zEngineer's EstimateX-Park Landscaping and Irrigation Improvements City Project No. 2016-03G Item Item Description Unit Quantity Unit Price Total Cost 1 Mobilization LS 1 50,330.00$ 50,330.00$ 2 Traffic Control LS 1 10,300.00$ 10,300.00$ 3 Dust Control LS 1 13,306.00$ 13,306.00$ 4 Demolition and Disposal per Plans (including bollard removal)LS 1 10,000.00$ 10,000.00$ 5 Site Walls per Plan SF 12 55.00$ 660.00$ 6 Clean/Paint Walls per Plan LS 1 7,000.00$ 7,000.00$ 7 Concrete for Board Yard per Plans SF 108 $ 10.00 $ 1,080.00 8 Sidewalk Construction per Plans SF 600 10.00$ 6,000.00$ 9 Stamped Concrete per Plans SF 483 10.00$ 4,830.00$ 10 Drainage Concrete Box/Grate per Plans EA 7 210.00$ 1,470.00$ 11 Full Depth Asphalt Concrete Grind (4"±), Compact Existing Aggregate Base, and 4" Asphalt Concrete Overlay SF 8 40.00$ 320.00$ 12 Modification of Existing Fence and Furnish and Install Pedestrian Gate per Plans EA 1 1,000.00$ 1,000.00$ 13 Trash Enclosure per Plans LS 1 20,000.00$ 20,000.00$ 14 Keystone Block Wall 6" high block, 3-course. Locations to be determined in field LF 100 80.00$ 8,000.00$ 15 Clearing, Grubbing, Weed Abatement, and Soil Preparation (including rock and debris removal)LS 1 11,741.00$ 11,741.00$ 16 Curb, including mow curb, median type curb, and modified median type curba as designated in the Plans LF 1,802 10.00$ 18,020.00$ 17 3/4" Crushed Rock - Desert Gold SF 18,036 1.50$ 27,054.00$ 18 6" Minus Baja Cresta Rubble SF 2,651 3.50$ 9,278.50$ 19 3/8" Crushed Rock - Apache Brown SF 1,018 1.88$ 1,913.84$ 20 3/8" Minus Decomposed Granite - Desert Gold SF 36,145 2.00$ 72,290.00$ 21 3/8" Minus Stabilized Decomposed Granite - Desert Gold SF 12,615 2.50$ 31,537.50$ 22 Lawn - Sod SF 4,215 2.50$ 10,537.50$ 23 Artificial Turf with Heatblock Technology SF 3,590 9.50$ 34,105.00$ 24 Furnish and Install Boulders per Plans EA 36 125.00$ 4,500.00$ 25 Furnish and Install Landscaping per Plans LS 1 18,005.00$ 18,005.00$ 26 Furnish and Install Irrigation per Plans LS 1 43,613.00$ 43,613.00$ 27 90 - Day Maintenance Period LS 1 2,375.00$ 2,375.00$ 28 Apply Stained Arrow per Caltrans Standard Plan A24A, Bike Lane Arrow, Three-part application EA 1 500.00$ 500.00$ 419,766.34$ 419,766.34$ Base Bid Only Sub-Total Base Bid: Engineer's Estimate - Base Bid