Loading...
MP2019-0004 AQ ReportThe Wave – Coral Mountain AIR QUALITY IMPACT ANALYSIS CITY OF LA QUINTA PREPARED BY: Haseeb Qureshi hqureshi@urbanxroads.com 949) 336-5987 Alyssa Tamase atamase@urbanxroads.com 949) 336-5988 DECEMBER 3, 2019 12641-03 AQ Report The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report i TABLE OF CONTENTS TABLE OF CONTENTS ........................................................................................................................... I APPENDICES ...................................................................................................................................... II LIST OF EXHIBITS ................................................................................................................................ II LIST OF TABLES .................................................................................................................................. II LIST OF ABBREVIATED TERMS ............................................................................................................ III EXECUTIVE SUMMARY ....................................................................................................................... 1 ES.1 Summary of Findings ..................................................................................................................... 1 ES.2 Standard Regulatory Requirements/Best Available Control Measures ........................................ 1 ES.3 Construction-Source Mitigation Measures ................................................................................... 2 ES.4 Operational-Source Mitigation Measures .................................................................................... 2 1 INTRODUCTION ......................................................................................................................... 4 1.1 Site Location .................................................................................................................................. 4 1.2 Project Description ........................................................................................................................ 4 2 AIR QUALITY SETTING ................................................................................................................ 8 2.1 Atmospheric Setting ...................................................................................................................... 8 2.2 Criteria Pollutants ......................................................................................................................... 9 2.3 Existing Air Quality ...................................................................................................................... 16 2.4 Regional Air Quality .................................................................................................................... 19 2.5 Local Air Quality .......................................................................................................................... 19 2.6 Regulatory Background ............................................................................................................... 20 3 PROJECT AIR QUALITY IMPACT ................................................................................................ 26 3.1 Introduction ................................................................................................................................ 26 3.2 Standards of Significance ............................................................................................................ 26 3.3 California Emissions Estimator Model™ Employed To Analyze Air Quality ................................ 27 3.4 Construction Emissions ............................................................................................................... 27 3.5 Operational Emissions ................................................................................................................ 33 3.6 Localized Significance - Construction Activity ............................................................................. 36 3.7 Localized Significance – Long-Term Operational Activity ........................................................... 45 3.8 CO “Hot Spot” Analysis ............................................................................................................... 46 3.9 Air Quality Management Planning .............................................................................................. 48 3.10 Potential Impacts to Sensitive Receptors ................................................................................... 50 3.11 Odors ........................................................................................................................................... 50 3.12 Cumulative Impacts .................................................................................................................... 51 4 REFERENCES ............................................................................................................................ 54 5 CERTIFICATIONS ...................................................................................................................... 57 The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report ii APPENDICES APPENDIX 2.1: STATE/FEDERAL ATTAINMENT STATUS OF CRITERIA POLLUTANTS APPENDIX 3.1: CALEEMOD CONSTRUCTION (UNMITIGATED) EMISSIONS MODEL OUTPUTS APPENDIX 3.2: CALEEMOD CONSTRUCTION (MITIGATED) EMISSIONS MODEL OUTPUTS APPENDIX 3.3: CALEEMOD OPERATIONAL EMISSIONS MODEL OUTPUTS LIST OF EXHIBITS EXHIBIT 1-A: LOCATION MAP ............................................................................................................. 5 EXHIBIT 1-B: PRELIMINARY LAND USE PLAN ....................................................................................... 6 EXHIBIT 3-A: SENSITIVE RECEPTOR LOCATIONS ................................................................................ 41 LIST OF TABLES TABLE ES-1: SUMMARY OF CEQA SIGNIFICANCE FINDINGS ................................................................. 1 TABLE 2-1: CRITERIA POLLUTANTS ...................................................................................................... 9 TABLE 2-2: AMBIENT AIR QUALITY STANDARDS (1 OF 2).................................................................... 17 TABLE 2-2: AMBIENT AIR QUALITY STANDARDS (2 OF 2).................................................................... 18 TABLE 2-3: ATTAINMENT STATUS OF CRITERIA POLLUTANTS IN THE SSAB ......................................... 19 TABLE 2-4: PROJECT AREA AIR QUALITY MONITORING SUMMARY 2016-2018.................................... 20 TABLE 3-1: MAXIMUM DAILY REGIONAL EMISSIONS THRESHOLDS .................................................... 26 TABLE 3-2: CONSTRUCTION DURATION ............................................................................................. 28 TABLE 3-3: CONSTRUCTION EQUIPMENT ASSUMPTIONS (1 OF 2) ...................................................... 29 TABLE 3-3: CONSTRUCTION EQUIPMENT ASSUMPTIONS (2 OF 2) ...................................................... 30 TABLE 3-4 OVERALL CONSTRUCTION EMISSIONS SUMMARY (WITHOUT MITIGATION) ....................... 31 TABLE 3-5 OVERALL CONSTRUCTION EMISSIONS SUMMARY (WITH MITIGATION) ............................. 32 TABLE 3-6: SUMMARY OF PEAK OPERATIONAL EMISSIONS (1 OF 2) ................................................... 35 TABLE 3-6: SUMMARY OF PEAK OPERATIONAL EMISSIONS (2 OF 2) ................................................... 36 TABLE 3-7: MAXIMUM DAILY DISTURBED-ACREAGE (1 OF 2) ............................................................. 38 TABLE 3-7: MAXIMUM DAILY DISTURBED-ACREAGE (2 OF 2) ............................................................. 39 TABLE 3-8: MAXIMUM DAILY LOCALIZED EMISSIONS THRESHOLDS (1 OF 2) ....................................... 42 TABLE 3-8: MAXIMUM DAILY LOCALIZED EMISSIONS THRESHOLDS (2 OF 2) ....................................... 43 TABLE 3-9: LOCALIZED SIGNIFICANCE SUMMARY OF CONSTRUCTION (WITHOUT MITIGATION, 1 OF 2) 43 TABLE 3-9: LOCALIZED SIGNIFICANCE SUMMARY OF CONSTRUCTION (WITHOUT MITIGATION, 2 OF 2) 44 TABLE 3-10: LOCALIZED SIGNIFICANCE SUMMARY OF CONSTRUCTION (WITH MITIGATION) .............. 45 TABLE 3-11: CO MODEL RESULTS ...................................................................................................... 46 TABLE 3-12: TRAFFIC VOLUMES ........................................................................................................ 47 TABLE 3-13: OPENING YEAR WITH PROJECT (2026 EPAC) TRAFFIC VOLUMES...................................... 48 The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report iii LIST OF ABBREVIATED TERMS 1) Reference µg/m3 Microgram per Cubic Meter AQIA Air Quality Impact Analysis AQMP Air Quality Management Plan BACM Best Available Control Measures BBAQMD Bay Area Air Quality Management District CAA Federal Clean Air Act CAAQS California Ambient Air Quality Standards CalEEMod California Emissions Estimator Model CalEPA California Environmental Protection Agency CALGreen California Green Building Standards Code CAPCOA California Air Pollution Control Officers Association CARB California Air Resources Board CCR California Code of Regulations CEC California Energy Commission CEQA California Environmental Quality Act CITY City of La Quinta CO Carbon Monoxide DU Dwelling Units EIR Environmental Impact Reports EMFAC Emission Factor Model EPA Environmental Protection Agency GHG Greenhouse Gas HI Hazard Index IBC Irvine Business Complex ITE Institute of Transportation Engineers LBS/DAY Pounds Per Day LST Localized Significance Threshold LST METHODOLOGY Final Localized Significance Threshold Methodology MCAS Marine Corps Air Station MM Mitigation Measure NAAQS National Ambient Air Quality Standards NO2 Nitrogen Dioxide NOX Nitrogen Oxides O3 Ozone OPR Office of Planning and Research The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report iv PAO Professional and Administrative Office Pb Lead PM10 Particulate Matter 10 microns in diameter or less PM2.5 Particulate Matter 2.5 microns in diameter or less PPM Parts Per Million Project The Wave – Coral Mountain RECLAIM Regional Clean Air Incentives Market ROG Reactive Organic Gases RTP/SCS Regional Transportation Plan/ Sustainable Communities Strategy SB Senate Bill SCAG Southern California Association of Governments SCAQMD South Coast Air Quality Management District SIP State Implementation Plan SO2 Sulfur Dioxide SRA Source Receptor Area SSAB Salton Sea Air Basin TAC Toxic Air Contaminant TIA Traffic Impact Analysis VMT Vehicle Miles Traveled VOC Volatile Organic Compounds VPH Vehicles Per Hour The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report v This page intentionally left blank The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report 1 EXECUTIVE SUMMARY ES.1 SUMMARY OF FINDINGS The results of this The Wave – Coral Mountain Air Quality Impact Analysis are summarized below based on the significance criteria in Section 3 of this report consistent with Appendix G of the California Environmental Quality Act (CEQA) Guidelines (1). Table ES-1 shows the findings of significance for each potential air quality impact under CEQA before and after any required mitigation measures described below. TABLE ES-1: SUMMARY OF CEQA SIGNIFICANCE FINDINGS Analysis Report Section Significance Findings Unmitigated Mitigated Regional Construction Emissions 3.4 Less Than Significant n/a Localized Construction Emissions 3.6 Potentially Significant Less Than Significant Regional Operational Emissions 3.5 Less Than Significant n/a Localized Operational Emissions 3.7 Less Than Significant n/a CO “Hot Spot” Analysis 3.8 Less Than Significant n/a Air Quality Management Plan 3.9 Potentially Significant Less Than Significant Sensitive Receptors 3.10 Less Than Significant n/a Odors 3.11 Less Than Significant n/a Cumulative Impacts 3.12 Potentially Significant Less Than Significant ES.2 STANDARD REGULATORY REQUIREMENTS/BEST AVAILABLE CONTROL MEASURES Measures listed below (or equivalent language) shall appear on all Project grading plans, construction specifications and bid documents, and the City shall ensure such language is incorporated prior to issuance of any development permits. South Coast Air Quality Management District (SCAQMD) Rules that are currently applicable during construction activity for this Project include but are not limited to Rule 403 (Fugitive Dust) (2) and Rule 1113 (Architectural Coatings) 3). It should be noted that these Best Available Control Measures (BACMs) are not mitigation as The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report 2 they are standard regulatory requirements. As such, credit for Rule 403 and Rule 1113 have been taken. BACM AQ-1 The contractor shall adhere to applicable measures contained in Table 1 of Rule 403 including, but not limited to (2): All clearing, grading, earth-moving, or excavation activities shall cease when winds exceed 25 mph per SCAQMD guidelines in order to limit fugitive dust emissions. The contractor shall ensure that all disturbed unpaved roads and disturbed areas within the Project are watered at least three (3) times daily during dry weather. Watering, with complete coverage of disturbed areas, shall occur at least three times a day, preferably in the mid-morning, afternoon, and after work is done for the day. The contractor shall ensure that traffic speeds on unpaved roads and Project site areas are limited to 15 miles per hour or less. BACM AQ-2 The following measures shall be incorporated into Project plans and specifications as implementation of SCAQMD Rule 1113 (3): Only “Low-Volatile Organic Compounds (VOC)” paints (no more than 50 gram/liter of VOC) consistent with SCAQMD Rule 1113 shall be used. BACM AQ-3 The Project is required to comply with SCAQMD Rule 445, which prohibits the use of wood burning stoves and fireplaces in new development (4). ES.3 CONSTRUCTION-SOURCE MITIGATION MEASURES MM AQ-1 For equipment greater than 150 horsepower (>150 HP), the Construction Contractor shall ensure that off-road diesel construction equipment that complies with Environmental Protection Agency EPA)/California Air Resources Board (CARB) Tier 3 emissions standards and shall ensure that all construction equipment is tuned and maintained in accordance with the manufacturer’s specifications. ES.4 OPERATIONAL-SOURCE MITIGATION MEASURES The Project would not result in an exceedance of any regional or localized operational-source emissions thresholds. As such, the Project would not result in any significant impacts and no mitigation measures are required. The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report 3 This page intentionally left blank The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report 4 1 INTRODUCTION This report presents the results of the air quality impact analysis (AQIA) prepared by Urban Crossroads, Inc., for the proposed The Wave – Coral Mountain (Project). The purpose of this AQIA is to evaluate the potential impacts to air quality associated with construction and operation of the proposed Project and recommend measures to mitigate impacts considered potentia lly significant in comparison to thresholds established by the SCAQMD. 1.1 SITE LOCATION The Project site is located on the southwest corner of re-aligned Madison Street at 58th Avenue in the City of La Quinta, as shown on Exhibit 1-A. 1.2 PROJECT DESCRIPTION The Project consists of a master planned themed resort comprised of a recreational pool (wave pool), a 150 key hotel, 104 attached dwelling units (DU), 496 detached DUs, 60,000 square feet of retail, a pop up village park, and a total of 265 parking spaces. The preliminary Project land use plan is presented on Exhibit 1 B. The Project is anticipated to be constructed in phases, with Phase 1 (2021) including resort (wave pool and hotel uses), 96 attached DUs, 38 detached DUs, and 10,000 square feet of retail use. Project Phase 2 (2023) adds 25,000 square feet of retail. Project Phase 3 (2026) adds 462 detached DUs and 30,000 square feet of retail use. The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report 5 EXHIBIT 1-A: LOCATION MAP The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report 6 EXHIBIT 1-B: PRELIMINARY LAND USE PLAN The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report 7 This page intentionally left blank The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report 8 2 AIR QUALITY SETTING This section provides an overview of the existing air quality conditions in the Project area and region. 2.1 ATMOSPHERIC SETTING The Project site is located within Salton Sea Air Basin (SSAB) within the jurisdiction of the SCAQMD. The SSAB is aligned in a north-west-southwest orientation stretching from Banning Pass to the Mexican border. The regional climate, as well as the temperature, wind, humidity, precipitation, and amount of sunshine significantly influence the air quality in the SSAB. The climate of the Coachella Valley is a continental, desert-type climate, with hot summers, mild winters, and very little annual rainfall. Precipitation is less than six inches annually and occurs mostly in the winter months from active frontal systems and in the late summer months from thunderstorms. Almost all of the annual rainfall comes from the fringes of mid -latitude storms from late November to early April with summers often being completely dry. Temperatures exceed 100 degrees Fahrenheit (°F), on the average, for four months each year, with daily highs near 110 °F during July and August. Summer nights are cooler with minimum temperatures in the mid-70s. During the winter season, daytime highs are quite mild, but the dry air is conducive to nocturnal radiational cooling, with early morning lows around 40 °F. The Coachella Valley and adjacent areas are exposed to frequent gusty winds. The flat terrain of the valley and strong temperature differentials, created by intense solar heating, produce moderate winds and deep thermal convection. Wind speeds exceeding 31 miles per hour (mph) occur most frequently in April and May. On an annual basis, strong winds (greater than 31 mph) are observed 0.6 percent of the time and speeds of less than 6.8 mph account for more than one- half of the observed winds. Prevailing winds are from the northwest through southwest, with secondary flows from the southeast. The strongest and most persistent winds typically occur immediately to the east of Banning Pass, which is noted as a wind power generation resource area. Aside from this locale, the wind conditions in the remainder of the Coachella Valley are geographically distinct. Stronger winds tend to occur closer to the foothills. Less frequently, widespread gusty winds occur over all areas of the Valley. Portions of the SSAB experience surface inversions almost every day of the year. Inversions in the SSAB are attributed to strong surface heating, but are usually broken, allowing pollutants to disperse more easily. Weak surface inversions are caused by cooling of air in contact with the cold surface of the earth at night. In the valleys and low -lying areas, this condition is intensified by the addition of cold air flowing downslope from the hills and pooling on the valle y floor. In addition, inversions in the SSAB caused by the presence of the Pacific high-pressure cell can cause the air mass aloft to sink. As the air descends, compressional heating warms the air to a temperature higher than the air below. This subsidence inversion can act as a nearly impenetrable lid to the vertical mixing of pollutants. These inversions can persist for one or more days, causing air stagnation and the buildup of pollutants. Subsidence inversions are common from November through June and are relatively absent from July through October. The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report 9 Within the Project area, there is a natural sand migration process, called “blowsand,” that has direct and indirect effects on air quality. Blowsand produces particulate matter (PM10) in two ways: (1) by direct particle erosion and fragmentation as natural PM10, and (2) by secondary effects, as sand deposits on road surfaces. Also, where water has already receded around the Salton Sea, the surface areas contain a salty mix of sediments that can change from a hardened salt crust to a fluffy soft layer of dust depending upon the season. Exposed sediments could elevate PM10 levels throughout the region. Almost 120,000 acres of Salton Sea lakebed could be exposed as inflows to the Sea decrease in future years. Local communities may be affected by 60,000 potentially dust-blowing acres, which will cause PM10 levels to rise. 2.2 CRITERIA POLLUTANTS Criteria pollutants are pollutants that are regulated through the development of human health based and/or environmentally based criteria for setting permissible levels. Criteria pollutants , their typical sources, and health effects are identified below (5): TABLE 2-1: CRITERIA POLLUTANTS Criteria Pollutant Description Sources Health Effects CO CO is a colorless, odorless gas produced by the incomplete combustion of carbon-containing fuels, such as gasoline or wood. CO concentrations tend to be the highest during the winter morning, when little to no wind and surface-based inversions trap the pollutant at ground levels. Because CO is emitted directly from internal combustion engines, unlike ozone, motor vehicles operating at slow speeds are the primary source of CO in the SSAB. The highest ambient CO concentrations are generally found near congested transportation corridors and intersections. Any source that burns fuel such as automobiles, trucks, heavy construction equipment, farming equipment and residential heating. Individuals with a deficient blood supply to the heart are the most susceptible to the adverse effects of CO exposure. The effects observed include earlier onset of chest pain with exercise, and electrocardiograph changes indicative of decreased oxygen supply to the heart. Inhaled CO has no direct toxic effect on the lungs but exerts its effect on tissues by interfering with oxygen transport and competing with oxygen to combine with hemoglobin present in the blood to form carboxyhemoglobin (COHb). Hence, conditions with an increased demand for oxygen supply can be adversely affected by exposure to CO. Individuals most at risk include fetuses, patients with diseases involving heart and blood vessels, and patients with chronic hypoxemia The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report 10 Criteria Pollutant Description Sources Health Effects oxygen deficiency) as seen at high altitudes. Sulfur Dioxide (SO2) SO2 is a colorless, extremely irritating gas or liquid. It enters the atmosphere as a pollutant mainly as a result of burning high sulfur-content fuel oils and coal and from chemical processes occurring at chemical plants and refineries. When SO2 oxidizes in the atmosphere, it forms sulfates SO4). Collectively, these pollutants are referred to as sulfur oxides (SOX) Coal or oil burning power plants and industries, refineries, diesel engines A few minutes of exposure to low levels of SO2 can result in airway constriction in some asthmatics, all of whom are sensitive to its effects. In asthmatics, increase in resistance to air flow, as well as reduction in breathing capacity leading to severe breathing difficulties, are observed after acute exposure to SO2. In contrast, healthy individuals do not exhibit similar acute responses even after exposure to higher concentrations of SO2. Animal studies suggest that despite SO2 being a respiratory irritant, it does not cause substantial lung injury at ambient concentrations. However, very high levels of exposure can cause lung edema (fluid accumulation), lung tissue damage, and sloughing off of cells lining the respiratory tract. Some population-based studies indicate that the mortality and morbidity effects associated with fine particles show a similar association with ambient SO2 levels. In these studies, efforts to separate the effects of SO2 from those of fine particles have not been successful. It is not clear whether the two pollutants act synergistically, or one pollutant alone is the predominant factor. The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report 11 Criteria Pollutant Description Sources Health Effects NOX NOX consist of nitric oxide (NO), nitrogen dioxide (NO2) and nitrous oxide (N2O) and are formed when nitrogen (N2) combines with oxygen (O2). Their lifespan in the atmosphere ranges from one to seven days for nitric oxide and nitrogen dioxide, to 170 years for nitrous oxide. Nitrogen oxides are typically created during combustion processes and are major contributors to smog formation and acid deposition. NO2 is a criteria air pollutant and may result in numerous adverse health effects; it absorbs blue light, resulting in a brownish-red cast to the atmosphere and reduced visibility. Of the seven types of nitrogen oxide compounds, NO2 is the most abundant in the atmosphere. As ambient concentrations of NO2 are related to traffic density, commuters in heavy traffic may be exposed to higher concentrations of NO2 than those indicated by regional monitoring station. Any source that burns fuel such as automobiles, trucks, heavy construction equipment, farming equipment and residential heating. Population-based studies suggest that an increase in acute respiratory illness, including infections and respiratory symptoms in children (not infants), is associated with long-term exposure to NO2 at levels found in homes with gas stoves, which are higher than ambient levels found in Southern California. Increase in resistance to air flow and airway contraction is observed after short-term exposure to NO2 in healthy subjects. Larger decreases in lung functions are observed in individuals with asthma or chronic obstructive pulmonary disease (e.g., chronic bronchitis, emphysema) than in healthy individuals, indicating a greater susceptibility of these sub-groups. In animals, exposure to levels of NO2 considerably higher than ambient concentrations result in increased susceptibility to infections, possibly due to the observed changes in cells involved in maintaining immune functions. The severity of lung tissue damage associated with high levels of ozone exposure increases when animals are exposed to a combination of ozone and NO2. Ozone (O3) O3 is a highly reactive and unstable gas that is formed when VOCs and NOX, both byproducts of internal combustion engine exhaust, undergo slow photochemical reactions in the presence of sunlight. Ozone concentrations are generally Formed when reactive organic gases (ROG) and nitrogen oxides react in the presence of sunlight. ROG sources Individuals exercising outdoors, children, and people with preexisting lung disease, such as asthma and chronic pulmonary lung disease, are considered to be the most susceptible sub- groups for ozone effects. The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report 12 Criteria Pollutant Description Sources Health Effects highest during the summer months when direct sunlight, light wind, and warm temperature conditions are favorable to the formation of this pollutant. include any source that burns fuels, e.g., gasoline, natural gas, wood, oil) solvents, petroleum processing and storage and pesticides. Short-term exposure (lasting for a few hours) to ozone at levels typically observed in Southern California can result in breathing pattern changes, reduction of breathing capacity, increased susceptibility to infections, inflammation of the lung tissue, and some immunological changes. Elevated ozone levels are associated with increased school absences. In recent years, a correlation between elevated ambient ozone levels and increases in daily hospital admission rates, as well as mortality, has also been reported. An increased risk for asthma has been found in children who participate in multiple outdoor sports and live in communities with high ozone levels. Ozone exposure under exercising conditions is known to increase the severity of the responses described above. Animal studies suggest that exposure to a combination of pollutants that includes ozone may be more toxic than exposure to ozone alone. Although lung volume and resistance changes observed after a single exposure diminish with repeated exposures, biochemical and cellular changes appear to persist, which can lead to subsequent lung structural changes. Particulate Matter PM10 (Particulate Matter less than 10 microns): A major air pollutant consisting of tiny solid or liquid particles of soot, dust, Sources of PM10 include road dust, windblown dust and construction. Also A consistent correlation between elevated ambient fine particulate matter (PM10 and PM2.5) levels and an The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report 13 Criteria Pollutant Description Sources Health Effects smoke, fumes, and aerosols. Particulate matter pollution is a major cause of reduce visibility haze) which is caused by the scattering of light and consequently the significant reduction air clarity. The size of the particles (10 microns or smaller, about 0.0004 inches or less) allows them to easily enter the lungs where they may be deposited, resulting in adverse health effects. Additionally, it should be noted that PM10 is considered a criteria air pollutant. PM2.5 (Particulate Matter less than 2.5 microns): A similar air pollutant to PM10 consisting of tiny solid or liquid particles which are 2.5 microns or smaller (which is often referred to as fine particles). These particles are formed in the atmosphere from primary gaseous emissions that include sulfates formed from SO2 release from power plants and industrial facilities and nitrates that are formed from NOX release from power plants, automobiles and other types of combustion sources. The chemical composition of fine particles highly depends on location, time of year, and weather conditions. PM2.5 is a criteria air pollutant. formed from other pollutants (acid rain, NOX, SOX, organics). Incomplete combustion of any fuel. PM2.5 comes from fuel combustion in motor vehicles, equipment and industrial sources, residential and agricultural burning. Also formed from reaction of other pollutants (acid rain, NOX, SOX, organics). increase in mortality rates, respiratory infections, number and severity of asthma attacks and the number of hospital admissions has been observed in different parts of the United States and various areas around the world. In recent years, some studies have reported an association between long-term exposure to air pollution dominated by fine particles and increased mortality, reduction in lifespan, and an increased mortality from lung cancer. Daily fluctuations in PM2.5 concentration levels have also been related to hospital admissions for acute respiratory conditions in children, to school and kindergarten absences, to a decrease in respiratory lung volumes in normal children, and to increased medication use in children and adults with asthma. Recent studies show lung function growth in children is reduced with long term exposure to particulate matter. The elderly, people with pre- existing respiratory or cardiovascular disease, and children appear to be more susceptible to the effects of high levels of PM10 and PM2.5. Volatile Organic Compounds (VOC) VOCs are hydrocarbon compounds (any compound containing various combinations of hydrogen and carbon atoms) that exist in the ambient air. VOCs contribute to the formation of smog through atmospheric photochemical reactions and/or may be toxic. Compounds of carbon (also known as organic Organic chemicals are widely used as ingredients in household products. Paints, varnishes and wax all contain organic solvents, as do many cleaning, disinfecting, Breathing VOCs can irritate the eyes, nose and throat, can cause difficulty breathing and nausea, and can damage the central nervous system as well as other organs. Some VOCs can cause cancer. Not all VOCs have all these health The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report 14 Criteria Pollutant Description Sources Health Effects compounds) have different levels of reactivity; that is, they do not react at the same speed or do not form ozone to the same extent when exposed to photochemical processes. VOCs often have an odor, and some examples include gasoline, alcohol, and the solvents used in paints. Exceptions to the VOC designation include carbon monoxide, carbon dioxide, carbonic acid, metallic carbides or carbonates, and ammonium carbonate. VOCs are a criteria pollutant since they are a precursor to O3, which is a criteria pollutant. The terms VOC and ROG (see below) interchangeably. cosmetic, degreasing and hobby products. Fuels are made up of organic chemicals. All of these products can release organic compounds while you are using them, and, to some degree, when they are stored. effects, though many have several. ROG Similar to VOC, ROGs are also precursors in forming ozone and consist of compounds containing methane, ethane, propane, butane, and longer chain hydrocarbons, which are typically the result of some type of combustion/decomposition process. Smog is formed when ROG and nitrogen oxides react in the presence of sunlight. ROGs are a criteria pollutant since they are a precursor to O3, which is a criteria pollutant. The terms ROG and VOC (see previous) interchangeably. Sources similar to VOCs. Health effects similar to VOCs. Lead (Pb) Lead is a heavy metal that is highly persistent in the environment and is considered a criteria pollutant. In the past, the primary source of lead in the air was emissions from vehicles burning leaded gasoline. The major sources of lead emissions are ore and metals processing, particularly lead smelters, and piston-engine aircraft operating on leaded aviation gasoline. Other stationary sources include Metal smelters, resource recovery, leaded gasoline, deterioration of lead paint. Fetuses, infants, and children are more sensitive than others to the adverse effects of Pb exposure. Exposure to low levels of Pb can adversely affect the development and function of the central nervous system, leading to learning disorders, distractibility, inability to follow simple commands, and lower intelligence quotient. In adults, increased Pb levels are The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report 15 Criteria Pollutant Description Sources Health Effects waste incinerators, utilities, and lead-acid battery manufacturers. It should be noted that the Project does not include operational activities such as metal processing or lead acid battery manufacturing. As such, the Project is not anticipated to generate a quantifiable amount of lead emissions. associated with increased blood pressure. Pb poisoning can cause anemia, lethargy, seizures, and death; although it appears that there are no direct effects of Pb on the respiratory system. Pb can be stored in the bone from early age environmental exposure, and elevated blood Pb levels can occur due to breakdown of bone tissue during pregnancy, hyperthyroidism increased secretion of hormones from the thyroid gland) and osteoporosis breakdown of bony tissue). Fetuses and breast-fed babies can be exposed to higher levels of Pb because of previous environmental Pb exposure of their mothers. Odor Odor means the perception experienced by a person when one or more chemical substances in the air come into contact with the human olfactory nerves (6). Odors can come from many sources including animals, human activities, industry, natures, and vehicles. Offensive odors can potentially affect human health in several ways. First, odorant compounds can irritate the eye, nose, and throat, which can reduce respiratory volume. Second, studies have shown that the VOCs that cause odors can stimulate sensory nerves to cause neurochemical changes that might influence health, for instance, by compromising the immune system. Finally, unpleasant odors can trigger memories or attitudes linked to unpleasant odors, causing cognitive and emotional effects such as stress. The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report 16 2.3 EXISTING AIR QUALITY Existing air quality is measured at established SCAQMD air quality monitoring stations. Monitored air quality is evaluated in the context of ambient air quality standards. These standards are the levels of air quality that are considered safe, with an adequate margin of safety, to protect the public health and welfare. National Ambient Air Quality Standards (NAAQS) an d California Ambient Air Quality Standards (CAAQS) currently in effect are shown in Table 2-2 (7). The determination of whether a region’s air quality is healthful or unhealthful is determined by comparing contaminant levels in ambient air samples to the state and federal standards. At the time of this AQIA, the most recent state and federal standards were updated by CARB on May ,4 2016 and are presented in Table 2-2. The air quality in a region is considered to be in attainment by the state if the measured ambient air pollutant levels for O3, CO (except 8-hour Lake Tahoe), SO2 (1 and 24 hour), NO2, PM10, and PM2.5 are not to be exceeded. All others are not to be equaled or exceeded. It should be noted that the three-year period is presented for informational purposes and is not the basis for how the State assigns attainment status. Attainment status for a pollutant means that the Air District meets the standards set by the Environmental Protection Agency (EPA) or the California EPA (CalEPA). Conversely, nonattainment means that an area has monitored air quality that does not meet the NAAQS or CAAQS standards. In order to improve air quality in nonattainment areas, a State Implementation Plan (SIP) is drafted by CARB. The SIP outlines the measures that the state will take to improve air quality. Once nonattainment areas meet the standards and additional redesignation requirements, the EPA will designate the area as a maintenance area (8). The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report 17 TABLE 2-2: AMBIENT AIR QUALITY STANDARDS (1 OF 2) The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report 18 TABLE 2-2: AMBIENT AIR QUALITY STANDARDS (2 OF 2) The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report 19 2.4 REGIONAL AIR QUALITY Air pollution contributes to a wide variety of adverse health effects. The EPA has established NAAQS for six of the most common air pollutants: CO, Pb, O3, particulate matter, NO2, and SO2 which are known as criteria pollutants. The SCAQMD monitors levels of various criteria pollutants at 37 permanent monitoring stations and 5 single-pollutant source Pb air monitoring sites throughout the air district (9). On February 21, 2019, CARB posted the 2018 amendments to the state and national area designations. See Table 2-3 for attainment designations for the SSAB (10). Appendix 2.1 provides geographic representation of the state and federal attainment status for applicable criteria pollutants within the SSAB. TABLE 2-3: ATTAINMENT STATUS OF CRITERIA POLLUTANTS IN THE SSAB Criteria Pollutant State Designation Federal Designation O3 – 1-hour standard Nonattainment - O3 – 8-hour standard Nonattainment Nonattainment PM10 Nonattainment Nonattainment PM2.5 Attainment Nonattainment CO Attainment Unclassifiable/Attainment NO2 Attainment Unclassifiable/Attainment SO2 Unclassifiable/Attainment Unclassifiable/Attainment Pb Attainment Unclassifiable/Attainment Note: See Appendix 2.1 for a detailed map of State/National Area Designations within the SSAB The national 1-hour O3 standard was revoked effective June 15, 2005. 2.5 LOCAL AIR QUALITY The Project site is located within the Source Receptor Area (SRA) 30. Within SRA 30, the SCAQMD Coachella Valley monitoring station, located 5.92 miles north of the Project site, is the nearest long-term air quality monitoring station for O3, CO, NO2, PM10, and PM2.5. The most recent three (3) years of data available is shown on Table 2-4 and identifies the number of days ambient air quality standards were exceeded for the study area, which is considered to be representative of the local air quality at the Project site. Data for O3, CO, NO2, PM10, and PM2.5 for 2016 through 2018 was obtained from the SCAQMD Air Quality Data Tables (11). Additionally, data for SO2 has been omitted as attainment is regularly met in the SSAB and few monitoring stations measure SO2 concentrations. The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report 20 TABLE 2-4: PROJECT AREA AIR QUALITY MONITORING SUMMARY 2016-2018 POLLUTANT STANDARD YEAR 2016 2017 2018 O3 Maximum Federal 1-Hour Concentration (ppm) 0.103 0.113 0.111 Maximum Federal 8-Hour Concentration (ppm) 0.092 0.097 0.099 Number of Days Exceeding State 1-Hour Standard > 0.09 ppm 6 18 11 Number of Days Exceeding State/Federal 8-Hour Standard > 0.070 ppm 48 87 56 CO Maximum Federal 1-Hour Concentration > 35 ppm 3.1 1.0 1.1 Maximum Federal 8-Hour Concentration > 20 ppm 1.5 0.5 0.8 NO2 Maximum Federal 1-Hour Concentration > 0.100 ppm 0.047 0.043 0.043 Annual Average 0.008 0.007 0.007 PM10 Maximum Federal 24-Hour Concentration (µg/m3) > 150 µg/m3 113 93 117 Annual Federal Arithmetic Mean (µg/m3) 20.8 21.0 21.0 Number of Days Exceeding Federal 24-Hour Standard > 150 µg/m3 0 0 0 Number of Days Exceeding State 24-Hour Standard > 50 µg/m3 6 7 7 PM2.5 Maximum Federal 24-Hour Concentration (µg/m3) > 35 µg/m3 14.71 14.50 30.20 Annual Federal Arithmetic Mean (µg/m3) > 12 µg/m3 5.53 6.05 6.02 Number of Days Exceeding Federal 24-Hour Standard > 35 µg/m3 0 0 0 µg/m3 = Microgram per Cubic Meter Source: Data for O3, CO, NO2, PM10, and PM2.5 was obtained from SCAQMD Air Quality Data Tables. 2.6 REGULATORY BACKGROUND 2.6.1 FEDERAL REGULATIONS The EPA is responsible for setting and enforcing the NAAQS for O3, CO, NOX, SO2, PM10, and Pb 12). The EPA has jurisdiction over emissions sources that are under the authority of the federal government including aircraft, locomotives, and emissions sources outside state waters (Outer Continental Shelf). The EPA also establishes emission standards for vehicles sold in states other than California. Automobiles sold in California must meet the stricter emission requirements of the CARB. The Federal Clean Air Act (CAA) was first enacted in 1955 and has been amended numerous times in subsequent years (1963, 1965, 1967, 1970, 1977, and 1990). The CAA establishes the federal air quality standards, the NAAQS, and specifies future dates for achieving compliance (13). The CAA also mandates that states submit and implement SIPs for local areas not meeting these The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report 21 standards. These plans must include pollution control measures that demonstrate how the standards will be met. The 1990 amendments to the CAA that identify specific emission reduction goals for areas not meeting the NAAQS require a demonstration of reasonable further progress toward attainment and incorporate additional sanctions for failure to attain or to meet interim milestones. The sections of the CAA most directly applicable to the development of the Project site include Title I (Non-Attainment Provisions) and Title II (Mobile Source Provisions) (14) (15). Title I provisions were established with the goal of attaining the NAAQS for the following criteria pollutants O3, NO2, SO2, PM10, CO, PM2.5, and Pb. The NAAQS were amended in July 1997 to include an additional standard for O3 and to adopt a NAAQS for PM2.5. Table 2-3 (previously presented) provides the NAAQS within the SSAB. Mobile source emissions are regulated in accordance with Title II provisions. These provisions require the use of cleaner burning gasoline and other cleaner burning fuels such as methanol and natural gas. Automobile manufacturers are also required to reduce tailpipe emissions of hydrocarbons and NOX. NOX is a collective term that includes all forms of nitrogen oxides (NO, NO2, NO3) which are emitted as byproducts of the combustion process. 2.6.2 CALIFORNIA REGULATIONS California Air Resource Board. The CARB, which became part of the CalEPA in 1991, is responsible for ensuring implementation of the California Clean Air Act (AB 2595), responding to the federal CAA, and for regulating emissions from consumer products and motor vehicles. AB 2595 mandates achievement of the maximum degree of emissions reductions possible from vehicular and other mobile sources in order to attain the state ambient air quality standards by the earliest practical date. The CARB established the CAAQS for all pollutants for which the federal government has NAAQS and, in addition, establishes standards for sulfates, visibility, hydrogen sulfide, and vinyl chloride. However, at this time, hydrogen sulfide and vinyl chloride are not measured at any monitoring stations in the SSAB because they are not considered to be a regional air quality problem. Generally, the CAAQS are more stringent than the NAAQS (16) (12). Local air quality management districts, such as the SCAQMD, regulate air emissions from stationary sources such as commercial and industrial facilities. All air pollution control districts have been formally designated as attainment or non -attainment for each CAAQS. Serious non-attainment areas are required to prepare air quality management plans (AQMPS) that include specified emission reduction strategies in an effort to meet clean air goals. These plans are required to include: Application of Best Available Retrofit Control Technology to existing sources; Developing control programs for area sources (e.g., architectural coatings and solvents) and indirect sources (e.g. motor vehicle use generated by residential and commercial development); A District permitting system designed to allow no net increase in emissions from any new or modified permitted sources of emissions; The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report 22 Implementing reasonably available transportation control measures and assuring a substantial reduction in growth rate of vehicle trips and miles traveled; Significant use of low emissions vehicles by fleet operators; Sufficient control strategies to achieve a five percent or more annual reduction in emissions or 15 percent or more in a period of three years for ROGs, NOX, CO and PM10. However, air basins may use alternative emission reduction strategy that achieves a reduction of less than five percent per year under certain circumstances. Title 24 Energy Efficiency Standards and California Green Building Standards . CCR Title 24 Part 6: California’s Energy Efficiency Standards for Residential and Nonresidential Buildings, was first adopted in 1978 in response to a legislative mandate to reduce California’s energy consumption. The standards are updated periodically to allow consideration and possible incorporation of new energy efficient technologies and methods. CCR, Title 24, Part 11: California Green Building Standards Code (CALGreen) is a comprehensive and uniform regulatory code for all residential, commercial, and school buildings that went in effect on January 1, 2011, and is administered by the California Building Standards Commission. CALGreen is updated on a regular basis, with the most recent approved update consisting of the 2019 California Green Building Code Standards that will be effective January 1, 2020. Local jurisdictions are permitted to adopt more stringent requirements, as state law provides methods for local enhancements. CALGreen recognizes that many jurisdictions have developed existing construction and demolition ordinances and defers to them as the ruling guidance provided, they establish a minimum 65 percent diversion requirement. The code also provides exemptions for areas not served by construction and demolition recycling infrastructure. The State Building Code provides the minimum standard that buildings must meet in order to be certified for occupancy, which is generally enforced by the local building official. Energy efficient buildings require less electricity; therefore, increased energy efficiency reduces fossil fuel consumption and decreases greenhouse gas (GHG) emissions. The 2019 version of Title 24 was adopted by the California Energy Commission (CEC) and will become effective on January 1, 2020. As a conservative measure, the analysis herein assumes compliance with the 2016 Title 24 Standards and no additional reduction for compliance with the 2019 standards have been taken. The 2019 Title 24 standards will result in less energy use, thereby reducing air pollutant emissions associated with energy consumption in the SSAB and across the State of California. For example, the 2019 Title 24 standards will require solar photovoltaic systems for new homes, establish requirements for newly constructed healthcare facilities, encourage demand responsive technologies for residential buildings, and update indoor and outdoor lighting requirements for nonresidential buildings. The CEC anticipates that single-family homes built with the 2019 standards will use approximately 7 percent less energy compared to the residential homes built under the 2016 standards. Additionally, after implementation of solar photovoltaic systems, homes built under the 2019 standards will use about 53 percent less energy than homes built under the 2016 standards. Nonresidential buildings (such as the Project) will use approximately 30 percent less energy due to lighting upgrade requirements (17). The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report 23 Because the Project will be constructed after January 1, 2020, the 2019 CALGreen standards are applicable to the Project and require, among other items (18): Short-term bicycle parking. If the new project or an additional alteration is anticipated to generate visitor traffic, provide permanently anchored bicycle racks within 200 feet of the visitors’ entrance, readily visible to passers-by, for 5 percent of new visitor motorized vehicle parking spaces being added, with a minimum of one two-bike capacity rack (5.106.4.1.1). Long-term bicycle parking. For new buildings with tenant spaces that have 10 or more tenant- occupants, provide secure bicycle parking for 5 percent of the tenant-occupant vehicular parking spaces with a minimum of one bicycle parking facility (5.106.4.1.2). Designated parking. In new projects or additions to alterations that add 10 or more vehicular parking spaces, provide designated parking for any combination of low-emitting, fuel-efficient and carpool/van pool vehicles as shown in Table 5.106.5.2 (5.106.5.2). Construction waste management. Recycle and/or salvage for reuse a minimum of 65 percent of the nonhazardous construction and demolition waste in accordance with Section 5.408.1.1. 5.405.1.2, or 5.408.1.3; or meet a local construction and demolition waste management ordinance, whichever is more stringent (5.408.1). Excavated soil and land clearing debris. 100 percent of trees, stumps, rocks and associated vegetation and soils resulting primarily from land clearing shall be reused or recycled. For a phased project, such material may be stockpiled on site until the storage site is developed 5.408.3). Recycling by Occupants. Provide readily accessible areas that serve the entire building and are identified for the depositing, storage and collection of non-hazardous materials for recycling, including (at a minimum) paper, corrugated cardboard, glass, plastics, organic waste, and metals or meet a lawfully enacted local recycling ordinance, if more restrictive (5.410.1). Water conserving plumbing fixtures and fittings. Plumbing fixtures (water closets and urinals) and fittings (faucets and showerheads) shall comply with the following: o Water Closets. The effective flush volume of all water closets shall not exceed 1.28 gallons per flush (5.303.3.1) o Urinals. The effective flush volume of wall-mounted urinals shall not exceed 0.125 gallons per flush (5.303.3.2.1). The effective flush volume of floor-mounted or other urinals shall not exceed 0.5 gallons per flush (5.303.3.2.2). o Showerheads. Single showerheads shall have a minimum flow rate of not more than 1.8 gallons per minute and 80 psi (5.303.3.3.1). When a shower is served by more than one showerhead, the combine flow rate of all showerheads and/or other shower outlets controlled by a single valve shall not exceed 1.8 gallons per minute at 80 psi (5.303.3.3.2). o Faucets and fountains. Nonresidential lavatory faucets shall have a maximum flow rate of note more than 0.5 gallons per minute at 60 psi (5.303.3.4.1). Kitchen faucets shall have a maximum flow rate of not more than 1.8 gallons per minute of 60 psi (5.303.3.4.2). Wash fountains shall have a maximum flow rate of not more than 1.8 gallons per minute 5.303.3.4.3). Metering faucets shall not deliver more than 0.20 gallons per cycle 5.303.3.4.4). Metering faucets for wash fountains shall have a maximum flow rate not more than 0.20 gallons per cycle (5.303.3.4.5). The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report 24 Outdoor portable water use in landscaped areas. Nonresidential developments shall comply with a local water efficient landscape ordinance or the current California Department of Water Resources’ Model Water Efficient (MWELO), whichever is more stringent (5.304.1). Water meters. Separate submeters or metering devices shall be installed for new buildings or additions in excess of 50,000 sf or for excess consumption where any tenant within a new building or within an addition that is project to consume more than 1,000 gal/day (5.303.1.1 and 5.303.1.2). Outdoor water use in rehabilitated landscape projects equal or greater than 2,500 sf. Rehabilitated landscape projects with an aggregate landscape area equal to or greater than 2,500 sf requiring a building or landscape permit (5.304.3). Commissioning. For new buildings 10,000 sf and over, building commissioning shall be included in the design and construction processes of the building project to verify that the building systems and components meet the owner’s or owner representative’s project requirements (5.410.2). 2.6.3 AIR QUALITY MANAGEMENT PLANNING Currently, the NAAQS and CAAQS are exceeded in most parts of the SSAB. In response, the SCAQMD has adopted a series of AQMPs to meet the state and federal ambient air quality standards (19). AQMPs are updated regularly in order to more effectively reduce emissions, accommodate growth, and to minimize any negative fiscal impacts of air pollution control on the economy. A detailed discussion on the AQMP and Project consistency with the AQMP is provided in Section 3.9. The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report 25 This page intentionally left blank The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report 26 3 PROJECT AIR QUALITY IMPACT 3.1 INTRODUCTION The Project has been evaluated to determine if it will violate an air quality standard or contribute to an existing or projected air quality violation. Additionally, the Project has been evaluated to determine if it will result in a cumulatively considerable net increase of a criteria pollutant for which the SSAB is non-attainment under an applicable federal or state ambient air quality standard. The significance of these potential impacts is described in the following section. 3.2 STANDARDS OF SIGNIFICANCE The criteria used to determine the significance of potential Project -related air quality impacts are taken from the Initial Study Checklist in Appendix G of the State CEQA Guidelines (14 CCR 15000, et seq.) as implemented by the City of La Quinta. Based on these thresholds, a project would result in a significant impact related to air quality if it would (1): Conflict with or obstruct implementation of the applicable air quality plan. Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is in non-attainment under an applicable federal or state ambient air quality standard. Expose sensitive receptors to substantial pollutant concentrations. Result in other emissions (such as those leading to odors) adversely affecting a substantial number of people. affecting a substantial number of people. The SCAQMD has developed regional significance thresholds for regulated pollutants, as summarized at Table 3-1 (20). The SCAQMD’s CEQA Air Quality Significance Thresholds (April 2019) indicate that any projects in the SSAB with daily emissions that exceed any of the indicated thresholds should be considered as having an individually and cumulatively significant air quality impact. TABLE 3-1: MAXIMUM DAILY REGIONAL EMISSIONS THRESHOLDS Regional Thresholds Pollutant Construction Operations NOX 100 lbs/day 100 lbs/day VOC 75 lbs/day 75 lbs/day PM10 150 lbs/day 150 lbs/day PM2.5 55 lbs/day 55 lbs/day SOX 150 lbs/day 150 lbs/day CO 550 lbs/day 550 lbs/day Pb 3 lbs/day 3 lbs/day lbs/day = Pounds Per Day Source: Regional Thresholds presented in this table are based on the SCAQMD Air Quality Significance Thresholds, April 2019 The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report 27 3.3 CALIFORNIA EMISSIONS ESTIMATOR MODEL™ EMPLOYED TO ANALYZE AIR QUALITY Land uses such as the Project affect air quality through construction-source and operational- source emissions. On October 17, 2017, the SCAQMD in conjunction with the California Air Pollution Control Officers Association (CAPCOA) and other California air districts, released the latest version of the California Emissions Estimator Model (CalEEMod) v2016.3.2. The purpose of this model is to calculate construction-source and operational-source criteria pollutant (VOCs, NOX, SOX, CO, PM10, and PM2.5) and GHG emissions from direct and indirect sources; and quantify applicable air quality and GHG reductions achieved from mitigation measures (21). Accordingly, the latest version of CalEEMod has been used for this Project to determine construction and operational air quality emissions. Output from the model runs for both construction and operational activity are provided in Appendices 3.1 and 3.3. 3.4 CONSTRUCTION EMISSIONS Construction activities associated with the Project will result in emissions of VOCs, NOX, SOX, CO, PM10, and PM2.5. Construction related emissions are expected from the following construction activities: Site Preparation Grading Building Construction Paving Architectural Coating Grading Activities Dust is typically a major concern during grading activities. Because such emissions are not amenable to collection and discharge through a controlled source, they are called “fugitive emissions”. Fugitive dust emissions rates vary as a function of many parameters (soil silt, soil moisture, wind speed, area disturbed, number of vehicles, depth of disturbance or excavation, etc.). CalEEMod was utilized to calculate fugitive dust emissions resulting from this phase of activity. Based on information provided by the Project applicant, earthwork activities are expected to balance on site and no import or export of soils would be required. Construction Worker Vehicle Trips Construction emissions for construction worker vehicles traveling to and from the Project site, as well as vendor trips (construction materials delivered to the Project site) were estimated based on information from CalEEMod defaults. 3.4.1 CONSTRUCTION DURATION Phase 1 construction is expected to commence in July 2020 and will last through December 2021; Phase 2 construction will begin September 2022 and last through February 2023; Phase 3 The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report 28 construction will commence July 2023 and last through December 2026 . The construction schedule utilized in the analysis, shown in Table 3-2, represents a “worst-case” analysis scenario should construction occur any time after the respective dates since emission factors for construction decrease as time passes and the analysis year increases due to emission regulations becoming more stringent.1 The duration of construction activity and associated equipment represents a reasonable approximation of the expected construction fleet as required per CEQA Guidelines. The duration of construction activity was generally based on CalEEMod defaults and the opening year of each respective phase. TABLE 3-2: CONSTRUCTION DURATION Phase Name Start Date End Date Days Phase 1 (2021) Site Preparation 07/01/2020 08/25/2020 40 Grading 08/26/2020 01/26/2021 110 Building Construction 01/27/2021 11/02/2021 200 Paving 09/01/2021 12/14/2021 75 Architectural Coating 09/01/2021 12/14/2021 75 Phase 2 (2023) Site Preparation 09/19/2022 09/19/2022 1 Grading 09/20/2022 09/21/2022 2 Building Construction 09/22/2022 02/08/2023 100 Paving 02/09/2023 02/15/2023 5 Architectural Coating 02/09/2023 02/15/2023 5 Phase 3 (2026) Site Preparation 07/09/2023 03/15/2024 180 Grading 03/16/2024 12/20/2024 200 Building Construction 12/21/2024 11/20/2026 500 Paving 09/01/2025 12/04/2026 330 Architectural Coating 09/01/2025 12/04/2026 330 Source: Construction activity is generally based on CalEEMod defaults and the opening year of each respective phase. 1 As shown in the CalEEMod User’s Guide Version 2016.3.2, Section 4.3 “Offroad Equipment” as the analysis year increases, emission factors for the same equipment pieces decrease due to the natural turnover of older equipment being replaced by newer less polluting equipment and new regulatory requirements. The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report 29 3.4.2 CONSTRUCTION EQUIPMENT Site specific construction fleet may vary due to specific project needs at the time of construction. The associated construction equipment was generally based on CalEEMod 2016.3.2 defaults. A detailed summary of construction equipment assumptions by phase is provided at Table 3-3. TABLE 3-3: CONSTRUCTION EQUIPMENT ASSUMPTIONS (1 OF 2) Activity Equipment Amount Hours Per Day Phase 1 (2021) Site Preparation Crawler Tractors 4 8 Rubber Tired Dozers 3 8 Grading Crawler Tractors 2 8 Excavators 2 8 Graders 1 8 Rubber Tired Dozers 1 8 Scrapers 2 8 Building Construction Cranes 1 8 Crawler Tractors 3 8 Forklifts 3 8 Generator Sets 1 8 Welders 1 8 Paving Pavers 2 8 Paving Equipment 2 8 Rollers 2 8 Architectural Coating Air Compressors 1 8 Phase 2 (2023) Site Preparation Crawler Tractors 1 8 Graders 1 8 Grading Concrete/Industrial Saws 1 8 Crawler Tractors 2 8 Rubber Tired Dozers 1 8 Building Construction Cranes 1 8 Crawler Tractors 2 8 Forklifts 2 8 The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report 30 TABLE 3-3: CONSTRUCTION EQUIPMENT ASSUMPTIONS (2 OF 2) Activity Equipment Amount Hours Per Day Phase 2 (2023) Paving Cement and Mortar Mixers 4 8 Crawler Tractors 1 8 Pavers 1 8 Rollers 1 8 Architectural Coating Air Compressors 1 8 Phase 3 (2026) Site Preparation Crawler Tractors 4 8 Rubber Tired Dozers 3 8 Grading Crawler Tractors 2 8 Excavators 2 8 Graders 1 8 Rubber Tired Dozers 1 8 Scrapers 2 8 Building Construction Cranes 1 8 Crawler Tractors 3 8 Forklifts 3 8 Generator Sets 1 8 Welders 1 8 Paving Pavers 2 8 Paving Equipment 2 8 Rollers 2 8 Architectural Coating Air Compressors 1 8 Source: In order to account for fugitive dust emissions associated with Site Preparation and Grading activities, Crawler Tractors were used in lieu of Tractors/Loaders/Backhoes. 3.4.1 CONSTRUCTION EMISSIONS SUMMARY Impacts without Mitigation CalEEMod calculates maximum daily emissions for summer and winter periods. The estimated maximum daily construction emissions without mitigation are summarized on Table 3-4. Detailed construction model outputs are presented in Appendix 3.1. Under the assumed scenarios, emissions resulting from the Project construction will not exceed criteria pollutant thresholds established by the SCAQMD for emissions of any criteria pollutant. The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report 31 TABLE 3-4 OVERALL CONSTRUCTION EMISSIONS SUMMARY (WITHOUT MITIGATION) Year Emissions (lbs/day) VOC NOX CO SOX PM10 PM2.5 Summer Phase 1 (2021) 2020 5.62 63.75 33.02 0.07 11.43 6.63 2021 70.87 77.23 68.59 0.22 12.28 4.88 Phase 2 (2023) 2022 2.21 23.60 12.13 0.03 4.07 2.33 2023 25.24 16.43 11.13 0.03 0.84 0.67 Phase 3 (2026) 2023 3.89 41.85 18.71 0.06 10.40 5.69 2024 10.72 80.84 77.33 0.38 23.77 7.17 2025 31.88 87.68 99.56 0.43 27.93 8.52 2026 31.43 86.86 95.49 0.42 27.92 8.51 Winter Phase 1 (2021) 2020 5.62 63.75 32.91 0.07 11.43 6.63 2021 70.74 76.97 64.28 0.21 12.28 4.88 Phase 2 (2023) 2022 5.62 63.75 32.91 0.07 11.43 6.63 2023 70.74 76.97 64.28 0.21 12.28 4.88 Phase 3 (2026) 2023 3.88 41.85 18.63 0.06 10.40 5.69 2024 10.56 80.11 69.72 0.35 23.77 7.18 2025 31.71 86.96 90.76 0.40 27.93 8.52 2026 31.29 86.12 87.32 0.40 27.93 8.51 Maximum Daily Emissions 70.87 87.68 99.56 0.43 27.93 8.52 SCAQMD Regional Threshold 75 100 550 150 150 55 Threshold Exceeded? NO NO NO NO NO NO Source: CalEEMod construction-source (unmitigated) emissions are presented in Appendix 3.1. Impacts with Mitigation Although mitigation is not needed to reduce estimated maximum daily construction regional emissions, mitigation measures would be required to decrease localized emissions (please refer The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report 32 to the subsequent discussions at “Localized Significance”). Detailed construction model outputs are presented in Appendix 3.2. Implementation of these localized emissions mitigation measures would further reduce already less-than-significant regional emissions as indicated at Table 3.5. TABLE 3-5 OVERALL CONSTRUCTION EMISSIONS SUMMARY (WITH MITIGATION) Year Emissions (lbs/day) VOC NOX CO SOX PM10 PM2.5 Summer Phase 1 (2021) 2020 1.84 31.02 41.02 0.07 9.67 5.09 2021 69.52 65.41 74.91 0.22 11.83 4.50 Phase 2 (2023) 2022 0.99 14.30 16.80 0.03 3.64 1.97 2023 24.99 12.57 14.18 0.03 0.67 0.54 Phase 3 (2026) 2023 1.46 27.04 30.70 0.06 9.67 5.09 2024 9.84 77.03 84.54 0.38 23.60 7.06 2025 31.17 86.57 107.11 0.43 27.86 8.50 2026 30.72 85.75 103.04 0.42 27.86 8.49 Winter Phase 1 (2021) 2020 1.84 34.02 40.91 0.07 9.67 5.09 2021 69.40 65.15 70.60 0.21 11.83 4.50 Phase 2 (2023) 2022 0.99 14.30 16.75 0.03 3.64 1.97 2023 24.98 12.56 14.12 0.03 0.67 0.54 Phase 3 (2026) 2023 1.46 27.04 30.62 0.06 9.67 5.09 2024 9.68 76.30 76.93 0.35 23.60 7.06 2025 30.99 85.85 98.31 0.02 27.86 8.50 2026 30.58 85.01 94.86 0.40 27.86 8.49 Maximum Daily Emissions 69.52 86.57 107.11 0.43 27.86 8.50 SCAQMD Regional Threshold 75 100 550 150 150 55 Threshold Exceeded? NO NO NO NO NO NO Source: CalEEMod construction-source (mitigated) emissions are presented in Appendix 3.2. The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report 33 3.5 OPERATIONAL EMISSIONS Operational activities associated with the proposed Project will result in emissions of VOCs, NOX, SOX, CO, PM10, and PM2.5. Operational emissions would be expected from the following primary sources: Area Source Emissions Energy Source Emissions Mobile Source Emissions 3.5.1 AREA SOURCE EMISSIONS Architectural Coatings Over a period of time the building that is part of this Project will be subject to emissions resulting from the evaporation of solvents contained in paints, varnishes, primers, and other surface coatings as part of Project maintenance. The emissions associated with architectural coatings were calculated using CalEEMod. Consumer Products Consumer products include, but are not limited to detergents, cleaning compounds, polishes, personal care products, and lawn and garden products. Many of these products contain organic compounds which when released in the atmosphere can react to form ozone and other photochemically reactive pollutants. The emissions associated with use of consumer products were calculated based on defaults provided within CalEEMod. Hearths/Fireplaces The emissions associated with use of hearths/fireplaces were calculated based on assumptions provided in the CalEEMod model. The Project is required to comply with SCAQMD Rule 445, which prohibits the use of wood burning stoves and fireplaces in new development. In order to account for the requirements of this Rule, the unmitigated CalEEMod model estimates were adjusted to remove wood burning stoves and fireplaces. As the project is required to comply with SCAQMD Rule 445, the removal of wood burning stoves and fireplaces is not considered mitigation" although it must be identified as such in CalEEMod in order to treat the case appropriately. Landscape Maintenance Equipment Landscape maintenance equipment would generate emissions from fuel combustion and evaporation of unburned fuel. Equipment in this category would include lawnmowers, shedders/grinders, blowers, trimmers, chain saws, and hedge trimmers used to maintain the landscaping of the Project. The emissions associated with landscape maintenance equipment were calculated based on assumptions provided in CalEEMod. The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report 34 3.5.2 ENERGY SOURCE EMISSIONS Combustion Emissions Associated with Natural Gas and Electricity Electricity and natural gas are used by almost every project. Criteria pollutant emissions are emitted through the generation of electricity and consumption of natural gas. However, because electrical generating facilities for the Project area are located either outside the region (state) or offset through the use of pollution credits (RECLAIM) for generation within the SSAB, criteria pollutant emissions from offsite generation of electricity is generally excluded from the evaluation of significance and only natural gas use is considered. The emissions associated with natural gas use were calculated using CalEEMod. Title 24 Energy Efficiency Standards California’s Energy Efficiency Standards for Residential and Nonresidential Buildings was first adopted in 1978 in response to a legislative mandate to reduce California’s energy consumption. The standards are updated periodically to allow consideration and possible incorporation of new energy efficient technologies and methods. Energy efficient buildings require less electricity . The 2019 version of Title 24 was adopted by the CEC and will become effective on January 1, 2020. As a conservative measure, the analysis herein assumes compliance with the 2016 Title 24 Standards and no additional reduction for compliance with the 2019 standards have been taken. 3.5.3 MOBILE SOURCE EMISSIONS Project mobile source air quality emissions are primarily dependent on overall daily vehicle trip generation. Trip characteristics available from The Wave – Coral Mountain Traffic Impact Analysis Report were utilized in this analysis (22). Fugitive Dust Related to Vehicular Travel Vehicles traveling on paved roads would be a source of fugitive emissions due to the generation of road dust inclusive of break and tire wear particulates. The emissions estimates for travel on paved roads were calculated using CalEEMod. 3.5.5 OPERATIONAL EMISSIONS SUMMARY The estimated operational-source emissions without project design features and mitigation are summarized on Tables 3-6. Detailed operation model outputs are presented in Appendix 3.3. Project operational-source emissions will not exceed the SCAQMD regional thresholds of significance for emissions of any criteria pollutant. The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report 35 TABLE 3-6: SUMMARY OF PEAK OPERATIONAL EMISSIONS (1 OF 2) Operational Activities – Summer Scenario Emissions (lbs/day) VOC NOX CO SOX PM10 PM2.5 Phase 1 (2021) Area Source 26.48 2.28 11.69 0.01 0.23 0.23 Energy Source 0.33 2.94 2.31 0.02 0.23 0.23 Mobile Source 5.05 31.80 27.59 0.10 5.26 1.45 Project Daily Emissions (Phase 1) 31.86 37.02 41.58 0.13 5.72 1.91 SCAQMD Regional Threshold 75 100 550 150 150 55 Threshold Exceeded? NO NO NO NO NO NO Phase 2 (2023) Area Source 27.18 2.28 11.67 0.01 0.23 0.23 Energy Source 0.33 2.95 2.32 0.02 0.23 0.23 Mobile Source 5.78 33.82 32.22 0.13 7.48 2.05 Project Daily Emissions (Phase 2) 33.28 39.05 46.21 0.17 7.94 2.51 SCAQMD Regional Threshold 75 100 550 150 150 55 Threshold Exceeded? NO NO NO NO NO NO Phase 3 (2026) Area Source 57.92 10.52 53.73 0.07 1.08 1.08 Energy Source 0.57 5.05 3.21 0.03 0.40 0.40 Mobile Source 10.90 71.48 55.13 0.26 14.34 3.92 Project Daily Emissions (Phase 3) 69.39 87.05 112.07 0.35 15.81 5.40 SCAQMD Regional Threshold 75 100 550 150 150 55 Threshold Exceeded? NO NO NO NO NO NO The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report 36 TABLE 3-6: SUMMARY OF PEAK OPERATIONAL EMISSIONS (2 OF 2) Operational Activities – Winter Scenario Emissions (lbs/day) VOC NOX CO SOX PM10 PM2.5 Phase 1 (2021) Area Source 26.48 2.28 11.69 0.01 0.23 0.23 Energy Source 0.33 2.94 2.31 0.02 0.23 0.23 Mobile Source 4.14 31.03 27.41 0.09 5.27 1.46 Project Daily Emissions (Phase 1) 30.94 36.25 41.40 0.13 5.72 1.91 SCAQMD Regional Threshold 75 100 550 150 150 55 Threshold Exceeded? NO NO NO NO NO NO Phase 2 (2023) Area Source 27.18 2.28 11.67 0.01 0.23 0.23 Energy Source 0.33 2.95 2.32 0.02 0.23 0.23 Mobile Source 4.67 33.09 31.43 0.12 7.48 2.05 Project Daily Emissions (Phase 2) 32.18 38.32 45.41 0.15 7.94 2.51 SCAQMD Regional Threshold 75 100 550 150 150 55 Threshold Exceeded? NO NO NO NO NO NO Phase 3 (2026) Area Source 57.92 10.52 53.73 0.07 1.08 1.08 Energy Source 0.57 5.05 3.21 0.03 0.40 0.40 Mobile Source 8.76 69.78 54.73 0.23 14.34 3.93 Project Daily Emissions (Phase 3) 67.25 85.35 111.67 0.33 15.82 5.40 SCAQMD Regional Threshold 75 100 550 150 150 55 Threshold Exceeded? NO NO NO NO NO NO Source: CalEEMod operational-source emissions are presented in Appendix 3.3. 