Loading...
2021-06-23 GamlinFirefox https://outlook.office.com/mail/deeplink?Print CM/Entry Drive John Gamlin <John@therobertgreencompany.com> Wed 6/23/2021 1:01 PM To: Consulting Planner<ConsultingPlanner@laquintaca.gov> Cc: Cheri Flores <clflores@laquintaca.gov>;Tania Flores <tflores@laquintaca.gov>;Depalatis, Paul <pdepalatis@msaconsultinginc.com> ** EXTERNAL: This message originated outside of the City of La Quinta. Please use proper judgement and caution when opening attachments, clicking links or responding to requests for information. ** Nicole, I was able to speak with John Kain. In his opinion, to transition the 40' pavement section to 28' between the west side of the intersection with the commercial access street and the entry island would have no issue with respect to traffic volumes and capacity respective of UX traffic analysis provided for the EIR. JG Sent from Mail for Windows 10 1 of 1 5/29/22, 1:54 PM