2021-08-20 McGill - Sheep Fence Documents_RedactedSaturday, April 2, 2022 at 11:54:58 Pacific Daylight Time
Page 1 of 2
Subject:Re: 2553 Coral Mountain Resort Sheep Fence Documents [2553-MSA1.NRzf]
Date:Friday, August 20, 2021 at 12:12:22 PM Pacific Daylight Time
From:Thomas J. McGill
To:Lee, Asia
CC:John Gamlin, James Vaughn, Tony Locacciato, Witherspoon, Michelle, Nicole Criste, DepalaPs, Paul
Thanks I will take a look. I have read through the earlier documents. 0nce I get through everything I will finalize my
thoughts and where I think the response strategy should go. As always, CDFW is way overreaching but I do think they
have given us an opening we can use.
Sent from my iPhone
On Aug 20, 2021, at 9:52 AM, Lee, Asia <alee@msaconsulPnginc.com> wrote:
Good Morning Dr. McGill,
Please see the sheep fence EIR documents provided in the link below. These documents are
regarding the Coral Mountain Resort Dra\ EIR.
Citrix A^achments Expires September 19, 2021
Coral Canyon BOR Agreement.pdf 1.4 MB
CVCC DEIR APPENDIX B - BIOLOGICAL RESO...CES.pdf 16.6 MB
CVCC DEIR FINAL.pdf 361.1 MB
CVCC LaQ Barrier FEIR Final 4.10.19emailsize.pdf 13.2 MB
TraverPne BO 2005.pdf 3.3 MB
Asia Lee uses Citrix Files to share documents securely.
Thank you,
Asia Lee
Environmental Planner
website | map | email
Page 2 of 2
<A^achments.html>