3.6 LOCALIZED SIGNIFICANCE - CONSTRUCTION ACTIVITY BACKGROUND ON LOCALIZED SIGNIFICANCE THRESHOLD (LST) DEVELOPMENT The analysis makes use of methodology included in the SCAQMD Final Localized Significance Threshold Methodology (LST Methodology) (23). The SCAQMD has established that impacts to air quality are significant if there is a potential to contribute or cause localized exceedances of the NAAQS and CAAQS. Collectively, these are referred to as Localized Significance Thresholds LSTs). The significance of localized emissions impacts depends on whether ambient levels in the vicinity of any given project are above or below State standards. In the case of CO and NO2, if ambient The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report 37 levels are below the standards, a project is considered to have a significant impact if project emissions result in an exceedance of one or more of these standards. If ambient levels already exceed a state or federal standard, then project emissions are considered significant if they increase ambient concentrations by a measurable amount. This would apply to PM10 and PM2.5; both of which are non-attainment pollutants. The SCAQMD established LSTs in response to the SCAQMD Governing Board’s Environmental Justice Initiative I-42. LSTs represent the maximum emissions from a project that will not cause or contribute to an exceedance of the most stringent applicable federal or state ambient air quality standard at the nearest residence or sensitive receptor. The SCAQMD states that lead agencies can use the LSTs as another indicator of significance in its air quality impact analyses. LSTs were developed in response to environmental justice and health concerns raised by the public regarding exposure of individuals to criteria pollutants in local communit ies. To address the issue of localized significance, the SCAQMD adopted LSTs that show whether a project would cause or contribute to localized air quality impacts and thereby cause or contribute to potential localized adverse health effects. The analysis makes use of methodology included in the LST Methodology (24). APPLICABILITY OF LSTS FOR THE PROJECT For this Project, the appropriate SRA for the LST analysis is Coachella Valley (SRA 30). LSTs apply to CO, NO2, PM10, and PM2.5. The SCAQMD produced look-up tables for projects less than or equal to 5 acres in size. In order to determine the appropriate methodology for determining localized impacts that could occur as a result of Project-related construction, the following process is undertaken: CalEEMod is utilized to determine the maximum daily on-site emissions that will occur during construction activity. The SCAQMD’s Fact Sheet for Applying CalEEMod to Localized Significance Thresholds (25) is used to determine the maximum site acreage that is actively disturbed based on the construction equipment fleet and equipment hours as estimated in CalEEMod. If the total acreage disturbed is less than or equal to five acres per day, then the SCAQMD’s screening look-up tables are utilized to determine if a project has the potential to result in a significant impact. The look-up tables establish a maximum daily emissions threshold in pounds per day that can be compared to CalEEMod outputs. If the total acreage disturbed is greater than five acres per day, then LST impacts are appropriately evaluated through dispersion modeling. EMISSIONS CONSIDERED SCAQMD’s Methodology clearly states that “off-site mobile emissions from the Project should not be included in the emissions compared to LSTs (23).” Therefore, for purposes of the 2 The purpose of SCAQMD’s Environmental Justice program is to ensure that everyone has the right to equal protection from air pollution and fair access to the decision-making process that works to improve the quality of air within their communities. Further, the SCAQMD defines Environmental Justice as “…equitable environmental policymaking and enforcement to protect the health of all residents, regardless of age, culture, ethnicity, gender, race, socioeconomic status, or geographic location, from the health effects of air pollution.” The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report 38 construction LST analysis, only emissions included in the CalEEMod “on -site” emissions outputs were considered. MAXIMUM DAILY DISTURBED ACREAGE The “acres disturbed” for analytical purposes are based on specific equipment type for each subcategory of construction activity and the estimated maximum area a given piece of equipment can pass over in an 8-hour workday (as shown on Table 3-7). The equipment-specific disturbance rates were obtained from the CalEEMod user’s guide, Appendix A: Calculation Details for CalEEMod (October 2017). It should be noted that the disturbed area per day is representative of a piece of equipment making multiple passes over the same land area. In other words, one Rubber Tired Dozer can make multiple passes over the same land area totaling 0.5 acres in a given 8-hour day. TABLE 3-7: MAXIMUM DAILY DISTURBED-ACREAGE (1 OF 2) Construction Phase Equipment Type Equipment Quantity Acres graded per 8-hour day Operating Hours per Day Acres graded per day Phase 1 (2021) Site Preparation Crawler Tractors 4 0.5 8 2.0 Rubber Tired Dozers 3 0.5 8 1.5 Total acres disturbed per day during Site Preparation 3.5 Grading Crawler Tractors 2 0.5 8 1.0 Graders 1 0.5 8 0.5 Rubber Tired Dozers 1 0.5 8 0.5 Scrapers 2 1 8 2.0 Total acres disturbed per day during Grading 4.0 Phase 2 (2023) Site Preparation Crawler Tractors 1 0.5 8 0.5 Graders 1 0.5 8 0.5 Total acres disturbed per day during Site Preparation 1.0 Grading Crawler Tractors 2 0.5 8 1.0 Rubber Tired Dozers 1 0.5 8 0.5 Total acres disturbed per day during Grading 1.5 The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report 39 TABLE 3-7: MAXIMUM DAILY DISTURBED-ACREAGE (2 OF 2) Construction Phase Equipment Type Equipment Quantity Acres graded per 8-hour day Operating Hours per Day Acres graded per day Phase 3 (2026) Site Preparation Crawler Tractors 4 0.5 8 2.0 Rubber Tired Dozers 3 0.5 8 1.5 Total acres disturbed per day during Site Preparation 3.5 Grading Crawler Tractors 2 0.5 8 1.0 Graders 1 0.5 8 0.5 Rubber Tired Dozers 1 0.5 8 0.5 Scrapers 2 1 8 2.0 Total acres disturbed per day during Grading 4.0 Source: Maximum daily disturbed acreage based on equipment list presented in Appendix 3.1. Sensitive Receptors As previously stated, LSTs represent the maximum emissions from a project that will not cause or contribute to an exceedance of the most stringent applicable NAAQS and CAAQS at the nearest residence or sensitive receptor. Receptor locations are off-site locations where individuals may be exposed to emissions from Project activities. Some people are especially sensitive to air pollution and are given special consideration when evaluating air quality impacts from projects. These groups of people include children, the elderly, individuals with pre-existing respiratory or cardiovascular illness, and athletes and others who engage in frequent exercise. Structures that house these persons or places where they gather to exercise are defined as “sensitive receptors”. These structures typically include residences, hotels, hospitals, etc. as they are also known to be locations where an individual can remain for 24 hours. Consistent with the LST Methodology, the nearest land use where an individual could remain for 24 hours to the Project site (in this case the nearest residential land use) has been used to determine construction and operational air quality impacts for emissions of PM10 and PM2.5, since PM10 and PM2.5 thresholds are based on a 24 hour averaging time. Commercial and industrial facilities are not included in the definition of sensitive receptor because employees and patrons do not typically remain onsite for a full 24 hours but are typically onsite for eight hours or less. The LST Methodology explicitly states that “LSTs based on shorter averaging periods, such as the NO2 and CO LSTs, could also be applied to receptors such as industrial or commercial facilities since it is reasonable to assume that a worker at these sites could be present for periods of one to eight hours (23).” Consistent with the LST Methodology, the nearest industrial/commercial use to the Project site is used to determine construction and operational LST air impacts for emissions of NO2 and CO The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report 40 Project-related Sensitive Receptors Sensitive receptors in the vicinity of the Project site are illustrated at Exhibit 3-A and are described below. Localized air quality impacts were evaluated at sensitive receptor land uses nearest the Project site. To assess the stationary source operational and construction air impacts, the following five sensitive receptor locations, as shown on Exhibit 3-A, were identified. R1: Located approximately 154 feet north of the Project site, R1 represents existing residential homes north of 58th Avenue. R2: Location R2 represents the existing residential homes located north of the Project site at roughly 181 feet, on the north side of 58th Avenue. R3: Location R3 represents the existing residential homes northeast of the intersection at 58th Avenue and Madison Street at approximately 231 feet from the Project site. R4: Location R4 represents the existing residential homes southeast of the intersection at 58th Avenue and Madison Street at approximately 185 feet from the Project site. R5: Location R5 represents the existing residential homes on the east side of Madison Street at approximately 352 feet from the Project site. R6: Location R6 represents the existing residential home located north of CII Conchita about 134 feet from the project site. R7: Location R7 represents the existing residential homes located north of Avenue 60 about 37 feet from the Project site. R8: Location R8 represents the existing residential homes located south of Avenue 60 about 38 feet from the project site. R9: Location R9 represents the existing residential homes located about 1,451 feet west of the Project site along Quarry Ranch Road. R10: Location R10 represents the existing residential homes located about 1,378 feet northwest of the Project site north of 58th Avenue. This AQIA analyzes localized construction and operational emissions impacts at the nearest sensitive receptors. For purposes of analysis, the nearest receptor used to evaluate construction and operational air quality impacts for emissions of PM10, PM2.5, NO2, and CO is represented by R7 which is an existing residential home located 37 feet/11 meters from the Project site. It should be noted that the LST Methodology explicitly states that “It is possible that a project may have receptors closer than 25 meters. Projects with boundaries located closer than 25 meters to the nearest receptor should use the LSTs for receptors located at 25 meters (23).” As such, the 25- meter distance will be used to evaluate construction and operational air quality impacts air quality impacts for emissions of PM10, PM2.5, NO2, and CO. The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report 41 EXHIBIT 3-A: SENSITIVE RECEPTOR LOCATIONS The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report 42 LOCALIZED THRESHOLDS FOR CONSTRUCTION ACTIVITY Since the total acreage disturbed is less than five acres per day for the site preparation phase and the grading phase, the SCAQMD’s screening look-up tables are utilized in determining impacts. It should be noted that since the look-up tables identifies thresholds at only 1 acre, 2 acres, and 5 acres, linear regression has been utilized, consistent with SCAQMD guidance, in order to interpolate the threshold values for the other disturbed acreage and distances not identified in the look-up tables. TABLE 3-8: MAXIMUM DAILY LOCALIZED EMISSIONS THRESHOLDS (1 OF 2) Pollutant Construction Operations Localized Thresholds Phase 1 (2021) NOX 248 lbs/day (Site Preparation) N/A 266 lbs/day (Grading) CO 1,796 lbs/day (Site Preparation) N/A 1,961 lbs/day (Grading) PM10 11 lbs/day (Site Preparation) N/A 12 lbs/day (Grading) PM2.5 7 lbs/day (Site Preparation) N/A 7 lbs/day (Grading) Phase 2 (2023) NOX 132 lbs/day (Site Preparation) N/A 162 lbs/day (Grading) CO 878 lbs/day (Site Preparation) N/A 1,089 lbs/day (Grading) PM10 4 lbs/day (Site Preparation) N/A 6 lbs/day (Grading) PM2.5 3 lbs/day (Site Preparation) N/A 4 lbs/day (Grading) The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report 43 TABLE 3-8: MAXIMUM DAILY LOCALIZED EMISSIONS THRESHOLDS (2 OF 2) Pollutant Construction Operations Localized Thresholds Phase 3 (2026) NOX 248 lbs/day (Site Preparation) N/A 266 lbs/day (Grading) CO 1,796 lbs/day (Site Preparation) N/A 1,961 lbs/day (Grading) PM10 11 lbs/day (Site Preparation) N/A 12 lbs/day (Grading) PM2.5 7 lbs/day (Site Preparation) N/A 7 lbs/day (Grading) CONSTRUCTION-SOURCE EMISSIONS LST ANALYSIS Impacts without Mitigation Table 3-9 identifies the localized impacts at the nearest receptor location in the vicinity of the Project. Without mitigation, localized construction emissions would not exceed the applicable SCAQMD LSTs for emissions of any criteria pollutant. Outputs from the model runs for construction LSTs are provided in Appendix 3.1. TABLE 3-9: LOCALIZED SIGNIFICANCE SUMMARY OF CONSTRUCTION (WITHOUT MITIGATION, 1 OF 2) On-Site Site Preparation Emissions Emissions (lbs/day) NOX CO PM10 PM2.5 Phase 1 (2021) Maximum Daily Emissions 63.70 22.37 11.28 6.59 SCAQMD Localized Threshold 248 1,796 11 7 Threshold Exceeded? NO NO YES NO Phase 2 (2023) Maximum Daily Emissions 11.25 4.03 0.81 0.41 SCAQMD Localized Threshold 132 878 4 3 Threshold Exceeded? NO NO NO NO Phase 3 (2026) Maximum Daily Emissions 41.82 18.27 10.25 5.64 SCAQMD Localized Threshold 248 1,796 11 7 Threshold Exceeded? NO NO NO NO The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report 44 TABLE 3-9: LOCALIZED SIGNIFICANCE SUMMARY OF CONSTRUCTION (WITHOUT MITIGATION, 2 OF 2) On-Site Grading Emissions Emissions (lbs/day) NOX CO PM10 PM2.5 Phase 1 (2021) Maximum Daily Emissions 60.88 32.40 6.47 3.74 SCAQMD Localized Threshold 266 1,961 12 7 Threshold Exceeded? NO NO NO NO Phase 2 (2023) Maximum Daily Emissions 23.58 11.86 3.99 2.31 SCAQMD Localized Threshold 162 1,089 6 4 Threshold Exceeded? NO NO NO NO Phase 3 (2026) Maximum Daily Emissions 38.95 27.64 5.57 2.91 SCAQMD Localized Threshold 266 1,961 12 7 Threshold Exceeded? NO NO NO NO Source: CalEEMod construction-source (unmitigated) emissions are presented in Appendix 3.1. Impacts with Mitigation Table 3-10 identifies the localized impacts at the nearest receptor location in the vicinity of the Project. MM AQ-1 is recommended to reduce the PM10 and PM2.5 impacts. After implementation of MM AQ-1, construction emissions would not exceed the applicable SCAQMD LSTs for any criteria pollutant. As stated in Section ES.3, MM AQ-1 requires that for construction equipment greater than 150 horsepower (>150 HP), the Construction Contractor shall ensure that off-road diesel construction equipment that complies with EPA/CARB Tier 3 emissions standards and shall ensure that all construction equipment is tuned and maintained in accordance with the manufacturer’s specifications. Therefore, a less than significant impact would occur. The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report 45 TABLE 3-10: LOCALIZED SIGNIFICANCE SUMMARY OF CONSTRUCTION (WITH MITIGATION) On-Site Site Preparation Emissions Emissions (lbs/day) NOX CO PM10 PM2.5 Phase 1 (2021) Maximum Daily Emissions 27.01 30.27 9.52 5.05 SCAQMD Localized Threshold 248 1,796 11 7 Threshold Exceeded? NO NO NO NO Phase 2 (2023) Maximum Daily Emissions 6.86 7.68 0.67 0.30 SCAQMD Localized Threshold 132 878 4 3 Threshold Exceeded? NO NO NO NO Phase 3 (2026) Maximum Daily Emissions 27.01 30.27 9.52 5.05 SCAQMD Localized Threshold 248 1,796 11 7 Threshold Exceeded? NO NO NO NO On-Site Grading Emissions Emissions (lbs/day) NOX CO PM10 PM2.5 Phase 1 (2021) Maximum Daily Emissions 33.97 40.40 5.34 2.81 SCAQMD Localized Threshold 266 1,961 12 7 Threshold Exceeded? NO NO NO NO Phase 2 (2023) Maximum Daily Emissions 14.28 16.53 3.55 1.94 SCAQMD Localized Threshold 162 1,089 6 4 Threshold Exceeded? NO NO NO NO Phase 3 (2026) Maximum Daily Emissions 33.95 40.38 5.34 2.81 SCAQMD Localized Threshold 266 1,961 12 7 Threshold Exceeded? NO NO NO NO Source: CalEEMod construction-source (mitigated) emissions are presented in Appendix 3.2. 3.7 LOCALIZED SIGNIFICANCE – LONG-TERM OPERATIONAL ACTIVITY As previously stated, the total development is proposed to consist of recreational pool (wave pool), a 150 key hotel, 104 attached DUs, 496 detached DUs, 60,000 square feet of retail, a pop up village park, and a total of 265 parking spaces. According to SCAQMD LST methodology, LSTs would apply to the operational phase of a proposed project, if the project includes stationar y sources, or attracts mobile sources that may spend long periods queuing and idling at the site e.g., transfer facilities and warehouse buildings). The proposed project does not include such The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report 46 uses, and thus, due to the lack of significant stationary source emissions, no long-term localized significance threshold analysis is needed. 3.8 CO “HOT SPOT” ANALYSIS As discussed below, the Project would not result in potentially adverse CO concentrations or “hot spots.” Further, detailed modeling of Project-specific CO “hot spots” is not needed to reach this conclusion. An adverse CO concentration, known as a “hot spot”, would occur if an exceedance of the state one-hour standard of 20 ppm or the eight-hour standard of 9 ppm were to occur. At the time of the 1993 Handbook, the SSAB was designated nonattainment under the CAAQS and NAAQS for CO (26). It has long been recognized that CO hotspots are caused by vehicular emissions, primarily when idling at congested intersections. In response, vehicle emissions standards have become increasingly stringent in the last twenty years. Currently, the allowable CO emissions standard in California is a maximum of 3.4 grams/mile for passenger cars (there are requirements for certain vehicles that are more stringent). With the turnover of older vehicles, introduction of cleaner fuels, and implementation of increasingly sophisticated and efficient emissions control technologies, CO concentration in the SSAB is now designated as attainment, as previously noted in Table 2-3. Also, CO concentrations in the Project vicinity have steadily declined, as indicated by historical emissions data presented previously at Table 2-4. To establish a more accurate record of baseline CO concentrations affecting the SSAB, a CO “hot spot” analysis was conducted in 2003 for four busy intersections in Los Angeles at the peak morning and afternoon time periods. This “hot spot” analysis did not predict any violation of CO standards, as shown on Table 3-11. TABLE 3-11: CO MODEL RESULTS Intersection Location CO Concentrations (ppm) Morning 1-hour Afternoon 1-hour 8-hour Wilshire/Veteran 4.6 3.5 3.7 Sunset/Highland 4 4.5 3.5 La Cienega/Century 3.7 3.1 5.2 Long Beach/Imperial 3 3.1 8.4 Source: 2003 AQMP, Appendix V: Modeling and Attainment Demonstrations Note: Federal 1-hour standard is 35 ppm and the deferral 8-hour standard is 9.0 ppm. Based on the SCAQMD's 2003 AQMP and the 1992 Federal Attainment Plan for Carbon Monoxide 1992 CO Plan), peak carbon monoxide concentrations in the SSAB were a result of unusual meteorological and topographical conditions and not a result of traffic volume s and congestion at a particular intersection. As evidence of this, for example, 9.3 ppm 8-hr CO concentration measured at the Long Beach Blvd. and Imperial Hwy. intersection (highest CO generating intersection within the “hot spot” analysis), only 0.7 ppm was attributable to the traffic volumes The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report 47 and congestion at this intersection; the remaining 8.6 ppm were due to the ambient air measurements at the time the 2003 AQMP was prepared (27). In contrast, the ambient 8-hr CO concentration within the Project study area is estimated at 1.4 ppm—1.6 ppm (please refer to previous Table 2-3). Therefore, even if the traffic volumes for the proposed Project were double or even triple of the traffic volumes generated at the Long Beach Blvd. and Imperial Hwy. intersection, coupled with the on-going improvements in ambient air quality, the Project would not be capable of resulting in a CO “hot spot” at any study area intersections . Similar considerations are also employed by other Air Districts when evaluating potential CO concentration impacts. More specifically, the Bay Area Air Quality Management District BAAQMD) concludes that under existing and future vehicle emission rates, a given project would have to increase traffic volumes at a single intersection by more than 44,000 vehicles per hour— or 24,000 vehicles per hour (vph) where vertical and/or horizontal air does not mix—in order to generate a significant CO impact (28). The 2003 AQMP, and as previously shown in Table 3-12, estimated that the 1-hour concentration for this intersection was 4.6 ppm; this indicates that, should the daily traffic volume increase four times to 400,000 vehicles per day, CO concentrations (4.6 ppm x 4= 18.4 ppm) would still not likely exceed the most stringent 1-hour CO standard (20.0 ppm).3 Traffic volumes generating the CO concentrations for the “hot spot” analysis is shown on Table 3-12. The busiest intersection evaluated for AM traffic volumes was at Wilshire Blvd. and Veter an Ave., which has an AM traffic volume of approximately 8,062 vehicles per hour. Alternatively, the busiest intersection for PM traffic volumes was at La Cienega Boulevard and Century Boulevard, which has a PM traffic volume of 8,674 vph (27). As shown on Table 3-13, the highest trips during the peak hour at an intersection in the Project’s study area is 4,440 vph at the intersection of Jefferson Street and Avenue 50 (22). As such, Project-related traffic volumes are less than the traffic volumes identified in the 2003 AQMP. TABLE 3-12: TRAFFIC VOLUMES Intersection Location Peak Traffic Volumes (vph) Eastbound AM/PM) Westbound AM/PM) Southbound AM/PM) Northbound AM/PM) Total AM/PM) Wilshire/Veteran 4,954/2,069 1,830/3,317 721/1,400 560/933 8,062/7,719 Sunset/Highland 1,417/1,764 1,342/1,540 2,304/1,832 1,551/2,238 6,614/5,374 La Cienega/Century 2,540/2,243 1,890/2,728 1,384/2,029 821/1,674 6,634/8,674 Long Beach/Imperial 1,217/2,020 1,760/1,400 479/944 756/1,150 4,212/5,514 Source: 2003 AQMP 3 Based on the ratio of the CO standard (20.0 ppm) and the modeled value (4.6 ppm). The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report 48 TABLE 3-13: OPENING YEAR WITH PROJECT (2026 EPAC) TRAFFIC VOLUMES Intersection Location Peak Traffic Volumes (vph) Northbound AM/PM) Southbound AM/PM) Eastbound AM/PM) Westbound AM/PM) Total AM/PM) Jefferson Street / Avenue 52 837/1,049 868/1,121 854/897 742/833 3,301/3,900 Jefferson Street / Avenue 50 1,002/1,284 1,317/1,508 640/912 663/736 3,622/4,440 Monroe Street / Avenue 52 509/673 549/718 519/650 536/632 2,113/2,673 Monroe Street / Avenue 50 587/850 580/757 355/634 545/598 2,067/2,839 Source: The Wave – Coral Mountain Traffic Impact Analysis (Urban Crossroads, Inc., 2019). The proposed Project considered herein would not produce the volume of traffic required to generate a CO “hot spot” either in the context of the 2003 Los Angeles hot spot study or based on representative BAAQMD CO threshold considerations. Therefore, CO “hot spots” are not an environmental impact of concern for the proposed Project. Localized air quality impacts related to mobile-source emissions would therefore be less than significant. 3.9 AIR QUALITY MANAGEMENT PLANNING The Project site is located within the SSAB, which is characterized by relatively poor air quality. The SCAQMD has jurisdiction over an approximately 10,743 square -mile area consisting of the four-county Basin and the Los Angeles County and Riverside County portions of what use to be referred to as the Southeast Desert Air Basin. In these areas, the SCAQMD is principally responsible for air pollution control, and works directly with the SCAG, county transportation commissions, local governments, as well as state and federal agencies to reduce emissions from stationary, mobile, and indirect sources to meet state and federal ambient air quality standards. Currently, these state and federal air quality standards are exceeded in most parts of the SSAB. In response, the SCAQMD has adopted a series of AQMPs to meet the state and federal ambient air quality standards. AQMPs are updated regularly in order to more effectively reduce emissions, accommodate growth, and to minimize any negative fiscal impacts of air pollution control on the economy. In March 2017, the AQMD released the Final 2016 AQMP. The 2016 AQMP continues to evaluate current integrated strategies and control measures to meet the NAAQS, as well as, explore new and innovative methods to reach its goals. Some of these approaches include utilizing incentive programs, recognizing existing co-benefit programs from other sectors, and developing a strategy with fair-share reductions at the federal, state, and local levels (29). Similar to the 2012 AQMP, the 2016 AQMP incorporates scientific and technological information and planning assumptions, including the 2016 Regional Transportation Plan/ Sustainable Communities Strategy (RTP/SCS), a planning document that supports the integration of land use and transportation to help the region meet the federal CAA requirements (19). The Project’s consistency with the AQMP will be determined using the 2016 AQMP as discussed below. The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report 49 Criteria for determining consistency with the AQMP are defined in Chapter 12, Section 12.2 and Section 12.3 of the SCAQMD’s CEQA Air Quality Handbook (1993) (30). These indicators are discussed below: Consistency Criterion No. 1: The proposed Project will not result in an increase in the frequency or severity of existing air quality violations or cause or contribute to new violations or delay the timely attainment of air quality standards or the interim emissions reductions specified in the AQMP. The violations that Consistency Criterion No. 1 refers to are the CAAQS and NAAQS. CAAQS and NAAQS violations would occur if regional or localized significance thresholds were exceeded. Construction Impacts – Consistency Criterion 1 The violations that Consistency Criterion No. 1 refers to are the CAAQS and NAAQS. CAAQS and NAAQS violations would occur if regional or localized significance thresholds were exceeded. The Project would not exceed the applicable regional significan ce thresholds or LST thresholds for construction activity after implementation of mitigation. Operational Impacts – Consistency Criterion 1 CAAQS and NAAQS violations would occur if regional or localized significance thresholds were exceeded. The Project would not exceed the applicable regional significance thresholds or LST thresholds for operational activity. On the basis of the preceding discussion, the Project is determined to be consistent with the first criterion. Consistency Criterion No. 2: The Project will not exceed the assumptions in the AQMP based on the years of Project build-out phase. The 2016 AQMP demonstrates that the applicable ambient air quality standards can be achieved within the timeframes required under federal law. Growth project ions from local general plans adopted by cities in the district are provided to the SCAG, which develops regional growth forecasts, which are then used to develop future air quality forecasts for the AQMP. Development consistent with the growth projections in City of La Quinta General Plan is considered to be consistent with the AQMP. Construction Impacts – Consistency Criterion 2 Peak day emissions generated by construction activities are largely independent of land use assignments, but rather are a function of development scope and maximum area of disturbance. Irrespective of the site’s land use designation, development of the site to its maximum potential would likely occur, with disturbance of the entire site occurring during construction activities. Operational Impacts – Consistency Criterion 2 As per the City’s General Plan, the Project site is designated as both Low Density Residential and Open Space – Recreational. The Low Density Residential land use designation is appropriate for single family residential development, whether attached or detached. The density of individual The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report 50 parcels is further refined in the Zoning Ordinance. These lands are typically developed as subdivisions, country club developments, or master planned communities. The Open Space – Recreational land use designation designations applies to parks, recreation facilities, public and private golf courses (31). As indicated, the total development is proposed to consist of recreational pool (wave pool), a 150 key hotel, 104 attached DUs, 496 detached DUs, 60,000 square feet of retail, a pop up village park, and a total of 265 parking spaces. Although the Project may exceed the growth intensities allowed within the current land designation and zoning designation, the Project would not exceed the applicable regional or localized significance thresholds. On the basis of the preceding discussion, the Project is det ermined to be consistent with the second criterion. AQMP Consistency Conclusion The Project would not have the potential to result in or cause NAAQS or CAAQS violations as Project-related construction and operational-source emissions would not exceed the regional or localized significance thresholds for emissions of any criteria pollutant As such, the Project is considered to be consistent with the AQMP. 3.10 POTENTIAL IMPACTS TO SENSITIVE RECEPTORS The potential impact of Project-generated air pollutant emissions at sensitive receptors has also been considered. Sensitive receptors can include uses such as long-term health care facilities, rehabilitation centers, and retirement homes. Residences, schools, playgrounds, childcare centers, and athletic facilities can also be considered as sensitive receptors. Results of the LST analysis indicate that, with application of mitigation, the Project will not exceed the SCAQMD localized significance thresholds during construction. Therefore, sensitive receptors would not be exposed to substantial criteria pollutant concentrations during Project construction. Results of the LST analysis indicate that the Project will not exceed the SCAQMD localized significance thresholds during operational activity. Further Project traffic would not create or result in a CO “hotspot.” Therefore, sensitive receptors would not be exposed to substantial pollutant concentrations as the result of Project operations. 3.11 ODORS The potential for the Project to generate objectionable odors has also been considered. Land uses generally associated with odor complaints include: Agricultural uses (livestock and farming) Wastewater treatment plants Food processing plants Chemical plants Composting operations The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report 51 Refineries Landfills Dairies Fiberglass molding facilities The Project does not contain land uses typically associated with emitting objectionable odors. Potential odor sources associated with the proposed Project may result from construction equipment exhaust and the application of asphalt and architectural coatings during construction activities and the temporary storage of typical solid waste (refuse) associated with the proposed Project’s (long-term operational) uses. Standard construction requirements would minimize odor impacts from construction. The construction odor emissions would be temporary, short - term, and intermittent in nature and would cease upon completion of the respective phase of construction and is thus considered less than significant. It is expected that Project-generated refuse would be stored in covered containers and removed at regular intervals in compliance with the City’s solid waste regulations. The proposed Project would also be required to comply with SCAQMD Rule 402 to prevent occurrences of public nuisances. Therefore, odors associated with the proposed Project construction and operations would be less than significant and no mitigation is required (32). 3.12 CUMULATIVE IMPACTS As previously shown in Table 2-3, the CAAQS designate the Project site as nonattainment for O3 and PM10, while the NAAQS designates the Project site as nonattainment for O3 (8-hour standard), PM10, and PM2.5. The AQMD has published a report on how to address cumulative impacts from air pollution: White Paper on Potential Control Strategies to Address Cumulative Impacts from Air Pollution (33). In this report the AQMD clearly states (Page D-3): the AQMD uses the same significance thresholds for project specific and cumulative impacts for all environmental topics analyzed in an Environmental Assessment or Environmental Impact Report (EIR). The only case where the significance thresholds for project specific and cumulative impacts differ is the Hazard Index (HI) significance threshold for toxic air contaminant (TAC) emissions. The project specific (project increment) significance threshold is HI > 1.0 while the cumulative (facility-wide) is HI > 3.0. It should be noted that the HI is only one of three TAC emission significance thresholds considered (when applicable) in a CEQA analysis. The other two are the maximum individual cancer risk (MICR) and the cancer burden, both of which use the same significance thresholds (MICR of 10 in 1 million and cancer burden of 0.5) for project specific and cumulative impacts. Projects that exceed the project-specific significance thresholds are considered by the SCAQMD to be cumulatively considerable. This is the reason project-specific and cumulative significance thresholds are the same. Conversely, projects that do not The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report 52 exceed the project-specific thresholds are generally not considered to be cumulatively significant. Therefore, this analysis assumes that individual projects that do not generate operational or construction emissions that exceed the SCAQMD’s recommended daily thresholds for project - specific impacts would also not cause a cumulatively considerable increase in emissions for those pollutants for which the SSAB is in nonattainment, and, therefore, would not be considered to have a significant, adverse air quality impact. Alternatively, individual project -related construction and operational emissions that exceed SCAQMD thresholds for project-specific impacts would be considered cumulatively considerable. Construction Impacts The Project specific evaluation of emissions presented in the preceding analysis demonstrates that Project construction-source air pollutant emissions would not result in exceedances of regional thresholds after implementation of mitigation. Therefore, Project construction-source emissions would be considered less than significant on a project-specific and cumulative basis. Operational Impacts The Project specific evaluation of emissions presented in the preceding analysis demonstrates that Project operational-source air pollutant emissions would not result in exceedances of regional thresholds. Therefore, Project construction -source emissions would be considered less than significant on a project-specific and cumulative basis. The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report 53 This page intentionally left blank The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report 54 4 REFERENCES 1. State of California. 2019 CEQA California Environmental Quality Act. 2019. 2. South Coast Air Quality Management District. RULE 403. FUGITIVE DUST. [Online] https://www.aqmd.gov/docs/default-source/rule-book/rule-iv/rule-403.pdf?sfvrsn=4. 3. —. RULE 1113. Architectural Coatings. [Online] http://www.aqmd.gov/docs/default-source/rule- book/reg-xi/r1113.pdf. 4. —. RULE 445. Wood-Burning Devices. [Online] http://www.aqmd.gov/docs/default-source/rule- book/rule-iv/rule-445.pdf. 5. —. Guidance Document for Addressing Air Quality Issues in General Plans and Local Planning. 2005. 6. St. Croix Sensory, Inc. The "Gray Line" Between Odor Nuisance and Health Effects. 2000. 7. California Air Resources Board. Ambient Air Quality Standards (AAQS). [Online] 2016. http://www.arb.ca.gov/research/aaqs/aaqs2.pdf. 8. United State Environmental Protection Agency. Frequent Questions about General Conformity . EPA. Online] https://www.epa.gov/general-conformity/frequent-questions-about-general-conformity#8. 9. South Coast Air Quality Management District. Annual Air Quality Monitoring Network Plan. [Online] July 2018. http://www.aqmd.gov/docs/default-source/clean-air-plans/air-quality-monitoring- network-plan/annual-air-quality-monitoring-network-plan-v2.pdf?sfvrsn=2. 10. Air Resources Board. State and National Ambient Air Quality Standards. [Online] https://www.arb.ca.gov/regact/2019/stateareadesignations/appc.pdf?_ga=2.169398369.15376157 02.1554741141-1192937971.1505156621. 11. District, South Coast Air Quality Management. Air Quality Data Tables. [Online] https://www.aqmd.gov/home/air-quality/air-quality-data-studies/historical-data-by-year. 12. Environmental Protection Agency. National Ambient Air Quality Standards (NAAQS). [Online] 1990. https://www.epa.gov/environmental-topics/air-topics. 13. —. Air Pollution and the Clean Air Act. [Online] http://www.epa.gov/air/caa/. 14. United States Environmental Protection Agency. 1990 Clean Air Act Amendment Summary: Title I. Online] https://www.epa.gov/clean-air-act-overview/1990-clean-air-act-amendment-summary- title-i. 15. —. 1990 Clean Air Act Amendment Summary: Title II. [Online] https://www.epa.gov/clean-air-act- overview/1990-clean-air-act-amendment-summary-title-ii. 16. Air Resources Board. California Ambient Air Quality Standards (CAAQS). [Online] 2009. [Cited: April 16, 2018.] http://www.arb.ca.gov/research/aaqs/caaqs/caaqs.htm. 17. The California Energy Commission. 2019 Building Energy Efficiency Standards . California Energy Commission. [Online] 2018. https://www.energy.ca.gov/title24/2019standards/documents/2018_Title_24_2019_Building_Stand ards_FAQ.pdf. 18. Department of General Services. Building Standards Commission. CALGreen. [Online] https://codes.iccsafe.org/content/chapter/15778/. 19. Southern California Association of Governments. 2016-2040 Regional Transportation Plan/Sustainable Communities Strategy. [Online] April 2016. http://scagrtpscs.net/Documents/2016/final/f2016RTPSCS.pdf. The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report 55 20. South Coast Air Quality Management District (SCAQMD). SCAQMD Air Quality Significance Thresholds. [Online] http://www.aqmd.gov/docs/default-source/ceqa/handbook/scaqmd-air- quality-significance-thresholds.pdf?sfvrsn=2. 21. California Air Pollution Control Officers Association (CAPCOA). California Emissions Estimator Model (CalEEMod). [Online] September 2016. www.caleemod.com. 22. Urban Crossroads, Inc. The Wave - Coral Mountain Traffic Impact Analysis. 2019. 23. South Coast Air Quality Management District. Localized Significance Thresholds Methodology. s.l. : South Coast Air Quality Managment District, 2003. 24. Lake Environmental. US EPA Models. Lake Environmental. [Online] http://www.weblakes.com/download/us_epa.html. 25. South Coast Air Quality Management District. Fact Sheet for Applying CalEEMod to Localized Significance Thresholds. [Online] http://www.aqmd.gov/docs/default- source/ceqa/handbook/localized-significance-thresholds/caleemod-guidance.pdf. 26. South coast Air Quality Management District. CEQA Air Quality Handbook (1993). 1993. 27. South Coast Air Quality Management District. 2003 Air Quality Management Plan. [Online] 2003. https://www.aqmd.gov/home/air-quality/clean-air-plans/air-quality-mgt-plan/2003-aqmp. 28. Bay Area Air Quality Management District. [Online] http://www.baaqmd.gov/. 29. South Coast Air Quality Management District. Final 2016 Air Quality Management Plan (AQMP). Online] March 2017. http://www.aqmd.gov/docs/default-source/clean-air-plans/air-quality- management-plans/2016-air-quality-management-plan/final-2016- aqmp/final2016aqmp.pdf?sfvrsn=11. 30. —. CEQA Air Quality Handbook (1993). 1993. 31. City of La Quinta. City of La Quinta General Plan. 2013. 32. South Coast Air Quality Management District. RULE 402 NUISANCE. [Online] http://www.aqmd.gov/docs/default-source/rule-book/rule-iv/rule-402.pdf. 33. Goss, Tracy A and Kroeger, Amy. White Paper on Potential Control Strategies to Address Cumulative Impacts from Air Pollution. [Online] South Coast Air Quality Management District, 2003. http://www.aqmd.gov/rules/ciwg/final_white_paper.pdf. 34. Southern California Air Quality Management District. California Emissions Estimator Model User's Guide Version 2016.3.2. [Online] http://www.aqmd.gov/docs/default-source/caleemod/01_user-39- s-guide2016-3-2_15november2017.pdf?sfvrsn=4. The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report 56 This page intentionally left blank The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report 57 5 CERTIFICATIONS The contents of this air study report represent an accurate depiction of the environmental impacts associated with the proposed The Wave – Coral Mountain. The information contained in this air quality impact assessment report is based on the best available data at the time of preparation. If you have any questions, please contact me directly at (949) 336-5987. Haseeb Qureshi Associate Principal URBAN CROSSROADS, INC. 260 E. Baker St., Suite 200 Costa Mesa, CA 92626 949) 336-5987 hqureshi@urbanxroads.com EDUCATION Master of Science in Environmental Studies California State University, Fullerton • May, 2010 Bachelor of Arts in Environmental Analysis and Design University of California, Irvine • June, 2006 PROFESSIONAL AFFILIATIONS AEP – Association of Environmental Planners AWMA – Air and Waste Management Association ASTM – American Society for Testing and Materials PROFESSIONAL CERTIFICATIONS Planned Communities and Urban Infill – Urban Land Institute • June, 2011 Indoor Air Quality and Industrial Hygiene – EMSL Analytical • April, 2008 Principles of Ambient Air Monitoring – California Air Resources Board • August, 2007 AB2588 Regulatory Standards – Trinity Consultants • November, 2006 Air Dispersion Modeling – Lakes Environmental • June, 2006 The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report 58 This page intentionally left blank The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report APPENDIX 2.1: STATE/FEDERAL ATTAINMENT STATUS OF CRITERIA POLLUTANTS The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report This page intentionally left blank APPENDIX C MAPS AND TABLES OF AREA DESIGNATIONS FOR STATE AND NATIONAL AMBIENT AIR QUALITY STANDARDS This page intentionally left blank] C-1 APPENDIX C MAPS AND TABLES OF AREA DESIGNATIONS FOR STATE AND NATIONAL AMBIENT AIR QUALITY STANDARDS This attachment fulfills the requirement of Health and Safety Code section 40718 for CARB to publish maps that identify areas where one or more violations of any State ambient air quality standard (State standard) or national ambient air quality standard national standard) have been measured. The national standards are those promulgated under section 109 of the federal Clean Air Act (42 U.S.C. 7409). This attachment is divided into three parts. The first part comprises a table showing the levels, averaging times, and measurement methods for each of the State and national standards. This is followed by a section containing maps and tables showing the area designations for each pollutant for which there is a State standard in the California Code of Regulations, title 17, section 70200. The last section contains maps and tables showing the most current area designations for the national standards. C-2 Concentration 3 Method 4 Primary 3,5 Secondary 3,6 Method 7 1 Hour 0.09 ppm (180 µg/m3)— 8 Hour 0.070 ppm (137 µg/m3)0.070 ppm (137 µg/m3) 24 Hour 50 µg/m3 150 µg/m3 Annual Arithmetic Mean 20 µg/m3 — 24 Hour ——35 µg/m3 Same as Primary Standard Annual Arithmetic Mean 12 µg/m3 Gravimetric or Beta Attenuation 12.0 µg/m3 15 µg/m3 1 Hour 20 ppm (23 mg/m3)35 ppm (40 mg/m3)— 8 Hour 9.0 ppm (10 mg/m3)9 ppm (10 mg/m3)— 8 Hour (Lake Tahoe)6 ppm (7 mg/m3)—— 1 Hour 0.18 ppm (339 µg/m3)100 ppb (188 g/m3)— Annual Arithmetic Mean 0.030 ppm (57 µg/m3)0.053 ppm (100 µg/m3)Same as Primary Standard 1 Hour 0.25 ppm (655 µg/m3)75 ppb (196 g/m3)— 3 Hour ——0.5 ppm (1300 µg/m3) 24 Hour 0.04 ppm (105 µg/m3)0.14 ppm for certain areas)11 — Annual Arithmetic Mean — 0.030 ppm for certain areas)11 — 30 Day Average 1.5 µg/m3 —— Calendar Quarter —1.5 µg/m3 for certain areas)12 Rolling 3-Month Average —0.15 µg/m3 Visibility Reducing Particles14 8 Hour See footnote 14 Beta Attenuation and Transmittance through Filter Tape Sulfates 24 Hour 25 µg/m3 Ion Chromatography Hydrogen Sulfide 1 Hour 0.03 ppm (42 µg/m3) Ultraviolet Fluorescence Vinyl Chloride 12 24 Hour 0.01 ppm (26 µg/m3) Gas Chromatography See footnotes on next page … Lead12,13 Atomic Absorption High Volume Sampler and Atomic AbsorptionSameasPrimary Standard No National Standards Nitrogen Dioxide NO2 )10 Gas Phase Chemiluminescence Gas Phase Chemiluminescence Sulfur Dioxide SO2 )11 Ultraviolet Fluorescence Ultraviolet Flourescence; Spectrophotometry Pararosaniline Method) Fine Particulate Matter PM2.5)9 Inertial Separation and Gravimetric Analysis Carbon Monoxide CO) Non-Dispersive Infrared Photometry NDIR) Non-Dispersive Infrared Photometry NDIR) Ozone (O3)8 Ultraviolet Photometry Same as Primary Standard Ultraviolet Photometry Respirable Particulate Matter (PM10)9 Gravimetric or Beta Attenuation Same as Primary Standard Inertial Separation and Gravimetric Analysis Ambient Air Quality Standards Pollutant Averaging Time California Standards 1 National Standards 2 Updated 5/4/16) C-3 1. California standards for ozone, carbon monoxide (except 8-hour Lake Tahoe), sulfur dioxide (1- and 24-hour), nitrogen dioxide, and particulate matter (PM10, PM2.5, and visibility reducing particles), are values that are not to be exceeded. All others are not to be equaled or exceeded. California ambient air quality standards are listed in the Table of Standards in Section 70200 of Title 17 of the California Code of Regulations. 2. National standards (other than ozone, particulate matter, and those based on annual arithmetic mean) are not to be exceeded more than once a year. The ozone standard is attained when the fourth highest 8-hour concentration measured at each site in a year, averaged over three years, is equal to or less than the standard. For PM10, the 24-hour standard is attained when the expected number of days per calendar year with a 24-hour average concentration above 150 µg/m3 is equal to or less than one. For PM2.5, the 24-hour standard is attained when 98 percent of the daily concentrations, averaged over three years, are equal to or less than the standard. Contact the U.S. EPA for further clarification and current national policies. 3. Concentration expressed first in units in which it was promulgated. Equivalent units given in parentheses are based upon a reference temperature of 25°C and a reference pressure of 760 torr. Most measurements of air quality are to be corrected to a reference temperature of 25°C and a reference pressure of 760 torr; ppm in this table refers to ppm by volume, or micromoles of pollutant per mole of gas. 4. Any equivalent measurement method which can be shown to the satisfaction of the CARB to give equivalent results at or near the level of the air quality standard may be used. 5. National Primary Standards: The levels of air quality necessary, with an adequate margin of safety to protect the public health. 6. National Secondary Standards: The levels of air quality necessary to protect the public welfare from any known or anticipated adverse effects of a pollutant. 7. Reference method as described by the U.S. EPA. An “equivalent method” of measurement may be used but must have a consistent relationship to the reference method” and must be approved by the U.S. EPA. 8. On October 1, 2015, the national 8-hour ozone primary and secondary standards were lowered from 0.075 to 0.070 ppm. 9. On December 14, 2012, the national annual PM2.5 primary standard was lowered from 15 g/m3 to 12.0 g/m3. The existing national 24-hour PM2.5 standards (primary and secondary) were retained at 35 g/m3, as was the annual secondary standard of 15 g/m3. The existing 24-hour PM10 standards (primary and secondary) of 150 g/m3 also were retained. The form of the annual primary and secondary standards is the annual mean, averaged over 3 years. 10. To attain the 1-hour national standard, the 3-year average of the annual 98th percentile of the 1-hour daily maximum concentrations at each site must not exceed 100 ppb. Note that the national 1-hour standard is in units of parts per billion (ppb). California standards are in units of parts per million (ppm). To directly compare the national 1-hour standard to the California standards the units can be converted from ppb to ppm. In this case, the national standard of 100 ppb is identical to 0.100 ppm. 11. On June 2, 2010, a new 1-hour SO2 standard was established and the existing 24-hour and annual primary standards were revoked. To attain the 1-hour national standard, the 3-year average of the annual 99th percentile of the 1-hour daily maximum concentrations at each site must not exceed 75 ppb. The 1971 SO2 national standards (24-hour and annual) remain in effect until one year after an area is designated for the 2010 standard, except that in areas designated nonattainment for the 1971 standards, the 1971 standards remain in effect until implementation plans to attain or maintain the 2010 standards are approved. Note that the 1-hour national standard is in units of parts per billion (ppb). California standards are in units of parts per million ppm). To directly compare the 1-hour national standard to the California standard the units can be converted to ppm. In this case, the national standard of 75 ppb is identical to 0.075 ppm. 12. The CARB has identified lead and vinyl chloride as 'toxic air contaminants' with no threshold level of exposure for adverse health effects determined. These actions allow for the implementation of control measures at levels below the ambient concentrations specified for these pollutants. 13. The national standard for lead was revised on October 15, 2008 to a rolling 3-month average. The 1978 lead standard (1.5 g/m3 as a quarterly average) remains in effect until one year after an area is designated for the 2008 standard, except that in areas designated nonattainment for the 1978 standard, the 1978 standard remains in effect until implementation plans to attain or maintain the 2008 standard are approved. 14. In 1989, the CARB converted both the general statewide 10-mile visibility standard and the Lake Tahoe 30-mile visibility standard to instrumental equivalents, which are "extinction of 0.23 per kilometer" and "extinction of 0.07 per kilometer" for the statewide and Lake Tahoe Air Basin standards, respectively. C-4 This page intentionally left blank] C-5 Area Designations for the State Ambient Air Quality Standards The following maps and tables show the area designations for each pollutant with a State standard set forth in the California Code of Regulations, title 17, section 60200. Each area is identified as attainment, nonattainment, nonattainment-transitional, or unclassified for each pollutant, as shown below: Attainment A Nonattainment N Nonattainment-Transitional NA-T Unclassified U In general, CARB designates areas by air basin for pollutants with a regional impact and by county for pollutants with a more local impact. However, when there are areas within an air basin or county with distinctly different air quality deriving from sources and conditions not affecting the entire air basin or county, CARB may designate a smaller area. Generally, when boundaries of the designated area differ from the air basin or county boundaries, the description of the specific area is referenced at the bottom of the summary table. C-6 FIGURE 1 C-7 TABLE 1 California Ambient Air Quality Standards Area Designations for Ozone (1) N NA-T U A N NA-T U A GREAT BASIN VALLEYS AIR BASIN NORTHEAST PLATEAU AIR BASIN X Alpine County X SACRAMENTO VALLEY AIR BASIN Inyo County X Colusa and Glenn Counties X Mono County X Sutter/Yuba Counties LAKE COUNTY AIR BASIN X Sutter Buttes X LAKE TAHOE AIR BASIN X Remainder of Sutter County X MOJAVE DESERT AIR BASIN X Yuba County X MOUNTAIN COUNTIES AIR BASIN Yolo/Solano Counties X Amador County X Remainder of Air Basin X Calaveras County X SALTON SEA AIR BASIN X El Dorado County (portion) X SAN DIEGO AIR BASIN X Mariposa County X SAN FRANCISCO BAY AREA AIR BASIN X Nevada County X SAN JOAQUIN VALLEY AIR BASIN X Placer County (portion) X SOUTH CENTRAL COAST AIR BASIN Plumas County X San Luis Obispo County X Sierra County X Santa Barbara County X Tuolumne County X Ventura County X NORTH CENTRAL COAST AIR BASIN X SOUTH COAST AIR BASIN X NORTH COAST AIR BASIN X 1) AB 3048 (Olberg) and AB 2525 (Miller) signed into law in 1996, made changes to Health and Safety Code, section 40925.5. One of the changes allows nonattainment districts to become nonattainment-transitional for ozone by operation of law. C-8 FIGURE 2 C-9 TABLE 2 California Ambient Air Quality Standards Area Designation for Suspended Particulate Matter (PM10) N U A N U A GREAT BASIN VALLEYS AIR BASIN X NORTH CENTRAL COAST AIR BASIN X LAKE COUNTY AIR BASIN X NORTH COAST AIR BASIN LAKE TAHOE AIR BASIN X Del Norte, Sonoma (portion) and Trinity Counties X MOJAVE DESERT AIR BASIN X Remainder of Air Basin X MOUNTAIN COUNTIES AIR BASIN NORTHEAST PLATEAU AIR BASIN Amador County X Siskiyou County X Calaveras County X Remainder of Air Basin X El Dorado County (portion) X SACRAMENTO VALLEY AIR BASIN Mariposa County Shasta County X Yosemite National Park X Remainder of Air Basin X Remainder of County X SALTON SEA AIR BASIN X Nevada County X SAN DIEGO AIR BASIN X Placer County (portion) X SAN FRANCISCO BAY AREA AIR BASIN X Plumas County X SAN JOAQUIN VALLEY AIR BASIN X Sierra County X SOUTH CENTRAL COAST AIR BASIN X Tuolumne County X SOUTH COAST AIR BASIN X C-10 FIGURE 3 C-11 TABLE 3 California Ambient Air Quality Standards Area Designations for Fine Particulate Matter (PM2.5) N U A N U A GREAT BASIN VALLEYS AIR BASIN X SALTON SEA AIR BASIN LAKE COUNTY AIR BASIN X Imperial County LAKE TAHOE AIR BASIN X - City of Calexico (3) X MOJAVE DESERT AIR BASIN Remainder of Air Basin X San Bernardino County SAN DIEGO AIR BASIN X County portion of federal Southeast Desert Modified AQMA for Ozone (1) X SAN FRANCISCO BAY AREA AIR BASIN X SAN JOAQUIN VALLEY AIR BASIN X Remainder of Air Basin X SOUTH CENTRAL COAST AIR BASIN MOUNTAIN COUNTIES AIR BASIN San Luis Obispo County X Plumas County Santa Barbara County X Portola Valley (2) X Ventura County X Remainder of Air Basin X SOUTH COAST AIR BASIN X NORTH CENTRAL COAST AIR BASIN X NORTH COAST AIR BASIN X NORTHEAST PLATEAU AIR BASIN X SACRAMENTO VALLEY AIR BASIN Butte County X Colusa County X Glenn County X Placer County (portion) X Sacramento County X Shasta County X Sutter and Yuba Counties X Remainder of Air Basin X 1) California Code of Regulations, title 17, section 60200(b) 2) California Code of Regulations, title 17, section 60200(c) 3) California Code of Regulations, title 17, section 60200(a) C-12 FIGURE 4 C-13 TABLE 4 California Ambient Air Quality Standards Area Designation for Carbon Monoxide* N NA-T U A N NA-T U A GREAT BASIN VALLEYS AIR BASIN SACRAMENTO VALLEY AIR BASIN Alpine County X Butte County X Inyo County X Colusa County X Mono County X Glenn County X LAKE COUNTY AIR BASIN X Placer County (portion) X LAKE TAHOE AIR BASIN X Sacramento County X MOJAVE DESERT AIR BASIN Shasta County X Kern County (portion) X Solano County (portion) X Los Angeles County (portion) X Sutter County X Riverside County (portion) X Tehama County X San Bernardino County (portion) X Yolo County X MOUNTAIN COUNTIES AIR BASIN Yuba County X Amador County X SALTON SEA AIR BASIN X Calaveras County X SAN DIEGO AIR BASIN X El Dorado County (portion) X SAN FRANCISCO BAY AREA AIR BASIN X Mariposa County X SAN JOAQUIN VALLEY AIR BASIN Nevada County X Fresno County X Placer County (portion) X Kern County (portion) X Plumas County X Kings County X Sierra County X Madera County X Tuolumne County X Merced County X NORTH CENTRAL COAST AIR BASIN San Joaquin County X Monterey County X Stanislaus County X San Benito County X Tulare County X Santa Cruz County X SOUTH CENTRAL COAST AIR BASIN X NORTH COAST AIR BASIN SOUTH COAST AIR BASIN X Del Norte County X Humboldt County X Mendocino County X Sonoma County (portion) X Trinity County X NORTHEAST PLATEAU AIR BASIN X The area designated for carbon monoxide is a county or portion of a county C-14 FIGURE 5 C-15 TABLE 5 California Ambient Air Quality Standards Area Designation for Nitrogen Dioxide N U A N U A GREAT BASIN VALLEYS AIR BASIN X SACRAMENTO VALLEY AIR BASIN X LAKE COUNTY AIR BASIN X SALTON SEA AIR BASIN X LAKE TAHOE AIR BASIN X SAN DIEGO AIR BASIN X MOJAVE DESERT AIR BASIN X SAN FRANCISCO BAY AREA AIR BASIN X MOUNTAIN COUNTIES AIR BASIN X SAN JOAQUIN VALLEY AIR BASIN X NORTH CENTRAL COAST AIR BASIN X SOUTH CENTRAL COAST AIR BASIN X NORTH COAST AIR BASIN X SOUTH COAST AIR BASIN NORTHEAST PLATEAU AIR BASIN X CA 60 Near-road Portion of San Bernardino, Riverside, and Los Angeles Counties X Remainder of Air Basin X C-16 FIGURE 6 C-17 TABLE 6 California Ambient Air Quality Standards Area Designation for Sulfur Dioxide* N U/A N U/A GREAT BASIN VALLEYS AIR BASIN X SACRAMENTO VALLEY AIR BASIN X LAKE COUNTY AIR BASIN X SALTON SEA AIR BASIN X LAKE TAHOE AIR BASIN X SAN DIEGO AIR BASIN X MOJAVE DESERT AIR BASIN X SAN FRANCISCO BAY AREA AIR BASIN X MOUNTAIN COUNTIES AIR BASIN X SAN JOAQUIN VALLEY AIR BASIN X NORTH CENTRAL COAST AIR BASIN X SOUTH CENTRAL COAST AIR BASIN X NORTH COAST AIR BASIN X SOUTH COAST AIR BASIN X NORTHEAST PLATEAU AIR BASIN X The area designated for sulfur dioxide is a county or portion of a county C-18 FIGURE 7 C-19 TABLE 7 California Ambient Air Quality Standards Area Designation for Sulfates N U A N U A GREAT BASIN VALLEYS AIR BASIN X SACRAMENTO VALLEY AIR BASIN X LAKE COUNTY AIR BASIN X SALTON SEA AIR BASIN X LAKE TAHOE AIR BASIN X SAN DIEGO AIR BASIN X MOJAVE DESERT AIR BASIN X SAN FRANCISCO BAY AREA AIR BASIN X MOUNTAIN COUNTIES AIR BASIN X SAN JOAQUIN VALLEY AIR BASIN X NORTH CENTRAL COAST AIR BASIN X SOUTH CENTRAL COAST AIR BASIN X NORTH COAST AIR BASIN X SOUTH COAST AIR BASIN X NORTHEAST PLATEAU AIR BASIN X C-20 FIGURE 8 C-21 TABLE 8 California Ambient Air Quality Standards Area Designations for Lead (particulate)* N U A N U A GREAT BASIN VALLEYS AIR BASIN X SALTON SEA AIR BASIN X LAKE COUNTY AIR BASIN X SAN DIEGO AIR BASIN X LAKE TAHOE AIR BASIN X SAN FRANCISCO BAY AREA AIR BASIN X MOJAVE DESERT AIR BASIN X SAN JOAQUIN VALLEY AIR BASIN X MOUNTAIN COUNTIES AIR BASIN X SOUTH CENTRAL COAST AIR BASIN X NORTH CENTRAL COAST AIR BASIN X SOUTH COAST AIR BASIN X NORTH COAST AIR BASIN X NORTHEAST PLATEAU AIR BASIN X SACRAMENTO VALLEY AIR BASIN X The area designated for lead is a county or portion of a county. Since all areas in the State are in attainment for this standard, air basins are indicated here for simplicity. C-22 FIGURE 9 C-23 TABLE 9 California Ambient Air Quality Standards Area Designation for Hydrogen Sulfide* N NA-T U A N NA-T U A GREAT BASIN VALLEYS AIR BASIN NORTH CENTRAL COAST AIR BASIN X Alpine County X NORTH COAST AIR BASIN Inyo County X Del Norte County X Mono County X Humboldt County X LAKE COUNTY AIR BASIN X Mendocino County X LAKE TAHOE AIR BASIN X Sonoma County (portion) MOJAVE DESERT AIR BASIN - Geyser Geothermal Area (2) X Kern County (portion) X - Remainder of County X Los Angeles County (portion) X Trinity County X Riverside County (portion) X NORTHEAST PLATEAU AIR BASIN X San Bernardino County (portion) SACRAMENTO VALLEY AIR BASIN X Searles Valley Planning Area (1) X SALTON SEA AIR BASIN X Remainder of County X SAN DIEGO AIR BASIN X MOUNTAIN COUNTIES AIR BASIN SAN FRANCISCO BAY AREA AIR BASIN X Amador County SAN JOAQUIN VALLEY AIR BASIN X City of Sutter Creek X SOUTH CENTRAL COAST AIR BASIN Remainder of County X San Luis Obispo County X Calaveras County X Santa Barbara County X El Dorado County (portion) X Ventura County X Mariposa County X SOUTH COAST AIR BASIN X Nevada County X Placer County (portion) X Plumas County X Sierra County X Tuolumne County X The area designated for hydrogen sulfide is a county or portion of a county 1) 52 Federal Register 29384 (August 7, 1987) 2) California Code of Regulations, title 17, section 60200(d) C-24 FIGURE 10 C-25 TABLE 10 California Ambient Air Quality Standards Area Designation for Visibility Reducing Particles N NA-T U A N NA-T U A GREAT BASIN VALLEYS AIR BASIN X SACRAMENTO VALLEY AIR BASIN X LAKE COUNTY AIR BASIN X SALTON SEA AIR BASIN X LAKE TAHOE AIR BASIN X SAN DIEGO AIR BASIN X MOJAVE DESERT AIR BASIN X SAN FRANCISCO BAY AREA AIR BASIN X MOUNTAIN COUNTIES AIR BASIN X SAN JOAQUIN VALLEY AIR BASIN X NORTH CENTRAL COAST AIR BASIN X SOUTH CENTRAL COAST AIR BASIN X NORTH COAST AIR BASIN X SOUTH COAST AIR BASIN X NORTHEAST PLATEAU AIR BASIN X C-26 Area Designations for the National Ambient Air Quality Standards The following maps and tables show the area designations for each pollutant with a national ambient air quality standard. Additional information about the federal area designations is available on the U.S. EPA website: https://www.epa.gov/green-book Over the last several years, U.S. EPA has been reviewing the levels of the various national standards. The agency has already promulgated new standard levels for some pollutants and is considering revising the levels for others. Information about the status of these reviews is available on the U.S. EPA website: https://www.epa.gov/criteria-air-pollutants Designation Categories Suspended Particulate Matter (PM10). The U.S. EPA uses three categories to designate areas with respect to PM10: Attainment Nonattainment Unclassifiable Ozone, Fine Suspended Particulate Matter (PM2.5), Carbon Monoxide (CO), and Nitrogen Dioxide (NO2). The U.S. EPA uses two categories to designate areas with respect to these standards: Nonattainment Unclassifiable/Attainment The national 1-hour ozone standard was revoked effective June 15, 2005, and the area designations map reflects the 2015 national 8-hour ozone standard of 0.070 ppm. Original designations were finalized on August 3, 2018. On December 14, 2012, the U.S. EPA established a new national annual primary PM2.5 standard of 12.0 µg/m3. New area designations reflecting this revised standard became final in December 2014. The current designation map reflects the most recently revised 2012) annual average standard of 12.0 g/m3 as well as the 24-hour standard of 35 g/m3, revised in 2006. On January 22, 2010, the U.S. EPA established a new national 1-hour NO2 standard of 100 parts per billion (ppb) and retained the annual average standard of 53 ppb. Designations for the primary NO2 standard became effective on February 29, 2012. All areas of California meet this standard. Sulfur Dioxide (SO2). The U.S. EPA uses three categories to designate areas with respect to the 24-hour and annual average sulfur dioxide standards. These designation categories are: Nonattainment, Unclassifiable, and Attainment/Unclassifiable. On June 2, 2010, the U.S. EPA established a new primary 1-hour SO2 standard of 75 parts per billion (ppb). At the same time, U.S. EPA revoked the 24-hour and annual C-27 average standards. Area designations for the 1-hour SO2 standard were finalized on December 21, 2017 and are reflected in the area designations map. Lead (particulate). The U.S. EPA promulgated a new rolling 3-month average lead standard in October 2008 of 0.15 g/m3. Designations were made for this standard in November 2010. Designation Areas From time to time, the boundaries of the California air basins have been changed to facilitate the planning process. CARB generally initiates these changes, and they are not always reflected in the U.S. EPA’s area designations. For purposes of consistency, the maps in this attachment reflect area designation boundaries and nomenclature as promulgated by the U.S. EPA. In some cases, these may not be the same as those adopted by CARB. For example, the national area designations reflect the former Southeast Desert Air Basin. In accordance with Health and Safety Code section 39606.1, CARB redefined this area in 1996 to be the Mojave Desert Air Basin and Salton Sea Air Basin. The definitions and boundaries for all areas designated for the national standards can be found in Title 40, Code of Federal Regulations (CFR), Chapter I, Subchapter C, Part 81.305. They are available on the web at: https://ecfr.io/Title-40/se40.20.81_1305 C-28 FIGURE 11 C-29 TABLE 11 National Ambient Air Quality Standards Area Designations for 8-Hour Ozone* N U/A N U/A GREAT BASIN VALLEYS AIR BASIN X SACRAMENTO VALLEY AIR BASIN cont.) LAKE COUNTY AIR BASIN X Yolo County (2) X LAKE TAHOE AIR BASIN X Yuba County X MOUNTAIN COUNTIES AIR BASIN SAN DIEGO COUNTY X Amador County X SAN FRANCISCO BAY AREA AIR BASIN X Calaveras County X SAN JOAQUIN VALLEY AIR BASIN X El Dorado County (portion) (2) X SOUTH CENTRAL COAST AIR BASIN (1) Mariposa County X San Luis Obispo County Nevada County - Eastern San Luis Obispo County X Western Nevada County X - Remainder of County X Remainder of County X Santa Barbara County X Placer County (portion) (2) X Ventura County Plumas County X - Area excluding Anacapa and San Nicolas Islands X Sierra County X - Channel Islands (1) X Tuolumne County X SOUTH COAST AIR BASIN (1) X NORTH CENTRAL COAST AIR BASIN X SOUTHEAST DESERT AIR BASIN NORTH COAST AIR BASIN X Kern County (portion) X NORTHEAST PLATEAU AIR BASIN X - Indian Wells Valley X SACRAMENTO VALLEY AIR BASIN Imperial County X Butte County X Los Angeles County (portion) X Colusa County X Riverside County (portion) Glenn County X - Coachella Valley X Sacramento Metro Area (2) X - Non-AQMA portion X Shasta County X San Bernardino County Sutter County - Western portion (AQMA) X Sutter Buttes X - Eastern portion (non-AQMA) X Southern portion of Sutter County (2) X Remainder of Sutter County X Tehama County Tuscan Buttes X Remainder of Tehama County X Definitions and references for all areas can be found in 40 CFR, Chapter I, Part 81.305. NOTE: This map and table reflect the 2015 8-hour ozone standard of 0.070 ppm. 1) South Central Coast Air Basin Channel Islands: Santa Barbara County includes Santa Cruz, San Miguel, Santa Rosa, and Santa Barbara Islands. Ventura County includes Anacapa and San Nicolas Islands. South Coast Air Basin: Los Angeles County includes San Clemente and Santa Catalina Islands. 2) For this purpose, the Sacramento Metro Area comprises all of Sacramento and Yolo Counties, the Sacramento Valley Air Basin portion of Solano County, the southern portion of Sutter County, and the Sacramento Valley and Mountain Counties Air Basins portions of Placer and El Dorado counties. C-30 FIGURE 12 C-31 TABLE 12 National Ambient Air Quality Standards Area Designations for Suspended Particulate Matter (PM10)* N U A N U A GREAT BASIN VALLEYS AIR BASIN SAN DIEGO COUNTY X Alpine County X SAN FRANCISCO BAY AREA AIR BASIN X Inyo County SAN JOAQUIN VALLEY AIR BASIN X Owens Valley Planning Area X SOUTH CENTRAL COAST AIR BASIN X Coso Junction X SOUTH COAST AIR BASIN X Remainder of County X SOUTHEAST DESERT AIR BASIN Mono County Eastern Kern County Mammoth Lake Planning Area X - Indian Wells Valley X Mono Lake Basin X - Portion within San Joaquin Valley Planning Area X Remainder of County X - Remainder of County X LAKE COUNTY AIR BASIN X Imperial County LAKE TAHOE AIR BASIN X - Imperial Valley Planning Area X MOUNTAIN COUNTIES AIR BASIN - Remainder of County X Placer County (portion) (2) X Los Angeles County (portion) X Remainder of Air Basin X Riverside County (portion) NORTH CENTRAL COAST AIR BASIN X - Coachella Valley (3) X NORTH COAST AIR BASIN X - Non-AQMA portion X NORTHEAST PLATEAU AIR BASIN X San Bernardino County SACRAMENTO VALLEY AIR BASIN - Trona X Butte County X - Remainder of County X Colusa County X Glenn County X Placer County (portion) (2) X Sacramento County (1) X Shasta County X Solano County (portion) X Sutter County X Tehama County X Yolo County X Yuba County X Definitions and references for all areas can be found in 40 CFR, Chapter I, Part 81.305. 1) Air quality in Sacramento County meets the national PM10 standards. The request for redesignation to attainment was approved by U.S. EPA in September 2013. 2) U.S. EPA designation puts the Sacramento Valley Air Basin portion of Placer County in the Mountain Counties Air Basin. 3) Air quality in Coachella Valley meets the national PM10 standards. A request for redesignation to attainment has been submitted to U.S. EPA. C-32 FIGURE 13 C-33 TABLE 13 National Ambient Air Quality Standards Area Designations for Fine Particulate Matter (PM2.5)* N U/A N U/A GREAT BASIN VALLEYS AIR BASIN X SAN DIEGO COUNTY X LAKE COUNTY AIR BASIN X SAN FRANCISCO BAY AREA AIR BASIN (2) X LAKE TAHOE AIR BASIN X SAN JOAQUIN VALLEY AIR BASIN X MOUNTAIN COUNTIES AIR BASIN SOUTH CENTRAL COAST AIR BASIN X Plumas County SOUTH COAST AIR BASIN (3) X Portola Valley Portion of Plumas X SOUTHEAST DESERT AIR BASIN Remainder of Plumas County X Imperial County (portion) (4) X Remainder of Air Basin X Remainder of Air Basin X NORTH CENTRAL COAST AIR BASIN X NORTH COAST AIR BASIN X NORTHEAST PLATEAU AIR BASIN X SACRAMENTO VALLEY AIR BASIN Sacramento Metro Area (1) X Sutter County X Yuba County (portion) X Remainder of Air Basin X Definitions and references for all areas can be found in 40 CFR, Chapter I, Part 81.305. This map reflects the 2006 24- hour PM2.5 standard as well as the 1997 and 2012 PM2.5 annual standards. 1) For this purpose, Sacramento Metro Area comprises all of Sacramento and portions of El Dorado, Placer, Solano, and Yolo Counties. Air quality in this area meets the national PM2.5 standards. A Determination of Attainment for the 2006 24-hour PM2.5 standard was made by U.S. EPA in June 2017. 2) Air quality in this area meets the national PM2.5 standards. A Determination of Attainment for the 2006 24-hour PM2.5 standard was made by U.S. EPA in June 2017. 3) Those lands of the Santa Rosa Band of Cahulla Mission Indians in Riverside County are designated Unclassifiable/Attainment. 