Loading...
2019-10-28 Morrow, Danielle - 55075 Monroe Electric Pedestal1 From:Danielle Morrow <danielle@morrowmgmt.com> Sent:Monday, October 28, 2019 11:30 AM To:Jim Morrow Cc:Jacob Fuson; AJ Ortega Subject:Re: 55075 Monroe Electric Pedestal ** EXTERNAL: This message originated outside of the City of La Quinta. Please use proper judgement and caution when opening  attachments, clicking links or responding to requests for information. **  Hi Jake,   I can provide additional information regarding #3. Debbie Lewis from Desert Iron Gates will be stopping at the City today  to submit for a permit for the new gate. It took longer than expected for Desert Iron to obtain the requested wind load  calculations however they are now in.   Danielle   Sent from my iPhone  On Oct 28, 2019, at 11:14 AM, Jim Morrow <jim@morrowmgmt.com> wrote:  Jake ….  Questions –  1.Did you send or do I pick‐up the final inspection clearance for the meter pedestal?  (something for our records) 2.When we add breakers for the trailers, time clock for irrigation controller or misc. do we need to take out an additional permit?  Or, do we add to the current pedestal permit? 3.I believe the gate people have, or will be requesting a permit/inspection for the new gate.  Since it will be powered, I assume an electrical inspection will be required for that installation – is that correct? Thanks for your help  Jim Morrow  949-218-9999 (Direct) 951-751-4749 (Cell) From: Jacob Fuson [mailto:Jfuson@laquintaca.gov] Sent: Monday, October 28, 2019 8:58 AM To: Jim Morrow Cc: Danielle Morrow; AJ Ortega Subject: RE: 55075 Monroe Property LIne Wall  Jim,  2 I think we can do both of the inspections at the same time. I would remove the top course where it exceeds 9 courses, dig the footing and install the steel at the last section of wall, and call for inspection. We can look at this section of footing as well as the rebar within the remainder of the wall on the same visit.     Attached is the detailing for the city standard garden wall which was utilized according to the permit notes. One thing to think about when removing the top course is to ensure that the new top course has (1) #4 bar as required by the design (see below).   <image001.jpg>       Thank you,    Jake Fuson |Plans Examiner  City of La Quinta  78495 Calle Tampico ◦ La Quinta, CA 92253  760.777.7081  www.laquintaca.gov   www.playinlaquinta.com    From: Jim Morrow <jim@morrowmgmt.com>   Sent: Friday, October 25, 2019 3:37 PM  To: Jacob Fuson <Jfuson@laquintaca.gov>  Cc: Danielle Morrow <danielle@morrowmgmt.com>; AJ Ortega <Aortega@laquintaca.gov>  Subject: RE: 55075 Monroe Property LIne Wall     ** EXTERNAL: This message originated outside of the City of La Quinta. Please use proper judgement and caution  when opening attachments, clicking links or responding to requests for information. **     Jake….  Continuation of latest comments ‐‐‐‐‐‐     We have pot‐holed the wall in eight (8) locations – four (4) on the street side and four (4) on the  property side.  At each location you can see the depth and width of the footing.  The primary one being  the area where the transition or stepping takes place.       Most of the wall appears to be nine (9) block high, except for the area at the transition – where we have  10‐blocks high for a short section.  These additional blocks could easily be taken off, if required.     I believe Danielle has called for an inspection to take place on Monday (10/28).  You should be able to  see in the block cells where rebar has been placed.  Please let me know if there are any issues.     Assuming all is acceptable, I believe our next step would be to form the footing at the opening for your  initial inspection of this last section of wall.        Jim Morrow  949-218-9999 (Direct)  951-751-4749 (Cell)  From: Jacob Fuson [mailto:Jfuson@laquintaca.gov] Sent: Wednesday, October 23, 2019 8:21 AM To: Jim Morrow 3 Cc: Danielle Morrow; AJ Ortega Subject: RE: 55075 Monroe Property LIne Wall     Jim,    Thanks for the update. It looks like the wall is in the right location so that’s a good thing. The next step is to excavate at the base of the transition area where the wall steps up and verify whether the footing was stepped and how many total courses were constructed. I don’t remember a step in the footing during the inspection, but that can be easily verified by digging down and exposing the footing and measuring the height from top of the footing (or counting the courses of CMU). The following step would be getting the wall inspected, however if the wall was constructed to over 9 courses it will not be approvable by our inspector.     