Loading...
2021-23 Bengal Engineering Amendment 11 - Dune Palms Bridge Project 2011-05MEMORANDUM DATE: TO: FROM: RE: Please list the Contracting Party / Vendor Name, type of agreement to be executed, including any change orders or amendments, and the type of services to be provided. Make sure to list any related Project No. and Project Name. ___ ___ ___ Authority to execute this agreement is based upon: Approved by City Council on ___________________________________________ City Manager’s signing authority provided under the City’s Purchasing Polic\ [Resolution No. 2019-021] for budget expenditures of $50,000 or less. Department Director’s or Manager’s signing authority provided under the City’s Purchasing Policy [Resolution No. 2019-021] for budget expenditures of $15,000 and $5,000, respectively, or less. Procurement Method (one must apply): ___ Bid ___ RFP ___ RFQ ___ 3 written informal bids ___ Sole Source ___ Select Source ___ Cooperative Procurement Requesting department shall check and attach the items below as appropriate: ___ Agreement payment will be charged to Account No.: _____________________ ___ Agreement term: Start Date ________________ End Date ________________ ___ Amount of Agreement, Amendment, Change Order, etc.: $____________________ REMINDER: Signing authorities listed above are applicable on the aggregate Agreement amount, not individual Amendments or Change Orders! ___ Insurance certificates as required by the Agreement for Risk Manager approval Approved by: ______________________________ Date: _______________ ___ Bonds (originals)as required by the Agreement (Performance, Payment, etc.) ___ Conflict of Interest Form 700 Statement of Economic Interests from Consultant(s) NOTE: Review the “Form 700 Disclosure for Consultants” guidance to determine if a Form 700 is required pursuant FPPC regulation 18701(2) ___ Business License No. __________________; Expires: __________________ ___ Requisition for a Purchase Order has been prepared (Agreements over $5,000) 6/22/2022 Jon McMillen, City Manager Julie Mignogna, Management Analyst Amendment No. 11 to Agreement with Bengal Engineering for the Dune Palms Road Bridge Project No 2011-05 ✔ ✔ ✔401-60185-111205D ✔7/1/2014 6/30/2023 ✔0 ✔ MR on file in LF; Exp 5/15/23 6/22/2022 ✔LIC-0100872 6/30/2023 ✔ AMENDMENT NO. 11 TO PROFESSIONAL SERVICES AGREEMENT WITH BENGAL ENGINEERING, INC. This Amendment No. 11 to Professional Services Agreement with Bengal Engineering ("Amendment No. 11") is made and entered into as of the 14th day of June 2022 ("Effective Date") by and between the CITY OF LA QUINTA ("City"), a California municipal corporation and Bengal Engineering, Inc., a California corporation (“Consultant”). RECITALS WHEREAS, on or about July 1, 2014, the City and Consultant entered into a Professional Services Agreement to provide those services related to the Dune Palms Road Low Water Crossing Replacement at the Coachella Valley Storm Water Channel, Project No. 2011-05. The term of the Agreement expires on June 30, 2023; and WHEREAS, Amendment 1, executed on or about March 24, 2015, previously amended Scope of Services, and Contract Sum to include additional Utility Pothole, Data Collection, and Noise Modeling work and to remove Section 7 Consultation Work Objective, resulting in a net contract sum decrease in the amount of ($2,233.00); and WHEREAS, Amendment 2, executed on or about December 1, 2015, previously amended Scope of Services and Contract Sum to include additional Cultural and Architectural Survey, resulting in a net contract sum increase in the amount of $7,800.00; and WHEREAS, Amendment 3, executed on or about July 7, 2016, previously amended Scope of Services and Contract Sum to revise the Traffic Technical Memorandum and Noise Study and to prepare and process an Air Quality Report, resulting in a net contract sum increase in the amount of $31,678.00; and WHEREAS, Amendment 4, executed on or about July 13, 2016, previously amended Scope of Services and Contract Sum to include the development of Three Conceptual Grade Control Structure Alternatives, resulting in a net contract sum