4) That portion of Imperial County encompassing the urban and surrounding areas of Brawley, Calexico, El Centro, Heber, Holtville, Imperial, Seeley, and Westmorland. Air quality in this area meets the national PM2.5 standards. A Determination of Attainment for the 2006 24-hour PM2.5 standard was made by U.S. EPA in June 2017. C-34 FIGURE 14 C-35 TABLE 14 National Ambient Air Quality Standards Area Designations for Carbon Monoxide* N U/A N U/A GREAT BASIN VALLEYS AIR BASIN X SACRAMENTO VALLEY AIR BASIN X LAKE COUNTY AIR BASIN X SAN DIEGO COUNTY X LAKE TAHOE AIR BASIN X SAN FRANCISCO BAY AREA AIR BASIN X MOUNTAIN COUNTIES AIR BASIN X SAN JOAQUIN VALLEY AIR BASIN X NORTH CENTRAL COAST AIR BASIN X SOUTH CENTRAL COAST AIR BASIN X NORTH COAST AIR BASIN X SOUTH COAST AIR BASIN X NORTHEAST PLATEAU AIR BASIN X SOUTHEAST DESERT AIR BASIN X Definitions and references for all areas can be found in 40 CFR, Chapter I, Part 81.305. C-36 FIGURE 15 C-37 TABLE 15 National Ambient Air Quality Standards Area Designations for Nitrogen Dioxide* N U/A N U/A GREAT BASIN VALLEYS AIR BASIN X SACRAMENTO VALLEY AIR BASIN X LAKE COUNTY AIR BASIN X SAN DIEGO COUNTY X LAKE TAHOE AIR BASIN X SAN FRANCISCO BAY AREA AIR BASIN X MOUNTAIN COUNTIES AIR BASIN X SAN JOAQUIN VALLEY AIR BASIN X NORTH CENTRAL COAST AIR BASIN X SOUTH CENTRAL COAST AIR BASIN X NORTH COAST AIR BASIN X SOUTH COAST AIR BASIN X NORTHEAST PLATEAU AIR BASIN X SOUTHEAST DESERT AIR BASIN X Definitions and references for all areas can be found in 40 CFR, Chapter I, Part 81.305. C-38 FIGURE 16 C-39 TABLE 16 National Ambient Air Quality Standards Area Designations for Sulfur Dioxide* N U/A N U/A GREAT BASIN VALLEYS AIR BASIN X SOUTH CENTRAL COAST AIR BASIN LAKE COUNTY AIR BASIN X San Luis Obispo County X LAKE TAHOE AIR BASIN X Santa Barbara County X MOUNTAIN COUNTIES AIR BASIN X Ventura County X NORTH CENTRAL COAST AIR BASIN X Channel Islands (1) X NORTH COAST AIR BASIN X SOUTH COAST AIR BASIN X NORTHEAST PLATEAU AIR BASIN X SOUTHEAST DESERT AIR BASIN SACRAMENTO VALLEY AIR BASIN X Imperial County X SAN DIEGO COUNTY X Remainder of Air Basin X SAN FRANCISCO BAY AREA AIR BASIN X SAN JOAQUIN VALLEY AIR BASIN Fresno County X Kern County (portion) X Kings County X Madera County X Merced County X San Joaquin County X Stanislaus County X Tulare County X Definitions and references for all areas can be found in 40 CFR, Chapter I, Part 81.305. NOTE: This map and table reflect the 2010 1-hour SO2 standard of 75 ppb. 1) South Central Coast Air Basin Channel Islands: Santa Barbara County includes Santa Cruz, San Miguel, Santa Rosa, and Santa Barbara Islands. Ventura County includes Anacapa and San Nicolas Islands. Note that the San Clemente and Santa Catalina Islands are considered part of Los Angeles County, and therefore, are included as part of the South Coast Air Basin. C-40 FIGURE 17 C-41 TABLE 17 National Ambient Air Quality Standards Area Designations for Lead (particulate) N U/A N U/A GREAT BASIN VALLEYS AIR BASIN X SAN DIEGO COUNTY X LAKE COUNTY AIR BASIN X SAN FRANCISCO BAY AREA AIR BASIN X LAKE TAHOE AIR BASIN X SAN JOAQUIN VALLEY AIR BASIN X MOUNTAIN COUNTIES AIR BASIN X SOUTH CENTRAL COAST AIR BASIN X NORTH CENTRAL COAST AIR BASIN X SOUTH COAST AIR BASIN NORTH COAST AIR BASIN X Los Angeles County (portion) (1) X NORTHEAST PLATEAU AIR BASIN X Remainder of Air Basin X SACRAMENTO VALLEY AIR BASIN X SOUTHEAST DESERT AIR BASIN X 1) Portion of County in Air Basin, not including Channel Islands The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report APPENDIX 3.1: CALEEMOD CONSTRUCTION (UNMITIGATED) EMISSIONS MODEL OUTPUTS The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report This page intentionally left blank 1.1 Land Usage Land Uses Size Metric Lot Acreage Floor Surface Area Population Other Asphalt Surfaces 23.19 Acre 23.19 1,010,156.40 0 Hotel 150.00 Room 5.00 217,800.00 0 User Defined Recreational 12.00 User Defined Unit 12.00 522,720.00 0 Apartments Low Rise 104.00 Dwelling Unit 6.50 104,000.00 279 Single Family Housing 26.00 Dwelling Unit 8.44 46,800.00 70 Regional Shopping Center 10.00 1000sqft 0.23 10,000.00 0 1.2 Other Project Characteristics Urbanization Climate Zone Urban 15 Wind Speed (m/s)Precipitation Freq (Days)2.4 28 1.3 User Entered Comments & Non-Default Data 1.0 Project Characteristics Utility Company Imperial Irrigation District 2021OperationalYear CO2 Intensity lb/MWhr) 1270.9 0.029CH4Intensity lb/MWhr) 0.006N2OIntensity lb/MWhr) The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) Riverside-Salton Sea County, Summer CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:24AMPage1of32 The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) - Riverside-Salton Sea County, Summer Project Characteristics - Land Use - Total Project Area is 55.36 acres. Construction Phase - Construction Schedule adjsuted to meet the 2021 Opening Year. Off-road Equipment - Hours are based on an 8-hour workday. Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Off-road Equipment - Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Grading - For purposes of analysis, total acres graded per day is based on the equipment specific grading rates (CalEEMod Appendix A) and the equipment list. Architectural Coating - Rule 1113 Vehicle Trips - Construction Run Only. Woodstoves - Construction Run Only. Energy Use - Construction Run Only. Water And Wastewater - Construction Run Only. Solid Waste - Construction Run Only. Construction Off-road Equipment Mitigation - Rule 403 Table Name Column Name Default Value New Value tblArchitecturalCoating EF_Nonresidential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Interior 250.00 50.00 tblArchitecturalCoating EF_Parking 250.00 50.00 tblArchitecturalCoating EF_Residential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Residential_Interior 250.00 50.00 tblConstructionPhase NumDays 1,110.00 200.00 tblConstructionPhase PhaseEndDate 4/29/2025 11/2/2021 tblConstructionPhase PhaseEndDate 8/12/2025 12/14/2021 tblConstructionPhase PhaseEndDate 11/25/2025 12/14/2021 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:24AMPage2of32 The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) - Riverside-Salton Sea County, Summer tblConstructionPhase PhaseStartDate 4/30/2025 9/1/2021 tblConstructionPhase PhaseStartDate 8/13/2025 9/1/2021 tblEnergyUse LightingElect 810.36 0.00 tblEnergyUse LightingElect 5.44 0.00 tblEnergyUse LightingElect 5.61 0.00 tblEnergyUse LightingElect 1,608.84 0.00 tblEnergyUse NT24E 3,172.76 0.00 tblEnergyUse NT24E 6.23 0.00 tblEnergyUse NT24E 2.44 0.00 tblEnergyUse NT24E 6,155.97 0.00 tblEnergyUse NT24NG 6,030.00 0.00 tblEnergyUse NT24NG 4.86 0.00 tblEnergyUse NT24NG 0.30 0.00 tblEnergyUse NT24NG 6,030.00 0.00 tblEnergyUse T24E 877.14 0.00 tblEnergyUse T24E 6.47 0.00 tblEnergyUse T24E 4.58 0.00 tblEnergyUse T24E 951.67 0.00 tblEnergyUse T24NG 9,544.50 0.00 tblEnergyUse T24NG 55.15 0.00 tblEnergyUse T24NG 1.92 0.00 tblEnergyUse T24NG 24,566.15 0.00 tblFireplaces NumberGas 83.20 0.00 tblFireplaces NumberGas 20.80 0.00 tblFireplaces NumberNoFireplace 10.40 0.00 tblFireplaces NumberNoFireplace 2.60 0.00 tblFireplaces NumberWood 10.40 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:24AMPage3of32 The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) - Riverside-Salton Sea County, Summer tblFireplaces NumberWood 2.60 0.00 tblGrading AcresOfGrading 385.00 440.00 tblGrading AcresOfGrading 80.00 140.00 tblLandUse LandUseSquareFeet 0.00 522,720.00 tblLandUse LotAcreage 0.00 12.00 tblLandUse Population 297.00 279.00 tblLandUse Population 74.00 70.00 tblOffRoadEquipment LoadFactor 0.43 0.43 tblOffRoadEquipment OffRoadEquipmentType Crawler Tractors tblOffRoadEquipment OffRoadEquipmentType Crawler Tractors tblOffRoadEquipment OffRoadEquipmentType Crawler Tractors tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 0.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 0.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 4.00 0.00 tblOffRoadEquipment UsageHours 6.00 8.00 tblOffRoadEquipment UsageHours 7.00 8.00 tblOffRoadEquipment UsageHours 7.00 8.00 tblSolidWaste SolidWasteGenerationRate 47.84 0.00 tblSolidWaste SolidWasteGenerationRate 82.13 0.00 tblSolidWaste SolidWasteGenerationRate 10.50 0.00 tblSolidWaste SolidWasteGenerationRate 28.70 0.00 tblVehicleTrips CC_TL 4.20 0.00 tblVehicleTrips CC_TL 4.20 0.00 tblVehicleTrips CC_TL 4.20 0.00 tblVehicleTrips CC_TL 4.20 0.00 tblVehicleTrips CC_TTP 61.60 0.00 tblVehicleTrips CC_TTP 64.70 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:24AMPage4of32 The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) - Riverside-Salton Sea County, Summer tblVehicleTrips CNW_TL 5.40 0.00 tblVehicleTrips CNW_TL 5.40 0.00 tblVehicleTrips CNW_TL 5.40 0.00 tblVehicleTrips CNW_TL 5.40 0.00 tblVehicleTrips CNW_TTP 19.00 0.00 tblVehicleTrips CNW_TTP 19.00 0.00 tblVehicleTrips CW_TL 12.50 0.00 tblVehicleTrips CW_TL 12.50 0.00 tblVehicleTrips CW_TL 12.50 0.00 tblVehicleTrips CW_TL 12.50 0.00 tblVehicleTrips CW_TTP 19.40 0.00 tblVehicleTrips CW_TTP 16.30 0.00 tblVehicleTrips DV_TP 11.00 0.00 tblVehicleTrips DV_TP 38.00 0.00 tblVehicleTrips DV_TP 35.00 0.00 tblVehicleTrips DV_TP 11.00 0.00 tblVehicleTrips HO_TL 4.50 0.00 tblVehicleTrips HO_TL 4.50 0.00 tblVehicleTrips HO_TTP 40.60 0.00 tblVehicleTrips HO_TTP 40.60 0.00 tblVehicleTrips HS_TL 3.50 0.00 tblVehicleTrips HS_TL 3.50 0.00 tblVehicleTrips HS_TTP 19.20 0.00 tblVehicleTrips HS_TTP 19.20 0.00 tblVehicleTrips HW_TL 11.00 0.00 tblVehicleTrips HW_TL 11.00 0.00 tblVehicleTrips HW_TTP 40.20 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:24AMPage5of32 The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) - Riverside-Salton Sea County, Summer tblVehicleTrips HW_TTP 40.20 0.00 tblVehicleTrips PB_TP 3.00 0.00 tblVehicleTrips PB_TP 4.00 0.00 tblVehicleTrips PB_TP 11.00 0.00 tblVehicleTrips PB_TP 3.00 0.00 tblVehicleTrips PR_TP 86.00 0.00 tblVehicleTrips PR_TP 58.00 0.00 tblVehicleTrips PR_TP 54.00 0.00 tblVehicleTrips PR_TP 86.00 0.00 tblVehicleTrips ST_TR 7.16 0.00 tblVehicleTrips ST_TR 8.19 0.00 tblVehicleTrips ST_TR 49.97 0.00 tblVehicleTrips ST_TR 9.91 0.00 tblVehicleTrips SU_TR 6.07 0.00 tblVehicleTrips SU_TR 5.95 0.00 tblVehicleTrips SU_TR 25.24 0.00 tblVehicleTrips SU_TR 8.62 0.00 tblVehicleTrips WD_TR 6.59 0.00 tblVehicleTrips WD_TR 8.17 0.00 tblVehicleTrips WD_TR 42.70 0.00 tblVehicleTrips WD_TR 9.52 0.00 tblWater IndoorWaterUseRate 6,776,018.66 0.00 tblWater IndoorWaterUseRate 3,805,015.50 0.00 tblWater IndoorWaterUseRate 740,725.21 0.00 tblWater IndoorWaterUseRate 1,694,004.67 0.00 tblWater OutdoorWaterUseRate 4,271,837.85 0.00 tblWater OutdoorWaterUseRate 422,779.50 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:24AMPage6of32 The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 2.0 Emissions Summary tblWater OutdoorWaterUseRate 453,992.87 0.00 tblWater OutdoorWaterUseRate 1,067,959.46 0.00 tblWoodstoves NumberCatalytic 5.20 0.00 tblWoodstoves NumberCatalytic 1.30 0.00 tblWoodstoves NumberNoncatalytic 5.20 0.00 tblWoodstoves NumberNoncatalytic 1.30 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:24AMPage7of32 The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 2.1 Overall Construction (Maximum Daily Emission) ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year lb/day lb/day 2020 5.6229 63.7462 33.0232 0.0732 21.9286 2.7853 24.7139 10.3714 2.5625 12.9339 0.0000 7,091.114 7 7,091.114 7 2.2441 0.0000 7,147.216 0 2021 70.8668 77.2337 68.5855 0.2169 10.4314 2.3733 12.7185 3.8126 2.2144 5.9168 0.0000 21,733.52 07 21,733.52 07 2.6280 0.0000 21,799.21 96 Maximum 70.8668 77.2337 68.5855 0.2169 21.9286 2.7853 24.7139 10.3714 2.5625 12.9339 0.0000 21,733.52 07 21,733.52 07 2.6280 0.0000 21,799.21 96 Unmitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year lb/day lb/day 2020 5.6229 63.7462 33.0232 0.0732 8.6440 2.7853 11.4294 4.0692 2.5625 6.6317 0.0000 7,091.114 7 7,091.114 7 2.2441 0.0000 7,147.216 0 2021 70.8668 77.2337 68.5855 0.2169 9.9070 2.3733 12.2802 2.6623 2.2144 4.8767 0.0000 21,733.52 07 21,733.52 07 2.6280 0.0000 21,799.21 96 Maximum 70.8668 77.2337 68.5855 0.2169 9.9070 2.7853 12.2802 4.0692 2.5625 6.6317 0.0000 21,733.52 07 21,733.52 07 2.6280 0.0000 21,799.21 96 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 0.00 0.00 0.00 0.00 42.67 0.00 36.66 52.54 0.00 38.95 0.00 0.00 0.00 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:24AMPage8of32 The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 2.2 Overall Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Area 26.2239 0.1243 10.7685 5.7000e- 004 0.0593 0.0593 0.0593 0.0593 0.0000 19.3545 19.3545 0.0188 0.0000 19.8252 Energy 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mobile 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 26.2239 0.1243 10.7685 5.7000e- 004 0.0000 0.0593 0.0593 0.0000 0.0593 0.0593 0.0000 19.3545 19.3545 0.0188 0.0000 19.8252 Unmitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Area 26.2239 0.1243 10.7685 5.7000e- 004 0.0593 0.0593 0.0593 0.0593 0.0000 19.3545 19.3545 0.0188 0.0000 19.8252 Energy 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mobile 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 26.2239 0.1243 10.7685 5.7000e- 004 0.0000 0.0593 0.0593 0.0000 0.0593 0.0593 0.0000 19.3545 19.3545 0.0188 0.0000 19.8252 Mitigated Operational CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:24AMPage9of32 The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 Site Preparation Site Preparation 7/1/2020 8/25/2020 5 40 2 Grading Grading 8/26/2020 1/26/2021 5 110 3 Building Construction Building Construction 1/27/2021 11/2/2021 5 200 4 Paving Paving 9/1/2021 12/14/2021 5 75 5 Architectural Coating Architectural Coating 9/1/2021 12/14/2021 5 75 OffRoad Equipment ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Residential Indoor: 305,370; Residential Outdoor: 101,790; Non-Residential Indoor: 1,125,780; Non-Residential Outdoor: 375,260; Striped Parking Area: 60,609 (Architectural Coating – sqft) Acres of Grading (Site Preparation Phase): 140 Acres of Grading (Grading Phase): 440 Acres of Paving: 23.19 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:24AMPage10of32 The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) - Riverside-Salton Sea County, Summer Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Site Preparation Crawler Tractors 4 8.00 212 0.43 Site Preparation Rubber Tired Dozers 3 8.00 247 0.40 Site Preparation Tractors/Loaders/Backhoes 0 8.00 97 0.37 Grading Crawler Tractors 2 8.00 212 0.43 Grading Excavators 2 8.00 158 0.38 Grading Graders 1 8.00 187 0.41 Grading Rubber Tired Dozers 1 8.00 247 0.40 Grading Scrapers 2 8.00 367 0.48 Grading Tractors/Loaders/Backhoes 0 8.00 97 0.37 Building Construction Cranes 1 8.00 231 0.29 Building Construction Crawler Tractors 3 8.00 212 0.43 Building Construction Forklifts 3 8.00 89 0.20 Building Construction Generator Sets 1 8.00 84 0.74 Building Construction Tractors/Loaders/Backhoes 0 8.00 97 0.37 Building Construction Welders 1 8.00 46 0.45 Paving Pavers 2 8.00 130 0.42 Paving Paving Equipment 2 8.00 132 0.36 Paving Rollers 2 8.00 80 0.38 Architectural Coating Air Compressors 1 8.00 78 0.48 Trips and VMT CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:24AMPage11of32 The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 3.2 Site Preparation - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 21.7780 0.0000 21.7780 10.3315 0.0000 10.3315 0.0000 0.0000 Off-Road 5.5474 63.7043 22.3668 0.0569 2.7844 2.7844 2.5616 2.5616 5,515.093 1 5,515.093 1 1.7837 5,559.685 4 Total 5.5474 63.7043 22.3668 0.0569 21.7780 2.7844 24.5624 10.3315 2.5616 12.8931 5,515.093 1 5,515.093 1 1.7837 5,559.685 4 Unmitigated Construction On-Site 3.1 Mitigation Measures Construction Water Exposed Area Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Site Preparation 7 18.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Grading 8 20.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Building Construction 9 823.00 302.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Paving 6 15.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Architectural Coating 1 165.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:24AMPage12of32 The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 3.2 Site Preparation - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0755 0.0420 0.5620 1.5000e- 003 0.1506 9.4000e- 004 0.1515 0.0400 8.7000e- 004 0.0408 149.4087 149.4087 3.9000e- 003 149.5062 Total 0.0755 0.0420 0.5620 1.5000e- 003 0.1506 9.4000e- 004 0.1515 0.0400 8.7000e- 004 0.0408 149.4087 149.4087 3.9000e- 003 149.5062 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 8.4934 0.0000 8.4934 4.0293 0.0000 4.0293 0.0000 0.0000 Off-Road 5.5474 63.7043 22.3668 0.0569 2.7844 2.7844 2.5616 2.5616 0.0000 5,515.093 1 5,515.093 1 1.7837 5,559.685 4 Total 5.5474 63.7043 22.3668 0.0569 8.4934 2.7844 11.2778 4.0293 2.5616 6.5909 0.0000 5,515.093 1 5,515.093 1 1.7837 5,559.685 4 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:24AMPage13of32 The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 3.2 Site Preparation - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0755 0.0420 0.5620 1.5000e- 003 0.1506 9.4000e- 004 0.1515 0.0400 8.7000e- 004 0.0408 149.4087 149.4087 3.9000e- 003 149.5062 Total 0.0755 0.0420 0.5620 1.5000e- 003 0.1506 9.4000e- 004 0.1515 0.0400 8.7000e- 004 0.0408 149.4087 149.4087 3.9000e- 003 149.5062 Mitigated Construction Off-Site 3.3 Grading - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 10.2641 0.0000 10.2641 3.7683 0.0000 3.7683 0.0000 0.0000 Off-Road 5.1888 60.8826 32.3988 0.0715 2.4690 2.4690 2.2714 2.2714 6,925.105 1 6,925.105 1 2.2397 6,981.098 1 Total 5.1888 60.8826 32.3988 0.0715 10.2641 2.4690 12.7331 3.7683 2.2714 6.0397 6,925.105 1 6,925.105 1 2.2397 6,981.098 1 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:24AMPage14of32 The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 3.3 Grading - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0839 0.0466 0.6244 1.6700e- 003 0.1673 1.0400e- 003 0.1684 0.0444 9.6000e- 004 0.0454 166.0097 166.0097 4.3300e- 003 166.1180 Total 0.0839 0.0466 0.6244 1.6700e- 003 0.1673 1.0400e- 003 0.1684 0.0444 9.6000e- 004 0.0454 166.0097 166.0097 4.3300e- 003 166.1180 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 4.0030 0.0000 4.0030 1.4696 0.0000 1.4696 0.0000 0.0000 Off-Road 5.1888 60.8826 32.3988 0.0715 2.4690 2.4690 2.2714 2.2714 0.0000 6,925.105 1 6,925.105 1 2.2397 6,981.098 1 Total 5.1888 60.8826 32.3988 0.0715 4.0030 2.4690 6.4720 1.4696 2.2714 3.7411 0.0000 6,925.105 1 6,925.105 1 2.2397 6,981.098 1 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:24AMPage15of32 The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 3.3 Grading - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0839 0.0466 0.6244 1.6700e- 003 0.1673 1.0400e- 003 0.1684 0.0444 9.6000e- 004 0.0454 166.0097 166.0097 4.3300e- 003 166.1180 Total 0.0839 0.0466 0.6244 1.6700e- 003 0.1673 1.0400e- 003 0.1684 0.0444 9.6000e- 004 0.0454 166.0097 166.0097 4.3300e- 003 166.1180 Mitigated Construction Off-Site 3.3 Grading - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 10.2641 0.0000 10.2641 3.7683 0.0000 3.7683 0.0000 0.0000 Off-Road 4.9185 56.5443 31.2281 0.0715 2.2861 2.2861 2.1032 2.1032 6,925.967 4 6,925.967 4 2.2400 6,981.967 3 Total 4.9185 56.5443 31.2281 0.0715 10.2641 2.2861 12.5502 3.7683 2.1032 5.8715 6,925.967 4 6,925.967 4 2.2400 6,981.967 3 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:24AMPage16of32 The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 3.3 Grading - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0780 0.0418 0.5722 1.6100e- 003 0.1673 1.0200e- 003 0.1684 0.0444 9.4000e- 004 0.0453 160.4598 160.4598 3.8900e- 003 160.5572 Total 0.0780 0.0418 0.5722 1.6100e- 003 0.1673 1.0200e- 003 0.1684 0.0444 9.4000e- 004 0.0453 160.4598 160.4598 3.8900e- 003 160.5572 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 4.0030 0.0000 4.0030 1.4696 0.0000 1.4696 0.0000 0.0000 Off-Road 4.9185 56.5443 31.2281 0.0715 2.2861 2.2861 2.1032 2.1032 0.0000 6,925.967 4 6,925.967 4 2.2400 6,981.967 3 Total 4.9185 56.5443 31.2281 0.0715 4.0030 2.2861 6.2891 1.4696 2.1032 3.5728 0.0000 6,925.967 4 6,925.967 4 2.2400 6,981.967 3 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:24AMPage17of32 The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 3.3 Grading - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0780 0.0418 0.5722 1.6100e- 003 0.1673 1.0200e- 003 0.1684 0.0444 9.4000e- 004 0.0453 160.4598 160.4598 3.8900e- 003 160.5572 Total 0.0780 0.0418 0.5722 1.6100e- 003 0.1673 1.0200e- 003 0.1684 0.0444 9.4000e- 004 0.0453 160.4598 160.4598 3.8900e- 003 160.5572 Mitigated Construction Off-Site 3.4 Building Construction - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 3.1137 33.9659 18.1952 0.0430 1.4763 1.4763 1.3775 1.3775 4,114.429 7 4,114.429 7 1.1209 4,142.452 0 Total 3.1137 33.9659 18.1952 0.0430 1.4763 1.4763 1.3775 1.3775 4,114.429 7 4,114.429 7 1.1209 4,142.452 0 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:24AMPage18of32 The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 3.4 Building Construction - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.6461 26.2162 4.6183 0.0663 1.5152 0.0428 1.5580 0.4364 0.0409 0.4774 6,989.555 8 6,989.555 8 0.5722 7,003.859 5 Worker 3.2110 1.7204 23.5456 0.0663 6.8858 0.0419 6.9277 1.8264 0.0385 1.8650 6,602.921 9 6,602.921 9 0.1603 6,606.928 3 Total 3.8571 27.9366 28.1639 0.1326 8.4010 0.0847 8.4856 2.2628 0.0795 2.3423 13,592.47 76 13,592.47 76 0.7324 13,610.78 77 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 3.1137 33.9659 18.1952 0.0430 1.4763 1.4763 1.3775 1.3775 0.0000 4,114.429 7 4,114.429 7 1.1209 4,142.452 0 Total 3.1137 33.9659 18.1952 0.0430 1.4763 1.4763 1.3775 1.3775 0.0000 4,114.429 7 4,114.429 7 1.1209 4,142.452 0 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:24AMPage19of32 The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 3.4 Building Construction - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.6461 26.2162 4.6183 0.0663 1.5152 0.0428 1.5580 0.4364 0.0409 0.4774 6,989.555 8 6,989.555 8 0.5722 7,003.859 5 Worker 3.2110 1.7204 23.5456 0.0663 6.8858 0.0419 6.9277 1.8264 0.0385 1.8650 6,602.921 9 6,602.921 9 0.1603 6,606.928 3 Total 3.8571 27.9366 28.1639 0.1326 8.4010 0.0847 8.4856 2.2628 0.0795 2.3423 13,592.47 76 13,592.47 76 0.7324 13,610.78 77 Mitigated Construction Off-Site 3.5 Paving - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.2556 12.9191 14.6532 0.0228 0.6777 0.6777 0.6235 0.6235 2,207.210 9 2,207.210 9 0.7139 2,225.057 3 Paving 0.8101 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 2.0657 12.9191 14.6532 0.0228 0.6777 0.6777 0.6235 0.6235 2,207.210 9 2,207.210 9 0.7139 2,225.057 3 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:24AMPage20of32 The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 3.5 Paving - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0585 0.0314 0.4291 1.2100e- 003 0.1255 7.6000e- 004 0.1263 0.0333 7.0000e- 004 0.0340 120.3449 120.3449 2.9200e- 003 120.4179 Total 0.0585 0.0314 0.4291 1.2100e- 003 0.1255 7.6000e- 004 0.1263 0.0333 7.0000e- 004 0.0340 120.3449 120.3449 2.9200e- 003 120.4179 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.2556 12.9191 14.6532 0.0228 0.6777 0.6777 0.6235 0.6235 0.0000 2,207.210 9 2,207.210 9 0.7139 2,225.057 3 Paving 0.8101 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 2.0657 12.9191 14.6532 0.0228 0.6777 0.6777 0.6235 0.6235 0.0000 2,207.210 9 2,207.210 9 0.7139 2,225.057 3 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:24AMPage21of32 The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 3.5 Paving - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0585 0.0314 0.4291 1.2100e- 003 0.1255 7.6000e- 004 0.1263 0.0333 7.0000e- 004 0.0340 120.3449 120.3449 2.9200e- 003 120.4179 Total 0.0585 0.0314 0.4291 1.2100e- 003 0.1255 7.6000e- 004 0.1263 0.0333 7.0000e- 004 0.0340 120.3449 120.3449 2.9200e- 003 120.4179 Mitigated Construction Off-Site 3.6 Architectural Coating - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 60.8362 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.2919 2.0358 2.4234 3.9600e- 003 0.1255 0.1255 0.1255 0.1255 375.2641 375.2641 0.0258 375.9079 Total 61.1281 2.0358 2.4234 3.9600e- 003 0.1255 0.1255 0.1255 0.1255 375.2641 375.2641 0.0258 375.9079 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:24AMPage22of32 The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 3.6 Architectural Coating - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.6438 0.3449 4.7206 0.0133 1.3805 8.3900e- 003 1.3889 0.3662 7.7300e- 003 0.3739 1,323.793 6 1,323.793 6 0.0321 1,324.596 8 Total 0.6438 0.3449 4.7206 0.0133 1.3805 8.3900e- 003 1.3889 0.3662 7.7300e- 003 0.3739 1,323.793 6 1,323.793 6 0.0321 1,324.596 8 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 60.8362 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.2919 2.0358 2.4234 3.9600e- 003 0.1255 0.1255 0.1255 0.1255 0.0000 375.2641 375.2641 0.0258 375.9079 Total 61.1281 2.0358 2.4234 3.9600e- 003 0.1255 0.1255 0.1255 0.1255 0.0000 375.2641 375.2641 0.0258 375.9079 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:24AMPage23of32 The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile 3.6 Architectural Coating - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.6438 0.3449 4.7206 0.0133 1.3805 8.3900e- 003 1.3889 0.3662 7.7300e- 003 0.3739 1,323.793 6 1,323.793 6 0.0321 1,324.596 8 Total 0.6438 0.3449 4.7206 0.0133 1.3805 8.3900e- 003 1.3889 0.3662 7.7300e- 003 0.3739 1,323.793 6 1,323.793 6 0.0321 1,324.596 8 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:24AMPage24of32 The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) - Riverside-Salton Sea County, Summer ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Mitigated 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Unmitigated 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 4.2 Trip Summary Information 4.3 Trip Type Information Average Daily Trip Rate Unmitigated Mitigated Land Use Weekday Saturday Sunday Annual VMT Annual VMT Apartments Low Rise 0.00 0.00 0.00 Hotel 0.00 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 0.00 Regional Shopping Center 0.00 0.00 0.00 Single Family Housing 0.00 0.00 0.00 User Defined Recreational 0.00 0.00 0.00 Total 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:24AMPage25of32 The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) - Riverside-Salton Sea County, Summer Miles Trip %Trip Purpose % Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C-W H-S or C-C H-O or C-NW Primary Diverted Pass-by Apartments Low Rise 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 Hotel 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 Regional Shopping Center 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 Single Family Housing 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 User Defined Recreational 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 5.0 Energy Detail 5.1 Mitigation Measures Energy 4.4 Fleet Mix Land Use LDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH Apartments Low Rise 0.542116 0.037578 0.185203 0.118503 0.016241 0.005141 0.017392 0.068695 0.001383 0.001183 0.004582 0.000945 0.001038 Hotel 0.542116 0.037578 0.185203 0.118503 0.016241 0.005141 0.017392 0.068695 0.001383 0.001183 0.004582 0.000945 0.001038 Other Asphalt Surfaces 0.542116 0.037578 0.185203 0.118503 0.016241 0.005141 0.017392 0.068695 0.001383 0.001183 0.004582 0.000945 0.001038 Regional Shopping Center 0.542116 0.037578 0.185203 0.118503 0.016241 0.005141 0.017392 0.068695 0.001383 0.001183 0.004582 0.000945 0.001038 Single Family Housing 0.542116 0.037578 0.185203 0.118503 0.016241 0.005141 0.017392 0.068695 0.001383 0.001183 0.004582 0.000945 0.001038 User Defined Recreational 0.542116 0.037578 0.185203 0.118503 0.016241 0.005141 0.017392 0.068695 0.001383 0.001183 0.004582 0.000945 0.001038 Historical Energy Use: N CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:24AMPage26of32 The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) - Riverside-Salton Sea County, Summer ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day NaturalGas Mitigated 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 NaturalGas Unmitigated 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:24AMPage27of32 The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 5.2 Energy by Land Use - NaturalGas NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr lb/day lb/day Apartments Low Rise 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hotel 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Other Asphalt Surfaces 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Regional Shopping Center 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Single Family Housing 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 User Defined Recreational 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Unmitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:24AMPage28of32 The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 6.1 Mitigation Measures Area 6.0 Area Detail 5.2 Energy by Land Use - NaturalGas NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr lb/day lb/day Apartments Low Rise 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hotel 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Other Asphalt Surfaces 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Regional Shopping Center 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Single Family Housing 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 User Defined Recreational 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:24AMPage29of32 The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) - Riverside-Salton Sea County, Summer ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Mitigated 26.2239 0.1243 10.7685 5.7000e- 004 0.0593 0.0593 0.0593 0.0593 0.0000 19.3545 19.3545 0.0188 0.0000 19.8252 Unmitigated 26.2239 0.1243 10.7685 5.7000e- 004 0.0593 0.0593 0.0593 0.0593 0.0000 19.3545 19.3545 0.0188 0.0000 19.8252 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory lb/day lb/day Architectural Coating 6.2503 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 19.6461 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hearth 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 0.3275 0.1243 10.7685 5.7000e- 004 0.0593 0.0593 0.0593 0.0593 19.3545 19.3545 0.0188 19.8252 Total 26.2239 0.1243 10.7685 5.7000e- 004 0.0593 0.0593 0.0593 0.0593 0.0000 19.3545 19.3545 0.0188 0.0000 19.8252 Unmitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:24AMPage30of32 The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 8.1 Mitigation Measures Waste 7.1 Mitigation Measures Water 7.0 Water Detail 8.0 Waste Detail 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory lb/day lb/day Architectural Coating 6.2503 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 19.6461 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hearth 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 0.3275 0.1243 10.7685 5.7000e- 004 0.0593 0.0593 0.0593 0.0593 19.3545 19.3545 0.0188 19.8252 Total 26.2239 0.1243 10.7685 5.7000e- 004 0.0593 0.0593 0.0593 0.0593 0.0000 19.3545 19.3545 0.0188 0.0000 19.8252 Mitigated 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year Horse Power Load Factor Fuel Type 10.0 Stationary Equipment CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:24AMPage31of32 The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 11.0 Vegetation Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power Load Factor Fuel Type Boilers Equipment Type Number Heat Input/Day Heat Input/Year Boiler Rating Fuel Type User Defined Equipment Equipment Type Number CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:24AMPage32of32 The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 1.1 Land Usage Land Uses Size Metric Lot Acreage Floor Surface Area Population Other Asphalt Surfaces 23.19 Acre 23.19 1,010,156.40 0 Hotel 150.00 Room 5.00 217,800.00 0 User Defined Recreational 12.00 User Defined Unit 12.00 522,720.00 0 Apartments Low Rise 104.00 Dwelling Unit 6.50 104,000.00 279 Single Family Housing 26.00 Dwelling Unit 8.44 46,800.00 70 Regional Shopping Center 10.00 1000sqft 0.23 10,000.00 0 1.2 Other Project Characteristics Urbanization Climate Zone Urban 15 Wind Speed (m/s)Precipitation Freq (Days)2.4 28 1.3 User Entered Comments & Non-Default Data 1.0 Project Characteristics Utility Company Imperial Irrigation District 2021OperationalYear CO2 Intensity lb/MWhr) 1270.9 0.029CH4Intensity lb/MWhr) 0.006N2OIntensity lb/MWhr) The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) Riverside-Salton Sea County, Winter CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:23AMPage1of32 The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) - Riverside-Salton Sea County, Winter Project Characteristics - Land Use - Total Project Area is 55.36 acres. Construction Phase - Construction Schedule adjsuted to meet the 2021 Opening Year. Off-road Equipment - Hours are based on an 8-hour workday. Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Off-road Equipment - Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Grading - For purposes of analysis, total acres graded per day is based on the equipment specific grading rates (CalEEMod Appendix A) and the equipment list. Architectural Coating - Rule 1113 Vehicle Trips - Construction Run Only. Woodstoves - Construction Run Only. Energy Use - Construction Run Only. Water And Wastewater - Construction Run Only. Solid Waste - Construction Run Only. Construction Off-road Equipment Mitigation - Rule 403 Table Name Column Name Default Value New Value tblArchitecturalCoating EF_Nonresidential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Interior 250.00 50.00 tblArchitecturalCoating EF_Parking 250.00 50.00 tblArchitecturalCoating EF_Residential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Residential_Interior 250.00 50.00 tblConstructionPhase NumDays 1,110.00 200.00 tblConstructionPhase PhaseEndDate 4/29/2025 11/2/2021 tblConstructionPhase PhaseEndDate 8/12/2025 12/14/2021 tblConstructionPhase PhaseEndDate 11/25/2025 12/14/2021 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:23AMPage2of32 The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) - Riverside-Salton Sea County, Winter tblConstructionPhase PhaseStartDate 4/30/2025 9/1/2021 tblConstructionPhase PhaseStartDate 8/13/2025 9/1/2021 tblEnergyUse LightingElect 810.36 0.00 tblEnergyUse LightingElect 5.44 0.00 tblEnergyUse LightingElect 5.61 0.00 tblEnergyUse LightingElect 1,608.84 0.00 tblEnergyUse NT24E 3,172.76 0.00 tblEnergyUse NT24E 6.23 0.00 tblEnergyUse NT24E 2.44 0.00 tblEnergyUse NT24E 6,155.97 0.00 tblEnergyUse NT24NG 6,030.00 0.00 tblEnergyUse NT24NG 4.86 0.00 tblEnergyUse NT24NG 0.30 0.00 tblEnergyUse NT24NG 6,030.00 0.00 tblEnergyUse T24E 877.14 0.00 tblEnergyUse T24E 6.47 0.00 tblEnergyUse T24E 4.58 0.00 tblEnergyUse T24E 951.67 0.00 tblEnergyUse T24NG 9,544.50 0.00 tblEnergyUse T24NG 55.15 0.00 tblEnergyUse T24NG 1.92 0.00 tblEnergyUse T24NG 24,566.15 0.00 tblFireplaces NumberGas 83.20 0.00 tblFireplaces NumberGas 20.80 0.00 tblFireplaces NumberNoFireplace 10.40 0.00 tblFireplaces NumberNoFireplace 2.60 0.00 tblFireplaces NumberWood 10.40 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:23AMPage3of32 The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) - Riverside-Salton Sea County, Winter tblFireplaces NumberWood 2.60 0.00 tblGrading AcresOfGrading 385.00 440.00 tblGrading AcresOfGrading 80.00 140.00 tblLandUse LandUseSquareFeet 0.00 522,720.00 tblLandUse LotAcreage 0.00 12.00 tblLandUse Population 297.00 279.00 tblLandUse Population 74.00 70.00 tblOffRoadEquipment LoadFactor 0.43 0.43 tblOffRoadEquipment OffRoadEquipmentType Crawler Tractors tblOffRoadEquipment OffRoadEquipmentType Crawler Tractors tblOffRoadEquipment OffRoadEquipmentType Crawler Tractors tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 0.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 0.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 4.00 0.00 tblOffRoadEquipment UsageHours 6.00 8.00 tblOffRoadEquipment UsageHours 7.00 8.00 tblOffRoadEquipment UsageHours 7.00 8.00 tblSolidWaste SolidWasteGenerationRate 47.84 0.00 tblSolidWaste SolidWasteGenerationRate 82.13 0.00 tblSolidWaste SolidWasteGenerationRate 10.50 0.00 tblSolidWaste SolidWasteGenerationRate 28.70 0.00 tblVehicleTrips CC_TL 4.20 0.00 tblVehicleTrips CC_TL 4.20 0.00 tblVehicleTrips CC_TL 4.20 0.00 tblVehicleTrips CC_TL 4.20 0.00 tblVehicleTrips CC_TTP 61.60 0.00 tblVehicleTrips CC_TTP 64.70 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:23AMPage4of32 The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) - Riverside-Salton Sea County, Winter tblVehicleTrips CNW_TL 5.40 0.00 tblVehicleTrips CNW_TL 5.40 0.00 tblVehicleTrips CNW_TL 5.40 0.00 tblVehicleTrips CNW_TL 5.40 0.00 tblVehicleTrips CNW_TTP 19.00 0.00 tblVehicleTrips CNW_TTP 19.00 0.00 tblVehicleTrips CW_TL 12.50 0.00 tblVehicleTrips CW_TL 12.50 0.00 tblVehicleTrips CW_TL 12.50 0.00 tblVehicleTrips CW_TL 12.50 0.00 tblVehicleTrips CW_TTP 19.40 0.00 tblVehicleTrips CW_TTP 16.30 0.00 tblVehicleTrips DV_TP 11.00 0.00 tblVehicleTrips DV_TP 38.00 0.00 tblVehicleTrips DV_TP 35.00 0.00 tblVehicleTrips DV_TP 11.00 0.00 tblVehicleTrips HO_TL 4.50 0.00 tblVehicleTrips HO_TL 4.50 0.00 tblVehicleTrips HO_TTP 40.60 0.00 tblVehicleTrips HO_TTP 40.60 0.00 tblVehicleTrips HS_TL 3.50 0.00 tblVehicleTrips HS_TL 3.50 0.00 tblVehicleTrips HS_TTP 19.20 0.00 tblVehicleTrips HS_TTP 19.20 0.00 tblVehicleTrips HW_TL 11.00 0.00 tblVehicleTrips HW_TL 11.00 0.00 tblVehicleTrips HW_TTP 40.20 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:23AMPage5of32 The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) - Riverside-Salton Sea County, Winter tblVehicleTrips HW_TTP 40.20 0.00 tblVehicleTrips PB_TP 3.00 0.00 tblVehicleTrips PB_TP 4.00 0.00 tblVehicleTrips PB_TP 11.00 0.00 tblVehicleTrips PB_TP 3.00 0.00 tblVehicleTrips PR_TP 86.00 0.00 tblVehicleTrips PR_TP 58.00 0.00 tblVehicleTrips PR_TP 54.00 0.00 tblVehicleTrips PR_TP 86.00 0.00 tblVehicleTrips ST_TR 7.16 0.00 tblVehicleTrips ST_TR 8.19 0.00 tblVehicleTrips ST_TR 49.97 0.00 tblVehicleTrips ST_TR 9.91 0.00 tblVehicleTrips SU_TR 6.07 0.00 tblVehicleTrips SU_TR 5.95 0.00 tblVehicleTrips SU_TR 25.24 0.00 tblVehicleTrips SU_TR 8.62 0.00 tblVehicleTrips WD_TR 6.59 0.00 tblVehicleTrips WD_TR 8.17 0.00 tblVehicleTrips WD_TR 42.70 0.00 tblVehicleTrips WD_TR 9.52 0.00 tblWater IndoorWaterUseRate 6,776,018.66 0.00 tblWater IndoorWaterUseRate 3,805,015.50 0.00 tblWater IndoorWaterUseRate 740,725.21 0.00 tblWater IndoorWaterUseRate 1,694,004.67 0.00 tblWater OutdoorWaterUseRate 4,271,837.85 0.00 tblWater OutdoorWaterUseRate 422,779.50 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:23AMPage6of32 The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 2.0 Emissions Summary tblWater OutdoorWaterUseRate 453,992.87 0.00 tblWater OutdoorWaterUseRate 1,067,959.46 0.00 tblWoodstoves NumberCatalytic 5.20 0.00 tblWoodstoves NumberCatalytic 1.30 0.00 tblWoodstoves NumberNoncatalytic 5.20 0.00 tblWoodstoves NumberNoncatalytic 1.30 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:23AMPage7of32 The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 2.1 Overall Construction (Maximum Daily Emission) ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year lb/day lb/day 2020 5.6196 63.7477 32.9107 0.0730 21.9286 2.7853 24.7139 10.3714 2.5625 12.9339 0.0000 7,074.110 9 7,074.110 9 2.2435 0.0000 7,130.198 8 2021 70.7439 76.9730 64.2781 0.2056 10.4314 2.3749 12.7185 3.8126 2.2159 5.9168 0.0000 20,598.98 58 20,598.98 58 2.6713 0.0000 20,665.76 81 Maximum 70.7439 76.9730 64.2781 0.2056 21.9286 2.7853 24.7139 10.3714 2.5625 12.9339 0.0000 20,598.98 58 20,598.98 58 2.6713 0.0000 20,665.76 81 Unmitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year lb/day lb/day 2020 5.6196 63.7477 32.9107 0.0730 8.6440 2.7853 11.4294 4.0692 2.5625 6.6317 0.0000 7,074.110 9 7,074.110 9 2.2435 0.0000 7,130.198 8 2021 70.7439 76.9730 64.2781 0.2056 9.9070 2.3749 12.2818 2.6623 2.2159 4.8782 0.0000 20,598.98 58 20,598.98 58 2.6713 0.0000 20,665.76 81 Maximum 70.7439 76.9730 64.2781 0.2056 9.9070 2.7853 12.2818 4.0692 2.5625 6.6317 0.0000 20,598.98 58 20,598.98 58 2.6713 0.0000 20,665.76 81 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 0.00 0.00 0.00 0.00 42.67 0.00 36.66 52.54 0.00 38.94 0.00 0.00 0.00 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:23AMPage8of32 The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 2.2 Overall Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Area 26.2239 0.1243 10.7685 5.7000e- 004 0.0593 0.0593 0.0593 0.0593 0.0000 19.3545 19.3545 0.0188 0.0000 19.8252 Energy 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mobile 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 26.2239 0.1243 10.7685 5.7000e- 004 0.0000 0.0593 0.0593 0.0000 0.0593 0.0593 0.0000 19.3545 19.3545 0.0188 0.0000 19.8252 Unmitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Area 26.2239 0.1243 10.7685 5.7000e- 004 0.0593 0.0593 0.0593 0.0593 0.0000 19.3545 19.3545 0.0188 0.0000 19.8252 Energy 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mobile 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 26.2239 0.1243 10.7685 5.7000e- 004 0.0000 0.0593 0.0593 0.0000 0.0593 0.0593 0.0000 19.3545 19.3545 0.0188 0.0000 19.8252 Mitigated Operational CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:23AMPage9of32 The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 Site Preparation Site Preparation 7/1/2020 8/25/2020 5 40 2 Grading Grading 8/26/2020 1/26/2021 5 110 3 Building Construction Building Construction 1/27/2021 11/2/2021 5 200 4 Paving Paving 9/1/2021 12/14/2021 5 75 5 Architectural Coating Architectural Coating 9/1/2021 12/14/2021 5 75 OffRoad Equipment ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Residential Indoor: 305,370; Residential Outdoor: 101,790; Non-Residential Indoor: 1,125,780; Non-Residential Outdoor: 375,260; Striped Parking Area: 60,609 (Architectural Coating – sqft) Acres of Grading (Site Preparation Phase): 140 Acres of Grading (Grading Phase): 440 Acres of Paving: 23.19 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:23AMPage10of32 The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) - Riverside-Salton Sea County, Winter Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Site Preparation Crawler Tractors 4 8.00 212 0.43 Site Preparation Rubber Tired Dozers 3 8.00 247 0.40 Site Preparation Tractors/Loaders/Backhoes 0 8.00 97 0.37 Grading Crawler Tractors 2 8.00 212 0.43 Grading Excavators 2 8.00 158 0.38 Grading Graders 1 8.00 187 0.41 Grading Rubber Tired Dozers 1 8.00 247 0.40 Grading Scrapers 2 8.00 367 0.48 Grading Tractors/Loaders/Backhoes 0 8.00 97 0.37 Building Construction Cranes 1 8.00 231 0.29 Building Construction Crawler Tractors 3 8.00 212 0.43 Building Construction Forklifts 3 8.00 89 0.20 Building Construction Generator Sets 1 8.00 84 0.74 Building Construction Tractors/Loaders/Backhoes 0 8.00 97 0.37 Building Construction Welders 1 8.00 46 0.45 Paving Pavers 2 8.00 130 0.42 Paving Paving Equipment 2 8.00 132 0.36 Paving Rollers 2 8.00 80 0.38 Architectural Coating Air Compressors 1 8.00 78 0.48 Trips and VMT CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:23AMPage11of32 The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 3.2 Site Preparation - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 21.7780 0.0000 21.7780 10.3315 0.0000 10.3315 0.0000 0.0000 Off-Road 5.5474 63.7043 22.3668 0.0569 2.7844 2.7844 2.5616 2.5616 5,515.093 1 5,515.093 1 1.7837 5,559.685 4 Total 5.5474 63.7043 22.3668 0.0569 21.7780 2.7844 24.5624 10.3315 2.5616 12.8931 5,515.093 1 5,515.093 1 1.7837 5,559.685 4 Unmitigated Construction On-Site 3.1 Mitigation Measures Construction Water Exposed Area Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Site Preparation 7 18.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Grading 8 20.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Building Construction 9 823.00 302.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Paving 6 15.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Architectural Coating 1 165.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:23AMPage12of32 The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 3.2 Site Preparation - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0721 0.0434 0.4607 1.3500e- 003 0.1506 9.4000e- 004 0.1515 0.0400 8.7000e- 004 0.0408 134.1053 134.1053 3.4200e- 003 134.1907 Total 0.0721 0.0434 0.4607 1.3500e- 003 0.1506 9.4000e- 004 0.1515 0.0400 8.7000e- 004 0.0408 134.1053 134.1053 3.4200e- 003 134.1907 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 8.4934 0.0000 8.4934 4.0293 0.0000 4.0293 0.0000 0.0000 Off-Road 5.5474 63.7043 22.3668 0.0569 2.7844 2.7844 2.5616 2.5616 0.0000 5,515.093 1 5,515.093 1 1.7837 5,559.685 4 Total 5.5474 63.7043 22.3668 0.0569 8.4934 2.7844 11.2778 4.0293 2.5616 6.5909 0.0000 5,515.093 1 5,515.093 1 1.7837 5,559.685 4 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:23AMPage13of32 The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 3.2 Site Preparation - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0721 0.0434 0.4607 1.3500e- 003 0.1506 9.4000e- 004 0.1515 0.0400 8.7000e- 004 0.0408 134.1053 134.1053 3.4200e- 003 134.1907 Total 0.0721 0.0434 0.4607 1.3500e- 003 0.1506 9.4000e- 004 0.1515 0.0400 8.7000e- 004 0.0408 134.1053 134.1053 3.4200e- 003 134.1907 Mitigated Construction Off-Site 3.3 Grading - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 10.2641 0.0000 10.2641 3.7683 0.0000 3.7683 0.0000 0.0000 Off-Road 5.1888 60.8826 32.3988 0.0715 2.4690 2.4690 2.2714 2.2714 6,925.105 1 6,925.105 1 2.2397 6,981.098 1 Total 5.1888 60.8826 32.3988 0.0715 10.2641 2.4690 12.7331 3.7683 2.2714 6.0397 6,925.105 1 6,925.105 1 2.2397 6,981.098 1 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:23AMPage14of32 The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 3.3 Grading - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0801 0.0482 0.5119 1.5000e- 003 0.1673 1.0400e- 003 0.1684 0.0444 9.6000e- 004 0.0454 149.0058 149.0058 3.8000e- 003 149.1008 Total 0.0801 0.0482 0.5119 1.5000e- 003 0.1673 1.0400e- 003 0.1684 0.0444 9.6000e- 004 0.0454 149.0058 149.0058 3.8000e- 003 149.1008 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 4.0030 0.0000 4.0030 1.4696 0.0000 1.4696 0.0000 0.0000 Off-Road 5.1888 60.8826 32.3988 0.0715 2.4690 2.4690 2.2714 2.2714 0.0000 6,925.105 1 6,925.105 1 2.2397 6,981.098 1 Total 5.1888 60.8826 32.3988 0.0715 4.0030 2.4690 6.4720 1.4696 2.2714 3.7411 0.0000 6,925.105 1 6,925.105 1 2.2397 6,981.098 1 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:23AMPage15of32 The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 3.3 Grading - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0801 0.0482 0.5119 1.5000e- 003 0.1673 1.0400e- 003 0.1684 0.0444 9.6000e- 004 0.0454 149.0058 149.0058 3.8000e- 003 149.1008 Total 0.0801 0.0482 0.5119 1.5000e- 003 0.1673 1.0400e- 003 0.1684 0.0444 9.6000e- 004 0.0454 149.0058 149.0058 3.8000e- 003 149.1008 Mitigated Construction Off-Site 3.3 Grading - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 10.2641 0.0000 10.2641 3.7683 0.0000 3.7683 0.0000 0.0000 Off-Road 4.9185 56.5443 31.2281 0.0715 2.2861 2.2861 2.1032 2.1032 6,925.967 4 6,925.967 4 2.2400 6,981.967 3 Total 4.9185 56.5443 31.2281 0.0715 10.2641 2.2861 12.5502 3.7683 2.1032 5.8715 6,925.967 4 6,925.967 4 2.2400 6,981.967 3 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:23AMPage16of32 The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 3.3 Grading - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0747 0.0432 0.4680 1.4500e- 003 0.1673 1.0200e- 003 0.1684 0.0444 9.4000e- 004 0.0453 144.0262 144.0262 3.4100e- 003 144.1115 Total 0.0747 0.0432 0.4680 1.4500e- 003 0.1673 1.0200e- 003 0.1684 0.0444 9.4000e- 004 0.0453 144.0262 144.0262 3.4100e- 003 144.1115 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 4.0030 0.0000 4.0030 1.4696 0.0000 1.4696 0.0000 0.0000 Off-Road 4.9185 56.5443 31.2281 0.0715 2.2861 2.2861 2.1032 2.1032 0.0000 6,925.967 4 6,925.967 4 2.2400 6,981.967 3 Total 4.9185 56.5443 31.2281 0.0715 4.0030 2.2861 6.2891 1.4696 2.1032 3.5728 0.0000 6,925.967 4 6,925.967 4 2.2400 6,981.967 3 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:23AMPage17of32 The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 3.3 Grading - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0747 0.0432 0.4680 1.4500e- 003 0.1673 1.0200e- 003 0.1684 0.0444 9.4000e- 004 0.0453 144.0262 144.0262 3.4100e- 003 144.1115 Total 0.0747 0.0432 0.4680 1.4500e- 003 0.1673 1.0200e- 003 0.1684 0.0444 9.4000e- 004 0.0453 144.0262 144.0262 3.4100e- 003 144.1115 Mitigated Construction Off-Site 3.4 Building Construction - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 3.1137 33.9659 18.1952 0.0430 1.4763 1.4763 1.3775 1.3775 4,114.429 7 4,114.429 7 1.1209 4,142.452 0 Total 3.1137 33.9659 18.1952 0.0430 1.4763 1.4763 1.3775 1.3775 4,114.429 7 4,114.429 7 1.1209 4,142.452 0 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:23AMPage18of32 The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 3.4 Building Construction - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.6895 25.8838 5.5343 0.0633 1.5152 0.0444 1.5595 0.4364 0.0425 0.4789 6,679.166 1 6,679.166 1 0.6396 6,695.157 2 Worker 3.0745 1.7793 19.2597 0.0595 6.8858 0.0419 6.9277 1.8264 0.0385 1.8650 5,926.679 1 5,926.679 1 0.1404 5,930.189 8 Total 3.7640 27.6631 24.7940 0.1228 8.4010 0.0863 8.4872 2.2628 0.0810 2.3438 12,605.84 52 12,605.84 52 0.7801 12,625.34 70 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 3.1137 33.9659 18.1952 0.0430 1.4763 1.4763 1.3775 1.3775 0.0000 4,114.429 7 4,114.429 7 1.1209 4,142.452 0 Total 3.1137 33.9659 18.1952 0.0430 1.4763 1.4763 1.3775 1.3775 0.0000 4,114.429 7 4,114.429 7 1.1209 4,142.452 0 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:23AMPage19of32 The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 3.4 Building Construction - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.6895 25.8838 5.5343 0.0633 1.5152 0.0444 1.5595 0.4364 0.0425 0.4789 6,679.166 1 6,679.166 1 0.6396 6,695.157 2 Worker 3.0745 1.7793 19.2597 0.0595 6.8858 0.0419 6.9277 1.8264 0.0385 1.8650 5,926.679 1 5,926.679 1 0.1404 5,930.189 8 Total 3.7640 27.6631 24.7940 0.1228 8.4010 0.0863 8.4872 2.2628 0.0810 2.3438 12,605.84 52 12,605.84 52 0.7801 12,625.34 70 Mitigated Construction Off-Site 3.5 Paving - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.2556 12.9191 14.6532 0.0228 0.6777 0.6777 0.6235 0.6235 2,207.210 9 2,207.210 9 0.7139 2,225.057 3 Paving 0.8101 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 2.0657 12.9191 14.6532 0.0228 0.6777 0.6777 0.6235 0.6235 2,207.210 9 2,207.210 9 0.7139 2,225.057 3 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:23AMPage20of32 The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 3.5 Paving - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0560 0.0324 0.3510 1.0800e- 003 0.1255 7.6000e- 004 0.1263 0.0333 7.0000e- 004 0.0340 108.0197 108.0197 2.5600e- 003 108.0837 Total 0.0560 0.0324 0.3510 1.0800e- 003 0.1255 7.6000e- 004 0.1263 0.0333 7.0000e- 004 0.0340 108.0197 108.0197 2.5600e- 003 108.0837 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.2556 12.9191 14.6532 0.0228 0.6777 0.6777 0.6235 0.6235 0.0000 2,207.210 9 2,207.210 9 0.7139 2,225.057 3 Paving 0.8101 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 2.0657 12.9191 14.6532 0.0228 0.6777 0.6777 0.6235 0.6235 0.0000 2,207.210 9 2,207.210 9 0.7139 2,225.057 3 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:23AMPage21of32 The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 3.5 Paving - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0560 0.0324 0.3510 1.0800e- 003 0.1255 7.6000e- 004 0.1263 0.0333 7.0000e- 004 0.0340 108.0197 108.0197 2.5600e- 003 108.0837 Total 0.0560 0.0324 0.3510 1.0800e- 003 0.1255 7.6000e- 004 0.1263 0.0333 7.0000e- 004 0.0340 108.0197 108.0197 2.5600e- 003 108.0837 Mitigated Construction Off-Site 3.6 Architectural Coating - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 60.8362 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.2919 2.0358 2.4234 3.9600e- 003 0.1255 0.1255 0.1255 0.1255 375.2641 375.2641 0.0258 375.9079 Total 61.1281 2.0358 2.4234 3.9600e- 003 0.1255 0.1255 0.1255 0.1255 375.2641 375.2641 0.0258 375.9079 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:23AMPage22of32 The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 3.6 Architectural Coating - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.6164 0.3567 3.8613 0.0119 1.3805 8.3900e- 003 1.3889 0.3662 7.7300e- 003 0.3739 1,188.216 3 1,188.216 3 0.0282 1,188.920 2 Total 0.6164 0.3567 3.8613 0.0119 1.3805 8.3900e- 003 1.3889 0.3662 7.7300e- 003 0.3739 1,188.216 3 1,188.216 3 0.0282 1,188.920 2 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 60.8362 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.2919 2.0358 2.4234 3.9600e- 003 0.1255 0.1255 0.1255 0.1255 0.0000 375.2641 375.2641 0.0258 375.9079 Total 61.1281 2.0358 2.4234 3.9600e- 003 0.1255 0.1255 0.1255 0.1255 0.0000 375.2641 375.2641 0.0258 375.9079 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:23AMPage23of32 The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile 3.6 Architectural Coating - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.6164 0.3567 3.8613 0.0119 1.3805 8.3900e- 003 1.3889 0.3662 7.7300e- 003 0.3739 1,188.216 3 1,188.216 3 0.0282 1,188.920 2 Total 0.6164 0.3567 3.8613 0.0119 1.3805 8.3900e- 003 1.3889 0.3662 7.7300e- 003 0.3739 1,188.216 3 1,188.216 3 0.0282 1,188.920 2 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:23AMPage24of32 The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) - Riverside-Salton Sea County, Winter ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Mitigated 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Unmitigated 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 4.2 Trip Summary Information 4.3 Trip Type Information Average Daily Trip Rate Unmitigated Mitigated Land Use Weekday Saturday Sunday Annual VMT Annual VMT Apartments Low Rise 0.00 0.00 0.00 Hotel 0.00 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 0.00 Regional Shopping Center 0.00 0.00 0.00 Single Family Housing 0.00 0.00 0.00 User Defined Recreational 0.00 0.00 0.00 Total 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:23AMPage25of32 The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) - Riverside-Salton Sea County, Winter Miles Trip %Trip Purpose % Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C-W H-S or C-C H-O or C-NW Primary Diverted Pass-by Apartments Low Rise 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 Hotel 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 Regional Shopping Center 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 Single Family Housing 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 User Defined Recreational 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 5.0 Energy Detail 5.1 Mitigation Measures Energy 4.4 Fleet Mix Land Use LDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH Apartments Low Rise 0.542116 0.037578 0.185203 0.118503 0.016241 0.005141 0.017392 0.068695 0.001383 0.001183 0.004582 0.000945 0.001038 Hotel 0.542116 0.037578 0.185203 0.118503 0.016241 0.005141 0.017392 0.068695 0.001383 0.001183 0.004582 0.000945 0.001038 Other Asphalt Surfaces 0.542116 0.037578 0.185203 0.118503 0.016241 0.005141 0.017392 0.068695 0.001383 0.001183 0.004582 0.000945 0.001038 Regional Shopping Center 0.542116 0.037578 0.185203 0.118503 0.016241 0.005141 0.017392 0.068695 0.001383 0.001183 0.004582 0.000945 0.001038 Single Family Housing 0.542116 0.037578 0.185203 0.118503 0.016241 0.005141 0.017392 0.068695 0.001383 0.001183 0.004582 0.000945 0.001038 User Defined Recreational 0.542116 0.037578 0.185203 0.118503 0.016241 0.005141 0.017392 0.068695 0.001383 0.001183 0.004582 0.000945 0.001038 Historical Energy Use: N CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:23AMPage26of32 The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) - Riverside-Salton Sea County, Winter ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day NaturalGas Mitigated 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 NaturalGas Unmitigated 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:23AMPage27of32 The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 5.2 Energy by Land Use - NaturalGas NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr lb/day lb/day Apartments Low Rise 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hotel 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Other Asphalt Surfaces 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Regional Shopping Center 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Single Family Housing 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 User Defined Recreational 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Unmitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:23AMPage28of32 The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 6.1 Mitigation Measures Area 6.0 Area Detail 5.2 Energy by Land Use - NaturalGas NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr lb/day lb/day Apartments Low Rise 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hotel 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Other Asphalt Surfaces 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Regional Shopping Center 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Single Family Housing 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 User Defined Recreational 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:23AMPage29of32 The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) - Riverside-Salton Sea County, Winter ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Mitigated 26.2239 0.1243 10.7685 5.7000e- 004 0.0593 0.0593 0.0593 0.0593 0.0000 19.3545 19.3545 0.0188 0.0000 19.8252 Unmitigated 26.2239 0.1243 10.7685 5.7000e- 004 0.0593 0.0593 0.0593 0.0593 0.0000 19.3545 19.3545 0.0188 0.0000 19.8252 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory lb/day lb/day Architectural Coating 6.2503 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 19.6461 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hearth 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 0.3275 0.1243 10.7685 5.7000e- 004 0.0593 0.0593 0.0593 0.0593 19.3545 19.3545 0.0188 19.8252 Total 26.2239 0.1243 10.7685 5.7000e- 004 0.0593 0.0593 0.0593 0.0593 0.0000 19.3545 19.3545 0.0188 0.0000 19.8252 Unmitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:23AMPage30of32 The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 8.1 Mitigation Measures Waste 7.1 Mitigation Measures Water 7.0 Water Detail 8.0 Waste Detail 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory lb/day lb/day Architectural Coating 6.2503 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 19.6461 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hearth 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 0.3275 0.1243 10.7685 5.7000e- 004 0.0593 0.0593 0.0593 0.0593 19.3545 19.3545 0.0188 19.8252 Total 26.2239 0.1243 10.7685 5.7000e- 004 0.0593 0.0593 0.0593 0.0593 0.0000 19.3545 19.3545 0.0188 0.0000 19.8252 Mitigated 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year Horse Power Load Factor Fuel Type 10.0 Stationary Equipment CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:23AMPage31of32 The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 11.0 Vegetation Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power Load Factor Fuel Type Boilers Equipment Type Number Heat Input/Day Heat Input/Year Boiler Rating Fuel Type User Defined Equipment Equipment Type Number CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:23AMPage32of32 The Wave - Coral Mountain (Phase 1 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 1.1 Land Usage Land Uses Size Metric Lot Acreage Floor Surface Area Population Other Asphalt Surfaces 0.41 Acre 0.41 17,859.60 0 Regional Shopping Center 25.00 1000sqft 0.57 25,000.00 0 1.2 Other Project Characteristics Urbanization Climate Zone Urban 15 Wind Speed (m/s)Precipitation Freq (Days)2.4 28 1.3 User Entered Comments & Non-Default Data 1.0 Project Characteristics Utility Company Imperial Irrigation District 2023OperationalYear CO2 Intensity lb/MWhr) 1270.9 0.029CH4Intensity lb/MWhr) 0.006N2OIntensity lb/MWhr) The Wave - Coral Mountain (Phase 2 Construction - Unmitigated) Riverside-Salton Sea County, Summer CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:41AMPage1of27 The Wave - Coral Mountain (Phase 2 Construction - Unmitigated) - Riverside-Salton Sea County, Summer Project Characteristics - Land Use - Total Project Area is 0.99 acres Construction Phase - Construction Schedule adjsuted to meet the 2023 Opening Year Off-road Equipment - Hours are based on an 8-hour workday. Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Grading - For purposes of analysis, total acres graded per day is based on the equipment specific grading rates (CalEEMod Appendix A) and the equipment list. Architectural Coating - Rule 1113 Vehicle Trips - Construction Run Only. Energy Use - Construction Run Only. Water And Wastewater - Construction Run Only. Solid Waste - Construction Run Only. Construction Off-road Equipment Mitigation - Rule 403 Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Table Name Column Name Default Value New Value tblArchitecturalCoating EF_Nonresidential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Interior 250.00 50.00 tblArchitecturalCoating EF_Parking 250.00 50.00 tblArchitecturalCoating EF_Residential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Residential_Interior 250.00 50.00 tblConstructionPhase PhaseEndDate 2/22/2023 2/15/2023 tblConstructionPhase PhaseStartDate 2/16/2023 2/9/2023 tblEnergyUse LightingElect 5.61 0.00 tblEnergyUse NT24E 2.44 0.00 tblEnergyUse NT24NG 0.30 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:41AMPage2of27 The Wave - Coral Mountain (Phase 2 Construction - Unmitigated) - Riverside-Salton Sea County, Summer tblEnergyUse T24E 4.58 0.00 tblEnergyUse T24NG 1.92 0.00 tblGrading AcresOfGrading 2.00 3.00 tblOffRoadEquipment LoadFactor 0.43 0.43 tblOffRoadEquipment LoadFactor 0.43 0.43 tblOffRoadEquipment LoadFactor 0.43 0.43 tblOffRoadEquipment LoadFactor 0.43 0.43 tblOffRoadEquipment OffRoadEquipmentType Crawler Tractors tblOffRoadEquipment OffRoadEquipmentType Crawler Tractors tblOffRoadEquipment OffRoadEquipmentType Crawler Tractors tblOffRoadEquipment OffRoadEquipmentType Crawler Tractors tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 0.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 0.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00 tblOffRoadEquipment UsageHours 6.00 8.00 tblOffRoadEquipment UsageHours 6.00 8.00 tblOffRoadEquipment UsageHours 4.00 8.00 tblOffRoadEquipment UsageHours 6.00 8.00 tblOffRoadEquipment UsageHours 7.00 8.00 tblOffRoadEquipment UsageHours 7.00 8.00 tblOffRoadEquipment UsageHours 1.00 8.00 tblOffRoadEquipment UsageHours 6.00 8.00 tblOffRoadEquipment UsageHours 7.00 8.00 tblSolidWaste SolidWasteGenerationRate 26.25 0.00 tblVehicleTrips CC_TL 4.20 0.00 tblVehicleTrips CC_TL 4.20 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:41AMPage3of27 The Wave - Coral Mountain (Phase 2 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 2.0 Emissions Summary tblVehicleTrips CC_TTP 64.70 0.00 tblVehicleTrips CNW_TL 5.40 0.00 tblVehicleTrips CNW_TL 5.40 0.00 tblVehicleTrips CNW_TTP 19.00 0.00 tblVehicleTrips CW_TL 12.50 0.00 tblVehicleTrips CW_TL 12.50 0.00 tblVehicleTrips CW_TTP 16.30 0.00 tblVehicleTrips DV_TP 35.00 0.00 tblVehicleTrips PB_TP 11.00 0.00 tblVehicleTrips PR_TP 54.00 0.00 tblVehicleTrips ST_TR 49.97 0.00 tblVehicleTrips SU_TR 25.24 0.00 tblVehicleTrips WD_TR 42.70 0.00 tblWater IndoorWaterUseRate 1,851,813.04 0.00 tblWater OutdoorWaterUseRate 1,134,982.18 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:41AMPage4of27 The Wave - Coral Mountain (Phase 2 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 2.1 Overall Construction (Maximum Daily Emission) ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year lb/day lb/day 2022 2.2124 23.5958 12.1271 0.0312 7.6965 1.0202 8.7167 3.5042 0.9506 4.4548 0.0000 3,010.828 2 3,010.828 2 0.7912 0.0000 3,030.607 2 2023 25.2375 16.4265 11.1318 0.0271 0.1757 0.6755 0.8444 0.0466 0.6214 0.6671 0.0000 2,642.347 0 2,642.347 0 0.7777 0.0000 2,661.788 3 Maximum 25.2375 23.5958 12.1271 0.0312 7.6965 1.0202 8.7167 3.5042 0.9506 4.4548 0.0000 3,010.828 2 3,010.828 2 0.7912 0.0000 3,030.607 2 Unmitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year lb/day lb/day 2022 2.2124 23.5958 12.1271 0.0312 3.0527 1.0202 4.0729 1.3802 0.9506 2.3308 0.0000 3,010.828 2 3,010.828 2 0.7912 0.0000 3,030.607 2 2023 25.2375 16.4265 11.1318 0.0271 0.1757 0.6755 0.8444 0.0466 0.6214 0.6671 0.0000 2,642.347 0 2,642.347 0 0.7777 0.0000 2,661.788 3 Maximum 25.2375 23.5958 12.1271 0.0312 3.0527 1.0202 4.0729 1.3802 0.9506 2.3308 0.0000 3,010.828 2 3,010.828 2 0.7912 0.0000 3,030.607 2 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 0.00 0.00 0.00 0.00 58.99 0.00 48.57 59.82 0.00 41.47 0.00 0.00 0.00 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:41AMPage5of27 The Wave - Coral Mountain (Phase 2 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 2.2 Overall Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Area 0.7037 2.0000e- 005 2.5900e- 003 0.0000 1.0000e- 005 1.0000e- 005 1.0000e- 005 1.0000e- 005 5.5600e- 003 5.5600e- 003 1.0000e- 005 5.9300e- 003 Energy 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mobile 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.7037 2.0000e- 005 2.5900e- 003 0.0000 0.0000 1.0000e- 005 1.0000e- 005 0.0000 1.0000e- 005 1.0000e- 005 5.5600e- 003 5.5600e- 003 1.0000e- 005 0.0000 5.9300e- 003 Unmitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Area 0.7037 2.0000e- 005 2.5900e- 003 0.0000 1.0000e- 005 1.0000e- 005 1.0000e- 005 1.0000e- 005 5.5600e- 003 5.5600e- 003 1.0000e- 005 5.9300e- 003 Energy 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mobile 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.7037 2.0000e- 005 2.5900e- 003 0.0000 0.0000 1.0000e- 005 1.0000e- 005 0.0000 1.0000e- 005 1.0000e- 005 5.5600e- 003 5.5600e- 003 1.0000e- 005 0.0000 5.9300e- 003 Mitigated Operational CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:41AMPage6of27 The Wave - Coral Mountain (Phase 2 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 Site Preparation Site Preparation 9/19/2022 9/19/2022 5 1 2 Grading Grading 9/20/2022 9/21/2022 5 2 3 Building Construction Building Construction 9/22/2022 2/8/2023 5 100 4 Paving Paving 2/9/2023 2/15/2023 5 5 5 Architectural Coating Architectural Coating 2/9/2023 2/15/2023 5 5 OffRoad Equipment ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Residential Indoor: 0; Residential Outdoor: 0; Non-Residential Indoor: 37,500; Non-Residential Outdoor: 12,500; Striped Parking Area: 1,072 Architectural Coating – sqft) Acres of Grading (Site Preparation Phase): 1 Acres of Grading (Grading Phase): 3 Acres of Paving: 0.41 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:41AMPage7of27 The Wave - Coral Mountain (Phase 2 Construction - Unmitigated) - Riverside-Salton Sea County, Summer Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Site Preparation Graders 1 8.00 187 0.41 Site Preparation Tractors/Loaders/Backhoes 0 8.00 97 0.37 Grading Concrete/Industrial Saws 1 8.00 81 0.73 Grading Rubber Tired Dozers 1 8.00 247 0.40 Grading Tractors/Loaders/Backhoes 0 8.00 97 0.37 Building Construction Cranes 1 8.00 231 0.29 Building Construction Forklifts 2 8.00 89 0.20 Building Construction Tractors/Loaders/Backhoes 0 8.00 97 0.37 Paving Cement and Mortar Mixers 4 8.00 9 0.56 Paving Pavers 1 8.00 130 0.42 Paving Rollers 1 8.00 80 0.38 Paving Tractors/Loaders/Backhoes 0 8.00 97 0.37 Architectural Coating Air Compressors 1 8.00 78 0.48 Site Preparation Crawler Tractors 1 8.00 212 0.43 Grading Crawler Tractors 2 8.00 212 0.43 Building Construction Crawler Tractors 2 8.00 212 0.43 Paving Crawler Tractors 1 8.00 212 0.43 Trips and VMT Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Site Preparation 2 5.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Grading 4 10.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Building Construction 5 16.00 7.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Paving 7 18.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Architectural Coating 1 3.