Loading...
JPR - Application Package to CVCC 2020DIS TURBURANCE536.1 CONS ERVATION294.7 NAP12.4 OF FS IT E CONSERVAT ION57.7 OS -REC18.1 OF FS IT E CONSERVAT ION17.2 OF FS IT E AV E 6210.4 OF FS IT E CONSERVAT ION10.7 CONS ERVATION-TAN K6.6 OF FS IT E MADIS ON3.6 OFFS ITE JEFFERS ON3.1 OF FS IT E CONSERVAT ION3.4 Leg end DIST UR BURA NCE - 536.1 AC CONS ERVATION - 294.7 AC CONS ERVATION -TA NK - 6.6 A C OS-RE C - 18.1 AC OFF SIT E CONS ER VAT ION - 89.0 AC OFF SIT E AV E 62 - 10.4 AC OFF SIT E JEF F ERS ON - 3.1 A C OFF SIT E MADIS ON - 3.6 AC NAP - 12.4 AC ONS IT EUSES855.4 AC OF FS IT EUSES106.0 AC TRAVERTINE PROJECT Coachella Valley Conservation Commission December 3, 2020 TRAVERTINE PROJECT Page 2 of 30 TRAVERTINE PROJECT Page 3 of 30 Tables of Contents Exhibit 1 - Regional Location Map ........................................................................................................ 4 Exhibit 2 - Vicinity Map ......................................................................................................................... 5 Exhibit 3 – Site Location Map ................................................................................................................ 6 1. PROPOSED PROJECT .......................................................................................................................... 7 1.1 Project Objectives ...................................................................................................................... 7 1.2 Project History ........................................................................................................................... 8 Exhibit 4 – City of La Quinta – Existing General Plan / 1999 Specific Plan ....................................... 12 Exhibit 5 – Proposed General Plan Land Use ...................................................................................... 13 1.3 Project Description................................................................................................................... 14 Table 2: Proposed Planning Area Summary ......................................................................................... 15 1.3.1 Residential Planning Areas ...................................................................................................... 16 Exhibit 6 – Planning Area Land Use Plan ............................................................................................ 17 1.3.2 Tourist Serving Recreational Facilities ................................................................................... 18 Table 3: Proposed Uses and Amenities for Resort/Golf Planning Areas ............................................. 18 1.3.3 Open Space/Recreation Planning Areas .................................................................................. 18 1.3.4 Open Space/Natural Planning Areas ....................................................................................... 18 1.3.5 Recreational Amenities ............................................................................................................ 20 Exhibit 7 – Recreation Plan .................................................................................................................. 21 1.3.6 Master Planned Roads ............................................................................................................. 22 Exhibit 8 – Circulation Plan ................................................................................................................. 23 1.3.7 Infrastructure ........................................................................................................................... 24 Exhibit 9 – Grading Plan ...................................................................................................................... 25 Exhibit 10 – Conceptual Hydrology ..................................................................................................... 26 Exhibit 11 –Conceptual Water Plan ..................................................................................................... 28 Exhibit 12 –Conceptual Sewer Plan ..................................................................................................... 30 TRAVERTINE PROJECT Page 4 of 30 Exhibit 1 - Regional Location Map TRAVERTINE PROJECT Page 5 of 30 Exhibit 2 - Vicinity Map TRAVERTINE PROJECT Page 6 of 30 Exhibit 3 – Site Location Map TRAVERTINE PROJECT Page 7 of 30 1. PROPOSED PROJECT 1.1 Project Objectives The Travertine Specific Plan serves as an overall framework to conscientiously guide development of the proposed project. To ensure the functional integrity, economic viability, environmental sensitivity, and positive aesthetic impact of this Specific Plan, planning and development goals for the project were established and supported through an extensive analysis. This analysis includes an examination of project environmental constraints, engineering feasibility, market acceptance, economic viability, City General Plan goals, development phasing, and local community goals. The Travertine Specific Plan has identified the following Project objectives: • To enhance the existing trail system by adding a staging and parking area and