Loading...
2021-06-23 DePalitis 1Firefox https://outlook.office.com/mail/deeplink?Print 2553 Coral Mtn SP & TTM - CM/Entry Drive [2553-MSA1.NRzf] Depalatis, Paul<pdepalatis@msaconsultinginc.com> Wed 6/23/2021 1:06 PM To: John Gamlin <John@therobertgreencompany.com>;Consulting Planner <ConsultingPlanner@laquintaca.gov> Cc: Cheri Flores <clflores@laquintaca.gov>;Tania Flores <tflores@laquintaca.gov> ** EXTERNAL: This message originated outside of the City of La Quinta. Please use proper judgement and caution when opening attachments, clicking links or responding to requests for information. ** And, tagging on to what John said, are we free then to change the street sections on the SP and TTM accordingly. Paul DePalatis, AICP Vice President / Director of Planning Services MSA Consulting, Inc. From: John Gamlin <John@therobertgreencompany.com> Sent: Wednesday, June 23, 2021 1:02 PM To: Nicole Criste <Ncriste@laquintaca.gov> Cc: Cheri Flores <clflores@laquintaca.gov>; Tania Flores <tflores@laquintaca.gov>; Depalatis, Paul <pdepalatis@msaconsultinginc.com> Subject: CM/Entry Drive Nicole, I was able to speak with John Kain. In his opinion, to transition the 40' pavement section to 28' between the west side of the intersection with the commercial access street and the entry island would have no issue with respect to traffic volumes and capacity respective of UX traffic analysis provided for the EIR. JG Sent from Mail for Windows 10 1 of 1 5/29/22, 1:55 PM