2021 Urban Habitat Change Order 14 - SRR Park Venue Project 2016-08
TO: Jon McMillen, City Manager
FROM: Carley Escarrega, Management Assistant
Via: Bryan McKinney, P.E., Public Works Director/City Engineer
DATE: May 27, 2021
RE: Contract Change Order No. 14
SilverRock Park Venue
Project No. 2016-08
Attached for your signatures is one (1) original Contract Change Order No. 14
between Urban Habitat and the City of La Quinta for the project referenced above.
This Contract Change Order allows for the following: gravel pave repair, grass pave
repair, mainline repair, electrical panel materials and labor, installation of concrete
ramp for Alongi, raising manhole to new design elevation, wall sealer for turfed walls
in amphitheater, and pavers in front of Alongi building.
Please sign and return the original to the City Clerk for final distribution.
The following Budget Summary is provided:
Project Budget
$ 6,321,900
Original Contract Amount
($ 4,218,880)
Contract Change Order No. 1 - 12
($ 1,236,913)
Contract Change Order No. 14
($ 36,275)
Balance Remaining
$ 829,832
REQUESTING DEPARTMENT TO CHECK THE ITEMS BELOW AS APPROPRIATE:
_X_ Contract payments will be charged to the construction account number: 401-0000-60188-201608-CT
Authority to execute this agreement is based upon:
___ City Manager’s signature authority provided under Resolution No. 2018-014 for budgeted expenditures of
$50,000 or less.
_X_ City Council approval on May 18, 2021
Adequate funding is available. The overall project budget is as follows:
Design $ 551,359
Design to be paid by Alongi Budget $ (48,635)
Professional $ 60,000
Construction Manager $ 125,000
Inspection/Testing/Survey/Monitors $ 89,921
Pre-Construction (Mass Grading) $ 88,630
Bidding Costs $ 4,741
Restroom Building $ 106,421
Construction $ 5,065,312
Change Order to be paid by Alongi Budget $ (98,161)
Utility Fees $ 288,021
Contingency $ 89,291
TOTAL $ 6,321,900
+
=1E(;;6&0v8";0vE(3D(v
+
D;$"3v,"$->">v
+
7Cv6)v2"v9D.3>"v
BSOv&^[lgKmv%+KRG\QOMvGjvP_XX^pj!v
6. 29 !3!+*&9,8/29 .+7*94 9 '+*"97#($*9
#'+*+) '+&+ ++ '+
$+ $''+!+# '$'#$+
>ROv^bUQU[GXv &^[lfGKlv<nZvpGjv
3Olv KRG[QOvJrvabOoW^njXrvGnlR^cVuOMv &RG[QOv^bMOiv
>ROv&^[lcGKlv<nZvah^bvl^vlRUjv&RG[QOv^bMObvpGjv
07-9
75+5)9
+*%*9
"(+
>ROv&^[lfGKmv<nZvpUXXv JOvGZO[MOMvJrvlRVjv &SG]QOv6cMOcvU[vlROv GZ^n[lv^Pv
>ROv[Opv&^[lfIKlv<nZvU[KXnMU[QvlRUjv&RG]QOv6fNOcvpVYXvJOv
>ROv&^[lgLmv >UZOvpUXXvJOvGZO[MOMvJrv
AROvMGlOv^Pv<nJjlG[lUGXv&^ZaXOlU^[vGjv^PvlROv MGlOv^PvlRUjv&RG]QOv 6cMOcvlROcOP`cOvUjv
3 "v DfJG[v,GJUlGlv
<D$&63@;"&A6;v &63A;"&?6;v
&,"3+(v6;'(;v3D5(;v
'">(v
8;6/(&?v 46v
&63>;"&>v'"A(v
&63>;"&@v*6; v
9
9
9
9
86v%qvv1Gv9nU[lGv&"v
#MdOjjv
'">(v
9+199
v
v
v
DbJG[v,GJTlGlv
&Ultv^Pv1Gv:nU[lGv
6F3(;v
"MMeOjjv
'">(v
v
v
v
v
v
v'Hskv
City of La Quinta
CITY COUNCIL MEETING: May 18, 2021
STAFF REPORT
AGENDA TITLE: APPROVE CHANGE ORDER NO. 14 TO CONTRACT WITH
URBAN HABITAT FOR THE SILVERROCK PARK VENUE PROJECT NO. 2016-08
FOR ADDITIONAL MISCELLANOUS WORK REQUESTS AND REPAIRS AND
RELATED COMPENSATION
RECOMMENDATION
Approve Change Order No. 14 in the amount of $36,275 to Contract with
Urban Habitat for the SilverRock Park Venue project for additional
miscellaneous work requests and repairs; and authorize the City Manager to
execute the change order.
EXECUTIVE SUMMARY
•On August 6, 2019, a contract was awarded to Urban Habitat
(Contractor) for the construction of the La Quinta SilverRock Park Venue
Project (Project) (Attachment 1) and construction began in September
2019.
•Change Order No. 14 (Attachment 2) includes improvements for repair
of the fire lane paving systems; repair of existing irrigation lines;
additional work request to install concrete and pavers at Alongi building;
and additional work request to raise a storm drain manhole, add an
electrical panel, and seal exposed concrete walls; in the amount of
$36,275.
FISCAL IMPACT
There are sufficient funds in the project budget (Account No. 401-0000-
60188, Project No. 2016-08) for the improvements in the amount of
$36,275.39. The following table shows the projects budgeted revenue
sources:
Budget
Arts in Public Spaces $ 300,000
Measure G Funding $ 1,866,600
Park & Rec DIF Fund $ 2,400,000
Quimby Funding $ 2,000,000
Total Budget: $ 6,566,600
If Change Order No. 14 is approved there will be approximately $174,000
remaining to close the project.
CONSENT CALENDAR ITEM NO. 15
187
The portion of work performed for the Alongi Building will fund from the
associated Alongi Building budget.
The following is a list of all change orders to date:
Total
Contract
Original Contract Amount: $ 4,218,880
Contract Change Order No. 1: $ 5,630
Contract Change Order No. 2: $ 8,759
Contract Change Order No. 3: $ 42,996
Contract Change Order No. 4: $ 35,195
Contract Change Order No. 5: $ 209,856
Contract Change Order No. 6: $ 321,900
Contract Change Order No. 7: $ 3,563
Contract Change Order No. 8: $ (14,695)
Contract Change Order No. 9: $ 98,161
Contract Change Order No. 10: $ 30,345
Contract Change Order No. 11: $ 60,602
Contract Change Order No. 12: $ 44,120
Contract Change Order No. 13: $ 390,481
This Contract Change Order No. 14 $ 36,275
Final Contract Amount: $ 5,492,068
BACKGROUND/ANALYSIS
Proposed Change Order No. 14 is recommended for approval in the amount
of $36,275.39 for the following:
•Gravel Pave repair to add mainline for overflow parking;
•Grass Pave repair to adjust to new elevation;
•Mainline repair to fix break in existing line;
•Electrical panel materials and labor for lake pump;
•Concrete pad for ramp and additional pavers in front for the Alongi
building;
•Raising storm drain manhole to new design elevation;
•Wall sealer to prevent damage to turfed walls at stage.
ALTERNATIVES
Council may elect to not approve the change order or approve only parts of
the change order.
Prepared by: Carley Escarrega, Management Assistant
Approved by: Bryan McKinney, P.E., Public Works Director/City Engineer
Attachments: 1.Project Vicinity Map
2. Change Order No. 14
188
131189