Addendum No. 2ta Qal�fra CALIFORNIA - ADDENDUM NUMBER 2 TO: All Prospective Bidders and Plan Holders FROM: Leonard R. St. Sauver, Construction Manager DATE: July 23, 2019 SUBJECT: Project No. 2016-08, La Quinta SilverRock Park Venue The following shall be considered as incorporated into the project plans and specifications for the above referenced project. Portions of plans and specifications not specifically mentioned in this Addendum remain in force. - PROJECT BID DOCUMENTS Section 1100 Sheet 1100-1, Paragraph 1, replace the following paragraph as shown: As Reads: SEALED BIDS will be received by the City of La Quinta (City) at the Office of the City Clerk located at 78-495 Calle Tampico, La Quinta, California, 92253, until 1:00 P.M. on Thursday, July 25, 2019 at which time they will be publicly opened and read for performing work as follows: Amended to Read SEALED BIDS will be received by the City of La Quinta (City) at the Office of the City Clerk located at 78-495 Calle Tampico, La Quinta, California, 92253, until 10:00 A.M. on Tuesday, July 30, 2019 at which time they will be publicly opened and read for performing work as follows: Section 1110 Sheet 1110-3, Address Label, Line 8, replace the following sentence as shown: As Reads: July 25, 2019 @ 1:00 P.M. ta CCU - (:A[ IFORNIA - Amended to Read July 30, 2019 @ 10:00 A.M. Section 1210 Section 1210 is replaced with the attached Section 1210 dated July 23, 2019. The following modifications are included: • Change Bid Item 34 from "Remove Existing Grinder Pump and Install City Furnished Grinder Pump" to "Furnish and Install Grinder Pump (2 pump system), Electrical Conduit/Lines, Control Panel, 4' Extension, Wet Well, Lateral Kit, Reducers, Couplings, Decorative Rock Cover, and Including All Appurtenances as Needed to Make Function." Change Bid Item 45 from "300 lb. Rock Rip -Rap per Plans" to "75 lb. Rock Rip Rap" i Change Bid Item 49 Unit Type from Square Foot to Lump Sum Section 4000 Sheet 4000-1, Section 4.1 '"Dust Control", the following is added after the second paragraph: The Contractor shall install temporary chain link fence with wind screen to match existing chain link fence and wind screen at existing locations within the project boundaries. The Contractor may coordinate with the Developer of the site to take over the payment and maintenance of the fence at no additional cost to the City and as negotiated directly between the Developer and the Contractor. This cost is considered as included in the cost for Dust Control and no other payments will be allowed therefore. Sheet 4000-2, Section 5.0 "Clearing and Grubbing", the following is added to bullet point 1 under 300-1.1.1.2.b There are several options for sourcing Construction Water, including but not limited to the following: • Water directly from the existing lake located at the northwest section of the property. The Contractor will be required to coordinate with the City to schedule the approximate amount of water and schedule needed to pull the water. The Contractor is responsible to furnish all items needed to source water from the lake including generators and trash pumps. ta Qw�(ev Water from fire hydrant located next to the restaurant on site. The Contractor will be responsible to coordinate with CVWD to place a meter on the fire hydrant including any associated fees. The Contractor will also be required for any piping and trenching needed to source the water. This location is approximately 1,300 feet from the proposed driveway. Water from an existing 6" irrigation main