Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
0211-108 (CSCS) Title 24
A Title 24 Energy Compliance Documentation Prepared for: PK Architects Project Title: EMASSY SUITES La Quinta, CA 41 "ics COP4 q-to 21 I CITY OF LA QUINTA BUILDING & SAFETY DEPT. APPROVED FOR CONSTRUCTION z r.ze-�>[ =,0J7z S DATE 6:2;,�-, SY ' 7&- 77 7 fa*a PLZA ``ewe %st.( Sul f e s �� I 10308 Placer Little, Suite 200, Sacramento, CA 95827 • 916-364-1786 • FAX 916-364-1789 TITLE 24 REPORT Title 24 Report for: Embassy Suites La Quinta, CA Project Designer: PK Architects 1620 North 48th Street #102 Phoenix, AZ 85008 (602) 283-1620 Report Prepared By: i Gregory Mize Valley Energy Consultants 10308 Placer Lane, Suite #200 Sacramento, CA 95827-2511 (916) 364-1786 Job Number: 21036R Date: 4/2/2003 The EnergyPro computer program has been used to perform the calculations summarized in this compliance report_ This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2001 Building Energy Efficiency Standards. ^j This program developed by EnergySoft, LLC (415) 883-5900. EnergyPro 3.1 By EnergySoft Job Number: 21036R User Number: 2531 1 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 1 of 3 PERF-1 PROJ Embassy Suites DATE 4/2/2003 •'UJlzGI AUUKtby I La Quinta I PFt4 UPAUUEl I NER �.P TELEPHONE Building Permit # PK Architects (602) 283-1620 N. AUTHOR TELEPHONE ° Checked by/Date Valley Energy Consultants (916) 364-1786 Enforcement Agency Use GENERAUNFORVATION s .0Nti a as v * DN ;IBUILDING TYPE NONRESIDENTIAL HIGH RISE RESIDENTIAL HASE OF CONSTRUCTION, NEW CONSTRUCTION ADDITION ALTERATION HOTEL/MOTEL GUEST ROOM ICI EXISTING+ADDITION ^� This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, farts 1 and 6, of the State Building Code. This certificate applies only to Building use rformance compliance approach. FOCL1UENT"UWA-U111O SIP I Gregory Mize The Principal Designers hereby certify that the proposed b ildin, for this permit application are consistent with all other farm and �permit application. The proposed building as designed meets 24, Part 6. ENV. LTG. MECH. A b) 1 WbrkVh LLs,ylpecifications, and other calculations submitted with this e energy efficiency requirements of the State Building Code, Title E, F—' 1. 1 hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am licensed as a civil engineer, mechanical engineer, electrical engineer or architect. 2. 1 affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code Section 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor preparing documents for work that I have contracted to perform. 3. 1 affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document because it pertains to a structure or type of work described as exempt pusuant to Business and Professions Code Sections 5537, 5538, and 6737.1. (These sections of the Business and Professions Code ae printed in full in the Nonresidential Manual.) N Indi ate location 6o CPns of Note Block for Mandatory Measur s I E -1 'PMK;1P E JZWER7- NAME - C. ❑. b +T PK Architects�f� Indicate location on plans of Note Block for Mand I Indicate location on plans of Note Block for Mandatory Measures Require�?Crms ,MECH-1, MECH-2, MECH-3 PRINCIPAL MECHANICAL DESIGN ER • NAME I —mw LIC. ISLO. DATE NP Mechanical, Inc. f. Run Initiation Time: 04f02103 15:25:58 Run Code: 1049325958 EnergyPro 3.1 By EnergySoft User Number: 2531 Job Number: 21036R Page:2 of 58 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 2 of 3 PERF-11 DATE Embassy Suites 4/2/2003 4NUAL SC513RCE ENERGY USE SUMMARY to sq -yr Standard Proposed Compliance ENERGY COMPONENT Design Design Margin 12 standard Proposed Space Heating 3. 9 1.75 1.441 Space Cooling 33.98 40.5-6.53"�� Indoor Fans 26.87 24.80 2.06 nd00 F"u. Heat Rejection 15.8 0.00 15.8' Pumps & Misc. 12.08 26.55 -14.47 Domestic Hot Water 39.90 36.24 3.66 Lighting 28.43 26.26 2.17 Receptacle 14.17 14.17 0.001` Process 1,45 1.45 0.00 0 10 20 30 40 TOTALS: 175.89 171.73 4.16 kBtu/sgh-yr -NERAL INFORMATION Building Orientation (South) 180 deg Conditioned Floor Area 129,020 sqft- Number of Stories 8 Unconditioned Floor Area o sqft. Number of Systems 172 Conditioned Footprint Area 49,047 sqft. Number of Zones 46 Orientation Gross Area Glazing Area Glazing Ratio Front Elevation �(South 14,097 sqft. F]3,739 sqft. 26.5% Left Elevation (Westll 8,858 sqft 772 sqft. 8.7% Rear Elevation (North 15,165.sgft. 3,044 sqft. 20.1% Right Elevation (East y' 9,667 sqft. 1,182 sqft. 12.2% Total 47,787 sgft. 8,737 sqft. Roof 18,181 sqft. 1,600 sgft. 8.8% Standard Proposed Lighting Power Density 1.267 w/sgft. 1.171 wisgft_ Prescriptive Env. Heat Loss 13,339 &12,4' 0Prescriptive Env. Heat Gain 1245,739 ,676 MUA-1 & MAU-2 as well as EF-6, 7 & 8 are process load only and are except from T24. I Smoke evacuation supply & exhaust are except also. The Cabana are is not a considered a conditioned space therefore FC-3 w/ CU-3 is not included 1f1 the energy compliance. r t,n Initiation Time: 4 02 03 15:25:58 Run ode: 1049325958 EnergyPro 3.1 By Energy oft User Number: 2531 Job Number: 21,0AR Page:3 of 58 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 3 of 3 PERF-1 ]PROJECT NAME DATE Embassy Suites 4/2/2003 System Name Zone Name Occupancy Type Floor Area (sgft.) Inst. Port. 1 Ctrl. LPD LPD Credits (W/sf)1 (W/sf)1 (W/sf)2 ai ore Proc: "1Pi] Loads (W/sf)3 (W/sf) HP-0.5 Storage Hotel Function Area 256 0.367 0.000 Electrical Electrical & Mechanical 357 1.22 0.000 HP-1 Retail Retail/Wholesale Sales 252 j 1.4921 0.000 2.500 Ther. 1 & 6 Office 311 1.929 0.000 2.500 Electrical/Mechanical Electrical & Mechanical 5851 1.179 0.000 Maintenance Hotel Function Area 210 1.790 0.000 HP-1.25 Library Library - Stacks 267 1.62 0.000 HP-1.5 Ther. 2-5 Office 1 783 1.91 0.000 2.500 PBX Hotel Function Area 108 2.611• 0.000 HP-2 Support Areas Corridor/Restroom/Support 1,637 1.414 0.000 justification and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted. i Plan I Field The HVAC System "Carrier 50TF0005" includes an Economizer. This system has a cooling output < 75,000 btuh or a supply cfm < 4500. The Hot Water Pump includes a Variable Speed Drive. The Cooling Tower "EVAPCO 1TW276C" includes a Two Speed Fan. The Cooling Tower "EVAPCO 1TW276C" has an Approach Temperature of 10 degrees F. i The exceptional features listed in this performance approach application have specifically been reviewed. Adequate written justification and documentation for their use have been provided by the applicant_ Authorized Signature or Stamp n InrtiatLon I ime: EnergyPro 3.1 By EnergySoft User Number: 2531 Job Number: 21036R PageA of 58 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 3 of 3 PERF-1 PROJECT NAME DATE Embassy Suites 4/2/2003 System Name Zone Name Occupancy Type Floor Area (sgft.) Inst. LPD (W/sf)1 Port. Ctrl. I hored Proc. LPD Credits Loads (W/sf)1 (W/sf)2 (W/sf)3 (W/sf) HP-3.5 Employee Break Room Dining Area 1 291 1.615 0.000 Linen/Storage Hotel Function Area 402 1.403 0.000 Restrooms Corridor/Restroom/Support 950 1.023 0.000 Lockers/Sitting Locker & Dressing Room 425 1.304 0.000 HP4 Offices Office 531 1.416 0.000 Sales Area Retail/Wholesale Sales 1,198 1.242 0.000 Support Areas Corridor/Restroom/Support 687 1.400 0.000 justification and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted.. Plan Field The exceptional features listed in this performance approach application have specifically been reviewed. Adequate written justification and documentation for their use have been provided by the applicant. Authorized Signature or Stamp n Time: EnergyPro 3.1 By EnergySoft User Number: 2531 n Gocle: l U4USZbUbd Job Number: 21036R Page:5 of 58 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 3 of 3 PERF-1 �PFi QJ E NAM E= DATE 4_ Embassy Suites 4/2/2003 System Name Zone Name Occupancy Type Floor Area (sqft.) Inst. LPD (W/sf)1 Port. Ctrl, ad ore Proc. LPD Credits D Loads (W/sf)1 (Wfsf)2 (W/sq3 (W/sf) RTU-4 Inner Corridors All Floors Corridor/Restroom/Support 8,687 0.951 0.000 RTU-10 Atrium Mall/Arcade/Atrium 4,488 0.000 0.000 RTU-12.5 Ballrooms/Conference Convention/Conference 5,586 1.786 0.000 HP-1 (Guests) Guest Rooms Hotel/Motel Guest Room 30,453 0.500' 0.000 HP-2 (Guests) Guest Rooms Hotel/Motel Guest Room 33,113 0.500 0.000 HP-3 (Guests) Guest Rooms Hotel/Motel Guest Room 5,956 0.500 0.000 1 i Notes: 1. See LTG-1 (items marked with asterisk, see LTG-2 by others) 2. See LTG-3 3. See L1 G-4 + "— --- ' doeumenlalion e local enforcement agency should pay special attention fo the items specified in this checklist. These items require special written justification and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted. EPqn I Field The exceptional features listed in this performance approach application have specifically been reviewed. Adequate written justification and documentation for their use have been provided by the applicant. Authorized Signature or Stamp Run initiation Time: 04/02/03 15:25:58 Run Code: 1049325958 EnergyPro 3.1 By EnergySoft User Number: 2531 Job Number: 21036R Page:6 of 58 ENVELOPE COMPLIANCE SUMMARY Performance ENV-1 PROJECT NAME Embassy Suites DATE 4/2/2003 # Surface Type Framing Type Area U.-Fac. Act. Azm. Solar Gains Tilt YIN Form 3 Reference Location / Comments 1 Wall Metal 287 0.075 . 0 9D X 1" EIFS w/ R19 Mtl Ther. 1 & 6 2 Wall Wt-aT 136 0.075 270 90 X1 1" EIFS wl R19 Mtl Ther. 1 & 6 3 Wall Metal 168 0 075 94 9i� 74 , X� 1 E1FS wl 19 Mtl 1 F w 1u1ti lectrio1 ec aniea ectnca ec anical 4 al eta 86 ❑ar a al X Hollow �hetalDoor DeFtricaliMechanica! 6 Metal R1 9 Milectrica 1" EIFS wl R1.9 Mtl ec anica 7 al[ Meta � _ r K. Maintenance FWaf Metal X '-1 -E1F5 Wr 1-TTA Maintenance -Wall-rWall Metal 5 1 0.075 D X "'�11=y-WTF8,5'ly her-2-5 1 " ECFS'wIR1-91A or - 1 a Y+Iletal T7 75 0 X 1""l'FS wCR1uf1 Support .eas 2 Doar e a Support Areas -C3 Wan Metal . 75 1 So 0 x � 7Ri-91 upport Areas W Will e. 0-- L reas 5 all 16 ; a Meta[ eta 210 0,075 9 go }(! FS-W PM'9Support f" EIFS wIRf9Nf Areas ..uppcAreas -T71 nor eta [ X' o ow NFefa oor Support Areas 8 al vne 0-55 S47 X 12" Concrete a swl RI-RI uppo reas -- 19 1wall IMetal Support " a ca ' .I redC BomX Site Assembled Glazing heck box Building s - 100.000 sq to FA and - 10,000 sq vertical glazing then IVF erti ication Is required. -J Follow NFRC 1010SS Procedures and submit NFRC Label Certificate Form. # Type Area ju-Fac. Act. Azm. SHGC Glazing Type Location 1 Comments 1 Window lit 0.610 0.36 Double MU Tinted LowF her. 1 & 6 2 Window 0.610 270 J0.36 Double 1vIH Tinted Low I r in ow .95 -6-6'Ol 0 0.36. Double Mtl Tinted LowE Terr Y-5 Window 75 0.610 270 0.36 Double Mtl Tinted LowE 5 !Window 26 1.230 270 082 Single Clear Default (NM) pport Areas fi Window 35 0.610 1 270 0.36 Double Mtl Tinted Loin o6b[eslReception 7 Window 2 0.620 270 0.39 1Double Mil inted�wL obbiesl..Reception 8 Window 20 0.720. 0 1 0.60 Double Mtl Tinted Default[Exercise Room 9 Window 0. 0.870 270 0.59 1You- 6 TMt17inteci default 13oardro4ms 10 Window 100 1.190 270 0.82 Ingle Clear 17efaulti (iJM.} obby 2 11 Window 60 1.230.. 270 0.82 ing e-Clear De{aulf� MJ vbby 2 12 Window 30 1.250 0 0.82 Single Clear Default (NM) mployee Break Room 13 Window 1 128 0.720 1 180 1 0,139. Double Mtl Tinted Default ff+ces 14 Window 1 128 1.190 1 180 0-82 1 Single Clear Default (NM) ales Area 15 Window 54 0. 20 � },50 eu6ie Mtl Tlnied Default p by Areas # Exterior Shade Type SHGC Window Hgt. Wd. Overhang Left Fin e�Ext�. E-X-t. i3tst. Len. H§f Right in ❑ist. Len�igt. 1 None 0.76 2 None 0.76 3 None .76 4 None 0.76 5 None 0.76 1 6.7 .6.10 2D.0 0A 20:0 20.0 6. None 0.76 7.0 5.0. 1 16.0 0.1 16.0 1&6 Nane 0,76 7A 6.0 16.0 0.1 16.0 16.0 8 None 0.76 6.7 3.0 7.0 4.0 7.0 T: 9 one. 0.76 6.7 3.0 7,0 4.O 7.0 7.0 10 None 0.76 10.0 10.0 14.0 0.1 14.0 14.0 11 None 1 0.75 10.0 6,0 14.0 0.1 14,0 14.0 I one a.76 5.0 6 Z 110 0.1 1.0 1.0 1.3 (iarie 0.76 8.0 16,0 14.0 0.6 14.0 14.0 14 None. 0.76 8.0 16.0 14.0 .S 14.0 14.0 15 one 0.76 8.0 0.8 1 8.0% 0.6 8.0 8.D Run Initiation Time: 04/02103 15:25:58 Run Code: 1049325958 EnergyPro 3.1 By EnergySoft User Number: 2531 Job Number: 21036R Page:7 of 58 ENVELOPE COMPLIANCE SUMMARY PROJECT NAME Embassy Suites Performance ENV-1 DATE 4/2/2003 # 21 j Surface Framing Act. Type Type Area U-Fac.Azm. 'Wall INone 140 0.552 1 270 1 Solar Gains Tilt YIN Form 3 Reference Location I Comments 90 1 X 12" Concrete Wall Break Room 22 'Wall Metal 98 1 0.075 270 1 90 X 1" EIFS wl R19 Mtl Staging/Storage Areas 23 Door Metal 21 0.5 1 270 90 jXjj I Hollow Metal Door Staging/Storage Areas 24 Door etal 42 0.581 1 270 90 JX]j I Hollow Metal Door taging forage Areas a eta Xi BRIO Mtl -LobbiesiReceprion 2 Wa eta _jM 90 JXJI 11" EIFz;-w7R19 Mtl i=xerci.se Room 27 Wall etal 6 D. 1 90 X 1 ' EIFS w Mtl boardrooms a e a 0.075 . 27 90 X w/ o moms all eta 99 0.075 X 1" .. 1 w Lobby 2 one X oncre e a 1 mp. oyes Break NQDm ' all one 45 0.55 X 1 1 Con crete all inen/Storage Concrete al #2estrooms a one 0 X Vial eta 98_TD75 270 X w t �Restrooms a e a - X$ w t Restrooms A etaetal 84 L).Ulb 1 90 X 1" I w tl Restrooms Wal l one X .Concrete.'VJI F�estroom� 37 a eta 9 X �IRT9 t estrooms Door Metal 0.581 1 225 90 X Hollow Metal Door Restrooms 9 Wall Metal 1 270 90 X 1" E w R19 Mtl IRestrooms -4 a eta 1 9U IX w 1 t oc ers i ling FENE9=ION SURFACES Site Assembled Glazing Check box if Building is >= 100,000 sgtt of i:f A and >= IUMOU sqR verticai glazing then NFRC; erurtcanon is requires. Follow NFRC 100-SB Procedures and submit NFRC Label Certificate Form. # Type Area Ili-Fac. Act. Azm. SHGC Glazing Type Location I Comments 1%Nin�dow 248 0.720 90 .60 Double Mtl Tinted Default n y Areas "7 48 0.850 90 .59 Double Mtl Tinted De ault obby Areas 0fin 204 0.720 90 0. D Double Mtl Tinted Default obby Areas 19 'Window 48 1 0.850 90 0. 