2021-10-29 DESIGN REVIEW LETTER 1 October 29, 2021 Mark Rogers TRG Land 898 Production Pl Newport Beach, CA 92663 mrogers@trgland.com SUBJECT: 7th DESIGN REVIEW – EA TECHNICAL STUDIES TRAVERTINE SPECIFIC PLAN PROJECT—GENERAL PLAN AMENDMENT 2017-0002, ZONE CHANGE 2017-0002, SPECIFIC PLAN AMENDMENT 2017-0004, TENTATIVE TRACT MAP 2017-0008, ENVIRONMENTAL ASSESSMENT 2017-0008 Dear Mr. Rogers: During September and October 2021, we received a number of resubmittals for the EA case including the following technical studies: Addendum to the Supplemental Cultural Resources Technical Report, Supplemental Paleontological Resources Assessment, Noise Impact Analysis, Air Quality Impact Analysis, Greenhouse Gas Analysis, Traffic Impact Analysis and Vehicle Miles Traveled (VMT) Study. The City has reviewed these documents and comments are summarized herein. EA Technical Studies These reports have been reviewed by City staff and peer reviewer and comments are noted in each document, available to download from the eTrakit portal. Some comments are also summarized below. There are no further comments on the EDR report and Supplemental Paleontological Resources Assessment. Documents uploaded to EA2017-0008 case: • 7TH REVIEW COMMENTS - AQ 10-18-21 • 7TH REVIEW COMMENTS - GHG 10-18-21 • 7TH REVIEW COMMENTS-Noise 9-29-21 • 5TH REVIEW COMMENTS - CR 10-2021 • 7TH REVIEW COMMENTS – TIA 10-29-21 2 Additional Comments VMT Study Please be sure to include Appendix A in the final version. If you have any questions, please contact me at (760) 777-7067. Sincerely, Cheri L. Flores Planning Manager Design and Development Department cc. Lou Miramontes, Hofmann Land Development Danny Castro, Design and Development Director 7TH REVIEW COMMENTS - AQ 10-18-21 Main document changes and comments Page 1: Formatted John Criste 10/15/2021 2:59:00 PM Highlight Page 5: Commented [JC1] John Criste 10/15/2021 11:37:00 AM The project description is not consistent with the current version of the SP. There will be four golf practice holes, not 12 holes of golf. The distribution of unit types has also changed. Please check with the project designer to get the updated master plan and Qs. Page 5: Commented [JC2] John Criste 10/15/2021 11:40:00 AM No longer correct. See J Kain’s latest understanding Page 9: Inserted John Criste 10/15/2021 2:52:00 PM the Page 30: Deleted Cheri Flores 10/28/2021 9:45:00 AM construction contractor Page 30: Commented [JC3] John Criste 10/15/2021 3:12:00 PM There isn’t a construction contractor yet. Is this data from the engineer? Please state. Page 30: Inserted Cheri Flores 10/28/2021 9:45:00 AM project engineer Page 41: Formatted John Criste 10/15/2021 3:30:00 PM Highlight Page 41: Formatted John Criste 10/15/2021 3:30:00 PM Highlight Page 41: Formatted John Criste 10/15/2021 3:30:00 PM Highlight Page 41: Formatted John Criste 10/15/2021 3:30:00 PM Highlight Page 41: Formatted John Criste 10/15/2021 3:30:00 PM Highlight Page 41: Formatted John Criste 10/15/2021 3:30:00 PM Highlight Page 41: Commented [JC4] John Criste 10/15/2021 3:30:00 PM This is way too close to the threshold. It is hard to imagine that there will be no hauling associated with the site grading but it is possible. Any additions to emissions would easily knock NOx over the threshold… Page 41: Formatted John Criste 10/15/2021 3:30:00 PM Highlight Page 41: Inserted John Criste 10/15/2021 3:33:00 PM ABOVE HIGHLIGHTED NUMBERS ARE SO VERY CLOSE TO THRESHOLD. PLEASE REVISIT INPUT FROM APPLICANT AND SECURE ACCURATE CUT AND FILL Page 44: Inserted Cheri Flores 10/28/2021 9:50:00 AM (UNMITIGATED) Page 45: Inserted Cheri Flores 10/28/2021 9:51:00 AM (UNMITIGATED) Page 52: Inserted Cheri Flores 10/28/2021 9:56:00 AM (UNMITIGATED) Page 53: Inserted Cheri Flores 10/28/2021 9:56:00 AM (UNMITIGATED) Page 54: Inserted Cheri Flores 10/28/2021 9:56:00 AM (UNMITIGATED) Page 55: Inserted Cheri Flores 10/28/2021 9:56:00 AM (UNMITIGATED) Page 56: Inserted Cheri Flores 10/28/2021 9:56:00 AM (UNMITIGATED) Page 57: Inserted Cheri Flores 10/28/2021 9:56:00 AM (UNMITIGATED) Page 57: Commented [CF5] Cheri Flores 10/28/2021 9:57:00 AM 4 holes now. We should state that the analysis covered 12 but they are actually doing 4 Page 62: Commented [JC6] John Criste 10/15/2021 3:53:00 PM Check with SP author; land use allocation has changed. Page 64: Inserted Cheri Flores 10/28/2021 1:21:00 PM LSTs Header and footer changes Page i: Inserted Cheri Flores 7/8/2022 12:03:00 PM Air Quality Impact Analysis Page i: Formatted Cheri Flores 7/8/2022 12:03:00 PM Font: Calibri Page i: Deleted Cheri Flores 7/8/2022 12:03:00 PM Air Quality Impact Analysis Page i: Inserted Cheri Flores 7/8/2022 12:03:00 PM 7TH REVIEW COMMENTS - AQ 10-18-21 Page i: Deleted Cheri Flores 7/8/2022 12:03:00 PM 12188-05 AQ Report Page 1: Inserted Cheri Flores 7/8/2022 12:03:00 PM 7TH REVIEW COMMENTS - AQ 10-18-21 Page 1: Deleted Cheri Flores 7/8/2022 12:03:00 PM 12188-05 AQ Report Page 8: Inserted Cheri Flores 7/8/2022 12:03:00 PM 7TH REVIEW COMMENTS - AQ 10-18-21 Page 8: Deleted Cheri Flores 7/8/2022 12:03:00 PM 12188-05 AQ Report Page 1: Inserted Cheri Flores 7/8/2022 12:03:00 PM 7TH REVIEW COMMENTS - AQ 10-18-21 Page 1: Deleted Cheri Flores 7/8/2022 12:03:00 PM 12188-05 AQ Report Page 1: Inserted Cheri Flores 7/8/2022 12:03:00 PM 7TH REVIEW COMMENTS - AQ 10-18-21 Page 1: Deleted Cheri Flores 7/8/2022 12:03:00 PM 12188-05 AQ Report Page 1: Inserted Cheri Flores 7/8/2022 12:03:00 PM 7TH REVIEW COMMENTS - AQ 10-18-21 Page 1: Deleted Cheri Flores 7/8/2022 12:03:00 PM 12188-05 AQ Report Page 1: Inserted Cheri Flores 7/8/2022 12:03:00 PM 7TH REVIEW COMMENTS - AQ 10-18-21 Page 1: Deleted Cheri Flores 7/8/2022 12:03:00 PM 12188-05 AQ Report Page 1: Inserted Cheri Flores 7/8/2022 12:03:00 PM 7TH REVIEW COMMENTS - AQ 10-18-21 Page 1: Deleted Cheri Flores 7/8/2022 12:03:00 PM 12188-05 AQ Report Page 1: Inserted Cheri Flores 7/8/2022 12:03:00 PM 7TH REVIEW COMMENTS - AQ 10-18-21 Page 1: Deleted Cheri Flores 7/8/2022 12:03:00 PM 12188-05 AQ Report Page 1: Inserted Cheri Flores 7/8/2022 12:03:00 PM 7TH REVIEW COMMENTS - AQ 10-18-21 Page 1: Deleted Cheri Flores 7/8/2022 12:03:00 PM 12188-05 AQ Report Page 1: Inserted Cheri Flores 7/8/2022 12:03:00 PM 7TH REVIEW COMMENTS - AQ 10-18-21 Page 1: Deleted Cheri Flores 7/8/2022 12:03:00 PM 12188-05 AQ Report Page 1: Inserted Cheri Flores 7/8/2022 12:03:00 PM 7TH REVIEW COMMENTS - AQ 10-18-21 Page 1: Deleted Cheri Flores 7/8/2022 12:03:00 PM 12188-05 AQ Report Page 1: Inserted Cheri Flores 7/8/2022 12:03:00 PM 7TH REVIEW COMMENTS - AQ 10-18-21 Page 1: Deleted Cheri Flores 7/8/2022 12:03:00 PM 12188-05 AQ Report Page 1: Inserted Cheri Flores 7/8/2022 12:03:00 PM 7TH REVIEW COMMENTS - AQ 10-18-21 Page 1: Deleted Cheri Flores 7/8/2022 12:03:00 PM 12188-05 AQ Report Page 1: Inserted Cheri Flores 7/8/2022 12:03:00 PM 7TH REVIEW COMMENTS - AQ 10-18-21 Page 1: Deleted Cheri Flores 7/8/2022 12:03:00 PM 12188-05 AQ Report Page 1: Inserted Cheri Flores 7/8/2022 12:03:00 PM 7TH REVIEW COMMENTS - AQ 10-18-21 Page 1: Deleted Cheri Flores 7/8/2022 12:03:00 PM 12188-05 AQ Report Page 1: Inserted Cheri Flores 7/8/2022 12:03:00 PM 7TH REVIEW COMMENTS - AQ 10-18-21 Page 1: Deleted Cheri Flores 7/8/2022 12:03:00 PM 12188-05 AQ Report Page 1: Inserted Cheri Flores 7/8/2022 12:03:00 PM 7TH REVIEW COMMENTS - AQ 10-18-21 Page 1: Deleted Cheri Flores 7/8/2022 12:03:00 PM 12188-05 AQ Report Page 1: Inserted Cheri Flores 7/8/2022 12:03:00 PM 7TH REVIEW COMMENTS - AQ 10-18-21 Page 1: Deleted Cheri Flores 7/8/2022 12:03:00 PM 12188-05 AQ Report Page 1: Inserted Cheri Flores 7/8/2022 12:03:00 PM 7TH REVIEW COMMENTS - AQ 10-18-21 Page 1: Deleted Cheri Flores 7/8/2022 12:03:00 PM 12188-05 AQ Report Page 1: Inserted Cheri Flores 7/8/2022 12:03:00 PM 7TH REVIEW COMMENTS - AQ 10-18-21 Page 1: Deleted Cheri Flores 7/8/2022 12:03:00 PM 12188-05 AQ Report Text Box changes Header and footer text box changes Footnote changes Endnote changes 7TH REVIEW COMMENTS - GHG 10-18-21 Main document changes and comments Page 4: Commented [CF1] Cheri Flores 10/29/2021 11:37:00 AM Check project description. 4 holes now Page 56: Commented [CF2] Cheri Flores 10/28/2021 1:45:00 PM Please state somewhere if the project would incorporate these measures. Header and footer changes Text Box changes Header and footer text box changes Footnote changes Endnote changes 7TH REVIEW COMMENTS-Noise 9-29-21 Main document changes and comments Page 1: Deleted Bill Lawson 9/14/2021 1:42:00 PM DECEMBER 28, 2020 Page 1: Inserted Bill Lawson 9/14/2021 1:42:00 PM AUGUST 10, 2021 Page 1: Deleted Bill Lawson 9/14/2021 1:42:00 PM 07 Page 1: Inserted Bill Lawson 9/14/2021 1:42:00 PM 09 Page iii: Deleted Bill Lawson 9/14/2021 1:42:00 PM ERROR! HYPERLINK REFERENCE NOT VALID. ERROR! HYPERLINK REFERENCE NOT VALID. ERROR! HYPERLINK REFERENCE NOT VALID. ERROR! HYPERLINK REFERENCE NOT VALID. ERROR! HYPERLINK REFERENCE NOT VALID. ERROR! HYPERLINK REFERENCE NOT VALID. Error! Hyperlink reference not valid. ERROR! HYPERLINK REFERENCE NOT VALID. Error! Hyperlink reference not valid. Error! Hyperlink reference not valid. ERROR! HYPERLINK REFERENCE NOT VALID. Error! Hyperlink reference not valid. Error! Hyperlink reference not valid. Error! Hyperlink reference not valid. Error! Hyperlink reference not valid. Error! Hyperlink reference not valid. Error! Hyperlink reference not valid. Error! Hyperlink reference not valid. Error! Hyperlink reference not valid. Error! Hyperlink reference not valid. ERROR! HYPERLINK REFERENCE NOT VALID. Error! Hyperlink reference not valid. Error! Hyperlink reference not valid. Error! Hyperlink reference not valid. Error! Hyperlink reference not valid. Error! Hyperlink reference not valid. ERROR! HYPERLINK REFERENCE NOT VALID. Error! Hyperlink reference not valid. Error! Hyperlink reference not valid. Error! Hyperlink reference not valid. Error! Hyperlink reference not valid. ERROR! HYPERLINK REFERENCE NOT VALID. Error! Hyperlink reference not valid. Error! Hyperlink reference not valid. Error! Hyperlink reference not valid. ERROR! HYPERLINK REFERENCE NOT VALID. Error! Hyperlink reference not valid. Error! Hyperlink reference not valid. ERROR! HYPERLINK REFERENCE NOT VALID. Error! Hyperlink reference not valid. Error! Hyperlink reference not valid. Error! Hyperlink reference not valid. ERROR! HYPERLINK REFERENCE NOT VALID. ERROR! HYPERLINK REFERENCE NOT VALID. Error! Hyperlink reference not valid. Error! Hyperlink reference not valid. Error! Hyperlink reference not valid. Error! Hyperlink reference not valid. Error! Hyperlink reference not valid. Error! Hyperlink reference not valid. Error! Hyperlink reference not valid. Error! Hyperlink reference not valid. Error! Hyperlink reference not valid. Error! Hyperlink reference not valid. Error! Hyperlink reference not valid. Error! Hyperlink reference not valid. Error! Hyperlink reference not valid. ERROR! HYPERLINK REFERENCE NOT VALID. ERROR! HYPERLINK REFERENCE NOT VALID. Page iii: Inserted Bill Lawson 9/14/2021 1:42:00 PM TABLE OF CONTENTS ......................................................................................................................... III APPENDICES .................................................................................................................................... IV LIST OF EXHIBITS ............................................................................................................................... V LIST OF TABLES ................................................................................................................................. V LIST OF ABBREVIATED TERMS ........................................................................................................... VI EXECUTIVE SUMMARY ....................................................................................................................... 1 Operational Noise Levels ......................................................................................................................... 1 Summary of CEQA Significance Findings ................................................................................................. 1 1 INTRODUCTION ......................................................................................................................... 3 1.1 Site Location .................................................................................................................................. 3 1.2 Project Description ........................................................................................................................ 3 2 FUNDAMENTALS ....................................................................................................................... 7 2.1 Range of Noise .............................................................................................................................. 7 2.2 Noise Descriptors .......................................................................................................................... 8 2.3 Sound Propagation ........................................................................................................................ 8 2.4 Noise Control ................................................................................................................................ 9 2.5 Noise Barrier Attenuation ............................................................................................................. 9 2.6 Land Use Compatibility With Noise ............................................................................................ 10 2.7 Community Response to Noise ................................................................................................... 10 2.8 Exposure to High Noise Levels .................................................................................................... 11 2.9 Vibration ..................................................................................................................................... 11 3 REGULATORY SETTING ............................................................................................................. 15 3.1 State of California Noise Requirements ...................................................................................... 15 3.2 State of California Building Standards ........................................................................................ 15 3.3 City of La Quinta General Plan Environmental Hazards Element ............................................... 15 3.4 Construction Noise Standards .................................................................................................... 18 3.5 Construction Vibration Standards ............................................................................................... 19 4 SIGNIFICANCE CRITERIA ........................................................................................................... 21 4.1 CEQA Guidelines Not Further Analyzed ...................................................................................... 21 4.2 Noise-Sensitive Receivers ........................................................................................................... 21 4.3 Non-Noise-Sensitive Receivers ................................................................................................... 23 4.4 Significance Criteria Summary .................................................................................................... 23 5 EXISTING NOISE LEVEL MEASUREMENTS .................................................................................. 27 5.1 Measurement Procedure and Criteria ........................................................................................ 27 5.2 Noise Measurement Locations ................................................................................................... 27 5.3 Noise Measurement Results ....................................................................................................... 28 6 METHODS AND PROCEDURES .................................................................................................. 33 6.1 FHWA Traffic Noise Prediction Model ........................................................................................ 33 6.2 Off-Site Traffic Noise Prediction Model Inputs ........................................................................... 33 6.3 On-Site Traffic Noise Prediction Model Inputs ........................................................................... 36 7 OFF-SITE TRAFFIC NOISE IMPACTS ........................................................................................... 37 7.1 Traffic Noise Contours ................................................................................................................ 37 7.2 Existing With Project Traffic Noise Level Increases .................................................................... 42 7.3 Phase 3 (2031) Project Traffic Noise Level Increases .................................................................. 43 8 ON-SITE TRANSPORTATION NOISE IMPACTS ............................................................................ 