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:41AMPage8of27 The Wave - Coral Mountain (Phase 2 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 3.2 Site Preparation - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 1.0605 0.0000 1.0605 0.1145 0.0000 0.1145 0.0000 0.0000 Off-Road 0.9055 11.2487 4.0301 0.0144 0.3933 0.3933 0.3618 0.3618 1,398.193 1 1,398.193 1 0.4522 1,409.498 2 Total 0.9055 11.2487 4.0301 0.0144 1.0605 0.3933 1.4538 0.1145 0.3618 0.4763 1,398.193 1 1,398.193 1 0.4522 1,409.498 2 Unmitigated Construction On-Site 3.1 Mitigation Measures Construction Water Exposed Area CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:41AMPage9of27 The Wave - Coral Mountain (Phase 2 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 3.2 Site Preparation - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0182 9.4000e- 003 0.1319 3.9000e- 004 0.0418 2.5000e- 004 0.0421 0.0111 2.3000e- 004 0.0113 38.6500 38.6500 8.7000e- 004 38.6718 Total 0.0182 9.4000e- 003 0.1319 3.9000e- 004 0.0418 2.5000e- 004 0.0421 0.0111 2.3000e- 004 0.0113 38.6500 38.6500 8.7000e- 004 38.6718 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 0.4136 0.0000 0.4136 0.0447 0.0000 0.0447 0.0000 0.0000 Off-Road 0.9055 11.2487 4.0301 0.0144 0.3933 0.3933 0.3618 0.3618 0.0000 1,398.193 1 1,398.193 1 0.4522 1,409.498 2 Total 0.9055 11.2487 4.0301 0.0144 0.4136 0.3933 0.8069 0.0447 0.3618 0.4065 0.0000 1,398.193 1 1,398.193 1 0.4522 1,409.498 2 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:41AMPage10of27 The Wave - Coral Mountain (Phase 2 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 3.2 Site Preparation - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0182 9.4000e- 003 0.1319 3.9000e- 004 0.0418 2.5000e- 004 0.0421 0.0111 2.3000e- 004 0.0113 38.6500 38.6500 8.7000e- 004 38.6718 Total 0.0182 9.4000e- 003 0.1319 3.9000e- 004 0.0418 2.5000e- 004 0.0421 0.0111 2.3000e- 004 0.0113 38.6500 38.6500 8.7000e- 004 38.6718 Mitigated Construction Off-Site 3.3 Grading - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 7.6128 0.0000 7.6128 3.4820 0.0000 3.4820 0.0000 0.0000 Off-Road 2.1759 23.5770 11.8634 0.0304 1.0197 1.0197 0.9501 0.9501 2,933.528 2 2,933.528 2 0.7894 2,953.263 5 Total 2.1759 23.5770 11.8634 0.0304 7.6128 1.0197 8.6325 3.4820 0.9501 4.4321 2,933.528 2 2,933.528 2 0.7894 2,953.263 5 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:41AMPage11of27 The Wave - Coral Mountain (Phase 2 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 3.3 Grading - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0365 0.0188 0.2637 7.8000e- 004 0.0837 5.0000e- 004 0.0842 0.0222 4.6000e- 004 0.0227 77.2999 77.2999 1.7500e- 003 77.3437 Total 0.0365 0.0188 0.2637 7.8000e- 004 0.0837 5.0000e- 004 0.0842 0.0222 4.6000e- 004 0.0227 77.2999 77.2999 1.7500e- 003 77.3437 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 2.9690 0.0000 2.9690 1.3580 0.0000 1.3580 0.0000 0.0000 Off-Road 2.1759 23.5770 11.8634 0.0304 1.0197 1.0197 0.9501 0.9501 0.0000 2,933.528 2 2,933.528 2 0.7894 2,953.263 5 Total 2.1759 23.5770 11.8634 0.0304 2.9690 1.0197 3.9887 1.3580 0.9501 2.3081 0.0000 2,933.528 2 2,933.528 2 0.7894 2,953.263 5 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:41AMPage12of27 The Wave - Coral Mountain (Phase 2 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 3.3 Grading - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0365 0.0188 0.2637 7.8000e- 004 0.0837 5.0000e- 004 0.0842 0.0222 4.6000e- 004 0.0227 77.2999 77.2999 1.7500e- 003 77.3437 Total 0.0365 0.0188 0.2637 7.8000e- 004 0.0837 5.0000e- 004 0.0842 0.0222 4.6000e- 004 0.0227 77.2999 77.2999 1.7500e- 003 77.3437 Mitigated Construction Off-Site 3.4 Building Construction - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.5813 18.2762 8.8165 0.0245 0.7657 0.7657 0.7044 0.7044 2,368.720 3 2,368.720 3 0.7661 2,387.872 6 Total 1.5813 18.2762 8.8165 0.0245 0.7657 0.7657 0.7044 0.7044 2,368.720 3 2,368.720 3 0.7661 2,387.872 6 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:41AMPage13of27 The Wave - Coral Mountain (Phase 2 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 3.4 Building Construction - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0140 0.5763 0.0995 1.5200e- 003 0.0351 8.3000e- 004 0.0360 0.0101 8.0000e- 004 0.0109 160.6258 160.6258 0.0125 160.9394 Worker 0.0583 0.0301 0.4219 1.2400e- 003 0.1339 7.9000e- 004 0.1347 0.0355 7.3000e- 004 0.0362 123.6799 123.6799 2.8000e- 003 123.7498 Total 0.0723 0.6064 0.5214 2.7600e- 003 0.1690 1.6200e- 003 0.1706 0.0456 1.5300e- 003 0.0472 284.3057 284.3057 0.0153 284.6892 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.5813 18.2762 8.8165 0.0245 0.7657 0.7657 0.7044 0.7044 0.0000 2,368.720 3 2,368.720 3 0.7661 2,387.872 6 Total 1.5813 18.2762 8.8165 0.0245 0.7657 0.7657 0.7044 0.7044 0.0000 2,368.720 3 2,368.720 3 0.7661 2,387.872 6 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:41AMPage14of27 The Wave - Coral Mountain (Phase 2 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 3.4 Building Construction - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0140 0.5763 0.0995 1.5200e- 003 0.0351 8.3000e- 004 0.0360 0.0101 8.0000e- 004 0.0109 160.6258 160.6258 0.0125 160.9394 Worker 0.0583 0.0301 0.4219 1.2400e- 003 0.1339 7.9000e- 004 0.1347 0.0355 7.3000e- 004 0.0362 123.6799 123.6799 2.8000e- 003 123.7498 Total 0.0723 0.6064 0.5214 2.7600e- 003 0.1690 1.6200e- 003 0.1706 0.0456 1.5300e- 003 0.0472 284.3057 284.3057 0.0153 284.6892 Mitigated Construction Off-Site 3.4 Building Construction - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.4423 15.9554 8.5988 0.0244 0.6743 0.6743 0.6204 0.6204 2,367.192 2 2,367.192 2 0.7656 2,386.332 1 Total 1.4423 15.9554 8.5988 0.0244 0.6743 0.6743 0.6204 0.6204 2,367.192 2 2,367.192 2 0.7656 2,386.332 1 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:41AMPage15of27 The Wave - Coral Mountain (Phase 2 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 3.4 Building Construction - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0107 0.4439 0.0876 1.4800e- 003 0.0351 3.7000e- 004 0.0355 0.0101 3.6000e- 004 0.0105 156.1729 156.1729 9.5400e- 003 156.4115 Worker 0.0546 0.0271 0.3892 1.1900e- 003 0.1339 7.7000e- 004 0.1346 0.0355 7.1000e- 004 0.0362 118.9820 118.9820 2.5100e- 003 119.0447 Total 0.0653 0.4710 0.4768 2.6700e- 003 0.1690 1.1400e- 003 0.1701 0.0456 1.0700e- 003 0.0467 275.1549 275.1549 0.0121 275.4562 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.4423 15.9554 8.5988 0.0244 0.6743 0.6743 0.6204 0.6204 0.0000 2,367.192 2 2,367.192 2 0.7656 2,386.332 1 Total 1.4423 15.9554 8.5988 0.0244 0.6743 0.6743 0.6204 0.6204 0.0000 2,367.192 2 2,367.192 2 0.7656 2,386.332 1 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:41AMPage16of27 The Wave - Coral Mountain (Phase 2 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 3.4 Building Construction - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0107 0.4439 0.0876 1.4800e- 003 0.0351 3.7000e- 004 0.0355 0.0101 3.6000e- 004 0.0105 156.1729 156.1729 9.5400e- 003 156.4115 Worker 0.0546 0.0271 0.3892 1.1900e- 003 0.1339 7.7000e- 004 0.1346 0.0355 7.1000e- 004 0.0362 118.9820 118.9820 2.5100e- 003 119.0447 Total 0.0653 0.4710 0.4768 2.6700e- 003 0.1690 1.1400e- 003 0.1701 0.0456 1.0700e- 003 0.0467 275.1549 275.1549 0.0121 275.4562 Mitigated Construction Off-Site 3.5 Paving - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.0236 10.0759 8.2062 0.0180 0.4326 0.4326 0.4026 0.4026 1,667.545 9 1,667.545 9 0.4949 1,679.919 5 Paving 0.2148 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 1.2384 10.0759 8.2062 0.0180 0.4326 0.4326 0.4026 0.4026 1,667.545 9 1,667.545 9 0.4949 1,679.919 5 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:41AMPage17of27 The Wave - Coral Mountain (Phase 2 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 3.5 Paving - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0614 0.0305 0.4378 1.3400e- 003 0.1506 8.7000e- 004 0.1515 0.0400 8.0000e- 004 0.0408 133.8547 133.8547 2.8200e- 003 133.9253 Total 0.0614 0.0305 0.4378 1.3400e- 003 0.1506 8.7000e- 004 0.1515 0.0400 8.0000e- 004 0.0408 133.8547 133.8547 2.8200e- 003 133.9253 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.0236 10.0759 8.2062 0.0180 0.4326 0.4326 0.4026 0.4026 0.0000 1,667.545 9 1,667.545 9 0.4949 1,679.919 5 Paving 0.2148 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 1.2384 10.0759 8.2062 0.0180 0.4326 0.4326 0.4026 0.4026 0.0000 1,667.545 9 1,667.545 9 0.4949 1,679.919 5 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:41AMPage18of27 The Wave - Coral Mountain (Phase 2 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 3.5 Paving - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0614 0.0305 0.4378 1.3400e- 003 0.1506 8.7000e- 004 0.1515 0.0400 8.0000e- 004 0.0408 133.8547 133.8547 2.8200e- 003 133.9253 Total 0.0614 0.0305 0.4378 1.3400e- 003 0.1506 8.7000e- 004 0.1515 0.0400 8.0000e- 004 0.0408 133.8547 133.8547 2.8200e- 003 133.9253 Mitigated Construction Off-Site 3.6 Architectural Coating - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 23.6719 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.2556 1.7373 2.4148 3.9600e- 003 0.0944 0.0944 0.0944 0.0944 375.2641 375.2641 0.0225 375.8253 Total 23.9274 1.7373 2.4148 3.9600e- 003 0.0944 0.0944 0.0944 0.0944 375.2641 375.2641 0.0225 375.8253 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:41AMPage19of27 The Wave - Coral Mountain (Phase 2 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 3.6 Architectural Coating - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0102 5.0800e- 003 0.0730 2.2000e- 004 0.0251 1.5000e- 004 0.0253 6.6600e- 003 1.3000e- 004 6.7900e- 003 22.3091 22.3091 4.7000e- 004 22.3209 Total 0.0102 5.0800e- 003 0.0730 2.2000e- 004 0.0251 1.5000e- 004 0.0253 6.6600e- 003 1.3000e- 004 6.7900e- 003 22.3091 22.3091 4.7000e- 004 22.3209 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 23.6719 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.2556 1.7373 2.4148 3.9600e- 003 0.0944 0.0944 0.0944 0.0944 0.0000 375.2641 375.2641 0.0225 375.8253 Total 23.9274 1.7373 2.4148 3.9600e- 003 0.0944 0.0944 0.0944 0.0944 0.0000 375.2641 375.2641 0.0225 375.8253 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:41AMPage20of27 The Wave - Coral Mountain (Phase 2 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile 3.6 Architectural Coating - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0102 5.0800e- 003 0.0730 2.2000e- 004 0.0251 1.5000e- 004 0.0253 6.6600e- 003 1.3000e- 004 6.7900e- 003 22.3091 22.3091 4.7000e- 004 22.3209 Total 0.0102 5.0800e- 003 0.0730 2.2000e- 004 0.0251 1.5000e- 004 0.0253 6.6600e- 003 1.3000e- 004 6.7900e- 003 22.3091 22.3091 4.7000e- 004 22.3209 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:41AMPage21of27 The Wave - Coral Mountain (Phase 2 Construction - Unmitigated) - Riverside-Salton Sea County, Summer ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Mitigated 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Unmitigated 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 4.2 Trip Summary Information 4.3 Trip Type Information Average Daily Trip Rate Unmitigated Mitigated Land Use Weekday Saturday Sunday Annual VMT Annual VMT Other Asphalt Surfaces 0.00 0.00 0.00 Regional Shopping Center 0.00 0.00 0.00 Total 0.00 0.00 0.00 Miles Trip %Trip Purpose % Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C-W H-S or C-C H-O or C-NW Primary Diverted Pass-by Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 Regional Shopping Center 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 4.4 Fleet Mix Land Use LDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH Other Asphalt Surfaces 0.548600 0.036250 0.186898 0.112544 0.014284 0.004806 0.017604 0.070134 0.001409 0.001147 0.004508 0.000918 0.000898 Regional Shopping Center 0.548600 0.036250 0.186898 0.112544 0.014284 0.004806 0.017604 0.070134 0.001409 0.001147 0.004508 0.000918 0.000898 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:41AMPage22of27 The Wave - Coral Mountain (Phase 2 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 5.0 Energy Detail ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day NaturalGas Mitigated 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 NaturalGas Unmitigated 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 5.1 Mitigation Measures Energy Historical Energy Use: N CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:41AMPage23of27 The Wave - Coral Mountain (Phase 2 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 6.1 Mitigation Measures Area 6.0 Area Detail 5.2 Energy by Land Use - NaturalGas NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr lb/day lb/day Other Asphalt Surfaces 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Regional Shopping Center 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Unmitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr lb/day lb/day Other Asphalt Surfaces 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Regional Shopping Center 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:41AMPage24of27 The Wave - Coral Mountain (Phase 2 Construction - Unmitigated) - Riverside-Salton Sea County, Summer ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Mitigated 0.7037 2.0000e- 005 2.5900e- 003 0.0000 1.0000e- 005 1.0000e- 005 1.0000e- 005 1.0000e- 005 5.5600e- 003 5.5600e- 003 1.0000e- 005 5.9300e- 003 Unmitigated 0.7037 2.0000e- 005 2.5900e- 003 0.0000 1.0000e- 005 1.0000e- 005 1.0000e- 005 1.0000e- 005 5.5600e- 003 5.5600e- 003 1.0000e- 005 5.9300e- 003 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory lb/day lb/day Architectural Coating 0.1621 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 0.5413 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 2.4000e- 004 2.0000e- 005 2.5900e- 003 0.0000 1.0000e- 005 1.0000e- 005 1.0000e- 005 1.0000e- 005 5.5600e- 003 5.5600e- 003 1.0000e- 005 5.9300e- 003 Total 0.7037 2.0000e- 005 2.5900e- 003 0.0000 1.0000e- 005 1.0000e- 005 1.0000e- 005 1.0000e- 005 5.5600e- 003 5.5600e- 003 1.0000e- 005 5.9300e- 003 Unmitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:41AMPage25of27 The Wave - Coral Mountain (Phase 2 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 8.1 Mitigation Measures Waste 7.1 Mitigation Measures Water 7.0 Water Detail 8.0 Waste Detail 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory lb/day lb/day Architectural Coating 0.1621 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 0.5413 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 2.4000e- 004 2.0000e- 005 2.5900e- 003 0.0000 1.0000e- 005 1.0000e- 005 1.0000e- 005 1.0000e- 005 5.5600e- 003 5.5600e- 003 1.0000e- 005 5.9300e- 003 Total 0.7037 2.0000e- 005 2.5900e- 003 0.0000 1.0000e- 005 1.0000e- 005 1.0000e- 005 1.0000e- 005 5.5600e- 003 5.5600e- 003 1.0000e- 005 5.9300e- 003 Mitigated 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year Horse Power Load Factor Fuel Type 10.0 Stationary Equipment Fire Pumps and Emergency Generators CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:41AMPage26of27 The Wave - Coral Mountain (Phase 2 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 11.0 Vegetation Equipment Type Number Hours/Day Hours/Year Horse Power Load Factor Fuel Type Boilers Equipment Type Number Heat Input/Day Heat Input/Year Boiler Rating Fuel Type User Defined Equipment Equipment Type Number CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:41AMPage27of27 The Wave - Coral Mountain (Phase 2 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 1.1 Land Usage Land Uses Size Metric Lot Acreage Floor Surface Area Population Other Asphalt Surfaces 0.41 Acre 0.41 17,859.60 0 Regional Shopping Center 25.00 1000sqft 0.57 25,000.00 0 1.2 Other Project Characteristics Urbanization Climate Zone Urban 15 Wind Speed (m/s)Precipitation Freq (Days)2.4 28 1.3 User Entered Comments & Non-Default Data 1.0 Project Characteristics Utility Company Imperial Irrigation District 2023OperationalYear CO2 Intensity lb/MWhr) 1270.9 0.029CH4Intensity lb/MWhr) 0.006N2OIntensity lb/MWhr) The Wave - Coral Mountain (Phase 2 Construction - Unmitigated) Riverside-Salton Sea County, Winter CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:39AMPage1of27 The Wave - Coral Mountain (Phase 2 Construction - Unmitigated) - Riverside-Salton Sea County, Winter Project Characteristics - Land Use - Total Project Area is 0.99 acres Construction Phase - Construction Schedule adjsuted to meet the 2023 Opening Year Off-road Equipment - Hours are based on an 8-hour workday. Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Grading - For purposes of analysis, total acres graded per day is based on the equipment specific grading rates (CalEEMod Appendix A) and the equipment list. Architectural Coating - Rule 1113 Vehicle Trips - Construction Run Only. Energy Use - Construction Run Only. Water And Wastewater - Construction Run Only. Solid Waste - Construction Run Only. Construction Off-road Equipment Mitigation - Rule 403 Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Table Name Column Name Default Value New Value tblArchitecturalCoating EF_Nonresidential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Interior 250.00 50.00 tblArchitecturalCoating EF_Parking 250.00 50.00 tblArchitecturalCoating EF_Residential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Residential_Interior 250.00 50.00 tblConstructionPhase PhaseEndDate 2/22/2023 2/15/2023 tblConstructionPhase PhaseStartDate 2/16/2023 2/9/2023 tblEnergyUse LightingElect 5.61 0.00 tblEnergyUse NT24E 2.44 0.00 tblEnergyUse NT24NG 0.30 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:39AMPage2of27 The Wave - Coral Mountain (Phase 2 Construction - Unmitigated) - Riverside-Salton Sea County, Winter tblEnergyUse T24E 4.58 0.00 tblEnergyUse T24NG 1.92 0.00 tblGrading AcresOfGrading 2.00 3.00 tblOffRoadEquipment LoadFactor 0.43 0.43 tblOffRoadEquipment LoadFactor 0.43 0.43 tblOffRoadEquipment LoadFactor 0.43 0.43 tblOffRoadEquipment LoadFactor 0.43 0.43 tblOffRoadEquipment OffRoadEquipmentType Crawler Tractors tblOffRoadEquipment OffRoadEquipmentType Crawler Tractors tblOffRoadEquipment OffRoadEquipmentType Crawler Tractors tblOffRoadEquipment OffRoadEquipmentType Crawler Tractors tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 0.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 0.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00 tblOffRoadEquipment UsageHours 6.00 8.00 tblOffRoadEquipment UsageHours 6.00 8.00 tblOffRoadEquipment UsageHours 4.00 8.00 tblOffRoadEquipment UsageHours 6.00 8.00 tblOffRoadEquipment UsageHours 7.00 8.00 tblOffRoadEquipment UsageHours 7.00 8.00 tblOffRoadEquipment UsageHours 1.00 8.00 tblOffRoadEquipment UsageHours 6.00 8.00 tblOffRoadEquipment UsageHours 7.00 8.00 tblSolidWaste SolidWasteGenerationRate 26.25 0.00 tblVehicleTrips CC_TL 4.20 0.00 tblVehicleTrips CC_TL 4.20 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:39AMPage3of27 The Wave - Coral Mountain (Phase 2 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 2.0 Emissions Summary tblVehicleTrips CC_TTP 64.70 0.00 tblVehicleTrips CNW_TL 5.40 0.00 tblVehicleTrips CNW_TL 5.40 0.00 tblVehicleTrips CNW_TTP 19.00 0.00 tblVehicleTrips CW_TL 12.50 0.00 tblVehicleTrips CW_TL 12.50 0.00 tblVehicleTrips CW_TTP 16.30 0.00 tblVehicleTrips DV_TP 35.00 0.00 tblVehicleTrips PB_TP 11.00 0.00 tblVehicleTrips PR_TP 54.00 0.00 tblVehicleTrips ST_TR 49.97 0.00 tblVehicleTrips SU_TR 25.24 0.00 tblVehicleTrips WD_TR 42.70 0.00 tblWater IndoorWaterUseRate 1,851,813.04 0.00 tblWater OutdoorWaterUseRate 1,134,982.18 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:39AMPage4of27 The Wave - Coral Mountain (Phase 2 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 2.1 Overall Construction (Maximum Daily Emission) ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year lb/day lb/day 2022 2.2109 23.5964 12.0787 0.0311 7.6965 1.0202 8.7167 3.5042 0.9506 4.4548 0.0000 3,002.915 1 3,002.915 1 0.7909 0.0000 3,022.688 8 2023 25.2349 16.4203 11.0374 0.0269 0.1757 0.6755 0.8444 0.0466 0.6214 0.6671 0.0000 2,623.301 3 2,623.301 3 0.7784 0.0000 2,642.761 9 Maximum 25.2349 23.5964 12.0787 0.0311 7.6965 1.0202 8.7167 3.5042 0.9506 4.4548 0.0000 3,002.915 1 3,002.915 1 0.7909 0.0000 3,022.688 8 Unmitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year lb/day lb/day 2022 2.2109 23.5964 12.0787 0.0311 3.0527 1.0202 4.0729 1.3802 0.9506 2.3308 0.0000 3,002.915 1 3,002.915 1 0.7909 0.0000 3,022.688 8 2023 25.2349 16.4203 11.0374 0.0269 0.1757 0.6755 0.8444 0.0466 0.6214 0.6671 0.0000 2,623.301 3 2,623.301 3 0.7784 0.0000 2,642.761 9 Maximum 25.2349 23.5964 12.0787 0.0311 3.0527 1.0202 4.0729 1.3802 0.9506 2.3308 0.0000 3,002.915 1 3,002.915 1 0.7909 0.0000 3,022.688 8 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 0.00 0.00 0.00 0.00 58.99 0.00 48.57 59.82 0.00 41.47 0.00 0.00 0.00 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:39AMPage5of27 The Wave - Coral Mountain (Phase 2 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 2.2 Overall Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Area 0.7037 2.0000e- 005 2.5900e- 003 0.0000 1.0000e- 005 1.0000e- 005 1.0000e- 005 1.0000e- 005 5.5600e- 003 5.5600e- 003 1.0000e- 005 5.9300e- 003 Energy 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mobile 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.7037 2.0000e- 005 2.5900e- 003 0.0000 0.0000 1.0000e- 005 1.0000e- 005 0.0000 1.0000e- 005 1.0000e- 005 5.5600e- 003 5.5600e- 003 1.0000e- 005 0.0000 5.9300e- 003 Unmitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Area 0.7037 2.0000e- 005 2.5900e- 003 0.0000 1.0000e- 005 1.0000e- 005 1.0000e- 005 1.0000e- 005 5.5600e- 003 5.5600e- 003 1.0000e- 005 5.9300e- 003 Energy 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mobile 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.7037 2.0000e- 005 2.5900e- 003 0.0000 0.0000 1.0000e- 005 1.0000e- 005 0.0000 1.0000e- 005 1.0000e- 005 5.5600e- 003 5.5600e- 003 1.0000e- 005 0.0000 5.9300e- 003 Mitigated Operational CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:39AMPage6of27 The Wave - Coral Mountain (Phase 2 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 Site Preparation Site Preparation 9/19/2022 9/19/2022 5 1 2 Grading Grading 9/20/2022 9/21/2022 5 2 3 Building Construction Building Construction 9/22/2022 2/8/2023 5 100 4 Paving Paving 2/9/2023 2/15/2023 5 5 5 Architectural Coating Architectural Coating 2/9/2023 2/15/2023 5 5 OffRoad Equipment ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Residential Indoor: 0; Residential Outdoor: 0; Non-Residential Indoor: 37,500; Non-Residential Outdoor: 12,500; Striped Parking Area: 1,072 Architectural Coating – sqft) Acres of Grading (Site Preparation Phase): 1 Acres of Grading (Grading Phase): 3 Acres of Paving: 0.41 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:39AMPage7of27 The Wave - Coral Mountain (Phase 2 Construction - Unmitigated) - Riverside-Salton Sea County, Winter Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Site Preparation Graders 1 8.00 187 0.41 Site Preparation Tractors/Loaders/Backhoes 0 8.00 97 0.37 Grading Concrete/Industrial Saws 1 8.00 81 0.73 Grading Rubber Tired Dozers 1 8.00 247 0.40 Grading Tractors/Loaders/Backhoes 0 8.00 97 0.37 Building Construction Cranes 1 8.00 231 0.29 Building Construction Forklifts 2 8.00 89 0.20 Building Construction Tractors/Loaders/Backhoes 0 8.00 97 0.37 Paving Cement and Mortar Mixers 4 8.00 9 0.56 Paving Pavers 1 8.00 130 0.42 Paving Rollers 1 8.00 80 0.38 Paving Tractors/Loaders/Backhoes 0 8.00 97 0.37 Architectural Coating Air Compressors 1 8.00 78 0.48 Site Preparation Crawler Tractors 1 8.00 212 0.43 Grading Crawler Tractors 2 8.00 212 0.43 Building Construction Crawler Tractors 2 8.00 212 0.43 Paving Crawler Tractors 1 8.00 212 0.43 Trips and VMT Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Site Preparation 2 5.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Grading 4 10.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Building Construction 5 16.00 7.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Paving 7 18.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Architectural Coating 1 3.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:39AMPage8of27 The Wave - Coral Mountain (Phase 2 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 3.2 Site Preparation - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 1.0605 0.0000 1.0605 0.1145 0.0000 0.1145 0.0000 0.0000 Off-Road 0.9055 11.2487 4.0301 0.0144 0.3933 0.3933 0.3618 0.3618 1,398.193 1 1,398.193 1 0.4522 1,409.498 2 Total 0.9055 11.2487 4.0301 0.0144 1.0605 0.3933 1.4538 0.1145 0.3618 0.4763 1,398.193 1 1,398.193 1 0.4522 1,409.498 2 Unmitigated Construction On-Site 3.1 Mitigation Measures Construction Water Exposed Area CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:39AMPage9of27 The Wave - Coral Mountain (Phase 2 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 3.2 Site Preparation - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0175 9.7200e- 003 0.1077 3.5000e- 004 0.0418 2.5000e- 004 0.0421 0.0111 2.3000e- 004 0.0113 34.6935 34.6935 7.7000e- 004 34.7126 Total 0.0175 9.7200e- 003 0.1077 3.5000e- 004 0.0418 2.5000e- 004 0.0421 0.0111 2.3000e- 004 0.0113 34.6935 34.6935 7.7000e- 004 34.7126 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 0.4136 0.0000 0.4136 0.0447 0.0000 0.0447 0.0000 0.0000 Off-Road 0.9055 11.2487 4.0301 0.0144 0.3933 0.3933 0.3618 0.3618 0.0000 1,398.193 1 1,398.193 1 0.4522 1,409.498 2 Total 0.9055 11.2487 4.0301 0.0144 0.4136 0.3933 0.8069 0.0447 0.3618 0.4065 0.0000 1,398.193 1 1,398.193 1 0.4522 1,409.498 2 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:39AMPage10of27 The Wave - Coral Mountain (Phase 2 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 3.2 Site Preparation - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0175 9.7200e- 003 0.1077 3.5000e- 004 0.0418 2.5000e- 004 0.0421 0.0111 2.3000e- 004 0.0113 34.6935 34.6935 7.7000e- 004 34.7126 Total 0.0175 9.7200e- 003 0.1077 3.5000e- 004 0.0418 2.5000e- 004 0.0421 0.0111 2.3000e- 004 0.0113 34.6935 34.6935 7.7000e- 004 34.7126 Mitigated Construction Off-Site 3.3 Grading - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 7.6128 0.0000 7.6128 3.4820 0.0000 3.4820 0.0000 0.0000 Off-Road 2.1759 23.5770 11.8634 0.0304 1.0197 1.0197 0.9501 0.9501 2,933.528 2 2,933.528 2 0.7894 2,953.263 5 Total 2.1759 23.5770 11.8634 0.0304 7.6128 1.0197 8.6325 3.4820 0.9501 4.4321 2,933.528 2 2,933.528 2 0.7894 2,953.263 5 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:39AMPage11of27 The Wave - Coral Mountain (Phase 2 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 3.3 Grading - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0350 0.0194 0.2153 7.0000e- 004 0.0837 5.0000e- 004 0.0842 0.0222 4.6000e- 004 0.0227 69.3869 69.3869 1.5300e- 003 69.4252 Total 0.0350 0.0194 0.2153 7.0000e- 004 0.0837 5.0000e- 004 0.0842 0.0222 4.6000e- 004 0.0227 69.3869 69.3869 1.5300e- 003 69.4252 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 2.9690 0.0000 2.9690 1.3580 0.0000 1.3580 0.0000 0.0000 Off-Road 2.1759 23.5770 11.8634 0.0304 1.0197 1.0197 0.9501 0.9501 0.0000 2,933.528 2 2,933.528 2 0.7894 2,953.263 5 Total 2.1759 23.5770 11.8634 0.0304 2.9690 1.0197 3.9887 1.3580 0.9501 2.3081 0.0000 2,933.528 2 2,933.528 2 0.7894 2,953.263 5 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:39AMPage12of27 The Wave - Coral Mountain (Phase 2 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 3.3 Grading - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0350 0.0194 0.2153 7.0000e- 004 0.0837 5.0000e- 004 0.0842 0.0222 4.6000e- 004 0.0227 69.3869 69.3869 1.5300e- 003 69.4252 Total 0.0350 0.0194 0.2153 7.0000e- 004 0.0837 5.0000e- 004 0.0842 0.0222 4.6000e- 004 0.0227 69.3869 69.3869 1.5300e- 003 69.4252 Mitigated Construction Off-Site 3.4 Building Construction - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.5813 18.2762 8.8165 0.0245 0.7657 0.7657 0.7044 0.7044 2,368.720 3 2,368.720 3 0.7661 2,387.872 6 Total 1.5813 18.2762 8.8165 0.0245 0.7657 0.7657 0.7044 0.7044 2,368.720 3 2,368.720 3 0.7661 2,387.872 6 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:39AMPage13of27 The Wave - Coral Mountain (Phase 2 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 3.4 Building Construction - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0149 0.5683 0.1197 1.4500e- 003 0.0351 8.7000e- 004 0.0360 0.0101 8.3000e- 004 0.0109 153.4521 153.4521 0.0140 153.8031 Worker 0.0560 0.0311 0.3445 1.1100e- 003 0.1339 7.9000e- 004 0.1347 0.0355 7.3000e- 004 0.0362 111.0191 111.0191 2.4500e- 003 111.0804 Total 0.0709 0.5994 0.4642 2.5600e- 003 0.1690 1.6600e- 003 0.1706 0.0456 1.5600e- 003 0.0472 264.4712 264.4712 0.0165 264.8835 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.5813 18.2762 8.8165 0.0245 0.7657 0.7657 0.7044 0.7044 0.0000 2,368.720 3 2,368.720 3 0.7661 2,387.872 6 Total 1.5813 18.2762 8.8165 0.0245 0.7657 0.7657 0.7044 0.7044 0.0000 2,368.720 3 2,368.720 3 0.7661 2,387.872 6 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:39AMPage14of27 The Wave - Coral Mountain (Phase 2 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 3.4 Building Construction - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0149 0.5683 0.1197 1.4500e- 003 0.0351 8.7000e- 004 0.0360 0.0101 8.3000e- 004 0.0109 153.4521 153.4521 0.0140 153.8031 Worker 0.0560 0.0311 0.3445 1.1100e- 003 0.1339 7.9000e- 004 0.1347 0.0355 7.3000e- 004 0.0362 111.0191 111.0191 2.4500e- 003 111.0804 Total 0.0709 0.5994 0.4642 2.5600e- 003 0.1690 1.6600e- 003 0.1706 0.0456 1.5600e- 003 0.0472 264.4712 264.4712 0.0165 264.8835 Mitigated Construction Off-Site 3.4 Building Construction - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.4423 15.9554 8.5988 0.0244 0.6743 0.6743 0.6204 0.6204 2,367.192 2 2,367.192 2 0.7656 2,386.332 1 Total 1.4423 15.9554 8.5988 0.0244 0.6743 0.6743 0.6204 0.6204 2,367.192 2 2,367.192 2 0.7656 2,386.332 1 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:39AMPage15of27 The Wave - Coral Mountain (Phase 2 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 3.4 Building Construction - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0114 0.4368 0.1023 1.4100e- 003 0.0351 3.9000e- 004 0.0355 0.0101 3.7000e- 004 0.0105 149.3011 149.3011 0.0106 149.5667 Worker 0.0526 0.0280 0.3173 1.0700e- 003 0.1339 7.7000e- 004 0.1346 0.0355 7.1000e- 004 0.0362 106.8081 106.8081 2.2000e- 003 106.8632 Total 0.0640 0.4649 0.4196 2.4800e- 003 0.1690 1.1600e- 003 0.1701 0.0456 1.0800e- 003 0.0467 256.1091 256.1091 0.0128 256.4298 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.4423 15.9554 8.5988 0.0244 0.6743 0.6743 0.6204 0.6204 0.0000 2,367.192 2 2,367.192 2 0.7656 2,386.332 1 Total 1.4423 15.9554 8.5988 0.0244 0.6743 0.6743 0.6204 0.6204 0.0000 2,367.192 2 2,367.192 2 0.7656 2,386.332 1 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:39AMPage16of27 The Wave - Coral Mountain (Phase 2 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 3.4 Building Construction - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0114 0.4368 0.1023 1.4100e- 003 0.0351 3.9000e- 004 0.0355 0.0101 3.7000e- 004 0.0105 149.3011 149.3011 0.0106 149.5667 Worker 0.0526 0.0280 0.3173 1.0700e- 003 0.1339 7.7000e- 004 0.1346 0.0355 7.1000e- 004 0.0362 106.8081 106.8081 2.2000e- 003 106.8632 Total 0.0640 0.4649 0.4196 2.4800e- 003 0.1690 1.1600e- 003 0.1701 0.0456 1.0800e- 003 0.0467 256.1091 256.1091 0.0128 256.4298 Mitigated Construction Off-Site 3.5 Paving - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.0236 10.0759 8.2062 0.0180 0.4326 0.4326 0.4026 0.4026 1,667.545 9 1,667.545 9 0.4949 1,679.919 5 Paving 0.2148 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 1.2384 10.0759 8.2062 0.0180 0.4326 0.4326 0.4026 0.4026 1,667.545 9 1,667.545 9 0.4949 1,679.919 5 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:39AMPage17of27 The Wave - Coral Mountain (Phase 2 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 3.5 Paving - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0592 0.0315 0.3569 1.2100e- 003 0.1506 8.7000e- 004 0.1515 0.0400 8.0000e- 004 0.0408 120.1591 120.1591 2.4800e- 003 120.2211 Total 0.0592 0.0315 0.3569 1.2100e- 003 0.1506 8.7000e- 004 0.1515 0.0400 8.0000e- 004 0.0408 120.1591 120.1591 2.4800e- 003 120.2211 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.0236 10.0759 8.2062 0.0180 0.4326 0.4326 0.4026 0.4026 0.0000 1,667.545 9 1,667.545 9 0.4949 1,679.919 5 Paving 0.2148 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 1.2384 10.0759 8.2062 0.0180 0.4326 0.4326 0.4026 0.4026 0.0000 1,667.545 9 1,667.545 9 0.4949 1,679.919 5 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:39AMPage18of27 The Wave - Coral Mountain (Phase 2 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 3.5 Paving - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0592 0.0315 0.3569 1.2100e- 003 0.1506 8.7000e- 004 0.1515 0.0400 8.0000e- 004 0.0408 120.1591 120.1591 2.4800e- 003 120.2211 Total 0.0592 0.0315 0.3569 1.2100e- 003 0.1506 8.7000e- 004 0.1515 0.0400 8.0000e- 004 0.0408 120.1591 120.1591 2.4800e- 003 120.2211 Mitigated Construction Off-Site 3.6 Architectural Coating - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 23.6719 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.2556 1.7373 2.4148 3.9600e- 003 0.0944 0.0944 0.0944 0.0944 375.2641 375.2641 0.0225 375.8253 Total 23.9274 1.7373 2.4148 3.9600e- 003 0.0944 0.0944 0.0944 0.0944 375.2641 375.2641 0.0225 375.8253 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:39AMPage19of27 The Wave - Coral Mountain (Phase 2 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 3.6 Architectural Coating - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 9.8600e- 003 5.2500e- 003 0.0595 2.0000e- 004 0.0251 1.5000e- 004 0.0253 6.6600e- 003 1.3000e- 004 6.7900e- 003 20.0265 20.0265 4.1000e- 004 20.0368 Total 9.8600e- 003 5.2500e- 003 0.0595 2.0000e- 004 0.0251 1.5000e- 004 0.0253 6.6600e- 003 1.3000e- 004 6.7900e- 003 20.0265 20.0265 4.1000e- 004 20.0368 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 23.6719 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.2556 1.7373 2.4148 3.9600e- 003 0.0944 0.0944 0.0944 0.0944 0.0000 375.2641 375.2641 0.0225 375.8253 Total 23.9274 1.7373 2.4148 3.9600e- 003 0.0944 0.0944 0.0944 0.0944 0.0000 375.2641 375.2641 0.0225 375.8253 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:39AMPage20of27 The Wave - Coral Mountain (Phase 2 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile 3.6 Architectural Coating - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 9.8600e- 003 5.2500e- 003 0.0595 2.0000e- 004 0.0251 1.5000e- 004 0.0253 6.6600e- 003 1.3000e- 004 6.7900e- 003 20.0265 20.0265 4.1000e- 004 20.0368 Total 9.8600e- 003 5.2500e- 003 0.0595 2.0000e- 004 0.0251 1.5000e- 004 0.0253 6.6600e- 003 1.3000e- 004 6.7900e- 003 20.0265 20.0265 4.1000e- 004 20.0368 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:39AMPage21of27 The Wave - Coral Mountain (Phase 2 Construction - Unmitigated) - Riverside-Salton Sea County, Winter ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Mitigated 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Unmitigated 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 4.2 Trip Summary Information 4.3 Trip Type Information Average Daily Trip Rate Unmitigated Mitigated Land Use Weekday Saturday Sunday Annual VMT Annual VMT Other Asphalt Surfaces 0.00 0.00 0.00 Regional Shopping Center 0.00 0.00 0.00 Total 0.00 0.00 0.00 Miles Trip %Trip Purpose % Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C-W H-S or C-C H-O or C-NW Primary Diverted Pass-by Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 Regional Shopping Center 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 4.4 Fleet Mix Land Use LDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH Other Asphalt Surfaces 0.548600 0.036250 0.186898 0.112544 0.014284 0.004806 0.017604 0.070134 0.001409 0.001147 0.004508 0.000918 0.000898 Regional Shopping Center 0.548600 0.036250 0.186898 0.112544 0.014284 0.004806 0.017604 0.070134 0.001409 0.001147 0.004508 0.000918 0.000898 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:39AMPage22of27 The Wave - Coral Mountain (Phase 2 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 5.0 Energy Detail ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day NaturalGas Mitigated 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 NaturalGas Unmitigated 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 5.1 Mitigation Measures Energy Historical Energy Use: N CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:39AMPage23of27 The Wave - Coral Mountain (Phase 2 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 6.1 Mitigation Measures Area 6.0 Area Detail 5.2 Energy by Land Use - NaturalGas NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr lb/day lb/day Other Asphalt Surfaces 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Regional Shopping Center 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Unmitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr lb/day lb/day Other Asphalt Surfaces 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Regional Shopping Center 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:39AMPage24of27 The Wave - Coral Mountain (Phase 2 Construction - Unmitigated) - Riverside-Salton Sea County, Winter ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Mitigated 0.7037 2.0000e- 005 2.5900e- 003 0.0000 1.0000e- 005 1.0000e- 005 1.0000e- 005 1.0000e- 005 5.5600e- 003 5.5600e- 003 1.0000e- 005 5.9300e- 003 Unmitigated 0.7037 2.0000e- 005 2.5900e- 003 0.0000 1.0000e- 005 1.0000e- 005 1.0000e- 005 1.0000e- 005 5.5600e- 003 5.5600e- 003 1.0000e- 005 5.9300e- 003 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory lb/day lb/day Architectural Coating 0.1621 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 0.5413 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 2.4000e- 004 2.0000e- 005 2.5900e- 003 0.0000 1.0000e- 005 1.0000e- 005 1.0000e- 005 1.0000e- 005 5.5600e- 003 5.5600e- 003 1.0000e- 005 5.9300e- 003 Total 0.7037 2.0000e- 005 2.5900e- 003 0.0000 1.0000e- 005 1.0000e- 005 1.0000e- 005 1.0000e- 005 5.5600e- 003 5.5600e- 003 1.0000e- 005 5.9300e- 003 Unmitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:39AMPage25of27 The Wave - Coral Mountain (Phase 2 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 8.1 Mitigation Measures Waste 7.1 Mitigation Measures Water 7.0 Water Detail 8.0 Waste Detail 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory lb/day lb/day Architectural Coating 0.1621 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 0.5413 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 2.4000e- 004 2.0000e- 005 2.5900e- 003 0.0000 1.0000e- 005 1.0000e- 005 1.0000e- 005 1.0000e- 005 5.5600e- 003 5.5600e- 003 1.0000e- 005 5.9300e- 003 Total 0.7037 2.0000e- 005 2.5900e- 003 0.0000 1.0000e- 005 1.0000e- 005 1.0000e- 005 1.0000e- 005 5.5600e- 003 5.5600e- 003 1.0000e- 005 5.9300e- 003 Mitigated 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year Horse Power Load Factor Fuel Type 10.0 Stationary Equipment Fire Pumps and Emergency Generators CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:39AMPage26of27 The Wave - Coral Mountain (Phase 2 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 11.0 Vegetation Equipment Type Number Hours/Day Hours/Year Horse Power Load Factor Fuel Type Boilers Equipment Type Number Heat Input/Day Heat Input/Year Boiler Rating Fuel Type User Defined Equipment Equipment Type Number CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:39AMPage27of27 The Wave - Coral Mountain (Phase 2 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 1.1 Land Usage Land Uses Size Metric Lot Acreage Floor Surface Area Population Other Asphalt Surfaces 110.42 Acre 110.42 4,809,895.20 0 Single Family Housing 470.00 Dwelling Unit 152.60 846,000.00 1260 Regional Shopping Center 25.00 1000sqft 0.57 25,000.00 0 1.2 Other Project Characteristics Urbanization Climate Zone Urban 15 Wind Speed (m/s)Precipitation Freq (Days)2.4 28 1.3 User Entered Comments & Non-Default Data 1.0 Project Characteristics Utility Company Imperial Irrigation District 2026OperationalYear CO2 Intensity lb/MWhr) 1270.9 0.029CH4Intensity lb/MWhr) 0.006N2OIntensity lb/MWhr) The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) Riverside-Salton Sea County, Summer CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:55AMPage1of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Summer Project Characteristics - Land Use - Total Project Area is 263.59 acres. Construction Phase - Construction Schedule adjusted to meet the 2026 Opening Year. Off-road Equipment - Hours are based on an 8-hour workday. Off-road Equipment - Hours are based on an 8-hour workday. Off-road Equipment - Grading - For purposes of analysis, total acres graded per day is based on the equipment specific grading rates (CalEEMod Appendix A) and the equipment list. Architectural Coating - Rule 1113 Vehicle Trips - Construction Run Only. Woodstoves - Construction Run Only. Energy Use - Construction Run Only. Water And Wastewater - Construction Run Only. Solid Waste - Construction Run Only. Construction Off-road Equipment Mitigation - Rule 403 Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Table Name Column Name Default Value New Value tblArchitecturalCoating EF_Nonresidential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Interior 250.00 50.00 tblArchitecturalCoating EF_Parking 250.00 50.00 tblArchitecturalCoating EF_Residential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Residential_Interior 250.00 50.00 tblConstructionPhase NumDays 465.00 200.00 tblConstructionPhase NumDays 4,650.00 500.00 tblEnergyUse LightingElect 5.61 0.00 tblEnergyUse LightingElect 1,608.84 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:55AMPage2of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Summer tblEnergyUse NT24E 2.44 0.00 tblEnergyUse NT24E 6,155.97 0.00 tblEnergyUse NT24NG 0.30 0.00 tblEnergyUse NT24NG 6,030.00 0.00 tblEnergyUse T24E 4.58 0.00 tblEnergyUse T24E 951.67 0.00 tblEnergyUse T24NG 1.92 0.00 tblEnergyUse T24NG 24,566.15 0.00 tblFireplaces NumberGas 376.00 0.00 tblFireplaces NumberNoFireplace 47.00 0.00 tblFireplaces NumberWood 47.00 0.00 tblGrading AcresOfGrading 700.00 800.00 tblGrading AcresOfGrading 360.00 630.00 tblLandUse Population 1,344.00 1,260.00 tblOffRoadEquipment LoadFactor 0.43 0.43 tblOffRoadEquipment LoadFactor 0.43 0.43 tblOffRoadEquipment LoadFactor 0.43 0.43 tblOffRoadEquipment OffRoadEquipmentType Crawler Tractors tblOffRoadEquipment OffRoadEquipmentType Crawler Tractors tblOffRoadEquipment OffRoadEquipmentType Crawler Tractors tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 0.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 0.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 4.00 0.00 tblOffRoadEquipment UsageHours 6.00 8.00 tblOffRoadEquipment UsageHours 7.00 8.00 tblOffRoadEquipment UsageHours 7.00 8.00 tblSolidWaste SolidWasteGenerationRate 26.25 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:55AMPage3of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Summer tblSolidWaste SolidWasteGenerationRate 516.60 0.00 tblVehicleTrips CC_TL 4.20 0.00 tblVehicleTrips CC_TL 4.20 0.00 tblVehicleTrips CC_TTP 64.70 0.00 tblVehicleTrips CNW_TL 5.40 0.00 tblVehicleTrips CNW_TL 5.40 0.00 tblVehicleTrips CNW_TTP 19.00 0.00 tblVehicleTrips CW_TL 12.50 0.00 tblVehicleTrips CW_TL 12.50 0.00 tblVehicleTrips CW_TTP 16.30 0.00 tblVehicleTrips DV_TP 35.00 0.00 tblVehicleTrips DV_TP 11.00 0.00 tblVehicleTrips HO_TL 4.50 0.00 tblVehicleTrips HO_TTP 40.60 0.00 tblVehicleTrips HS_TL 3.50 0.00 tblVehicleTrips HS_TTP 19.20 0.00 tblVehicleTrips HW_TL 11.00 0.00 tblVehicleTrips HW_TTP 40.20 0.00 tblVehicleTrips PB_TP 11.00 0.00 tblVehicleTrips PB_TP 3.00 0.00 tblVehicleTrips PR_TP 54.00 0.00 tblVehicleTrips PR_TP 86.00 0.00 tblVehicleTrips ST_TR 49.97 0.00 tblVehicleTrips ST_TR 9.91 0.00 tblVehicleTrips SU_TR 25.24 0.00 tblVehicleTrips SU_TR 8.62 0.00 tblVehicleTrips WD_TR 42.70 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:55AMPage4of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 2.0 Emissions Summary 2.1 Overall Construction (Maximum Daily Emission) ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year lb/day lb/day 2023 3.8871 41.8531 18.7064 0.0582 21.9286 1.7564 23.6850 10.3714 1.6159 11.9873 0.0000 5,639.479 3 5,639.479 3 1.7835 0.0000 5,684.065 7 2024 10.7221 80.8407 77.3311 0.3783 22.6105 1.6995 23.7686 10.3714 1.5636 11.9350 0.0000 38,579.04 48 38,579.04 48 2.5419 0.0000 38,642.59 30 2025 31.8799 87.6817 99.5605 0.4287 26.4089 1.5203 27.9291 7.1011 1.4166 8.5178 0.0000 43,523.29 81 43,523.29 81 3.2714 0.0000 43,605.08 38 2026 31.4299 86.8595 95.4895 0.4208 26.4088 1.5158 27.9245 7.1011 1.4125 8.5135 0.0000 42,735.24 11 42,735.24 11 3.2103 0.0000 42,815.49 93 Maximum 31.8799 87.6817 99.5605 0.4287 26.4089 1.7564 27.9291 10.3714 1.6159 11.9873 0.0000 43,523.29 81 43,523.29 81 3.2714 0.0000 43,605.08 38 Unmitigated Construction tblVehicleTrips WD_TR 9.52 0.00 tblWater IndoorWaterUseRate 1,851,813.04 0.00 tblWater IndoorWaterUseRate 30,622,392.04 0.00 tblWater OutdoorWaterUseRate 1,134,982.18 0.00 tblWater OutdoorWaterUseRate 19,305,421.07 0.00 tblWoodstoves NumberCatalytic 23.50 0.00 tblWoodstoves NumberNoncatalytic 23.50 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:55AMPage5of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 2.1 Overall Construction (Maximum Daily Emission) ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year lb/day lb/day 2023 3.8871 41.8531 18.7064 0.0582 8.6440 1.7564 10.4004 4.0692 1.6159 5.6851 0.0000 5,639.479 3 5,639.479 3 1.7835 0.0000 5,684.065 7 2024 10.7221 80.8407 77.3311 0.3783 22.6105 1.6995 23.7686 6.0937 1.5636 7.1734 0.0000 38,579.04 48 38,579.04 48 2.5419 0.0000 38,642.59 30 2025 31.8799 87.6817 99.5605 0.4287 26.4089 1.5203 27.9291 7.1011 1.4166 8.5178 0.0000 43,523.29 81 43,523.29 81 3.2714 0.0000 43,605.08 38 2026 31.4299 86.8595 95.4895 0.4208 26.4088 1.5158 27.9245 7.1011 1.4125 8.5135 0.0000 42,735.24 10 42,735.24 10 3.2103 0.0000 42,815.49 93 Maximum 31.8799 87.6817 99.5605 0.4287 26.4089 1.7564 27.9291 7.1011 1.6159 8.5178 0.0000 43,523.29 81 43,523.29 81 3.2714 0.0000 43,605.08 38 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 0.00 0.00 0.00 0.00 13.65 0.00 12.86 30.28 0.00 27.02 0.00 0.00 0.00 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:55AMPage6of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 2.2 Overall Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Area 29.8339 0.4464 38.7527 2.0500e- 003 0.2150 0.2150 0.2150 0.2150 0.0000 69.8492 69.8492 0.0669 0.0000 71.5227 Energy 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mobile 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 29.8339 0.4464 38.7527 2.0500e- 003 0.0000 0.2150 0.2150 0.0000 0.2150 0.2150 0.0000 69.8492 69.8492 0.0669 0.0000 71.5227 Unmitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Area 29.8339 0.4464 38.7527 2.0500e- 003 0.2150 0.2150 0.2150 0.2150 0.0000 69.8492 69.8492 0.0669 0.0000 71.5227 Energy 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mobile 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 29.8339 0.4464 38.7527 2.0500e- 003 0.0000 0.2150 0.2150 0.0000 0.2150 0.2150 0.0000 69.8492 69.8492 0.0669 0.0000 71.5227 Mitigated Operational CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:55AMPage7of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 Site Preparation Site Preparation 7/9/2023 3/15/2024 5 180 2 Grading Grading 3/16/2024 12/20/2024 5 200 3 Building Construction Building Construction 12/21/2024 11/20/2026 5 500 4 Paving Paving 9/1/2025 12/4/2026 5 330 5 Architectural Coating Architectural Coating 9/1/2025 12/4/2026 5 330 OffRoad Equipment ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Residential Indoor: 1,713,150; Residential Outdoor: 571,050; Non-Residential Indoor: 37,500; Non-Residential Outdoor: 12,500; Striped Parking Area: 288,594 (Architectural Coating – sqft) Acres of Grading (Site Preparation Phase): 630 Acres of Grading (Grading Phase): 800 Acres of Paving: 110.42 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:55AMPage8of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Summer Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Site Preparation Rubber Tired Dozers 3 8.00 247 0.40 Site Preparation Tractors/Loaders/Backhoes 0 8.00 97 0.37 Grading Excavators 2 8.00 158 0.38 Grading Graders 1 8.00 187 0.41 Grading Rubber Tired Dozers 1 8.00 247 0.40 Grading Scrapers 2 8.00 367 0.48 Grading Tractors/Loaders/Backhoes 0 8.00 97 0.37 Building Construction Cranes 1 8.00 231 0.29 Building Construction Forklifts 3 8.00 89 0.20 Building Construction Generator Sets 1 8.00 84 0.74 Building Construction Tractors/Loaders/Backhoes 0 8.00 97 0.37 Building Construction Welders 1 8.00 46 0.45 Paving Pavers 2 8.00 130 0.42 Paving Paving Equipment 2 8.00 132 0.36 Paving Rollers 2 8.00 80 0.38 Architectural Coating Air Compressors 1 8.00 78 0.48 Site Preparation Crawler Tractors 4 8.00 212 0.43 Grading Crawler Tractors 2 8.00 212 0.43 Building Construction Crawler Tractors 3 8.00 212 0.43 Trips and VMT CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:55AMPage9of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 3.2 Site Preparation - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 21.7780 0.0000 21.7780 10.3315 0.0000 10.3315 0.0000 0.0000 Off-Road 3.8257 41.8226 18.2686 0.0568 1.7555 1.7555 1.6151 1.6151 5,505.624 6 5,505.624 6 1.7806 5,550.140 4 Total 3.8257 41.8226 18.2686 0.0568 21.7780 1.7555 23.5335 10.3315 1.6151 11.9465 5,505.624 6 5,505.624 6 1.7806 5,550.140 4 Unmitigated Construction On-Site 3.1 Mitigation Measures Construction Water Exposed Area Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Site Preparation 7 18.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Grading 8 20.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Building Construction 9 2,197.00 843.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Paving 6 15.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Architectural Coating 1 439.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:55AMPage10of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 3.2 Site Preparation - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0614 0.0305 0.4378 1.3400e- 003 0.1506 8.7000e- 004 0.1515 0.0400 8.0000e- 004 0.0408 133.8547 133.8547 2.8200e- 003 133.9253 Total 0.0614 0.0305 0.4378 1.3400e- 003 0.1506 8.7000e- 004 0.1515 0.0400 8.0000e- 004 0.0408 133.8547 133.8547 2.8200e- 003 133.9253 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 8.4934 0.0000 8.4934 4.0293 0.0000 4.0293 0.0000 0.0000 Off-Road 3.8257 41.8226 18.2686 0.0568 1.7555 1.7555 1.6151 1.6151 0.0000 5,505.624 6 5,505.624 6 1.7806 5,550.140 4 Total 3.8257 41.8226 18.2686 0.0568 8.4934 1.7555 10.2489 4.0293 1.6151 5.6443 0.0000 5,505.624 6 5,505.624 6 1.7806 5,550.140 4 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:55AMPage11of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 3.2 Site Preparation - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0614 0.0305 0.4378 1.3400e- 003 0.1506 8.7000e- 004 0.1515 0.0400 8.0000e- 004 0.0408 133.8547 133.8547 2.8200e- 003 133.9253 Total 0.0614 0.0305 0.4378 1.3400e- 003 0.1506 8.7000e- 004 0.1515 0.0400 8.0000e- 004 0.0408 133.8547 133.8547 2.8200e- 003 133.9253 Mitigated Construction Off-Site 3.2 Site Preparation - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 21.7780 0.0000 21.7780 10.3315 0.0000 10.3315 0.0000 0.0000 Off-Road 3.7768 40.3224 18.1788 0.0569 1.6987 1.6987 1.5628 1.5628 5,507.078 0 5,507.078 0 1.7811 5,551.605 5 Total 3.7768 40.3224 18.1788 0.0569 21.7780 1.6987 23.4767 10.3315 1.5628 11.8942 5,507.078 0 5,507.078 0 1.7811 5,551.605 5 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:55AMPage12of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 3.2 Site Preparation - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0578 0.0276 0.4102 1.2900e- 003 0.1506 8.6000e- 004 0.1515 0.0400 7.9000e- 004 0.0407 129.0763 129.0763 2.5700e- 003 129.1406 Total 0.0578 0.0276 0.4102 1.2900e- 003 0.1506 8.6000e- 004 0.1515 0.0400 7.9000e- 004 0.0407 129.0763 129.0763 2.5700e- 003 129.1406 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 8.4934 0.0000 8.4934 4.0293 0.0000 4.0293 0.0000 0.0000 Off-Road 3.7768 40.3224 18.1788 0.0569 1.6987 1.6987 1.5628 1.5628 0.0000 5,507.078 0 5,507.078 0 1.7811 5,551.605 5 Total 3.7768 40.3224 18.1788 0.0569 8.4934 1.6987 10.1921 4.0293 1.5628 5.5920 0.0000 5,507.078 0 5,507.078 0 1.7811 5,551.605 5 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:55AMPage13of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 3.2 Site Preparation - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0578 0.0276 0.4102 1.2900e- 003 0.1506 8.6000e- 004 0.1515 0.0400 7.9000e- 004 0.0407 129.0763 129.0763 2.5700e- 003 129.1406 Total 0.0578 0.0276 0.4102 1.2900e- 003 0.1506 8.6000e- 004 0.1515 0.0400 7.9000e- 004 0.0407 129.0763 129.0763 2.5700e- 003 129.1406 Mitigated Construction Off-Site 3.3 Grading - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 10.2641 0.0000 10.2641 3.7683 0.0000 3.7683 0.0000 0.0000 Off-Road 3.7761 38.9502 27.6444 0.0715 1.5701 1.5701 1.4445 1.4445 6,919.282 7 6,919.282 7 2.2378 6,975.228 6 Total 3.7761 38.9502 27.6444 0.0715 10.2641 1.5701 11.8342 3.7683 1.4445 5.2127 6,919.282 7 6,919.282 7 2.2378 6,975.228 6 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:55AMPage14of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 3.3 Grading - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0642 0.0307 0.4557 1.4400e- 003 0.1673 9.6000e- 004 0.1683 0.0444 8.8000e- 004 0.0453 143.4181 143.4181 2.8600e- 003 143.4896 Total 0.0642 0.0307 0.4557 1.4400e- 003 0.1673 9.6000e- 004 0.1683 0.0444 8.8000e- 004 0.0453 143.4181 143.4181 2.8600e- 003 143.4896 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 4.0030 0.0000 4.0030 1.4696 0.0000 1.4696 0.0000 0.0000 Off-Road 3.7761 38.9502 27.6444 0.0715 1.5701 1.5701 1.4445 1.4445 0.0000 6,919.282 7 6,919.282 7 2.2378 6,975.228 6 Total 3.7761 38.9502 27.6444 0.0715 4.0030 1.5701 5.5731 1.4696 1.4445 2.9141 0.0000 6,919.282 7 6,919.282 7 2.2378 6,975.228 6 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:55AMPage15of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 3.3 Grading - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0642 0.0307 0.4557 1.4400e- 003 0.1673 9.6000e- 004 0.1683 0.0444 8.8000e- 004 0.0453 143.4181 143.4181 2.8600e- 003 143.4896 Total 0.0642 0.0307 0.4557 1.4400e- 003 0.1673 9.6000e- 004 0.1683 0.0444 8.8000e- 004 0.0453 143.4181 143.4181 2.8600e- 003 143.4896 Mitigated Construction Off-Site 3.4 Building Construction - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 2.4039 24.2847 17.1094 0.0429 1.0085 1.0085 0.9404 0.9404 4,103.013 4 4,103.013 4 1.1048 4,130.632 9 Total 2.4039 24.2847 17.1094 0.0429 1.0085 1.0085 0.9404 0.9404 4,103.013 4 4,103.013 4 1.1048 4,130.632 9 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:55AMPage16of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 3.4 Building Construction - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.2628 53.1819 10.1608 0.1773 4.2289 0.0445 4.2734 1.2180 0.0425 1.2606 18,721.55 44 18,721.55 44 1.1231 18,749.63 07 Worker 7.0554 3.3741 50.0610 0.1581 18.3817 0.1051 18.4868 4.8756 0.0968 4.9724 15,754.47 70 15,754.47 70 0.3141 15,762.32 93 Total 8.3182 56.5560 60.2217 0.3354 22.6105 0.1496 22.7602 6.0937 0.1393 6.2329 34,476.03 15 34,476.03 15 1.4371 34,511.96 00 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 2.4039 24.2847 17.1094 0.0429 1.0085 1.0085 0.9404 0.9404 0.0000 4,103.013 4 4,103.013 4 1.1048 4,130.632 9 Total 2.4039 24.2847 17.1094 0.0429 1.0085 1.0085 0.9404 0.9404 0.0000 4,103.013 4 4,103.013 4 1.1048 4,130.632 9 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:55AMPage17of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 3.4 Building Construction - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.2628 53.1819 10.1608 0.1773 4.2289 0.0445 4.2734 1.2180 0.0425 1.2606 18,721.55 44 18,721.55 44 1.1231 18,749.63 07 Worker 7.0554 3.3741 50.0610 0.1581 18.3817 0.1051 18.4868 4.8756 0.0968 4.9724 15,754.47 70 15,754.47 70 0.3141 15,762.32 93 Total 8.3182 56.5560 60.2217 0.3354 22.6105 0.1496 22.7602 6.0937 0.1393 6.2329 34,476.03 15 34,476.03 15 1.4371 34,511.96 00 Mitigated Construction Off-Site 3.4 Building Construction - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 2.1777 21.2010 16.7425 0.0429 0.8645 0.8645 0.8062 0.8062 4,101.888 0 4,101.888 0 1.1008 4,129.407 2 Total 2.1777 21.2010 16.7425 0.0429 0.8645 0.8645 0.8062 0.8062 4,101.888 0 4,101.888 0 1.1008 4,129.407 2 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:55AMPage18of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 3.4 Building Construction - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.2290 52.6666 9.8002 0.1760 4.2287 0.0439 4.2727 1.2180 0.0420 1.2600 18,590.89 09 18,590.89 09 1.0931 18,618.21 78 Worker 6.6585 3.0707 46.4325 0.1517 18.3817 0.1033 18.4849 4.8756 0.0950 4.9707 15,123.34 08 15,123.34 08 0.2846 15,130.45 58 Total 7.8875 55.7372 56.2327 0.3277 22.6104 0.1472 22.7576 6.0936 0.1370 6.2306 33,714.23 17 33,714.23 17 1.3777 33,748.67 36 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 2.1777 21.2010 16.7425 0.0429 0.8645 0.8645 0.8062 0.8062 0.0000 4,101.888 0 4,101.888 0 1.1008 4,129.407 2 Total 2.1777 21.2010 16.7425 0.0429 0.8645 0.8645 0.8062 0.8062 0.0000 4,101.888 0 4,101.888 0 1.1008 4,129.407 2 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:55AMPage19of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 3.4 Building Construction - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.2290 52.6666 9.8002 0.1760 4.2287 0.0439 4.2727 1.2180 0.0420 1.2600 18,590.89 09 18,590.89 09 1.0931 18,618.21 78 Worker 6.6585 3.0707 46.4325 0.1517 18.3817 0.1033 18.4849 4.8756 0.0950 4.9707 15,123.34 08 15,123.34 08 0.2846 15,130.45 58 Total 7.8875 55.7372 56.2327 0.3277 22.6104 0.1472 22.7576 6.0936 0.1370 6.2306 33,714.23 17 33,714.23 17 1.3777 33,748.67 36 Mitigated Construction Off-Site 3.4 Building Construction - 2026 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 2.1777 21.2010 16.7425 0.0429 0.8645 0.8645 0.8062 0.8062 4,101.888 0 4,101.888 0 1.1008 4,129.407 2 Total 2.1777 21.2010 16.7425 0.0429 0.8645 0.8645 0.8062 0.8062 4,101.888 0 4,101.888 0 1.1008 4,129.407 2 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:55AMPage20of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 3.4 Building Construction - 2026 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.1997 52.1560 9.5079 0.1748 4.2286 0.0433 4.2719 1.2179 0.0414 1.2593 18,467.72 99 18,467.72 99 1.0625 18,494.29 23 Worker 6.3098 2.8124 43.3009 0.1461 18.3817 0.1001 18.4817 4.8756 0.0921 4.9677 14,572.31 23 14,572.31 23 0.2593 14,578.79 50 Total 7.5095 54.9684 52.8088 0.3210 22.6103 0.1434 22.7537 6.0936 0.1335 6.2270 33,040.04 22 33,040.04 22 1.3218 33,073.08 72 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 2.1777 21.2010 16.7425 0.0429 0.8645 0.8645 0.8062 0.8062 0.0000 4,101.888 0 4,101.888 0 1.1008 4,129.407 2 Total 2.1777 21.2010 16.7425 0.0429 0.8645 0.8645 0.8062 0.8062 0.0000 4,101.888 0 4,101.888 0 1.1008 4,129.407 2 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:55AMPage21of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 3.4 Building Construction - 2026 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.1997 52.1560 9.5079 0.1748 4.2286 0.0433 4.2719 1.2179 0.0414 1.2593 18,467.72 99 18,467.72 99 1.0625 18,494.29 23 Worker 6.3098 2.8124 43.3009 0.1461 18.3817 0.1001 18.4817 4.8756 0.0921 4.9677 14,572.31 23 14,572.31 23 0.2593 14,578.79 50 Total 7.5095 54.9684 52.8088 0.3210 22.6103 0.1434 22.7537 6.0936 0.1335 6.2270 33,040.04 22 33,040.04 22 1.3218 33,073.08 72 Mitigated Construction Off-Site 3.5 Paving - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.9152 8.5816 14.5780 0.0228 0.4185 0.4185 0.3850 0.3850 2,206.745 2 2,206.745 2 0.7137 2,224.587 8 Paving 0.8767 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 1.7918 8.5816 14.5780 0.0228 0.4185 0.4185 0.3850 0.3850 2,206.745 2 2,206.745 2 0.7137 2,224.587 8 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:55AMPage22of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 3.5 Paving - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0455 0.0210 0.3170 1.0400e- 003 0.1255 7.1000e- 004 0.1262 0.0333 6.5000e- 004 0.0339 103.2545 103.2545 1.9400e- 003 103.3031 Total 0.0455 0.0210 0.3170 1.0400e- 003 0.1255 7.1000e- 004 0.1262 0.0333 6.5000e- 004 0.0339 103.2545 103.2545 1.9400e- 003 103.3031 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.9152 8.5816 14.5780 0.0228 0.4185 0.4185 0.3850 0.3850 0.0000 2,206.745 2 2,206.745 2 0.7137 2,224.587 8 Paving 0.8767 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 1.7918 8.5816 14.5780 0.0228 0.4185 0.4185 0.3850 0.3850 0.0000 2,206.745 2 2,206.745 2 0.7137 2,224.587 8 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:55AMPage23of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 3.5 Paving - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0455 0.0210 0.3170 1.0400e- 003 0.1255 7.1000e- 004 0.1262 0.0333 6.5000e- 004 0.0339 103.2545 103.2545 1.9400e- 003 103.3031 Total 0.0455 0.0210 0.3170 1.0400e- 003 0.1255 7.1000e- 004 0.1262 0.0333 6.5000e- 004 0.0339 103.2545 103.2545 1.9400e- 003 103.3031 Mitigated Construction Off-Site 3.5 Paving - 2026 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.9152 8.5816 14.5780 0.0228 0.4185 0.4185 0.3850 0.3850 2,206.745 2 2,206.745 2 0.7137 2,224.587 8 Paving 0.8767 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 1.7918 8.5816 14.5780 0.0228 0.4185 0.4185 0.3850 0.3850 2,206.745 2 2,206.745 2 0.7137 2,224.587 8 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:55AMPage24of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 3.5 Paving - 2026 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0431 0.0192 0.2956 1.0000e- 003 0.1255 6.8000e- 004 0.1262 0.0333 6.3000e- 004 0.0339 99.4924 99.4924 1.7700e- 003 99.5366 Total 0.0431 0.0192 0.2956 1.0000e- 003 0.1255 6.8000e- 004 0.1262 0.0333 6.3000e- 004 0.0339 99.4924 99.4924 1.7700e- 003 99.5366 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.9152 8.5816 14.5780 0.0228 0.4185 0.4185 0.3850 0.3850 0.0000 2,206.745 2 2,206.745 2 0.7137 2,224.587 8 Paving 0.8767 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 1.7918 8.5816 14.5780 0.0228 0.4185 0.4185 0.3850 0.3850 0.0000 2,206.745 2 2,206.745 2 0.7137 2,224.587 8 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:55AMPage25of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 3.5 Paving - 2026 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0431 0.0192 0.2956 1.0000e- 003 0.1255 6.8000e- 004 0.1262 0.0333 6.3000e- 004 0.0339 99.4924 99.4924 1.7700e- 003 99.5366 Total 0.0431 0.0192 0.2956 1.0000e- 003 0.1255 6.8000e- 004 0.1262 0.0333 6.3000e- 004 0.0339 99.4924 99.4924 1.7700e- 003 99.5366 Mitigated Construction Off-Site 3.6 Architectural Coating - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 18.4192 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.2278 1.5273 2.4122 3.9600e- 003 0.0687 0.0687 0.0687 0.0687 375.2641 375.2641 0.0205 375.7758 Total 18.6470 1.5273 2.4122 3.9600e- 003 0.0687 0.0687 0.0687 0.0687 375.2641 375.2641 0.0205 375.7758 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:55AMPage26of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 3.6 Architectural Coating - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.3305 0.6136 9.2781 0.0303 3.6730 0.0206 3.6936 0.9742 0.0190 0.9932 3,021.914 7 3,021.914 7 0.0569 3,023.336 4 Total 1.3305 0.6136 9.2781 0.0303 3.6730 0.0206 3.6936 0.9742 0.0190 0.9932 3,021.914 7 3,021.914 7 0.0569 3,023.336 4 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 18.4192 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.2278 1.5273 2.4122 3.9600e- 003 0.0687 0.0687 0.0687 0.0687 0.0000 375.2641 375.2641 0.0205 375.7758 Total 18.6470 1.5273 2.4122 3.9600e- 003 0.0687 0.0687 0.0687 0.0687 0.0000 375.2641 375.2641 0.0205 375.7758 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:55AMPage27of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 3.6 Architectural Coating - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.3305 0.6136 9.2781 0.0303 3.6730 0.0206 3.6936 0.9742 0.0190 0.9932 3,021.914 7 3,021.914 7 0.0569 3,023.336 4 Total 1.3305 0.6136 9.2781 0.0303 3.6730 0.0206 3.6936 0.9742 0.0190 0.9932 3,021.914 7 3,021.914 7 0.0569 3,023.336 4 Mitigated Construction Off-Site 3.6 Architectural Coating - 2026 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 18.4192 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.2278 1.5273 2.4122 3.9600e- 003 0.0687 0.0687 0.0687 0.0687 375.2641 375.2641 0.0205 375.7758 Total 18.6470 1.5273 2.4122 3.9600e- 003 0.0687 0.0687 0.0687 0.0687 375.2641 375.2641 0.0205 375.7758 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:55AMPage28of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 3.6 Architectural Coating - 2026 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.2608 0.5620 8.6523 0.0292 3.6730 0.0200 3.6930 0.9742 0.0184 0.9926 2,911.809 3 2,911.809 3 0.0518 2,913.104 7 Total 1.2608 0.5620 8.6523 0.0292 3.6730 0.0200 3.6930 0.9742 0.0184 0.9926 2,911.809 3 2,911.809 3 0.0518 2,913.104 7 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 18.4192 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.2278 1.5273 2.4122 3.9600e- 003 0.0687 0.0687 0.0687 0.0687 0.0000 375.2641 375.2641 0.0205 375.7758 Total 18.6470 1.5273 2.4122 3.9600e- 003 0.0687 0.0687 0.0687 0.0687 0.0000 375.2641 375.2641 0.0205 375.7758 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:55AMPage29of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile 3.6 Architectural Coating - 2026 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.2608 0.5620 8.6523 0.0292 3.6730 0.0200 3.6930 0.9742 0.0184 0.9926 2,911.809 3 2,911.809 3 0.0518 2,913.104 7 Total 1.2608 0.5620 8.6523 0.0292 3.6730 0.0200 3.6930 0.9742 0.0184 0.9926 2,911.809 3 2,911.809 3 0.0518 2,913.104 7 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:55AMPage30of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Summer ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Mitigated 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Unmitigated 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 4.2 Trip Summary Information 4.3 Trip Type Information Average Daily Trip Rate Unmitigated Mitigated Land Use Weekday Saturday Sunday Annual VMT Annual VMT Other Asphalt Surfaces 0.00 0.00 0.00 Regional Shopping Center 0.00 0.00 0.00 Single Family Housing 0.00 0.00 0.00 Total 0.00 0.00 0.00 Miles Trip %Trip Purpose % Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C-W H-S or C-C H-O or C-NW Primary Diverted Pass-by Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 Regional Shopping Center 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 Single Family Housing 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 4.4 Fleet Mix CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:55AMPage31of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 5.0 Energy Detail ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day NaturalGas Mitigated 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 NaturalGas Unmitigated 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 5.1 Mitigation Measures Energy Land Use LDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH Other Asphalt Surfaces 0.556393 0.035040 0.189382 0.106465 0.012088 0.004430 0.017405 0.070208 0.001420 0.001115 0.004429 0.000881 0.000745 Regional Shopping Center 0.556393 0.035040 0.189382 0.106465 0.012088 0.004430 0.017405 0.070208 0.001420 0.001115 0.004429 0.000881 0.000745 Single Family Housing 0.556393 0.035040 0.189382 0.106465 0.012088 0.004430 0.017405 0.070208 0.001420 0.001115 0.004429 0.000881 0.000745 Historical Energy Use: N CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:55AMPage32of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 6.0 Area Detail 5.2 Energy by Land Use - NaturalGas NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr lb/day lb/day Other Asphalt Surfaces 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Regional Shopping Center 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Single Family Housing 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Unmitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr lb/day lb/day Other Asphalt Surfaces 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Regional Shopping Center 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Single Family Housing 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:55AMPage33of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 6.1 Mitigation Measures Area 6.0 Area Detail ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Mitigated 29.8339 0.4464 38.7527 2.0500e- 003 0.2150 0.2150 0.2150 0.2150 0.0000 69.8492 69.8492 0.0669 0.0000 71.5227 Unmitigated 29.8339 0.4464 38.7527 2.0500e- 003 0.2150 0.2150 0.2150 0.2150 0.0000 69.8492 69.8492 0.0669 0.0000 71.5227 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:55AMPage34of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory lb/day lb/day Architectural Coating 8.3265 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 20.3431 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hearth 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 1.1644 0.4464 38.7527 2.0500e- 003 0.2150 0.2150 0.2150 0.2150 69.8492 69.8492 0.0669 71.5227 Total 29.8339 0.4464 38.7527 2.0500e- 003 0.2150 0.2150 0.2150 0.2150 0.0000 69.8492 69.8492 0.0669 0.0000 71.5227 Unmitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:55AMPage35of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 8.1 Mitigation Measures Waste 7.1 Mitigation Measures Water 7.0 Water Detail 8.0 Waste Detail 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory lb/day lb/day Architectural Coating 8.3265 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 20.3431 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hearth 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 1.1644 0.4464 38.7527 2.0500e- 003 0.2150 0.2150 0.2150 0.2150 69.8492 69.8492 0.0669 71.5227 Total 29.8339 0.4464 38.7527 2.0500e- 003 0.2150 0.2150 0.2150 0.2150 0.0000 69.8492 69.8492 0.0669 0.0000 71.5227 Mitigated 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year Horse Power Load Factor Fuel Type 10.0 Stationary Equipment CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:55AMPage36of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 11.0 Vegetation Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power Load Factor Fuel Type Boilers Equipment Type Number Heat Input/Day Heat Input/Year Boiler Rating Fuel Type User Defined Equipment Equipment Type Number CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:55AMPage37of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Summer 1.1 Land Usage Land Uses Size Metric Lot Acreage Floor Surface Area Population Other Asphalt Surfaces 110.42 Acre 110.42 4,809,895.20 0 Single Family Housing 470.00 Dwelling Unit 152.60 846,000.00 1260 Regional Shopping Center 25.00 1000sqft 0.57 25,000.00 0 1.2 Other Project Characteristics Urbanization Climate Zone Urban 15 Wind Speed (m/s)Precipitation Freq (Days)2.4 28 1.3 User Entered Comments & Non-Default Data 1.0 Project Characteristics Utility Company Imperial Irrigation District 2026OperationalYear CO2 Intensity lb/MWhr) 1270.9 0.029CH4Intensity lb/MWhr) 0.006N2OIntensity lb/MWhr) The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) Riverside-Salton Sea County, Winter CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:53AMPage1of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Winter Project Characteristics - Land Use - Total Project Area is 263.59 acres. Construction Phase - Construction Schedule adjusted to meet the 2026 Opening Year. Off-road Equipment - Hours are based on an 8-hour workday. Off-road Equipment - Hours are based on an 8-hour workday. Off-road Equipment - Grading - For purposes of analysis, total acres graded per day is based on the equipment specific grading rates (CalEEMod Appendix A) and the equipment list. Architectural Coating - Rule 1113 Vehicle Trips - Construction Run Only. Woodstoves - Construction Run Only. Energy Use - Construction Run Only. Water And Wastewater - Construction Run Only. Solid Waste - Construction Run Only. Construction Off-road Equipment Mitigation - Rule 403 Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Table Name Column Name Default Value New Value tblArchitecturalCoating EF_Nonresidential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Interior 250.00 50.00 tblArchitecturalCoating EF_Parking 250.00 50.00 tblArchitecturalCoating EF_Residential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Residential_Interior 250.00 50.00 tblConstructionPhase NumDays 465.00 200.00 tblConstructionPhase NumDays 4,650.00 500.00 tblEnergyUse LightingElect 5.61 0.00 tblEnergyUse LightingElect 1,608.84 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:53AMPage2of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Winter tblEnergyUse NT24E 2.44 0.00 tblEnergyUse NT24E 6,155.97 0.00 tblEnergyUse NT24NG 0.30 0.00 tblEnergyUse NT24NG 6,030.00 0.00 tblEnergyUse T24E 4.58 0.00 tblEnergyUse T24E 951.67 0.00 tblEnergyUse T24NG 1.92 0.00 tblEnergyUse T24NG 24,566.15 0.00 tblFireplaces NumberGas 376.00 0.00 tblFireplaces NumberNoFireplace 47.00 0.00 tblFireplaces NumberWood 47.00 0.00 tblGrading AcresOfGrading 700.00 800.00 tblGrading AcresOfGrading 360.00 630.00 tblLandUse Population 1,344.00 1,260.00 tblOffRoadEquipment LoadFactor 0.43 0.43 tblOffRoadEquipment LoadFactor 0.43 0.43 tblOffRoadEquipment LoadFactor 0.43 0.43 tblOffRoadEquipment OffRoadEquipmentType Crawler Tractors tblOffRoadEquipment OffRoadEquipmentType Crawler Tractors tblOffRoadEquipment OffRoadEquipmentType Crawler Tractors tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 0.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 0.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 4.00 0.00 tblOffRoadEquipment UsageHours 6.00 8.00 tblOffRoadEquipment UsageHours 7.00 8.00 tblOffRoadEquipment UsageHours 7.00 8.00 tblSolidWaste SolidWasteGenerationRate 26.25 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:53AMPage3of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Winter tblSolidWaste SolidWasteGenerationRate 516.60 0.00 tblVehicleTrips CC_TL 4.20 0.00 tblVehicleTrips CC_TL 4.20 0.00 tblVehicleTrips CC_TTP 64.70 0.00 tblVehicleTrips CNW_TL 5.40 0.00 tblVehicleTrips CNW_TL 5.40 0.00 tblVehicleTrips CNW_TTP 19.00 0.00 tblVehicleTrips CW_TL 12.50 0.00 tblVehicleTrips CW_TL 12.50 0.00 tblVehicleTrips CW_TTP 16.30 0.00 tblVehicleTrips DV_TP 35.00 0.00 tblVehicleTrips DV_TP 11.00 0.00 tblVehicleTrips HO_TL 4.50 0.00 tblVehicleTrips HO_TTP 40.60 0.00 tblVehicleTrips HS_TL 3.50 0.00 tblVehicleTrips HS_TTP 19.20 0.00 tblVehicleTrips HW_TL 11.00 0.00 tblVehicleTrips HW_TTP 40.20 0.00 tblVehicleTrips PB_TP 11.00 0.00 tblVehicleTrips PB_TP 3.00 0.00 tblVehicleTrips PR_TP 54.00 0.00 tblVehicleTrips PR_TP 86.00 0.00 tblVehicleTrips ST_TR 49.97 0.00 tblVehicleTrips ST_TR 9.91 0.00 tblVehicleTrips SU_TR 25.24 0.00 tblVehicleTrips SU_TR 8.62 0.00 tblVehicleTrips WD_TR 42.70 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:53AMPage4of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 2.0 Emissions Summary 2.1 Overall Construction (Maximum Daily Emission) ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year lb/day lb/day 2023 3.8849 41.8541 18.6256 0.0581 21.9286 1.7564 23.6850 10.3714 1.6159 11.9873 0.0000 5,625.783 7 5,625.783 7 1.7831 0.0000 5,670.361 5 2024 10.5623 80.1070 69.7208 0.3543 22.6105 1.6995 23.7703 10.3714 1.5636 11.9350 0.0000 36,148.36 53 36,148.36 53 2.6307 0.0000 36,214.13 20 2025 31.7051 86.9551 90.7585 0.4023 26.4089 1.5218 27.9307 7.1011 1.4181 8.5192 0.0000 40,848.95 07 40,848.95 07 3.3531 0.0000 40,932.77 87 2026 31.2879 86.1193 87.3162 0.3952 26.4088 1.5172 27.9259 7.1011 1.4138 8.5149 0.0000 40,139.51 90 40,139.51 90 3.2919 0.0000 40,221.81 57 Maximum 31.7051 86.9551 90.7585 0.4023 26.4089 1.7564 27.9307 10.3714 1.6159 11.9873 0.0000 40,848.95 07 40,848.95 07 3.3531 0.0000 40,932.77 87 Unmitigated Construction tblVehicleTrips WD_TR 9.52 0.00 tblWater IndoorWaterUseRate 1,851,813.04 0.00 tblWater IndoorWaterUseRate 30,622,392.04 0.00 tblWater OutdoorWaterUseRate 1,134,982.18 0.00 tblWater OutdoorWaterUseRate 19,305,421.07 0.00 tblWoodstoves NumberCatalytic 23.50 0.00 tblWoodstoves NumberNoncatalytic 23.50 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:53AMPage5of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 2.1 Overall Construction (Maximum Daily Emission) ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year lb/day lb/day 2023 3.8849 41.8541 18.6256 0.0581 8.6440 1.7564 10.4004 4.0692 1.6159 5.6851 0.0000 5,625.783 7 5,625.783 7 1.7831 0.0000 5,670.361 5 2024 10.5623 80.1070 69.7208 0.3543 22.6105 1.6995 23.7703 6.0937 1.5636 7.1750 0.0000 36,148.36 53 36,148.36 53 2.6307 0.0000 36,214.13 20 2025 31.7051 86.9551 90.7585 0.4023 26.4089 1.5218 27.9307 7.1011 1.4181 8.5192 0.0000 40,848.95 07 40,848.95 07 3.3531 0.0000 40,932.77 87 2026 31.2879 86.1193 87.3162 0.3952 26.4088 1.5172 27.9259 7.1011 1.4138 8.5149 0.0000 40,139.51 90 40,139.51 90 3.2919 0.0000 40,221.81 57 Maximum 31.7051 86.9551 90.7585 0.4023 26.4089 1.7564 27.9307 7.1011 1.6159 8.5192 0.0000 40,848.95 07 40,848.95 07 3.3531 0.0000 40,932.77 87 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 0.00 0.00 0.00 0.00 13.65 0.00 12.86 30.28 0.00 27.01 0.00 0.00 0.00 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:53AMPage6of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 2.2 Overall Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Area 29.8339 0.4464 38.7527 2.0500e- 003 0.2150 0.2150 0.2150 0.2150 0.0000 69.8492 69.8492 0.0669 0.0000 71.5227 Energy 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mobile 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 29.8339 0.4464 38.7527 2.0500e- 003 0.0000 0.2150 0.2150 0.0000 0.2150 0.2150 0.0000 69.8492 69.8492 0.0669 0.0000 71.5227 Unmitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Area 29.8339 0.4464 38.7527 2.0500e- 003 0.2150 0.2150 0.2150 0.2150 0.0000 69.8492 69.8492 0.0669 0.0000 71.5227 Energy 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mobile 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 29.8339 0.4464 38.7527 2.0500e- 003 0.0000 0.2150 0.2150 0.0000 0.2150 0.2150 0.0000 69.8492 69.8492 0.0669 0.0000 71.5227 Mitigated Operational CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:53AMPage7of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 Site Preparation Site Preparation 7/9/2023 3/15/2024 5 180 2 Grading Grading 3/16/2024 12/20/2024 5 200 3 Building Construction Building Construction 12/21/2024 11/20/2026 5 500 4 Paving Paving 9/1/2025 12/4/2026 5 330 5 Architectural Coating Architectural Coating 9/1/2025 12/4/2026 5 330 OffRoad Equipment ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Residential Indoor: 1,713,150; Residential Outdoor: 571,050; Non-Residential Indoor: 37,500; Non-Residential Outdoor: 12,500; Striped Parking Area: 288,594 (Architectural Coating – sqft) Acres of Grading (Site Preparation Phase): 630 Acres of Grading (Grading Phase): 800 Acres of Paving: 110.42 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:53AMPage8of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Winter Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Site Preparation Rubber Tired Dozers 3 8.00 247 0.40 Site Preparation Tractors/Loaders/Backhoes 0 8.00 97 0.37 Grading Excavators 2 8.00 158 0.38 Grading Graders 1 8.00 187 0.41 Grading Rubber Tired Dozers 1 8.00 247 0.40 Grading Scrapers 2 8.00 367 0.48 Grading Tractors/Loaders/Backhoes 0 8.00 97 0.37 Building Construction Cranes 1 8.00 231 0.29 Building Construction Forklifts 3 8.00 89 0.20 Building Construction Generator Sets 1 8.00 84 0.74 Building Construction Tractors/Loaders/Backhoes 0 8.00 97 0.37 Building Construction Welders 1 8.00 46 0.45 Paving Pavers 2 8.00 130 0.42 Paving Paving Equipment 2 8.00 132 0.36 Paving Rollers 2 8.00 80 0.38 Architectural Coating Air Compressors 1 8.00 78 0.48 Site Preparation Crawler Tractors 4 8.00 212 0.43 Grading Crawler Tractors 2 8.00 212 0.43 Building Construction Crawler Tractors 3 8.00 212 0.43 Trips and VMT CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:53AMPage9of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 3.2 Site Preparation - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 21.7780 0.0000 21.7780 10.3315 0.0000 10.3315 0.0000 0.0000 Off-Road 3.8257 41.8226 18.2686 0.0568 1.7555 1.7555 1.6151 1.6151 5,505.624 6 5,505.624 6 1.7806 5,550.140 4 Total 3.8257 41.8226 18.2686 0.0568 21.7780 1.7555 23.5335 10.3315 1.6151 11.9465 5,505.624 6 5,505.624 6 1.7806 5,550.140 4 Unmitigated Construction On-Site 3.1 Mitigation Measures Construction Water Exposed Area Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Site Preparation 7 18.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Grading 8 20.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Building Construction 9 2,197.00 843.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Paving 6 15.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Architectural Coating 1 439.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:53AMPage10of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 3.2 Site Preparation - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0592 0.0315 0.3569 1.2100e- 003 0.1506 8.7000e- 004 0.1515 0.0400 8.0000e- 004 0.0408 120.1591 120.1591 2.4800e- 003 120.2211 Total 0.0592 0.0315 0.3569 1.2100e- 003 0.1506 8.7000e- 004 0.1515 0.0400 8.0000e- 004 0.0408 120.1591 120.1591 2.4800e- 003 120.2211 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 8.4934 0.0000 8.4934 4.0293 0.0000 4.0293 0.0000 0.0000 Off-Road 3.8257 41.8226 18.2686 0.0568 1.7555 1.7555 1.6151 1.6151 0.0000 5,505.624 6 5,505.624 6 1.7806 5,550.140 4 Total 3.8257 41.8226 18.2686 0.0568 8.4934 1.7555 10.2489 4.0293 1.6151 5.6443 0.0000 5,505.624 6 5,505.624 6 1.7806 5,550.140 4 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:53AMPage11of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 3.2 Site Preparation - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0592 0.0315 0.3569 1.2100e- 003 0.1506 8.7000e- 004 0.1515 0.0400 8.0000e- 004 0.0408 120.1591 120.1591 2.4800e- 003 120.2211 Total 0.0592 0.0315 0.3569 1.2100e- 003 0.1506 8.7000e- 004 0.1515 0.0400 8.0000e- 004 0.0408 120.1591 120.1591 2.4800e- 003 120.2211 Mitigated Construction Off-Site 3.2 Site Preparation - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 21.7780 0.0000 21.7780 10.3315 0.0000 10.3315 0.0000 0.0000 Off-Road 3.7768 40.3224 18.1788 0.0569 1.6987 1.6987 1.5628 1.5628 5,507.078 0 5,507.078 0 1.7811 5,551.605 5 Total 3.7768 40.3224 18.1788 0.0569 21.7780 1.6987 23.4767 10.3315 1.5628 11.8942 5,507.078 0 5,507.078 0 1.7811 5,551.605 5 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:53AMPage12of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 3.2 Site Preparation - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0558 0.0286 0.3336 1.1600e- 003 0.1506 8.6000e- 004 0.1515 0.0400 7.9000e- 004 0.0407 115.8519 115.8519 2.2600e- 003 115.9085 Total 0.0558 0.0286 0.3336 1.1600e- 003 0.1506 8.6000e- 004 0.1515 0.0400 7.9000e- 004 0.0407 115.8519 115.8519 2.2600e- 003 115.9085 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 8.4934 0.0000 8.4934 4.0293 0.0000 4.0293 0.0000 0.0000 Off-Road 3.7768 40.3224 18.1788 0.0569 1.6987 1.6987 1.5628 1.5628 0.0000 5,507.078 0 5,507.078 0 1.7811 5,551.605 5 Total 3.7768 40.3224 18.1788 0.0569 8.4934 1.6987 10.1921 4.0293 1.5628 5.5920 0.0000 5,507.078 0 5,507.078 0 1.7811 5,551.605 5 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:53AMPage13of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 3.2 Site Preparation - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0558 0.0286 0.3336 1.1600e- 003 0.1506 8.6000e- 004 0.1515 0.0400 7.9000e- 004 0.0407 115.8519 115.8519 2.2600e- 003 115.9085 Total 0.0558 0.0286 0.3336 1.1600e- 003 0.1506 8.6000e- 004 0.1515 0.0400 7.9000e- 004 0.0407 115.8519 115.8519 2.2600e- 003 115.9085 Mitigated Construction Off-Site 3.3 Grading - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 10.2641 0.0000 10.2641 3.7683 0.0000 3.7683 0.0000 0.0000 Off-Road 3.7761 38.9502 27.6444 0.0715 1.5701 1.5701 1.4445 1.4445 6,919.282 7 6,919.282 7 2.2378 6,975.228 6 Total 3.7761 38.9502 27.6444 0.0715 10.2641 1.5701 11.8342 3.7683 1.4445 5.2127 6,919.282 7 6,919.282 7 2.2378 6,975.228 6 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:53AMPage14of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 3.3 Grading - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0620 0.0317 0.3706 1.2900e- 003 0.1673 9.6000e- 004 0.1683 0.0444 8.8000e- 004 0.0453 128.7244 128.7244 2.5100e- 003 128.7872 Total 0.0620 0.0317 0.3706 1.2900e- 003 0.1673 9.6000e- 004 0.1683 0.0444 8.8000e- 004 0.0453 128.7244 128.7244 2.5100e- 003 128.7872 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 4.0030 0.0000 4.0030 1.4696 0.0000 1.4696 0.0000 0.0000 Off-Road 3.7761 38.9502 27.6444 0.0715 1.5701 1.5701 1.4445 1.4445 0.0000 6,919.282 7 6,919.282 7 2.2378 6,975.228 6 Total 3.7761 38.9502 27.6444 0.0715 4.0030 1.5701 5.5731 1.4696 1.4445 2.9141 0.0000 6,919.282 7 6,919.282 7 2.2378 6,975.228 6 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:53AMPage15of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 3.3 Grading - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0620 0.0317 0.3706 1.2900e- 003 0.1673 9.6000e- 004 0.1683 0.0444 8.8000e- 004 0.0453 128.7244 128.7244 2.5100e- 003 128.7872 Total 0.0620 0.0317 0.3706 1.2900e- 003 0.1673 9.6000e- 004 0.1683 0.0444 8.8000e- 004 0.0453 128.7244 128.7244 2.5100e- 003 128.7872 Mitigated Construction Off-Site 3.4 Building Construction - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 2.4039 24.2847 17.1094 0.0429 1.0085 1.0085 0.9404 0.9404 4,103.013 4 4,103.013 4 1.1048 4,130.632 9 Total 2.4039 24.2847 17.1094 0.0429 1.0085 1.0085 0.9404 0.9404 4,103.013 4 4,103.013 4 1.1048 4,130.632 9 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:53AMPage16of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 3.4 Building Construction - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.3440 52.3372 11.9001 0.1696 4.2289 0.0462 4.2751 1.2180 0.0442 1.2622 17,904.97 97 17,904.97 97 1.2500 17,936.22 92 Worker 6.8144 3.4851 40.7114 0.1418 18.3817 0.1051 18.4868 4.8756 0.0968 4.9724 14,140.37 22 14,140.37 22 0.2759 14,147.26 98 Total 8.1584 55.8223 52.6115 0.3114 22.6105 0.1513 22.7618 6.0937 0.1409 6.2346 32,045.35 19 32,045.35 19 1.5259 32,083.49 91 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 2.4039 24.2847 17.1094 0.0429 1.0085 1.0085 0.9404 0.9404 0.0000 4,103.013 4 4,103.013 4 1.1048 4,130.632 9 Total 2.4039 24.2847 17.1094 0.0429 1.0085 1.0085 0.9404 0.9404 0.0000 4,103.013 4 4,103.013 4 1.1048 4,130.632 9 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:53AMPage17of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 3.4 Building Construction - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.3440 52.3372 11.9001 0.1696 4.2289 0.0462 4.2751 1.2180 0.0442 1.2622 17,904.97 97 17,904.97 97 1.2500 17,936.22 92 Worker 6.8144 3.4851 40.7114 0.1418 18.3817 0.1051 18.4868 4.8756 0.0968 4.9724 14,140.37 22 14,140.37 22 0.2759 14,147.26 98 Total 8.1584 55.8223 52.6115 0.3114 22.6105 0.1513 22.7618 6.0937 0.1409 6.2346 32,045.35 19 32,045.35 19 1.5259 32,083.49 91 Mitigated Construction Off-Site 3.4 Building Construction - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 2.1777 21.2010 16.7425 0.0429 0.8645 0.8645 0.8062 0.8062 4,101.888 0 4,101.888 0 1.1008 4,129.407 2 Total 2.1777 21.2010 16.7425 0.0429 0.8645 0.8645 0.8062 0.8062 4,101.888 0 4,101.888 0 1.1008 4,129.407 2 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:53AMPage18of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 3.4 Building Construction - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.3091 51.8194 11.5092 0.1684 4.2287 0.0455 4.2742 1.2180 0.0435 1.2615 17,785.13 02 17,785.13 02 1.2163 17,815.53 85 Worker 6.4473 3.1705 37.7216 0.1361 18.3817 0.1033 18.4849 4.8756 0.0950 4.9707 13,574.76 10 13,574.76 10 0.2502 13,581.01 48 Total 7.7564 54.9899 49.2308 0.3045 22.6104 0.1488 22.7592 6.0936 0.1385 6.2321 31,359.89 12 31,359.89 12 1.4665 31,396.55 34 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 2.1777 21.2010 16.7425 0.0429 0.8645 0.8645 0.8062 0.8062 0.0000 4,101.888 0 4,101.888 0 1.1008 4,129.407 2 Total 2.1777 21.2010 16.7425 0.0429 0.8645 0.8645 0.8062 0.8062 0.0000 4,101.888 0 4,101.888 0 1.1008 4,129.407 2 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:53AMPage19of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 3.4 Building Construction - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.3091 51.8194 11.5092 0.1684 4.2287 0.0455 4.2742 1.2180 0.0435 1.2615 17,785.13 02 17,785.13 02 1.2163 17,815.53 85 Worker 6.4473 3.1705 37.7216 0.1361 18.3817 0.1033 18.4849 4.8756 0.0950 4.9707 13,574.76 10 13,574.76 10 0.2502 13,581.01 48 Total 7.7564 54.9899 49.2308 0.3045 22.6104 0.1488 22.7592 6.0936 0.1385 6.2321 31,359.89 12 31,359.89 12 1.4665 31,396.55 34 Mitigated Construction Off-Site 3.4 Building Construction - 2026 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 2.1777 21.2010 16.7425 0.0429 0.8645 0.8645 0.8062 0.8062 4,101.888 0 4,101.888 0 1.1008 4,129.407 2 Total 2.1777 21.2010 16.7425 0.0429 0.8645 0.8645 0.8062 0.8062 4,101.888 0 4,101.888 0 1.1008 4,129.407 2 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:53AMPage20of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 3.4 Building Construction - 2026 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.2787 51.3066 11.1908 0.1673 4.2286 0.0447 4.2734 1.2179 0.0428 1.2607 17,672.27 64 17,672.27 64 1.1819 17,701.82 35 Worker 6.1267 2.9028 35.1328 0.1311 18.3817 0.1001 18.4817 4.8756 0.0921 4.9677 13,080.35 07 13,080.35 07 0.2279 13,086.04 92 Total 7.4054 54.2094 46.3235 0.2984 22.6103 0.1448 22.7551 6.0936 0.1348 6.2284 30,752.62 71 30,752.62 71 1.4098 30,787.87 27 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 2.1777 21.2010 16.7425 0.0429 0.8645 0.8645 0.8062 0.8062 0.0000 4,101.888 0 4,101.888 0 1.1008 4,129.407 2 Total 2.1777 21.2010 16.7425 0.0429 0.8645 0.8645 0.8062 0.8062 0.0000 4,101.888 0 4,101.888 0 1.1008 4,129.407 2 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:53AMPage21of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 3.4 Building Construction - 2026 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.2787 51.3066 11.1908 0.1673 4.2286 0.0447 4.2734 1.2179 0.0428 1.2607 17,672.27 64 17,672.27 64 1.1819 17,701.82 35 Worker 6.1267 2.9028 35.1328 0.1311 18.3817 0.1001 18.4817 4.8756 0.0921 4.9677 13,080.35 07 13,080.35 07 0.2279 13,086.04 92 Total 7.4054 54.2094 46.3235 0.2984 22.6103 0.1448 22.7551 6.0936 0.1348 6.2284 30,752.62 71 30,752.62 71 1.4098 30,787.87 27 Mitigated Construction Off-Site 3.5 Paving - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.9152 8.5816 14.5780 0.0228 0.4185 0.4185 0.3850 0.3850 2,206.745 2 2,206.745 2 0.7137 2,224.587 8 Paving 0.8767 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 1.7918 8.5816 14.5780 0.0228 0.4185 0.4185 0.3850 0.3850 2,206.745 2 2,206.745 2 0.7137 2,224.587 8 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:53AMPage22of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 3.5 Paving - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0440 0.0217 0.2575 9.3000e- 004 0.1255 7.1000e- 004 0.1262 0.0333 6.5000e- 004 0.0339 92.6816 92.6816 1.7100e- 003 92.7243 Total 0.0440 0.0217 0.2575 9.3000e- 004 0.1255 7.1000e- 004 0.1262 0.0333 6.5000e- 004 0.0339 92.6816 92.6816 1.7100e- 003 92.7243 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.9152 8.5816 14.5780 0.0228 0.4185 0.4185 0.3850 0.3850 0.0000 2,206.745 2 2,206.745 2 0.7137 2,224.587 8 Paving 0.8767 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 1.7918 8.5816 14.5780 0.0228 0.4185 0.4185 0.3850 0.3850 0.0000 2,206.745 2 2,206.745 2 0.7137 2,224.587 8 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:53AMPage23of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 3.5 Paving - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0440 0.0217 0.2575 9.3000e- 004 0.1255 7.1000e- 004 0.1262 0.0333 6.5000e- 004 0.0339 92.6816 92.6816 1.7100e- 003 92.7243 Total 0.0440 0.0217 0.2575 9.3000e- 004 0.1255 7.1000e- 004 0.1262 0.0333 6.5000e- 004 0.0339 92.6816 92.6816 1.7100e- 003 92.7243 Mitigated Construction Off-Site 3.5 Paving - 2026 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.9152 8.5816 14.5780 0.0228 0.4185 0.4185 0.3850 0.3850 2,206.745 2 2,206.745 2 0.7137 2,224.587 8 Paving 0.8767 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 1.7918 8.5816 14.5780 0.0228 0.4185 0.4185 0.3850 0.3850 2,206.745 2 2,206.745 2 0.7137 2,224.587 8 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:53AMPage24of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 3.5 Paving - 2026 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0418 0.0198 0.2399 9.0000e- 004 0.1255 6.8000e- 004 0.1262 0.0333 6.3000e- 004 0.0339 89.3060 89.3060 1.5600e- 003 89.3449 Total 0.0418 0.0198 0.2399 9.0000e- 004 0.1255 6.8000e- 004 0.1262 0.0333 6.3000e- 004 0.0339 89.3060 89.3060 1.5600e- 003 89.3449 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.9152 8.5816 14.5780 0.0228 0.4185 0.4185 0.3850 0.3850 0.0000 2,206.745 2 2,206.745 2 0.7137 2,224.587 8 Paving 0.8767 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 1.7918 8.5816 14.5780 0.0228 0.4185 0.4185 0.3850 0.3850 0.0000 2,206.745 2 2,206.745 2 0.7137 2,224.587 8 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:53AMPage25of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 3.5 Paving - 2026 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0418 0.0198 0.2399 9.0000e- 004 0.1255 6.8000e- 004 0.1262 0.0333 6.3000e- 004 0.0339 89.3060 89.3060 1.5600e- 003 89.3449 Total 0.0418 0.0198 0.2399 9.0000e- 004 0.1255 6.8000e- 004 0.1262 0.0333 6.3000e- 004 0.0339 89.3060 89.3060 1.5600e- 003 89.3449 Mitigated Construction Off-Site 3.6 Architectural Coating - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 18.4192 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.2278 1.5273 2.4122 3.9600e- 003 0.0687 0.0687 0.0687 0.0687 375.2641 375.2641 0.0205 375.7758 Total 18.6470 1.5273 2.4122 3.9600e- 003 0.0687 0.0687 0.0687 0.0687 375.2641 375.2641 0.0205 375.7758 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:53AMPage26of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 3.6 Architectural Coating - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.2883 0.6335 7.5375 0.0272 3.6730 0.0206 3.6936 0.9742 0.0190 0.9932 2,712.480 7 2,712.480 7 0.0500 2,713.730 3 Total 1.2883 0.6335 7.5375 0.0272 3.6730 0.0206 3.6936 0.9742 0.0190 0.9932 2,712.480 7 2,712.480 7 0.0500 2,713.730 3 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 18.4192 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.2278 1.5273 2.4122 3.9600e- 003 0.0687 0.0687 0.0687 0.0687 0.0000 375.2641 375.2641 0.0205 375.7758 Total 18.6470 1.5273 2.4122 3.9600e- 003 0.0687 0.0687 0.0687 0.0687 0.0000 375.2641 375.2641 0.0205 375.7758 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:53AMPage27of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 3.6 Architectural Coating - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.2883 0.6335 7.5375 0.0272 3.6730 0.0206 3.6936 0.9742 0.0190 0.9932 2,712.480 7 2,712.480 7 0.0500 2,713.730 3 Total 1.2883 0.6335 7.5375 0.0272 3.6730 0.0206 3.6936 0.9742 0.0190 0.9932 2,712.480 7 2,712.480 7 0.0500 2,713.730 3 Mitigated Construction Off-Site 3.6 Architectural Coating - 2026 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 18.4192 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.2278 1.5273 2.4122 3.9600e- 003 0.0687 0.0687 0.0687 0.0687 375.2641 375.2641 0.0205 375.7758 Total 18.6470 1.5273 2.4122 3.9600e- 003 0.0687 0.0687 0.0687 0.0687 375.2641 375.2641 0.0205 375.7758 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:53AMPage28of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 3.6 Architectural Coating - 2026 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.2242 0.5800 7.0202 0.0262 3.6730 0.0200 3.6930 0.9742 0.0184 0.9926 2,613.688 7 2,613.688 7 0.0456 2,614.827 3 Total 1.2242 0.5800 7.0202 0.0262 3.6730 0.0200 3.6930 0.9742 0.0184 0.9926 2,613.688 7 2,613.688 7 0.0456 2,614.827 3 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 18.4192 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.2278 1.5273 2.4122 3.9600e- 003 0.0687 0.0687 0.0687 0.0687 0.0000 375.2641 375.2641 0.0205 375.7758 Total 18.6470 1.5273 2.4122 3.9600e- 003 0.0687 0.0687 0.0687 0.0687 0.0000 375.2641 375.2641 0.0205 375.7758 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:53AMPage29of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile 3.6 Architectural Coating - 2026 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.2242 0.5800 7.0202 0.0262 3.6730 0.0200 3.6930 0.9742 0.0184 0.9926 2,613.688 7 2,613.688 7 0.0456 2,614.827 3 Total 1.2242 0.5800 7.0202 0.0262 3.6730 0.0200 3.6930 0.9742 0.0184 0.9926 2,613.688 7 2,613.688 7 0.0456 2,614.827 3 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:53AMPage30of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Winter ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Mitigated 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Unmitigated 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 4.2 Trip Summary Information 4.3 Trip Type Information Average Daily Trip Rate Unmitigated Mitigated Land Use Weekday Saturday Sunday Annual VMT Annual VMT Other Asphalt Surfaces 0.00 0.00 0.00 Regional Shopping Center 0.00 0.00 0.00 Single Family Housing 0.00 0.00 0.00 Total 0.00 0.00 0.00 Miles Trip %Trip Purpose % Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C-W H-S or C-C H-O or C-NW Primary Diverted Pass-by Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 Regional Shopping Center 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 Single Family Housing 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 4.4 Fleet Mix CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:53AMPage31of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 5.0 Energy Detail ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day NaturalGas Mitigated 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 NaturalGas Unmitigated 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 5.1 Mitigation Measures Energy Land Use LDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH Other Asphalt Surfaces 0.556393 0.035040 0.189382 0.106465 0.012088 0.004430 0.017405 0.070208 0.001420 0.001115 0.004429 0.000881 0.000745 Regional Shopping Center 0.556393 0.035040 0.189382 0.106465 0.012088 0.004430 0.017405 0.070208 0.001420 0.001115 0.004429 0.000881 0.000745 Single Family Housing 0.556393 0.035040 0.189382 0.106465 0.012088 0.004430 0.017405 0.070208 0.001420 0.001115 0.004429 0.000881 0.000745 Historical Energy Use: N CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:53AMPage32of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 6.0 Area Detail 5.2 Energy by Land Use - NaturalGas NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr lb/day lb/day Other Asphalt Surfaces 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Regional Shopping Center 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Single Family Housing 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Unmitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr lb/day lb/day Other Asphalt Surfaces 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Regional Shopping Center 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Single Family Housing 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:53AMPage33of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 6.1 Mitigation Measures Area 6.0 Area Detail ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Mitigated 29.8339 0.4464 38.7527 2.0500e- 003 0.2150 0.2150 0.2150 0.2150 0.0000 69.8492 69.8492 0.0669 0.0000 71.5227 Unmitigated 29.8339 0.4464 38.7527 2.0500e- 003 0.2150 0.2150 0.2150 0.2150 0.0000 69.8492 69.8492 0.0669 0.0000 71.5227 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:53AMPage34of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory lb/day lb/day Architectural Coating 8.3265 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 20.3431 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hearth 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 1.1644 0.4464 38.7527 2.0500e- 003 0.2150 0.2150 0.2150 0.2150 69.8492 69.8492 0.0669 71.5227 Total 29.8339 0.4464 38.7527 2.0500e- 003 0.2150 0.2150 0.2150 0.2150 0.0000 69.8492 69.8492 0.0669 0.0000 71.5227 Unmitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:53AMPage35of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 8.1 Mitigation Measures Waste 7.1 Mitigation Measures Water 7.0 Water Detail 8.0 Waste Detail 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory lb/day lb/day Architectural Coating 8.3265 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 20.3431 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hearth 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 1.1644 0.4464 38.7527 2.0500e- 003 0.2150 0.2150 0.2150 0.2150 69.8492 69.8492 0.0669 71.5227 Total 29.8339 0.4464 38.7527 2.0500e- 003 0.2150 0.2150 0.2150 0.2150 0.0000 69.8492 69.8492 0.0669 0.0000 71.5227 Mitigated 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year Horse Power Load Factor Fuel Type 10.0 Stationary Equipment CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:53AMPage36of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Winter 11.0 Vegetation Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power Load Factor Fuel Type Boilers Equipment Type Number Heat Input/Day Heat Input/Year Boiler Rating Fuel Type User Defined Equipment Equipment Type Number CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:53AMPage37of37 The Wave - Coral Mountain (Phase 3 Construction - Unmitigated) - Riverside-Salton Sea County, Winter The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report APPENDIX 3.2: CALEEMOD CONSTRUCTION (MITIGATED) EMISSIONS MODEL OUTPUTS The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report This page intentionally left blank 1.1 Land Usage Land Uses Size Metric Lot Acreage Floor Surface Area Population Other Asphalt Surfaces 23.19 Acre 23.19 1,010,156.40 0 Hotel 150.00 Room 5.00 217,800.00 0 User Defined Recreational 12.00 User Defined Unit 12.00 522,720.00 0 Apartments Low Rise 104.00 Dwelling Unit 6.50 104,000.00 279 Single Family Housing 26.00 Dwelling Unit 8.44 46,800.00 70 Regional Shopping Center 10.00 1000sqft 0.23 10,000.00 0 1.2 Other Project Characteristics Urbanization Climate Zone Urban 15 Wind Speed (m/s)Precipitation Freq (Days)2.4 28 1.3 User Entered Comments & Non-Default Data 1.0 Project Characteristics Utility Company Imperial Irrigation District 2021OperationalYear CO2 Intensity lb/MWhr) 1270.9 0.029CH4Intensity lb/MWhr) 0.006N2OIntensity lb/MWhr) The Wave - Coral Mountain (Phase 1 Construction - Mitigated) Riverside-Salton Sea County, Summer CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:30AMPage1of32 The Wave - Coral Mountain (Phase 1 Construction - Mitigated) - Riverside-Salton Sea County, Summer Project Characteristics - Land Use - Total Project Area is 55.36 acres. Construction Phase - Construction Schedule adjsuted to meet the 2021 Opening Year. Off-road Equipment - Hours are based on an 8-hour workday. Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Off-road Equipment - Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Grading - For purposes of analysis, total acres graded per day is based on the equipment specific grading rates (CalEEMod Appendix A) and the equipment list. Architectural Coating - Rule 1113 Vehicle Trips - Construction Run Only. Woodstoves - Construction Run Only. Energy Use - Construction Run Only. Water And Wastewater - Construction Run Only. Solid Waste - Construction Run Only. Construction Off-road Equipment Mitigation - All equipment operating at >150 HP are required to be equipped with Tier 3 or better engines. Table Name Column Name Default Value New Value tblArchitecturalCoating EF_Nonresidential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Interior 250.00 50.00 tblArchitecturalCoating EF_Parking 250.00 50.00 tblArchitecturalCoating EF_Residential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Residential_Interior 250.00 50.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 9.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 2.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:30AMPage2of32 The Wave - Coral Mountain (Phase 1 Construction - Mitigated) - Riverside-Salton Sea County, Summer tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 4.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 2.00 tblConstEquipMitigation Tier No Change Tier 3 tblConstEquipMitigation Tier No Change Tier 3 tblConstEquipMitigation Tier No Change Tier 3 tblConstEquipMitigation Tier No Change Tier 3 tblConstEquipMitigation Tier No Change Tier 3 tblConstEquipMitigation Tier No Change Tier 3 tblConstructionPhase NumDays 1,110.00 200.00 tblConstructionPhase PhaseEndDate 4/29/2025 11/2/2021 tblConstructionPhase PhaseEndDate 8/12/2025 12/14/2021 tblConstructionPhase PhaseEndDate 11/25/2025 12/14/2021 tblConstructionPhase PhaseStartDate 4/30/2025 9/1/2021 tblConstructionPhase PhaseStartDate 8/13/2025 9/1/2021 tblEnergyUse LightingElect 810.36 0.00 tblEnergyUse LightingElect 5.44 0.00 tblEnergyUse LightingElect 5.61 0.00 tblEnergyUse LightingElect 1,608.84 0.00 tblEnergyUse NT24E 3,172.76 0.00 tblEnergyUse NT24E 6.23 0.00 tblEnergyUse NT24E 2.44 0.00 tblEnergyUse NT24E 6,155.97 0.00 tblEnergyUse NT24NG 6,030.00 0.00 tblEnergyUse NT24NG 4.86 0.00 tblEnergyUse NT24NG 0.30 0.00 tblEnergyUse NT24NG 6,030.00 0.00 tblEnergyUse T24E 877.14 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:30AMPage3of32 The Wave - Coral Mountain (Phase 1 Construction - Mitigated) - Riverside-Salton Sea County, Summer tblEnergyUse T24E 6.47 0.00 tblEnergyUse T24E 4.58 0.00 tblEnergyUse T24E 951.67 0.00 tblEnergyUse T24NG 9,544.50 0.00 tblEnergyUse T24NG 55.15 0.00 tblEnergyUse T24NG 1.92 0.00 tblEnergyUse T24NG 24,566.15 0.00 tblFireplaces NumberGas 83.20 0.00 tblFireplaces NumberGas 20.80 0.00 tblFireplaces NumberNoFireplace 10.40 0.00 tblFireplaces NumberNoFireplace 2.60 0.00 tblFireplaces NumberWood 10.40 0.00 tblFireplaces NumberWood 2.60 0.00 tblGrading AcresOfGrading 385.00 440.00 tblGrading AcresOfGrading 80.00 140.00 tblLandUse LandUseSquareFeet 0.00 522,720.00 tblLandUse LotAcreage 0.00 12.00 tblLandUse Population 297.00 279.00 tblLandUse Population 74.00 70.00 tblOffRoadEquipment LoadFactor 0.43 0.43 tblOffRoadEquipment OffRoadEquipmentType Crawler Tractors tblOffRoadEquipment OffRoadEquipmentType Crawler Tractors tblOffRoadEquipment OffRoadEquipmentType Crawler Tractors tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 0.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 0.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 4.00 0.00 tblOffRoadEquipment UsageHours 6.00 8.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:30AMPage4of32 The Wave - Coral Mountain (Phase 1 Construction - Mitigated) - Riverside-Salton Sea County, Summer tblOffRoadEquipment UsageHours 7.00 8.00 tblOffRoadEquipment UsageHours 7.00 8.00 tblSolidWaste SolidWasteGenerationRate 47.84 0.00 tblSolidWaste SolidWasteGenerationRate 82.13 0.00 tblSolidWaste SolidWasteGenerationRate 10.50 0.00 tblSolidWaste SolidWasteGenerationRate 28.70 0.00 tblVehicleTrips CC_TL 4.20 0.00 tblVehicleTrips CC_TL 4.20 0.00 tblVehicleTrips CC_TL 4.20 0.00 tblVehicleTrips CC_TL 4.20 0.00 tblVehicleTrips CC_TTP 61.60 0.00 tblVehicleTrips CC_TTP 64.70 0.00 tblVehicleTrips CNW_TL 5.40 0.00 tblVehicleTrips CNW_TL 5.40 0.00 tblVehicleTrips CNW_TL 5.40 0.00 tblVehicleTrips CNW_TL 5.40 0.00 tblVehicleTrips CNW_TTP 19.00 0.00 tblVehicleTrips CNW_TTP 19.00 0.00 tblVehicleTrips CW_TL 12.50 0.00 tblVehicleTrips CW_TL 12.50 0.00 tblVehicleTrips CW_TL 12.50 0.00 tblVehicleTrips CW_TL 12.50 0.00 tblVehicleTrips CW_TTP 19.40 0.00 tblVehicleTrips CW_TTP 16.30 0.00 tblVehicleTrips DV_TP 11.00 0.00 tblVehicleTrips DV_TP 38.00 0.00 tblVehicleTrips DV_TP 35.00 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:30AMPage5of32 The Wave - Coral Mountain (Phase 1 Construction - Mitigated) - Riverside-Salton Sea County, Summer tblVehicleTrips DV_TP 11.00 0.00 tblVehicleTrips HO_TL 4.50 0.00 tblVehicleTrips HO_TL 4.50 0.00 tblVehicleTrips HO_TTP 40.60 0.00 tblVehicleTrips HO_TTP 40.60 0.00 tblVehicleTrips HS_TL 3.50 0.00 tblVehicleTrips HS_TL 3.50 0.00 tblVehicleTrips HS_TTP 19.20 0.00 tblVehicleTrips HS_TTP 19.20 0.00 tblVehicleTrips HW_TL 11.00 0.00 tblVehicleTrips HW_TL 11.00 0.00 tblVehicleTrips HW_TTP 40.20 0.00 tblVehicleTrips HW_TTP 40.20 0.00 tblVehicleTrips PB_TP 3.00 0.00 tblVehicleTrips PB_TP 4.00 0.00 tblVehicleTrips PB_TP 11.00 0.00 tblVehicleTrips PB_TP 3.00 0.00 tblVehicleTrips PR_TP 86.00 0.00 tblVehicleTrips PR_TP 58.00 0.00 tblVehicleTrips PR_TP 54.00 0.00 tblVehicleTrips PR_TP 86.00 0.00 tblVehicleTrips ST_TR 7.16 0.00 tblVehicleTrips ST_TR 8.19 0.00 tblVehicleTrips ST_TR 49.97 0.00 tblVehicleTrips ST_TR 9.91 0.00 tblVehicleTrips SU_TR 6.07 0.00 tblVehicleTrips SU_TR 5.95 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:30AMPage6of32 The Wave - Coral Mountain (Phase 1 Construction - Mitigated) - Riverside-Salton Sea County, Summer 2.0 Emissions Summary tblVehicleTrips SU_TR 25.24 0.00 tblVehicleTrips SU_TR 8.62 0.00 tblVehicleTrips WD_TR 6.59 0.00 tblVehicleTrips WD_TR 8.17 0.00 tblVehicleTrips WD_TR 42.70 0.00 tblVehicleTrips WD_TR 9.52 0.00 tblWater IndoorWaterUseRate 6,776,018.66 0.00 tblWater IndoorWaterUseRate 3,805,015.50 0.00 tblWater IndoorWaterUseRate 740,725.21 0.00 tblWater IndoorWaterUseRate 1,694,004.67 0.00 tblWater OutdoorWaterUseRate 4,271,837.85 0.00 tblWater OutdoorWaterUseRate 422,779.50 0.00 tblWater OutdoorWaterUseRate 453,992.87 0.00 tblWater OutdoorWaterUseRate 1,067,959.46 0.00 tblWoodstoves NumberCatalytic 5.20 0.00 tblWoodstoves NumberCatalytic 1.30 0.00 tblWoodstoves NumberNoncatalytic 5.20 0.00 tblWoodstoves NumberNoncatalytic 1.30 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:30AMPage7of32 The Wave - Coral Mountain (Phase 1 Construction - Mitigated) - Riverside-Salton Sea County, Summer 2.1 Overall Construction (Maximum Daily Emission) ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year lb/day lb/day 2020 5.6229 63.7462 33.0232 0.0732 21.9286 2.7853 24.7139 10.3714 2.5625 12.9339 0.0000 7,091.114 7 7,091.114 7 2.2441 0.0000 7,147.216 0 2021 70.8668 77.2337 68.5855 0.2169 10.4314 2.3733 12.7185 3.8126 2.2144 5.9168 0.0000 21,733.52 07 21,733.52 07 2.6280 0.0000 21,799.21 96 Maximum 70.8668 77.2337 68.5855 0.2169 21.9286 2.7853 24.7139 10.3714 2.5625 12.9339 0.0000 21,733.52 07 21,733.52 07 2.6280 0.0000 21,799.21 96 Unmitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year lb/day lb/day 2020 1.8409 34.0162 41.0234 0.0732 8.6440 1.3404 9.6694 4.0692 1.3403 5.0945 0.0000 7,091.114 7 7,091.114 7 2.2441 0.0000 7,147.216 0 2021 69.5217 65.4115 74.9100 0.2169 9.9070 1.9184 11.8253 2.6623 1.8382 4.5004 0.0000 21,733.52 07 21,733.52 07 2.6280 0.0000 21,799.21 96 Maximum 69.5217 65.4115 74.9100 0.2169 9.9070 1.9184 11.8253 4.0692 1.8382 5.0945 0.0000 21,733.52 07 21,733.52 07 2.6280 0.0000 21,799.21 96 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 6.70 29.47 -14.10 0.00 42.67 36.83 42.58 52.54 33.46 49.10 0.00 0.00 0.00 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:30AMPage8of32 The Wave - Coral Mountain (Phase 1 Construction - Mitigated) - Riverside-Salton Sea County, Summer 2.2 Overall Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Area 26.2239 0.1243 10.7685 5.7000e- 004 0.0593 0.0593 0.0593 0.0593 0.0000 19.3545 19.3545 0.0188 0.0000 19.8252 Energy 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mobile 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 26.2239 0.1243 10.7685 5.7000e- 004 0.0000 0.0593 0.0593 0.0000 0.0593 0.0593 0.0000 19.3545 19.3545 0.0188 0.0000 19.8252 Unmitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Area 26.2239 0.1243 10.7685 5.7000e- 004 0.0593 0.0593 0.0593 0.0593 0.0000 19.3545 19.3545 0.0188 0.0000 19.8252 Energy 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mobile 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 26.2239 0.1243 10.7685 5.7000e- 004 0.0000 0.0593 0.0593 0.0000 0.0593 0.0593 0.0000 19.3545 19.3545 0.0188 0.0000 19.8252 Mitigated Operational CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:30AMPage9of32 The Wave - Coral Mountain (Phase 1 Construction - Mitigated) - Riverside-Salton Sea County, Summer 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 Site Preparation Site Preparation 7/1/2020 8/25/2020 5 40 2 Grading Grading 8/26/2020 1/26/2021 5 110 3 Building Construction Building Construction 1/27/2021 11/2/2021 5 200 4 Paving Paving 9/1/2021 12/14/2021 5 75 5 Architectural Coating Architectural Coating 9/1/2021 12/14/2021 5 75 OffRoad Equipment ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Residential Indoor: 305,370; Residential Outdoor: 101,790; Non-Residential Indoor: 1,125,780; Non-Residential Outdoor: 375,260; Striped Parking Area: 60,609 (Architectural Coating – sqft) Acres of Grading (Site Preparation Phase): 140 Acres of Grading (Grading Phase): 440 Acres of Paving: 23.19 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:30AMPage10of32 The Wave - Coral Mountain (Phase 1 Construction - Mitigated) - Riverside-Salton Sea County, Summer Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Site Preparation Crawler Tractors 4 8.00 212 0.43 Site Preparation Rubber Tired Dozers 3 8.00 247 0.40 Site Preparation Tractors/Loaders/Backhoes 0 8.00 97 0.37 Grading Crawler Tractors 2 8.00 212 0.43 Grading Excavators 2 8.00 158 0.38 Grading Graders 1 8.00 187 0.41 Grading Rubber Tired Dozers 1 8.00 247 0.40 Grading Scrapers 2 8.00 367 0.48 Grading Tractors/Loaders/Backhoes 0 8.00 97 0.37 Building Construction Cranes 1 8.00 231 0.29 Building Construction Crawler Tractors 3 8.00 212 0.43 Building Construction Forklifts 3 8.00 89 0.20 Building Construction Generator Sets 1 8.00 84 0.74 Building Construction Tractors/Loaders/Backhoes 0 8.00 97 0.37 Building Construction Welders 1 8.00 46 0.45 Paving Pavers 2 8.00 130 0.42 Paving Paving Equipment 2 8.00 132 0.36 Paving Rollers 2 8.00 80 0.38 Architectural Coating Air Compressors 1 8.00 78 0.48 Trips and VMT CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:30AMPage11of32 The Wave - Coral Mountain (Phase 1 Construction - Mitigated) - Riverside-Salton Sea County, Summer 3.2 Site Preparation - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 21.7780 0.0000 21.7780 10.3315 0.0000 10.3315 0.0000 0.0000 Off-Road 5.5474 63.7043 22.3668 0.0569 2.7844 2.7844 2.5616 2.5616 5,515.093 1 5,515.093 1 1.7837 5,559.685 4 Total 5.5474 63.7043 22.3668 0.0569 21.7780 2.7844 24.5624 10.3315 2.5616 12.8931 5,515.093 1 5,515.093 1 1.7837 5,559.685 4 Unmitigated Construction On-Site 3.1 Mitigation Measures Construction Use Cleaner Engines for Construction Equipment Water Exposed Area Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Site Preparation 7 18.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Grading 8 20.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Building Construction 9 823.00 302.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Paving 6 15.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Architectural Coating 1 165.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:30AMPage12of32 The Wave - Coral Mountain (Phase 1 Construction - Mitigated) - Riverside-Salton Sea County, Summer 3.2 Site Preparation - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0755 0.0420 0.5620 1.5000e- 003 0.1506 9.4000e- 004 0.1515 0.0400 8.7000e- 004 0.0408 149.4087 149.4087 3.9000e- 003 149.5062 Total 0.0755 0.0420 0.5620 1.5000e- 003 0.1506 9.4000e- 004 0.1515 0.0400 8.7000e- 004 0.0408 149.4087 149.4087 3.9000e- 003 149.5062 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 8.4934 0.0000 8.4934 4.0293 0.0000 4.0293 0.0000 0.0000 Off-Road 1.3969 27.0067 30.2661 0.0569 1.0244 1.0244 1.0244 1.0244 0.0000 5,515.093 1 5,515.093 1 1.7837 5,559.685 4 Total 1.3969 27.0067 30.2661 0.0569 8.4934 1.0244 9.5178 4.0293 1.0244 5.0537 0.0000 5,515.093 1 5,515.093 1 1.7837 5,559.685 4 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:30AMPage13of32 The Wave - Coral Mountain (Phase 1 Construction - Mitigated) - Riverside-Salton Sea County, Summer 3.2 Site Preparation - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0755 0.0420 0.5620 1.5000e- 003 0.1506 9.4000e- 004 0.1515 0.0400 8.7000e- 004 0.0408 149.4087 149.4087 3.9000e- 003 149.5062 Total 0.0755 0.0420 0.5620 1.5000e- 003 0.1506 9.4000e- 004 0.1515 0.0400 8.7000e- 004 0.0408 149.4087 149.4087 3.9000e- 003 149.5062 Mitigated Construction Off-Site 3.3 Grading - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 10.2641 0.0000 10.2641 3.7683 0.0000 3.7683 0.0000 0.0000 Off-Road 5.1888 60.8826 32.3988 0.0715 2.4690 2.4690 2.2714 2.2714 6,925.105 1 6,925.105 1 2.2397 6,981.098 1 Total 5.1888 60.8826 32.3988 0.0715 10.2641 2.4690 12.7331 3.7683 2.2714 6.0397 6,925.105 1 6,925.105 1 2.2397 6,981.098 1 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:30AMPage14of32 The Wave - Coral Mountain (Phase 1 Construction - Mitigated) - Riverside-Salton Sea County, Summer 3.3 Grading - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0839 0.0466 0.6244 1.6700e- 003 0.1673 1.0400e- 003 0.1684 0.0444 9.6000e- 004 0.0454 166.0097 166.0097 4.3300e- 003 166.1180 Total 0.0839 0.0466 0.6244 1.6700e- 003 0.1673 1.0400e- 003 0.1684 0.0444 9.6000e- 004 0.0454 166.0097 166.0097 4.3300e- 003 166.1180 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 4.0030 0.0000 4.0030 1.4696 0.0000 1.4696 0.0000 0.0000 Off-Road 1.7571 33.9695 40.3990 0.0715 1.3393 1.3393 1.3393 1.3393 0.0000 6,925.105 1 6,925.105 1 2.2397 6,981.098 1 Total 1.7571 33.9695 40.3990 0.0715 4.0030 1.3393 5.3423 1.4696 1.3393 2.8090 0.0000 6,925.105 1 6,925.105 1 2.2397 6,981.098 1 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:30AMPage15of32 The Wave - Coral Mountain (Phase 1 Construction - Mitigated) - Riverside-Salton Sea County, Summer 3.3 Grading - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0839 0.0466 0.6244 1.6700e- 003 0.1673 1.0400e- 003 0.1684 0.0444 9.6000e- 004 0.0454 166.0097 166.0097 4.3300e- 003 166.1180 Total 0.0839 0.0466 0.6244 1.6700e- 003 0.1673 1.0400e- 003 0.1684 0.0444 9.6000e- 004 0.0454 166.0097 166.0097 4.3300e- 003 166.1180 Mitigated Construction Off-Site 3.3 Grading - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 10.2641 0.0000 10.2641 3.7683 0.0000 3.7683 0.0000 0.0000 Off-Road 4.9185 56.5443 31.2281 0.0715 2.2861 2.2861 2.1032 2.1032 6,925.967 4 6,925.967 4 2.2400 6,981.967 3 Total 4.9185 56.5443 31.2281 0.0715 10.2641 2.2861 12.5502 3.7683 2.1032 5.8715 6,925.967 4 6,925.967 4 2.2400 6,981.967 3 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:30AMPage16of32 The Wave - Coral Mountain (Phase 1 Construction - Mitigated) - Riverside-Salton Sea County, Summer 3.3 Grading - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0780 0.0418 0.5722 1.6100e- 003 0.1673 1.0200e- 003 0.1684 0.0444 9.4000e- 004 0.0453 160.4598 160.4598 3.8900e- 003 160.5572 Total 0.0780 0.0418 0.5722 1.6100e- 003 0.1673 1.0200e- 003 0.1684 0.0444 9.4000e- 004 0.0453 160.4598 160.4598 3.8900e- 003 160.5572 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 4.0030 0.0000 4.0030 1.4696 0.0000 1.4696 0.0000 0.0000 Off-Road 1.7571 33.9695 40.3990 0.0715 1.3393 1.3393 1.3393 1.3393 0.0000 6,925.967 4 6,925.967 4 2.2400 6,981.967 3 Total 1.7571 33.9695 40.3990 0.0715 4.0030 1.3393 5.3423 1.4696 1.3393 2.8090 0.0000 6,925.967 4 6,925.967 4 2.2400 6,981.967 3 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:30AMPage17of32 The Wave - Coral Mountain (Phase 1 Construction - Mitigated) - Riverside-Salton Sea County, Summer 3.3 Grading - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0780 0.0418 0.5722 1.6100e- 003 0.1673 1.0200e- 003 0.1684 0.0444 9.4000e- 004 0.0453 160.4598 160.4598 3.8900e- 003 160.5572 Total 0.0780 0.0418 0.5722 1.6100e- 003 0.1673 1.0200e- 003 0.1684 0.0444 9.4000e- 004 0.0453 160.4598 160.4598 3.8900e- 003 160.5572 Mitigated Construction Off-Site 3.4 Building Construction - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 3.1137 33.9659 18.1952 0.0430 1.4763 1.4763 1.3775 1.3775 4,114.429 7 4,114.429 7 1.1209 4,142.452 0 Total 3.1137 33.9659 18.1952 0.0430 1.4763 1.4763 1.3775 1.3775 4,114.429 7 4,114.429 7 1.1209 4,142.452 0 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:30AMPage18of32 The Wave - Coral Mountain (Phase 1 Construction - Mitigated) - Riverside-Salton Sea County, Summer 3.4 Building Construction - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.6461 26.2162 4.6183 0.0663 1.5152 0.0428 1.5580 0.4364 0.0409 0.4774 6,989.555 8 6,989.555 8 0.5722 7,003.859 5 Worker 3.2110 1.7204 23.5456 0.0663 6.8858 0.0419 6.9277 1.8264 0.0385 1.8650 6,602.921 9 6,602.921 9 0.1603 6,606.928 3 Total 3.8571 27.9366 28.1639 0.1326 8.4010 0.0847 8.4856 2.2628 0.0795 2.3423 13,592.47 76 13,592.47 76 0.7324 13,610.78 77 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.7686 22.1437 24.5197 0.0430 1.0214 1.0214 1.0013 1.0013 0.0000 4,114.429 7 4,114.429 7 1.1209 4,142.452 0 Total 1.7686 22.1437 24.5197 0.0430 1.0214 1.0214 1.0013 1.0013 0.0000 4,114.429 7 4,114.429 7 1.1209 4,142.452 0 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:30AMPage19of32 The Wave - Coral Mountain (Phase 1 Construction - Mitigated) - Riverside-Salton Sea County, Summer 3.4 Building Construction - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.6461 26.2162 4.6183 0.0663 1.5152 0.0428 1.5580 0.4364 0.0409 0.4774 6,989.555 8 6,989.555 8 0.5722 7,003.859 5 Worker 3.2110 1.7204 23.5456 0.0663 6.8858 0.0419 6.9277 1.8264 0.0385 1.8650 6,602.921 9 6,602.921 9 0.1603 6,606.928 3 Total 3.8571 27.9366 28.1639 0.1326 8.4010 0.0847 8.4856 2.2628 0.0795 2.3423 13,592.47 76 13,592.47 76 0.7324 13,610.78 77 Mitigated Construction Off-Site 3.5 Paving - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.2556 12.9191 14.6532 0.0228 0.6777 0.6777 0.6235 0.6235 2,207.210 9 2,207.210 9 0.7139 2,225.057 3 Paving 0.8101 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 2.0657 12.9191 14.6532 0.0228 0.6777 0.6777 0.6235 0.6235 2,207.210 9 2,207.210 9 0.7139 2,225.057 3 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:30AMPage20of32 The Wave - Coral Mountain (Phase 1 Construction - Mitigated) - Riverside-Salton Sea County, Summer 3.5 Paving - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0585 0.0314 0.4291 1.2100e- 003 0.1255 7.6000e- 004 0.1263 0.0333 7.0000e- 004 0.0340 120.3449 120.3449 2.9200e- 003 120.4179 Total 0.0585 0.0314 0.4291 1.2100e- 003 0.1255 7.6000e- 004 0.1263 0.0333 7.0000e- 004 0.0340 120.3449 120.3449 2.9200e- 003 120.4179 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.2556 12.9191 14.6532 0.0228 0.6777 0.6777 0.6235 0.6235 0.0000 2,207.210 9 2,207.210 9 0.7139 2,225.057 3 Paving 0.8101 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 2.0657 12.9191 14.6532 0.0228 0.6777 0.6777 0.6235 0.6235 0.0000 2,207.210 9 2,207.210 9 0.7139 2,225.057 3 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:30AMPage21of32 The Wave - Coral Mountain (Phase 1 Construction - Mitigated) - Riverside-Salton Sea County, Summer 3.5 Paving - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0585 0.0314 0.4291 1.2100e- 003 0.1255 7.6000e- 004 0.1263 0.0333 7.0000e- 004 0.0340 120.3449 120.3449 2.9200e- 003 120.4179 Total 0.0585 0.0314 0.4291 1.2100e- 003 0.1255 7.6000e- 004 0.1263 0.0333 7.0000e- 004 0.0340 120.3449 120.3449 2.9200e- 003 120.4179 Mitigated Construction Off-Site 3.6 Architectural Coating - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 60.8362 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.2919 2.0358 2.4234 3.9600e- 003 0.1255 0.1255 0.1255 0.1255 375.2641 375.2641 0.0258 375.9079 Total 61.1281 2.0358 2.4234 3.9600e- 003 0.1255 0.1255 0.1255 0.1255 375.2641 375.2641 0.0258 375.9079 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:30AMPage22of32 The Wave - Coral Mountain (Phase 1 Construction - Mitigated) - Riverside-Salton Sea County, Summer 3.6 Architectural Coating - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.6438 0.3449 4.7206 0.0133 1.3805 8.3900e- 003 1.3889 0.3662 7.7300e- 003 0.3739 1,323.793 6 1,323.793 6 0.0321 1,324.596 8 Total 0.6438 0.3449 4.7206 0.0133 1.3805 8.3900e- 003 1.3889 0.3662 7.7300e- 003 0.3739 1,323.793 6 1,323.793 6 0.0321 1,324.596 8 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 60.8362 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.2919 2.0358 2.4234 3.9600e- 003 0.1255 0.1255 0.1255 0.1255 0.0000 375.2641 375.2641 0.0258 375.9079 Total 61.1281 2.0358 2.4234 3.9600e- 003 0.1255 0.1255 0.1255 0.1255 0.0000 375.2641 375.2641 0.0258 375.9079 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:30AMPage23of32 The Wave - Coral Mountain (Phase 1 Construction - Mitigated) - Riverside-Salton Sea County, Summer 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile 3.6 Architectural Coating - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.6438 0.3449 4.7206 0.0133 1.3805 8.3900e- 003 1.3889 0.3662 7.7300e- 003 0.3739 1,323.793 6 1,323.793 6 0.0321 1,324.596 8 Total 0.6438 0.3449 4.7206 0.0133 1.3805 8.3900e- 003 1.3889 0.3662 7.7300e- 003 0.3739 1,323.793 6 1,323.793 6 0.0321 1,324.596 8 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:30AMPage24of32 The Wave - Coral Mountain (Phase 1 Construction - Mitigated) - Riverside-Salton Sea County, Summer ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Mitigated 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Unmitigated 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 4.2 Trip Summary Information 4.3 Trip Type Information Average Daily Trip Rate Unmitigated Mitigated Land Use Weekday Saturday Sunday Annual VMT Annual VMT Apartments Low Rise 0.00 0.00 0.00 Hotel 0.00 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 0.00 Regional Shopping Center 0.00 0.00 0.00 Single Family Housing 0.00 0.00 0.00 User Defined Recreational 0.00 0.00 0.00 Total 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:30AMPage25of32 The Wave - Coral Mountain (Phase 1 Construction - Mitigated) - Riverside-Salton Sea County, Summer Miles Trip %Trip Purpose % Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C-W H-S or C-C H-O or C-NW Primary Diverted Pass-by Apartments Low Rise 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 Hotel 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 Regional Shopping Center 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 Single Family Housing 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 User Defined Recreational 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 5.0 Energy Detail 5.1 Mitigation Measures Energy 4.4 Fleet Mix Land Use LDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH Apartments Low Rise 0.542116 0.037578 0.185203 0.118503 0.016241 0.005141 0.017392 0.068695 0.001383 0.001183 0.004582 0.000945 0.001038 Hotel 0.542116 0.037578 0.185203 0.118503 0.016241 0.005141 0.017392 0.068695 0.001383 0.001183 0.004582 0.000945 0.001038 Other Asphalt Surfaces 0.542116 0.037578 0.185203 0.118503 0.016241 0.005141 0.017392 0.068695 0.001383 0.001183 0.004582 0.000945 0.001038 Regional Shopping Center 0.542116 0.037578 0.185203 0.118503 0.016241 0.005141 0.017392 0.068695 0.001383 0.001183 0.004582 0.000945 0.001038 Single Family Housing 0.542116 0.037578 0.185203 0.118503 0.016241 0.005141 0.017392 0.068695 0.001383 0.001183 0.004582 0.000945 0.001038 User Defined Recreational 0.542116 0.037578 0.185203 0.118503 0.016241 0.005141 0.017392 0.068695 0.001383 0.001183 0.004582 0.000945 0.001038 Historical Energy Use: N CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:30AMPage26of32 The Wave - Coral Mountain (Phase 1 Construction - Mitigated) - Riverside-Salton Sea County, Summer ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day NaturalGas Mitigated 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 NaturalGas Unmitigated 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:30AMPage27of32 The Wave - Coral Mountain (Phase 1 Construction - Mitigated) - Riverside-Salton Sea County, Summer 5.2 Energy by Land Use - NaturalGas NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr lb/day lb/day Apartments Low Rise 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hotel 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Other Asphalt Surfaces 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Regional Shopping Center 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Single Family Housing 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 User Defined Recreational 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Unmitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:30AMPage28of32 The Wave - Coral Mountain (Phase 1 Construction - Mitigated) - Riverside-Salton Sea County, Summer 6.1 Mitigation Measures Area 6.0 Area Detail 5.2 Energy by Land Use - NaturalGas NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr lb/day lb/day Apartments Low Rise 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hotel 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Other Asphalt Surfaces 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Regional Shopping Center 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Single Family Housing 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 User Defined Recreational 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:30AMPage29of32 The Wave - Coral Mountain (Phase 1 Construction - Mitigated) - Riverside-Salton Sea County, Summer ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Mitigated 26.2239 0.1243 10.7685 5.7000e- 004 0.0593 0.0593 0.0593 0.0593 0.0000 19.3545 19.3545 0.0188 0.0000 19.8252 Unmitigated 26.2239 0.1243 10.7685 5.7000e- 004 0.0593 0.0593 0.0593 0.0593 0.0000 19.3545 19.3545 0.0188 0.0000 19.8252 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory lb/day lb/day Architectural Coating 6.2503 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 19.6461 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hearth 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 0.3275 0.1243 10.7685 5.7000e- 004 0.0593 0.0593 0.0593 0.0593 19.3545 19.3545 0.0188 19.8252 Total 26.2239 0.1243 10.7685 5.7000e- 004 0.0593 0.0593 0.0593 0.0593 0.0000 19.3545 19.3545 0.0188 0.0000 19.8252 Unmitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:30AMPage30of32 The Wave - Coral Mountain (Phase 1 Construction - Mitigated) - Riverside-Salton Sea County, Summer 8.1 Mitigation Measures Waste 7.1 Mitigation Measures Water 7.0 Water Detail 8.0 Waste Detail 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory lb/day lb/day Architectural Coating 6.2503 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 19.6461 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hearth 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 0.3275 0.1243 10.7685 5.7000e- 004 0.0593 0.0593 0.0593 0.0593 19.3545 19.3545 0.0188 19.8252 Total 26.2239 0.1243 10.7685 5.7000e- 004 0.0593 0.0593 0.0593 0.0593 0.0000 19.3545 19.3545 0.0188 0.0000 19.8252 Mitigated 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year Horse Power Load Factor Fuel Type 10.0 Stationary Equipment CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:30AMPage31of32 The Wave - Coral Mountain (Phase 1 Construction - Mitigated) - Riverside-Salton Sea County, Summer 11.0 Vegetation Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power Load Factor Fuel Type Boilers Equipment Type Number Heat Input/Day Heat Input/Year Boiler Rating Fuel Type User Defined Equipment Equipment Type Number CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:30AMPage32of32 The Wave - Coral Mountain (Phase 1 Construction - Mitigated) - Riverside-Salton Sea County, Summer 1.1 Land Usage Land Uses Size Metric Lot Acreage Floor Surface Area Population Other Asphalt Surfaces 23.19 Acre 23.19 1,010,156.40 0 Hotel 150.00 Room 5.00 217,800.00 0 User Defined Recreational 12.00 User Defined Unit 12.00 522,720.00 0 Apartments Low Rise 104.00 Dwelling Unit 6.50 104,000.00 279 Single Family Housing 26.00 Dwelling Unit 8.44 46,800.00 70 Regional Shopping Center 10.00 1000sqft 0.23 10,000.00 0 1.2 Other Project Characteristics Urbanization Climate Zone Urban 15 Wind Speed (m/s)Precipitation Freq (Days)2.4 28 1.3 User Entered Comments & Non-Default Data 1.0 Project Characteristics Utility Company Imperial Irrigation District 2021OperationalYear CO2 Intensity lb/MWhr) 1270.9 0.029CH4Intensity lb/MWhr) 0.006N2OIntensity lb/MWhr) The Wave - Coral Mountain (Phase 1 Construction - Mitigated) Riverside-Salton Sea County, Winter CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:29AMPage1of32 The Wave - Coral Mountain (Phase 1 Construction - Mitigated) - Riverside-Salton Sea County, Winter Project Characteristics - Land Use - Total Project Area is 55.36 acres. Construction Phase - Construction Schedule adjsuted to meet the 2021 Opening Year. Off-road Equipment - Hours are based on an 8-hour workday. Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Off-road Equipment - Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Grading - For purposes of analysis, total acres graded per day is based on the equipment specific grading rates (CalEEMod Appendix A) and the equipment list. Architectural Coating - Rule 1113 Vehicle Trips - Construction Run Only. Woodstoves - Construction Run Only. Energy Use - Construction Run Only. Water And Wastewater - Construction Run Only. Solid Waste - Construction Run Only. Construction Off-road Equipment Mitigation - All equipment operating at >150 HP are required to be equipped with Tier 3 or better engines. Table Name Column Name Default Value New Value tblArchitecturalCoating EF_Nonresidential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Interior 250.00 50.00 tblArchitecturalCoating EF_Parking 250.00 50.00 tblArchitecturalCoating EF_Residential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Residential_Interior 250.00 50.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 9.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 2.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:29AMPage2of32 The Wave - Coral Mountain (Phase 1 Construction - Mitigated) - Riverside-Salton Sea County, Winter tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 4.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 2.00 tblConstEquipMitigation Tier No Change Tier 3 tblConstEquipMitigation Tier No Change Tier 3 tblConstEquipMitigation Tier No Change Tier 3 tblConstEquipMitigation Tier No Change Tier 3 tblConstEquipMitigation Tier No Change Tier 3 tblConstEquipMitigation Tier No Change Tier 3 tblConstructionPhase NumDays 1,110.00 200.00 tblConstructionPhase PhaseEndDate 4/29/2025 11/2/2021 tblConstructionPhase PhaseEndDate 8/12/2025 12/14/2021 tblConstructionPhase PhaseEndDate 11/25/2025 12/14/2021 tblConstructionPhase PhaseStartDate 4/30/2025 9/1/2021 tblConstructionPhase PhaseStartDate 8/13/2025 9/1/2021 tblEnergyUse LightingElect 810.36 0.00 tblEnergyUse LightingElect 5.44 0.00 tblEnergyUse LightingElect 5.61 0.00 tblEnergyUse LightingElect 1,608.84 0.00 tblEnergyUse NT24E 3,172.76 0.00 tblEnergyUse NT24E 6.23 0.00 tblEnergyUse NT24E 2.44 0.00 tblEnergyUse NT24E 6,155.97 0.00 tblEnergyUse NT24NG 6,030.00 0.00 tblEnergyUse NT24NG 4.86 0.00 tblEnergyUse NT24NG 0.30 0.00 tblEnergyUse NT24NG 6,030.00 0.00 tblEnergyUse T24E 877.14 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:29AMPage3of32 The Wave - Coral Mountain (Phase 1 Construction - Mitigated) - Riverside-Salton Sea County, Winter tblEnergyUse T24E 6.47 0.00 tblEnergyUse T24E 4.58 0.00 tblEnergyUse T24E 951.67 0.00 tblEnergyUse T24NG 9,544.50 0.00 tblEnergyUse T24NG 55.15 0.00 tblEnergyUse T24NG 1.92 0.00 tblEnergyUse T24NG 24,566.15 0.00 tblFireplaces NumberGas 83.20 0.00 tblFireplaces NumberGas 20.80 0.00 tblFireplaces NumberNoFireplace 10.40 0.00 tblFireplaces NumberNoFireplace 2.60 0.00 tblFireplaces NumberWood 10.40 0.00 tblFireplaces NumberWood 2.60 0.00 tblGrading AcresOfGrading 385.00 440.00 tblGrading AcresOfGrading 80.00 140.00 tblLandUse LandUseSquareFeet 0.00 522,720.00 tblLandUse LotAcreage 0.00 12.00 tblLandUse Population 297.00 279.00 tblLandUse Population 74.00 70.00 tblOffRoadEquipment LoadFactor 0.43 0.43 tblOffRoadEquipment OffRoadEquipmentType Crawler Tractors tblOffRoadEquipment OffRoadEquipmentType Crawler Tractors tblOffRoadEquipment OffRoadEquipmentType Crawler Tractors tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 0.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 0.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 4.00 0.00 tblOffRoadEquipment UsageHours 6.00 8.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:29AMPage4of32 The Wave - Coral Mountain (Phase 1 Construction - Mitigated) - Riverside-Salton Sea County, Winter tblOffRoadEquipment UsageHours 7.00 8.00 tblOffRoadEquipment UsageHours 7.00 8.00 tblSolidWaste SolidWasteGenerationRate 47.84 0.00 tblSolidWaste SolidWasteGenerationRate 82.13 0.00 tblSolidWaste SolidWasteGenerationRate 10.50 0.00 tblSolidWaste SolidWasteGenerationRate 28.70 0.00 tblVehicleTrips CC_TL 4.20 0.00 tblVehicleTrips CC_TL 4.20 0.00 tblVehicleTrips CC_TL 4.20 0.00 tblVehicleTrips CC_TL 4.20 0.00 tblVehicleTrips CC_TTP 61.60 0.00 tblVehicleTrips CC_TTP 64.70 0.00 tblVehicleTrips CNW_TL 5.40 0.00 tblVehicleTrips CNW_TL 5.40 0.00 tblVehicleTrips CNW_TL 5.40 0.00 tblVehicleTrips CNW_TL 5.40 0.00 tblVehicleTrips CNW_TTP 19.00 0.00 tblVehicleTrips CNW_TTP 19.00 0.00 tblVehicleTrips CW_TL 12.50 0.00 tblVehicleTrips CW_TL 12.50 0.00 tblVehicleTrips CW_TL 12.50 0.00 tblVehicleTrips CW_TL 12.50 0.00 tblVehicleTrips CW_TTP 19.40 0.00 tblVehicleTrips CW_TTP 16.30 0.00 tblVehicleTrips DV_TP 11.00 0.00 tblVehicleTrips DV_TP 38.00 0.00 tblVehicleTrips DV_TP 35.00 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:29AMPage5of32 The Wave - Coral Mountain (Phase 1 Construction - Mitigated) - Riverside-Salton Sea County, Winter tblVehicleTrips DV_TP 11.00 0.00 tblVehicleTrips HO_TL 4.50 0.00 tblVehicleTrips HO_TL 4.50 0.00 tblVehicleTrips HO_TTP 40.60 0.00 tblVehicleTrips HO_TTP 40.60 0.00 tblVehicleTrips HS_TL 3.50 0.00 tblVehicleTrips HS_TL 3.50 0.00 tblVehicleTrips HS_TTP 19.20 0.00 tblVehicleTrips HS_TTP 19.20 0.00 tblVehicleTrips HW_TL 11.00 0.00 tblVehicleTrips HW_TL 11.00 0.00 tblVehicleTrips HW_TTP 40.20 0.00 tblVehicleTrips HW_TTP 40.20 0.00 tblVehicleTrips PB_TP 3.00 0.00 tblVehicleTrips PB_TP 4.00 0.00 tblVehicleTrips PB_TP 11.00 0.00 tblVehicleTrips PB_TP 3.00 0.00 tblVehicleTrips PR_TP 86.00 0.00 tblVehicleTrips PR_TP 58.00 0.00 tblVehicleTrips PR_TP 54.00 0.00 tblVehicleTrips PR_TP 86.00 0.00 tblVehicleTrips ST_TR 7.16 0.00 tblVehicleTrips ST_TR 8.19 0.00 tblVehicleTrips ST_TR 49.97 0.00 tblVehicleTrips ST_TR 9.91 0.00 tblVehicleTrips SU_TR 6.07 0.00 tblVehicleTrips SU_TR 5.95 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:29AMPage6of32 The Wave - Coral Mountain (Phase 1 Construction - Mitigated) - Riverside-Salton Sea County, Winter 2.0 Emissions Summary tblVehicleTrips SU_TR 25.24 0.00 tblVehicleTrips SU_TR 8.62 0.00 tblVehicleTrips WD_TR 6.59 0.00 tblVehicleTrips WD_TR 8.17 0.00 tblVehicleTrips WD_TR 42.70 0.00 tblVehicleTrips WD_TR 9.52 0.00 tblWater IndoorWaterUseRate 6,776,018.66 0.00 tblWater IndoorWaterUseRate 3,805,015.50 0.00 tblWater IndoorWaterUseRate 740,725.21 0.00 tblWater IndoorWaterUseRate 1,694,004.67 0.00 tblWater OutdoorWaterUseRate 4,271,837.85 0.00 tblWater OutdoorWaterUseRate 422,779.50 0.00 tblWater OutdoorWaterUseRate 453,992.87 0.00 tblWater OutdoorWaterUseRate 1,067,959.46 0.00 tblWoodstoves NumberCatalytic 5.20 0.00 tblWoodstoves NumberCatalytic 1.30 0.00 tblWoodstoves NumberNoncatalytic 5.20 0.00 tblWoodstoves NumberNoncatalytic 1.30 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:29AMPage7of32 The Wave - Coral Mountain (Phase 1 Construction - Mitigated) - Riverside-Salton Sea County, Winter 2.1 Overall Construction (Maximum Daily Emission) ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year lb/day lb/day 2020 5.6196 63.7477 32.9107 0.0730 21.9286 2.7853 24.7139 10.3714 2.5625 12.9339 0.0000 7,074.110 9 7,074.110 9 2.2435 0.0000 7,130.198 8 2021 70.7439 76.9730 64.2781 0.2056 10.4314 2.3749 12.7185 3.8126 2.2159 5.9168 0.0000 20,598.98 58 20,598.98 58 2.6713 0.0000 20,665.76 81 Maximum 70.7439 76.9730 64.2781 0.2056 21.9286 2.7853 24.7139 10.3714 2.5625 12.9339 0.0000 20,598.98 58 20,598.98 58 2.6713 0.0000 20,665.76 81 Unmitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year lb/day lb/day 2020 1.8372 34.0178 40.9109 0.0730 8.6440 1.3404 9.6694 4.0692 1.3403 5.0945 0.0000 7,074.110 9 7,074.110 9 2.2435 0.0000 7,130.198 8 2021 69.3988 65.1508 70.6027 0.2056 9.9070 1.9200 11.8269 2.6623 1.8397 4.5020 0.0000 20,598.98 58 20,598.98 58 2.6713 0.0000 20,665.76 81 Maximum 69.3988 65.1508 70.6027 0.2056 9.9070 1.9200 11.8269 4.0692 1.8397 5.0945 0.0000 20,598.98 58 20,598.98 58 2.6713 0.0000 20,665.76 81 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 6.71 29.53 -14.74 0.00 42.67 36.82 42.57 52.54 33.45 49.09 0.00 0.00 0.00 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:29AMPage8of32 The Wave - Coral Mountain (Phase 1 Construction - Mitigated) - Riverside-Salton Sea County, Winter 2.2 Overall Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Area 26.2239 0.1243 10.7685 5.7000e- 004 0.0593 0.0593 0.0593 0.0593 0.0000 19.3545 19.3545 0.0188 0.0000 19.8252 Energy 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mobile 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 26.2239 0.1243 10.7685 5.7000e- 004 0.0000 0.0593 0.0593 0.0000 0.0593 0.0593 0.0000 19.3545 19.3545 0.0188 0.0000 19.8252 Unmitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Area 26.2239 0.1243 10.7685 5.7000e- 004 0.0593 0.0593 0.0593 0.0593 0.0000 19.3545 19.3545 0.0188 0.0000 19.8252 Energy 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mobile 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 26.2239 0.1243 10.7685 5.7000e- 004 0.0000 0.0593 0.0593 0.0000 0.0593 0.0593 0.0000 19.3545 19.3545 0.0188 0.0000 19.8252 Mitigated Operational CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:29AMPage9of32 The Wave - Coral Mountain (Phase 1 Construction - Mitigated) - Riverside-Salton Sea County, Winter 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 Site Preparation Site Preparation 7/1/2020 8/25/2020 5 40 2 Grading Grading 8/26/2020 1/26/2021 5 110 3 Building Construction Building Construction 1/27/2021 11/2/2021 5 200 4 Paving Paving 9/1/2021 12/14/2021 5 75 5 Architectural Coating Architectural Coating 9/1/2021 12/14/2021 5 75 OffRoad Equipment ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Residential Indoor: 305,370; Residential Outdoor: 101,790; Non-Residential Indoor: 1,125,780; Non-Residential Outdoor: 375,260; Striped Parking Area: 60,609 (Architectural Coating – sqft) Acres of Grading (Site Preparation Phase): 140 Acres of Grading (Grading Phase): 440 Acres of Paving: 23.19 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:29AMPage10of32 The Wave - Coral Mountain (Phase 1 Construction - Mitigated) - Riverside-Salton Sea County, Winter Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Site Preparation Crawler Tractors 4 8.00 212 0.43 Site Preparation Rubber Tired Dozers 3 8.00 247 0.40 Site Preparation Tractors/Loaders/Backhoes 0 8.00 97 0.37 Grading Crawler Tractors 2 8.00 212 0.43 Grading Excavators 2 8.00 158 0.38 Grading Graders 1 8.00 187 0.41 Grading Rubber Tired Dozers 1 8.00 247 0.40 Grading Scrapers 2 8.00 367 0.48 Grading Tractors/Loaders/Backhoes 0 8.00 97 0.37 Building Construction Cranes 1 8.00 231 0.29 Building Construction Crawler Tractors 3 8.00 212 0.43 Building Construction Forklifts 3 8.00 89 0.20 Building Construction Generator Sets 1 8.00 84 0.74 Building Construction Tractors/Loaders/Backhoes 0 8.00 97 0.37 Building Construction Welders 1 8.00 46 0.45 Paving Pavers 2 8.00 130 0.42 Paving Paving Equipment 2 8.00 132 0.36 Paving Rollers 2 8.00 80 0.38 Architectural Coating Air Compressors 1 8.00 78 0.48 Trips and VMT CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:29AMPage11of32 The Wave - Coral Mountain (Phase 1 Construction - Mitigated) - Riverside-Salton Sea County, Winter 3.2 Site Preparation - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 21.7780 0.0000 21.7780 10.3315 0.0000 10.3315 0.0000 0.0000 Off-Road 5.5474 63.7043 22.3668 0.0569 2.7844 2.7844 2.5616 2.5616 5,515.093 1 5,515.093 1 1.7837 5,559.685 4 Total 5.5474 63.7043 22.3668 0.0569 21.7780 2.7844 24.5624 10.3315 2.5616 12.8931 5,515.093 1 5,515.093 1 1.7837 5,559.685 4 Unmitigated Construction On-Site 3.1 Mitigation Measures Construction Use Cleaner Engines for Construction Equipment Water Exposed Area Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Site Preparation 7 18.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Grading 8 20.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Building Construction 9 823.00 302.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Paving 6 15.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Architectural Coating 1 165.