Loading...
zEngineer's EstimateLa Quinta Landscape Renovation Improvements ‐ Desert Pride, Marbella, and Sierra Del Rey City Project No. 2016‐03F2 2016‐03F3 Item Item Description Unit Quantity Unit Price Total Cost 1 Mobilization LS 1 42,000.00$            42,000.00$                    2 Traffic Contol and Plans LS 1 29,800.00$            29,800.00$                    3 Dust Control LS 1 25,379.00$            25,379.00$                    4 Clearing and Grubbing  LS  1 8,460.00$              8,460.00$                      5 Demolition and Disposal  LS  1 21,000.00$            21,000.00$                    6 Modify, Relocate, and Repair Existing Lighting Electrical System  with New Fixtures LS 1 20,000.00$            20,000.00$                    7 Install Solar Lighting  LS  1   $          10,000.00   $                   10,000.00  8 Install New Sleeving per City Standard 600 LF 180 50.00$                   9,000.00$                      9 Remove and Replace 6' Sidewalk per City Standard No. 245 SF 675 10.00$                   6,750.00$                      10 Wall Cleaning  LS 1 40,992.00$            40,992.00$                    11 Soil Prep and Fine Grading  LS 1 22,394.00$            22,394.00$                    12 Furnish and Install Boulders per Plan ‐ "Rustic Brown", 2' ‐3' EA 150 125.00$                 18,750.00$                    13 Furnish and Install 3/8" Apache Brown Crushed Rock SF 9,756 1.88$                      18,341.28$                    14 Furnish and Install 12"‐18" Sierra Cobble SF 94 2.00$                      188.00$                         15 Furnish and Install 3/4" Desert Gold Crushed Rock SF 56,345 1.30$                      73,248.50$                    16 Furnish and Install 6" Minus Baja Cresta Rubble SF 20,585 3.50$                      72,047.50$                    17 Furnish and Install PermaLoc Header ‐ Asphalt Edge LF 170 10.00$                   1,700.00$                      18 Furnish and Install Landscaping Per Plan LS  1 30,425.00$            30,425.00$                    19 Furnish and Install Irrigation per Plan LS 1 235,372.00$         235,372.00$                  20 Furnish and Install Keystone Block Tree Well ‐ 5 Course Stack  (Complete in place per detail)LF 243 80.00$                   19,440.00$                    21 Furnish and Install Keystone Block Retaining Wall ‐ 4 Course  Stack LF 1,800 90.00$                   162,000.00$                  22 Furnish and Install Keystone Block Retaining Wall ‐ 6 Course  Stack LF 3,275 100.00$                 327,500.00$                  23 90 ‐ Day Maintenance Period LS 1 2,576.00$              2,576.00$                      1,197,363.28$              Item Item Description Unit Quantity Unit Price Total Cost 24 Mobilization LS 1 40,000.00$            40,000.00$                    25 Traffic Control and Plans LS 1 29,800.00$            29,800.00$                    26 Dust Control LS 1 18,026.00$            18,026.00$                    27 Clearing and Grubbing LS 1 89,536.00$            89,536.00$                    28 Demolition and Disposal LS 1 51,750.00$            51,750.00$                    29 Modify, Relocate, and Repair Existing Lighting Electrical System  w/ New Fixtures LS 1 15,000.00$            15,000.00$                    30 Install New Sleeving per City Standard 600 LF 60 50.00$                   3,000.00$                      31 Remove and Replace 6' Sidewalk per City Standard No. 245 SF 70 10.00$                   700.00$                         32 Metal Fencing  LF  185 175.00$                 32,375.00$                    33 Wall Cleaning  LS 1 576.00$                 576.00$                         34 Wall Patching and Painting  SF 7,000 1.75$                      12,250.00$                    35 Soil Prep and Fine Grading LS 1 15,905.00$            15,905.00$                    36 Furnish and Install Boulder ‐ "Baja Cresta Red", 2'‐3' EA 126 125.00$                 15,750.00$                    37 Furnish and Install 3/8" Apache Brown Crushed Rock SF  8,090 1.88$                      15,209.20$                    38 Furnish and Install 3/8" Desert Gold Stablized Decomposed  Granite SF 6,865 2.00$                      13,730.00$                    39 Furnish and Install 3/4" Desert Gold Crushed Rock SF 68,260 1.30$                      88,738.00$                    40 Furnish and Install 6" Minus Baja Cresta Rubble SF 11,198 3.50$                      39,193.00$                    41 Furnish and Install 6" Minus Cresta Rubble SF 3,559 3.50$                      12,456.50$                    42 Furnish and Install 12" ‐ 18" Sierra Cobble SF 103 2.00$                      206.00$                         43 Furnish and Install PermaLoc Header ‐ Asphalt Edge SF 1,767 10.00$                   17,670.00$                    44 Furnish and Install Landscaping per Plan LS 1 43,295.00$            43,295.00$                    45 Furnish and Install Irrigation per Plan LS 1 277,037.00$         277,037.00$                  46 Furnish and Install Keystone Block LF 38 80.00$                   3,040.00$                      47 90 ‐ Day Maintenace Period LS 1 4,736.00$              4,736.00$                      839,978.70$                  2,037,341.98$              1,197,363.28$              839,978.70$                Base Bid Area 02 ‐ Marbella and Sierra Del Rey Only: Base Bid Area 01 ‐ Desert Pride Only: Sub‐Total Base Bid Area 01 Bid: Engineer's Estimate ‐ Base Bids Sub‐Total Base Bid Area 02 Bid: Grand Total Base Bid Area 01 and 02: BASE BID AREA 02 ‐ Marbella and Sierra Del Rey BASE BID AREA 01 ‐ Desert Pride