47 8.1 Exterior Noise Analysis ................................................................................................................ 47 8.2 Interior Noise Analysis ................................................................................................................ 48 9 RECEIVER LOCATIONS .............................................................................................................. 49 10 CONSTRUCTION IMPACTS ........................................................................................................ 51 10.1 Construction Noise Standards .................................................................................................... 51 10.2 Construction Activities ................................................................................................................ 51 10.3 Typical Construction Reference Noise Levels ............................................................................. 51 10.4 CadnaA Noise Prediction Model ................................................................................................. 53 10.5 Typical Construction Noise Analysis............................................................................................ 54 10.6 Typical Construction Noise Level Compliance ............................................................................ 55 10.7 Rock Crushing Reference Noise Levels ....................................................................................... 55 10.8 Rock Crushing Construction Noise Analysis and Compliance ..................................................... 56 10.9 Water Well Construction ............................................................................................................ 57 10.10 Off-Site Substation ...................................................................................................................... 57 10.11 Typical Construction Noise Level Increases ................................................................................ 57 10.12 On-Site Construction Noise Analysis ........................................................................................... 58 10.13 Off-Site Construction Vibration Impacts ..................................................................................... 64 10.14 Construction Noise and Vibration Abatement Measures ........................................................... 66 11 REFERENCES ............................................................................................................................ 67 12 CERTIFICATION ........................................................................................................................ 69 Page iv: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page iv: Inserted Bill Lawson 9/14/2021 1:42:00 PM 8 Page iv: Deleted Bill Lawson 9/14/2021 1:42:00 PM CADNAA TYPICAL CONSTRUCTION Page iv: Inserted Bill Lawson 9/14/2021 1:42:00 PM ON-SITE TRAFFIC Page iv: Deleted Bill Lawson 9/14/2021 1:42:00 PM MODEL INPUTS Page iv: Inserted Bill Lawson 9/14/2021 1:42:00 PM CALCULATIONS Page iv: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page iv: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10.1: CADNAA TYPICAL CONSTRUCTION NOISE MODEL INPUTS APPENDIX 10 Page iv: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page iv: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page v: Deleted Bill Lawson 9/14/2021 1:42:00 PM TOC60068333 Page v: Inserted Bill Lawson 9/14/2021 1:42:00 PM TOC79341985 Page v: Deleted Bill Lawson 9/14/2021 1:42:00 PM TOC60068334 Page v: Inserted Bill Lawson 9/14/2021 1:42:00 PM TOC79341986 Page v: Deleted Bill Lawson 9/14/2021 1:42:00 PM TOC60068335 Page v: Inserted Bill Lawson 9/14/2021 1:42:00 PM TOC79341987 Page v: Deleted Bill Lawson 9/14/2021 1:42:00 PM TOC60068336 Page v: Inserted Bill Lawson 9/14/2021 1:42:00 PM TOC79341988 Page v: Deleted Bill Lawson 9/14/2021 1:42:00 PM TOC60068337 Page v: Inserted Bill Lawson 9/14/2021 1:42:00 PM TOC79341989 Page v: Deleted Bill Lawson 9/14/2021 1:42:00 PM TOC60068338 Page v: Inserted Bill Lawson 9/14/2021 1:42:00 PM TOC79341990 Page v: Deleted Bill Lawson 9/14/2021 1:42:00 PM TOC60068339 Page v: Inserted Bill Lawson 9/14/2021 1:42:00 PM TOC79341991 Page v: Deleted Bill Lawson 9/14/2021 1:42:00 PM 8 Page v: Inserted Bill Lawson 9/14/2021 1:42:00 PM 9 Page v: Deleted Bill Lawson 9/14/2021 1:42:00 PM TOC60068340 Page v: Inserted Bill Lawson 9/14/2021 1:42:00 PM TOC79341992 Page v: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page v: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page v: Deleted Bill Lawson 9/14/2021 1:42:00 PM TOC60068341 Page v: Inserted Bill Lawson 9/14/2021 1:42:00 PM TOC79341993 Page v: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page v: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page v: Deleted Bill Lawson 9/14/2021 1:42:00 PM TOC60068342 Page v: Inserted Bill Lawson 9/14/2021 1:42:00 PM TOC79341994 Page v: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page v: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page v: Deleted Bill Lawson 9/14/2021 1:42:00 PM TOC60068343 Page v: Inserted Bill Lawson 9/14/2021 1:42:00 PM TOC79341995 Page v: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page v: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page v: Deleted Bill Lawson 9/14/2021 1:42:00 PM TOC60068344 Page v: Inserted Bill Lawson 9/14/2021 1:42:00 PM TOC79341996 Page v: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page v: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page v: Deleted Bill Lawson 9/14/2021 1:42:00 PM 6458 Page v: Inserted Cheri Flores 7/8/2022 12:06:00 PM 64 Page v: Inserted Bill Lawson 9/14/2021 1:42:00 PM 64 Page v: Deleted Bill Lawson 9/14/2021 1:42:00 PM 1 Page v: Inserted Cheri Flores 7/8/2022 12:06:00 PM 1 Page v: Inserted Bill Lawson 9/14/2021 1:42:00 PM 1 Page v: Deleted Bill Lawson 9/14/2021 1:42:00 PM TOC60068347 Page v: Inserted Bill Lawson 9/14/2021 1:42:00 PM TOC79341999 Page v: Deleted Bill Lawson 9/14/2021 1:42:00 PM TOC60068348 Page v: Inserted Bill Lawson 9/14/2021 1:42:00 PM TOC79342000 Page v: Deleted Bill Lawson 9/14/2021 1:42:00 PM TOC60068349 Page v: Inserted Bill Lawson 9/14/2021 1:42:00 PM TOC79342001 Page v: Deleted Bill Lawson 9/14/2021 1:42:00 PM TOC60068350 Page v: Inserted Bill Lawson 9/14/2021 1:42:00 PM TOC79342002 Page v: Deleted Bill Lawson 9/14/2021 1:42:00 PM TOC60068351 Page v: Inserted Bill Lawson 9/14/2021 1:42:00 PM TOC79342003 Page v: Deleted Bill Lawson 9/14/2021 1:42:00 PM TOC60068352 Page v: Inserted Bill Lawson 9/14/2021 1:42:00 PM TOC79342004 Page v: Deleted Bill Lawson 9/14/2021 1:42:00 PM TOC60068353 Page v: Inserted Bill Lawson 9/14/2021 1:42:00 PM TOC79342005 Page v: Deleted Bill Lawson 9/14/2021 1:42:00 PM TOC60068354 Page v: Inserted Bill Lawson 9/14/2021 1:42:00 PM TOC79342006 Page v: Inserted Bill Lawson 9/14/2021 1:42:00 PM TABLE 6-5: ON-SITE ROADWAY PARAMETERS .................................................................................. 36 Page v: Deleted Bill Lawson 9/14/2021 1:42:00 PM TOC60068355 Page v: Inserted Bill Lawson 9/14/2021 1:42:00 PM TOC79342008 Page v: Deleted Bill Lawson 9/14/2021 1:42:00 PM TOC60068356 Page v: Inserted Bill Lawson 9/14/2021 1:42:00 PM TOC79342009 Page v: Deleted Bill Lawson 9/14/2021 1:42:00 PM TOC60068357 Page v: Inserted Bill Lawson 9/14/2021 1:42:00 PM TOC79342010 Page v: Deleted Bill Lawson 9/14/2021 1:42:00 PM TOC60068358 Page v: Inserted Bill Lawson 9/14/2021 1:42:00 PM TOC79342011 Page v: Deleted Bill Lawson 9/14/2021 1:42:00 PM TOC60068359 Page v: Inserted Bill Lawson 9/14/2021 1:42:00 PM TOC79342012 Page v: Deleted Bill Lawson 9/14/2021 1:42:00 PM TOC60068360 Page v: Inserted Bill Lawson 9/14/2021 1:42:00 PM TOC79342013 Page v: Deleted Bill Lawson 9/14/2021 1:42:00 PM TOC60068361 Page v: Inserted Bill Lawson 9/14/2021 1:42:00 PM TOC79342014 Page v: Deleted Bill Lawson 9/14/2021 1:42:00 PM TOC60068362 Page v: Inserted Bill Lawson 9/14/2021 1:42:00 PM TOC79342015 Page v: Deleted Bill Lawson 9/14/2021 1:42:00 PM TOC60068363 Page v: Inserted Bill Lawson 9/14/2021 1:42:00 PM TOC79342016 Page v: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page v: Inserted Bill Lawson 9/14/2021 1:42:00 PM 8-1: EXTERIOR TRAFFIC NOISE LEVELS .............................................................................................. 47 TABLE 8-2: INTERIOR NOISE LEVELS (CNEL) ....................................................................................... 48 TABLE 10 Page v: Deleted Bill Lawson 9/14/2021 1:42:00 PM TOC60068364 Page v: Inserted Bill Lawson 9/14/2021 1:42:00 PM TOC79342019 Page v: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page v: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page v: Deleted Bill Lawson 9/14/2021 1:42:00 PM TOC60068365 Page v: Inserted Bill Lawson 9/14/2021 1:42:00 PM TOC79342020 Page v: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page v: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page v: Deleted Bill Lawson 9/14/2021 1:42:00 PM TOC60068366 Page v: Inserted Bill Lawson 9/14/2021 1:42:00 PM TOC79342021 Page v: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page v: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page v: Deleted Bill Lawson 9/14/2021 1:42:00 PM TOC60068367 Page v: Inserted Bill Lawson 9/14/2021 1:42:00 PM TOC79342022 Page v: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page v: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page v: Deleted Bill Lawson 9/14/2021 1:42:00 PM TOC60068368 Page v: Inserted Bill Lawson 9/14/2021 1:42:00 PM TOC79342023 Page v: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page v: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page v: Deleted Bill Lawson 9/14/2021 1:42:00 PM TOC60068369 Page v: Inserted Bill Lawson 9/14/2021 1:42:00 PM TOC79342024 Page v: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page v: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page v: Deleted Bill Lawson 9/14/2021 1:42:00 PM TOC60068370 Page v: Inserted Bill Lawson 9/14/2021 1:42:00 PM TOC79342025 Page vi: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page vi: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page vi: Deleted Bill Lawson 9/14/2021 1:42:00 PM TOC60068371 Page vi: Inserted Bill Lawson 9/14/2021 1:42:00 PM TOC79342026 Page vi: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page vi: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page vi: Deleted Bill Lawson 9/14/2021 1:42:00 PM TOC60068372 Page vi: Inserted Bill Lawson 9/14/2021 1:42:00 PM TOC79342027 Page vi: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page vi: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page vi: Deleted Bill Lawson 9/14/2021 1:42:00 PM TOC60068373 Page vi: Inserted Bill Lawson 9/14/2021 1:42:00 PM TOC79342028 Page vi: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page vi: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page vi: Deleted Bill Lawson 9/14/2021 1:42:00 PM TOC60068374 Page vi: Inserted Bill Lawson 9/14/2021 1:42:00 PM TOC79342029 Page vi: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page vi: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page vi: Deleted Bill Lawson 9/14/2021 1:42:00 PM 6660 Page vi: Inserted Cheri Flores 7/8/2022 12:06:00 PM 66 Page vi: Inserted Bill Lawson 9/14/2021 1:42:00 PM 66 Page 1: Inserted Bill Lawson 9/14/2021 1:42:00 PM OPERATIONAL NOISE LEVELS The Page 1: Inserted Cheri Flores 10/15/2021 3:51:00 PM Travertine Specific Plan Page 1: Inserted Bill Lawson 9/14/2021 1:42:00 PM is not expected to include any operational noise source levels beyond those typically associated with the planned residential, resort hotel and golf course land use in the Project study area. This includes people moving around the site, parking lot vehicle movements, air conditioning units, play areas, etc. and is generally considered as a noise-sensitive receiving land use. Therefore, no potential operational noise impacts for the planned residential, resort hotel and golf course land use are analyzed in the noise study. It is expected that the primary noise activity will be due to the Project-related off-site vehicle traffic on nearby roadways. Page 1: Commented [JC1] John Criste 9/27/2021 1:51:00 PM These should be flipped shouldn’t they? Page 1: Inserted Bill Lawson 9/14/2021 1:42:00 PM On-Site Traffic 8 Less Than Significant - Page 1: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page 1: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page 1: Inserted Bill Lawson 9/14/2021 1:42:00 PM Page 2: Moved from page 36 (Move #1) Bill Lawson 9/14/2021 1:42:00 PM This page intentionally left blank Page 2: Formatted Bill Lawson 9/14/2021 1:42:00 PM Centered Page 2: Formatted Bill Lawson 9/14/2021 1:42:00 PM Font: 12 pt, Italic Page 2: Formatted Bill Lawson 9/14/2021 1:42:00 PM Font: Italic, Not Small caps, All caps, Condensed by 0.15 pt Page 3: Commented [NC2] Nicole Criste (Contract Planner) 5/5/2020 1:43:00 PM General Question: Does the analysis take into consideration the temporary access proposed in the Fire Management Plan (see recently updated traffic study) and those routes’ potential impacts on noise? Since they could be in place for a number of years, the noise impact associated with the Fire Plan access ways should be considered. Page 3: Commented [b3R2] blawson@urbanxroads.onmicrosoft.com 10/8/2020 2:01:00 PM Add LTS text at the end of the section. Page 3: Commented [CF4] Cheri Flores 10/15/2021 3:53:00 PM Please add off-sites to the description and maps Page 3: Commented [CF5] Cheri Flores 6/9/2020 4:31:00 PM Is there a 12 hole golf course to be constructed in each phase resulting in 3 golf courses? This seems to suggest so. Page 3: Commented [b6R5] blawson@urbanxroads.onmicrosoft.com 10/8/2020 1:52:00 PM This represents the total development for each phase. This was taken directly from the TIA text. Page 3: Commented [b7R5] blawson@urbanxroads.onmicrosoft.com 10/8/2020 1:53:00 PM Page 3: Commented [CF8] Cheri Flores 4/2/2021 10:21:00 AM Please revise as in AQ and GHG reports. Page 3: Commented [CF9R8] Cheri Flores 10/15/2021 3:52:00 PM Please revise per updated traffic study. Only 4 holes proposed now Page 3: Inserted Bill Lawson 9/14/2021 1:42:00 PM The Travertine Page 3: Deleted Bill Lawson 9/14/2021 1:42:00 PM Phase Page 3: Inserted Bill Lawson 9/14/2021 1:42:00 PM is proposed to be served by two access points: Page 3: Deleted Bill Lawson 9/14/2021 1:42:00 PM includes Page 3: Inserted Bill Lawson 9/14/2021 1:42:00 PM ) the southerly extension of South Jefferson as a Modified Secondary, south of Avenue 58, and 2) Page 3: Deleted Bill Lawson 9/14/2021 1:42:00 PM an interim section (40-foot pavement section), Page 3: Inserted Bill Lawson 9/14/2021 1:42:00 PM a Modified Secondary, Page 3: Deleted Bill Lawson 9/14/2021 1:42:00 PM For Project Phases 2 and 3, two public Page 3: Inserted Bill Lawson 9/14/2021 1:42:00 PM An emergency vehicle Page 3: Deleted Bill Lawson 9/14/2021 1:42:00 PM routes are Page 3: Inserted Bill Lawson 9/14/2021 1:42:00 PM (EVA) is Page 3: Deleted Bill Lawson 9/14/2021 1:42:00 PM : the southerly extension of South Jefferson south of Avenue 58, and Page 3: Inserted Bill Lawson 9/14/2021 1:42:00 PM via Madison Street, from Page 3: Deleted Bill Lawson 9/14/2021 1:42:00 PM westerly extension Page 3: Inserted Bill Lawson 9/14/2021 1:42:00 PM northerly boundary Page 3: Inserted Bill Lawson 9/14/2021 1:42:00 PM the Project’s Planning Area 18 to Page 3: Deleted Bill Lawson 9/14/2021 1:42:00 PM 62 west of Monroe Street Page 3: Inserted Bill Lawson 9/14/2021 1:42:00 PM 60 Page 5: Deleted Bill Lawson 9/14/2021 1:42:00 PM Page 5: Commented [BL10] Bill Lawson 12/28/2020 9:29:00 AM From TIA. Page 5: Commented [CF11R10] Cheri Flores 4/2/2021 10:22:00 AM Please update with latest from applicant. Land uses have changed and Madison EVA needs to be shown. Page 5: Commented [BL12R10] Bill Lawson 8/8/2021 6:58:00 PM Land Use Plan updated Page 5: Inserted Bill Lawson 9/14/2021 1:42:00 PM Page 6: Moved from page 49 (Move #2) Bill Lawson 9/14/2021 1:42:00 PM This page intentionally left blank Page 6: Formatted Bill Lawson 9/14/2021 1:42:00 PM Normal, Space Before: 6 pt, After: 6 pt, Add space between paragraphs of the same style Page 6: Formatted Bill Lawson 9/14/2021 1:42:00 PM Font: 12 pt, Italic Page 6: Formatted Bill Lawson 9/14/2021 1:42:00 PM Font: Bold, Italic, All caps, Condensed by 0.15 pt Page 9: Deleted Bill Lawson 9/14/2021 1:42:00 PM Page 19: Commented [CF13] Cheri Flores 4/2/2021 10:23:00 AM Why remove the NIOSH discussion? Also where are Sections 3.4.2 and 3.4.3? Page 19: Commented [BL14R13] Bill Lawson 5/4/2021 8:41:00 AM We revised the criteria to rely on the more restrictive FTA construction noise standards, so we removed the discussion on NIOSH. The analysis no longer references NIOSH. Page 21: Commented [JC15] John Criste 9/27/2021 1:58:00 PM March 2021: According to state guidelines, two levels of analysis are needed; 1) changes in the ambient noise environment todav. These impacts should be significant. The second