9 Double Mtl Tinted Default Lob y Areas 20 Window 182 1 0.720 180 0.60 Double Mtl Tinted Default Vobby Areas 21 'Win ow 196 1 0.720 180 D Double Mtl Tinted Default _obby Areas 22 mdow 84 0.720 180 0.60 Double Mtl Tinted Default ILobby Areas 23 Window 44 0.720 180-0.60 Double Mtl Tinted Default -obby Areas 24 Window 48 0.850 18 0.59 Double Mtl Tinted Default -obby Areas 25 +Window 48 0.610 180---- 0.3 Double Mtl Tinted LowE Lobby Areas 26 Window 48 0.620 180 0.39 Double Mtl Tinted LowE _obby Areas 27 Window 64 0.610 180 0.36 Double Mtl Tinted LowE obby Areas 28T. Window 48 0. 20 180 0.39 Double Mtl Tinted LowE Lobby Areas Z ✓Window 36 F0.610 180 D. ouble Mtl Tinted LowE obby Areas Window 1.196 180 U.82 Single C ear Default ffices Areas EXTEMOR SHADING # Exterior Shade Type SHGC Window Hgt. Wd. Overhang Left Fin l Right Fin Dist. Len. H t. Dist. Len. H t. Len. Hgt. xt. 16 None 0.76 8.0 31.0 14.0 0.6 14.0 14.0 17 None 0.76 8.0 6.0 14.0 0.6 14.0 14.0 18 None 0.76 8.0 25.5 4.0 0.6 4.0 4.0 19 None 0.76 8.0 6.0 4.0 0.6 4.0 4.0 20 None 0.76 8.0 2.8 4.0 0.6 4.0 4.0 21 None 6.76 7.0 28.0 4.0 1.5 4.0 4.0 22 None 0.7 8.0 10. 6.0 1.8 6.0 6.0 23 one 0.76 8.0 5.5 12.5 0.6 12.5 i T.5 24 None 0.76 8.0 6.T 12.5 0.6 12-.T 12.5 25 one 0.76 8:D 6.0 20.0 5.0 270-20.0 26 None 0.76 8.0 6.0 20.0 5.0 20.0 20.0 27 None 0.76 8.0 8.0 14.0 0.6 14.0 14.0 28 None 0.76 8.0 6.0 20.0 5.0 0. 20.0 72None 0.76 3.0 12.0 20.0 2.0 .0 0.0 30 None 0.76 8.0 8.0 14.0 0.6 14.0 4.0 Run Initiation Iime: 04/UZ/D3 15:Z5:58 stun code: i049625vou EnergyPro 3.1 By EnergySoft User Number: 2531 Job Number: 21036R Page:8 of 58 ENVELOPE COMPLIANCE SUMMARY Performance ENV-1 PROJECT NAME DATE Embassy Suites 4/2/2003 # Surface Type Framing Type l ` Area .tf-Fac. Act. Azm. Solar Gains Tilt y/N Form 3 Reference Location / Comments 41 ;Wall Metal 243 0.075 180 90 Y. 1" EIFS wl R19 Mtl Offices 42 Wall Metal 91 0. 75 90 X 1" EIFS wl R19 Mt1 Sales Area 43 Wall None 257 0.364 1 p x 18" CMU Garage V%r.all Sales Area 44 all eta 35 90 ?{ 1" EIFS w1 R19 Mtt ales Area 4 al a as 1 92 lx I EIFS w -M a -up orage 4 Donr [Metal liltx� Hollow Meta! Door et-upTStarage 47 all Vetal 252 ❑. x _ �' E1F5 wl R19 tl le�atar CnhTy 49 al Wail Metal X iFEIFS�RIVJ t `Lob y Areas eta 8 1 .075 " x 1" EIFS w1"Fi b"�Ilt 1" EiFS wFRT9 NT ❑ y reas j( y reas �Vlall Meta 1 0.075 7 x' 1" EiFS� I fs nb y Areas 52 I a e X -1 ETI �'w721�5Ta1# y reas -53 wall Metal 368 0.075 180 1 9 X1 1{"-ETFS w711 Mtl Lobby Areas a eta X wTRfi9�I R1Z3 Mu Lobby Areas iT V17a1 eta 35 0.075 90 ces reas: VTa a 'f"EFwTR1'9'+III +OfficessAreas S �s8'oor 6 a Roo 1 one 1 eta ee€al' e a $ 1 �f9 .5 .0 � (f x x X 72'"'C5ncreta 1Nafi Laundry & Storage. Hollow Metal Door I Unary & Storage IV'I9 R' oal-wi Rigi Insulation Guest FZopm Corridors " s w t U ogm tim ors Site Assembled Glazing n uneck boxit buming Is 7= IUU,UUU sgrt of U-H ano - -I u.Uuu sqr[ verucal glazing wen n4r-mL. l-. rt cauvn is TuquiF uci. Follow NFRC 100-SB Procedures and submit NFRC Label Certificate Form. # Type Area IU-Fac. Act. Azm. SHGC I Glazing Type Location / Comments 31 'Window 12$ 1 1.190 180 1 0.82 S ngle Clear Default (NM) Offices Areas # I Exterior Shade Type 31 1 None 32 1 None 33 None 34 1 None one one one one one one "IUU U.ulu `du 25 0.610 22' 14 1 0.610 122` 10 0.870 1 9U _ 5 870 180 Window SHGC Hgt. Wd. 0.76 8.0 16.0 0.76 0.76 0.76 7.0 2.0 0.76 7.0 3.0 0.76 0.76 0.76 U.3`U I UUUDIe IVI❑ 1 InieU LOWC 0.39 Double MtI TintedI-owrz 0.36 1 Double Mtl Tinted LowE ouble Mtl Tinted Default ouble Mtl Tinted Default ouble Mtl Tinted Default ouble Mtl Tinted Default ouble Mtl Tinted Default uvernang .en. Hgt. LExt.REx 12.0 0.6 12.0 12. 5.5 0.1 5.5 5.! 5.5 0.1 5.5 5.! JUCSI RUUIiI UUIIIUUIb Same Room Same Room Same Room nner Corridors AI F of nner Corridors Ail Flo( atrium 3uest Rooms west Rooms west Left Fin s n Run Initiation Time: 04102J03 15.,25:58 Run Code: 104932b958 EnergyPro 3.1 By EnergySoft User Number: 2531 Job Number: 21036R Page:9 of 7 [ENVELOPE COMPLIANCE SUMMARY Performance ENV-1 PROJECT NAME Embassy Suites DATE 4/2/2003 Surface Framing # Type I Type Area U-Fac. I Act. Azm. Solar Gains Tilt Y/N Form 3 Reference Location / Comments 61 Roof `Metal 274 0.033. 0 0 X R19 Roaf w/ Rigid Insulation Vending 62 Wall Metal 216 10.075 ' 0 _ 90 )C 1" EIFS w/ R19 Mtl lVanding t13 Wall Metal 54 0.075 90 90 X 11' EI S w R19 mil IVending M-et-aF 77 0.075 "5 9 x 1 i'rElFs w tl Game Room 5 Wail a a' 75 X iFSwR Game. ao Im a e .07 .05 1 EfF9 w7 Ri 9 inner ❑rridars11 Floars Wall a �lv�eta e a 33-`0�7 .075 90 0 9 X X �C" 1 I R 9 tl E[FS w7R Inner.Comdors AI loars nner Corridors A oors 9 oar metal _7 4 5 70 0 x ❑ low M.e{al•156or We Corridors All s oa Metal U� 033 X TRoa0Tw7 Rigid lnsu ahon num 71 Vti1a ]-Metal n7'5 0 X 1 wl 9_itq at rooms on erence �LToar eta 3$ T X ❑ ow e. a Ivor a rams Conference 73 a wl�etal 312 0.075 0 90 X 1 w 1 0 lanilroams on erence 74-We-11'l e a 99 :U7 X' ETF Wi. K19 uestt Roams 75 I efa 7L8 n 0 . 0 9 x 1 ETFS W"i -W uest Rooms etaetal X rEfFR1'j M11 touest Roams 'T Metal d 0 X i ETFS w7R'1'TMt Guest Rooms 7 all Tt"'V, eta zS i 75 X "IFS w? R-19 t Guest Rooms all ali jll�efaT� a r- '72 -f-.rl 0. 75 [f7a .. X f6-E1r5 wTl 1g Mu Guest Rooms T�E7FS wTR�9 t uest Roams Site Assembled Glazing Check box it Bullding is >= 1 UU,U{]U sgtt 01 Gl-A ana >= lu,uuu sqn verncai.glazing men txr-Kti. �'ernncauon is requuuu. Follow NFRC 100-SB Procedures and submit NFRC Label Certificate Form. # Type Area IU-Fac. Act. Azm. I SHGC Glazing Type Location / Comments 44 endow 125 0.870 270 0.59 Double Mtl Tinted Default Guest Rooms 47 Window 225 D.870 D 0.59 Double tl Tinted e au t Guest Rooms F Wndow 100 0.870 9U 0.59 Double MtI Tinted -Default Guest Rooms •49 Window 250 0.870 180 0.59 Double Mtl Tinted Default Guest Rooms 50 Window 125 0.870 27 0.59 Double Mtl Tinted Default Rooms 51 'Win ow 75 0-850 0 0.59 Double Mtl Tinte e au t r-uestest ooms 52'Win ow 120 0.870 0 0.59 Double Mtl Tinte efault est Rooms 53 'Window 180 0.850 45 0.59 Double MtI Tinted Default Guest Rooms 54 Window 125 0.870 45 0.59 Double Mtl Tinted Default Guest Rooms 55 Win ow 210 0.855 22 0.59 Dou e Tinte efau t Puest Rooms 56 i bw 125 0.T7 225 0.59 D-ou-S-le-M-3 Tinted Defau t Guest Rooms 57 Window 75 8-50 0 0.59 Double Mtl Tinted Default Fuest Rooms 58 'Window 120 0.870 0 0.59 Double Mtf Tinted Default Guest Rooms 59 ndow 18D 0.850 45 .5 ou le Mtl Tinted Default Guest Rooms 60 Window 5 0.870 1 45 0.59Double Mtl Tinted Default Puest Rooms # Exterior Shade Type None SHGC In ow Hgt. Wd. Overhang Len. Hgt. LExt.Rl< t. Dist. Left Fin Hat. Right Fin Dist. Len. Hgt. 46 0.76 47 None 0.76 48 None 0.76 49 None 0.76 50 None 0.76 51 None 0.76 7.0 6.0 5.0 0.1 _5_.0 5. 52 None 0.76 53 None 0-76 7.0 6.0 5.0 0.1 5.0 5.0 54 None 0-76 55 None 0.76 7.0 6.0 5.0 0.1 5.0 5.0 56 None 0.76 None 0.76 7.0 6.0 5.0 0.1 5.0 5.0 t None 0.76None 0.76 6.0 5.0 0.1 5.0 5.0 60 None 0.76 Kun Initiation time: u4iuEau.s-lo:co:5ts Kun cone: iu4s6t5s68 EnergyPro 3.1 By EnergySoft User Number: 2531 Job Number: 21036R Page:10 of 58 ENVELOPE COMPLIANCE SUMMARY Performance ENV-1 PROJECT NAME DATE Embassy Suites 4/2/2003 # I Surface Type Framing Type Area u-Fac. Act. Azm_ Solar Gains Tilt YIN Form 3 Reference Location I Comments 81 pNall Metal 685 0X75 270 90 IX 1' E1FS wl R19 Mtl Guest Rooms 82 ]Root Meta! 1,421 0.033 0 0 X R19 RciDf w1 Rigld Insulation Guest Rooms 83 lWall Metal 900 0.075 0 90 X 1 EIF w 19 mti Guest Rooms Wall e a 11043 A75 x. I I EIFS W1 9 MtI uest ooms Wall e a i', 0—Q7 X FS WRI-9 Guest Rooms Ball e 1,25 .075 X 1 w Guest Rooms 87 all et1171 a� 3.27 �7 X _'F F 7 F fi3 Guest ooms a �T" `O Q w nest ooms 8 Wa a Metal 63 7 11W X 1 I w t best Roams 7[[efa7 i77 w -Guest ooms 1 WaII eta 1 2�7 al e a .015- fl ?(fLIFS wGuest Rooms 93 Wail eta 90 X 1" EI w 1--Guest Rooms Wall eta IMetal 77 315 4 __W56 X W1 Rig wi Guest Roarris 95 Wall 5` 3 22 X 1" EIFS w 1 t Guest Rooms Wall �iet�— X W.1 R19 Guest Rooms War Metal 171 75 7 X EtFSiK19 t uest Rooms $ a V e 7_ �b 75 0:075 7 315 0 ]( 1 w 1 best Rooms gH Wall e 0 90 X f-ETF5�19_9 Guest ooms a e. a X w 19�4tT uest RoomsfFrENESTRATION SURFACES Site Assembled Glazing Check box if Building is — 100,000 sgtt Dt UFA and- i 0,000 sglt vertical glazing then NFKi Uertiticat,nn is required. Follow NFRC 100-59 Procedures and submit NFRC Label Certificate Form. # Type jArea Eu-Fac. Act. A. SHGC Glazing Type Location I Comments 61 Window 1 210 0.850 1 225 Double Mtl Tinted Default Suest Rooms ENVELOPE COMPLIANCE SUMMARY Performance ENV-1 ROJECT NAME Embassy Suites DATE 4/2/2003 # Surface Type Framing Type Area U-Fac. Act. Azm. Solar Gains Tilt y/N Form 3 Reference Location / Comments Guest Rooms Guest'Ropms 101 Wall Metal 389 0.075 90 90 X11 11"Ell'SwIR19W 102Wa[I-Metal 369 6.075 135 90 X 1" EIFS wl R19 MD 103 Wall Metal 565 0.075 225 90 X 1" ElF wl R1 tl Guest Rooms W4 a[ eta 71 n-7 7 9 X 1" EIFS w 1 9 Mfi uest oomq a e a90 [X w/ K1 9 Md Uuest Koorns TO v efa ,7 3 0.0 3 1 0 X R1 na w gi nsu ation uest ooms 1�7 all e a 4 75 9 X 1" 1=1 wJ R19MU nest ooms Wai etaetal 775. X rET[ S w t Guest Rooms 109 wall Imelal 389 0175 90 so X1 11" EiFSwlR119 t[ Guest Rooms lfil0 W5TF 1 eta 5 X11 I r EIFS wGuest Rooms a l etal 1 1 .075 19 9U X 1" EIFS wl R19 Mtl nest Rooms ues. ooms uest Raams 2iLN_ap Wa I eta etal 5 i 0. 22 OATS 2T 9#X11'- 1 "�fFS�R1J T7l [' iF wl R1 Mt f4 a I Iuv�l T6�1]�] 1_ 0i �E1F5 w�R�9�� uest ooms 'I1 Roof Meta 679 3 t3 X R19 Ro�Rlgi Insulailon -,Guest opens 1Ti ail e a X f_Ell S wr Wl SI tt! ues cams 17 a etaT__ SN J_Uf b 90 90X"-El w Guest 'ooms 118 a Meta 72 .0.5 9 X 1" tF w.. 1 t uest Dams 119 a etal 9 0.075 1$0 X 1"EiFS wi Ri9i nest .00ms i QWall _ Metal 1 1 9 J Xj 1" Ll -6wIR19W Guestoams Site Assembled Glazing Gheck qpX iT oullding 3s >= 1 UD,UUU sgtt of LA -A and >= 10,000 sgtt vertical glazing then NF-KL. Uertgivatson is required. Follow NFRC 100-SB Procedures and submit NFRC Label Certificate Form. # Type Area IU-Fac. Act. Azm_. SHGC Glazing Type Location / Comments 76 Window 210 1 0.850 225 0.59 Double Utl Tinted Default guest ooms 77 Window 125 0.870 225 0.59 Double Mtl Tinted Default guest Rooms Window 25 0.870 0.59 Double MU Tinted Default ;uest ooms Wffindow 25 D.870 90 0.59 Double Mtl7inted Default guest Rooms 80 'endow 50 0.870 180 0.59 Dou le Mil Tinted Default Suest Rooms 81 Window 21 D.850 135 D.59Double Mtl Tinte3 Default Suest Rooms 8 'Window 50 0.8 0 18D .59 Double Mtl inted Default west Rooms 83 Window 21 0.850 135 0.59 Double Mtl Tinted Default 3uest Rooms 84 Window 21 j 0.850 135 0.59 Double Mtl Tinted Default west Rooms 85 Window 42 0.850 180 Double Mtl Tinted Default west Rooms 8 Window 50- 0. 7 1 0.59 ouble Mtl Tinted Default west Rooms 87 Window 42 0.850 225 0.59 Double Mtl Tinted Default west Rooms 88 Window 21 0.850 135 0.59 Double Mtl Tinted Default rSuest Rooms 89 'Window 42 0.850 18D 0.59 Double Mtl Tinted Default ISuest Rooms Window 50 0.870 180 0.59 Double Mtl Tinted Default Cuest Rooms [EXTERIOR SHADING ## Exterior Shade Type None SHGC Window Hgt. Wd. Overhang aI Left Fin -t Cen. 14ST Rig t Fin i Dist. Len. H t. Len. Hgf. xt. xt. 76 0.76 7.0 6.0 5.0 0.1 5.0 5.0 77 None 0.76 78 None 0.76 j 79 None 0.76 80 None 0.76 81 None 0.76 7.0 6.0 5.0 0.1 5.0 5.0 82 None .7 83 one 0. 6 7.0 6.0 5.0 0.1 5.0 5.0 84 None 0.76 7.0 3.0 5.0 0.1 5.0 5.0 85 None 0.76 7.0 6. 5.0 0.1 5.0 5.0 86 None 0.76 7 None 0.76 7.0 6.0 1 5.0 0.1 5.0 5.0 88 None 0.76 1 7.0 3.0 5.0 5.0 89 one 0-76 7.0 6.0 5:D 0. 5.0 5.0 90 None D. -1 Run Initiation Time: 04/02/03 15:25:58 Run Code: 1049325958 1 1 EnergyPro 3.1 By EnergySoft User Number: 2531 Job Number: 21036R Page:12 of 58 1 ENVELOPE COMPLIANCE SUMMARY PROJECT NAME Performance ENV-1 DATE 4/2/2003 _ - 1 # Surface Framing Type Type Area U-Fac. Act. Azm. Solar Gains Tilt YIN Form 3 Reference Location I Comments 121 Wall IMetal 90 0.075 1 225 90 X T EIFS w/ R19. MU Guest Roams 1oV71! Meta 324 0,075 270 90 X 11" EIFSw! R19 Mtl Guest Rooms 1231Na11 eta 22 0.075 a 90 X 1" EIFS w� 09 Mil Guest Rooms 1 Wa-1Fr615 22 .07. X ETF��w 9 Mtl Guest ohms e 3 X w R-% . # Guestooms .�/��• L91VV �al1�l' , eta. U.075 x 1 I w R19 Mt Guest ooms 127�11 all eta#24. 0.075 0] D �] Xl 1 w 113Iu1 Guest Rooms a ea XI w 9Tv1tl Guest Rooms 129 wall eta0,075 15 X 1" rtlTfl Guest Reams a eta. 87 0—.07 x w 1 IGuest Rooms 131 mall Metal OLO75 225 1 9 Xf rrElFSw1 1 IGuest Rooms 132 e 32 -07 Xi �w oomsa st 133i as Metal 'IDS 0 9 D 0 X 1319 Roo ul Ouest Rooms a e 2` D.07 .675 D x R'f3Tvlt Guest Roams 135 wail eta 1 X 1" S wn{T9 A7! Guest ooms 3b Wall lMetal1'87 0; 9Zi wl R19 FMA u. esfRooms 3 2 e a 0= - ... X w ' : "t nest ooms al Elea 324 0.0 5 7 K 1' wl K19 Mtl Guest ovens I I I FENE5TKA11014 SURFACES Site Assembled Glazing Utleck box tS l3UIlding is >= 1UU,UUu sgtt ur UrH ana �=-lu,uuu sq.n verucal yia4iriy UIVH [4r-M%,.. l V1 611U&11u11 IJ IUHU11UU. �i 1:1 Follow NFRC 100-5B Procedures and submit NFRC Label Certificate Form. # Type Area 0-Fac.1 Act. Azm. SH.GC Glazing Type Location I Comments 91 intlow 42 0:850 225 0.59 Double Mtl Tinted Default uest Rooms ., [EXTERIOR SRADING # Exterior Shade Type �SHGC Window Hgt. Wd. Overhang Let Rn Right Fin en. gt: Ext. xt. Dist. Len. gt. Dist. en. gt- 91 None 0.76 7.0 6.0 5.0 0.1 5.0 5.0 i � 1 i Run Initiation Time: 04/02/83 15:25:58 Run Code: 1049325958 EnergyPro 3.1 By EnergySoft User Number: 2531 Job Number: 21036R Page:13 of 58 LIGHTING COMPLIANCE SUMMARY Part 1 of 2 LTG-1 PROJECT NAME Embassy Suites DATE 4/2/2003 LAMPS BALLASTS Luminaire +Ballast Code LUMINAIRE DESCRIPTION TYPE DESCRIPTION # Watts Lamp DESCRIPTION # (Lamp # Watts Total Watts 10 (3) 4 ft Fluorescent T8 Elec F32T8 3 32 Electronic 2. 