from the golf course irrigation. The Contractor will be responsible to coordinate with the Developer and the City to connect. The Contractor will also be required for any piping and trenching needed to source the water. This location is approximately 2,500 feet from the northeast corner of the improvements. Sheet 4000-13, Section 12.0 "Sewer Improvements", add section 12.4 per the following: 12.4 Grinder Pump The Contractor shall furnish and install a hardwired Grinder Pump (2 pump system), Electrical Conduit/Lines, Control Panel, 4' Extension, Wet Well, Lateral Kit, Reducers, Couplings, Decorative Rock Cover, and Including All Appurtenances as Needed to Make Function. The grinder pump shall conform to model DH152, manufacturer E/One Sewer System; the lateral assembly shall conform to NA033OP02, manufacturer E/One Sewer System; the control panel shall conform to E/One T260, manufacturer E/One Sewer System; and the following specifications: Grinder Pump The grinder pump station shall be a complete unit that includes: two grinder pumps, check valve, HDPE (high density polyethylene) tank, controls, and alarm panel. It shall be ideal for up to four, average single-family homes. • Rated for flows of 3000 gpd (11,356 Ipd) • 150 gallons (568 liters) of capacity • Indoor or outdoor installation • Standard outdoor heights range from 93 inches to 160 inches It shall be "hardwired," or "wired," where a cable connects the motor controls to the level controls through watertight penetrations. Motor: 1 hp, 1,725 rpm, high torque, capacitor start, thermally protected, 120/240V, 60 Hz, 1 phase. Inlet and Discharge Connections shall be modified to match the plans. 4-foot slip on extension will be required to meet invert grade. Duplex Alternating Alarm Panel CALIFORNIA - Shall be designed for use with the grinder pump. Duplex grinder pump stations, a station with two grinder pumps, require the pumping load to be shared equally between the two pumps. Under normal conditions, one pump removes the accumulated sewage from the grinder pump basin. After 24 hours, the Alternating Panel toggles the electrical supply power to the pump that was idle. If the sewage level reaches the alarm level, the two grinder pumps will operate simultaneously for 3 to 4 minutes. If, after that time, the sewage is not below the alarm level, the alarm circuit is engaged. The Alternating Panel shall be supplied with audible and visual high-water level alarms. The panel shall be listed by Underwriters Laboratories, CSA, CE and NSF to ensure high quality and safety. Standard Features: • UL-approved, corrosion -proof enclosure • NEMA 4X-rated enclosure with hinged access panel • Lockable latch with keyed -alike padlock included • Circuit breakers • Terminal blocks & ground lugs • Dry contacts ■ Lead/lag, run and alarm indicator lights Manual push -to -run Buck -Boost Transformer Requirements or as otherwise required by the manufacturer: Single Phase with 208 Line Voltage (Available), 240 Load Voltage (Output), and with Load 5.63 kVA and 23.44 Amps. Set-up and Training The manufacturer shall be present when starting up the pump. The manufacturer shall be available on -site for a demonstration to the City as set up and coordinated by the Contractor. Payment Payment for this item shall be paid for on a lump sum (LS) basis and shall include full compensation in furnishing all labor, materials, tools and equipment as specified by the manufacturer and the Special Provisions, including furnish, installing, excavation, backfill, wiring, conduits, training, and