2020 Urban Habitat Change Order 03 - SRR Park Venue Project 2016-08t(l U Qaa — GEM ofrbc DESERT — TO: Jon McMillen, City Manager FROM: Leonard St. Sauver, Construction Manage/5 Via: Bryan McKinney, P.E., Public Works Director/City Engineer DATE: February 20, 2020 RE: Contract Change Order No. 3 SilverRock Park Venue Project No. 2016-08 Attached for your signatures is one (1) original Contract Change Order No. 3 between Urban Habitat and the City of La Quinta for the project referenced above. This Contract Change Order allows for the installation or IID conduit not called out on the plan and potholing for the existing 15" irrigation line. Please sign and return the original to the City Clerk for final distribution. REQUESTING DEPARTMENT TO CHECK THE ITEMS BELOW AS APPROPRIATE: x Contract payments will be charged to the construction account number: 401-0000-60188-201608-CT Authority to execute this agreement is based upon: x City Manager's signature authority provided under Resolution No. 2018-014 for budgeted expenditures of $50,000 or less. The following Budget Summary is provided: Project Budget $ 6,000,000 Original Contract Amount ($ 4,218,880) Contract Change Order No. 1 - 2 ($ 14,389) Contract Change Order No. 3 ($ 42,997) Balance Remaining $ 1,723,734 As indicated, adequate funding is available. 78-495 Calle Tampico La Quinta, CA 92253 760.777.7000 ta Q�W — (A[ IFORNIA — Sheet 1 of 3 CONTRACT: SilverRock Park Venue PROJECT NO. 2016-08 CONTRACTOR: Urban Habitat PO Box 1177 La Quinta, CA 92247 CONTRACT CHANGE ORDER NO. 3 ********************************************************************** Pursuant to the terms of the original Contract Agreement, you are hereby directed to make the herein described changes or do the following described work not included in the plans and specifications for this Contract. Unless otherwise stated all work shall conform to the terms, general conditions, and special provisions of the original Contract. ********************************************************************** DESCRIPTION OF CHANGE This Contract Change Order allows for the installation of IID Conduit not called out on the plan: Total $ 40,843.48 This Contract Change Order allows for potholing for the existing 15" irrigation line: Total $ 2,153.02 ********************************************************************** Previous Contract Amount Through CCO #2 Add This Change Order No. 3 Revised Contract Total $ 4,233,268.49 $ 42,996.50 $ 4,276,264.99 By reason of this contract change order the time of completion is adjusted as follows: - 10 - days added to contract time. The revised contract completion date shall be: 4/24/2020 Submitted By: Z<� Date: -20 -&,120 Approved _Date: 2-19 ]2 OI,O JON McMILLEN, City Manager ************************************************************* We, the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, perform all labor, except as may be noted above, and perform all services necessary to complete the above specified work, and hereby accept as full payment the amount shown above, which includes all direct and indirect overhead expenses for any delays. Accepted Contractor Title: dZefi