There are plans at the City, but City Hall remains closed. I have copied our City Clerk here, as they
handle public record requests. We can provide the master plan from the Specific Plan, and the
current grading plan through this process. I will work with Monika and Nichole to send you these
materials.
Nicole Sauviat Criste
Consulting Planner
City of La Quinta
From: pwayneplaza@yahoo.com <pwayneplaza@yahoo.com>
Sent: Saturday, March 13, 20214:20 PM
To: Consulting Planner <ConsultingPlanner@laquintaca.gov>; Weiss Kathy <kathy@crystalspringsranch.com>
Subject: Re: La Quinta Surf Park Resort
** EXTERNAL: This message originated outside of the City of La Quinta. Please use proper judgement and caution when
opening attachments, clicking links or responding to requests for information. **
Are there design drawings show the master plan, grading, etc., at the City?
Pete Plaza
Sent from Yahoo Mail for iPhone
On Tuesday, March 9, 2021, 12:47 PM, Consulting Planner <ConsultingPlanner@laquintaca.gov>
wrote:
Mr. Plaza,
Thank you for your comments. They will be included in the EIR Notice of Preparation
comments for the project.
Please note that the EIR has not been released for this project. As a commenter on the
Notice of Preparation, you will receive a notice when the EIR is available for public
review and comment.
Nicole Sauviat Criste
Consulting Planner
1 of 5 5/29/22, 12:47 PM
Firefox https://outlook.office.com/mail/deeplink?Print
City of La Quinta
From: Peter Plaza <pwayneplaza@yahoo.com>
Sent: Tuesday, March 9, 2021 12:40 PM
To: Consulting Planner <ConsultingPlanner@laquintaca.gov>; Peter Plaza
<pwayneplaza@yahoo.com>; Maria Plaza <mnplaza@yahoo.com>
Subject: La Quinta Surf Park Resort
** EXTERNAL: This message originated outside of the City of La Quinta. Please use proper judgement and
caution when opening attachments, clicking links or responding to requests for information. **
Hello,
My name is Pete Plaza and I'm a homeowner in Trilogy at La Quinta.
My unbiased comments below come from 40 years of experience in the
development and construction industry. I trust many of my comments are being
considered by City officials, planners, developer and EIR responses, and are not
in any order, priority or choosing sides as to what/who is right and wrong.
Typically, when a project has gotten to this point the dice have been rolled and
the game moves forward regardless of what the opposition has to say. It seems
that the City has made the decision that there are NO ALTERNATE LOCATIONS
for the Surf Park Development in La Quinta or for that matter, the entire
Coachella Valley? One would wonder why all the open acreage that is visible
throughout the Coachella Valley is not an alternate consideration, especially
along Interstate 10, where the property is already zone for this type of
development, and more importantly, no major issues with the EIR Report,
certainly to a lesser degree.....NO, the City of La Quinta chooses to put this
development right in the middle of multi -million dollar homes and in proximity to
some of the most beautiful golf courses in the nation. I and others in the
surrounding communities are at a total loss as to why this location has been
chosen and no other locations are acceptable? As stated earlier, the train has left
the station and picking up speed. Can the residents surrounding this
development stop this project...absolutely! Below are my construction "gotcha"
impacts that everyone will experience, should the project move forward. These
"gotcha's" must be a topic of discussion at future meetings and address EIR
comments:
CONSTRUCTION
1. Tranquility in the community not for 10 years! Constructing a major
development of 377 acres is no easy task, nor does is it come without
impacts to the surrounding community. There will be lots of heavy
construction equipment, dirt trucks with tandem (pups), cranes, bulldozers,
supply trucks, tradesman vehicles, and the list goes on and on. This
constant and increased flow of vehicle traffic on our roadways will cause
noise, diesel fumes, disruption to local traffic, increase in potential
accidents/injuries, airborne dust, pollution, smog, loud -speaker noise from
construction activities (safety meetings), and overall general construction
noise. This will be the "NEW NORMAL" for our local communities many
years to come.
2. It's important to point -out that one of the biggest nemesis for any
construction project is DUST, especially so when a large parcel of land is
being cleared, grubbed, and excavated. Due to the prevailing winds our
communities experience in a westerly to easterly direction, DUST will be
2 of 5 5/29/22, 12:47 PM
Firefox https://outlook.office.com/mail/deeplink?Print
driven towards Trilogy at La Quinta and Andalusia. This is always a
daunting task for the construction crews, and in the case of the Surf Resort
Development, it will not be an exception. Yes, the developer will use water
trucks to wet -down the dry -soil surface, but they will not have enough water
trucks to cover 377 acres in a short period of time, nor can they cover
100% of the development due to inaccessibility. There is no -doubt wind
driven dust will occur during construction and considering the development
will be done in "phases", this problem will be permanent throughout the
entire 10-year duration.
3. The first impact the community will experience are the tandem dirt trucks.
There are 377 acres in the development. Assuming an average 1-foot cut
of organic soil exported off -site (some topsoil will be reused) and 2-foot of
engineered fill imported on -site, and the site is a balanced cut and fill
calculation. Assume an average dump truck carries 14 cubic yards of dirt
and (30 cubic yards with a tandem carrier).
a. 377 acres x 43,560 sf. x 3.0 ft. / 30 cubic yards per tandem dump
truck = That's approximately 1,650,000 tandem trucks on our local
roadways, spanned over 10 years: 165,000 tandem truck each year,
or 13,750 tandem dump trucks each month!
4. It's important to ask, "what is the truck route for these trucks? Who is
buying the dirt? What is the destination of that dumpsite? Is the truck route
on Jefferson, or 58th Street to Madison?
