MP2019-0004 CEQA ANALYSIS LTR 1.13.20January 13, 2019
Mr. Garrett Simon
CM Wave Development LLC
2440 Junction Place, Suite 200
Boulder, CO 80301
SUBJECT: CEQA ANALYSIS AND REQUIREMENTS
GENERAL PLAN AMENDMENT 2019-0002
ZONE CHANGE 2019-0004
SPECIFIC PLAN 2019-0003 (AMENDMENT 5 TO SP 03-067)
TENTATIVE TRACT MAP 2019-0005 (TTM 37815)
MASTER PROJECT 2019-0004
Dear Mr. Simon,
Following a telephone conversation with Geri Bone, Chris Butcher, Bill Ihrke and me on
January 8, 2020 and subsequent discussions internally with Cheri Flores, Planning
Manager, and Danny Castro, Design & Development Director, we have prepared the
following analysis to describe the City’s position on the required environmental review
for the above-referenced applications.
California law requires that each Lead Agency, in this case the City of La Quinta,
determine first whether a project is subject to the California Environmental Quality Act
CEQA), and if it is, what level of environmental review the project requires. As you are
aware, the City has determined that the project is subject to CEQA. The level of review
has been discussed on multiple occasions. The following first provides a history of the
project, and then considers the requirements of CEQA as they relate to your project.
Background and Project Status
To provide background, the Andalusia Specific Plan, in which your property occurs, was
approved by the County of Riverside in 1988 as part of the Rancho La Quinta Specific
Plan. At the time of the original County approval, the County also certified an EIR (EIR
232 for SP 218) which included what are now the Trilogy and Andalusia projects. That
project would have resulted in 4,262 residential units, 380 acres of golf course, and 35
acres of commercial development. In 2000, the County approved Amendment #1 to the
Specific Plan, which renamed the project Coral Mountain, reduced the maximum
dwelling units to 2,762, increased golf course lands to 567 acres, and decreased
commercial lands to 23 acres. At that time, the County also processed Addendum #1
to EIR 232, and certified that document. In 2002, the entire Coral Canyon project was
annexed into the City of La Quinta. As part of the annexation process, the City accepted,
as is the norm, the County’s approvals, and agreed to allow development of the Coral
Canyon Specific Plan per County approvals. In 2003, the Andalusia Specific Plan,
consisting of the northerly half of the Coral Mountain Specific Plan, and allowing up to
1,400 residential units, 10 acres of commercial development and 421 acres of golf
course, was separated from the balance of the original County Specific Plan. At that
time, the City adopted Environmental Assessment 2003-483 for the Specific Plan.
At your request, your team met informally with City staff to discuss your development
concepts, resulting in a summary letter prepared by Cheri Flores, dated January 24,
2019. Although not technically a pre-application review, the meeting and letter outlined
likely permit requirements based on the concepts you outlined. As stated in that letter,
and as described above, the applicable existing CEQA document for the Andalusia
Specific Plan is Environmental Assessment 2003-483, certified by the City in December
of 2003. Also as stated in that letter, the City found at the time that either an Addendum
to EA 2003-483, or a Subsequent Mitigated Negative Declaration could be appropriate
for your project. As stated multiple times in that letter, however, the final CEQA
determination would be made when applications were submitted.
On April 7, 2019, at MSA Consultants’ request, a “kick off” meeting was held, including
your design and legal team, and City staff. At that time, I was introduced to you as the
project planner. Although you had yet to file applications, you presented plans which
were discussed in the meeting. During that meeting, there was extensive discussion of
the level of CEQA review that would be required for the project. A number of reasons
were provided to you why an Addendum to the original County EIR was not appropriate.
These are detailed in the analysis below. Both an EIR and a new project Initial Study
leading to a Mitigated Negative Declaration were discussed. It was also discussed that
if the technical analyses for the project demonstrated that impacts associated with the
project could be mitigated to less than significant levels, an Initial Study and Mitigated
Negative Declaration would be the appropriate level of review. At the conclusion of that
meeting, the City team understood that you concurred with this approach, and that you
would analyze, in particular, traffic, air quality and greenhouse gas impacts early to
determine whether the impacts could be mitigated to less than significant levels based
on CEQA thresholds. On October 22, 2019, you submitted applications for a General
Plan Amendment, Change of Zone, Specific Plan Amendment, Tentative Tract Map and
Environmental Assessment Form. Since that time, on multiple occasions, you have
submitted technical studies associated with the project. No Initial Study has been
received to date. You have been provided comments on the traffic impact analysis and
air quality and greenhouse gas analyses. Other technical studies are being reviewed
currently. Your application, determined incomplete on November 12, 2019, remains
incomplete pending receipt or revision of project materials.
