2020-11-17 McKinneySunday, May 29, 2022 at 11:39:40 Pacific Daylight Time
Subject: RE: Wave Perimeter improvements
Date: Tuesday, November 17, 2020 at 1:47:52 PM Pacific Standard Time
From: Bryan McKinney
To: Nicole Criste
CC: Cheri Flores, Amy Yu
Attachments: image003.png, image004.jpg
That is what I would want to see. I think council would want to see that also to avoid the Andulusia issue.
Bryan McKinney, P.E. I Public Works Director/City Engineer
City of La Quinta
78495 Calle Tampico La Quinta, CA 92253
760.777.7045
Email: bmckinney@laquintaca.gov
Website: www.laquintaca.gov
PLEASE NOTE: City Hall is now open on a limited basis by advanced
appointment only.
Issues or questions for Public Works can be submitted through
GoRequest. I will be working remotely until further notice, but will be
conducting business during regular business hours and will be available
via phone and email. Thank you for your understanding.
For additional updates visit: www.laquintaca.gov/COVID19
From: Nicole Criste <ncriste@terranovaplanning.com>
Sent: Tuesday, November 17, 2020 1:45 PM
To: Bryan McKinney <Bmckinney@laquintaca.gov>
Cc: Cheri Flores <clflores@laquintaca.gov>; Amy Yu <Ayu@laquintaca.gov>
Subject: Wave Perimeter improvements
EXTERNAL: This message originated outside of the City of La Quinta. Please use proper judgement and caution when
opening attachments, clicking links or responding to requests for information.
Bryan,
We have discussed this before, but I need to confirm — I'm reviewing the Wave SP document, and they are
saying that they will be making perimeter improvements when adjacent development occurs per phasing
exhibit below. What you and I have discussed is all perimeter improvements with Phase 1, to avoid the
Page 1 of 2
ongoing Andalusia problem. It is also more aesthetically appealing, rather than open desert everywhere
except at the entry. Is this still your plan?
CORAL MOUNTAIN RESORT SPECIFIC PLAN
I find:
.. -
y
PmjecF B Jndm
Phobia Ekoundoc
PkaFe I
PKom 5
PF+4se 2
PF•u Fe S
Ph. pia 3
PhOF. I
PF.bpe 4
-
PF.4F.} 5
MOO 1O0C4ragbCNP5#On 59dC4r9M+C
sequence. k is crnreprol and subject do reEnernmlrt
rep Yqe d4 naked G4rcdrheoF
%b.
} ti
a
AVErquE 58
•
7
A VtI rjP. bO
4
1
i
I
SeleAreft f.}yj C.OnSuObrIS.in
Er lid( Dote' SepteMber 2'4.2420
0 f 5A CONSU LTING, INC.
LISACONSAINCMICCOM
CONCEPTUAL PHASING PLAN
FIGURE Tl
PAGE ZD
Page 2 of 2
Nicole Sauviat Criste
Principal
TERRA NOVA PLANNING & RESEARCH, INC.®
42635 Melanie Place, Ste 101
PALM DESERT, CA 92211
(760) 341-4800
FAX#: 760-341-4455
E-Mail: ncriste@terranovaplanning.com
Page 3 of 2