78 94.0 7,332 11 (2) 13w Compact Fluorescent Twin 2 Pin 17,FT13W/GX23 2 1 Magnetic Standard 2. 4 34.0 136 12 j;3) 4 ft Fluorescent T8 Elec 1-32T8 3 32 Electronic 2.0 1241 94.0 11,656 13 90w Recessed Incandescent 90W 1 96 No Ballast 192 90.0 17,280 14 .250w Surface Mount Incandescent 250W 1 250 No Ballast 30 250.0 7,500 15 (1) 4 ft FluorescentT8,(Tandem) Elec F32T8 1 32 Electronic 0. 104 31.0 .3,224 16 75w Recessed Incandescent 75W 1 75 No Ballast 28 75.0 2,100 17 (2) 2 ft U-Tube T8 Elec 1331T8 2 32 Electronic 1. 24 62.0 1,488 18 (2) 8 ft Fluorescent T8 Slimline Inst. Start Elec 96T8 2 60 Electronic 1. 61 115.0 690 6 (2) 4 ft Fluorescent T8 Elec F32T8 2 32 Electronic 1. 6 62.0 372 8 (2) 13w Compact Fluorescent Twin 2 Pin CFT13W/GX23 2 13, Magnetic Standard 2. 420 34.0 14,280 9 (2) 13w Compact Fluorescent Twin 2 Pin 3W/GX23 2 13 Magnetic Standard 2. 106 34.0 3,604 Lighting Schedule on Plans Shows Exterior Lighting Subtotal from this Page L 69,662 Meets Total 69,662 Portable Lighting (From LTG-1) L____� Efficacy and Control Requirement of§130(c) 01 Less Control Credit Watts (From LTG-3) Control Requirements of§131(f) Adjusted Actual Watts 69,662 CONTROL LOCATION (Room #) CONTROL IDENTIFICATION CONTROL TYPE (Auto Time Switch, Exterior, etc.) SPACE CONTROLLED NOTE TO FIELD LL OUT VIA, " 6" Lo _ LD , V1 A CONTROL LOCATION (Room # or Dwg. #) CONTROL IDENTIFICATION CONTROL TYPE (Occupant, Daylight, Dimming, etc.) LUMINAIRES CONTROLLED NOTE TO FIELD IYPE i # OF EUMIN KES - For Building Department Use Only f Run Initiation Time: 04/02/03 15:25:58 Run Code:/049325958 1 EnergyPro 3.1 By EnergySoft User Number: 2531 Job Number: 21036R Page:14 of 58 1 LIGHTING COMPLIANCE SUMMARY Part 2 of 2 LTG-1 PROJECT NAME DATE 4/2/2003 Embassy Suites ABLE >25 LA] rc-i 0 fKUUMIA OR ZONE ID ---DEFAULT (W/sgft) -- ��REA (SF) (B X C) 0 0 TOTAL I ABLE 1 - PORI ABLE LIGRIIN6J k-UROFFIGE AREA' >L 1 l i � B LJ D LUMIN. TASK # OF TOTAL TOTAL ROOM # PORTABLE LIGHTING # OF WATTS PER AREA TASK AREA (SF) WATTS OR ZONE ID Description FIXT. FIXTURE (SF) AREAS (D x E) (C x E) I tiLt V - PLANS SHUVV PUKI ABLE LlUtl 1 ING IS NO I KEQUIUK Ut-t-IUL AREAS > LbU SQUARE Designer needs to provide detailed documentation that the ligt level provided by the overhead lighting meets the needs of the space. The details include luminaire types, CU, and mounting locations relative to work areas. IUTALAKLA(Sr) IUTALVVAIIJ BUILDING SUMMARY (FROM TABLES 1A+1B+1C) (FROM TABLES 1A+1B) BUILDING TOTAL' I EnergyPro 3.1 By EnergySoft User Number: 2531 Job Number: 21036R Page:15 of 58 1 iCERTIFICATE OF COMPLIANCE Performance MECH-1I PROJECT —NAME� ,- DATE Embassy Suites 4/2/2003 r SYSTEM NAME Cooling Tower TIME CONTROL n/a SETBACK CONTROL n/a ISOLATION ZONES n/a HEAT PUMP THERMOSTAT? n/a ELECTRIC HEAT? n/a FAN CONTROL n/a VAV MINIMUM POSITION CONTROL? n/a SIMULTANEOUS HEAT/COOL? n/a HEATING SUPPLY RESET n/a COOLING SUPPLY RESET Fixed -Temp HEAT REJECTION CONTROL Two -Speed -Fan VENTILATION n/a OUTDOOR DAMPER CONTROL n/a ECONOMIZER TYPE n/a DESIGN O.A. CFM (MECH-3, COLUMN 11 n/a HEATING EQUIPMENT TYPE n/a '1EATING EQUIPMENT EFFICIENCY n/a COOLING EQUIPMENT TYPE Tower w/25.0 bhp fan COOLING EQUIPMENT EFFICIENCY 10 F App MAKE AND MODEL NUMBER EV-APi✓ 79C PIPE INSULATION REQUIRED? No PIPE/DUCT INSULATION PROTECTED. n/a HEATING DUCT LOCATION; R-VALUE n/a n/a COOLING DUCT LOCATIO R-VALUE n/a n/a F1E[)SEALEi) D CEILING/ROOF SPACE n/a Hot Water Boiler n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a Gas Fired 84% RAYPAK H'-2002 n/a Yes Yes n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a Gas Fired 79% A O Smith FGR-30-240D n/a na Yes Yes n/a n/a n/a n/a n/a CODE TABLES: 'Enter code from tab a elow into columns above. HEAT PUMP THERMOSTAT? Y: Yes N: No ? TIME CONTROL SETBACK CTRL. ISOLATION ZONES FAN CONTROL ELECTRIC HEAT? S: Prog. Switch O: Occupancy Sensor M: Manual Timer H: Heating Enter Number of C: Cooling Isolation Zones. B: Both I: Inlet Vanes P: Variable Pitch V: VFD O: Other C: Curve VAV MINIMUM POSITION CONTROL? SIMULTANEOUS HEAT / COOL? HEAT AND COOL SUPPLY RESET? VENTILATION OUTDOOR DAMPER ECONOMIZER O.A. CFM HIGH EFFICIENCY? Air a ance u a C: Outside Air Cert. G: Gravity M: Out. Air Measure D: Demand Control N: Natural it Enter' aor it W: Water CFM. N: Not Required Note: This shall be na EC: Economizer less than Col. H on Control See Section :MECH-3. 1144(e)3 PIPE INSULATION REQUIRED? PIPE/DUCT INSULATION PROTECTED? SEALED DUCTS IN CEILING/ROOF SPACE vu I to I u rlr-Lta - ror t5uiiaing uepariment use unly I Run Initiation Time: 04/02/03 15:25:58 Run Code: 1049325958 EnergyPro 3.1 By EnergySoft User Number: 2531 Job Number: 21036R Page:16 of 58 CERTIFICATE OF COMPLIANCE Performance MECH-1 T-ROJECT NAME DATE Embassy Suites 4/2/2003 jSYSTEM NAME TIME CONTROL SETBACK CONTROL ISOLATION ZONES HEAT PUMP THERMOSTAT? ELECTRIC HEAT? FAN CONTROL VAV MINIMUM POSITION CONTROL? SIMULTANEOUS HEAT/COOL? HEATING SUPPLY RESET COOLING SUPPLY RESET HEAT REJECTION CONTROL VENTILATION OUTDOOR DAMPER CONTROL ECONOMIZER TYPE DESIGN O.A. CFM (MECH-3, COLUMN I' HEATING EQUIPMENT TYPE VEATING EQUIPMENT EFFICIENCY OCOC OLING EQUIPMENT TYPE COOLING EQUIPMENT EFFICIENCY MAKE AND MODEL NUMBER PIPE INSULATION REQUIRED? PIPE/DUCT INSULATION PROTECTED., HEATING DUCT LOCATION R-VALUE COOLING DUCT LOCATIO R-VALUE VEKu-IED-SFA=-DUCTS�i� CEILING/ROOF SPACE DHW Heater I n/a H P-0.5 Programmable Switch Heating & Cooling Requi n/a Yes 0.0 kW Constant Volume No No Constant Temp Constant Temp n/a Air Balance Auto No Economizer 463 cfm Heat Pump 3.90 COP Hydronic Heat Pump 10.7 EER Yes No Ducts in Conditioned Ducts in Conditioned No HP-1 Programmable Switch Heating & Cooling Requh n/a Yes 0.0 kW Constant Volume No No Constant Temp Constant Temp n/a Air Balance Auto No Economizer 1573 cfm Heat Pump 4.00 COP Hydronic Heat Pump 12.1 EER Yes No n/a Ducts in Conditioned n/a n/a Ducts in Conditioned n/a No CODE: TAB ES Enter cadeiromtable below into columns above. HEAT PUMP THERMOSTAT? ELECTRIC HEAT? VAV MINIMUM POSITION CONTROL? SIMULTANEOUS HEAT / COOL? HEAT AND COOL SUPPLY RESET? HIGH EFFICIENCY? PIPE INSULATION REQUIRED? PIPE/DUCT INSULATION PROTECTED? SEALED DUCTS IN CEILING/ROOF SPAC� TIME CONTROL SETBACK CTRL. ISOLATION ZONES I FAN CONTROL S: Prog. Switch H: Heating Enter Number of I: Inlet Vanes O: Occupancy C: Cooling Isolation Zones. P: Variable Pitch Sensor B: Both V: VFD Y: Yes. M: Manual Timer O: Other C: Curve N: No VENTILATION OUTDOOR DAMPER ECONOMIZER O.A. CFM —Balance uo epB:7ir [rRQf t C: Outside Air Cert. G: Gravity W: Water ICFM. M: Out. Air Measure N: Not Required !Note: This shall be n D: Demand Control EC: Economizer less than Col. H on i N: Natural Control See Section 1144(e)3 MECH-3_ +4 I Run Initiation Time: 04102103 15:25:58 Run ode: 1049325958 EnergyPro 3.1 By EnergySoft User Number: 2531 Job Number: 21036R Page:17 of 58 CERTIFICATE OF COMPLIANCE Performance MECH-1 YKUJtL; l nHmt 4/2/2003 Embassy Suites J SYSTEM NAME HP-1.25 HP-1.5 HP-2 NOTE TO FIELD PTIMEONTROL CK CONTROL ISOLATION ZONES HEAT PUMP THERMOSTAT? ELECTRIC HEAT? Programmable Switch [Heating & Cooling Require n/a Yes 0.0 kW Programmable Switch Heating & Cooling Require: n/a Yes 0.0 kW i Programmable Switch Heating & Cooling Require n/a Yes 0.0 kW FAN CONTROL Constant Volume Constant Volume Constant Volume VAV MINIMUM POSITION CONTROL? No No No SIMULTANEOUS HEAT/COOL? No No No HEATING SUPPLY RESET Constant Temp Constant Temp Constant Temp COOLING SUPPLY RESET Constant Temp Constant Temp Constant Temp HEAT REJECTION CONTROL n/a n/a n/a VENTILATION OUTDOOR DAMPER CONTROL ECONOMIZER TYPE DESIGN O.A. CFM (MECH-3, COLUMN I Air Balance Auto No Economizer 80 cfm Air Balance Auto No Economizer 134 cfm Air Balance Auto No Economizer 416 cfm HEATING EQUIPMENT TYPE HEATING EQUIPMENT EFFICIENCY Heat Pump 3.90 COP Heat Pump 4.00 COP Heat Pump 4.10 COP COOLING EQUIPMENT TYPE Hydronic Heat Pump Hydronic Heat Pump Hydronic Heat Pump COOLING EQUIPMENT EFFICIENCY 12.2 EER 12.1 EER 12.1 EER MAKE AND MODEL NUMBER PIPE INSULATION REQUIRED? PIPE/DUCT INSULATION PROTECTED? HEATFUCT LOCATIONI R-VALUE onaion - - Yes No Ducts in Conditioned n/a arrzontaTVJSFiP- - Yes No Ducts in Conditioned anon SFiP Yes No n/a Ducts in Conditioned n/a COOUCT LOCATIO R-VALUE Ducts in Conditioned n/a Ducts in Conditioned n/a .Ducts in Conditioned n/a 7� _=MC � CEILINGIROOF SPACE No No No CODE TABL.E$: Enter code from table below into oofumns a ar+e HEAT PUMP THERMOSTAT? Y: Yes TIME CONTROL SETBACK CTRL. ISOLATION ZONES S: Prog. Switch H: Heating Enter Number of O: Occupancy C: Cooling 'Isolation Zones. Sensor B: Both M: Manual Timer FAN CONTROL 1: Inlet Vanes P: Variable Pitch V: VFD O: Other C: Curve': ELECTRIC HEAT? VAV MINIMUM POSITION CONTROL? SIMULTANEOUS HEAT / COOL? N: No VENTILATION OUTDOOFDAMPERR�j�,�ECONOMT�ZER�O.A. CFM HEAT AND COOL SUPPLY RESET? HIGH EFFICIENCY? �i��ce : Auto r CC:Outside Air Cert. G: Gravit: Water M: Out. Air Measure 1N. Not Required D: Demand Control IEC: Economizer N: Natural Control See Section ? 144(e)3 ent se n y u am rr Note: This shall be no iess than Col. H on IMECH-3. PIPE INSULATION REQUIRED? PIPEIDUCT INSULATION PROTECTED? SEALED DUCTS IN CEILING/ROOF $PAC nr RtjilMnEi eoa EnergyRm 3.1 By Energy5oft User Number: 2531 Job Number: 21036R Page:18 of 58 CERTIFICATE OF COMPLIANCE Performance MECH-1 PROSECT NAME Embassy Suites .7 SYSTEM NAME TIME CONTROL SETBACK CONTROL DATE 4/2/2003 ECFlXRTC-Ar SYSTEMS Ff HP-2.5 HP-3 HP-3.5 NOTE TO FIELD Programmable Switch Programmable Switch Programmable Switch Heating & Coaling Requir Heating & Cooling Required Heating & Cooling Requtreq ISOLATION ZONES PUMP THERMOSTAT? rELECT=RICHEAT? ONTROL VAV MINIMUM POSITION CONTROL? n/a Yes 0.0 kW Constant Volume No n/a Yes 0.0 kW Constant Volume No n/a WConstant SIMULTANEOUS HEAT/COOL? No No HEATING SUPPLY RESET Constant Temp Constant Temp COOLING SUPPLY RESET Constant Temp Constant Temp HEAT REJECTION CONTROL VENTILATION OUTDOOR DAMPER CONTROL n/a Air Balance Auto n/a Air Balance Auto n/a Air Balance Auto ECONOMIZER TYPE No Economizer No Economizer No Economizer DESIGN O.A. CFM (MECH-3, COLUMN 11. 1543 cfm 1212 cfm 1312 cfm 1 HEATING EQUIPMENT TYPE Heat Pump Heat Pump Heat Pump } HEATING EQUIPMENT EFFICIENCY 4.00 COP 4.20 COP 3.90 COP COOLING EQUIPMENT TYPE Hydronic Heat Pump Hydronic Heat Pump Hydronic Heat Pump COOLING EQUIPMENT EFFICIENCY MAKE AND MODEL NUMBER 12.0 EER onzonta FtP`-2-b� 12.6 EER onzon a 12.2 EER pnzQ� PIPE INSULATION REQUIRED? Yes Yes Yes PIPE/DUCT INSULATION PROTECTED? No No No HEATING DUCT LOCATION R VALUE Ducts in Conditioned n/a Ductless / with Fan n/a Ductless / with Fan n/a COOLING DUCT LOCATIO R-VALUE Ducts in Conditioned n/a Ducts Outdoors 4.2 Ducts Outdoors 4.2 N {CEILING1DROOF SPACE No No No CODE TABLES: Enter code ram ta6le.below into columns above. ' CONTRtiLI ETBACK CTRL. ISOLATION ZONESFFAN CONTROL HEAT PUMP THERMOSTAT? Y: Yesual N: No . Switch LSensor Timer Heating Enter Number of Cooling Isolation Zones. Both let Vanespancy ariable PitchVAV :VFD O: Other C: Curve ELECTRIC HEAT? MINIMUM POSITION CONTROL? SIMULTANEOUS HEAT / COOL? VENTILATION 4 OUTDOOR DAMPS ECO.NC3MIZER O.A. CFM n eufdoor it I CFM. Note: This shall be no Lan Col. H on -3. J HEAT AND COOL SUPPLY RESET? HIGH EFFICIENCY? it a ance ��iito� it C: Outside Air Cert. G: Gravity W: Water M: Out. Air Measure . N: Not Required D: Demand Control EC: Economizer N: Natural (Control See Section I� �144(e)3 PIPE INSULATION REQUIRED? PIPE/DUCT INSULATION PROTECTED? SEALED DUCTS IN CEILING/ROOF SPAC5-? Run Initiation Time: 04102103 15:25:bti (tun L.00e_ EnergyPro 3.1 By EnergySoft User Number: 2531 Job Number: 21036R Pagella of 58 CERTIFICATE OF COMPLIANCE Performance MECH-1 rPROJ EC3 NAME `un 1 L ~, Embassy Suites 11 4/2/2003 J r— _ A>+TIOACSYSTEAfS 5Y5TEriA NAMtC HP-4 HP-5 I ` HP-6 Programmable Switch Programmable Switch Programmable Switch -ieating & Cooling Require. n/a Heating & Cooling Req� n/a Heating & CaDE.ing Requin n/a Yes Yes Yes 0.0 kW 0.0 kW 0.0 kW Constant Volume Constant Volume Constant Volume No No No No No No Constant Temp Constant Temp Constant Temp Constant Temp Constant Temp Constant Temp n/a n/a n/a Air Balance Air Balance Air Balance Auto Auto Auto No Economizer No Economizer No Economizer 1424 cfm 3961 cfm 3374 cfm Heat Pump Heat Pump Heat Pump 4.10 COP 3.90 COP 4.20 COP ., u,..,. o,.-- F4,jrlrnnir Haaf pi imn Hvdronic Heat Pump l'V VLIIYV Ll.f V1�11�1� El COOLING EQUIPMENT EFFICIENCY2.2 EER 10.9 EER 12.0 EER on a orizon a - Horizontal SBH-b MAKE AND MODEL NUMBER PIPE INSULATION REQUIRED? Yes Yes Yes PIPE/DUCT INSULATION PROTECTED? No NO NO HEATING DUCT LOCATION R-VALUE Ductless / with Fan n/a Ductless / with Fan n/a Ductless I with Fan]E2 /a COOLING DUCT LOCATIO R-VALUE Ducts Outdoors 4.2 Ducts Outdoors 42 Ducts Outdoors . 1-YEconKFMUe T No No No CODE TA6LES: Enter co a rom tablebelow into cc umns above I_FTIME COHTROt_ SEBAEKCTR (ISOLATION ZONES FAN CONTROL I HEAT PUMP THERMOSTAT? 