I am assuming the wall is not grouted. I see a couple options if the wall is in fact too high (i.e. 6’8” or 10 courses from top of footing):    -You can remove the top course and finish the wall at 72” from T.O.F.  -You can work with a licensed engineer to provide structural calculations to show that the current wall as constructed is compliant with the applicable structural code requirements  -You can have a licensed engineer provide a design to either widen/deepen the footing and/or provide additional reinforcement in the wall to make it compliant with the applicable structural code requirements    Regardless of what method you take from here, the next action by the city would be to come out and inspect the work, but we need to get the wall height/structural design figured out first.  Please feel free to reach out with any questions.    Thank you,    Jake Fuson |Plans Examiner  City of La Quinta  78495 Calle Tampico ◦ La Quinta, CA 92253  760.777.7081  www.laquintaca.gov   www.playinlaquinta.com    From: Jim Morrow <jim@morrowmgmt.com>   Sent: Wednesday, October 23, 2019 7:16 AM  To: Jacob Fuson <Jfuson@laquintaca.gov>  Cc: Danielle Morrow <danielle@morrowmgmt.com>  Subject: RE: 55075 Monroe Property LIne Wall     ** EXTERNAL: This message originated outside of the City of La Quinta. Please use proper judgement and caution  when opening attachments, clicking links or responding to requests for information. **     Jake….  Property / permit update.     1. IID completed the electric service cutover to the pedestal on Monday (10/21) – new pedestal is  now operational and the old ones removed  2. Next step will be the wall – I have attached the following:   City permit dated 8/15/18  4  2‐photos of the wall  3. On pg. 8 of the permit there is a site plan with dimensions.  From my measurements I came up  with the following   Face of curb to the southern part of the wall 31’6”   Face of curb to the northern section of the wall 42’   Section of wall connecting to the Woodbridge Pacific wall (Monterra) is 87’6” long (south to  north)  4. The photos show    The connection of the wall to the Woodbridge wall   The number of blocks above the footing appears to be 9 in the parallel sections to the curb  face   The number of blocks in the transition appears to be 10 – will need to pot‐hole to verify  depth of footing – was the footing strpped?     We would like to move to the next step – need your direction  1. Can you inspect the newly constructed wall in it’s current state?  2. I have asked the Ranch foreman (Julio) to pot‐hole in three (3) other locations to expose the  footings  3. As I understand to fill in the opening we need to   Have our block wall contractor form the footing with vertical rebar in place for your  inspection   Construct remaining block in opening – call for inspection before pre‐grout   Once cell grout is in place call for final inspection prior to cap placement   Lastly, you mentioned the need to paint or stucco the outside of the wall, fronting Monroe  before we can receive final inspection – is that correct.     Please comment on the above and let me know if I understand the next series of events.  As always –  thanks for your help and direction.     Jim Morrow  949-218-9999 (Direct)  951-751-4749 (Cell)     From: Jim Morrow Sent: Tuesday, October 15, 2019 3:44 PM To: Jacob Fuson Cc: Danielle Morrow Subject: RE: 55075 Monroe     Jake…. No problem – are you available to talk now via phone?        Jim Morrow  949-218-9999 (Direct)  951-751-4749 (Cell)     From: Jacob Fuson [mailto:Jfuson@laquintaca.gov] Sent: Tuesday, October 15, 2019 2:29 PM To: Jim Morrow Cc: Danielle Morrow Subject: RE: 55075 Monroe     Jim,  5   Due to staffing levels I can’t meet out on the site but I can speak via telephone, email or in person here at City Hall if you’d like. I am typically available in the afternoons but if you have a specific time on Monday that you’d be shooting for let me know and I’ll see if I can accommodate.    Thank you    Jake Fuson |Plans Examiner  City of La Quinta  78495 Calle Tampico ◦ La Quinta, CA 92253  760.777.7081  www.laquintaca.gov   www.playinlaquinta.com    From: Jim Morrow <jim@morrowmgmt.com>   Sent: Tuesday, October 15, 2019 2:25 PM  To: Jacob Fuson <Jfuson@laquintaca.gov>  Cc: Danielle Morrow <danielle@morrowmgmt.com>  Subject: RE: 55075 Monroe     ** EXTERNAL: This message originated outside of the City of La Quinta. Please use proper judgement and caution  when opening attachments, clicking links or responding to requests for information. **     Jake……  I just spoke with Danielle and she indicated the block wall fronting Monroe was never inspected during  construction.  