BzftJL-4"- LJgBA, t-Wa zv-Date: Z (to`Zz) CHANGE ORDER PROJECT: CHANGE ORDER NUMBER: 7 SILVERROCK PARK VENUE DATE: 2/6/20 CONTRACTOI;t PROJECT NO.: 2016-08 URBAN HABITAT OWNER: CONTRACT DATE: CITY OF LA QUINTA CONTRACT FOR: Urban Habitat The Contract is changed as follows: Due to not having the final and approved IID plans available at bid time, the following change order is requested: Subcontractor Brudvik, Inc. cost to install their portion of the new plans (not including conduit costs and labor to trench and install conduit) is $10,992.00 Credit returned to City for bid allocated IID pad $5,400.00 Costs are as follows (inclusive of all markup and bonding) Original Bid $ (5,400.00) Subcontractor $ 12,333.02 UH Materials $ 12,373.99 UH Labor $ 19,531.36 ,UH Equipment $ 2,005.11 _ Grand Total $ 40,843.48 Not valid until si ned by the Owner. Architect and Contractor. The original Contract Sum was $ 4,218,879.75 Net change by previously authorized Change orders $ 14,388.74 The Contract Sum prior to this Change order was $ 4,233,268.49 The Contract Sum will be amended by this Change Order in the amount of $ 4,093.11 The new Contract Sum including this Change Order will be $ 4,237,351.60 The Contract Time will be amended by 10 Days The date of Substantial Completion as of the date of this Change Order therefore is N/A Urban Habitat City of La Quinta SUBCONTRACTOR CONTRACTOR OWNER PO Box 1 J 7, La Quinta, CA 92247 Address Address ti BY DATE DATE 6-Feb-20 Address BY DATE AIA Form G701 URBAN HABITAT LANDSCAPE CONTRACTORS Reguest for Change Order City of City of La Quinta Project Name: SilverRock Park Venus Project Number: #201Fr08 This change order modifies and amends the provisions of the contract dated August 22,2019 between The City of la Quinta and Urban Habitat. Urban Habitat is hereby directed to make the following change(s) in the performance of the contract work: 15" irrigation line locator As a result of the change(s) described above, the amount payable for the contractor hereunder is modified as follows: rlpsr_rintinn Date: 1/6/2020 Unit Tyne t3ty Unit Cost Sub Total Labor 2 4 $ 173.361 $ 693.44 Labor Mark up 25% 1 $ 173.36 Equipment 1 1 $ 50.00 $ 50.00 Equipment Mark-up 15% 1 $ 7.50 $ 7.50 Sub -Contractor 1 $" 1,130.00 Sub -Contractor Markup 5%1 1 $ 56.50 2% Bonding increase 2%1 1 $ _ $ 42.22 $ - Contract increase of: Total $ 2,153.02 As a result of the change(s) noted above, the time permitted for the performance of the Subcontract is hereby modified as follows: == (0) days EXCEPT AS SET FORTH ABOVE, ALL TERMS AND PROVISIONS OF THE CONTRACT AND ALL PRIOR CHANGE ORDERS REMAIN IN FULL FORCE AND EFFECT. Execution of this Change Order by both parties constitutes a binding agreement that no adjustment in compensation or time of performance shall be made as a result of the foregoing change(s), except as provided here. ACCEPTED AND AGREED: Urban Habitat City of By: Brett Brennan By: Ubaldo Avon Position: Chief Operations Officer Position: Assist. Public Works Manager Signature: Signature: Date: 12/7/2019 Date: PO Box 1177 La Quinta, CA 92247 l URBAN U HABITAT LANDSCAPE CONTRACTORS Request for Change Order City of City of La Quinta