CEQA Analysis
First, we wish to address your contention that this project should be reviewed through
an Addendum to County EIR 232. CEQA Guidelines Section 15164 states that a “lead
agency or responsible agency shall prepare an addendum to a previously certified EIR
if some changes or addition are necessary, but none of the conditions described in
Section 15162 calling for the preparation of a subsequent EIR have occurred.”
CEQA Guidelines Section 15162 provide that a subsequent EIR would be required for a
project if any of the following conditions exist:
1. Substantial changes to the project require major revisions to the previously
certified EIR due to the involvement of new significant environmental effects or
a substantial increase in the severity of previously identified effects;
2. Substantial changes occur with respect to the circumstances under which the
project is undertaken that require major revisions to the previously certified EIR
due to the involvement of new significant environmental effects or a substantial
increase in the severity of previously identified effects; or
3. The availability of new information of substantial importance, which was not
known or could not have been known with the exercise of reasonable diligence at
the time the previous EIR was certified, shows that the project will have one or
more significant effects not discussed in the previous EIR, significant effects
previously examined will be substantially more severe than shown in the previous
EIR, or mitigation measures or alternatives that were previously found not to be
feasible or that are considerably different from those analyzed in the previously
certified EIR would substantially reduce one or more significant effects on the
environment, but the project proponent declines to adopt the mitigation measure
or alternative.
Next, we address the changes to the project. The 1988 EIR analyzed a golf course-
centered planned community with 4,262 single family attached and detached units, and
35 acres of commercial development. The currently proposed Specific Plan Amendment
includes 600 units on the east side of Madison Street, 600 units and 150 hotel rooms
on the west side of Madison Street, and a 15-acre surf pool. This represents a
substantial change to the project” which would “require major revisions to the
previously certified EIR due to the involvement of new significant environmental
effects.”
The premise of Section 15162 is that the lead agency finds, based on substantial
evidence in the record, that the project analyzed in an Addendum would have equivalent
or lesser impacts on the environment than that previously analyzed. As described
above, at the time of our meeting in April, and since that time through our review of
the technical studies submitted to date, the project requires the imposition of new
mitigation measures to address project impacts, particularly as regards traffic. By
definition, this means that the project will generate “new significant environmental
effects.” If the environmental impacts associated with your projects were equivalent or
less than those analyzed in EIR 232, no new mitigation measures would be required,
because no new significant effects requiring mitigation would have been identified.
Finally, the EIR certified by the County in 1988 did not address greenhouse gas
emissions, energy impacts, tribal cultural impacts or wildfire impacts at all. It did not
address, to today’s standards, air quality, biological resource, hydrology or water
resource impacts. It did not address land use, planning or housing impacts as related
to the City’s General Plan, since it was prepared for the County. Further, the City’s
physical environment, as well as the regulatory environment under which a project is
reviewed under CEQA have substantially changed since 1988. Therefore, “the
availability of new information of substantial importance, which was not known or could
not have been known with the exercise of reasonable diligence at the time the previous
EIR was certified, shows that the project will have one or more significant effects not
discussed in the previous EIR.”
Similarly, the information contained in EA 2003-483 is outdated, and did not address
greenhouse gas emissions, energy impacts, tribal cultural resources or wildfire impacts
at all. It also analyzed a golf-centered master planned community and not a hotel or
15-acre surf pool. All of these changes and unaddressed environmental issue areas are
part of the CEQA documentation process now, and must be addressed if the City is to
adequately analyze the project under CEQA. Under Section 15164, an “addendum to an
adopted negative declaration may be prepared if only minor technical changes or
additions are necessary or none of the conditions described in Section 15152…have
occurred.”
This analysis was the basis of our discussion with you in April, and the reasons why we
continue to find that an Initial Study leading to a Mitigated Negative Declaration is the
appropriate level of review required for the project, assuming that all impacts of the
project can be reduced to less than significant levels. As we have yet to review the draft
of your Initial Study, and revisions will be required to both your traffic impact analysis
and your air quality analysis, we can only assume that this is the case. I hope that this
letter provides you with the basis to move forward and complete the necessary
documentation to allow the City to continue processing your application.
If you have any questions please contact me at ncriste@terranovaplanning.com, and/or
at (760) 777-7132 or (760) 341-4800.
Sincerely,
Nicole Sauviat Criste
Consulting Planner