parameter is to compare the “approved” specific plan impacts against those of the new (revised) SP; this should yield a net reduction in noise compared to the approved SP. Page 21: Commented [JC16] John Criste 9/27/2021 3:06:00 PM Bill: the above issue has not been addressed (unless I missed it). The project is already entitled. The approved needs to be compared with the proposed. Page 21: Deleted Bill Lawson 9/14/2021 1:42:00 PM 1 Page 21: Inserted Bill Lawson 9/14/2021 1:42:00 PM 2 Page 22: Deleted Bill Lawson 9/14/2021 1:42:00 PM 1 Page 22: Inserted Bill Lawson 9/14/2021 1:42:00 PM 2 Page 22: Deleted Bill Lawson 9/14/2021 1:42:00 PM 1 Page 22: Inserted Bill Lawson 9/14/2021 1:42:00 PM 2 Page 23: Deleted Bill Lawson 9/14/2021 1:42:00 PM 2 Page 23: Inserted Bill Lawson 9/14/2021 1:42:00 PM 3 Page 23: Commented [NC17] Nicole Criste (Contract Planner) 5/7/2020 1:18:00 PM I do not understand the relevance of agricultural land use criteria for this, unless the reference is relating to the Keck properties to the east? Perhaps an opening paragraph that describes what surrounding land uses are, and whether they are sensitive or not? Page 23: Commented [b18R17] blawson@urbanxroads.onmicrosoft.com 10/8/2020 2:19:00 PM Clarify text added. Page 23: Commented [JC19] John Criste 9/27/2021 3:09:00 PM Does not look like these comments have been addressed. Page 23: Commented [CF20R19] Cheri Flores 4/2/2021 10:23:00 AM That explanation makes sense but the CEQA significance criteria says that if the project causes generation of a substantial temporary or permanent increase in ambient noise levels in excess of standards established in the local general plan or noise ordinance. If the ambient levels already exceed the standards, then any increase would constitute a significant impact since any increase would be in excess of the standards. Page 23: Deleted Bill Lawson 9/14/2021 1:42:00 PM 3 Page 23: Inserted Bill Lawson 9/14/2021 1:42:00 PM 4 Page 23: Commented [NC21] Nicole Criste (Contract Planner) 5/7/2020 1:24:00 PM If the City’s standard is 65 dBA CNEL for sensitive land uses, how can anything above that not be a significant impact? Page 23: Commented [b22R21] blawson@urbanxroads.onmicrosoft.com 10/8/2020 2:19:00 PM The 65 dBA CNEL noise criteria is intended to describe the mitigated exterior noise levels in private backyards. Often the unmitigated exterior noise levels at the right-of-way are much higher than 65 dBA before walls are installed. The use 65 dBA allow us to identify potential impacts related to project traffic noise level increases. The increase is the value we are using to determine significance not the 65 dBA. Page 23: Commented [CF23R21] Cheri Flores 4/2/2021 10:23:00 AM That explanation makes sense but the CEQA significance criteria says that if the project causes generation of a substantial temporary or permanent increase in ambient noise levels in excess of standards established in the local general plan or noise ordinance. If the ambient levels already exceed the standards, then any increase would constitute a significant impact since any increase would be in excess of the standards. Page 23: Commented [BL24R21] Bill Lawson 5/4/2021 8:46:00 AM The comment is suggesting that if the ambient noise levels already exceed the standards, then any increase would constitute a significant impact since any increase would be in excess of the standards. However, the City does not maintain any significant noise level increase standards, only land use/noise compatibility levels outlined in the General Plan Noise Element. The new CEQA criteria is focused on the significance of the increase in ambient noise levels over existing conditions and brings in the concept of a “noise-level increase standard”. It does not imply an increase is significant if it is excess of a fixed noise level limit or on the increase over a fixed standard such as the land use compatibility guidelines or an ordinance limit. Unfortunately, most jurisdictions have noise level limits and land use guidelines for new development but not standards for what is a substantial temporary or permanent increase in ambient noise levels. We have identified the closest documentation of a “noise-level increase standard” available for transportation sources In addition, if we applied this interpretation, any increase would effectively be considered significant when measured at the right-of-way boundary. Page 24: Inserted Bill Lawson 9/14/2021 1:42:00 PM TABLE 4-2: SIGNIFICANCE CRITERIA SUMMARY Page 24: Commented [CF25] Cheri Flores 4/2/2021 10:24:00 AM Where did the on-site criteria go? Page 24: Commented [BL26R25] Bill Lawson 5/4/2021 8:48:00 AM On-Site traffic analysis is now included. Page 24: Moved from page 26 (Move #3) Bill Lawson 9/14/2021 1:42:00 PM Analysis Land Use Condition(s) Significance Criteria Daytime Nighttime Page 24: Inserted Bill Lawson 9/14/2021 1:42:00 PM Off-Site Traffic Noise Noise- Sensitive1 if ambient is < 60 dBA CNEL ≥ 5 dBA CNEL Project increase if ambient is 60 - 65 dBA CNEL ≥ 3 dBA CNEL Project increase if ambient is > 65 dBA CNEL ≥ 1.5 dBA CNEL Project increase Non-Noise- Sensitive2 if ambient is < 70 dBA CNEL ≥ 5 dBA CNEL Project increase if ambient is > 70 dBA CNEL ≥ 3 dBA CNEL Project increase On-Site Traffic Noise3 Noise- Sensitive Exterior Noise Level Criteria 65 dBA CNEL Interior Noise Level Criteria 45 dBA CNEL Construction4 Noise- Sensitive October 1st to April 30th 7:00 a.m. to 5:30 p.m. Mondays to Fridays May 1st to September 30th 6:00 a.m. to 7:00 p.m. Mondays to Fridays All Year: 8:00 a.m. to 5:00 p.m. Saturdays; no activity Sundays and holidays Exterior Noise Level Threshold5 80 dBA Leq n/a Noise Level Increase4 12 dBA Leq n/a Vibration Level Threshold5 0.01 in/sec RMS n/a 1 FICON, 1992. 2 City of La Quinta General Plan, Chapter 4, Environmental Hazards Element Table IV-3 3 City of La Quinta Municipal Code, Ordinance 550, Section 9.100.210 (B) & General Plan Noise Element Policy N-1.2. 4 City of La Quinta Municipal Code, Section 6.08.050 (Appendix 3.1). 5 Federal Transit Administration, Transit Noise and Vibration Impact Assessment Manual. 6 Threshold based on the substantial increase criteria in the Caltrans Traffic Noise Analysis Protocol, May 2011. 7 County of Riverside General Plan Noise Element, Policy 16.3. "Daytime" = 7:00 a.m. to 10:00 p.m.; "Nighttime" = 10:00 p.m. to 7:00 a.m. ON-SITE TRANSPORTATION NOISE  If the on-site exterior noise levels exceed 65 dBA CNEL at the private outdoor living areas of residential homes, or common outdoor areas at hotel uses. Interior noise levels shall not exceed 45 dBA CNEL for residential homes and the hotel building (City of La Quinta Municipal Code, Ordinance 550, Section 9.100.210 (B) & General Plan Noise Element Policy N-1.2). Page 25: Deleted Bill Lawson 9/14/2021 1:42:00 PM TABLE 4-2: Significance Criteria Summary Page 25: Commented [CF27] Cheri Flores 4/2/2021 10:24:00 AM Where did the on-site criteria go? Page 25: Inserted Bill Lawson 9/14/2021 1:42:00 PM THIS PAGE INTENTIONALLY LEFT BLANK Page 26: Moved to page 24 (Move #3) Bill Lawson 9/14/2021 1:42:00 PM Analysis Land Use Condition(s) Significance Criteria Daytime Nighttime Page 26: Deleted Bill Lawson 9/14/2021 1:42:00 PM Off-Site Noise- Sensitive1 if ambient is < 60 dBA CNEL ≥ 5 dBA CNEL Project increase if ambient is 60 - 65 dBA CNEL ≥ 3 dBA CNEL Project increase if ambient is > 65 dBA CNEL ≥ 1.5 dBA CNEL Project increase Non-Noise- Sensitive1 if ambient is < 70 dBA CNEL ≥ 5 dBA CNEL Project increase if ambient is > 70 dBA CNEL ≥ 3 dBA CNEL Project increase Construction2 Noise- Sensitive October 1st to April 30th 7:00 a.m. to 5:30 p.m. Mondays to Fridays May 1st to September 30th 6:00 a.m. to 7:00 p.m. Mondays to Fridays All Year: 8:00 a.m. to 5:00 p.m. Saturdays; no activity Sundays and holidays Exterior Noise Level Threshold3 80 dBA Leq n/a Noise Level Increase4 12 dBA Leq n/a Vibration Level Threshold5 0.01 in/sec RMS n/a 1 FICON, 1992. 2 City of La Quinta Municipal Code, Section 6.08.050 (Appendix 3.1). 3 Federal Transit Administration, Transit Noise and Vibration Impact Assessment Manual. 4 Threshold based on the substantial increase criteria in the Caltrans Traffic Noise Analysis Protocol, May 2011. 5 County of Riverside General Plan Noise Element, Policy 16.3. "Daytime" = 7:00 a.m. to 10:00 p.m.; "Nighttime" = 10:00 p.m. to 7:00 a.m. Page 26: Formatted Bill Lawson 9/14/2021 1:42:00 PM Font: 12 pt, Italic Page 26: Formatted Bill Lawson 9/14/2021 1:42:00 PM Normal, Centered, Space Before: 6 pt, After: 6 pt Page 26: Formatted Bill Lawson 9/14/2021 1:42:00 PM Font: Bold, Italic, All caps, Condensed by 0.15 pt Page 27: Commented [NC28] Nicole Criste (Contract Planner) 5/7/2020 1:38:00 PM Given that traffic volumes are significantly lower in August than during peak and shoulder seasons, was an adjustment made for noise measurements next to major roadways where a doubling of the traffic could realistically occur during January or February? On a related note, are the noise levels adjusted based on annual increases in traffic volumes, given that measurements are 3 years old at this point? Page 27: Commented [b29R28] blawson@urbanxroads.onmicrosoft.com 10/8/2020 2:22:00 PM From a noise standpoint lower ambient noise levels provide for the worst-case noise conditions. Since we only use ambient noise level measurements to describe the project operational or construction noise level increases, when compared to the project only noise levels, a lower ambient will produce a higher project related impact. Page 33: Inserted Bill Lawson 9/14/2021 1:42:00 PM OFF-SITE Page 35: Commented [NC30] Nicole Criste (Contract Planner) 5/7/2020 1:56:00 PM Please either footnote or put in table headers that these are in thousands. Page 35: Commented [b31R30] blawson@urbanxroads.onmicrosoft.com 10/8/2020 2:25:00 PM Good catch. Page 35: Commented [BL32R30] Bill Lawson 12/28/2020 5:12:00 PM Update using same segments and volumes from TIA. Page 35: Deleted Bill Lawson 9/14/2021 1:42:00 PM November 2020 Page 35: Inserted Bill Lawson 9/14/2021 1:42:00 PM April 2021 Page 35: Commented [JC33] John Criste 9/27/2021 3:18:00 PM This still doesn’t seem right. Didn’t the collection of traffic data provide a real-world vehicle mix instead of one that could work on I-10? Page 35: Formatted Bill Lawson 9/14/2021 1:42:00 PM Font: 14 pt, Small caps, Not All caps Page 36: Inserted Bill Lawson 9/14/2021 1:42:00 PM 6.3 ON-SITE TRAFFIC NOISE PREDICTION MODEL INPUTS The on-site roadway parameters including the average daily traffic (ADT) volumes used for this study are presented on Table 6-5. To predict the future on-site noise environment at the Project site, parameters including the number of lanes and daily volume thresholds were obtained from the Page 36: Inserted Cheri Flores 10/15/2021 3:51:00 PM Travertine Specific Plan Page 36: Inserted Bill Lawson 9/14/2021 1:42:00 PM Traffic Impact Analysis. The exterior noise level impacts were placed five feet above the finished floor elevation at the outdoor living areas and proposed building façades. Second-floor receivers were located 14 feet above the finished floor elevation. TABLE 6-5: ON-SITE ROADWAY PARAMETERS Roadway Lanes Classification1 Average Daily Traffic Volume1 Speed Limit (mph) Site Conditions Jefferson Street 2 Secondary Arterial 5,600 45 Soft North Loop 2 Secondary Arterial 2,000 45 Soft South Loop 2 Collector 2,700 45 Soft 1 Travertine Specific Plan Traffic Phasing Analysis General Plan Buildout (2040) . Page 36: Formatted Bill Lawson 9/14/2021 1:42:00 PM Body Text, Left, Space Before: 0 pt, After: 0 pt Page 36: Moved to page 2 (Move #1) Bill Lawson 9/14/2021 1:42:00 PM This page intentionally left blank Page 36: Formatted Bill Lawson 9/14/2021 1:42:00 PM Font: Not Italic Page 36: Formatted Bill Lawson 9/14/2021 1:42:00 PM Font: Not Bold, Not Italic, Not All caps, Not Expanded by / Condensed by Page 37: Commented [CF34] Cheri Flores 4/2/2021 10:28:00 AM Were noise contours for each traffic scenario removed? Why? Page 37: Commented [BL35R34] Bill Lawson 5/4/2021 8:11:00 AM Updated for consistency with TIA. Page 37: Inserted Bill Lawson 9/14/2021 1:42:00 PM Noise contours were developed for the following traffic scenarios:  Existing: This scenario refers to the existing present-day noise 2019 conditions, without the proposed Project. Existing plus Ambient plus Cumulative (EAC) Project Phase 1 (2026): This scenario refers to the existing plus ambient plus cumulative noise conditions at 2026 without and with the proposed Project Phase 1. Project Phase 1 includes 530 single family detached residential homes, 74 duplex residential units, and a golf course (12 holes).  Page 37: Commented [JC36] John Criste 9/27/2021 3:23:00 PM The 12 holes has been reduced to four; check with JK; he was on today’s call with the applicant. Page 37: Commented [BL37R36] Bill Lawson 12/28/2020 4:02:00 PM The 65 CNEL threshold represents the exterior noise level in the private backyard areas. The off-site traffic noise levels represent the exterior levels measured at the ROW without the benefit of any existing barriers. Page 37: Inserted Bill Lawson 9/14/2021 1:42:00 PM   Existing plus Ambient plus Cumulative (EAC) Project Phase 2 (2029): This scenario refers to the existing plus ambient plus cumulative noise conditions at 2029 without and with the proposed Project Phase 2. In addition, to Project Phase 1, Project Phase 2 includes 143 single family detached residential homes and 163 duplex residential units.  Existing plus Ambient plus Cumulative (EAC) Project Phase 3 (2031): This scenario refers to the existing plus ambient plus cumulative noise conditions at 2031 without and with the proposed Project Phase 3. In addition, to Project Phase 1 and 2, Project Phase 3 includes 85 single family detached residential homes and 205 duplex residential units and a 100-room resort hotel. Page 37: Commented [NC38] Nicole Criste (Contract Planner) 5/19/2020 12:20:00 PM Per comments made on similar issue for other projects – if the City’s standard is 65 dBA CNEL for a residential back yard, and the project increases that noise level above 65, even fractionally, the impact is significant. Page 37: Commented [BL39R38] Bill Lawson 12/28/2020 4:02:00 PM The 65 CNEL threshold represents the exterior noise level in the private backyard areas. The off-site traffic noise levels represent the exterior levels measured at the ROW without the benefit of any existing barriers. The comment is suggesting that if the ambient noise levels already exceed the standards, then any increase would constitute a significant impact since any increase would be in excess of the standards. However, the City does not maintain any significant noise level increase standards, only land use/noise compatibility levels outlined in the General Plan Noise Element. The new CEQA criteria is focused on the significance of the increase in ambient noise levels over existing conditions and brings in the concept of a “noise-level increase standard”. It does not imply an increase is significant if it is excess of a fixed noise level limit or on the increase over a fixed standard such as the land use compatibility guidelines or an ordinance limit. Unfortunately, most jurisdictions have noise level limits and land use guidelines for new development but not standards for what is a substantial temporary or permanent increase in ambient noise levels. We have identified the closest documentation of a “noise-level increase standard” available for transportation sources Page 38: Deleted Bill Lawson 9/14/2021 1:42:00 PM 7 Page 38: Inserted Bill Lawson 9/14/2021 1:42:00 PM following seven Page 38: Commented [CF40] Cheri Flores 4/2/2021 10:28:00 AM Please provide a summary of what those scenarios are. Page 38: Commented [BL41R40] Bill Lawson 5/4/2021 8:51:00 AM List of scenarios included. Page 38: Commented [CF42] Cheri Flores 4/2/2021 10:28:00 AM Please provide a summary of what those scenarios are. Page 38: Inserted Bill Lawson 9/14/2021 1:42:00 PM  Existing Conditions  Existing With Project (Phase 3) Conditions  Phase 3 (2031) Without Project  Phase 3 (2031) With Project  Year 2040 Conditions with Madison Street extension  Year 2040 Conditions without Madison Street extension (GPA Option 1) Year 2040 Conditions without Madison Street extension and without Jefferson Street / Avenue 62 extensions (GPA  Page 38: Commented [CF43] Cheri Flores 10/29/2021 11:51:00 AM Please coordinate with project applicant team and CEQA team to confirm alternatives for analysis Page 38: Inserted Bill Lawson 9/14/2021 1:42:00 PM  Option 2) Page 41: Commented [JC44] John Criste 9/28/2021 8:31:00 AM Again, This and GPA Option 2 need to be defined before this analysis is presented. What do these “options” mean? Are they project alternatives that will be analysed in the Draft EIR? Page 42: Inserted John Criste 9/28/2021 8:31:00 AM off-site Page 43: Commented [JC45] John Criste 9/28/2021 8:39:00 AM Quantify the actual 2040 CNEL at these homes; they should be well below thresholds, shouldn’t they? Page 43: Commented [CF46] Cheri Flores 4/2/2021 10:29:00 AM Finish