access from the proposed extension of Jefferson. • Provide an interpretive trail element that circumnavigates the project and identifies the unique features both historical and current within the project setting. • To focus the activities for the community on walking and hiking as well as providing a major recreational facility along the eastern edge of the project. • The primary goal of the Amendment is to reduce the overall intensity of the 1995 approved Specific Plan. • Establish a distinctive community character through place-making elements that embrace and respect the site’s special physical attributes, as well as authentic architecture that reflects local heritage. • Provide a comprehensive system of parks and recreation facilities and services that meet the active and passive needs of all residents and visitors. • Contribute to the preservation, conservation and management of open space lands and scenic resources for enhanced recreational, environmental and economic purposes. • Provide protection of the health, safety, and welfare of the community from flooding and hydrological hazards. The following Project objectives have been identified for the EIR: • To contribute to the reduction of air emissions generated within the City. • Provide a regulatory framework that facilitates and encourages energy and water conservation through sustainable site planning, project design, and green technologies and building materials. TRAVERTINE PROJECT Page 8 of 30 • Assist in the protection and preservation of native and environmentally significant biological resources and their habitats. • Assist in the protection and preservation of cultural resources. • Contribute to the preservation, conservation and management of the City’s open space lands and scenic resources for enhanced recreation, environmental and economic purposes. • Provide protection of the residents’ health and safety, and of their property, from geologic and seismic hazards. • Provide protection of the health and safety, and welfare of the community from flooding and hydrological hazards. • Provide protection of residents from the potential impacts of hazardous and toxic materials. • Provide a healthful noise environment which complements the City’s residential and Resort/Spa character. • Provide housing opportunities that meet the diverse needs of the City’s existing and projected population. • Provide public facilities and services that are available, adequate and convenient to all City residents. • Provide a circulation system that promotes and enhances transit, alternative vehicle, bicycle and pedestrian systems. • Provide domestic water, sewer and flood control infrastructure and services which adequately serve the project development and the existing and long-term needs of the City. 1.2 Project History The project site is located on an alluvial fan emanating from the Santa Rosa Mountains in the southeast portion of the City of La Quinta. The only known land use of the site can be seen in an area near the center of the site, see Exhibit 3; this area was used as a vineyard that included, grape vines, irrigation lines, access roads. The vineyard is no longer active and appears to have ceased operation sometime in 2005-2006. In 1988-1989 the project site was part of a proposed land exchange, the Toro Canyon Land Exchange, between the Bureau of Land Management (BLM) and the Nature Conservancy, to dispose of public lands that would be more suitable for development in exchange for private land further to the south that provides important habitat for Bighorn Sheep. An EA was prepared for the land exchange. The EA concluded that the private land offered in the exchange would now be protected as federal resources in support of Bighorn Sheep and critical habitat. Also, as part of the land exchange, the Travertine project site would be available for development in accordance with the land use planning designations imposed by the City of La Quinta. The exchange consisted of the following: • Five sections of land within the Santa Rosa Mountains, four sections owned by Travertine property owners and one section owned by the Nature Conservancy; together comprising 3,207 acres within the Santa Rosa Mountain National Scenic Area, offered to the BLM. TRAVERTINE PROJECT Page 9 of 30 • One section of land owned by the BLM comprising approximately 639 acres offered to the Travertine property owners. • Upon approval of the Toro Canyon land exchange, the 639 acres were combined with approximately 270 acres of adjacent acres to create the Travertine project site for a total of approximately 909 acres of developable land. The County of Riverside included the Travertine project site within its Eastern Coachella Valley Community Plan (ECVCP). The ECVCP land use designation for the site’s lower elevation - the flatter portions of the site - was “Planned Residential Reserve”. This designation was intended to allow for large scale, self-contained Resort/Spa communities. The steeper portions of the site were designated as “Mountainous Areas” in the ECVCP where limited land uses permitted in areas covered by this designation included Open Space, limited recreational uses, limited single family