5. Tandem trucks drop residual dirt, stones, and rocks from the rear of the
truck. The developer's solution to this is using road sweepers. Truck
hauling operation will begin early morning. The road sweepers will be hard
at work starting at 6:30AM and clean Jefferson and/or 58th Street. Like any
dirt hauling operation, it's not perfect, so residual dirt and gravel will remain
on the roadways leaving an obvious patch of travel in its wake.
6. Road damage will occur from the quantity and weight of the dirt trucks over
the 10 years. This will require major repairs to the roadways. The damage
will not be continuous, so repairs will be done by "patching" segments of
the roadway resulting in changing the aesthetic appearance of a
continuous and smooth asphalt road to multiple patches (change in color)
and the possibility of the asphalt cracking, breaking apart and causing
"potholes". The City will be left with patching the potholes with cold -asphalt
patch which is only a temporary solution. Over -time, vehicle will loosen -up
the cold -asphalt patch, causing another pothole and the process repeats
itself. This is a classic repair process due to city budget constraints.
Bottomline, our roadways will never look the same. A typical solution to
counter -act this issue is requiring the developer to put a Roadway Bond in
place, should the City need the funds to repair the roadways in the future.
7. Multiple utility connections will be required for this development, requiring
roadways to be closed at Jefferson, 58th Street and 60th Street and local
traffic re-routed to Monroe Street. Again, cutting -up the existing asphalt
roadways will be required and patched. The City must include
"entitlements" in the agreement with the developer to remove the existing
asphalt roadways, by scarifying the top layer of the roadways and installing
a "new" paved surface. This needs to be applied to all the roadways
affected on Jefferson, 58th Street, 60th Street and Monroe.
8. Parking for all construction vehicles must be maintained on the
development site and not outside the construction fence line.
9. Will the developer "guarantee" and be fully liable for any impact to the
aquifer water supply and/or disruptions to the water supply serving
residents? If not, there should be!
3 of 5 5/29/22, 12:47 PM
Firefox https://outlook.office.com/mail/deeplink?Print
SURF RESORT DEVELOPMENT AND OPERATION
1 Many of the operational issues have been brought to the table that need to
be address in the EIR and forth -coming meeting. Consider this: Let's look
down at this development from 5,000 feet, getting the full perspective of
what the community will look like and experience once an event is in full
operation:
a. All the roadways converging to this parcel of land, surrounded by
beautiful, serene residential communities and golf courses will be
backed -up with cars coming from Interstate 10, Highway 111,
Jefferson Street, Madison Street, Monroe Street, 58th Street, 60th
Street and alternate roads snaking through and avoiding the traffic
jam. There will police vehicles and flashing light everywhere,
attempting to control traffic with barricades and traffic policeman. Any
local resident that needs to do normal shopping along the Highway
111 corridor may find it easy to leave their communities but will face
the wrath of traffic jams on every available artery roadway coming
back home. IT WILL TAKE YOU HOURS TO RETURN! The
community residents will have no other choice but to stay at home
until all the event spectators have entered the Surf Resort parking
area. Of course, the reverse will occur once the event is finished.
b. The EIR refers to off -site parking and a shuttle service will be
transporting spectators to and from the parking lot to the event. What
happened to the developers plan to provide all the necessary parking
stalls for the permanent residents, temporary residents, hotel guests,
event staff, surfing professionals/participants, security personnel, NBC
media personnel, etc., etc., etc.? OH! BY THE WAY, WHERE IS THIS
PARKING LOT LOCATED?
c. All the local shopping centers will be consumed by event spectators,
making shopping a very unpleasant experience.
d. Alcohol will be consumed at tremendous quantities, thus creating
other problems: drunk and disorderly individuals, fighting and attacks
to individuals, traffic accidents, injuries because of alcohol, late night
parties, loudspeaker music, shouting, screaming and police and
ambulance sirens responding to these occurrences. As far as the
residents are concerned, we will be facing the full effect of this
development every time there's an event well into the future.
e. Re -Zoning for this development will create a "slippery slope" for
allowing other developments in the area. So, it's OK to allow the City
of La Quinta to surround Trilogy at La Quinta with commercial
developments? I don't think so! My wife and I were planning to retire
in Trilogy at La Quinta the rest of our lives. This development may
change that if approved.
PROPERTY APPRECIATION
1. There has been a lot of discussions concerning the impact the Surf Resort
Development will have on the home values in the surrounding
communities. I for one, don't believe home prices will increase soon,
certainly until the development is complete and what the full affect this
facility will have on the sale of homes during "disclosure". Potential buyers
looking at Trilogy at La Quinta and Andalusia are +55 seniors are looking
for a quiet neighborhood to retire. They will not buy a home that puts them
in the same high -congestion environment they came from. The potential
buyers will know that this facility is under construction (if approved), and
what it brings to the local communities when it's fully operational. Will this
4 of 5 5/29/22, 12:47 PM
Firefox https://outlook.office.com/mail/deeplink?Print
resort force potential buyers to look elsewhere? If I was looking to buy in
Trilogy at La Quinta, I would have seriously considered this Surf Resort as a
negative and looked elsewhere.
2. If there will be property appreciation, when will it happen? How much, and
at what price do we pay for this appreciation? Is it worth it?
CONCLUSION
I ask again, why has the City of La Quinta approved this development in our
neighborhood when there are many other locations, such as Interstate 10, to
consider that are zoned for this type of development, environmental affects are
minimal, and will give the developer improved visibility and marketing attraction?
It's beyond my comprehension why this isn't the case.
Relocating this facility gives the residents peace -of -mind and develops trust in
those City officials we elected, to make sure the City of La Quinta maintains the
highest standard of living and that a balance of community is always maintained.
Thank you.
Peter W. Plaza
Trilogy at La Quinta Resident
Sent from Mail for Windows 10
5 of 5 5/29/22, 12:47 PM