the sentence. Page 43: Commented [BL47R46] Bill Lawson 8/8/2021 6:59:00 PM Corrected. Page 43: Commented [JC48R46] John Criste 9/28/2021 8:40:00 AM Bill, you’re ignoring some of my best (if not most critical) editing! Page 43: Deleted Bill Lawson 9/14/2021 1:42:00 PM , . Page 43: Inserted Bill Lawson 9/14/2021 1:42:00 PM , the off-site traffic noise level impacts at the adjacent noise-sensitive land use are considered a significant and unavoidable impact. Page 43: Commented [JC49] John Criste 9/28/2021 8:42:00 AM Is this the right conclusion? CEQA says that “significance” is an increase in ambient noise levels in the vicinity of the project in excess of standards established in the local general plan or noise ordinance. Do we exceed these? If not, effects should be less than significant. Page 43: Commented [CF50] Cheri Flores 4/2/2021 10:29:00 AM Is this still significant and unavoidable? Page 43: Commented [BL51R50] Bill Lawson 8/8/2021 6:59:00 PM Text added. Page 43: Commented [CF52] Cheri Flores 4/2/2021 10:29:00 AM Is this still significant and unavoidable? Page 44: Commented [JC53] John Criste 9/28/2021 8:45:00 AM Again, this logic also applies to homes north of Ave 62. Page 45: Commented [JC54] John Criste 9/28/2021 8:51:00 AM If the increase in ambient noise levels in the vicinity of the project is not in excess of standards established in the local general plan or noise ordinance, then the 3 CNEL increase should be insignificant. Otherwise, we’ll be making this significance finding all over; that does not seem correct. Page 47: Inserted Bill Lawson 9/14/2021 1:42:00 PM 8 ON-SITE TRANSPORTATION NOISE IMPACTS An on-site exterior noise impact analysis has been completed to determine the noise exposure levels that would result from adjacent traffic noise sources to the noise sensitive receivers located within the Project, and to identify potential noise abatement measures that would achieve acceptable Project exterior and interior noise levels. Exterior noise levels are generally limited to outdoor living areas of frequent human use (e.g., backyards of single-family homes). Interior noise levels are evaluated at the first and second floor building façade. The primary source of traffic noise affecting the Project site is anticipated to be from Jefferson Street, North Loop and South Loop roadway segments. The Project will also experience some background traffic noise impacts from other internal streets and parking lots Page 47: Inserted John Criste 9/29/2021 8:51:00 AM ; Page 47: Deleted John Criste 9/29/2021 8:51:00 AM , Page 47: Inserted Bill Lawson 9/14/2021 1:42:00 PM , however, due to the low traffic volume and low speeds of vehicles travelling on these roadways, traffic noise will not make a significant contribution to the noise environment beyond of the right- of-way of each road. 8.1 EXTERIOR NOISE ANALYSIS Page 47: Commented [JC55] John Criste 9/29/2021 8:53:00 AM For which alternative is this? Is it analysing Jefferson as open as opposed to gated? Will any of the alternatives bring us closer to the threshold? Page 47: Inserted Bill Lawson 9/14/2021 1:42:00 PM Using the FHWA traffic noise prediction model and the parameters outlined in Tables 6-3 to 6-5, the expected future exterior noise levels for the on-site building were calculated. Table 8-1 presents a summary of future exterior noise levels for the planned residential development within the Travertine Specific Plan. The on-site exterior traffic noise levels indicate that the single-family residential development adjacent to Jefferson Street, North Loop and South Loop will experience exterior noise levels ranging from 61.2 to 62.5 dBA CNEL. Therefore, the future on-site exterior traffic noise impacts will be less than significant. and no exterior noise abatement is needed to satisfy the City of La Quinta 65 dBA CNEL exterior noise level standards for the proposed land uses adjacent to Jefferson Street, North Loop or South Loop. TABLE 8-1: EXTERIOR TRAFFIC NOISE LEVELS Adjacent Receivers Unmitigated Noise Level (dBA CNEL)1 Exterior Noise Level Threshold (dBA CNEL)2 Threshold Exceeded? Jefferson Street 62.0 65 No North Loop 61.2 65 No South Loop 62.5 65 No 1 On-site traffic noise calculations included in Appendix 8.1. 2 City of La Quinta exterior noise criteria (See Section 4). 8.2 INTERIOR NOISE ANALYSIS To ensure that the interior noise levels comply with the City of La Quinta interior noise level standards, future noise levels were calculated at the first and second floor building façade locations. 8.2.1 NOISE REDUCTION METHODOLOGY The interior noise level is the difference between the predicted exterior noise level at the building facade and the noise reduction of the structure. Typical building construction will provide a Noise Reduction (NR) of approximately 12 dBA with "windows open" and a minimum 25 dBA noise reduction with "windows closed." (22) (4) However, sound leaks, cracks and openings within the window assembly can greatly diminish its effectiveness in reducing noise. Several methods are used to improve interior noise reduction, including: (1) weather-stripped solid core exterior doors; (2) upgraded dual glazed windows; (3) mechanical ventilation/air conditioning; and (4) exterior wall/roof assembles free of cut outs or openings. 8.2.2 INTERIOR NOISE LEVEL ASSESSMENT Table 8-2 shows that the Project buildings will require a windows-closed condition and a means of mechanical ventilation (e.g., air conditioning). Table 8-2 shows that the future interior noise levels are expected to range from 36.2 to 37.5 dBA CNEL. The interior noise level analysis shows that the City of La Quinta 45 dBA CNEL residential interior noise standards can be satisfied using standard building construction and windows with standard STC ratings of 27 for all lots/units. Therefore, the future on-site interior traffic noise impacts will be less than significant. TABLE 8-2: INTERIOR NOISE LEVELS (CNEL) Adjacent Receivers Noise Level at Façade1 Required Interior NR2 Minimum Estimated Interior NR3 Upgraded Windows4 Interior Noise Level5 Threshold Threshold Exceeded? Jefferson Street 62.0 17.0 25 No 37.0 45 No North Loop 61.2 16.2 25 No 36.2 45 No South Loop 62.5 17.5 25 No 37.5 45 No 1 Exterior noise level at the facade with a windows closed condition requiring a means of mechanical ventilation (e.g. air conditioning). 2 Noise reduction required to satisfy the 45 dBA CNEL interior noise standard for residential uses. 3 Estimated minimum interior noise reduction with the recommended windows and standard building construction. 4 Does the required interior noise reduction trigger upgraded windows with a minimum STC rating of greater than 27? 5 Estimated interior noise level with minimum STC rating for all windows. "NR" = Noise Reduction 9 Page 49: Moved to page 6 (Move #2) Bill Lawson 9/14/2021 1:42:00 PM This page intentionally left blank Page 49: Deleted Bill Lawson 9/14/2021 1:42:00 PM 8 Page 49: Deleted Bill Lawson 9/14/2021 1:42:00 PM 8 Page 49: Inserted Bill Lawson 9/14/2021 1:42:00 PM 9 Page 49: Commented [NC56] Nicole Criste (Contract Planner) 5/19/2020 12:46:00 PM Need to explain why no measurements were taken between the project site and the levee – potential for development on those intervening lands. Page 49: Commented [BL57R56] Bill Lawson 12/28/2020 4:07:00 PM This section is used to describe the receiver locations needed to estimate the construction related noise level impacts to existing noise sensitive receivers. Measurements are used to estimate the project related increases due to project activities over time. Since potential receivers between the project site and levee do not exist, measurements are not needed. Page 50: Deleted Bill Lawson 9/14/2021 1:42:00 PM 8 Page 50: Inserted Bill Lawson 9/14/2021 1:42:00 PM 9 Page 51: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page 51: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page 51: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page 51: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page 51: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page 51: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page 51: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page 51: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page 51: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page 51: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page 52: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page 52: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page 53: Deleted Bill Lawson 9/14/2021 1:42:00 PM 22 Page 53: Inserted Bill Lawson 9/14/2021 1:42:00 PM 23 Page 53: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page 53: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page 53: Deleted Bill Lawson 9/14/2021 1:42:00 PM 23 Page 53: Inserted Bill Lawson 9/14/2021 1:42:00 PM 24 Page 53: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page 53: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page 53: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page 53: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page 53: Commented [JC58] John Criste 9/29/2021 9:04:00 AM The site plan has changed somewhat. Please be sure the most current (Proposed) site plan was used for the analysis. Also, applicant should provide a phasing plan so UXR can analyse the impacts of post-Phase I construction on Phase I homes and other Phase I sensitive uses. Page 54: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page 54: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page 54: Formatted John Criste 9/29/2021 9:06:00 AM Font: +Body (Calibri) Page 54: Inserted John Criste 9/29/2021 9:06:00 AM FOR OFF-SITE LANDS Page 54: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page 54: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page 54: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page 54: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page 54: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page 54: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page 54: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page 54: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page 55: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page 55: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page 55: Inserted John Criste 9/29/2021 9:06:00 AM FOR OFF-SITE LANDS Page 55: Commented [CF59] Cheri Flores 10/15/2021 3:58:00 PM Is there operation analysis for off sites? Let me know if I missed it but it should be included with as much info as we possibly can. Page 55: Commented [JC60] John Criste 9/29/2021 9:08:00 AM What about intra-project impacts? Can strategic management be recommended in this report to prevent or reduce undue intra-project construction impacts? Page 55: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page 55: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page 55: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page 55: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page 55: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page 55: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page 55: Deleted Bill Lawson 9/14/2021 1:42:00 PM 24 Page 55: Inserted Bill Lawson 9/14/2021 1:42:00 PM 25 Page 55: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page 55: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page 56: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page 56: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page 56: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page 56: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page 56: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page 56: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page 56: Commented [JC61] John Criste 9/29/2021 9:10:00 AM Again, what about intra-project impacts. Can we protect early phase residents from what could be many years of on-going construction noise, including rock crushing? Describe the rock-crushing activities, volumes, locations and duration. Page 56: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page 56: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page 56: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page 56: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page 56: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page 56: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page 56: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page 56: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page 56: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page 56: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page 57: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page 57: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page 57: Commented [CF62] Cheri Flores 4/2/2021 10:30:00 AM Please also add analysis for construction of an off-site substation. Page 57: Commented [BL63R62] Bill Lawson 8/8/2021 7:00:00 PM Added below. Page 57: Deleted Bill Lawson 9/14/2021 1:42:00 PM 23 Page 57: Inserted Bill Lawson 9/14/2021 1:42:00 PM 24 Page 57: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page 57: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page 57: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9.10 Page 57: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10.10 OFF-SITE SUBSTATION Electric service to Travertine will be provided by Imperial Irrigation District (IID). An offsite substation will be required for the Travertine development and will be located and constructed during Construction Phase I. The location of the five-acre site will be within a two-mile radius of the project. The actual location of the substation and potentially impacted nearby noise sensitive receivers are not known at this time. However, all substation construction noise levels shall satisfy the reasonable daytime exterior noise threshold of 80 dBA Leq during temporary Project construction activities. 10.11 Page 57: Commented [NC64] Nicole Criste (Contract Planner) 5/19/2020 1:04:00 PM Address future phases and intervening developable lands here as well. Page 57: Commented [BL65R64] Bill Lawson 12/24/2020 11:01:00 AM On-site impact added Page 57: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page 57: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page 57: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page 57: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page 57: Inserted Bill Lawson 9/14/2021 1:42:00 PM Page 57: Formatted Bill Lawson 9/14/2021 1:42:00 PM Font: Bold, Small caps, All caps Page 58: Deleted Bill Lawson 9/14/2021 1:42:00 PM Page 58: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page 58: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page 58: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page 58: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page 58: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page 58: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page 58: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9.11 Page 58: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10.12 Page 58: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page 58: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page 58: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page 58: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page 59: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page 59: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page 60: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page 60: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page 60: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page 60: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page 60: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page 60: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page 60: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page 60: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page 60: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page 60: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page 60: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page 60: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page 61: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page 61: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page 61: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page 61: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page 61: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page 61: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page 62: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page 62: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page 63: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page 63: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page 63: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page 63: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page 63: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page 63: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page 63: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page 63: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page 63: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page 63: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page 64: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page 64: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page 64: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9.12 Page 64: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10.13 Page 65: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page 65: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page 65: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page 65: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page 65: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page 65: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page 65: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page 65: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page 66: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page 66: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page 66: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9.13 Page 66: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10.14 Page 66: Commented [NC66] Nicole Criste (Contract Planner) 5/19/2020 1:07:00 PM Supplement as needed to address intervening lands and later phases of development. Page 66: Commented [BL67R66] Bill Lawson 12/24/2020 12:01:00 PM No updates required. Page 67: Deleted Bill Lawson 9/14/2021 1:42:00 PM 10 Page 67: Inserted Bill Lawson 9/14/2021 1:42:00 PM 11 Page 68: Deleted Bill Lawson 9/14/2021 1:42:00 PM November 2020 Page 68: Inserted Bill Lawson 9/14/2021 1:42:00 PM April 2021 Page 68: Deleted Bill Lawson 9/14/2021 1:42:00 PM 22. Page 68: Inserted Bill Lawson 9/14/2021 1:42:00 PM 22. California Department of Transportation. Traffic Noise Analysis Protocol. May 2011. 