PC Resolution 2022-024 PGA West AT&T Smartlink MonopalmPLANNING COMMISSION RESOLUTION 2022 - 024
A RESOLUTION OF THE PLANNING COMMISSION
OF THE CITY OF LA QUINTA, CALIFORNIA,
APPROVING A CONDITIONAL USE PERMIT FOR
THE CONSTRUCTION OF A WIRELESS
TELECOMMUNICATION FACILITY WITHIN PGA
WEST AND FINDING THE PROJECT EXEMPT
FROM THE CALIFORNIA ENVIRONMENTAL
QUALITY ACT
CASE NUMBER: CONDITIONAL USE PERMIT 2022-0002
APPLICANT: SMARTLINK GROUP/AT&T MOBILITY
WHEREAS, the Planning Commission of the City of La Quinta, California
did, on November 8, 2022, hold a duly noticed Public Hearing to consider a
request by Smartlink Group, on behalf of AT&T Mobility, for approval of a
wireless telecommunication monopalm tower and mechanical equipment,
generally located at the private clubhouse of PGA West, more particularly
described as:
APN: 775-220-027
55955 PGA Boulevard
WHEREAS, the Design and Development Department published a public
hearing notice in The Desert Sun newspaper on October 28, 2022 as
prescribed by the Municipal Code. Public hearing notices were also mailed to
all property owners within 500 feet of the site; and,
WHEREAS, at said Public Hearing, upon hearing and considering all
testimony and arguments, if any, of all interested persons desiring to be
heard, said Planning Commission did make the following mandatory findings
pursuant to Section 9.170.090 of the Municipal Code to justify approval of said
Conditional Use Permit:
1. Consistency with General Plan
The design of the proposed wireless facility is consistent with La
Quinta General Plan, insofar as the applicant has demonstrated the
need for the facility, which supports the General Plan's policies that
utilities and communication facilities be available, adequate, and
convenient for all residents. The location of the monopalm is
compatible with the land uses in the area and the designation of Low
Density Residential.
PLANNING COMMISSION RESOLUTION 2022-024
CONDITIONAL USE PERMIT 2022-0002
APPLICANT: SMARTLINK GROUP/AT&T MOBILITY
ADOPTED: NOVEMBER 8, 2022
Page 2 of 3
2. Public Welfare
The proposed wireless facility will not create conditions materially
detrimental to the public health, safety, and general welfare. The
facility will provide service in an area of the City that needs additional
coverage, and the equipment and facilities will be screened or within
enclosed structures and provide separation from other uses. The
wireless facility is required to comply with the American National
Standard Institute (ANSI) standards for professionally acceptable
radio frequency emissions to ensure the antennae will not interfere
with the surrounding land uses.
3. Visual Impacts
The project implements the City's required "stealth" standards and
proposes antennae that will be screened from view. The location of
the monopalm in a row of existing real palm trees will also reduce
visual impacts.
4. Tower Design
The tower is designed at the minimum height required to provide
service and will be screened by palm trees fronds and skirt. The
screening is consistent with the row of palm trees in which it will be
located.
5. Justification
The proposed wireless telecommunication facility is necessary, as
shown in the applicant's justification letter, to continue and improve
community access to wireless service from the project site.
Therefore, this facility is necessary to improve community access to
wireless services.
NOW, THEREFORE, BE IT RESOLVED by the Planning Commission of
the City of La Quinta, California, as follows:
SECTION 1. That the above recitations are true and constitute the findings of
the Planning Commission in this case.
SECTION 2. That the above project be determined by the Planning
Commission to be exempt from CEQA pursuant to Section 15303 of the CEQA
Guidelines for new construction or conversion of small structures since the
monopalm and associated ground -mounted equipment contains a small
footprint.
PLANNING COMMISSION RESOLUTION 2022-024
CONDITIONAL USE PERMIT 2022-0002
APPLICANT: SMARTLINK GROUP/AT&T MOBILITY
ADOPTED: NOVEMBER 8, 2022
Page 3 of 3
SECTION 3. That it does hereby approve Conditional Use Permit 2022-0002,
for the reasons set forth in this Resolution and subject to the attached
Conditions of Approval [Exhibit A].
