2018-10-18 Morrow, Scott 55075 Monroe - Permits1
From:Scott Morrow <scott@morrowmgmt.com>
Sent:Thursday, October 18, 2018 10:32 AM
To:James Wiatrak
Cc:AJ Ortega; Carlos Flores; Danny Castro
Subject:RE: Morrow Ranch - 55075 Monroe St - Google Earth Imagery
JW,
Thanks for the response. I know the barn is completed which we plan to submit soon. We will get going on the
additional plans going.
Scott
Scott Morrow
Morrow Management
1130 Via Callejon
San Clemente, CA 92673
949/218‐8400 direct
949/533‐5050 cell
CONFIDENTIALITY NOTICE: This email including any attachments may contain confidential and/or privileged information. If you are not the intended recipient or
have received this email in error please notify the sender immediately by return email and delete this message from your system. Any unauthorized copying,
disclosure or distribution of the material in this email is strictly prohibited.
From: James Wiatrak <jwiatrak@laquintaca.gov>
Sent: Wednesday, October 17, 2018 11:12 AM
To: Scott Morrow <scott@morrowmgmt.com>
Cc: AJ Ortega <Aortega@laquintaca.gov>; Carlos Flores <cflores@laquintaca.gov>; Danny Castro
<dcastro@laquintaca.gov>
Subject: RE: Morrow Ranch ‐ 55075 Monroe St ‐ Google Earth Imagery
Hi Scott,
Absent any information such as city approved stamped plans, inspection record cards, etc. we
have to assume that the connecting wing and outdoor bar structure were unpermitted
construction. That being said, I recommend including those areas in your scope of work for the
barn alterations and obtaining a permit for all of this work under the one submittal.
Let me know should you have any questions.
Regards,
From: Scott Morrow
<scott@morrowmgmt.com>
Sent: Tuesday, October 16, 2018
4:56 PM
To: James Wiatrak
James “JW” Wiatrak, CBO, CASp
Building Official ◦ ADA Coordinator
Design & Development Department
City of La Quinta
78495 Calle Tampico ◦ La Quinta, CA 92253
Ph. 760.777.7023
jwiatrak@laquintaca.gov
2
<jwiatrak@laquintaca.gov>
Cc: Danielle Morrow <danielle@morrowmgmt.com>
Subject: FW: Morrow Ranch ‐ 55075 Monroe St ‐ Google Earth Imagery
Hi JW,
It was nice meeting with you earlier today and I was excited to get back to my computer to look through Google Earth
time lapse. As you can see from the snapshot below the property was built to it’s existing condition as far back as June
2011. The image prior to this is from September 2009 so at some point between 2009 and 2011 the connecting section
was built. This includes the rooms between house and garage as well as outdoor bar structure. As mentioned, we’re in
the process of drawing plans for permit on the bedrooms in the barn we know were not permitted, but not sure
anything else would be required. Please advise.
3
Thanks,
Scott
Scott Morrow
Morrow Management
1130 Via Callejon
San Clemente, CA 92673
949/218‐8400 direct
949/533‐5050 cell
CONFIDENTIALITY NOTICE: This email including any attachments may contain confidential and/or privileged information. If you are not the intended recipient or
have received this email in error please notify the sender immediately by return email and delete this message from your system. Any unauthorized copying,
disclosure or distribution of the material in this email is strictly prohibited.
NOTICE: This email message and any attachments hereto may contain confidential information. Any unauthorized
review, use, disclosure, or distribution of such information is prohibited. If you are not the intended recipient, please
contact the sender by reply email and destroy the original message and all copies of it.