Project Name: SilverRock Park Venus Project Number: #2016-08 This change order modifies and amends the provisions of the contract dated August 22,2019 between The City of la Quinta and Urban Habitat. Urban Habitat is hereby directed to make the following change(s) in the performance of the contract work: 15" irrigation line locator As a result of the change(s) described above, the amount payable for the contractor hereunder is modified as follows: Descri ntion Date: 1 /6/2020 Unit Tvne Qtv Unit Cost Sub Total Labor 2 4 $ 173.36 $ 693.44 Labor Mark up 25% 1 $ 173.36 Equipment 1 1 $ 50.00 $ 50.00 Equipment Mark-up 15% 1 $ 7.50 $ 7.50 Sub -Contractor 1 $ 1,130.00 Sub -Contractor Markup 5%1 1 $ 56.50 2% Bonding increase 1 2%1 1 $ - 1 $ 42.22 $ - Contract increase of: Total $ 2,153.02 As a result of the change(s) noted above, the time permitted for the performance of the Subcontract is hereby modified as follows: == (0) days EXCEPT AS SET FORTH ABOVE, ALL TERMS AND PROVISIONS OF THE CONTRACT AND ALL PRIOR CHANGE ORDERS REMAIN IN FULL FORCE AND EFFECT. Execution of this Change Order by both parties constitutes a binding agreement that no adjustment in compensation or time of performance shall be made as a result of the foregoing change(s), except as provided here. ACCEPTED AND AGREED: Urban Habitat By: Brett Brennan Position: Chief Operations Officer Signature: Date: 12/7/2019 City of By: Ubaldo Ayon Position: Assist. Public Works Manager Signature: Date: PO Box 1177 La Quinta, CA 92247 BELOW SUBSURFACE IMAGING Bill To: Urban Habitat PO Box 1177 La Quinta, CA 92247 14280 Euclid Ave Invoice Chino, CA 91710 Date Invoice # Phone (888) 902-3569 1/15/2020 21990 Fax (909) 606-6555 Project: 19-1659 Ave. 52 Utility Locating Ave. 52 Utility Locating Investigation Ave 52 & Silverrock Way La Quinto, CA 92253 P.O. No. Terms COD Description Service Date Rate Hrs/Qty Amount Locating I Supervising Technician 1/8/2020 180.00 4 720.00 Administration 1/8/2020 95.00 1 95.00 Mobilization I Single Tech 1/8/2020 110.00 2 220.00 Project Coordination 1/8/2020 95.00 1 95.00 Invoices are deemed past due if unpaid within thirty (30) days from date of invoice, and will be subject to a monthly finance charge of 1.5 0 of invoice total for each month unpaid. Total $1,130.00 Payments/Credits $0.00 Please make checks payable to C Below, Inc. Remit Address 14280 Euclid Ave Chino, CA 91710 Balance Due $1,130.00 CHANGE ORDER PROJECT: CHANGE ORDER NUMBER: 7 SILVERROCK PARK VENUE DATE: 2/6/20 CONTRACTOR: PROJECT NO.: 2016.08 URBAN HABITAT OWNER: CONTRACT DATE: CITY OF LA OUINTA CONTRACT FOR: Urban Habitat The Contract is changed as fellows: Due to not having the final and approved IID plans avallable at bid time, the following change order is requested: Subcontractor Brudvik, Inc. cost to install their portion of the new plans (not including conduit costs and labor to trench and install conduit) is $10,992,00 Credit returned to City for bid allocated I I D pad $5,400.00 Costs are as follows (inclusive of all markup and bonding) Original Bid $ (5,400.00) Subcontractor $ 12,333.02 UH Materials $ 12,373.99 UH Labor $ 19,531.36 UH Equipment $ 2,005.11 Grand Total $ 