any Appurtenances as Needed to Make Function. No further compensation will be allowed therefore. tC4.1 QUilk& (A[ IFORNIA - Sheet 4000-14, Section 14.0 "Miscellaneous Metal Items", the following is added after the third paragraph: Trash Rack shall be inclined type per Greenbook Standard 361-2. It shall be paid for under the associated headwall. Sheet 4000-14, Section 15.0 "Rip -Rap", replace the third paragraph with the following: As Reads: Payment for 300 lb. Rock Rip -Rap per Plans shall be measured and paid for at the contract price bid per Square Foot and will be a FINAL PAY item as shown on the Bid Schedule and shall include full compensation for all labor, materials, tools, and equipment and for doing all work involved in placing the rip -rap per the plan. Amended to Read Payment for 75 lb. Rock Rip -Rap per Plans shall be measured and paid for at the contract price bid per Square Foot and will be a FINAL PAY item as shown on the Bid Schedule and shall include full compensation for all labor, materials, tools, and equipment and for doing all work involved in placing the rip -rap per the plan. Sheet 4000-27, Section 18.1 "Water Feature General Description", the following is added to the list: 10. 6" PVC Pump Filter Flush/Discharge Line with 6" minimum grouted rip -rap per the plans. Length of pipe is approximately 430 feet. PROJECT PLANS Plan Sheets G5 Modify Water and Sewer Construction Note per the following: As Reads: Install Grinder / Pump Manhole per City of La Quinta (City Supplied) Amended to Read Furnish and Install Grinder / Pump Manhole and Appurtenances Plan Sheet G8 Clarification - The proposed 2-inch force main is ending at the point of connection at Water and Sewer Note 12. No work beyond this point is required. The proposed 8" sewer, proposed grinder pump, and proposed 2" force main shown off the site north of Ahmanson Lane is existing and is not included in the work. ta Qwkta CAI IFORNIA - • Clarifications Q-1. There is no application rate for stolons installation. Please provide number of required bushels per acre and method of stolonizing. Per our supplier, stolons will not be available until next summer and this will exceed allotted time to complete this project. Please advise. A.1 There is no stolonization. Bid Sod as specified with overseed. Q-2. Please provide a clear irrigation booster pump model number. A.Z See the following: IBPCO-25-2-4/PACT-HP 220 GPM 185 PSI 4 INCH System Model Number System Desi n Flow Rate System Design Pressure I System P.i ing Size 75 PSI 208 VAC 3 PHASE 60 Hz Minimum Suction Pressure System Electrical Voltage Svstem Electrical Phase and Fre uencv PACO 1595-9 220 GPM 265 FEET Pump Model Number Pump Capacity (GPM) Pump Total Head (Feet) 25 HP 3500 RPM 63 AMPS @ 208/3 ph Pump Horsepower I Pump RPM j System Full Load Amperage Q-3. What material exactly will the city of La Quinta be providing for the Grinder/sewer pump? A.3 The Contractor shall furnish and supply the grinder pump as specified in this addendum. Q-4. Per bid alternate 2, there is a line item for additional irrigation but there is no any line items for planting items for this area. Please advise. A.4 It will be sod per the base bid. Q-5. There doesn't appear to be a line item value attributable to the 6" irrigation pump filter flush/discharge line identified by construction note #10 on the precise grading plans. Construction of the grouted rip -rap identified by construction note #43 as this rip rap is not considered part of the Rip -Rap identified as part of the storm