increase in the amount of $16,100.00; and WHEREAS, Amendment 5 executed on or about June 13, 2016, previously amended Scope of Services and Contract Sum to include additional Hydrology and Hydraulic Study to address concerns expressed by the Coachella Valley Water District, resulting in a net contract sum increase in the amount of $19,900.00; and WHEREAS, Amendment 6, executed on or about October 27, 2016, previously amended Scope of Services and Contract Sum to include an Extended Archeological Phase I Work Plan (XP1) as directed by Caltrans Environmental, resulting in a net contract sum increase in the amount of $9,583.00; and WHEREAS, Amendment 7, executed on or about April 20, 2017, previously amended Scope of Services and Contract Sum to include the Field Work for the Extended Archeological Phase I Work Plan required by Caltrans, resulting in a net contract sum increase in the amount of $96,449.00; and WHEREAS, Amendment 8 executed on or about October 16, 2018 previously amended Scope of Services, Contract Sum, and Agreement Term to include additional engineering services related to Coachella Valley Water District Equilibrium Slope and Scour Determination, Environmental Permitting, Right of Way Acquisition, and preparation of Water, Sewer and Landscape Plans; and WHEREAS, on or about April 28, 2020, the City and Contracting Party executed Amendment 9 to amend the Scope of Services to include additional engineering services related to design accommodations for connector trails and artistic CV Link Project components, design of CVWD access accommodations and additional project management, resulting in a net contract sum increase in the amount of $53,310.00; and WHEREAS, on or about June 28, 2021, the City and Contracting Party executed Amendment No. 10 to amend section 3.4 Term of the Agreement to extend the contract term through June 30, 2023 (“Extended Term”); and WHEREAS, the City and Contracting Party mutually agree to amend the Scope of Services to include Constructability Review in Phase III and shift $8,000 in funding from Phase I and II to Phase III Constructability Review Task as identified in Exhibit B, attached hereto and made a part heretof. NOW THEREFORE, in consideration of the mutual covenant herein contained, the parties agree as follows: AMENDMENT In consideration of the foregoing Recitals and the covenants and promises hereinafter contained, and for good and valuable consideration, the sufficiency and receipt of which are hereby acknowledged, the parties hereto agree as follows: 1. Section 1.1 – Scope of Services is amended to read as follows: For the services rendered pursuant to this Agreement, Consultant shall provide additional services outlined in Exhibit “A”, attached hereto and made a part hereof. 2. Section 2.1 – Contract Sum is amended to read as follows: For the Services rendered pursuant to this Agreement, Consultant shall be compensated in accordance with “Exhibit B” (the “Schedule of Compensation”) in a total amount up to but shall not exceed One Million Four Hundred Ninety-Nine Thousand Two Hundred and Forty Three Dollars ($1,499,243) (the “Contract Sum”) for the life of the Agreement encompassing initial terms and Amendments 1 through 11, except as provided in Section 1.6. Exhibit B –Budget is amended as attached in “Exhibit B”, attached hereto and made apart hereof. In all other respects, the Original Agreement shall remain in effect. Exhibit A Scope of Services Consultant will provide constructability review on a time and materials basis as requested by City Staff. Exhibit B Budget The following represents the contract total of One Million, Four Hundred Ninety-Nine Thousand, Two Hundred Forty-Three Dollars ($1,499,243.00) after the consideration of Amendments 1 through 11. Base Contract Amount: $ 1,176,781.00 Amendment No. 1: ($2,233.00) Amendment No. 2: $7,800.00 Amendment No. 3: $31,678.00 Amendment No. 4: $16,100.00 Amendment No. 5: $19,900.00 Amendment No. 6: $9,583.00 Amendment No. 7: $ 96,449.00 Amendment No. 8: $89,875.00 Amendment No. 9: $53,310.00 Amendment No. 10: Amendment No. 11: 0 Contract Total: $ 1,499,243.00