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:29AMPage12of32 The Wave - Coral Mountain (Phase 1 Construction - Mitigated) - Riverside-Salton Sea County, Winter 3.2 Site Preparation - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0721 0.0434 0.4607 1.3500e- 003 0.1506 9.4000e- 004 0.1515 0.0400 8.7000e- 004 0.0408 134.1053 134.1053 3.4200e- 003 134.1907 Total 0.0721 0.0434 0.4607 1.3500e- 003 0.1506 9.4000e- 004 0.1515 0.0400 8.7000e- 004 0.0408 134.1053 134.1053 3.4200e- 003 134.1907 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 8.4934 0.0000 8.4934 4.0293 0.0000 4.0293 0.0000 0.0000 Off-Road 1.3969 27.0067 30.2661 0.0569 1.0244 1.0244 1.0244 1.0244 0.0000 5,515.093 1 5,515.093 1 1.7837 5,559.685 4 Total 1.3969 27.0067 30.2661 0.0569 8.4934 1.0244 9.5178 4.0293 1.0244 5.0537 0.0000 5,515.093 1 5,515.093 1 1.7837 5,559.685 4 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:29AMPage13of32 The Wave - Coral Mountain (Phase 1 Construction - Mitigated) - Riverside-Salton Sea County, Winter 3.2 Site Preparation - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0721 0.0434 0.4607 1.3500e- 003 0.1506 9.4000e- 004 0.1515 0.0400 8.7000e- 004 0.0408 134.1053 134.1053 3.4200e- 003 134.1907 Total 0.0721 0.0434 0.4607 1.3500e- 003 0.1506 9.4000e- 004 0.1515 0.0400 8.7000e- 004 0.0408 134.1053 134.1053 3.4200e- 003 134.1907 Mitigated Construction Off-Site 3.3 Grading - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 10.2641 0.0000 10.2641 3.7683 0.0000 3.7683 0.0000 0.0000 Off-Road 5.1888 60.8826 32.3988 0.0715 2.4690 2.4690 2.2714 2.2714 6,925.105 1 6,925.105 1 2.2397 6,981.098 1 Total 5.1888 60.8826 32.3988 0.0715 10.2641 2.4690 12.7331 3.7683 2.2714 6.0397 6,925.105 1 6,925.105 1 2.2397 6,981.098 1 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:29AMPage14of32 The Wave - Coral Mountain (Phase 1 Construction - Mitigated) - Riverside-Salton Sea County, Winter 3.3 Grading - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0801 0.0482 0.5119 1.5000e- 003 0.1673 1.0400e- 003 0.1684 0.0444 9.6000e- 004 0.0454 149.0058 149.0058 3.8000e- 003 149.1008 Total 0.0801 0.0482 0.5119 1.5000e- 003 0.1673 1.0400e- 003 0.1684 0.0444 9.6000e- 004 0.0454 149.0058 149.0058 3.8000e- 003 149.1008 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 4.0030 0.0000 4.0030 1.4696 0.0000 1.4696 0.0000 0.0000 Off-Road 1.7571 33.9695 40.3990 0.0715 1.3393 1.3393 1.3393 1.3393 0.0000 6,925.105 1 6,925.105 1 2.2397 6,981.098 1 Total 1.7571 33.9695 40.3990 0.0715 4.0030 1.3393 5.3423 1.4696 1.3393 2.8090 0.0000 6,925.105 1 6,925.105 1 2.2397 6,981.098 1 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:29AMPage15of32 The Wave - Coral Mountain (Phase 1 Construction - Mitigated) - Riverside-Salton Sea County, Winter 3.3 Grading - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0801 0.0482 0.5119 1.5000e- 003 0.1673 1.0400e- 003 0.1684 0.0444 9.6000e- 004 0.0454 149.0058 149.0058 3.8000e- 003 149.1008 Total 0.0801 0.0482 0.5119 1.5000e- 003 0.1673 1.0400e- 003 0.1684 0.0444 9.6000e- 004 0.0454 149.0058 149.0058 3.8000e- 003 149.1008 Mitigated Construction Off-Site 3.3 Grading - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 10.2641 0.0000 10.2641 3.7683 0.0000 3.7683 0.0000 0.0000 Off-Road 4.9185 56.5443 31.2281 0.0715 2.2861 2.2861 2.1032 2.1032 6,925.967 4 6,925.967 4 2.2400 6,981.967 3 Total 4.9185 56.5443 31.2281 0.0715 10.2641 2.2861 12.5502 3.7683 2.1032 5.8715 6,925.967 4 6,925.967 4 2.2400 6,981.967 3 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:29AMPage16of32 The Wave - Coral Mountain (Phase 1 Construction - Mitigated) - Riverside-Salton Sea County, Winter 3.3 Grading - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0747 0.0432 0.4680 1.4500e- 003 0.1673 1.0200e- 003 0.1684 0.0444 9.4000e- 004 0.0453 144.0262 144.0262 3.4100e- 003 144.1115 Total 0.0747 0.0432 0.4680 1.4500e- 003 0.1673 1.0200e- 003 0.1684 0.0444 9.4000e- 004 0.0453 144.0262 144.0262 3.4100e- 003 144.1115 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 4.0030 0.0000 4.0030 1.4696 0.0000 1.4696 0.0000 0.0000 Off-Road 1.7571 33.9695 40.3990 0.0715 1.3393 1.3393 1.3393 1.3393 0.0000 6,925.967 4 6,925.967 4 2.2400 6,981.967 3 Total 1.7571 33.9695 40.3990 0.0715 4.0030 1.3393 5.3423 1.4696 1.3393 2.8090 0.0000 6,925.967 4 6,925.967 4 2.2400 6,981.967 3 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:29AMPage17of32 The Wave - Coral Mountain (Phase 1 Construction - Mitigated) - Riverside-Salton Sea County, Winter 3.3 Grading - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0747 0.0432 0.4680 1.4500e- 003 0.1673 1.0200e- 003 0.1684 0.0444 9.4000e- 004 0.0453 144.0262 144.0262 3.4100e- 003 144.1115 Total 0.0747 0.0432 0.4680 1.4500e- 003 0.1673 1.0200e- 003 0.1684 0.0444 9.4000e- 004 0.0453 144.0262 144.0262 3.4100e- 003 144.1115 Mitigated Construction Off-Site 3.4 Building Construction - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 3.1137 33.9659 18.1952 0.0430 1.4763 1.4763 1.3775 1.3775 4,114.429 7 4,114.429 7 1.1209 4,142.452 0 Total 3.1137 33.9659 18.1952 0.0430 1.4763 1.4763 1.3775 1.3775 4,114.429 7 4,114.429 7 1.1209 4,142.452 0 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:29AMPage18of32 The Wave - Coral Mountain (Phase 1 Construction - Mitigated) - Riverside-Salton Sea County, Winter 3.4 Building Construction - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.6895 25.8838 5.5343 0.0633 1.5152 0.0444 1.5595 0.4364 0.0425 0.4789 6,679.166 1 6,679.166 1 0.6396 6,695.157 2 Worker 3.0745 1.7793 19.2597 0.0595 6.8858 0.0419 6.9277 1.8264 0.0385 1.8650 5,926.679 1 5,926.679 1 0.1404 5,930.189 8 Total 3.7640 27.6631 24.7940 0.1228 8.4010 0.0863 8.4872 2.2628 0.0810 2.3438 12,605.84 52 12,605.84 52 0.7801 12,625.34 70 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.7686 22.1437 24.5197 0.0430 1.0214 1.0214 1.0013 1.0013 0.0000 4,114.429 7 4,114.429 7 1.1209 4,142.452 0 Total 1.7686 22.1437 24.5197 0.0430 1.0214 1.0214 1.0013 1.0013 0.0000 4,114.429 7 4,114.429 7 1.1209 4,142.452 0 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:29AMPage19of32 The Wave - Coral Mountain (Phase 1 Construction - Mitigated) - Riverside-Salton Sea County, Winter 3.4 Building Construction - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.6895 25.8838 5.5343 0.0633 1.5152 0.0444 1.5595 0.4364 0.0425 0.4789 6,679.166 1 6,679.166 1 0.6396 6,695.157 2 Worker 3.0745 1.7793 19.2597 0.0595 6.8858 0.0419 6.9277 1.8264 0.0385 1.8650 5,926.679 1 5,926.679 1 0.1404 5,930.189 8 Total 3.7640 27.6631 24.7940 0.1228 8.4010 0.0863 8.4872 2.2628 0.0810 2.3438 12,605.84 52 12,605.84 52 0.7801 12,625.34 70 Mitigated Construction Off-Site 3.5 Paving - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.2556 12.9191 14.6532 0.0228 0.6777 0.6777 0.6235 0.6235 2,207.210 9 2,207.210 9 0.7139 2,225.057 3 Paving 0.8101 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 2.0657 12.9191 14.6532 0.0228 0.6777 0.6777 0.6235 0.6235 2,207.210 9 2,207.210 9 0.7139 2,225.057 3 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:29AMPage20of32 The Wave - Coral Mountain (Phase 1 Construction - Mitigated) - Riverside-Salton Sea County, Winter 3.5 Paving - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0560 0.0324 0.3510 1.0800e- 003 0.1255 7.6000e- 004 0.1263 0.0333 7.0000e- 004 0.0340 108.0197 108.0197 2.5600e- 003 108.0837 Total 0.0560 0.0324 0.3510 1.0800e- 003 0.1255 7.6000e- 004 0.1263 0.0333 7.0000e- 004 0.0340 108.0197 108.0197 2.5600e- 003 108.0837 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.2556 12.9191 14.6532 0.0228 0.6777 0.6777 0.6235 0.6235 0.0000 2,207.210 9 2,207.210 9 0.7139 2,225.057 3 Paving 0.8101 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 2.0657 12.9191 14.6532 0.0228 0.6777 0.6777 0.6235 0.6235 0.0000 2,207.210 9 2,207.210 9 0.7139 2,225.057 3 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:29AMPage21of32 The Wave - Coral Mountain (Phase 1 Construction - Mitigated) - Riverside-Salton Sea County, Winter 3.5 Paving - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0560 0.0324 0.3510 1.0800e- 003 0.1255 7.6000e- 004 0.1263 0.0333 7.0000e- 004 0.0340 108.0197 108.0197 2.5600e- 003 108.0837 Total 0.0560 0.0324 0.3510 1.0800e- 003 0.1255 7.6000e- 004 0.1263 0.0333 7.0000e- 004 0.0340 108.0197 108.0197 2.5600e- 003 108.0837 Mitigated Construction Off-Site 3.6 Architectural Coating - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 60.8362 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.2919 2.0358 2.4234 3.9600e- 003 0.1255 0.1255 0.1255 0.1255 375.2641 375.2641 0.0258 375.9079 Total 61.1281 2.0358 2.4234 3.9600e- 003 0.1255 0.1255 0.1255 0.1255 375.2641 375.2641 0.0258 375.9079 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:29AMPage22of32 The Wave - Coral Mountain (Phase 1 Construction - Mitigated) - Riverside-Salton Sea County, Winter 3.6 Architectural Coating - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.6164 0.3567 3.8613 0.0119 1.3805 8.3900e- 003 1.3889 0.3662 7.7300e- 003 0.3739 1,188.216 3 1,188.216 3 0.0282 1,188.920 2 Total 0.6164 0.3567 3.8613 0.0119 1.3805 8.3900e- 003 1.3889 0.3662 7.7300e- 003 0.3739 1,188.216 3 1,188.216 3 0.0282 1,188.920 2 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 60.8362 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.2919 2.0358 2.4234 3.9600e- 003 0.1255 0.1255 0.1255 0.1255 0.0000 375.2641 375.2641 0.0258 375.9079 Total 61.1281 2.0358 2.4234 3.9600e- 003 0.1255 0.1255 0.1255 0.1255 0.0000 375.2641 375.2641 0.0258 375.9079 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:29AMPage23of32 The Wave - Coral Mountain (Phase 1 Construction - Mitigated) - Riverside-Salton Sea County, Winter 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile 3.6 Architectural Coating - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.6164 0.3567 3.8613 0.0119 1.3805 8.3900e- 003 1.3889 0.3662 7.7300e- 003 0.3739 1,188.216 3 1,188.216 3 0.0282 1,188.920 2 Total 0.6164 0.3567 3.8613 0.0119 1.3805 8.3900e- 003 1.3889 0.3662 7.7300e- 003 0.3739 1,188.216 3 1,188.216 3 0.0282 1,188.920 2 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:29AMPage24of32 The Wave - Coral Mountain (Phase 1 Construction - Mitigated) - Riverside-Salton Sea County, Winter ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Mitigated 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Unmitigated 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 4.2 Trip Summary Information 4.3 Trip Type Information Average Daily Trip Rate Unmitigated Mitigated Land Use Weekday Saturday Sunday Annual VMT Annual VMT Apartments Low Rise 0.00 0.00 0.00 Hotel 0.00 0.00 0.00 Other Asphalt Surfaces 0.00 0.00 0.00 Regional Shopping Center 0.00 0.00 0.00 Single Family Housing 0.00 0.00 0.00 User Defined Recreational 0.00 0.00 0.00 Total 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:29AMPage25of32 The Wave - Coral Mountain (Phase 1 Construction - Mitigated) - Riverside-Salton Sea County, Winter Miles Trip %Trip Purpose % Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C-W H-S or C-C H-O or C-NW Primary Diverted Pass-by Apartments Low Rise 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 Hotel 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 Regional Shopping Center 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 Single Family Housing 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 User Defined Recreational 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 5.0 Energy Detail 5.1 Mitigation Measures Energy 4.4 Fleet Mix Land Use LDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH Apartments Low Rise 0.542116 0.037578 0.185203 0.118503 0.016241 0.005141 0.017392 0.068695 0.001383 0.001183 0.004582 0.000945 0.001038 Hotel 0.542116 0.037578 0.185203 0.118503 0.016241 0.005141 0.017392 0.068695 0.001383 0.001183 0.004582 0.000945 0.001038 Other Asphalt Surfaces 0.542116 0.037578 0.185203 0.118503 0.016241 0.005141 0.017392 0.068695 0.001383 0.001183 0.004582 0.000945 0.001038 Regional Shopping Center 0.542116 0.037578 0.185203 0.118503 0.016241 0.005141 0.017392 0.068695 0.001383 0.001183 0.004582 0.000945 0.001038 Single Family Housing 0.542116 0.037578 0.185203 0.118503 0.016241 0.005141 0.017392 0.068695 0.001383 0.001183 0.004582 0.000945 0.001038 User Defined Recreational 0.542116 0.037578 0.185203 0.118503 0.016241 0.005141 0.017392 0.068695 0.001383 0.001183 0.004582 0.000945 0.001038 Historical Energy Use: N CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:29AMPage26of32 The Wave - Coral Mountain (Phase 1 Construction - Mitigated) - Riverside-Salton Sea County, Winter ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day NaturalGas Mitigated 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 NaturalGas Unmitigated 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:29AMPage27of32 The Wave - Coral Mountain (Phase 1 Construction - Mitigated) - Riverside-Salton Sea County, Winter 5.2 Energy by Land Use - NaturalGas NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr lb/day lb/day Apartments Low Rise 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hotel 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Other Asphalt Surfaces 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Regional Shopping Center 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Single Family Housing 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 User Defined Recreational 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Unmitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:29AMPage28of32 The Wave - Coral Mountain (Phase 1 Construction - Mitigated) - Riverside-Salton Sea County, Winter 6.1 Mitigation Measures Area 6.0 Area Detail 5.2 Energy by Land Use - NaturalGas NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr lb/day lb/day Apartments Low Rise 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hotel 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Other Asphalt Surfaces 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Regional Shopping Center 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Single Family Housing 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 User Defined Recreational 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:29AMPage29of32 The Wave - Coral Mountain (Phase 1 Construction - Mitigated) - Riverside-Salton Sea County, Winter ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Mitigated 26.2239 0.1243 10.7685 5.7000e- 004 0.0593 0.0593 0.0593 0.0593 0.0000 19.3545 19.3545 0.0188 0.0000 19.8252 Unmitigated 26.2239 0.1243 10.7685 5.7000e- 004 0.0593 0.0593 0.0593 0.0593 0.0000 19.3545 19.3545 0.0188 0.0000 19.8252 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory lb/day lb/day Architectural Coating 6.2503 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 19.6461 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hearth 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 0.3275 0.1243 10.7685 5.7000e- 004 0.0593 0.0593 0.0593 0.0593 19.3545 19.3545 0.0188 19.8252 Total 26.2239 0.1243 10.7685 5.7000e- 004 0.0593 0.0593 0.0593 0.0593 0.0000 19.3545 19.3545 0.0188 0.0000 19.8252 Unmitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:29AMPage30of32 The Wave - Coral Mountain (Phase 1 Construction - Mitigated) - Riverside-Salton Sea County, Winter 8.1 Mitigation Measures Waste 7.1 Mitigation Measures Water 7.0 Water Detail 8.0 Waste Detail 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory lb/day lb/day Architectural Coating 6.2503 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 19.6461 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hearth 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 0.3275 0.1243 10.7685 5.7000e- 004 0.0593 0.0593 0.0593 0.0593 19.3545 19.3545 0.0188 19.8252 Total 26.2239 0.1243 10.7685 5.7000e- 004 0.0593 0.0593 0.0593 0.0593 0.0000 19.3545 19.3545 0.0188 0.0000 19.8252 Mitigated 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year Horse Power Load Factor Fuel Type 10.0 Stationary Equipment CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:29AMPage31of32 The Wave - Coral Mountain (Phase 1 Construction - Mitigated) - Riverside-Salton Sea County, Winter 11.0 Vegetation Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power Load Factor Fuel Type Boilers Equipment Type Number Heat Input/Day Heat Input/Year Boiler Rating Fuel Type User Defined Equipment Equipment Type Number CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:29AMPage32of32 The Wave - Coral Mountain (Phase 1 Construction - Mitigated) - Riverside-Salton Sea County, Winter 1.1 Land Usage Land Uses Size Metric Lot Acreage Floor Surface Area Population Other Asphalt Surfaces 0.41 Acre 0.41 17,859.60 0 Regional Shopping Center 25.00 1000sqft 0.57 25,000.00 0 1.2 Other Project Characteristics Urbanization Climate Zone Urban 15 Wind Speed (m/s)Precipitation Freq (Days)2.4 28 1.3 User Entered Comments & Non-Default Data 1.0 Project Characteristics Utility Company Imperial Irrigation District 2023OperationalYear CO2 Intensity lb/MWhr) 1270.9 0.029CH4Intensity lb/MWhr) 0.006N2OIntensity lb/MWhr) The Wave - Coral Mountain (Phase 2 Construction - Mitigated) Riverside-Salton Sea County, Summer CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:46AMPage1of27 The Wave - Coral Mountain (Phase 2 Construction - Mitigated) - Riverside-Salton Sea County, Summer Project Characteristics - Land Use - Total Project Area is 0.99 acres Construction Phase - Construction Schedule adjsuted to meet the 2023 Opening Year Off-road Equipment - Hours are based on an 8-hour workday. Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Grading - For purposes of analysis, total acres graded per day is based on the equipment specific grading rates (CalEEMod Appendix A) and the equipment list. Architectural Coating - Rule 1113 Vehicle Trips - Construction Run Only. Energy Use - Construction Run Only. Water And Wastewater - Construction Run Only. Solid Waste - Construction Run Only. Construction Off-road Equipment Mitigation - All equipment operating at >150 HP are required to be equipped with Tier 3 or better engines. Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Table Name Column Name Default Value New Value tblArchitecturalCoating EF_Nonresidential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Interior 250.00 50.00 tblArchitecturalCoating EF_Parking 250.00 50.00 tblArchitecturalCoating EF_Residential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Residential_Interior 250.00 50.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 6.00 tblConstEquipMitigation Tier No Change Tier 3 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:46AMPage2of27 The Wave - Coral Mountain (Phase 2 Construction - Mitigated) - Riverside-Salton Sea County, Summer tblConstEquipMitigation Tier No Change Tier 3 tblConstEquipMitigation Tier No Change Tier 3 tblConstEquipMitigation Tier No Change Tier 3 tblConstructionPhase PhaseEndDate 2/22/2023 2/15/2023 tblConstructionPhase PhaseStartDate 2/16/2023 2/9/2023 tblEnergyUse LightingElect 5.61 0.00 tblEnergyUse NT24E 2.44 0.00 tblEnergyUse NT24NG 0.30 0.00 tblEnergyUse T24E 4.58 0.00 tblEnergyUse T24NG 1.92 0.00 tblGrading AcresOfGrading 2.00 3.00 tblOffRoadEquipment LoadFactor 0.43 0.43 tblOffRoadEquipment LoadFactor 0.43 0.43 tblOffRoadEquipment LoadFactor 0.43 0.43 tblOffRoadEquipment LoadFactor 0.43 0.43 tblOffRoadEquipment OffRoadEquipmentType Crawler Tractors tblOffRoadEquipment OffRoadEquipmentType Crawler Tractors tblOffRoadEquipment OffRoadEquipmentType Crawler Tractors tblOffRoadEquipment OffRoadEquipmentType Crawler Tractors tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 0.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 0.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00 tblOffRoadEquipment UsageHours 6.00 8.00 tblOffRoadEquipment UsageHours 6.00 8.00 tblOffRoadEquipment UsageHours 4.00 8.00 tblOffRoadEquipment UsageHours 6.00 8.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:46AMPage3of27 The Wave - Coral Mountain (Phase 2 Construction - Mitigated) - Riverside-Salton Sea County, Summer 2.0 Emissions Summary tblOffRoadEquipment UsageHours 7.00 8.00 tblOffRoadEquipment UsageHours 7.00 8.00 tblOffRoadEquipment UsageHours 1.00 8.00 tblOffRoadEquipment UsageHours 6.00 8.00 tblOffRoadEquipment UsageHours 7.00 8.00 tblSolidWaste SolidWasteGenerationRate 26.25 0.00 tblVehicleTrips CC_TL 4.20 0.00 tblVehicleTrips CC_TL 4.20 0.00 tblVehicleTrips CC_TTP 64.70 0.00 tblVehicleTrips CNW_TL 5.40 0.00 tblVehicleTrips CNW_TL 5.40 0.00 tblVehicleTrips CNW_TTP 19.00 0.00 tblVehicleTrips CW_TL 12.50 0.00 tblVehicleTrips CW_TL 12.50 0.00 tblVehicleTrips CW_TTP 16.30 0.00 tblVehicleTrips DV_TP 35.00 0.00 tblVehicleTrips PB_TP 11.00 0.00 tblVehicleTrips PR_TP 54.00 0.00 tblVehicleTrips ST_TR 49.97 0.00 tblVehicleTrips SU_TR 25.24 0.00 tblVehicleTrips WD_TR 42.70 0.00 tblWater IndoorWaterUseRate 1,851,813.04 0.00 tblWater OutdoorWaterUseRate 1,134,982.18 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:46AMPage4of27 The Wave - Coral Mountain (Phase 2 Construction - Mitigated) - Riverside-Salton Sea County, Summer 2.1 Overall Construction (Maximum Daily Emission) ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year lb/day lb/day 2022 2.2124 23.5958 12.1271 0.0312 7.6965 1.0202 8.7167 3.5042 0.9506 4.4548 0.0000 3,010.828 2 3,010.828 2 0.7912 0.0000 3,030.607 2 2023 25.2375 16.4265 11.1318 0.0271 0.1757 0.6755 0.8444 0.0466 0.6214 0.6671 0.0000 2,642.347 0 2,642.347 0 0.7777 0.0000 2,661.788 3 Maximum 25.2375 23.5958 12.1271 0.0312 7.6965 1.0202 8.7167 3.5042 0.9506 4.4548 0.0000 3,010.828 2 3,010.828 2 0.7912 0.0000 3,030.607 2 Unmitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year lb/day lb/day 2022 0.9881 14.3020 16.7961 0.0312 3.0527 0.5862 3.6389 1.3802 0.5862 1.9663 0.0000 3,010.828 2 3,010.828 2 0.7912 0.0000 3,030.607 2 2023 24.9870 12.5708 14.1754 0.0271 0.1757 0.5059 0.6749 0.0466 0.4963 0.5420 0.0000 2,642.347 0 2,642.347 0 0.7777 0.0000 2,661.788 3 Maximum 24.9870 14.3020 16.7961 0.0312 3.0527 0.5862 3.6389 1.3802 0.5862 1.9663 0.0000 3,010.828 2 3,010.828 2 0.7912 0.0000 3,030.607 2 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 5.37 32.86 -33.16 0.00 58.99 35.59 54.88 59.82 31.14 51.03 0.00 0.00 0.00 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:46AMPage5of27 The Wave - Coral Mountain (Phase 2 Construction - Mitigated) - Riverside-Salton Sea County, Summer 2.2 Overall Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Area 0.7037 2.0000e- 005 2.5900e- 003 0.0000 1.0000e- 005 1.0000e- 005 1.0000e- 005 1.0000e- 005 5.5600e- 003 5.5600e- 003 1.0000e- 005 5.9300e- 003 Energy 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mobile 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.7037 2.0000e- 005 2.5900e- 003 0.0000 0.0000 1.0000e- 005 1.0000e- 005 0.0000 1.0000e- 005 1.0000e- 005 5.5600e- 003 5.5600e- 003 1.0000e- 005 0.0000 5.9300e- 003 Unmitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Area 0.7037 2.0000e- 005 2.5900e- 003 0.0000 1.0000e- 005 1.0000e- 005 1.0000e- 005 1.0000e- 005 5.5600e- 003 5.5600e- 003 1.0000e- 005 5.9300e- 003 Energy 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mobile 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.7037 2.0000e- 005 2.5900e- 003 0.0000 0.0000 1.0000e- 005 1.0000e- 005 0.0000 1.0000e- 005 1.0000e- 005 5.5600e- 003 5.5600e- 003 1.0000e- 005 0.0000 5.9300e- 003 Mitigated Operational CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:46AMPage6of27 The Wave - Coral Mountain (Phase 2 Construction - Mitigated) - Riverside-Salton Sea County, Summer 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 Site Preparation Site Preparation 9/19/2022 9/19/2022 5 1 2 Grading Grading 9/20/2022 9/21/2022 5 2 3 Building Construction Building Construction 9/22/2022 2/8/2023 5 100 4 Paving Paving 2/9/2023 2/15/2023 5 5 5 Architectural Coating Architectural Coating 2/9/2023 2/15/2023 5 5 OffRoad Equipment ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Residential Indoor: 0; Residential Outdoor: 0; Non-Residential Indoor: 37,500; Non-Residential Outdoor: 12,500; Striped Parking Area: 1,072 Architectural Coating – sqft) Acres of Grading (Site Preparation Phase): 1 Acres of Grading (Grading Phase): 3 Acres of Paving: 0.41 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:46AMPage7of27 The Wave - Coral Mountain (Phase 2 Construction - Mitigated) - Riverside-Salton Sea County, Summer Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Site Preparation Graders 1 8.00 187 0.41 Site Preparation Tractors/Loaders/Backhoes 0 8.00 97 0.37 Grading Concrete/Industrial Saws 1 8.00 81 0.73 Grading Rubber Tired Dozers 1 8.00 247 0.40 Grading Tractors/Loaders/Backhoes 0 8.00 97 0.37 Building Construction Cranes 1 8.00 231 0.29 Building Construction Forklifts 2 8.00 89 0.20 Building Construction Tractors/Loaders/Backhoes 0 8.00 97 0.37 Paving Cement and Mortar Mixers 4 8.00 9 0.56 Paving Pavers 1 8.00 130 0.42 Paving Rollers 1 8.00 80 0.38 Paving Tractors/Loaders/Backhoes 0 8.00 97 0.37 Architectural Coating Air Compressors 1 8.00 78 0.48 Site Preparation Crawler Tractors 1 8.00 212 0.43 Grading Crawler Tractors 2 8.00 212 0.43 Building Construction Crawler Tractors 2 8.00 212 0.43 Paving Crawler Tractors 1 8.00 212 0.43 Trips and VMT Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Site Preparation 2 5.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Grading 4 10.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Building Construction 5 16.00 7.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Paving 7 18.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Architectural Coating 1 3.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:46AMPage8of27 The Wave - Coral Mountain (Phase 2 Construction - Mitigated) - Riverside-Salton Sea County, Summer 3.2 Site Preparation - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 1.0605 0.0000 1.0605 0.1145 0.0000 0.1145 0.0000 0.0000 Off-Road 0.9055 11.2487 4.0301 0.0144 0.3933 0.3933 0.3618 0.3618 1,398.193 1 1,398.193 1 0.4522 1,409.498 2 Total 0.9055 11.2487 4.0301 0.0144 1.0605 0.3933 1.4538 0.1145 0.3618 0.4763 1,398.193 1 1,398.193 1 0.4522 1,409.498 2 Unmitigated Construction On-Site 3.1 Mitigation Measures Construction Use Cleaner Engines for Construction Equipment Water Exposed Area CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:46AMPage9of27 The Wave - Coral Mountain (Phase 2 Construction - Mitigated) - Riverside-Salton Sea County, Summer 3.2 Site Preparation - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0182 9.4000e- 003 0.1319 3.9000e- 004 0.0418 2.5000e- 004 0.0421 0.0111 2.3000e- 004 0.0113 38.6500 38.6500 8.7000e- 004 38.6718 Total 0.0182 9.4000e- 003 0.1319 3.9000e- 004 0.0418 2.5000e- 004 0.0421 0.0111 2.3000e- 004 0.0113 38.6500 38.6500 8.7000e- 004 38.6718 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 0.4136 0.0000 0.4136 0.0447 0.0000 0.0447 0.0000 0.0000 Off-Road 0.3547 6.8568 7.6844 0.0144 0.2601 0.2601 0.2601 0.2601 0.0000 1,398.193 1 1,398.193 1 0.4522 1,409.498 2 Total 0.3547 6.8568 7.6844 0.0144 0.4136 0.2601 0.6737 0.0447 0.2601 0.3048 0.0000 1,398.193 1 1,398.193 1 0.4522 1,409.498 2 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:46AMPage10of27 The Wave - Coral Mountain (Phase 2 Construction - Mitigated) - Riverside-Salton Sea County, Summer 3.2 Site Preparation - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0182 9.4000e- 003 0.1319 3.9000e- 004 0.0418 2.5000e- 004 0.0421 0.0111 2.3000e- 004 0.0113 38.6500 38.6500 8.7000e- 004 38.6718 Total 0.0182 9.4000e- 003 0.1319 3.9000e- 004 0.0418 2.5000e- 004 0.0421 0.0111 2.3000e- 004 0.0113 38.6500 38.6500 8.7000e- 004 38.6718 Mitigated Construction Off-Site 3.3 Grading - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 7.6128 0.0000 7.6128 3.4820 0.0000 3.4820 0.0000 0.0000 Off-Road 2.1759 23.5770 11.8634 0.0304 1.0197 1.0197 0.9501 0.9501 2,933.528 2 2,933.528 2 0.7894 2,953.263 5 Total 2.1759 23.5770 11.8634 0.0304 7.6128 1.0197 8.6325 3.4820 0.9501 4.4321 2,933.528 2 2,933.528 2 0.7894 2,953.263 5 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:46AMPage11of27 The Wave - Coral Mountain (Phase 2 Construction - Mitigated) - Riverside-Salton Sea County, Summer 3.3 Grading - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0365 0.0188 0.2637 7.8000e- 004 0.0837 5.0000e- 004 0.0842 0.0222 4.6000e- 004 0.0227 77.2999 77.2999 1.7500e- 003 77.3437 Total 0.0365 0.0188 0.2637 7.8000e- 004 0.0837 5.0000e- 004 0.0842 0.0222 4.6000e- 004 0.0227 77.2999 77.2999 1.7500e- 003 77.3437 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 2.9690 0.0000 2.9690 1.3580 0.0000 1.3580 0.0000 0.0000 Off-Road 0.9516 14.2832 16.5324 0.0304 0.5857 0.5857 0.5857 0.5857 0.0000 2,933.528 2 2,933.528 2 0.7894 2,953.263 5 Total 0.9516 14.2832 16.5324 0.0304 2.9690 0.5857 3.5547 1.3580 0.5857 1.9437 0.0000 2,933.528 2 2,933.528 2 0.7894 2,953.263 5 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:46AMPage12of27 The Wave - Coral Mountain (Phase 2 Construction - Mitigated) - Riverside-Salton Sea County, Summer 3.3 Grading - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0365 0.0188 0.2637 7.8000e- 004 0.0837 5.0000e- 004 0.0842 0.0222 4.6000e- 004 0.0227 77.2999 77.2999 1.7500e- 003 77.3437 Total 0.0365 0.0188 0.2637 7.8000e- 004 0.0837 5.0000e- 004 0.0842 0.0222 4.6000e- 004 0.0227 77.2999 77.2999 1.7500e- 003 77.3437 Mitigated Construction Off-Site 3.4 Building Construction - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.5813 18.2762 8.8165 0.0245 0.7657 0.7657 0.7044 0.7044 2,368.720 3 2,368.720 3 0.7661 2,387.872 6 Total 1.5813 18.2762 8.8165 0.0245 0.7657 0.7657 0.7044 0.7044 2,368.720 3 2,368.720 3 0.7661 2,387.872 6 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:46AMPage13of27 The Wave - Coral Mountain (Phase 2 Construction - Mitigated) - Riverside-Salton Sea County, Summer 3.4 Building Construction - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0140 0.5763 0.0995 1.5200e- 003 0.0351 8.3000e- 004 0.0360 0.0101 8.0000e- 004 0.0109 160.6258 160.6258 0.0125 160.9394 Worker 0.0583 0.0301 0.4219 1.2400e- 003 0.1339 7.9000e- 004 0.1347 0.0355 7.3000e- 004 0.0362 123.6799 123.6799 2.8000e- 003 123.7498 Total 0.0723 0.6064 0.5214 2.7600e- 003 0.1690 1.6200e- 003 0.1706 0.0456 1.5300e- 003 0.0472 284.3057 284.3057 0.0153 284.6892 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.7538 12.2902 13.7166 0.0245 0.5259 0.5259 0.5147 0.5147 0.0000 2,368.720 3 2,368.720 3 0.7661 2,387.872 6 Total 0.7538 12.2902 13.7166 0.0245 0.5259 0.5259 0.5147 0.5147 0.0000 2,368.720 3 2,368.720 3 0.7661 2,387.872 6 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:46AMPage14of27 The Wave - Coral Mountain (Phase 2 Construction - Mitigated) - Riverside-Salton Sea County, Summer 3.4 Building Construction - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0140 0.5763 0.0995 1.5200e- 003 0.0351 8.3000e- 004 0.0360 0.0101 8.0000e- 004 0.0109 160.6258 160.6258 0.0125 160.9394 Worker 0.0583 0.0301 0.4219 1.2400e- 003 0.1339 7.9000e- 004 0.1347 0.0355 7.3000e- 004 0.0362 123.6799 123.6799 2.8000e- 003 123.7498 Total 0.0723 0.6064 0.5214 2.7600e- 003 0.1690 1.6200e- 003 0.1706 0.0456 1.5300e- 003 0.0472 284.3057 284.3057 0.0153 284.6892 Mitigated Construction Off-Site 3.4 Building Construction - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.4423 15.9554 8.5988 0.0244 0.6743 0.6743 0.6204 0.6204 2,367.192 2 2,367.192 2 0.7656 2,386.332 1 Total 1.4423 15.9554 8.5988 0.0244 0.6743 0.6743 0.6204 0.6204 2,367.192 2 2,367.192 2 0.7656 2,386.332 1 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:46AMPage15of27 The Wave - Coral Mountain (Phase 2 Construction - Mitigated) - Riverside-Salton Sea County, Summer 3.4 Building Construction - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0107 0.4439 0.0876 1.4800e- 003 0.0351 3.7000e- 004 0.0355 0.0101 3.6000e- 004 0.0105 156.1729 156.1729 9.5400e- 003 156.4115 Worker 0.0546 0.0271 0.3892 1.1900e- 003 0.1339 7.7000e- 004 0.1346 0.0355 7.1000e- 004 0.0362 118.9820 118.9820 2.5100e- 003 119.0447 Total 0.0653 0.4710 0.4768 2.6700e- 003 0.1690 1.1400e- 003 0.1701 0.0456 1.0700e- 003 0.0467 275.1549 275.1549 0.0121 275.4562 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.7317 12.0998 13.6987 0.0244 0.5048 0.5048 0.4953 0.4953 0.0000 2,367.192 2 2,367.192 2 0.7656 2,386.332 1 Total 0.7317 12.0998 13.6987 0.0244 0.5048 0.5048 0.4953 0.4953 0.0000 2,367.192 2 2,367.192 2 0.7656 2,386.332 1 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:46AMPage16of27 The Wave - Coral Mountain (Phase 2 Construction - Mitigated) - Riverside-Salton Sea County, Summer 3.4 Building Construction - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0107 0.4439 0.0876 1.4800e- 003 0.0351 3.7000e- 004 0.0355 0.0101 3.6000e- 004 0.0105 156.1729 156.1729 9.5400e- 003 156.4115 Worker 0.0546 0.0271 0.3892 1.1900e- 003 0.1339 7.7000e- 004 0.1346 0.0355 7.1000e- 004 0.0362 118.9820 118.9820 2.5100e- 003 119.0447 Total 0.0653 0.4710 0.4768 2.6700e- 003 0.1690 1.1400e- 003 0.1701 0.0456 1.0700e- 003 0.0467 275.1549 275.1549 0.0121 275.4562 Mitigated Construction Off-Site 3.5 Paving - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.0236 10.0759 8.2062 0.0180 0.4326 0.4326 0.4026 0.4026 1,667.545 9 1,667.545 9 0.4949 1,679.919 5 Paving 0.2148 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 1.2384 10.0759 8.2062 0.0180 0.4326 0.4326 0.4026 0.4026 1,667.545 9 1,667.545 9 0.4949 1,679.919 5 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:46AMPage17of27 The Wave - Coral Mountain (Phase 2 Construction - Mitigated) - Riverside-Salton Sea County, Summer 3.5 Paving - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0614 0.0305 0.4378 1.3400e- 003 0.1506 8.7000e- 004 0.1515 0.0400 8.0000e- 004 0.0408 133.8547 133.8547 2.8200e- 003 133.9253 Total 0.0614 0.0305 0.4378 1.3400e- 003 0.1506 8.7000e- 004 0.1515 0.0400 8.0000e- 004 0.0408 133.8547 133.8547 2.8200e- 003 133.9253 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.7731 8.6853 10.1374 0.0180 0.3755 0.3755 0.3613 0.3613 0.0000 1,667.545 9 1,667.545 9 0.4949 1,679.919 5 Paving 0.2148 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.9879 8.6853 10.1374 0.0180 0.3755 0.3755 0.3613 0.3613 0.0000 1,667.545 9 1,667.545 9 0.4949 1,679.919 5 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:46AMPage18of27 The Wave - Coral Mountain (Phase 2 Construction - Mitigated) - Riverside-Salton Sea County, Summer 3.5 Paving - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0614 0.0305 0.4378 1.3400e- 003 0.1506 8.7000e- 004 0.1515 0.0400 8.0000e- 004 0.0408 133.8547 133.8547 2.8200e- 003 133.9253 Total 0.0614 0.0305 0.4378 1.3400e- 003 0.1506 8.7000e- 004 0.1515 0.0400 8.0000e- 004 0.0408 133.8547 133.8547 2.8200e- 003 133.9253 Mitigated Construction Off-Site 3.6 Architectural Coating - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 23.6719 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.2556 1.7373 2.4148 3.9600e- 003 0.0944 0.0944 0.0944 0.0944 375.2641 375.2641 0.0225 375.8253 Total 23.9274 1.7373 2.4148 3.9600e- 003 0.0944 0.0944 0.0944 0.0944 375.2641 375.2641 0.0225 375.8253 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:46AMPage19of27 The Wave - Coral Mountain (Phase 2 Construction - Mitigated) - Riverside-Salton Sea County, Summer 3.6 Architectural Coating - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0102 5.0800e- 003 0.0730 2.2000e- 004 0.0251 1.5000e- 004 0.0253 6.6600e- 003 1.3000e- 004 6.7900e- 003 22.3091 22.3091 4.7000e- 004 22.3209 Total 0.0102 5.0800e- 003 0.0730 2.2000e- 004 0.0251 1.5000e- 004 0.0253 6.6600e- 003 1.3000e- 004 6.7900e- 003 22.3091 22.3091 4.7000e- 004 22.3209 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 23.6719 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.2556 1.7373 2.4148 3.9600e- 003 0.0944 0.0944 0.0944 0.0944 0.0000 375.2641 375.2641 0.0225 375.8253 Total 23.9274 1.7373 2.4148 3.9600e- 003 0.0944 0.0944 0.0944 0.0944 0.0000 375.2641 375.2641 0.0225 375.8253 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:46AMPage20of27 The Wave - Coral Mountain (Phase 2 Construction - Mitigated) - Riverside-Salton Sea County, Summer 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile 3.6 Architectural Coating - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0102 5.0800e- 003 0.0730 2.2000e- 004 0.0251 1.5000e- 004 0.0253 6.6600e- 003 1.3000e- 004 6.7900e- 003 22.3091 22.3091 4.7000e- 004 22.3209 Total 0.0102 5.0800e- 003 0.0730 2.2000e- 004 0.0251 1.5000e- 004 0.0253 6.6600e- 003 1.3000e- 004 6.7900e- 003 22.3091 22.3091 4.7000e- 004 22.3209 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:46AMPage21of27 The Wave - Coral Mountain (Phase 2 Construction - Mitigated) - Riverside-Salton Sea County, Summer ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Mitigated 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Unmitigated 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 4.2 Trip Summary Information 4.3 Trip Type Information Average Daily Trip Rate Unmitigated Mitigated Land Use Weekday Saturday Sunday Annual VMT Annual VMT Other Asphalt Surfaces 0.00 0.00 0.00 Regional Shopping Center 0.00 0.00 0.00 Total 0.00 0.00 0.00 Miles Trip %Trip Purpose % Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C-W H-S or C-C H-O or C-NW Primary Diverted Pass-by Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 Regional Shopping Center 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 4.4 Fleet Mix Land Use LDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH Other Asphalt Surfaces 0.548600 0.036250 0.186898 0.112544 0.014284 0.004806 0.017604 0.070134 0.001409 0.001147 0.004508 0.000918 0.000898 Regional Shopping Center 0.548600 0.036250 0.186898 0.112544 0.014284 0.004806 0.017604 0.070134 0.001409 0.001147 0.004508 0.000918 0.000898 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:46AMPage22of27 The Wave - Coral Mountain (Phase 2 Construction - Mitigated) - Riverside-Salton Sea County, Summer 5.0 Energy Detail ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day NaturalGas Mitigated 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 NaturalGas Unmitigated 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 5.1 Mitigation Measures Energy Historical Energy Use: N CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:46AMPage23of27 The Wave - Coral Mountain (Phase 2 Construction - Mitigated) - Riverside-Salton Sea County, Summer 6.1 Mitigation Measures Area 6.0 Area Detail 5.2 Energy by Land Use - NaturalGas NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr lb/day lb/day Other Asphalt Surfaces 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Regional Shopping Center 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Unmitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr lb/day lb/day Other Asphalt Surfaces 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Regional Shopping Center 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:46AMPage24of27 The Wave - Coral Mountain (Phase 2 Construction - Mitigated) - Riverside-Salton Sea County, Summer ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Mitigated 0.7037 2.0000e- 005 2.5900e- 003 0.0000 1.0000e- 005 1.0000e- 005 1.0000e- 005 1.0000e- 005 5.5600e- 003 5.5600e- 003 1.0000e- 005 5.9300e- 003 Unmitigated 0.7037 2.0000e- 005 2.5900e- 003 0.0000 1.0000e- 005 1.0000e- 005 1.0000e- 005 1.0000e- 005 5.5600e- 003 5.5600e- 003 1.0000e- 005 5.9300e- 003 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory lb/day lb/day Architectural Coating 0.1621 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 0.5413 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 2.4000e- 004 2.0000e- 005 2.5900e- 003 0.0000 1.0000e- 005 1.0000e- 005 1.0000e- 005 1.0000e- 005 5.5600e- 003 5.5600e- 003 1.0000e- 005 5.9300e- 003 Total 0.7037 2.0000e- 005 2.5900e- 003 0.0000 1.0000e- 005 1.0000e- 005 1.0000e- 005 1.0000e- 005 5.5600e- 003 5.5600e- 003 1.0000e- 005 5.9300e- 003 Unmitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:46AMPage25of27 The Wave - Coral Mountain (Phase 2 Construction - Mitigated) - Riverside-Salton Sea County, Summer 8.1 Mitigation Measures Waste 7.1 Mitigation Measures Water 7.0 Water Detail 8.0 Waste Detail 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory lb/day lb/day Architectural Coating 0.1621 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 0.5413 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 2.4000e- 004 2.0000e- 005 2.5900e- 003 0.0000 1.0000e- 005 1.0000e- 005 1.0000e- 005 1.0000e- 005 5.5600e- 003 5.5600e- 003 1.0000e- 005 5.9300e- 003 Total 0.7037 2.0000e- 005 2.5900e- 003 0.0000 1.0000e- 005 1.0000e- 005 1.0000e- 005 1.0000e- 005 5.5600e- 003 5.5600e- 003 1.0000e- 005 5.9300e- 003 Mitigated 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year Horse Power Load Factor Fuel Type 10.0 Stationary Equipment Fire Pumps and Emergency Generators CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:46AMPage26of27 The Wave - Coral Mountain (Phase 2 Construction - Mitigated) - Riverside-Salton Sea County, Summer 11.0 Vegetation Equipment Type Number Hours/Day Hours/Year Horse Power Load Factor Fuel Type Boilers Equipment Type Number Heat Input/Day Heat Input/Year Boiler Rating Fuel Type User Defined Equipment Equipment Type Number CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:46AMPage27of27 The Wave - Coral Mountain (Phase 2 Construction - Mitigated) - Riverside-Salton Sea County, Summer 1.1 Land Usage Land Uses Size Metric Lot Acreage Floor Surface Area Population Other Asphalt Surfaces 0.41 Acre 0.41 17,859.60 0 Regional Shopping Center 25.00 1000sqft 0.57 25,000.00 0 1.2 Other Project Characteristics Urbanization Climate Zone Urban 15 Wind Speed (m/s)Precipitation Freq (Days)2.4 28 1.3 User Entered Comments & Non-Default Data 1.0 Project Characteristics Utility Company Imperial Irrigation District 2023OperationalYear CO2 Intensity lb/MWhr) 1270.9 0.029CH4Intensity lb/MWhr) 0.006N2OIntensity lb/MWhr) The Wave - Coral Mountain (Phase 2 Construction - Mitigated) Riverside-Salton Sea County, Winter CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:44AMPage1of27 The Wave - Coral Mountain (Phase 2 Construction - Mitigated) - Riverside-Salton Sea County, Winter Project Characteristics - Land Use - Total Project Area is 0.99 acres Construction Phase - Construction Schedule adjsuted to meet the 2023 Opening Year Off-road Equipment - Hours are based on an 8-hour workday. Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Grading - For purposes of analysis, total acres graded per day is based on the equipment specific grading rates (CalEEMod Appendix A) and the equipment list. Architectural Coating - Rule 1113 Vehicle Trips - Construction Run Only. Energy Use - Construction Run Only. Water And Wastewater - Construction Run Only. Solid Waste - Construction Run Only. Construction Off-road Equipment Mitigation - All equipment operating at >150 HP are required to be equipped with Tier 3 or better engines. Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Table Name Column Name Default Value New Value tblArchitecturalCoating EF_Nonresidential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Interior 250.00 50.00 tblArchitecturalCoating EF_Parking 250.00 50.00 tblArchitecturalCoating EF_Residential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Residential_Interior 250.00 50.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 6.00 tblConstEquipMitigation Tier No Change Tier 3 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:44AMPage2of27 The Wave - Coral Mountain (Phase 2 Construction - Mitigated) - Riverside-Salton Sea County, Winter tblConstEquipMitigation Tier No Change Tier 3 tblConstEquipMitigation Tier No Change Tier 3 tblConstEquipMitigation Tier No Change Tier 3 tblConstructionPhase PhaseEndDate 2/22/2023 2/15/2023 tblConstructionPhase PhaseStartDate 2/16/2023 2/9/2023 tblEnergyUse LightingElect 5.61 0.00 tblEnergyUse NT24E 2.44 0.00 tblEnergyUse NT24NG 0.30 0.00 tblEnergyUse T24E 4.58 0.00 tblEnergyUse T24NG 1.92 0.00 tblGrading AcresOfGrading 2.00 3.00 tblOffRoadEquipment LoadFactor 0.43 0.43 tblOffRoadEquipment LoadFactor 0.43 0.43 tblOffRoadEquipment LoadFactor 0.43 0.43 tblOffRoadEquipment LoadFactor 0.43 0.43 tblOffRoadEquipment OffRoadEquipmentType Crawler Tractors tblOffRoadEquipment OffRoadEquipmentType Crawler Tractors tblOffRoadEquipment OffRoadEquipmentType Crawler Tractors tblOffRoadEquipment OffRoadEquipmentType Crawler Tractors tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 0.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 0.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00 tblOffRoadEquipment UsageHours 6.00 8.00 tblOffRoadEquipment UsageHours 6.00 8.00 tblOffRoadEquipment UsageHours 4.00 8.00 tblOffRoadEquipment UsageHours 6.00 8.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:44AMPage3of27 The Wave - Coral Mountain (Phase 2 Construction - Mitigated) - Riverside-Salton Sea County, Winter 2.0 Emissions Summary tblOffRoadEquipment UsageHours 7.00 8.00 tblOffRoadEquipment UsageHours 7.00 8.00 tblOffRoadEquipment UsageHours 1.00 8.00 tblOffRoadEquipment UsageHours 6.00 8.00 tblOffRoadEquipment UsageHours 7.00 8.00 tblSolidWaste SolidWasteGenerationRate 26.25 0.00 tblVehicleTrips CC_TL 4.20 0.00 tblVehicleTrips CC_TL 4.20 0.00 tblVehicleTrips CC_TTP 64.70 0.00 tblVehicleTrips CNW_TL 5.40 0.00 tblVehicleTrips CNW_TL 5.40 0.00 tblVehicleTrips CNW_TTP 19.00 0.00 tblVehicleTrips CW_TL 12.50 0.00 tblVehicleTrips CW_TL 12.50 0.00 tblVehicleTrips CW_TTP 16.30 0.00 tblVehicleTrips DV_TP 35.00 0.00 tblVehicleTrips PB_TP 11.00 0.00 tblVehicleTrips PR_TP 54.00 0.00 tblVehicleTrips ST_TR 49.97 0.00 tblVehicleTrips SU_TR 25.24 0.00 tblVehicleTrips WD_TR 42.70 0.00 tblWater IndoorWaterUseRate 1,851,813.04 0.00 tblWater OutdoorWaterUseRate 1,134,982.18 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:44AMPage4of27 The Wave - Coral Mountain (Phase 2 Construction - Mitigated) - Riverside-Salton Sea County, Winter 2.1 Overall Construction (Maximum Daily Emission) ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year lb/day lb/day 2022 2.2109 23.5964 12.0787 0.0311 7.6965 1.0202 8.7167 3.5042 0.9506 4.4548 0.0000 3,002.915 1 3,002.915 1 0.7909 0.0000 3,022.688 8 2023 25.2349 16.4203 11.0374 0.0269 0.1757 0.6755 0.8444 0.0466 0.6214 0.6671 0.0000 2,623.301 3 2,623.301 3 0.7784 0.0000 2,642.761 9 Maximum 25.2349 23.5964 12.0787 0.0311 7.6965 1.0202 8.7167 3.5042 0.9506 4.4548 0.0000 3,002.915 1 3,002.915 1 0.7909 0.0000 3,022.688 8 Unmitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year lb/day lb/day 2022 0.9866 14.3026 16.7478 0.0311 3.0527 0.5862 3.6389 1.3802 0.5862 1.9663 0.0000 3,002.915 1 3,002.915 1 0.7909 0.0000 3,022.688 8 2023 24.9844 12.5646 14.1183 0.0269 0.1757 0.5059 0.6749 0.0466 0.4964 0.5420 0.0000 2,623.301 3 2,623.301 3 0.7784 0.0000 2,642.761 9 Maximum 24.9844 14.3026 16.7478 0.0311 3.0527 0.5862 3.6389 1.3802 0.5862 1.9663 0.0000 3,002.915 1 3,002.915 1 0.7909 0.0000 3,022.688 8 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 5.37 32.86 -33.53 0.00 58.99 35.59 54.88 59.82 31.14 51.03 0.00 0.00 0.00 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:44AMPage5of27 The Wave - Coral Mountain (Phase 2 Construction - Mitigated) - Riverside-Salton Sea County, Winter 2.2 Overall Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Area 0.7037 2.0000e- 005 2.5900e- 003 0.0000 1.0000e- 005 1.0000e- 005 1.0000e- 005 1.0000e- 005 5.5600e- 003 5.5600e- 003 1.0000e- 005 5.9300e- 003 Energy 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mobile 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.7037 2.0000e- 005 2.5900e- 003 0.0000 0.0000 1.0000e- 005 1.0000e- 005 0.0000 1.0000e- 005 1.0000e- 005 5.5600e- 003 5.5600e- 003 1.0000e- 005 0.0000 5.9300e- 003 Unmitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Area 0.7037 2.0000e- 005 2.5900e- 003 0.0000 1.0000e- 005 1.0000e- 005 1.0000e- 005 1.0000e- 005 5.5600e- 003 5.5600e- 003 1.0000e- 005 5.9300e- 003 Energy 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mobile 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.7037 2.0000e- 005 2.5900e- 003 0.0000 0.0000 1.0000e- 005 1.0000e- 005 0.0000 1.0000e- 005 1.0000e- 005 5.5600e- 003 5.5600e- 003 1.0000e- 005 0.0000 5.9300e- 003 Mitigated Operational CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:44AMPage6of27 The Wave - Coral Mountain (Phase 2 Construction - Mitigated) - Riverside-Salton Sea County, Winter 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 Site Preparation Site Preparation 9/19/2022 9/19/2022 5 1 2 Grading Grading 9/20/2022 9/21/2022 5 2 3 Building Construction Building Construction 9/22/2022 2/8/2023 5 100 4 Paving Paving 2/9/2023 2/15/2023 5 5 5 Architectural Coating Architectural Coating 2/9/2023 2/15/2023 5 5 OffRoad Equipment ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Residential Indoor: 0; Residential Outdoor: 0; Non-Residential Indoor: 37,500; Non-Residential Outdoor: 12,500; Striped Parking Area: 1,072 Architectural Coating – sqft) Acres of Grading (Site Preparation Phase): 1 Acres of Grading (Grading Phase): 3 Acres of Paving: 0.41 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:44AMPage7of27 The Wave - Coral Mountain (Phase 2 Construction - Mitigated) - Riverside-Salton Sea County, Winter Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Site Preparation Graders 1 8.00 187 0.41 Site Preparation Tractors/Loaders/Backhoes 0 8.00 97 0.37 Grading Concrete/Industrial Saws 1 8.00 81 0.73 Grading Rubber Tired Dozers 1 8.00 247 0.40 Grading Tractors/Loaders/Backhoes 0 8.00 97 0.37 Building Construction Cranes 1 8.00 231 0.29 Building Construction Forklifts 2 8.00 89 0.20 Building Construction Tractors/Loaders/Backhoes 0 8.00 97 0.37 Paving Cement and Mortar Mixers 4 8.00 9 0.56 Paving Pavers 1 8.00 130 0.42 Paving Rollers 1 8.00 80 0.38 Paving Tractors/Loaders/Backhoes 0 8.00 97 0.37 Architectural Coating Air Compressors 1 8.00 78 0.48 Site Preparation Crawler Tractors 1 8.00 212 0.43 Grading Crawler Tractors 2 8.00 212 0.43 Building Construction Crawler Tractors 2 8.00 212 0.43 Paving Crawler Tractors 1 8.00 212 0.43 Trips and VMT Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Site Preparation 2 5.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Grading 4 10.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Building Construction 5 16.00 7.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Paving 7 18.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Architectural Coating 1 3.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:44AMPage8of27 The Wave - Coral Mountain (Phase 2 Construction - Mitigated) - Riverside-Salton Sea County, Winter 3.2 Site Preparation - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 1.0605 0.0000 1.0605 0.1145 0.0000 0.1145 0.0000 0.0000 Off-Road 0.9055 11.2487 4.0301 0.0144 0.3933 0.3933 0.3618 0.3618 1,398.193 1 1,398.193 1 0.4522 1,409.498 2 Total 0.9055 11.2487 4.0301 0.0144 1.0605 0.3933 1.4538 0.1145 0.3618 0.4763 1,398.193 1 1,398.193 1 0.4522 1,409.498 2 Unmitigated Construction On-Site 3.1 Mitigation Measures Construction Use Cleaner Engines for Construction Equipment Water Exposed Area CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:44AMPage9of27 The Wave - Coral Mountain (Phase 2 Construction - Mitigated) - Riverside-Salton Sea County, Winter 3.2 Site Preparation - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0175 9.7200e- 003 0.1077 3.5000e- 004 0.0418 2.5000e- 004 0.0421 0.0111 2.3000e- 004 0.0113 34.6935 34.6935 7.7000e- 004 34.7126 Total 0.0175 9.7200e- 003 0.1077 3.5000e- 004 0.0418 2.5000e- 004 0.0421 0.0111 2.3000e- 004 0.0113 34.6935 34.6935 7.7000e- 004 34.7126 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 0.4136 0.0000 0.4136 0.0447 0.0000 0.0447 0.0000 0.0000 Off-Road 0.3547 6.8568 7.6844 0.0144 0.2601 0.2601 0.2601 0.2601 0.0000 1,398.193 1 1,398.193 1 0.4522 1,409.498 2 Total 0.3547 6.8568 7.6844 0.0144 0.4136 0.2601 0.6737 0.0447 0.2601 0.3048 0.0000 1,398.193 1 1,398.193 1 0.4522 1,409.498 2 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:44AMPage10of27 The Wave - Coral Mountain (Phase 2 Construction - Mitigated) - Riverside-Salton Sea County, Winter 3.2 Site Preparation - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0175 9.7200e- 003 0.1077 3.5000e- 004 0.0418 2.5000e- 004 0.0421 0.0111 2.3000e- 004 0.0113 34.6935 34.6935 7.7000e- 004 34.7126 Total 0.0175 9.7200e- 003 0.1077 3.5000e- 004 0.0418 2.5000e- 004 0.0421 0.0111 2.3000e- 004 0.0113 34.6935 34.6935 7.7000e- 004 34.7126 Mitigated Construction Off-Site 3.3 Grading - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 7.6128 0.0000 7.6128 3.4820 0.0000 3.4820 0.0000 0.0000 Off-Road 2.1759 23.5770 11.8634 0.0304 1.0197 1.0197 0.9501 0.9501 2,933.528 2 2,933.528 2 0.7894 2,953.263 5 Total 2.1759 23.5770 11.8634 0.0304 7.6128 1.0197 8.6325 3.4820 0.9501 4.4321 2,933.528 2 2,933.528 2 0.7894 2,953.263 5 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:44AMPage11of27 The Wave - Coral Mountain (Phase 2 Construction - Mitigated) - Riverside-Salton Sea County, Winter 3.3 Grading - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0350 0.0194 0.2153 7.0000e- 004 0.0837 5.0000e- 004 0.0842 0.0222 4.6000e- 004 0.0227 69.3869 69.3869 1.5300e- 003 69.4252 Total 0.0350 0.0194 0.2153 7.0000e- 004 0.0837 5.0000e- 004 0.0842 0.0222 4.6000e- 004 0.0227 69.3869 69.3869 1.5300e- 003 69.4252 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 2.9690 0.0000 2.9690 1.3580 0.0000 1.3580 0.0000 0.0000 Off-Road 0.9516 14.2832 16.5324 0.0304 0.5857 0.5857 0.5857 0.5857 0.0000 2,933.528 2 2,933.528 2 0.7894 2,953.263 5 Total 0.9516 14.2832 16.5324 0.0304 2.9690 0.5857 3.5547 1.3580 0.5857 1.9437 0.0000 2,933.528 2 2,933.528 2 0.7894 2,953.263 5 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:44AMPage12of27 The Wave - Coral Mountain (Phase 2 Construction - Mitigated) - Riverside-Salton Sea County, Winter 3.3 Grading - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0350 0.0194 0.2153 7.0000e- 004 0.0837 5.0000e- 004 0.0842 0.0222 4.6000e- 004 0.0227 69.3869 69.3869 1.5300e- 003 69.4252 Total 0.0350 0.0194 0.2153 7.0000e- 004 0.0837 5.0000e- 004 0.0842 0.0222 4.6000e- 004 0.0227 69.3869 69.3869 1.5300e- 003 69.4252 Mitigated Construction Off-Site 3.4 Building Construction - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.5813 18.2762 8.8165 0.0245 0.7657 0.7657 0.7044 0.7044 2,368.720 3 2,368.720 3 0.7661 2,387.872 6 Total 1.5813 18.2762 8.8165 0.0245 0.7657 0.7657 0.7044 0.7044 2,368.720 3 2,368.720 3 0.7661 2,387.872 6 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:44AMPage13of27 The Wave - Coral Mountain (Phase 2 Construction - Mitigated) - Riverside-Salton Sea County, Winter 3.4 Building Construction - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0149 0.5683 0.1197 1.4500e- 003 0.0351 8.7000e- 004 0.0360 0.0101 8.3000e- 004 0.0109 153.4521 153.4521 0.0140 153.8031 Worker 0.0560 0.0311 0.3445 1.1100e- 003 0.1339 7.9000e- 004 0.1347 0.0355 7.3000e- 004 0.0362 111.0191 111.0191 2.4500e- 003 111.0804 Total 0.0709 0.5994 0.4642 2.5600e- 003 0.1690 1.6600e- 003 0.1706 0.0456 1.5600e- 003 0.0472 264.4712 264.4712 0.0165 264.8835 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.7538 12.2902 13.7166 0.0245 0.5259 0.5259 0.5147 0.5147 0.0000 2,368.720 3 2,368.720 3 0.7661 2,387.872 6 Total 0.7538 12.2902 13.7166 0.0245 0.5259 0.5259 0.5147 0.5147 0.0000 2,368.720 3 2,368.720 3 0.7661 2,387.872 6 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:44AMPage14of27 The Wave - Coral Mountain (Phase 2 Construction - Mitigated) - Riverside-Salton Sea County, Winter 3.4 Building Construction - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0149 0.5683 0.1197 1.4500e- 003 0.0351 8.7000e- 004 0.0360 0.0101 8.3000e- 004 0.0109 153.4521 153.4521 0.0140 153.8031 Worker 0.0560 0.0311 0.3445 1.1100e- 003 0.1339 7.9000e- 004 0.1347 0.0355 7.3000e- 004 0.0362 111.0191 111.0191 2.4500e- 003 111.0804 Total 0.0709 0.5994 0.4642 2.5600e- 003 0.1690 1.6600e- 003 0.1706 0.0456 1.5600e- 003 0.0472 264.4712 264.4712 0.0165 264.8835 Mitigated Construction Off-Site 3.4 Building Construction - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.4423 15.9554 8.5988 0.0244 0.6743 0.6743 0.6204 0.6204 2,367.192 2 2,367.192 2 0.7656 2,386.332 1 Total 1.4423 15.9554 8.5988 0.0244 0.6743 0.6743 0.6204 0.6204 2,367.192 2 2,367.192 2 0.7656 2,386.332 1 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:44AMPage15of27 The Wave - Coral Mountain (Phase 2 Construction - Mitigated) - Riverside-Salton Sea County, Winter 3.4 Building Construction - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0114 0.4368 0.1023 1.4100e- 003 0.0351 3.9000e- 004 0.0355 0.0101 3.7000e- 004 0.0105 149.3011 149.3011 0.0106 149.5667 Worker 0.0526 0.0280 0.3173 1.0700e- 003 0.1339 7.7000e- 004 0.1346 0.0355 7.1000e- 004 0.0362 106.8081 106.8081 2.2000e- 003 106.8632 Total 0.0640 0.4649 0.4196 2.4800e- 003 0.1690 1.1600e- 003 0.1701 0.0456 1.0800e- 003 0.0467 256.1091 256.1091 0.0128 256.4298 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.7317 12.0998 13.6987 0.0244 0.5048 0.5048 0.4953 0.4953 0.0000 2,367.192 2 2,367.192 2 0.7656 2,386.332 1 Total 0.7317 12.0998 13.6987 0.0244 0.5048 0.5048 0.4953 0.4953 0.0000 2,367.192 2 2,367.192 2 0.7656 2,386.332 1 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:44AMPage16of27 The Wave - Coral Mountain (Phase 2 Construction - Mitigated) - Riverside-Salton Sea County, Winter 3.4 Building Construction - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0114 0.4368 0.1023 1.4100e- 003 0.0351 3.9000e- 004 0.0355 0.0101 3.7000e- 004 0.0105 149.3011 149.3011 0.0106 149.5667 Worker 0.0526 0.0280 0.3173 1.0700e- 003 0.1339 7.7000e- 004 0.1346 0.0355 7.1000e- 004 0.0362 106.8081 106.8081 2.2000e- 003 106.8632 Total 0.0640 0.4649 0.4196 2.4800e- 003 0.1690 1.1600e- 003 0.1701 0.0456 1.0800e- 003 0.0467 256.1091 256.1091 0.0128 256.4298 Mitigated Construction Off-Site 3.5 Paving - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.0236 10.0759 8.2062 0.0180 0.4326 0.4326 0.4026 0.4026 1,667.545 9 1,667.545 9 0.4949 1,679.919 5 Paving 0.2148 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 1.2384 10.0759 8.2062 0.0180 0.4326 0.4326 0.4026 0.4026 1,667.545 9 1,667.545 9 0.4949 1,679.919 5 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:44AMPage17of27 The Wave - Coral Mountain (Phase 2 Construction - Mitigated) - Riverside-Salton Sea County, Winter 3.5 Paving - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0592 0.0315 0.3569 1.2100e- 003 0.1506 8.7000e- 004 0.1515 0.0400 8.0000e- 004 0.0408 120.1591 120.1591 2.4800e- 003 120.2211 Total 0.0592 0.0315 0.3569 1.2100e- 003 0.1506 8.7000e- 004 0.1515 0.0400 8.0000e- 004 0.0408 120.1591 120.1591 2.4800e- 003 120.2211 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.7731 8.6853 10.1374 0.0180 0.3755 0.3755 0.3613 0.3613 0.0000 1,667.545 9 1,667.545 9 0.4949 1,679.919 5 Paving 0.2148 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.9879 8.6853 10.1374 0.0180 0.3755 0.3755 0.3613 0.3613 0.0000 1,667.545 9 1,667.545 9 0.4949 1,679.919 5 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:44AMPage18of27 The Wave - Coral Mountain (Phase 2 Construction - Mitigated) - Riverside-Salton Sea County, Winter 3.5 Paving - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0592 0.0315 0.3569 1.2100e- 003 0.1506 8.7000e- 004 0.1515 0.0400 8.0000e- 004 0.0408 120.1591 120.1591 2.4800e- 003 120.2211 Total 0.0592 0.0315 0.3569 1.2100e- 003 0.1506 8.7000e- 004 0.1515 0.0400 8.0000e- 004 0.0408 120.1591 120.1591 2.4800e- 003 120.2211 Mitigated Construction Off-Site 3.6 Architectural Coating - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 23.6719 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.2556 1.7373 2.4148 3.9600e- 003 0.0944 0.0944 0.0944 0.0944 375.2641 375.2641 0.0225 375.8253 Total 23.9274 1.7373 2.4148 3.9600e- 003 0.0944 0.0944 0.0944 0.0944 375.2641 375.2641 0.0225 375.8253 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:44AMPage19of27 The Wave - Coral Mountain (Phase 2 Construction - Mitigated) - Riverside-Salton Sea County, Winter 3.6 Architectural Coating - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 9.8600e- 003 5.2500e- 003 0.0595 2.0000e- 004 0.0251 1.5000e- 004 0.0253 6.6600e- 003 1.3000e- 004 6.7900e- 003 20.0265 20.0265 4.1000e- 004 20.0368 Total 9.8600e- 003 5.2500e- 003 0.0595 2.0000e- 004 0.0251 1.5000e- 004 0.0253 6.6600e- 003 1.3000e- 004 6.7900e- 003 20.0265 20.0265 4.1000e- 004 20.0368 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 23.6719 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.2556 1.7373 2.4148 3.9600e- 003 0.0944 0.0944 0.0944 0.0944 0.0000 375.2641 375.2641 0.0225 375.8253 Total 23.9274 1.7373 2.4148 3.9600e- 003 0.0944 0.0944 0.0944 0.0944 0.0000 375.2641 375.2641 0.0225 375.8253 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:44AMPage20of27 The Wave - Coral Mountain (Phase 2 Construction - Mitigated) - Riverside-Salton Sea County, Winter 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile 3.6 Architectural Coating - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 9.8600e- 003 5.2500e- 003 0.0595 2.0000e- 004 0.0251 1.5000e- 004 0.0253 6.6600e- 003 1.3000e- 004 6.7900e- 003 20.0265 20.0265 4.1000e- 004 20.0368 Total 9.8600e- 003 5.2500e- 003 0.0595 2.0000e- 004 0.0251 1.5000e- 004 0.0253 6.6600e- 003 1.3000e- 004 6.7900e- 003 20.0265 20.0265 4.1000e- 004 20.0368 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:44AMPage21of27 The Wave - Coral Mountain (Phase 2 Construction - Mitigated) - Riverside-Salton Sea County, Winter ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Mitigated 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Unmitigated 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 4.2 Trip Summary Information 4.3 Trip Type Information Average Daily Trip Rate Unmitigated Mitigated Land Use Weekday Saturday Sunday Annual VMT Annual VMT Other Asphalt Surfaces 0.00 0.00 0.00 Regional Shopping Center 0.00 0.00 0.00 Total 0.00 0.00 0.00 Miles Trip %Trip Purpose % Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C-W H-S or C-C H-O or C-NW Primary Diverted Pass-by Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 Regional Shopping Center 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 4.4 Fleet Mix Land Use LDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH Other Asphalt Surfaces 0.548600 0.036250 0.186898 0.112544 0.014284 0.004806 0.017604 0.070134 0.001409 0.001147 0.004508 0.000918 0.000898 Regional Shopping Center 0.548600 0.036250 0.186898 0.112544 0.014284 0.004806 0.017604 0.070134 0.001409 0.001147 0.004508 0.000918 0.000898 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:44AMPage22of27 The Wave - Coral Mountain (Phase 2 Construction - Mitigated) - Riverside-Salton Sea County, Winter 5.0 Energy Detail ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day NaturalGas Mitigated 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 NaturalGas Unmitigated 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 5.1 Mitigation Measures Energy Historical Energy Use: N CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:44AMPage23of27 The Wave - Coral Mountain (Phase 2 Construction - Mitigated) - Riverside-Salton Sea County, Winter 6.1 Mitigation Measures Area 6.0 Area Detail 5.2 Energy by Land Use - NaturalGas NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr lb/day lb/day Other Asphalt Surfaces 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Regional Shopping Center 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Unmitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr lb/day lb/day Other Asphalt Surfaces 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Regional Shopping Center 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:44AMPage24of27 The Wave - Coral Mountain (Phase 2 Construction - Mitigated) - Riverside-Salton Sea County, Winter ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Mitigated 0.7037 2.0000e- 005 2.5900e- 003 0.0000 1.0000e- 005 1.0000e- 005 1.0000e- 005 1.0000e- 005 5.5600e- 003 5.5600e- 003 1.0000e- 005 5.9300e- 003 Unmitigated 0.7037 2.0000e- 005 2.5900e- 003 0.0000 1.0000e- 005 1.0000e- 005 1.0000e- 005 1.0000e- 005 5.5600e- 003 5.5600e- 003 1.0000e- 005 5.9300e- 003 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory lb/day lb/day Architectural Coating 0.1621 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 0.5413 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 2.4000e- 004 2.0000e- 005 2.5900e- 003 0.0000 1.0000e- 005 1.0000e- 005 1.0000e- 005 1.0000e- 005 5.5600e- 003 5.5600e- 003 1.0000e- 005 5.9300e- 003 Total 0.7037 2.0000e- 005 2.5900e- 003 0.0000 1.0000e- 005 1.0000e- 005 1.0000e- 005 1.0000e- 005 5.5600e- 003 5.5600e- 003 1.0000e- 005 5.9300e- 003 Unmitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:44AMPage25of27 The Wave - Coral Mountain (Phase 2 Construction - Mitigated) - Riverside-Salton Sea County, Winter 8.1 Mitigation Measures Waste 7.1 Mitigation Measures Water 7.0 Water Detail 8.0 Waste Detail 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory lb/day lb/day Architectural Coating 0.1621 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 0.5413 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 2.4000e- 004 2.0000e- 005 2.5900e- 003 0.0000 1.0000e- 005 1.0000e- 005 1.0000e- 005 1.0000e- 005 5.5600e- 003 5.5600e- 003 1.0000e- 005 5.9300e- 003 Total 0.7037 2.0000e- 005 2.5900e- 003 0.0000 1.0000e- 005 1.0000e- 005 1.0000e- 005 1.0000e- 005 5.5600e- 003 5.5600e- 003 1.0000e- 005 5.9300e- 003 Mitigated 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year Horse Power Load Factor Fuel Type 10.0 Stationary Equipment Fire Pumps and Emergency Generators CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:44AMPage26of27 The Wave - Coral Mountain (Phase 2 Construction - Mitigated) - Riverside-Salton Sea County, Winter 11.0 Vegetation Equipment Type Number Hours/Day Hours/Year Horse Power Load Factor Fuel Type Boilers Equipment Type Number Heat Input/Day Heat Input/Year Boiler Rating Fuel Type User Defined Equipment Equipment Type Number CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:44AMPage27of27 The Wave - Coral Mountain (Phase 2 Construction - Mitigated) - Riverside-Salton Sea County, Winter 1.1 Land Usage Land Uses Size Metric Lot Acreage Floor Surface Area Population Other Asphalt Surfaces 110.42 Acre 110.42 4,809,895.20 0 Single Family Housing 470.00 Dwelling Unit 152.60 846,000.00 1260 Regional Shopping Center 25.00 1000sqft 0.57 25,000.00 0 1.2 Other Project Characteristics Urbanization Climate Zone Urban 15 Wind Speed (m/s)Precipitation Freq (Days)2.4 28 1.3 User Entered Comments & Non-Default Data 1.0 Project Characteristics Utility Company Imperial Irrigation District 2026OperationalYear CO2 Intensity lb/MWhr) 1270.9 0.029CH4Intensity lb/MWhr) 0.006N2OIntensity lb/MWhr) The Wave - Coral Mountain (Phase 3 Construction - Mitigated) Riverside-Salton Sea County, Summer CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:59AMPage1of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Summer Project Characteristics - Land Use - Total Project Area is 263.59 acres. Construction Phase - Construction Schedule adjusted to meet the 2026 Opening Year. Off-road Equipment - Hours are based on an 8-hour workday. Off-road Equipment - Hours are based on an 8-hour workday. Off-road Equipment - Grading - For purposes of analysis, total acres graded per day is based on the equipment specific grading rates (CalEEMod Appendix A) and the equipment list. Architectural Coating - Rule 1113 Vehicle Trips - Construction Run Only. Woodstoves - Construction Run Only. Energy Use - Construction Run Only. Water And Wastewater - Construction Run Only. Solid Waste - Construction Run Only. Construction Off-road Equipment Mitigation - All equipment operating at >150 HP are required to be equipped with Tier 3 or better engines. Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Table Name Column Name Default Value New Value tblArchitecturalCoating EF_Nonresidential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Interior 250.00 50.00 tblArchitecturalCoating EF_Parking 250.00 50.00 tblArchitecturalCoating EF_Residential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Residential_Interior 250.00 50.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 2.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 4.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:59AMPage2of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Summer tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 2.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 9.00 tblConstEquipMitigation Tier No Change Tier 3 tblConstEquipMitigation Tier No Change Tier 3 tblConstEquipMitigation Tier No Change Tier 3 tblConstEquipMitigation Tier No Change Tier 3 tblConstEquipMitigation Tier No Change Tier 3 tblConstEquipMitigation Tier No Change Tier 3 tblConstructionPhase NumDays 465.00 200.00 tblConstructionPhase NumDays 4,650.00 500.00 tblEnergyUse LightingElect 5.61 0.00 tblEnergyUse LightingElect 1,608.84 0.00 tblEnergyUse NT24E 2.44 0.00 tblEnergyUse NT24E 6,155.97 0.00 tblEnergyUse NT24NG 0.30 0.00 tblEnergyUse NT24NG 6,030.00 0.00 tblEnergyUse T24E 4.58 0.00 tblEnergyUse T24E 951.67 0.00 tblEnergyUse T24NG 1.92 0.00 tblEnergyUse T24NG 24,566.15 0.00 tblFireplaces NumberGas 376.00 0.00 tblFireplaces NumberNoFireplace 47.00 0.00 tblFireplaces NumberWood 47.00 0.00 tblGrading AcresOfGrading 700.00 800.00 tblGrading AcresOfGrading 360.00 630.00 tblLandUse Population 1,344.00 1,260.00 tblOffRoadEquipment LoadFactor 0.43 0.43 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:59AMPage3of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Summer tblOffRoadEquipment LoadFactor 0.43 0.43 tblOffRoadEquipment LoadFactor 0.43 0.43 tblOffRoadEquipment OffRoadEquipmentType Crawler Tractors tblOffRoadEquipment OffRoadEquipmentType Crawler Tractors tblOffRoadEquipment OffRoadEquipmentType Crawler Tractors tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 0.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 0.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 4.00 0.00 tblOffRoadEquipment UsageHours 6.00 8.00 tblOffRoadEquipment UsageHours 7.00 8.00 tblOffRoadEquipment UsageHours 7.00 8.00 tblSolidWaste SolidWasteGenerationRate 26.25 0.00 tblSolidWaste SolidWasteGenerationRate 516.60 0.00 tblVehicleTrips CC_TL 4.20 0.00 tblVehicleTrips CC_TL 4.20 0.00 tblVehicleTrips CC_TTP 64.70 0.00 tblVehicleTrips CNW_TL 5.40 0.00 tblVehicleTrips CNW_TL 5.40 0.00 tblVehicleTrips CNW_TTP 19.00 0.00 tblVehicleTrips CW_TL 12.50 0.00 tblVehicleTrips CW_TL 12.50 0.00 tblVehicleTrips CW_TTP 16.30 0.00 tblVehicleTrips DV_TP 35.00 0.00 tblVehicleTrips DV_TP 11.00 0.00 tblVehicleTrips HO_TL 4.50 0.00 tblVehicleTrips HO_TTP 40.60 0.00 tblVehicleTrips HS_TL 3.50 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:59AMPage4of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Summer 2.0 Emissions Summary tblVehicleTrips HS_TTP 19.20 0.00 tblVehicleTrips HW_TL 11.00 0.00 tblVehicleTrips HW_TTP 40.20 0.00 tblVehicleTrips PB_TP 11.00 0.00 tblVehicleTrips PB_TP 3.00 0.00 tblVehicleTrips PR_TP 54.00 0.00 tblVehicleTrips PR_TP 86.00 0.00 tblVehicleTrips ST_TR 49.97 0.00 tblVehicleTrips ST_TR 9.91 0.00 tblVehicleTrips SU_TR 25.24 0.00 tblVehicleTrips SU_TR 8.62 0.00 tblVehicleTrips WD_TR 42.70 0.00 tblVehicleTrips WD_TR 9.52 0.00 tblWater IndoorWaterUseRate 1,851,813.04 0.00 tblWater IndoorWaterUseRate 30,622,392.04 0.00 tblWater OutdoorWaterUseRate 1,134,982.18 0.00 tblWater OutdoorWaterUseRate 19,305,421.07 0.00 tblWoodstoves NumberCatalytic 23.50 0.00 tblWoodstoves NumberNoncatalytic 23.50 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:59AMPage5of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Summer 2.1 Overall Construction (Maximum Daily Emission) ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year lb/day lb/day 2023 3.8871 41.8531 18.7064 0.0582 21.9286 1.7564 23.6850 10.3714 1.6159 11.9873 0.0000 5,639.479 3 5,639.479 3 1.7835 0.0000 5,684.065 7 2024 10.7221 80.8407 77.3311 0.3783 22.6105 1.6995 23.7686 10.3714 1.5636 11.9350 0.0000 38,579.04 48 38,579.04 48 2.5419 0.0000 38,642.59 30 2025 31.8799 87.6817 99.5605 0.4287 26.4089 1.5203 27.9291 7.1011 1.4166 8.5178 0.0000 43,523.29 81 43,523.29 81 3.2714 0.0000 43,605.08 38 2026 31.4299 86.8595 95.4895 0.4208 26.4088 1.5158 27.9245 7.1011 1.4125 8.5135 0.0000 42,735.24 11 42,735.24 11 3.2103 0.0000 42,815.49 93 Maximum 31.8799 87.6817 99.5605 0.4287 26.4089 1.7564 27.9291 10.3714 1.6159 11.9873 0.0000 43,523.29 81 43,523.29 81 3.2714 0.0000 43,605.08 38 Unmitigated Construction CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:59AMPage6of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Summer 2.1 Overall Construction (Maximum Daily Emission) ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year lb/day lb/day 2023 1.4583 27.0372 30.7039 0.0582 8.6440 1.0253 9.6693 4.0692 1.0252 5.0944 0.0000 5,639.479 3 5,639.479 3 1.7835 0.0000 5,684.065 7 2024 9.8407 77.0319 84.5449 0.3783 22.6105 1.3395 23.5987 6.0937 1.3394 7.0592 0.0000 38,579.04 48 38,579.04 48 2.5419 0.0000 38,642.59 30 2025 31.1681 86.5739 107.1080 0.4287 26.4089 1.4507 27.8596 7.1011 1.3948 8.4960 0.0000 43,523.29 81 43,523.29 81 3.2714 0.0000 43,605.08 38 2026 30.7180 85.7517 103.0370 0.4208 26.4088 1.4462 27.8550 7.1011 1.3907 8.4917 0.0000 42,735.24 10 42,735.24 10 3.2103 0.0000 42,815.49 93 Maximum 31.1681 86.5739 107.1080 0.4287 26.4089 1.4507 27.8596 7.1011 1.3948 8.4960 0.0000 43,523.29 81 43,523.29 81 3.2714 0.0000 43,605.08 38 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 6.08 7.01 -11.79 0.00 13.65 18.95 13.87 30.28 14.29 28.84 0.00 0.00 0.00 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:59AMPage7of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Summer 2.2 Overall Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Area 29.8339 0.4464 38.7527 2.0500e- 003 0.2150 0.2150 0.2150 0.2150 0.0000 69.8492 69.8492 0.0669 0.0000 71.5227 Energy 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mobile 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 29.8339 0.4464 38.7527 2.0500e- 003 0.0000 0.2150 0.2150 0.0000 0.2150 0.2150 0.0000 69.8492 69.8492 0.0669 0.0000 71.5227 Unmitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Area 29.8339 0.4464 38.7527 2.0500e- 003 0.2150 0.2150 0.2150 0.2150 0.0000 69.8492 69.8492 0.0669 0.0000 71.5227 Energy 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mobile 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 29.8339 0.4464 38.7527 2.0500e- 003 0.0000 0.2150 0.2150 0.0000 0.2150 0.2150 0.0000 69.8492 69.8492 0.0669 0.0000 71.5227 Mitigated Operational CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:59AMPage8of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Summer 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 Site Preparation Site Preparation 7/9/2023 3/15/2024 5 180 2 Grading Grading 3/16/2024 12/20/2024 5 200 3 Building Construction Building Construction 12/21/2024 11/20/2026 5 500 4 Paving Paving 9/1/2025 12/4/2026 5 330 5 Architectural Coating Architectural Coating 9/1/2025 12/4/2026 5 330 OffRoad Equipment ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Residential Indoor: 1,713,150; Residential Outdoor: 571,050; Non-Residential Indoor: 37,500; Non-Residential Outdoor: 12,500; Striped Parking Area: 288,594 (Architectural Coating – sqft) Acres of Grading (Site Preparation Phase): 630 Acres of Grading (Grading Phase): 800 Acres of Paving: 110.42 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:59AMPage9of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Summer Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Site Preparation Rubber Tired Dozers 3 8.00 247 0.40 Site Preparation Tractors/Loaders/Backhoes 0 8.00 97 0.37 Grading Excavators 2 8.00 158 0.38 Grading Graders 1 8.00 187 0.41 Grading Rubber Tired Dozers 1 8.00 247 0.40 Grading Scrapers 2 8.00 367 0.48 Grading Tractors/Loaders/Backhoes 0 8.00 97 0.37 Building Construction Cranes 1 8.00 231 0.29 Building Construction Forklifts 3 8.00 89 0.20 Building Construction Generator Sets 1 8.00 84 0.74 Building Construction Tractors/Loaders/Backhoes 0 8.00 97 0.37 Building Construction Welders 1 8.00 46 0.45 Paving Pavers 2 8.00 130 0.42 Paving Paving Equipment 2 8.00 132 0.36 Paving Rollers 2 8.00 80 0.38 Architectural Coating Air Compressors 1 8.00 78 0.48 Site Preparation Crawler Tractors 4 8.00 212 0.43 Grading Crawler Tractors 2 8.00 212 0.43 Building Construction Crawler Tractors 3 8.00 212 0.43 Trips and VMT CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:59AMPage10of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Summer 3.2 Site Preparation - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 21.7780 0.0000 21.7780 10.3315 0.0000 10.3315 0.0000 0.0000 Off-Road 3.8257 41.8226 18.2686 0.0568 1.7555 1.7555 1.6151 1.6151 5,505.624 6 5,505.624 6 1.7806 5,550.140 4 Total 3.8257 41.8226 18.2686 0.0568 21.7780 1.7555 23.5335 10.3315 1.6151 11.9465 5,505.624 6 5,505.624 6 1.7806 5,550.140 4 Unmitigated Construction On-Site 3.1 Mitigation Measures Construction Use Cleaner Engines for Construction Equipment Water Exposed Area Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Site Preparation 7 18.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Grading 8 20.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Building Construction 9 2,197.00 843.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Paving 6 15.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Architectural Coating 1 439.