drainage improvements. Please advise. A.5 These items will be paid for under the Water Feature Bid Item Q-6. Please clarify what would be the method of parking lot area (decomposed granite) striping if any is required. A.6 No striping is required in the DG area. Q-7. There are waste containers shown on the plans but there is no bid item for it. Please clarify. A.7 No waste containers are required for this project. ta Quigra - CAI IFORNIA - Q-8. Per construction plan, sheet L1.9, there are six round planter areas that has no callout or detail. Please provide a detail and pay item for it. A.8 The round planters shown are 6-foot diameter omitted holes in the concrete walk way. The Contractor is hereby notified; Addendum No. 2 must be acknowledged as stipulated under the instructions to Bidders and submitted as part of the Bid. Failure to do so shall result in the City designating said bid as "Non -Responsive." APPROVE Leonard/R. St. Sauver Construction Manager Attachments: 1. Section 1210 dated 7-23-2019 END OF ADDENDUM NUMBER 2 ADDENDUM 02 — JULY 23, 2019 SECTION 1210 BID SCHEDULE PROJECT NO. 2016-08 LA QUINTA SILVERROCK PARK VENUE City of La Quinta 78-495 Calle Tampico La Quinta, CA 92253 To Whom It May Concern: Pursuant to the Invitation to Bid, and in accordance with the provisions therein stated, the undersigned hereby proposes and agrees that on award by the City under this Bid, to execute a Contract, with necessary bonds, to furnish and install any and all labor, materials, transportation and services for City Project No. 2016-08, La Quinta SilverRock Park Venue, in accordance with the plans and specifications therefore adopted and on file with the City within the time hereinafter set forth and at the prices named in this Bid. It is understood that the basis of award shall be the lowest total price of the Base Bid Area plus all Additive Alternates. Unit prices in each and every case represent the true unit price used in preparing the bid schedule totals (Bid Form). Unit prices listed herein include material, installation and appurtenant work as is necessary to have the item complete and in place meeting the full intent of the plans and specifications. We acknowledge that unbalanced unit prices shall be sufficient cause for the rejection of our bid. Bid Schedule 1210-1 ADDENDUM 02 - JULY 23, 2019 BASE BID UNIT PRICE ITEM TOTAL ITEM ITEM DESCRIPTION EST. UNIT (in figures) (in figures) NO. QTY. DOLLARS DOLLARS GENERAL 1 Mobilization 1 LS $ $ 2 Traffic Control 1 LS $ $ 3 Dust Control 1 LS $ $ 4 Storm Water Pollution 1 LS $ $ Prevention Plan (SWPPP) 5 Demolition and Disposal 1 LS j $ $ SITE CONSTRUCTION & AMENITIES Site Improvements 6 Subgrade Preparation and 1 LS $ $ Precise Grading 6a Remove and Replace Soil 82,000 SF $ $ Stabilization Decomposed Stabilized Granite 7 Over Class II Aggregate Base per 69,943 SF $ $ Plan 6" P.C.C. Pavement Over Class II 8 Aggregate Base per Plan 1,788 SF $ $ (Parking) Interlocking Pavers Over Class II 9 Aggregate Base per Plan (Site 9,167 SF $ $ Entrance) Gravel Pave2 with 3/8" Crushed 10 Rock Over Class II Aggregate 4,727 SF $ $ Base with Permaloc per Plan 11 12" Wide P.C.C. Banding Over 346 LF $ $ Class II Aggregate Base per Plan 12 6" Class II Aggregate Base Over 8,775 SF $ $ Compacted Native Soil per Plans 13 6" P.C.C. - See Plan for Width(s) 45,158 SF $ $ 14 6" PCC Hardscape per Landscape 2060 SF $ $ Plans ' 15 2" Thick Stabilized Decomposed 4,794 SF $ $ Granite Trail per Plan 16 6" Concrete Vertical Curb per City 170 LF $ $ of La Quinta Std. 210 17 4" Concrete