residential, landfills and resource development. Once the Toro Canyon land exchange was approved, the City of La Quinta began annexation proceedings with the county if Riverside for the Travertine project site. The annexation was completed in 1993 with the project site designated as Low Density Residential (LDR, 2 to 4 du/ac) and Open Space (1 du/ac) land uses. In June 1995, the Travertine Specific Plan was approved and an EIR was certified by the La Quinta City Council by adoption of Resolutions 95-38 and 95-39, subject to conditions of approval and a Mitigation Monitoring and Reporting Program (MMRP). Along with the Specific Plan, the corresponding General Plan Amendment and Change of Zone were also approved. The Specific Plan identified a number of land uses including: • Very Low Density Residential • Medium Residential • Medium High Residential • Neighborhood Commercial • Tourist Commercial • Golf Course Open Space In June 1999, the La Quinta Planning Commission re-approved the Specific Plan for the Travertine project site to allow for an indefinite extension of time by adoption of Resolution 99-061. In June 2004, a request was submitted to the U.S. Fish and Wildlife Service (USFWS) to initiate a Section 7 consultation regarding the impacts to the Peninsular Bighorn Sheep and its designated critical habitat. A Biological Opinion (BO) was completed by the USFWS in December 2005 that evaluated the biological resources on the project site in a Biological Assessments (BA). The Travertine property owners had acquired several areas off-site to preserve open space habitat for the Bighorn Sheep and had proposed several mitigation measures in the time between the initial Specific Plan approval (1995) and the start of the Section 7 consultations (2005). The BO concluded that the mitigation measures proposed by Travertine, including the setbacks from habitat and the types of vegetation allowed near the southern and western property lines, would be appropriate for the preservation of any critical habitat that existed in the area and that the development of the site as TRAVERTINE PROJECT Page 10 of 30 previously approved, would not interfere with the Bighorn Sheep or its critical habitat. Table 1: Approved Specific Plan and Proposed Specific Plan Comparison Previously Approved Specific Plan Proposed Specific Plan Amendment Bounded by Avenue 60 to the North, Avenue 64and BLM Land to the South, Madison Street to East and Jefferson Street to the West Bounded by Avenue 60 to the North, Avenue 64 and BLM Land to the South, Madison Street to East and Jefferson Street to the West 909-acres 855-acres 2,300 Residential Dwelling Units 1,200 Residential Dwelling Units 10-acres of Commercial 100 Villa Resort and Wellness Spa 500 Room Resort / Hotel 36 – Hole Golf Course Golf Facility with associated Recreational and Commercial Elements Tennis Club Tennis Club Removed Private Recreation in Individual Developments Private Recreation in Individual Developments 378-acres of Open Space Recreation (all golf course) 55.9-acres Open Space / Recreational 301.2 Open Space Natural/ Preserved TRAVERTINE PROJECT Page 11 of 30 The current plan: • Preserves 35% of the project area as permanent open space. • Reduces the number of dwelling units by 1,100 residences or 52% • Reduces the acreage of golf uses from 363 acres to 46.2 acres or 79% • Reduces the number of resort rooms from 500 to 100 or 80% TRAVERTINE PROJECT Page 12 of 30 Exhibit 4 – City of La Quinta – Existing General Plan / 1999 Specific Plan TRAVERTINE PROJECT Page 13 of 30 Exhibit 5 – Proposed General Plan Land Use TRAVERTINE PROJECT Page 14 of 30 1.3 Project Description The proposed Specific Plan Amendment area covers an area of approximately 855 acres. As shown in Exhibit 5, Proposed General Plan Land Use Map, the proposed project will be comprised of a variety of land uses. Residential land uses will range from low density (1.5 to 4.5 dwelling units per acre) to medium density (4.5 to 8.5 dwelling units per acre). A resort/spa facility will serve residents, tourists and recreational visitors, including a 40,058-square-foot boutique hotel with a 175-seat restaurant, and 100 resort villas totaling 210,000 square-foot. The resort/spa will also allow for a 11,654-square-foot spa and wellness center. The golf training facility with a 2,000-square-foot clubhouse/locker room and 46,378-square-foot banquet facility and 15,904 square foot restaurant will provide recreational and dining opportunities to serve the daily needs of the community and its visitors. Table 1, Proposed Planning Area Summary, shows the land use associated with each planning area. Exhibit 6, Planning Area Land Use Plan, shows the location of each project planning area. The project components shall include: • 1,200 Dwelling Units of varying types o 758 Low Density Units and 442 Medium Density Units o Estate Homes, Single Family Luxury Homes, Single Family Mid Homes, Single Family Entry Homes, Patio Homes, Single Family Attached Units • Golf training facility • 100-villa resort • Wellness Spa • Tourist serving recreational facilities and amenities including restaurants, small shops, spa facilities, lounge and activity rooms, outdoor activities, tennis, yoga, etc. • Bike