11 S: Prog. Switch H: Heating Enter Number of I: Inlet Vanes ELECTRIC HEAT? 10: Occupancy IC: Cooling Isolation Zones. P: Variable Pitch VAV MINIMUM POSITION CONTROL? fill Sensor IB: Both V: VFD SIMULTANEOUS HEAT / COOL? Y: Yes M: Manual Timer O: Other C: Curve HEAT AND COOL SUPPLY RESET? N: No VENTILATION OUTDOOR DAMPED ECONOMIZER I O.A. CFM : Air` BaTanee IA: u o l7 Air NCY? C: Outside Air Cert. G: Gravity W: Water EFM. REQUIRED? M: Out. Air Measure N: Not Required ote: This shall be no• N PROTECTED? [Eg D: Demand Control iEC: Economizer Control See Section less than Col. H on MECH-3. ILING/ROOF SPA. C? N: Natural 144(e)3 NOTES Tu FIELD - For BuTding Department USe Only i Page:20 of 58 EnergyPro 3.1 By En>rgySDft User Number: 2531 Job Number: 21036R [CERTIFICATE OF COMPLIANCE Performance MECH-11 iPRQ,fECT NAME DATE Embassy Suites 4/2/2003 -- — SYSTEM NAME TIME CONTROL SETBACK CONTROL ISOLATION ZONES HEAT PUMP THERMOSTAT? ELECTRIC HEAT? FAN CONTROL VAV MINIMUM POSITION CONTROL? SIMULTANEOUS HEAT/COOL? HEATING SUPPLY RESET COOLING SUPPLY RESET HEAT REJECTION CONTROL VENTILATION OUTDOOR DAMPER CONTROL ECONOMIZER TYPE DESIGN O.A. CFM (MECH-3, COLUMN I) HEATING EQUIPMENT TYPE I HEATING EQUIPMENT EFFICIENCY COOLING EQUIPMENT TYPE COOLING EQUIPMENT EFFICIENCY MAKE AND MODEL NUMBER PIPE INSULATION REQUIRED? PIPE/DUCT INSULATION PROTECTED? HEATING DUCT LOCATION, R-VALUE COOLING DUCT LOCATIOf R-VALUE T=1T"D SEALEif6UCTS-T� CEILING/ROOF SPACE HP-1V Programmable Switch Heating & Cooling Require n/a Yes 0.0 kW Constant Volume No No Constant Temp Constant Temp n/a Air Balance Auto No Economizer 658 cfm Heat Pump 3.80 COP Hydronic Heat Pump 11.2 EER a ira - Yes No Ductless / with Fan Ductless No H P-2V Programmable Switch Heating & Cooling Requii n/a Yes 0.0 kW Constant Volume No No Constant Temp Constant Temp n/a Air Balance Auto No Economizer 411 cfm Heat Pump 4.00 COP Hydronic Heat Pump 12.0 EER Yes No n/a Ductless / with Fan n/a Ductless No lultaeIVA Programmable Switch Heating & Cooling Requir n/a Yes 0.0 kW Constant Volume No No Constant Temp Constant Temp n/a Air Balance Auto No Economizer 278 cfm Heat Pump 4.00 COP Hydronic Heat Pump 11.9 EER Yes No Ductless / with Fan Ductless No CODE TAff UE8: nter code from to a below into columns above. n/a n/a HEAT PUMP THERMOSTAT? TIME CONTROL SETBACK CTRL. ISOLATION ZONES FAN CONTROL S: Prog. Switch H: Heating Enter Number of I: Inlet Vanes ELECTRIC HEAT? O: Occupancy C: Cooling Isolation Zones. P: Variable Pitch VAV MINIMUM POSITION CONTROL? Sensor B: Both V: VFD SIMULTANEOUS HEAT / COOL? Y: Yes M: Manual Timer O: Other C: Curve N: No ` HEAT AND COOL SUPPLY RESET? VENTILATION 'OUTDOOR DAMPER ECONOMIZER O.A. CFM HIGH EFFICIENCY?Air Balance : Auto rr n er Outdoor �Cr C: Outside Air Cert. G: Gravity �N: 'W: Water CFM. PIPE INSULATION REQUIRED? M: Out. Air Measure Not Required Note: This shall be nc PIPE/DUCT INSULATION PROTECTED? D: Demand Control EC: Economizer less than Col. H on N: Natural Control See Section MACH-3. SEALED DUCTS IN CEILING/ROOF SPACE.? 144(e)3 Run InitiationTime: 04/02/03 15:25:58 Run Code: 1049325958 I EnergyPro 3.1 By EnergySoft User Number: 2531 Job Number: 21036R P7ge.21 of 58 CERTIFICATE OF COMPLIANCE Performance MECH-1 �RROJECT NAifKE DATE 4/2/2003 Embassy Suites J 5Y5TEM NAME �RTU-4 ' RTU-10 RTU-12.5 TIME CONTROL Programmable Switch Programmable Switch I Programmable Switch SETBACK CONTROL Heating & Cooling Require Hea#jT g & Caaling Required Heating: & Cooling "t it ISOLATION ZONES n/a n/a n/a HEAT PUMP THERMOSTAT? Yes Yes Yes ELECTRIC HEAT? 0.0 kW 0.0 kW 0.0 kW FAN CONTROL VAV MINIMUM POSITION CONTROL? Constant Volume No Constant Volume No tn SIMULTANEOUS HEAT/COOL? No No HEATING SUPPLY RESET COOLING SUPPLY RESET Constant Temp Constant Temp Constant Temp Constant Temp Constant Temp Constant Temp HEAT REJECTION CONTROL n/a n/a n/a VENTILATION Air Balance Air Balance Air Balance OUTDOOR DAMPER CONTROL Auto Auto Auto ECONOMIZER TYPE Fixed Enth (Integrated) Fixed Enth (Integrated) Fixed Enth (Integrated) DESIGN O.A. CFM (MECH-3, COLUMN 1 1.3 3 cfm 673 cfm 5586 cfm HEATING EQUIPMENT TYPE Heat Pump Heat Pump Heat Pump HEATING EQUIPMENT EFFICIENCY 7.00 HSPF 7.52 HSPF 7.84 HSPF COOLING EQUIPMENT TYPE COOLING EQUIPMENT EFFICIENCY MAKE AND MODEL NUMBER Packaged DX Packaged DX Packaged DX 10.0 SEER / 9-2 EER 9-0 EER 9.8 EER arner'SOTFQ1505— Omer 0i F amen bU I FQUT4 PIPE INSULATION REQUIRED? Yes Yes Yes PIPE/DUCT INSULATION PROTECTED? HEATING DUCT LOCATIONI R-VALUE COOLING DUCT LOCATION R-VALUE fR]E6'Sf=AL` l UCTS� —0 ILIi .ronnc cDArc I No No NO Ducts in Conditioned n/a Ducts in Conditioned n/a Ducts in Conditioned n/ Ducts in Conditioned n/a Ducts in Conditioned n/a Ducts in Conditioned n/ NO No No �r�'i7E TAS E5: Enter qod+; isom table below into ca umns a ove. j ISOLATION ZONES FAN CCiNTRQL SI TBACK CTRL. TIME. CONTROLFal HEAT PUMP THERMOSTAT? S: Prog. Switch : Heating I Enter Number of I: InletVanesO: ELECTRIC HEAT? Occupancy - Cooling Isolation Zones. P: Variable Pitch VAV MINIMUM POSITION CONTROL? Sensor B: Both V: VFD SIMULTANEOUS HEAT / COOL? Y: Yes M: Manual Timer O: Other C: Curve HEAT AND COOL SUPPLY RESET? N: No VENTILATION OUTDOOR DAMPER ECONOMIZER - CFM HIGH EFFICIENCY? it a Once u o �iir �W: Water nfec 0uf flor Lr CFM. PIPE INSULATION REQUIRED? C: Outside Air Cert. G: Gravity M: Out_ Air Measure jld: Not Required Note: This shall be n: PIPE/DUCT INSULATION PROTECTED? D: Demand Control IIt C: Economizer Control See Section less than Col. H on MECH-3. SEALED DUCTS IN CEILINGIROOF SPACE ? N: Natural I 144(e)3 EnergyPro 3.1 By EnergySoft User Number: 2531 Job Number: 21036R Page:22 of 58 CERTIFICATE OF COMPLIANCE Performance MECH-1 PRO.#EGT NAMI" DATE Embassy Suites 4/2/2003 J SYSTE3Vl NAME TIME CONTROL SETBACK CONTROL ISOLATION ZONES HEAT PUMP THERMOSTAT? ELECTRIC HEAT? FAN CONTROL VAV MINIMUM POSITION CONTROL? SIMULTANEOUS HEAT/COOL? HEATING SUPPLY RESET COOLING SUPPLY RESET HEAT REJECTION CONTROL ]q VENTILATION OUTDOOR DAMPER CONTROL ECONOMIZER TYPE DESIGN O.A. CFM (MECH-3, COLUMN 11 HEATING EQUIPMENT TYPE HEATING EQUIPMENT EFFICIENCY COOLING EQUIPMENT TYPE COOLING EQUIPMENT EFFICIENCY MAKE AND MODEL NUMBER PIPE INSULATION REQUIRED? PIPE/DUCT INSULATION PROTECTED? HEATING DUCT LOCATION R-VALUE COOLING DUCT LOCATION R-VALUE CTSiI CEILING/ROOF SPACE HP-1 (Guests) HP-2 (Guests) HP-3 (Guests) Programmable Switch Programmable Switch Programmable Switch Heating & Cooling Require Heating & Coaling Reuir TConstantV n/a Yes 0.0 kW Constant Volume #ConstantTemp' No No No No Constant Temp Constant Temp Constant Temp Constant Temp Constant Temp n/a Air Balance Auto n/a Air Balance Auto n/a Air Balance Auto No Economizer No Economizer No Economizer 5810 cfm 3850 cfm 560 cfm Heat Pump 3.90 COP Heat Pump 3.80 COP Heat Pump 4.10 COP Hydronic Heat Pump Hydronic Heat Pump LHydronic Heat Pump 11.1 EER 11.0 EER 12.3 EER ima e as er - Climate Mas ear VHS-b - a aster 1 Yes Yes Yes No No No Ducts in Conditioned n/a Ducts in Conditioned ]n/a Ducts in Conditioned nh Ducts in Conditioned n/a Ducts in Conditioned /a Ducts in Conditioned nh No No No CODE TABL 5: Enter Code from table Below info columns a ove, HEAT PUMP THERMOSTAT? CONTROL SETBACK CTRL. H: Heating ISOLATION ZONES Enter Number of FAN CONTROL I: Inlet Vanes i g. Switch ��E ELECTRIC HEAT? Y: Yes. N: No : Occupancy Sensor M: Manual Timer C: Cooling B: Both l Isolation Zones. P: Variable Pitch `V: VFD O: Other C: Curve VAV MINIMUM POSITION CONTROL? SIMULTANEOUS HEAT / COOL? HEAT AND COOL SUPPLY RESET? VENTILATION OUTDOOR DAMPS ' ECONOMIZER O.A_ CFM : Alma ante C: Outside Air Cert. M: Out. Air Measure D: Demand Control o 4G: Gravity A. Air -W. Water N: Not Required EC: Economizer Enter 0 oor Air CFM. Note: This shall be n . less than Col. H on HIGH EFFICIENCY? PIPE INSULATION REQUIRED? PIPE/DUCT INSULATION PROTECTED? ? N: Natural , Control See Section I144(e)3 MECH-3. I SEALED DUCTS IN CEILING/ROOF SPAC EnergyPro 3.1 By EnergySoft User Number: 2531 Job Number: 21036R Page23 of 58 MECHANICAL EQUIPMENT SUMMARY Part 1 of 2 MECH-2 PROJECT NAME Embassy Suites DATE , 4/2/2003 1 I?❑t;tiPs I Tot I Motor Drive I Pump j Equipment Name Equipment Type Qty- ! Efficiency .! Tons Qty GPM I BHP Eff, ! Eff. Control ,FVAPCO 1TVV276C Tower w/25.0 bhp fan I 11 10 F Approach 276� 111,050 5.00. 87.59I6 I 97.0%'One-Speed _ � !Building Loop Pumps 21 1,0501 20.00 91-0°/°I 97.0%Variable-Speed Hot Water Pumps 2 812i 0.751 77.0°/a 97.09£1jVariahle-speed 1 Energy Factor Standby AN BULL 1 - Rated Vol. or Recovery Loss or Ext. System Name System Type Distribution Type Qty Input (Gals.) Efficiency - Pilot R I RAYPAK H*-2002 Instant Gas 11-iydronic Heating 1111,999,000! O 0.84 01 nla O Smith FGR-30-240D 1 40,000 30 0:6 n!a nfa' Small Gas Standard ¢'VI 500P 250A-TP il_arge Gas Recirc/Dem+Pipelns 2 399,0001 250 0.80 2.40001 �iFAi'tN��� OOZING I m Name System Type Qty. Output Aux. kW Eff. Output I Sensible Efficiency Economizer Type NSH P-0.5 IHydronic Heat Pump 5 8,4001 O.O 3.90 COP� 7,000' 5,000,10.7 EER No Economizer NSHP- Hydronic Heat Pump 6 13,000' 0.0� 4.00 COP 11,700 8,40012.1 EER 'No Economizer tvs P-1.25 'Hydronic Heat Pump 1 17,80011 0.0i 3.90 COPj 15,300 12,100:12.2 EER 'No Economizer ] 3 Hydronic Heat Pump 5 20,100 0.0 4.00 COP 18,400Ii 13,70012.1 EER [No Economizer ✓V 2 IHydronic Heat Pump 4 27,400i 0.01 4.10 COP 24,800 18,00012.1 EER jNo Economizer Hydronic Heat Pump 61 36,100 0.01 4.00 COPi', 30,0001 i 22,00012.0 EER fhlo Economizer HP-3 IHydronic Heat PumpNS- 4 40,200 0:0 4.20 COP( 36,800I 26,800EER i,12.6No Economizer NS P-3.5 Hydronic Heat Pump 2 44,600 O.OI 3.90 COP 41,5001 30,20DI12.2 EER iNo Economizer In Orizurudl vvonr- w Hydronic Heat Pump 1 41 48,4001 0.0 4.10 CC]PI 48,000 35,800.12.2 EER , No Economizer J CENTRAL SYSTEM FAN SUMMARY SUPPLY FAN RETURN FAN -j Motorl Drive I Motor Drive i System Name j Fan Type Motor Location CFM BHP Eff. I Eff. I, Eff. EffConstant Volume Draw -Through i 230 0.05 77.0% 97.0°I°�C�FFMBBHHP `IonzOnta SRP- ;Constant Volume Draw -Through 1 400; 0.1.21 77.0°I°' 97.0%1 I�non-e I Iionial1�P51�iP�[ 2 (Constant Volume raw Through 500 0.12j 77.0°/0 97.0M% it none I nr F, off 1-.FVV FIPP-1 5(Constant Volume Draw -Through 630 0.12' 77.0%! 97.0%. none f Horizontal WSa I'P-2 !Constant Volume lDraw-Through 8001 0.331 77_0%1 97.0%' none 4 ona9n al ARP-2- yConstant Volume Draw-Thnaugh 1,0001 0.31 77.Q-A 97.0% II none) Horizontal WSHP-3 Ponstant Volume I3raw-Through 1,200 i ° 0.50' 77,0/° ° 97.0 o crone onzortta SFiP 3.5 .Constant Volume (Drava -Through 1,4001 0,501 77.0%1 97.0% nonel LSiFnstarlt Volume 'Draw -Through 1,6001 0.75 77.0%I 97:0`i� none `HorRa[aI _ Run Initiation Time: 04/02/03 15.25:58 Run Code:/049325958 EnergyPro 3.1 By EnergySoft User Number: 2531 _ Job Number: 21036R Page:24 of 58 MECHANICAL EQUIPMENT SUMMARY Part 1 of 2 MECH-2 PROJECT NAME DATE 4IZ/ZOOS Embassy Suites IILLER AND TuvvEFZ SUMMARY Tot. Motor i Drive Pump I� Equipment Name Equipment Type Qty. j Efficiency Tons Qty :GPM BHP Eff. Eff. Control 1� DHW I BOILER SUMMARY Energy Factor Standby TAW-KLNSWU�I System Name System Type Rated '1 Vol. Distribution Type Qty, Input • (Gals.) 1 or Recovery Efficiency Loss or Pilot Ext. R-Val. � System Name ` System Type Qty_ I Aux. Output 1 kW Eff. Output , Sensible' Efficiency Economizer Type Horizontal WSHP-5 Hydronic Heat Pump 14 68,500 0.0 3.90 COP 58'0001 43,100{10.9 EER No Economizer rR ❑rranWFWS. iP IHydronic Heat Pump 4 69,600 0.0� 4.20 COPS 70,000 51,800112.0 EER �No Economizer Vertical WSHP-1V jHydronic Heat Pump 6 16,000 0.01 3.80 COPI 9,400 12,80011.2 EER jI.No Economizer Pe �caC WSRF�2 IHydronic Heat Pump I 3 37,000 0.0 4.00 COPI 25,400• 18,500,12.0 EER INo Economizer eV ;Hydronic Heat Pump I 1 50,700I 0-0 4.00 COP 38,1001 26,M0111.9 EER ,No Economizer C,arner 50-MD-On� Packaged DX 1 31,80010.0 7.00 HSP 44,600� 32 400.10.0 SEER / 9.2 EER it rxsd Enth {Integrated Carrier 50TFOO12 (Packaged DX 3 83,800I 0.0 7.52 HSPF 108,2001 84,2009.0 EER Fixed Enth (Integrated Carrier 50T UQ_ 4 1 Packaged DX 3 0811 001 0.0[7.84 HSP 130,000 1 104,00a9.8 EER Fixed Enth (intagra#ed: 'Climate Master VHS-816- Heat Pump 37 7,8001 0.01 3.90 COP. 8,3001 5,600.11.1 EER INo Economizer 10 ]Hydronic CENTRAL SYSTEM FAN SUMMARY SUPPLY FA I ; RETURN Drive i1 FAN Motor Drive 1 I System Name Fan Type Motor Location I iMotor CFM BHP Eff. Eff. I CFM BHP I Eff, Eff_ !t Corzrsrita - Constant Volume (Draw -Through 1 2,000 o 0.75. 77.Q 1°, a I' 97.Q la nnr18 orizonta - Constant Volume praw-Throw h 9 2,400 1.00 $2 5°6f 1 97:Li°/aI. none �ertica - Constant Volume 'Draw -Through 400; 0.121 77:0°Iu 97.0°1 l none1 Vertical- Constant Volume Draw -Through 800 0.20i 77.0%1 97.0.°/°' none �ertica W H - Constant Volume DraWv-Through 112001 0.50 77.i1%j 97.0%L1 none 1 arrier 50 0 Constant Volume I,� [Draw -Through 1 1,600 ° 0.75 77.0/°; 97.1.0 ° [ Carrier 5OTFQ012 lDraw-Through i 4,0001 ° 2.00 84.0/a1 a 1 97-.0/oil none y i Constant Volume arrEer TF(] 'I' 1 (Constant Volume (Draw -Through 1 5,000. 