23. Page 68: Deleted Bill Lawson 9/14/2021 1:42:00 PM 23 Page 68: Inserted Bill Lawson 9/14/2021 1:42:00 PM 24 Page 68: Deleted Bill Lawson 9/14/2021 1:42:00 PM 24 Page 68: Inserted Bill Lawson 9/14/2021 1:42:00 PM 25 Page 69: Deleted Bill Lawson 9/14/2021 1:42:00 PM 11 Page 69: Inserted Bill Lawson 9/14/2021 1:42:00 PM 12 Page 79: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page 79: Inserted Bill Lawson 9/14/2021 1:42:00 PM 8.1: ON-SITE TRAFFIC NOISE CALCULATIONS This page intentionally left blank APPENDIX 10 Page 83: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page 83: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Page 85: Deleted Bill Lawson 9/14/2021 1:42:00 PM 9 Page 85: Inserted Bill Lawson 9/14/2021 1:42:00 PM 10 Header and footer changes Page 1: Inserted Cheri Flores 7/8/2022 12:06:00 PM Noise Impact Analysis Page 1: Formatted Cheri Flores 7/8/2022 12:06:00 PM Font: +Body (Calibri), 9 pt, Italic Page 1: Deleted Cheri Flores 7/8/2022 12:06:00 PM Noise Impact Analysis Page ii: Inserted Cheri Flores 7/8/2022 12:06:00 PM Noise Impact Analysis Page ii: Formatted Cheri Flores 7/8/2022 12:06:00 PM Font: +Body (Calibri), 9 pt, Italic Page ii: Deleted Cheri Flores 7/8/2022 12:06:00 PM Noise Impact Analysis Page ii: Inserted Cheri Flores 7/8/2022 12:06:00 PM 7TH REVIEW COMMENTS-Noise 9-29-21 Page ii: Formatted Cheri Flores 7/8/2022 12:06:00 PM Font: 9 pt, Italic, Do not check spelling or grammar Page ii: Deleted Cheri Flores 7/8/2022 12:06:00 PM 12189-0709 Noise Study Page ii: Inserted Bill Lawson 9/14/2021 1:42:00 PM 09 Page ii: Inserted Cheri Flores 7/8/2022 12:06:00 PM 7TH REVIEW COMMENTS-Noise 9-29-21 Page ii: Formatted Cheri Flores 7/8/2022 12:06:00 PM Font: 9 pt, Italic, Do not check spelling or grammar Page ii: Deleted Cheri Flores 7/8/2022 12:06:00 PM 12189-0709 Noise Study Page ii: Inserted Bill Lawson 9/14/2021 1:42:00 PM 09 Page 1: Inserted Cheri Flores 7/8/2022 12:06:00 PM 7TH REVIEW COMMENTS-Noise 9-29-21 Page 1: Deleted Cheri Flores 7/8/2022 12:06:00 PM 12189-0709 Noise Study Page 1: Inserted Bill Lawson 9/14/2021 1:42:00 PM 09 Page 45: Inserted Cheri Flores 7/8/2022 12:06:00 PM 7TH REVIEW COMMENTS-Noise 9-29-21 Page 45: Deleted Cheri Flores 7/8/2022 12:06:00 PM 12189-0709 Noise Study Page 45: Inserted Bill Lawson 9/14/2021 1:42:00 PM 09 Page 47: Inserted Cheri Flores 7/8/2022 12:06:00 PM 7TH REVIEW COMMENTS-Noise 9-29-21 Page 47: Formatted Cheri Flores 7/8/2022 12:06:00 PM Font: 9 pt, Italic, Do not check spelling or grammar Page 47: Deleted Cheri Flores 7/8/2022 12:06:00 PM 12189-0709 Noise Study Page 47: Inserted Bill Lawson 9/14/2021 1:42:00 PM 09 Page 71: Inserted Cheri Flores 7/8/2022 12:06:00 PM 7TH REVIEW COMMENTS-Noise 9-29-21 Page 71: Formatted Cheri Flores 7/8/2022 12:06:00 PM Font: +Body (Calibri), 9 pt, Italic, Do not check spelling or grammar Page 71: Deleted Cheri Flores 7/8/2022 12:06:00 PM 12189-0709 Noise Study Page 71: Inserted Bill Lawson 9/14/2021 1:42:00 PM 09 Text Box changes Header and footer text box changes Footnote changes Endnote changes 5TH REVIEW COMMENTS - CR 10-2021 Main document changes and comments Page i: Inserted Cheri Flores 7/8/2022 12:08:00 PM 48 Page i: Deleted Cheri Flores 7/8/2022 12:08:00 PM 47 Page i: Inserted Cheri Flores 7/8/2022 12:08:00 PM 48 Page i: Deleted Cheri Flores 7/8/2022 12:08:00 PM 47 Page i: Inserted Cheri Flores 7/8/2022 12:08:00 PM 50 Page i: Deleted Cheri Flores 7/8/2022 12:08:00 PM 49 Page i: Inserted Cheri Flores 7/8/2022 12:08:00 PM 51 Page i: Deleted Cheri Flores 7/8/2022 12:08:00 PM 50 Page i: Inserted Cheri Flores 7/8/2022 12:08:00 PM 52 Page i: Deleted Cheri Flores 7/8/2022 12:08:00 PM 51 Page i: Inserted Cheri Flores 7/8/2022 12:08:00 PM 53 Page i: Deleted Cheri Flores 7/8/2022 12:08:00 PM 52 Page i: Inserted Cheri Flores 7/8/2022 12:08:00 PM 54 Page i: Deleted Cheri Flores 7/8/2022 12:08:00 PM 53 Page i: Inserted Cheri Flores 7/8/2022 12:08:00 PM 55 Page i: Deleted Cheri Flores 7/8/2022 12:08:00 PM 54 Page i: Inserted Cheri Flores 7/8/2022 12:08:00 PM 55 Page i: Deleted Cheri Flores 7/8/2022 12:08:00 PM 54 Page i: Inserted Cheri Flores 7/8/2022 12:08:00 PM 56 Page i: Deleted Cheri Flores 7/8/2022 12:08:00 PM 55 Page i: Inserted Cheri Flores 7/8/2022 12:08:00 PM 57 Page i: Deleted Cheri Flores 7/8/2022 12:08:00 PM 56 Page i: Inserted Cheri Flores 7/8/2022 12:08:00 PM 57 Page i: Deleted Cheri Flores 7/8/2022 12:08:00 PM 56 Page i: Inserted Cheri Flores 7/8/2022 12:08:00 PM 57 Page i: Deleted Cheri Flores 7/8/2022 12:08:00 PM 56 Page i: Inserted Cheri Flores 7/8/2022 12:08:00 PM 58 Page i: Deleted Cheri Flores 7/8/2022 12:08:00 PM 57 Page i: Inserted Cheri Flores 7/8/2022 12:08:00 PM 58 Page i: Deleted Cheri Flores 7/8/2022 12:08:00 PM 57 Page ii: Inserted Cheri Flores 7/8/2022 12:08:00 PM 58 Page ii: Deleted Cheri Flores 7/8/2022 12:08:00 PM 57 Page ii: Inserted Cheri Flores 7/8/2022 12:08:00 PM 58 Page ii: Deleted Cheri Flores 7/8/2022 12:08:00 PM 57 Page ii: Inserted Cheri Flores 7/8/2022 12:08:00 PM 59 Page ii: Deleted Cheri Flores 7/8/2022 12:08:00 PM 58 Page ii: Inserted Cheri Flores 7/8/2022 12:08:00 PM 59 Page ii: Deleted Cheri Flores 7/8/2022 12:08:00 PM 58 Page ii: Inserted Cheri Flores 7/8/2022 12:08:00 PM 59 Page ii: Deleted Cheri Flores 7/8/2022 12:08:00 PM 58 Page ii: Inserted Cheri Flores 7/8/2022 12:08:00 PM 59 Page ii: Deleted Cheri Flores 7/8/2022 12:08:00 PM 58 Page ii: Inserted Cheri Flores 7/8/2022 12:08:00 PM 60 Page ii: Deleted Cheri Flores 7/8/2022 12:08:00 PM 59 Page ii: Inserted Cheri Flores 7/8/2022 12:08:00 PM 60 Page ii: Deleted Cheri Flores 7/8/2022 12:08:00 PM 59 Page ii: Inserted Cheri Flores 7/8/2022 12:08:00 PM 60 Page ii: Deleted Cheri Flores 7/8/2022 12:08:00 PM 59 Page ii: Inserted Cheri Flores 7/8/2022 12:08:00 PM 61 Page ii: Deleted Cheri Flores 7/8/2022 12:08:00 PM 60 Page ii: Inserted Cheri Flores 7/8/2022 12:08:00 PM 61 Page ii: Deleted Cheri Flores 7/8/2022 12:08:00 PM 60 Page ii: Inserted Cheri Flores 7/8/2022 12:08:00 PM 62 Page ii: Deleted Cheri Flores 7/8/2022 12:08:00 PM 61 Page ii: Inserted Cheri Flores 7/8/2022 12:08:00 PM 62 Page ii: Deleted Cheri Flores 7/8/2022 12:08:00 PM 61 Page ii: Inserted Cheri Flores 7/8/2022 12:08:00 PM 63 Page ii: Deleted Cheri Flores 7/8/2022 12:08:00 PM 62 Page ii: Inserted Cheri Flores 7/8/2022 12:08:00 PM 67 Page ii: Deleted Cheri Flores 7/8/2022 12:08:00 PM 65 Page ii: Inserted Cheri Flores 7/8/2022 12:08:00 PM 2 Page ii: Deleted Cheri Flores 7/8/2022 12:08:00 PM 5 Page ii: Inserted Cheri Flores 7/8/2022 12:08:00 PM 3 Page ii: Deleted Cheri Flores 7/8/2022 12:08:00 PM 6 Page ii: Inserted Cheri Flores 7/8/2022 12:08:00 PM 4 Page ii: Deleted Cheri Flores 7/8/2022 12:08:00 PM 7 Page ii: Inserted Cheri Flores 7/8/2022 12:08:00 PM 5 Page ii: Deleted Cheri Flores 7/8/2022 12:08:00 PM 8 Page ii: Inserted Cheri Flores 7/8/2022 12:08:00 PM 6 Page ii: Deleted Cheri Flores 7/8/2022 12:08:00 PM 9 Page ii: Inserted Cheri Flores 7/8/2022 12:08:00 PM 7 Page ii: Deleted Cheri Flores 7/8/2022 12:08:00 PM 10 Page ii: Inserted Cheri Flores 7/8/2022 12:08:00 PM 17 Page ii: Deleted Cheri Flores 7/8/2022 12:08:00 PM 20 Page ii: Inserted Cheri Flores 7/8/2022 12:08:00 PM 18 Page ii: Deleted Cheri Flores 7/8/2022 12:08:00 PM 21 Page ii: Inserted Cheri Flores 7/8/2022 12:08:00 PM 19 Page ii: Deleted Cheri Flores 7/8/2022 12:08:00 PM 22 Page ii: Inserted Cheri Flores 7/8/2022 12:08:00 PM 20 Page ii: Deleted Cheri Flores 7/8/2022 12:08:00 PM 23 Page iii: Inserted Cheri Flores 7/8/2022 12:08:00 PM 21 Page iii: Deleted Cheri Flores 7/8/2022 12:08:00 PM 24 Page iii: Inserted Cheri Flores 7/8/2022 12:08:00 PM 29 Page iii: Deleted Cheri Flores 7/8/2022 12:08:00 PM 32 Page iii: Inserted Cheri Flores 7/8/2022 12:08:00 PM 30 Page iii: Deleted Cheri Flores 7/8/2022 12:08:00 PM 33 Page iii: Inserted Cheri Flores 7/8/2022 12:08:00 PM 31 Page iii: Deleted Cheri Flores 7/8/2022 12:08:00 PM 34 Page iii: Inserted Cheri Flores 7/8/2022 12:08:00 PM 32 Page iii: Deleted Cheri Flores 7/8/2022 12:08:00 PM 35 Page iii: Inserted Cheri Flores 7/8/2022 12:08:00 PM 33 Page iii: Deleted Cheri Flores 7/8/2022 12:08:00 PM 36 Page iii: Inserted Cheri Flores 7/8/2022 12:08:00 PM 34 Page iii: Deleted Cheri Flores 7/8/2022 12:08:00 PM 37 Page iii: Inserted Cheri Flores 7/8/2022 12:08:00 PM 35 Page iii: Deleted Cheri Flores 7/8/2022 12:08:00 PM 38 Page iii: Inserted Cheri Flores 7/8/2022 12:08:00 PM 36 Page iii: Deleted Cheri Flores 7/8/2022 12:08:00 PM 39 Page iii: Inserted Cheri Flores 7/8/2022 12:08:00 PM 42 Page iii: Deleted Cheri Flores 7/8/2022 12:08:00 PM 45 Page iii: Inserted Cheri Flores 7/8/2022 12:08:00 PM 47 Page iii: Deleted Cheri Flores 7/8/2022 12:08:00 PM 49 Page iii: Inserted Cheri Flores 7/8/2022 12:08:00 PM 49 Page iii: Deleted Cheri Flores 7/8/2022 12:08:00 PM 51 Page iii: Inserted Cheri Flores 7/8/2022 12:08:00 PM 49 Page iii: Deleted Cheri Flores 7/8/2022 12:08:00 PM 51 Page iii: Inserted Cheri Flores 7/8/2022 12:08:00 PM 50 Page iii: Deleted Cheri Flores 7/8/2022 12:08:00 PM 52 Page iii: Inserted Cheri Flores 7/8/2022 12:08:00 PM 51 Page iii: Deleted Cheri Flores 7/8/2022 12:08:00 PM 53 Page iii: Inserted Cheri Flores 7/8/2022 12:08:00 PM 52 Page iii: Deleted Cheri Flores 7/8/2022 12:08:00 PM 54 Page iii: Inserted Cheri Flores 7/8/2022 12:08:00 PM 53 Page iii: Deleted Cheri Flores 7/8/2022 12:08:00 PM 55 Page iii: Inserted Cheri Flores 7/8/2022 12:08:00 PM 54 Page iii: Deleted Cheri Flores 7/8/2022 12:08:00 PM 56 Page iii: Inserted Cheri Flores 7/8/2022 12:08:00 PM 55 Page iii: Deleted Cheri Flores 7/8/2022 12:08:00 PM 57 Page iii: Inserted Cheri Flores 7/8/2022 12:08:00 PM 56 Page iii: Deleted Cheri Flores 7/8/2022 12:08:00 PM 58 Page iii: Inserted Cheri Flores 7/8/2022 12:08:00 PM 57 Page iii: Deleted Cheri Flores 7/8/2022 12:08:00 PM 59 Page iii: Inserted Cheri Flores 7/8/2022 12:08:00 PM 9 Page iii: Deleted Cheri Flores 7/8/2022 12:08:00 PM 12 Page iii: Inserted Cheri Flores 7/8/2022 12:08:00 PM 13 Page iii: Deleted Cheri Flores 7/8/2022 12:08:00 PM 16 Page iii: Inserted Cheri Flores 7/8/2022 12:08:00 PM 15 Page iii: Deleted Cheri Flores 7/8/2022 12:08:00 PM 18 Page iii: Inserted Cheri Flores 7/8/2022 12:08:00 PM 23 Page iii: Deleted Cheri Flores 7/8/2022 12:08:00 PM 25 Page iii: Inserted Cheri Flores 7/8/2022 12:08:00 PM 26 Page iii: Deleted Cheri Flores 7/8/2022 12:08:00 PM 29 Page iii: Inserted Cheri Flores 7/8/2022 12:08:00 PM 37 Page iii: Deleted Cheri Flores 7/8/2022 12:08:00 PM 40 Page iii: Inserted Cheri Flores 7/8/2022 12:08:00 PM 39 Page iii: Deleted Cheri Flores 7/8/2022 12:08:00 PM 42 Page iii: Inserted Cheri Flores 7/8/2022 12:08:00 PM 46 Page iii: Deleted Cheri Flores 7/8/2022 12:08:00 PM 48 Page 1: Inserted Cheri Flores 7/8/2022 12:08:00 PM Figure 1 Page 1: Deleted Cheri Flores 7/8/2022 12:08:00 PM Figure 1 Page 9: Inserted John Criste 10/18/2021 1:18:00 PM and location of wells and substation Page 9: Deleted John Criste 10/18/2021 1:18:00 PM and Page 17: Commented [JC1] John Criste 10/18/2021 1:22:00 PM Shouldn’t the off-site BLM lands to the west and north (Jeff St extension and channel construction) be designated areas of “Direct Impact” rather than just added to the APE? Page 43: Inserted John Criste 10/18/2021 1:55:00 PM (also see Figures 5 and 6). Page 48: Inserted Cheri Flores 7/8/2022 12:08:00 PM Figure 13 Page 48: Deleted Cheri Flores 7/8/2022 12:08:00 PM Figure 8 Page 48: Inserted Cheri Flores 7/8/2022 12:08:00 PM Figure Page 48: Deleted Cheri Flores 7/8/2022 12:08:00 PM Figure 9 Page 48: Inserted Cheri Flores 7/8/2022 12:08:00 PM Figure Page 48: Deleted Cheri Flores 7/8/2022 12:08:00 PM Figure 10 Page 50: Inserted Cheri Flores 7/8/2022 12:08:00 PM Figure Page 50: Deleted Cheri Flores 7/8/2022 12:08:00 PM Figure 11 Page 51: Inserted Cheri Flores 7/8/2022 12:08:00 PM Figure Page 51: Deleted Cheri Flores 7/8/2022 12:08:00 PM Figure 12 Page 52: Inserted Cheri Flores 7/8/2022 12:08:00 PM Figure Page 52: Deleted Cheri Flores 7/8/2022 12:08:00 PM Figure 13 Page 53: Inserted Cheri Flores 7/8/2022 12:08:00 PM Figure Page 53: Deleted Cheri Flores 7/8/2022 12:08:00 PM Figure 14 Page 55: Inserted Cheri Flores 7/8/2022 12:08:00 PM Figure Page 55: Deleted Cheri Flores 7/8/2022 12:08:00 PM Figure 16 Page 56: Inserted Cheri Flores 7/8/2022 12:08:00 PM Figure Page 56: Deleted Cheri Flores 7/8/2022 12:08:00 PM Figure 17 Header and footer changes Text Box changes Header and footer text box changes Footnote changes Endnote changes 7TH REVIEW COMMENTS - TIA Main document changes and comments Page 1: Inserted Urban Crossroads 9/27/2021 4:21:00 PM SEPTEMBER 27, 2021 Page iii: Inserted Urban Crossroads 9/27/2021 8:11:00 PM TABLE OF CONTENTS ......................................................................................................................... III APPENDICES ..................................................................................................................................... V LIST OF EXHIBITS ............................................................................................................................. VII LIST OF TABLES .................................................................................................................................IX LIST OF ABBREVIATED TERMS ............................................................................................................XI 1 EXECUTIVE SUMMARY ............................................................................................................... 1 1.1 Introduction .................................................................................................................................. 1 1.2 Description of Proposed Project ................................................................................................... 1 1.3 Study Area and Analysis Scenarios ............................................................................................... 3 1.4 Criteria for Determining Significant Impacts ................................................................................ 5 1.5 Summary of Findings ..................................................................................................................... 6 2 EXISTING CONDITIONS .......................................................................................................... 025 2.1 Traffic Volumes and Conditions ................................................................................................ 025 2.2 Existing Intersection Level of Service ........................................................................................ 126 2.3 Existing Roadway Segment Level of Service ............................................................................. 126 2.4 Existing Traffic Signal Warrant Analysis .................................................................................... 732 3 EXISTING PLUS PROJECT TRAFFIC ANALYSIS ........................................................................... 833 3.1 Operations Analysis .................................................................................................................. 833 3.2 Traffic Signal Warrant Analysis ................................................................................................. 833 4 PROJECT PHASE 1 TRAFFIC ANALYSIS ................................................................................... 