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:59AMPage11of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Summer 3.2 Site Preparation - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0614 0.0305 0.4378 1.3400e- 003 0.1506 8.7000e- 004 0.1515 0.0400 8.0000e- 004 0.0408 133.8547 133.8547 2.8200e- 003 133.9253 Total 0.0614 0.0305 0.4378 1.3400e- 003 0.1506 8.7000e- 004 0.1515 0.0400 8.0000e- 004 0.0408 133.8547 133.8547 2.8200e- 003 133.9253 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 8.4934 0.0000 8.4934 4.0293 0.0000 4.0293 0.0000 0.0000 Off-Road 1.3969 27.0067 30.2661 0.0568 1.0244 1.0244 1.0244 1.0244 0.0000 5,505.624 6 5,505.624 6 1.7806 5,550.140 4 Total 1.3969 27.0067 30.2661 0.0568 8.4934 1.0244 9.5178 4.0293 1.0244 5.0537 0.0000 5,505.624 6 5,505.624 6 1.7806 5,550.140 4 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:59AMPage12of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Summer 3.2 Site Preparation - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0614 0.0305 0.4378 1.3400e- 003 0.1506 8.7000e- 004 0.1515 0.0400 8.0000e- 004 0.0408 133.8547 133.8547 2.8200e- 003 133.9253 Total 0.0614 0.0305 0.4378 1.3400e- 003 0.1506 8.7000e- 004 0.1515 0.0400 8.0000e- 004 0.0408 133.8547 133.8547 2.8200e- 003 133.9253 Mitigated Construction Off-Site 3.2 Site Preparation - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 21.7780 0.0000 21.7780 10.3315 0.0000 10.3315 0.0000 0.0000 Off-Road 3.7768 40.3224 18.1788 0.0569 1.6987 1.6987 1.5628 1.5628 5,507.078 0 5,507.078 0 1.7811 5,551.605 5 Total 3.7768 40.3224 18.1788 0.0569 21.7780 1.6987 23.4767 10.3315 1.5628 11.8942 5,507.078 0 5,507.078 0 1.7811 5,551.605 5 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:59AMPage13of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Summer 3.2 Site Preparation - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0578 0.0276 0.4102 1.2900e- 003 0.1506 8.6000e- 004 0.1515 0.0400 7.9000e- 004 0.0407 129.0763 129.0763 2.5700e- 003 129.1406 Total 0.0578 0.0276 0.4102 1.2900e- 003 0.1506 8.6000e- 004 0.1515 0.0400 7.9000e- 004 0.0407 129.0763 129.0763 2.5700e- 003 129.1406 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 8.4934 0.0000 8.4934 4.0293 0.0000 4.0293 0.0000 0.0000 Off-Road 1.3969 27.0067 30.2661 0.0569 1.0244 1.0244 1.0244 1.0244 0.0000 5,507.078 0 5,507.078 0 1.7811 5,551.605 5 Total 1.3969 27.0067 30.2661 0.0569 8.4934 1.0244 9.5178 4.0293 1.0244 5.0537 0.0000 5,507.078 0 5,507.078 0 1.7811 5,551.605 5 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:59AMPage14of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Summer 3.2 Site Preparation - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0578 0.0276 0.4102 1.2900e- 003 0.1506 8.6000e- 004 0.1515 0.0400 7.9000e- 004 0.0407 129.0763 129.0763 2.5700e- 003 129.1406 Total 0.0578 0.0276 0.4102 1.2900e- 003 0.1506 8.6000e- 004 0.1515 0.0400 7.9000e- 004 0.0407 129.0763 129.0763 2.5700e- 003 129.1406 Mitigated Construction Off-Site 3.3 Grading - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 10.2641 0.0000 10.2641 3.7683 0.0000 3.7683 0.0000 0.0000 Off-Road 3.7761 38.9502 27.6444 0.0715 1.5701 1.5701 1.4445 1.4445 6,919.282 7 6,919.282 7 2.2378 6,975.228 6 Total 3.7761 38.9502 27.6444 0.0715 10.2641 1.5701 11.8342 3.7683 1.4445 5.2127 6,919.282 7 6,919.282 7 2.2378 6,975.228 6 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:59AMPage15of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Summer 3.3 Grading - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0642 0.0307 0.4557 1.4400e- 003 0.1673 9.6000e- 004 0.1683 0.0444 8.8000e- 004 0.0453 143.4181 143.4181 2.8600e- 003 143.4896 Total 0.0642 0.0307 0.4557 1.4400e- 003 0.1673 9.6000e- 004 0.1683 0.0444 8.8000e- 004 0.0453 143.4181 143.4181 2.8600e- 003 143.4896 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 4.0030 0.0000 4.0030 1.4696 0.0000 1.4696 0.0000 0.0000 Off-Road 1.7560 33.9487 40.3756 0.0715 1.3385 1.3385 1.3385 1.3385 0.0000 6,919.282 7 6,919.282 7 2.2378 6,975.228 6 Total 1.7560 33.9487 40.3756 0.0715 4.0030 1.3385 5.3415 1.4696 1.3385 2.8082 0.0000 6,919.282 7 6,919.282 7 2.2378 6,975.228 6 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:59AMPage16of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Summer 3.3 Grading - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0642 0.0307 0.4557 1.4400e- 003 0.1673 9.6000e- 004 0.1683 0.0444 8.8000e- 004 0.0453 143.4181 143.4181 2.8600e- 003 143.4896 Total 0.0642 0.0307 0.4557 1.4400e- 003 0.1673 9.6000e- 004 0.1683 0.0444 8.8000e- 004 0.0453 143.4181 143.4181 2.8600e- 003 143.4896 Mitigated Construction Off-Site 3.4 Building Construction - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 2.4039 24.2847 17.1094 0.0429 1.0085 1.0085 0.9404 0.9404 4,103.013 4 4,103.013 4 1.1048 4,130.632 9 Total 2.4039 24.2847 17.1094 0.0429 1.0085 1.0085 0.9404 0.9404 4,103.013 4 4,103.013 4 1.1048 4,130.632 9 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:59AMPage17of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Summer 3.4 Building Construction - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.2628 53.1819 10.1608 0.1773 4.2289 0.0445 4.2734 1.2180 0.0425 1.2606 18,721.55 44 18,721.55 44 1.1231 18,749.63 07 Worker 7.0554 3.3741 50.0610 0.1581 18.3817 0.1051 18.4868 4.8756 0.0968 4.9724 15,754.47 70 15,754.47 70 0.3141 15,762.32 93 Total 8.3182 56.5560 60.2217 0.3354 22.6105 0.1496 22.7602 6.0937 0.1393 6.2329 34,476.03 15 34,476.03 15 1.4371 34,511.96 00 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.5225 20.4759 24.3231 0.0429 0.8385 0.8385 0.8263 0.8263 0.0000 4,103.013 4 4,103.013 4 1.1048 4,130.632 9 Total 1.5225 20.4759 24.3231 0.0429 0.8385 0.8385 0.8263 0.8263 0.0000 4,103.013 4 4,103.013 4 1.1048 4,130.632 9 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:59AMPage18of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Summer 3.4 Building Construction - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.2628 53.1819 10.1608 0.1773 4.2289 0.0445 4.2734 1.2180 0.0425 1.2606 18,721.55 44 18,721.55 44 1.1231 18,749.63 07 Worker 7.0554 3.3741 50.0610 0.1581 18.3817 0.1051 18.4868 4.8756 0.0968 4.9724 15,754.47 70 15,754.47 70 0.3141 15,762.32 93 Total 8.3182 56.5560 60.2217 0.3354 22.6105 0.1496 22.7602 6.0937 0.1393 6.2329 34,476.03 15 34,476.03 15 1.4371 34,511.96 00 Mitigated Construction Off-Site 3.4 Building Construction - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 2.1777 21.2010 16.7425 0.0429 0.8645 0.8645 0.8062 0.8062 4,101.888 0 4,101.888 0 1.1008 4,129.407 2 Total 2.1777 21.2010 16.7425 0.0429 0.8645 0.8645 0.8062 0.8062 4,101.888 0 4,101.888 0 1.1008 4,129.407 2 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:59AMPage19of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Summer 3.4 Building Construction - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.2290 52.6666 9.8002 0.1760 4.2287 0.0439 4.2727 1.2180 0.0420 1.2600 18,590.89 09 18,590.89 09 1.0931 18,618.21 78 Worker 6.6585 3.0707 46.4325 0.1517 18.3817 0.1033 18.4849 4.8756 0.0950 4.9707 15,123.34 08 15,123.34 08 0.2846 15,130.45 58 Total 7.8875 55.7372 56.2327 0.3277 22.6104 0.1472 22.7576 6.0936 0.1370 6.2306 33,714.23 17 33,714.23 17 1.3777 33,748.67 36 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.4658 20.0932 24.2901 0.0429 0.7950 0.7950 0.7845 0.7845 0.0000 4,101.888 0 4,101.888 0 1.1008 4,129.407 2 Total 1.4658 20.0932 24.2901 0.0429 0.7950 0.7950 0.7845 0.7845 0.0000 4,101.888 0 4,101.888 0 1.1008 4,129.407 2 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:59AMPage20of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Summer 3.4 Building Construction - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.2290 52.6666 9.8002 0.1760 4.2287 0.0439 4.2727 1.2180 0.0420 1.2600 18,590.89 09 18,590.89 09 1.0931 18,618.21 78 Worker 6.6585 3.0707 46.4325 0.1517 18.3817 0.1033 18.4849 4.8756 0.0950 4.9707 15,123.34 08 15,123.34 08 0.2846 15,130.45 58 Total 7.8875 55.7372 56.2327 0.3277 22.6104 0.1472 22.7576 6.0936 0.1370 6.2306 33,714.23 17 33,714.23 17 1.3777 33,748.67 36 Mitigated Construction Off-Site 3.4 Building Construction - 2026 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 2.1777 21.2010 16.7425 0.0429 0.8645 0.8645 0.8062 0.8062 4,101.888 0 4,101.888 0 1.1008 4,129.407 2 Total 2.1777 21.2010 16.7425 0.0429 0.8645 0.8645 0.8062 0.8062 4,101.888 0 4,101.888 0 1.1008 4,129.407 2 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:59AMPage21of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Summer 3.4 Building Construction - 2026 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.1997 52.1560 9.5079 0.1748 4.2286 0.0433 4.2719 1.2179 0.0414 1.2593 18,467.72 99 18,467.72 99 1.0625 18,494.29 23 Worker 6.3098 2.8124 43.3009 0.1461 18.3817 0.1001 18.4817 4.8756 0.0921 4.9677 14,572.31 23 14,572.31 23 0.2593 14,578.79 50 Total 7.5095 54.9684 52.8088 0.3210 22.6103 0.1434 22.7537 6.0936 0.1335 6.2270 33,040.04 22 33,040.04 22 1.3218 33,073.08 72 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.4658 20.0932 24.2901 0.0429 0.7950 0.7950 0.7845 0.7845 0.0000 4,101.888 0 4,101.888 0 1.1008 4,129.407 2 Total 1.4658 20.0932 24.2901 0.0429 0.7950 0.7950 0.7845 0.7845 0.0000 4,101.888 0 4,101.888 0 1.1008 4,129.407 2 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:59AMPage22of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Summer 3.4 Building Construction - 2026 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.1997 52.1560 9.5079 0.1748 4.2286 0.0433 4.2719 1.2179 0.0414 1.2593 18,467.72 99 18,467.72 99 1.0625 18,494.29 23 Worker 6.3098 2.8124 43.3009 0.1461 18.3817 0.1001 18.4817 4.8756 0.0921 4.9677 14,572.31 23 14,572.31 23 0.2593 14,578.79 50 Total 7.5095 54.9684 52.8088 0.3210 22.6103 0.1434 22.7537 6.0936 0.1335 6.2270 33,040.04 22 33,040.04 22 1.3218 33,073.08 72 Mitigated Construction Off-Site 3.5 Paving - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.9152 8.5816 14.5780 0.0228 0.4185 0.4185 0.3850 0.3850 2,206.745 2 2,206.745 2 0.7137 2,224.587 8 Paving 0.8767 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 1.7918 8.5816 14.5780 0.0228 0.4185 0.4185 0.3850 0.3850 2,206.745 2 2,206.745 2 0.7137 2,224.587 8 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:59AMPage23of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Summer 3.5 Paving - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0455 0.0210 0.3170 1.0400e- 003 0.1255 7.1000e- 004 0.1262 0.0333 6.5000e- 004 0.0339 103.2545 103.2545 1.9400e- 003 103.3031 Total 0.0455 0.0210 0.3170 1.0400e- 003 0.1255 7.1000e- 004 0.1262 0.0333 6.5000e- 004 0.0339 103.2545 103.2545 1.9400e- 003 103.3031 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.9152 8.5816 14.5780 0.0228 0.4185 0.4185 0.3850 0.3850 0.0000 2,206.745 2 2,206.745 2 0.7137 2,224.587 8 Paving 0.8767 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 1.7918 8.5816 14.5780 0.0228 0.4185 0.4185 0.3850 0.3850 0.0000 2,206.745 2 2,206.745 2 0.7137 2,224.587 8 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:59AMPage24of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Summer 3.5 Paving - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0455 0.0210 0.3170 1.0400e- 003 0.1255 7.1000e- 004 0.1262 0.0333 6.5000e- 004 0.0339 103.2545 103.2545 1.9400e- 003 103.3031 Total 0.0455 0.0210 0.3170 1.0400e- 003 0.1255 7.1000e- 004 0.1262 0.0333 6.5000e- 004 0.0339 103.2545 103.2545 1.9400e- 003 103.3031 Mitigated Construction Off-Site 3.5 Paving - 2026 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.9152 8.5816 14.5780 0.0228 0.4185 0.4185 0.3850 0.3850 2,206.745 2 2,206.745 2 0.7137 2,224.587 8 Paving 0.8767 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 1.7918 8.5816 14.5780 0.0228 0.4185 0.4185 0.3850 0.3850 2,206.745 2 2,206.745 2 0.7137 2,224.587 8 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:59AMPage25of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Summer 3.5 Paving - 2026 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0431 0.0192 0.2956 1.0000e- 003 0.1255 6.8000e- 004 0.1262 0.0333 6.3000e- 004 0.0339 99.4924 99.4924 1.7700e- 003 99.5366 Total 0.0431 0.0192 0.2956 1.0000e- 003 0.1255 6.8000e- 004 0.1262 0.0333 6.3000e- 004 0.0339 99.4924 99.4924 1.7700e- 003 99.5366 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.9152 8.5816 14.5780 0.0228 0.4185 0.4185 0.3850 0.3850 0.0000 2,206.745 2 2,206.745 2 0.7137 2,224.587 8 Paving 0.8767 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 1.7918 8.5816 14.5780 0.0228 0.4185 0.4185 0.3850 0.3850 0.0000 2,206.745 2 2,206.745 2 0.7137 2,224.587 8 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:59AMPage26of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Summer 3.5 Paving - 2026 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0431 0.0192 0.2956 1.0000e- 003 0.1255 6.8000e- 004 0.1262 0.0333 6.3000e- 004 0.0339 99.4924 99.4924 1.7700e- 003 99.5366 Total 0.0431 0.0192 0.2956 1.0000e- 003 0.1255 6.8000e- 004 0.1262 0.0333 6.3000e- 004 0.0339 99.4924 99.4924 1.7700e- 003 99.5366 Mitigated Construction Off-Site 3.6 Architectural Coating - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 18.4192 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.2278 1.5273 2.4122 3.9600e- 003 0.0687 0.0687 0.0687 0.0687 375.2641 375.2641 0.0205 375.7758 Total 18.6470 1.5273 2.4122 3.9600e- 003 0.0687 0.0687 0.0687 0.0687 375.2641 375.2641 0.0205 375.7758 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:59AMPage27of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Summer 3.6 Architectural Coating - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.3305 0.6136 9.2781 0.0303 3.6730 0.0206 3.6936 0.9742 0.0190 0.9932 3,021.914 7 3,021.914 7 0.0569 3,023.336 4 Total 1.3305 0.6136 9.2781 0.0303 3.6730 0.0206 3.6936 0.9742 0.0190 0.9932 3,021.914 7 3,021.914 7 0.0569 3,023.336 4 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 18.4192 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.2278 1.5273 2.4122 3.9600e- 003 0.0687 0.0687 0.0687 0.0687 0.0000 375.2641 375.2641 0.0205 375.7758 Total 18.6470 1.5273 2.4122 3.9600e- 003 0.0687 0.0687 0.0687 0.0687 0.0000 375.2641 375.2641 0.0205 375.7758 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:59AMPage28of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Summer 3.6 Architectural Coating - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.3305 0.6136 9.2781 0.0303 3.6730 0.0206 3.6936 0.9742 0.0190 0.9932 3,021.914 7 3,021.914 7 0.0569 3,023.336 4 Total 1.3305 0.6136 9.2781 0.0303 3.6730 0.0206 3.6936 0.9742 0.0190 0.9932 3,021.914 7 3,021.914 7 0.0569 3,023.336 4 Mitigated Construction Off-Site 3.6 Architectural Coating - 2026 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 18.4192 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.2278 1.5273 2.4122 3.9600e- 003 0.0687 0.0687 0.0687 0.0687 375.2641 375.2641 0.0205 375.7758 Total 18.6470 1.5273 2.4122 3.9600e- 003 0.0687 0.0687 0.0687 0.0687 375.2641 375.2641 0.0205 375.7758 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:59AMPage29of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Summer 3.6 Architectural Coating - 2026 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.2608 0.5620 8.6523 0.0292 3.6730 0.0200 3.6930 0.9742 0.0184 0.9926 2,911.809 3 2,911.809 3 0.0518 2,913.104 7 Total 1.2608 0.5620 8.6523 0.0292 3.6730 0.0200 3.6930 0.9742 0.0184 0.9926 2,911.809 3 2,911.809 3 0.0518 2,913.104 7 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 18.4192 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.2278 1.5273 2.4122 3.9600e- 003 0.0687 0.0687 0.0687 0.0687 0.0000 375.2641 375.2641 0.0205 375.7758 Total 18.6470 1.5273 2.4122 3.9600e- 003 0.0687 0.0687 0.0687 0.0687 0.0000 375.2641 375.2641 0.0205 375.7758 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:59AMPage30of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Summer 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile 3.6 Architectural Coating - 2026 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.2608 0.5620 8.6523 0.0292 3.6730 0.0200 3.6930 0.9742 0.0184 0.9926 2,911.809 3 2,911.809 3 0.0518 2,913.104 7 Total 1.2608 0.5620 8.6523 0.0292 3.6730 0.0200 3.6930 0.9742 0.0184 0.9926 2,911.809 3 2,911.809 3 0.0518 2,913.104 7 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:59AMPage31of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Summer ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Mitigated 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Unmitigated 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 4.2 Trip Summary Information 4.3 Trip Type Information Average Daily Trip Rate Unmitigated Mitigated Land Use Weekday Saturday Sunday Annual VMT Annual VMT Other Asphalt Surfaces 0.00 0.00 0.00 Regional Shopping Center 0.00 0.00 0.00 Single Family Housing 0.00 0.00 0.00 Total 0.00 0.00 0.00 Miles Trip %Trip Purpose % Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C-W H-S or C-C H-O or C-NW Primary Diverted Pass-by Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 Regional Shopping Center 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 Single Family Housing 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 4.4 Fleet Mix CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:59AMPage32of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Summer 5.0 Energy Detail ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day NaturalGas Mitigated 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 NaturalGas Unmitigated 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 5.1 Mitigation Measures Energy Land Use LDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH Other Asphalt Surfaces 0.556393 0.035040 0.189382 0.106465 0.012088 0.004430 0.017405 0.070208 0.001420 0.001115 0.004429 0.000881 0.000745 Regional Shopping Center 0.556393 0.035040 0.189382 0.106465 0.012088 0.004430 0.017405 0.070208 0.001420 0.001115 0.004429 0.000881 0.000745 Single Family Housing 0.556393 0.035040 0.189382 0.106465 0.012088 0.004430 0.017405 0.070208 0.001420 0.001115 0.004429 0.000881 0.000745 Historical Energy Use: N CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:59AMPage33of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Summer 6.0 Area Detail 5.2 Energy by Land Use - NaturalGas NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr lb/day lb/day Other Asphalt Surfaces 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Regional Shopping Center 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Single Family Housing 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Unmitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr lb/day lb/day Other Asphalt Surfaces 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Regional Shopping Center 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Single Family Housing 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:59AMPage34of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Summer 6.1 Mitigation Measures Area 6.0 Area Detail ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Mitigated 29.8339 0.4464 38.7527 2.0500e- 003 0.2150 0.2150 0.2150 0.2150 0.0000 69.8492 69.8492 0.0669 0.0000 71.5227 Unmitigated 29.8339 0.4464 38.7527 2.0500e- 003 0.2150 0.2150 0.2150 0.2150 0.0000 69.8492 69.8492 0.0669 0.0000 71.5227 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:59AMPage35of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Summer 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory lb/day lb/day Architectural Coating 8.3265 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 20.3431 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hearth 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 1.1644 0.4464 38.7527 2.0500e- 003 0.2150 0.2150 0.2150 0.2150 69.8492 69.8492 0.0669 71.5227 Total 29.8339 0.4464 38.7527 2.0500e- 003 0.2150 0.2150 0.2150 0.2150 0.0000 69.8492 69.8492 0.0669 0.0000 71.5227 Unmitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:59AMPage36of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Summer 8.1 Mitigation Measures Waste 7.1 Mitigation Measures Water 7.0 Water Detail 8.0 Waste Detail 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory lb/day lb/day Architectural Coating 8.3265 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 20.3431 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hearth 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 1.1644 0.4464 38.7527 2.0500e- 003 0.2150 0.2150 0.2150 0.2150 69.8492 69.8492 0.0669 71.5227 Total 29.8339 0.4464 38.7527 2.0500e- 003 0.2150 0.2150 0.2150 0.2150 0.0000 69.8492 69.8492 0.0669 0.0000 71.5227 Mitigated 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year Horse Power Load Factor Fuel Type 10.0 Stationary Equipment CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:59AMPage37of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Summer 11.0 Vegetation Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power Load Factor Fuel Type Boilers Equipment Type Number Heat Input/Day Heat Input/Year Boiler Rating Fuel Type User Defined Equipment Equipment Type Number CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:59AMPage38of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Summer 1.1 Land Usage Land Uses Size Metric Lot Acreage Floor Surface Area Population Other Asphalt Surfaces 110.42 Acre 110.42 4,809,895.20 0 Single Family Housing 470.00 Dwelling Unit 152.60 846,000.00 1260 Regional Shopping Center 25.00 1000sqft 0.57 25,000.00 0 1.2 Other Project Characteristics Urbanization Climate Zone Urban 15 Wind Speed (m/s)Precipitation Freq (Days)2.4 28 1.3 User Entered Comments & Non-Default Data 1.0 Project Characteristics Utility Company Imperial Irrigation District 2026OperationalYear CO2 Intensity lb/MWhr) 1270.9 0.029CH4Intensity lb/MWhr) 0.006N2OIntensity lb/MWhr) The Wave - Coral Mountain (Phase 3 Construction - Mitigated) Riverside-Salton Sea County, Winter CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:58AMPage1of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Winter Project Characteristics - Land Use - Total Project Area is 263.59 acres. Construction Phase - Construction Schedule adjusted to meet the 2026 Opening Year. Off-road Equipment - Hours are based on an 8-hour workday. Off-road Equipment - Hours are based on an 8-hour workday. Off-road Equipment - Grading - For purposes of analysis, total acres graded per day is based on the equipment specific grading rates (CalEEMod Appendix A) and the equipment list. Architectural Coating - Rule 1113 Vehicle Trips - Construction Run Only. Woodstoves - Construction Run Only. Energy Use - Construction Run Only. Water And Wastewater - Construction Run Only. Solid Waste - Construction Run Only. Construction Off-road Equipment Mitigation - All equipment operating at >150 HP are required to be equipped with Tier 3 or better engines. Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Table Name Column Name Default Value New Value tblArchitecturalCoating EF_Nonresidential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Nonresidential_Interior 250.00 50.00 tblArchitecturalCoating EF_Parking 250.00 50.00 tblArchitecturalCoating EF_Residential_Exterior 250.00 50.00 tblArchitecturalCoating EF_Residential_Interior 250.00 50.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 2.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 4.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:58AMPage2of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Winter tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 2.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 9.00 tblConstEquipMitigation Tier No Change Tier 3 tblConstEquipMitigation Tier No Change Tier 3 tblConstEquipMitigation Tier No Change Tier 3 tblConstEquipMitigation Tier No Change Tier 3 tblConstEquipMitigation Tier No Change Tier 3 tblConstEquipMitigation Tier No Change Tier 3 tblConstructionPhase NumDays 465.00 200.00 tblConstructionPhase NumDays 4,650.00 500.00 tblEnergyUse LightingElect 5.61 0.00 tblEnergyUse LightingElect 1,608.84 0.00 tblEnergyUse NT24E 2.44 0.00 tblEnergyUse NT24E 6,155.97 0.00 tblEnergyUse NT24NG 0.30 0.00 tblEnergyUse NT24NG 6,030.00 0.00 tblEnergyUse T24E 4.58 0.00 tblEnergyUse T24E 951.67 0.00 tblEnergyUse T24NG 1.92 0.00 tblEnergyUse T24NG 24,566.15 0.00 tblFireplaces NumberGas 376.00 0.00 tblFireplaces NumberNoFireplace 47.00 0.00 tblFireplaces NumberWood 47.00 0.00 tblGrading AcresOfGrading 700.00 800.00 tblGrading AcresOfGrading 360.00 630.00 tblLandUse Population 1,344.00 1,260.00 tblOffRoadEquipment LoadFactor 0.43 0.43 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:58AMPage3of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Winter tblOffRoadEquipment LoadFactor 0.43 0.43 tblOffRoadEquipment LoadFactor 0.43 0.43 tblOffRoadEquipment OffRoadEquipmentType Crawler Tractors tblOffRoadEquipment OffRoadEquipmentType Crawler Tractors tblOffRoadEquipment OffRoadEquipmentType Crawler Tractors tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 0.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 0.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 4.00 0.00 tblOffRoadEquipment UsageHours 6.00 8.00 tblOffRoadEquipment UsageHours 7.00 8.00 tblOffRoadEquipment UsageHours 7.00 8.00 tblSolidWaste SolidWasteGenerationRate 26.25 0.00 tblSolidWaste SolidWasteGenerationRate 516.60 0.00 tblVehicleTrips CC_TL 4.20 0.00 tblVehicleTrips CC_TL 4.20 0.00 tblVehicleTrips CC_TTP 64.70 0.00 tblVehicleTrips CNW_TL 5.40 0.00 tblVehicleTrips CNW_TL 5.40 0.00 tblVehicleTrips CNW_TTP 19.00 0.00 tblVehicleTrips CW_TL 12.50 0.00 tblVehicleTrips CW_TL 12.50 0.00 tblVehicleTrips CW_TTP 16.30 0.00 tblVehicleTrips DV_TP 35.00 0.00 tblVehicleTrips DV_TP 11.00 0.00 tblVehicleTrips HO_TL 4.50 0.00 tblVehicleTrips HO_TTP 40.60 0.00 tblVehicleTrips HS_TL 3.50 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:58AMPage4of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Winter 2.0 Emissions Summary tblVehicleTrips HS_TTP 19.20 0.00 tblVehicleTrips HW_TL 11.00 0.00 tblVehicleTrips HW_TTP 40.20 0.00 tblVehicleTrips PB_TP 11.00 0.00 tblVehicleTrips PB_TP 3.00 0.00 tblVehicleTrips PR_TP 54.00 0.00 tblVehicleTrips PR_TP 86.00 0.00 tblVehicleTrips ST_TR 49.97 0.00 tblVehicleTrips ST_TR 9.91 0.00 tblVehicleTrips SU_TR 25.24 0.00 tblVehicleTrips SU_TR 8.62 0.00 tblVehicleTrips WD_TR 42.70 0.00 tblVehicleTrips WD_TR 9.52 0.00 tblWater IndoorWaterUseRate 1,851,813.04 0.00 tblWater IndoorWaterUseRate 30,622,392.04 0.00 tblWater OutdoorWaterUseRate 1,134,982.18 0.00 tblWater OutdoorWaterUseRate 19,305,421.07 0.00 tblWoodstoves NumberCatalytic 23.50 0.00 tblWoodstoves NumberNoncatalytic 23.50 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:58AMPage5of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Winter 2.1 Overall Construction (Maximum Daily Emission) ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year lb/day lb/day 2023 3.8849 41.8541 18.6256 0.0581 21.9286 1.7564 23.6850 10.3714 1.6159 11.9873 0.0000 5,625.783 7 5,625.783 7 1.7831 0.0000 5,670.361 5 2024 10.5623 80.1070 69.7208 0.3543 22.6105 1.6995 23.7703 10.3714 1.5636 11.9350 0.0000 36,148.36 53 36,148.36 53 2.6307 0.0000 36,214.13 20 2025 31.7051 86.9551 90.7585 0.4023 26.4089 1.5218 27.9307 7.1011 1.4181 8.5192 0.0000 40,848.95 07 40,848.95 07 3.3531 0.0000 40,932.77 87 2026 31.2879 86.1193 87.3162 0.3952 26.4088 1.5172 27.9259 7.1011 1.4138 8.5149 0.0000 40,139.51 90 40,139.51 90 3.2919 0.0000 40,221.81 57 Maximum 31.7051 86.9551 90.7585 0.4023 26.4089 1.7564 27.9307 10.3714 1.6159 11.9873 0.0000 40,848.95 07 40,848.95 07 3.3531 0.0000 40,932.77 87 Unmitigated Construction CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:58AMPage6of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Winter 2.1 Overall Construction (Maximum Daily Emission) ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year lb/day lb/day 2023 1.4561 27.0382 30.6230 0.0581 8.6440 1.0253 9.6693 4.0692 1.0252 5.0944 0.0000 5,625.783 7 5,625.783 7 1.7831 0.0000 5,670.361 5 2024 9.6809 76.2982 76.9346 0.3543 22.6105 1.3395 23.6003 6.0937 1.3394 7.0608 0.0000 36,148.36 53 36,148.36 53 2.6307 0.0000 36,214.13 20 2025 30.9933 85.8472 98.3060 0.4023 26.4089 1.4523 27.8611 7.1011 1.3963 8.4975 0.0000 40,848.95 07 40,848.95 07 3.3531 0.0000 40,932.77 87 2026 30.5761 85.0114 94.8637 0.3952 26.4088 1.4476 27.8564 7.1011 1.3920 8.4931 0.0000 40,139.51 90 40,139.51 90 3.2919 0.0000 40,221.81 57 Maximum 30.9933 85.8472 98.3060 0.4023 26.4089 1.4523 27.8611 7.1011 1.3963 8.4975 0.0000 40,848.95 07 40,848.95 07 3.3531 0.0000 40,932.77 87 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 6.11 7.06 -12.88 0.00 13.65 18.94 13.87 30.28 14.28 28.84 0.00 0.00 0.00 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:58AMPage7of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Winter 2.2 Overall Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Area 29.8339 0.4464 38.7527 2.0500e- 003 0.2150 0.2150 0.2150 0.2150 0.0000 69.8492 69.8492 0.0669 0.0000 71.5227 Energy 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mobile 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 29.8339 0.4464 38.7527 2.0500e- 003 0.0000 0.2150 0.2150 0.0000 0.2150 0.2150 0.0000 69.8492 69.8492 0.0669 0.0000 71.5227 Unmitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Area 29.8339 0.4464 38.7527 2.0500e- 003 0.2150 0.2150 0.2150 0.2150 0.0000 69.8492 69.8492 0.0669 0.0000 71.5227 Energy 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mobile 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 29.8339 0.4464 38.7527 2.0500e- 003 0.0000 0.2150 0.2150 0.0000 0.2150 0.2150 0.0000 69.8492 69.8492 0.0669 0.0000 71.5227 Mitigated Operational CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:58AMPage8of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Winter 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 Site Preparation Site Preparation 7/9/2023 3/15/2024 5 180 2 Grading Grading 3/16/2024 12/20/2024 5 200 3 Building Construction Building Construction 12/21/2024 11/20/2026 5 500 4 Paving Paving 9/1/2025 12/4/2026 5 330 5 Architectural Coating Architectural Coating 9/1/2025 12/4/2026 5 330 OffRoad Equipment ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Residential Indoor: 1,713,150; Residential Outdoor: 571,050; Non-Residential Indoor: 37,500; Non-Residential Outdoor: 12,500; Striped Parking Area: 288,594 (Architectural Coating – sqft) Acres of Grading (Site Preparation Phase): 630 Acres of Grading (Grading Phase): 800 Acres of Paving: 110.42 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:58AMPage9of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Winter Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Site Preparation Rubber Tired Dozers 3 8.00 247 0.40 Site Preparation Tractors/Loaders/Backhoes 0 8.00 97 0.37 Grading Excavators 2 8.00 158 0.38 Grading Graders 1 8.00 187 0.41 Grading Rubber Tired Dozers 1 8.00 247 0.40 Grading Scrapers 2 8.00 367 0.48 Grading Tractors/Loaders/Backhoes 0 8.00 97 0.37 Building Construction Cranes 1 8.00 231 0.29 Building Construction Forklifts 3 8.00 89 0.20 Building Construction Generator Sets 1 8.00 84 0.74 Building Construction Tractors/Loaders/Backhoes 0 8.00 97 0.37 Building Construction Welders 1 8.00 46 0.45 Paving Pavers 2 8.00 130 0.42 Paving Paving Equipment 2 8.00 132 0.36 Paving Rollers 2 8.00 80 0.38 Architectural Coating Air Compressors 1 8.00 78 0.48 Site Preparation Crawler Tractors 4 8.00 212 0.43 Grading Crawler Tractors 2 8.00 212 0.43 Building Construction Crawler Tractors 3 8.00 212 0.43 Trips and VMT CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:58AMPage10of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Winter 3.2 Site Preparation - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 21.7780 0.0000 21.7780 10.3315 0.0000 10.3315 0.0000 0.0000 Off-Road 3.8257 41.8226 18.2686 0.0568 1.7555 1.7555 1.6151 1.6151 5,505.624 6 5,505.624 6 1.7806 5,550.140 4 Total 3.8257 41.8226 18.2686 0.0568 21.7780 1.7555 23.5335 10.3315 1.6151 11.9465 5,505.624 6 5,505.624 6 1.7806 5,550.140 4 Unmitigated Construction On-Site 3.1 Mitigation Measures Construction Use Cleaner Engines for Construction Equipment Water Exposed Area Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Site Preparation 7 18.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Grading 8 20.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Building Construction 9 2,197.00 843.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Paving 6 15.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT Architectural Coating 1 439.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:58AMPage11of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Winter 3.2 Site Preparation - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0592 0.0315 0.3569 1.2100e- 003 0.1506 8.7000e- 004 0.1515 0.0400 8.0000e- 004 0.0408 120.1591 120.1591 2.4800e- 003 120.2211 Total 0.0592 0.0315 0.3569 1.2100e- 003 0.1506 8.7000e- 004 0.1515 0.0400 8.0000e- 004 0.0408 120.1591 120.1591 2.4800e- 003 120.2211 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 8.4934 0.0000 8.4934 4.0293 0.0000 4.0293 0.0000 0.0000 Off-Road 1.3969 27.0067 30.2661 0.0568 1.0244 1.0244 1.0244 1.0244 0.0000 5,505.624 6 5,505.624 6 1.7806 5,550.140 4 Total 1.3969 27.0067 30.2661 0.0568 8.4934 1.0244 9.5178 4.0293 1.0244 5.0537 0.0000 5,505.624 6 5,505.624 6 1.7806 5,550.140 4 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:58AMPage12of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Winter 3.2 Site Preparation - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0592 0.0315 0.3569 1.2100e- 003 0.1506 8.7000e- 004 0.1515 0.0400 8.0000e- 004 0.0408 120.1591 120.1591 2.4800e- 003 120.2211 Total 0.0592 0.0315 0.3569 1.2100e- 003 0.1506 8.7000e- 004 0.1515 0.0400 8.0000e- 004 0.0408 120.1591 120.1591 2.4800e- 003 120.2211 Mitigated Construction Off-Site 3.2 Site Preparation - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 21.7780 0.0000 21.7780 10.3315 0.0000 10.3315 0.0000 0.0000 Off-Road 3.7768 40.3224 18.1788 0.0569 1.6987 1.6987 1.5628 1.5628 5,507.078 0 5,507.078 0 1.7811 5,551.605 5 Total 3.7768 40.3224 18.1788 0.0569 21.7780 1.6987 23.4767 10.3315 1.5628 11.8942 5,507.078 0 5,507.078 0 1.7811 5,551.605 5 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:58AMPage13of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Winter 3.2 Site Preparation - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0558 0.0286 0.3336 1.1600e- 003 0.1506 8.6000e- 004 0.1515 0.0400 7.9000e- 004 0.0407 115.8519 115.8519 2.2600e- 003 115.9085 Total 0.0558 0.0286 0.3336 1.1600e- 003 0.1506 8.6000e- 004 0.1515 0.0400 7.9000e- 004 0.0407 115.8519 115.8519 2.2600e- 003 115.9085 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 8.4934 0.0000 8.4934 4.0293 0.0000 4.0293 0.0000 0.0000 Off-Road 1.3969 27.0067 30.2661 0.0569 1.0244 1.0244 1.0244 1.0244 0.0000 5,507.078 0 5,507.078 0 1.7811 5,551.605 5 Total 1.3969 27.0067 30.2661 0.0569 8.4934 1.0244 9.5178 4.0293 1.0244 5.0537 0.0000 5,507.078 0 5,507.078 0 1.7811 5,551.605 5 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:58AMPage14of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Winter 3.2 Site Preparation - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0558 0.0286 0.3336 1.1600e- 003 0.1506 8.6000e- 004 0.1515 0.0400 7.9000e- 004 0.0407 115.8519 115.8519 2.2600e- 003 115.9085 Total 0.0558 0.0286 0.3336 1.1600e- 003 0.1506 8.6000e- 004 0.1515 0.0400 7.9000e- 004 0.0407 115.8519 115.8519 2.2600e- 003 115.9085 Mitigated Construction Off-Site 3.3 Grading - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 10.2641 0.0000 10.2641 3.7683 0.0000 3.7683 0.0000 0.0000 Off-Road 3.7761 38.9502 27.6444 0.0715 1.5701 1.5701 1.4445 1.4445 6,919.282 7 6,919.282 7 2.2378 6,975.228 6 Total 3.7761 38.9502 27.6444 0.0715 10.2641 1.5701 11.8342 3.7683 1.4445 5.2127 6,919.282 7 6,919.282 7 2.2378 6,975.228 6 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:58AMPage15of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Winter 3.3 Grading - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0620 0.0317 0.3706 1.2900e- 003 0.1673 9.6000e- 004 0.1683 0.0444 8.8000e- 004 0.0453 128.7244 128.7244 2.5100e- 003 128.7872 Total 0.0620 0.0317 0.3706 1.2900e- 003 0.1673 9.6000e- 004 0.1683 0.0444 8.8000e- 004 0.0453 128.7244 128.7244 2.5100e- 003 128.7872 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 4.0030 0.0000 4.0030 1.4696 0.0000 1.4696 0.0000 0.0000 Off-Road 1.7560 33.9487 40.3756 0.0715 1.3385 1.3385 1.3385 1.3385 0.0000 6,919.282 7 6,919.282 7 2.2378 6,975.228 6 Total 1.7560 33.9487 40.3756 0.0715 4.0030 1.3385 5.3415 1.4696 1.3385 2.8082 0.0000 6,919.282 7 6,919.282 7 2.2378 6,975.228 6 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:58AMPage16of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Winter 3.3 Grading - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0620 0.0317 0.3706 1.2900e- 003 0.1673 9.6000e- 004 0.1683 0.0444 8.8000e- 004 0.0453 128.7244 128.7244 2.5100e- 003 128.7872 Total 0.0620 0.0317 0.3706 1.2900e- 003 0.1673 9.6000e- 004 0.1683 0.0444 8.8000e- 004 0.0453 128.7244 128.7244 2.5100e- 003 128.7872 Mitigated Construction Off-Site 3.4 Building Construction - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 2.4039 24.2847 17.1094 0.0429 1.0085 1.0085 0.9404 0.9404 4,103.013 4 4,103.013 4 1.1048 4,130.632 9 Total 2.4039 24.2847 17.1094 0.0429 1.0085 1.0085 0.9404 0.9404 4,103.013 4 4,103.013 4 1.1048 4,130.632 9 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:58AMPage17of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Winter 3.4 Building Construction - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.3440 52.3372 11.9001 0.1696 4.2289 0.0462 4.2751 1.2180 0.0442 1.2622 17,904.97 97 17,904.97 97 1.2500 17,936.22 92 Worker 6.8144 3.4851 40.7114 0.1418 18.3817 0.1051 18.4868 4.8756 0.0968 4.9724 14,140.37 22 14,140.37 22 0.2759 14,147.26 98 Total 8.1584 55.8223 52.6115 0.3114 22.6105 0.1513 22.7618 6.0937 0.1409 6.2346 32,045.35 19 32,045.35 19 1.5259 32,083.49 91 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.5225 20.4759 24.3231 0.0429 0.8385 0.8385 0.8263 0.8263 0.0000 4,103.013 4 4,103.013 4 1.1048 4,130.632 9 Total 1.5225 20.4759 24.3231 0.0429 0.8385 0.8385 0.8263 0.8263 0.0000 4,103.013 4 4,103.013 4 1.1048 4,130.632 9 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:58AMPage18of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Winter 3.4 Building Construction - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.3440 52.3372 11.9001 0.1696 4.2289 0.0462 4.2751 1.2180 0.0442 1.2622 17,904.97 97 17,904.97 97 1.2500 17,936.22 92 Worker 6.8144 3.4851 40.7114 0.1418 18.3817 0.1051 18.4868 4.8756 0.0968 4.9724 14,140.37 22 14,140.37 22 0.2759 14,147.26 98 Total 8.1584 55.8223 52.6115 0.3114 22.6105 0.1513 22.7618 6.0937 0.1409 6.2346 32,045.35 19 32,045.35 19 1.5259 32,083.49 91 Mitigated Construction Off-Site 3.4 Building Construction - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 2.1777 21.2010 16.7425 0.0429 0.8645 0.8645 0.8062 0.8062 4,101.888 0 4,101.888 0 1.1008 4,129.407 2 Total 2.1777 21.2010 16.7425 0.0429 0.8645 0.8645 0.8062 0.8062 4,101.888 0 4,101.888 0 1.1008 4,129.407 2 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:58AMPage19of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Winter 3.4 Building Construction - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.3091 51.8194 11.5092 0.1684 4.2287 0.0455 4.2742 1.2180 0.0435 1.2615 17,785.13 02 17,785.13 02 1.2163 17,815.53 85 Worker 6.4473 3.1705 37.7216 0.1361 18.3817 0.1033 18.4849 4.8756 0.0950 4.9707 13,574.76 10 13,574.76 10 0.2502 13,581.01 48 Total 7.7564 54.9899 49.2308 0.3045 22.6104 0.1488 22.7592 6.0936 0.1385 6.2321 31,359.89 12 31,359.89 12 1.4665 31,396.55 34 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.4658 20.0932 24.2901 0.0429 0.7950 0.7950 0.7845 0.7845 0.0000 4,101.888 0 4,101.888 0 1.1008 4,129.407 2 Total 1.4658 20.0932 24.2901 0.0429 0.7950 0.7950 0.7845 0.7845 0.0000 4,101.888 0 4,101.888 0 1.1008 4,129.407 2 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:58AMPage20of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Winter 3.4 Building Construction - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.3091 51.8194 11.5092 0.1684 4.2287 0.0455 4.2742 1.2180 0.0435 1.2615 17,785.13 02 17,785.13 02 1.2163 17,815.53 85 Worker 6.4473 3.1705 37.7216 0.1361 18.3817 0.1033 18.4849 4.8756 0.0950 4.9707 13,574.76 10 13,574.76 10 0.2502 13,581.01 48 Total 7.7564 54.9899 49.2308 0.3045 22.6104 0.1488 22.7592 6.0936 0.1385 6.2321 31,359.89 12 31,359.89 12 1.4665 31,396.55 34 Mitigated Construction Off-Site 3.4 Building Construction - 2026 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 2.1777 21.2010 16.7425 0.0429 0.8645 0.8645 0.8062 0.8062 4,101.888 0 4,101.888 0 1.1008 4,129.407 2 Total 2.1777 21.2010 16.7425 0.0429 0.8645 0.8645 0.8062 0.8062 4,101.888 0 4,101.888 0 1.1008 4,129.407 2 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:58AMPage21of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Winter 3.4 Building Construction - 2026 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.2787 51.3066 11.1908 0.1673 4.2286 0.0447 4.2734 1.2179 0.0428 1.2607 17,672.27 64 17,672.27 64 1.1819 17,701.82 35 Worker 6.1267 2.9028 35.1328 0.1311 18.3817 0.1001 18.4817 4.8756 0.0921 4.9677 13,080.35 07 13,080.35 07 0.2279 13,086.04 92 Total 7.4054 54.2094 46.3235 0.2984 22.6103 0.1448 22.7551 6.0936 0.1348 6.2284 30,752.62 71 30,752.62 71 1.4098 30,787.87 27 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.4658 20.0932 24.2901 0.0429 0.7950 0.7950 0.7845 0.7845 0.0000 4,101.888 0 4,101.888 0 1.1008 4,129.407 2 Total 1.4658 20.0932 24.2901 0.0429 0.7950 0.7950 0.7845 0.7845 0.0000 4,101.888 0 4,101.888 0 1.1008 4,129.407 2 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:58AMPage22of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Winter 3.4 Building Construction - 2026 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.2787 51.3066 11.1908 0.1673 4.2286 0.0447 4.2734 1.2179 0.0428 1.2607 17,672.27 64 17,672.27 64 1.1819 17,701.82 35 Worker 6.1267 2.9028 35.1328 0.1311 18.3817 0.1001 18.4817 4.8756 0.0921 4.9677 13,080.35 07 13,080.35 07 0.2279 13,086.04 92 Total 7.4054 54.2094 46.3235 0.2984 22.6103 0.1448 22.7551 6.0936 0.1348 6.2284 30,752.62 71 30,752.62 71 1.4098 30,787.87 27 Mitigated Construction Off-Site 3.5 Paving - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.9152 8.5816 14.5780 0.0228 0.4185 0.4185 0.3850 0.3850 2,206.745 2 2,206.745 2 0.7137 2,224.587 8 Paving 0.8767 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 1.7918 8.5816 14.5780 0.0228 0.4185 0.4185 0.3850 0.3850 2,206.745 2 2,206.745 2 0.7137 2,224.587 8 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:58AMPage23of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Winter 3.5 Paving - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0440 0.0217 0.2575 9.3000e- 004 0.1255 7.1000e- 004 0.1262 0.0333 6.5000e- 004 0.0339 92.6816 92.6816 1.7100e- 003 92.7243 Total 0.0440 0.0217 0.2575 9.3000e- 004 0.1255 7.1000e- 004 0.1262 0.0333 6.5000e- 004 0.0339 92.6816 92.6816 1.7100e- 003 92.7243 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.9152 8.5816 14.5780 0.0228 0.4185 0.4185 0.3850 0.3850 0.0000 2,206.745 2 2,206.745 2 0.7137 2,224.587 8 Paving 0.8767 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 1.7918 8.5816 14.5780 0.0228 0.4185 0.4185 0.3850 0.3850 0.0000 2,206.745 2 2,206.745 2 0.7137 2,224.587 8 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:58AMPage24of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Winter 3.5 Paving - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0440 0.0217 0.2575 9.3000e- 004 0.1255 7.1000e- 004 0.1262 0.0333 6.5000e- 004 0.0339 92.6816 92.6816 1.7100e- 003 92.7243 Total 0.0440 0.0217 0.2575 9.3000e- 004 0.1255 7.1000e- 004 0.1262 0.0333 6.5000e- 004 0.0339 92.6816 92.6816 1.7100e- 003 92.7243 Mitigated Construction Off-Site 3.5 Paving - 2026 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.9152 8.5816 14.5780 0.0228 0.4185 0.4185 0.3850 0.3850 2,206.745 2 2,206.745 2 0.7137 2,224.587 8 Paving 0.8767 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 1.7918 8.5816 14.5780 0.0228 0.4185 0.4185 0.3850 0.3850 2,206.745 2 2,206.745 2 0.7137 2,224.587 8 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:58AMPage25of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Winter 3.5 Paving - 2026 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0418 0.0198 0.2399 9.0000e- 004 0.1255 6.8000e- 004 0.1262 0.0333 6.3000e- 004 0.0339 89.3060 89.3060 1.5600e- 003 89.3449 Total 0.0418 0.0198 0.2399 9.0000e- 004 0.1255 6.8000e- 004 0.1262 0.0333 6.3000e- 004 0.0339 89.3060 89.3060 1.5600e- 003 89.3449 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.9152 8.5816 14.5780 0.0228 0.4185 0.4185 0.3850 0.3850 0.0000 2,206.745 2 2,206.745 2 0.7137 2,224.587 8 Paving 0.8767 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 1.7918 8.5816 14.5780 0.0228 0.4185 0.4185 0.3850 0.3850 0.0000 2,206.745 2 2,206.745 2 0.7137 2,224.587 8 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:58AMPage26of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Winter 3.5 Paving - 2026 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0418 0.0198 0.2399 9.0000e- 004 0.1255 6.8000e- 004 0.1262 0.0333 6.3000e- 004 0.0339 89.3060 89.3060 1.5600e- 003 89.3449 Total 0.0418 0.0198 0.2399 9.0000e- 004 0.1255 6.8000e- 004 0.1262 0.0333 6.3000e- 004 0.0339 89.3060 89.3060 1.5600e- 003 89.3449 Mitigated Construction Off-Site 3.6 Architectural Coating - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 18.4192 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.2278 1.5273 2.4122 3.9600e- 003 0.0687 0.0687 0.0687 0.0687 375.2641 375.2641 0.0205 375.7758 Total 18.6470 1.5273 2.4122 3.9600e- 003 0.0687 0.0687 0.0687 0.0687 375.2641 375.2641 0.0205 375.7758 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:58AMPage27of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Winter 3.6 Architectural Coating - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.2883 0.6335 7.5375 0.0272 3.6730 0.0206 3.6936 0.9742 0.0190 0.9932 2,712.480 7 2,712.480 7 0.0500 2,713.730 3 Total 1.2883 0.6335 7.5375 0.0272 3.6730 0.0206 3.6936 0.9742 0.0190 0.9932 2,712.480 7 2,712.480 7 0.0500 2,713.730 3 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 18.4192 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.2278 1.5273 2.4122 3.9600e- 003 0.0687 0.0687 0.0687 0.0687 0.0000 375.2641 375.2641 0.0205 375.7758 Total 18.6470 1.5273 2.4122 3.9600e- 003 0.0687 0.0687 0.0687 0.0687 0.0000 375.2641 375.2641 0.0205 375.7758 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:58AMPage28of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Winter 3.6 Architectural Coating - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.2883 0.6335 7.5375 0.0272 3.6730 0.0206 3.6936 0.9742 0.0190 0.9932 2,712.480 7 2,712.480 7 0.0500 2,713.730 3 Total 1.2883 0.6335 7.5375 0.0272 3.6730 0.0206 3.6936 0.9742 0.0190 0.9932 2,712.480 7 2,712.480 7 0.0500 2,713.730 3 Mitigated Construction Off-Site 3.6 Architectural Coating - 2026 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 18.4192 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.2278 1.5273 2.4122 3.9600e- 003 0.0687 0.0687 0.0687 0.0687 375.2641 375.2641 0.0205 375.7758 Total 18.6470 1.5273 2.4122 3.9600e- 003 0.0687 0.0687 0.0687 0.0687 375.2641 375.2641 0.0205 375.7758 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:58AMPage29of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Winter 3.6 Architectural Coating - 2026 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.2242 0.5800 7.0202 0.0262 3.6730 0.0200 3.6930 0.9742 0.0184 0.9926 2,613.688 7 2,613.688 7 0.0456 2,614.827 3 Total 1.2242 0.5800 7.0202 0.0262 3.6730 0.0200 3.6930 0.9742 0.0184 0.9926 2,613.688 7 2,613.688 7 0.0456 2,614.827 3 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 18.4192 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.2278 1.5273 2.4122 3.9600e- 003 0.0687 0.0687 0.0687 0.0687 0.0000 375.2641 375.2641 0.0205 375.7758 Total 18.6470 1.5273 2.4122 3.9600e- 003 0.0687 0.0687 0.0687 0.0687 0.0000 375.2641 375.2641 0.0205 375.7758 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:58AMPage30of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Winter 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile 3.6 Architectural Coating - 2026 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.2242 0.5800 7.0202 0.0262 3.6730 0.0200 3.6930 0.9742 0.0184 0.9926 2,613.688 7 2,613.688 7 0.0456 2,614.827 3 Total 1.2242 0.5800 7.0202 0.0262 3.6730 0.0200 3.6930 0.9742 0.0184 0.9926 2,613.688 7 2,613.688 7 0.0456 2,614.827 3 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:58AMPage31of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Winter ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Mitigated 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Unmitigated 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 4.2 Trip Summary Information 4.3 Trip Type Information Average Daily Trip Rate Unmitigated Mitigated Land Use Weekday Saturday Sunday Annual VMT Annual VMT Other Asphalt Surfaces 0.00 0.00 0.00 Regional Shopping Center 0.00 0.00 0.00 Single Family Housing 0.00 0.00 0.00 Total 0.00 0.00 0.00 Miles Trip %Trip Purpose % Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C-W H-S or C-C H-O or C-NW Primary Diverted Pass-by Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 Regional Shopping Center 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 Single Family Housing 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 4.4 Fleet Mix CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:58AMPage32of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Winter 5.0 Energy Detail ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day NaturalGas Mitigated 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 NaturalGas Unmitigated 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 5.1 Mitigation Measures Energy Land Use LDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH Other Asphalt Surfaces 0.556393 0.035040 0.189382 0.106465 0.012088 0.004430 0.017405 0.070208 0.001420 0.001115 0.004429 0.000881 0.000745 Regional Shopping Center 0.556393 0.035040 0.189382 0.106465 0.012088 0.004430 0.017405 0.070208 0.001420 0.001115 0.004429 0.000881 0.000745 Single Family Housing 0.556393 0.035040 0.189382 0.106465 0.012088 0.004430 0.017405 0.070208 0.001420 0.001115 0.004429 0.000881 0.000745 Historical Energy Use: N CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:58AMPage33of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Winter 6.0 Area Detail 5.2 Energy by Land Use - NaturalGas NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr lb/day lb/day Other Asphalt Surfaces 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Regional Shopping Center 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Single Family Housing 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Unmitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr lb/day lb/day Other Asphalt Surfaces 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Regional Shopping Center 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Single Family Housing 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:58AMPage34of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Winter 6.1 Mitigation Measures Area 6.0 Area Detail ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Mitigated 29.8339 0.4464 38.7527 2.0500e- 003 0.2150 0.2150 0.2150 0.2150 0.0000 69.8492 69.8492 0.0669 0.0000 71.5227 Unmitigated 29.8339 0.4464 38.7527 2.0500e- 003 0.2150 0.2150 0.2150 0.2150 0.0000 69.8492 69.8492 0.0669 0.0000 71.5227 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:58AMPage35of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Winter 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory lb/day lb/day Architectural Coating 8.3265 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 20.3431 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hearth 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 1.1644 0.4464 38.7527 2.0500e- 003 0.2150 0.2150 0.2150 0.2150 69.8492 69.8492 0.0669 71.5227 Total 29.8339 0.4464 38.7527 2.0500e- 003 0.2150 0.2150 0.2150 0.2150 0.0000 69.8492 69.8492 0.0669 0.0000 71.5227 Unmitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:58AMPage36of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Winter 8.1 Mitigation Measures Waste 7.1 Mitigation Measures Water 7.0 Water Detail 8.0 Waste Detail 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory lb/day lb/day Architectural Coating 8.3265 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 20.3431 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hearth 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 1.1644 0.4464 38.7527 2.0500e- 003 0.2150 0.2150 0.2150 0.2150 69.8492 69.8492 0.0669 71.5227 Total 29.8339 0.4464 38.7527 2.0500e- 003 0.2150 0.2150 0.2150 0.2150 0.0000 69.8492 69.8492 0.0669 0.0000 71.5227 Mitigated 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year Horse Power Load Factor Fuel Type 10.0 Stationary Equipment CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:58AMPage37of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Winter 11.0 Vegetation Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power Load Factor Fuel Type Boilers Equipment Type Number Heat Input/Day Heat Input/Year Boiler Rating Fuel Type User Defined Equipment Equipment Type Number CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 10:58AMPage38of38 The Wave - Coral Mountain (Phase 3 Construction - Mitigated) - Riverside-Salton Sea County, Winter The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report APPENDIX 3.3: CALEEMOD OPERATIONAL EMISSIONS MODEL OUTPUTS The Wave – Coral Mountain Air Quality Impact Analysis 12641-03 AQ Report This page intentionally left blank 1.1 Land Usage Land Uses Size Metric Lot Acreage Floor Surface Area Population Other Asphalt Surfaces 23.19 Acre 23.19 1,010,156.40 0 Hotel 150.00 Room 5.00 217,800.00 0 User Defined Recreational 12.00 User Defined Unit 12.00 522,720.00 0 Apartments Low Rise 104.00 Dwelling Unit 6.50 104,000.00 279 Single Family Housing 26.00 Dwelling Unit 8.44 46,800.00 70 Regional Shopping Center 10.00 1000sqft 0.23 10,000.00 0 1.2 Other Project Characteristics Urbanization Climate Zone Urban 15 Wind Speed (m/s)Precipitation Freq (Days)2.4 28 1.3 User Entered Comments & Non-Default Data 1.0 Project Characteristics Utility Company Imperial Irrigation District 2021OperationalYear CO2 Intensity lb/MWhr) 1270.9 0.029CH4Intensity lb/MWhr) 0.006N2OIntensity lb/MWhr) The Wave - Coral Mountain (Phase 1 Operations) Riverside-Salton Sea County, Summer CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 11:52AMPage1of17 The Wave - Coral Mountain (Phase 1 Operations) - Riverside-Salton Sea County, Summer Project Characteristics - Land Use - Total Project area is 55.36 acres. Construction Phase - Operational Run Only. Off-road Equipment - Operational Run Only. Trips and VMT - Operational Run Only. Vehicle Trips - Trip Rate and Trips based on information provided in the Traffic Study0 Woodstoves - Rule 445 Energy Use - The project will design building shells and building components to meet 2019 Title 24 Standards which expects 30% less energy for nonresidential uses and 53% for residential uses Water And Wastewater - For the Wave Pool Facility, CalEEMod default for the Recreational Swimming Pool use was used. Solid Waste - For the Wave Pool Facility, CalEEMod default for the Recreational Swimming Pool use was used. Table Name Column Name Default Value New Value tblEnergyUse LightingElect 810.36 380.87 tblEnergyUse LightingElect 5.44 3.81 tblEnergyUse LightingElect 5.61 3.93 tblEnergyUse LightingElect 1,608.84 756.15 tblEnergyUse T24E 877.14 412.26 tblEnergyUse T24E 6.47 4.53 tblEnergyUse T24E 4.58 3.21 tblEnergyUse T24E 951.67 447.28 tblEnergyUse T24NG 9,544.50 4,485.92 tblEnergyUse T24NG 55.15 38.61 tblEnergyUse T24NG 1.92 1.34 tblEnergyUse T24NG 24,566.15 11,546.09 tblFireplaces NumberGas 83.20 104.00 tblFireplaces NumberGas 20.80 26.00 tblFireplaces NumberNoFireplace 10.40 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 11:52AMPage2of17 The Wave - Coral Mountain (Phase 1 Operations) - Riverside-Salton Sea County, Summer tblFireplaces NumberNoFireplace 2.60 0.00 tblFireplaces NumberWood 10.40 0.00 tblFireplaces NumberWood 2.60 0.00 tblLandUse LandUseSquareFeet 0.00 522,720.00 tblLandUse LotAcreage 0.00 12.00 tblLandUse Population 297.00 279.00 tblLandUse Population 74.00 70.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 0.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 0.00 tblSolidWaste SolidWasteGenerationRate 0.00 2,979.50 tblVehicleTrips CC_TTP 0.00 48.00 tblVehicleTrips CNW_TTP 0.00 19.00 tblVehicleTrips CW_TTP 0.00 33.00 tblVehicleTrips DV_TP 11.00 0.00 tblVehicleTrips DV_TP 38.00 0.00 tblVehicleTrips DV_TP 35.00 0.00 tblVehicleTrips DV_TP 11.00 0.00 tblVehicleTrips PB_TP 3.00 85.00 tblVehicleTrips PB_TP 4.00 73.00 tblVehicleTrips PB_TP 11.00 56.00 tblVehicleTrips PB_TP 3.00 88.00 tblVehicleTrips PB_TP 0.00 49.00 tblVehicleTrips PR_TP 86.00 15.00 tblVehicleTrips PR_TP 58.00 27.00 tblVehicleTrips PR_TP 54.00 44.00 tblVehicleTrips PR_TP 86.00 12.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 11:52AMPage3of17 The Wave - Coral Mountain (Phase 1 Operations) - Riverside-Salton Sea County, Summer 2.0 Emissions Summary tblVehicleTrips PR_TP 0.00 51.00 tblVehicleTrips ST_TR 7.16 8.14 tblVehicleTrips ST_TR 49.97 46.12 tblVehicleTrips ST_TR 9.91 9.54 tblVehicleTrips ST_TR 0.00 9.10 tblVehicleTrips SU_TR 6.07 6.28 tblVehicleTrips SU_TR 25.24 21.10 tblVehicleTrips SU_TR 8.62 8.55 tblVehicleTrips SU_TR 0.00 13.60 tblVehicleTrips WD_TR 6.59 7.32 tblVehicleTrips WD_TR 8.17 7.87 tblVehicleTrips WD_TR 42.70 37.75 tblVehicleTrips WD_TR 9.52 9.44 tblVehicleTrips WD_TR 0.00 50.00 tblWater IndoorWaterUseRate 0.00 30,915,304.25 tblWater OutdoorWaterUseRate 0.00 18,948,089.70 tblWoodstoves NumberCatalytic 5.20 0.00 tblWoodstoves NumberCatalytic 1.30 0.00 tblWoodstoves NumberNoncatalytic 5.20 0.00 tblWoodstoves NumberNoncatalytic 1.30 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 11:52AMPage4of17 The Wave - Coral Mountain (Phase 1 Operations) - Riverside-Salton Sea County, Summer 2.1 Overall Construction (Maximum Daily Emission) ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year lb/day lb/day 2020 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Maximum 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Unmitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year lb/day lb/day 2020 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Maximum 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 11:52AMPage5of17 The Wave - Coral Mountain (Phase 1 Operations) - Riverside-Salton Sea County, Summer 2.2 Overall Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Area 26.4762 2.2807 11.6861 0.0143 0.2337 0.2337 0.2337 0.2337 0.0000 2,772.295 7 2,772.295 7 0.0716 0.0505 2,789.125 8 Energy 0.3260 2.9390 2.3065 0.0178 0.2253 0.2253 0.2253 0.2253 3,556.744 6 3,556.744 6 0.0682 0.0652 3,577.880 5 Mobile 5.0533 31.8018 27.5860 0.1021 5.1956 0.0674 5.2630 1.3902 0.0631 1.4533 10,484.88 27 10,484.88 27 0.9916 10,509.67 18 Total 31.8556 37.0214 41.5785 0.1342 5.1956 0.5263 5.7219 1.3902 0.5220 1.9122 0.0000 16,813.92 30 16,813.92 30 1.1313 0.1157 16,876.67 81 Unmitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Area 26.4762 2.2807 11.6861 0.0143 0.2337 0.2337 0.2337 0.2337 0.0000 2,772.295 7 2,772.295 7 0.0716 0.0505 2,789.125 8 Energy 0.3260 2.9390 2.3065 0.0178 0.2253 0.2253 0.2253 0.2253 3,556.744 6 3,556.744 6 0.0682 0.0652 3,577.880 5 Mobile 5.0533 31.8018 27.5860 0.1021 5.1956 0.0674 5.2630 1.3902 0.0631 1.4533 10,484.88 27 10,484.88 27 0.9916 10,509.67 18 Total 31.8556 37.0214 41.5785 0.1342 5.1956 0.5263 5.7219 1.3902 0.5220 1.9122 0.0000 16,813.92 30 16,813.92 30 1.1313 0.1157 16,876.67 81 Mitigated Operational CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 11:52AMPage6of17 The Wave - Coral Mountain (Phase 1 Operations) - Riverside-Salton Sea County, Summer 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 Demolition Demolition 7/1/2020 10/6/2020 5 70 OffRoad Equipment Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Demolition Concrete/Industrial Saws 0 8.00 81 0.73 Demolition Excavators 0 8.00 158 0.38 Demolition Rubber Tired Dozers 0 8.00 247 0.40 Trips and VMT Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Demolition 0 0.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Residential Indoor: 0; Residential Outdoor: 0; Non-Residential Indoor: 0; Non-Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating – sqft) Acres of Grading (Site Preparation Phase): 0 Acres of Grading (Grading Phase): 0 Acres of Paving: 23.19 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 11:52AMPage7of17 The Wave - Coral Mountain (Phase 1 Operations) - Riverside-Salton Sea County, Summer 3.2 Demolition - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Unmitigated Construction Off-Site 3.1 Mitigation Measures Construction CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 11:52AMPage8of17 The Wave - Coral Mountain (Phase 1 Operations) - Riverside-Salton Sea County, Summer 4.0 Operational Detail - Mobile 3.2 Demolition - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 11:52AMPage9of17 The Wave - Coral Mountain (Phase 1 Operations) - Riverside-Salton Sea County, Summer ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Mitigated 5.0533 31.8018 27.5860 0.1021 5.1956 0.0674 5.2630 1.3902 0.0631 1.4533 10,484.88 27 10,484.88 27 0.9916 10,509.67 18 Unmitigated 5.0533 31.8018 27.5860 0.1021 5.1956 0.0674 5.2630 1.3902 0.0631 1.4533 10,484.88 27 10,484.88 27 0.9916 10,509.67 18 4.1 Mitigation Measures Mobile 4.2 Trip Summary Information 4.3 Trip Type Information Average Daily Trip Rate Unmitigated Mitigated Land Use Weekday Saturday Sunday Annual VMT Annual VMT Apartments Low Rise 761.28 846.56 653.12 309,895 309,895 Hotel 1,180.50 1,228.50 892.50 710,660 710,660 Other Asphalt Surfaces 0.00 0.00 0.00 Regional Shopping Center 377.50 461.20 211.00 346,018 346,018 Single Family Housing 245.44 248.04 222.30 81,080 81,080 User Defined Recreational 600.00 109.20 163.20 630,319 630,319 Total 3,164.72 2,893.50 2,142.12 2,077,972 2,077,972 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 11:52AMPage10of17 The Wave - Coral Mountain (Phase 1 Operations) - Riverside-Salton Sea County, Summer Miles Trip %Trip Purpose % Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C-W H-S or C-C H-O or C-NW Primary Diverted Pass-by Apartments Low Rise 11.00 3.50 4.50 40.20 19.20 40.60 15 0 85 Hotel 12.50 4.20 5.40 19.40 61.60 19.00 27 0 73 Other Asphalt Surfaces 12.50 4.20 5.40 0.00 0.00 0.00 0 0 0 Regional Shopping Center 12.50 4.20 5.40 16.30 64.70 19.00 44 0 56 Single Family Housing 11.00 3.50 4.50 40.20 19.20 40.60 12 0 88 User Defined Recreational 12.50 4.20 5.40 33.00 48.00 19.00 51 0 49 5.0 Energy Detail 5.1 Mitigation Measures Energy 4.4 Fleet Mix Land Use LDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH Apartments Low Rise 0.542116 0.037578 0.185203 0.118503 0.016241 0.005141 0.017392 0.068695 0.001383 0.001183 0.004582 0.000945 0.001038 Hotel 0.542116 0.037578 0.185203 0.118503 0.016241 0.005141 0.017392 0.068695 0.001383 0.001183 0.004582 0.000945 0.001038 Other Asphalt Surfaces 0.542116 0.037578 0.185203 0.118503 0.016241 0.005141 0.017392 0.068695 0.001383 0.001183 0.004582 0.000945 0.001038 Regional Shopping Center 0.542116 0.037578 0.185203 0.118503 0.016241 0.005141 0.017392 0.068695 0.001383 0.001183 0.004582 0.000945 0.001038 Single Family Housing 0.542116 0.037578 0.185203 0.118503 0.016241 0.005141 0.017392 0.068695 0.001383 0.001183 0.004582 0.000945 0.001038 User Defined Recreational 0.542116 0.037578 0.185203 0.118503 0.016241 0.005141 0.017392 0.068695 0.001383 0.001183 0.004582 0.000945 0.001038 Historical Energy Use: N CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 11:52AMPage11of17 The Wave - Coral Mountain (Phase 1 Operations) - Riverside-Salton Sea County, Summer ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day NaturalGas Mitigated 0.3260 2.9390 2.3065 0.0178 0.2253 0.2253 0.2253 0.2253 3,556.744 6 3,556.744 6 0.0682 0.0652 3,577.880 5 NaturalGas Unmitigated 0.3260 2.9390 2.3065 0.0178 0.2253 0.2253 0.2253 0.2253 3,556.744 6 3,556.744 6 0.0682 0.0652 3,577.880 5 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 11:52AMPage12of17 The Wave - Coral Mountain (Phase 1 Operations) - Riverside-Salton Sea County, Summer 5.2 Energy by Land Use - NaturalGas NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr lb/day lb/day Apartments Low Rise 2996.32 0.0323 0.2761 0.1175 1.7600e- 003 0.0223 0.0223 0.0223 0.0223 352.5079 352.5079 6.7600e- 003 6.4600e- 003 354.6027 Hotel 25939.1 0.2797 2.5431 2.1362 0.0153 0.1933 0.1933 0.1933 0.1933 3,051.657 1 3,051.657 1 0.0585 0.0560 3,069.791 5 Other Asphalt Surfaces 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Regional Shopping Center 44.9315 4.8000e- 004 4.4100e- 003 3.7000e- 003 3.0000e- 005 3.3000e- 004 3.3000e- 004 3.3000e- 004 3.3000e- 004 5.2861 5.2861 1.0000e- 004 1.0000e- 004 5.3175 Single Family Housing 1252 0.0135 0.1154 0.0491 7.4000e- 004 9.3300e- 003 9.3300e- 003 9.3300e- 003 9.3300e- 003 147.2936 147.2936 2.8200e- 003 2.7000e- 003 148.1689 User Defined Recreational 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.3260 2.9390 2.3065 0.0178 0.2253 0.2253 0.2253 0.2253 3,556.744 6 3,556.744 6 0.0682 0.0652 3,577.880 5 Unmitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 11:52AMPage13of17 The Wave - Coral Mountain (Phase 1 Operations) - Riverside-Salton Sea County, Summer 6.1 Mitigation Measures Area 6.0 Area Detail 5.2 Energy by Land Use - NaturalGas NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr lb/day lb/day Apartments Low Rise 2.99632 0.0323 0.2761 0.1175 1.7600e- 003 0.0223 0.0223 0.0223 0.0223 352.5079 352.5079 6.7600e- 003 6.4600e- 003 354.6027 Hotel 25.9391 0.2797 2.5431 2.1362 0.0153 0.1933 0.1933 0.1933 0.1933 3,051.657 1 3,051.657 1 0.0585 0.0560 3,069.791 5 Other Asphalt Surfaces 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Regional Shopping Center 0.0449315 4.8000e- 004 4.4100e- 003 3.7000e- 003 3.0000e- 005 3.3000e- 004 3.3000e- 004 3.3000e- 004 3.3000e- 004 5.2861 5.2861 1.0000e- 004 1.0000e- 004 5.3175 Single Family Housing 1.252 0.0135 0.1154 0.0491 7.4000e- 004 9.3300e- 003 9.3300e- 003 9.3300e- 003 9.3300e- 003 147.2936 147.2936 2.8200e- 003 2.7000e- 003 148.1689 User Defined Recreational 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.3260 2.9390 2.3065 0.0178 0.2253 0.2253 0.2253 0.2253 3,556.744 6 3,556.744 6 0.0682 0.0652 3,577.880 5 Mitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 11:52AMPage14of17 The Wave - Coral Mountain (Phase 1 Operations) - Riverside-Salton Sea County, Summer ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Mitigated 26.4762 2.2807 11.6861 0.0143 0.2337 0.2337 0.2337 0.2337 0.0000 2,772.295 7 2,772.295 7 0.0716 0.0505 2,789.125 8 Unmitigated 26.4762 2.2807 11.6861 0.0143 0.2337 0.2337 0.2337 0.2337 0.0000 2,772.295 7 2,772.295 7 0.0716 0.0505 2,789.125 8 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory lb/day lb/day Architectural Coating 6.2503 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 19.6461 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hearth 0.2524 2.1565 0.9177 0.0138 0.1744 0.1744 0.1744 0.1744 0.0000 2,752.941 2 2,752.941 2 0.0528 0.0505 2,769.300 5 Landscaping 0.3275 0.1243 10.7685 5.7000e- 004 0.0593 0.0593 0.0593 0.0593 19.3545 19.3545 0.0188 19.8252 Total 26.4762 2.2807 11.6861 0.0143 0.2337 0.2337 0.2337 0.2337 0.0000 2,772.295 7 2,772.295 7 0.0716 0.0505 2,789.125 8 Unmitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 11:52AMPage15of17 The Wave - Coral Mountain (Phase 1 Operations) - Riverside-Salton Sea County, Summer 8.1 Mitigation Measures Waste 7.1 Mitigation Measures Water 7.0 Water Detail 8.0 Waste Detail 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory lb/day lb/day Architectural Coating 6.2503 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 19.6461 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hearth 0.2524 2.1565 0.9177 0.0138 0.1744 0.1744 0.1744 0.1744 0.0000 2,752.941 2 2,752.941 2 0.0528 0.0505 2,769.300 5 Landscaping 0.3275 0.1243 10.7685 5.7000e- 004 0.0593 0.0593 0.0593 0.0593 19.3545 19.3545 0.0188 19.8252 Total 26.4762 2.2807 11.6861 0.0143 0.2337 0.2337 0.2337 0.2337 0.0000 2,772.295 7 2,772.295 7 0.0716 0.0505 2,789.125 8 Mitigated 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year Horse Power Load Factor Fuel Type 10.0 Stationary Equipment CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 11:52AMPage16of17 The Wave - Coral Mountain (Phase 1 Operations) - Riverside-Salton Sea County, Summer 11.0 Vegetation Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power Load Factor Fuel Type Boilers Equipment Type Number Heat Input/Day Heat Input/Year Boiler Rating Fuel Type User Defined Equipment Equipment Type Number CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 11:52AMPage17of17 The Wave - Coral Mountain (Phase 1 Operations) - Riverside-Salton Sea County, Summer 1.1 Land Usage Land Uses Size Metric Lot Acreage Floor Surface Area Population Other Asphalt Surfaces 23.19 Acre 23.19 1,010,156.40 0 Hotel 150.00 Room 5.00 217,800.00 0 User Defined Recreational 12.00 User Defined Unit 12.00 522,720.00 0 Apartments Low Rise 104.00 Dwelling Unit 6.50 104,000.00 279 Single Family Housing 26.00 Dwelling Unit 8.44 46,800.00 70 Regional Shopping Center 10.00 1000sqft 0.23 10,000.00 0 1.2 Other Project Characteristics Urbanization Climate Zone Urban 15 Wind Speed (m/s)Precipitation Freq (Days)2.4 28 1.3 User Entered Comments & Non-Default Data 1.0 Project Characteristics Utility Company Imperial Irrigation District 2021OperationalYear CO2 Intensity lb/MWhr) 1270.9 0.029CH4Intensity lb/MWhr) 0.006N2OIntensity lb/MWhr) The Wave - Coral Mountain (Phase 1 Operations) Riverside-Salton Sea County, Winter CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 11:51AMPage1of17 The Wave - Coral Mountain (Phase 1 Operations) - Riverside-Salton Sea County, Winter Project Characteristics - Land Use - Total Project area is 55.36 acres. Construction Phase - Operational Run Only. Off-road Equipment - Operational Run Only. Trips and VMT - Operational Run Only. Vehicle Trips - Trip Rate and Trips based on information provided in the Traffic Study0 Woodstoves - Rule 445 Energy Use - The project will design building shells and building components to meet 2019 Title 24 Standards which expects 30% less energy for nonresidential uses and 53% for residential uses Water And Wastewater - For the Wave Pool Facility, CalEEMod default for the Recreational Swimming Pool use was used. Solid Waste - For the Wave Pool Facility, CalEEMod default for the Recreational Swimming Pool use was used. Table Name Column Name Default Value New Value tblEnergyUse LightingElect 810.36 380.87 tblEnergyUse LightingElect 5.44 3.81 tblEnergyUse LightingElect 5.61 3.93 tblEnergyUse LightingElect 1,608.84 756.15 tblEnergyUse T24E 877.14 412.26 tblEnergyUse T24E 6.47 4.53 tblEnergyUse T24E 4.58 3.21 tblEnergyUse T24E 951.67 447.28 tblEnergyUse T24NG 9,544.50 4,485.92 tblEnergyUse T24NG 55.15 38.61 tblEnergyUse T24NG 1.92 1.34 tblEnergyUse T24NG 24,566.15 11,546.09 tblFireplaces NumberGas 83.20 104.00 tblFireplaces NumberGas 20.80 26.00 tblFireplaces NumberNoFireplace 10.40 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 11:51AMPage2of17 The Wave - Coral Mountain (Phase 1 Operations) - Riverside-Salton Sea County, Winter tblFireplaces NumberNoFireplace 2.60 0.00 tblFireplaces NumberWood 10.40 0.00 tblFireplaces NumberWood 2.60 0.00 tblLandUse LandUseSquareFeet 0.00 522,720.00 tblLandUse LotAcreage 0.00 12.00 tblLandUse Population 297.00 279.00 tblLandUse Population 74.00 70.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 0.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 0.00 tblSolidWaste SolidWasteGenerationRate 0.00 2,979.50 tblVehicleTrips CC_TTP 0.00 48.00 tblVehicleTrips CNW_TTP 0.00 19.00 tblVehicleTrips CW_TTP 0.00 33.00 tblVehicleTrips DV_TP 11.00 0.00 tblVehicleTrips DV_TP 38.00 0.00 tblVehicleTrips DV_TP 35.00 0.00 tblVehicleTrips DV_TP 11.00 0.00 tblVehicleTrips PB_TP 3.00 85.00 tblVehicleTrips PB_TP 4.00 73.00 tblVehicleTrips PB_TP 11.00 56.00 tblVehicleTrips PB_TP 3.00 88.00 tblVehicleTrips PB_TP 0.00 49.00 tblVehicleTrips PR_TP 86.00 15.00 tblVehicleTrips PR_TP 58.00 27.00 tblVehicleTrips PR_TP 54.00 44.00 tblVehicleTrips PR_TP 86.00 12.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 11:51AMPage3of17 The Wave - Coral Mountain (Phase 1 Operations) - Riverside-Salton Sea County, Winter 2.0 Emissions Summary tblVehicleTrips PR_TP 0.00 51.00 tblVehicleTrips ST_TR 7.16 8.14 tblVehicleTrips ST_TR 49.97 46.12 tblVehicleTrips ST_TR 9.91 9.54 tblVehicleTrips ST_TR 0.00 9.10 tblVehicleTrips SU_TR 6.07 6.28 tblVehicleTrips SU_TR 25.24 21.10 tblVehicleTrips SU_TR 8.62 8.55 tblVehicleTrips SU_TR 0.00 13.60 tblVehicleTrips WD_TR 6.59 7.32 tblVehicleTrips WD_TR 8.17 7.87 tblVehicleTrips WD_TR 42.70 37.75 tblVehicleTrips WD_TR 9.52 9.44 tblVehicleTrips WD_TR 0.00 50.00 tblWater IndoorWaterUseRate 0.00 30,915,304.25 tblWater OutdoorWaterUseRate 0.00 18,948,089.70 tblWoodstoves NumberCatalytic 5.20 0.00 tblWoodstoves NumberCatalytic 1.30 0.00 tblWoodstoves NumberNoncatalytic 5.20 0.00 tblWoodstoves NumberNoncatalytic 1.30 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 11:51AMPage4of17 The Wave - Coral Mountain (Phase 1 Operations) - Riverside-Salton Sea County, Winter 2.1 Overall Construction (Maximum Daily Emission) ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year lb/day lb/day 2020 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Maximum 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Unmitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year lb/day lb/day 2020 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Maximum 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 11:51AMPage5of17 The Wave - Coral Mountain (Phase 1 Operations) - Riverside-Salton Sea County, Winter 2.2 Overall Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Area 26.4762 2.2807 11.6861 0.0143 0.2337 0.2337 0.2337 0.2337 0.0000 2,772.295 7 2,772.295 7 0.0716 0.0505 2,789.125 8 Energy 0.3260 2.9390 2.3065 0.0178 0.2253 0.2253 0.2253 0.2253 3,556.744 6 3,556.744 6 0.0682 0.0652 3,577.880 5 Mobile 4.1426 31.0335 27.4061 0.0930 5.1956 0.0697 5.2653 1.3902 0.0653 1.4555 9,555.355 0 9,555.355 0 1.0900 9,582.606 0 Total 30.9449 36.2532 41.3986 0.1251 5.1956 0.5286 5.7242 1.3902 0.5243 1.9144 0.0000 15,884.39 53 15,884.39 53 1.2298 0.1157 15,949.61 23 Unmitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Area 26.4762 2.2807 11.6861 0.0143 0.2337 0.2337 0.2337 0.2337 0.0000 2,772.295 7 2,772.295 7 0.0716 0.0505 2,789.125 8 Energy 0.3260 2.9390 2.3065 0.0178 0.2253 0.2253 0.2253 0.2253 3,556.744 6 3,556.744 6 0.0682 0.0652 3,577.880 5 Mobile 4.1426 31.0335 27.4061 0.0930 5.1956 0.0697 5.2653 1.3902 0.0653 1.4555 9,555.355 0 9,555.355 0 1.0900 9,582.606 0 Total 30.9449 36.2532 41.3986 0.1251 5.1956 0.5286 5.7242 1.3902 0.5243 1.9144 0.0000 15,884.39 53 15,884.39 53 1.2298 0.1157 15,949.61 23 Mitigated Operational CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 11:51AMPage6of17 The Wave - Coral Mountain (Phase 1 Operations) - Riverside-Salton Sea County, Winter 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 Demolition Demolition 7/1/2020 10/6/2020 5 70 OffRoad Equipment Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Demolition Concrete/Industrial Saws 0 8.00 81 0.73 Demolition Excavators 0 8.00 158 0.38 Demolition Rubber Tired Dozers 0 8.00 247 0.40 Trips and VMT Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Demolition 0 0.