2020-08-17 INCOMPLETE LETTER 1 August 18, 2020 Lou Miramontes Hofmann Land Development 1380 Galaxy Way, Suite B Concord, CA 94520 SUBJECT: COMPLETENESS REVIEW FOR TRAVERTINE SPECIFIC PLAN PROJECT AND TRUST ACCOUNT STATUS GENERAL PLAN AMENDMENT 2017-0002, ZONE CHANGE 2017-0002, SPECIFIC PLAN AMENDMENT 2017-0004, TENTATIVE TRACT MAP 2017-0008, ENVIRONMENTAL ASSESSMENT 2017-0008 Dear Mr. Miramontes: On March 20, 2020, we provided you with a letter indicating that the above-mentioned applications were incomplete and gave an update of what was still missing from the application package. The following items are still pending: • A copy of the USFWS approved Biological Opinion and Concurrence Letter • Administrative Draft Environmental Impact Report (EIR) Since the pending items above have not been received, your applications are deemed incomplete. Once these items have been received, the applications can be deemed complete. Additionally, a Development Agreement application was determined to be required per the Preapplication Review letter dated June 22, 2017. This application has not been submitted to date. Please work with City staff to submit the application. As stated in the March 20, 2020 letter, there have been several changes in the project and changes in the project team that have contributed to delays in application processing. As such, please provide us with updated owner information and contact information for the Hofmann trust and engineer of record so that we may update the application records. Additionally, please provide us with an authorization letter allowing TRG Land to process the applications on your behalf, so that staff can continue the processing of the applications. 2 TRAVERTINE CORPORATION TRUST ACCOUNT STATUS When applications were first submitted, in September 2017, $61,223 was deposited into the Travertine Corporation trust account with the City. Fees for the above-mentioned applications amounted to $30,881 and was withdrawn from the trust account. To date, $15,307.50 has been expended for the peer review, leaving a remaining balance of $15,034.50 in the trust account, which can be used for the Development Agreement application and City Attorney deposit. When the applications were submitted, a bank of 198.15 hours was created for staff to review the project. At this time, that bank has 30 hours remaining and staff anticipates this to be quickly depleted with the next set of submittals. Once the bank has been depleted, staff can no longer review the project applications until another deposit is received. Staff estimates that another 100 hours will be necessary to continue the review of applications, which would amount to $16,100. This amount needs to be deposited as soon as possible to avoid any delays in application processing. GENERAL PLAN AMENDMENT 2017-0002 AND ZONE CHANGE 2017-0002 Staff completed the first review of the General Plan Amendment (GPA) and Zone Change (ZC) application materials, including the GPA and ZC justification and maps, and provided comments on November 28, 2017. To date, we have not received a second submittal of the materials addressing staff’s comments. Please review the GPA and ZC justification and maps and update them per staff’s comments and changes in the project and resubmit. Fiscal Impact Study A fiscal impact study was submitted in January 2018 and staff had some correspondence with Roger Dale, who prepared the study, regarding this. Please update the land use assumptions in the study according to the changes made to the Planning Areas and update the basis for projected home values with more recent data. Once this is updated, it will be sent to Finance staff for review. TENTATIVE TRACT MAP 2017-0008 Previously, staff had completed their review of the Tentative Tract Map and had no further comments, except for comments on the Traffic Impact Analysis. Because of changes in the project, the Tentative Tract Map will need to be reviewed again. Please submit a revised copy of the following: • Tentative Tract Map • Preliminary Precise Grading Plan • Preliminary Landscape Plan • Hydrology/Drainage Study 3 • Water Quality Management Plan • Updated Geotechnical Report ENVIRONMENTAL ASSESSMENT 2017-0008 The Notice of Preparation (NOP) has been circulated for public review. Comments have been received and forwarded to the environmental consultant for consideration in the Draft EIR. Portions of the Draft EIR were submitted in May 2018 as listed below: • Chapter 1-Executive Summary • Chapter 2-Introduction • Chapter 3-Project Description • Sections of Chapter 4-Environmental Impact Analysis The remaining portions, as listed below, were not submitted. • Sections of Chapter 4-Environmental Impact Analysis o Aesthetics o Biological Resources o Public Services o Utilities and Service Systems • Chapter 5-Other CEQA Required Sections • Chapter 6-Alternatives to the Proposed Project • Chapter 7-EIR Preparation Due to project changes as noted above and changes in the CEQA guidelines since 2018, all portions of the Draft EIR need to be updated and resubmitted. Several technical studies were submitted to the City in May 2018 with the portions of the Draft EIR as listed below: • Land Evaluation and Site Assessment (LESA) • Air Quality Impact Analysis • Jurisdictional Delineation • Supplemental Cultural Resources Technical Report • Class III Cultural Resources Inventory and Evaluation • Geotechnical Report • Soils Report • Greenhouse Gas Analysis • Travertine Radius Map Report • Hydrology Reports • Hydrology and Debris Production Report 4 • Existing Off-Site Flood Risk Assessment Report • Flood Hazard Analysis for Devil Canyon • Travertine Development Drainage Master Plan • Preliminary Drainage Study • Preliminary Water Quality Management Plan • Noise Impact Analysis • Traffic Impact Analysis • Water Supply Assessment These studies will need to be updated based on changes that have been made to the project as noted above, incorporate the revised tentative tract map and changes in CEQA guidelines since 2018, with the exception of the Class III Cultural Resources Inventory and Evaluation. Staff is happy to discuss how extensive the changes would need to be for each report. If you have any questions, please contact me at (760) 777-7067. Sincerely, Cheri L. Flores Planning Manager Design and Development Department cc. Mark Rogers, TRG Land Danny Castro, Design and Development Director