I was not aware of that issue.     I will be at the site Monday morning (10/21) – we have IID cutting over the pedestal that morning.     Can we meet at the site to discuss what needs to be done to receive final inspection on the wall?  Do I  need to call the request desk on Friday?  Or, can we just set up a time?     Thanks      Jim Morrow  949-218-9999 (Direct)  951-751-4749 (Cell)    From: Jim Morrow Sent: Monday, September 30, 2019 8:30 AM To: Jacob Fuson Cc: Danielle Morrow Subject: RE: 55075 Monroe     Jake ….  I just called your inspection desk and left the details.  As discussed, I believe the items you requested  have been corrected in the field.     As a reminder the pedestal is located at       55‐075 #B Monroe Street   Permit #BELC2018‐0113     6 Do you have an approximate time when you will inspect tomorrow?     Thanks for your help.     Jim Morrow  949-218-9999 (Direct)  951-751-4749 (Cell)  From: Jim Morrow Sent: Monday, September 23, 2019 2:52 PM To: Jacob Fuson Cc: Danielle Morrow; AJ Ortega Subject: RE: 55075 Monroe     Jake…..  1:30 on Thursday (9/26) will work – see you at your office        Jim Morrow  949-218-9999 (Direct)  951-751-4749 (Cell)  From: Jim Morrow Sent: Monday, September 23, 2019 9:57 AM To: Jacob Fuson Cc: Danielle Morrow; AJ Ortega Subject: RE: 55075 Monroe     Jake ….  Thanks for the response – can you and AJ meet on Thursday afternoon?        Jim Morrow     From: Jacob Fuson [mailto:Jfuson@laquintaca.gov] Sent: Monday, September 23, 2019 9:04 AM To: Jim Morrow Cc: Danielle Morrow; AJ Ortega Subject: RE: 55075 Monroe     Jim,    Thanks for reaching out. Now that the items below have been completed, once the outstanding permit fees of $240.05 have been paid we should be able to conduct the inspection in order to energize the meter pedestal at the front parcel. Like we spoke about, this would be to energize the pedestal only, and any branch circuitry installed after that time would require inspection prior to them being connected to the system and energized (i.e. the gate motor, RV parking pedestal, trailer feeders, etc).     I wasn’t heavily involved with some of the other issues at this property (i.e. unpermitted remodels and additions) so I would like to gather other staff members as necessary to answer your questions. My supervisor, AJ Ortega will be able to provide more information about those items, so I would like to shoot for a meeting between the three of us to lay out all the requested information to you. AJ will be off this Friday when you will be in town but let me know whenever else works for you and I will see if we can swing a time that works for all of us.    7 Thanks,    Jake Fuson |Plans Examiner  City of La Quinta  78495 Calle Tampico ◦ La Quinta, CA 92253  760.777.7081  www.laquintaca.gov   www.playinlaquinta.com    From: Jim Morrow <jim@morrowmgmt.com>   Sent: Friday, September 20, 2019 12:26 PM  To: Jacob Fuson <Jfuson@laquintaca.gov>  Cc: Danielle Morrow <danielle@morrowmgmt.com>  Subject: 55075 Monroe     ** EXTERNAL: This message originated outside of the City of La Quinta. Please use proper judgement and caution  when opening attachments, clicking links or responding to requests for information. **     Jake….  Thanks for the meeting this past Monday and provided tasks needed to clear the inspection for the  meter pedestal.  From my notes I had the following items to be taken care of ‐‐‐‐‐     1. Disconnect the branch circuits to the trailer – this work was completed by our electrician  2. Blank off open breaker spaces – our electrician said he completed yesterday (9/19)  3. Address to the pedestal – per Carlos Partida at IID he indicated his records show the address to  be 55‐075 B, Monroe Street – see attached     Since we have an issue with the gate – I would like to treat the inspection for the pedestal  separately.  Assuming the above 3‐items are the only outstanding to obtain your inspection – we would  like to proceed in getting that finalized.     I plan to be at the property next Friday (9/27) and was wondering if you would be available to go over  the other outstanding items as we discussed.  If you are, can we meet at 1:00pm at your office?     Thanks in advance for your reply     Jim Morrow  949-218-9999 (Office)  951-751-4749 (Cell)