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Residential Indoor: 0; Residential Outdoor: 0; Non-Residential Indoor: 0; Non-Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating – sqft) Acres of Grading (Site Preparation Phase): 0 Acres of Grading (Grading Phase): 0 Acres of Paving: 23.19 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 11:51AMPage7of17 The Wave - Coral Mountain (Phase 1 Operations) - Riverside-Salton Sea County, Winter 3.2 Demolition - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Unmitigated Construction Off-Site 3.1 Mitigation Measures Construction CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 11:51AMPage8of17 The Wave - Coral Mountain (Phase 1 Operations) - Riverside-Salton Sea County, Winter 4.0 Operational Detail - Mobile 3.2 Demolition - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 11:51AMPage9of17 The Wave - Coral Mountain (Phase 1 Operations) - Riverside-Salton Sea County, Winter ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Mitigated 4.1426 31.0335 27.4061 0.0930 5.1956 0.0697 5.2653 1.3902 0.0653 1.4555 9,555.355 0 9,555.355 0 1.0900 9,582.606 0 Unmitigated 4.1426 31.0335 27.4061 0.0930 5.1956 0.0697 5.2653 1.3902 0.0653 1.4555 9,555.355 0 9,555.355 0 1.0900 9,582.606 0 4.1 Mitigation Measures Mobile 4.2 Trip Summary Information 4.3 Trip Type Information Average Daily Trip Rate Unmitigated Mitigated Land Use Weekday Saturday Sunday Annual VMT Annual VMT Apartments Low Rise 761.28 846.56 653.12 309,895 309,895 Hotel 1,180.50 1,228.50 892.50 710,660 710,660 Other Asphalt Surfaces 0.00 0.00 0.00 Regional Shopping Center 377.50 461.20 211.00 346,018 346,018 Single Family Housing 245.44 248.04 222.30 81,080 81,080 User Defined Recreational 600.00 109.20 163.20 630,319 630,319 Total 3,164.72 2,893.50 2,142.12 2,077,972 2,077,972 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 11:51AMPage10of17 The Wave - Coral Mountain (Phase 1 Operations) - Riverside-Salton Sea County, Winter Miles Trip %Trip Purpose % Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C-W H-S or C-C H-O or C-NW Primary Diverted Pass-by Apartments Low Rise 11.00 3.50 4.50 40.20 19.20 40.60 15 0 85 Hotel 12.50 4.20 5.40 19.40 61.60 19.00 27 0 73 Other Asphalt Surfaces 12.50 4.20 5.40 0.00 0.00 0.00 0 0 0 Regional Shopping Center 12.50 4.20 5.40 16.30 64.70 19.00 44 0 56 Single Family Housing 11.00 3.50 4.50 40.20 19.20 40.60 12 0 88 User Defined Recreational 12.50 4.20 5.40 33.00 48.00 19.00 51 0 49 5.0 Energy Detail 5.1 Mitigation Measures Energy 4.4 Fleet Mix Land Use LDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH Apartments Low Rise 0.542116 0.037578 0.185203 0.118503 0.016241 0.005141 0.017392 0.068695 0.001383 0.001183 0.004582 0.000945 0.001038 Hotel 0.542116 0.037578 0.185203 0.118503 0.016241 0.005141 0.017392 0.068695 0.001383 0.001183 0.004582 0.000945 0.001038 Other Asphalt Surfaces 0.542116 0.037578 0.185203 0.118503 0.016241 0.005141 0.017392 0.068695 0.001383 0.001183 0.004582 0.000945 0.001038 Regional Shopping Center 0.542116 0.037578 0.185203 0.118503 0.016241 0.005141 0.017392 0.068695 0.001383 0.001183 0.004582 0.000945 0.001038 Single Family Housing 0.542116 0.037578 0.185203 0.118503 0.016241 0.005141 0.017392 0.068695 0.001383 0.001183 0.004582 0.000945 0.001038 User Defined Recreational 0.542116 0.037578 0.185203 0.118503 0.016241 0.005141 0.017392 0.068695 0.001383 0.001183 0.004582 0.000945 0.001038 Historical Energy Use: N CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 11:51AMPage11of17 The Wave - Coral Mountain (Phase 1 Operations) - Riverside-Salton Sea County, Winter ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day NaturalGas Mitigated 0.3260 2.9390 2.3065 0.0178 0.2253 0.2253 0.2253 0.2253 3,556.744 6 3,556.744 6 0.0682 0.0652 3,577.880 5 NaturalGas Unmitigated 0.3260 2.9390 2.3065 0.0178 0.2253 0.2253 0.2253 0.2253 3,556.744 6 3,556.744 6 0.0682 0.0652 3,577.880 5 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 11:51AMPage12of17 The Wave - Coral Mountain (Phase 1 Operations) - Riverside-Salton Sea County, Winter 5.2 Energy by Land Use - NaturalGas NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr lb/day lb/day Apartments Low Rise 2996.32 0.0323 0.2761 0.1175 1.7600e- 003 0.0223 0.0223 0.0223 0.0223 352.5079 352.5079 6.7600e- 003 6.4600e- 003 354.6027 Hotel 25939.1 0.2797 2.5431 2.1362 0.0153 0.1933 0.1933 0.1933 0.1933 3,051.657 1 3,051.657 1 0.0585 0.0560 3,069.791 5 Other Asphalt Surfaces 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Regional Shopping Center 44.9315 4.8000e- 004 4.4100e- 003 3.7000e- 003 3.0000e- 005 3.3000e- 004 3.3000e- 004 3.3000e- 004 3.3000e- 004 5.2861 5.2861 1.0000e- 004 1.0000e- 004 5.3175 Single Family Housing 1252 0.0135 0.1154 0.0491 7.4000e- 004 9.3300e- 003 9.3300e- 003 9.3300e- 003 9.3300e- 003 147.2936 147.2936 2.8200e- 003 2.7000e- 003 148.1689 User Defined Recreational 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.3260 2.9390 2.3065 0.0178 0.2253 0.2253 0.2253 0.2253 3,556.744 6 3,556.744 6 0.0682 0.0652 3,577.880 5 Unmitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 11:51AMPage13of17 The Wave - Coral Mountain (Phase 1 Operations) - Riverside-Salton Sea County, Winter 6.1 Mitigation Measures Area 6.0 Area Detail 5.2 Energy by Land Use - NaturalGas NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr lb/day lb/day Apartments Low Rise 2.99632 0.0323 0.2761 0.1175 1.7600e- 003 0.0223 0.0223 0.0223 0.0223 352.5079 352.5079 6.7600e- 003 6.4600e- 003 354.6027 Hotel 25.9391 0.2797 2.5431 2.1362 0.0153 0.1933 0.1933 0.1933 0.1933 3,051.657 1 3,051.657 1 0.0585 0.0560 3,069.791 5 Other Asphalt Surfaces 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Regional Shopping Center 0.0449315 4.8000e- 004 4.4100e- 003 3.7000e- 003 3.0000e- 005 3.3000e- 004 3.3000e- 004 3.3000e- 004 3.3000e- 004 5.2861 5.2861 1.0000e- 004 1.0000e- 004 5.3175 Single Family Housing 1.252 0.0135 0.1154 0.0491 7.4000e- 004 9.3300e- 003 9.3300e- 003 9.3300e- 003 9.3300e- 003 147.2936 147.2936 2.8200e- 003 2.7000e- 003 148.1689 User Defined Recreational 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.3260 2.9390 2.3065 0.0178 0.2253 0.2253 0.2253 0.2253 3,556.744 6 3,556.744 6 0.0682 0.0652 3,577.880 5 Mitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 11:51AMPage14of17 The Wave - Coral Mountain (Phase 1 Operations) - Riverside-Salton Sea County, Winter ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Mitigated 26.4762 2.2807 11.6861 0.0143 0.2337 0.2337 0.2337 0.2337 0.0000 2,772.295 7 2,772.295 7 0.0716 0.0505 2,789.125 8 Unmitigated 26.4762 2.2807 11.6861 0.0143 0.2337 0.2337 0.2337 0.2337 0.0000 2,772.295 7 2,772.295 7 0.0716 0.0505 2,789.125 8 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory lb/day lb/day Architectural Coating 6.2503 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 19.6461 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hearth 0.2524 2.1565 0.9177 0.0138 0.1744 0.1744 0.1744 0.1744 0.0000 2,752.941 2 2,752.941 2 0.0528 0.0505 2,769.300 5 Landscaping 0.3275 0.1243 10.7685 5.7000e- 004 0.0593 0.0593 0.0593 0.0593 19.3545 19.3545 0.0188 19.8252 Total 26.4762 2.2807 11.6861 0.0143 0.2337 0.2337 0.2337 0.2337 0.0000 2,772.295 7 2,772.295 7 0.0716 0.0505 2,789.125 8 Unmitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 11:51AMPage15of17 The Wave - Coral Mountain (Phase 1 Operations) - Riverside-Salton Sea County, Winter 8.1 Mitigation Measures Waste 7.1 Mitigation Measures Water 7.0 Water Detail 8.0 Waste Detail 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory lb/day lb/day Architectural Coating 6.2503 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 19.6461 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hearth 0.2524 2.1565 0.9177 0.0138 0.1744 0.1744 0.1744 0.1744 0.0000 2,752.941 2 2,752.941 2 0.0528 0.0505 2,769.300 5 Landscaping 0.3275 0.1243 10.7685 5.7000e- 004 0.0593 0.0593 0.0593 0.0593 19.3545 19.3545 0.0188 19.8252 Total 26.4762 2.2807 11.6861 0.0143 0.2337 0.2337 0.2337 0.2337 0.0000 2,772.295 7 2,772.295 7 0.0716 0.0505 2,789.125 8 Mitigated 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year Horse Power Load Factor Fuel Type 10.0 Stationary Equipment CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 11:51AMPage16of17 The Wave - Coral Mountain (Phase 1 Operations) - Riverside-Salton Sea County, Winter 11.0 Vegetation Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power Load Factor Fuel Type Boilers Equipment Type Number Heat Input/Day Heat Input/Year Boiler Rating Fuel Type User Defined Equipment Equipment Type Number CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 11:51AMPage17of17 The Wave - Coral Mountain (Phase 1 Operations) - Riverside-Salton Sea County, Winter 1.1 Land Usage Land Uses Size Metric Lot Acreage Floor Surface Area Population Other Asphalt Surfaces 23.60 Acre 23.60 1,028,016.00 0 Hotel 150.00 Room 5.00 217,800.00 0 User Defined Recreational 12.00 User Defined Unit 12.00 522,720.00 0 Apartments Low Rise 104.00 Dwelling Unit 6.50 104,000.00 279 Single Family Housing 26.00 Dwelling Unit 8.44 46,800.00 70 Regional Shopping Center 35.00 1000sqft 0.80 35,000.00 0 1.2 Other Project Characteristics Urbanization Climate Zone Urban 15 Wind Speed (m/s)Precipitation Freq (Days)2.4 28 1.3 User Entered Comments & Non-Default Data 1.0 Project Characteristics Utility Company Imperial Irrigation District 2023OperationalYear CO2 Intensity lb/MWhr) 1270.9 0.029CH4Intensity lb/MWhr) 0.006N2OIntensity lb/MWhr) The Wave - Coral Mountain (Phase 2 Operations) Riverside-Salton Sea County, Summer CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:18PMPage1of17 The Wave - Coral Mountain (Phase 2 Operations) - Riverside-Salton Sea County, Summer Project Characteristics - Land Use - Total Project area is 56.34 acres. Construction Phase - Operational Run Only. Off-road Equipment - Operational Run Only. Trips and VMT - Operational Run Only. Vehicle Trips - Trip Rate and Trips based on information provided in the Traffic Study0 Woodstoves - Rule 445 Energy Use - The project will design building shells and building components to meet 2019 Title 24 Standards which expects 30% less energy for nonresidential uses and 53% for residential uses Water And Wastewater - For the Wave Pool Facility, CalEEMod default for the Recreational Swimming Pool use was used. Solid Waste - For the Wave Pool Facility, CalEEMod default for the Recreational Swimming Pool use was used. Table Name Column Name Default Value New Value tblEnergyUse LightingElect 810.36 380.87 tblEnergyUse LightingElect 5.44 3.81 tblEnergyUse LightingElect 5.61 3.93 tblEnergyUse LightingElect 1,608.84 756.15 tblEnergyUse T24E 877.14 412.26 tblEnergyUse T24E 6.47 4.53 tblEnergyUse T24E 4.58 3.84 tblEnergyUse T24E 951.67 447.28 tblEnergyUse T24NG 9,544.50 4,485.92 tblEnergyUse T24NG 55.15 38.61 tblEnergyUse T24NG 1.92 1.34 tblEnergyUse T24NG 24,566.15 11,546.09 tblFireplaces NumberGas 83.20 104.00 tblFireplaces NumberGas 20.80 26.00 tblFireplaces NumberNoFireplace 10.40 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:18PMPage2of17 The Wave - Coral Mountain (Phase 2 Operations) - Riverside-Salton Sea County, Summer tblFireplaces NumberNoFireplace 2.60 0.00 tblFireplaces NumberWood 10.40 0.00 tblFireplaces NumberWood 2.60 0.00 tblLandUse LandUseSquareFeet 0.00 522,720.00 tblLandUse LotAcreage 0.00 12.00 tblLandUse Population 297.00 279.00 tblLandUse Population 74.00 70.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 0.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 0.00 tblSolidWaste SolidWasteGenerationRate 0.00 2,979.50 tblVehicleTrips CC_TTP 0.00 48.00 tblVehicleTrips CNW_TTP 0.00 19.00 tblVehicleTrips CW_TTP 0.00 33.00 tblVehicleTrips DV_TP 11.00 0.00 tblVehicleTrips DV_TP 38.00 0.00 tblVehicleTrips DV_TP 35.00 0.00 tblVehicleTrips DV_TP 11.00 0.00 tblVehicleTrips PB_TP 3.00 83.00 tblVehicleTrips PB_TP 4.00 69.00 tblVehicleTrips PB_TP 11.00 64.00 tblVehicleTrips PB_TP 3.00 87.00 tblVehicleTrips PB_TP 0.00 45.00 tblVehicleTrips PR_TP 86.00 17.00 tblVehicleTrips PR_TP 58.00 31.00 tblVehicleTrips PR_TP 54.00 36.00 tblVehicleTrips PR_TP 86.00 13.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:18PMPage3of17 The Wave - Coral Mountain (Phase 2 Operations) - Riverside-Salton Sea County, Summer 2.0 Emissions Summary tblVehicleTrips PR_TP 0.00 55.00 tblVehicleTrips ST_TR 7.16 8.14 tblVehicleTrips ST_TR 49.97 46.12 tblVehicleTrips ST_TR 9.91 9.54 tblVehicleTrips ST_TR 0.00 9.10 tblVehicleTrips SU_TR 6.07 6.28 tblVehicleTrips SU_TR 25.24 21.10 tblVehicleTrips SU_TR 8.62 8.55 tblVehicleTrips SU_TR 0.00 13.60 tblVehicleTrips WD_TR 6.59 7.32 tblVehicleTrips WD_TR 8.17 7.87 tblVehicleTrips WD_TR 42.70 37.75 tblVehicleTrips WD_TR 9.52 9.44 tblVehicleTrips WD_TR 0.00 50.00 tblWater IndoorWaterUseRate 0.00 30,915,304.25 tblWater OutdoorWaterUseRate 0.00 18,948,089.70 tblWoodstoves NumberCatalytic 5.20 0.00 tblWoodstoves NumberCatalytic 1.30 0.00 tblWoodstoves NumberNoncatalytic 5.20 0.00 tblWoodstoves NumberNoncatalytic 1.30 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:18PMPage4of17 The Wave - Coral Mountain (Phase 2 Operations) - Riverside-Salton Sea County, Summer 2.1 Overall Construction (Maximum Daily Emission) ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year lb/day lb/day 2022 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Maximum 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Unmitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year lb/day lb/day 2022 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Maximum 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:18PMPage5of17 The Wave - Coral Mountain (Phase 2 Operations) - Riverside-Salton Sea County, Summer 2.2 Overall Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Area 27.1774 2.2803 11.6677 0.0143 0.2338 0.2338 0.2338 0.2338 0.0000 2,772.301 3 2,772.301 3 0.0715 0.0505 2,789.128 0 Energy 0.3273 2.9500 2.3157 0.0179 0.2261 0.2261 0.2261 0.2261 3,569.959 7 3,569.959 7 0.0684 0.0655 3,591.174 2 Mobile 5.7761 33.8180 32.2244 0.1346 7.4127 0.0704 7.4831 1.9831 0.0655 2.0486 13,845.85 04 13,845.85 04 0.9941 13,870.70 19 Total 33.2807 39.0483 46.2078 0.1668 7.4127 0.5304 7.9430 1.9831 0.5254 2.5085 0.0000 20,188.11 14 20,188.11 14 1.1339 0.1159 20,251.00 41 Unmitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Area 27.1774 2.2803 11.6677 0.0143 0.2338 0.2338 0.2338 0.2338 0.0000 2,772.301 3 2,772.301 3 0.0715 0.0505 2,789.128 0 Energy 0.3273 2.9500 2.3157 0.0179 0.2261 0.2261 0.2261 0.2261 3,569.959 7 3,569.959 7 0.0684 0.0655 3,591.174 2 Mobile 5.7761 33.8180 32.2244 0.1346 7.4127 0.0704 7.4831 1.9831 0.0655 2.0486 13,845.85 04 13,845.85 04 0.9941 13,870.70 19 Total 33.2807 39.0483 46.2078 0.1668 7.4127 0.5304 7.9430 1.9831 0.5254 2.5085 0.0000 20,188.11 14 20,188.11 14 1.1339 0.1159 20,251.00 41 Mitigated Operational CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:18PMPage6of17 The Wave - Coral Mountain (Phase 2 Operations) - Riverside-Salton Sea County, Summer 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 Demolition Demolition 9/19/2022 12/23/2022 5 70 OffRoad Equipment Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Demolition Concrete/Industrial Saws 0 8.00 81 0.73 Demolition Excavators 0 8.00 158 0.38 Demolition Rubber Tired Dozers 0 8.00 247 0.40 Trips and VMT Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Demolition 0 0.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Residential Indoor: 0; Residential Outdoor: 0; Non-Residential Indoor: 0; Non-Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating – sqft) Acres of Grading (Site Preparation Phase): 0 Acres of Grading (Grading Phase): 0 Acres of Paving: 23.6 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:18PMPage7of17 The Wave - Coral Mountain (Phase 2 Operations) - Riverside-Salton Sea County, Summer 3.2 Demolition - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Unmitigated Construction Off-Site 3.1 Mitigation Measures Construction CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:18PMPage8of17 The Wave - Coral Mountain (Phase 2 Operations) - Riverside-Salton Sea County, Summer 4.0 Operational Detail - Mobile 3.2 Demolition - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:18PMPage9of17 The Wave - Coral Mountain (Phase 2 Operations) - Riverside-Salton Sea County, Summer ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Mitigated 5.7761 33.8180 32.2244 0.1346 7.4127 0.0704 7.4831 1.9831 0.0655 2.0486 13,845.85 04 13,845.85 04 0.9941 13,870.70 19 Unmitigated 5.7761 33.8180 32.2244 0.1346 7.4127 0.0704 7.4831 1.9831 0.0655 2.0486 13,845.85 04 13,845.85 04 0.9941 13,870.70 19 4.1 Mitigation Measures Mobile 4.2 Trip Summary Information 4.3 Trip Type Information Average Daily Trip Rate Unmitigated Mitigated Land Use Weekday Saturday Sunday Annual VMT Annual VMT Apartments Low Rise 761.28 846.56 653.12 347,536 347,536 Hotel 1,180.50 1,228.50 892.50 809,762 809,762 Other Asphalt Surfaces 0.00 0.00 0.00 Regional Shopping Center 1,321.25 1,614.20 738.50 999,339 999,339 Single Family Housing 245.44 248.04 222.30 87,101 87,101 User Defined Recreational 600.00 109.20 163.20 678,422 678,422 Total 4,108.47 4,046.50 2,669.62 2,922,159 2,922,159 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:18PMPage10of17 The Wave - Coral Mountain (Phase 2 Operations) - Riverside-Salton Sea County, Summer Miles Trip %Trip Purpose % Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C-W H-S or C-C H-O or C-NW Primary Diverted Pass-by Apartments Low Rise 11.00 3.50 4.50 40.20 19.20 40.60 17 0 83 Hotel 12.50 4.20 5.40 19.40 61.60 19.00 31 0 69 Other Asphalt Surfaces 12.50 4.20 5.40 0.00 0.00 0.00 0 0 0 Regional Shopping Center 12.50 4.20 5.40 16.30 64.70 19.00 36 0 64 Single Family Housing 11.00 3.50 4.50 40.20 19.20 40.60 13 0 87 User Defined Recreational 12.50 4.20 5.40 33.00 48.00 19.00 55 0 45 5.0 Energy Detail 5.1 Mitigation Measures Energy 4.4 Fleet Mix Land Use LDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH Apartments Low Rise 0.548600 0.036250 0.186898 0.112544 0.014284 0.004806 0.017604 0.070134 0.001409 0.001147 0.004508 0.000918 0.000898 Hotel 0.548600 0.036250 0.186898 0.112544 0.014284 0.004806 0.017604 0.070134 0.001409 0.001147 0.004508 0.000918 0.000898 Other Asphalt Surfaces 0.548600 0.036250 0.186898 0.112544 0.014284 0.004806 0.017604 0.070134 0.001409 0.001147 0.004508 0.000918 0.000898 Regional Shopping Center 0.548600 0.036250 0.186898 0.112544 0.014284 0.004806 0.017604 0.070134 0.001409 0.001147 0.004508 0.000918 0.000898 Single Family Housing 0.548600 0.036250 0.186898 0.112544 0.014284 0.004806 0.017604 0.070134 0.001409 0.001147 0.004508 0.000918 0.000898 User Defined Recreational 0.548600 0.036250 0.186898 0.112544 0.014284 0.004806 0.017604 0.070134 0.001409 0.001147 0.004508 0.000918 0.000898 Historical Energy Use: N CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:18PMPage11of17 The Wave - Coral Mountain (Phase 2 Operations) - Riverside-Salton Sea County, Summer ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day NaturalGas Mitigated 0.3273 2.9500 2.3157 0.0179 0.2261 0.2261 0.2261 0.2261 3,569.959 7 3,569.959 7 0.0684 0.0655 3,591.174 2 NaturalGas Unmitigated 0.3273 2.9500 2.3157 0.0179 0.2261 0.2261 0.2261 0.2261 3,569.959 7 3,569.959 7 0.0684 0.0655 3,591.174 2 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:18PMPage12of17 The Wave - Coral Mountain (Phase 2 Operations) - Riverside-Salton Sea County, Summer 5.2 Energy by Land Use - NaturalGas NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr lb/day lb/day Apartments Low Rise 2996.32 0.0323 0.2761 0.1175 1.7600e- 003 0.0223 0.0223 0.0223 0.0223 352.5079 352.5079 6.7600e- 003 6.4600e- 003 354.6027 Hotel 25939.1 0.2797 2.5431 2.1362 0.0153 0.1933 0.1933 0.1933 0.1933 3,051.657 1 3,051.657 1 0.0585 0.0560 3,069.791 5 Other Asphalt Surfaces 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Regional Shopping Center 157.26 1.7000e- 003 0.0154 0.0130 9.0000e- 005 1.1700e- 003 1.1700e- 003 1.1700e- 003 1.1700e- 003 18.5012 18.5012 3.5000e- 004 3.4000e- 004 18.6112 Single Family Housing 1252 0.0135 0.1154 0.0491 7.4000e- 004 9.3300e- 003 9.3300e- 003 9.3300e- 003 9.3300e- 003 147.2936 147.2936 2.8200e- 003 2.7000e- 003 148.1689 User Defined Recreational 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.3273 2.9500 2.3157 0.0179 0.2261 0.2261 0.2261 0.2261 3,569.959 7 3,569.959 7 0.0684 0.0655 3,591.174 2 Unmitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:18PMPage13of17 The Wave - Coral Mountain (Phase 2 Operations) - Riverside-Salton Sea County, Summer 6.1 Mitigation Measures Area 6.0 Area Detail 5.2 Energy by Land Use - NaturalGas NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr lb/day lb/day Apartments Low Rise 2.99632 0.0323 0.2761 0.1175 1.7600e- 003 0.0223 0.0223 0.0223 0.0223 352.5079 352.5079 6.7600e- 003 6.4600e- 003 354.6027 Hotel 25.9391 0.2797 2.5431 2.1362 0.0153 0.1933 0.1933 0.1933 0.1933 3,051.657 1 3,051.657 1 0.0585 0.0560 3,069.791 5 Other Asphalt Surfaces 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Regional Shopping Center 0.15726 1.7000e- 003 0.0154 0.0130 9.0000e- 005 1.1700e- 003 1.1700e- 003 1.1700e- 003 1.1700e- 003 18.5012 18.5012 3.5000e- 004 3.4000e- 004 18.6112 Single Family Housing 1.252 0.0135 0.1154 0.0491 7.4000e- 004 9.3300e- 003 9.3300e- 003 9.3300e- 003 9.3300e- 003 147.2936 147.2936 2.8200e- 003 2.7000e- 003 148.1689 User Defined Recreational 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.3273 2.9500 2.3157 0.0179 0.2261 0.2261 0.2261 0.2261 3,569.959 7 3,569.959 7 0.0684 0.0655 3,591.174 2 Mitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:18PMPage14of17 The Wave - Coral Mountain (Phase 2 Operations) - Riverside-Salton Sea County, Summer ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Mitigated 27.1774 2.2803 11.6677 0.0143 0.2338 0.2338 0.2338 0.2338 0.0000 2,772.301 3 2,772.301 3 0.0715 0.0505 2,789.128 0 Unmitigated 27.1774 2.2803 11.6677 0.0143 0.2338 0.2338 0.2338 0.2338 0.0000 2,772.301 3 2,772.301 3 0.0715 0.0505 2,789.128 0 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory lb/day lb/day Architectural Coating 6.4124 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 20.1874 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hearth 0.2524 2.1565 0.9177 0.0138 0.1744 0.1744 0.1744 0.1744 0.0000 2,752.941 2 2,752.941 2 0.0528 0.0505 2,769.300 5 Landscaping 0.3253 0.1239 10.7501 5.7000e- 004 0.0595 0.0595 0.0595 0.0595 19.3601 19.3601 0.0187 19.8275 Total 27.1774 2.2803 11.6677 0.0143 0.2338 0.2338 0.2338 0.2338 0.0000 2,772.301 3 2,772.301 3 0.0715 0.0505 2,789.128 0 Unmitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:18PMPage15of17 The Wave - Coral Mountain (Phase 2 Operations) - Riverside-Salton Sea County, Summer 8.1 Mitigation Measures Waste 7.1 Mitigation Measures Water 7.0 Water Detail 8.0 Waste Detail 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory lb/day lb/day Architectural Coating 6.4124 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 20.1874 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hearth 0.2524 2.1565 0.9177 0.0138 0.1744 0.1744 0.1744 0.1744 0.0000 2,752.941 2 2,752.941 2 0.0528 0.0505 2,769.300 5 Landscaping 0.3253 0.1239 10.7501 5.7000e- 004 0.0595 0.0595 0.0595 0.0595 19.3601 19.3601 0.0187 19.8275 Total 27.1774 2.2803 11.6677 0.0143 0.2338 0.2338 0.2338 0.2338 0.0000 2,772.301 3 2,772.301 3 0.0715 0.0505 2,789.128 0 Mitigated 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year Horse Power Load Factor Fuel Type 10.0 Stationary Equipment CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:18PMPage16of17 The Wave - Coral Mountain (Phase 2 Operations) - Riverside-Salton Sea County, Summer 11.0 Vegetation Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power Load Factor Fuel Type Boilers Equipment Type Number Heat Input/Day Heat Input/Year Boiler Rating Fuel Type User Defined Equipment Equipment Type Number CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:18PMPage17of17 The Wave - Coral Mountain (Phase 2 Operations) - Riverside-Salton Sea County, Summer 1.1 Land Usage Land Uses Size Metric Lot Acreage Floor Surface Area Population Other Asphalt Surfaces 23.60 Acre 23.60 1,028,016.00 0 Hotel 150.00 Room 5.00 217,800.00 0 User Defined Recreational 12.00 User Defined Unit 12.00 522,720.00 0 Apartments Low Rise 104.00 Dwelling Unit 6.50 104,000.00 279 Single Family Housing 26.00 Dwelling Unit 8.44 46,800.00 70 Regional Shopping Center 35.00 1000sqft 0.80 35,000.00 0 1.2 Other Project Characteristics Urbanization Climate Zone Urban 15 Wind Speed (m/s)Precipitation Freq (Days)2.4 28 1.3 User Entered Comments & Non-Default Data 1.0 Project Characteristics Utility Company Imperial Irrigation District 2023OperationalYear CO2 Intensity lb/MWhr) 1270.9 0.029CH4Intensity lb/MWhr) 0.006N2OIntensity lb/MWhr) The Wave - Coral Mountain (Phase 2 Operations) Riverside-Salton Sea County, Winter CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:17PMPage1of17 The Wave - Coral Mountain (Phase 2 Operations) - Riverside-Salton Sea County, Winter Project Characteristics - Land Use - Total Project area is 56.34 acres. Construction Phase - Operational Run Only. Off-road Equipment - Operational Run Only. Trips and VMT - Operational Run Only. Vehicle Trips - Trip Rate and Trips based on information provided in the Traffic Study0 Woodstoves - Rule 445 Energy Use - The project will design building shells and building components to meet 2019 Title 24 Standards which expects 30% less energy for nonresidential uses and 53% for residential uses Water And Wastewater - For the Wave Pool Facility, CalEEMod default for the Recreational Swimming Pool use was used. Solid Waste - For the Wave Pool Facility, CalEEMod default for the Recreational Swimming Pool use was used. Table Name Column Name Default Value New Value tblEnergyUse LightingElect 810.36 380.87 tblEnergyUse LightingElect 5.44 3.81 tblEnergyUse LightingElect 5.61 3.93 tblEnergyUse LightingElect 1,608.84 756.15 tblEnergyUse T24E 877.14 412.26 tblEnergyUse T24E 6.47 4.53 tblEnergyUse T24E 4.58 3.84 tblEnergyUse T24E 951.67 447.28 tblEnergyUse T24NG 9,544.50 4,485.92 tblEnergyUse T24NG 55.15 38.61 tblEnergyUse T24NG 1.92 1.34 tblEnergyUse T24NG 24,566.15 11,546.09 tblFireplaces NumberGas 83.20 104.00 tblFireplaces NumberGas 20.80 26.00 tblFireplaces NumberNoFireplace 10.40 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:17PMPage2of17 The Wave - Coral Mountain (Phase 2 Operations) - Riverside-Salton Sea County, Winter tblFireplaces NumberNoFireplace 2.60 0.00 tblFireplaces NumberWood 10.40 0.00 tblFireplaces NumberWood 2.60 0.00 tblLandUse LandUseSquareFeet 0.00 522,720.00 tblLandUse LotAcreage 0.00 12.00 tblLandUse Population 297.00 279.00 tblLandUse Population 74.00 70.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 0.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 0.00 tblSolidWaste SolidWasteGenerationRate 0.00 2,979.50 tblVehicleTrips CC_TTP 0.00 48.00 tblVehicleTrips CNW_TTP 0.00 19.00 tblVehicleTrips CW_TTP 0.00 33.00 tblVehicleTrips DV_TP 11.00 0.00 tblVehicleTrips DV_TP 38.00 0.00 tblVehicleTrips DV_TP 35.00 0.00 tblVehicleTrips DV_TP 11.00 0.00 tblVehicleTrips PB_TP 3.00 83.00 tblVehicleTrips PB_TP 4.00 69.00 tblVehicleTrips PB_TP 11.00 64.00 tblVehicleTrips PB_TP 3.00 87.00 tblVehicleTrips PB_TP 0.00 45.00 tblVehicleTrips PR_TP 86.00 17.00 tblVehicleTrips PR_TP 58.00 31.00 tblVehicleTrips PR_TP 54.00 36.00 tblVehicleTrips PR_TP 86.00 13.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:17PMPage3of17 The Wave - Coral Mountain (Phase 2 Operations) - Riverside-Salton Sea County, Winter 2.0 Emissions Summary tblVehicleTrips PR_TP 0.00 55.00 tblVehicleTrips ST_TR 7.16 8.14 tblVehicleTrips ST_TR 49.97 46.12 tblVehicleTrips ST_TR 9.91 9.54 tblVehicleTrips ST_TR 0.00 9.10 tblVehicleTrips SU_TR 6.07 6.28 tblVehicleTrips SU_TR 25.24 21.10 tblVehicleTrips SU_TR 8.62 8.55 tblVehicleTrips SU_TR 0.00 13.60 tblVehicleTrips WD_TR 6.59 7.32 tblVehicleTrips WD_TR 8.17 7.87 tblVehicleTrips WD_TR 42.70 37.75 tblVehicleTrips WD_TR 9.52 9.44 tblVehicleTrips WD_TR 0.00 50.00 tblWater IndoorWaterUseRate 0.00 30,915,304.25 tblWater OutdoorWaterUseRate 0.00 18,948,089.70 tblWoodstoves NumberCatalytic 5.20 0.00 tblWoodstoves NumberCatalytic 1.30 0.00 tblWoodstoves NumberNoncatalytic 5.20 0.00 tblWoodstoves NumberNoncatalytic 1.30 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:17PMPage4of17 The Wave - Coral Mountain (Phase 2 Operations) - Riverside-Salton Sea County, Winter 2.1 Overall Construction (Maximum Daily Emission) ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year lb/day lb/day 2022 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Maximum 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Unmitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year lb/day lb/day 2022 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Maximum 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:17PMPage5of17 The Wave - Coral Mountain (Phase 2 Operations) - Riverside-Salton Sea County, Winter 2.2 Overall Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Area 27.1774 2.2803 11.6677 0.0143 0.2338 0.2338 0.2338 0.2338 0.0000 2,772.301 3 2,772.301 3 0.0715 0.0505 2,789.128 0 Energy 0.3273 2.9500 2.3157 0.0179 0.2261 0.2261 0.2261 0.2261 3,569.959 7 3,569.959 7 0.0684 0.0655 3,591.174 2 Mobile 4.6731 33.0873 31.4299 0.1227 7.4127 0.0718 7.4845 1.9831 0.0669 2.0499 12,627.57 15 12,627.57 15 1.0850 12,654.69 55 Total 32.1777 38.3176 45.4133 0.1549 7.4127 0.5318 7.9444 1.9831 0.5268 2.5098 0.0000 18,969.83 25 18,969.83 25 1.2248 0.1159 19,034.99 78 Unmitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Area 27.1774 2.2803 11.6677 0.0143 0.2338 0.2338 0.2338 0.2338 0.0000 2,772.301 3 2,772.301 3 0.0715 0.0505 2,789.128 0 Energy 0.3273 2.9500 2.3157 0.0179 0.2261 0.2261 0.2261 0.2261 3,569.959 7 3,569.959 7 0.0684 0.0655 3,591.174 2 Mobile 4.6731 33.0873 31.4299 0.1227 7.4127 0.0718 7.4845 1.9831 0.0669 2.0499 12,627.57 15 12,627.57 15 1.0850 12,654.69 55 Total 32.1777 38.3176 45.4133 0.1549 7.4127 0.5318 7.9444 1.9831 0.5268 2.5098 0.0000 18,969.83 25 18,969.83 25 1.2248 0.1159 19,034.99 78 Mitigated Operational CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:17PMPage6of17 The Wave - Coral Mountain (Phase 2 Operations) - Riverside-Salton Sea County, Winter 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 Demolition Demolition 9/19/2022 12/23/2022 5 70 OffRoad Equipment Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Demolition Concrete/Industrial Saws 0 8.00 81 0.73 Demolition Excavators 0 8.00 158 0.38 Demolition Rubber Tired Dozers 0 8.00 247 0.40 Trips and VMT Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Demolition 0 0.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Residential Indoor: 0; Residential Outdoor: 0; Non-Residential Indoor: 0; Non-Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating – sqft) Acres of Grading (Site Preparation Phase): 0 Acres of Grading (Grading Phase): 0 Acres of Paving: 23.6 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:17PMPage7of17 The Wave - Coral Mountain (Phase 2 Operations) - Riverside-Salton Sea County, Winter 3.2 Demolition - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Unmitigated Construction Off-Site 3.1 Mitigation Measures Construction CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:17PMPage8of17 The Wave - Coral Mountain (Phase 2 Operations) - Riverside-Salton Sea County, Winter 4.0 Operational Detail - Mobile 3.2 Demolition - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:17PMPage9of17 The Wave - Coral Mountain (Phase 2 Operations) - Riverside-Salton Sea County, Winter ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Mitigated 4.6731 33.0873 31.4299 0.1227 7.4127 0.0718 7.4845 1.9831 0.0669 2.0499 12,627.57 15 12,627.57 15 1.0850 12,654.69 55 Unmitigated 4.6731 33.0873 31.4299 0.1227 7.4127 0.0718 7.4845 1.9831 0.0669 2.0499 12,627.57 15 12,627.57 15 1.0850 12,654.69 55 4.1 Mitigation Measures Mobile 4.2 Trip Summary Information 4.3 Trip Type Information Average Daily Trip Rate Unmitigated Mitigated Land Use Weekday Saturday Sunday Annual VMT Annual VMT Apartments Low Rise 761.28 846.56 653.12 347,536 347,536 Hotel 1,180.50 1,228.50 892.50 809,762 809,762 Other Asphalt Surfaces 0.00 0.00 0.00 Regional Shopping Center 1,321.25 1,614.20 738.50 999,339 999,339 Single Family Housing 245.44 248.04 222.30 87,101 87,101 User Defined Recreational 600.00 109.20 163.20 678,422 678,422 Total 4,108.47 4,046.50 2,669.62 2,922,159 2,922,159 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:17PMPage10of17 The Wave - Coral Mountain (Phase 2 Operations) - Riverside-Salton Sea County, Winter Miles Trip %Trip Purpose % Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C-W H-S or C-C H-O or C-NW Primary Diverted Pass-by Apartments Low Rise 11.00 3.50 4.50 40.20 19.20 40.60 17 0 83 Hotel 12.50 4.20 5.40 19.40 61.60 19.00 31 0 69 Other Asphalt Surfaces 12.50 4.20 5.40 0.00 0.00 0.00 0 0 0 Regional Shopping Center 12.50 4.20 5.40 16.30 64.70 19.00 36 0 64 Single Family Housing 11.00 3.50 4.50 40.20 19.20 40.60 13 0 87 User Defined Recreational 12.50 4.20 5.40 33.00 48.00 19.00 55 0 45 5.0 Energy Detail 5.1 Mitigation Measures Energy 4.4 Fleet Mix Land Use LDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH Apartments Low Rise 0.548600 0.036250 0.186898 0.112544 0.014284 0.004806 0.017604 0.070134 0.001409 0.001147 0.004508 0.000918 0.000898 Hotel 0.548600 0.036250 0.186898 0.112544 0.014284 0.004806 0.017604 0.070134 0.001409 0.001147 0.004508 0.000918 0.000898 Other Asphalt Surfaces 0.548600 0.036250 0.186898 0.112544 0.014284 0.004806 0.017604 0.070134 0.001409 0.001147 0.004508 0.000918 0.000898 Regional Shopping Center 0.548600 0.036250 0.186898 0.112544 0.014284 0.004806 0.017604 0.070134 0.001409 0.001147 0.004508 0.000918 0.000898 Single Family Housing 0.548600 0.036250 0.186898 0.112544 0.014284 0.004806 0.017604 0.070134 0.001409 0.001147 0.004508 0.000918 0.000898 User Defined Recreational 0.548600 0.036250 0.186898 0.112544 0.014284 0.004806 0.017604 0.070134 0.001409 0.001147 0.004508 0.000918 0.000898 Historical Energy Use: N CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:17PMPage11of17 The Wave - Coral Mountain (Phase 2 Operations) - Riverside-Salton Sea County, Winter ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day NaturalGas Mitigated 0.3273 2.9500 2.3157 0.0179 0.2261 0.2261 0.2261 0.2261 3,569.959 7 3,569.959 7 0.0684 0.0655 3,591.174 2 NaturalGas Unmitigated 0.3273 2.9500 2.3157 0.0179 0.2261 0.2261 0.2261 0.2261 3,569.959 7 3,569.959 7 0.0684 0.0655 3,591.174 2 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:17PMPage12of17 The Wave - Coral Mountain (Phase 2 Operations) - Riverside-Salton Sea County, Winter 5.2 Energy by Land Use - NaturalGas NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr lb/day lb/day Apartments Low Rise 2996.32 0.0323 0.2761 0.1175 1.7600e- 003 0.0223 0.0223 0.0223 0.0223 352.5079 352.5079 6.7600e- 003 6.4600e- 003 354.6027 Hotel 25939.1 0.2797 2.5431 2.1362 0.0153 0.1933 0.1933 0.1933 0.1933 3,051.657 1 3,051.657 1 0.0585 0.0560 3,069.791 5 Other Asphalt Surfaces 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Regional Shopping Center 157.26 1.7000e- 003 0.0154 0.0130 9.0000e- 005 1.1700e- 003 1.1700e- 003 1.1700e- 003 1.1700e- 003 18.5012 18.5012 3.5000e- 004 3.4000e- 004 18.6112 Single Family Housing 1252 0.0135 0.1154 0.0491 7.4000e- 004 9.3300e- 003 9.3300e- 003 9.3300e- 003 9.3300e- 003 147.2936 147.2936 2.8200e- 003 2.7000e- 003 148.1689 User Defined Recreational 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.3273 2.9500 2.3157 0.0179 0.2261 0.2261 0.2261 0.2261 3,569.959 7 3,569.959 7 0.0684 0.0655 3,591.174 2 Unmitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:17PMPage13of17 The Wave - Coral Mountain (Phase 2 Operations) - Riverside-Salton Sea County, Winter 6.1 Mitigation Measures Area 6.0 Area Detail 5.2 Energy by Land Use - NaturalGas NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr lb/day lb/day Apartments Low Rise 2.99632 0.0323 0.2761 0.1175 1.7600e- 003 0.0223 0.0223 0.0223 0.0223 352.5079 352.5079 6.7600e- 003 6.4600e- 003 354.6027 Hotel 25.9391 0.2797 2.5431 2.1362 0.0153 0.1933 0.1933 0.1933 0.1933 3,051.657 1 3,051.657 1 0.0585 0.0560 3,069.791 5 Other Asphalt Surfaces 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Regional Shopping Center 0.15726 1.7000e- 003 0.0154 0.0130 9.0000e- 005 1.1700e- 003 1.1700e- 003 1.1700e- 003 1.1700e- 003 18.5012 18.5012 3.5000e- 004 3.4000e- 004 18.6112 Single Family Housing 1.252 0.0135 0.1154 0.0491 7.4000e- 004 9.3300e- 003 9.3300e- 003 9.3300e- 003 9.3300e- 003 147.2936 147.2936 2.8200e- 003 2.7000e- 003 148.1689 User Defined Recreational 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.3273 2.9500 2.3157 0.0179 0.2261 0.2261 0.2261 0.2261 3,569.959 7 3,569.959 7 0.0684 0.0655 3,591.174 2 Mitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:17PMPage14of17 The Wave - Coral Mountain (Phase 2 Operations) - Riverside-Salton Sea County, Winter ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Mitigated 27.1774 2.2803 11.6677 0.0143 0.2338 0.2338 0.2338 0.2338 0.0000 2,772.301 3 2,772.301 3 0.0715 0.0505 2,789.128 0 Unmitigated 27.1774 2.2803 11.6677 0.0143 0.2338 0.2338 0.2338 0.2338 0.0000 2,772.301 3 2,772.301 3 0.0715 0.0505 2,789.128 0 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory lb/day lb/day Architectural Coating 6.4124 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 20.1874 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hearth 0.2524 2.1565 0.9177 0.0138 0.1744 0.1744 0.1744 0.1744 0.0000 2,752.941 2 2,752.941 2 0.0528 0.0505 2,769.300 5 Landscaping 0.3253 0.1239 10.7501 5.7000e- 004 0.0595 0.0595 0.0595 0.0595 19.3601 19.3601 0.0187 19.8275 Total 27.1774 2.2803 11.6677 0.0143 0.2338 0.2338 0.2338 0.2338 0.0000 2,772.301 3 2,772.301 3 0.0715 0.0505 2,789.128 0 Unmitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:17PMPage15of17 The Wave - Coral Mountain (Phase 2 Operations) - Riverside-Salton Sea County, Winter 8.1 Mitigation Measures Waste 7.1 Mitigation Measures Water 7.0 Water Detail 8.0 Waste Detail 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory lb/day lb/day Architectural Coating 6.4124 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 20.1874 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hearth 0.2524 2.1565 0.9177 0.0138 0.1744 0.1744 0.1744 0.1744 0.0000 2,752.941 2 2,752.941 2 0.0528 0.0505 2,769.300 5 Landscaping 0.3253 0.1239 10.7501 5.7000e- 004 0.0595 0.0595 0.0595 0.0595 19.3601 19.3601 0.0187 19.8275 Total 27.1774 2.2803 11.6677 0.0143 0.2338 0.2338 0.2338 0.2338 0.0000 2,772.301 3 2,772.301 3 0.0715 0.0505 2,789.128 0 Mitigated 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year Horse Power Load Factor Fuel Type 10.0 Stationary Equipment CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:17PMPage16of17 The Wave - Coral Mountain (Phase 2 Operations) - Riverside-Salton Sea County, Winter 11.0 Vegetation Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power Load Factor Fuel Type Boilers Equipment Type Number Heat Input/Day Heat Input/Year Boiler Rating Fuel Type User Defined Equipment Equipment Type Number CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:17PMPage17of17 The Wave - Coral Mountain (Phase 2 Operations) - Riverside-Salton Sea County, Winter 1.1 Land Usage Land Uses Size Metric Lot Acreage Floor Surface Area Population Other Asphalt Surfaces 134.02 Acre 134.02 5,837,911.20 0 Hotel 150.00 Room 5.00 217,800.00 0 User Defined Recreational 12.00 User Defined Unit 12.00 522,720.00 0 Apartments Low Rise 104.00 Dwelling Unit 6.50 104,000.00 279 Single Family Housing 496.00 Dwelling Unit 161.04 892,800.00 1419 Regional Shopping Center 60.00 1000sqft 1.38 60,000.00 0 1.2 Other Project Characteristics Urbanization Climate Zone Urban 15 Wind Speed (m/s)Precipitation Freq (Days)2.4 28 1.3 User Entered Comments & Non-Default Data 1.0 Project Characteristics Utility Company Imperial Irrigation District 2026OperationalYear CO2 Intensity lb/MWhr) 1270.9 0.029CH4Intensity lb/MWhr) 0.006N2OIntensity lb/MWhr) The Wave - Coral Mountain (Phase 3 Operations) Riverside-Salton Sea County, Summer CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:35PMPage1of22 The Wave - Coral Mountain (Phase 3 Operations) - Riverside-Salton Sea County, Summer Project Characteristics - Land Use - Total Project area is 319.93 acres. Construction Phase - Operational Run Only. Off-road Equipment - Operational Run Only. Trips and VMT - Operational Run Only. Vehicle Trips - Trip Rate and Trips based on information provided in the Traffic Study0 Woodstoves - Rule 445 Energy Use - The project will design building shells and building components to meet 2019 Title 24 Standards which expects 30% less energy for nonresidential uses and 53% for residential uses Water And Wastewater - For the Wave Pool Facility, CalEEMod default for the Recreational Swimming Pool use was used. Solid Waste - For the Wave Pool Facility, CalEEMod default for the Recreational Swimming Pool use was used. Table Name Column Name Default Value New Value tblEnergyUse LightingElect 810.36 380.87 tblEnergyUse LightingElect 5.44 3.81 tblEnergyUse LightingElect 5.61 3.93 tblEnergyUse LightingElect 1,608.84 756.15 tblEnergyUse T24E 877.14 412.26 tblEnergyUse T24E 6.47 4.53 tblEnergyUse T24E 4.58 3.21 tblEnergyUse T24E 951.67 447.28 tblEnergyUse T24NG 9,544.50 4,485.92 tblEnergyUse T24NG 55.15 38.61 tblEnergyUse T24NG 1.92 1.34 tblEnergyUse T24NG 24,566.15 11,546.09 tblFireplaces NumberGas 83.20 104.00 tblFireplaces NumberGas 396.80 496.00 tblFireplaces NumberNoFireplace 10.40 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:35PMPage2of22 The Wave - Coral Mountain (Phase 3 Operations) - Riverside-Salton Sea County, Summer tblFireplaces NumberNoFireplace 49.60 0.00 tblFireplaces NumberWood 10.40 0.00 tblFireplaces NumberWood 49.60 0.00 tblLandUse LandUseSquareFeet 0.00 522,720.00 tblLandUse LotAcreage 0.00 12.00 tblLandUse Population 297.00 279.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 0.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 0.00 tblSolidWaste SolidWasteGenerationRate 0.00 2,979.50 tblVehicleTrips CC_TTP 0.00 48.00 tblVehicleTrips CNW_TTP 0.00 19.00 tblVehicleTrips CW_TTP 0.00 33.00 tblVehicleTrips DV_TP 11.00 0.00 tblVehicleTrips DV_TP 38.00 0.00 tblVehicleTrips DV_TP 35.00 0.00 tblVehicleTrips DV_TP 11.00 0.00 tblVehicleTrips PB_TP 3.00 86.00 tblVehicleTrips PB_TP 4.00 65.00 tblVehicleTrips PB_TP 11.00 55.00 tblVehicleTrips PB_TP 3.00 89.00 tblVehicleTrips PB_TP 0.00 22.00 tblVehicleTrips PR_TP 86.00 14.00 tblVehicleTrips PR_TP 58.00 35.00 tblVehicleTrips PR_TP 54.00 45.00 tblVehicleTrips PR_TP 86.00 11.00 tblVehicleTrips PR_TP 0.00 78.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:35PMPage3of22 The Wave - Coral Mountain (Phase 3 Operations) - Riverside-Salton Sea County, Summer 2.0 Emissions Summary tblVehicleTrips ST_TR 7.16 8.14 tblVehicleTrips ST_TR 49.97 46.12 tblVehicleTrips ST_TR 9.91 9.54 tblVehicleTrips ST_TR 0.00 9.10 tblVehicleTrips SU_TR 6.07 6.28 tblVehicleTrips SU_TR 25.24 21.10 tblVehicleTrips SU_TR 8.62 8.55 tblVehicleTrips SU_TR 0.00 13.60 tblVehicleTrips WD_TR 6.59 7.32 tblVehicleTrips WD_TR 8.17 7.87 tblVehicleTrips WD_TR 42.70 37.75 tblVehicleTrips WD_TR 9.52 9.44 tblVehicleTrips WD_TR 0.00 50.00 tblWater IndoorWaterUseRate 0.00 30,915,304.25 tblWater OutdoorWaterUseRate 0.00 18,948,089.70 tblWoodstoves NumberCatalytic 5.20 0.00 tblWoodstoves NumberCatalytic 24.80 0.00 tblWoodstoves NumberNoncatalytic 5.20 0.00 tblWoodstoves NumberNoncatalytic 24.80 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:35PMPage4of22 The Wave - Coral Mountain (Phase 3 Operations) - Riverside-Salton Sea County, Summer 2.1 Overall Construction (Maximum Daily Emission) ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year lb/day lb/day 2023 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 2024 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 2025 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Maximum 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Unmitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year lb/day lb/day 2023 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 2024 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 2025 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Maximum 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated Construction CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:35PMPage5of22 The Wave - Coral Mountain (Phase 3 Operations) - Riverside-Salton Sea County, Summer ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:35PMPage6of22 The Wave - Coral Mountain (Phase 3 Operations) - Riverside-Salton Sea County, Summer 2.2 Overall Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Area 57.9222 10.5229 53.7254 0.0662 1.0792 1.0792 1.0792 1.0792 0.0000 12,795.09 17 12,795.09 17 0.3291 0.2329 12,872.73 53 Energy 0.5725 5.0467 3.2125 0.0312 0.3956 0.3956 0.3956 0.3956 6,245.789 6 6,245.789 6 0.1197 0.1145 6,282.905 2 Mobile 10.8960 71.4815 55.1345 0.2551 14.2051 0.1341 14.3392 3.7990 0.1245 3.9236 26,332.23 73 26,332.23 73 1.9265 26,380.39 88 Total 69.3907 87.0511 112.0725 0.3524 14.2051 1.6089 15.8140 3.7990 1.5993 5.3984 0.0000 45,373.11 86 45,373.11 86 2.3753 0.3475 45,536.03 93 Unmitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Area 57.9222 10.5229 53.7254 0.0662 1.0792 1.0792 1.0792 1.0792 0.0000 12,795.09 17 12,795.09 17 0.3291 0.2329 12,872.73 53 Energy 0.5725 5.0467 3.2125 0.0312 0.3956 0.3956 0.3956 0.3956 6,245.789 6 6,245.789 6 0.1197 0.1145 6,282.905 2 Mobile 10.8960 71.4815 55.1345 0.2551 14.2051 0.1341 14.3392 3.7990 0.1245 3.9236 26,332.23 73 26,332.23 73 1.9265 26,380.39 88 Total 69.3907 87.0511 112.0725 0.3524 14.2051 1.6089 15.8140 3.7990 1.5993 5.3984 0.0000 45,373.11 86 45,373.11 86 2.3753 0.3475 45,536.03 93 Mitigated Operational CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:35PMPage7of22 The Wave - Coral Mountain (Phase 3 Operations) - Riverside-Salton Sea County, Summer 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 Demolition Demolition 7/9/2023 1/17/2025 5 400 OffRoad Equipment Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Demolition Concrete/Industrial Saws 0 8.00 81 0.73 Demolition Excavators 0 8.00 158 0.38 Demolition Rubber Tired Dozers 0 8.00 247 0.40 Trips and VMT Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Demolition 0 0.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Residential Indoor: 0; Residential Outdoor: 0; Non-Residential Indoor: 0; Non-Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating – sqft) Acres of Grading (Site Preparation Phase): 0 Acres of Grading (Grading Phase): 0 Acres of Paving: 134.02 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:35PMPage8of22 The Wave - Coral Mountain (Phase 3 Operations) - Riverside-Salton Sea County, Summer 3.2 Demolition - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Unmitigated Construction Off-Site 3.1 Mitigation Measures Construction CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:35PMPage9of22 The Wave - Coral Mountain (Phase 3 Operations) - Riverside-Salton Sea County, Summer 3.2 Demolition - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:35PMPage10of22 The Wave - Coral Mountain (Phase 3 Operations) - Riverside-Salton Sea County, Summer 3.2 Demolition - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:35PMPage11of22 The Wave - Coral Mountain (Phase 3 Operations) - Riverside-Salton Sea County, Summer 3.2 Demolition - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:35PMPage12of22 The Wave - Coral Mountain (Phase 3 Operations) - Riverside-Salton Sea County, Summer 3.2 Demolition - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:35PMPage13of22 The Wave - Coral Mountain (Phase 3 Operations) - Riverside-Salton Sea County, Summer 4.0 Operational Detail - Mobile 3.2 Demolition - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:35PMPage14of22 The Wave - Coral Mountain (Phase 3 Operations) - Riverside-Salton Sea County, Summer ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Mitigated 10.8960 71.4815 55.1345 0.2551 14.2051 0.1341 14.3392 3.7990 0.1245 3.9236 26,332.23 73 26,332.23 73 1.9265 26,380.39 88 Unmitigated 10.8960 71.4815 55.1345 0.2551 14.2051 0.1341 14.3392 3.7990 0.1245 3.9236 26,332.23 73 26,332.23 73 1.9265 26,380.39 88 4.1 Mitigation Measures Mobile 4.2 Trip Summary Information 4.3 Trip Type Information Average Daily Trip Rate Unmitigated Mitigated Land Use Weekday Saturday Sunday Annual VMT Annual VMT Apartments Low Rise 761.28 846.56 653.12 291,075 291,075 Hotel 1,180.50 1,228.50 892.50 908,864 908,864 Other Asphalt Surfaces 0.00 0.00 0.00 Regional Shopping Center 2,265.00 2,767.20 1266.00 2,121,475 2,121,475 Single Family Housing 4,682.24 4,731.84 4240.80 1,431,888 1,431,888 User Defined Recreational 600.00 109.20 163.20 955,009 955,009 Total 9,489.02 9,683.30 7,215.62 5,708,311 5,708,311 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:35PMPage15of22 The Wave - Coral Mountain (Phase 3 Operations) - Riverside-Salton Sea County, Summer Miles Trip %Trip Purpose % Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C-W H-S or C-C H-O or C-NW Primary Diverted Pass-by Apartments Low Rise 11.00 3.50 4.50 40.20 19.20 40.60 14 0 86 Hotel 12.50 4.20 5.40 19.40 61.60 19.00 35 0 65 Other Asphalt Surfaces 12.50 4.20 5.40 0.00 0.00 0.00 0 0 0 Regional Shopping Center 12.50 4.20 5.40 16.30 64.70 19.00 45 0 55 Single Family Housing 11.00 3.50 4.50 40.20 19.20 40.60 11 0 89 User Defined Recreational 12.50 4.20 5.40 33.00 48.00 19.00 78 0 22 5.0 Energy Detail 5.1 Mitigation Measures Energy 4.4 Fleet Mix Land Use LDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH Apartments Low Rise 0.556393 0.035040 0.189382 0.106465 0.012088 0.004430 0.017405 0.070208 0.001420 0.001115 0.004429 0.000881 0.000745 Hotel 0.556393 0.035040 0.189382 0.106465 0.012088 0.004430 0.017405 0.070208 0.001420 0.001115 0.004429 0.000881 0.000745 Other Asphalt Surfaces 0.556393 0.035040 0.189382 0.106465 0.012088 0.004430 0.017405 0.070208 0.001420 0.001115 0.004429 0.000881 0.000745 Regional Shopping Center 0.556393 0.035040 0.189382 0.106465 0.012088 0.004430 0.017405 0.070208 0.001420 0.001115 0.004429 0.000881 0.000745 Single Family Housing 0.556393 0.035040 0.189382 0.106465 0.012088 0.004430 0.017405 0.070208 0.001420 0.001115 0.004429 0.000881 0.000745 User Defined Recreational 0.556393 0.035040 0.189382 0.106465 0.012088 0.004430 0.017405 0.070208 0.001420 0.001115 0.004429 0.000881 0.000745 Historical Energy Use: N CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:35PMPage16of22 The Wave - Coral Mountain (Phase 3 Operations) - Riverside-Salton Sea County, Summer ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day NaturalGas Mitigated 0.5725 5.0467 3.2125 0.0312 0.3956 0.3956 0.3956 0.3956 6,245.789 6 6,245.789 6 0.1197 0.1145 6,282.905 2 NaturalGas Unmitigated 0.5725 5.0467 3.2125 0.0312 0.3956 0.3956 0.3956 0.3956 6,245.789 6 6,245.789 6 0.1197 0.1145 6,282.905 2 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:35PMPage17of22 The Wave - Coral Mountain (Phase 3 Operations) - Riverside-Salton Sea County, Summer 5.2 Energy by Land Use - NaturalGas NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr lb/day lb/day Apartments Low Rise 2996.32 0.0323 0.2761 0.1175 1.7600e- 003 0.0223 0.0223 0.0223 0.0223 352.5079 352.5079 6.7600e- 003 6.4600e- 003 354.6027 Hotel 25939.1 0.2797 2.5431 2.1362 0.0153 0.1933 0.1933 0.1933 0.1933 3,051.657 1 3,051.657 1 0.0585 0.0560 3,069.791 5 Other Asphalt Surfaces 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Regional Shopping Center 269.589 2.9100e- 003 0.0264 0.0222 1.6000e- 004 2.0100e- 003 2.0100e- 003 2.0100e- 003 2.0100e- 003 31.7164 31.7164 6.1000e- 004 5.8000e- 004 31.9048 Single Family Housing 23884.2 0.2576 2.2011 0.9366 0.0141 0.1780 0.1780 0.1780 0.1780 2,809.908 3 2,809.908 3 0.0539 0.0515 2,826.606 2 User Defined Recreational 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.5725 5.0467 3.2125 0.0312 0.3956 0.3956 0.3956 0.3956 6,245.789 6 6,245.789 6 0.1197 0.1145 6,282.905 2 Unmitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:35PMPage18of22 The Wave - Coral Mountain (Phase 3 Operations) - Riverside-Salton Sea County, Summer 6.1 Mitigation Measures Area 6.0 Area Detail 5.2 Energy by Land Use - NaturalGas NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr lb/day lb/day Apartments Low Rise 2.99632 0.0323 0.2761 0.1175 1.7600e- 003 0.0223 0.0223 0.0223 0.0223 352.5079 352.5079 6.7600e- 003 6.4600e- 003 354.6027 Hotel 25.9391 0.2797 2.5431 2.1362 0.0153 0.1933 0.1933 0.1933 0.1933 3,051.657 1 3,051.657 1 0.0585 0.0560 3,069.791 5 Other Asphalt Surfaces 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Regional Shopping Center 0.269589 2.9100e- 003 0.0264 0.0222 1.6000e- 004 2.0100e- 003 2.0100e- 003 2.0100e- 003 2.0100e- 003 31.7164 31.7164 6.1000e- 004 5.8000e- 004 31.9048 Single Family Housing 23.8842 0.2576 2.2011 0.9366 0.0141 0.1780 0.1780 0.1780 0.1780 2,809.908 3 2,809.908 3 0.0539 0.0515 2,826.606 2 User Defined Recreational 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.5725 5.0467 3.2125 0.0312 0.3956 0.3956 0.3956 0.3956 6,245.789 6 6,245.789 6 0.1197 0.1145 6,282.905 2 Mitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:35PMPage19of22 The Wave - Coral Mountain (Phase 3 Operations) - Riverside-Salton Sea County, Summer ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Mitigated 57.9222 10.5229 53.7254 0.0662 1.0792 1.0792 1.0792 1.0792 0.0000 12,795.09 17 12,795.09 17 0.3291 0.2329 12,872.73 53 Unmitigated 57.9222 10.5229 53.7254 0.0662 1.0792 1.0792 1.0792 1.0792 0.0000 12,795.09 17 12,795.09 17 0.3291 0.2329 12,872.73 53 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory lb/day lb/day Architectural Coating 14.7389 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 40.5304 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hearth 1.1647 9.9529 4.2353 0.0635 0.8047 0.8047 0.8047 0.8047 0.0000 12,705.88 24 12,705.88 24 0.2435 0.2329 12,781.38 71 Landscaping 1.4882 0.5700 49.4901 2.6200e- 003 0.2745 0.2745 0.2745 0.2745 89.2093 89.2093 0.0856 91.3482 Total 57.9222 10.5229 53.7254 0.0662 1.0792 1.0792 1.0792 1.0792 0.0000 12,795.09 17 12,795.09 17 0.3291 0.2329 12,872.73 53 Unmitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:35PMPage20of22 The Wave - Coral Mountain (Phase 3 Operations) - Riverside-Salton Sea County, Summer 8.1 Mitigation Measures Waste 7.1 Mitigation Measures Water 7.0 Water Detail 8.0 Waste Detail 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory lb/day lb/day Architectural Coating 14.7389 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 40.5304 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hearth 1.1647 9.9529 4.2353 0.0635 0.8047 0.8047 0.8047 0.8047 0.0000 12,705.88 24 12,705.88 24 0.2435 0.2329 12,781.38 71 Landscaping 1.4882 0.5700 49.4901 2.6200e- 003 0.2745 0.2745 0.2745 0.2745 89.2093 89.2093 0.0856 91.3482 Total 57.9222 10.5229 53.7254 0.0662 1.0792 1.0792 1.0792 1.0792 0.0000 12,795.09 17 12,795.09 17 0.3291 0.2329 12,872.73 53 Mitigated 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year Horse Power Load Factor Fuel Type 10.0 Stationary Equipment CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:35PMPage21of22 The Wave - Coral Mountain (Phase 3 Operations) - Riverside-Salton Sea County, Summer 11.0 Vegetation Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power Load Factor Fuel Type Boilers Equipment Type Number Heat Input/Day Heat Input/Year Boiler Rating Fuel Type User Defined Equipment Equipment Type Number CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:35PMPage22of22 The Wave - Coral Mountain (Phase 3 Operations) - Riverside-Salton Sea County, Summer 1.1 Land Usage Land Uses Size Metric Lot Acreage Floor Surface Area Population Other Asphalt Surfaces 134.02 Acre 134.02 5,837,911.20 0 Hotel 150.00 Room 5.00 217,800.00 0 User Defined Recreational 12.00 User Defined Unit 12.00 522,720.00 0 Apartments Low Rise 104.00 Dwelling Unit 6.50 104,000.00 279 Single Family Housing 496.00 Dwelling Unit 161.04 892,800.00 1419 Regional Shopping Center 60.00 1000sqft 1.38 60,000.00 0 1.2 Other Project Characteristics Urbanization Climate Zone Urban 15 Wind Speed (m/s)Precipitation Freq (Days)2.4 28 1.3 User Entered Comments & Non-Default Data 1.0 Project Characteristics Utility Company Imperial Irrigation District 2026OperationalYear CO2 Intensity lb/MWhr) 1270.9 0.029CH4Intensity lb/MWhr) 0.006N2OIntensity lb/MWhr) The Wave - Coral Mountain (Phase 3 Operations) Riverside-Salton Sea County, Winter CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:34PMPage1of22 The Wave - Coral Mountain (Phase 3 Operations) - Riverside-Salton Sea County, Winter Project Characteristics - Land Use - Total Project area is 319.93 acres. Construction Phase - Operational Run Only. Off-road Equipment - Operational Run Only. Trips and VMT - Operational Run Only. Vehicle Trips - Trip Rate and Trips based on information provided in the Traffic Study0 Woodstoves - Rule 445 Energy Use - The project will design building shells and building components to meet 2019 Title 24 Standards which expects 30% less energy for nonresidential uses and 53% for residential uses Water And Wastewater - For the Wave Pool Facility, CalEEMod default for the Recreational Swimming Pool use was used. Solid Waste - For the Wave Pool Facility, CalEEMod default for the Recreational Swimming Pool use was used. Table Name Column Name Default Value New Value tblEnergyUse LightingElect 810.36 380.87 tblEnergyUse LightingElect 5.44 3.81 tblEnergyUse LightingElect 5.61 3.93 tblEnergyUse LightingElect 1,608.84 756.15 tblEnergyUse T24E 877.14 412.26 tblEnergyUse T24E 6.47 4.53 tblEnergyUse T24E 4.58 3.21 tblEnergyUse T24E 951.67 447.28 tblEnergyUse T24NG 9,544.50 4,485.92 tblEnergyUse T24NG 55.15 38.61 tblEnergyUse T24NG 1.92 1.34 tblEnergyUse T24NG 24,566.15 11,546.09 tblFireplaces NumberGas 83.20 104.00 tblFireplaces NumberGas 396.80 496.00 tblFireplaces NumberNoFireplace 10.40 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:34PMPage2of22 The Wave - Coral Mountain (Phase 3 Operations) - Riverside-Salton Sea County, Winter tblFireplaces NumberNoFireplace 49.60 0.00 tblFireplaces NumberWood 10.40 0.00 tblFireplaces NumberWood 49.60 0.00 tblLandUse LandUseSquareFeet 0.00 522,720.00 tblLandUse LotAcreage 0.00 12.00 tblLandUse Population 297.00 279.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 0.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 0.00 tblSolidWaste SolidWasteGenerationRate 0.00 2,979.50 tblVehicleTrips CC_TTP 0.00 48.00 tblVehicleTrips CNW_TTP 0.00 19.00 tblVehicleTrips CW_TTP 0.00 33.00 tblVehicleTrips DV_TP 11.00 0.00 tblVehicleTrips DV_TP 38.00 0.00 tblVehicleTrips DV_TP 35.00 0.00 tblVehicleTrips DV_TP 11.00 0.00 tblVehicleTrips PB_TP 3.00 86.00 tblVehicleTrips PB_TP 4.00 65.00 tblVehicleTrips PB_TP 11.00 55.00 tblVehicleTrips PB_TP 3.00 89.00 tblVehicleTrips PB_TP 0.00 22.00 tblVehicleTrips PR_TP 86.00 14.00 tblVehicleTrips PR_TP 58.00 35.00 tblVehicleTrips PR_TP 54.00 45.00 tblVehicleTrips PR_TP 86.00 11.00 tblVehicleTrips PR_TP 0.00 78.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:34PMPage3of22 The Wave - Coral Mountain (Phase 3 Operations) - Riverside-Salton Sea County, Winter 2.0 Emissions Summary tblVehicleTrips ST_TR 7.16 8.14 tblVehicleTrips ST_TR 49.97 46.12 tblVehicleTrips ST_TR 9.91 9.54 tblVehicleTrips ST_TR 0.00 9.10 tblVehicleTrips SU_TR 6.07 6.28 tblVehicleTrips SU_TR 25.24 21.10 tblVehicleTrips SU_TR 8.62 8.55 tblVehicleTrips SU_TR 0.00 13.60 tblVehicleTrips WD_TR 6.59 7.32 tblVehicleTrips WD_TR 8.17 7.87 tblVehicleTrips WD_TR 42.70 37.75 tblVehicleTrips WD_TR 9.52 9.44 tblVehicleTrips WD_TR 0.00 50.00 tblWater IndoorWaterUseRate 0.00 30,915,304.25 tblWater OutdoorWaterUseRate 0.00 18,948,089.70 tblWoodstoves NumberCatalytic 5.20 0.00 tblWoodstoves NumberCatalytic 24.80 0.00 tblWoodstoves NumberNoncatalytic 5.20 0.00 tblWoodstoves NumberNoncatalytic 24.80 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:34PMPage4of22 The Wave - Coral Mountain (Phase 3 Operations) - Riverside-Salton Sea County, Winter 2.1 Overall Construction (Maximum Daily Emission) ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year lb/day lb/day 2023 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 2024 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 2025 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Maximum 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Unmitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year lb/day lb/day 2023 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 2024 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 2025 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Maximum 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated Construction CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:34PMPage5of22 The Wave - Coral Mountain (Phase 3 Operations) - Riverside-Salton Sea County, Winter ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:34PMPage6of22 The Wave - Coral Mountain (Phase 3 Operations) - Riverside-Salton Sea County, Winter 2.2 Overall Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Area 57.9222 10.5229 53.7254 0.0662 1.0792 1.0792 1.0792 1.0792 0.0000 12,795.09 17 12,795.09 17 0.3291 0.2329 12,872.73 53 Energy 0.5725 5.0467 3.2125 0.0312 0.3956 0.3956 0.3956 0.3956 6,245.789 6 6,245.789 6 0.1197 0.1145 6,282.905 2 Mobile 8.7580 69.7842 54.7335 0.2323 14.2051 0.1365 14.3416 3.7990 0.1268 3.9259 23,978.61 48 23,978.61 48 2.1187 24,031.58 30 Total 67.2528 85.3538 111.6714 0.3296 14.2051 1.6113 15.8164 3.7990 1.6016 5.4007 0.0000 43,019.49 61 43,019.49 61 2.5675 0.3475 43,187.22 35 Unmitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Area 57.9222 10.5229 53.7254 0.0662 1.0792 1.0792 1.0792 1.0792 0.0000 12,795.09 17 12,795.09 17 0.3291 0.2329 12,872.73 53 Energy 0.5725 5.0467 3.2125 0.0312 0.3956 0.3956 0.3956 0.3956 6,245.789 6 6,245.789 6 0.1197 0.1145 6,282.905 2 Mobile 8.7580 69.7842 54.7335 0.2323 14.2051 0.1365 14.3416 3.7990 0.1268 3.9259 23,978.61 48 23,978.61 48 2.1187 24,031.58 30 Total 67.2528 85.3538 111.6714 0.3296 14.2051 1.6113 15.8164 3.7990 1.6016 5.4007 0.0000 43,019.49 61 43,019.49 61 2.5675 0.3475 43,187.22 35 Mitigated Operational CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:34PMPage7of22 The Wave - Coral Mountain (Phase 3 Operations) - Riverside-Salton Sea County, Winter 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 Demolition Demolition 7/9/2023 1/17/2025 5 400 OffRoad Equipment Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Demolition Concrete/Industrial Saws 0 8.00 81 0.73 Demolition Excavators 0 8.00 158 0.38 Demolition Rubber Tired Dozers 0 8.00 247 0.40 Trips and VMT Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Demolition 0 0.00 0.00 0.00 11.00 5.40 20.00 LD_Mix HDT_Mix HHDT ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Residential Indoor: 0; Residential Outdoor: 0; Non-Residential Indoor: 0; Non-Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating – sqft) Acres of Grading (Site Preparation Phase): 0 Acres of Grading (Grading Phase): 0 Acres of Paving: 134.02 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:34PMPage8of22 The Wave - Coral Mountain (Phase 3 Operations) - Riverside-Salton Sea County, Winter 3.2 Demolition - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Unmitigated Construction Off-Site 3.1 Mitigation Measures Construction CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:34PMPage9of22 The Wave - Coral Mountain (Phase 3 Operations) - Riverside-Salton Sea County, Winter 3.2 Demolition - 2023 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:34PMPage10of22 The Wave - Coral Mountain (Phase 3 Operations) - Riverside-Salton Sea County, Winter 3.2 Demolition - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:34PMPage11of22 The Wave - Coral Mountain (Phase 3 Operations) - Riverside-Salton Sea County, Winter 3.2 Demolition - 2024 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:34PMPage12of22 The Wave - Coral Mountain (Phase 3 Operations) - Riverside-Salton Sea County, Winter 3.2 Demolition - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:34PMPage13of22 The Wave - Coral Mountain (Phase 3 Operations) - Riverside-Salton Sea County, Winter 4.0 Operational Detail - Mobile 3.2 Demolition - 2025 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:34PMPage14of22 The Wave - Coral Mountain (Phase 3 Operations) - Riverside-Salton Sea County, Winter ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Mitigated 8.7580 69.7842 54.7335 0.2323 14.2051 0.1365 14.3416 3.7990 0.1268 3.9259 23,978.61 48 23,978.61 48 2.1187 24,031.58 30 Unmitigated 8.7580 69.7842 54.7335 0.2323 14.2051 0.1365 14.3416 3.7990 0.1268 3.9259 23,978.61 48 23,978.61 48 2.1187 24,031.58 30 4.1 Mitigation Measures Mobile 4.2 Trip Summary Information 4.3 Trip Type Information Average Daily Trip Rate Unmitigated Mitigated Land Use Weekday Saturday Sunday Annual VMT Annual VMT Apartments Low Rise 761.28 846.56 653.12 291,075 291,075 Hotel 1,180.50 1,228.50 892.50 908,864 908,864 Other Asphalt Surfaces 0.00 0.00 0.00 Regional Shopping Center 2,265.00 2,767.20 1266.00 2,121,475 2,121,475 Single Family Housing 4,682.24 4,731.84 4240.80 1,431,888 1,431,888 User Defined Recreational 600.00 109.20 163.20 955,009 955,009 Total 9,489.02 9,683.30 7,215.62 5,708,311 5,708,311 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:34PMPage15of22 The Wave - Coral Mountain (Phase 3 Operations) - Riverside-Salton Sea County, Winter Miles Trip %Trip Purpose % Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C-W H-S or C-C H-O or C-NW Primary Diverted Pass-by Apartments Low Rise 11.00 3.50 4.50 40.20 19.20 40.60 14 0 86 Hotel 12.50 4.20 5.40 19.40 61.60 19.00 35 0 65 Other Asphalt Surfaces 12.50 4.20 5.40 0.00 0.00 0.00 0 0 0 Regional Shopping Center 12.50 4.20 5.40 16.30 64.70 19.00 45 0 55 Single Family Housing 11.00 3.50 4.50 40.20 19.20 40.60 11 0 89 User Defined Recreational 12.50 4.20 5.40 33.00 48.00 19.00 78 0 22 5.0 Energy Detail 5.1 Mitigation Measures Energy 4.4 Fleet Mix Land Use LDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH Apartments Low Rise 0.556393 0.035040 0.189382 0.106465 0.012088 0.004430 0.017405 0.070208 0.001420 0.001115 0.004429 0.000881 0.000745 Hotel 0.556393 0.035040 0.189382 0.106465 0.012088 0.004430 0.017405 0.070208 0.001420 0.001115 0.004429 0.000881 0.000745 Other Asphalt Surfaces 0.556393 0.035040 0.189382 0.106465 0.012088 0.004430 0.017405 0.070208 0.001420 0.001115 0.004429 0.000881 0.000745 Regional Shopping Center 0.556393 0.035040 0.189382 0.106465 0.012088 0.004430 0.017405 0.070208 0.001420 0.001115 0.004429 0.000881 0.000745 Single Family Housing 0.556393 0.035040 0.189382 0.106465 0.012088 0.004430 0.017405 0.070208 0.001420 0.001115 0.004429 0.000881 0.000745 User Defined Recreational 0.556393 0.035040 0.189382 0.106465 0.012088 0.004430 0.017405 0.070208 0.001420 0.001115 0.004429 0.000881 0.000745 Historical Energy Use: N CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:34PMPage16of22 The Wave - Coral Mountain (Phase 3 Operations) - Riverside-Salton Sea County, Winter ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day NaturalGas Mitigated 0.5725 5.0467 3.2125 0.0312 0.3956 0.3956 0.3956 0.3956 6,245.789 6 6,245.789 6 0.1197 0.1145 6,282.905 2 NaturalGas Unmitigated 0.5725 5.0467 3.2125 0.0312 0.3956 0.3956 0.3956 0.3956 6,245.789 6 6,245.789 6 0.1197 0.1145 6,282.905 2 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:34PMPage17of22 The Wave - Coral Mountain (Phase 3 Operations) - Riverside-Salton Sea County, Winter 5.2 Energy by Land Use - NaturalGas NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr lb/day lb/day Apartments Low Rise 2996.32 0.0323 0.2761 0.1175 1.7600e- 003 0.0223 0.0223 0.0223 0.0223 352.5079 352.5079 6.7600e- 003 6.4600e- 003 354.6027 Hotel 25939.1 0.2797 2.5431 2.1362 0.0153 0.1933 0.1933 0.1933 0.1933 3,051.657 1 3,051.657 1 0.0585 0.0560 3,069.791 5 Other Asphalt Surfaces 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Regional Shopping Center 269.589 2.9100e- 003 0.0264 0.0222 1.6000e- 004 2.0100e- 003 2.0100e- 003 2.0100e- 003 2.0100e- 003 31.7164 31.7164 6.1000e- 004 5.8000e- 004 31.9048 Single Family Housing 23884.2 0.2576 2.2011 0.9366 0.0141 0.1780 0.1780 0.1780 0.1780 2,809.908 3 2,809.908 3 0.0539 0.0515 2,826.606 2 User Defined Recreational 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.5725 5.0467 3.2125 0.0312 0.3956 0.3956 0.3956 0.3956 6,245.789 6 6,245.789 6 0.1197 0.1145 6,282.905 2 Unmitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:34PMPage18of22 The Wave - Coral Mountain (Phase 3 Operations) - Riverside-Salton Sea County, Winter 6.1 Mitigation Measures Area 6.0 Area Detail 5.2 Energy by Land Use - NaturalGas NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr lb/day lb/day Apartments Low Rise 2.99632 0.0323 0.2761 0.1175 1.7600e- 003 0.0223 0.0223 0.0223 0.0223 352.5079 352.5079 6.7600e- 003 6.4600e- 003 354.6027 Hotel 25.9391 0.2797 2.5431 2.1362 0.0153 0.1933 0.1933 0.1933 0.1933 3,051.657 1 3,051.657 1 0.0585 0.0560 3,069.791 5 Other Asphalt Surfaces 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Regional Shopping Center 0.269589 2.9100e- 003 0.0264 0.0222 1.6000e- 004 2.0100e- 003 2.0100e- 003 2.0100e- 003 2.0100e- 003 31.7164 31.7164 6.1000e- 004 5.8000e- 004 31.9048 Single Family Housing 23.8842 0.2576 2.2011 0.9366 0.0141 0.1780 0.1780 0.1780 0.1780 2,809.908 3 2,809.908 3 0.0539 0.0515 2,826.606 2 User Defined Recreational 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.5725 5.0467 3.2125 0.0312 0.3956 0.3956 0.3956 0.3956 6,245.789 6 6,245.789 6 0.1197 0.1145 6,282.905 2 Mitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:34PMPage19of22 The Wave - Coral Mountain (Phase 3 Operations) - Riverside-Salton Sea County, Winter ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Mitigated 57.9222 10.5229 53.7254 0.0662 1.0792 1.0792 1.0792 1.0792 0.0000 12,795.09 17 12,795.09 17 0.3291 0.2329 12,872.73 53 Unmitigated 57.9222 10.5229 53.7254 0.0662 1.0792 1.0792 1.0792 1.0792 0.0000 12,795.09 17 12,795.09 17 0.3291 0.2329 12,872.73 53 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory lb/day lb/day Architectural Coating 14.7389 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 40.5304 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hearth 1.1647 9.9529 4.2353 0.0635 0.8047 0.8047 0.8047 0.8047 0.0000 12,705.88 24 12,705.88 24 0.2435 0.2329 12,781.38 71 Landscaping 1.4882 0.5700 49.4901 2.6200e- 003 0.2745 0.2745 0.2745 0.2745 89.2093 89.2093 0.0856 91.3482 Total 57.9222 10.5229 53.7254 0.0662 1.0792 1.0792 1.0792 1.0792 0.0000 12,795.09 17 12,795.09 17 0.3291 0.2329 12,872.73 53 Unmitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:34PMPage20of22 The Wave - Coral Mountain (Phase 3 Operations) - Riverside-Salton Sea County, Winter 8.1 Mitigation Measures Waste 7.1 Mitigation Measures Water 7.0 Water Detail 8.0 Waste Detail 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory lb/day lb/day Architectural Coating 14.7389 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 40.5304 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hearth 1.1647 9.9529 4.2353 0.0635 0.8047 0.8047 0.8047 0.8047 0.0000 12,705.88 24 12,705.88 24 0.2435 0.2329 12,781.38 71 Landscaping 1.4882 0.5700 49.4901 2.6200e- 003 0.2745 0.2745 0.2745 0.2745 89.2093 89.2093 0.0856 91.3482 Total 57.9222 10.5229 53.7254 0.0662 1.0792 1.0792 1.0792 1.0792 0.0000 12,795.09 17 12,795.09 17 0.3291 0.2329 12,872.73 53 Mitigated 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year Horse Power Load Factor Fuel Type 10.0 Stationary Equipment CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:34PMPage21of22 The Wave - Coral Mountain (Phase 3 Operations) - Riverside-Salton Sea County, Winter 11.0 Vegetation Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power Load Factor Fuel Type Boilers Equipment Type Number Heat Input/Day Heat Input/Year Boiler Rating Fuel Type User Defined Equipment Equipment Type Number CalEEMod Version: CalEEMod.2016.3.2 Date: 11/27/2019 12:34PMPage22of22 The Wave - Coral Mountain (Phase 3 Operations) - Riverside-Salton Sea County, Winter