Loading...
5.02 Conceptual Phasing PlanN OS/REC 17.2 AC RESORT 38.2 AC 100 Rooms OS/REC 18.1 AC JEFFERSON STREET MDR 205 DU 26.1 AC LDR 85 DU 29.2 AC LDR 116 DU 50.6 AC LDR 27 DU 9.9 AC MDR 163 DU 20.7 AC LDR 70 DU 35.1 AC LDR 61 DU 18.1 AC LDR 73 DU 21.7 AC LDR 107 DU 50.5 AC MDR 74 DU 14.8 AC LDR 65 DU 35.2 AC LDR 75 DU 26.5 AC LDR 48 DU 30.6 AC RESORT/GOLF OS/RECREATION 28.4 AC OS/NATURAL 151.8 AC 45.9 AC OS/GOLF 122.0 AC LOOP ROAD EAST 5.9 AC LOOP ROAD WEST 10.9 AC SECTION 5 ACCESS 0.3 AC 18.3 AC OS/NATURAL 10.7 AC OS/NAT 22.0 AC LDR 31 DU 11.3 AC OS/NAT 8.8 AC PA-18 PA-17 PA-2 PA-1 PA-16 PA-15 PA-14 PA-13 PA-12 PA-3 PA-4 PA-7 PA-5 PA-8 PA-9 PA-10 PA-11 PA-23 PA-22 PA-25 PA-21 PA-19 PA-6 PA-24 PA-25 PA-25 PA-25 PA-20 *Total Acres: 843.5 Ac Total Units: 1,200 Phase 1 (295 Units - 383.2 Ac) Phase 2 (309 Units - 109.8 Ac) Phase 3 (306 Units - 81.3 Ac) Phase 4 (290 Units - 279.2 Ac) LEGEND *Master Planned Roadways not included. Master Planned Roadways, 32.5 Ac, are built in each Phase expanding from the South-East to the North-West. AVENUE 62 AVENUE 60 PROPOSED JEFFERSON STREET CORAL CANYON (FUTURE)MADISON STREETCoral Mountain Martinez Rock SlideBoo Hoff TrailN.A.P. Exhibit No: 5.2 Conceptual Phasing Plan