3.701 86.5°I°I 97.03a� noneil 1 C ilrrate Mas er 5-81 Gr Constant Volume Draw -Through 3201 0.07 77.0% 1 97.0°/a none) 1 1 Run initiation Time: 04102103 15:25:58 Run Code. 1049325959 EnergyPro 3.1 By EnergySoft User Number: 2531 Job Number: 21036R Page:25 of 58 MECHANICAL EQUIPMENT SUMMARY Part 1 of 2 MECH-2 :PROJECT NAME Embassy Suites DATE 4/2/2003 --- — Tot. MOWT I Drive Pump I Equipment Name Equipment Type Qty. Efficiency I Tons Qty GPM BHP Eff.. Eff. Control IDHVV I BOILER SUMMARY Energy Factor Standby T�TV�tSSUL. Rated Vol. or Recovery Loss or Ext. System Name System Type Distribution Type Qt� Input (Gals.) Efficiency Pilot i R-Val. 4 I f j Aux. I System Name System Type. Qty. output kW Eff. Output Sensible Efficiency Economizer Type Climate Master V 5-816 ' 15 Hydronic Heat Pump 55 12,700 0.01 3.80 Ct7P� 12400 .13;50011.0 EER No Economizer Clima aster H5�16 aff Hydronic Heat Pump 811 16,r00 Orel 4.10 COR 19,000 13,800�12.3 EER INa Economizer SYSTEM FAN 5 gt}ppLy Fq F— RETURN FAN I Motor Drive Motor Drive System Name Fan Type j Motor Location, CFM BHP Eff. Eff_ - I CFM BHP i Eff. Eff. ITmato 117raster VFS�r3Tfr 15 (Constant Volume Draw -Through A30 0.107i 770% 97.0% I none I -,Cimat-e aster VHS-8 e j 20 Constant Volume R)raw-Through 700' 0.17 77.0o 1 97.0.Io, none l I Run Initiation Time: 04/02/03 15: EnergyPro 3.1 By EnergySoft User Number: 2531 Run Code: 1049325958 Job Number: 21036R Page:26 of 58 MECHANICAL EQUIPMENT SUMMARY Part 2 of 2 MECH-2 IPROJECT NAME Embassy Suites DATE 4/2/2003 jvAv I ERti"ilfiNA ----f1 RMINAL � ESOI�R Min. CFM Reheat Coil Moto Drive Zone Name System Type Qty_ Ratio ype etaT CFM BHP Eff_ Eff. Type Output (Retail VAV Box 1 10% none n/a none none n/a 'They. 1 & 6 VAV Box 1 10% none n/a none none n(a 'Library VAV Box 1 10% none n/a none none n/a Ther. 2-5 VAV Box 1 10% none n/a none none n/a PBX VAV Box 1 10% none n/a none none n/a :Support Areas VAV Box 1 10% none n/a none none n/a Break Room VAV Box 1 10% none n/a none none n/a ,;Staging/Storage Areas VAV Box 1 10% none n/a none none n/a 'Lobbies/Reception I VAV Box 1 10% none n/a none none n/a Exercise Room VAV Box 1 10% none n/a none none n/a Hotel Function Areas VAV Box 1 10% none n!a none none n/a Atrium 1 st flr.. VAV Box 1 10% none n/a none none n/a Lobby 2 VAV Box 1 10% none n/a none none n/a Hotel Function Areas VAV Box 1 10% none n/a none none n/a Hotel Corridor VAV Box 1 10% none n/a none none n/a 'Employee Break Room VAV Box 1 10% none n/a none none n/a Linen/Storage VAV Box 1 10% none nla none none n/a Restrooms VAV Box 1 10% none n/a none none n/a _ockers/Sitting VAV Box 1 10% none n/a none none n/a Offices VAV Box 1 10% none n/al none none n/a Sales Area VAV Box 1 10% none n/a none none n/a Support Areas VAV Box 1 10% none n/a none none n/a 'Set-up/Storage VAV Box 1 10% none n/a none none n/a (Elevator Lobby VAV Box 1 10% none n/a none none n/a Hotel Function Areas VAV Box 1 109/6none j n/a none none n/a Support Areas VAV Box 1 10% none n/a none none n/a Lobby Areas VAV Box 1, 10% none n/a none none n/a Offices Areas VAV Box 1. 10% none n/a none none n/a Room Name Qty, CFM BHP Motor Eff. Drive Eff. Room Name Qty. CFM BHP Motor Eff_ Drive Eff. Elev. Equip Rooms 1 10 0.08 77.0% 97.0% Maintenance 2 350 0.12 77A°/ 97.0% Electrical 1 350 0.12 77.0°/ 97.0% Men's Restroom 1 25 0.25 77.0°/ 97.0% Electrical/Mechanical) 2 _ 35 0.12 77.0°/ 97.0% Employee Break Room 1 15 0.08 77.00/ 97.0% Run Initiation Time: 04/02103 15:25:58 Run Code: 1049325958 EnergyPro 3.1 By EnergySoft User Number: 2531 Job Number: 21036R — Page27 of 58 MECHANICAL EQUIPMENT SUMMARY Part 2 of 2 MECH-2 Embassy Suites IBalIroom s/Conference '-EXHAU i Room Name Qty. CFM BHP =jEff. en & Women's Restrooms 1 650 0.50 77.0°/ 97.0% Women's Restroom 1 30 0.25 77.0% 97.0% Vlen & Women's Restrooms 1 640' 0.50 77.E/J 97.0% Run EnergyPro 3.1 By EnergySofl 7n Time: 04/02/03 15:25: User Number: 2531 Room Name Employee Bath Meeting Rooms DATE 4/2/2003 Type one one one lone lone lone .IIMVJI (sty. 1 CFM BHP Motor Eff. Drive Eff. 1 5 0.07 77.0°/ 97.0% 1 1,50 0.75 77.0°/ 97.0% 1 35011 0.10 77.0% 97.0% 3de: 1049325958 Job Number: 21036R Output n/a n/a n/a n/a n/a Page:28 of 58 MECHANICAL EQUIPMENT SUMMARY Part 2 of 2 MECH-2' rROJECT NA E I DATE 4/2/2003 Embassy Suites Type I Output X1#AtJST F-A tnrsFauO i riary Room Name Qty, CFM BHP Motor Eff, Drive Eff. Room Name CFM BHP Motor Drive Eff. Eff. Game Room 1 150 0.08 77.0°/ 97.0% 4th Flr. G,J,K,L Guest Rms 112 70. 0.07 77.0°/ 97.0% 2nd Flr. G,J,K,L Guest Rms 28 7 0.07 77.0°/ 97.0% 1st Flr. E,C,B,A Guest 7 0.07 77.0°/ 97.0%3rd Flr. G,J,K,L Guest Rms 27 . 70 0.0777.0°/ 97.0%j1.5 Flr. E,C,B,A Guest 70� 0.07 77.0°/ 97.0% 58 EnefgyPro 3.1 By EnergySoft User Number: 2531 Job Number: 21036R Page:29 of 58 MECHANICAL EQUIPMENT SUMMARY Part 2 of 2 MECH-2 PROJECT NAME Embassy Suites x DATE 4/2/2003 -- - - - - ----- - MECHANICAL EQUIPMENT SUMMARY Part 2 of 2 MECH-2 PROJECT NAME DATE 4 Embassy Suites 4/2/2003 4 SAL—BO Zone Name System Type Qty. Min. CFM Ratio --Ty- MTRAL FAN Reheat Coil Moto Drive pe e. a CFM BHP Eff. Eff. BA3EBOAKU Type Output l 1 l 1 3 UST -FA 1 fiAUSI'f A Motori Drive i Room Name Qty. CFM BHP Eff. Eff. Room Name Qty. CFM BHP Motor Eff. Drive Eff. 3rd D & F Guest Rms 2 70 0.07 77.00/ 97.0% Run Initiation Time: 041OV03 15:25:58 Run Code: 1049325958 EnergyPro 3.1 By EnergySoft User Number: 2531 Job Number: 21036R Page:31 of 58 MECHANICAL VENTILATION MECH-3 FT NAME Ft Embassy Suites DATE 4/2/2003 f I A ❑ B ❑ C D ❑ ❑ E F G ❑ ❑ ❑ H ❑ I J K ❑ ❑ ❑ AREA BASIS OCCUPANCY BASIS REQ'D DESIGN — O.A. rJUTD00 VAV ZONE/SYSTEM AREA CFM CFM OF PER CFM (MAX OF AIR MIN. RATIOStorage r (SF) PER SF (B x C) PEOPL PERSON (ExF) D OR G) CFM 256 0.50 128 128 13 Electrical 357 0.15 54 54 450 H P 0.5 Total 182 463 Retail 25 0.25 63 126 10% her. 1 & 6 31 0.15 47 F63 47 47 10% Electrical/Mechanical 58 0.15 88 88 700 Maintenance 21 0.50 105 105 700 HP-1 Total 302 1,573 Library 26 0.15 40 40 80 10% HP-1.25 Total 40 80 'Ther.2-5 783 0.15 117 117 117 10% I'BX 10 0.50 54 54 16 10%• 3 HP 1.5 Total 171 134 ,uppvrt Areas 1,637 0.15 246 246 250 10% Break Room 16 0.50 82 82 82 10% Staging/Storage Areas 614 0.50 307 307 83 10% 2, HP-2 Total 635 416 ILobbies/Reception 1,443 0.15 216 216 722 10% Exercise Room 595 0.15 89 89 255 10% Boardrooms 486 0.50 243 243 486 Hotel Function Areas 590 0... 295 295 8 10% 2 H P-2.5 Total 844 1,543 Atrium 1stflr, 1,02 0.25 256E 256 513 10% Lobby 2 883.. 0.15 132 132 442 10% Hotel Function Areas 1,163 0.5.0. 582 582 93 10% 4 I 10% Hotel Corridor 1,099 0.15 165 165 165 HP-3 Total 1,135 1,212 IFmnlovee Break Room 29.. 0.50 1461 1146 150 10% MECHANICAL VENTILATION MECH-3 11 PROJECT NAME DATE. Embassy Suites 4/2/2003 LA LJ [ ] IJ © Li.I 0 AREA BASIS r OCCUPANCY BASIS REQ-D Nfi O.A. ZONE/SYSTEM AREA CFM CFM OF PER CFM (MAX OF (SF) PER SF (B x C) PEOPL PERSON (ExF) D OR G) Linen/Storage 40 0.50 201 201 IRestrooms 950 0.15 142 142 ILockers/Sitting 425 0.15 64 64 H P-3.5 Total 553 Offices 531 0.15 80 80 Sales Area 1,19 0.25 300 300 Support Areas F 68 0.15 103 103 Set-up/Storage 943 0.50. 472 472 Elevator Lobby 11 0.15 18 18 HP-4 Total 971 IHotel Function Areas 1,01 0.50 506 506 Support Areas 764 0.15 115 115 Kitchen Area 1,21 0.15 182 182 7.obby Areas 7.770 0.15 1,166 1,166 Offices Areas 1,44$ 0.15 217 217 HP-5 Total 2,186 Meeting Rooms 3,00 0-50 1,504 1,504 1_aundry & Storage 1,267 0.15 190 190 Laundry Office r44,3881 0.15 16 16 H P-6 Total 1,711' Guest Room Corridors 0.15 658 658 H P-1 V Total 658 Vending 822 0.151 123 27.4 15.0 411 411 H P-2V Game Room H P-3V Inner Corridors All Floors RTU-4 0.151 1,303 Total 411 278 278 Total 278 1,303 Total! 1,303 C Minimum Ventilation Rate per Section 121, Table 1-F. E Based on Expected Number of Occupants or at least 50% of Chapter 10 1997 UBC Occupant Density. ! Must be greater than or equal to H, or use Transfer Air. Design Outdoor Air includes ventilation from Supply Air System & Room Exhaust Fans. K Must be greater than or equal to (H minus 1), and, for VAV, greater than or equal to (H-J). EnergyPro 3.1 By EnergySoft User Number: 2531 Job Number: 21036R _ Page:33 of 58 MECHANICAL VENTILATION MECH-3 1 �PROdECT A E Embassy Suites DATE -� 4/2/2003 r A' QLE � E �1 L7 C [:K] ARF-A - ---CON" ZONE/SYSTEM AREA (SF) ,Atrium 4,48 RTU-10 Ballrooms/Conference 5,586 BASIS OCCUPANCY BASIS REQ'D O.A. (MAX OF D OR G) DESIGN l OUTDOO AIR CFM 673 VAV MIN. RATI 10°/ TRANS FER AIR 449 CFM CFM PER SF (B x C) OF PER PEOPL PERSON CFM (ExF) 0.25 1,122 1,122 Total 1,122 673 5,586 5,586 10% 0,50 2,793 2,793 RTU-12.5 Total 2,793 Guest Rooms 30,453 0.1 4,568 4,568 5,810 HP-1 (Guests) Total 4,568 5,810 Guest Rooms 33,113 0.15 4,967 4,967 3,850 HP-2 (Guests) Total 4,967 3,850 Guest Rooms 5,9561 0.15 893 893 560 HP-3 (Guests) Total 893 560 1,117 333 1 C E 1 K Minimum Ventilation Rate per Section 121, Table 1-F. Based on Expected Number of Occupants or at least 50% of Chapter 10 1997 UBC Occupant Density. Must be greater than or equal to H, or use Transfer Air. Design Outdoor Air includes ventilation from Supply Must be greater than or equal to (H minus 1), and, for VAV, greater than or equal to (H-J). Air System & Room Exhaust Fans. EnergyPro 3.1 By EnergySoft User Number: 2531 Job Number: 21036R Page:34 of 58 , PROPOSED CONSTRUCTION ASSEMBLY ENV-3 'PROJECT NAME DATE I Embassy Suites 4/2/2003 , ASSEMBLY NAME 1" EIFS w/ R19 Mtl ASSEMBLY �I Floor TYPE I (check one) i. Wall W Ceiling I Roof p N W FRAMING MATERIAL Metal H � J O FRAMING % _ j Framing /o 15% (16" o.c. Wall) 12% (24" o.c. Wall) 10% (16" o.c. Floor/Ceil.) SKETCH OF ASSEMBLY 7% (24" o.c. Floor/Cell.) DESCRIPTION FRAMING OUTSIDE SURFACE AIR FILM 1 Insulation, Polystyrene, Smooth Skin 2 Gypsum or Plaster Board 3 'Insulation, Mineral Fiber, R-19 4 Gypsum or Plaster Board 5 6 7 8 9 (INSIDE SURFACE AIR FILM R-VALUE *HEAT CAPACITY (Optional) CAVITY R-VALUE (Rc) WOOD FRAME R-VALUE WALL WEIGHT (lbs/sf) SPECIFIC HEAT (Btu/F-lb) HC (A X B) (Btu/F-sf) 0.170 — -- 5.0001 0.151 0.29 0. 44 0.562 2.601 0.26 0.68 19.002 0.301 0.17 0.05 0.5621 .601 0.26 0.68 SUBTOTAL 25.98 f� 5.7 TOTAL HC 1.4 *NOTE: Weiqht and Specific Heat values for materials penetrated by wood framing include the effects of the framing members. C� x � x �� 1 / Rc 1 - (Fr% / 100) 1 / Rf Fr% / 100 ASSEMBLY U-VALUE This assembly contains metal framing. The Assembly U-Value has been calculated using the ASHRAE/CEC Zonal Cavity Method. II EnergyPro 3,1 By EnergySoft User Number: 2531 Job Number: 21036R Page:35 of 58 PROPOSED CONSTRUCTION ASSEMBLY ENV-3 IPW(Mb T Nnl�iE Embassy Suites ASSEMBLY NAME 2" Concrete Wall I ASSEMBLY Floor TYPE Wall (check one) W U Ceiling / Roof � W N FRAMING MATERIAL None z FRAMING % % O SKETCH OF ASSEMBLY FM DESCRIPTION FRAMING OUTSIDE SURFACE AIR FILM D 1 Concrete, 140 lb, Not Dried 2 3 4 5 6 7 8 9 INSIDE SURFACE AIR FILM R-VALUE CAVITY WOOD R-VALUE FRAME (Rc) R-VALUE 0.170 0.960 ATE 4/2/2003 i Framing % 15% (16" o.c. Wall) 12% (24" o.c. Wall) 10% (16" o.c. Floor/Cell.) 7% (24" o.c. Floor/Cell.) *HEAT CAPACITY (Optional) WALL SPECIFIC HC WEIGHT HEAT (A X B) (lbs/sf) (Btu/F-lb) (Btu/F-sf) 140.00 0.20, 28.0 SUBTOTAL 1.811 TOTAL HC 28 *NOTE: Weight and Specific Heat KT values for materials penetrated by wood framing include the effects of the framing members. X C _. � I X _ 1 1 / Rc 1 - (Fr% 1100) 1 / Rf Fr% 1100 -- ASSEMBLY U-VALUE COMMENTS EnergyPro 3.1 By EnergySoft User Number: 2531 Job Number: 21036R Page:36 of 58 PROPOSED CONSTRUCTION ASSEMBLY ENV-3 PROJECT NAME DATE Embassy Suites j — 4/2/2003 ASSEMBLY NAME g CMU Garage Wall 1 ASSEMBLY Floor TYPE (check one) Wall _ W � I Ceiling 1 Roof 0 U) W o I FRAMING MATERIAL None. O FRAMING % C�1% Framing % 15% (16" o.c. Wall) 12% (24" o.c. Wall) 10% (16" o.c_ Floor/Ceil.) SKETCH OF ASSEMBLY — 7% (24" o.c. Floor/Ceil.) =OUTSIDE CRIPTION ACEAIR FILM 1 Air Space 2 Conc Block, Normal Weight, Conc Filled 3 Gypsum or Plaster Board 4 5 6 7 H INSIDE SURFACE AIR FILM _ SUBTOTAL 2 7 j 85.8 TOTAL HC 171 'NOTE: Weight and Specific Heat values for materials penetrated by wood framing include the effects of the framing members. x - + _. x 1 - (Fr% / 100) 1 / Rf Fr% / 100 ASSEMBLY U-VALUE COMMENTS j R-VALUE FCAVITY I WOOD R-VALLIE FRAME (Rc) R-VALUE u _I 'HEAT CAPACITY (Optional) WALL SPECIFIC WEIGHT HEAT (lbs/sf) (Btu/F-lb) HC (A X B) (BtulF-sf) 0.170 — — 0.850 0.40 0.10 0.0 0.600 83.33 0.20 16.6 0.450 0.26 0.5 ,1 • :1 EnergyPro 3.1 By EnergySoft User Number: 2531 Job Number: 21036R Page:37 of 58 PROPOSED CONSTRUCTION ASSEMBLY ENV-3 ` PROJECT NAME Embassy Suites 7-4/2/2003 ASSEMBLY NAME ASSEMBLY R19 Roof w/ Rigid Insulation Floor TYPE (check one) Wall W Ix Ceiling / Roof 0 W N FRAMING MATERIAL I Metal' 0 Z � FRAMING % o I 14 fo 0 Framing /o i 15% (16" o.c_ Wall) 12% (24" o.c. Wall) 10% (16" o.c. Floor/Cell.) SKETCH OF ASSEMBLY 7% (24" o.c. Floor/Cell.) DESCRIPTION OUTSIDE SURFACE AIR FILM 1 Insulation, Expanded Rubber (rigid) 2 Gypsum or Plaster Board 3 -insulation, Mineral Fiber, R-19 4 Gypsum or. Plaster Board 5 6 7 8 9 INSIDE SURFACE AIR FILM THICK NESS (in.) R-VALUE CAVITY WOOD R-VALUE FRAME I (Rc) R-VALUE 0.170 IAl I— *HEAT CAPACITY WALL WEIGHT (Ibs/sf) — (Optional) SPECIFIC HEAT (Btu/F-Ib) — HC (A X B) (Btu/F-sf) — -- 5.0001 22.750 1.88 0.401 0.7 0.625 0.5621 2.60 0.26 0.6 6.000 19.002 0.30 0.17 0.0 1.000 0.900 4.17 0.26 1.0 0.61 SUBTpTA' 43.Q9 8 9 TOTAL HC 2.6 *NOTE: Weight and Specific Heat values for materials penetrated by wood framing include the effects of the framing members. - - + - — - X 1 / Rc 1 - (Fr% / 100) 1 / Rf Fr% / 100 — ASSEMBLY U-VALUE This assembly contains metal framing. The Assembly U-Value has been calculated using the ASHRAE/CEC Zonal Cavity Method. EnergyPro 3-1 By EnergySoft User Number: 2531 Job Number: 21036R Page:38 of 58 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY 'PROJECT NAME Embassy Suites L 1 1 a 1 CIYI IYMI�IL H P-0.5 :NGINEERING CHECKS Number of Systems 511 Heating System II Output per System 8,400 ` Total Output (Btuh) 4.2.f7E}0 r Output (Btuh/sgft) 68.5 { I Cooling System output per System Total Output (Btuh) 35,000 Total Output (Tons) 2.9 Total Output (Btuh/sgft) 57.1 Total Output (sgft/Ton) 210.2 Air System 1 CFM per System 230 Airflow (cfm) 11150 Airflow (cfm/sgft) 1.88 Airflow (cfm/Ton) 394.3 1 Outside Air (%) 40.2� d Outside Air (cfm/sgft) O 751 Note: values above given at ARI conditions 26.0 of Outside Air 463 cfm 70.0 of �1.12.0/77.7OF 1 Outside 463 cfm DATE 4/2/2003 FLOOR AREA 613 SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK j CFM Sensible Latent CFM Sensible Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD 23,743" 30$ 4631.;831 A0 1 21,8311 4 jHVAC EQUIPr&ENT SELECTION Horizontal WSHP-0.5 19,891 22,0041 Total Adjusted System Output �-- ,g 8911 22,004 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Jul 3 pm am i emperarures 52.3OF ,_ 85.60F Heating Coil at I Ime f 0 Supply Fan 1150 cfm 85.6 of Supply Air Ducts 85.6 of ROOMS 70.0 of L Return Air Ducts V irstream Temperatures at 89.4/71.70F t 73.3/66.90F 1 74.2/67.3 of I EnergyPro 3.1 By EnergySoft User Number: 2531 Cooling Coil Supply Fa 1150 cfm ng 73.3 / 66.9 of > Supply Air Ducts n 73.5/66.9OF 71.1% R.H. ROOMS 74.0/67.3"F y I Retum Air Ducts I I Job Number 21036R Page:39 of 58 1 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME Embassy Suites 'STEM NAME HP-1 DATE 4/2/2003 FLOOR AREA 1,358 ENGINEERING CHECKS SYSTEM LOAD Number of Systems %6, COIL COOLING PEAK COIL HTG. PEAK '. Heating System . Output per System 13,000i� Total Output (Btuh) 78,000. Output (Btuh/sgft) 57.4 Cooling System Output per System 11,700 Total Output (Btuh) 70,200 Total Output (Tons) 5.0 Total Output (Btuh/sqft) 51.7 Total Output (sgft[Ton) 232.11 Air System CFM per System 400 Airflow (cfm) 2,4001 Airflow (cfm/sgft) 1.77 { Airflow (cfmrron) 410.3 Outside Air (%) 65.5' Outside Air (cfm/sgft) 1.16 CFM 'Sensible Latent i CFM Sensible Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD 1 'v 96,235 1 695i HVAC EQUIPMENT SELECTION iHorizontal WSHP-1 34,075`, 54,314 82,307� ` 11I I 4 Total Adjusted System Output (Adjusted for Peak Design Conditions) 34,075 54,3141 82 3R7 TIME OF SYSTEM PEAK Jul 3 pm F Jan 12 am Note: values above given at ARI conditions _ J (Airstream Temperatures at ime of Heating ea I 26.0OF 41.10F 73.10F 73.1OF R Supply Air Ducts Outside Al 1573 cfm 69.7 of 112.0 / 77.7 of Outside fair 1573 cfm 74.6/67.90F Heating Coil 99.1 / 74.3 of Supply Fan 2400 cfm �. Return Air Ducts 4 72.8 of ROOMS 70.0 of 85.9 / 70.7 of 85.9 / 70.7 of Supply Air Ducts a Cooling Coil Supply Fan 2400 cfm �, Return Air Ducts 4 86.4/70.8OF 72.9% R.H. 1 ROOMS 74.0/67.7OF EnergyPro 3.1 By EnergySoft User Number: 2531 Job Number. 21036R Page:40 of 58 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME Embassy Suites 'STElIA NAME HP-1.25 ENGINEERING CHECKS SYSTEM LOAD Number of Systems Heating stSy em r k Output per System ! 17,800 i Total Output (Btuh) 17,800� Output (Btuh/sgft) 66.71. Cooling System Output per System 15,300 Total Output (Btuh) 15,300! Total Output (Tons) 1.311 Total Output (Btuh/sqft) 57.3 Total Output (sgftrron) 209.41 ,Air System CFM per System 500 Airflow (cfm) 500 Airflow (cfm/sqft) I 1.87 Airflow (cfm/Ton) 392.2 Outside Air (%) 16.0 Outsid Air (cfm/sqft) Note: values above given at ARI conditions DATE 4/2/2003 FLOOR AREA 267 COIL COOLING PEAK COIL HTG. PEAK CFM Sensible' Latent 1 CFM Sensible i. Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD IHVAC EQUIPMENT SELECTION !Horizontal WSHP-1.25 j 12,330; 3,9461 Total Adjusted System Output f 12 33pJ 3 9461 (Adjusted for Peak Design Conditions) I TIME OF SYSTEM PEAK _ Jul 3 pm = 16,144 16,144' Jan 12 aml FTEATING SYSTEM ETRICS (Airstream Temperatures at I Ime of Heating 1'eaK) 1 26.0 OF Outside Air 80 cfm 70.0 of 112.0 / 77.7 of Outside 80 cfm 74.4 / 63.4 o F 610OF 93.1OF Heating Coil 93.1 of --�F ) Supply Air Ducts Supply Fan 93.1IF 500 cfm ROOMS 70-0 of Return Air Ducts 80.4/65.90F = 57.4/56.20F Cooling Coil 57.4 / 56.2 of Supply Air Ducts Supply Fan 57.8 / 56.3 of 500 cfm 55.6% R.H. ROOM 5 74.0 f 613 of I Return Air Ducts i EnergyPro 3.1 By EnergySoft User Number: 2531 Job Number: 21036R Page:41 of 58 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY 'PROJECT NAME Embassy Suites "STEM NAME HP-1.5 ,Number of Systems Heating System Output per System Total Output (Btuh) Output (Btuh/sqft) Cooling System Output per System Total Output (Btuh) Total Output (Tons) Total Output (Btuh/sqft) Total Output (sgft/Ton) 'Air System rFM per System I Airflow (cfm) Airflow (cfmisgft) Airflow (cfm/F Outside Air (%) Outside Air (cfmisgft) DATE 4/2/2003 i FLOOR AREA 891 5' COIL COOLING PEAK i COIL HTG. PEAK ;CFM I Sensiblel Latent ;CFM Sensible I 1 20,100 Total Room Loads 1,239 28,828; 2,34811 431. 11,005 II 100,500 Return Vented Lighting 11^z.f3 Return Air Ducts 1,4411 L 550 j Return Fan 01 0 18,4001 Ventilation 134 5,23i 3;,263i 134 6,281 92,000 Supply Fan 01 0 1 77 Supply Air Ducts 1� 5501 103.3 TOTAL SYSTEM LOAD 36,965', 5.61 18,387 116 2 FHHVAC EQUIPMENT SELECTION I I1 W10�"' T�I1 Horizontal WSHP-1.5 3,15 3.5 410. 4. 0.1 Note: values above given at ARI conditions 26.0 OF Outside Air 134 cfm 69.8 of 68.0 of 1 81.429, 4,91Q.1 Total Adjusted System Output 81,4291 4.,910i Ij (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Jul 4 pm 94.0 of Heating Coil res at -i tme of Heating -(�J, Supply Fan 3150 cfm 87,725 87,72 Jan 12 am 94.0 of Supply Air Ducts 93.8 of 1 ROOMS 70.0 of �, Return Air Ducts V 111.0/77.4OF 76.0/60.6OF 51.9/50.5OF 51.9/50.5IF 1 Supply Air Ducts l ■ Outside Air 134 cfm Cooling Coil Supply Fan 52.3 / 50.7 of 3150 cfm 42.4% R.H. ROOM 11 74.0159.5.017 74.4/59.7IF 4 Return Air Ducts I I EnergyPro 3.1 By EnergySoft User Number: 2531 Job Number: 21036R Page:42 of 58 I HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME Embassy Suites 'STEM NAME HP-2 DATE 4/2/2003 FLOOR AREA 2,416 ENGINEERING CHECKS SYSTEM LOAD Number of Systems j 4 COIL COOLING PEAK 1 COIL HTG. PEAK' Heating System j CFM Sensible) Latent it CFM j Sensible I . Output per System 27,4001� Total Output (Btuh) 109,6001 Output (Btuh/sgft) 45.4 (Cooling System Output per System 24,0-0-011 Total Output (Btuh) 99,200 Total Output (Tons) 8.3 Total Output (Btuh/sqft) 41 '1 Total Output (sgftfron) 292.3 Air System CFM per System 800 Airflow (cfm) 3.200 Airflow (cfm/sgft) 1.32 Airflow (cfm/Ton) 387.1. Outside Air (%) 13.0 Outside Air (cfm/sgft) 0.17 Note: values above given at ARI conditions Total Room Loads 44.186, B,187. 8791 21,1.66 Return Vented Lighting j 0 f Return Air Ducts j 2,2091 6 Return Fan 0 O l Ventilation 41 16,644 5,388 - 416 19,4. Supply Fan I Ol j 0; Supply Air Ducts 2,209. 1`0581� TOTAL SYSTEM LOAD HVAC EQUIPMENT SELECTION Horizontal WSHP-2 65,249; 13,574j 29, Total Adjusted System Output 74,503I. 29,984 (Adjusted for Peak Design Conditions) I TIME OF SYSTEM PEAK Aug 3 pm I 42.7521 ` (Airstream Temperatures at Time of Heating ea 26.0OF 64.0OF 92.80E 92.8OF Supply Air Ducts Outside Air (TTl 416 cfm 92.5 OF Heating Coil Supply Fan 3200 cfm ROOMS 1 70.0 OF 69.7 OF 12.0 / 77.7 IF Outside Air 416 cfm 79.5 / 65.5 IF L Return Air Ducts 4 57.8 / 56.6 IF 57.8 / 56.6 of Supply Air Ducts s 58.4156.8 OF 55.4% R_H- ROOMS, - I 74.0/63.20F 74.6/63.4 °F Return Air Ducts 1 EnergyPro 3.1 By EnergySoft User Number: 2531 Job Number: 21036R Page:43 of 58 Cooling Coil Supply Fan 3200 cfm HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY :PROJECT NAME uA i t Embassy Suites 4/2/2003 'STEM NAME FLOOR AREA H P-2.5 3,114 ENGINI=ERING CHECKS SYSTEM LOAD Number of Systems 611 illll Heating System { Output per System 36,100 i Total Output (Btuh) 2161,600 j Output (Btuh/sgft)Si£ Cooling System Output per System 36,oaal Total Output (Btuh) 180,0001 Total Output (Tons) 1.Q.1 Total Output (Btuh/sgft)4 557 8• Total Output (sgfUTon) 207kil ;Air System CFM per System 1,000 J Airflow (cfm) 0 L:t Airflow (cfm/sqft) 3 Airflow (cfmfTon) 400.0 Outside Air (%) 25.7 nutside Air (cfm/saft) 0.50 Note: values above given at ARI conditions 26.0 OF Outside Air 1543 cfm 69.9 of 112.0 / 77.7 of Outside Air 1543 cfm 74.6/70.7 of 58.6 of COIL COOLING PEAK I COIL HTG. PEAK 1 CFM 'Sensible: Latent CFM Sensible y Total Room Loads 14,202i 72,733, 44,577, 1 3451• 7,4451 Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD i 142,038! 24,60 72,692 1 01 (III 372 80,882 HVAC EQUIPMENT SELECTION (Horizontal WSHP-2.5 100,0331 119,063 202,77 Total Adjusted System Output 100,033 119,063 202,771' (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Aug 3 pm Jan 12 am Heating Coil Supply Fan 6000 cfm 90.2 of Supply Air Ducts 90.1 of ROOMS. 70.0 OF s. Return Air Ducts Y irstream Temperatures at t Ime 84.2 / 72.5 of = 68.6 / 66.9 of Cooling Coil Supply Fa 6000 cfm cooling t'eaK) 68.6 / 66.9 of Supply Air Ducts n 69.2/67.1OF j 84.6% R.H. 1 ROOMS , 74.0/70.5OF I Return Air Ducts EnergyPro 3.1 By EnergySoft User Number: 2531 Job Number: 21036R Page:44 of 58 J HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY :PROJECT NAME DATE 4�2�2��3 Embassy Suites _ fSTEM NAME FLOOR AREA H P-3 4,171 ENGINEERING CHECKS SYSTEM LOAD ` Number of Systems T— 4 COIL COOLING PEAK ;COIL HTG. PEAK'i Heating System - . CFM T Sensiblel Latent CFM Sensible . I Output per System 40,200 Total Output (Btuh) 160,800 Output (Btuh/sqft)-8I Cooling System Output per System 36,800 Total Output (Btuh) 147,200 Total Output (Tons) 12.3 Total Output (Btuh/sqft) 35.3 Total Output (sgftlTon) 340-0 Total Room Loads 13,591 74,856' 31,389 1 265' 24,049; Return Vented Lighting O Return Air Ducts 37431 Return Fan Ventilation 1,212 48,403 -13,827 I 1,212` 56,873' l Supply Fan 0i 01 1.202i Supply Air Ducts 3,743 � ` TOTAL SYSTEM LOAD 130,9941, 17,56 i 83,32s ,Air System CFM per System 1,200 Airflow (cfm) 4,800 Airflow (cfmisgft) 1.151 Airflow (cfmrron) 39 Outside Air (%) 25.3 Outside Air (cfmisgft) ^ 1 0.29 IHVAC EQUIPMENT SELECTION i Horizontal WSHP-3 82,574 95,627 Total Adjusted System Output I 82,574 95,627� (Adjusted for Peak Design Conditions) J TIME OF SYSTEM PEAK Jul 3pml Note: values above given at Arta conanions Airstream 26.0 OF Outside Air 1212 cfm 69.8 OF I [112.0 / 77.7 OF er d OutAli 1212 cfm 1 j 74.8/70.4OF 58.70F 88-0OF Heating Coil 84.2 / 72.2OF Ime at Fmeating (�J' Supply Fan 4800 cfm 88.0 OF Supply Air Ducts .h Return Air Ducts to 87.7 OF I, ROOMS 70.0 OF 68.1 / 66.6 OF 68.1 / 66.6 OF f—P Supply Air Ducts v Cooling Coil Supply an 68.9 / 66.8 OF 4800 cfm 82.9% R.H. ROOMS 'I 74.04 70.1 OF Return Air Ducts EnergyPro 3.1 By EnergySoft User Number: 2531 Job Number: 21036R Page:45 of 58 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME Embassy Suites ,7-STEM NAME } HP-3.5 Number of Systems 2!! .Heating System Output per System 44,600 Total Output (Btuh) 89,200 l i Output (Btuh/sgft) 43.1 Cooling System Output per System 41,500 Total Output (Btuh) 83,000 Total Output (Tons) 6.9 Total Output (Btuh/sgft) 40.1 i Total Output (sgfUTon) 299.OJ Air System CFM per System 1,400 Airflow (cfm) Airflow (cfm/sgft) 1.35; Airflow, (cfmfron) 404.8 Outside Air (%) 46.91 Outside Air (cfm/sgft) 0.63 Note: values above given atARI conditions SYSTEM LOAD DATE 4/2/2003 FLOOR AREA 2,068 I COIL COOLING PEAK !COIL HTG. PEAK C MF Sensible) Latent I, CFM Sensible I IHVAC EQUIPMENT SELECTION I i I Horizontal WSHP-3.5 44,460 57,5121 89,272 I � Total Adjusted System Output I (Adjusted for Peak Design Conditions) 44,4601 57,512 �89,272 TIME OF SYSTEM PEAK Aug 3 pm Jan 12attll (Airstream emperatures at I rme of eating ea 26.0 OF 49.1°F 78.80F 78.8°F 4 Supply Air Ducts Outside Air(STJ 1312 cfm 78.3 OF Heating Coil Supply Fan 2800 cfm ROOMS 1 70.0 OF 69.5 °F Return Air Ducts E---• (Airstream Temperatures at I Ime of Cooling ea '112.0 / 77.7 OF 92.2 / 73.0 OF 77.4 168.6 OF 77.4 / 68.6 IF Supply Air Ducts Outside Air 1312 cfm Cooling Coil Supply Fan 78.2 / 68.8 OF 2800 cfm 76.2% R.H. j ROOMS' 174.8 / 68.8 °F 74.0 / 68.5 °F Return Air Ducts IE v�L EnergyPro 3.1 By EnergySoft User Number: 2531 Job Number: 21036R Page:46 of 58 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE Embassy Suites 4/2/2003 'YSTEM NAME FLOOR AREA HP-4 3,476 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 4j' COIL COOLING PEAK COIL HTG. PEAK Heatinn Svstem 1 Output per System 48.400� Total Output (Btuh) 193,600 1 Output (Btuh/sqft) 55.7 Cooling System Output per System 48,000�J Total Output (Btuh) 192,0001 Total Output (Tons) 16.0 Total Output (Btuh/sqft) 55:?' Total Output (sgft/Ton) 217.2 ,Air System CFM per System 1,600. Airflow (cfm) 6,400 Airflow (cfm/sqft) 1.84 Airflow (cfm/Ton) 400 0' Outside Air (%) 22.3 Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD CFM � Sensible{ Latent 'I I CFM Sensible ' 6,712! 64,12-8, 18,2481� 1,2581 21,56 ~ I ql 3,206 o o. 1,424' 57,311 -1,165 11424'I I 66,945.' 01 i 3.206 127,852 17,0831 a 1,0831 HVAC EQUIPMENT SELECTION Horizontal WSFIP-4 124,858{ 96,773 179.345 V, Total Adjusted System Output 124,868' 96,773J 71�9345 (Adjusted for Peak Design Conditions) UMblU6 ~'< tU16111a41y TIME OF SYSTEM PEAK Aug 3pm Jan 12am� Note: values above given at ARI conditions (Ai rstream I emperatures at I Ime of H eating Pea ?6 n of 60.1OF 86.20F 86.2OF Outside Air 1 1424 cfm 69.8 of ` 12.0/77.7OF Outside Air 1424 cfm 74.5 / 67.4 OF Heating Coil 82.8 / 69.8 of Cooling Coil C0 Supply Fan 6400 cfm S. Return Air Ducts �4 64.6 / 63.4 of 64.6 / 63.4 of (F-->b Supply Air Ducts Supply Fan 65.1 / 63.6 of 6400 cfm 71.0% R.H. ROOM S 74.0167.3 of Return Air Ducts 1E I Supply Air Ducts I 86.1 of ROOMS-1 70.0 of EnergyPro 3.1 By EnergySoft User Number: 2531 Job Number: 21036R Page:47 of 58 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME Embassy Suites s•rEM NAME HP-5 I DATE 4/2/2003 FLOOR AREA �I 12,211 (ENGINEERING CHECKS SYSTEM LOAD Number of Systems 14,E COIL COOLING PEAK COIL HTG. PEAK' CFM Sensible Latent j 1 CIF I Sensible Heating System Output per System 68,50011 Total Room Loads 16,781 251,399 68,917, 3,296 78,970' I Total Output (Btuh) ; 959,000 Return Vented Lighting a 14 I Output (Btuh/sgft) 78.51 Return Air Ducts Ij 12,570, 3,9�49. I• Cooling System Return Fan 1—�01 o! Output per System 58;000 Total Output (Btuh) 812,000� Total Output (Tons) 67.7 Total Output (Btuh/sqft) 66.5 Total Output (sgft/Ton) 1805 Air System 1 CFM per System 2,000 Airflow (cfm) 28,0001 Airflow (cfm/sgft) 2.29 Airflow (cfm/Ton) 413.8 Outside Air (%) 1 14.1' Ventilation Supply Fan Supply Air Ducts 1 TOTAL SYSTEM LOAD _ AC EQUIPMENT S Horizontal WSHP-5 I 604.200 269,042� i 865,136. 1 1 Total Adjusted System Output 1} 200269,042 865,136 (Adjusted For Peak Design Conditions) I _ _ _ — I' Outside Air (cfmisqft) 0.32. TIME OF SYSTEM PEAK I Jul 3 pm1 Jan 12 am Note: values above given at ARI conditions (Airstream Temperatures at Time of Heating ea 26.0 OF Outside Air 3961 cfm 69.9 OF 1112.0/77.7OF Outside Air � 3961 cfm 74.4 / 64.3 °F 63.70F 92.5OF Heating Coil 79.7 / 66.4 OF EnergyPro 3.1 By EnergySoft User Number: 2531 Supply Fan 28000 cfm 92.5 OF Supply Air Ducts 92.4 OF -ROOMS 70.0 OF P, Return Air Ducts V 59.6 / 58.4 OF 59.6 / 58.4 of Supply Air Ducts ■ Cooling Coil Supply Fan 28000 cfm 60.0 / 58.6 °F i 59.2% R.H. ROOMS I i 74.0/64.2°F Return Air Ducts I Page:48 of 58 Job Number: 21036R IHVAC SYSTEM HEATING AND COOLING LOADS SUMMARY I PROJECT NAME DATE Embassy Suites 4/2/2003 (STEM NAME FLOOR AREA HP-6 4,385 I�GINEERING CHECKS II SYSTEM LOAD j 'Number of Systems Ego (Heating System Output per System 69,600I Total Output (Btuh) 278,400�� Output (Btuh/sqft) I 63-5 Cooling System Output per System 70,000 Total Output (Btuh) 280,000 j Total Output (Tons) 23.3 I Total Output (Btuh/sqft) 63.91 I Total Output (sgftrron) 1879 Air System CFM per System 2,400 Airflow (cfm) 9,600 Airflow (cfm/sgft) 2.19 low 411.4 �Airf(cfmlron) Outside Air (%) 35-2 i+ Outside Air (cfmisgft) 0.77i Note: values above given at ARI conditions 26.0 OF Outside Air 3374 cfm 69-9 of 1 COIL COOLING PEAK COIL HTG. PEAK. CFM 'Sensible) Latent CFM I Sensibll I Total Room Loads ' 141,498i 125;326; 54,6471 I 2,2921 251592i Return Vented Lighting Oi 1 Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD HVAC EQUIPMENT SELECTION I- l[Horizontal WSHP-6 156.340! 1 Total Adjusted System Output (Adjusted for Peak Design Conditions) 156,340; 184,960 TIME OF SYSTEM PEAK Jul 3pml i emperatures at I trne 54.5OF ON 80.5OF Heating Coil m (ST, Supply Fan 9600 cfm I� 268,52 r=1 I L�268,5291 Jan 12 am 80.5 of Supply Air Ducts 80.4 of ROOMS 70.0 oi= Rafi irn Air ni in-tc Q Ing 112.0/77.7OF 87.8/72.6OF 72.6/67.6OF 72.6/67.6OF 1 Supply Air Ducts Outside Fair � 3374 cfm 73.2 / 67.8 of Cooling Coil Supply Fan 9600 cfm 80.6% R.H- ROOMS ; 74.6/69.80F 74.0/69.6OFo l 1 . Retum Air Ducts I j EnergyPro 3-1 By Energysoft User Number: 2531 Job Number: 21036R Page:49 of 58 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY I PROJECT NAME Embassy Suites 'STEM NAME HP-1V 1 DATE 4/2/2003 FLOOR AREA 4,388 (ENGINEERING CHECKS 11SYSTEM LOAD Number of Systems 61 I COIL COOLING PEAK COIL HTG. PEAK rHeating System CFM 1 Sensible Latent CFM � Sensible I Output per System L 160.00 Total Output (Btuh) 1 96,000 Output (Btuh/sgft) 21.9 Cooling System Output per System 9,400 Total Output (Btuh) 56,400 Total Output (Tons) 4.7 Total Output (Btuh/sqft) 12.9; Total Output (sgft/Ton) 933.E Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD Air System HVAC EQUIPMENT SELECTION 400 Vertical WSHP-1V El 34,08 43,046 91,649 2,400 0.55' 510.6 Total Adjusted System Output 27.4 34,0831 43,046 91,649 CFM per System Airflow (cfm) 1 Airflow (cfm/sgft) Airflow (cfm/ron) % Outside Air ( ) (Adjusted for Peak Design Conditions) 0.15 TIME OF SYSTEM PEAK Jul 3 pm Jan 12 am,; (Airstream at Time of eating Peak) Outside Air (cfm/sgft) Note: values above given at ARI conditions 26.0OF 55.9OF 91.5OF 91.5OF ' Supply Air Ducts Outside Air g 658 cfm 88.7 of Heating Coil Supply Fan 2400 cfm ROOMS 70.0 of 67.2 of Return Air Ducts 12.0 / 77.7 of 86.8 / 79.0 of = 73.6 / 72.2 of Outside Air . 658 cfm Cooling Coil 177.3/79.60F `I EnergyPro 3.1 By EnergySoft User Number: 2531 73.6 / 72.2 of Supply Air Ducts • Supply Fan 76.9 / 73.2 of 2400 cfm 123.3% R.H. ROOMS' 74.0178.8 OF Return Air Ducts Job Number: 21036R Page:50 of 58 -IVAC SYSTEM HEATING AND COOLING LOADS SUMMARY 'PROJECT NAME DATE Embassy Suites 4/2/2003 �YSTEM NAME FLOOR AREA HP-2V 822 NGINEERiNG CHECKS SYSTEM LOAD Number of Systems l 3 COIL COOLING PEAK 1 COIL HTG. PEAK 'I CFM ; ' Sensible; Latent i CFM ens Sible . Heating System I Output per System 37,000 1 Total Output (Btuh) 111,000!, Output (Btuh/sqft) 135.O� Cooling System Output per System 26,400 Total Output (Btuh) 79,200 Total Output (Tons) 6.Fi Total Output (Btuh/sqft) 96.4 Total Output (sgftrron) 124.5 Air System i C F M per System 800 Airflow (cfm) 2,400 Airflow (cfm/sqft) 2.92 Airflow (cfm/Ton) l 363.6 Outside Air (%) 17.1 Outside Air (cfm/sqft) 0.50 Note: values above given at ARI conditions Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD 1,11516,622. 8;905' 381. 0 831 1,2811 411 16,61)t 3,337 I 4111 0 E31i-1 S 34,8871 12,24� 19,37 01 20,79 �HVAC EQUIPMENT SELECTION 'Vertical WSHP-2V 54,035 32,544 I Total Adjusted System Output 0351 32 544 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Jul 3pml 26.0OF 62.4OF 101.70F Outside ';ir 411 cfm Heating Coil 70.0 °F 101.7 OF Supply Fan 2400 cfm Return Air Ducts C 101,052 101,052 Jan 12 am Supply Air Ducts 101.7 OF ROOMS 70.0 OF I 1 r—OOUNG SYSTEM PSYC:HRUME I KIL:6 (Airstream I emperatures at i Ime of t.00ung reai;) I I 2.0 / 77.7 OF 80.8 / 67.2 °F ■ 59.8 / 58.6 °F Outside Air 411 cfm Cooling Coil 74.3 / 64.8 °F I 59.8 / 58.6 of Supply Air Ducts n 60.1 158.7 of 60.9% R.H. ROOMS 74.0./ rA.7 OF Return Air Ducts I I Q Supply Fa 2400 cfm EnergyPro 3.1 By EnergySoft User Number: 2531 Job Number: 21036R Page:51 of 58 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME Embassy Suites 'STEM NAME i HP-3V (Number of Systems 1� Heating System 1. Output per System 50,7W,1j Total Room Loads Total Output (Btuh) 50,700 Output (Btuh/sgft) 01. Cooling System Output per System 38,100 Total Output (Btuh) 38,100 Total Output (Tons) 3.2 Total Output (Btuh/sqft) 68.4 Total Output (sgft/Ton) 175.4 Air System CFM per System 1,200 Airflow (cfm) 1,200i Airflow (cfm/sgft) 2.15 Airflow (cfm/Ton) 378.0 Outside Air (%) 23.2 I Outside Air (cfm/sgft) 1 0.50 Note: values above given at ARI conditions Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD DATE 4/2/2003 FLOOR AREA 557 COIL COOLING PEAK I' COIL HTG. PEAK CFM Sensible, Latent CFM Sensible 1,859 13,928i 6,0341 i 135j 3,7751 fll 1 696� 0 189, ' fl• 278i 11,181! -2,07 278 13,493 o 696 26,5321 3,95, a 189 17,246 HVAC EQUIPMENT SELECTION Vertical WSHP-3V 1 21,593 23,677 47,108 Total Adjusted System Output for Conditions) 21,5931 23,67 (Adjusted Peak Design TIME OF SYSTEM PEAK Aug 3 pm Jan 12 am F-iLA I INU 5Y61 LM PbYGHKUML 1 KIGS (Airstream I emperatures at I ime of Heating PeaK) I 26.0OF 59.7OF 96.30F 96.3OF Outside Air 278 cfm Heating Coil 69.9 of Supply Fan 1200 cfm i, Return Air Ducts Supply Air Ducts 96.1 of ROOMS 70.0 of (Airstream Temperatures at tme of Cooling ea 112.0/77.7OF 83.2/71.3OF 66.5/65.4OF 66.5/65.4OF O Supply Air Ducts Outside Air 278 cfm Cooling Coil Supply Fan 67.0 / 65.5 of 1200 cfm 78.5% R.H. ROOMS 111 74.6/69.20F 74.0/69.1OF 1 Return Air Ducts Vf� � EnergyPro 3.1 By EnergySoft User Number: 2531 Job Number: 21036R Page:52 of 58 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE I Embassy Suites 4/2/2003 `'STEM NAME FLOOR AREA RTU-4 8,687 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1l COIL COOLING PEAK 4 COIL HTG. PEAK]: Heating System CFM ! Sensiblel Latent CFM I Sensible I Output per System 31,800 . Total Room Loads 13,531 85,991, 22,152 -146. 3,711 1 it Total Output (Btuh) 31,800� , Return Vented Llghting � 0. Return Air Ducts 0 18: Output (Btuh/sgft) 3.7 Cooling System '1 Output per System 4416M Total Output (Btuh) 44,600 Total Output (Tons) 3.7 Return Fan Ventilation Supply Fan Supply Air Ducts Total output (Btuh/sgft) 5.1. TOTAL SYSTEM LOAD Total Output (sgft/fon) 2,337.3i Air -)ysiem CFM per System 1,600 Airflow (cfm) 1,600 Airflow (cfm/sqft) 0.18 Airflow (cfm/Ton) 430.5 4 Outside Air (%) 81.4 Outside Air (cfm/sqft) 0.151 144,173j 729 9 HVAC EQUIPMENT SELECTION Carrier 5OTFQ005 _ 48,0141 20,914 i r Total Adjusted System Output 48,0141 0 20,914 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK i Jul 3pml L Jan 12 amp Note: values above given at ARI conditions (Airstream Temperawres at 1 ime of H ea Ing ea 26.0 OF Outs 1303 cfm 69.9 OF i112.0/77.7OF Outside Air 1303 cfm 76.5 / 72.1 °F 34.1°F r,, 46.30F Heating Coil 105.4 / 76.4 OF 46.3 OF Supply Air Ducts. • Supply Fan 46.2 OF 1600 cfm ROOMS 70.0 OF Return Air Ducts I 77.4/68.7OF 77.4/68.7OF Supply Air Ducts • Cooling Coil Supply Fan 1600 cfm �, Return Air Ducts �4 79.9 / 69.5 of 88.5% R.H. ROOMS 74.0 / 71.4 OF EnergyPro 3.1 By EnergySoft User Number: 2531 Job Number: 21036R Page:53 of 58 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DAI L Embassy Suites 4/2/2003 � STEM NAME FLOOR AREA 4 488 RTU-10 L ENGINEERING CHECKS SYSTEM LOAD Number of Systems 3 1 COIL COOLING PEAK COIL HTG. PEAK li Heating System CFM Sensible] Latent 1 CFM I Sensible I Output per System 83,800 Total Room Loads i 23,4371 301,367 59,175; 15,465! 152,99 Total Output (Btuh) 251.440011 Return Vented Lighting 01 Output (Btuhlsgft) 56.0y! Return Air Ducts 1 15,068 I ` Cooling System Return Fan 0 q Output per System 108,2001 Ventilation 673 26,574' 2,703 673 31,327' Total Output (Btuh) 324,60., Supply Fan 0 0 Total Output (Tons) 27,fl Supply Air Ducts i:5,053 7,650 Total Output (Btuhlsgft) 72.3 TOTAL SYSTEM LOAD 358,3011 61,87199,623 Total Output (sgft/Ton) 165.91i i Air System I, CFM per System 4,000 Airflow (cfm) 12,000 Airflow (cfm/sgft) 2.67 yAirflow (cfm/Ton) 1 443.6 Outside Air (%) 5.61 r� Outside Air (cfm/sgft) 0.15 Note: values above given at ARI conditions 1 26.0 of Outside A 673 cfm 69.4 of 112.0 / 77.7 of Outside Air 673 cfm I 75.2 / 662 of IHVAC EQUIPMENT SELECTION iCarrier50TFQ012 211,236 86,514 Total Adjusted System Output 211,?36 86 55 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Jul 3 pm 3ICS (Airstream Temperatures at I Ime 67.0OF ® 79.80F Heating Coil Supply Fan 12000 cfm 061 P 65,340 i 1 �1 165,340' Jan 12 aml 79.8 of Supply Air Ducts 79.2 of ROOMS] 70.0 of Return Air Ducts E- empera ures at I Ime of oo ing 77.2/66.9OF 60.8/59.9OF LJ Cooling Coil Supply Fa 12000 cfm 60.8 / 59.9 of Supply Air Ducts n 62.0/60.3OF 65.6% R.H. ROOMS 74,0.165.9 of Return Air Ducts k1 f I EnergyPro 3.1 By EnergySoft User Number: 2531 Job Number: 21036R Page:54 of 58 �HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME Embassy Suites }STEM NAME RTU-12.5 DAIt 4/2/2003 FLOOR AREA 5,586 ENGINEERING CHECKS SYSTEM LOAD Number of Systems ti ,! l COIL COOLING PEAK COIL HTG. PEAK CFM Sensible' Latent CFM Sensible 1Heating System J Output per System 118,000! Total Room Loads 1 22,641 152,26 f 94,952 -3,31•$ 5,907i Total Output (Btuh) 354,G#' Return Vented Lighting 0, I Output (Btuh/sgft) 63.4i i• Return Air Ducts 7 345� Cooling System Output per System 13.0,00[l Total Output (Btuh) 390,000 Total Output (Tons) 32.5 Return Fan 0, 1 01; Ventilation 5,58& 224,732 -52,1 5,586 263,3721 Supply Fan e 0 0` Supply Air Ducts 7,6131 Total Output (Btuh/sqft) 1 69'8 TOTAL SYSTEM LOAD 392,2261 42,382j 770, 7701 Total Output (sgftlron) 171,9 - Air System HVAC EQUIPMENT SELECTION CFM per System 5,000 Carrier 50TFQ014 340,838 53,408 232,81151 Airflow (cfm) 15,000i'' � I i Airflow (cfm/sqft) 2.6911 Airflow (cfm/ron) 461.5 % Outside Air ( ) 37'2'j Total Adjusted System Output 340,8381 53,4081 232. 5 (Adjusted for Peak Design Conditions) ` Outside Air (cfm/sgft) 1.00 TIME OF SYSTEM PEAK Jul 3 PMl Jan 12 am Note: values above given at ARI conditions Irstream emperatures at i Inge of eating ea i 26.0 OF 53.6 OF 68.10E 68.10E Supply Air Ducts Outside Ai l 5586 cfm 70.0 OF Heating Coil Supply Fan 15000 cfm �, Return Air Ducts Y 68.1 OF ROOMS,! i 70.0 OF (Airstream I emperatures at I Imen oo ing ea I 112.0 / 77.7 OF 88.4 / 72.7OF 67.3 / 65.8 OF 67.3 / 65.8 OF Supply Air Ducts Outside Air 5586 cfm 67.7 / 65.9 OF i Cooling Coil Supply Fan 15000 cfm 74.5/69.70F i" Return Air Ducts Y 80.7% R.H. ROOMS 74.0169.6 OF EnergyPro 3.1 By EnergySoft User Number: 2531 Job Number: 21036R Page:55 of 58 VAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME Embassy Suites DATE 4/2/2003 'STEM NAME FLOOR AREA HP-1 (Guests) 30,453 ENGINEERING CHECKS SYSTEM LOAD ;Number of Systems 37 COIL COOLING PEAK COIL HTG. PEAK' i Heating System III CFM Sensibtel, 'Latent CFM Sensible Output per System 7,800ii Total Room Loads - 4,2531; 451.0271 38,828 1 187,651i 119,1 Total Output (Btuh) 288,600; Return Vented Lighting Ot I I Output (Btuh/sgft) 9.5 I Return Air Ducts r:2:2,5:5]1 5,987'Cooling System Return Fan o Output per System 8,3001Ventilation _ 5,810; 225,5911-28,339 5,810 271,129 Total Output (Btuh) 307,100 Supply Fan 1�0 0{ Total Output (Tons) 25,f3 Supply Air Ducts 22,551 5,987 Total Output (Btuhlsgft) 10.1 1 i TOTAL SYSTEM LOAD 721,870, 10,489 402,862j Total Output (sgftrron) 1,190.0i11._ Air System I1 HVAC EQUIPMENT SELECTION CFM per System I 320i A G a ,a' o o m7i l oon ��cT Airflow (cfm) 4— Airflow (cfm/sgft) 0.391 uumate master vna-a i o- i u .` I Total Adjusted System Output 150171 228,923 29(l 659 , (Adjusted for Peak Design Conditions) 1 Airflow (cfmrron) Outside Air 49.1 % ( ) 1 Outside Air (cfm/sgft) t 0.19i TIME OF SYSTEM PEAK Aug 3 pm Jan 12am Note: values above given at ARI conditions 1 26.0 of Outside Air 5810 cfm I 69.5 of 112.0/77.7OF Outside Au 5810 cfm 75.8 / 68.9 ° F emneratures 48.2OF 71.10F Heating Coil (2/ Supply Fan 11840 cfm nngea 71.1 of Supply Air Ducts 70.6 OF ROOMS 70.0 of �. Return Air Ducts V 93.6 / 73.3 of 81.7 / 69.8 of Q Cooling Coil Supply Fa 11840 cfm 81.7 / 69.8 of �� Supply Air Ducts n 83.5/70.3OF 75.6% R.H. E ROOMS 74.0 / 68.4 of 1 f I � Return Air Ducts Y EnergyPro 3.1 By EnergySoft User Number: 2531 — Job Number: 21036R Page:56 of 58 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME Embassy Suites DATE 4/2/2003 - TSTEM NAME FLOOR AREA HP-2 (Guests) 33,113 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 551 COIL COOLING PEAK 'COIL HTG. PEAK'' . Heating System Il Total Room Loads Return Vented Lighting CFM TSem7iblel 52,510 491,2a4i a Latent l CFM � Sensible 42,219 j 11,522: 211,740 Output per System 1 12,700�111 Total Output (Btuh) 698.500' Output (Btuh/sgft) 21.i'` I Return Air Ducts 24,564 10,58 Cooling System Return Fan 01 0; Output per System Total Output (Btuh) Total Output (Tons) Total Output (Btuh/sgft) Total Output (sgft/Ton) r System CFM per System Airflow (cfm) Airflow (cfm/sgft) Airflow (cfm/Ton) Outside Air (%) 12,4001- Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD 3,t::io, 152,8241 o 24,564 i 693,5101 Z581 44,805. 