Rolled Curb per City 114 LF $ $ of La Quinta Std. 203 Bid Schedule 1210-2 ADDENDUM 02 - JULY 23, 2019 UNIT PRICE ITEM TOTAL ITEM ITEM DESCRIPTION EST. UNIT (in figures) (in figures) NO. QTY. DOLLARS DOLLARS Concrete Cross Gutter and 18 Spandrel (Modified with Rolled 806 SF $ $ Curb) per City of La Quinta Std. 230 2' Transition from 4" Rolled Curb 19 Height to 0" Curb Height per 2 EA $ $ Plans 20 Parking Lot Wheel Stops per 7 EA $ $ Plans 21 "Stop Bar" and Legend per 1 EA $ $ Caltrans Std. A24D and A24E 22 Parking Lot Signage and Striping 1 LS $ $ 23 ADA Site Entrance Sign and Stop 1 L $ $ Sin per Plan 36" Wide Truncated Domes per 24 Plans and 2016 CBC 628 $ Requirements 6' CMU Irrigation Equipment 25 Screen Wall per City 46 LF $ $ Freestanding Block Wall Standard Detail - Final Pay Item Water/Sewer/Irrigation Improvements_ 26 6" PVC C-900 Fire Line (Including 876 LF $ $ Bends and Fittings) per Plans 1 1/2" PVC Schedule 40 Water 27 Line (Including Bends and 976 LF $ $ Fittings) per Plans 28 Connect to Existing Domestic 1 LS $ $ Water Meter 6" Fire Hydrant Assembly (Wet 29 Barrel) per CVWD Std. W-33A 2 EA $ $ and Plans 6" PVC C-900 Irrigation Line 30 (Including Reducer, Gate Valves, 2,486 LF $ $ Blind Flange, Tees, Bends and Fittings) per Plans 6" PVC C-900 Irrigation Line 31 Connection to Existing 15" Line 40 LF $ $ per Plans (Including Gate Valves, Flanges) 1/4" PVC Schedule 40 Water Line 32 (Including Bends and Fittings) 194 LF $ $ per Plans Bid Schedule 1210-3 ADDENDUM 02 - JULY 23, 2019 UNIT PRICE ITEM TOTAL ITEM ITEM DESCRIPTION QTY. UNIT (in figures) (in figures) DOLLARS DO DO 6" PVC (SDR-35) Sewer Line 33 (Including Bends, Fittings and 966 LF $ $ Cleanouts to Grade with Cap) per Plans Furnish and Install Grinder Pump (2 pump system), Electrical Conduit/Lines, Control Panel, 4' 34 Extension, Wet Well, Lateral Kit, 1 LS $ $ Reducers, Couplings, Decorative Rock Cover, and Including All Appurtenances as Needed to Make Function. 2" HDP SDR 11 Force Main W/ 35 Metal Identification Tape Placed 468 LF $ $ Over Top of Pipe (4' Cover Min.) per Plans Site S or aina e 6" ABS Drain Line at 1.0% 36 Minimum per Plans- Final Pay 4,766 LF $ $ Item 37 8" HDPE N-12 Storm Drain Line 30 LF $ $ per Plans- FinItem 38 12" HDPE N-12 Storm Drain Line 105 LF $ $ per Plans- Final Pay Item 12" Square Area Drain per NDS- 39 1200 and 1210 as per Plans- 1 EA $ $ Final Pay Item 9" Square Area Drain per NDS- 40 900 and 916 as per Plans- Final 1 EA $ $ Pay Item 24" Inline Drain Basin per 41 Nyloplast 2824AG with Traffic 1 EA $ $ Rated Grate per Plans- Final Pay Item Trench Drain per NDS Part 550 42 and Cast Iron Grate per NDS Part 47 LF $ $ 554 as per Plans- Final Pay Item 43 8" ABS End Caps per Plans 2 EA $ $ 18" ADS Flared End Section 44 Model No. 1810 NP- Final Pay 1 EA $ $ Item 45 75 lb. Rock Rip -Rap per Plans- 350 SF $ $ Final Pay Item Bid Schedule 1210-4 ADDENDUM 02 — JULY 23, 2019 UNIT PRICE ITEM TOTAL ITEM ITEM DESCRIPTION EST. UNIT (in figures) (in figures) NO. QTY. DOLLARS DOLLARS Modify 54" Storm Drain, 46 Construct Headwall, and Place 1/4 1 LS $ $ Ton Grouted Rip -Rap Limits per Plans (Including Trash Rack) Water Feature Furnish and Install Water Feature per Plans and Specifications Including All Appurtenances as Shown on the 47 Plans and as Needed to Make 1 LS $ $ Function. Including but not limited to items listed in Technical Specifications 18.1, crossing structure, and railing. - Specialty Item Site Amenities 48 Restroom Building Utility and 1 LS $ $ Construction Coordination 49 P.C.C. Stage, Stage