1439 4.1 Project Land Use and Trip Generation .................................................................................... 1439 4.2 Project Trip Distribution .......................................................................................................... 1439 4.3 MODAL SPLIT .............................................................................................................................. 1742 4.4 Traffic Volume Assignment ..................................................................................................... 1742 4.5 Operations Analysis ................................................................................................................ 1742 4.6 Phase 1 Site Access Improvements ......................................................................................... 2550 4.7 Traffic Signal Warrant Analysis ............................................................................................... 2954 5 PROJECT PHASE 2 TRAFFIC ANALYSIS ................................................................................... 3055 5.1 Project Phase 2 Land Use and Trip Generation ...................................................................... 3055 5.2 Project Trip Distribution .......................................................................................................... 3055 5.3 Traffic Volume Assignment ..................................................................................................... 3055 5.4 Operations Analysis ................................................................................................................ 3661 5.5 Phase 2 Site Access Improvements ......................................................................................... 3762 5.6 Traffic Signal Warrant Analysis ............................................................................................... 4873 6 PROJECT PHASE 3 TRAFFIC ANALYSIS ................................................................................... 5075 6.1 Project Phase 3 Land Use and Trip Generation ...................................................................... 5075 6.2 Project Trip Distribution .......................................................................................................... 5075 6.3 Traffic Volume Assignment ..................................................................................................... 5075 6.4 Operations Analysis ................................................................................................................ 5984 6.5 Phase 3 Site Access Improvements ......................................................................................... 6590 7 YEAR 2040 CONDITIONS TRAFFIC ANALYSIS ......................................................................... 6691 7.1 General Plan Buildout (Year 2040) with Madison Street Extension Conditions ..................... 6691 7.2 General Plan Buildout (Year 2040) without Madison Street Extension (GPA Option 1) Conditions ............................................................................................................................... 7297 7.3 General Plan Buildout (Year 2040) without Madison Street Extension and with Project Entry Gates (GPA Option 2) Conditions ......................................................................................... 78103 7.4 Evacuation and Access Considerations with Flood Events ................................................... 85110 8 PROJECT INTERNAL CIRCULATION ...................................................................................... 88113 8.1 Project Intersection Controls and Street Cross-Sections ...................................................... 88113 8.2 Pedestrian / Bicycle Accommodations ................................................................................. 91116 8.3 Roundabout Design Features ................................................................................................ 91116 9 FINDINGS AND RECOMMENDATIONS ............................................................................... 104129 9.1 Project Traffic ...................................................................................................................... 104129 9.2 Project Access ..................................................................................................................... 104129 9.3 Off-Site Project Phase Impacts and Cumulative Needs ...................................................... 105130 9.4 Fair Share Contribution ....................................................................................................... 114139 9.5 Vehicle Miles Traveled ........................................................................................................ 114139 10 REFERENCES .................................................................................................................... 116141 Page iii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 25 Page iii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 25 Page iii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 26 Page iii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 26 Page iii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 32 Page iii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 33 Page iii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 33 Page iii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 33 Page iii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 39 Page iii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 39 Page iii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 39 Page iii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 42 Page iii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 42 Page iii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 42 Page iii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 50 Page iii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 54 Page iii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 55 Page iii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 55 Page iii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 55 Page iii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 55 Page iii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 61 Page iii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 62 Page iii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 73 Page iii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 75 Page iii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 75 Page iii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 75 Page iii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 75 Page iii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 84 Page iii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 90 Page iii: Formatted Urban Crossroads 9/27/2021 8:12:00 PM Font: (Default) Calibri, Check spelling and grammar Page iii: Formatted Urban Crossroads 9/27/2021 8:12:00 PM Normal Page iv: Deleted Cheri Flores 7/8/2022 12:07:00 PM 91 Page iv: Deleted Cheri Flores 7/8/2022 12:07:00 PM 91 Page iv: Deleted Cheri Flores 7/8/2022 12:07:00 PM 97 Page iv: Deleted Cheri Flores 7/8/2022 12:07:00 PM 103 Page iv: Deleted Cheri Flores 7/8/2022 12:07:00 PM 110 Page iv: Deleted Cheri Flores 7/8/2022 12:07:00 PM 113 Page iv: Deleted Cheri Flores 7/8/2022 12:07:00 PM 113 Page iv: Deleted Cheri Flores 7/8/2022 12:07:00 PM 116 Page iv: Deleted Cheri Flores 7/8/2022 12:07:00 PM 116 Page iv: Deleted Cheri Flores 7/8/2022 12:07:00 PM 129 Page iv: Deleted Cheri Flores 7/8/2022 12:07:00 PM 129 Page iv: Deleted Cheri Flores 7/8/2022 12:07:00 PM 129 Page iv: Deleted Cheri Flores 7/8/2022 12:07:00 PM 130 Page iv: Deleted Cheri Flores 7/8/2022 12:07:00 PM 139 Page iv: Deleted Cheri Flores 7/8/2022 12:07:00 PM 139 Page iv: Deleted Cheri Flores 7/8/2022 12:07:00 PM 141 Page iv: Deleted Urban Crossroads 9/27/2021 8:11:00 PM TABLE OF CONTENTS ......................................................................................................................... III APPENDICES ..................................................................................................................................... V LIST OF EXHIBITS ............................................................................................................................. VII LIST OF TABLES .................................................................................................................................IX LIST OF ABBREVIATED TERMS ............................................................................................................XI 1 EXECUTIVE SUMMARY ............................................................................................................... 1 1.1 Introduction .................................................................................................................................. 1 1.2 Description of Proposed Project ................................................................................................... 1 1.3 Study Area and Analysis Scenarios ............................................................................................... 1 1.4 Criteria for Determining Significant Impacts ................................................................................ 5 1.5 Summary of Findings ..................................................................................................................... 6 2 EXISTING CONDITIONS ............................................................................................................ 25 2.1 Traffic Volumes and Conditions .................................................................................................. 25 2.2 Existing Intersection Level of Service .......................................................................................... 26 2.3 Existing Roadway Segment Level of Service ............................................................................... 26 2.4 Existing Traffic Signal Warrant Analysis ...................................................................................... 32 3 EXISTING PLUS PROJECT TRAFFIC ANALYSIS ............................................................................. 33 3.1 Operations Analysis .................................................................................................................... 33 3.2 Traffic Signal Warrant Analysis ................................................................................................... 33 4 PROJECT PHASE 1 TRAFFIC ANALYSIS ....................................................................................... 39 4.1 Project Land Use and Trip Generation ........................................................................................ 39 4.2 Project Trip Distribution .............................................................................................................. 39 4.3 Modal Split .................................................................................................................................. 39 4.4 Traffic Volume Assignment ......................................................................................................... 42 4.5 Operations Analysis .................................................................................................................... 42 4.6 Phase 1 Site Access Improvements ............................................................................................. 50 4.7 Traffic Signal Warrant Analysis ................................................................................................... 50 5 PROJECT PHASE 2 TRAFFIC ANALYSIS ....................................................................................... 55 5.1 Project Phase 2 Land Use and Trip Generation .......................................................................... 55 5.2 Project Trip Distribution .............................................................................................................. 55 5.3 Traffic Volume Assignment ......................................................................................................... 55 5.4 Operations Analysis .................................................................................................................... 61 5.5 Phase 2 Site Access Improvements ............................................................................................. 62 5.6 Traffic Signal Warrant Analysis ................................................................................................... 73 6 PROJECT PHASE 3 TRAFFIC ANALYSIS ....................................................................................... 75 6.1 Project Phase 3 Land Use and Trip Generation .......................................................................... 75 6.2 Project Trip Distribution .............................................................................................................. 75 6.3 Traffic Volume Assignment ......................................................................................................... 75 6.4 Operations Analysis .................................................................................................................... 84 6.5 Phase 3 Site Access Improvements ............................................................................................. 90 7 YEAR 2040 CONDITIONS TRAFFIC ANALYSIS ............................................................................. 91 7.1 General Plan Buildout (Year 2040) with Madison Street Extension Conditions ......................... 91 7.2 General Plan Buildout (Year 2040) without Madison Street Extension (GPA Option 1) Conditions ................................................................................................................................... 97 7.3 General Plan Buildout (Year 2040) without Madison Street Extension and with Project Entry Gates (GPA Option 2) Conditions ............................................................................................. 103 7.4 Evacuation and Access Considerations with Flood Events ....................................................... 110 8 PROJECT INTERNAL CIRCULATION .......................................................................................... 113 8.1 Project Intersection Controls and Street Cross-Sections .......................................................... 113 8.2 Pedestrian / Bicycle Accommodations ..................................................................................... 116 8.3 Roundabout Design Features .................................................................................................... 116 9 FINDINGS AND RECOMMENDATIONS ..................................................................................... 129 9.1 Project Traffic ............................................................................................................................ 129 9.2 Project Access ........................................................................................................................... 129 9.3 Off-Site Project Phase Impacts and Cumulative Needs ............................................................ 130 9.4 Fair Share Contribution ............................................................................................................. 139 9.5 Vehicle Miles Traveled .............................................................................................................. 139 10 REFERENCES .......................................................................................................................... 