PASSED, APPROVED, and ADOPTED at a regular meeting of the City
of La Quinta Planning Commission, held on November 8, 2022, by the
following vote:
AYES: Commissioners Caldwell, Hassett, McCune, Nieto, Tyerman,
and Chairperson Currie
NOES: None
ABSENT: None
ABSTAIN: None
Vacancy: One
ATTEST:
ORETTA CURRIE, Chairperson
City of La Quinta, California
DANNY CASTRO, Design and Development Director
City of La Quinta, California
PLANNING COMMISSION RESOLUTION 2022-024
CONDITIONS OF APPROVAL
CONDITIONAL USE PERMIT 2022-0002
APPLICANT: SMARTLINK GROUP/AT&T MOBILITY
ADOPTED: NOVEMBER 8, 2022
PAGE 1 OF 6
GENERAL
EXHIBIT A
1. The applicant agrees to defend, indemnify, and hold harmless the City of La
Quinta ("City"), its agents, officers, and employees, from any claim, action or
proceeding to attack, set aside, void, or annul the approval of this Conditional
Use Permit. The City shall have sole discretion in selecting its defense counsel.
The City shall promptly notify the applicant of any claim, action or proceeding
and shall cooperate fully in the defense.
2. This Conditional Use Permit shall comply with the requirements and standards
of Section 9.170 and Section 9.210.020 of the La Quinta Municipal Code
("LQMC").
The City of La Quinta's Municipal Code can be accessed on the City's Web Site
at www.laquintaca.gov.
3. This Conditional Use Permit shall expire on November 8, 2024 and shall
become null and void in accordance with Municipal Code Section 9.200.080,
unless the use has been established.
4. Any expansion or substantial modifications to the approved plan shall require
an amendment of this Conditional Use Permit. Minor modifications to this
Conditional Use Permit shall be considered by the Design and Development
Director and may require notification of surrounding property owners prior to
such approval. All other amendments shall be processed in accordance with
LQMC 9.200.100.
5. Prior to the issuance of any grading, construction, or building permit by the
City, the applicant shall obtain any necessary clearances and/or permits from
the following agencies, if required:
• Riverside County Fire Marshal
• La Quinta Public Works Department (Grading Permit, Green Sheet
(Public Works Development Clearance) for Building Permits, Water
Quality Management Plan (WQMP) Exemption Form - Whitewater River
Region, Improvement Permit)
• La Quinta Building and Safety Division for Building Permits
• La Quinta Planning Division
• Riverside Co. Environmental Health Department
• Desert Sands Unified School District (DSUSD)
• Coachella Valley Water District (CVWD)
• Imperial Irrigation District (IID)
• California Regional Water Quality Control Board (CRWQCB)
PLANNING COMMISSION RESOLUTION 2022-024
CONDITIONS OF APPROVAL
CONDITIONAL USE PERMIT 2022-0002
APPLICANT: SMARTLINK GROUP/AT&T MOBILITY
ADOPTED: NOVEMBER 8, 2022
PAGE 2 OF 6
• State Water Resources Control Board
• SunLine Transit Agency
• South Coast Air Quality Management District Coachella Valley
• Federal Communication Commission
• Federal Aviation Administration
The applicant is responsible for all requirements of the permits and/or
clearances from the above listed agencies. When the requirements include
approval of improvement plans, the applicant shall furnish proof of such
approvals when submitting those improvements plans for City approval.
6. Developer shall reimburse the City, within thirty (30) days of presentment of
the invoice, all costs and actual attorney's fees incurred by the City Attorney
to review, negotiate and/or modify any documents or instruments required by
these conditions, if Developer requests that the City modify or revise any
documents or instruments prepared initially by the City to effect these
conditions. This obligation shall be paid in the time noted above without
deduction or offset and Developer's failure to make such payment shall be a
material breach of the Conditions of Approval.