40,843.48 Not valid until signed bv the Owner, Architect and Contractor. The original Contract Sum was Net change by previously authorized Change orders The Contract Sum prior to this Change order was The Contract Sum will be amended by this Change Order in the amount of The new Contract Sum Including this Change Order will be The Contract Time witi be amended by The date of Substantial. Completion as of the date of this Change Order therefore is N/A SUBCONTRACTOR Address BY Urban Habitat CONTRACTOR PO Box 1177, La Quanta, CA 92247 Address DATE 6-Feb-20 $ 4,218,879.75 $ 14,388.74 $ 4,233,269.49 $ 4,083.11 $ 4,237,351.60 10 Days Citv of La Quinta OWNER Address BY DATE AIA Form G701 Materials 700 LF SCH 40 4" Electrical Conduit 70 EA 10' $19.13 $1,339.10 170 LF SCH 40 5" Electrical Conduit 17 EA 10' $26.29 $446.93 160 LF SCH 40 6" Electrical Conduit 16 EA 10' $35.49 $567.84 SCH 40 4" Sweep 20 EA $22.95 $459.00 SCH 40 5" Sweep 2 EA $31.51 $63.02 SCH 40 6" Sweep 6 EA $75.93 $455.58 SCH 40 Coupling 4" 60 EA $2.68 $160.80 SCH 40 Coupling 5" 17 EA $5.32 $90.44 SCH 40 Coupling 6" 16 EA $6.41 $102.56 4" Base Spacers 35 EA $1.49 $52.15 5" Base Spacers 9 EA $1.78 $16.02 6" Base Spacers 12 EA $2.58 $30.96 Duct Plug 6" 6 EA $3.45 $20.70 Primer-1 Gallon 1 EA $57.76 $57.76 Glue -1 Gallon 1 EA $65.22 $65.22 Slurry 75 CU Yds $66.50 $5,120.50 Class II Base 7 CU Yds $16.58 $116.06 DG 10 Yds $34.06 $340.60 Misc. Plants-1 Gallon 10 EA $4.50 $45.00 Misc. Irrigation Repair Misc. $150.00 $150.00 Sub -Total $9,700.24 Tax 8.75% $848.77 Sub -Total $10,549.01 Markup 15% 1 82.35 Sub -Total $12,131.36 Bonding _ 2% $242.63 Grand Total $12,373.99 Labor Operator 35.2 Hours $89.55 $3,152.16 Foreman 47.2 Hours $85.24 $4,023.33 Laborer 47.2 Hours $78.79 $3,718.89 Laborer 47.2 Hours $78.79 $3,718.89 Cement Mason 8 Hours 88.18 $705.44 Sub -Total $15, 318.71 Markup 25°% $3,829.68 Sub -Total $19,148.39 Bonding 2% 382.97 Grand Total $19,531.36 Equipment Mini Excavator 305.5 1 week $1,709.38 Markup 15%_ $256.41 Sub -Total $1,965.79 Bonding 2% $39.32 Grand Total $2,005.11 CED - PALM DESERT 74-866 JONI DR., UNIT C PALM DESERT CA 92260 USA TEL: (760)568-6869 FAX: (760)568-3199 CONTACT: TERRY QUOTE FOR: MISC CHARGE CARD ACCT ACCT: 09-00043 MISC CHARGE CARD ACCT PALM DESERT 5725 74856 JONI DR C PALM DESERT, CA 92260 TEL: IN QTY PRODUCT CODE QUOTATION AGE I QUOTE # PATE REV # REV DATE 1055399 02/04/2020 6 2/05/2020 QUOTE EXPIRES PREPARED BY 03/05/2020 TERRY SLS INSLS 0519 0516 FOB FREIGHT SHIPPING POINT PREPAID :UST PO # 4Y URBAN HABITAT JOB NAME DESCRIPTION PRICE PER EXT AMT 91-----i-0------ -PVC_----G.•C�q___ _— ---SG-YiEDiibE-4fi3--C�ii-Ii`-------- ---------•---------- ---391.33-E—_._- - 1-9-.13-- -.. -02---- 10 PVC- GOND5 CONDU-I =03-_ -- -10-.-.----PVC-•---COND6 --- ----5=11W-1yVC--SCHED=4- i-IOFT - - 65 -- -04--1- - - PVC - EL4X48 SFiEEP-M-90D -3 E - -•-•--- 36. 