Loading...
2020 Urban Habitat Change Order 06 - SRR Park Venue Project 2016-08 TO: Jon McMillen, City Manager FROM: Ubaldo Ayon, Assistant Construction Manager Via: Bryan McKinney, P.E., Public Works Director/City Engineer DATE: May 27, 2020 RE: Contract Change Order No. 6 SilverRock Park Venue Project No. 2016-08 Attached for your signatures is one (1) original Contract Change Order No. 6 between Urban Habitat and the City of La Quinta for the project referenced above. This Contract Change Order allows for the installation of the restroom building, a new electrical subcontractor, and replacing sod with stolon. Please sign and return the original to the City Clerk for final distribution. The following Budget Summary is provided: Project Budget $ 6,000,000 Original Contract Amount ($ 4,218,880) Contract Change Order No. 1 - 5 ($ 302,437) Contract Change Order No. 6 ($ 321,900) Balance Remaining $ 1,156,783 As indicated, adequate funding is available. REQUESTING DEPARTMENT TO CHECK THE ITEMS BELOW AS APPROPRIATE: _X_ Contract payments will be charged to the construction account number: 401-0000-60188-201608-CT Authority to execute this agreement is based upon: ___ City Manager’s signature authority provided under Resolution No. 2018-014 for budgeted expenditures of $50,000 or less. _X_ City Council approval on May 5, 2020 a a Qw'�(& CALIFORNIA - CONTRACT: SilverRock Park Venue--Stteet-1 of -- PROJECT NO. 2016-08 CONTRACTOR: Urban Habitat PO Box 1177 La Quinta, CA 92247 CONTRACT CHANGE ORDER NO. 6 Pursuant to the terms of the original Contract Agreement, you are hereby directed to make the herein described changes or do the following described work not included in the plans and specifications for this Contract. Unless otherwise stated all work shall conform to the terms, general conditions, and special provisions of the original Contract. i3ESCRTPTJ[0 OF CHONYE This Contract Change Order allows for approval to repair the severely damaged retention basin slope and damaged outlet structure: Total S25—441-04 This Contract Change Order allows for approval to repair irrigation conduit in the parkway along Avenue 52 adjacent to the project site that was discovered to be non-functional: Total S 31.fi70.fli) This Contract Change Order allows for approval for costs incurred for additional potholing needed to locate a well line: Total L--115AOQ This Contract Change Order allows for approval for costs incurred to make modifications to the stage area to add a portion of retaining wall for functionality: Total 1.f 57.00 This Contract Change Order allows for approval for costs incurred to place temporary protection measures on the eroded retention basin slope and to pump water out of the damaged retention basin to place temporary measures.: Total $ 14.fi99.00 This Contract Change Order allows for approval to replace a proposed gravel pave surface with grass pave surface used for fire department access to the site: Total $ 12,279.00 Previous Contract Amount Through CCQ #5 $ 4,521,630.80 Add This Change Order No. 6 $ 321,900.00 Revised Contract Total $ 4,843,530.80 By reason of this contract change order the time of completion is adjusted as follows: - 30 - days added to contract time. The contract completion date shall be: 8/6/2020 Oig'.IN.g— by Bryn Wd nn _ m. cn=8ry mclbnn .'. ou• . y,•�Ji moi1=b—i—y4P.9ui-. gw' v us Submitted Bv- D..: tam 0527 ry:M MoTgu Approved QZ0 We, the gadCrsigned Contractor, have given careful consideration to the change proposed and hereby agree, If this Proposal is approved, that we will provide all equipment, furnish all materials, perform all labor, except as may be noted above, and perform all services necessary to complete the above specified work, and hereby accept as full payment the amount shown abov which includes all direct and indirect overhead expenses for any delays. Accepted By. Title: Contractor: Date: •��. L�-siU