Loading...
2020-08-21 Invoice 061720ALONGI EBENISTERIE ET GC INC 08/21/2020VENDOR: 09089 ALONGI EBENISTERIE ET GC INC CHECK NO: 202629City of La Quinta DATE ID AMOUNTDESCRIPTIONPO #GL ACCT # 6/17/2020 061720 11,760.0006/17/20 - ADA DOOR SRR EVENT BLDG 101-1007-71050 11,760.00CHECK TOTAL ALONGI EBENISTERIE ET GC INC 5110 FAIRWAY LA CHINE, H8T 1B8 ---Eleven Thousand Seven Hundred Sixty Dollars and 00/100 Cents--- 08/21/2020 $11,760.00 CHECK NO: 202629 DATE PAY THIS AMOUNT 78-495 Calle Tampico La Quinta, CA 92253 City of La Quinta BANK OF THE WEST 90-78/1211 PAY TO THE ORDER OF AUTHORIZED SIGNATURE AUTHORIZED SIGNATURE O202629O T121100782T O059731851O 1018-05-09 Rev.l DEMAND / CHECK REQUEST Return check to requestor Mali check Name / Title of person requesting check Angela Ferreira, Management Analyst Department individual is associated with; City Manager's Office @[iOW AUG 1 7 2020 CITY OFLAQUINTA FINANCE DEPT.-A/P Check payable to: Alongi Ebenisterie et CG Inc. fName) (Vendor" No.) 5110 Fairway (Addr^s) , Lachine, Quebec H8T 1B8 Amount: $ 11,760.00 / Account Number: 101-1007-71050 Project Number; 201806-E, PO 1717-0175-R2 Check description and invoice number; ADA Door for SilverRock Event building uaJLI tyipK -h? PO Signature: (Department ^ August 12.2Da) (Datel APPROVED FOR PAYMENT (Finance Department Use Only) BY: ACCOUNT NO. DESCRIPTION Qlongi ebenisterie et CG inc. 51 10 f-airway. Lachine, Quebec H8T 1B8 | T 514. 633.5110 | F 514.633.5199 | www.alongi.com ADA Door / WORK ORDER #4.R3 Client: City Of La Quinta Project: La Quinta Event Unit 78495 C'alle I'ampico Silver Rock , Caiifornia, I'SA La Quinta, ( A 92253 Tel: (760) 777-7030 ADA Door - WORK ORDER #4.R3 Email: jmcmillenidlaquintaca.gov Attn: Mr. Jon McMillen Date; June 17. 2020 Page: 1 of 1 Image Rcf: S" 4'.0" 3'.6 WORK l)KS( RIPTION For the Supply, delivery & Installation of New ADA Door Item#!: Door Frame Modirication * To modify existing cube side to receive the New ADA Door ltem#2: ADA Door * Supply and installation of I new ADA Door ' Sizc:3'-6" Wx8'l! ~ Mad^of aluminum frame and glass, stainless steel handle to match existing double doors. •• Idiminaie the double door and keep existing window Administration & Overhead Fees Terms: 50% Deposit. 40% Progressive, 10% .\t Installation I .S.I). lOTAI. 12% 53.000.00 $7,500.00 $1,260.00 ^ran^p()^t:llit)l1 i,(K AI . i'AXliS TOTAL L.S.D. Dollars 1 INtUDED Not Applicable with Owner's Letter of Capital Improvement $11,760.00 Approved By Date: AInnoi PO int* Pnnfidpntial Wnric OrHorMA Rt Prepared By: