2021-02-12 Ad Proof for City of La Quinta1
From:Helmbrecht, Alex <ahelmbrech@localiq.com>
Sent:Friday, February 12, 2021 12:43 PM
To:Cheri Flores
Subject:RE: Ad Proof for City Of La Quinta GCI0590879
EXTERNAL:This message originated outside of the City of La Quinta.Please use proper judgement and caution when opening
attachments,clicking links or responding to requests for information.
Thanks Cheri I have this approved for the 17th.
Alex Helmbrecht
Client Success Manager, SMB
888) 263-7991
ahelmbrech@localiq.com
LOCALiQ.com
From:Cheri Flores clflores@laquintaca.gov>
Sent:Friday,February 12,2021 3:35 PM
To:Helmbrecht,Alex ahelmbrech@localiq.com>
Cc:Tania Flores tflores@laquintaca.gov>
Subject:Re:Ad Proof for City Of La Quinta GCI0590879
Hi Alex,
This ad is approved to run.Thank you!
cid:image008.png@01D566E6.638C2DA0
Cheri L.Flores Planning Manager
City of La Quinta
78495 Calle Tampico La Quinta,CA 92253
Ph.760 777 7067
www.laquintaca.gov
From:Helmbrecht,Alex ahelmbrech@localiq.com>
Sent:Friday,February 12,2021 5:26 AM
To:Cheri Flores clflores@laquintaca.gov>
Subject:Ad Proof for City Of La Quinta GCI0590879
EXTERNAL:This message originated outside of the City of La Quinta.Please use proper judgement and caution when opening
attachments,clicking links or responding to requests for information.
2
Good morning,
The attached display ad is set to run in the Palm Springs Desert Sun on February 17th for a total cost of
441.00.
Please let me know if you’d like any updates to your ad or if this is approved to run.
Thanks,
Alex Helmbrecht
Client Success Manager, SMB
888) 263-7991
ahelmbrech@localiq.com
LOCALiQ.com
DS-GCI0590879-01
Project Title: Coral Mountain Resort
Project Location: Within the City of La Quinta, the project encompasses an
area of approximately 929 acres south of Avenue 58, north of Avenue 60, and
east and west of Madison Street. As a part of the proposed project, the 386-
acre portion of the site west of Madison Street is proposed to be removed from
the existing Andalusia Specific Plan (SP 03-067) and developed under Specific
Plan 2019-0003. This area is generally bounded by the Avenue 58 to the north;
Madison Street to the east; the extension of Avenue 60 to the south; and Coral
Mountain to the west. Located in portions of Section 27 and 28, Township 6
South, Range 7 East, San Bernardino Base Line and Meridian; Latitude 33° 37’
15” N Longitude 116° 15’ 21” W (approximate geographic center of the site).
Project Description: The proposed project would result in the development
of a master planned resort community, and the removal of the 386-acre
development site from the existing 929-acre Andalusia at Coral Mountain
Specific Plan. The project proposes to develop the 386-acre site with a mix of
uses including up to 600 dwelling units of varying product types, a resort facility
with up to 150 rooms, 57,000 square feet of tourist commercial uses, 60,000
square feet of neighborhood commercial uses, and open space recreational
uses on approximately 23.6 acres. In addition, the project proposes a 16.62-
acre artificial wave basin for recreational purposes. The project consists of
the following entitlement applications: a General Plan Amendment (GPA 2019-0002), a Zone Change (ZC 2019-0004), a Specific Plan
Amendment to SP 03-067, a Specific Plan (SP 2019-0003), a Tentative Tract Map (TTM 2019-0005), and a Site Development Permit (SDP)
for a portion of the project consisting of an artificial wave basin.
The City of La Quinta, acting as the Lead Agency, has determined that an Environmental Impact Report (EIR) should be prepared for the
proposed project. The EIR will be prepared in accordance with the California Environmental Quality Act (CEQA) to evaluate the potential
environmental impacts associated with the implementation of the project.
This Notice of Preparation also solicits comments and questions from responsible agencies, trustee agencies, federal, State and local
agencies and the general public, on the scope and content of the environmental document to be prepared to analyze the potential
environmental impacts of the proposed project. Comments received in response to this Notice of Preparation will be reviewed and
considered in determining the scope of the EIR. The time period to submit comments will begin February 17, 2021 and will end March
19, 2021.
Comments and questions may be directed to: Nicole Sauviat Criste, Consulting Planner, City of La Quinta, 78-495 Calle Tampico, La
Quinta, CA 92253, or consultingplanner@laquintaca.gov. Please include the name, phone number, and address of your agency’s contact
person in your response.
PUBLISH ONCE ON FEBRUARY 17, 2021 1/8 PAGE DISPLAY AD
CITY OF LA QUINTA
NOTICE OF PREPARATION