682,000 56.8 582.61 1 3,8501 179,887i 0 10,587 0 635,6971 l l 635,697 ' I Outside Air (cfm/sgft) 0.121; TIME OF SYSTEM PEAK Aug 3 pm Jan 12 aml Note: values above given at ARI conditions (Airstream Temperatures at I ime ot HeatingPeak) I 26.0OF 62-5OF 87.6OF 87.6OF Outside Air 3850 cfm 69.6 of HVAC EQUIPMENT SELECTION 430 23,6501 Climate Master VHS-816-15 1 423,4951 350,E 0.71 416.1' i Total Adjusted System Output 350,294 16.31 (Adjusted for Peak Design Conditions) 423,495,1 Heating Coil Supply Fan 23650 cfm S, Return Air Ducts Y Supply Air Ducts 87.1 of ROOMS 70.0 of 64.3/63.2OF Supply Air Ducts 65.3/63.5OF' 69.3% R.H. ROOMS 74.0/66.8OF EnergyPro 3.1 By EnergySoft User Number: 2531 Job Number: 21036R Page:57 of 58 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY ;PROJECT NAME Embassy Suites STEM NAME HP-3 (Guests) DATE 4/2/2003 FLOOR AREA 5,956 ENGINEERING CHECKS 11SYSTEM LOAD Number of Systems 81' _ COIL COOLING PEAK 1 ; COIL HTG. PEAK' CFM S 3b1 L t t' CFM Sensible I Heating System Output per System 16,700 Total Output (Btuh) 133,600. Output (Btuh/sgft) Cooling System Output per System 19,000 Total Output (Btuh) 152,000. Total Output (Tons) 12.71 Total Output (Btuh/sqft) 25.5 Total Output (sgft/Ton) 470.2 Air System CFM per System 70M Airflow (cfm) 5,600 Airflow (cfm/sgft) 0.94 Airflow (cfm/Ton) 442.1 r Outside Air (%) 10.0 J Outside Air (cfm/sqft) 0,09 Note: values above given at ARI conditions len I ensi ea I I l I Total Room Loads � 5,254 84,830 7,594 2,0161 32,221 Return Vented Lighting 1 00 i Return Air Ducts ' 4,241' 1,611- Return Fan ol Q Ventilation 560i 19,38511 564, 550 20,255 Supply Fan � of 01 Supply Air Ducts 4,2411 1,611: TOTAL SYSTEM LOAD 112,755 8,159i HVAC EQUIPMENT SELECTION Climate Master VHS-816-20 118,262 38,0261 118,988 I, 1 Total Adjusted System Output 118,262 38,026 118,988 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Sep 3 pm Jan 12 aml 26.0OF 65.4OF .e, 85.2OF 85.2OF Outside Air i 560 cfm 69.7 cF 107.0 / 73.5 of i Outside A i 560 cfm 74.7 / 63.3 ° F Heating Coil 77.9 / 64.4 of Supply Fan 5600 cfm Supply Air Ducts L 84.9 of ROOMS 70.0 of Return Air Ducts < I 58.2 / 57.0 of 58.2 / 57.0 of Supply Air Ducts Cooling Coil Supply Fan 5600 cfm �, Return Air Ducts 59.0/57.3OF 55.0% R.H. ROOMS 74.0 / 63.1 OF I EnergyPro 3.1 By EnergySoft User Number: 2531 Job Number: 21036R Page:58 of 58 Note: values above given at ARI conditions len I ensi ea I I l I Total Room Loads � 5,254 84,830 7,594 2,0161 32,221 Return Vented Lighting 1 00 i Return Air Ducts ' 4,241' 1,611- Return Fan ol Q Ventilation 560i 19,38511 564, 550 20,255 Supply Fan � of 01 Supply Air Ducts 4,2411 1,611: TOTAL SYSTEM LOAD 112,755 8,159i HVAC EQUIPMENT SELECTION Climate Master VHS-816-20 118,262 38,0261 118,988 I, 1 Total Adjusted System Output 118,262 38,026 118,988 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Sep 3 pm Jan 12 aml 26.0OF 65.4OF .e, 85.2OF 85.2OF Outside Air i 560 cfm 69.7 cF 107.0 / 73.5 of i Outside A i 560 cfm 74.7 / 63.3 ° F Heating Coil 77.9 / 64.4 of Supply Fan 5600 cfm Supply Air Ducts L 84.9 of ROOMS 70.0 of Return Air Ducts < I 58.2 / 57.0 of 58.2 / 57.0 of Supply Air Ducts Cooling Coil Supply Fan 5600 cfm �, Return Air Ducts 59.0/57.3OF 55.0% R.H. ROOMS 74.0 / 63.1 OF I EnergyPro 3.1 By EnergySoft User Number: 2531 Job Number: 21036R Page:58 of 58 Envelope Mandatory Measures §118(a) Installed insulating material shall have been certified by the manufacturer to comply with the California Quality Standards for insulating material, Title 20, Chapter 4, Article 3. § 118(c) All insulating Materials shall be installed in compliance with the flame spread rating and smoke density requirements of Sections 2602 and 707 of the Title 24, Part 2. § 117(a) All Exterior Joints and openings in the building that are observable sources of air leakage shall be caulked, gasketed, weatherstripped or otherwise sealed. §116(b) Site Constructed Doors, Windows and Skylights shall be caulked between the unit and the building, and shall be weatherstripped (except for unframed glass doors and fire doors). § 116(a)1 Manufactured Doors and Windows installed shall have air infiltration rates not exceeding those shown in Table Number 1-E. of the Standards. Manufactured fenestration products must be labeled for U-value according to NFRC procedures. §118(e) Demising Walls in Nonresidential Buildings: The opaque portions of framed demising walls in nonresidential buildings shall have insulation with an installed R-value of no less than R-11 between framing members. Lighting Mandatory Measures § 131(d) l For every floor, all interior lighting systems shall be equipped with a separate automatic control to shut off the lighting. This automatic control shall meet the requirements of section 119 and may be an occupancy sensor, automatic time switch, or other device capable of automatically shutting off the lighting. § 131(d)2 Override for Building Lighting Shut-off: The automatic building shut-off system is provided with a manual, accessible override switch in sight of the lights. The area of override is not to exceed 5,000 square feet. § 119(h) Automatic Control Devices Certified: All automatic devices specified are certified, all alternate equipment shall be certified and installed as directed by the manufacturer. Fluorescent Ballast and Luminaries Certified: All fluorescent fixtures specified for the project are certified and listed in the directory. All installed fixtures shall be certified. §132 Tandem Wiring for One and Three Lamp Fluorescent Fixtures: All one and three lamp fluorescents fixtures are tandem wired with two lamp ballasts were required by Standards Section 132; or all three lamp fluorescents fixtures are specified with electronic high - frequency ballasts and are exempt from tandem wiring requirements. § 131(a) Individual Room/Area Controls: Each room and area in this building is equipped with a separate switch or occupancy sensor device for each area with floor -to -ceiling walls. § 131(b) Uniform Reduction for Individual Rooms: All rooms and areas greater than 100 square feet and more than 0.8 watts per square foot of lighting load shall be controlled with bi-level switching for uniform reduction of lighting within the room. § 131(c) Daylight Area Control: All rooms with windows and skylights that are greater than 250 Square feet and that allow for the effective use of daylight in the area shall have 50 % of the lamps in each daylit area controlled by separate switch; or the effective use of daylight cannot be accomplished because the windows are continuously shaded by a building on the adjacent lot. Diagram of shading during different times of the year is included on the plans. §131(f) Control of Exterior Lights: Exterior mounted fixtures served from the electrical panel inside the building are controlled with a directional photo cell control on the roof and corresponding relay in the electrical panel. §131(e) Display Lighting: Display lighting shall be separately switched on circuits that are 20 amps of less. Mechanical Mandatory Measures EQUIPMENT AND SYSTEM EFFICIENCES §111 Any appliance for which there is a California standard established in the Appliance Efficiency Regulations with comply with the applicable standard. §115(a) Fan type central furnaces shall not have pilot lights. §123 Piping, except that conveying fluids at temperatures between 60 and 105 degrees Fahrenheit, or within HVAC equipment, shall be insulated in accordance with Standards Section 123. § 124 Air handling duct systems shall be installed and insulated in compliance with Sections 601, 603 and 604 of the Uniform Mechanical Code. CONTROLS § 122(e) Each space conditioning system shall be installed with one of the following: §122(E)lA Each space conditioning system serving building types such as offices and manufacturing facilities (and all others not explicitly exempt from the requirements of section 122(d)) shall be installed with an automatic time switch with an accessible manual override that allows operation of the system during off -hours for up to 4 hours. The time switch shall be capable of programming different schedules for weekdays and weekends; incorporate an automatic holiday "shut off" feature that turns off all loads for at least 24 hours, then resumes the normally scheduled operation; and has program backup capabilities that prevent the loss of the device's program and time settings for at least 10 hours if power is interrupted; or §122(e)1B An occupancy sensor to control the operating period of the systems; or § 122(e) l C A 4-hour timer that can be manually operated to control the operating period of the system. §122(e)2 Each space conditioning system shall be installed with controls that temporarily restart and temporarily operate the system as required to maintain a setback heating and/or a setup cooling thermostat setpoint. § 122(g) Each space conditioning system serving multiple zones with combined conditioned floor area more than 25,000 square feet shall be provided with isolation zones. Each zone: shall not exceed 25,000 square feet; shall be provided with isolation devices, such as valves or dampers, that allow supply of heating or cooling to be setback or shut off independently of other isolation areas; and shall be controlled by a time control device as described above. § 122(a&b) Each space conditioning zone shall be controlled by an individual thermostatic control that responds to temperature within the zone. Where used to control heating, the control shall be adjustable down to 55°F or lower. For cooling, the control shall be adjustable up to 85°F or higher. Where used to control both heating and cooling, the control shall be capable of providing a deadband of at least 5°F within which the supply of heating and cooling is shut off or reduced to a minimum. § 122(c) Thermostats shall have numeric setpoints in degrees Fahrenheit (F) and adjustable setpoint stops accessible only to authorized personnel. §122(b) Heat pumps shall be installed with controls to prevent electric resistance supplementary heater operation when the heating load can be met by the heat pump alone. VENTILATION § 121(e) Controls shall be provided to allow outside air dampers or devices to be operated at the ventilation rates as specified on these plans. §122(f) Gravity or automatic dampers interlocked and closed on the fan shutdown shall be provided on the outside air intakes and discharges of all space conditioning and exhaust systems. § 122(f) All gravity ventilating systems shall be provided with automatic or readily accessible manually operated dampers in all openings to the outside, except for combustion air openings. § 121(f) l Air Balancing: The system shall be balanced in accordance with the National Environmental Balancing Bureau (NEBB) Procedural Standards (1983), or Associated Air Balance Council (AABC) National Standards (1989); or §121(02 Outside Air Certification: The system shall provide the minimum outside air as shown on the mechanical drawings, and shall be measured and certified by the installing licenced C- 20 Mechanical contractor and certified by (1) the design mechanical engineer, (2) the installing licenced C-20 mechanical contractor, or (3) the person with overall responsibility for the design of the ventilation system; or §121(f)3 Outside Air Measurement: The System shall be equipped with a calibrated local or remote device capable of measuring the quantity of outside air on a continuous basis and displaying that quantity on a ready accessible displays; or § 121(f)4 Another method approved by the Commission. WATER HEATING SYSTEMS §113(b)2 If a circulating hot water system is installed, it shall have a control capable of automatically turning off the circulating pump(s) when hot water is not required. §113(b)3B Lavatories in restrooms of public facilities shall be equipped with controls to limit the outlet temperature to 1100 F. §113(b)3C Lavatories in restrooms of public facilities shall be equipped within of the following: -Outlet devices that limit the flow of hot water to a maximum of 0.5 gallons per minute. -Foot actuated control valves, and outlet devices that limit the flow of hot water to a maximum of 0.75 gallons per minute. -Proximity sensors actuated control valves, and outlet devices that limit the flow of hot water to a maximum of 0.75 gallons per minute. -Self-closing valves, and outlets devices that limit the flow of hot water to a maximum of 2.5 gallons per minute, and 0.25 gallons/cycle (circulating system). -Self-closing valves, and outlet devices that limit the flow of hot water to a maximum of 2.5 gallons per minute, and 0.50 gallons/cycle (non -circulating system) -Self-closing valves, and outlet devices that limit the flow of hot water to a maximum of 2.5 gallons per minute, and 0.75 gallons/cycle (foot switches and proximity sensor controls).