28 06 ]---pye - EL53C-1-8 R '76.33 07 1 PVC 6" POLY PLUG CONDUIT TEMP CLOSEOFF 3.45 E 3.45 08 1 PVC BASESPCR4X3 4X3-SASE-SPACER 1.49 E 1.49 09 1 PVC BASESPCR5X3 5X3-BLASE -SPACER 1.78 E 1-78 10 1 PVC BASESPCR6X3 6X3-BASE-SPACER 2.58 E 2.58 11 1 PVC CPL4 CONDUIT CPLG 2.68 E 2.68 12 1 PVC CPL5 CONDUIT CPLG 5.32 E 5.32 13 1 PVC CPL6 6-IN-PVC-COND-CPLG 6.41 E 6.41 MDSE: 328.86* TAX: 25.49 TOTAL: 354.35** PLEASE NOTE: This is not an offer to contract, but merely a quotation of current prices for your convenience and information. Orders based on this quotation are subject to your acceptance of the terms and conditions located at sales.our terms.com, which we may change from time to time without prior notice. We make no representation with respect to compliance with job specifications. W aa WHOLESALE ELECTRIC CO. WALTERS - INDIO 42921 MADIO STREET INDIO, CA 92201-1978 760-345-4727 Fax 760-345-4720 QUOTE TO: CASH SALE - INDIO 42921 MADIO STREET INDIO, CA92201-1978 III III I I IIIIi I IIII 1111111111111 Quotation QUOTE DATE QUOTE NUMBER PAGE NO. 02/04/2020 S114975903 1 of 1 CUST PO#: URBAN HABITAT JOB/REL#: QUOTE SHIP TO: CASH SALE - INDIO URBAN HABITAT 42921 MADIO STREET INDIO, CA 92201-1978 CUSTOMER NUMBER CUSTOMER PHONE ORDERED BY SALESPERSON 171479 JAIME HOUSE ACCOUNT WRITER SHIP VIA TERMS EXPIRATION DATE FREIGHT EXEMPT EDGAR RIVAS 49WALTERSCD70 COD 03/05/2020 No 7 - S-d 27 ORDER QTY DESCRIPTION UNIT PRICE EXT PRICE 100ft PVC SCH 40 4" X 10' PIPE 194.532/c 194.53 100ft PVC SCH 40 5" X 10' PIPE 262.879/c 262.88 100ft PVC SCH 40 6" X 10' PIPE 354.924/c 354.92 lea PVCF 41N-36RAD-90DEG-SCH-40-ELL 2294.725/c 22.95 ELBOW lea PVCF 51N-36RAD-90DEG-SCH-40-ELL 31.506/ea 31.51 ELBOW lea PVCF 6-IN-36RAD-90DEG-SCH-40-ELL 7593.213/c 75.93 ELBOW Prices listed on this quotation are subject to change without notice beyond expiration date, include only the equipment listed and do not Subtotal 942.72 include any sales tax unless noted otherwise. Expiration date does Shipping Chgs 0.00 not apply to commodity pricing which may be subject to change after 24 hours. Special order items cannot be cancelled unless the manufacturer permits cancellation. All Walters Terms & Conditions of Amount Due 942.72 Cola ,annlu Cln Fn hftnQ- lhinviirl rnmAA/aIto ma-.i ictnmor-TC.L Prhitad By: RIVEDG on 2/4/2D2D 1:5255 PM EST K4,i-INC, Brudvik, Inc. ECT QCTOR 600 Eugene Road ems, Palm Springs, CA 92264 --T- 7= Phone: (760) 320-4429 Fax: (760) 323-3302 License #482623 To: Urban Habitat Description of Work: CHANGE ORDER REQUEST Date: Attn: Project: Job # COR# 1 /2/2020 LQ Silverrock Park Venue Provide labor and material necessary to install electrical service infrastructure per drawings provided by 11D. Price this Request $10,992.00 Signed: Larry "Bo" Ford_ Accepted: Brudvik, Inc. Date: 1 /2/2020 Date: Price Summary Report La Quinta Silverrock Park Venue Revised III) Work Materials $ 3,433.00 Sales Tax 9.25% $ 317.55 Subtotal $ 3,750.55 Markup 15.00% $ 562.58 $ 4,313.14 Supplier Quotes $ - Sales Tax 9.25% $ - Subtotal $ - Markup 15.00% $ Subcontractor $ - Sales Tax 0.00% $ - Subtotal $ Markup 10.00% $ Rental Equipment $ - Sales Tax 9.25% $ - Subtotal $ - Markup 15.00% $ - Labor Rate Hours $72.87 X 73.33 $ 5,343.56 Markup 25.00% $ 1,335.89 $ 6,679.45 Subtotal $ 10,992.58. Bond $ - $ 10,992.58 Sell Price $ 10,992.00 • Item Name Quantity Price Unit Ext Price Unit Labor Unit Ext Labor Unit 2/0 THHN STIR CU BLK 500R WIRE 20.00 $2.435 $48.700 0.0420 0.840 Pull Line 