lanes throughout community, including Class II bike lanes located along both sides of Jefferson Street • Pedestrian walkways and a Travertine community trail – a network of trails suitable for pedestrian use planned throughout the community • Recreational Open Space uses, including picnic tables, barbeques, golf training facilities, a tot lot playground and staging facilities for the regional interpretive trail • One staging area located to the south of the Avenue 62 extension with parking • CVWD Well Sites (quantity to be determined by CVWD) • Future 5-acre IID substation will be located off-site within a 2.5-mile radius of the project area. • Perimeter flood protection barrier along the western and southern boundaries to manage alluvial fan flows. The barrier will consist of a raised edge condition with a slope lining to protect against scour and erosion. • Two off-site booster stations. One on Avenue 62, east of the project site, and the second at Avenue 58 and Dike #2, north of the project site. TRAVERTINE PROJECT Page 15 of 30 Table 2: Proposed Planning Area Summary PA Land Use Acres Density Range (du/ac) Target Density (du/ac) Target Units 1 Resort/Spa Boutique Hotel (175-seat restaurant) – 40,058 sf Resort Villas – 210,000 sf Spa and Wellness – 11,654 sf 38.3 100 villas 2 Medium Density Residential 25.9 4.5-8.5 7.9 205 3 Low Density Residential 29.4 1.5-4.5 2.9 85 4 Low Density Residential 9.6 1.5-4.5 2.8 27 5 Low Density Residential 16.2 1.5-4.5 1.9 31 6 Medium Density Residential 20.1 4.5-8.5 8.1 163 7 Low Density Residential 18.7 1.5-4.5 3.2 61 8 Low Density Residential 16.9 1.5-4.5 4.3 73 9 Medium Density Residential 14.8 4.5-8.5 5.0 74 10 Low Density Residential 25.6 1.5-4.5 2.9 75 11 Resort / Golf Banquet Facility – 46,378 sf Golf Clubhouse Restaurant – 15,904 sf Golf Clubhouse Locker Room – 2,000 sf 46.2 12 Low Density Residential 52.2 1.5-4.5 2.3 107 13 Low Density Residential 26.7 1.5-4.5 1.8 48 14 Low Density Residential 39.0 1.5-4.5 1.6 65 15 Low Density Residential 33.3 1.5-4.5 2.2 70 16 Low Density Residential 50.4 1.5-4.5 2.3 116 17 Open Space Recreational 18.1 18 Open Space Recreational 14.7 19 Open Space Recreational 23.1 20 Open Space Natural 301.2 21 Master Planned Roadways 35.0 Total 855.4 1,200 DU 100 villas Master Planned Roadways Roadways Acres Jefferson Street 17.1 Loop West 9.7 Loop East 5.5 Section 5 Access & PA Access 1.2 Madison EVA 1.5 Total 35.0 TRAVERTINE PROJECT Page 16 of 30 1.3.1 Residential Planning Areas Residential areas account for approximately 44.2 percent of the project’s total land area. The project proposes a maximum of 1,200 dwelling units based on a range of lot sizes. Residential planning areas would vary in density from 1.5 du/ac to 8.5 du/ac, resulting in an overall average density for the project of 1.4 du/gross ac. Planning areas 2 through 10, and 12 through 16, totaling approximately 378.9 acres, are designated for residential land uses. (See Exhibit 6 – Planning Area Land Use Plan). Planning Areas 3, 4, 5, 7, 8, and 10 and 12 through 16 will have a maximum overall density of 4.5 du/ac and Planning Areas 2, 6 and 9 would have maximum overall density of 8.5 du/ac. Based on the target density for each residential planning area the proposed project would include 442 medium density (4.5-8.5 du/ac) residential dwelling units and 758 low density (1.5-4.5 du/ac) residential dwelling units. The Low-Density Residential category will be characterized by larger single-family residential lots (6,300 to 9,600 square feet). The Medium Density Residential planning areas are intended to provide medium density, single-family residential products to accommodate lots ranging from 4,000 to 5,775 square feet. In conformance with project goals, several housing styles are proposed that comply with the maximum density for each planning area. Residential product types would vary to meet market demand but are anticipated to include the following: • Estate Homes • Single Family Luxury Homes • Single Family Mid Homes • Single Family Entry Homes • Patio Homes • Single Family Attached Units Travertine will offer a variety of housing sizes and styles designed to meet the needs of all age groups. The Specific Plan Amendment incorporates neighborhood design and sustainability principles. TRAVERTINE PROJECT Page 17 of 30 Exhibit 6 – Planning Area Land Use Plan TRAVERTINE PROJECT Page 18 of 30 1.3.2 Tourist Serving Recreational Facilities A luxury resort, wellness spa and golf training facility are planned for an approximately 84.5-acre site located in Planning Areas 1 and 11. These areas will consist of resort related amenities including restaurants, small shops, spa facilities, lounge and activity rooms, outdoor activities, yoga, walking and hiking trails. The resort planning areas are anticipated to provide 100-villas and a golf training facility. Table 2 Proposed Uses and Amenities for Resort/Golf Planning Areas shows additional details. Table 3: Proposed Uses and Amenities for Resort/Golf Planning Areas Planning Area Proposed Use Estimated Indoor Area (Square Feet) 1 Boutique Hotel & (175-seat restaurant) 40,058 1 Resort Villas 210,000 1 Spa and Wellness 11,654 11 Banquet Facility 46,378 11 Banquet Facility Restaurant 15,904 11 Golf Clubhouse Locker Room 2,000 1.3.3 Open Space/Recreation Planning Areas Open Space Recreational areas include Planning Areas 1 7 , 18, and 19, and encompass a total of 55.9 acres of the approximately 855-acre site. Exhibit 6 shows the proposed planning area land use locations. Exhibit 7, Recreation Plan, shows areas designated as Open Space, as well as the proposed recreational trails. A golf training facility is located near the southeastern entry to the project on approximately 46.2 acres (Planning Area 11). This will provide a high-end practice and training facility for both the residents and guests. 