2021-06-23 Criste 3Firefox https://outlook.office.com/mail/deeplink?Print
Re: 2553 Coral Mtn SP & TTM - CM/Entry Drive [2553-MSA1.NRzf]
Nicole Criste <ncriste@terranovaplanning.com>
Wed 6/23/2021 1:20 PM
To: Depalatis, Paul <pdepalatis@msaconsultinginc.com>;John Gamlin
<John@therobertgreencompany.com>;Consulting Planner <ConsultingPlanner@laquintaca.gov>
Cc: Cheri Flores <clflores@laquintaca.gov>;Tania Flores <tflores@laquintaca.gov>
** EXTERNAL: This message originated outside of the City of La Quinta. Please use proper judgement and caution when
opening attachments, clicking links or responding to requests for information. **
John and Paul,
On the basis of Urban's response, I think it would be best to work on the modification to the entry drive now,
and resubmit both the SP and the TTM to reflect those changes.
Nicole
Nicole Sauviat Criste
Principal
TERRA NOVA PLANNING & RESEARCH, INC.®
42635 Melanie Place, Ste 101
PALM DESERT, CA. 92211
(760) 341-4800
FAX#: 760-341-4455
E-Mail: ncriste@terranovaplanning.com
From: "Depalatis, Paul" <pdepalatis@msaconsultinginc.com>
Date: Wednesday, June 23, 2021 at 1:06 PM
To: John Gamlin <John@therobertgreencompany.com>, Nicole Criste <Ncriste@laquintaca.gov>
Cc: Cheri Flores <clflores@laquintaca.gov>, Tania Flores <tflores@laquintaca.gov>
Subject: 2553 Coral Mtn SP & TTM - CM/Entry Drive [2553-MSA1.NRzf]
Resent -From: <ConsultingPlanner@laquintaca.gov>
And, tagging on to what John said, are we free then to change the street sections on the SP and TTM
accordingly.
Paul DePalatis, AICP
Vice President / Director of Planning Services
MSA Consulting, Inc.
From: John Gamlin <John@therobertgreencompany.com>
Sent: Wednesday, June 23, 2021 1:02 PM
To: Nicole Criste <Ncriste@laquintaca.gov>
Cc: Cheri Flores <clflores@laquintaca.gov>; Tania Flores <tflores@laquintaca.gov>; Depalatis, Paul
<pdepalatis@msaconsultinginc.com>
Subject: CM/Entry Drive
1 of 2 5/29/22, 1:56 PM
Firefox https://outlook.office.com/mail/deeplink?Print
Nicole,
I was able to speak with John Kain. In his opinion, to transition the 40' pavement section to 28' between the
west side of the intersection with the commercial access street and the entry island would have no issue with
respect to traffic volumes and capacity respective of UX traffic analysis provided for the EIR.
JG
Sent from Mail for Windows 10
2 of 2 5/29/22, 1:56 PM