distribu4on, but we will make the final decision regarding any changes they request. We will need to make arrangements for me to review their changes aler the City has provided you with comments, and before the document is finalized. Nicole From: Vann, Nicole <nvann@msaconsul4nginc.com> Sent: Tuesday, February 11, 2020 11:32 AM To: Nicole Criste <Ncriste@laquintaca.gov> Cc: Witherspoon, Michelle <mwitherspoon@msaconsul4nginc.com> Subject: 2553 The Wave CEQA Ini4al Study Update [2553-MSA1.NRzf] EXTERNAL: This message originated outside of the City of La Quinta. Please use proper judgement and cau4on when opening aeachments, clicking links or responding to requests for informa4on. ** Page 3 of 3 Hi Nicole, I wanted to touch base on the environmental IS for the Wave and let you know in advance about a request that has been made from IID. IID has agreed to a distribution line extension from the IID substation facility on Avenue 58 to the project site and would like this distribution line to be incorporated into the projects IS. The applicant would be responsible for installing a transformer bank to update the substation and install three conduit systems as part of the extension. The improvements would occur in the right-of-way as shown on the attached exhibit we received from IID. I have coordinated with Donald Vargas in the Environmental Department at IID on this request to ensure we cover what they need. Our intent is to add the line extension, conduits and transformer bank into the project description and then include them as part of our analysis in the relevant sections. We anticipate the IS to be a Mitigated Neg-Dec and given the location of the IID work, we do not anticipate any substantial impacts would occur to change this direction. IID has agreed with this approach and also requests a draft of the IS/MND to review before it is issued for public review. Once the MND is finalized, IID would proceed with responsible agency findings and would need a copy of the lead agency-approved IS/MND and a copy of the NOD filing. I thought it would be good to bring this up now since there will need to be additional agency coordination. We will continue to work with IID to get additional details to be incorporated into the IS/MND. I would like to include you on our future correspondence with IID so that you stay in the loop. Please let me know if you have any questions. Thank you, Nicole Vann Planner 34200 Bob Hope Drive | Rancho Mirage, CA 92270 office 760.320.9811 website | map | email