1.3.4 Open Space/Natural Planning Areas Open Space Natural Areas include Planning Area 20 and encompass approximately 301.2 acres. An area of land along the southern, western and eastern boundaries of the site is restricted from development due to various environmental constraints including biological, geological and cultural resources. Portions of the open space/natural area were determined to be of biological importance by the US Fish and Wildlife Service (USFWS) through the Biological Opinion completed in 2005 and the subsequent federal Environmental Assessment completed in 2006. TRAVERTINE PROJECT Page 19 of 30 Equestrian/multi-use trails are provided in the Specific Plan. This plan will incorporate access, signage, and detailed design. The area along the southern edge of this site, adjacent to the Martinez Rock Slide, will be limited to recreational uses. As part of the recreational plan and trail system, an interpretive design element will provide signage and educational information to discourage trespassing on unauthorized areas of cultural significance. A cultural resources study has been conducted for development near the Martinez Rock Slide, and local tribes have been contacted as part of the procedures. This area is designated as a buffer between the residential development and the natural open space of the foothills of the Santa Rosa Mountains. This area will not include permanent structures as required by the Biological Opinion completed by the US Fish and Wildlife Service in 2005. The Conceptual Land Use Plan was developed with consideration of the environmental constraints associated with the surrounding land, including adjacency to the Santa Rosa Mountains and Martinez Rock Slide area to the south, Coral Mountain to the north, and the CVWD spreading grounds to the east and northeast. Exhibit 6, Planning Area Land Use Plan shows the proposed land use locations. Access to the proposed water tanks will be provided from the project internal loop road, into Planning Area 20 Open Space/Natural area and development of this area will be limited to the project’s water tanks and related infrastructure. TRAVERTINE PROJECT Page 20 of 30 1.3.5 Recreational Amenities The Travertine project will offer a range of amenities that will be accessible to neighborhood homeowners and the public. These recreational amenities include a two-mile long public trail that will be developed around the perimeter of the project site; a central private spine trail that bisects the residential areas of the property; on-street biking paths; preservation of natural open space; and additional private parks located within the development areas. A golf training facility with club facilities such as banquet facilities, will be open to residents, citizens of La Quinta and tourists. A resort and spa with restaurants, shops and activities and a wellness facility will attract both residents and visitors to the community. TRAVERTINE PROJECT Page 21 of 30 Exhibit 7 – Recreation Plan TRAVERTINE PROJECT Page 22 of 30 1.3.6 Master Planned Roads The development of the Travertine site provides for substantial improvements to several roadways, including the southerly extension of Jefferson Street as a private Modified Secondary Arterial south of the proposed Coral Mountain property and the westerly extension of Avenue 62 as a Modified Secondary Arterial. Loop roads extended from both sides of the Jefferson Street spine via roundabout intersections. Exhibit 8, Circulation Plan, shows the proposed alignment of Jefferson Street and the main loop road within the project site. Access to the southwest portion of the development area (access to the proposed water tanks) will be provided from the internal loop road. This area is Restricted Open Space, and development of this area will be limited to the project’s water tanks and related infrastructure. TRAVERTINE PROJECT Page 23 of 30 Exhibit 8 – Circulation Plan TRAVERTINE PROJECT Page 24 of 30 1.3.7 Infrastructure Existing infrastructure on the project site is very limited as the site has not been previously developed. The former vineyard area was provided with water from an on-site well. In addition to the Master Planned Roadway system, the project also includes a master plan for infrastructure including drainage features, underground utilities and water tanks. Grading and Drainage The project site slopes gently in a downslope direction from west to east and is subject to two types of drainage conditions: alluvial fan flow and incised drainage corridors along inactive fans. Existing