690.00 $0.015 $10.350 0.0040 2.590 3/8" Pull Rope 690.00 $0.080 $55,200 0.0060 4.140 5 PVC BELL END 2.00 $11,311 $22.622 0.0200 0.040 6 PVC BELL END 6.00 $13.452 $80.712 0.0200 0.120 IID PMH Pad with Covers 1.00 $2,080.000 $2,080.000 12.0000 12.000 Transformer Pad 1.00 $985.000 $985.000 8.0000 8.000 5/8 x 10 Ground Rod 2.00 $18.000 $36.000 1.0000 2.000 Caldweld One -Shot 1.00 $22.000 $22.000 1.2000 1.200 Stub Out Marker 1.00 $54.900 $54.900 0.6000 0.600 UG Marking Tape - Lin Ft 150.00 $0.249 $37.350 0.0120 1.800 Supervision 1.00 $0.000 $0.000 X 40.0000 40.000 3 433.130 73.330 OIdcas#e Infrastructure Page: 1 Contract & Proposal A CRN COMPANY Quote No..........: S234095-3 10650 HEMLOCK AVE Telephone..: 909-428-3700 old castleinfrastructure.com FONTANA, CA 92337 7296 Fax .............: 909-428-3737 Quote To ...: Brudvik Electric Inc 600 S EUGENE RD PALM SPRINGS, CA 92264 1514 R afa ra n r_a Ship To...: LA QUINTA 79153 Ave 52 La Quinta, CA 92253 r,^nf�rf. Rn Order No Date Customer No Terms Cash discount Delivery terms Quote valid for: S234095 12/31/2019 000194 Net 60 Days 2% If paid in 10 Day FOB Job Site 30 days Group: A Qty Unit Item 1.00 Ea 0000001 1.00 Ea 0180310 1.00 Ea E3500233 1.00 Ea 3500590 3.00 Ea E3500585 1.00 $ 9400010 Group: B Qty Unit Item 1.00 Ea 0140250 1.00 $ 9400010 Group: X Qty Unit Item 1.00 Ea 0000001 Description - Mark IID 586-00 PMH PAD w/ 2x3 RPM cover & Panel 9.25x63.25 I ID, Pannel 20.75 x 63.25 IID IID 586-00 PMH Pad 2'X T RPM Cover IID EA Panel 9.25 X 63.25 IID EA Panel of 20.75 X 63.25 IID FOB Jobsite PREVAILING WAGE Description Mark IID 68-08 Pad FOB Jobsite PREVAILING WAGE Descriotion Mark PRICE INCLUDES DELIVERY ON FULL TRUCK LOADS W/ 1 HR OF SET TIME PER DELIVERY. ADDITIONAL STANDBY/CRANE Unit price 2,080.00 A .........a 2,080.00 Unit price Amount 985.00 985.00 Unit price Amount 0 Oldcastle Infrastructure` Contract & Proposal Page: 2 A CRH COMPANY No..........: S234095-3 10650 HEMLOCK AVE Telephone..:909-4283700 oldcastleinfrastructure.com FONTANA, CA 92337 7296 Fax .............: 909-428-3737 Quote To ...: Brudvik Electric Inc Ship To...: LA QUINTA 600 S EUGENE RD 79153 Ave 52 PALM SPRINGS, CA 92264 1514 La Quinta, CA 92253 Reference. Cnntact- RO aM1TMM Order No Date Customer No Terms Cash discount Delivery terms I Quote valid for: S234095 12/31/2019 I 000194 Net 60 Days 2% If paid in 10 Day FOB Job Site 30 days TIME WILL BE BILLED AT $195.00 PER HOUR. NO OBSTRUCTIONS/ OVERHEAD LINES. MUST BE ABLE TO REACH 15' TO THE CENTER OF THE EXCAVATION FROM THE REAR OF THE TRUCK. WE DELIVER RAIN OR SHINE. ALL DELIVERY CANCELLATIONS MUST BE MADE BY 12 NOON ON THE BUSINESS DAY PRIOR TO DELIVERY OR CANCELLATION FEES WILL BE ASSESSED Should this be a prevailing wage project, Oldcastle must be notified immediately as additional costs may be applied to the quotation. All products and services listed on this Quotation are provided under the Standard Terms and Conditions located at: https://oldcastleinfrastructu re. com/customer-support/terms-conditions/material-sales/ IMPORTANT: This proposal is based on standard terms and conditions. Items and quantities shown are the basis forthe quotation, and we are not