141 Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page iv: Formatted Urban Crossroads 9/27/2021 8:11:00 PM Default Paragraph Font, Check spelling and grammar Page vii: Inserted Cheri Flores 7/8/2022 12:07:00 PM 4 Page vii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 43 Page vii: Inserted Urban Crossroads 9/27/2021 8:11:00 PM 4 Page vii: Inserted Cheri Flores 7/8/2022 12:07:00 PM 16 Page vii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 1615 Page vii: Inserted Urban Crossroads 9/27/2021 8:11:00 PM 16 Page vii: Inserted Cheri Flores 7/8/2022 12:07:00 PM 2 Page vii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 27 Page vii: Inserted Cheri Flores 7/8/2022 12:07:00 PM 3 Page vii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 28 Page vii: Inserted Cheri Flores 7/8/2022 12:07:00 PM 4 Page vii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 29 Page vii: Inserted Cheri Flores 7/8/2022 12:07:00 PM 9 Page vii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 34 Page vii: Inserted Cheri Flores 7/8/2022 12:07:00 PM 10 Page vii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 35 Page vii: Inserted Cheri Flores 7/8/2022 12:07:00 PM 11 Page vii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 36 Page vii: Inserted Cheri Flores 7/8/2022 12:07:00 PM 16 Page vii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 41 Page vii: Inserted Cheri Flores 7/8/2022 12:07:00 PM 18 Page vii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 43 Page vii: Inserted Cheri Flores 7/8/2022 12:07:00 PM 19 Page vii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 44 Page vii: Inserted Cheri Flores 7/8/2022 12:07:00 PM 20 Page vii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 45 Page vii: Inserted Cheri Flores 7/8/2022 12:07:00 PM 21 Page vii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 46 Page vii: Inserted Cheri Flores 7/8/2022 12:07:00 PM 22 Page vii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 47 Page vii: Inserted Cheri Flores 7/8/2022 12:07:00 PM 23 Page vii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 48 Page vii: Inserted Cheri Flores 7/8/2022 12:07:00 PM 26 Page vii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 5152 Page vii: Inserted Urban Crossroads 9/27/2021 8:11:00 PM 51 Page vii: Inserted Cheri Flores 7/8/2022 12:07:00 PM 27 Page vii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 5253 Page vii: Inserted Urban Crossroads 9/27/2021 8:11:00 PM 52 Page vii: Inserted Cheri Flores 7/8/2022 12:07:00 PM 32 Page vii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 57 Page vii: Inserted Cheri Flores 7/8/2022 12:07:00 PM 33 Page vii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 58 Page vii: Inserted Cheri Flores 7/8/2022 12:07:00 PM 34 Page vii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 59 Page vii: Inserted Cheri Flores 7/8/2022 12:07:00 PM 35 Page vii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 60 Page vii: Inserted Cheri Flores 7/8/2022 12:07:00 PM 38 Page vii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 63 Page vii: Inserted Cheri Flores 7/8/2022 12:07:00 PM 39 Page vii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 64 Page vii: Inserted Cheri Flores 7/8/2022 12:07:00 PM 40 Page vii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 65 Page vii: Inserted Cheri Flores 7/8/2022 12:07:00 PM 41 Page vii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 66 Page vii: Inserted Cheri Flores 7/8/2022 12:07:00 PM 42 Page vii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 67 Page vii: Inserted Cheri Flores 7/8/2022 12:07:00 PM 43 Page vii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 68 Page vii: Inserted Cheri Flores 7/8/2022 12:07:00 PM 45 Page vii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 70 Page vii: Inserted Cheri Flores 7/8/2022 12:07:00 PM 46 Page vii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 71 Page vii: Inserted Cheri Flores 7/8/2022 12:07:00 PM 52 Page vii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 77 Page vii: Inserted Cheri Flores 7/8/2022 12:07:00 PM 53 Page vii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 78 Page vii: Inserted Cheri Flores 7/8/2022 12:07:00 PM 54 Page vii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 79 Page vii: Inserted Cheri Flores 7/8/2022 12:07:00 PM 55 Page vii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 80 Page viii: Inserted Cheri Flores 7/8/2022 12:07:00 PM 56 Page viii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 81 Page viii: Inserted Cheri Flores 7/8/2022 12:07:00 PM 57 Page viii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 82 Page viii: Inserted Cheri Flores 7/8/2022 12:07:00 PM 58 Page viii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 83 Page viii: Inserted Cheri Flores 7/8/2022 12:07:00 PM 60 Page viii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 85 Page viii: Inserted Cheri Flores 7/8/2022 12:07:00 PM 61 Page viii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 86 Page viii: Inserted Cheri Flores 7/8/2022 12:07:00 PM 67 Page viii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 92 Page viii: Inserted Cheri Flores 7/8/2022 12:07:00 PM 68 Page viii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 93 Page viii: Inserted Cheri Flores 7/8/2022 12:07:00 PM 69 Page viii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 94 Page viii: Inserted Cheri Flores 7/8/2022 12:07:00 PM 73 Page viii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 98 Page viii: Inserted Cheri Flores 7/8/2022 12:07:00 PM 74 Page viii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 99 Page viii: Inserted Cheri Flores 7/8/2022 12:07:00 PM 75 Page viii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 100 Page viii: Inserted Cheri Flores 7/8/2022 12:07:00 PM 80 Page viii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 105 Page viii: Inserted Cheri Flores 7/8/2022 12:07:00 PM 81 Page viii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 106 Page viii: Inserted Cheri Flores 7/8/2022 12:07:00 PM 82 Page viii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 107 Page viii: Inserted Cheri Flores 7/8/2022 12:07:00 PM 89 Page viii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 114 Page viii: Inserted Cheri Flores 7/8/2022 12:07:00 PM 90 Page viii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 115 Page viii: Inserted Cheri Flores 7/8/2022 12:07:00 PM 92 Page viii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 117 Page viii: Inserted Cheri Flores 7/8/2022 12:07:00 PM 93 Page viii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 118 Page viii: Inserted Cheri Flores 7/8/2022 12:07:00 PM 94 Page viii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 119 Page viii: Inserted Cheri Flores 7/8/2022 12:07:00 PM 95 Page viii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 120 Page viii: Inserted Cheri Flores 7/8/2022 12:07:00 PM 96 Page viii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 121 Page viii: Inserted Cheri Flores 7/8/2022 12:07:00 PM 97 Page viii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 122 Page viii: Inserted Cheri Flores 7/8/2022 12:07:00 PM 98 Page viii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 123 Page viii: Inserted Cheri Flores 7/8/2022 12:07:00 PM 99 Page viii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 124 Page viii: Inserted Cheri Flores 7/8/2022 12:07:00 PM 100 Page viii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 125 Page ix: Inserted Cheri Flores 7/8/2022 12:07:00 PM 5 Page ix: Deleted Cheri Flores 7/8/2022 12:07:00 PM 54 Page ix: Inserted Urban Crossroads 9/27/2021 8:12:00 PM 5 Page ix: Inserted Cheri Flores 7/8/2022 12:07:00 PM 5 Page ix: Deleted Cheri Flores 7/8/2022 12:07:00 PM 54 Page ix: Inserted Urban Crossroads 9/27/2021 8:12:00 PM 5 Page ix: Inserted Cheri Flores 7/8/2022 12:07:00 PM 6 Page ix: Deleted Cheri Flores 7/8/2022 12:07:00 PM 65 Page ix: Inserted Urban Crossroads 9/27/2021 8:12:00 PM 6 Page ix: Inserted Cheri Flores 7/8/2022 12:07:00 PM 17 Page ix: Deleted Cheri Flores 7/8/2022 12:07:00 PM 1716 Page ix: Inserted Urban Crossroads 9/27/2021 8:12:00 PM 17 Page ix: Inserted Cheri Flores 7/8/2022 12:07:00 PM 0 Page ix: Deleted Cheri Flores 7/8/2022 12:07:00 PM 25 Page ix: Inserted Cheri Flores 7/8/2022 12:07:00 PM 0 Page ix: Deleted Cheri Flores 7/8/2022 12:07:00 PM 25 Page ix: Inserted Cheri Flores 7/8/2022 12:07:00 PM 5 Page ix: Deleted Cheri Flores 7/8/2022 12:07:00 PM 30 Page ix: Inserted Cheri Flores 7/8/2022 12:07:00 PM 6 Page ix: Deleted Cheri Flores 7/8/2022 12:07:00 PM 31 Page ix: Inserted Cheri Flores 7/8/2022 12:07:00 PM 12 Page ix: Deleted Cheri Flores 7/8/2022 12:07:00 PM 37 Page ix: Inserted Cheri Flores 7/8/2022 12:07:00 PM 13 Page ix: Deleted Cheri Flores 7/8/2022 12:07:00 PM 38 Page ix: Inserted Cheri Flores 7/8/2022 12:07:00 PM 15 Page ix: Deleted Cheri Flores 7/8/2022 12:07:00 PM 40 Page ix: Inserted Cheri Flores 7/8/2022 12:07:00 PM 24 Page ix: Deleted Cheri Flores 7/8/2022 12:07:00 PM 49 Page ix: Inserted Cheri Flores 7/8/2022 12:07:00 PM 28 Page ix: Deleted Cheri Flores 7/8/2022 12:07:00 PM 5354 Page ix: Inserted Urban Crossroads 9/27/2021 8:12:00 PM 53 Page ix: Inserted Cheri Flores 7/8/2022 12:07:00 PM 31 Page ix: Deleted Cheri Flores 7/8/2022 12:07:00 PM 56 Page ix: Inserted Cheri Flores 7/8/2022 12:07:00 PM 44 Page ix: Deleted Cheri Flores 7/8/2022 12:07:00 PM 69 Page ix: Inserted Cheri Flores 7/8/2022 12:07:00 PM 47 Page ix: Deleted Cheri Flores 7/8/2022 12:07:00 PM 72 Page ix: Inserted Cheri Flores 7/8/2022 12:07:00 PM 51 Page ix: Deleted Cheri Flores 7/8/2022 12:07:00 PM 76 Page ix: Inserted Cheri Flores 7/8/2022 12:07:00 PM 62 Page ix: Deleted Cheri Flores 7/8/2022 12:07:00 PM 87 Page ix: Inserted Cheri Flores 7/8/2022 12:07:00 PM 64 Page ix: Deleted Cheri Flores 7/8/2022 12:07:00 PM 89 Page ix: Inserted Cheri Flores 7/8/2022 12:07:00 PM 70 Page ix: Deleted Cheri Flores 7/8/2022 12:07:00 PM 95 Page ix: Inserted Cheri Flores 7/8/2022 12:07:00 PM 71 Page ix: Deleted Cheri Flores 7/8/2022 12:07:00 PM 96 Page ix: Inserted Cheri Flores 7/8/2022 12:07:00 PM 76 Page ix: Deleted Cheri Flores 7/8/2022 12:07:00 PM 101 Page ix: Inserted Cheri Flores 7/8/2022 12:07:00 PM 77 Page ix: Deleted Cheri Flores 7/8/2022 12:07:00 PM 102 Page ix: Inserted Cheri Flores 7/8/2022 12:07:00 PM 83 Page ix: Deleted Cheri Flores 7/8/2022 12:07:00 PM 108 Page ix: Inserted Cheri Flores 7/8/2022 12:07:00 PM 84 Page ix: Deleted Cheri Flores 7/8/2022 12:07:00 PM 109 Page ix: Inserted Cheri Flores 7/8/2022 12:07:00 PM 101 Page ix: Deleted Cheri Flores 7/8/2022 12:07:00 PM 126 Page ix: Inserted Cheri Flores 7/8/2022 12:07:00 PM 102 Page ix: Deleted Cheri Flores 7/8/2022 12:07:00 PM 127 Page ix: Inserted Cheri Flores 7/8/2022 12:07:00 PM 106 Page ix: Deleted Cheri Flores 7/8/2022 12:07:00 PM 131 Page ix: Inserted Cheri Flores 7/8/2022 12:07:00 PM 108 Page ix: Deleted Cheri Flores 7/8/2022 12:07:00 PM 133 Page 1: Inserted John Kain 9/27/2021 3:00:00 PM other resort/golf facilities located in Planning Area 11 (PA 11). Page 1: Deleted John Kain 9/27/2021 3:07:00 PM a golf course (12 holes). Page 1: Inserted John Kain 9/27/2021 3:08:00 PM PA 11 consists of 46.2 acres and includes the following land uses:  Golf Practice (4-Holes) & Driving Range: 23.9 Acres (up to 1,000 sf of clubhouse area)  Golf Academy: 4.7 Acres (up to 5,500 sf of indoor floor area)  Banquet Facility & Restaurant: 4.6 Acres (up to 10,000 sf of indoor floor area)  Slopes: 13.0 Acres (passive outdoor use) Page 1: Deleted John Kain 9/27/2021 3:09:00 PM Page 1: Formatted John Kain 9/27/2021 3:16:00 PM Bullets, Space Before: 2 pt, After: 2 pt Page 1: Inserted John Kain 9/27/2021 3:24:00 PM Page 1: Deleted John Kain 9/27/2021 3:24:00 PM Page 1: Inserted John Kain 9/27/2021 3:24:00 PM Page 1: Deleted John Kain 9/27/2021 3:24:00 PM Page 2: Deleted John Kain 9/27/2021 3:18:00 PM 1.3 STUDY AREA AND ANALYSIS SCENARIOS 1.3.1 INTERSECTIONS The following 21 study area intersections shown on Exhibit 1-2 and listed in Table 1-1 were selected for this TIA based on consultation with City of La Quinta staff. Page 3: Inserted John Kain 9/27/2021 3:19:00 PM 1.3 STUDY AREA AND ANALYSIS SCENARIOS 1.3.1 INTERSECTIONS The following 21 study area intersections shown on Exhibit 1-2 and listed in Table 1-1 were selected for this TIA based on consultation with City of La Quinta staff. Page 3: Moved from page 5 (Move #1) John Kain 9/27/2021 3:31:00 PM TABLE 1-1: INTERSECTION ANALYSIS LOCATIONS ID Intersection Location ID Intersection Location 1 Madison Street at Avenue 58 12 Monroe Street at Airport Boulevard 2 Madison Street at Airport Bl. 13 Monroe Street at Avenue 54 3 Madison Street at Avenue 54 14 Monroe Street at Avenue 52 4 Madison Street at Avenue 52 15 Monroe Street at 50th Avenue 5 Madison Street at Avenue 50 16 Jackson Street at 62nd Avenue 6 Jefferson Street at Avenue 54 17 Jackson Street at 60th Avenue 7 Jefferson Street at Avenue 52 18 Jackson Street at 58th Avenue 8 Jefferson Street at Avenue 50 19 Jackson Street at Airport Boulevard 9 Monroe Street at Avenue 62 20 Jefferson St. & N. Loop - (Future Intersection) 10 Monroe Street at Avenue 60 21 Jefferson St. & S. Loop - (Future Intersection) 11 Monroe Street at Avenue 58 1.3.2 ROADWAY SEGMENTS Through consultation with City staff, daily volume-to-capacity (V/C) roadway analyses have been evaluated for the following roadway segments as shown on Table 1-2: TABLE 1-2: ROADWAY SEGMENT ANALYSIS LOCATIONS Roadway Segment 1 Avenue 58, west of Madison Street 7 Avenue 62, west of Jackson Street 2 Avenue 58, west of Monroe Street 8 Monroe Street, south of Avenue 60 3 Avenue 58, west of Jackson Street 9 Monroe Street, south of Avenue 58 4 Madison Street south of Avenue 56 10 Monroe Street, south of Avenue 56 5 Avenue 60, west of Jackson Street 11 Jackson Street, south of Airport Bl. 6 Avenue 62, west of Monroe Street The TIA included Existing (2017) conditions, but in response to City comments, the previous 2017 traffic counts has been adjusted to represent 2019 baseline conditions. A sample comparison of the 2017 data and new 2019 counts focuses on key locations (5 intersections and 5 roadway segments), documented in Section 2 of this report. Volume changes at these locations are extrapolated to the remaining existing study area locations as identified in the TIA. Page 3: Inserted John Kain 9/27/2021 3:19:00 PM Page 5: Moved to page 3 (Move #1) John Kain 9/27/2021 3:31:00 PM TABLE 1-1: INTERSECTION ANALYSIS LOCATIONS ID Intersection Location ID Intersection Location 1 Madison Street at Avenue 58 12 Monroe Street at Airport Boulevard 2 Madison Street at Airport Bl. 13 Monroe Street at Avenue 54 3 Madison Street at Avenue 54 14 Monroe Street at Avenue 52 4 Madison Street at Avenue 52 15 Monroe Street at 50th Avenue 5 Madison Street at Avenue 50 16 Jackson Street at 62nd Avenue 6 Jefferson Street at Avenue 54 17 Jackson Street at 60th Avenue 7 Jefferson Street at Avenue 52 18 Jackson Street at 58th Avenue 8 Jefferson Street at Avenue 50 19 Jackson Street at Airport Boulevard 9 Monroe Street at Avenue 62 20 Jefferson St. & N. Loop - (Future Intersection) 10 Monroe Street at Avenue 60 21 Jefferson St. & S. Loop - (Future Intersection) 11 Monroe Street at Avenue 58 1.3.2 ROADWAY SEGMENTS Through consultation with City staff, daily volume-to-capacity (V/C) roadway analyses have been evaluated for the following roadway segments as shown on Table 1-2: TABLE 1-2: ROADWAY SEGMENT ANALYSIS LOCATIONS Roadway Segment 1 Avenue 58, west of Madison Street 7 Avenue 62, west of Jackson Street 2 Avenue 58, west of Monroe Street 8 Monroe Street, south of Avenue 60 3 Avenue 58, west of Jackson Street 9 Monroe Street, south of Avenue 58 4 Madison Street south of Avenue 56 10 Monroe Street, south of Avenue 56 5 Avenue 60, west of Jackson Street 11 Jackson Street, south of Airport Bl. 6 Avenue 62, west of Monroe Street The TIA included Existing (2017) conditions, but in response to City comments, the previous 2017 traffic counts has been adjusted to represent 2019 baseline conditions. A sample comparison of the 2017 data and new 2019 counts focuses on key locations (5 intersections and 5 roadway segments), documented in Section 2 of this report. Volume changes at these locations are extrapolated to the remaining existing study area locations as identified in the TIA. Page 6: Deleted Urban Crossroads 9/27/2021 5:48:00 PM ID Intersection Location ID Intersection Location 1 Madison Street at Avenue 58 12 Monroe Street at Airport Boulevard 2 Madison Street at Airport Bl. 13 Monroe Street at Avenue 54 3 Madison Street at Avenue 54 14 Monroe Street at Avenue 52 4 Madison Street at Avenue 52 15 Monroe Street at 50th Avenue 5 Madison Street at Avenue 50 16 Jackson Street at 62nd Avenue 6 Jefferson Street at Avenue 54 17 Jackson Street at 60th Avenue 7 Jefferson Street at Avenue 52 18 Jackson Street at 58th Avenue 8 Jefferson Street at Avenue 50 19 Jackson Street at Airport Boulevard 9 Monroe Street at Avenue 62 20 Jefferson St. & N. Loop - (Future Intersection) 10 Monroe Street at Avenue 60 21 Jefferson St. & S. Loop - (Future Intersection) 11 Monroe Street at Avenue 58 1.3.2 ROADWAY SEGMENTS Through consultation with City staff, daily volume-to-capacity (V/C) roadway analyses have been evaluated for the following roadway segments as shown on Table 1-2: TABLE 1-2: ROADWAY SEGMENT ANALYSIS LOCATIONS Roadway Segment 1 Avenue 58, west of Madison Street 7 Avenue 62, west of Jackson Street 2 Avenue 58, west of Monroe Street 8 Monroe Street, south of Avenue 60 3 Avenue 58, west of Jackson Street 9 Monroe Street, south of Avenue 58 4 Madison Street south of Avenue 56 10 Monroe Street, south of Avenue 56 5 Avenue 60, west of Jackson Street 11 Jackson Street, south of Airport Bl. 6 Avenue 62, west of Monroe Street Page 6: Formatted Table Urban Crossroads 9/27/2021 5:48:00 PM Formatted Table Page 5: Inserted Urban Crossroads 9/27/2021 4:26:00 PM , With Jefferson Street connection to Avenue 58) o Page 5: Deleted Urban Crossroads 9/27/2021 4:26:00 PM ) o Page 5: Inserted Urban Crossroads 9/27/2021 4:26:00 PM and with Jefferson Street connection to Avenue 58  Page 5: Inserted Urban Crossroads 9/27/2021 4:27:00 PM and with Jefferson Street connection to Avenue 58  Page 6: Deleted John Kain 9/27/2021 3:38:00 PM As shown in Table 1-5, the project’s cumulative impact at the abovementioned intersections are mitigated to operate at an acceptable level of service (LOS “D” or better) with the implementation of the improvements shown on Exhibit 1-3 and described in detail in Sections 4 through 6. Page 6: Inserted John Kain 9/27/2021 3:38:00 PM Page 7: Deleted Urban Crossroads 9/27/2021 7:58:00 PM Page 7: Moved to page 9 (Move #2) John Kain 9/27/2021 3:34:00 PM Project access improvements, fully funded CIP improvements and added improvements (if necessary) are shown on Exhibit 1-3. Roadway cross-sections for Project facilities are shown on Exhibit 1-4. Page 7: Deleted Urban Crossroads 9/27/2021 7:57:00 PM Page 9: Inserted John Kain 9/27/2021 3:38:00 PM As shown in Table 1-5, the project’s cumulative impact at the abovementioned intersections are mitigated to operate at an acceptable level of service (LOS “D” or better) with the implementation of the improvements shown on Exhibit 1-3 and described in detail in Sections 4 through 6. Page 9: Formatted John Kain 9/27/2021 3:39:00 PM Space Before: 8 pt, After: 8 pt Page 9: Moved from page 7 (Move #2) John Kain 9/27/2021 3:34:00 PM Project access improvements, fully funded CIP improvements and added improvements (if necessary) are shown on Exhibit 1-3. Roadway cross-sections for Project facilities are shown on Exhibit 1-4. The results of the General Plan Buildout (2040) conditions, including GPA Option 1 and GPA Option 2 and recommended improvements are summarized in Table 1-6. A summary of roadway segment volume-to-capacity analysis is provided on Table 1-7. Intersection recommendations to provide acceptable operations for Year 2040 for various network scenarios are also documented. 