Loading...
2021-07-13 Criste 3Firefox https://outlook.office.com/mail/deeplink?Print Coral Mountain Resort EIR Comment Follow -Up Consulting Planner <ConsultingPlanner@laquintaca.gov> Tue 7/13/2021 10:49 AM To: Diane Rebryna <drebryna@telusplanet.net>;bdvatland@gmail.com <bdvatland@gmail.com>;Ken Jones <kenjonesmail@aol.com>;Dave Wiezel <hnldjw@yahoo.com>;mike charles <mgacharles@yahoo.com>;Ilona Sala <ilonalsala@gmail.com>;Agnes Collins <ascollinsl@telus.net> Cc: Linda Evans <Levans@laquintaca.gov>;Kathleen Fitzpatrick <kfitzpatrick@laquintaca.gov>;John Pena <jpena@laquintaca.gov>;Robert Radi <Rradi@laquintaca.gov>;Steve Sanchez <ssanchez@laquintaca.gov>;Danny Castro <dcastro@laquintaca.gov>;Cheri Flores <clflores@laquintaca.gov> Good Morning, In response to your similar comments regarding the format of the EIR, the City has carefully and thoroughly reviewed the proposed project to address the requirements of CEQA. Although the CEQA Guidelines suggest page limits, the complexity of this project requires that it be analyzed thoroughly, resulting in a longer document. The language in the document, although technical, is not unduly scientific or complex. CEQA documents usually are highly detailed and cover many variables. Likewise, the various environmental impact areas may have some redundancy of analysis, all in an effort to make the document as complete as possible. The City has completed the EIR to address all currently known aspects of the project, and to provide decisionmakers and the public with a comprehensive analysis of the potential direct, indirect and cumulative impacts associated with its implementation. The City will not be retracting the document or reissuing it. Please provide your comments by the close of the public comment period on August 6, 2021. Nicole Sauviat Criste Consulting Planner City of La Quinta 1 of 1 5/30/22, 10:26 AM