responsible for any discrepancies between this list and actual items or quantities. (Accepted by) (Position) �uaie/ Sales Person: Tracy Pitts By: Telephone: (909)770-7823 CONTRACTOR NOTES THIS WORK REQUIRES IID UNDERGROUND INSPECTION. FOR THE UNDERGROUND INSPECTiON PROCESS, SEE DETAIL PAGES 7 THRU 11 FROM THE DEVELOPER ENERGY PLANNING GUIDE. ALL EQUIPMENT OR MATERIAL INSTALLED, COVERED, OR ENCLOSED BY THE CONTRACTOR PRIOR TO IID INSPECTION SHALL BE REMOVED OR UNCOVERED FOR INSPECTION, AND REINSTALLED, AT NO EXPENSE TO IID. IID WILL NOT ACCEPT OR ENERGIZE FACILITIES THAT FAIL TO MEET THE REQUIREMENTS OUTLINED IN THE PROCESS. DETAIL PAGES DETAIL PAGES REFER TO THE DEVELOPER ENERGY PLANNING GUIDE (D.E.P.G.) REV. 4.8 2018, IT CAN BE OBTAINED ON THE IID WEBSITE W W W.I Ii3_CQMIENERGYIN EVV-CO NSTRUCTI O N CAUTION_ ENERGIZED STRUCTURES & CABLE DO NOT PERFORM ANY TYPE OF WORK ON OR AROUND ENERGIZED STRUCTURES. A QUALIFIED IID ELECTRICAL WORKER MUST BE PRESENT AT JOB SITE BEFORE ANY CONDUIT OR ANY TYPE OF WORK IS PERFORMED. PLEASE CONTACT IID INSPECTION DESK AT LA QUINTA @:(760) 398-5828 ; IMPERIAL @:(760) 482-3300- INSPECTION SCHEDULES ARE SUBJECT TO A MINIMUM 48 HOUR ADVANCE NOTICE AND ARE BY APPOINTMENT ONLY. UNDERGROUND SERVICE ALERT 1-800-422-4133 CALL USAISC FOR UNDERGROUND LOCATING 2 WORKING DAYS BEFORE YOU DIG ❑ CUSTOMER ❑ DISTRIBUTION SUPERVISOR ❑ OISTRIBUTION ❑ PROJECT MANAGER ❑ INSPECTOR ❑ PROJECT SITE �•.�..� � -tip �.[�-.��+ -ft4j :'�• -.! 44. At LA QUINTA LOCATION MAP NOT TO SCALE OJECT NOTES: 53 AVE 52 QUINTA, CA 92253 AER CONTACT:760-275-2143 NUMBER:LENARD ST.SAUVER ZOJECT MANAGER: TRAVIS MASTON STRIBUTION ESTIMATOR:STEVEN SALADO NOTIFICATION: 4026783 ORDER: 60117602 SHEET 1 OF 2 IMPERIAL IRRIGATION DISTRICT IMPERIAL, CA IMPERIAL VALLEY ENERGY PROJEi CHECKED BY: U.G. DISTRIBUTION CITY OF LA QUINTA LA QUINTA IDATE: r a K co co co N v w z w J_ LL V L I V V A'E"UECOSTOMER TO PROVIDE SWITCH VAULT TOP RING -FOR I(D.TO INSTALL. REFER TO SHBE,SS 179-180, 206-2070F THE RE.P.G. REV. 4.82U18 N� KEN Vs� i 1 Wit] i000A, 3O • 12012OBV CONNECTED LOAD 877.8 A STRUCTURE NOTES: INSTALL 5-4" CND SCHAO PVC PER SHOWN LENGTH. (REFER TO SHEETS 10-11.104-105, 107-110, 112-115 OF THE D.E.P.G. REV. 4.8 2018) INSTALL 2-5" CND SCHAO PVC PER SHOWN LENGTH. (REFER TO SHEETS 10-11,104-105, 107-110, 112-115 OF THE D.E.P.G. REV. 4.8 2018) INSTALL 6 8 CND SCHAO PVC PEP. SHOWI,I^ E.NCTH. (REFER TO SHEETS CU VE DATA TALE p RADIU5 < LENGTH AIENbL-s? TRENCHING NOTES: TYPICAL: CONTRACTOR SHALL INSTALL 2" LINE GUARD TAPE (RED) "CAUTION: BURIED ELECTRIC LINE BELOW." (REFER TO SHEET 115 OF THE D.E P.G. REV. 4.8 2018) TRENCH DETAILS SINGLE SEC.OR SERV.DUOT L�REFERTOSHEET5100S115OFTHED•E.P.G.REV.4.82018 24 M. DUCT CONC_ ENCASED b d REFER TO SHEETS 109 & 115 OF THE D.E.P.G. REV. 4.8 2018 STRUCTURE DETAILS:- PRECAST PAD FOR THREE PHASE TRANSFORMER 45KVA TO 500KVA REFER TO SHEETS 155-156 & 169-170. 196-197, 200.201 OF THE D.E.P.G. REV. 4.8 2D18 ap LARGE: SWITCH PAD REFER TO SHEETS 179.180, 206-207 OF THE D.E.P.G. REV. 4.8 2018 r STUB OUT MARKER DETAIL ^ T REFER TO SHEETS 117 R 118 OF THE D.E.P.G. REV. 4,6 2018 r c! V l IID I�li�(Q 5 SCALE:1:100 T.7, R•7, SECAD