Apron, Ramp, 1 LS $ $ Railing and Step Slab per Plans 50 Decorative Brick Pavers per Plan 3,944 SF $ $ 51 Stage Retaining Walls per Plans 100 LF $ $ 52 Bike Racks with Concrete Pad per 5 EA $ $ Plans 53 Benches with Concrete Pads per 8 EA $ $ Plans 54 Drinking Fountains with Concrete 2 EA $ $ Pads and Sums per Plans 55 Tubular Steel Fence and Gates 468 LF $ $ per Plan 56 Concrete Mow Curb per Plans 2,200 LF $ $ 57 Permaloc Steel Edging per Plans 41100 LF $ $ Site Electrical and Lighting Pedestal, Conduit (Including 58 Empty Conduit), Wire and 1 LS $ $ Circuiting per Plans 59 Parking Lot Lighting per Plans 20 EA $ $ 60 Pole Lights per Plans 24 EA $ $ Bid Schedule 1210-5 ADDENDUM 02 — JULY 23, 2019 UNIT PRICE ITEM TOTAL ITEM ITEM DESCRIPTION EST. UNIT (in figures) (in figures) NO. QTY. DOLLARS DOLLARS 61 Bollards per Plans 6 EA $ $ 62 Ingrade Uptight with Wide Flood 15 EA $ $ Distribution per Plans 63 Ingrade Uptight with Spot 12 EA $ $ Distribution per Plans 64 Color Changing Tree Uplights per 36 EA $ $ Plans 65 Steplights for Stage Area per 3 EA $ $ Plans 66 Utility Company Service Charges 1 LS $ $ and Transformer Pad per Plans 67 Panel Boards and Panel Board 1 LS $ $ Feeders per Plans 68 Pull Boxes per Plans 1 LS $ $ Landscape and Irrigation 69 Soil Prep and Fine Grade per 1 LS $ $ Plans 70 Weed Abatement per Plans 1 LS $ $ 71 Concrete Vault per Plans 1 LS $ $ 72 Furnish and Install Landscaping 1 LS $ $ per Plans Furnish and Install Irrigation per 73 Plans (Includes Filter, Pump, 1 LS $ $ Concrete Pads and All Fittings) 74 Furnish and Install Boulders per 27 EA $ $ Plan - "Rustic Brown" 75 Furnish and Install 6" Minus Baja 410 SF $ $ Cresta Rubble per Plans 76 Furnish and Install 3/8" Apache 660 SF $ $ Brown Crushed Rock per Plans Furnish and Install 3/8" Minus 77 Desert Gold Crushed Rock per 66,400 SF $ $ Plans 78 90-Day Maintenance Period 1 LS $ $ Total Amount of Bid Items 1 - 78 $ Bid Schedule 1210-6 ADDENDUM 02 — JULY 23, 2019 ADDITIVE ALTERNATIVES: City may approve any, all, or none of the following items BID ALTERNATE 1 - Architectural Metal Screens UNIT PRICE ITEM TOTAL ITEM ITEM DESCRIPTION EST. UNIT (in figures) (in figures) NO. QTY. DOLLARS DOLLARS i METAL SCREEN ADD 1 Metal Screens at Amphitheater 1 LS I $ $ Platform Total Amount of Bid Alternate 1 $ BID ALTERNATE 2 - Additional Terrace Walls UNIT PRICE ITEM TOTAL ITEM ITEM DESCRIPTION EST. UNIT (in figures) (in figures) NO. QTY. DOLLARS DOLLARS TERRACE WALL ADD 1 Additional Terrace Walls per Plans 2 1 Additional Irrigation per Plans BID ALTERNATE 3 - Floatina Fountain 1 LS $ $ 1 LS $ $ Total Amount of Bid Alternate 2 $ UNIT PRICE ITEM TOTAL ITEM ITEM DESCRIPTION EST. UNIT (in figures) (in figures) NO. QTY. DOLLARS DOLLARS FLOATING FOUNTAIN ADD Furnish and Install Floating Fountain and All 1 Appurtenances as Shown on 1 LS $ $ the Plans and as Needed to Make Function Total Amount of Bid Alternate 3 $ Bid Schedule 1210-7 ADDENDUM 02 — JULY 23, 2019 GRAND TOTAL BASE BID PLUS ALL ADDITIVE ALTERNATES (Figures): GRAND TOTAL BASE BID PLUS ALL ADDITIVE ALTERNATES (Words): Bid Amount of each of the above Bid Items must be filled in and completed. It is understood that the quantities shown hereon are but estimates and the bidder is responsible to verify quantities prior to submitting a bid. Final payment will be based upon actual work performed, subject to such adjustments and alterations as elsewhere provided herein. Signature of Bidder (Ink) Name of Bidder (Printed or Typed) Bidder Telephone Number Bidder Email Address Bid Schedule 1210-8