2021-Feb. Coral Mountain Resort - EIR Notice of PreparationPROOF OF
PUBLICATION
STATE OF CALIFORNIA SS.
COUNTY OF RIVERSIDE
CITY OF LA QUINTA
ATTN-. CARLOS FLORES
78495 CALLE TAMPICO
LA QUINTA, CA 92253
1 am over the age of 18 years old, a citizen of the
United States and not a party to, or have interest in
this matter. 1 hereby certify that the attached
advertisement appeared in said newspaper (set in
type not smaller than non pariel) in each and entire
issue of said newspaper and not in any supplement
thereof on the following dates, to wit:
2/17/21
I acknowledge that I am a principal clerk of the
printer of The Desert Sun, printed and published
weekly I the City of Palm Springs, County of
Riverside, State of California. The Desert Sun was
adjudicated a Newspaper of general circulation on
March 24, 1988 by the Superior Court of the
County of Riverside, State of California Case No.
191236.
mediagroup
PANT OF R?E USA TODAY NETWORK
750 N Gene Autry Trail
Palm Spnngs, CA 92262
Tef: 760-7784578/Fax 760-7784731
Email. lea-9—Nf&thedeserisun. com
4V Qu L a CITY OF LA QUINTA
. _ -- GUM 4'A,PP,PRI _ NOTICE OF PREPARATION
Project Title: Coral Mountain Resort
Project Location: Within the City of La Quinta, the project encompasses an
area of approximately 929 acres south of Avenue 58, north of Avenue 60, and
east and west of Madison Street. As a part of the proposed project, the 386-
acre portion of the site west of Madison Street is proposed to be removed from
the existing Andalusia Specific Plan (SP 03-067) and developed under Specific
Plan 2019-0003. This area is generally bounded by the Avenue 58 to the north;
Madison Street to the east; the extension of Avenue 60 to the south; and Coral
Mountain to the west. Located in portions of Section 27 and 28, Township 6
South, Range 7 East, San Bernardino Base Line and Meridian; Latitude 330 37'
15" N Longitude 116° 15' 21"W (approximate geographic center of the site).
Project Description: The proposed project would result in the development
of a master planned resort community, and the removal of the 386-acre
development site from the existing 929-acre Andalusia at Coral Mountain NA
Specific Plan. The project proposes to develop the 986-acresite with a mix of
uses including up to 600 dwelling units of varying pro(lurt types, a resortfacility SITE w r
with up to 150 moms, 57.000 square feet of tourist commercial uses, 60,000
square feet of nelghbofhood commercial uses, and Open space recreational
AVENUE
uses on approximately 23.6 acres. In addition, the project proposes a 16.62- t
acre artificial wave basin for recreational purposes. The project conslsls of
the 1611bwing entltlonwt applications: a General Plan Amendment (GPA 2019-0002), a Zone Change (ZC 2019-0004), a Specific Plan
Amendment to SIP 03.067, a Specfgc Plan (SP2019.0004 sTentativeTract Map (TTM 2019-0005), and a Site Development Permit (SDP)
for a portion of the project consisting of an artificial wave basin.
The City of La Quinta, acting as the Lead Agency, has determined that an Environmental Impact Report (EIR) should be prepared for the
proposed project. The EIR will be prepared in accordance with the California Environmental Quality Act (CEQA) to evaluate the pDlentlel
environmental impacts associated with the implementation of the project.
This Notice of Preparation also sDIUS wromenls and ghestlonS from responsible agencies, trustee genies, federal. Slate and local
agencies and the general pdhk, on the scope and consent of the onvlmnmental document to be prepared to analyze the potential
environmental Impads of the proposed project. Comments received In response to this Notice of Prepaiefiop will be reviewed and
contoldered In dalerml Ring the scope of the EAR. The time period to submit comments will begin February 17. 2021 and will and March
19,2021.
Comments and questions may be directed to: Nicole Sauviat Cristo, Consulting Planner, City of La Dulnto. 78-495 Celle Tampico, La
Quinta, CA 92253, or consultingplanner@laquintaca.gov. Please include the name, phone number, and address of your agency's contact
person in your response.
PUBLISH ONCE ON FEBRUARY 17, 2021 1/B PAGE DISPLAY AD oscc10590879-oi
certify under penalty of perjury, under the laws of the
State of California, that the foregoing is true and
correct. Executed on this 18th of February 2021 in
Green Bay, Wisconsin; County of Brown
DECLARANT
Ad#: GC10590879
P O: Notice of Preparation
# of Affidavits: 1
ta a;Arav Cl TY OF LA QUINTA
GU,I olffr 1)b FIKI - NOTICE OF PREPARATION
Project Title: Coral Mountain Resort
Project Location: Within the City of La Quinta, the project encompasses an
area of approximately 929 acres south of Avenue 58, north of Avenue 60, and
east and west of Madison Street. As a part of the proposed project, the 386-
acre portion of the site west of Madison Street is proposed to be removed from
the existing Andalusia Specific Plan (SP 03-067) and developed under Specific
Plan 2019-0003. This area is generally bounded by the Avenue 58 to the north;
Madison Street to the east; the extension of Avenue 60 to the south; and Coral
Mountain to the west. Located in portions of Section 27 and 28, Township 6
South, Range 7 East, San Bernardino Base Line and Meridian; Latitude 33' 37'
15" N Longitude 116" 15' 21 " W (approximate geographic center of the site).
Project Description: The proposed project would result in the development
of a master planned resort community, and the removal of the 386-acre
development site from the existing 929-acre Andalusia at Coral Mountain
Specific Plan. The project proposes to develop the 386-acre site with a mix of
uses including up to 600 dwelling units of varying product types, a resortfacility
with up to 150 rooms, 57,000 square feet of tourist commercial uses, 60,000
square feet of neighborhood commercial uses, and open space recreational L I' NJTH AVENOE
uses on approximately 23.6 acres. In addition, the project proposes a 16.62-
acre artificial wave basin for recreational purposes. The project consists of
the following entitlement applications: a General Plan Amendment (GPA 2019-0002), a Zone Change (ZC 2019-0004), a Specific Plan
Amendment to SP 03-067, a Specific Plan (SP 2019-0003), a Tentative Tract Map (TTM 2019-0005), and a Site Development Permit (SDP)
for a portion of the project consisting of an artificial wave basin.
The City of La Quinta, acting as the Lead Agency, has determined that an Environmental Impact Report (EIR) should be prepared for the
proposed project. The EIR will be prepared in accordance with the California Environmental Quality Act (CEQA) to evaluate the potential
environmental impacts associated with the implementation of the project.
This Notice of Preparation also solicits comments and questions from responsible agencies, trustee agencies, federal, State and local
agencies and the general public, on the scope and content of the environmental document to be prepared to analyze the potential
environmental impacts of the proposed project. Comments received in response to this Notice of Preparation will be reviewed and
considered in determining the scope of the EIR. The time period to submit comments will begin February 17, 2021 and will end March
19, 2021.
Comments and questions may be directed to: Nicole Sauviat Criste, Consulting Planner, City of La Quinta, 78-495 Calle Tampico, La
Quinta, CA 92253, or consultingplanner@laquintaca.gov. Please include the name, phone number, and address of your agency's contact
person in your response.
PUBLISH ONCE ON FEBRUARY 17, 2021 1/8 PAGE DISPLAY AD DS-GC10590879-01 I