7. Developer shall reimburse the City, within thirty (30) days of presentment of
the invoice, all costs and actual consultant's fees incurred by the City for
engineering and/or surveying consultants to review and/or modify any
documents or instruments required by this project. This obligation shall be
paid in the time noted above without deduction or offset and Developer's
failure to make such payment shall be a material breach of the Conditions of
Approval.
IMPROVEMENT PLANS
As used throughout these Conditions of Approval, professional titles such as
"engineer," "surveyor," and "architect," refer to persons currently certified or
licensed to practice their respective professions in the State of California.
8. Improvement plans shall be prepared by or under the direct supervision of
qualified engineers and/or architects, as appropriate, and shall comply with
the provisions of LQMC Section 13.24.040 (Improvement Plans).
9. A precise grading plan prepared by a Civil Engineer registered in California and
a Soils Report prepared by a professional registered in California must be
approved by the City Engineer prior to the commencement of grading.
PLANNING COMMISSION RESOLUTION 2022-024
CONDITIONS OF APPROVAL
CONDITIONAL USE PERMIT 2022-0002
APPLICANT: SMARTLINK GROUP/AT&T MOBILITY
ADOPTED: NOVEMBER 8, 2022
PAGE 3 OF 6
Other engineered improvement plans prepared for City approval that are not
listed shall be prepared in formats approved by the City Engineer prior to
commencing plan preparation.
"On -Site Precise Grading" plans shall normally include all on -site surface
improvements including but not necessarily limited to finish grades for curbs &
gutters, building floor elevations, parking lot improvements and ADA
requirements.
Building plans and structural calculations shall be submitted for review and
approval by the Building and Safety Division.
PRECISE GRADING
10. The applicant shall comply with the provisions of LQMC Section 8.80
(Grading).
11. To obtain an approved grading permit, the applicant shall submit and obtain
approval of all of the following:
A. A grading plan prepared by a qualified engineer,
B. A preliminary geotechnical ("soils") report prepared by a qualified
engineer,
All grading shall conform to the recommendations contained in the Preliminary
Soils Report and shall be certified as being adequate by a soils engineer, or by
an engineering geologist.
The applicant shall furnish security, in a form acceptable to the City, and in an
amount sufficient to guarantee compliance with the approved Fugitive Dust
Control Plan provisions as submitted with its application for a grading permit.
UTILITIES
12. The applicant shall comply with the provisions of LQMC Section 13.24.110
(Utilities).
13. Underground utilities shall be installed prior to overlaying hardscape. For
installation of utilities in existing improved streets, the applicant shall comply
with trench restoration requirements as required by the City Engineer.
The applicant shall provide certified reports of all utility trench compaction for
approval by the City Engineer.
PLANNING COMMISSION RESOLUTION 2022-024
CONDITIONS OF APPROVAL
CONDITIONAL USE PERMIT 2022-0002
APPLICANT: SMARTLINK GROUP/AT&T MOBILITY
ADOPTED: NOVEMBER 8, 2022
PAGE 4 OF 6
MAINTENANCE
14. The applicant shall protect existing hardscape along the proposed construction
area to include but not be limited to garden walls, landscaping, irrigation
systems, curb and gutter, sidewalk and pavement, and existing building
structures. Restoration to any damaged hardscape shall be to the satisfaction
of the City of La Quinta. Any disturbed areas including landscaping shall be
replaced in -kind.
FEES AND DEPOSITS
15. The applicant shall comply with the provisions of LQMC Section 13.24.180
(Fees and Deposits). These fees include all deposits and fees required by the
City for plan checking and construction inspection. Deposits and fee amounts
shall be those in effect when the applicant makes application for plan check
and permits.
PLANNING
16. The proposed telecommunication facility shall comply with all federal and state
statutes, including, but not limited to, FCC licensing, NIER levels, and FAA
requirements. No wireless telecommunication facility or combination of
facilities shall produce, at any time; power densities that exceed current FCC
adopted standards for human exposure for RF (Radio Frequency Radiation
Exposure Standards) fields. Failure to comply with FCC Standards will result in
the immediate cessation of operation of the wireless telecommunication
facility.