1.5.1 EXISTING (2019) CONDITIONS As shown in Table 1-4, the intersection analysis for Existing conditions indicates that the 19 existing study area intersections are currently operating at an acceptable LOS during the peak hours. As shown on Table 1-7, all study area roadway segments analyzed are currently operating at acceptable LOS. 1.5.2 E+P CONDITIONS The 21 (19 existing + 2 Project intersections) study area intersections are anticipated to operate at acceptable LOS with the addition of Project traffic for E+P traffic conditions. As shown in Table 1-4, 18 of the 19 existing study area intersections are anticipated to continue to operate at acceptable LOS with the addition of Project traffic for E+P traffic conditions. The study area intersection of Monroe Street at Avenue 52 (#14), require installation of a traffic signal (which is funded in the CIP) in order to maintain acceptable LOS under E+P conditions. As shown on Table 1-7, all study roadway segments analyzed are anticipated to operate at acceptable LOS for E+P and Opening Year traffic conditions, consistent with Existing traffic conditions. 1.5.3 PHASE 1 (2026) CONDITIONS For Phase 1 (2026) traffic conditions, the following eight study area intersections are anticipated to require installation of a traffic signal (which is funded in the CIP) in order to maintain acceptable LOS under Phase 1 (2026) without and with Project conditions: Page 9: Deleted John Kain 9/27/2021 3:39:00 PM Page 9: Inserted John Kain 9/27/2021 3:35:00 PM The results of the General Plan Buildout (2040) conditions, including GPA Option 1 and GPA Option 2 and recommended improvements are summarized in Table 1-6. A summary of roadway segment volume-to-capacity analysis is provided on Table 1-7. Intersection recommendations to provide acceptable operations for Year 2040 for various network scenarios are also documented. 1.5.1 EXISTING (2019) CONDITIONS As shown in Table 1-4, the intersection analysis for Existing conditions indicates that the 19 existing study area intersections are currently operating at an acceptable LOS during the peak hours. As shown on Table 1-7, all study area roadway segments analyzed are currently operating at acceptable LOS. 1.5.2 E+P CONDITIONS The 21 (19 existing + 2 Project intersections) study area intersections are anticipated to operate at acceptable LOS with the addition of Project traffic for E+P traffic conditions. As shown in Table 1-4, 18 of the 19 existing study area intersections are anticipated to continue to operate at acceptable LOS with the addition of Project traffic for E+P traffic conditions. The study area intersection of Monroe Street at Avenue 52 (#14), require installation of a traffic signal (which is funded in the CIP) in order to maintain acceptable LOS under E+P conditions. As shown on Table 1-7, all study roadway segments analyzed are anticipated to operate at acceptable LOS for E+P and Opening Year traffic conditions, consistent with Existing traffic conditions. 1.5.3 PHASE 1 (2026) CONDITIONS For Phase 1 (2026) traffic conditions, the following eight study area intersections are anticipated to require installation of a traffic signal (which is funded in the CIP) in order to maintain acceptable LOS under Phase 1 (2026) without and with Project conditions: Page 17: Deleted John Kain 9/27/2021 3:34:00 PM The results of the General Plan Buildout (2040) conditions, including GPA Option 1 and GPA Option 2 and recommended improvements are summarized in Table 1-6. A summary of roadway segment volume-to-capacity analysis is provided on Table 1-7. Intersection recommendations to provide acceptable operations for Year 2040 for various network scenarios are also documented. 1.5.1 EXISTING (2019) CONDITIONS As shown in Table 1-4, the intersection analysis for Existing conditions indicates that the 19 existing study area intersections are currently operating at an acceptable LOS during the peak hours. As shown on Table 1-7, all study area roadway segments analyzed are currently operating at acceptable LOS. 1.5.2 E+P CONDITIONS The 21 (19 existing + 2 Project intersections) study area intersections are anticipated to operate at acceptable LOS with the addition of Project traffic for E+P traffic conditions. As shown in Table 1-4, 18 of the 19 existing study area intersections are anticipated to continue to operate at acceptable LOS with the addition of Project traffic for E+P traffic conditions. The study area intersection of Monroe Street at Avenue 52 (#14), require installation of a traffic signal (which is funded in the CIP) in order to maintain acceptable LOS under E+P conditions. As shown on Table 1-7, all study roadway segments analyzed are anticipated to operate at acceptable LOS for E+P and Opening Year traffic conditions, consistent with Existing traffic conditions. 1.5.3 PHASE 1 (2026) CONDITIONS For Phase 1 (2026) traffic conditions, the following eight study area intersections are anticipated to require installation of a traffic signal (which is funded in the CIP) in order to maintain acceptable LOS under Phase 1 (2026) without and with Project conditions: Page 17: Moved to page 20 (Move #3) John Kain 9/27/2021 3:36:00 PM  #1 - Madison Street at Avenue 58  #3 - Madison Street at Avenue 54  #6 - Jefferson Street at Avenue 54  #10 – Monroe Street at Avenue 60  #11 – Monroe Street at Avenue 58  #12 – Monroe Street at Airport Boulevard  #13 – Monroe Street at Avenue 54  #14 – Monroe Street at Avenue 52 Page 17: Deleted John Kain 9/27/2021 3:37:00 PM Page 20: Moved from page 17 (Move #3) John Kain 9/27/2021 3:36:00 PM  #1 - Madison Street at Avenue 58  #3 - Madison Street at Avenue 54  #6 - Jefferson Street at Avenue 54  #10 – Monroe Street at Avenue 60  #11 – Monroe Street at Avenue 58  #12 – Monroe Street at Airport Boulevard  #13 – Monroe Street at Avenue 54  #14 – Monroe Street at Avenue 52 Page 20: Deleted John Kain 9/27/2021 3:36:00 PM Page 20: Inserted Urban Crossroads 9/27/2021 4:33:00 PM Project Page 20: Inserted John Kain 9/27/2021 3:37:00 PM Page 21: Deleted John Kain 9/27/2021 3:37:00 PM Page 21: Inserted John Kain 9/27/2021 3:37:00 PM Page 21: Formatted John Kain 9/27/2021 3:37:00 PM Normal Page 23: Deleted Urban Crossroads 9/27/2021 5:26:00 PM For General Plan Buildout (Year 2040) without Madison Street Extension (GPA Option 1) and for General Plan Buildout (Year 2040) without Madison Street Extension and with Project Entry Gates (GPA Option 2), lane recommendations for intersections included in the City of La Quinta General Plan analysis are generally consistent with that report, but the following four intersections require modifications to the previously identified improvements for General Plan buildout: Page 23: Formatted Urban Crossroads 9/27/2021 5:26:00 PM Font: +Body (Calibri), 12 pt Page 23: Inserted Urban Crossroads 9/27/2021 5:26:00 PM Four intersections require modifications to the previously identified improvements for General Plan buildout conditions. If either of the following alternatives occur:  General Plan Buildout (Year 2040) without Madison Street Extension (GPA Option 1) General Plan Buildout (Year 2040) without Madison Street Extension and with Project Entry Gates  Page 23: Formatted Urban Crossroads 9/27/2021 5:26:00 PM Formatted Page 23: Formatted Urban Crossroads 9/27/2021 5:27:00 PM Bullets Page 23: Commented [CF1] Cheri Flores 10/29/2021 12:05:00 PM These alternatives don’t match what has been determined. Please confirm with project applicant and EIR consultant. Page 23: Inserted Urban Crossroads 9/27/2021 5:26:00 PM  (GPA Option 2) The four intersections which would require modifications with either of the above two scenarios are as follows: Page 23: Formatted Urban Crossroads 9/27/2021 5:26:00 PM Formatted Page 23: Formatted Urban Crossroads 9/27/2021 5:27:00 PM Add space between paragraphs of the same style Page 0: Deleted Urban Crossroads 9/27/2021 7:58:00 PM This Page Intentionally Left Blank Page 14: Deleted Urban Crossroads 9/27/2021 4:38:00 PM a golf course (12 holes) Page 14: Inserted Urban Crossroads 9/27/2021 4:38:00 PM PA 11 resort/golf uses (golf practice, golf academy, and banquet accommodations). Page 14: Inserted John Kain 9/27/2021 3:46:00 PM Page 14: Deleted John Kain 9/27/2021 3:46:00 PM Page 14: Inserted John Kain 9/27/2021 3:44:00 PM ITE LU Code 430 indicates golf course sites may also have driving ranges and clubhouses with a pro shop, restaurant, lounge, and banquet facilities. This LU code is therefore used to estimate the vehicle trips generated by resort/golf uses in PA 11, resulting in 365 trip ends per day on a typical weekday, with 21 vehicles per hour (VPH) during the weekday AM peak hour, and 34 VPH during the weekday PM peak hour. Page 14: Deleted John Kain 9/27/2021 3:51:00 PM 4.3 MODAL SPLIT Although the use of public transit, walking, and/or bicycling have the potential to reduce Project- related traffic, such reductions have not been taken into considerations in this traffic study in order to provide a conservative analysis of the Project’s potential to add traffic at study area analysis locations. Page 17: Inserted John Kain 9/27/2021 3:52:00 PM 4.3 MODAL SPLIT Although the use of public transit, walking, and/or bicycling have the potential to reduce Project- related traffic, such reductions have not been taken into considerations in this traffic study in order to provide a conservative analysis of the Project’s potential to add traffic at study area analysis locations. Page 18: Moved to page 25 (Move #4) John Kain 9/27/2021 3:53:00 PM Table 4-2 also indicates that the intersection of Jefferson Street at Avenue 52 experiences deficient operations under cumulative “without project” conditions. As shown in Table 4-2, Jefferson Street at Avenue 52 requires reconstruction of the current roundabout design to incorporate 2 circulating lanes around the center island. This effectively accommodates an additional through lane in the northbound and southbound directions to provide acceptable LOS. Page 25: Moved from page 18 (Move #4) John Kain 9/27/2021 3:53:00 PM Table 4-2 also indicates that the intersection of Jefferson Street at Avenue 52 experiences deficient operations under cumulative “without project” conditions. As shown in Table 4-2, Jefferson Street at Avenue 52 requires reconstruction of the current roundabout design to incorporate 2 circulating lanes around the center island. This effectively accommodates an additional through lane in the northbound and southbound directions to provide acceptable LOS. Page 25: Deleted John Kain 9/27/2021 3:56:00 PM IN ORDER TO PROVIDE SECONDARY EMERGENCY ACCESS TO THE PHASE 1 DEVELOPMENT AREA, AN EVA ALIGNMENT IS IDENTIFIED (SEE EXHIBIT 4-9). THE EVA ALIGNMENT EXTENDS FROM THE NORTHERLY EDGE OF PLANNING AREA 18 TO THE INTERSECTION OF MADISON STREET AT AVENUE 60. 4.7 TRAFFIC SIGNAL WARRANT ANALYSIS Traffic signal warrant analyses have been performed at all applicable unsignalized study area intersections for Phase 1 (2026) Without Project traffic conditions (see Appendix 4.2). Five additional intersections are projected to satisfy traffic signal warrants: Madison Street at Avenue 58 (Traffic signal improvement included in the La Quinta GP) Monroe Street at Airport Boulevard (Traffic signal improvement included in the La Quinta CIP 2018-2023 as “unfunded additional projects”) Monroe Street at Avenue 58 (Traffic signal improvement included in the La Quinta GP) Monroe Street at Avenue 60 (Traffic signal improvement included in the La Quinta GP) Jackson Street at Airport Boulevard Jackson Street at Avenue 58 For Phase 1 (2026) With Project traffic conditions, Monroe Street at Avenue 62 is also projected to satisfy traffic signal warrants. Page 29: Inserted John Kain 9/27/2021 4:00:00 PM In order to provide secondary emergency access to the Phase 1 development area, an EVA alignment is identified (see Exhibit 4-9). The EVA alignment extends from the northerly edge of Planning Area 18 to the intersection of Madison Street at Avenue 60. 4.7 TRAFFIC SIGNAL WARRANT ANALYSIS Traffic signal warrant analyses have been performed at all applicable unsignalized study area intersections for Phase 1 (2026) Without Project traffic conditions (see Appendix 4.2). Five additional intersections are projected to satisfy traffic signal warrants:  Madison Street at Avenue 58 (Traffic signal improvement included in the La Quinta GP)  Monroe Street at Airport Boulevard (Traffic signal improvement included in the La Quinta CIP 2018-2023 as “unfunded additional projects”)  Monroe Street at Avenue 58 (Traffic signal improvement included in the La Quinta GP)  Monroe Street at Avenue 60 (Traffic signal improvement included in the La Quinta GP)  Jackson Street at Airport Boulevard  Jackson Street at Avenue 58 For Phase 1 (2026) With Project traffic conditions, Monroe Street at Avenue 62 is also projected to satisfy traffic signal warrants. Page 30: Deleted John Kain 9/27/2021 4:02:00 PM a golf course (12 holes) Page 30: Inserted John Kain 9/27/2021 4:02:00 PM PA 11 resort/golf uses (golf practice, golf academy, and banquet accommodations) Page 31: Deleted Urban Crossroads 9/27/2021 8:00:00 PM Page 31: Formatted Urban Crossroads 9/27/2021 8:00:00 PM Justified Page 37: Inserted Urban Crossroads 9/27/2021 8:01:00 PM Page 37: Formatted Urban Crossroads 9/27/2021 8:01:00 PM Normal Page 49: Formatted Urban Crossroads 9/27/2021 8:06:00 PM Body Text, Centered Page 49: Formatted Urban Crossroads 9/27/2021 8:06:00 PM Font: Italic Page 50: Inserted John Kain 9/27/2021 4:04:00 PM PA 11 resort/golf uses (golf practice, golf academy, and banquet accommodations). Page 50: Deleted John Kain 9/27/2021 4:04:00 PM a golf course (12 holes). Page 104: Inserted John Kain 9/27/2021 4:06:00 PM PA 11 resort/golf uses (golf practice, golf academy, and banquet accommodations). Page 104: Deleted Urban Crossroads 9/27/2021 5:31:00 PM . Page 104: Deleted John Kain 9/27/2021 4:06:00 PM a golf course (12 holes) Page 104: Inserted Urban Crossroads 9/27/2021 5:30:00 PM and PA 11 resort/golf uses (golf practice, golf academy, and banquet accommodations)  Page 104: Deleted Urban Crossroads 9/27/2021 4:39:00 PM and a golf course (12 holes)  Page 105: Deleted Urban Crossroads 9/27/2021 8:11:00 PM Page 106: Deleted Urban Crossroads 9/27/2021 8:11:00 PM Header and footer changes Page iii: Inserted Cheri Flores 7/8/2022 12:07:00 PM Traffic Impact Analysis Page iii: Formatted Cheri Flores 7/8/2022 12:07:00 PM Font: +Body (Calibri), 9 pt, Italic, Underline Page iii: Deleted Cheri Flores 7/8/2022 12:07:00 PM Traffic Impact Analysis Page iii: Inserted Cheri Flores 7/8/2022 12:07:00 PM 7TH REVIEW COMMENTS - TIA Page iii: Deleted Cheri Flores 7/8/2022 12:07:00 PM 12184-04 TIA Report.docx Page 1: Inserted Cheri Flores 7/8/2022 12:07:00 PM 7TH REVIEW COMMENTS - TIA Page 1: Formatted Cheri Flores 7/8/2022 12:07:00 PM Font: 9 pt, Italic, Do not check spelling or grammar Page 1: Deleted Cheri Flores 7/8/2022 12:07:00 PM 12184-04 TIA Report.docx Page 0: Inserted Cheri Flores 7/8/2022 12:07:00 PM 7TH REVIEW COMMENTS - TIA Page 0: Formatted Cheri Flores 7/8/2022 12:07:00 PM Font: 9 pt, Italic, Do not check spelling or grammar Page 0: Deleted Cheri Flores 7/8/2022 12:07:00 PM 12184-04 TIA Report.docx Page 7: Inserted Cheri Flores 7/8/2022 12:07:00 PM 7TH REVIEW COMMENTS - TIA Page 7: Deleted Cheri Flores 7/8/2022 12:07:00 PM 12184-04 TIA Report.docx Page 1: Inserted Cheri Flores 7/8/2022 12:07:00 PM 7TH REVIEW COMMENTS - TIA Page 1: Deleted Cheri Flores 7/8/2022 12:07:00 PM 12184-04 TIA Report.docx Text Box changes Header and footer text box changes Footnote changes Endnote changes