drainages originate in the Santa Rosa Mountains to the west. Exhibit 9, shows the proposed Grading Plan for the project. Exhibit 10, Conceptual Hydrology, illustrates the off-site and proposed on- site water flow., The exhibit also shows a proposed perimeter flood barrier to divert watershed flows. The project’s flood control berms will be constructed to shield and encompass the project’s developable planning areas and convey upstream flow from Devils Canyon/Guadalupe Creek, Middle North Canyon, Middle South Canyon, and Rock Avalanche Canyon downward towards Dike No. 4 south of the proposed Avenue 62 crossing. The drainage plan proposes to capture on-site flows and direct them across the project to the eastern side of the project site. The intent is to capture all flows and detain them on-site in a series of basins that will be developed with water quality best management practices (BMPs) to treat the water before percolation into the ground. The proposed basins are designed to detain and percolate the projected on-site flows created from impervious surfaces. Excess water relative to existing flows will not be released unimpeded into the adjacent CVWD groundwater recharge ponds. TRAVERTINE PROJECT Page 25 of 30 Exhibit 9 – Grading Plan TRAVERTINE PROJECT Page 26 of 30 Exhibit 10 – Conceptual Hydrology TRAVERTINE PROJECT Page 27 of 30 Water The Coachella Valley Water District (CVWD) currently has jurisdiction over domestic water service to the project property illustrated in Exhibit 11, Conceptual Water Plan. Currently, domestic water service lines exist in three areas near the project. These include the intersection of Avenue 60 and from the Jefferson extension and Avenue 62. Water lines will be extended from Avenue 62 and the proposed EVA to serve the project. Water lines will be connected prior to any construction. Nine additional well sites are necessary to serve the project. One well will be constructed during Phase I, located off the Travertine project site. The locations of the future well sites are currently under discussion with CVWD and will be identified and analyzed in the EIR. Additional facilities will include two water reservoirs and booster station(s) to collect well water and store it at the appropriate elevation to provide the required water pressure for the site. Two off-site booster stations currently exist near the project property. One booster station is locat ed on Avenue 62, east of the project site, while the second booster station is located at Avenue 58 and Dike #2, north of the project site. The project site will be served with a thirty-inch main line within Jefferson Street/Madison Street alignments. Twelve-inch and smaller lines will then feed off the main line to serve the individual developments along these public streets. Water tanks are proposed to be developed to serve the site in Planning Area 23. The water tank locations, including related facilities (road, pipelines, etc.), are subject to review and approval by the USFWS. Permanent structures, with the exception of two water reservoirs, service roadway, underground pipelines and ancillary facilities, as allowed through the consultation with the USFWS, will be prohibited in the Restricted Open Space (Natural) area. A portion of the Open Space Natural Planning Areas is located in a conservation area of the Coachella Valley Multiple-Species Habitat Conservation Plan (CVMSHCP). The project will be required to undergo Joint Project Review (JPR) for development of the water infrastructure improvements within the conservation area. During the JPR process, the Coachella Valley Conservation Commission and other interested Wildlife Agencies have the opportunity to comment on the proposed development. The JPR will be analyzed in the EIR. TRAVERTINE PROJECT Page 28 of 30 Exhibit 11 –Conceptual Water Plan TRAVERTINE PROJECT Page 29 of 30 Sewer The closest Coachella Valley Water District sewer connection currently exists at Monroe Street and Avenue 62, approximately one mile east. The proposed facilities are comprised of a series of eight- inch sewer lines serving the individual developments and flowing into the main sewer line located within Jefferson Street/spine road alignment. The main sewer line increases in size as it extends eastward, ranging from eight inches on the west side to 15 inches at Madison Street, where the line exits the project site. The offsite sewer alignment and improvements will come from the east in Avenue 62. The EIR will further analyze the impacts to sewer and the offsite extension. (See Exhibit 12, Conceptual Sewer Plan) Utilities Southern California Gas Company provides natural gas to the project site. Electric service to Travertine will be provided by Imperial Irrigation District. An offsite substation will be required for the Travertine development and will be located and constructed during Construction Phase I. The five-acre site required by IID for a substation will be studied in the EIR. The location of the five-acre site will be within a two-mile radius of the project. The routing of the proposed service lines along the route to the site will be studied in the EIR. TRAVERTINE PROJECT Page 30 of 30 Exhibit 12 –Conceptual Sewer Plan