17. All wireless telecommunication facilities shall be installed and maintained in
compliance with the requirements of the Uniform Building Code, National
Electrical Code, the City's noise ordinance, and other applicable codes, as well
as other restrictions specified in the permit and the La Quinta Municipal Code.
The facility operator and the property owner shall be responsible for
maintaining the facility in good condition, which shall include, but not be
limited to, regular cleaning, painting, and general upkeep and maintenance of
the site consistent with the facility's original approval.
18. The panel antennas shall be mounted securely to the monopalm tower.
19. The proposed monopalm shall be approved at a height of 65 feet.
PLANNING COMMISSION RESOLUTION 2022-024
CONDITIONS OF APPROVAL
CONDITIONAL USE PERMIT 2022-0002
APPLICANT: SMARTLINK GROUP/AT&T MOBILITY
ADOPTED: NOVEMBER 8, 2022
PAGE 5 OF 6
20. Antennas, equipment, and all ancillary components shall be stealth to the
maximum extent feasible. Both fronds and a skirt are required to screen all
antennae.
21. The applicant shall negotiate in good faith for shared use by third parties; an
owner generally will negotiate in the order in which requests for information
are received, except an owner generally will negotiate with a party who has
received an FCC license or permit before doing so with other parties.
22. AT&T, or successor, shall have a continuing obligation to respond to and
resolve any and all complaints associated with any potential interference with
frequencies related to residential and/or life safety communications and
operations. Response shall be within 48 hours of receipt of notice of any such
complaints.
23. AT&T, or successor, shall provide the Planning Division with the name and
contact information of the maintenance representation who shall be available
24 hours a day, seven days a week, to receive calls regarding facility
maintenance. Response shall be within 48 hours on weekdays and within 72
hours on weekends/holidays of receipt of such notice of complaints.
24. The placement of the monopalm shall not interfere with the existing
infrastructure and improvements at this location. The pole shall not be placed
on a public paths -of -travel.
25. The wireless telecommunication facility operators are required to notify the
City of La Quinta's Planning Division within sixty (60) days of any change of
ownership of the facility.
26. The entire facility shall be maintained in a condition consistent with the
conditions of this approval and, if the facility is not so maintained, this
approval is subject to revocation or other correcting actions as determined
appropriate by the City.
27. No cables, conduit, or other equipment on the monopalm tower pole shall be
visible. All electrical work for the proposed antennas shall be contained within
the monopalm tower cavity.
FIRE
28. Install a minimum size 2A1OBC portable fire extinguisher located in
extinguisher cabinet.
PLANNING COMMISSION RESOLUTION 2022-024
CONDITIONS OF APPROVAL
CONDITIONAL USE PERMIT 2022-0002
APPLICANT: SMARTLINK GROUP/AT&T MOBILITY
ADOPTED: NOVEMBER 8, 2022
PAGE 6 OF 6
29. Install an approved Knox Box on the exterior of the gate or structure with a
supply of tagged access keys to be stored within the Knox Box.
30. NFPA 704 placarding is required to be displayed on the exterior of the facility
of the specific hazard element. Ensure the correct NFPA hazard values are
provided in the required sections. (For facilities with fuel -fired generators)
31. Provide site addressing by means of 6" numbers and letters completing the
entire numeric and street name address. Characters shall be contrasting and
reflectorized.
32. DEFERRED SUBMITTALS
a. FUEL STORAGE - for fuel -powered generators require separate/deferred
submittal to the Office of the Fire Marshal.
b. ELECTRICAL ENERGY STORAGE SYSTEMS - in quantities exceeding levels
identified in CFC Table 1206.1 require separate/deferred submittal to the
Office of the Fire Marshal.
33. The Fire Department approved plans and conditions letter must be at the job
site.
34. Plans shall be prepared to the applicable code at the time of submittal for
building permit. Currently the 2019 California Building Codes, as of January 1,
2023, these will be the 2022 California Building Codes.
35. Provide 10' Fire Separation Distance to adjacent property lines per CBC 602 or
note on plans that equipment shelter will be of one (1) hour fire -resistive
construction.